APPENDIX C – EXAMINATION LIBRARY

This examination library contains a list of representations and documents that were put to the Panel during their consideration of the application. Each entry has a unique reference and a link to the document on the Planning Inspectorate website.

To aid navigation the submissions have been listed under sub-headings relating to events that occurred between the submission of the application and the end of the examination. Some submissions contain information relevant to more than one event and sub-heading. Where this is the case they have only been listed once.

Readers should therefore be aware that, in the instances noted above, each sub-category may not contain a comprehensive list of every submission made in relation to that particular event and that other relevant submissions may be listed under another sub-heading.

INDEX

Application Documents -

Procedural Decisions PD

Relevant Representations RRP

Written Representations WRR

Representations APP/REP

Other Documents – documents received during OD the examination not included in the above categories. Also includes Adequacy of Consultation responses received from Local Authorities

Hearing and Site Visit – audio recordings of the HEA/SV Preliminary Meeting and hearing sessions and correspondence received in relation to the site visits

Report on the Implications for European Sites RIES

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C1 Application Documents

Submitted 28 February 2013

Application Form 1.1 Covering Letter 1.2 Application Form 1.3 Newspaper Notices 1.4 Guide to the Application 1.5 PINS Application Checklist Plans & Drawings 2.01 Works Plans and Sections 2.02 Land Acquisition Plans 2.03 Land Plans 2.04 Crown and Special Category Land Plans 2.05 Acton Storm Tanks Plans 2.06 Hammersmith Pumping Station Plans 2.07 Barn Elms Plans 2.08 Putney Embankment Foreshore Plans 2.09 Carnwath Road Riverside Plans 2.10 Dormay Street Plans 2.11 King George’s Park Plans 2.12 Falconbrook Pumping Station Plans 2.13 Cremorne Wharf Depot Plans 2.14 Chelsea Embankment Foreshore Plans 2.15 Kirtling Street Plans 2.16 Heathwall Pumping Station Plans 2.17 Albert Embankment Foreshore Plans 2.18 Victoria Embankment Foreshore Plans 2.19 Blackfriars Bridge Foreshore Plans 2.20 Shad Thames Pumping Station Plans 2.21 Chambers Wharf Plans 2.22 Earl Pumping Station Plans 2.23 Deptford Church Street Plans 2.24 Greenwich Pumping Station Plans 2.25 King Edward Memorial Park Foreshore Plans 2.26 Bekesbourne Street Plans 2.27 Abbey Mills Pumping Station Plans 2.28 Beckton Sewage Treatment Works Plans 2.29 Project wide Ventilation Columns Plans 2.30 Red line boundary shapefiles.zip Draft Development Consent Order 3.1 The Draft Thames Water Utilities Limited (Thames Tideway Tunnel) Development Consent Order 3.2 Explanatory Memorandum

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C2 Compulsory Acquisition Information 4.1 Statement of Reasons 4.2 Funding Statement 4.3.01 City of Westminster Book of Reference 4.3.02 City of Book of Reference 4.3.03 London Borough of Ealing Book of Reference 4.3.04 Royal Borough of Greenwich Book of Reference 4.3.05 London Borough of Hammersmith and Fulham Book of Reference 4.3.06 London Borough of Hounslow Book of Reference 4.3.07 Royal Borough of Kensington and Chelsea Book of Reference 4.3.08 London Borough of Lambeth Book of Reference 4.3.09 London Borough of Lewisham Book of Reference 4.3.10 London Borough of Newham Book of Reference 4.3.11 London Borough of Richmond upon Thames Book of Reference 4.3.12 London Borough of Southwark Book of Reference 4.3.13 London Borough of Tower Hamlets Book of Reference 4.3.14 London Borough of Wandsworth Book of Reference Consultation Report 5.1 Consultation Report Sections 1 to 10 5.1 Consultation Report Section 11 Acton Storm Tanks 5.1 Consultation Report Section 12 Hammersmith Pumping Station 5.1 Consultation Report Section 13 Barn Elms 5.1 Consultation Report Section 14 Putney Embankment Foreshore 5.1 Consultation Report Section 15 Dormay Street 5.1 Consultation Report Section 16 King George’s Park 5.1 Consultation Report Section 17 Carnwath Road Riverside 5.1 Consultation Report Section 18 Falconbrook Pumping Station 5.1 Consultation Report Section 19 Cremorne Wharf Depot 5.1 Consultation Report Section 20 Chelsea Embankment Foreshore 5.1 Consultation Report Section 21 Kirtling Street 5.1 Consultation Report Section 22 Heathwall Pumping Station 5.1 Consultation Report Section 23 Albert Embankment Foreshore 5.1 Consultation Report Section 24 Victoria Embankment Foreshore 5.1 Consultation Report Section 25 Blackfriars Bridge Foreshore 5.1 Consultation Report Section 26 Shad Thames Pumping Station 5.1 Consultation Report Section 27 Chambers Wharf 5.1 Consultation Report Section 28 Earl Pumping Station 5.1 Consultation Report Section 29 Deptford Church Street 5.1 Consultation Report Section 30 Greenwich Pumping Station

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C3 5.1 Consultation Report Section 31 King Edward Memorial Park Foreshore 5.1 Consultation Report Section 32 Bekesbourne Street 5.1 Consultation Report Section 33 Abbey Mills Pumping Station 5.1 Consultation Report Section 34 Beckton Sewage Treatment Works 5.1 Consultation Report Section 35 Jews Row 5.1 Consultation Report Sections 36 to 38 5.1 Consultation Report Appendices A to U 5.1 Consultation Report Appendix V Supplementary report on phase one consultation 5.1 Consultation Report Appendix W Interim engagement report 5.1 Consultation Report Appendix X Supplementary report on phase two consultation 5.1 Consultation Report Appendix Y report on post phase two consultation 5.1 Consultation Report Appendix Z report on Section 48 publicity 5.1 Consultation Report Appendices AA to CC Statement in Respect of Statutory Nuisance 5.2 Statement in Respect of Statutory Nuisance Heritage Statement 5.3 Heritage Statement Main Report 5.3 Heritage Statement Appendix A Hammersmith Pumping Station 5.3 Heritage Statement Appendix B Putney Embankment Foreshore 5.3 Heritage Statement Appendix C Carnwath Road Riverside 5.3 Heritage Statement Appendix D Dormay Street 5.3 Heritage Statement Appendix E Cremorne Wharf Depot 5.3 Heritage Statement Appendix F Chelsea Embankment Foreshore 5.3 Heritage Statement Appendix G Albert Embankment Foreshore 5.3 Heritage Statement Appendix H Victoria Embankment Foreshore 5.3 Heritage Statement Appendix J Blackfriars Bridge Foreshore 5.3 Heritage Statement Appendix K Shad Thames Pumping Station 5.3 Heritage Statement Appendix L Chambers Wharf 5.3 Heritage Statement Appendix M Deptford Church Street 5.3 Heritage Statement Appendix N Greenwich Pumping Station 5.3 Heritage Statement Appendix P King Edward Memorial Park Foreshore 5.3 Heritage Statement Appendix Q Abbey Mills Pumping Station

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C4 Environmental Statement 6.1 Environmental Statement Non-Technical Summary 6.2.01 Environmental Statement Volume 1 Introduction 6.2.01 Environmental Statement Volume 1 Appendix A Code of Construction Practice Part A 6.2.01 Environmental Statement Volume 1 Appendix A Code of Construction Practice Part B 6.2.01 Environmental Statement Volume 1 Appendix B Design Principles 6.2.01 Environmental Statement Volume 1 Appendix C Compensation Programme 6.2.02 Environmental Statement Volume 2 Assessment Methodology 6.2.02 Environmental Statement Volume 2 Figures 6.2.02 Environmental Statement Volume 2 Appendices A to O 6.2.02 Environmental Statement Volume 2 Appendix P 6.2.03 Environmental Statement Volume 3 Project wide effects assessment 6.2.03 Environmental Statement Volume 3 Figures Part A 6.2.03 Environmental Statement Volume 3 Figures Part B 6.2.03 Environmental Statement Volume 3 Appendices A to A4 6.2.03 Environmental Statement Volume 3 Appendices B to D 6.2.03 Environmental Statement Volume 3 Appendix A4 Annexes C1 to C3 6.2.03 Environmental Statement Volume 3 Appendix A4 Annexes D1 to D4 6.2.03 Environmental Statement Volume 3 Appendix E 6.2.03 Environmental Statement Volume 3 Appendices F to M 6.2.04 Environmental Statement Volume 4 Acton Storm Tanks Site Assessment 6.2.04 Environmental Statement Volume 4 Figures 6.2.04 Environmental Statement Volume 4 Appendices A to N 6.2.05 Environmental Statement Volume 5 Hammersmith Pumping Station Site Assessment 6.2.05 Environmental Statement Volume 5 Figures 6.2.05 Environmental Statement Volume 5 Appendices A to N 6.2.06 Environmental Statement Volume 6 Barn Elms Site Assessment 6.2.06 Environmental Statement Volume 6 Figures 6.2.06 Environmental Statement Volume 6 Appendices A to N 6.2.07 Environmental Statement Volume 7 Putney Embankment Foreshore Site Assessment 6.2.07 Environmental Statement Volume 7 Figures 6.2.07 Environmental Statement Volume 7 Appendices A to N 6.2.08 Environmental Statement Volume 8 Dormay Street Site Assessment 6.2.08 Environmental Statement Volume 8 Figures 6.2.08 Environmental Statement Volume 8 Appendices A to N 6.2.09 Environmental Statement Volume 9 King George’s Park Site Assessment 6.2.09 Environmental Statement Volume 9 Figures

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C5 6.2.09 Environmental Statement Volume 9 Appendices A to N 6.2.10 Environmental Statement Volume 10 Carnwath Road Riverside Site Assessment 6.2.10 Environmental Statement Volume 10 Figures 6.2.10 Environmental Statement Volume 10 Appendices A to N 6.2.11 Environmental Statement Volume 11 Falconbrook Pumping Station Site Assessment 6.2.11 Environmental Statement Volume 11 Figures 6.2.11 Environmental Statement Volume 11 Appendices A to N 6.2.12 Environmental Statement Volume 12 Cremorne Wharf Depot Site Assessment 6.2.12 Environmental Statement Volume 12 Figures 6.2.12 Environmental Statement Volume 12 Appendices A to N 6.2.13 Environmental Statement Volume 13 Chelsea Embankment Foreshore 6.2.13 Environmental Statement Volume 13 Figures 6.2.13 Environmental Statement Volume 13 Appendices A to N 6.2.14 Environmental Statement Volume 14 Kirtling Street Site Assessment 6.2.14 Environmental Statement Volume 14 Figures 6.2.14 Environmental Statement Volume 14 Appendices A to N 6.2.15 Environmental Statement Volume 15 Heathwall Pumping Station Site Assessment 6.2.15 Environmental Statement Volume 15 Figures 6.2.15 Environmental Statement Volume 15 Appendices A to N 6.2.16 Environmental Statement Volume 16 Albert Embankment Foreshore Site Assessment 6.2.16 Environmental Statement Volume 16 Figures 6.2.16 Environmental Statement Volume 16 Appendices A to N 6.2.17 Environmental Statement Volume 17 Victoria Embankment Foreshore Site Assessment 6.2.17 Environmental Statement Volume 17 Figures 6.2.17 Environmental Statement Volume 17 Appendices A to N 6.2.18 Environmental Statement Volume 18 Blackfriars Bridge Foreshore Site Assessment 6.2.18 Environmental Statement Volume 18 Figures Part A 6.2.18 Environmental Statement Volume 18 Figures Part B 6.2.18 Environmental Statement Volume 18 Appendices A to N 6.2.19 Environmental Statement Volume 19 Shad Thames Pumping Station Site Assessment 6.2.19 Environmental Statement Volume 19 Figures 6.2.19 Environmental Statement Volume 19 Appendices A to N 6.2.20 Environmental Statement Volume 20 Chambers Wharf Site Assessment 6.2.20 Environmental Statement Volume 20 Figures 6.2.20 Environmental Statement Volume 20 Appendices A to N 6.2.21 Environmental Statement Volume 21 King Edward Memorial Park Foreshore Site Assessment 6.2.21 Environmental Statement Volume 21 Figures 6.2.21 Environmental Statement Volume 21 Appendices A to N 6.2.22 Environmental Statement Volume 22 Earl Pumping Station Site Assessment

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C6 6.2.22 Environmental Statement Volume 22 Appendices A to N 6.2.23 Environmental Statement Volume 23 Deptford Church Street Site Assessment 6.2.23 Environmental Statement Volume 23 Figures 6.2.23 Environmental Statement Volume 23 Appendices A to N 6.2.24 Environmental Statement Volume 24 Greenwich Pumping Station Site Assessment 6.2.24 Environmental Statement Volume 24 Figures 6.2.24 Environmental Statement Volume 24 Appendices A to N 6.2.25 Environmental Statement Volume 25 Abbey Mills Pumping Station Site Assessment 6.2.25 Environmental Statement Volume 25 Figures 6.2.25 Environmental Statement Volume 25 Appendices A to N 6.2.26 Environmental Statement Volume 26 Beckton Sewage Treatment Works Site Assessment 6.2.26 Environmental Statement Volume 26 Figures 6.2.26 Environmental Statement Volume 26 Appendices A to N 6.2.27 Environmental Statement Volume 27 Minor Works Sites Assessment 6.2.27 Environmental Statement Volume 27 Figures 6.2.27 Environmental Statement Volume 27 Appendices A to N 6.2.28 Environmental Statement Volume 28 Glossary and Abbreviations Habitats Regulations Assessment 6.3 Habitats Regulations Assessment No Significant Effects Report Planning Statement 7.01 Planning Statement Main Report 7.01 Appendix A Planning Assessment Acton Storm Tanks 7.01 Appendix B Planning Assessment Hammersmith Pumping Station 7.01 Appendix C Planning Assessment Barn Elms 7.01 Appendix D Planning Assessment Putney Embankment Foreshore 7.01 Appendix E Planning Assessment Dormay Street 7.01 Appendix F Planning Assessment King George’s Park 7.01 Appendix G Planning Assessment Carnwath Road Riverside 7.01 Appendix H Planning Assessment Falconbrook Pumping Station 7.01 Appendix J Planning Assessment Kirtling Street 7.01 Appendix K Planning Assessment Heathwall Pumping Station 7.01 Appendix L Planning Assessment Cremorne Wharf Depot 7.01 Appendix M Planning Assessment Chelsea Embankment Foreshore 7.01 Appendix N Planning Assessment Albert Embankment Foreshore 7.01 Appendix P Planning Assessment Victoria Embankment Foreshore

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C7 7.01 Appendix Q Planning Assessment Blackfriars Bridge Foreshore 7.01 Appendix R Planning Assessment Shad Thames Pumping Station 7.01 Appendix S Planning Assessment Chambers Wharf 7.01 Appendix T Planning Assessment King Edward Memorial Park Foreshore 7.01 Appendix U Planning Assessment Earl Pumping Station 7.01 Appendix V Planning Assessment Deptford Church Street 7.01 Appendix W Planning Assessment Greenwich Pumping Station 7.01 Appendix X Planning Assessment Abbey Mills Pumping Station 7.01 Appendix Y Planning Assessment Beckton Sewage Treatment Works 7.01 Appendix Z Planning Assessment Bekesbourne Street Draft Statement of Common Ground 7.02 Draft Statements of Common Ground Section 106 Obligations Heads of Terms 7.03 Section 106 Obligations: Heads of Terms Design and Access Statement 7.04 Design and Access Statement Sections 1 to 5 7.04 Design and Access Statement Abbey Mills Pumping Station 7.04 Design and Access Statement Acton Storm Tanks 7.04 Design and Access Statement Albert Embankment Foreshore 7.04 Design and Access Statement Barn Elms 7.04 Design and Access Statement Beckton Sewage Treatment Works 7.04 Design and Access Statement Bekesbourne Street 7.04 Design and Access Statement Blackfriars Bridge Foreshore 7.04 Design and Access Statement Carnwath Road Riverside 7.04 Design and Access Statement Chambers Wharf 7.04 Design and Access Statement Chelsea Embankment Foreshore 7.04 Design and Access Statement Cremorne Wharf Depot 7.04 Design and Access Statement Deptford Church Street 7.04 Design and Access Statement Dormay Street 7.04 Design and Access Statement Earl Pumping Station 7.04 Design and Access Statement Falconbrook Pumping Station 7.04 Design and Access Statement Greenwich Pumping Station 7.04 Design and Access Statement Hammersmith Pumping Station 7.04 Design and Access Statement Heathwall Pumping Station 7.04 Design and Access Statement King Edward Memorial Park Foreshore 7.04 Design and Access Statement King George’s Park 7.04 Design and Access Statement Kirtling Street

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C8 7.04 Design and Access Statement Putney Embankment Foreshore 7.04 Design and Access Statement Shad Thames Pumping Station 7.04 Design and Access Statement Victoria Embankment Foreshore 7.04 Design and Access Statement Glossary Site Selection Process 7.05 Final Report on Site Selection Process Volumes 1 and 2 7.05 Final Report on Site Selection Process Volume 3 Acton Storm Tanks 7.05 Final Report on Site Selection Process Volume 4 Hammersmith Pumping Station 7.05 Final Report on Site Selection Process Volume 5 Barn Elms 7.05 Final Report on Site Selection Process Volume 6 Putney Embankment Foreshore 7.05 Final Report on Site Selection Process Volume 7 Dormay Street 7.05 Final Report on Site Selection Process Volume 8 King George’s Park 7.05 Final Report on Site Selection Process Volume 9 Carnwath Road Riverside 7.05 Final Report on Site Selection Process Volume 10 Falconbrook Pumping Station 7.05 Final Report on Site Selection Process Volume 11 Cremorne Wharf Depot 7.05 Final Report on Site Selection Process Volume 12 Chelsea Embankment Foreshore 7.05 Final Report on Site Selection Process Volume 13 Kirtling Street 7.05 Final Report on Site Selection Process Volume 14 Heathwall Pumping Station 7.05 Final Report on Site Selection Process Volume 15 Albert Embankment Foreshore 7.05 Final Report on Site Selection Process Volume 16 Victoria Embankment Foreshore 7.05 Final Report on Site Selection Process Volume 17 Blackfriars Bridge Foreshore 7.05 Final Report on Site Selection Process Volume 18 Chambers Wharf 7.05 Final Report on Site Selection Process Volume 19 King Edward Memorial Park Foreshore 7.05 Final Report on Site Selection Process Volume 20 Earl Pumping Station 7.05 Final Report on Site Selection Process Volume 21 Deptford Church Street 7.05 Final Report on Site Selection Process Volume 22 Greenwich Pumping Station 7.05 Final Report on Site Selection Process Volume 23 Abbey Mills Pumping Station

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C9 Open Space Assessment 7.06 Open Space Assessment Sustainability Statement 7.07 Sustainability Statement Main Report 7.07 Sustainability Statement Appendix A Sustainability appraisal thematic 7.07 Sustainability Statement Appendix B1 Acton Storm Tanks 7.07 Sustainability Statement Appendix B2 Hammersmith Pumping Station 7.07 Sustainability Statement Appendix B3 Barn Elms 7.07 Sustainability Statement Appendix B4 Putney Embankment Foreshore 7.07 Sustainability Statement Appendix B5 Dormay Street 7.07 Sustainability Statement Appendix B6 King George’s Park 7.07 Sustainability Statement Appendix B7 Carnwath Road Riverside 7.07 Sustainability Statement Appendix B8 Falconbrook Pumping Station 7.07 Sustainability Statement Appendix B9 Cremorne Wharf Depot 7.07 Sustainability Statement Appendix B10 Chelsea Embankment Foreshore 7.07 Sustainability Statement Appendix B11 Kirtling Street 7.07 Sustainability Statement Appendix B12 Heathwall Pumping Station 7.07 Sustainability Statement Appendix B13 Albert Embankment Foreshore 7.07 Sustainability Statement Appendix B14 Victoria Embankment Foreshore 7.07 Sustainability Statement Appendix B15 Blackfriars Bridge Foreshore 7.07 Sustainability Statement Appendix B16 Shad Thames Pumping Station 7.07 Sustainability Statement Appendix B17 Chambers Wharf 7.07 Sustainability Statement Appendix B18 King Edward Memorial Park Foreshore 7.07 Sustainability Statement Appendix B19 Earl Pumping Station 7.07 Sustainability Statement Appendix B20 Deptford Church Street 7.07 Sustainability Statement Appendix B21 Greenwich Pumping Station 7.07 Sustainability Statement Appendix B22 Abbey Mills Pumping Station 7.07 Sustainability Statement Appendix B23 Beckton Sewage Treatment Works 7.07 Sustainability Statement Appendix B24 Bekesbourne Street Energy and Carbon Footprint Report 7.08 Energy and Carbon Footprint Report

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C10 Transport Strategy 7.09 Transport Strategy Transport Assessment 7.10 Transport Assessment Main Report 7.10 Transport Assessment Annex A Baseline data GIS database.zip 7.10.01 Transport Assessment Acton Storm Tanks 7.10.02 Transport Assessment Hammersmith Pumping Station 7.10.03 Transport Assessment Barn Elms 7.10.04 Transport Assessment Putney Embankment Foreshore 7.10.05 Transport Assessment Dormay Street 7.10.06 Transport Assessment King George’s Park 7.10.07 Transport Assessment Carnwath Road Riverside 7.10.08 Transport Assessment Falconbrook Pumping Station 7.10.09 Transport Assessment Cremorne Wharf Depot 7.10.10 Transport Assessment Chelsea Embankment Foreshore 7.10.11 Transport Assessment Kirtling Street 7.10.12 Transport Assessment Heathwall Pumping Station 7.10.13 Transport Assessment Albert Embankment Foreshore 7.10.14 Transport Assessment Victoria Embankment Foreshore 7.10.15 Transport Assessment Blackfriars Bridge Foreshore 7.10.16 Transport Assessment Shad Thames Pumping Station 7.10.17 Transport Assessment Chambers Wharf 7.10.18 Transport Assessment King Edward Memorial Park Foreshore 7.10.19 Transport Assessment Earl Pumping Station 7.10.20 Transport Assessment Deptford Church Street 7.10.21 Transport Assessment Greenwich Pumping Station 7.10.22 Transport Assessment Abbey Mills Pumping Station 7.10.23 Transport Assessment Beckton Sewage Treatment Works 7.10.24 Transport Assessment Minor Works Sites Project Framework Travel Plan 7.11 Draft Project Framework Travel Plan Health Impact Assessment 7.12 Health Impact Assessment Main Report 7.12 Health Impact Assessment Appendices A to D1 7.12 Health Impact Assessment Appendix D2 Site profiles figures 7.12 Health Impact Assessment Appendix E Community profiling maps 7.12 Health Impact Assessment Appendix F Site Assessments Overarching Archaeological Written Scheme of Investigation 7.13 Overarching Archaeological Written Scheme of Investigation Air Management Plan 7.14 Air Management Plan

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C11 Skills and Employment Strategy 7.15 Skills and Employment Strategy Equalities Impact Assessment 7.16 Equalities Impact Assessment Design Principles 7.17 Design Principles Engineering Design Statement 7.18 Engineering Design Statement Code of Construction Practice 7.19.1 Code of Construction Practice Part A 7.19.2 Code of Construction Practice Part B Abbey Mills Pumping Station 7.19.2 Code of Construction Practice Part B Acton Storm Tanks 7.19.2 Code of Construction Practice Part B Albert Embankment Foreshore 7.19.2 Code of Construction Practice Part B Barn Elms 7.19.2 Code of Construction Practice Part B Beckton Sewage Treatment Works 7.19.2 Code of Construction Practice Part B Bekesbourne Street 7.19.2 Code of Construction Practice Part B Blackfriars Bridge Foreshore 7.19.2 Code of Construction Practice Part B Carnwath Road Riverside 7.19.2 Code of Construction Practice Part B Chambers Wharf 7.19.2 Code of Construction Practice Part B Chelsea Embankment Foreshore 7.19.2 Code of Construction Practice Part B Cremorne Wharf Depot 7.19.2 Code of Construction Practice Part B Deptford Church Street 7.19.2 Code of Construction Practice Part B Dormay Street 7.19.2 Code of Construction Practice Part B Earl Pumping Station 7.19.2 Code of Construction Practice Part B Falconbrook Pumping Station 7.19.2 Code of Construction Practice Part B Greenwich Pumping Station 7.19.2 Code of Construction Practice Part B Hammersmith Pumping Station 7.19.2 Code of Construction Practice Part B Heathwall Pumping Station 7.19.2 Code of Construction Practice Part B King Edward Memorial Park Foreshore 7.19.2 Code of Construction Practice Part B King George’s Park 7.19.2 Code of Construction Practice Part B Kirtling Street 7.19.2 Code of Construction Practice Part B Putney Embankment Foreshore 7.19.2 Code of Construction Practice Part B Shad Thames Pumping Station

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C12 7.19.2 Code of Construction Practice Part B Victoria Embankment Foreshore Navigational Issues and Preliminary Risk Assessment 7.20.01 Navigational Issues and Preliminary Risk Assessment Putney Embankment Foreshore Main Report and Appendices 7.20.01 Navigational Issues and Preliminary Risk Assessment Putney Embankment Foreshore Annexes Hazard Logs 7.20.02 Navigational Issues and Preliminary Risk Assessment Blackfriars Bridge Foreshore Main Report and Appendices 7.20.02 Navigational Issues and Preliminary Risk Assessment Blackfriars Bridge Foreshore Annexes Hazard Logs 7.20.03 Navigational Issues and Preliminary Risk Assessment Albert Embankment Foreshore Main Report and Appendices 7.20.03 Navigational Issues and Preliminary Risk Assessment Albert Embankment Foreshore Annexes Hazard Logs 7.20.04 Navigational Issues and Preliminary Risk Assessment Kirtling Street Main Report and Appendices 7.20.04 Navigational Issues and Preliminary Risk Assessment Kirtling Street Annexes Hazard Logs 7.20.05 Navigational Issues and Preliminary Risk Assessment Carnwath Road Riverside Main Report and Appendices 7.20.05 Navigational Issues and Preliminary Risk Assessment Carnwath Road Riverside Annexes Hazard Logs 7.20.06 Navigational Issues and Preliminary Risk Assessment Cremorne Wharf Depot Main Report and Appendices 7.20.06 Navigational Issues and Preliminary Risk Assessment Cremorne Wharf Depot Annexes Hazard Logs 7.20.07 Navigational Issues and Preliminary Risk Assessment Chelsea Embankment Foreshore Main Report and Appendices 7.20.07 Navigational Issues and Preliminary Risk Assessment Chelsea Embankment Foreshore Annexes Hazard Logs 7.20.08 Navigational Issues and Preliminary Risk Assessment Heathwall Pumping Station Main Report and Appendices 7.20.08 Navigational Issues and Preliminary Risk Assessment Heathwall Pumping Station Annexes Hazard Logs 7.20.09 Navigational Issues and Preliminary Risk Assessment Victoria Embankment Foreshore Main Report and Appendices 7.20.09 Navigational Issues and Preliminary Risk Assessment Victoria Embankment Foreshore Annexes Hazard Logs 7.20.10 Navigational Issues and Preliminary Risk Assessment Chambers Wharf Main Report and Appendices 7.20.10 Navigational Issues and Preliminary Risk Assessment Chambers Wharf Annexes Hazard Logs 7.20.11 Navigational Issues and Preliminary Risk Assessment King Edward Memorial Park Foreshore Main Report and Appendices

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C13 7.20.11 Navigational Issues and Preliminary Risk Assessment King Edward Memorial Park Foreshore Annexes Hazard Logs Settlement Information Paper 7.21 Settlement Information Paper Utilities Statement 7.22 Utilities Statement Resilience to Change 7.23 Resilience to Change Daylight/Sunlight Assessment 7.24 Daylight/Sunlight Assessment Thames Tideway Strategic Study 8.1.1 Thames Tideway Strategic Study Executive Summary 8.1.2 Thames Tideway Strategic Study Steering Group Report 8.1.3 Thames Tideway Strategic Study Objectives Working Group Volume 1 8.1.4 Thames Tideway Strategic Study Objectives Working Group Volume 2 8.1.5 Thames Tideway Strategic Study Solutions Working Group Volume 1 8.1.6 Thames Tideway Strategic Study Solutions Working Group Volume 2 8.1.7 Cost Benefit Working Group Report (February 2005) 8.1.8 Supplementary Report to Government Summary 8.1.9 Supplementary Report to Government 8.2.1 Summary Report 8.2.2 Objectives and Compliance Working Group Report Volume 1 8.2.3 Objectives and Compliance Working Group Report Volume 2 8.2.4 Solutions Working Group Report Volume 1 8.2.5 Solutions Working Group Report Volume 2 8.2.6 Cost Benefit Working Group Report (December 2006) 8.2.7 Planning and Environment Working Group Report Needs Report 8.3 Needs Report Main Report 8.3 Needs Report Appendix A Regulatory Impact Report 8.3 Needs Report Appendix B Compliance in Relation to CSOs in major cities across Europe 8.3 Needs Report Appendix C Population Statistics 8.3 Needs Report Appendix D Sewer Separation Feasibility Study Final Report 8.3 Needs Report Appendix E Potential Source Control and SuDS Application 8.3 Needs Report Appendix F Tideway Fisheries Review

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C14 Procedural Decisions

Acceptance of application PD001 S55 Checklist dated 27 March 2013 PD002 S55 Decision dated 27 March 2013 Pre-Examination PD003 Rule 6 letter dated 25 July 2013 PD004 Agenda for the Preliminary Meeting PD005 Appointment under s101 Examination PD006 Rule 8 letter dated 26 September sent following the Preliminary Meeting PD007 Preliminary Meeting note PD008 ExA's first written questions PD009 Procedural decision dated 15 October 2013 regarding the Applicant's proposed changes PD010 Letters dated 15 October 2013 giving notification of: the dates, times, and places of hearings and Accompanied Site Visit; and the ExA's procedural decision in respect of changes to the application PD011-PD015 These reference numbers have not been used PD016 Letter dated 19 December 2013 giving notification of hearings and the accompanied site visit PD017 ExA's second written questions PD018-PD020 These reference numbers have not been used PD021 Letter dated 8 January 2014 notifying Interested Parties of the date, time, and place of 5 February hearing PD022-PD028 These reference numbers have not been used PD029 Letter dated 12 February 2014 re adjournment of hearings PD030 Letter dated 20 February regarding timetable amendment and other matters PD031 ExA's request for information PD032 Department for Communities and Local Government s98(4) extension decision 20 February 2014 PD033 Letter dated 13 March 2014 notifying the close of the Examination PD041 s95A appointment and hearing notice relating to the closed hearing S102 Requests PD034 s102(1)(ab) Confirmation (Simon Shepherd and Victoria Brinkley, Patrick Zutshi, Sir Frank Lowe, City of London School) dated 26 September 2013 PD035 s102(1)(ab) Confirmation (Basil Demeroutis, Orion III European 20 S.a.r.l, Dr Daryl and Lorraine Dob, Louise Duckett and Andrew Mackenzie-Betty, Elizabeth Lindsay and Andrew Page) dated 4 November 2013

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C15 PD036 s102(1)(ab) Confirmation (Saffron Building Society) dated 18 November 2013 PD037 s102(1)(ab) Confirmation (Lucie Stephens, Riverside Primary School) dated 27 November 2013 PD038 s102(1)(ab) Confirmation(65 Eaton Place Limited) dated 9 January 2014 PD039 s102(1)(ab) Confirmation (Janet Suckling, Arthur Haslehurst, Kasim Zafar and Tavneet Bakshi) dated 20 January 2014 PD040 s102(1)(ab) Confirmation (Paul Weston of Hermitage Community Moorings) dated 13 February 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C16 Relevant Representations (Deadline 28 May 2013) RRP001 Prakash Pallathadka Kumar RRP002 RRP003 CGL Rail RRP004 George S Baldwin RRP005 Gordon Macdonald RRP006 Laurence Corbett RRP007 Darren Woolf RRP008 Guy Lindsay-Watson RRP009 Jane Garrett RRP010 Building RRP011 Zoe Vanderwolk RRP012 John Martin Jamie Darke RRP013 Martin Dyer RRP014 Simon James RRP015 Michael Davies RRP016 David Stuart Adams RRP017 London Forum of Amenity and Civic Societies RRP018 Edward Pailthorpe RRP019 Jane Bartlett RRP020 Thomas Martin Blaiklock RRP021 Timothy Leone Ganado RRP022 Paul Dolan RRP023 Gregory Choubana RRP024 Nancy Cooper RRP025 Steve Croft RRP026 James West RRP027 Peter Sofoluke RRP028 David Cohen RRP029 David Roberts RRP030 Mark Churly RRP031 John Wright RRP032 Bill Ambrose RRP033 Sarah Sheldon RRP034 Tony Roome RRP035 National Small-bore Rifle Association RRP036 Martin C Grierson RRP037 Jeffrey Box RRP038 The Vale Private Retirement Trust RRP039 Margarette Lincoln RRP040 Nicole Wilcock RRP041 Josephine Boyd RRP042 Darren Sany RRP043 Mrs Leeda Sany RRP044 Stuart Conney RRP045 The Old Chiswick Protection Society RRP046 Paul Dunbar RRP047 Timothy Payne RRP048 Boris Konoshenko

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C17 RRP049 Fiona Paterson RRP050 Vincent Keaveny RRP051 Harbledown Road Residents Association RRP052 John Harris RRP053 Chris Jones RRP054 G.Shaw RRP055 Mr Anthony Williams RRP056 Taisiya Izhutkina RRP057 Mr Charles Blennerhassett RRP058 Mrs Unity Harvey RRP059 John Kenyon RRP060 Dr Diana Elisabeth Banks-Conney RRP061 Eileen Richards RRP062 Nick Squire RRP063 Louise Soanes RRP064 Diane Stedman RRP065 Robert A. Mckenzie RRP066 East of England Waste Technical Advisory Body RRP067 David Fox RRP068 Tempus Wharf Freehold Limited RRP069 Arhag Housing Association RRP070 Mrs MDM Behrens RRP071 Ms Gill Lister RRP072 Ms Lyndsay Gough RRP073 Mr John Riddell RRP074 Paula Melville RRP075 Daniel Manns RRP076 John G Bullard RRP077 Adam Thompson RRP078 Dan Goldsack RRP079 Richard G Brown RRP080 Mr Dorian Mead RRP081 Neil Wilson RRP082 Southfield Park Triangle Residents Association (SPTRA) RRP083 Ms Rachel Lalchan RRP084 Thames21 RRP085 Ann Rothwell RRP086 St Josephs Catholic Primary School RRP087 Paul Gendle RRP088 Carol Morley RRP089 Tim Keleher RRP090 James Sewell RRP091 Arthur Edward Watson RRP092 Howard Cousins RRP093 Dr Yvonne Cripps RRP094 London Borough of Camden RRP095 Stephen Cook RRP096 Cairo Cannon RRP097 RYA Thames Valley and London Region RRP098 Marian Monas RRP099 Peter Colvin RRP100 Rev

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C18 RRP101 Gordon Joly RRP102 Colet Estates RRP103 Sarah Goodchild RRP104 Katy Bradfield RRP105 Mrs Katherine Bradfield RRP106 Richard Azoulay RRP107 Christopher Cripps RRP108 Stuart Madewell RRP109 Anne-Marie Conaty RRP110 Anne-Marie Conaty RRP111 Alan Bradfield RRP112 James Foley RRP113 Henry Brown RRP114 Daniel Fulton RRP115 Society RRP116 Carol Henrey RRP117 Ian Richard Osborne RRP118 Linton Fuel Oils Limited (c/o LFO Properties Limited) RRP119 Dharmesh Odedra RRP120 Swita Odedra RRP121 Dr Romesh Angunawela RRP122 Yvonne Jackson RRP123 Mrs H Parker-Brown RRP124 Impregilo Spa RRP125 Judith Evans RRP126 Bermondsey and Rotherhithe Environment Group RRP127 National Association of Boat Owners RRP128 Mrs Angela Mee RRP129 North & East London Branch, Inland Waterways Association RRP130 Janet Morris RRP131 Strand on the Green Sailing Club RRP132 British Telecommunications plc RRP133 Fr Paul Butler RRP134 Jacqueline van Oosterwijk RRP135 Parish Council of St Paul's and St Mark's RRP136 The South London Church Fund and Southwark Diocesan Board of Finance RRP137 Livett’s Launches Ltd RRP138 Cannon Wharf London LLP RRP139 The Inland Waterways Association RRP140 Putney Society RRP141 Anthony Duggan RRP142 John Richard Layton RRP143 Christine Jervis RRP144 Mr Peter John Millar RRP145 Keith Kirby RRP146 James Franks RRP147 Justin Gallagher RRP148 Jacqueline Carol Freeman RRP149 Kate Byrne Weir RRP150 Martina Fowler

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C19 RRP151 Glen Smith RRP152 Suk Goh RRP153 Glenn Benson RRP154 John Craven RRP155 Bill Hedley RRP156 Brian Ward RRP157 Norman Devlin FRICS RRP158 Claire Ovenell RRP159 Robert Ghenchev RRP160 Yana Dostinova RRP161 Lucy Dexter RRP162 Russell Pheasey RRP163 Wai Ka Chan RRP164 Dr John Padfield RRP165 Nigel Swinbank RRP166 Edward Cartwright RRP167 William Howe RRP168 Thamesfield Ward Councillors RRP169 Mr Rhoderick Voremberg RRP170 Karen Walker RRP171 Helen Cathryn Marsden RRP172 Mr R Gilmore RRP173 Peter Fuller RRP174 Avshalom Caspi RRP175 Monique Van Der Linden RRP176 Nigel Spain RRP177 Eileen Khoo RRP178 Jeffrey Ford RRP179 Pat Crawford RRP180 Perry Phillips RRP181 Karen Watts RRP182 Sharon Freeman RRP183 Dr. Rita Cruise OBrien RRP184 Mary Bernadette Whitley RRP185 Barry Atkinson RRP186 Philip Robin RRP187 Nicola Pateman RRP188 Graham Guest RRP189 Mike Davis RRP190 Nick Golson RRP191 Adrian Knowles RRP192 Alexander Veness RRP193 Jean-Christophe Blanc RRP194 The Salmon & Trout Association RRP195 Anouk Cruttenden RRP196 Eraldo Datri RRP197 Mr Larry Broomhead RRP198 David Parker RRP199 James Parker RRP200 Graham Elliott RRP201 Tana Parker RRP202 Nicholas William Horan

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C20 RRP203 James Parker RRP204 Damiano Cimignolo RRP205 Mr Oliver Troop RRP206 London Corinthian Sailing Club RRP207 Philip Moore RRP208 Pam Rooke RRP209 Julie Patten RRP210 Bruce Adams RRP211 Mark Hill RRP212 Alan Moore RRP213 Mad 4 Fitness Ltd, t/a Energie Fitness Club RRP214 Mr C R Folley RRP215 John Grant RRP216 Nora Tandberg RRP217 Mark Baynes RRP218 Derek Gassyt RRP219 Alex Bagguley RRP220 Mr Ralph Geoghegan RRP221 Terrie E Moffitt RRP222 Graham Doyle RRP223 Benjamin Berenson RRP224 George Ellis RRP225 Andrew Nugee RRP226 Christopher Mallia RRP227 Tamara Dragadze RRP228 Geraldine Higson RRP229 Jenny Naylor RRP230 David Kaspar RRP231 Matt Thorley RRP232 Michael Willoughby RRP233 Mrs Patricia Mansfield RRP234 Griselda Kellie-Smith RRP235 Moni Chalabi RRP236 Mark Loveday RRP237 Caroline Keighley Elstub RRP238 Timothy Prager RRP239 Valentina Fazzari RRP240 Peter Bryant RRP241 Olivia Deighton RRP242 Hugo Kirby RRP243 Lucien Oppler RRP244 Julian Thompson RRP245 Mrs Carolyn Smyth RRP246 Talal Bajour RRP247 Qing Stevens RRP248 Anne-Christin Miller RRP249 Kerry Evans RRP250 Charles Brocket RRP251 Rory Smith RRP252 Javier Benavides RRP253 Nathalie McCLure RRP254 Pauline Lyle-Smith

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C21 RRP255 Clotilde Lasocki RRP256 Michael Cooper-Mitchell RRP257 Sean Foo RRP258 Jane Wareing RRP259 Michael Swann RRP260 Sarah Pittam RRP261 Shakeel Ahmad RRP262 Joanna Matthews RRP263 Francesco Berni RRP264 Richard Nehme RRP265 Kevin McIntosh RRP266 Peter Kehr RRP267 Dr Jean Pierre Isal RRP268 Laura Frost RRP269 Dermot Keane RRP270 Shona Robertson RRP271 Fenella Gray RRP272 Gail Slater RRP273 Robert OKeeffe RRP274 Denis Power RRP275 Mark Reynolds RRP276 Vicky Hau RRP277 Philip Leslie Thomas RRP278 Alexander Bradford RRP279 Cordelia Barbour RRP280 Ian Mizrahi RRP281 Annie Street RRP282 King-Fung Yiu RRP283 Louise Bryant RRP284 Andrew Harding RRP285 Chrissy Stenning RRP286 David de Maupeou RRP287 Miss Louisa Pope RRP288 Eric Galbraith RRP289 Giovanni Fiorentino RRP290 Richard Elliot-Square RRP291 Tara Anne RRP292 Angela Matyhew RRP293 Ann Rosenberg RRP294 Dr Josephine Storek RRP295 Tony Bell RRP296 Anne Garden RRP297 Julia Le Blan RRP298 Claire Digby-Bell RRP299 Jane Reed RRP300 Mr Steve Fielding RRP301 Mrs J Raadtgever-Lavooij RRP302 Shivani de Chassey RRP303 Carla Kaspar RRP304 Derek Snowball RRP305 Ann Snowball RRP306 Emma Gibson

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C22 RRP307 Timothy Ryland RRP308 Richard Ahl RRP309 Sarah Doyle RRP310 David Kellie-Smith RRP311 Florence Frankland RRP312 Dr R Paul Quilliam RRP313 Leigh Henson RRP314 Mrs Catherine Bajour RRP315 Paul Mullen RRP316 John Michael May RRP317 Jonathan Paul Redding RRP318 Matthew Sommerville RRP319 Laura de Benito-Llopis RRP320 Chay Pearce-Cochrane RRP321 Nicola Pateman RRP322 Daniel Richards RRP323 Arin Basu RRP324 Anthony Jelley RRP325 Felix Fiennes RRP326 Lise Frandsen RRP327 Stephanie Cryan RRP328 H Anthony Fenn RRP329 Kieran McCaldin RRP330 John Bullard RRP331 Alastair Robertson RRP332 Anthony Field RRP333 Sue Campbell RRP334 Elliot Bialick RRP335 David Harbour RRP336 Caroline Bristow RRP337 Martin Anthony RRP338 Omma Adjei RRP339 Laura Ivill RRP340 Nicky Allison RRP341 A D Willis RRP342 Alison Male RRP343 Carole Mansur RRP344 Mrs Laurence & Mr Thierry Fournier-Foch RRP345 Mr Matthew Blount RRP346 Allan Kelly RRP347 David Robb RRP348 Francis Ellison RRP349 Julia Archer-Ashenden RRP350 Helen Clarke RRP351 Karima Taouche RRP352 Matthew Seymour RRP353 Chiara Visioni RRP354 Thomas's London Day Schools RRP355 Granville & Co RRP356 Shalene Singh-Shepherd RRP357 Marc Hearn RRP358 Dame Joan Ruddock (MP)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C23 RRP359 Daniel Romer-Lee RRP360 David Morphet RRP361 James Thornton RRP362 Professor Philip Secker RRP363 Digby Mansions (39-58A) Residents Association RRP364 Andrew Johnson RRP365 Tim McIntosh RRP366 Richard Lawson RRP367 Nicholas Botterill RRP368 Hammersmith Mall Residents RRP369 Tom Pakenham RRP370 James Karp RRP371 Jessica Davies Jones RRP372 Keith Arthur RRP373 Commercial Boat Operators Association (CBOA) RRP374 Tony Valsamidis RRP375 Simon Shepherd RRP376 Peter Huddleston RRP377 William James Reed RRP378 Lucy Russell RRP379 Chris Carter RRP380 Margaret Rawbone RRP381 Lucy Martin RRP382 Tim Turner RRP383 The Royal Borough of Kensington and Chelsea RRP384 Agatha Janczukowicz RRP385 Peabody RRP386 R N Austin RRP387 Nick Lanyon RRP388 Valerie Griffith RRP389 Riverside Parents and Carers Association RRP390 Chris Wooding RRP391 Fishing London RRP392 Justin Garrett RRP393 Rod Pickup RRP394 Prem Goyal RRP395 Get Hooked On Fishing RRP396 Joseph Lee RRP397 John Biggs AM, London Assembly Member for City & East London RRP398 Mr John Folkard RRP399 Richard Nicoll RRP400 Sheila Taylor RRP401 Andrew Studd RRP402 Simon Nicholas Mansfield JP RRP403 J Whitehouse RRP404 Mark Broadmore RRP405 Andrew Matson RRP406 Scott Brown RRP407 Mohammed Ibrahim RRP408 Nigel Christie RRP409 Sally Unwin

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C24 RRP410 Richard Unwin RRP411 Alex Petlenko RRP412 Benjamin Porter RRP413 Michal Skrbek RRP414 John Chambers RRP415 John Colman RRP416 Roger Weston RRP417 Mrs Amanda Stocker RRP418 Hilary Mackay RRP419 Sean Geer RRP420 Christopher Prior RRP421 FoodTrade RRP422 G Hamilton-Deeley RRP423 Martin Saunders RRP424 Roger Prater RRP425 Steve Day RRP426 Stuart McAlpine RRP427 William Powell RRP428 Andrew Bell RRP429 Garry Hall RRP430 Geraldine Tickle RRP431 Barnaby Perrin Aldous RRP432 Konstantin Torgov RRP433 Mrs R Troop RRP434 David Holgate RRP435 John Salt RRP436 Hugh Barnard RRP437 Jason Bowsher RRP438 Dermot Bates FRSA RRP439 Isabella Cant-Kaleta RRP440 Philip Saunders RRP441 Miss Susy Thomas RRP442 Marilyn Earl RRP443 Simon J Humphries RRP444 Melissa Longley RRP445 Jacob's Island Resident's Association RRP446 Ian Arnott RRP447 Gabriella Parker RRP448 Richard Chalkley RRP449 Hazel Paes RRP450 Andrew Hilton RRP451 Christopher Littmoden RRP452 Dr Philip Ting RRP453 Riverside West Residents Association RRP454 Alan Fairleigh RRP455 Battersea Reach Residents RRP456 Riverside West Residents' Association RRP457 Councillor Christine Percival RRP458 Katharine Austin RRP459 Christopher Turner RRP460 Robin Millward RRP461 Capitalstart Limited

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C25 RRP462 Martin Stuart Dance RRP463 Kyra Van Den Bosch RRP464 Karina Olliver RRP465 Timothy Dearden RRP466 Graham Martin RRP467 Henry Pelly RRP468 John Donovan RRP469 Geri Carden RRP470 Barry Everett RRP471 Archie Campbell RRP472 Canal & River Trust RRP473 Esther RRP474 James Haines RRP475 Susan Ahad RRP476 Anthony Wales RRP477 Robbie Bryan RRP478 Mr Steve O'Hara RRP479 Alastair and Edwina Eliott Lockhart RRP480 Francis Mitchell RRP481 Barnes Community Association Environment Group RRP482 Busy Bee by the Bridge Nursery School RRP483 Dr George Fieldman RRP484 J R Attar RRP485 Roderic Mac Clancy RRP486 Maureen Holmes-Higgin RRP487 Susanne Preece RRP488 Lisa Irwin RRP489 Vanessa Rhode RRP490 Justin Kandiah RRP491 Lynn Waunford-Brown RRP492 Ms C Bamping RRP493 Colin Hallmark RRP494 Kirstin Contaroudas RRP495 Stuart Birrell RRP496 Emily Curtis-Harper RRP497 Joelle Hallmark RRP498 Jon-Selous Borlace RRP499 Rebecca Walters RRP500 D Spring RRP501 Sarah Skinner RRP502 Paul Brocklehurst RRP503 Stephen Savage RRP504 Anthea Savage RRP505 William Allinson RRP506 Gary Kandinsky RRP507 Jennifer Kim RRP508 Richard Wickes RRP509 Paul Wickman RRP510 Matthew Johns RRP511 John LeSurf RRP512 J Moore RRP513 Raj Bhatia

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C26 RRP514 Gloria David RRP515 St Christopher's Fellowship RRP516 Ashfern House Ltd RRP517 Ashfern House Ltd RRP518 Ashfern House Ltd RRP519 Diana Allan RRP520 Ashfern House Ltd RRP521 Profe Sandra File RRP522 Ashfern House Ltd RRP523 Ashfern House Ltd RRP524 Mr & Mrs Allibhai RRP525 St Nicholas' Church RRP526 V A Tesmer RRP527 Dr John Snelson RRP528 South London Church Fund and Southwark Diocesan Board of Finance RRP529 John-Paul Parker RRP530 Chris Patel RRP531 Shadwell Basin Outdoor Activity Centre RRP532 Martin Kovats RRP533 Reverend Ailsa Newby RRP534 Christopher Scull RRP535 Celia Lorimer RRP536 South London Church Fund and Southwark Diocesan Board of Finance RRP537 Miss Jennifer Forrester RRP538 Anthony Ian Godfrey Charles South RRP539 Nigel Mountford RRP540 Mahbub Alam RRP541 Anthony Ruben RRP542 Camilla Durgan RRP543 David Grindall RRP544 Orla Tomany McKeon RRP545 Jean Houlder RRP546 Ben Cooper-Melchiors RRP547 Robert James Winstanley RRP548 Josephine Elsie Winstanley RRP549 Nicola Gardner RRP550 Stuart Tyler RRP551 Faizal Sherifdeen RRP552 Hilary Mehta RRP553 Vaughan Limited RRP554 Amy Lindemann RRP555 Nigel Carrier RRP556 Carl Mace RRP557 Jenny Sillen RRP558 Elm Quay Freehold Ltd & Elm Quay Management Ltd RRP559 FPA Financial Corporation Pte Ltd RRP560 The Battersea Barge RRP561 Kenilworth Court Co-Ownership Housing Association Limited RRP562 Putney Wharf Association

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C27 RRP563 Cabe at the Design Council RRP564 Khalil Zaman and Mrs Hameeda Khunji RRP565 Putney Pantry RRP566 Stephen William Baker RRP567 Edward Peshall RRP568 Reverend Gregory Prior RRP569 Lance Pierson RRP570 All Saints with Holy Trinity Parochial Church Council RRP571 Francesca Hamon RRP572 Margaret Forbes RRP573 South London Church Fund and Southwark Diocesan Board of Finance RRP574 Michael David Hutchinson RRP575 London Legacy Development Corporation RRP576 St Nicholas' with St Luke's Parochial Church Council RRP577 Thames Anglers' Conservancy RRP578 Robin Tam RRP579 Christopher Owen RRP580 Neil Depledge RRP581 Andrea Caponi RRP582 Sean Lavan RRP583 Judith Enright RRP584 Charles Hickman RRP585 Colne Valley Anglers Consultative RRP586 P J Cook RRP587 Stuart Williams RRP588 Irene Baragli RRP589 Peter Borgers RRP590 Mr C Garlington RRP591 Daniel Dolan RRP592 Katie Cowell RRP593 Franc Vissers RRP594 Arthur Talbot RRP595 Tony Barry RRP596 RRP597 Ofwat RRP598 Marine Conservation Society RRP599 Alexis Nolte RRP600 Save King RRP601 Charles Nicolas Robertson RRP602 Mr Lee Ranson RRP603 Nicola Passam RRP604 James McIlroy RRP605 Mr H H R Towler RRP606 Josephine Talbot RRP607 David Waterhouse RRP608 Kevin Wall RRP609 Matthew Giles & Elizabeth Giles RRP610 David Percival RRP611 Emma Redstone RRP612 Katie DeAlbuquerque RRP613 TCG Bars Ltd

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C28 RRP614 The Kent Environment and Community Network RRP615 Steve Roberts-Mee RRP616 Vanessa Cecillon RRP617 Marc Burke RRP618 John Hugh Darnton RRP619 Tuikku Alaviitala RRP620 City of London Corporation RRP621 Helen Jones RRP622 Minerva (Wandsworth) Ltd RRP623 Paul Kellaway RRP624 Patricia Leon Jones RRP625 Elizabeth Carew RRP626 Hermitage Community Moorings RRP627 Chris Wainwright RRP628 Jane Burton RRP629 B Ash RRP630 Bill Bloom RRP631 Betty Van Der Raedt RRP632 Carol Martyr RRP633 Anna Versteeg RRP634 Chris Poll RRP635 Joanne Wallen RRP636 Susan Lawes RRP637 Jo Cox RRP638 Stockhurst Close Residents Association RRP639 Lauren Dunford RRP640 Anne Towler RRP641 Eric Sivry RRP642 Nadia Rahmatulla RRP643 Jens Kleyenstuber & Jenny Koch RRP644 John Shepherd RRP645 Islay Symonette RRP646 Shobhit Kumar RRP647 Gordon Muir-Carby RRP648 Anne Wainwright RRP649 The Royal Hospital Chelsea RRP650 Higgins Homes plc RRP651 Adrian Lewis RRP652 Philippa Aylmer RRP653 Barrie Dunn RRP654 The Marine Management Organisation RRP655 Anthony Lionel Blackman RRP656 Orla Dunne RRP657 David Ernest Brown RRP658 Karl-Reiner Riedlinger RRP659 Crown River Cruises Limited RRP660 Misty Spooner RRP661 Peter Joseph Hegarty RRP662 Wandsworth Borough Council RRP663 Charles Hallett RRP664 Gillian Carol South RRP665 Simon McKeown

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C29 RRP666 Ruth Benzies RRP667 Claire Morris RRP668 Gregory Begley RRP669 Cemex UK Operations Limited RRP670 B G Bushell RRP671 Susan Antell RRP672 Nick Roe RRP673 Mr P J Hughan c/o UK Property Investments RRP674 Flora McLean RRP675 Hugh Maloney RRP676 Sue Antell RRP677 Rt Hon Justine Greening MP RRP678 Maria Carey RRP679 Battersea Project Land Company Limited RRP680 J Cousins RRP681 Helen Harbour RRP682 Ana Williams RRP683 Halliard Property Company (part of the Freshwater Group of Companies) RRP684 St George Central London Ltd. RRP685 Lord Aberconway RRP686 Regina Syhunliong RRP687 Save Your Riverside RRP688 Alessio Pecorella RRP689 Computer Warehouse Ltd. RRP690 Liz Campbell RRP691 Gavin Charles Alexander Campbell RRP692 Looker Motor Group Limited RRP693 Ioana Damian RRP694 Robert Leftwich RRP695 Christopher David Perry RRP696 Metro Nominees (Wandsworth) No. 1 Ltd & Metro Nominees (Wandsworth) No. 2 Ltd RRP697 Desmond Gilroy RRP698 Gavin Starks RRP699 David J Powell RRP700 St James Group Land and Planning RRP701 Southfields Grid Residents Association RRP702 Andrew Gwynn RRP703 Graham Group Limited and Jewson Limited RRP704 Andrew Swords RRP705 Sally Sutton RRP706 RRP707 Network Rail Infrastructure Limited RRP708 Mayor of London RRP709 Public Health England RRP710 Environment Agency RRP711 Natural England RRP712 Jeffrey Hughes RRP713 Mrs Maureen Perkins RRP714 Manuel Williams RRP715 Paul Klinkby-Silver

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C30 RRP716 Circadian Limited RRP717 Barney Holbeche RRP718 Andrew Dacey RRP719 Victoria Buxton RRP720 London Wildlife Trust RRP721 Josephine Flattery RRP722 Mr Richard Norton RRP723 Peter Makower RRP724 Stuart Turner RRP725 Graham Clayworth RRP726 Miss Parisha Patel RRP727 Eleanor Edgar RRP728 Markus Wunde RRP729 Dessislava Petkova RRP730 Andrew Edgar RRP731 Anna Lane RRP732 Katharina Stanzel RRP733 Vickie Flores RRP734 Michael Reichl RRP735 Mr I P Chattaway RRP736 Georgina Davidson RRP737 Nicholas & Linda Peck RRP738 Paul Davidson RRP739 Michael Hussey RRP740 Western Riverside Waste Authority RRP741 Veronica Borgers RRP742 Natasha Blunt RRP743 Peter Sheppard Skaerved RRP744 Susan Rose RRP745 Mr Jon Simkin RRP746 Mr Andrew Clark RRP747 David Shinkins RRP748 Tom Heys RRP749 Richard Cottyn RRP750 Juliet Kemp RRP751 Fiona Richards RRP752 Brian Robinson RRP753 Mrs Pamela Coate RRP754 Bill and Maeve Doherty RRP755 Evangelino Tzannatos RRP756 Peter Rooke RRP757 Neil McBennett RRP758 Martin McGinty RRP759 C Carris RRP760 Dinah Morley RRP761 Alison Hammond RRP762 Don't Dump on Deptford's Heart RRP763 The Battersea Society RRP764 Tessa Ing RRP765 Youssef Boussaid RRP766 Yvonne Alexander RRP767 West London River Group

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C31 RRP768 Cllr Craig Aston RRP769 Edna Mathieson RRP770 Stuart Roy Spencer RRP771 T Chamberlain RRP772 James Currell RRP773 Liberty Mosse RRP774 Brendan Bird RRP775 Stuart Sutton RRP776 Mrs J Pearce RRP777 Peter de Haan RRP778 Hammersmith & Fulham Historic Buildings Group RRP779 Mr G Pluck RRP780 Malcolm Hamer RRP781 Linda Holbeche RRP782 Montevetro Management Company Ltd RRP783 Paul Wells RRP784 Ms Kirsi Pyy RRP785 Michael Keep RRP786 Saloni Malalgoda RRP787 The Fulham Society RRP788 Susan Ray RRP789 Rukeya Khan RRP790 John Lee RRP791 Graham Coupar RRP792 Catherine Walsh RRP793 Residents Association RRP794 Tom Adamski RRP795 Kishore Rajani RRP796 Payal Saxena RRP797 Sandra Melville RRP798 Richard Magnus RRP799 Jean Magnus RRP800 Greg Hands MP RRP801 Christine F Barnes RRP802 Tristan Haley-Burrows RRP803 Peter Erftemeijer RRP804 M E Landy RRP805 Richard Melville RRP806 Geoffrey Tattersall QC RRP807 Michael de Souza RRP808 Dawn Neeson RRP809 Hazel Tattersall RRP810 Diane Roome RRP811 Aneita Lewis RRP812 David Ballois RRP813 Chris Bowles RRP814 Jianhua Ba RRP815 Christopher Eddison RRP816 John Jenkins RRP817 Laurent Dujacquier RRP818 I A Moore RRP819 Stephen West

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C32 RRP820 Mr E J Randall RRP821 Carol Irving RRP822 James Page RRP823 Stuart Smith RRP824 Michael Lear RRP825 Association of Waterways Cruising Clubs RRP826 Jonathan Campbell RRP827 Imogen Parmar RRP828 Wandsworth Society RRP829 Abul Hasnat Ali RRP830 Gemma Heales RRP831 The Creekside Education Trust Ltd RRP832 Caroline Staffell RRP833 M. de Jager RRP834 Kelly Smith RRP835 Birgit Kolenda RRP836 David Harvey RRP837 Paul Murphy RRP838 Trafalgar Court Residents Association RRP839 Richard Bate RRP840 A Zatorski RRP841 Olaiz Miyar SL RRP842 Nicholas Peall RRP843 Lara Ah-Moye RRP844 William Silvester RRP845 Angela Murphy RRP846 Neil Sanis RRP847 Iulia Tudor RRP848 Timothy Bentley RRP849 U L Boathouse Ltd RRP850 Ronald Herman RRP851 Michael McInerney RRP852 Sarah Ings RRP853 Kate Vandenberg RRP854 Peter-Yves Thynne RRP855 Niky Rathbone RRP856 Caroline Watson RRP857 Barry Kneller RRP858 The Hammersmith Society RRP859 Colin Passmore RRP860 Ian Smith RRP861 Joel Reynolds RRP862 Catherine Egan RRP863 Adnan Tufail RRP864 Barry Silverman RRP865 Sheila Silverman RRP866 Hannah Mellor RRP867 The Parsons Green Sports & Social Club RRP868 Jess Cordingly RRP869 Janos Pataki RRP870 Anne Donoghue RRP871 Rosemary Therese Buckley

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C33 RRP872 Ranelagh Sailing Club RRP873 Flying Fish Theatriks Ltd RRP874 Thomas Zatorski RRP875 Robin Patterson RRP876 Yngve Ness RRP877 Peter Lynch RRP878 Simon Webb RRP879 Ian Mowbray Gildart Jackson RRP880 Ute Chatterjee RRP881 Mr Ferry van Dijk & Dr Ravindra Rajakariar RRP882 Preston Morley RRP883 Robert Marsh RRP884 Keith Welch RRP885 Geoffrey Lewtas RRP886 Lyubov-Maria Dark RRP887 Jeffrey Richard Box RRP888 Michael Bainbridge RRP889 Louise Rutherford RRP890 Jacqueline Brett RRP891 Miss Anna Gilthorpe RRP892 Friends of RRP893 Hugo Nugent RRP894 Lynda Catt RRP895 Catherine A J Wogan RRP896 David Dinsmore RRP897 Mrs M de Souza RRP898 Mr Hussain Kubba RRP899 David Nicol RRP900 Abraham Thomas RRP901 Phoebe Ross RRP902 Aynsley Jardin RRP903 Florian Kuehn RRP904 Helena Russell RRP905 Leona Ford RRP906 Mark Hailey RRP907 Gabby Kuehn RRP908 Angling Trust RRP909 Creekside Forum RRP910 Miss L du Bosky RRP911 Fiona Davis RRP912 Kahair Properties Limited RRP913 Elena Moreno RRP914 Ellen Shipley RRP915 Robin Ross RRP916 Mattia Da Pozzo RRP917 Freda Graf RRP918 Mrs J du Bosky RRP919 The Vauxhall Society RRP920 Amina Akhtar RRP921 Gillian Owens RRP922 Mrs Heather M Parkinson RRP923 Nigel Barnes

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C34 RRP924 Denise Dorling RRP925 Nicola Barnes RRP926 Sandra Kendal RRP927 Keir Mottram RRP928 Daniel Mannion RRP929 Elaine McKenzie RRP930 Mr and Mrs Tyekiff RRP931 Victor Lunn-Rockliffe RRP932 Maria Polo RRP933 Paulo Ashton RRP934 Mrs V Featherstone RRP935 John Stanley RRP936 Graham Stevens RRP937 Keith Revell RRP938 Michael Daniels RRP939 Susanna Carver RRP940 David Lester RRP941 Shona Conacher RRP942 Natassia Rushton RRP943 Edouard de Guitaut RRP944 Vivienne Lester RRP945 Nina Ezra RRP946 Catherine Overton RRP947 Chandy Thomas RRP948 Anna Coward RRP949 Katrina Douglas RRP950 Ian B M Stephen RRP951 Gerard Robinson RRP952 Emma Louise Burrows RRP953 Putney Embankment Foreshore sub-group of Justine Greening's Working Group on the Tunnel RRP954 Simone Goldate RRP955 Meghan Cavanagh RRP956 Iraina Cadbury RRP957 Alexa Perrin RRP958 Richard Gosling RRP959 Michael O'Rorke RRP960 Hannah Lombers RRP961 Richard Dilks RRP962 Susan McMahon RRP963 Mr M Lombers RRP964 Alun Evans RRP965 Miranda Hayes RRP966 Adolfo Montoro RRP967 Susan Voremberg RRP968 Andre Levy and Mairaide Ann Levy RRP969 Mrs Jo Wright RRP970 Miss Fuchsia Voremberg RRP971 Paul Canning RRP972 W Alexander H Hamilton RRP973 Mark Douglas RRP974 Carol Farrugia

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C35 RRP975 Dr Aalam RRP976 Mr Aalam RRP977 Simonti Basu RRP978 Matthew O'Leary RRP979 LB of Hounslow RRP980 Jamie Paris RRP981 Manon Whittle RRP982 Institution of Mechanical Engineers RRP983 Penelope Tuson RRP984 Sanjeev P Ramchandani RRP985 Wesley Court Management Limited RRP986 A J Bowen RRP987 Derek Kelly RRP988 Shamshu Datoo RRP989 Emma Wilkinson RRP990 Young & Co RRP991 Wesley Court (Bermondsey) Management limited RRP992 London Legacy Development Corporation RRP993 T A Warner RRP994 Mark Southwood RRP995 Mark Pearson RRP996 Helen Christianson RRP997 Mark Southwood RRP998 Helen Adams RRP999 Carmen Ruibal RRP1000 Daryl M Stafford RRP1001 Francesca Seri RRP1002 Stephen Routledge RRP1003 Clean Thames Now and Always RRP1004 David Rampton RRP1005 St Mary's Church, Cable Street RRP1006 LB of Hammersmith and Fulham RRP1007 Sue Antell RRP1008 Mr George Stevenson RRP1009 Adam Newey RRP1010 Royal Mail Group Limited RRP1011 Desmond Ellerbeck RRP1012 Westminster City Council RRP1013 St Matthews Church RRP1014 The Pier Head Prep School RRP1015 Karen Brown RRP1016 Bruce Quarterman RRP1017 Conrad Teixeira RRP1018 Dr Thomas Turner RRP1019 The Chelsea Society RRP1020 Daniel Roberts RRP1021 Delia Gaze RRP1022 Andrew Lincoln RRP1023 Graham O RRP1024 Nicola Titley RRP1025 London Borough of Lambeth RRP1026 Juliet Hodgson

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C36 RRP1027 Virginia Bredin RRP1028 Free Trade Wharf Management Company Ltd RRP1029 Simonetta Lulli RRP1030 The Glamis Residents RRP1031 Mrs Catherine Rita Roberts RRP1032 Professor Peter Toyne RRP1033 Surrey Quays Limited RRP1034 Gillian Mary Hicks RRP1035 Spirit Managed Inns Limited and Spirit Pub Company (Managed) Limited RRP1036 Willmott Dixon Regen Ltd RRP1037 Melanie Watson RRP1038 Manifest, MMK Enterprises, Kirtling Properties Ltd, John Woodman, Ian Thompson, Pequod BVI Inc. RRP1039 Susi Crawford RRP1040 Robert Osborne RRP1041 English Heritage RRP1042 Malcolm Hollis LLP RRP1043 Robert Wilkinson RRP1044 CGIS Ltd RRP1045 Richard White RRP1046 MCS Leslie RRP1047 John Allison RRP1048 Nick Williams RRP1049 William Briston RRP1050 Tim Bishop RRP1051 Weston Williamson + Partners RRP1052 Geoff Pine RRP1053 Parsons Green Sports and Social Club Ltd RRP1054 Alex Van Marle RRP1055 Katie Brown RRP1056 Teresa Lundquist RRP1057 Dorthe Bendtsen RRP1058 LB Richmond upon Thames RRP1059 Royal London Mutual Insurance Society Limited RRP1060 Steve Brown RRP1061 Alex Hensley RRP1062 Nicola Veall RRP1063 Florence Dewar RRP1064 Roger Mills RRP1065 Mr and Mrs Charles Willson RRP1066 Amy Palm RRP1067 St Mary's Putney Parochial Church Council RRP1068 London Duck Tours Limited (LDT) RRP1069 David White RRP1070 Peter Shaw RRP1071 Olivia Higginson RRP1072 Thamesbank RRP1073 Mr and Mrs Collini RRP1074 Lord Berkeley RRP1075 Tony Bell RRP1076 Asif Din

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C37 RRP1077 Elizabeth OConor RRP1078 Carla Groom RRP1079 Authority RRP1080 Dr. Madeliene Gunaratnam RRP1081 Paulina Szews RRP1082 Magnus Smidak RRP1083 Catherine & Kevin Roberts RRP1084 London First RRP1085 Dahlia ChanTang RRP1086 Jill Guymer RRP1087 Nicholas Lacey RRP1088 Mr Jeremy Blyth RRP1089 James Jones RRP1090 Save KEMP RRP1091 British Geological Survey RRP1092 Joel Nesbitt RRP1093 Clare Dilks RRP1094 Ed Hammerton RRP1095 V Williams RRP1096 Tower Bridge Yacht and Boat Company Ltd RRP1097 Barbara Elisabeth Younis-Maurer RRP1098 Christian Sarrasin RRP1099 LB of Lewisham RRP1100 Catherine Wickens RRP1101 Andrew Whetnall RRP1102 Cannon Wharf LLP RRP1103 The Manor Fields Estate Limited RRP1104 Michael Scammell RRP1105 LB of Tower Hamlets RRP1106 Keepier Wharf RRP1107 Gavin Lodder RRP1108 Old Sun Wharf Freehold Management Limited RRP1109 Bill Dunster RRP1110 Segro plc RRP1111 Michael Liebreich RRP1112 One Housing Group RRP1113 Mark Hale RRP1114 Sue Dunster RRP1115 Nicola Heweston RRP1116 Christiane Killick RRP1117 Cory Environmental Holdings Limited RRP1118 Francesca Adler RRP1119 Mary Vango RRP1120 Mark Hale RRP1121 Bassam Awni Younis RRP1122 Lee Valley Regional Park Authority RRP1123 May Hale RRP1124 Helen Parker RRP1125 May Hale RRP1126 Wendy Abrams (Nadine Thomas) RRP1127 Anthony Willoughby RRP1128 Nine Elms Pier Limited

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C38 RRP1129 Renuka Indrarajah RRP1130 Consumer Council for Water RRP1131 Liberal Democrat Group, Southwark Council RRP1132 Lisa Bomba RRP1133 Serge Platonow RRP1134 H&M Hennes and Mauritz UK Limited RRP1135 Cllr Eliza Mann RRP1136 Regent on the River RRP1137 Taus Larsen RRP1138 Mark Barrett RRP1139 Nortrust Nominees Limited RRP1140 LB of Southwark RRP1141 Kath Whittam RRP1142 Mrs A M Sanders RRP1143 Terrelll Jenkins RRP1144 Notting Hill Home Ownership RRP1145 Stephanie Kirwan RRP1146 Angus Margerison RRP1147 Sarah Woolcott RRP1148 David Iredale RRP1149 Richard Hefferan RRP1150 Patrick Schoengruber RRP1151 National Grid plc RRP1152 Rachel Sanis RRP1153 Peter McLean RRP1154 Claire Troughton RRP1155 Carl Dunsire RRP1156 Susana Seijas RRP1157 Barbara Osborne RRP1158 Thames Anglers Conservancy RRP1159 Laurie Greenall RRP1160 Lester Romine RRP1161 Sophie Schoengruber RRP1162 Tina Khakee RRP1163 Vanessa Garrett RRP1164 Canoe England RRP1165 Rania El-Farouki RRP1166 Dr Suparna Das RRP1167 E Brownlie RRP1168 Taryn Ozorio RRP1169 Jim Mee RRP1170 Peter Aukamp RRP1171 Mrs D Raimes RRP1172 Rose Bell RRP1173 J C Smith RRP1174 Melissa Parker RRP1175 Mr Harvey Adams RRP1176 Nicholas Pead RRP1177 John Ready RRP1178 Lisa Hori RRP1179 Claire Doherty RRP1180 Penny Mitchell

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C39 RRP1181 Graham Taylor RRP1182 Aoife Egar RRP1183 William Knight RRP1184 Deanna Hayes RRP1185 James Marment RRP1186 Catherine Lalani RRP1187 Nicola Edgley RRP1188 Dr Nicola Martin RRP1189 Rebecca Slagle RRP1190 Elizabeth Anderson RRP1191 JS Newby RRP1192 Susan Anker RRP1193 Amit Jain RRP1194 Jason Dunnett RRP1195 Steve Hamilton RRP1196 Jill Goodman RRP1197 Ann Birrell RRP1198 Hamish McLean RRP1199 Belinda Richardson RRP1200 Jane Karmel RRP1201 Philip Miller RRP1202 Julie Wilkinson RRP1203 Sophie McDonald RRP1204 John Venpin RRP1205 Michael Wallner RRP1206 Azimah Heus RRP1207 Sonia Richardson RRP1208 Konstantinos Koukoravas RRP1209 Mr Jeremy Taylor RRP1210 Alice Miller RRP1211 Enda Twomey RRP1212 Richard Brace RRP1213 Rose Ades RRP1214 Kai Qu RRP1215 Bethan McDonald RRP1216 Nancy Johnson RRP1217 David Turnbull RRP1218 Zara Vissani RRP1219 Richard Wilkinson RRP1220 Dermot Gleeson RRP1221 Ethical Consumer Research Association RRP1222 Richard Buckle RRP1223 James Nierinck RRP1224 Christiane Frolic RRP1225 St Paul's Shadwell RRP1226 Daniel Wilkinson RRP1227 Khaled Dawas RRP1228 Louise Sheridan RRP1229 Tola Adesina RRP1230 Ric Thorpe RRP1231 Rt Hon Simon Hughes MP RRP1232 RAB Jenks

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C40 RRP1233 David Gillman RRP1234 Mrs Margaret Cahill RRP1235 Morgans Walk Management Ltd RRP1236 Mr Brian Wilcockson RRP1237 Mr Tunch Meral RRP1238 Nicola Harries RRP1239 Winifred Figgures RRP1240 Mrs Federika Goulden RRP1241 Inland Waterways Association RRP1242 Ms Brenda Roberts RRP1243 Avril Silver RRP1244 Mr Robert Tipping RRP1245 Mr Martin Cohen RRP1246 David Starkie

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C41 Written Representations (Deadline 4 November 2013)

APP20 Applicant's proposed changes at Chambers Wharf WRR001 Ian Hudson WRR002 LBH02 LB Hounslow WRR003 Martin Blaiklock WRR004 David and Zoe Hyde WRR005 Wimbledon and Putney Commons Conservatives WRR006 plc and The Yard Arm Club Ltd WRR007 Putney Wharf Association WRR008 NERITA003 Nerita Properties WRR009 Perry Phillips WRR010 CRR-01 Ann Rosenberg WRR011 Anne Conaty WRR012 Helen Marsden WRR013 Jane Wenlock WRR014 LBRUT04 LB Richmond upon Thames WRR015 David Percival WRR016 Mike Scammel WRR017 Royal Mail Group Ltd and Others WRR018 Andrew Edgar WRR019 Eleanor Edgar WRR020 Gabriella Parker WRR021 Canal and River Trust WRR022 John Biggs WRR023 Cemex WRR024 Fr Paul Butler WRR025 Glendola Leisure Limited WRR026 Larry Broomhead WRR027 RB Kensington and Chelsea WRR028 Olaiz Miyar WRR029 P Secker and Judith Secker WRR030 Royal Hospital Chelsea WRR031 St James Group Limited WRR032 Vanessa Cecillon WRR033 Save King's Stairs Gardens WRR034 STYLE01 Stuart Tyler WRR035 Anthony Alexander for Arhag Housing Association WRR036 Circadian Limited WRR037 David Starkie WRR038 EA05 Environment Agency WRR039 Fiona Pryor for Riverside Parents and Carers Association WRR040 FTWMCL006 Free Trade Wharf Management Company Ltd WRR041 James Parker WRR042 Justine Greening MP WRR043 Lee Ranson WRR044 Anood Al-Samerai on behalf of Lib Dem group Southwark Council and Riverside Ward Southwark WRR045 Neil Austin WRR046 Nine Elms Pier Ltd

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C42 WRR047 OSW003 Old Sun Wharf Freehold Management Limited WRR048 Putney Society WRR049 Reverend Ailsa Newby for St Mary's WRR050 Willmott Dixon Regen Limited WRR051 Marine Management Organisation WRR052 Capitalstart Limited WRR053 National Grid Gas plc and National Grid Electricity Transmission plc WRR054 Nick Williams WRR055 The Mercers Company WRR056 Wendy Abrams WRR057 Assael Architecture WRR058 WCC02 City of Westminster WRR059 Amy Palm WRR060 18612.02 Andrew Whetnall WRR061 Barnards Retirement Benefit Scheme WRR062 Battersea Power Station Owning Group WRR063 Bermondsey and Rotherhithe Environment Group WRR064 Birgit Kolenda WRR065 Bruce Quarterman WRR066 COL10 City of London Corporation WRR067 Consumer Council for Water WRR068 Cory/02 - Cory/04 Cory Environmental WRR069 EH02 English Heritage WRR070 Graham Stevens WRR071 Hammersmith and Fulham Historic Buildings Group WRR072 Laura Ivill WRR073 LB Hammersmith and Fulham WRR074 LBLew04 LB Lewisham WRR075 LB Southwark WRR076 Lookers Motor Group WRR077 Mark and May Hale WRR078 METRO02 Metro Nominees WRR079 RAMB03 Minerva (Wandsworth)Limited WRR080 Network Rail WRR081 Nick Lacey WRR082 Nine Elms Pier Ltd WRR083 WRR084 Save KEMP WRR085 Save Your Riverside WRR086 SH3 Rt Hon Simon Hughes MP WRR087 STJMS02 St James Group Ltd WRR088 SQL03 Surrey Quays Limited WRR089 Temple Group Ltd WRR090 Tempus Wharf WRR091 Teresa Lundquist WRR092 TFL Part 1 WRR093 TFL Part 2 WRR094 TFL Part 3 WRR095 TFL Part 4 WRR096 Thamesbank WRR097 LB Tower Hamlets

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C43 WRR098 London Duck Tours Ltd WRR099 London Legacy Development Corporation WRR100 Larry Broomhead on behalf of Dickens Estate WRR101 Larry Broomhead on behalf of Wrayburn House WRR102 Ethical Consumer WRR103 Steve Brown WRR104 LR16712- 02.1Livett's Launches (Late submission) WRR105 Helen Marsden WRR106 Riverside Primary School WRR107 Lucie Stephens WRR108 Valarie Shawcross (Non Interested Party) WRR109 Edward Middleton (Non Interested Party) WRR110 Tower Bridge Yacht and Boat Company

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C44 Representations

Deadline 28 August 2013 Preliminary Meeting submissions: oral representation notifications, agenda suggestions, legal submissions about the examination and other information REP001 PM LB Wandsworth REP002 PM David Starkie REP003 PM Minerva (Wandsworth) Ltd REP004 PM Blue Green Expert Team REP005 PM Graham Bird REP006 PM London Duck Tours REP007 PM RB Kensington and Chelsea REP008 PM Ofwat REP009 PM St Mary's Putney REP010 PM Hernando Ltd REP011 PM Canal and River Trust REP012 PM Alex Hamilton REP013 PM Cllr Al-Samerai REP014 PM Mayor of London REP015 PM Thamesbank REP016 PM St Paul’s Deptford REP017 PM Consumer Council for Water REP018 PM City of London Corporation REP019 PM Battersea Project Land Company REP020 PM Free Trade Wharf Management Company Limited REP021 PM Marine Management Organisation REP022 PM LB Tower Hamlets REP023 PM Port of London Authority REP024 PM Cruising Association REP025 PM David Percival REP026 PM Ann Rosenberg on behalf of Carnwath Road Coalition REP027 PM Transport for London REP028 PM Clean Thames Now and Always REP029 PM LB Southwark REP030 PM Mark Hale REP031 PM Save Your Riverside REP032 PM Tempus Wharf Freehold Ltd REP033 PM Applicant REP034 PM English Heritage REP035 PM LB Hammersmith and Fulham REP036 PM Topps Tiles REP037 PM Capitalstart Ltd REP038 PM LB Lewisham REP039 PM London Fire Brigade REP040 PM Robert Tipping REP041 PM Rt Hon Simon Hughes MP REP042 PM Hammersmith and Fulham Historic Buildings Group REP043 PM Environment Agency

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C45 REP044 PM Workspace Group and Canada Life Investments Deadline 23 September 2013 Applicant's submissions, including corrections and omissions 9.01 Cover Letter 23 September 2013 Compulsory acquisition 9.02.01 Crown Land and Interests City of London 9.02.02 Crown Land and Interests City of Westminster 9.02.03 Crown Land and Interests RB Kensington and Chelsea 9.02.04 Crown Land and Interests LB Lambeth 9.02.05 Crown Land and Interests LB Tower Hamlets 9.02.06 Crown Land and Interests LB Wandsworth 9.03.01 Statutory Undertaker Land and Apparatus Schedule City of London 9.03.01 Statutory Undertaker Land and Apparatus Schedule City of Westminster 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Ealing 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Hammersmith and Fulham 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Hounslow 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Lambeth 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Lewisham 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Newham 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Richmond upon Thames 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Southwark 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Tower Hamlets 9.03.01 Statutory Undertaker Land and Apparatus Schedule LB Wandsworth 9.03.01 Statutory Undertaker Land and Apparatus Schedule preliminary sheets 9.03.01 Statutory Undertaker Land and Apparatus Schedule RB Greenwich 9.03.01 Statutory Undertaker Land and Apparatus Schedule RB Kensington and Chelsea 9.03.02 Statutory Tests relating to Statutory Undertakers’ rights and apparatus and draft certificates 9.06.01 Order Land Schedule City of London 9.06.02 Order Land Schedule City of Westminster 9.06.03 Order Land Schedule LB Ealing 9.06.04 Order Land Schedule RB Greenwich 9.06.05 Order Land Schedule LB Hammersmith and Fulham 9.06.06 Order Land Schedule LB Hounslow 9.06.07 Order Land Schedule RB Kensington and Chelsea

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C46 9.06.08 Order Land Schedule LB Lambeth 9.06.09 Order Land Schedule LB Lewisham 9.06.10 Order Land Schedule LB Newham 9.06.11 Order Land Schedule LB Richmond upon Thames 9.06.12 Order Land Schedule LB Southwark 9.06.13 Order Land Schedule LB Tower Hamlets 9.06.14 Order Land Schedule LB Wandsworth Errata and corrections 9.04.01 Errata 2.01 to 2.29 Book of Plans 9.04.01 Errata 4.1 Statement of Reasons 9.04.01 Errata 4.3.01 to 4.3.14 Book of Reference 9.04.01 Errata 5.3 Heritage Statement 9.04.01 Errata 6.2.03 Environmental Statement volume 3 Project Wide Effects Assessment 9.04.01 Errata 6.2.04 Environmental Statement volume 4 Acton Storm Tanks 9.04.01 Errata 6.2.05 Environmental Statement volume 5 Hammersmith Pumping Station 9.04.01 Errata 6.2.06 Environmental Statement volume 6 Barn Elms 9.04.01 Errata 6.2.07 Environmental Statement volume 7 Putney Embankment Foreshore 9.04.01 Errata 6.2.08 Environmental Statement volume 8 Dormay Street 9.04.01 Errata 6.2.09 Environmental Statement volume 9 King George's Park 9.04.01 Errata 6.2.10 Environmental Statement volume 10 Carnwath Road Riverside 9.04.01 Errata 6.2.11 Environmental Statement volume 11 Falconbrook Pumping Station 9.04.01 Errata 6.2.12 Environmental Statement volume 12 Cremorne Wharf Depot 9.04.01 Errata 6.2.13 Environmental Statement volume 13 Chelsea Embankment Foreshore 9.04.01 Errata 6.2.14 Environmental Statement volume 14 Kirtling Street 9.04.01 Errata 6.2.15 Environmental Statement volume 15 Heathwall Pumping Station 9.04.01 Errata 6.2.16 Environmental Statement volume 16 Albert Embankment Foreshore 9.04.01 Errata 6.2.17 Environmental Statement volume 17 Victoria Embankment Foreshore 9.04.01 Errata 6.2.18 Environmental Statement volume 18 Blackfriars Bridge Foreshore 9.04.01 Errata 6.2.19 Environmental Statement volume 19 Shad Thames Pumping Station 9.04.01 Errata 6.2.20 Environmental Statement volume 20 Chambers Wharf 9.04.01 Errata 6.2.21 Environmental Statement volume 21 King Edward Memorial Park

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C47 9.04.01 Errata 6.2.22 Environmental Statement volume 22 Earl Pumping Station 9.04.01 Errata 6.2.23 Environmental Statement volume 23 Deptford Church Street 9.04.01 Errata 6.2.24 Environmental Statement volume 24 Greenwich Pumping Station 9.04.01 Errata 6.2.25 Environmental Statement volume 25 Abbey Mills Pumping Station 9.04.01 Errata 6.2.27 Environmental Statement volume 27 Minor Works Sites 9.04.01 Errata 7.01 Planning Statement 9.04.01 Errata 7.04 Design and Access Statement 9.04.01 Errata 7.05 Final Report on Site Selection Process 9.04.01 Errata 7.06 Open Space Assessment 9.04.01 Errata 7.07 Sustainability Statement 9.04.01 Errata 7.10.01 Transport Assessment Acton Storm Tanks 9.04.01 Errata 7.10.02 Transport Assessment Hammersmith Pumping Station 9.04.01 Errata 7.10.03 Transport Assessment Barn Elms 9.04.01 Errata 7.10.04 Transport Assessment Putney Embankment Foreshore 9.04.01 Errata 7.10.06 Transport Assessment King George's Park 9.04.01 Errata 7.10.07 Transport Assessment Carnwath Road Riverside 9.04.01 Errata 7.10.08 Transport Assessment Falconbrook Pumping Station 9.04.01 Errata 7.10.09 Transport Assessment Cremorne Wharf Depot 9.04.01 Errata 7.10.10 Transport Assessment Chelsea Embankment Foreshore 9.04.01 Errata 7.10.11 Transport Assessment Kirtling Street 9.04.01 Errata 7.10.12 Transport Assessment Heathwall Pumping Station 9.04.01 Errata 7.10.14 Transport Assessment Victoria Embankment Foreshore 9.04.01 Errata 7.10.15 Transport Assessment Blackfriars Bridge Foreshore 9.04.01 Errata 7.10.17 Transport Assessment Chambers Wharf 9.04.01 Errata 7.10.18 Transport Assessment King Edward Memorial Park Foreshore 9.04.01 Errata 7.10.19 Transport Assessment Earl Pumping Station 9.04.01 Errata 7.10.20 Transport Assessment Deptford Church Street 9.04.01 Errata 7.10.21 Transport Assessment Greenwich Pumping Station 9.04.01 Errata 7.10.22 Transport Assessment Abbey Mills Pumping Station 9.04.01 Errata 7.10.24 Transport Assessment Minor Work Sites 9.04.01 Errata 7.10 Transport Assessment main report 9.04.01 Errata 7.18 Engineering Design Statement 9.04.01 Errata 7.20.02 Navigational Issues and Preliminary Risk Assessment

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C48 9.04.02 Errata drawings omitted from the Transport Assessment (7.10) 9.04.03 Errata drawings omitted from the Open Space Assessment 9.04.04 Errata Replacement Noise Tables 9.04.05 Corrections to the Assessment of Settlement Effects on the Historic Environment Other documents 9.05 Book of Plans Section 1 Works Plans and Sections 9.05 Book of Plans Section 2 Land Acquisition Plans 9.05 Book of Plans Section 3 Land Plans 9.05 Book of Plans Section 4 Crown and Special Category Land Plans 9.05 Book of Plans Section 5 Barn Elms 9.05 Book of Plans Section 6 Putney Embankment Foreshore 9.05 Book of Plans Section 9 Carnwath Road Riverside 9.05 Book of Plans Section 12 Falconbrook Pumping Station 9.05 Book of Plans Section 14 Chelsea Embankment Foreshore 9.05 Book of Plans Section 16 Heathwall Pumping Station 9.05 Book of Plans Section 17 Albert Embankment Foreshore 9.05 Book of Plans Section 18 Victoria Embankment Foreshore 9.05 Book of Plans Section 19 Blackfriars Bridge Foreshore 9.05 Book of Plans Section 20 Shad Thames Pumping Station 9.05 Book of Plans Section 24 Greenwich Pumping Station 9.05 Book of Plans Section 25 King Edward Memorial Park Foreshore 9.05 Book of Plans Section 26 Bekesbourne Street 9.07 Mitigation route map 9.08 Estuarine Habitat Calculation Method 9.09.01 HR Wallingford Detailed Scour Assessment Putney Embankment Foreshore 9.09.02 HR Wallingford Detailed Scour Assessment Albert Embankment Foreshore 9.09.03 HR Wallingford Detailed Scour Assessment Blackfriars Bridge Foreshore 9.09.04 HR Wallingford Detailed Scour Assessment Chelsea Embankment Foreshore 9.09.05 HR Wallingford Detailed Scour Assessment Tideway Walk (Kirtling Street/Heathwall) 9.09.06 HR Wallingford Detailed Scour Assessment King Edward Memorial Park 9.09.07 HR Wallingford Detailed Scour Assessment Victoria Embankment Foreshore 9.09.08 HR Wallingford Detailed Scour Assessment Chambers Wharf 9.09.09 HR Wallingford Detailed Scour Assessment Carnwath Road Riverside 9.10.01 Engineering Options Report Abbey Mills Route 9.10.01 Engineering Options Report appendices Abbey Mills Route 9.10.01 Site Suitability Reports Abbey Mills 9.10.01 Site Suitability Reports Barn Elms 1 9.10.01 Site Suitability Reports Barn Elms 2

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C49 9.10.01 Site Suitability Reports Borthwick Wharf Foreshore 9.10.01 Site Suitability Reports Carnwath Road Riverside 9.10.01 Site Suitability Reports Chambers Wharf 9.10.01 Site Suitability Reports Deptford Church Street 9.10.01 Site Suitability Reports Heckford Street 9.10.01 Site Suitability Reports King Edward Memorial Park 9.10.01 Site Suitability Reports King Edward Memorial Park Foreshore 9.10.01 Site Suitability Reports Kings Stairs Gardens 9.10.02 Information regarding archaeological evaluation 9.10.03 Excavated Materials Options Assessment (EMOA) annex C1 to C3 9.10.03 Excavated Materials Options Assessment (EMOA) annex D1 to D8 9.10.03 Excavated Materials Options Assessment (EMOA) annex D9 to D16 9.10.03 Excavated Materials Options Assessment (EMOA) figures 9.10.03 Excavated Materials Options Assessment (EMOA) main report 9.10.04 Updated Terrestrial Ecology Survey 9.10.05 Report on Long Term Settlement 9.10.06 Funding Statement September 2013 9.11.01 Noise Contours and Assessment Summary Plans Explanatory Note 9.11.02 Noise Contours and Assessment Summary Plans Carnwath Road Riverside 9.11.03 Noise Contours and Assessment Summary Plans Kirtling Street 9.11.04 Noise Contours and Assessment Summary Plans Chambers Wharf 9.11.05 Noise Contours and Assessment Summary Plans King Edward Memorial Park Foreshore 9.11.06 Noise Contours and Assessment Summary Plans Deptford Church Street 9.11.07 Noise Contours and Assessment Summary Plans Greenwich Pumping Station 9.11.08 Noise Contours and Assessment Summary Plans Acton Storm Tanks (Late submission) 9.11.09 Noise Contours and Assessment Summary Plans Hammersmith Pumping Station (Late submission) 9.11.10 Noise Contours and Assessment Summary Plans Barn Elms (Late submission) 9.11.11 Noise Contours and Assessment Summary Plans Putney Embankment Foreshore (Late submission) 9.11.12 Noise Contours and Assessment Summary Plans Dormay Street (Late submission) 9.11.13 Noise Contours and Assessment Summary Plans King George's Park (Late submission) 9.11.14 Noise Contours and Assessment Summary Plans Falconbrook Pumping Station (Late submission) 9.11.15 Noise Contours and Assessment Summary Plans Cremorne Wharf Depot (Late submission)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C50 9.11.16 Noise Contours and Assessment Summary Plans Chelsea Embankment Foreshore (Late submission) 9.11.17 Noise Contours and Assessment Summary Plans Heathwall Pumping Station (Late submission) 9.11.18 Noise Contours and Assessment Summary Plans Albert Embankment Foreshore (Late submission) 9.11.19 Noise Contours and Assessment Summary Plans Victoria Embankment Foreshore (Late submission) 9.11.20 Noise Contours and Assessment Summary Plans Blackfriars Bridge Foreshore (Late submission) 9.11.21 Noise Contours and Assessment Summary Plans Shad Thames Pumping Station (Late submission) 9.11.22 Noise Contours and Assessment Summary Plans Earl Pumping Station (Late submission) 9.11.23 Noise Contours and Assessment Summary Plans Abbey Mills Pumping Station (Late submission) 9.11.24 Noise Contours and Assessment Summary Plans Minor Works Site-Bekesbourne (Late submission) 9.12 Pipework Schematics 9.13 Third Party Verification for Settlement Reports 9.14 Hungerford Bridge Assessment 9.15.01 Tunnel and Bridge Assessments Bell Lane Creek Bridge 9.15.02 Tunnel and Bridge Assessments Bell Lane Creek Cable Bridge 9.15.03 Tunnel and Bridge Assessments Wandsworth Town Viaduct Arches 13 to 19 9.15.04 Tunnel and Bridge Assessments Richmond to Fulham Crossing 9.15.05 Tunnel and Bridge Assessments Wimbledon to Pimlico Tunnel Crossing 9.15.06 Tunnel and Bridge Assessments Wimbledon to Kensal Green Tunnel Crossing 9.15.07 Tunnel and Bridge Assessments Thames to Lee Valley Raw Water Main 9.15.08 Tunnel and Bridge Assessments Thames to Lee Valley Raw Water Main 9.15.09 Tunnel and Bridge Assessments Ring Main Barnes to Kew Section 9.15.10 Tunnel and Bridge Assessments Hammersmith Bridge 9.15.11 Tunnel and Bridge Assessments Putney Road Bridge 9.15.12 Tunnel and Bridge Assessments Putney Road Bridge (Site Interface Assessment) 9.15.13 Tunnel and Bridge Assessments Putney Rail Bridge over River Thames 9.15.14 Tunnel and Bridge Assessments Wandle Creek Footbridge 9.15.15 Tunnel and Bridge Assessments Stamford Brook Bridges 9.15.16 Tunnel and Bridge Assessments Stamford Brook Bridges 9.15.17 Tunnel and Bridge Assessments Stamford Brook Bridges 9.15.18 Tunnel and Bridge Assessments Stamford Brook Bridges 9.15.19 Tunnel and Bridge Assessments Stamford Brook Bridges 9.15.20 Tunnel and Bridge Assessments Retaining Wall D184 W85

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C51 9.15.21 Tunnel and Bridge Assessments Armoury Way Road Bridge over River Wandle 9.15.22 Tunnel and Bridge Assessments Chelsea River Bridge 9.15.23 Tunnel and Bridge Assessments Grosvenor Rail Bridge 9.15.24 Tunnel and Bridge Assessments Charing Cross Hungerford Rail Bridge 9.15.25 Tunnel and Bridge Assessments Blackfriars Rail Bridge 9.15.26 Tunnel and Bridge Assessments Cannon Street Rail Bridge 9.15.27 Tunnel and Bridge Assessments Battersea B Power Station Cable Tunnel 9.15.28 Tunnel and Bridge Assessments Battersea A Power Station Cable Tunnel 9.15.29 Tunnel and Bridge Assessments BT Open Reach St Martins Tunnel 9.15.30 Tunnel and Bridge Assessments BT Open Reach Blackfriars to St Pauls GPO Tunnel 9.15.31 Tunnel and Bridge Assessments Cable and Wireless Tower Subway Crossing 9.15.32 Tunnel and Bridge Assessments Discharge Tunnel 9.15.33 Tunnel and Bridge Assessments Bankside Cable Tunnel 9.15.34 Tunnel and Bridge Assessments Wimbledon to Pimlico Tunnel Crossing at Thames Tunnel 9.15.35 Tunnel and Bridge Assessments Wimbledon to Pimlico Tunnel Crossing at Tideway Walk 9.15.36 Tunnel and Bridge Assessments Wimbledon to Kensal Green Cable Tunnel 9.15.37 Tunnel and Bridge Assessments Victoria Embankment Services Subway 9.15.38 Tunnel and Bridge Assessments Thames Water Utilities Limited Cross Thames Link Tunnel 9.15.39 Tunnel and Bridge Assessments Battersea to Pimlico Tunnel 9.15.40 Tunnel and Bridge Assessments Thames Water Utilities Limited Ring Main Battersea to Barrow Hill Section 9.15.41 Tunnel and Bridge Assessments Lots Road Intake and Discharge Tunnels 9.15.42 Tunnel and Bridge Assessments Blackfriars Services Subway 9.15.43 Tunnel and Bridge Assessments Victoria Embankment Services Subway 9.15.44 Tunnel and Bridge Assessments Blackfriars Bridge Pedestrian Subway 9.15.45 Tunnel and Bridge Assessments Golden Jubilee Footbridges (Downstream and Upstream) 9.15.46 Tunnel and Bridge Assessments Waterloo Bridge Structure No BR015 9.15.47 Tunnel and Bridge Assessments Blackfriars Bridge Site Interface Assessment 9.15.48 Tunnel and Bridge Assessments Blackfriars Bridge (A201) Structure No 33 T01 (BR016) 9.15.49 Tunnel and Bridge Assessments Southwark Bridge (A300) Structure No 33 T02 (BR019)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C52 9.15.50 Tunnel and Bridge Assessments London Bridge (A3) Structure No 33 T03 (BR021) 9.15.51 Tunnel and Bridge Assessments Tower Bridge (A100) Structure No BR022 9.15.52 Tunnel and Bridge Assessments Wandsworth Road Bridge 9.15.53 Tunnel and Bridge Assessments Battersea Road Bridge 9.15.54 Tunnel and Bridge Assessments Albert Road Bridge 9.15.55 Tunnel and Bridge Assessments Chelsea Bridge 9.15.56 Tunnel and Bridge Assessments Vauxhall Road Bridge 9.15.57 Tunnel and Bridge Assessments Vauxhall Road Bridge (Assessment Certificate) 9.15.58 Tunnel and Bridge Assessments CSO Works Interface Assessment Vauxhall Bridge 9.15.59 Tunnel and Bridge Assessments Lambeth Road Bridge 9.15.60 Tunnel and Bridge Assessments Westminster Bridge 9.15.61 Tunnel and Bridge Assessments Blackfriars Road Bridge Departure Ramp 9.15.62 Tunnel and Bridge Assessments LUL Victoria Line Tunnels (Vauxhall to Pimlico) 9.15.63 Tunnel and Bridge Assessments Victoria Line at Albert Embankment 9.15.64 Tunnel and Bridge Assessments LUL Jubilee Line Tunnels (Westminster to Waterloo) 9.15.65 Tunnel and Bridge Assessments LUL Northern Line Tunnels (Charing Cross Branch) 9.15.66 Tunnel and Bridge Assessments LUL Northern Line Tunnel (Disused Loop) 9.15.67 Tunnel and Bridge Assessments LUL Northern Line Tunnels (Bank Branch) 9.15.68 Tunnel and Bridge Assessments LUL Northern Line Tunnels (Abandoned CSLR) 9.15.69 Tunnel and Bridge Assessments LUL District and Circle Line (Temple to Blackfriars) 9.15.70 Tunnel and Bridge Assessments LUL Bakerloo Line Tunnels (Waterloo to Embankment) 9.15.71 Tunnel and Bridge Assessments LUL Waterloo and City Line Tunnels (Waterloo to Bank) 9.15.72 Tunnel and Bridge Assessments Waterloo and City Line at Blackfriars Bridge Foreshore 9.15.73 Tunnel and Bridge Assessments LUL District and Circle Line (Embankment to Westminster) 9.15.74 Tunnel and Bridge Assessments Tunnel and Bridge Assessments Network Rail Deptford Creek Lifting Bridge 9.15.75 Tunnel and Bridge Assessments National Grid Electric River Lee Footbridge at Abbey Mills 9.15.76 Tunnel and Bridge Assessments TfL Road Management Services (A13) plc Britannia Bridge 9.15.77 Tunnel and Bridge Assessments Cut Structure No 9 9.15.78 Tunnel and Bridge Assessments Network Rail Disused Viaduct at Island Row

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C53 9.15.79 Tunnel and Bridge Assessments British Waterways Swing Bridge 9.15.80 Tunnel and Bridge Assessments Network Rail Harts Wharf Viaduct 9.15.81 Tunnel and Bridge Assessments Atlantic Wharf Footbridge 9.15.82 Tunnel and Bridge Assessments Network Rail Railway Bridge over Deptford Church Street 9.15.83 Tunnel and Bridge Assessments Network Rail Browne House and Farrer House Viaduct 9.15.84 Tunnel and Bridge Assessments Network Rail Railway Bridge over Creekside 9.15.85 Tunnel and Bridge Assessments Network Rail Sun Wharf Viaduct 9.15.86 Tunnel and Bridge Assessments Network Rail Mechanics Path Viaduct 9.15.87 Tunnel and Bridge Assessments Gas Pipe Bridge over the River Lee at Abbey Mills 9.15.88 Tunnel and Bridge Assessments Gas Pipe Bridge over at Bow Common Bridge 9.15.89 Tunnel and Bridge Assessments Cable Bridges over Limehouse Cut at Violet Road 9.15.90 Tunnel and Bridge Assessments Utility Bridge over Limehouse Cut at A13 9.15.91 Tunnel and Bridge Assessments Network Rail Bridge over Limehouse Cut and River Lee 9.15.92 Tunnel and Bridge Assessments Canal and River Trust Public Footbridge 9.15.93 Tunnel and Bridge Assessments Canal and River Trust Three Mills Lock Service Footbridge 9.15.94 Tunnel and Bridge Assessments Canal and River Trust Public Footbridge 9.15.95 Tunnel and Bridge Assessments Canal and River Trust Bow Locks Service Footbridge 9.15.96 Tunnel and Bridge Assessments UK Power Networks Wellclose to New Cross Cable Tunnel 9.15.97 Tunnel and Bridge Assessments National Grid Hurst New Cross Proposed Cable Tunnel 9.15.98 Tunnel and Bridge Assessments Tunnel Asset TU055 Rotherhithe Tunnel 9.15.99 Tunnel and Bridge Assessments Tunnel Asset TU058 Limehouse Link Tunnel 9.15.100 Tunnel and Bridge Assessments Tunnel Asset TU361 Jamaica Road Subway 9.15.101 Tunnel and Bridge Assessments Tunnel Asset TU378 Empsom Street Subway 9.15.102 Tunnel and Bridge Assessments Halfpenny Hatch Footbridge Structure No BR126 9.15.103 Tunnel and Bridge Assessments Twelvetrees Crescent Bridge Structure No BR403 9.15.104 Tunnel and Bridge Assessments Violet Road Bridge Structure No BR406

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C54 9.15.105 Tunnel and Bridge Assessments Bow Common Lane Bridge Structure No BR407 9.15.106 Tunnel and Bridge Assessments Oxestalls Roadbridge Structure No BR414 9.15.107 Tunnel and Bridge Assessments Blackhorse Bridge Structure No BR473 9.15.108 Tunnel and Bridge Assessments DLR Deptford Creek Viaduct 9.15.109 Tunnel and Bridge Assessments A12 Gillender Street (Limehouse Cut Four Mills) Bridge 9.15.110 Tunnel and Bridge Assessments DLR Limehouse Cut Bridge on the DLR North Route 9.15.111 Tunnel and Bridge Assessments A1205 Burdett Road Bridge (Over Limehouse Cut) 9.15.112 Tunnel and Bridge Assessments DLR Brick Arch Viaduct at Island Row 9.15.113 Tunnel and Bridge Assessments Lower Road Bridge (EL31) over Surrey Quays Station 9.15.114 Tunnel and Bridge Assessments LUL District Line Bridge over Limehouse Cut and River Lee 9.15.115 Tunnel and Bridge Assessments Service Bridge (EL30) over Surrey Quays Station 9.15.116 Tunnel and Bridge Assessments Pipe Crossing, PC252 under Surrey Quays Station 9.15.117 Tunnel and Bridge Assessments Form A Approval in Principle for Brunel Thames Tunnel Preliminary Impact Assessment 9.15.118 Tunnel and Bridge Assessments Form AA Approval in Principle for Preliminary Impact Assessment of Brunel Thames Tunnel 9.15.119 Tunnel and Bridge Assessments Form BA Certificate of Assessment and Checking Brunel Thames Tunnel Preliminary Impact Assessment 9.15.120 Tunnel and Bridge Assessments Line 1 (Limehouse Basin) 9.15.121 Tunnel and Bridge Assessments LUL Jubilee Line Tunnels (London Bridge to Bermondsey) 9.16.01 Generic List of Mitigation Strategies River Wall Screening and Assessment Reports Part 1 9.16.01 Generic List of Mitigation Strategies River Wall Screening and Assessment Reports Part 2 9.16.01 Generic List of Mitigation Strategies River Wall Screening and Assessment Reports Part 3 9.16.02 Generic List of Mitigation Strategies River Wall Mitigation Options Report 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Abbey Mills Pumping Station 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Albert Embankment Foreshore 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Barn Elms

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C55 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Blackfriars Bridge Foreshore 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Carnwath Road Riverside Part 1 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Carnwath Road Riverside Part 2 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Carnwath Road Riverside Part 3 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Carnwath Road Riverside Part 4 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Chambers Wharf 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Chelsea Embankment Foreshore 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Cremorne Wharf Depot 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Dormay Street 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Greenwich Pumping Station 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Heathwall Pumping Station 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report King Edward Memorial Park Foreshore 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Kirtling Street 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Putney Embankment Foreshore 9.16.03 Generic List of Mitigation Strategies Enhanced River Wall Inspection Report Victoria Embankment Foreshore 9.16.03 Generic List of Mitigation Strategies Standard River Wall Inspection Report Part 1 of 6 9.16.03 Generic List of Mitigation Strategies Standard River Wall Inspection Report Part 2 of 6 9.16.03 Generic List of Mitigation Strategies Standard River Wall Inspection Report Part 3 of 6 9.16.03 Generic List of Mitigation Strategies Standard River Wall Inspection Report Part 4 of 6 9.16.03 Generic List of Mitigation Strategies Standard River Wall Inspection Report Part 5 of 6 9.16.03 Generic List of Mitigation Strategies Standard River Wall Inspection Report Part 6 of 6 9.17 Flood Defence Asset Interpretative Report 9.18 Ground Investigation Report on Route Geology Part 1 9.18 Ground Investigation Report on Route Geology Part 2 9.19 Engineering Design Statement Addendum Updated DCO, CoCP and Design Principles 9.20.01 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order Revised 9.20.02 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order Comparite

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C56 9.20.03 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order Comparite Model Provisions 9.21.01 CoCP Part A General Requirements Revised superseded by doc 9.21.03 9.21.02 CoCP Part A General Requirements Comparite superseded by doc 9.21.04 9.21.03 Correct CoCP Part A General Requirements Revised 9.21.04 Correct CoCP Part A General Requirements Comparite 9.22.01 CoCP Part B Acton Storm Tanks Comparite 9.22.01 CoCP Part B Acton Storm Tanks Revised 9.22.02 CoCP Part B Hammersmith Pumping Station Comparite 9.22.02 CoCP Part B Hammersmith Pumping Station Revised 9.22.03 CoCP Part B Barn Elms Comparite 9.22.03 CoCP Part B Barn Elms Revised 9.22.04 CoCP Part B Putney Embankment Foreshore Comparite 9.22.04 CoCP Part B Putney Embankment Foreshore Revised 9.22.05 CoCP Part B Dormay Street Comparite 9.22.05 CoCP Part B Dormay Street Revised 9.22.06 CoCP Part B King George’s Park Comparite 9.22.06 CoCP Part B King George’s Park Revised 9.22.07 CoCP Part B Carnwath Road Riverside Comparite 9.22.07 CoCP Part B Carnwath Road Riverside Revised 9.22.08 CoCP Part B Falconbrook Pumping Station Comparite 9.22.08 CoCP Part B Falconbrook Pumping Station Revised 9.22.09 CoCP Part B Cremorne Wharf Depot Comparite 9.22.09 CoCP Part B Cremorne Wharf Depot Revised 9.22.10 CoCP Part B Chelsea Embankment Foreshore Comparite 9.22.10 CoCP Part B Chelsea Embankment Foreshore Revised 9.22.11 CoCP Part B Kirtling Street Comparite 9.22.11 CoCP Part B Kirtling Street Revised 9.22.12 CoCP Part B Heathwall Pumping Station Comparite 9.22.12 CoCP Part B Heathwall Pumping Station Revised 9.22.13 CoCP Part B Albert Embankment Foreshore Comparite 9.22.13 CoCP Part B Albert Embankment Foreshore Revised 9.22.14 CoCP Part B Victoria Embankment Foreshore Comparite 9.22.14 CoCP Part B Victoria Embankment Foreshore Revised 9.22.15 CoCP Part B Blackfriars Bridge Foreshore Comparite 9.22.15 CoCP Part B Blackfriars Bridge Foreshore Revised 9.22.16 CoCP Part B Shad Thames Pumping Station Comparite 9.22.16 CoCP Part B Shad Thames Pumping Station Revised 9.22.17 CoCP Part B Chambers Wharf Comparite 9.22.17 CoCP Part B Chambers Wharf Revised 9.22.18 CoCP Part B King Edward Memorial Park Comparite 9.22.18 CoCP Part B King Edward Memorial Park revised 9.22.19 CoCP Part B Earl Pumping Station Comparite 9.22.19 CoCP Part B Earl Pumping Station Revised 9.22.20 CoCP Part B Deptford Church Street Comparite 9.22.20 CoCP Part B Deptford Church Street Revised 9.22.21 CoCP Part B Greenwich Pumping Station Comparite 9.22.21 CoCP Part B Greenwich Pumping Station Revised 9.22.22 CoCP Part B Abbey Mills Pumping Station Comparite 9.22.22 CoCP Part B Abbey Mills Pumping Station Revised

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C57 9.22.23 CoCP Part B Beckton Sewage Treatment Works Comparite 9.22.23 CoCP Part B Beckton Sewage Treatment Works Revised 9.22.24 CoCP Part B Bekesbourne Street Comparite 9.22.24 CoCP Part B Bekesbourne Street Revised 9.23.01 Design Principles Revised 9.23.02 Design Principles Comparite Proposed changes to the application and a list of consulted bodies 10.01 Proposed changes covering letter 10.03 Proposed changes Blackfriars Bridge Foreshore 10.02 Proposed changes Victoria Embankment Foreshore REP045 Applicant's list of bodies consulted on proposed amendments to the Application Submissions from Other Parties REP046 LB Lewisham REP047 W Alexander H Hamilton Part 1 REP048 Ann Rosenberg on behalf of Carnwath Road Coalition REP049 Battersea Project Land Company Limited REP050 Capitalstart Limited REP051 Circadian Limited REP052 City and Provincial REP053 City of London Corporation REP054 Cruising Association REP055 Environment Agency REP056 Free Trade Wharf Management Company REP057 LB Hammersmith and Fulham Part 1 REP058 LB Southwark REP059 Lee Ranson REP060 Marine and Coastguard Agency REP061 Metro Nominees REP062 Minerva (Wandsworth) Limited REP063 National Grid REP064 Nerita Properties Limited REP065 Network Rail Infrastructure Limited REP066 Ian Jackson REP067 Robert Tipping REP068 Mark Hale REP069 Nortrust Nominees Limited REP070 Old Sun Wharf Freehold and Management Company Limited REP071 Royal Mail Group Limited REP072 Save Your Riverside REP073 St Michaels Catholic College REP074 Surrey Quays Limited REP075 Trafalgar Court Residents Association REP076 Transport for London REP077 W Alexander H Hamilton Part 2 REP078 Unity Harvey (Late submission) REP079 LB Hammersmith and Fulham Part 2 (Late submission) REP080 Canal and River Trust (Late submission) REP081 English Heritage (Late submission)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C58 7 October 2013 Deadline Written submissions from other Interested Parties on whether the Applicant's changes as submitted are substantial and whether they would amount to a different application REP082 Transport for London REP083 Environment Agency REP084 City of Westminster 4 November 2013 Deadline

Local Impact Reports REP085 LB Ealing REP086 LBH01 LB Hounslow REP087 LB Newham REP088 COL09 City of London Corporation REP089 City of Westminster REP090 LB Hammersmith and Fulham REP091 RB Kensington and Chelsea REP092 LB Lambeth REP093 LBLew05 LB Lewisham REP094 LBRUT02 LB Richmond upon Thames REP095 LB Southwark REP096 LB Tower Hamlets REP097 LB Tower Hamlets appendix REP098 LB Wandsworth REP099 Mayor of London REP100 Mayor of London LIR Appendix 3 combined Transport Assessment trackers Responses to ExA's first written questions REP101 COL12 City of London Corporation REP102 EA03 Environment Agency REP103 Joint Borough submission REP104 LB Hammersmith and Fulham REP105 LB Southwark REP106 LB Wandsworth REP107 Mayor of London REP108 National Grid REP109 Natural England REP110 Port of London Authority REP111 Wandsworth Society APP00 Covering Letter 4 November APP01 Air Quality and Emissions APP02 Biodiversity, Biological Environment and Ecology APP03 Coastal River Change APP04 Compulsory Acquisition and Related Matters APP05 Design, Landscape and Visual Impact APP06 Development Consent Drafting and Related Matters APP07 Flood Risk and Climate Change APP08 Historic Environment APP09 Land Use Including Regeneration and Open Space

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C59 APP11 Noise and Disturbance APP12 Other matters APP13 Policy APP14 Rationale for the Selection of Work Sites and Drive Strategies APP15 Socio-Economic Effects APP16 Traffic, Travel and Transportation APP17 Waste Management APP18 Water Quality and Resources APP19.S1.01 (S9) Land Use Including Regeneration and Open Space - SoCG summary APP19.S1.02 (S9) Land Use Including Regeneration and Open Space - SoCG LB Ealing APP19.S1.03 (S9) Land Use Including Regeneration and Open Space - SoCG LB Hammersmith and Fulham APP19.S1.04 (S9) Land Use Including Regeneration and Open Space - SoCG LB Hounslow APP19.S1.05 (S9) Land Use Including Regeneration and Open Space - SoCG LB Richmond APP19.S1.06 (S9) Land Use Including Regeneration and Open Space - SoCG LB Wandsworth APP19.S1.07 (S9) Land Use Including Regeneration and Open Space - SoCG LB Lambeth APP19.S1.08 (S9) Land Use Including Regeneration and Open Space - SoCG City of London APP19.S1.09 (S9) Land Use Including Regeneration and Open Space - SoCG City of Westminster APP19.S1.10 (S9) Land Use Including Regeneration and Open Space - SoCG RB Kensington and Chelsea APP19.S1.11 (S9) Land Use Including Regeneration and Open Space - SoCG LB Newham APP19.S1.12 (S9) Land Use Including Regeneration and Open Space - SoCG RB Greenwich APP19.S1.13 (S9) Land Use Including Regeneration and Open Space - SoCG LB Lewisham APP19.S1.14 (S9) Land Use Including Regeneration and Open Space - SoCG LB Southwark APP19.S1.15 (S9) Land Use Including Regeneration and Open Space - SoCG LB Tower Hamlets APP19.S1.16 (S9) Land Use Including Regeneration and Open Space - SoCG Mayor of London APP19.S1.17 (S9) Land Use Including Regeneration and Open Space - SoCG Transport for London APP19.S1.18 (S9) Land Use Including Regeneration and Open Space - SoCG Port of London APP19.S1.19 (S9) Land Use Including Regeneration and Open Space - SoCG Environment Agency APP19.S1.20 (S9) Land Use Including Regeneration and Open Space - SoCG The Historic Buildings and Monuments Commission for England (English Heritage) APP19.S1.21 (S9) Land Use Including Regeneration and Open Space - SoCG Natural England

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C60 APP19.S1.22 (S9) Land Use Including Regeneration and Open Space - SoCG London Legacy Development Corporation APP19.S1.23 (S9) Land Use Including Regeneration and Open Space - SoCG Canal and River Trust APP19.S1.24 (S9) Land Use Including Regeneration and Open Space - SoCG Marine Management Organisation APP19.S1.25 (S9) Land Use Including Regeneration and Open Space - SoCG Network Rail APP19.S2 (S9) Land Use Including Regeneration and Open Space - SoCG Battersea Project Land Company Ltd APP19.S3 (S9) Land Use Including Regeneration and Open Space - SoCG Cemex (UK) Limited APP21 Comments on Relevant Representation of the Environment Agency APP22 Comments on Relevant Representation of Transport for London APP23 Comments on Relevant Representation of the Marine Management Organisation APP24 Comments on Relevant Representation of the Port of London Authority APP25 Draft s106 Agreements APP26 Response to the ExA's procedural decision APP01.06.01 Air Quality and Emissions - Appendix APP02.04.01 Biodiversity, Biological Environment and Ecology - Appendix APP02.04.02 Biodiversity, Biological Environment and Ecology - Appendix APP02.07.01 Biodiversity, Biological Environment and Ecology - Appendix APP02.14.01 Biodiversity, Biological Environment and Ecology - Appendix APP03.05.01 Coastal River Change - Appendix APP03.08.01 Coastal River Change - Appendix APP04.03.01 Compulsory Acquisition and Related Matters - Appendix APP04.03.02 Compulsory Acquisition and Related Matters - Appendix APP04.13.01 Compulsory Acquisition and Related Matters - Appendix APP04.13.02 Compulsory Acquisition and Related Matters - Appendix APP04.25.01 Compulsory Acquisition and Related Matters - Appendix APP04.25.02 Compulsory Acquisition and Related Matters - Appendix APP04.29.01 Compulsory Acquisition and Related Matters - Appendix APP04.30.01 Compulsory Acquisition and Related Matters - Appendix APP04.30.02 Compulsory Acquisition and Related Matters - Appendix APP04.31.01 Compulsory Acquisition and Related Matters - Appendix APP04.31.02 Compulsory Acquisition and Related Matters - Appendix APP04.35.01 Compulsory Acquisition and Related Matters - Appendix APP04.37.01 Compulsory Acquisition and Related Matters - Appendix APP04.37.02 Compulsory Acquisition and Related Matters - Appendix APP04.37.03 Compulsory Acquisition and Related Matters - Appendix APP04.38.01 Compulsory Acquisition and Related Matters - Appendix APP04.43.01 Compulsory Acquisition and Related Matters - Appendix APP04.52.01 Compulsory Acquisition and Related Matters - Appendix APP04.77.01 Compulsory Acquisition and Related Matters - Appendix

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C61 APP04.100.01 Compulsory Acquisition and Related Matters - Appendix APP04.102.01 Compulsory Acquisition and Related Matters - Appendix APP05.01.01 Design, Landscape and Visual Impact - Appendix APP05.01.02 Design, Landscape and Visual Impact - Appendix APP05.02.01 Design, Landscape and Visual Impact - Appendix APP05.13.01 Design, Landscape and Visual Impact - Appendix APP05.13.02 Design, Landscape and Visual Impact - Appendix APP05.16.01 Design, Landscape and Visual Impact - Appendix APP05.29.01 Design, Landscape and Visual Impact - Appendix APP06.23.01 Development Consent Drafting and Related Matters - Appendix APP06.65.01 Development Consent Drafting and Related Matters - Appendix APP06.65.02 Development Consent Drafting and Related Matters - Appendix APP06.72.01 Development Consent Drafting and Related Matters - Appendix APP06.79.01 Development Consent Drafting and Related Matters - Appendix APP06.83.01 Development Consent Drafting and Related Matters - Appendix APP06.86.01 Development Consent Drafting and Related Matters - Appendix APP07.01.01 Flood Risk and Climate Change - Appendix APP07.02.01 Flood Risk and Climate Change - Appendix APP07.02.02 Flood Risk and Climate Change - Appendix APP07.02.03 Flood Risk and Climate Change - Appendix APP07.03.01 Flood Risk and Climate Change - Appendix APP08.10.01 Historic Environment - Appendix APP08.12.01 Historic Environment - Appendix APP08.12.02 Historic Environment - Appendix APP08.12.03 Historic Environment - Appendix APP08.12.04 Historic Environment - Appendix APP08.13.01 Historic Environment - Appendix APP08.16.01 Historic Environment - Appendix APP11.01.01 Noise and Disturbance - Appendix APP11.09.01 Noise and Disturbance - Appendix APP11.41.01 Noise and Disturbance - Appendix APP12.03.01 Other Matters - Appendix APP12.03.02 Other Matters - Appendix APP12.03.03 Other Matters - Appendix APP14.01.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.02 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.03 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.04 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.05 Rationale for the Selection of Work Sites and Drive Strategies - Appendix

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C62 APP14.01.06 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.07 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.08 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.09 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.10 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.11 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.12 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.13 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.14 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.15 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.16 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.17 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.18 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.19 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.20 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.21 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.22 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.23 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.24 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.25 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.26 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.27 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.28 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.29 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.30 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.31 Rationale for the Selection of Work Sites and Drive Strategies - Appendix

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C63 APP14.01.32 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.33 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.34 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.35 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.36 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.37 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.01.38 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.08.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.08.02 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.08.03 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.08.04 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.09.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.09.02 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.09.03 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.10.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.16.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.16.02 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.23.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.24.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.24.02 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.24.03 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.25.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.25.02 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.25.03 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.25.04 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.29.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C64 APP14.30.01 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP14.30.02 Rationale for the Selection of Work Sites and Drive Strategies - Appendix APP15.25.01 Socio-Economic Effects - Appendix APP16.01.01 Traffic, Travel and Transportation - Appendix APP16.01.02 Traffic, Travel and Transportation - Appendix APP16.01.03 Traffic, Travel and Transportation - Appendix APP16.01.04 Traffic, Travel and Transportation - Appendix APP16.01.05 Traffic, Travel and Transportation - Appendix APP17.01.01 Waste Management - Appendix APP17.01.02 Waste Management - Appendix 26 November 2013 Deadline Written summaries of cases put orally and responses to matters arising at hearings 11- 23 November. (NB The Applicant’s written summaries of cases put orally for these hearings were submitted for the deadline of 2 December.) 11 November IS hearing REP112 Capitalstart REP113 LR16712-03.1 Livett's Launches REP114 Thamesbank REP115 Unity Harvey APP27.02 Applicant's expert witness biographies 12 November IS hearing REP116 Save King's Stairs Gardens Action Group REP117 LB Southwark APP28.01 Applicant's expert witness biographies 13 November IS hearing REP118 EH04 English Heritage 14 November IS hearing REP119 FTWMCL008 Free Trade Wharf Management Company Limited REP120 EA07 Environment Agency Securing Mechanism and Encroachment briefing note Part 1 of 2 REP121 EA08 Environment Agency Securing Mechanism and Encroachment briefing note Part 2 of 2 15 November IS hearing REP122 Royal Foundation of St Katherine's REP123 LB Southwark REP124 LB Hammersmith and Fulham REP125 LB Tower Hamlets (Late submission) REP126 FTWMCL007 Free Trade Wharf Management Company Limited REP127 Applicant's plans distributed at Issue Specific Hearings 11 - 15 November 20 November OF hearing REP128 Assael Architecture REP129 Patricia Hicks Part 1 of 2 REP130 Patricia Hicks Part 2 of 2 REP131 Deaconess Sue Pierson REP132 Griselda Kellie-Smith

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C65 REP133 Jean Houlder REP134 Rosemary Sisson REP135 Susanna Carver REP136 LB Hammersmith and Fulham REP137 W. Allan Kelly REP138 Amanda Toyne 22 November OF hearing REP139 Larry Broomhead on behalf of Dickens Estate and Wrayburn House REP140 Bernardo Luque REP141 Paul Melville 23 November OF hearing REP142 Tempus Wharf Freehold Ltd REP143 Alex Hamilton REP144 Thamesbank REP145 Mark Hale 2 December 2013 Deadline Applicant's comments on Written Representations, ISHs and Local Impact Reports including other documents APP29.00 Applicant's Covering Letter 2 December APP30.01 Applicant's response to LB of Hounslow LIR APP30.02 Applicant's response to LB Richmond upon Thames LIR APP30.03 Applicant's response to LB Ealing LIR APP30.04 Applicant's response to LB Wandsworth LIR APP30.05 Applicant's response to LB Hammersmith and Fulham LIR APP30.06 Applicant's response to RB Kensington and Chelsea LIR APP30.07 Applicant's response to City of Westminster LIR APP30.08 Applicant's response to LB Lambeth LIR APP30.09 Applicant's response to LB Southwark LIR APP30.10 Applicant's response to City of London Corporation LIR APP30.11 Applicant's response to LB Tower Hamlets LIR APP30.12 Applicant's response to LB Lewisham LIR APP30.13 Applicant's response to LB Newham LIR APP30.14 Applicant's response to London Legacy Development Corporation LIR APP30.15 Applicant's response to Mayor of London LIR APP31.01 Applicant's response to IS hearing and WRs relating to Carnwath Road Riverside, Alternative Drive Strategy and Putney Embankment Foreshore APP31.02 Applicant's response to IS hearing and WR relating to Chambers Wharf and Alternative Drive Strategy APP31.03 Applicant's response to IS hearing and WR relating to Deptford Church Street APP31.04 Applicant's response to IS hearing and WR relating to King Edward Memorial Park Foreshore APP31.05 Applicant's response to IS hearing and WRs relating to Shad Thames Pumping Station and Bekesbourne Street APP31.06 Applicant's response to Written Representation from Battersea Project Land Company Limited APP31.07 Applicant's response to Written Representation from Canal and River Trust

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C66 APP31.08 Applicant's response to Written Representation from Capitalstart Limited APP31.09 Applicant's response to Written Representation from CEMEX APP31.10 Applicant's response to Written Representation from Circadian Limited APP31.11 Applicant's response to Written Representation from City Cruises plc and The Yard Arm Club Ltd APP31.12 Applicant's response to Written Representation from the City of London Corporation APP31.13 Applicant's response to Written Representation from the City of Westminster APP31.14 Applicant's response to Written Representation from CoCP Joint Borough Representation APP31.15 Applicant's response to Written Representation from Consumer Council for Water APP31.16 Applicant's response to Written Representation from Cory Environmental APP31.17 Applicant's response to Written Representation from David Starkie APP31.18 Applicant's response to Written Representation from English Heritage APP31.19 Applicant's response to Written Representation from Glendola Leisure Limited APP31.20 Applicant's response to Written Representation from Justine Greening MP APP31.21 Applicant's response to Written Representation from Livett’s Launches APP31.22 Applicant's response to Written Representation from LB Hounslow APP31.23 Applicant's response to Written Representation from LB Borough of Richmond upon Thames APP31.24 Applicant's response to Written Representation from London Duck Tours Ltd APP31.25 Applicant's response to Written Representation from Lookers Motor Group APP31.26 Applicant's response to Written Representation from Mark and May Hale APP31.27 Applicant's response to Written Representation from Bermondsey and Rotherhithe Environment Group APP31.28 Applicant's response to Written Representation from Martin Blaiklock APP31.29 Applicant's response to Written Representation from Metro Nominees APP31.30 Applicant's response to Written Representation from Minerva (Wandsworth) Limited APP31.31 Applicant's response to Written Representation from Marine Management Organisation APP31.32 Applicant's response to Written Representation from National Grid Gas plc and National Grid Electricity Transmissions plc

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C67 APP31.33 Applicant's response to Written Representation from Nerita Properties APP31.34 Applicant's response to Written Representation from Network Rail APP31.35 Applicant's response to Written Representation from Nine Elms Pier Ltd (Jamie Darke) APP31.36 Applicant's response to Written Representation from Nine Elms Pier Ltd (Robert Tipping) APP31.37 Applicant's response to Written Representation from Olaiz Miyar APP31.38 Applicant's response to Written Representation from Port of London Authority APP31.39 Applicant's response to Written Representation from Reverend Ailsa Newby for St Mary’s Church APP31.40 Applicant's response to Written Representation from RB of Kensington and Chelsea APP31.41 Applicant's response to Written Representation from Royal Hospital Chelsea APP31.42 Applicant's response to Written Representation from Rt Hon Simon Hughes MP APP31.43 Applicant's response to Written Representation from St James Group Ltd APP31.44 Applicant's response to Written Representation from Surrey Quays Limited APP31.45 Applicant's response to Written Representation from Transport for London APP31.46 Applicant's response to Written Representation from Tower Bridge Yacht and Boat Company APP31.47 Applicant's response to Written Representation from the Mercers Company APP31.48 Applicant's response to Written Representation from Valerie Shawcross AM APP31.49 Applicant's response to Written Representation from Willmott Dixon Regen Limited APP32.01 Applicant's submissions on agenda items 24-1 and 24-2 APP32.02 Applicant's submissions on the approach to considering alternatives APP36v1 Applicant's compulsory acquisition document tracker Comments on responses to ExA’s first written questions, comments on written representations and representations from Other Parties REP146 Paula Melville REP147 Wrayburn Residents Together REP148 Alex Hamilton REP149 18612.04 Andrew Whetnall REP150 Geraldine Charles REP151 Graham Stevens Part 1 REP152 Graham Stevens Part 2 REP153 Graham Taylor REP154 Lance Pierson REP155 Port of London Authority Part 1 REP156 Defra letter to Thamesbank REP157 Transport for London

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C68 REP158 Trafalgar Court Residents’ Association REP159 WCC03 Westminster City Council REP160 Don't Dump on Deptford's Heart REP161 Port of London Authority Part 2 REP162 Temple Group Limited REP163 Unity Harvey appreciation letter REP164 LB Hammersmith and Fulham REP165 Segro plc REP166 Edward Davey Part 1 (Non Interested Party) REP167 Edward Davey Part 2 (Non Interested Party) REP168 Emma Redstone REP169 Kahair Properties Limited REP170 LBlew06 LB Lewisham REP171 Ben Mackworth-Praed REP172 Sue Lawes REP173 Wrayburn Residents’ Together (Late submission) REP174 Fr Paul Butler REP175 EA09 Environment Agency REP176 LB Tower Hamlets REP177 COL15 City of London Corporation REP178 EH06 English Heritage REP179 FTWMCL009 Free Trade Wharf Management Company Limited REP180 Mark Hale REP181 Minerva (Wandsworth) Ltd Part 1 REP182 Minerva (Wandsworth) Ltd Part 2 REP183 STJMS03 St James Group Limited REP184 London Duck Tours REP185 EA06 Environment Agency REP186 CRR-02 Ann Rosenberg on behalf of Carnwath Road Coalition Part 1 REP187 Ann Rosenberg on behalf of Carnwath Road Coalition Part 2 REP188 Ann Rosenberg on behalf of Carnwath Road Coalition Part 3 REP189 Ann Rosenberg on behalf of Carnwath Road Coalition Part 4 REP190 Justine Greening MP REP191 LBRUT06 LB Richmond upon Thames REP192 Thamesbank Part 1 REP193 Thamesbank Part 2 REP194 Tower Bridge Yacht and Boat Company Part 1 REP195 Dame Joan Ruddock (MP) REP196 Kirston Sittard REP197 LB Southwark REP198 LB Wandsworth REP199 Mayor of London REP200 Rt Hon Simon Hughes MP REP201 FORE Advisors LLP REP202 Jackie Brett (Late Submision) REP203 Katy Roll REP204 SYR05 Save Your Riverside

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C69 Correspondence regarding the hearings and written summaries of cases put orally and responses to matters arising at hearings 26 and 27 November REP205 Port of London Authority REP206 Royal Mail Group Ltd Part 1 REP207 STJMS02 St James Group Limited REP208 Transport for London REP209 Network Rail REP210 Royal Mail Group Ltd Part 2 REP211 Justine Greening MP REP212 EA10 Environment Agency REP213 Network Rail REP214 COL16 City of London Corporation REP215 National Grid REP216 Marine Management Organisation REP217 EH05 English Heritage APP34.00 Applicant APP33.01 Applicant's expert witness biographies 27 November 23 December 2013 Deadline Correspondence regarding the hearings and written summaries of cases put orally and responses to matters arising at hearings 28 November to 20 December 28 November CA hearing REP218 Network Rail REP219 Transport for London APP42.1 Applicant APP35 Applicant's expert witness biographies 29 November CA hearing APP42.2 Applicant 3 December CA hearing REP220 LB Hammersmith and Fulham APP37 Applicant's expert witness biographies APP42.3 Applicant 4 December CA hearing APP42.4 Applicant 5 December CA hearing REP221 Minerva (Wandsworth) Limited APP38 Applicant's expert witness biographies APP42.5 Applicant 6 December CA hearing APP42.6 Applicant 10 December CA hearing REP222 SQL04 Surrey Quays Limited APP39 Applicant's expert witness biographies APP42.7 Applicant 11 December CA hearing REP223 SQL05 Surrey Quays Limited APP42.8 Applicant 12 December CA hearing APP42.9 Applicant

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C70 13 December CA hearing APP42.10 Applicant 17 December CA hearing APP42.11 Applicant 18 December CA hearing APP42.12 Applicant 19 December CA hearing APP42.13 Applicant 20 December CA hearing APP40 Applicant's plans distributed at CA hearings between 3 - 20 December APP41 Applicant's cover letter concerning hearing submissions APP42 and APP43 APP42.14 Applicant's written summaries of cases put orally and responses to matters arising at hearings APP43 Applicant's Tunnel Limits of Deviation APP44.1 Applicant's update on status of Statutory Undertaking and Communication Code Operators Land and Apparatus APP44.2 Applicant's Statutory Undertakers and Communication Code Operators - Errata for Book of Reference 13 January 2014 Deadline Responses to ExA's second written questions from other Interested Parties REP224 St Paul's Church REP225 David Percival REP226 Natural England REP227 LB Lambeth REP228 LBRUT07 LB Richmond upon Thames REP229 Marine Management Organisation REP230 Minerva (Wandsworth) Limited REP231 COL18 City of London Corporation REP232 David Starkie on behalf of Elm Quay Court REP233 EH07 English Heritage REP234 EA11 Environment Agency REP235 Battersea Power Station Development Company REP236 LBLew07 LB Lewisham REP237 LB Southwark REP238 LB Wandsworth REP239 WCC04 City of Westminster REP240 Mayor of London Part 1 REP241 National Grid Gas plc and National Grid Electricity plc REP242 Port of London Authority REP243 STYLE02 Stuart Tyler REP244 Transport for London REP245 Thamesbank REP246 Mayor of London Part 2 (Late submission) Responses to ExA's second written questions from Applicant, including updated and additional documents APP96 Covering letter Noise and Disturbance ExA’s second Written Question 29.2 supplementary information

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C71 APP97 Noise and Disturbance ExA’s second Written Question 29.2 supplementary information APP45 Cover Letter 13 January 2014 APP46.1 Required Documents Schedule (APP36V2) APP46.2 Drawing schedule APP47 Applicant Air Quality and Emissions APP48 Applicant Biodiversity Biological Environment and Ecology APP49 Applicant Coastal River Change APP50 Applicant Compulsory Acquisition and Related Matters APP50.03.01 Supporting Appendix Common Land - Counsel's opinion APP50.05.01 Supporting Appendix Historic Drawings APP51 Applicant Design Landscape and Visual Impact APP52 Applicant DCO Drafting and Related Matters APP53 Applicant Flood Risk and Climate Change APP54 Applicant Historic Environment APP54.01.01 Supporting Appendix Technical Note on Timing and Evaluation APP54.10.01 Supporting Appendix Albert Embankment Foreshore - Initial Results from Archaeological Cores APP54.13.01 Supporting Appendix Victoria Embankment Foreshore - Additional visualisations APP54.15.01 Supporting Appendix Monitoring Point Location Diagram APP55 Applicant Land Use Including Regeneration and Open Space APP56 Applicant Noise and Disturbance APP56.04.01 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Acton Storm Tanks APP56.04.02 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Hammersmith Pumping Station APP56.04.03 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Barn Elms APP56.04.04 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Putney Embankment Foreshore APP56.04.05 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Carnwath Road Riverside APP56.04.06 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Cremorne Wharf Depot APP56.04.07 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Kirtling Street APP56.04.08 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Shad Thames Pumping Station APP56.04.09 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Chambers Wharf APP56.04.10 Supporting Appendix Area of likely significant effect using BS5228 ABC method - King Edward Memorial Park Foreshore APP56.04.11 Supporting Appendix Area of likely significant effect using BS5228 ABC Method - Earl Pumping Station APP56.04.12 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Greenwich Pumping Station

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C72 APP56.04.13 Supporting Appendix Area of likely significant effect using BS5228 ABC method - Minor Works Site (Bekesbourne Street) APP57 Applicant Other Matters APP58 Applicant's Policy APP59 Applicant's Rationale for the Selection of Work Sites and Drive Strategies APP59.07.01 Supporting Appendix Chambers Wharf Plans and Construction Verifiable Photomontages APP59.14.01 Supporting Appendix Noise and vibration assessment tables for the Heckford Street and Park option APP59.22.01 Supporting Appendix Profile of Movements at Abbey Mills with Four Barges APP59.22.02 Supporting Appendix Effect at Abbey Mills of Variable Drive Rates APP59.22.03 Supporting Appendix Inefficiency of Barging at Abbey Mills APP59.22.04 Supporting Appendix Profile of Movements at Chambers Wharf APP60 Applicant Socio-Economic Effects APP61 Applicant Traffic Travel and Transportation APP61.04.01 Supporting Appendix Marine Routes of Entry to Project V3.0 APP61.13.01 Supporting Appendix Draft Transport Strategy Summary APP61.13.02 Supporting Appendix Lorry Movement Capacity at River Sites APP63 Applicant Water Quality and Resources APP64.01.01 Supporting Appendix Meeting Minutes APP64.1 Applicant additional SoCG request - LB Southwark, LB Newham, PLA and Thames Tideway Tunnel APP64.2 Applicant additional SoCG request – Applicant, Cory Environmental and Port of London Authority APP64.3 Applicant additional SoCG Request - Applicant and London Duck Tours APP65 Book of plans - Revised Drawings - Part 1 of 3 APP65 Book of plans - Revised Drawings - Part 2 of 3 APP65 Book of plans - Revised Drawings - Part 3 of 3 APP66 Supporting drawings - Part 1 of 2 APP66 Supporting drawings - Part 2 of 2 APP67 Summary of Further On-site Mitigation Measures and Revisions to Compensation Policies APP68 Non-Statutory Off-site Mitigation and Compensation Policy (DRAFT) APP68.01.01 Supporting appendix Houseboat Compensation Policy APP69 Exceptional Hardship Procedure APP70 Settlement Deed APP71 Updated Settlement Information Paper APP72.1 Code of Construction Practice Part A General Requirements - Revised 13 January 2014 APP72.1 Code of Construction Practice Part A General Requirements - Comparite against 23 September 2013 APP72.1 Code of Construction Practice Part A General Requirements - Comparite against 28 February 2013

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C73 APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Revised 13 January 2014) APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Comparite against 23 September 2013) APP72.2 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks (Comparite against 28 February 2013) APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Revised 13 January 2014) APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Comparite against 23 September 2013) APP72.3 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station (Comparite against 28 February 2013) APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Revised 13 January 2014) APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Comparite against 23 September 2013) APP72.4 Code of Construction Practice Part B Site Specific Requirements - Barn Elms (Comparite against 28 February 2013) APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Revised 13 January 2014) APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Comparite against 23 September 2013) APP72.5 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore (Comparite against 28 February 2013) APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Revised 13 January 2014) APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Comparite against 23 September 2013) APP72.6 Code of Construction Practice Part B Site Specific Requirements - Dormay Street (Comparite against 28 February 2013) APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Revised 13 January 2014) APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Comparite against 23 September 2013) APP72.7 Code of Construction Practice Part B Site Specific Requirements - King George's Park (Comparite against 28 February 2013)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C74 APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Revised 13 January 2014) APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Comparite against 23 September 2013) APP72.8 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside (Comparite against 28 February 2013) APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Revised 13 January 2014) APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Comparite against 23 September 2013) APP72.9 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station (Comparite against 28 February 2013) APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Revised 13 January 2014) APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Comparite against 23 September 2013) APP72.10 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot (Comparite against 28 February 2013) APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Revised 13 January 2014) APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Comparite against 23 September 2013) APP72.11 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore (Comparite against 28 February 2013) APP72.12 Code of Construction Practice Part B Specific Site Requirements - Kirtling Street (Revised 13 January 2014) APP72.12 Code of Construction Practice Part B Specific Site Requirements - Kirtling Street (Comparite against 23 September 2013) APP72.12 Code of Construction Practice Part B Specific Site Requirements - Kirtling Street (Comparite against 28 February 2013) APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Revised 13 January 2014) APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Comparite against 23 September 2013)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C75 APP72.13 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station (Comparite against 28 February 2013) APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Revised 13 January 2014) APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Comparite against 23 September 2013) APP72.14 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore (Comparite against 28 February 2013) APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Revised 13 January 2014) APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Comparite against 23 September 2013) APP72.15 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore (Comparite against 28 February 2013) APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Revised 13 January 2014) APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Comparite against 23 September 2013) APP72.16 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore (Comparite against 28 February 2013) APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Revised 13 January 2014) APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Comparite against 23 September 2013) APP72.17 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station (Comparite against 28 February 2013) APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Revised 13 January 2014) APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Comparite against 23 September 2013) APP72.18 Code of Construction Practice Part B Site Specific Requirements - Chambers Wharf (Comparite against 28 February 2013) APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park (Revised 13 January 2014)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C76 APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park (Comparite against 23 September 2013) APP72.19 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park (Comparite against 28 February 2013) APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Revised 13 January 2014) APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Comparite against 23 September 2013) APP72.20 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station (Comparite against 28 February 2013) APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Revised 13 January 2014) APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Comparite against 23 September 2013) APP72.21 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street (Comparite against 28 February 2013) APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Revised 13 January 2014) APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Comparite against 23 September 2013) APP72.22 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station (Comparite against 28 February 2013) APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Revised 13 January 2014) APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Comparite against 23 September 2013) APP72.23 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station (Comparite against 28 February 2013) APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Revised 13 January 2014) APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Comparite against 23 September 2013) APP72.24 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works (Comparite against 28 February 2013)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C77 APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Revised 13 January 2014) APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Comparite against 23 September 2013) APP72.25 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street (Comparite against 28 February 2013) APP73 Transport Strategy APP74 Draft s106 Legal Agreements APP75.1 Drafting Notes relating to updated Draft DCO APP76.1 Design Principles update – 13 January 2014 APP76.2 Design Principles - Comparite against 23 September 2013 APP76.3 Design Principles - Comparite against 28 February 2013 APP77 Equalities Impact Assessment - 13 January 2014 APP78.1 Book of Reference - 13 January 2014 - Change Log APP78.2 Book of Reference - 13 January 2014 - City of Westminster APP78.3 Book of Reference - 13 January 2014 - City of London APP78.4 Book of Reference - 13 January 2014 - LB Hammersmith and Fulham APP78.5 Book of Reference - 13 January 2014 - RB Kensington and Chelsea APP78.6 Book of Reference - 13 January 2014 - LB Lambeth APP78.7 Book of Reference - 13 January 2014 - LB Newham APP78.8 Book of Reference - 13 January 2014 - LB Wandsworth APP79.1 Statement of Reasons - Revised for 13 January 2014 APP79.2 Statement of Reasons - Comparite against 4 November 2013 APP79.3 Statement of Reasons - Comparite against 28 February 2013 APP80 Draft River Transport Strategy as submitted 21 January 2014 APP81 List of application documents APP82 Draft Guide for Developers APP83 The Groundwater Environmental Management Dewatering and Monitoring Strategy APP84 The Excavated Material and Waste Commitments APP85.1 SoCG - Summary APP85.2 SoCG - LB Ealing APP85.3 SoCG - LB Hammersmith and Fulham APP85.4 SoCG - LB Hounslow APP85.5 SoCG - LB Richmond upon Thames APP85.6 SoCG - LB Wandsworth APP85.7 SoCG - LB Lambeth APP85.8 SoCG - City of London Corporation APP85.9 SoCG - City of Westminster APP85.10 SoCG - RB Kensington and Chelsea APP85.11 SoCG - LB Newham APP85.12 SoCG - RB Greenwich APP85.13 SoCG - LB Lewisham APP85.14 SoCG - LB Southwark

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C78 APP85.15 SoCG - LB Tower Hamlets APP85.16 SoCG - Mayor of London APP85.17 SoCG - Transport for London APP85.18 SoCG - Port of London Authority APP85.19 SoCG - Environment Agency APP85.20 SoCG - Historic Buildings and Monuments Commission for England (English Heritage) APP85.21 SoCG - Natural England APP85.22 SoCG - London Legacy Development Corporation APP85.23 SoCG - Canal and River Trust APP85.24 SoCG – Marine Management Organisation APP85.25 SoCG - Network Rail APP86 Update on actions from Compulsory Acquisition hearings APP88 Covering Letter (DCO, CoCP and s106) REP247 Cover letter for APP80 - River Transport Strategy Revised draft DCO APP75.2 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order - Revised 13 January 2014 APP75.3 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order - Comparite against 23 September 2013 APP75.4 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order - Comparite against 28 February 2013 Other Parties SoCG, s106 and other agreements REP248 Mayor of London REP249 COL17 City of London Corporation REP250 LB Southwark REP251 LB Tower Hamlets REP252 London Duck Tours REP253 LB Tower Hamlets SoCG and Design Principles - Clean and track changes (Late submission) REP254 LB Wandsworth REP255 LB Tower Hamlets - Cover letter for joint borough submission in relation to the CoCP Part A and request to attend Site Visit Other submissions REP256 Catherine Schade REP257 Don't Dump on Deptford's Heart REP258 GTC – Maggie Ketteridge REP259 Jo Bradford on behalf of Justine Greening MP REP260 National Association of Boat Owners REP261 Ranelagh Sailing Club REP262 Spirit Pub Company Limited REP263 John Harris REP264 St Paul's Church Deptford REP265 RB Kensington and Chelsea REP266 18612.05 Andrew Whetnall Part 1

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C79 REP267 Andrew Whetnall Part 2 REP268 Andrew Whetnall (Late submission) REP269 CRR-03 Ann Rosenberg for Carnwath Road Coalition REP270 Graham Stevens (Late submission) REP271 Katie Persaud for Cannon Wharf LLP REP272 Carnwath Road Coalition REP273 LB Hammersmith and Fulham REP274 Mark Southwood on behalf of Temple Group REP275 Duncan Rimmer (Non Interested Party) REP276 SYR06 Save Your Riverside REP277 Rt Hon Simon Hughes MP REP278 Derek Joseph in behalf of Tempus Wharf Freehold Ltd REP279 Larry Broomhead on behalf of Wrayburn Resident's Together REP280 Open Spaces Society (Non Interested Party) REP281 Lise Frandsen REP282 Unity Harvey 20 January 2014 Deadline Correspondence regarding the hearings and written summaries of cases put orally and responses to matters arising at hearings 14 - 17 January 14 January CA hearing REP283 Battersea Power Station Development Company REP284 National Grid Gas and National Grid Electricty Transmissions plc REP285 Open Spaces Society REP286 Canal and River Trust Part 1 REP287 Port of London Authority Part 1 REP288 Canal and River Trust Part 2 REP289 Port of London Authority Part 2 REP290 London Duck Tours APP90.01 Applicant’s written summaries of the cases put orally and responses to matters arising at the hearing REP291 Transport for London written cases put orally and responses to matters arising at hearings 14 - 20 January 15 January CA hearing REP292 Network Rail written summaries of cases put orally and responses to matters arising at hearings 15 - 20 January APP62 Applicant's expert witness biography for Sue Hitchcock APP90.02 Applicant’s written summaries of the cases put orally and responses to matters arising at the hearing 16 January CA hearing APP90.03 Applicant’s written summaries of the cases put orally and responses to matters arising at the hearing 17 January CA hearing APP70 Update on Status of Statutory Undertakers and Communication Code Operators Land and Apparatus APP89 Covering Letter APP90.04 Applicant's written summaries of the cases put orally and responses to matters arising at the hearing APP91 SoCG - Transport for London

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C80 APP92 Schedule of plans submitted during Compulsory Acquisition hearings 14-17 January APP93 Draft Section 127 Certificate for Canal and River Trust REP293 Port of London Authority - Note for ExA - Open Space Land (Late submission) REP294 Port of London Authority - Appendix 3 of note to the ExA - Open Space Land (Late submission) REP295 Port of London Authority - Update concerning information requested by the ExA (Late submission) REP296 This reference number has not been used 3 February 2014 Deadline Applicant's submissions: comments on responses to ExA's second written questions and updated application documents APP101 Covering Letter 03 February 2014 APP103.01 Applicant's response to Thamesbank APP103.02 Applicant's response to Derek Joseph on behalf of Tempus Wharf Freehold Ltd APP103.03 Applicant's response to Mark Southwood on behalf of Temple Group Limited APP103.04 Applicant's response to Juliet Munn on behalf of Battersea Power Station Development Company APP103.05 Applicant's response to Minerva (Wandsworth) Limited APP103.06 Applicant's response to London Borough of Southwark APP103.07 Applicant's response to Transport for London - Pell Frischmann report APP103.08 Applicant's response to Stuart Tyler APP103.09 Applicant's response to Catherine Schade APP103.10 Applicant's response to Hermitage Community Moorings APP103.11 Applicant's response to Unity Harvey APP104.01 Explanatory note for changes to the Code of Construction Practice APP104.02 Code of Construction Practice Part A General Requirements - Revised 3 February 2014 APP104.02 CoCP Part A General Requirements – Comparite against 13 January APP104.03 Code of Construction Practice Part B Site Specific Requirements - Acton Storm Tanks - Revised 3 February 2014 APP104.03 CoCP Part B Site Specific Requirements – Acton Storm Tanks -Comparite against 13 January APP104.04 Code of Construction Practice Part B Site Specific Requirements - Hammersmith Pumping Station - Revised 3 February 2014 APP104.04 CoCP Part B Site Specific Requirements – Hammersmith Pumping Station - Comparite against 13 January 2014 APP104.05 Code of Construction Practice Part B Site Specific Requirements - Barn Elms - Revised 3 February 2014 APP104.05 CoCP Part B Site Specific Requirements – Barn Elms - Comparite against 13 January 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C81 APP104.06 Code of Construction Practice Part B Site Specific Requirements - Putney Embankment Foreshore - Revised 3 February 2014 APP104.06 CoCP Part B Site Specific Requirements – Putney Embankment Foreshore - Comparite against 13 January 2014 APP104.07 Code of Construction Practice Part B Site Specific Requirements - Dormay Street - Revised 3 February 2014 APP104.07 CoCP Part B Site Specific Requirements – Dormay Street - Comparite against 13 January 2014 APP104.08 Code of Construction Practice Part B Site Specific Requirements - King George's Park - Revised 3 February 2014 APP104.08 CoCP Part B Site Specific Requirements – King George’s Park - Comparite against 13 January 2014 APP104.09 Code of Construction Practice Part B Site Specific Requirements - Carnwath Road Riverside - Revised 3 February 2014 APP104.09 CoCP Part B Site Specific Requirements – Carnwath Road Riverside - Comparite against 13 January 2014 APP104.10 Code of Construction Practice Part B Site Specific Requirements - Falconbrook Pumping Station - Revised 3 February 2014 APP104.10 CoCP Part B Site Specific Requirements – Falconbrook Pumping Station - Comparite against 13 January 2014 APP104.11 Code of Construction Practice Part B Site Specific Requirements - Cremorne Wharf Depot - Revised 3 February 2014 APP104.11 CoCP Part B Site Specific Requirements – Cremorne Wharf Depot - Comparite against 13 January 2014 APP104.12 Code of Construction Practice Part B Site Specific Requirements - Chelsea Embankment Foreshore - Revised 3 February 2014 APP104.12 CoCP Part B Site Specific Requirements – Chelsea Embankment Foreshore - Comparite against 13 January 2014 APP104.13 Code of Construction Practice Part B Site Specific Requirements - Kirtling Street - Revised 3 February 2014 APP104.13 CoCP Part B Site Specific Requirements – Kirtling Street - Comparite against 13 January 2014 APP104.14 Code of Construction Practice Part B Site Specific Requirements - Heathwall Pumping Station - Revised 3 February 2014 APP104.14 CoCP Part B Site Specific Requirements – Heathwall Pumping Station - Comparite against 13 January 2014 APP104.15 Code of Construction Practice Part B Site Specific Requirements - Albert Embankment Foreshore - Revised 3 February 2014 APP104.15 CoCP Part B Site Specific Requirements – Albert Embankment Foreshore - Comparite against 13 January 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C82 APP104.16 Code of Construction Practice Part B Site Specific Requirements - Victoria Embankment Foreshore - Revised 3 February 2014 APP104.16 CoCP Part B Site Specific Requirements – Victoria Embankment Foreshore - Comparite against 13 January 2014 APP104.17 Code of Construction Practice Part B Site Specific Requirements - Blackfriars Bridge Foreshore - Revised 3 February 2014 APP104.17 CoCP Part B Site Specific Requirements – Blackfriars Brdige Foreshore - Comparite against 13 January 2014 APP104.18 Code of Construction Practice Part B Site Specific Requirements - Shad Thames Pumping Station - Revised 3 February 2014 APP104.18 CoCP Part B Site Specific Requirements – Shad Thames Pumping Station - Comparite against 13 January 2014 APP104.19 Code of Construction Practice Part B Site Specific Requirements-Chambers Wharf - Revised 3 February 2014 APP104.19 CoCP Part B Site Specific Requirements – Chambers Wharf - Comparite against 13 January 2014 APP104.20 Code of Construction Practice Part B Site Specific Requirements - King Edward Memorial Park - Revised 3 February 2014 APP104.20 CoCP Part B Site Specific Requirements – King Edward Memorial Park Foreshore - Comparite against 13 January 2014 APP104.21 Code of Construction Practice Part B Site Specific Requirements - Earl Pumping Station - Revised 3 February 2014 APP104.21 CoCP Part B Site Specific Requirements – Earl Pumping Station - Comparite against 13 January 2014 APP104.22 Code of Construction Practice Part B Site Specific Requirements - Deptford Church Street - Revised 3 February 2014 APP104.22 CoCP Part B Site Specific Requirements – Deptford Church Street - Comparite against 13 January 2014 APP104.23 Code of Construction Practice Part B Site Specific Requirements - Greenwich Pumping Station - Revised 3 February 2014 APP104.23 CoCP Part B Site Specific Requirements – Greenwich Pumping Station - Comparite against 13 January 2014 APP104.24 Code of Construction Practice Part B Site Specific Requirements - Abbey Mills Pumping Station - Revised 3 February 2014 APP104.24 CoCP Part B Site Specific Requirements – Abbey Mills Pumping Station - Comparite against 13 January 2014 APP104.25 Code of Construction Practice Part B Site Specific Requirements - Beckton Sewage Treatment Works - Revised 3 February 2014 APP104.25 CoCP Part B Site Specific Requirements – Beckton Sewage Treatment works - Comparite against 13 January 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C83 APP104.26 Code of Construction Practice Part B Site Specific Requirements - Bekesbourne Street - Revised 3 February 2014 APP104.26 CoCP Part B Site Specific Requirements – Bekesbourne Street - Comparite against 13 January 2014 APP105.01 Drafting notes relating to updated draft DCO APP105.02 The Applicant's Draft (Thames Tideway Tunnel) DCO - Comparite against 13 January 2014 APP105.02 The Applicant's Draft (Thames Tideway Tunnel) DCO - Comparite against 28 February 2013 APP105.02 The Applicant's Draft (Thames Tideway Tunnel) DCO - Revised 3 February 2014 APP106.01 Design Principles update - Revised 3 February 2014 APP106.01 Design Principles Comparite against 13 January 2014 APP106.01 Design Principles Comparite against 28 February 2013 APP106.02 Design Principles Route Map APP107 Consents Management Plan APP108 Groundwater Environmental Management - Dewatering and Monitoring APP109 Excavated Material and Waste Commitments APP111 Noise Insulation Proposals APP112 Non-Statutory off-site Mitigation and Compensation policy APP113 Sample Trigger Action Plan (TAP) APP144 SoCG with the Occupiers of 85 Albert Embankment Submissions from Other Interested Parties REP297 EA14 Environment Agency update part 1 REP298 EA16 Environment Agency update part 2 REP299 85 Albert Embankment Part 1 of 2 REP300 85 Albert Embankment Part 2 of 2 REP301 Martin Goudie - Open Note Concerning Closed hearing - Served 27 January 2014 REP302 EA12 Environment Agency REP303 Crossfields Tennants and Residents Association REP304 EA 13 - 14 Environment Agency Part 1 REP305 EA 15 - 17 Environment Agency Part 2 REP306 FTWMCL010 Free Trade Wharf Management Company Limited REP307 LB Hammersmith and Fulham REP308 LB Lewisham REP309 LB Southwark REP310 LB Tower Hamlets REP311 Lee Valley Regional Park Authority (Non Interested Party) REP312 Marine Management Organisation REP313 Mayor of London REP314 Port of London Authority REP315 SYR07 Save Your Riverside REP316 Rt Hon Simon Hughes MP REP317 STJMS04 St James Group REP318 SQL06 Surrey Quays Ltd REP319 18612.06A Andrew Whetnall (Late submission) REP320 Brian Chadwick

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C84 REP321 Stop the Shaft Correspondence regarding the hearings and written summaries of cases put orally and responses to matters arising at hearings 20 - 28 January 20 January IS hearing REP322 St James Group Ltd REP323 Planning Inspectorate response to LB Hammersmith and Fulham request to change hearing date REP324 Port of London Authority Part 1 of 2 REP325 Mayor of London REP326 Save Your Riverside REP327 English Heritage REP328 City of Westminster REP329 Port of London Authority Part 2 of 2 APP98 and Applicant's expert witness biographies APP99 APP102.01 Applicant's written summary of the case put orally and responses to matters arising at the hearing 21 January IS hearing REP330 COL19 City of London Corporation APP102.02 Applicant's written summary of the case put orally and responses to matters arising at the hearing 22 January IS hearing REP331 Stop the Shaft Part 1 REP332 Stop the Shaft Part 2 REP333 LB Hammersmith and Fulham Part 1 REP334 LB Hammersmith and Fulham expert witness biography REP335 Applicant's expert witness notification by agenda Item REP336 Applicant's submission relating to Cross Examination REP337 LB Hammersmith and Fulham Part 2 REP338 Ranelagh Sailing Club REP339 Battersea Power Station Owning Group REP340 EH08 English Heritage REP341 Thamesbank APP102.03 Applicant's written summary of the case put orally and responses to matters arising at the hearing 23 January IS hearing REP342 Save KEMP REP343 LB Southwark REP344 Carnwath Road Coalition APP102.04 Applicant's written summary of the case put orally and responses to matters arising at the hearing 24 January IS hearing REP345 Livett's Launches Part 2 REP346 St James Group Ltd REP347 Transport for London expert witness biography REP348 Barnes Community Association Environment Group REP349 Tower Bridge Yacht and Boat Company REP350 Transport for London discussion points REP351 Transport for London REP352 LR16712-04.1 Livett's Launches Part 1 APP95 Applicant's expert witness biographies

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C85 APP100 Applicant's expert witness biography APP102.05 Applicant's written summary of the case put orally and responses to matters arising at the hearing 27 January CA hearing REP353 Battersea Power Station Owning Group REP354 London Duck Tours APP102.06 Applicant's written summary of the cases put orally and responses to matters arising at the hearing 28 January CA hearing REP355 Applicant's plans distributed at hearings 20 - 28 January APP102.07 Applicant's written summary of the case put orally and responses to matters arising at the hearing 12 February 2014 Deadline Applicant's submissions including updated documents and SoCGs APP114 Covering Letter 12 February 2014 APP116.01 SoCG - Summary APP116.02 SoCG - LB of Ealing APP116.03 SoCG - LB Hammersmith and Fulham APP116.04 SoCG - LB Hounslow APP116.05 SoCG - LB Richmond upon Thames APP116.06 SoCG - LB Wandsworth APP116.07 SoCG - LB Lambeth APP116.08 SoCG - City of London Corporation APP116.09 SoCG - City of Westminster APP116.10 SoCG - RB Kensington and Chelsea APP116.11 SoCG - LB Newham APP116.12 SoCG - RB Greenwich APP116.13 SoCG - LB Lewisham APP116.14 SoCG - LB Southwark APP116.15 SoCG - LB Tower Hamlets APP116.16 SoCG - Mayor of London APP116.17 SoCG - Transport for London APP116.18 SoCG - Port of London Authority APP116.19 SoCG - Environment Agency APP116.20 SoCG - Historic Buildings and Monuments Commission for England (English Heritage) APP116.21 SoCG - London Legacy Development Corporation APP116.22 SoCG - Canal and River Trust APP116.23 SoCG - Network Rail APP116.24 SoCG - National Grid APP116.25 SoCG - British Telecommunications plc APP116.26 SoCG - Marine Management Organisation APP116.27 SoCG - Cory Environmental Ltd APP116.28 SoCG - UK Power Networks APP116.29 SoCG - Vodafone Limited APP116.30 SoCG - Private Landowners and Businesses APP116.31 SoCG - Diocese of Southwark APP116.32 SoCG- Port of London Authority, LB Southwark, LB Newham and Applicant APP119.04 Section 106 Agreement - LB Ealing

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C86 APP119.05 Section 106 Agreement - LB Hammersmith and Fulham APP119.06 Section 106 Agreement - LB Wandsworth APP119.07 Section 106 Agreement - LB Lambeth APP119.08 Section 106 Agreement - City of London Corporation APP119.09 Section 106 Agreement - City of Westminster APP119.10 Section 106 Agreement - RB Kensington and Chelsea APP119.11 Section 106 Agreement - LB Newham APP119.12 Section 106 Agreement - RB Greenwich APP119.13 Section 106 Agreement - LB Lewisham APP119.14 Section 106 Agreement - LB Southwark APP119.15 Section 106 Agreement - LB Tower Hamlets APP121.01 Letter of Intent from The Crown Estate regarding Section 135 of the Planning Act 2008 APP121.02 Letter from the Department for Work and Pensions regarding Section 135 of the Planning Act 2008 APP123 Errata Notification - Submission Errors APP124.01 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order - Drafting Notes relating to Updated Draft DCO APP124.02 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order - Revised 12 February 2014 APP124.02 The Applicant's Draft (Thames Tideway Tunnel) development Consent Order - Comparite against 28 February 2013 APP124.02 The Applicant's Draft (Thames Tideway Tunnel) Development Consent Order - Comparite against 3 February 2014 APP125.01 Code of Construction Practice part A General Requirements - Revised 12 February 2014 APP125.02 Code of Construction Practice part A General Requirements - Comparite against 3 February 2014 APP125.03 Code of Construction Practice part B Site Specific Requirements - Acton Storm Tanks - Revised 12 February 2014 APP125.04 Code of Construction Practice part B Site Specific Requirements - Acton Storm tanks - Comparite against 3 February 2014 APP125.05 Code of Construction Practice part B Site Specific Requirements - Hammersmith Pumping Station - Revised 12 February 2014 APP125.06 Code of Construction Practice part B Site Specific Requirements - Hammersmith Pumping Station - Comparite against 3 February 2014 APP125.07 Code of Construction Practice part B Site Specific Requirements - Barn Elms - Revised 12 February 2014 APP125.08 Code of Construction Practice part B Site Specific Requirements - Barn Elms - Comparite against 3 February 2014 APP125.09 Code of Construction Practice part B Site Specific Requirements - Putney Embankment Foreshore - Revised 12 February 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C87 APP125.10 Code of Construction Practice part B Site Specific Requirements - Putney Embankment Foreshore - Comparite against 3 February 2014 APP125.11 Code of Construction Practice part B Site Specific Requirements - Dormay Street - Revised 12 February 2014 APP125.12 Code of Construction Practice part B Site Specific Requirements - Dormay Street - Comparite against 3 February 2014 APP125.13 Code of Construction Practice part B Site Specific Requirements - King George's Park - Revised 12 February 2014 APP125.14 Code of Construction Practice part B Site Specific Requirements - King George's Park - Comparite against 3 February 2014 APP125.15 Code of Construction Practice part B Site Specific Requirements - Carnwath Road Riverside - Revised 12 February 2014 APP125.16 Code of Construction Practice part B Site Specific Requirements - Carnwath Road Riverside - Comparite against 3 February 2014 APP125.17 Code of Construction Practice part B Site Specific Requirements - Falconbrook Pumping Station - Revised 12 February 2014 APP125.18 Code of Construction Practice part B Site Specific Requirements - Falconbrook Pumping Station - Comparite against 3 February 2014 APP125.19 Code of Construction Practice part B Site Specific Requirements - Cremorne Wharf Depot - Revised 12 February 2014 APP125.20 Code of Construction Practice part B Site Specific Requirements - Cremorne Wharf Depot - Comparite against 3 February 2014 APP125.21 Code of Construction Practice part B Site Specific Requirements - Chelsea Embankment Foreshore - Revised 12 February 2014 APP125.22 Code of Construction Practice part B Site Specific Requirements - Chelsea Embankment Foreshore - Comparite against 3 February 2014 APP125.23 Code of Construction Practice part B Site Specific Requirements - Kirtling Street - Revised 12 February 2014 APP125.24 Code of Construction Practice part B Site Specific Requirements - Kirtling Street - Comparite against 3 February 2014 APP125.25 Code of Construction Practice part B Site Specific Requirements - Heathwall Pumping Station - Revised 12 February 2014 APP125.26 Code of Construction Practice part B Site Specific Requirements - Heathwall Pumping Station - Comparite against 3 February 2014 APP125.27 Code of Construction Practice part B Site Specific Requirements - Albert Embankment Foreshore - Revised 12 February 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C88 APP125.28 Code of Construction Practice part B Site Specific Requirements - Albert Embankment Foreshore - Comparite against 3 February 2014 APP125.29 Code of Construction Practice part B Site Specific Requirements - Victoria Embankment Foreshore - Revised 12 February 2014 APP125.30 Code of Construction Practice part B Site Specific Requirements - Victoria Embankment Foreshore - Comparite against 3 February 2014 APP125.31 Code of Construction Practice part B Site Specific Requirements - Blackfriars Bridge Foreshore - Revised 12 February 2014 APP125.32 Code of Construction Practice part B Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite against 3 February 2014 APP125.33 Code of Construction Practice part B Site Specific Requirements - Shad Thames Pumping Station - Revised 12 February 2014 APP125.34 Code of Construction Practice part B Site Specific Requirements - Shad Thames Pumping Station - Comparite against 3 February 2014 APP125.35 Code of Construction Practice part B Site Specific Requirements - Chambers Wharf - Revised 12 February 2014 APP125.36 Code of Construction Practice part B Site Specific Requirements - Chambers Wharf - Comparite against 3 February 2014 APP125.37 Code of Construction Practice part B Site Specific Requirements - King Edward Memorial Park Foreshore - Revised 12 February 2014 APP125.38 Code of Construction Practice part B Site Specific Requirements - King Edward Memorial Park Foreshore - Comparite against 3 February 2014 APP125.39 Code of Construction Practice part B Site Specific Requirements - Earl Pumping Station - Revised 12 February 2014 APP125.40 Code of Construction Practice part B Site Specific Requirements - Earl Pumping Station - Comparite against 3 February 2014 APP125.41 Code of Construction Practice part B Site Specific Requirements - Deptford Church Street - Revised 12 February 2014 APP125.42 Code of Construction Practice part B Site Specific Requirements - Deptford Church Street - Comparite against 3 February 2014 APP125.43 Code of Construction Practice part B Site Specific Requirements - Greenwich Pumping Station - Revised 12 February 2014 APP125.44 Code of Construction Practice part B Site Specific Requirements - Greenwich Pumping Station - Comparite against 3 February 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C89 APP125.45 Code of Construction Practice part B Site Specific Requirements - Abbey Mills Pumping Station - Revised 12 February 2014 APP125.46 Code of Construction Practice part B Site Specific Requirements - Abbey Mills Pumping Station - Comparite against 3 February 2014 APP125.47 Code of Construction Practice part B Site Specific Requirements - Beckton Sewage Treatment Works - Revised 12 February 2014 APP125.48 Code of Construction Practice part B Site Specific Requirements - Beckton Sewage Treatment Works - Comparite against 3 February 2014 APP125.49 Code of Construction Practice part B Site Specific Requirements - Bekesbourne Street - Revised against 12 February 2014 APP125.50 Code of Construction Practice part B Site Specific Requirements - Bekesbourne Street - Comparite against 3 February 2014 APP126.01 Design Principles - Comparite against 28 February 2013 APP126.01 Design Principles - Comparite against 3 February 2014 APP126.01 Design Principles - Revised 12 February 2014 APP128 Groundwater Environment Management - Dewatering and Monitoring Strategy APP129 Excavated Material and Waste Commitments APP130 River Transport Strategy APP131 ES Update Report - February 2014 APP131.01.01 ES Update Report Appendices - February 2014 - Summary Assessment Tables - Project wide APP131.01.02 ES Update Report Appendices -February 2014 -Updated ES Vol 3 Project wide effects assessment Section 14 APP131.01.03 ES Update Report Appendices - February 2014 - Sediment Fluxes in the Tidal Thames APP131.01.04 ES Update Report Appendices - February 2014 - Scour and Accretion Strategy - temporary and permanent works APP131.01.05 ES Update Report Appendices - February 2014 - Summary of changes between ES and the ES Update Report APP131.01.06 ES Update Report Appendices - February 2014 - Summary Assessment Tables Acton Storm Tanks APP131.01.07 ES Update Report Appendices - February 2014 - Summary Assessment Tables Hammersmith Pumping Station APP131.01.08 ES Update Report Appendices - February 2014 - Summary Assessment Tables Barn Elms APP131.01.09 ES Update Report Appendices - February 2014 - Summary Assessment Tables Putney Embankment Foreshore APP131.01.10 ES Update Report Appendices - February 2014 - Summary Assessment Tables Dormay Street APP131.01.11 ES Update Report Appendices - February 2014 - Summary Assessment Tables King George's Park APP131.01.12 ES Update Report Appendices - February 2014 - Summary Assessment Tables Carnwath Road Riverside APP131.01.13 ES Update Report Appendices - February 2014 - Summary Assessment Tables Falconbrook Pumping Station

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C90 APP131.01.14 ES Update Report Appendices - February 2014 - Summary Assessment Tables Cremorne Wharf APP131.01.15 ES Update Report Appendices - February 2014 - Summary Assessment Tables Chelsea Embankment Foreshore APP131.01.16 ES Update Report Appendices - February 2014 - Summary Assessment Tables Kirtling Street APP131.01.17 ES Update Report Appendices - February 2014 - Summary Assessment Tables Heathwall Pumping Station APP131.01.18 ES Update Report Appendices - February 2014 - Summary Assessment Tables Albert Embankment Foreshore APP131.01.19 ES Update Report Appendices - February 2014 - Summary Assessment Tables Victoria Embankment Foreshore APP131.01.20 ES Update Report Appendices - February 2014 - Visualisations - Victoria APP131.01.21 ES Update Report Appendices - February 2014 - Victoria Embankment Foreshore Vessel Relocation APP131.01.22 ES Update Report Appendices - February 2014 - Summary Assessment Tables Blackfriars Bridge Foreshore APP131.01.23 ES Update Report Appendices - February 2014 - Blackfriars Bridge Foreshore Vessel Relocations APP131.01.24 ES Update Report Appendices - February 2014 - Summary Assessment Tables Shad Thames Pumping Station APP131.01.25 ES Update Report Appendices - February 2014 - Summary Assessment Tables Chambers Wharf APP131.01.26 ES Update Report Appendices - February 2014 - Summary Assessment Tables King Edward Memorial Park APP131.01.27 ES Update Report Appendices - February 2014 - Summary Assessment Tables Earl Pumping Station APP131.01.28 ES Update Report Appendices - February 2014 - Summary Assessment Tables Deptford Church Street APP131.01.29 ES Update Report Appendices - February 2014 - Summary Assessment Tables Greenwich Pumping Station APP131.01.30 ES Update Report Appendices - February 2014 - Summary Assessment Tables Abbey Mills Pumping Station APP131.01.31 ES Update Report Appendices - February 2014 - Summary Assessment Tables Beckton Sewage Treatment Works APP131.01.32 ES Update Report Appendices - February 2014 - Summary Assessment Tables Minor Works Site APP132 Summary of Additional Mitigation Measures and Revisions to Compensation Policies APP132.01 Summary of Additional Mitigation Measures and Revisions to Compensation Policies - Comparite APP133 Non-Statutory Off-site Mitigation and Compensation Policy APP134 Exceptional Hardship Procedure APP135 Settlement Deed APP136 Settlement Information Paper APP137 Mitigation Route Map - Comparite against 23 September 2013 APP140.01 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Covering Letter

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C91 APP140.02 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Supporting Statement APP140.02.01 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Supporting Statement Appendix A schedule of potential sites APP140.02.02 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Supporting Statement Appendix B(i) land based plans APP140.02.03 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Supporting Statement Appendix B(ii) Foreshore Plans APP140.03 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Schedule of Land APP140.04 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Plans of Affected Sites APP140.05 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Supplementary Supporting Information APP140.06 Application for Certificates in Respect of Compulsory Acquisition of Open Space and Rights over Open Space - Clarifications Regarding Valuation References APP147 Covering Letter relating to APP131 - APP131.01.32 APP148 Covering Letter 17 February 2014 APP149 Section 106 Agreement - London Borough of Wandsworth APP150 Noise Limits Discussion Paper - (Late submission) APP151 Letter with additional information to 12 February 2014 SoCG with Historic Buildings and Monuments Commission for England (English Heritage) APP152 Offsite Mitigation Discussion Paper - (Late submission) APP153 Overarching Archaeological Written Scheme of Investigation (OAWSI) APP154 Letter with additional information to 12 February 2014 SoCG with the Environment Agency APP155 Covering Letter 19 February 2014 (Late submission) Other submissions from other Interested Parties REP356 British Telecommunications plc SoCG REP357 LB Lewisham SoCG REP358 Mayor of London SoCG REP359 Network Rail Infrastructure Ltd SoCG REP360 Port of London Authority with Cory Environment SoCG REP361 Port of London Authority with London Duck Tours SoCG REP362 Port of London Authority, LB Southwark, LB Newham SoCG REP363 Port of London Authority SoCG REP364 Cory Environmental SoCG(Late submission) REP365 Stop the Shaft REP366 Marine Management Organisation REP367 LB Hammersmith and Fulham REP368 Thamesbank

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C92 REP369 LB Southwark REP370 SYR08 Save Your Riverside REP371 Wrayburn Residents Together REP372 85 Albert Embankment REP373 Delia Gaze REP374 EA18 Environment Agency REP375 Assael Architecture Limited ExA Question 2 REP376 LBLew03 LB Lewisham first written questions response REP377 COL20 City of London Corporation REP378 National Grid Gas plc and National Grid Electricity Transmission plc REP379 LB Tower Hamlets REP380 Thamesbank objection to extending the examination REP381 Minerva (Wandsworth) Limited REP382 Glendola Leisure Limited - (Late submission) Correspondence regarding the hearings and written summaries of cases put orally and responses to matters arising at hearings 29 January - 7 February 30 January OF hearing REP383 Anthony Williams REP384 Carnwath Road Coalition REP385 Stop the Shaft 3 Feburary OF hearing REP386 18612.06 Andrew Whetnall REP387 Cllr Anood Al-Samerai REP388 Cllr Eliza Mann REP389 Larry Broomhead on behalf of Wrayburn Residents' Together REP390 Thamesbank REP391 Rt Hon Simon Hughes MP (Late submission) REP392 Philip Miller 4/5 February IS hearing REP393 STJMS05 St James Group Limited REP394 Network Rail Infrastructure Limited REP395 Applicant's expert witness biographies REP396 LB Southwark expert witness biographies REP397 FTWMCL012 Free Trade Wharf Management Company Limited REP398 Applicant's letter referred to in the agenda for the Issue Specific hearing relating to Noise and Vibration APP115.01 Applicant's written summaries of the cases put orally and responses to matters arising at the hearings held on 4 and 5 February 2014 5 February OF hearing REP399 Roland Gilmore REP400 Vanessa Mackness REP401 Andrew Lincoln REP402 Harry Richardson REP403 Dame Joan Ruddock (MP) REP404 Sue Lawes part 1 of 4 REP405 Sue Lawes part 2 of 4 REP406 Sue Lawes part 3 of 4

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C93 REP407 Sue Lawes part 4 of 4 REP408 Thamesbank REP409 Graham Stevens - (Late submission) APP115.04 Applicant's written submission following the Open Floor hearing at Deptford on 5 February 2014 6/7 February IS hearing REP410 Transport for London REP411 LB Southwark REP412 Transport for London expert witness biographies APP146 Applicant's expert witness biographies APP115.02 Applicant's written summaries of the cases put orally and responses to matters arising at the hearings held on 6 February 2014 APP115.03 Applicant's written summaries of the cases put orally and responses to matters arising at the hearings held on 7 February 2014 3 March 2014 Deadline

Applicant's submissions APP117 Required Documents Schedule APP118 Drawing Schedule APP120.01 Plans referred to in final draft DCO as submitted to ExA 3 March - Section 1 - Work Plans APP120.02 Plans referred to in final draft DCO as submitted to ExA 3 March - Section 2 - Land Plans - A APP120.02 Plans referred to in final draft DCO as submitted to ExA 3 March - Section 2 - Land Plans - B APP120.03 Plans referred to in final draft DCO as submitted to ExA 3 March - Section 3 - Access Plans APP120.04 Plans referred to in final draft DCO as submitted to ExA 3 March - Section 4.1 - Approved Plans APP120.05 Plans referred to in final draft DCO as submitted to ExA 3 March - Section 4.2 - Approved Plans APP120.06 Plans referred to in final draft DCO as submitted to ExA 3 March - Sections 5 to 29 - Other Plans APP138.01 Book of Reference - Change Log APP138.02 Book of Reference - City of Westminster (parts 1 to 5) APP138.03 Book of Reference - City of London (parts 1 to 5) APP138.04 Book of Reference - London Borough of Ealing (parts 1 to 5) APP138.05 Book of Reference - Royal Borough of Greenwich (parts 1 to 5) APP138.06 Book of Reference - London Borough of Hammersmith and Fulham (parts 1 to 5) APP138.07 Book of Reference - London Borough of Hounslow (parts 1 to 5) APP138.08 Book of Reference - Royal Borough of Kensington and Chelsea (parts 1 to 5) APP138.09 Book of Reference - London Borough of Lambeth (parts 1 to 5)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C94 APP138.10 Book of Reference - London Borough of Lewisham (parts 1 to 5) APP138.11 Book of Reference - London Borough of Newham (parts 1 to 5) APP138.12 Book of Reference - London Borough of Richmond upon Thames (parts 1 to 5) APP138.13 Book of Reference - London Borough of Southwark (parts 1 to 5) APP138.14 Book of Reference - London Borough of Tower Hamlets (parts 1 to 5) APP138.15 Book of Reference - London Borough of Wandsworth (parts 1 to 5) APP139.01 Order Land Schedule - City of Westminster APP139.02 Order Land Schedule - City of London Corporation APP139.03 Order Land Schedule - London Borough of Ealing APP139.04 Order Land Schedule - Royal Borough of Greenwich APP139.05 Order Land Schedule - London Borough of Hammersmith and Fulham APP139.06 Order Land Schedule - London Borough of Hounslow APP139.07 Order Land Schedule - Royal Borough of Kensington and Chelsea APP139.08 Order Land Schedule - London Borough of Lambeth APP139.09 Order Land Schedule - London Borough of Lewisham APP139.10 Order Land Schedule - London Borough of Newham APP139.11 Order Land Schedule - London Borough of Richmond upon Thames APP139.12 Order Land Schedule - London Borough of Southwark APP139.13 Order Land Schedule - London Borough of Tower Hamlets APP139.14 Order Land Schedule - London Borough of Wandsworth APP141 Groundwater Environment Management - Dewatering and Monitoring Strategy APP142 Excavated Material and Waste Commitments APP156 Covering Letter 03 March 2014 APP157 Written summaries of cases put orally and responses to matters arising at the hearings held 20 February 2014 APP158 Written summaries of cases put orally and responses to matters arising at the hearings held 21 February 2014 APP159.01 3 March 2014 update to SoCG - London Borough of Lewisham APP159.02 3 March 2014 update to SoCG - London Borough of Southwark APP159.03 3 March 2014 update to SoCG - Transport for London APP159.04 3 March 2014 update to SoCG - Network Rail APP159.05 3 March 2014 update to SoCG - Port of London Authority APP159.06 3 March 2014 update to SoCG - Marine Management Organisation APP159.07 3 March 2014 update to SoCG - British Telecommunications plc APP159.08 SoCG - Cory Environmental Limited APP159.09 SoCG - Environment Agency APP159.10 3 March 2014 update to SoCG - Royal Borough of Kensington and Chelsea

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C95 APP160 Response to the ExA's request for information - R50 - Air Quality and Emissions APP161 Response to the ExA's request for information - R51 - Biodiversity, Biological Environment and Ecology APP162 Response to the ExA's request for information - R52 - Design, Landscape and Visual Impact APP163 Response to the ExA's request for information - R53 - DCO Drafting and Related Matters APP164 Response to the ExA's request for information - R54 - Flood risk and Climate Change APP165 Response to the ExA's request for information - R55 - Historic Environment APP166 Response to the ExA's request for information - R56 - Land Use including Regeneration and Open Space APP167 Response to the ExA's request for information - R57 - Noise and Disturbance APP168 Response to the ExA's request for information - R58 - Other Matters APP169 Response to the ExA's request for information - R59 - Site Selection and Drive Strategy APP170 Response to the ExA's request for information - R60 - Socio-economic Effects APP171 Response to the ExA's request for information - R61 - Traffic, Travel and Transportation APP172 Response to the ExA's request for information - R62 - Waste Management APP173 Response to the ExA's request for information - R63 - Water Quality and Resources APP174 Letter from The Crown Estate regarding Section 135 of the Planning Act 2008 APP175 Letter from The Duchy of Cornwall regarding Section 135 of the Planning Act 2008 APP176 Letter from the Foreign and Commonwealth Office regarding Section 135 of the Planning Act 2008 APP177.01 The Applicant's Draft (Thames Tideway Tunnel) DCO - Drafting Notes APP177.02 The Applicant's Draft (Thames Tideway Tunnel) DCO - Revised 3 March 2014 APP177.02 The Applicant's Draft (Thames Tideway Tunnel) DCO - Comparite 12 February 2014 APP177.02 The Applicant's Draft (Thames Tideway Tunnel) DCO - Comparite 28 February 2013 APP178.01 CoCP Part A General Requirements - Revised 3 March 2014 APP178.02 CoCP Part A General Requirements - Comparite 12 February 2014 APP178.03 CoCP Part B Site Specific Requirements -Acton Storm Tanks - Revised 3 March 2014 APP178.04 CoCP Part B Site Specific Requirements -Acton Storm Tanks - Comparite 12 February 2014 APP178.05 CoCP Part B Site Specific Requirements - Hammersmith Pumping Station - Revised 3 March 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C96 APP178.06 CoCP Part B Site Specific Requirements - Hammersmith Pumping Station - Comparite 12 February 2014 APP178.07 CoCP Part B Site Specific Requirements - Barn Elms - Revised 3 March 2014 APP178.08 CoCP Part B Site Specific Requirements - Barn Elms - Comparite 12 February 2014 APP178.09 CoCP Part B Site Specific Requirements - Putney Embankment Foreshore - Revised 3 March 2014 APP178.10 CoCP Part B Site Specific Requirements - Putney Embankment Foreshore - Comparite 12 February 2014 APP178.11 CoCP Part B Site Specific Requirements - Dormay Street - Revised 3 March 2014 APP178.12 CoCP Part B Site Specific Requirements - Dormay Street - Comparite 12 February 2014 APP178.13 CoCP Part B Site Specific Requirements - King George's Park - Revised 3 March 2014 APP178.14 CoCP Part B Site Specific Requirements - King George's Park - Comparite 12 February 2014 APP178.15 CoCP Part B Site Specific Requirements - Carnwath Road Riverside - Revised 3 March 2014 APP178.16 CoCP Part B Site Specific Requirements - Carnwath Road Riverside - Comparite 12 February 2014 APP178.17 CoCP Part B Site Specific Requirements - Falconbrook Pumping Station - Revised 3 March 2014 APP178.18 CoCP Part B Site Specific Requirements - Falconbrook Pumping Station - Comparite 12 February 2014 APP178.19 CoCP Part B Site Specific Requirements - Cremorne Wharf Depot - Revised 3 March 2014 APP178.20 CoCP Part B Site Specific Requirements - Cremorne Wharf Depot - Comparite 12 February 2014 APP178.21 CoCP Part B Site Specific Requirements - Chelsea Embankment Foreshore - Revised 3 March 2014 APP178.22 CoCP Part B Site Specific Requirements - Chelsea Embankment Foreshore - Comparite 12 February 2014 APP178.23 CoCP Part B Site Specific Requirements - Kirtling Street - Revised 3 March 2014 APP178.24 CoCP Part B Site Specific Requirements - Kirtling Street - Comparite 12 February 2014 APP178.25 CoCP Part B Site Specific Requirements - Heathwall Pumping Station - Revised 3 March 2014 APP178.26 CoCP Part B Site Specific Requirements - Heathwall Pumping Station - Comparite 12 February 2014 APP178.27 CoCP Part B Site Specific Requirements - Albert Embankment Foreshore - Revised 3 March 2014 APP178.28 CoCP Part B Site Specific Requirements - Albert Embankment Foreshore - Comparite 12 February 2014 APP178.29 CoCP Part B Site Specific Requirements - Victoria Embankment Foreshore - Revised 3 March 2014 APP178.30 CoCP Part B Site Specific Requirements - Victoria Embankment Foreshore - Comparite 12 February 2014 APP178.31 CoCP Part B Site Specific Requirements - Blackfriars Bridge Foreshore - Revised 3 March 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C97 APP178.32 CoCP Part B Site Specific Requirements - Blackfriars Bridge Foreshore - Comparite 12 February 2014 APP178.33 CoCP Part B Site Specific Requirements - Shad Thames Pumping Station - Revised 3 march 2014 APP178.34 CoCP Part B Site Specific Requirements - Shad Thames Pumping Station - Comparite 12 February 2014 APP178.35 CoCP Part B Site Specific Requirements - Chambers Wharf - Revised 3 March 2014 APP178.36 CoCP Part B Site Specific Requirements - Chambers Wharf - Comparite 12 February 2014 APP178.37 CoCP Part B Site Specific Requirements - King Edward Memorial Park Foreshore - Revised 3 March 2014 APP178.38 CoCP Part B Site Specific Requirements - King Edward Memorial Park Foreshore - Comparite 12 February 2014 APP178.39 CoCP Part B Site Specific Requirements - Earl Pumping Station - Revised 3 March 2014 APP178.40 CoCP Part B Site Specific Requirements - Earl Pumping Station - Comparite 12 February 2014 APP178.41 CoCP Part B Site Specific Requirements - Deptford Church Street - Revised 3 March 2014 APP178.42 CoCP Part B Site Specific Requirements - Deptford Church Street - Comparite 12 February 2014 APP178.43 CoCP Part B Site Specific Requirements - Greenwich Pumping Station - Revised 3 March 2014 APP178.44 CoCP Part B Site Specific Requirements - Greenwich Pumping Station -Comparite 12 February 2014 APP178.45 CoCP Part B Site Specific Requirements - Abbey Mills Pumping Station - Revised 3 March 2014 APP178.46 CoCP Part B Site Specific Requirements - Abbey Mills Pumping Station - Comparite 12 February 2014 APP178.47 CoCP Part B Site Specific Requirements - Beckton Sewage Treatment Works - Revised 3 March 2014 APP178.48 CoCP Part B Site Specific Requirements - Beckton Sewage Treatment Works - Comparite 12 February 2014 APP178.49 CoCP Part B Site Specific Requirements - Bekesbourne Street - Revised 3 March 2014 APP178.50 CoCP Part B Site Specific Requirements - Bekesbourne Street - Comparite 12 February 2014 APP179.01 Design Principles - Revised 3 March 2014 APP179.01 Design Principles - Comparite 12 February 2014 APP179.01 Design Principles - Comparite 28 February 2014 APP180.01 River Transport Strategy - Drafting Notes APP180.02 River Transport Strategy - Update 3 March 2014 APP180.03 River Transport Strategy - Comparite 12 February 2014 APP181 Unilateral Undertaking for Securing Noise Mitigation and Compensation Policies APP182 Legal Agreement for Securing Noise Mitigation and Compensation Policies APP183 Legal Agreement with River Regulators (PLA, EA and MMO) APP184.01 ES Update Report - 3 March 2014 APP184.01.01 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Project Wide

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C98 APP184.01.02 ES Update report Appendices - 3 March 2014 - Updated ES Vol.3 Project Wide Effects Sec.14 Surface Water APP184.01.03 ES Update report Appendices - 3 March 2014 - Sediment Fluxes in the Tidal Thames APP184.01.04 ES Update report Appendices - 3 March 2014 - Scour and Accretion Strategy - Temporary and Permanent Works APP184.01.05 ES Update report Appendices - 3 March 2014 - Summary of Changes Between ES and the ES Update Report APP184.01.06 ES Update report Appendices - 3 March 2014 - The Treatment of Operational Derogations in the ES APP184.01.07 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Acton Storm Tanks APP184.01.08 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Hammersmith Pumping Station APP184.01.09 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Barn Elms APP184.01.10 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Putney Embankment Foreshore APP184.01.11 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Dormay Street APP184.01.12 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - King George's Park APP184.01.13 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Carnwath Road Riverside APP184.01.14 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Falconbrook Pumping Station APP184.01.15 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Cremorne Wharf Depot APP184.01.16 ES Update report Appendices - 3 March 2014 - Summary Assessment Tables - Chelsea Embankment Foreshore APP184.01.17 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables - Kirtling Street APP184.01.18 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables - Heathwall Pumping Station APP184.01.19 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables - Albert Embankment Foreshore APP184.01.20 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables - Victoria Embankment Foreshore APP184.01.21 ES Update Report Appendices - 3 March 2014 - Visualisations - Victoria Embankment Foreshore APP184.01.22 ES Update Report Appendices - 3 March 2014 - Victoria Embankment Foreshore - Vessel Relocation APP184.01.23 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables - Blackfriars Bridge Foreshore APP184.01.24 ES Update Report Appendices - 3 March 2014 - Blackfriars Bridge Foreshore - Vessel Relocations APP184.01.25 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Shad Thames Pumping Station APP184.01.26 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Chambers Wharf APP184.01.27 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables King Edward Memorial Park

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C99 APP184.01.28 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Earl Pumping Station APP184.01.29 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Deptford Church Street APP184.01.30 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Greenwich Pumping Station APP184.01.31 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Abbey Mills Pumping Station APP184.01.32 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Beckton Sewage Treatment Works APP184.01.33 ES Update Report Appendices - 3 March 2014 - Summary Assessment Tables Minor Works Site APP184.02 ES Update Report - Comparite 14 February 2014 APP185 Summary of Additional Mitigation Measures and Revisions to Compensation policies APP186 Non-Statutory Off-site Mitigation and Compensation Policy APP187 Offsite Mitigation Paper - Update 3 March 2014 APP188 Noise Limits Paper - Update 3 March 2014 APP189 Exceptional Hardship Procedure APP190 Settlement Deed APP191 Settlement Information Paper APP192 Mitigation Route Map APP193 Section 127 Schedule APP194 Section 138 Schedule APP195 Overarching Archaeological Written Scheme of Investigation APP196 ExA Request for outstanding evidence and/ or Alternative Drafting (Item 24) 15 November 2013 IS hearing Other Interested Party submissions REP413 Larry Broomhead on behalf of Wrayburn Residents Together REP414 Marc Hearn REP415 Mark Reynolds REP416 Brian Chadwick REP417 Roland Gilmore REP418 UK Power Networks REP419 Energetics REP420 GTC Pipelines Limited REP421 Kahair Properties Ltd REP422 Astra Spyrou (LB Lambeth) REP423 EH09 English Heritage REP424 Margarette Lincoln REP425 Richard Bull on behalf of Dioceses of Southwark and Others REP426 RB Kensington and Chelsea REP427 St George REP428 Virgin Media Limited REP429 Paul Weston for Hermitage Community Moorings REP430 85 Albert Embankment REP431 18612.08 Andrew Whetnall REP432 CRR-05 Ann Rosenberg on behalf of the Carnwath Road Coalition

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C100 REP433 Arhag Housing REP434 British Telecommunications plc REP435 COL22 & COL23 City of London Corporation REP436 WCC05 City of Westminster REP437 Cllr Anood Al-Samerai REP438 Cory Environmental REP439 David Starkie REP440 EA21 and EA22 Environment Agency REP441 Eversheds on behalf of Lee Ranson REP442 FTWMCL012 Free Trade Wharf Management Company Limited REP443 LR16712-05.1 Livett's Launches REP444 LB Hammersmith and Fulham REP445 LB Lewisham REP446 LB Newham REP447 LB Tower Hamlets REP448 LB Wandsworth REP449 LB Southwark (Late submission) REP450 London Duck Tours REP451 Marine Management Organisation REP452 Mark Hale and May Hale REP453 Mayor of London REP454 Minerva (Wandsworth) Limited REP455 Port of London Authority REP456 SYR09 Save Your Riverside REP457 STJMS06 St James Group Ltd REP458 Sue Lawes REP459 SQL7 Surrey Quays Limited REP460 Thamesbank REP461 The Mercers' Company and St Paul's School REP462 Transport for London REP463 Thomas Bender on behalf of CABE at the Design Council Additional submissions withdrawing or qualifying objections to the Application - received after the 3 March deadline REP464 Free Trade Wharf Management Company REP465 National Grid Gas plc and National Grid Electricity Transmission plc REP466 UK Power Networks plc REP467 Canal and River Trust REP468 Chris Poll REP469 Network Rail Infrastructure Limited REP470 Port of London Authority REP471 Diocese of Southwark and Others REP472 Minerva (Wandsworth) Limited REP473 The Mercers' Company and St Paul's School 11 March 2014 Deadline

Applicant's final written responses and other submissions APP197 Covering Letter 11 March 2014

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C101 APP198.02 Response to the Andrew Whetnall 3 March 2014 submission APP198.03 Response to the Ann Rosenberg on behalf of Carnwath Road Coalition 3 March 2014 submission APP198.04 Response to the Anthony Alexander on behalf of Arhag Housing 3 March 2014 submission APP198.05 Response to the Brian Chadwick 3 March 2014 submission APP198.06 Response to the British Telecommuncations plc 3 March 2014 submission APP198.07 Response to the City of London Corporation 3 March 2014 submission APP198.08 Response to the City of Westminster 3 March 2014 submission APP198.09 Response to the Cory Environmental 3 March 2014 submission APP198.10 Response to the Councillor Anood Al-Samerai 3 March 2014 submission APP198.11 Response to the David Starkie 3 March 2014 submission APP198.12 Response to the Historic Buildings and Monuments Commission for England (English Heritage)3 March 2014 submission APP198.13 Response to the Environment Agency 3 March 2014 submission APP198.14 Response to the Eversheds on behalf of Luna House 3 March 2014 submission APP198.15 Response to the Free Trade Wharf Management Company 3 March 2014 submission APP198.16 Response to the Hermitage Community Moorings 3 March 2014 submission APP198.18 Response to the Larry Broomhead on behalf of Wrayburn Residents Together 3 March 2014 submission APP198.19 Response to the Livett's Launches 3 March 2014 submission APP198.20 Response to the London Borough of Hammersmith and Fulham 3 March 2014 submission APP198.21 Response to the London Borough of Lambeth 3 March 2014 submission APP198.22 Response to the London Borough of Lewisham 3 March 2014 submission APP198.23 Response to the London Borough of Newham 3 March 2014 submission APP198.24 Response to the London Borough of Southwark 3 March 2014 submission APP198.25 Response to the London Borough of Tower Hamlets 3 March 2014 submission APP198.26 Response to the London Borough of Wandsworth 3 March 2014 submission APP198.27 Response to the London Duck Tours 3 March 2014 submission APP198.28 Response to the Marc Hearn 3 March 2014 submission APP198.29 Response to the Margarette Lincoln 3 March 2014 submission

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C102 APP198.30 Response to the Marine Management Organisation 3 March 2014 submission APP198.31 Response to the Mark and May Hale 3 March 2014 submission APP198.32 Response to the Port of London Authority 3 March 2014 submission APP198.33 Response to the Roland Gilmore 3 March 2014 submission APP198.34 Response to the Save Your Riverside 3 March 2014 submission APP198.35 Response to the St George 3 March 2014 submission APP198.36 Response to the St James Group 3 March 2014 submission APP198.37 Response to the Sue Lawes 3 March 2014 submission APP198.38 Response to the Surrey Quays Limited 3 March 2014 submission APP198.39 Response to the Thamesbank 3 March 2014 submission APP198.40 Response to the The Mercers Company 3 March 2014 submission APP198.41 Response to the Transport for London 3 March 2014 submission APP199 Guide to the Application APP200 Errata APP201 Section 127 Schedule APP202 Section 138 Schedule APP203.01 Mitigation Route Map - 11 March 2014 APP203.02 Mitigation Route Map - Comparite against 3 March 2014 APP204.01 The Applicant's Draft (Thames Tideway Tunnel) DCO - Drafting Notes APP204.02 The Applicant's Draft (Thames Tideway Tunnel) DCO - 11 March 2014 APP204.03 The Applicant's Draft (Thames Tideway Tunnel) DCO - Comparite against 3 March 2014 APP204.04 The Applicant's Draft (Thames Tideway Tunnel) DCO - Comparite against 28 February 2013 APP205.01 Code of Construction Practice Part A General Requirements - 11 March 2014 APP205.02 Code of Construction Practice Part A General Requirements - Comparite against 3 March 2014 (Extract) APP206.01 Design Principles - 11 March 2014 APP206.02 Design Principles - Comparite against 3 March 2014 (Extract) APP206.03 Design Principles - Comparite against 28 February 2013 (Extract) APP207.01 River Transport Strategy - Drafting Notes APP207.02 River Transport Strategy - Update 11 March 2014 APP207.03 River Transport Strategy - Comparite to 3 March 2014 APP208.01 Environmental Statement Update Report - 11 March 2014 APP208.01.01 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables - Project wide APP208.01.02 ES Update Report Appendices - 11 March 2014 - Updated ES Vol.3 Project Wide Effects Sec.14 Surface Water APP208.01.03 ES Update Report Appendices - 11 March 2014 - Sediment Fluxes in the Tidal Thames

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C103 APP208.01.04 ES Update Report Appendices - 11 March 2014 - Scour and Accretion Strategy - Temporary and Permanent Works APP208.01.05 ES Update Report Appendices - 11 March 2014 - Summary of Changes Between ES and the ES Update Report APP208.01.06 ES Update Report Appendices - 11 March 2014 - The Treatment of Operational Derogations in the ES APP208.01.07 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Acton Storm Tanks APP208.01.08 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Hammersmith Pumping Station APP208.01.09 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Barn Elms APP208.01.10 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Putney Embankment Foreshore APP208.01.11 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Dormay Street APP208.01.12 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables King George's park APP208.01.13 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Carnwath Road Riverside APP208.01.14 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Falconbrook Pumping Station APP208.01.15 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Cremorne Wharf Depot APP208.01.16 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Chelsea Embankment Foreshore APP208.01.17 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Kirtling Street APP208.01.18 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Heathwall Pumping Station APP208.01.19 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Albert Embankment Foreshore APP208.01.20 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Victoria Embankment Foreshore APP208.01.21 ES Update Report Appendices - 11 March 2014 - Visualisations - Victoria Embankment Foreshore APP208.01.22 ES Update Report Appendices - 11 March 2014 - Victoria Embankment Foreshore Vessel Relocation APP208.01.23 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Blackfriars Bridge Foreshore APP208.01.24 ES Update Report Appendices - 11 March 2014 - Blackfriars Bridge Foreshore Vessel Relocations APP208.01.25 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Shad Thames Pumping Station APP208.01.26 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Chambers Wharf APP208.01.27 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Kind Edward Memorial Park APP208.01.28 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Earl Pumping Station APP208.01.29 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Deptford Church Street

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C104 APP208.01.30 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Greenwich Pumping Station APP208.01.31 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Abbey Mills Pumping Station APP208.01.32 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Beckton Sewage Treatment Works APP08.01.33 ES Update Report Appendices - 11 March 2014 - Summary Assessment Tables Minor Works Site APP208.02 Environmental Statement Update Report - Comparite with 3 March 2014 APP209.01 Legal Agreement and Section 106 Unilateral Undertaking - Covering Note APP209.02 Legal Agreement and Section 106 Unilateral Undertaking - Drafting Notes APP209.03 Legal Agreement for Securing Off-site Mitigation policies and Resources for Local Planning Authorities APP209.06 Letters to Local Planning Authorities relating to Legal Agreements and Section 106 Unilateral Undertaking APP210.01 Non-Statutory Off-site Mitigation and Compensation Policy -Update 11 March APP210.02 Non-Statutory Off-site Mitigation and Compensation Policy - Comparite against 3 March 2014 APP213.01 Exceptional Hardship Procedure - Update 11 March 2014 APP213.02 Exceptional Hardship Procedure - Comparite against 3 March 2014 APP214.03 Position Statement - Cannon Wharf APP215.01 11 March 2014 Update to SoCG - Transport for London APP215.02 11 March 2014 Update to SoCG - Port of London Authority APP215.03 11 March 2014 Update to SoCG - Environment Agency APP215.04 11 March 2014 Update to SoCG - British Telecommunications plc APP215.05 11 March 2014 Update to SoCG - Cory Environmental APP216 City of London Asset Protection Letter REP503 Applicant's - Letters to the Secretaries of State - s127 and s138 Other Parties final written responses and other submissions REP474 Cory Environmental REP475 EA23 Environment Agency REP476 LB Ealing REP477 Roland Gilmore REP478 18612.09 Andrew Whetnall REP479 CRR-06 Ann Rosenberg on behalf of Carnwath Road Coalition REP480 Cannon Wharf LLP REP481 COL24 and COL25 City of London Corporation REP482 Cllr Anood Al-Samerai REP483 Diocese of Southwark - Parish of St Luke's REP484 Diocese of Southwark - Parish of St Mary's REP485 EH10 English Heritage REP486 FTWMCL012 Free Trade Wharf Management Company Limited

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C105 REP487 Graham Stevens REP488 Hammersmith and Fulham Historic Buildings Group REP489 Larry Broomhead on behalf of Wrayburn Residents Together REP490 LB Hammersmith and Fulham REP491 LB Southwark REP492 LB Tower Hamlets REP493 LB Wandsworth REP494 Marine Management Organisation REP495 Mark and May Hale REP496 SYR10 Save Your Riverside REP497 Thamesbank REP498 Transport for London REP499 Vodafone Limited REP500 Western Riverside Waste Authority REP501 Rt Hon Simon Hughes MP (Late submission) REP502 Graham Stevens 11 March submission resubmitted with amendments

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C106 Hearing and Site Visit Documents

Preliminary Meeting HEA001 Preliminary Meeting Audio Part 1 HEA002 Preliminary Meeting Audio Part 2 Agendas for hearings HEA003 This reference number has not been used HEA004 Agenda for the Issue Specific hearings held 11 - 15 November HEA005 Agenda for the Open Floor hearings held 19 - 23 November HEA006 Agenda for the Compulsory Acquisition hearings held 28 November - 20 December HEA007 Agenda for the First Draft DCO Issue Specific hearing held 26 - 27 November HEA008 Agenda for the Open Floor hearings held 29 January - 5 February HEA009 Agenda for the Compulsory Acquisition hearings held 14 - 17 January HEA010 Agenda for the Second Draft DCO Issue Specific hearing held 20 - 21 January HEA011 Agenda for the Rationale for selection of work sites and drive strategy Issue Specific hearing held 22 - 23 January HEA012 Agenda for the Transport and Traffic Issue Specific hearing held 24 January HEA013 Agenda for the Compulsory Acquisition hearing held 27 - 28 January HEA014 This reference number has not been used HEA015 Agenda for the Noise Issue Specific hearing held 4, 5 and 20 February HEA016 Agenda for the Third DCO Issue Specific hearing held 6, 7 and 21 February Issue Specific hearings relating to the rationale for the selection of work sites and drive strategies matters 11-15 November 2013 HEA017 Carnwath Road Riverside and alternative drive strategy, followed by Barn Elms and Putney Part 1 audio 11 November HEA018 Carnwath Road Riverside and alternative drive strategy, followed by Barn Elms and Putney Part 2 audio 11 November HEA019 Carnwath Road Riverside and alternative drive strategy, followed by Barn Elms and Putney Part 3 audio 11 November HEA020 Chambers Wharf and Alternative Drive Strategy Part 1 audio 12 November HEA021 Chambers Wharf and Alternative Drive Strategy Part 2 audio 12 November HEA022 Chambers Wharf and Alternative Drive Strategy Part 3 audio 12 November

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C107 HEA023 Deptford Church Street Part 1 audio 13 November HEA024 Deptford Church Street Part 2 audio 13 November HEA025 Deptford Church Street Part 3 audio 13 November HEA026 King Edward Memorial Park Part 1 audio 14 November HEA027 King Edward Memorial Park Part 2 audio 14 November HEA028 King Edward Memorial Park Part 3 audio 14 November HEA029 Other submissions on alternative sites proposed by Interested Parties Part 1 audio 15 November HEA030 Other submissions on alternative sites proposed by Interested Parties Part 2 audio 15 November Open Floor hearings 19-23 November 2013 HEA031 Open Floor hearing - Grange Tower Bridge Hotel - session 1 audio 19 November HEA032 Open Floor hearing - Grange Tower Bridge Hotel - session 2 audio 19 November HEA033 Open Floor hearing - The Worx - session 1 audio 20 November HEA034 Open Floor hearing - The Worx - session 2 audio 20 November HEA035 Open Floor hearing - The Worx - session 3 audio 20 November HEA036 Open Floor hearing - The AHOY Centre - session 1 audio 21 November HEA037 Open Floor hearing - The AHOY Centre - session 2 audio 21 November HEA038 Open Floor hearing - Glaziers Hall - sessions 1 (Part 1) audio 22 November HEA039 Open Floor hearing - Glaziers Hall - sessions 1 (Part 2) audio 22 November HEA040 Open Floor hearing - Glaziers Hall - session 2 audio 22 November HEA041 Open Floor hearing - The Queen Elizabeth II Conference Centre - session 1 audio 23 November HEA042 Open Floor hearing - The Queen Elizabeth II Conference Centre - session 2 audio 23 November Issue Specific hearing on DCO, requirements, any s106 undertaking and related LIR matters 26-27 November 2013 HEA043 Issue Specific hearing - First DCO audio 26 November Part 1 HEA044 Issue Specific hearing - First DCO audio 26 November Part 2 HEA045 Issue Specific hearing - First DCO audio 26 November Part 3 HEA046 Issue Specific hearing - First DCO audio 27 November Part 1 HEA047 Issue Specific hearing - First DCO audio 27 November Part 2 HEA048 Issue Specific hearing - First DCO audio 27 November Part 3

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C108 Compulsory Acquisition hearings 28 November - 20 December 2013 HEA049 Compulsory Acquisition hearing audio 28 November Part 1 HEA050 Compulsory Acquisition hearing audio 28 November Part 2 HEA051 Compulsory Acquisition hearing audio 28 November Part 3 HEA052 Compulsory Acquisition hearing audio 29 November Part 1 HEA053 Compulsory Acquisition hearing audio 29 November Part 2 HEA054 Compulsory Acquisition hearing audio 03 December Part 1 HEA055 Compulsory Acquisition hearing audio 03 December Part 2 HEA056 Compulsory Acquisition hearing audio 03 December Part 3 HEA057 Compulsory Acquisition hearing audio 04 December Part 1 HEA058 Compulsory Acquisition hearing audio 04 December Part 2 HEA059 Compulsory Acquisition hearing audio 04 December Part 3 HEA060 Compulsory Acquisition hearing audio 05 December Part 1 HEA061 Compulsory Acquisition hearing audio 05 December Part 2 HEA062 Compulsory Acquisition hearing audio 05 December Part 3 HEA063 Compulsory Acquisition hearing audio 05 December Part 4 HEA064 Compulsory Acquisition hearing audio 06 December Part 1 HEA065 Compulsory Acquisition hearing audio 06 December Part 2 HEA066 Compulsory Acquisition hearing audio 06 December Part 3 HEA067 Compulsory Acquisition hearing audio 06 December Part 4 HEA068 Compulsory Acquisition hearing audio 10 December Part 1 HEA069 Compulsory Acquisition hearing audio 10 December Part 2 HEA070 Compulsory Acquisition hearing audio 10 December Part 3 HEA071 Compulsory Acquisition hearing audio 10 December Part 4 HEA072 Compulsory Acquisition hearing audio 11 December Part 1 HEA073 Compulsory Acquisition hearing audio 11 December Part 2 HEA074 Compulsory Acquisition hearing audio 11 December Part 3 HEA075 Compulsory Acquisition hearing audio 12 December Part 1 HEA076 Compulsory Acquisition hearing audio 12 December Part 2 HEA077 Compulsory Acquisition hearing audio 13 December Part 1 HEA078 Compulsory Acquisition hearing audio 13 December Part 2 HEA079 Compulsory Acquisition hearing audio 17 December HEA080 Compulsory Acquisition hearing audio 18 December Part 1 HEA081 Compulsory Acquisition hearing audio 18 December Part 2 HEA082 Compulsory Acquisition hearing audio 19 December HEA083 Compulsory Acquisition hearing audio 20 December Part 1 HEA084 Compulsory Acquisition hearing audio 20 December Part 2 Compulsory Acquisition hearings including but not limited to Statutory Undertaker and special category land, interests and apparatus 14 - 17 January 2014 HEA085 Compulsory Acquisition hearing audio 14 January Part 1 HEA086 Compulsory Acquisition hearing audio 14 January Part 2 HEA087 Compulsory Acquisition hearing audio 15 January Part 1 HEA088 Compulsory Acquisition hearing audio 15 January Part 2 HEA089 Compulsory Acquisition hearing audio 15 January Part 3 HEA090 Compulsory Acquisition hearing audio 16 January Part 1 HEA091 Compulsory Acquisition hearing audio 16 January Part 2 HEA092 Compulsory Acquisition hearing audio 17 January Part 1 (AM) HEA093 Compulsory Acquisition hearing audio 17 January Part 2 (AM)

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C109 HEA094 Compulsory Acquisition hearing audio 17 January (PM) HEA095 Planning Inspectorate note regarding incomplete audio recording on Friday 17 January Issue Specific hearings on DCO, requirements, any s106 undertaking, on the rationale for the selection of work sites and drive strategies and on Traffic and Transport. Compulsory Acquisition hearings including but not limited to Statutory Undertaker and special category land, interests and apparatus 20 - 28 January 2014 HEA096 Issue Specific hearing - Second DCO audio 20 January AM HEA097 Issue Specific hearing - Second DCO audio 20 January PM HEA098 Issue Specific hearing - Second DCO audio 21 January AM HEA099 Issue Specific hearing - Second DCO audio 21 January PM Part 1 HEA100 Issue Specific hearing - Second DCO audio 21 January PM Part 2 HEA101 Issue Specific hearing - site selection and drive strategy audio 22 January AM Part 1 HEA102 Issue Specific hearing - site selection and drive strategy audio 22 January AM Part 2 HEA103 Issue Specific hearing - site selection and drive strategy audio 22 January PM Part 1 HEA104 Issue Specific hearing - site selection and drive strategy audio 22 January PM Part 2 HEA105 Issue Specific hearing - site selection and drive strategy audio 22 January PM Part 3 HEA106 Issue Specific hearing - site selection and drive strategy audio 23 January AM Part 1 HEA107 Issue Specific hearing - site selection and drive strategy audio 23 January AM Part 2 HEA108 Issue Specific hearing - site selection and drive strategy audio 23 January PM Part 1 HEA109 Issue Specific hearing - site selection and drive strategy audio 23 January PM Part 2 HEA110 Issue Specific hearing - site selection and drive strategy audio 23 January PM Part 3 HEA111 Issue Specific hearing - site selection and drive strategy audio 23 January PM Part 4 HEA112 Issue Specific hearing - Traffic and Transport audio 24 January AM Part 1 HEA113 Issue Specific hearing - Traffic and Transport audio 24 January AM Part 2 HEA114 Issue Specific hearing - Traffic and Transport audio 24 January PM Part 1 HEA115 Issue Specific hearing - Traffic and Transport audio 24 January PM Part 2 HEA116 Compulsory Acquisition hearing audio 27 January AM Part 1 HEA117 Compulsory Acquisition hearing audio 27 January AM Part 2 HEA118 Compulsory Acquisition hearing audio 27 January PM Part 1

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C110 HEA119 Compulsory Acquisition hearing audio 27 January PM Part 2 HEA120 Compulsory Acquisition hearing audio 27 January PM Part 3 HEA121 Compulsory Acquisition hearing audio 28 January AM Part 1 HEA122 Compulsory Acquisition hearing audio 28 January AM Part 2 Open Floor hearings, Issue Specific hearings relating to Noise and Vibration and Issue Specific hearing on DCO, requirements, any s106 undertaking and related LIR matters, Compulsory Acquisition hearings 28 January - 7 February 2014 HEA123 Open Floor hearing - St Paul's Shadwell audio 29 January Part 1 HEA124 Open Floor hearing - St Paul's Shadwell audio 29 January Part 2 HEA125 Open Floor hearing - Hurlingham and Chelsea School audio 30 January Part 1 HEA126 Open Floor hearing - Hurlingham and Chelsea School audio 30 January Part 2 HEA127 Open Floor hearing - Glaziers Hall audio 03 February HEA128 Issue Specific hearing - Noise and Vibration audio 04 February AM Part 1 HEA129 Issue Specific hearing - Noise and Vibration audio 04 February AM Part 2 HEA130 Issue Specific hearing - Noise and Vibration audio 04 February PM Part 1 HEA131 Issue Specific hearing - Noise and Vibration audio 04 February PM Part 2 HEA132 Open Floor hearing - AHOY Centre audio 05 February Part 1 HEA133 Open Floor hearing - AHOY Centre audio 05 February Part 2 HEA134 Open Floor hearing - Deptford Lounge audio 05 February HEA135 Issue Specific hearing - Third DCO audio 06 February AM Part 1 HEA136 Issue Specific hearing - Third DCO audio 06 February AM Part 2 HEA137 Issue Specific hearing - Third DCO audio 06 February AM Part 3 HEA138 Issue Specific hearing - Third DCO audio 06 February AM Part 4 HEA139 Issue Specific hearing - Third DCO audio 07 February AM Part 5 HEA140 Issue Specific hearing - Third DCO audio 07 February AM Part 6 HEA141 Issue Specific hearing - Third DCO audio 07 February PM Part 7 HEA142 Issue Specific hearing - Third DCO audio 07 February PM Part 8

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C111 Adjourned hearings - Issue Specific hearings relating to Noise and Vibration and Issue Specific hearing on DCO, requirements, any s106 undertaking and related LIR matters HEA143 Issue Specific hearing - Noise and Vibration audio 05 February Part 1 HEA144 Issue Specific hearing - Noise and Vibration audio 05 February Part 2 HEA145 Issue Specific hearing - Noise and Vibration audio 05 February Part 3 HEA146 Issue Specific hearing - Noise and Vibration audio 05 February Part 4 HEA147 Issue Specific hearing - Noise and Vibration audio 05 February Part 5 HEA148 Issue Specific hearing - Noise and Vibration audio 20 February AM Part 1 HEA149 Issue Specific hearing - Noise and Vibration audio 20 February AM Part 2 HEA150 Issue Specific hearing - Noise and Vibration audio 20 February PM Part 1 HEA151 Issue Specific hearing - Noise and Vibration audio 20 February PM Part 2 HEA152 Issue Specific hearing - Noise and Vibration audio 20 February PM Part 3 HEA153 Issue Specific hearing - Third DCO audio 21 February AM Part 1 HEA154 Issue Specific hearing - Third DCO audio 21 February AM Part 2 HEA155 Issue Specific hearing - Third DCO audio 21 February PM Part 1 HEA156 Issue Specific hearing - Third DCO audio 21 February PM Part 2 HEA157 Issue Specific hearing - Third DCO audio 21 February PM Part 3 HEA158 Issue Specific hearing - Third DCO audio 21 February PM Part 4 Accompanied Site Visit 29 October 2013 SV001 Plans and timings for the Accompanied Site Visit 29 October 2013 Accompanied Site Visit 29 - 31 January 2014 SV002 Site Visit Itinerary SV003 LB Westminster Site Visit concerns SV004 Battersea Power Station Owning Group request SV005 Free Trade Wharf Management Company request Part 1 SV006 Tower Bridge Yacht and Boat Company request SV007 LB Wandsworth request SV008 Livett's Launches request SV009 Save Your Riverside request SV010 St James Group request SV011 City of London Corporation request SV012 Larry Broomhead request

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C112 SV013 Trafalgar Court Residents request SV014 David Starkie request SV015 Free Trade Wharf Management Company request Part 2 SV016 Paul Haines request SV017 Carnwath Road Coalition request SV018 Elm Quay Court Management Ltd and Elm Quay Freehold Ltd request SV019 Kahair Properties Ltd request SV020 LB Southwark request SV021 LB Tower Hamlets request Accompanied Site Visit 27 February 2014 PD030 Letter dated 20 February regarding timetable amendment and other matters giving notice to Interested Parties of the 27 February ASV

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C113 Other Documents

Adequacy of Consultation OD001 AoC Bexley OD002 AoC Bromley OD003 AoC Camden OD004 AoC City of London Corporation OD005 AoC Croydon OD006 AoC Ealing OD007 AoC Greater London Authority OD008 AoC Hammersmith and Fulham OD009 AoC Hillingdon OD010 AoC Hounslow OD011 AoC Kensington and Chelsea OD012 AoC Lambeth OD013 AoC Lewisham OD014 AoC Merton OD015 AoC Richmond OD016 AoC Southwark OD017 AoC Spelthorne OD018 AoC Tower Hamlets OD019 AoC Wandsworth OD020 AoC Westminster OD021 Other correspondence received in relation to acceptance OD022 AoC Harrow (Late) Applicant's application changes consultation responses OD023 John Pearson OD024 Energetics OD025 Geo Networks Ltd OD026 Lewisham Hospital and Greenwich NHS Trust 1 OD027 Natural England OD028 Port of London Authority OD029 Highways Agency OD030 Total UK Ltd OD031 Wales and West Utilities Section 127 Applications OD032 Applications for certification under s127 and s138 - draft certificates OD033 Applications for certification under s127 and s138 - letters OD034 Applications for certification under s127 and s138 - Required Approvals Bibliography OD035 s127 and s138 revised schedules OD036 s127 and s138 letters and revised schedules OD037 Applicant's clarification of revised schedules to Secretaries of State Section 131/132 Applications OD038 Section 131 and 132 App 1 Covering Letter

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C114 OD039 Section 131 and 132 App 2 supporting statement OD040 Section 131 and 132 App 3 Schedule Land OD041 Section 131 and 132 App 3a Schedule of Land Appendix A OD042 Section 131 and 132 App 3b Schedule of Land- Appendix B i OD043 Section 131 and 132 App 3c Schedule of Land - Appendix B ii OD044 Section 131 and 132 application supplementary supporting information OD045 Section 131 and 132 App 4 Plans of Affected Sites OD046 Section 131 and 132 application clarifications regarding valuation references Applicant's notices of Hearings under Rule 13 APP27.01 Notices of hearings Under Rule 13(6) of the Infrastructure Planning (Examination Procedure) Rules 2013 APP87 Notices of hearings Under Rule 13(6) of the Infrastructure Planning (Examination Procedure) Rules 2013 APP143 Notices of 5 February hearing Under Rule 13(6) of the Infrastructure Planning (Examination Procedure) Rules 2013 Miscellaneous other correspondence OD047 National Grid email regarding PM OD048 National Grid PM Position OD049 Applicant's query regarding advertising proposed changes OD050 Planning Inspectorate's response regarding Applicant's proposed changes procedure OD051 London Legacy Development Corporation status of submission OD052 LB Hammersmith and Fulham letter regarding exam timetable OD053 London Legacy Development Corporation withdrawal of objection to DCO OD054 Royal Mail Group Limited, Royal Mail Estates Limited and Post Office Limited withdrawal of representation OD055 Nerita Properties Limited - Partial withdrawal of objection to the application OD056 Letter to local authorities advising them of the anticipated submission date of the application OD057 Applicant's extension request OD058 Certificates of compliance with s.56 and s.59 of the Planning Act 2008 and Regulation 13 of the Infrastructure EIA Regulations ExA Report on the Implications for European Sites RIES01 Thames Tideway Tunnel RIES

Thames Tideway Tunnel Examining authority's Report of Findings and Conclusions and Recommendation to the Secretaries of State C115