CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

TABLE OF

Julius Berger is proud to celebrate its 50th Anniversary since incorporation as CONTENTS a Nigerian Company. We commemorate this milestone with an ongoing strong commitment to our clients, staff, partners and communities. Building off 4 Chairman’s Introduction our strong history, Julius Berger will continue innovating and advancing to remain a key contributor to ’s 6 Projects Footprint growth and development. 8 Milestones & Achievements

34 Our Social Responsibility

36 Our Innovations for the Future

38 Managing Director’s Closing Note

JULIUS BERGER 50 YEARS | CONTENTS 3 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

Since that historic moment, Julius Berger For Julius Berger, no challenge has been has continued to make huge strides, too big, no job too complex. We have Mutiu Sunmonu all the while adapting to the needs of constructed some of Nigeria’s most the country and its development goals. iconic structures and demanding Chairman Starting with a single bridge project, engineering feats; project after project, swiftly expanding into road construction, we have proven ourselves to be a followed by the construction of ports, reliable partner equipped with the dams, water supply schemes and technical knowhow and organizational industrial plants, and with the conception edge to deliver quality solutions. Such of Abuja as the Federal Capital Territory, excellence has been made possible turnkey construction of infrastructure by the dedication and skill of our staff, and high-rise buildings, then soon after the professionalism and vision of our executing oil & gas and power industry management and by our operational CHAIRMAN’S projects, Julius Berger has transformed foresight and investment into sustainable itself into a provider of comprehensive domestic solutions, underscored by our construction solutions, with an extensive backward integration across key areas of and diverse portfolio covering the areas our value chain and greater group structure. of infrastructure, buildings and industrial INTRODUCTION construction as well as the provision of As I present to you this brochure, I feel facility services. an overwhelming sense of pride and inspiration. I invite you to look back over From a single project team in Nigeria, the past 50 years that have preceded While the signing of the contract for we have grown to become a renowned us, and reflect with us, the significance Nigerian company, one of the country’s of Julius Berger’s contributions on construction of the in 1965 largest private employers, a leader in Nigeria’s physical and economic growth marks Julius Berger’s entry into Nigeria, corporate governance and an industry and on each and every Nigerian alike – it is the company’s incorporation as a pacemaker. Today, Julius Berger sets and envision with us, a future filled with the benchmark for health and safety, even greater possibilities. Nigerian entity, on February 18, 1970, innovation and high standards in that paved the way for the five decades the construction sector – positively supporting key areas of Nigeria’s growth of solid growth and achievement, which and advancement while maintaining a we now commemorate. strong sense of responsibility towards the quality of our work and its greater impact on our fellow Nigerians.

4 CHAIRMAN’S STATEMENT | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | CHAIRMAN’S STATEMENT 5 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

PROJECTS FOOTPRINT

Over the past five decades, Julius Berger has left its mark across all 36 States in Nigeria. We have worked in all geopolitical areas, to reliably deliver quality construction solutions, no matter the scope or challenge. We are proud to have successfully constructed some of the country’s most significant infrastructure, industrial facilities and buildings, combining tried-and-true engineering principles with the latest methodologies and building innovations. Our unique company structure, extensive resources and years of experience support our ability to continue undertaking ambitious and diverse construction projects across Nigeria, including the pioneering of works in remote locations. Julius Berger is committed to continually expanding its reach, to deliver buildings and infrastructure to the highest standards of quality for lasting results.

Airport Expressway

LAGOS ABUJA

Since its pioneer project, the Eko Further to the inauguration of Abuja as Bridge, Julius Berger has remained Nigeria’s new capital in 1991, Julius a pivotal contributor to the growth Berger has reliably supported the FCT and functioning of State. We in realizing its master plan. We have have developed much of the key carried out major construction work, infrastructure including main roads, including for roads, bridges, reservoirs bridges and buildings, which stand and water courses, residential and Admiralty Alexander Link-Bridge Central Bank Lagos Office Petroleum Technology strong in supporting the megacity. administrative buildings, to quite Development Fund literally build the city.

6 PROJECTS FOOTPRINT | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | PROJECTS FOOTPRINT 7 MILESTONES & ACHIEVEMENTS 1965 1968

Julius Berger has played an integral role in building the Julius Berger Tiefbau AG is awarded Commissioning of the Second Mainland foundations for progress and development in Nigeria through the contract for the construction of the Bridge, symbolically named Eko Bridge “Second Mainland Bridge” the construction of major industrial and civil infrastructure. The pioneering design, high quality and We have built important road networks, essential bridges, This milestone marks the beginning of Julius timely completion set standards against Berger’s success story in Nigeria. which Julius Berger is still measured today. vital buildings and key landmarks, all of which augment the achievement of a modern-day Nigeria. We have established numerous manufacturing facilities, which promote local content, increase domestic production and ultimately contribute to Nigeria’s economic growth. And through it all, we have empowered our staff through investments in long term training and education, which not only sharpen their skills, but also contribute to the overall human capital development of Nigeria.

IMAGE ABOVE: Eko Bridge, Lagos

8 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 9 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

Contract award for the vast Lagos Julius Berger Nigeria Ltd. Inner Ring Road system is incorporated Turnkey construction for the Volkswagen assembly plant With this award Julius Berger starts Thus transforming into a Nigerian entity kicks off offering complete projects, from 28km Itoikin-Epe road commissioned one source, comprising planning, as the company begins to execute Julius Berger’s first industrial engineering, preparation, coordination complex and diverse projects nationwide. The road links towns in a particularly contract. Construction includes the and construction. difficult swampy terrain and includes plant facility and ancillary buildings. the construction of four small bridges.

1970 1971 1972 1973 1974 1975 1976

Award for first major project outside of Lagos and first contract for damn construction Works commence on the 920m Repair of the Onitsha Bridge is Falomo Bridge Jebba Road Bridge commissioned The 500m long and 25m high Laminga Dam, completed in just seven weeks with a spillway system, water-treatment plant An integral part of the traffic network plan The road bridge serves as a vital Using a temporary bailey structure, and 48km pipeline distribution network. for Lagos, connecting Kingsway Road on infrastructure opening up the North- the company is able to quickly support Island with Victoria Island, crossing South highway trunk, from Niger Nigeria to reconnect the East and West Five Cowrie Creek. State to . of the country.

10 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 11 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

Tin Can Island Port commissioned, just 18 months after the project’s inception

Close to 6,000 staff work around the clock for months Award for the Sapele Port Warri bypass Award for the Langtang at a stretch to achieve commissioned Water Supply Schemes the unbelievable feat of Comprising six berths, with constructing a modern five general cargo and one Thus completing the Water supply systems for Pankshin port facility against a very roll-on / roll-off platform, port-hinterland route. and Langtang towns, each with challenging time schedule. with a length of 200m each. an earth dam, water treatment plant, storage tanks and 75km of pipelines.

1977 1978 1979 1980 1981

Warri port is completed supporting the development of the oil & gas industry Construction begins on the Delta Steel The port comprises six berths, offering plant in Warri a real transshipment alternative to the Nigeria’s first steel plant and major pillar in bottleneck in Lagos. the government’s industrialization plans. Julius Works begin on the Berger is responsible for the civil works and infrastructure of the later constructs the administration building new capital of Abuja of the Delta Steel Company Ltd. Starting with a Bailey bridge, which enables free movement of larger vehicles and trucks in and out of Abuja, consecutive contracts follow for the Wuse I residential district.

12 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 13 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

As a key influencer of innovation and high standards in construction, major private employer and active corporate citizen, Julius Berger Work on Abuja’s Central Area, Works progress on the Infrastructure of Maitama District and Central Phase I commences New Area Phase II works commences in Abuja has had a significant impact on the country and on its fellow Nigerians. Of Julius Berger’s 20,000 employees, Africa’s longest concrete bridge Includes the design and construction of the 11,000 are at present working on the and the first of its kind, Julius Berger complete infrastructure of 900ha, comprising construction of the new capital, on what builds the New Carter Bridge within a more than 1,200,000m2 of highways, feeders is likely the largest construction site challenging 30-month time schedule. and residential roads, including the construction in all of Africa at the time. of 12 major concrete road bridges.

1982 1983 1985 1986 1987

Work progresses on the Ajaokuta steel plant, Commissioning of the Jos Steel Rolling Mill Commissioning of the Administration Building Ajaokuta Steel part of the government’s heavy industry Ajaokuta Road Bridge Plant ready for occupation The company later constructs the Standard development Flour Mill, including associated buildings and With a length of 2,890m, the bridge The main seven-story building provides office In addition to the massive complex, Julius Berger infrastructure, further expanding its role in construction is carried out using space for some 900 employees, with a also constructs a levee to protect the plant from supporting Nigeria’s industrial development. the span by span wet joints segmental spacious elegant reception hall, the floor the rising water of the Niger in rain season. method – implemented for the first and walls of which are tiled with Nigerian time in Africa. polished granite produced by Julius Berger.

14 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 15 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

PROJECT FACT: Itakpe-Ajaokuta railway project The first meeting held in the commences to connect ore conference centre, the Organisation mines to the steel mills of African Unity summit, is attended by 53 Heads of State. Works for the 51km long railway line includes eleven bridges with spans ranging from 11m to 33m and four road underpasses of Abuja’s International Conference six-meter clearance. Centre is built in record time

Turnkey delivery is achieved in only nine months, in time to host the Organization of African Unity Heads of Government meeting in Nigeria - thus setting the foundation for Abuja to become the ECOWAS headquarters.

1988 1989 1990

Tuga Bridge Awarded Zungeru roads and bridge Julius Berger opens a furniture completed production factory and aluminium Construction of a bridge over the Niger and glass processing subsidiary River and continuation of the road for Construction of a 10km long road in Nigeria 23km to Kaoje. The bridge has a total bypassing the Zungeru town, including length of 780m and total superstructure two bridges. The approach road leads Abumet Nigeria Limited and AFP width of 13.6m. through a rocky hill where about furniture production are established 62,000m³ of rock are blasted and cut. to provide turnkey solutions for building projects, effectively delivering products and services unavailable locally on the market.

16 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 17 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

Julius Berger Nigeria Ltd. Ikot Abasi aluminum smelter Construction of the Louis Edet House, transforms into a public Work progresses on the National Assembly Annex plant commissioned Nigeria Police Force Headquarters limited company Construction of two four-story office buildings Another key industrial project in Eight-story office block on a turnkey basis with interconnected by two pedestrian passages. Julius Berger Nigeria Plc is listed on the the Delta heartland. In addition to all necessary infrastructure, including a power The building is designed to accommodate 400 Nigerian Stock Exchange. the 720m long electrolytic plant, house with all substations and connections. offices and to allow future modernization of the a gas-turbine power plant, a jetty main parliament building without hindrance. and a number of buildings are Completion of construction work for ready for occupation. Nnamdi Azikiwe International Airport, Abuja

1991 1992 1993 1996 1998 1999

Challawa Gorge Dam inaugurated Federal Secretariat Ministry Building commissioned The dam is 7.8km long and 42m high and requires 5.1 million m³ of Turnkey contract for an 81,000m² building filling material. Works also include the complex including 12-story twin towers, construction of a 30m intake tower, 4-6 story annex buildings, restaurant, Work forges ahead on intake main and a 600m long spillway. auditorium, library and car park buildings. Bonny Island

Julius Berger builds the residential area and camp for Nigeria LNG, in addition to the foundations of the plant and a special LNG jetty.

18 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 19 CELEBRATING THE PAST, INNOVATING THE FUTURE

Turnkey contract for Central Bank of Nigeria Head Office building awarded

The 70m high administration Julius Berger commissions building is to be built to the highest new Head Office Building standard and requires extensive in Abuja piling works to stand tall as one Construction of a turnkey of Julius Berger’s first high-rise office complex with a gross building projects (pictured). floor area of 10,500m2. All materials used for the interior 2 finishing and furnishing are 64,000 m GFA locally manufactured, for the and most part by the company. 99.9m high

2000 2001 2002

Dualisation of Otta - Contract awarded for the Construction of the New Atlas Cove jetty in the Abeokuta Road in Ogun Tombia Bridge over the Nun Lagos harbor basin and Lagos gets underway River, opening up Bayelsa EPC Contract for the construction of a berthing and State to development. Dualisation of 60.7km and offloading jetty for 50,000 DWT vessels. The scope rehabilitation of 20km of includes two platforms and a 520m long access existing and highly critical trestle accommodating a service road and pipe racks. road connection, including the construction of thirteen bridges and 1,700m of culverts. Work starts on the Yar’Adua Centre

The conference centre includes a research library, auditorium for approximately 450 people and an exhibition hall.

20 JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 21 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

Completion of National Stadium and Velodrome Construction of Obajana Cement Factory progresses The 60,000 spectator National Stadium meets the requirements Civil works and infrastructure for a of international sport associations, cement plant with a capacity of 7,000t FIFA and IAAF. The aesthetically per day, including structures at the and technically unique Velodrome quarry site, an 8km conveyor belt to the has a capacity of up to 7,000 main plant, power plant buildings and people for multipurpose use. residential area.

2003 2005 2006

Works commence for 36 NNPC mega-filling stations, one per state, to assist in getting Civil works for Train 4, Bonny petrol to motorists nationwide. NLNG get underway

Simultaneously, works progress Contract awarded for Tinapa Business Centre EGTL Escravos Gas-To- on the modernization of the NLNG Administration buildings. Located on Nigeria’s Calabar River – a significant Liquids Project awarded trading hub for West Africa, Tinapa is the single largest purely private infrastructure investment Scope includes the general civil in Africa at this time. works such as earthworks and infrastructure, onshore piling with approximately 1,600 piles, EPC of buildings, administrative and utilities and an 8,800m2 heavy load wharf.

22 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 23 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

CERTIFICATE

DQS GmbH Deutsche Gesellschaft zur Zertifizierung von Managementsystemen

hereby certifies that the company

Head Office

Berger Junction – Utako District P.O. Box 453 Abuja F.C.T Nigeria

has implemented and maintains a Quality Management System.

Scope: Conception, design and engineering, procurement and construction for civil, building, infrastructure and industry projects, facility services and maintenance and provision of technical and administrative services associated with their realization

Through an audit, documented in a report, it was verified that the management system fulfills the requirements of the following standard:

I SO 9001 : 2008

Certificate registration no. 460773 QM08 Date of certification 2010-10-29

Valid until 2013-10-28

Michael Drechsel Jan Böge Managing Director Managing Director

August-Schanz-Straße 21, 60433 Frankfurt am Main 1 / 2

Phase 1 construction begins for the Central Bank Lagos office building Julius Berger achieves ISO 9001:2008 certification The existing facility is torn down to make way for a new 19-story building. Planning is highly Demonstrating that Julius Berger’s complex, given two facts: Bank operations management systems are well Works progress on the rehabilitation and must be maintained and massive piling is equipped to consistently meet expansion of the Airport Expressway in Abuja required without the pile-driving disturbing clients’ needs and that quality the foundations of the adjacent high-rises. The new expressway is planned as a ten-lane is continuously improved. highway across its entire 26.5km length, from the City Gate to the airport entrance.

2007 2008 2009 2010

Construction and Installation of six National Assembly office wings completed Floating Petrol Stations Turnkey construction of two five-story office Design, procurement, turnkey construction buildings, one for the Senate and one for the Julius Berger expands portfolio 2 and shipment of six floating petrol filling House of Representatives, with a GFA of 70,700m . to include Facility Management stations in the Niger Delta area. services

Julius Berger is awarded the contract to build the iconic Admiralty-Alexander Link Bridge

Additionally, work commences on expanding the Lagos-Badagry Road. Both projects are critical parts of Lagos State’s drive to ease traffic congestion in the mega city.

24 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 25 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

Construction on Uyo Ring Road is underway

A dual main carriage way in Uyo town, both sides with service roads, medium, shoulder, kerbs, street lightning, culverts and drains for dewatering, inclusive one flyover. 21km long and will have Julius Berger pioneers pipe jacking Award Procter & Gamble BayCare Plant technology 17 flyovers Located in Agbara, the production plant and 2 The trenchless micro-tunnelling technique warehouse comprise approximately 33,400m upon is implemented for the construction of GFA, built under LEED requirements and several discharge drain projects in Akwa certified accordingly. completion Ibom State.

2011 2012 2012

Escravos Gas to Liquid Project Julius Berger receives several sets HSE record awards for its outstanding contributions to technology Establishment of PrimeTech Design 10 million man-hours worked and innovation in construction and Engineering Nigeria Limited incident free in three years. The African Society Merit The groups Abuja-based Design and Award for contributions to the Engineering arm, working in compliance technological development with the Nigerian Oil and Gas Industry and economic growth of the Content Development Act. Nigerian economy and the BID International Quality Summit Convention Gold Award, in recognition of commitments to quality, leadership, technology and innovation.

26 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 27 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

Admiralty Alexander Link- Bridge is commissioned

West Africa’s first cable- stayed bridge comprising a 1,357m long four lane bridge, two main spans suspended from a 91m high pylon and 28 stay cables.

Commissioning of Akwa 1,357m long Ibom Stadium Complex The two-tiered multipurpose with arena in Uyo is furnished with a football pitch and a running 91m high track and has the capacity for 30,000 spectators. pylons

2013 2014

Works completed for the Commissioning of the PrimeTech Julius Berger receives awards for operational Central Bank of Nigeria Design and Engineering Nigeria Ltd. and financial excellence branch Office in Lagos, the head office Bonny River Terminal Airstrip Including the “Best Company in the Building and the Lagos Oando Jetty The office is built to comply and Construction Sector” award and the with Leadership in Energy and Performance, Earnings and Returns Leadership Environmental Design (LEED) (PEARL) “Sectoral Leadership Award” in gold requirements, showcasing Julius for construction. Nigerian Society of Engineers Berger’s capacities in green building. presents Julius Berger the Gold Award for proficiency and partnership on infrastructure development

28 JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 29 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

PROJECT FACT: The capital’s airport is completely shut with flights diverted for six weeks.

Emergency rehabilitation of the Capital City’s International Airport Works begin on the expansive National Institute No Potholes Programme in Port is achieved of Legislative Studies Harcourt transforms township roads Emergency rehabilitation of the A premier parliamentary academic and research existing runway and main taxiways at the Nnamdi Azikiwe International institution, the permanent campus is to support Julius Berger joins UN Global Airport is completed ahead of the the sustenance of dynamic and effective legislature Compact, reinforcing commitments almost impossible six-week project in Nigeria and the ECOWAS region. to sustainable business schedule.

Contract awarded for the Dangote Jetty in , Lagos

2015 2016 2017

Commissioning of the Edo Commissioning of Jetty on Bonny Cement Plant Island and Industrial Facility in the Calabar Free Trade Zone Design and construction of civil, building, and infrastructure works Julius Berger successfully for a Greenfield Cement Plant with commissions a number of industrial a planned output of 6,000t per day. construction projects, reinforcing its position as a strong partner to the private sector.

Commissioning of the Award for Procurement and Nestoil Office Tower Construction of Civil and Piling Works for the Okpai Phase II The 15-story mixed-use tower makes an Independent Power Project impact on the Lagos skyline and is one of the first LEED certified buildings of its kind in West Africa.

30 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | MILESTONES & ACHIEVEMENTS 31 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

Julius Berger pioneers the use of innovative Cold Recycling Methodology on the Abuja-Kano Road

The highly efficient and innovative solution for the road rehabilitation provides a number of benefits in regards to cost, safety and environmental impact.

Julius Berger celebrates 50 years of construction excellence, partnership and progress as Nigeria’s leading Works continue on the construction company. Lagos-Shagamu Expressway

The project includes expansion of the highway to three lanes in both directions, as well as maintenance and construction of several bridges and flyovers.

2018 2019 2020

Second ISO certification / transition to ISO 9001:2015 Julius Berger is awarded construction of three flyover bridges in the city of Commissioning of the Azura-Edo Port Harcourt Independent Power Plant Further to the successful township Works continue to Nigeria’s first project financed independent roads rehabilitation, the flyovers are progress on the Second power project. to be completed within 16 months to River Niger Bridge, a support in alleviating traffic congestion. project of national priority

32 MILESTONES & ACHIEVEMENTS | JULIUS BERGER 50 YEARS 33 Julius Berger’s Corporate Social Responsibility programs extend from several main areas of focus that seek to support economic viability, environmental responsibility OUR SOCIAL and social inclusion: RESPONSIBILITY

Julius Berger believes that sustainable business is good business. We continuously assess the impact of our activities and proactively seek opportunities to create shared value for both the company and the RESEARCH AND HUMAN CAPITAL COMMUNITY country, including our communities and staff. As such, excellence in TECHNOLOGY DEVELOPMENT DEVELOPMENT TRANSFER AND INCLUSIVITY health, safety and environmental protection and investments towards the professional development of staff are fundamental components of Julius Berger’s corporate culture and business practices. Corporate social responsibility programs are developed and carried out with the notion that by focusing efforts on areas that support economic viability, environmental responsibility and social inclusion, measurable progress can be made. In support of our commitments, Julius Berger has pledged alignment PHILANTHROPY SUSTAINABLE EMERGENCY with the ten universal principles of the United Nations Global Compact. AND SOCIAL WELFARE OPERATIONS RESPONSE

34 OUR SOCIAL RESPONSIBILITY | JULIUS BERGER 50 YEARS JULIUS BERGER 50 YEARS | OUR SOCIAL RESPONSIBILITY 35 CELEBRATING THE PAST, INNOVATING THE FUTURE CELEBRATING THE PAST, INNOVATING THE FUTURE

OUR INNOVATIONS FOR THE FUTURE

Julius Berger is committed to The future holds many new and exciting staying at the forefront of the developments. Driven by our continuous push to deliver the most effective construction build environment in Nigeria, solutions and supported by the rise of by spearheading research technology in the construction sector, we Augmented Reality Automatic level control icon 3D base will continually expand our knowledge on and innovation programs and course + asphalt laying progressive industry advancements and pioneering the use of state-of-the- Virtual architectural designs are combined implement relevant digital transformations to with the physical reality of a job site to Stringless machine led system regulates steer art construction technologies and heighten productivity and project performance. increase accuracy and accelerate the and elevation corrections to deliver precise methodologies. We see innovation construction process. paving with a high level of efficiency. In Nigeria, Julius Berger has pioneered as a catalyst for our continued use of innovations such as: success; a means to reduce costs, save time and improve quality, • 5-D building information modelling (BIM) thereby providing the greatest • Cold recycling road reconstruction value to our clients. • Trenchless pipe-jacking microtunneling • Geotextile encased column foundations

• Reinforced concrete pipes for heavy loads

• Site surveys by drone

36 37 CELEBRATING THE PAST, INNOVATING THE FUTURE

MANAGING DIRECTOR’S CLOSING NOTE Dr. Lars Richter

Julius Berger’s strong value system has Looking ahead, we view the future with been the foundation of our success for great optimism. We will continue to build the past 50 years and counting. From our from our past, while also keeping a keen earliest beginnings we have remained eye on industry developments, optimizing committed to working in line with our our tools, systems and methodologies, enduring core principles, partnering in line with relevant new technologies to with our clients to reliably deliver high ensure we reach our fullest potential in quality value-driven project planning meeting the progressing needs of our and execution, carrying out works with clients for another 50 years and counting. technical excellence, innovation capacity and leading sustainability standards. Our vision is to be Nigeria’s most dynamic construction company. Julius As we commemorate our 50th Berger’s core values of quality, integrity, Anniversary, we reaffirm our unwavering partnership and innovation underpin commitment to these ideals. We honor our corporate culture and define how the projects and progress realized by our we conduct business. Our unwavering great company and the incredibly talented commitment to upholding a high standard staff that has contributed to our numerous of excellence across all aspects of our accomplishments and sustained operations has consistently differentiated leadership in Nigeria’s construction our company and supported our ability to sector. We also recognize the partners unfailingly meet our clients’ requirements. to our success external to our company, including our subcontractors, communities and of course, our clients, who have continued to trust in Julius Berger and rely on us as a partner to their success.

38 MANAGING DIRECTOR’S CLOSING NOTE | JULIUS BERGER 50 YEARS Timeline photos - Dieter Blum. © 2020 Julius Berger Nigeria Plc All rights reserved Julius Berger Nigeria Plc 10 Shettima A. Munguno Crescent Utako 900 108 | FCT Abuja RC No. 6852