PROJECT LISTING COMPLETED PROJECTS Highway and Access Road Completed Project Commencement No
Total Page:16
File Type:pdf, Size:1020Kb
____________________________________________________________________________________________ PROJECT LISTING COMPLETED PROJECTS Highway and Access Road Completed Project Commencement No. Details of Project Date Value Client Date (RM) Access Road to Pelabuhan Tanjung Pelepas, Johor Public Works Dept, 1. (Engineering design, contract 10/1996 11/1999 155 Mil Malaysia documentation and contracts supervision) Proposed Design and Build Contract for the Privatisation of the KLKuala Selangor Expressway (KLSE) for package 1 – Assam Jawa to Kundang 1996/ 2. and Package 2 – Kundang to Taman 06/2011 1 Bil LATAR Berhad 06/2008 Rimba Templer (Engineering design for civil/structure components, contract documentation & construction supervision) Road Upgrading Works of Jalan Ijok – Jalan Raja Muda, Sekinchan, Kuala Public Works Dept, 3. Selangor (Pakej 1) (Engineering 03/1999 07/2002 150 Mil Malaysia design, contract documentation and construction supervision) Visitors Car Parking Bay Secondary Access Road (Project management, 4. engineering design, contract 10/1998 11/1999 0.5 Mil MIMOS Berhad documentation and construction supervision) Multistorey Office Building Renovation Works (Engineering design, contract 5. documentation and construction 05/1999 10/2000 2.5 Mil SIME UEP monitoring) Upgrading Highways and Roads (Road Upgrading Works) for JitraKodiang Public Works Dept, 6. Arau (Package 1 & 2) (Engineering 2002 12/2009 157 Mil Malaysia design, contract documentation & construction supervision) Putra Heights Interchange and Toll Plaza at KM 13.2 North South Central Sime UEP Heights Sdn 7. 07/2007 08/2009 64 Mil Link Expressway (Design, build, Bhd commissioning and maintenance) DPI Konsult Sdn Bhd (310105X) 1 ____________________________________________________________________________________________ Completed Project Commencement No. Details of Project Date Value Client Date (RM) Norida Cable & Upgrading 4km access road to Peramu 8. 2002 5.3 Mil Construction Sdn Bhd, Industrial Area, Pekan Pahang Malaysia Road Upgrading Works of Ulu Tiram – 9. Kota Tinggi 4Carriageway, Kota Tinggi, 2006 10/2010 28.5 Mil PKNS Infra Sdn Bhd Johor Road Upgrading works of Benta – JerantutMaran, Pahang Phase 1 (Segmen Jabatan Kerjaraya 10. 2009 2010 40 Mil 7: CH 2500 – CH8600 along 6km) – Malaysia conventional contract East Coast Highway Phase 2, State of Public Works Dept, 11. Trengganu for Phase 9a1 Chainage of 2006 09/2011 119 Mil Malaysia 91,800m to 98,000m Menaiktaraf dari BentaJerantutMaran, Pahang Public Works Dept, 12. 2010 255 Mil (Fasa 1) dari Benta ke Jerantut secara Malaysia reka dan bina serta rundingan terus Proposed Electrified Double Track Project Ipoh to Padang Besar Package N5 : Butterworth to Parit Buntar (Provision of consultancy services of 4 nos 2007 MMCGamuda JV Sdn 13. Railway Over Bridges for Double Tracking & 2012 100 mil Bhd of Northern Section (Ipoh to Padang 2013 Besar) (Engineering design, contract documentation & construction supervision) DPI Konsult Sdn Bhd (310105X) 2 ____________________________________________________________________________________________ Bridge Audit Construction and Upgrading Works Complete Project Commencement No. Details of Project d Date Value Client Date (RM) Sg. Jelai Bridge, Kuala Medang, State of Pahang Public Works Dept, 1. 1997 04/1999 10.7 Mil (Engineering design, contract documentation Malaysia and construction monitoring) Bridge Management System Public Works Dept, 2. (Feasibility study, design configuration and 08/1997 09/1998 0.5 Mil Malaysia implementation of pilot project for JKR BMS) Highway linking Westport to North/Southports Public Works Dept, 3. (Structural auditing on bridges and highway 04/1997 06/1998 360 Mil Malaysia structures) Replacement of steel bridge at Jalan Sultan Sulaiman and widening of bridge between Jalan 4. Sultan Sulaiman and Jalan Tun Sambanthan, 03/1999 04/2002 19.5 Mil CityHall Kuala Lumpur Kuala Lumpur (Engineering design and construction supervision) DPI Konsult Sdn Bhd (310105X) 3 ____________________________________________________________________________________________ Slope Rehabilitation Completed Project Commencement No. Details of Project Date Value Client Date (RM) Rehabilitation works on collapsed and damaged slopes at Jalan Sg. Lalang (B19) and Jalan Ehsan Pantas Sdn 1. 10/2003 11/2005 5 Mil Ampang (B62) of Hulu Langat Territory, State of Bhd Selangor 2. Repair works on collapsed slopes at the 11/2007 12/2008 1.2 Mil Employees’ Employees’ Provident Fund (EPF) Holiday Provident Fund Apartments at Cameron Highland, State of Pahang 3. Design, construct and complete slope 07/2005 08/2007 9.5 Mil Sanjung Sempurna rehabilitation and associated works at Hulu Sdn Bhd Perak, State of Perak DPI Konsult Sdn Bhd (310105X) 4 ____________________________________________________________________________________________ Port related engineering works Completed Project Commencement No. Details of Project Date Value Client Date (RM) Design and supervision of the Port Operating Facilities for Phase 1 of Port Tanjung Pelabuhan Tanjung 1. Pelepas 10/1996 11/1997 400 Mil Pelepas Sdn Bhd (Engineering design, contract documentation and construction supervision) Terminal Operating Facilities for Port Pelabuhan Tanjung 2. Tanjung Pelepas 04/1996 05/1998 600 Mil Pelepas Sdn Bhd (Conceptual design and Engineering design) Northport and Southport, Port Klang Klang Port 3. (Siltation, stability and serviceability analysis 03/1998 04/1999 3. Mil Management Sdn study) Bhd 4. Expansion of Kuantan Port 07/1999 08/2002 153 Mil Kuantan Port (Project management and supervision of Authority dredging works) Klang Port Southport – Rehabilitation of Berth 3 and 5. 09/1999 10/2001 5 Mil Management Sdn Berth 4 Bhd Klang Port Conversion of Berths 12 & 13 into Multi 6. 06/2000 08/2002 85 Mil Management Sdn purpose Berths Bhd Design and build for the Conversion of Berth Muhibbah 7. 14 into Multipurpose Berth and associated 03/2004 04/2006 39 Mil Engineering (M) works at Northport, Port Klang Sdn Bhd Detailed investigation and survey, engineering design review and supervision of 8. wharves Nos 1, 2 and 3 and Oil Jetties Nos. 03/2005 07/2007 20 Mil Johor Port Berhad 1 and 2 of Johor Port, Pasir Gudang, State of Johor. DPI Konsult Sdn Bhd (310105X) 5 ____________________________________________________________________________________________ Completed Project Commencement No. Details of Project Date Value Client Date (RM) Construction of Marine Dept Jetty and Marine Dept 9. Public Jetty at Tanjung Pengelih, State of 12/2004 06/2006 30 Mil Peninsular Malaysia Johor Defect Rectification works on existing storm water drainage system and Komuniti BKR Sdn 10. 2010 2012 1.5 Mil associated works at Bukit Kiara Residence, Bhd Sri Hartamas Kuala Lumpur Cadangan Pembangunan Pelabuhan PTP Tanjung Pelepas Phase II Consultancy Block A, Wisma Services for the Tender, Design Review PTP and Site Supervision For Development of Jalan Pelabuhan, Container Terminal Yard Blocks 16, 17 & 2012 Tanjung Pelepas 11. 18 (Row E to M) and 19, 20 & 21(Row A to 09/2014 193 Mil TST 507, 81560 D) at Pelabuhan Tanjung Pelepas Gelang Patah Johor Darul Takzim Contract No. : PTP/PROP/PJD/CONCTY No. : 607 5042222 (1621)/CO2/12 DPI Konsult Sdn Bhd (310105X) 6 ____________________________________________________________________________________________ Civil, Structural, Electrical and Mechanical Engineering, Design and Audit Completed Project Commencement No. Details of Project Date Value Client Date (RM) Pandan Hospital (704 beds) Johor (Engineering design, contract Metro Health Sdn 1. documentation and construction 02/1997 04/1999 560 Mil Bhd supervision) Permodalan Nasional Berhad Corporate Office and Kolej Kurniawan Campus, Bangi, State of Selangor Permodalan 2. (Engineering design, contract 1998 05/2000 81 Mil Nasional Berhad documentation and construction supervision) Burger King Outlet at Suria Kuala Lumpur City Centre (Project management, engineering design, Cosmo Restaurants 3. 03/1998 06/2000 1.9 Mil contract documentation and construction Sdn Bhd supervision) MIMOS Building Complex 4. (Post technical review / audit services) 07/1998 09/2000 0.2 Mil MIMOS Berhad Mahkamah Shariah Complex, Kuala Kangsar, State of Perak (Engineering design, contract Iza Construction 5. 05/1998 07/2000 4.5 Mil documentation and construction Sdn Bhd monitoring) Building extension and upgrading of 4 storey Office Block, Subang Jaya (Project ma nagement, engineering design, 59 Communication 6. 1998 11/1998 0.5 Mil contract documentation and construction Sdn Bhd supervision) Community Complex, Subang Jaya (Engineering design, contract Subang Jaya 7. documentation and construction 01/1998 05/2000 17.8 Mil Municipal Council monitoring) Community Complex, Puchong, State of Selangor Engineering design, contract Subang Jaya 8. 03/1999 05/2000 12 Mil documentation and construction Municipal Council monitoring) Mahkamah Shariah Manjung Complex, State of Perak Public Works Dept, (Engineering design, contract 03/1999 04/2001 4 Mil State of Perak 9. documentation and construction monitoring) DPI Konsult Sdn Bhd (310105X) 7 ____________________________________________________________________________________________ Completed Project Commencement No. Details of Project Date Value Client Date (RM) Food Court and Surau, Serdang, State of Selangor (Engineering design, contract Subang Jaya Municipal 10. 04/1999 02/2001 0.75 Mil documentation and construction Council monitoring) Food Court and Surau, Batu 3, Shah Alam and Puchong, State of Selangor