| CONSTRUCTION MANAGEMENT

| DESIGN-BUILD

| GENERAL CONTRACTING

| SUSTAINABLE CONSTRUCTION S.B. BALLARD | P3 CONSTRUCTION COMPANY | PRECONSTRUCTION BUILDING BETTER FUTURES | VIRTUAL DESIGN CONSTRUCTION K-12 EDUCATIONAL FACILITIES

SBBALLARD.COM BEACH RICHMOND

2828 SHIPPS CORNER ROAD 104 SHOCKOE SLIP VIRGINIA BEACH, VA 23453 LOWER LEVEL, #C S.B. BALLARD RICHMOND, VA 23219 CONSTRUCTION COMPANY

P: 757-440-5555 P: 804-343-3433 F: 757-451-2873 F: 804-343-3412

E-MAIL: [email protected]

CONSTRUCTION MANAGEMENT | DESIGN-BUILD | GENERAL CONTRACTING SUSTAINABLE CONSTRUCTION | P3 | PRECONSTRUCTION | VIRTUAL DESIGN CONSTRUCTION ONE OF THE LARGEST GENERAL CONTRACTING FIRMS SERVING THE MID-ATLANTIC AND

SOUTHEAST REGIONS OF THE U.S. AND BEYOND, S.B. BALLARD CONSTRUCTION COMPANY

BELIEVES THAT GOOD EDUCATION IS BUILT FROM THE GROUND UP. OUR EXTENSIVE AND

WELL-DEFINED LEVELS OF EXPERTISE HAVE RESULTED IN THE SUCCESSFUL COMPLETION

OF EDUCATIONAL FACILITIES IN BOTH THE PUBLIC AND PRIVATE SECTORS. COVERING EVERY

ASPECT OF THIS SPECIALIZED SEGMENT OF THE INDUSTRY, OUR COMMITMENT TO SAFETY

AND QUALITY ENSURES BRIGHTER FUTURES FOR OUR UP-AND-COMING GENERATIONS. RICHARD H. BOWLING ELEMENTARY SCHOOL STUDENTS THRIVE IN OPEN, COLLABORATIVE CLASSROOM SPACES FULL OF LIGHT AND THE LATEST ADVANCES.

“OUR MISSION IS TO PROVIDE UNMATCHED CUSTOMER SERVICE BY CONSTRUCTING SUPERIOR S.B. BALLARD QUALITY PROJECTS DELIVERED SAFELY, ON TIME, ON BUDGET AND BY EMPLOYING SUSTAINABLE CONSTRUCTION COMPANY BUSINESS PRACTICES.”

STEPHEN B. BALLARD PRESIDENT/CEO

1. KING’S FORK HIGH SCHOOL

THE 870-SEAT AUDITORIUM AND 150-SEAT BLACK-BOX THEATER WERE DESIGNED THE 2,000-SEAT GYMNASIUM FEATURES TWO BASKETBALL COURTS WITH THE LATEST AV AND TECHNICAL ENHANCEMENTS. FOR CHEERING ON THE KING’S FORK BULLDOGS.

“DURING CONSTRUCTION, THE TIDEWATER AREA WITNESSED ONE OF THE WETTEST WEATHER PERIODS IN DECADES…S.B. BALLARD’S MANAGEMENT TEAM DEVELOPED A NEW SCHEDULE AND BEGAN WORKING MULTIPLE SHIFTS TO COMPLETE THE SUFFOLK, VIRGINIA KING’S FORK HIGH’S DECENTRALIZED “SCHOOL WITHIN A SCHOOL” CONCEPT ALLOWS FOR PROJECT ON TIME…SAFELY AND SUCCESSFULLY.” SEPARATE GRADE LEVELS TO ATTEND CLASS IN A SINGLE-STORY ENVIRONMENT. EACH ZONE

STUDENT CAPACITY: 1,800 INCLUDES SPACE FOR THAT GRADE LEVEL’S ASSISTANT PRINCIPAL, GUIDANCE COUNSELOR, JOHN MADDUX BUILDING SIZE: 277,910 SF TEACHER WORK AREAS AND GENERAL CLASSROOM, LAB AND RESOURCE AREAS. ADDITIONAL REFP PRINCIPAL, AREAS ARE SUITED FOR SPECIALIZED AND CAREER COURSES. FLEXIBILITY WAS BUILT INTO THE HBA ARCHITECTURE PROJECT WITH A GUIDANCE SUITE THAT CAN ADJUST AS NEEDED. A CENTRAL ATRIUM WITH DINING HALL, COURTYARD, AMPHITHEATER AND GYM MAKE THE CAMPUS A THRIVING EXAMPLE

OF MEETING THE EDUCATIONAL NEEDS OF A GROWING COMMUNITY. THE TWO-STORY ATRIUM (19,000 SF) AND SURROUNDING COURTYARD (8,000 SF) OFFER A SAFE, SECURE DINING ENVIRONMENT.

2. 3. “THE PUBLIC-PRIVATE EDUCATIONAL FACILITIES INFRASTRUCTURE ACT (PPEA) PROCESS…IS THE ONLY PROCESS I WOULD USE. YOU CAN BUILD SCHOOLS FASTER, CENTRAL HIGH SCHOOL LOWER YOUR RISK, BUILD THEM MORE ECONOMICALLY AND PRODUCE A BETTER PRODUCT BY USING PPEA.”

DR. JEFF PERRY SUPERINTENDENT WISE COUNTY PUBLIC SCHOOLS

WISE, VIRGINIA THROUGH A DESIGN-BUILD PPEA, S.B. BALLARD WAS RESPONSIBLE FOR THIS 127,425 SQUARE FOOT HIGH SCHOOL. CENTRAL HIGH SCHOOL IS A CONSOLIDATION OF J.J. KELLY AND POUND HIGH STUDENT CAPACITY: 750 SCHOOLS AND ACCOMMODATES 750 STUDENTS. THE FACILITY INCLUDES CLASSROOMS, A MEDIA BUILDING SIZE: 127,425 SF CENTER, COMPUTER LABS, OFFICES, SCIENCE LABS, LOCKER ROOMS, GYMNASIUM, EXAM ROOMS, TEACHERS’ LOUNGES, CAFETERIA, LAUNDRY ROOM, AUDITORIUM AND CONFERENCE ROOMS.

4. 5. UNION HIGH SCHOOL

OUR BROWNFIELD EXPERTISE ALLOWED US TO BUILD THE NEW FACILITY ADJACENT TO THE OLD SCHOOL WITHOUT INTERRUPTING DAILY ACTIVITIES. AFTER OPENING THE NEW BUILDING, WE WERE ABLE TO DEMOLISH THE OLDER SCHOOL.

THE 870-SEAT AUDITORIUM INCLUDES ADVANCED AUDIO-VISUAL TECHNOLOGIES AND LIGHTING AND ENHANCED ACOUSTICS.

BIG STONE GAP, VIRGINIA THROUGH A DESIGN-BUILD PPEA, S.B. BALLARD WAS RESPONSIBLE FOR THE BUILDOUT OF UNION HIGH SCHOOL, A CONSOLIDATION OF APPALACHIA AND POWELL VALLEY HIGH SCHOOLS. THE STUDENT CAPACITY: 750 FACILITY INCLUDES NEW, OPEN CLASSROOMS, A STATE-OF-THE-ART MEDIA CENTER, COMPUTER BUILDING SIZE: 127,425 SF AND SCIENCE LABS, LOCKER ROOMS, GYMNASIUM WITH DOUBLE BASKETBALL COURTS, EXAM ROOMS, TEACHERS’ LOUNGES, CAFETERIA AND DINING HALL THAT SEATS OVER 400, LAUNDRY ROOM, AUDITORIUM AND CONFERENCE ROOMS.

GAME-DAY SEATING FEATURES THE SCHOOL’S LOGO.

6. 7. FLOYD E. KELLAM HIGH SCHOOL

VIRGINIA BEACH, VIRGINIA PRIOR TO CONSTRUCTION, KELLAM HIGH SCHOOL WAS ONE OF THE OLDEST HIGH SCHOOLS IN VIRGINIA BEACH. ITS REPLACEMENT IS A NEW 2,100-STUDENT SCHOOL CREATED AS A PROTOTYPE STUDENT CAPACITY: 2,100 TO SUPPORT 21ST CENTURY LEARNING. VOTED AS ONE OF THE TOP 5 NEW SCHOOLS IN THE BUILDING SIZE: 350,950 SF WORLD BY THE ASSOCIATION FOR LEARNING ENVIRONMENTS, KELLAM WAS TRULY DESIGNED FROM THE INSIDE OUT. THE FACILITY WAS COLLABORATIVELY PLANNED BY STAKEHOLDERS AND BUILT TO SUPPORT AND FACILITATE A NEW CHALLENGE-BASED LEARNING CURRICULUM THAT

FOCUSES ON FULLY ENGAGING STUDENTS IN THEIR LEARNING PROCESSES. THE SILVER CERTIFIED LEED™ SCHOOL FEATURES A TWO-STORY CONSTRUCTION, COURTYARD WITH WATERFALL, AND AN OPEN PLAN DINING AREA FILLED WITH NATURAL LIGHT.

8. 9. TRANSPARENCY VISUAL CONNECTIONS BETWEEN LEARNING SPACES ALLOW: • PASSIVE SECURITY FLOYD E. KELLAM HIGH SCHOOL • INCREASED INTERACTION • COLLABORATION AMONG STUDENTS AND TEACHERS

FLEXIBILITY MOVABLE WALLS AND MODULAR CLASSROOM FURNITURE ALLOW: • SPACES TO BE COMBINED FOR LARGE PROGRAMS • SPACES TO BE TRANSFORMED FOR DIFFERENT FUNCTIONS

EDIBLE GARDEN/GATHERING GARDEN/ INFILTRATION GARDEN • CONTAINS PLANTER BOXES • GREENHOUSE • COMPOSTING BINS • OUTDOOR CLASSROOM • MARSH ENVIRONMENT • SEATING AREAS

ATHLETIC FACILITIES • TRACK AND FIELD • BAND PRACTICE FIELD • TENNIS COURTS • BASEBALL FIELD • 2 FIELD HOCKEY FIELDS • SPORTS PRACTICE FIELDS • SPORTS STADIUM VIRGINIA BEACH, VIRGINIA PRIOR TO CONSTRUCTION, KELLAM HIGH SCHOOL WAS ONE OF THE OLDEST HIGH SCHOOLS IN • BASKETBALL COURTS VIRGINIA BEACH. ITS REPLACEMENT IS A NEW 2,100 STUDENT SCHOOL CREATED AS A PROTOTYPE STUDENT CAPACITY: 2,100 TO SUPPORT 21ST CENTURY LEARNING. VOTED AS ONE OF THE TOP 5 NEW SCHOOLS IN THE INNOVATIVE LEARNING SPACES DESIGNED TO FACILITATE: BUILDING SIZE: 350,950 SF WORLD BY THE ASSOCIATION FOR LEARNING ENVIRONMENTS, KELLAM WAS TRULY DESIGNED • STUDENT DISCUSSION “…S.B. BALLARD’S PRECONSTRUCTION TEAM STARTED WORKING WITH OUR STAFF ON VALUE ENGINEERING, MICHAEL ROSS, AIA FROM THE INSIDE OUT. THE FACILITY WAS COLLABORATIVELY PLANNED BY STAKEHOLDERS AND • COLLABORATION CONSTRUCTABILITY REVIEWS AND BIM MODELING. S.B. BALLARD WORKED DILIGENTLY WITH HBA AND OUR REFP PRINCIPAL, • PRESENTATION CONSULTANTS TO ACHIEVE THE BEST POSSIBLE RESULTS. TOGETHER, WE WERE ABLE TO REDUCE HBA ARCHITECTURE BUILT TO SUPPORT AND FACILITATE A NEW CHALLENGE-BASED LEARNING CURRICULUM THAT • DEMONSTRATION CONSTRUCTION COST BY OVER $9 MILLION.” FOCUSES ON FULLY ENGAGING STUDENTS IN THEIR LEARNING PROCESSES. • EXPLORATION • INTERACTION

8. 10. 11. SOUTHSIDE STEM ACADEMY AT CAMPOSTELLA

THE MODERN DESIGN OF THE LIBRARY FEATURES CURVED WALLS NORFOLK, VIRGINIA THE THREE-STORY CONSTRUCTION OF CAMPOSTELLA K-8 SCHOOL REPLACED THE ORIGINAL SCHOOL AND CEILING-HEIGHT WINDOWS THAT FLOOD THE ROOM WITH LIGHT. CONSTRUCTED IN 1965. SUPPORTING CAMPOSTELLA’S STEM (SCIENCE, TECHNOLOGY, ENGINEERING, STUDENT CAPACITY: 1,200 MATH) CURRICULUM, EACH OF THE THREE ACADEMIC FLOORS IS HOME TO THREE GRADES. EACH GRADE LEVEL INCLUDES STEM-SUPPORTING LEARNING STUDIOS, FLEXIBLE CLASSROOM AND BREAK- BUILDING SIZE: 181,850 SF OUT SPACES DESIGNED TO PROMOTE A COLLABORATIVE, ADVANCED LEARNING EXPERIENCE. A DEDICATED NATURE CLASSROOM ALLOWS EXPLORATION AND CLASS EXPERIENCES UTILIZING ON-SITE WETLAND AREAS. THE GYMNATORIUM DESIGN FEATURES PARTITIONED ZONES TO ACCOMMODATE STUDENT DINING WHILE OTHER STUDENTS PARTICIPATE IN P.E. IN THE ADJOINING K-5 GYMNASIUM.

12. 13. RICHARD H. BOWLING ELEMENTARY SCHOOL

THE BRIGHT, MODERN LIBRARY INCLUDES FLOOR-TO-CEILING WINDOWS AND AMPLE COMPUTER WORKSTATIONS FOR STUDENTS.

NORFOLK, VIRGINIA PART OF A FIVE-YEAR PPEA INITIATIVE, RICHARD H. BOWLING ELEMENTARY FEATURES AMENITIES AND DESIGN DETAILS TO ENHANCE THE ACADEMIC AND PERSONAL EXCELLENCE OF EACH OF THE STUDENT CAPACITY: 700 STUDENTS ATTENDING. THE K-5 INTERNATIONAL BACCALAUREATE THEMED SCHOOL WAS CON- BUILDING SIZE: 101,100 SF STRUCTED TO ENHANCE THE EDUCATIONAL EXPERIENCE AND SUCCESS OF LIFELONG LEARNERS. WITH A CENTRAL ANNEX FOR ADMIN, ADJOINING DINING, GYMNASIUM AND STAGE AREAS, AND A BAND/ORCHESTRA ROOM TO SUPPORT THE FINE ARTS FOCUS OF THE SCHOOL, BROAD CREEK ALSO INCLUDES SEPARATE ACADEMIC ZONES FOR CLASSROOMS THAT INCLUDE ADJOINING THINK TANK AND PROJECT AREAS FOR SMALL GROUP AND COLLABORATIVE LEARNING.

14. 15. LARCHMONT SCHOOL

THE CAFETERIA COMFORTABLY SEATS 270 AND FEATURES NATURAL LIGHT AND EXPOSED TRUSSES AND VENTILATION.

NORFOLK, VIRGINIA THROUGH ITS MULTI-FACILITY PPEA INITIATIVE WITH , S.B. BALLARD CELEBRATED LARCHMONT ELEMENTARY’S REBUILD WHEN THE SCHOOL OPENED IN SEPTEMBER OF 2017. THE TWO-STORY, PRE-K THROUGH FIFTH GRADE BUILDING IS HOME TO 700+ STUDENTS AND STUDENT CAPACITY: 700 FEATURES A ONE-STORY ENTRY AND COMMONS AREA, A 270-SEAT CAFETERIA FOR DINING, BUILDING SIZE: 92,000 SF ADJOINING GYMNASIUM, ADMINISTRATIVE OFFICES AND VOLUNTEER ROOMS, AND TWO-STORY LEARNING AREAS FOR CLASSROOM ACTIVITY. PLANNED SUSTAINABLE USE OF NATURAL LIGHTING THROUGHOUT THE SCHOOL BENEFITS STUDENT LEARNING AND ENERGY EFFICIENCY. THE LARCHMONT GROUNDS ALSO INCLUDE PROTECTED TIDAL WETLANDS, FOR WHICH WALKWAYS AND LEARNING LABS WERE INCLUDED IN THE DESIGN TO ENHANCE THE CURRICULUM. THE 4,400 SQUARE FOOT GYMNASIUM SITS ADJACENT TO THE CAFETERIA.

16. 17. ELEMENTARY SCHOOL

THE BRIGHT AND AIRY CAFETERIA KEEPS IN LINE WITH THE MARITIME FEEL WITH SURFBOARD-SHAPED DINING TABLES.

NORFOLK, VIRGINIA ONE OF FIVE PPEA SCHOOLS CONTRACTED THROUGH THE CITY OF NORFOLK, OCEAN VIEW ELEMENTARY SCHOOL’S TWO-STORY NEW FACILITY, LOCATED BETWEEN THE CHESAPEAKE AND STUDENT CAPACITY: 700 WILLOUGHBY BAYS, WAS OPENED IN SEPTEMBER OF 2017. THE 92,000 SQUARE-FOOT SCHOOL IS A MARITIME-THEMED SCHOOL THAT INCLUDES A “HOUSE” CONCEPT. A JOINT-USE, ONE-STORY BUILDING SIZE: 92,350 SF CENTRAL AREA OF THE FACILITY INCLUDES ADMINISTRATIVE OFFICES, A GYMNATORIUM/CAFETERIA FLEX SPACE, KITCHEN, MEDIA CENTER, AND COMMUNITY/SERVICE ROOMS. THE 700 STUDENTS PARTICIPATE IN K-1 CLASSROOMS ON THE FIRST FLOOR OF THE ACADEMIC AREA, WHILE GRADES 2-5 STUDENTS’ CLASSROOMS ARE LOCATED ON THE SECOND FLOOR. THE SIX ACRES OF DUNES AND MARITIME FOREST ON THE PROPERTY FACILITATED THE DESIGN OF OUTDOOR LEARNING LABS AND COURTYARD FOR ENHANCED EDUCATION, STUDY AND ACTIVITY.

18. 19. OPENED IN APRIL 1998, LINKHORN FEATURES A CENTRAL SQUARE FLOOR LINKHORN PARK PLAN WITH THREE CLASSROOM WINGS. LINKHORN HOUSES OVER THIRTY CAMP ALLEN ELEMENTARY SCHOOL ELEMENTARY GENERAL AND SPECIAL EDUCATION CLASSROOMS, TEACHERS’ WORK- VIRGINIA BEACH, VIRGINIA ROOMS, MEDIA CENTER AND COMPUTER STATIONS. THE 270-SEAT STUDENT CAPACITY: 716 CAFETERIA WITH PLATFORM, EXTERIOR COURTYARD AND COMMONS BUILDING SIZE: 76,285 SF AREAS WERE DESIGNED TO HOLD A VARIETY OF GATHERINGS.

BAYSIDE BAYSIDE ELEMENTARY OPENED ITS DOORS TO VIRGINIA BEACH STUDENTS IN DECEMBER 2000. THIS “COMMUNITY” SCHOOL’S DESIGN INCLUDES A ELEMENTARY SQUARE FLOOR PLAN WITH THREE ACADEMIC WINGS, ALL OF WHICH VIRGINIA BEACH, VIRGINIA INCLUDE GENERAL AND SPECIAL EDUCATION CLASSROOMS, RESOURCE STUDENT CAPACITY: 725 ROOMS, A WORKOUT ROOM, COMPUTER LABS AND MEDIA CENTER. BUILDING SIZE: 77,428 SF

MODERNIZATION AND REMODELING OF THALIA ELEMENTARY WAS THALIA COMPLETED IN 2001 TO ACCOMMODATE ITS GROWING STUDENT BODY. ELEMENTARY S.B. BALLARD WAS ABLE TO COMPLETE THE RENOVATIONS WITHOUT HAVING TO RELOCATE STUDENTS, SAVING BOTH TIME AND RESOURCES. VIRGINIA BEACH, VIRGINIA THE SCOPE OF WORK INCLUDED ADDITION OF NEW CLASSROOMS, STUDENT CAPACITY: 727 TEACHER WORKROOMS, WINDOW UPGRADES, NEW MASONRY AND BUILDING SIZE: 91,550 SF ADDITIONAL PARKING. NORFOLK, VIRGINIA REPLACING A 1970 FACILITY LOCATED ON , CAMP ALLEN ELEMENTARY NORFOLK, VIRGINIA SCHOOL’S TWO-PHASE DEMOLITION AND CONSTRUCTION INCLUDES A CENTRAL SINGLE-STORY

STUDENT CAPACITY: 600 ZONE THAT HOUSES THE PARTITIONED GYMNATORIUM AND CAFETERIA AREAS, ART AND MUSIC STUDENT CAPACITY: 000 CLASSROOMS, AND KITCHEN AND SERVICES AREAS. EACH OF TWO, TWO-STORY WINGS INCLUDES BUILDING SIZE: 97,630 SF BUILDING SIZE: 000,000 SF ACADEMIC CLASSROOMS FOR EACH GRADE LEVEL. TO PROMOTE INCLUSION, EACH GRADE “I’VE HAD THE OPPORTUNITY TO WORK WITH S.B. BALLARD CONSTRUCTION COMPANY ON MULTIPLE PROJECTS TONY ARNOLD, P.E. BUILDING COST: $00,000,000 LEVEL’S SPECIAL EDUCATION CLASSROOM FEATURES AN ADJACENT VIEWING ROOM SO STUDENTS INCLUDING LINKHORN PARK, BAYSIDE AND THALIA ELEMENTARY SCHOOLS AND MOST RECENTLY KELLAM HIGH DIRECTOR OF FACILITIES, CAN REMAIN IN THE CLASSROOM ENVIRONMENT AS MUCH AS POSSIBLE. IN ADDITION TO SCHOOL. S.B. BALLARD’S IMPRESSIVE SAFETY RECORD, EFFECTIVE PROJECT MANAGEMENT APPROACH AND PLANNING & CONSTRUCTION SUSTAINABLE USE OF NATURAL LIGHTING THROUGHOUT THE SCHOOL, SPECIAL DESIGN DETAILS DEDICATION TO PROVIDING THE BEST PRODUCT FOR THE BEST VALUE…S.B. BALLARD HAS CONSISTENTLY VIRGINIA BEACH PUBLIC SCHOOLS WERE INCLUDED TO GIVE CONSIDERATION TO THE SOUND ENVIRONMENT, DUE TO THE SCHOOLS EXCEEDED THE COMMUNITY’S, VIRGINIA BEACH PUBLIC SCHOOLS’ AND MY EXPECTATIONS.” PROXIMITY TO THE BASE’S NAVAL AIRFIELD.

20. 21. OUR SERVICES

PUBLIC-PRIVATE PARTNERSHIPS (P3/PPEA) CONSTRUCTION MANAGEMENT S.B. BALLARD HAS WORKED ON MANY PUBLIC-PRIVATE EDUCATION ANTICIPATING POTENTIAL CHALLENGES DURING CONSTRUCTION FACILITIES AND INFRASTRUCTURE ACT (PPEA) INITIATIVES OVER PRIOR TO BREAKING GROUND GIVES US THE OPPORTUNITY TO THE YEARS. WHEN COMBINED WITH OUR DESIGN-BUILD EXPERTISE, MAXIMIZE EFFICIENCY AND BUDGET. THIS “BIG PICTURE” VIEW OF THESE PROJECTS SAVE TIME AND MONEY BECAUSE THEY ENCOURAGE THE FULL SCOPE OF WORK IS MADE AVAILABLE THROUGH OUR TEAM MULTI-TIERED, HASSLE-FREE COMMUNICATION BETWEEN ALL PARTIES. OF PROFESSIONALS, ALL WHO HAVE ACCESS TO UPDATES AND INFORMATION 24/7 TO ENSURE YOUR PROJECT RUNS SMOOTHLY FROM PRECONSTRUCTION START TO FINISH. SUCCESSFUL CONSTRUCTION DEPENDS ON DECISIONS MADE BEFORE THE JOB BEGINS. PRIOR TO GROUNDBREAKING, ALL TEAMS DESIGN-BUILD INVOLVED IN ANY PROJECT ARE CONSULTED TO MAXIMIZE EFFICIENCY, SINCE BREAKING GROUND IN 1978, S.B. BALLARD CONSTRUCTION HAS A DESIGN-BUILD CONSTRUCTION MEANS THE OWNER HAS A SINGLE ESTABLISH TIMELINES AND ORCHESTRATE A PLAN THAT WILL ENSURE POINT OF CONTACT FOR CONSTRUCTION AND DESIGN. SINGLE-SOURCE THE SUCCESS OF THE BUILD. S.B. BALLARD USES THE LATEST COMPLETED EVERY SINGLE PROJECT, FOR EVERY SINGLE CLIENT, ON TIME ACCOUNTABILITY ALLOWS S.B. BALLARD TO STREAMLINE THE TECHNOLOGIES TO MAINTAIN SCOPE AND TRACK COMMUNICATIONS CONSTRUCTION PROCESS, STAY ON SCHEDULE AND REDUCE COST. AND ON BUDGET – 100% OF THE TIME. AND WE CAN SAY PROUDLY THAT AND KEY PROJECT GOALS.

GENERAL CONTRACTING BECAUSE OF OUR A+ RECORD AND OUR PROVEN DEDICATION TO OUR CLIENTS, VIRTUAL DESIGN CONSTRUCTION S.B. BALLARD HAS A TOP-NOTCH TEAM OF INDUSTRY PROFESSIONALS WITH VIRTUAL DESIGN TOOLS AND 3-D TECHNOLOGIES, OUR TEAM IS THAT 80% OF OUR ONGOING WORK IS FOR “THREE-PEAT” CUSTOMERS. TO MANAGE EVERY PROJECT AND STAY ON SCHEDULE. WE PROVIDE ABLE TO MAP OUT ALL PROJECTS BEFORE WE LAY A SINGLE BRICK. SUBCONTRACTOR ADMINISTRATION, COST CONTROL, QUALITY WITH THESE TOOLS WE CAN IMPROVE DESIGN AND CONSTRUC - ASSURANCE, SAFETY PROGRAM ADMINISTRATION AND OTHER TION INTEGRATION, SCHEDULE THE BUILD, DETERMINE A BUDGET, RESOURCES NECESSARY TO ENSURE THE SUCCESS OF THE BUILD. AND OVERSEE LOGISTICS AND ASSET MANAGEMENT, RESULTING IN COST-EFFICIENT, ON-TIME PROJECT COMPLETION. SUSTAINABLE CONSTRUCTION AT S.B. BALLARD, ENVIRONMENTAL STEWARDSHIP IS CRITICAL. WHENEVER POSSIBLE, WE USE GREEN BUILDING PRACTICES AND S.B. BALLARD EXCEED WHAT’S REQUIRED BY THE STANDARD. WE ARE WELL- CONSTRUCTION COMPANY ENTRENCHED IN GREEN BUILDING/LEED™ PRACTICES AND AFFILIATIONS CERTIFICATIONS. OUR GOAL IS TO CREATE BUILDINGS THAT MEET AND/OR EXCEED CURRENT BUILDING STANDARDS WITHOUT COMPROMISING THE ABILITY TO MAINTAIN ENVIRONMENTAL STANDARDS FOR FUTURE GENERATIONS.

22. 23. COMMITMENT TO SAFETY TRANSPARENCY SUSTAINABILITY COMMUNITY INVOLVEMENT

“SAFETY FIRST” IS MORE THAN A SLOGAN. IT’S A WAY OF LIFE AND S.B. BALLARD INSTALLS CAMERAS ALLOWING THE PROPERTY OWNER BECAUSE WE ARE ALL STEWARDS OF OUR PLANET, S.B. BALLARD WITH EVERY NEW PROJECT, WE BUILD COMMUNITY. WE LOVE TO PART OF EVERYTHING WE DO. AND THE COMMUNITY TO VIEW PROGRESS ON THE JOB SITES ANY- INCORPORATES SUSTAINABLE, EARTH-FRIENDLY PRACTICES, MATERIALS SEE PEOPLE USE AND ENJOY OUR FINISHED WORK, AND IT’S TIME, DAY OR NIGHT. IN ADDITION, THERE IS A DEDICATED PROJECT AND PROCESSES WHEN- AND WHEREVER POSSIBLE. OUR MISSION IS IMPORTANT FOR THE BALLARD TEAM TO REMAIN ENGAGED. FOR S.B. BALLARD HAS RECEIVED NUMEROUS SAFETY AWARDS THROUGH- WEB PAGE THAT ALLOWS THE COMMUNITY TO SEE AFFECTED TRAFFIC TO THINK OF LONG-TERM PROJECT VIABILITY THAT WILL PROMOTE STEPHEN B. BALLARD, GIVING BACK IS A PASSION, AND WHILE WE’VE OUT THE YEARS. THIS IS A TESTAMENT TO OUR COMMITMENT TO A PATTERNS, NOTIFICATIONS FOR UPCOMING MEETINGS, AND LOGISTIC GOOD, SOLID CONSTRUCTION UPGRADES THAT WILL EASILY AND PARTICIPATED IN HUNDREDS OF EVENTS AND INITIATIVES OVER THE SAFE WORK ENVIRONMENT FOR STAFF, VISITORS AND CLIENTS. PLANS. WE HAVE FOUND THIS A VALUABLE TOOL FOR MAINTAINING SAFELY TRANSFER TO FUTURE GENERATIONS. OUR PHILOSOPHY YEARS, WE DON’T SEEK RECOGNITION OR ACCOLADES. WE SERVE PEOPLE ARE OUR NUMBER ONE ASSET AND WE PROTECT THEM EVERY PUBLIC INTEREST ON NEW CONSTRUCTION IN THE COMMUNITY. INCORPORATES ELEMENTS OF CONSTRUCTION, ENGINEERING, BECAUSE AS MEMBERS OF THE COMMUNITIES IN WHICH WE LIVE, WE STEP OF THE WAY. ECONOMICS, ENVIRONMENTAL AND CIVIC ACCOUNTABILITY. FEEL IT IS OUR RESPONSIBILITY AND HONOR TO GIVE BACK.

24. 25. NOTES

S.B. BALLARD CONSTRUCTION COMPANY

CONSTRUCTION MANAGEMENT | DESIGN-BUILD | GENERAL CONTRACTING SUSTAINABLE CONSTRUCTION | P3 | PRECONSTRUCTION | VIRTUAL DESIGN CONSTRUCTION

26. 27.