APPENDIX I (See Paragraph­6) FORM 1

Total Page:16

File Type:pdf, Size:1020Kb

APPENDIX I (See Paragraph­6) FORM 1 APPENDIX I (See Paragraph­6) FORM 1 Note : If space provided against any parameter is inadequate,Kindly upload supporting document under 'Additional Attachments if any' at the last part of the Form1. Please note that all such Annexures must be part of single pdf document. (I) Basic Information S.No. Item Details Whether it is a violation case and application is being submitted under Notification No. No S.O.804(E) dated 14.03.2017 ? Name of the Project/s Starlight Energy Pvt. Ltd. Brief summary of project Annexure­Brief summary of project 1. Proposal Number IA/OR/IND/24323/2014 Project Cost (in lacs) 11250 2. S. No. in the schedule 5(g) Distilleries Project Sector Industrial Projects ­ 1 Proposed capacity/area/length/tonnage to 2 x 45 KLPD capacity grain based distillery unit having 2 x 3. be handled/command area/lease 3.0 MW cogeneration power plant alongwith around 2 x 8000 area/number or wells to be drilled cases/day of IMFL/IMIL bottling unit ha. 4. New/Expansion/Modernization New 5. Existing Capacity/Area etc. a ha. 6. Category of project i.e. 'A' or 'B' A Does it attract the general condition? If yes, 7. No please specify 8. Does it attract the specific condition? If yes, No please specify 9. Village Goud Sargiguda, Taluka Junagarh, Dist Kalahandi, Location of the project Odisha Shape of the project land Block (Polygon) Uploaded GPS file Annexure­GPS file Uploaded copy of survey of India Toposheet Annexure­Survey of india toposheet 244, 249 to 251, 253 to 262, 295 to 298, 300 to 3024, Plot/Survey/Khasra No. 314, 317, 319, 322, 327,331, 334, 337, 339, 340 Town / Village Village Goud Sargiguda State of the project Orissa Details of State of the project S.no State Name District Name Tehsil Name NIL Nearest railway station along with distance Junagarh, 9 km 10. in kms Nearest airport along with distance in kms Raipur, 280 km 11. Nearest Town/City/District Headquarters Junagarh , 7 km along with distance in kms Village Panchayats, Zila Parishad, Muncipal 12. Corporation, Local body (Complete postal address with telephone nos. to be given) 13. Name of the Applicant Sunil Choudhary Village Goud Sargiguda, Taluka Junagarh, Dist Kalahandi, 14. Registered Address Odisha Address for correspondance: Name of the Company Starlight Energy Pvt. Ltd. Name of the Applicant Sunil Choudhary Designation (Owner/ Partner/ CEO) Director Pin code 769001 15. E­mail [email protected] Telephone No. 0661­2600525 Fax No. 0661­2600528 Copy of documents in support of the competence/authority of the person making NIL this application to make application on behalf of the User Agency . 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on No a toposheet 17. Whether part of Interlinked projects? No Whether separate application of Interlinked 18. N/A project has been submitted? 19. If Yes, MoEF file number N/A Date of submission N/A 20. If No, Reason N/A 21. Whether the proposal involves Approval/ Clearance under: if yes, details of the same and their status to be given (i) Whether the proposal involves approval/clearance under the Forest No (Conservation) Act,1980? (ii) Whether the proposal involves approval/clearance under the wildlife No (Protection) Act,1972? (iii) Whether the proposal involves approval/clearance under the C.R.Z No notification, 2011? 22. Whether there is any Government No Order/Policy relevent/relating to the site? 23. Whether any Forest Land Involved? Area of Forest land Involved (hectares) N/A 24. Whether there is any litigation pending against the project and/or land in which the No project is proposed to be set up? (a) Name of the Court N/A (b) Name of the Sub court N/A (c) Case No. N/A (d) Orders/directions of the court, if any and N/A relevance with the proposed project (II) Activity Construction, operation or decommissioning of the Project involving actions, which will cause 1 physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No Details there of (with approximate Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data Permanent or temporary change in land The company has purchased around 90 acres of land use, land cover or topography including 1.1 No from Govt. The land was earlier used for industrial increase in intensity of land use (with purposes. respect to local land use plan) Clearance of existing land, vegetation and 1.2 No No clearance of existing land, vegetation and buildings. buildings? 1.3 Creation of new land uses? No The land was earlier used for industrial purposes only. Pre­construction investigations e.g. bore No heavy construction activities needed, therefore bore 1.4 No houses, soil testing? houses or soil testing is not required. Construction of foundations (of shed and machinery), 1.5 Construction works? Yes sheds/buildings to house the plant and machinery. 1.6 Demolition works? No No demolition is needed. Temporary sites used for construction works Temporary sites for storage of construction material and 1.7 Yes or housing of construction workers? housing of workers would be constructed at site. Above ground buildings, structures or Construction of silos for the storage of grains, MS tanks 1.8 earthworks including linear structures,cut Yes for the storage of potable alcohol, foundations for boiler and fill or excavations and fill or excavations etc. Buildings for the bottling plant and office etc. Underground works including mining or 1.9 No No underground works would be there. tunneling? 1.10 Reclamation works? No No reclamation is involved. 1.11 Dredging? No No dredging is involved. 1.12 Offshore structures? No No offshore structures are needed. 1.13 Production and manufacturing processes? Yes Refer pre­feasibility project report attached. The industry would develop environmentally sound 1.14 Facilities for storage of goods or materials? Yes storage space for raw materials as wells as finished goods. The solid wastes generated in the form of wet cake Facilities for treatment or disposal of solid during grain based operation would be sold for cattle 1.15 Yes waste or liquid effluents? feed manufacturing. The ash generated @ 30 MT/day would be used for making of flyash bricks. Facilities for long term housing of There would not be any long term housing of 1.16 No operational workers? operational workers. New road, rail or sea traffic during No new road, rail or sea traffic required during 1.17 No construction or operation? construction or operation. New road, rail, air water borne or other No new road, rail, air waterborne or other transport transport infrastructure including new or 1.18 No infrastructure including new or altered routes and altered routes and stations, ports, airports stations, ports, airports, etc., required etc? Closure or diversion of existing transport No need for closure or diversion of existing transport 1.19 routes or infrastructure leading to changes No routes or infrastructure leading to changes in traffic in traffic movements? movements. 1.20 New or diverted transmission lines or No No new transmission line required. pipelines? Impoundment, damming, culverting, No need of any impoundment, damming, culverting, 1.21 realignment or other changes to the No realignment or other changes to the hydrology of hydrology of watercourses or aquifers? watercourses or aquifers 1.22 Stream crossings? No No stream crossing at/near the site. Abstraction or transfers of water from River water and ground water would be used @ around 1.23 Yes ground or surface waters? 1500 KL/day for industrial use. Changes in water bodies or the land surface No changes in water bodies or the land surface 1.24 No affecting drainage or run­off? affecting drainage or run­off. Limited manpower (max. 100 persons) would be Transport of personnel or materials for required from local level for the construction work. 1.25 construction, operation or Yes During operation of the industry local labour (maximum decommissioning? 200 persons) would be employed No decommissioning required. Long­term dismantling or decommissioning There is no long­term dismantling or decommissioning 1.26 No or restoration works? or restoration works Ongoing activity during decommissioning There is no ongoing activity during decommissioning 1.27 which could have an impact on the No which could have an impact on the environment environment? Influx of people to an area in either No influx of people to an area in either temporarily or 1.28 No temporarily or permanently? permanently There are no alien species in and around the industrial 1.29 Introduction of alien species? No unit There would not be any loss of native species or genetic 1.30 Loss of native species or genetic diversity? No diversity 1.31 Any other actions? No Use of Natural resources for construction or operation of the Project (such as land, water, 2 materials or energy, especially any resources which are non­renewable or in short supply): S.No Details thereof (with approximate Information/Checklist confirmation Yes/No quantities/rates, wherever possible) with source of information data Land especially undeveloped or agricultural 2.1 No The land was earlier used for industrial purposes. land (ha) The total quantity of water consumption for industrial Water (expected source & competing users) 2.2 Yes use will be about 1500 KL per day. River water and unit: KLD ground water would be used for the purpose. 2.3 Minerals (MT) No No natural minerals required/to be used. Construction material in the form of brick, aggregates, Construction material – stone, aggregates, 2.4 Yes sand/soil is only required for the construction of the sand / soil (expected source – MT) industrial unit.
Recommended publications
  • Governivient of Orissa Department of School & Mass Education District Primary Education Programme
    GOVERNIVIENT OF ORISSA DEPARTMENT OF SCHOOL & MASS EDUCATION DISTRICT PRIMARY EDUCATION PROGRAMME NIEPA DC D09227 DISTRICT PLAN FOR k a l a h a n d i d is t r ic t 6 4 / 3 ^ imKARY & DOCUMENTATION CENfRB National Inscitu’e of Kciucationa/ Planning »nd /^dminiKtriirion. 17-B, Srj Aurobiiido Marj, New Delhi-110016 ^ ^ o •)-7 page • CHAPTER-I INTRODUCTION a-4 CHAPTER-II THE DISTRICT PROFILE OF KALAHANDI. 5-18 CrlAPTER-III PRESENT EDDCATIONAL STATUS IN THE DISTRICT. 19-24 CHAPTEB-IV PROBLEMS AND ISSUES 20-35 CHAPTER-V GOALS AND TARGET 36-43 CHAPTER-VI PROCESS OF PLANNING PARTICIPATION OF PEOPLE. 44-47 CHAPTER-VII PROGRAMME COMPONENT AND COST ESTIMATE (ITEMWISE) CHAPTER-VIII BENEFITS AND RISKS s k CHAPTER-IX PHYSICAL AND FINANCIAL 9'5 ' TABLES OF PROGRAMME COMPONENT WITH YEAR WISE COST ESTIMATE. ANNEXTURES N ORISSA MAP t , 2 - CBAPTEP -I INTRODUCTION Education is a powerful instrument of social change. It invariably brings about a gradual transformation of the society in all spheres enriching the lives of the individuals. It is in this context that every nation in the world now lays much stress on education, specially on Primary education in as much as primary education is the very foundation of the educational system on which the edifice of the higher education rests. Now with the development of modern civilisation, a worldwide perception has been in evidence in which education for all is gradually gaining ground. In fact, Article 26(1) of the universal declaration of Human Rights, endows everybody in the world with the right to education.
    [Show full text]
  • Poverty and Economic Change in Kalahandi, Orissa: the Unfinished Agenda and New Challenges Sunil Kumar Mishra * Abstract
    Poverty and Economic Change in Kalahandi, Orissa: The Unfinished Agenda and New Challenges Sunil Kumar Mishra * Abstract Poverty rips the very social fabric of a society. Its victims are apparently divested of some universally accepted human quality of life. This paper analyses the incidence of poverty in the backward district of Kalahandi, Orissa. It focuses on the economic structure and socio-economic conditions of the people to identify the probable reasons for chronic poverty in the district. The paper argues that to reap the benefits of large deposits of raw material and human resources, development of the non-agricultural sector through proper planning is a prerequisite. Collectivity among the members of the co-operative societies and other decentralized institutions would help in harnessing the benefits. The possibilities of such collective actions for rural development are explored. Introduction Poverty in Kalahandi1 is paradoxical in nature. The district is rich in natural resources like forests and minerals, and has a large labour force. The landholding size is larger than the average size of landholdings in Punjab; it receives more rain than Punjab, and the cropped area in the district is the highest in Orissa (Mahapatra et al. 2001). Yet, people here are trapped in a vicious circle of poverty. Kalahandi is well known for its backwardness, hunger, starvation deaths and all other social maladies. The district came into prominence in the national and international developmental discourse in the 1980s when the people of the lower strata faced serious economic and social deprivation and were driven to eat inedible roots and grasses. Kalahandi has a high concentration of Scheduled Caste (SC) and Scheduled Tribe (ST) populations.
    [Show full text]
  • List of Colleges Affiliated to Sambalpur University
    List of Colleges affiliated to Sambalpur University Sl. No. Name, address & Contact Year Status Gen / Present 2f or Exam Stream with Sanctioned strength No. of the college of Govt/ Profes Status of 12b Code (subject to change: to be verified from the Estt. Pvt. ? sional Affilia- college office/website) Aided P G ! tion Non- WC ! (P/T) aided Arts Sc. Com. Others (Prof) Total 1. +3 Degree College, 1996 Pvt. Gen Perma - - 139 96 - - - 96 Karlapada, Kalahandi, (96- Non- nent 9937526567, 9777224521 97) aided (P) 2. +3 Women’s College, 1995 Pvt. Gen P - 130 128 - 64 - 192 Kantabanji, Bolangir, Non- W 9437243067, 9556159589 aided 3. +3 Degree College, 1990 Pvt. Gen P- 2003 12b 055 128 - - - 128 Sinapali, Nuapada aided (03-04) 9778697083,6671-235601 4. +3 Degree College, Tora, 1995 Pvt. Gen P-2005 - 159 128 - - - 128 Dist. Bargarh, Non- 9238773781, 9178005393 Aided 5. Area Education Society 1989 Pvt. Gen P- 2002 12b 066 64 - - - 64 (AES) College, Tarbha, Aided Subarnapur, 06654- 296902, 9437020830 6. Asian Workers’ 1984 Pvt. Prof P 12b - - - 64 PGDIRPM 136 Development Institute, Aided 48 B.Lib.Sc. Rourkela, Sundargarh 24 DEEM 06612640116, 9238345527 www.awdibmt.net , [email protected] 7. Agalpur Panchayat Samiti 1989 Pvt. Gen P- 2003 12b 003 128 64 - - 192 College, Roth, Bolangir Aided 06653-278241,9938322893 www.apscollege.net 8. Agalpur Science College, 2001 Pvt. Tempo - - 160 64 - - - 64 Agalpur, Bolangir Aided rary (T) 9437759791, 9. Anchal College, 1965 Pvt. Gen P 12 b 001 192 128 24 - 344 Padampur, Bargarh Aided 6683-223424, 0437403294 10. Anchalik Kishan College, 1983 Pvt.
    [Show full text]
  • Annual Report 2018-19
    Annual Report 2018-19 Shri Narendra Modi, Hon’ble Prime Minister of India launching “Saubhagya” Yojana Contents Sl No. Chapter Page No. 1 Performance Highlights 3 2 Organisational Set-Up 11 3 Capacity Addition Programme 13 4 Generation & Power Supply Position 17 5 Ultra Mega Power Projects (UMPPs) 21 6 Transmission 23 7 Status of Power Sector Reforms 29 8 5XUDO(OHFWULÀFDWLRQ,QLWLDWLYHV 33 ,QWHJUDWHG3RZHU'HYHORSPHQW6FKHPH ,3'6 8MMZDO'LVFRP$VVXUDQFH<RMDQD 8'$< DQG1DWLRQDO 9 41 Electricty Fund (NEF) 10 National Smart Grid Mission 49 11 (QHUJ\&RQVHUYDWLRQ 51 12 Charging Infrastructure for Electric Vehicles (EVs) 61 13 3ULYDWH6HFWRU3DUWLFLSDWLRQLQ3RZHU6HFWRU 63 14 International Co-Operation 67 15 3RZHU'HYHORSPHQW$FWLYLWLHVLQ1RUWK(DVWHUQ5HJLRQ 73 16 Central Electricity Authority (CEA) 75 17 Central Electricity Regulatory Commission (CERC) 81 18 Appellate Tribunal For Electricity (APTEL) 89 PUBLIC SECTOR UNDERTAKING 19 NTPC Limited 91 20 NHPC Limited 115 21 Power Grid Corporation of India Limited (PGCIL) 123 22 Power Finance Corporation Ltd. (PFC) 131 23 5XUDO(OHFWULÀFDWLRQ&RUSRUDWLRQ/LPLWHG 5(& 143 24 North Eastern Electric Power Corporation (NEEPCO) Ltd. 155 25 Power System Operation Corporation Ltd. (POSOCO) 157 JOINT VENTURE CORPORATIONS 26 SJVN Limited 159 27 THDC India Ltd 167 STATUTORY BODIES 28 Damodar Valley Corporation (DVC) 171 29 Bhakra Beas Management Board (BBMB) 181 30 %XUHDXRI(QHUJ\(IÀFLHQF\ %(( 185 AUTONOMOUS BODIES 31 Central Power Research Institute (CPRI) 187 32 National Power Training Institute (NPTI) 193 OTHER IMPORTANT
    [Show full text]
  • Place Based Incentive.Pdf
    GOVERNMENT OF ODISHA HEALTH & FAMILY WELFARE DEPARTMENT *** NOTIFICATION )c)5. 9 6 35/2015- /H., Dated: Government of Odisha is committed to provide adequate, acceptable, accessible, equitable and affordable Health Care Services to the people of Odisha. It has been experienced that retention of medical officers in rural and remote areas with specific focus on KBK, KBK+ and Tribal Sub-Plan areas continues to remain a big challenge before the Health Service sector. In order to incentivise the doctors to work in KBK, KBK+ and Tribal Sub-Plan difficult areas Government have been paying special incentive / allowance of Rs. 4,000/- per month to the M.Os. working at DHHs and SDHs and Rs. 8,000/- per month to the M.Os. working in CHCs and PHCs vide H & FW Department resolution No. 1489/H, dtd. 20.01.2012. However, it was seen that this needed a re-examination. It is therefore felt necessary to provide place based incentives to the Medical Officers working in different difficult / remote areas in the state as per vulnerability status of the places taking into consideration certain key parameters such as difficult and back wardness of the location, tribal dominance, left wing extremisms, train communication, road and transport facilities, social infrastructure and distance from state head quarter etc. Hence, Government have been pleased to categories the peripheral health institutions of the state as follows basing on their vulnerability status. 1. Vulnerability status of peripheral Health Institutions :- All the 1751 (One thousand seven hundred fifty one) peripheral Government Health Institutions of the State are differentiated into five different categories and declared as V-0 to V-4 Health Institutions as mentioned at Annexure-'A', taking into consideration their vulnerability status.
    [Show full text]
  • IEE: India: Rural Roads Sector II Investment Program (Project 4
    Environmental Assessment Report Initial Environmental Examination for Orissa Project Number: 37066 June 2009 India: Rural Roads Sector II Investment Program (Project 4) Prepared by [Author(s)] [Firm] [City, Country] Prepared by Ministry of Rural Development for the Asian Development Bank (ADB). Prepared for [Executing Agency] [Implementing Agency] The views expressed herein are those of the consultant and do not necessarily represent those of ADB’s members, Board of Directors, Management, or staff, and may be preliminary in nature. The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. RURAL ROADS SECTOR II INVESTMENT PROGRAMME ORISSA, INDIA INITIAL ENVIRONMENTAL EXAMINATION REPORT BATCH III: 1498.58 Km of Rural Roads June 2009 MINISTRY OF RURAL DEVELOPMENT Acronyms and Abbreviations ADB : Asian Development Bank BIS : Bureau of Indian Standards CD : Cross Drainage CGWB : Central Ground Water Board CO : Carbon Monoxide COI : Corridor of Impact DM : District Magistrate EA : Executing Agency EAF : Environment Assessment Framework ECOP : Environmental Codes of Practice EIA : Environmental Impact Assessment EMAP : Environmental Management Action Plan EO : Environmental Officer FEO : Field Environmental Officer FGD : Focus Group Discussion FFA : Framework Financing Agreement GOI : Government of India GP : Gram Panchayat GSB : Granular Sub Base HC : Hydro Carbon IA : Implementing Agency
    [Show full text]
  • Proceedidng of the Permit Grant Committee Meeting
    PROCEEDIDNG OF THE PERMIT GRANT COMMITTEE MEETING OF STA, ODISHA, CUTTACK HELD IN THE 7th FLOOR CONFERENCE HALL OF TRANSPSORT COMMISSIONER-CUM-CHAIRMAN,STA, ODISHA ON 23RD SEPTEMBER, 2019. 1. ROUTE- ANGUL TO ROURKELA, VIA-KHAMAR, BALIPASI AND BACK. VEHICLE NO. Vehicle No.OR19K-6937, CMD, OSRTC, BHUBANESWAR The applicant is represented by Sri Bibhuti Samal Sri Ashok Ku. Pattanayak and Pradipta Kumar Nayak the employees of OSRTC. There are two objections 1. Sri Bijay Kumar Sahoo, owner of vehicle No.OD19F-0096 ob:ected that the applied vehicle will start from Angul 05 minutes ahead or his vez-licie 2. Sri Dileswar Samal, owner of vehicle No.OD05H-421.6 has tiled objection stating that OSRTC has applied 10 minutes ahead of his timing There is clash of timing from Khamar to Rourkela. This may be verified. 2 ROUTE- BAHARANA TO SATAPADA, VIA-UTTARA CHHAK. PiPID .L\NDBACK VEHICLE NO OR19H-0747, CMD, OSRTC, BHUBANESWAR The applicant is represented by Sri Bibhuti Samal Sri Ashok Ku Pattanayak and Pradipta Kumar Nayak, the employee of OSRTC There is no objection. T.P. may be considered after checking of clash free timing. 3. ROUTE- JHARSUGUDA TO MALKANGIRI, VIA-NABARANGPUR, VEHICLE .OD17L- 0728, CMD, OSRTC, BHUBANESWAR The applicant is represented by Sri Bibhuti Sa, al Si Ashok Ku. Pattanayak and Pradipta Kumar Nayak, the employee of OSRTC. 1'nere is no objection. This is alter service of OD17L-0725. T.P. may be cori:deed as per the timing of the alter service. 4. ROUTE- PADAMPUR TO SONEPUR, VIA-DUDUKA, SALEBHATA AND BACK VEHICLE NO.ODO2BC-6649, CMD, OSRTC, BHUBANESWAR The applicant is represented by Sri Bibhuti Samal, S:i ;\shok Ku.
    [Show full text]
  • TOTAL List of Different 33/11Kv Sub-Stations in Phase-I For
    List of different 33/11kV sub-stations in Phase-I for construction under CESU PACKAGE-1 Type Sl.No District Constituency Proposed S/s Tapping point of S/s 1 Parjanga Sanda 33/11kV Parjang S/S 2 Hindol Meramundali 132/33 KV Hind Metal Grid Dhenkanal Kamakhyanaga 3 Pandua 132/33KV Kamakhyanagar Grid r Dhenkanal 4 Banasing 132/33KV Grid S/s Gundichhapada sadar AIS 5 Talchar Kalamchhuin Near Lakeipasi Village 6 Palahada kunjam 33/11kV Khamar S/S Near Brundaban Hotel 7 Anugul Angul Badakera Badakera 8 Athamallik Daurapalli 33/11KV Bamur S/s Near Nursury of 9 Chhendipada Kosala Chhendipada TOTAL 9Nos List of different 33/11kV sub-stations in Phase-I for construction under SOUTHCO PACKAGE-2 SL No District Name Name of Constituencies Proposed 33/11kV S/S Source(Either grid or Tapping point) Types os S/s 1 Boudha Baghiapada Katatala BOUDH Ghantapada (Back side of 2 Kantamal Kantamala Medical) 3 Phulbani Ganjuguda Baliguda feeder at Ganjuguda 4 KANDHAMAL Balliguda Sarangagada Baliguda feeder at Saranguda 5 G.Udayagiri Karada Raikia 6 Bisama Cuttack Ambadola Muniguda S/s-Proposed Hatadahikhal S/s 7 RAYAGADA Rayagada Jimilipeta Rayagada Grid 8 Gunupur Dambasora Padmapur Feeder 9 Bisama Cuttack K.Singpur Sikarpai S/s Total 9Nos List of different 33/11kV sub-stations in Phase-I for construction under SOUTHCO PACKAGE-3 SL No District Name Name of Constituencies Proposed 33/11kV S/S Source(Either grid or Tapping point) Types os S/s 1 Koraput Dasmantapur 33 kV line from Boipariguda to Govindpalli 2 Jeypore Kamta 33/11 kV Bisingpur 3 KORAPUT Laxmipur Podagada
    [Show full text]
  • District Irrigation Plan of Kalahandi District, Odisha
    District Irrigation Plan of Kalahandi, Odisha DISTRICT IRRIGATION PLAN OF KALAHANDI DISTRICT, ODISHA i District Irrigation Plan of Kalahandi, Odisha Prepared by: District Level Implementation Committee (DLIC), Kalahandi, Odisha Technical Support by: ICAR-Indian Institute of Soil and Water Conservation (IISWC), Research Centre, Sunabeda, Post Box-12, Koraput, Odisha Phone: 06853-220125; Fax: 06853-220124 E-mail: [email protected] For more information please contact: Collector & District Magistrate Bhawanipatna :766001 District : Kalahandi Phone : 06670-230201 Fax : 06670-230303 Email : [email protected] ii District Irrigation Plan of Kalahandi, Odisha FOREWORD Kalahandi district is the seventh largest district in the state and has spread about 7920 sq. kms area. The district is comes under the KBK region which is considered as the underdeveloped region of India. The SC/ST population of the district is around 46.31% of the total district population. More than 90% of the inhabitants are rural based and depends on agriculture for their livelihood. But the literacy rate of the Kalahandi districts is about 59.62% which is quite higher than the neighboring districts. The district receives good amount of rainfall which ranges from 1111 to 2712 mm. The Net Sown Area (NSA) of the districts is 31.72% to the total geographical area(TGA) of the district and area under irrigation is 66.21 % of the NSA. Though the larger area of the district is under irrigation, un-equal development of irrigation facility led to inequality between the blocks interns overall development. The district has good forest cover of about 49.22% of the TGA of the district.
    [Show full text]
  • Improving Rural Livelihoods Through Farmer-Centric Integrated Watershed Management
    Yearly Progress Report 2019-2020 Improving Rural Livelihoods through Farmer-centric Integrated Watershed Management Submitted to PowerGrid, Odisha Contents 1. Executive Summary ………………………………………………………………………………………………………3 2. Background…………………………………………………………………………………………………………………..3 3. Launching of the watershed program and implementation of interventions ................... 4 4. Team-building, local partnerships and liaising with stakeholders ..................................... 5 5. Formation of watershed committee .................................................................................. 6 6. Soil sampling and need-based fertilizer recommendations ............................................... 7 7. Participatory R&D trials/demonstrations .......................................................................... 9 8. Establishment of run-off recorder and automatic weather station .................................. 9 9. Baseline survey and participatory rural appraisal ........................................................... 10 10. Topographic survey and mapping of in-situ, ex-situ water conservation interventions . 24 11. Other income generating activities .................................................................................. 26 12. Capacity Building .............................................................................................................. 26 13. Annexures ......................................................................................................................... 27 1. Executive Summary
    [Show full text]
  • Sl. No Name of the DISCOM Name of the District Name Of
    Name of Sl. Name of the Name of the Name of 33/11 kV Notified injection the No District Division Substation capacity (In MW) DISCOM 196 TPSODL GANJAM BED-III Kukudakhandi 3.00 197 TPSODL GANJAM BNED SORADA 3.00 New Bus Stand (Burial 198 TPSODL KORAPUT JED Ground) 3.00 199 TPSODL GANJAM BNED BD PUR 3.00 200 TPSODL GANJAM BED-II Corporation Road (CAPEX) 3.00 201 TPSODL GANJAM GNED, Chatrapur Khalikote 3.00 202 TPSODL GAJAPATI PKED NUAGADA 3.00 203 TPSODL RAYAGADA GED Dambasara (odssp) 3.00 204 TPSODL BOUDH BOED Jannapanka 3.00 205 TPSODL GAJAPATI PKED PARALAKHEMUNDI(NEW) 3.00 206 TPSODL GAJAPATI PKED Uppalada 3.00 207 TPSODL GAJAPATI PKED Kharda 3.00 208 TPSODL GANJAM AED-I NUAGAM 3.00 209 TPSODL GANJAM BED-III Jagapur 3.00 210 TPSODL GANJAM BED-III Konishi 3.00 211 TPSODL GANJAM BED-II N.K.Nagar 3.00 212 TPSODL BOUDH BOED BOUDH 3.00 213 TPSODL KORAPUT JED Gumuda 3.00 214 TPCODL PURI NED, Nimapara Kakatpur 3.00 215 TPCODL PURI NED, Nimapara Balipatna 3.00 216 TPCODL CUTTACK SED, Salipur Nischintkoili 3.00 217 TPCODL CUTTACK SED, Salipur Orikanta 3.00 218 TPCODL CUTTACK AED, Atthagarh Badamba 3.00 219 TPCODL DHENKANAL DED, Dhenkanal Gundichapada 3.00 220 TPCODL DHENKANAL DED, Dhenkanal Bhuban 3.00 221 TPCODL ANGUL AED, Angul Chhendipada 3.00 222 TPCODL ANGUL AED, Angul Hemsarpada 3.00 223 TPCODL ANGUL TED, Chainpal Banarapal 3.00 224 TPCODL ANGUL TED, Chainpal Talcher, Hatatota-I 3.00 225 TPCODL ANGUL TED, Chainpal Kaniha 3.00 226 TPCODL NAYAGARH NED, Nayagarh Odogaon 3.00 227 TPCODL NAYAGARH NED, Nayagarh Itamati 3.00 228 TPCODL JAGATSINGHPUR JED, Jagatsinghpur Jagatsinghpur 3.00 229 TPCODL JAGATSINGHPUR JED, Jagatsinghpur Balikuda 3.00 JHARSUGUDA 230 TPWODL JHARSUGUDA BAMRA DIVISION 3.00 231 TPWODL KALAHANDI KEED NAKTIGUDA 3.00 232 TPWODL SAMBALPUR SEED PADIABAHAL 3.00 233 TPWODL KALAHANDI NED Sarabong 3.00 KHOLAN 234 TPWODL BOLANGIR TED, TITILAGARH 1X5MVA+1X3.15MVA 3.00 235 TPWODL BOLANGIR TED, TITILAGARH SAINTALA 2X3.15MVA 3.00 236 TPWODL SUBARNAPUR SED, SONEPUR CHERUPALI 3X5MVA 3.00 237 TPWODL JHARSUGUDA JHARSUGUDA BADMAL 3.00 RFP No.
    [Show full text]
  • Boudh District, Odisha River Sand
    DISTRICT SURVEY REPORT (DSR) OF BOUDH DISTRICT, ODISHA FOR RIVER SAND ODISHA BOUDH DIST. As per Notification No. S.O. 3611(E) New Delhi, 25th July, 2018 MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE (MoEF & CC) Prepared by COLLECTORATE, BOUDH CONTENT SL.NO DESCRIPTION PAGE NO 1 INTRODUCTION 1 2 OVERVIEW OF MINING ACTIVITIES IN THE DISTRICT 3 3 LIST OF LEASES WITH LOCATION, AREA AND PERIOD OF 3 VALIDITY 4 DETAILS OF ROYALITY COLLECTED 3 5 DETAILS OF PRODUCTION OF SAND 3 6 PROCESS OF DEPOSIT OF SEDIMENTS IN THE RIVERS 3 7 GENERAL PROFILE 4 8 LAND UTILISATION PATTERN 13 9 PHYSIOGRAPHY 13 10 RAINFALL 14 11 GEOLOGY AND MINERAL WALTH 14 12 DRAINAGE AND IRRIGATION PATTERN 16 13 DETAILS OF ECO-SENSTIVE ZONE AREA 19 14 MINING LEASES MARKED ON THE MAP OF THE DISTRICT 20 15 LIST OF LOI HOLDERS ALONG WITH VALIDITY 20 16 QUALITY/ GRADE OF MINERAL 20 17 USE OF MINERAL 20 18 DEMAND & SUPPLY OF THE MINERAL 20 19 DETAILS OF AREA WHERE THERE IS A CLUSTER OF MINING 20 LEASES 20 IMPACT ON THE ENVIRONMENT (AIR, WATER, NOISE, SOIL 21 FLORA & FAUNAL, LAND USE, AGRICULTURE, FOREST ETC.) DUE TO MINING 21 REMEDIAL MEASURES TO MITIGATE THE IMPACT OF 22 MINING ON THE ENVIRONMENT:- 22 ANY OTHER INFORMATION 24 LIST OF PLATES DESCRIPTION PLATE NO INDEX MAP OF THE DISTRICT 1 MAP SHOWING TAHASILS 2 ROAD MAP OF THE DISTRICT 3 MINERAL MAP OF THE DISTRICT 4 LEASE/POTENTIAL AREA MAP OF THE DISTRICT 5 DISTRICT SURVEY REPORT (DSR) BOUDH, DISTRICT PREFACE In compliance to the notification issued by the ministry of environment and forest and Climate Change Notification no.
    [Show full text]