Water Quality Bulletin 2 March 2011

Total Page:16

File Type:pdf, Size:1020Kb

Water Quality Bulletin 2 March 2011 D11/6241 Water Quality Bulletin 2 March 2011 Update on blackwater in the River Murray system The blackwater event in the River Murray, the Edward–Wakool, the Goulburn–Broken, Lower Darling, Murrumbidgee and Loddon rivers is continuing. The severity and extent of this event is due to the prolonged drought followed by widespread and persistent flooding, as a result there has been several sources of blackwater. Poor water quality from these floodplains continues to have a detrimental impact on the River Murray, however, the effect is no longer as pronounced as in previous weeks. Water quality information compiled by the Murray–Darling Freshwater Research Centre, (MDFRC) indicates that Dissolved Oxygen (DO) levels around Barmah-Millewa Forest remain stable at non critical levels. DO monitoring at Taylors Bridge Road, and in Barmah Lake, still exhibits DO concentrations at critical levels. This has been caused by a recent flood pulse through the Barmah- Millewa Forest. Downstream of Barmah in the River Murray between Echuca and Robinvale DO concentrations remain at critical levels. A slight recovery of DO concentrations has been observed between Robinvale and Mildura. The Goulburn River, Broken Creek and Gunbower Creek daily average DO concentrations have stabilised at non critical levels except at the monitoring site Condidorios which is continuing to record extremely low DO concentrations. Monitoring in the Coliban River, and Loddon River at Yando Road continue to record high DO concentrations at non critical levels. In the Edward River at Deniliquin, the DO concentrations have continued to increase to non critical levels. DO concentrations in the lower Darling River are stable at non critical levels, except at Wentworth the DO concentrations continue to be near critical levels. Frenchmans Creek inlet regulator is continuing to record critically low DO concentrations. Physical re-aeration over the inlet structure is having a moderate positive impact on DO concentrations along the remainder of Frenchmans Creek to Lake Victoria. DO monitoring on Lake Victoria shows that DO has increased to non critical levels. A continuing trend of increasing DO concentrations have been recorded in the River Murray above Waikerie in South Australia. At all sites downstream of Waikerie to the Lower Lakes, DO concentrations continue to be stable at near critical levels. To provide information on water quality during the blackwater event in the River Murray system the MDBA releases a dissolved oxygen level status map and weekly bulletin. This map visually represents the most recent dissolved oxygen levels measured within a 10 day period for sites monitored by numerous agencies. This information can be accessed at the MDBA website, http://www.mdba.gov.au/water/blackwater on a weekly basis. D11/6241 To report fish deaths In Victoria contact the Environment Protection Authority on 1800 444 004 In NSW contact Fisheries, Department of Industry and Investment on 1300 550 474 In SA contact Fishwatch on 1800 065 522 For media information Contact the MDBA media office on (02) 6279 0141 or email [email protected] For NSW contact Office of Water media on 0407 403 234 For Victoria contact the Department of Sustainability and Environment on 0400 983 471 For South Australia contact the Department for Water media team on (08) 8463 6637 For further information on blackwater please visit the MDBA website www.mdba.gov.au .
Recommended publications
  • Northern Region
    Section 5 Northern Region 109 5.1 Northern Region overview ............................................................................................... 111 5.2 Victorian Murray system .................................................................................................. 114 5.2.1 Barmah Forest ...................................................................................................... 116 5.2.2 Gunbower Creek and Forest ................................................................................ 119 5.2.3 Central Murray wetlands ...................................................................................... 124 5.2.4 Hattah Lakes ........................................................................................................ 129 5.2.5 Lower Murray wetlands ........................................................................................ 132 5.2.6 Lindsay, Mulcra and Wallpolla islands .................................................................. 137 5.3 Ovens system ................................................................................................................... 141 5.4 Goulburn system .............................................................................................................. 145 5.4.1 Goulburn River ..................................................................................................... 147 5.4.2 Goulburn wetlands ............................................................................................... 152 5.5 Broken system .................................................................................................................
    [Show full text]
  • Campaspe River Reach 2 Environmental Watering Plan
    CAMPASPE RIVER REACH 2 ENVIRONMENTAL WATERING PLAN PREPARED FOR THE GOULBURN-MURRAY WATER CONNECTIONS PROJECT JULY 2013 Campaspe River Reach 2 Environmental Watering Plan DOCUMENT HISTORY AND STATUS Version Date Issued Prepared By Reviewed By Date Approved Version 1 14 May 2013 Michelle Maher Emer Campbell 20 May 2013 Version 2 21 May 2013 Michelle Maher G-MW CP ETAC 7 June 2013 Version 3 13 June 2013 Michelle Maher G-MW CP ERP 12 July 2013 Version 4 16 July 2013 Michelle Maher G-MW CP ERP 22 July 2013 Version 5 22 July 2013 Michelle Maher G-MW CP ETAC TBC DISTRIBUTION Version Date Quantity Issued To Version 1 14 May 2013 Email Emer Campbell Version 2 21 May 2013 Email G-MW CP ETAC Version 3 13 June 2013 Email G-MW CP ERP Version 4 16 July 2013 Email G-MW CP ERP Version 5 22 July 2013 Email G-MW CP ETAC DOCUMENT MANAGEMENT Printed: 22 July 2013 Last saved: 22 July 2013 10:00 AM File name: NCCMA-81689 – Campaspe River Reach 2 EWP Authors: Michelle Maher Name of organisation: North Central CMA Name of document: Campaspe River Reach 2 Environmental Watering Plan Document version: Version 4, Final Document manager: 81689 For further information on any of the information contained within this document contact: North Central Catchment Management Authority PO Box 18 Huntly Vic 3551 T: 03 5440 1800 F: 03 5448 7148 E: [email protected] www.nccma.vic.gov.au © North Central Catchment Management Authority, 2013 Front cover photo: Campaspe River upstream of Runnymeade, Winter High Flow, 14 November 2011, Darren White, North Central CMA The Campaspe River Reach 2 Environmental Watering Plan is a working document, compiled from the best available information.
    [Show full text]
  • Trading Rules Controlling Irrigation Water Movement
    DEPARTMENT OF PRIMARY INDUSTRIES IMPACTS OF WATER TRADE ON AGRICULTURAL ECOSYSTEMS Trading rules controlling irrigation water movement July 2007 IMPACTS OF WATER TRADE ON AGRICULTURAL ECOSYSTEMS Trading rules controlling irrigation water movement For further information contact: Mike Morris Primary Industries Research Victoria Department of Primary Industries Private Bag 1 Ferguson Road Tatura Victoria 3616 Phone: (03) 5833 5283 Fax: (03) 5833 5299 Email: [email protected] Published by Primary Industries Research Victoria Department of Primary Industries, Tatura Private Bag 1 Ferguson Road Tatura Victoria 3616 July 2007 Find more information about DPI on the Internet at: www.dpi.vic.gov.au ISBN 978-1-74199-219-9 (print) ISBN 978-1-74199-220-5 (online) Disclaimer The information contained in this report is offered by the State of Victoria, through its Department of Primary Industries, solely to provide information. While the information contained in this report has been formulated with due care by the Department of Primary Industries, the State of Victoria, its servants and agents accept no responsibility for any error, omission, loss or other consequence which may arise from any person relying on anything contained in this paper. © State of Victoria, Department of Primary Industries, 2007 Executive summary This report presents an overview of water trading rules controlling irrigation water movement and information on the historical background preceding and underpinning current rules and regulations. Irrigation water trade ocurs under a Cap on consumptive entitlements implemented in 1995 and administered by the MDBC. Since imposition of the Cap, consumptive allocations have been progressively reduced to improve the condition of riverine ecosystems, and further reductions are likely.
    [Show full text]
  • Northern Region
    Section 5 Northern Region 109 5.1 Northern Region overview ............................................................................................... 111 5.2 Victorian Murray system .................................................................................................. 114 5.2.1 Barmah Forest ...................................................................................................... 116 5.2.2 Gunbower Creek and Forest ................................................................................ 119 5.2.3 Central Murray wetlands ...................................................................................... 124 5.2.4 Hattah Lakes ........................................................................................................ 129 5.2.5 Lower Murray wetlands ........................................................................................ 132 5.2.6 Lindsay, Mulcra and Wallpolla islands .................................................................. 137 5.3 Ovens system ................................................................................................................... 141 5.4 Goulburn system .............................................................................................................. 145 5.4.1 Goulburn River ..................................................................................................... 147 5.4.2 Goulburn wetlands ............................................................................................... 152 5.5 Broken system .................................................................................................................
    [Show full text]
  • Coliban Water Corporate Plan 2020 2025
    WATER SECURITY AND ZERO CARBON WATER IS A PRECIOUS RESOURCE HEALTHY PEOPLE AND ENVIRONMENT WATER IS ESSENTIAL TO SUSTAIN LIFE PROSPEROUS ECONOMIES WATER UNDERPINS ECONOMIC PROSPERITY Corporate Plan GREEN AND ACTIVE COMMUNITIES WATER UNDERPINS LIVEABILITY 2020–2025 OUR REGION LEGEND TRADITIONAL LAND OWNERS DJA DJA WURRUNG CLANS ABORIGINAL CORPORATION Cohuna TAUNGURUNG LAND AND WATERS COUNCIL (ABORIGINAL CORPORATION) (TLAWC) MURRAY RIVER YORTA YORTA NATION Leitchville ABORIGINAL CORPORATION Macorna CURRENTLY NOT REPRESENTED BY A Gunbower REGISTERED ABORIGINAL CORPORATION Pyramid Hill WATER SUPPLY SYSTEMS Echuca CAMPASPE Boort COLIBAN Mitiamo Mysia GOULBURN GROUNDWATER Jarklin Lockington Borung LODDON Wychitella Rochester MURRAY Korong Vale Dingee WIMMERA Serpentine Wedderburn SEWER Elmore Raywood WATER NON POTABLE Inglewood WATER (UNTREATED) Bridgewater Goornong RIVER AVOCA RIVER Sebastian RECYCLED WATER CAMPASPE Marong LODDON RIVER Bendigo Tarnagulla Bealiba Axedale Laanecoorie LAKE EPPALOCK Dunolly Heathcote Maldon Harcourt Tooborac Castlemaine Campbells Creek Chewton Elphinstone Mildura Newstead Fryerstown Taradale Guildford Malmsbury MALMSBURY Kyneton Echuca LAURISTON SheppartonShepppartpar oon WodongaWodoododoonganga UPPER COLIBAN Tylden HorshamHorsham BendigoBenBeenndigddiigo WangarattaW StawellStawell Castlemaine NORTH AraratArarat Kyneton victoriavictoria HamiltonHamilton 08,000 16,000 32,000 BallaratBallarat MelbourneMelbourne BairnsdaleBairnsdale Trentham GeelongGeelong SaleSale METRES Portland MorwellMorwell Warrnambool ColacColac COLIBAN WATER | CORPORATE PLAN 2020–2025 CONTENTS OUR CHALLENGE 2 OUR RESPONSE TO CORONAVIRUS (COVID-19) 3 WHO WE ARE AND WHAT WE DO 4 STRATEGY 2030 8 Strategic direction 1: Water security and zero carbon 8 Strategic direction 2: Healthy people and environment 14 Strategic direction 3: Prosperous economies 22 Strategic direction 4: Green and active communities 28 Business enablers 32 OUR FINANCIALS 33 APPENDICES 39 This photo was taken prior to coronavirus (COVID-19) restrictions and 1.
    [Show full text]
  • NORTH CENTRAL WATERWAY STRATEGY 2014-2022 CONTENTS Iii
    2014-2022 NORTH CENTRAL WATERWAY STRATEGY Acknowledgement of Country The North Central Catchment Management Authority acknowledges Aboriginal Traditional Owners within the region, their rich culture and spiritual connection to Country. We also recognise and acknowledge the contribution and interest of Aboriginal people and organisations in land and natural resource management. Document name: 2014-22 North Central Waterway Strategy North Central Catchment Management Authority PO Box 18 Huntly Vic 3551 T: 03 5440 1800 F: 03 5448 7148 E: [email protected] www.nccma.vic.gov.au © North Central Catchment Management Authority, 2014 A copy of this strategy is also available online at: www.nccma.vic.gov.au The North Central Catchment Management Authority wishes to acknowledge the Victorian Government for providing funding for this publication through the Victorian Waterway Management Strategy. This publication may be of assistance to you, but the North Central Catchment Management Authority (North Central CMA) and its employees do not guarantee it is without flaw of any kind, or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on information in this publication. The North Central Waterway Strategy was guided by a Steering Committee consisting of: • James Williams (Steering Committee Chair and North Central CMA Board Member) • Richard Carter (Natural Resource Management Committee Member) • Andrea Keleher (Department of Environment and Primary Industries) • Greg Smith (Goulburn-Murray Water) • Rohan Hogan (North Central CMA) • Tess Grieves (North Central CMA). The North Central CMA would like to acknowledge the contributions of the Steering Committee, Natural Resource Management Committee (NRMC) and the North Central CMA Board.
    [Show full text]
  • North Central CMA Region Loddon River System Environmental Water Management Plan
    North Central CMA Region Loddon River System Environmental Water Management Plan EWMP Area: Loddon River downstream of Cairn Curran Reservoir and including Tullaroop Creek downstream of Tullaroop Reservoir, Serpentine Creek, Twelve Mile Creek and Pyramid Creek Document History and Status Date Date Version Prepared By Reviewed By Issued Approved 1 (Ch 1-3) 27/2/15 Jon Leevers Louissa Rogers 15/3/15 1 (Ch 7-9) 12/3/15 Jon Leevers Louissa Rogers 17/3/15 1 (Whole) 13/4/15 Louissa Rogers Emer Campbell 17/4/15 DELWP (Melanie Tranter on behalf of Suzanne Witteveen, 2 17/4/15 Louissa Rogers 5/5/15 Susan Watson) Project Steering Committee (PSC), Community Advisory Group 3 21/5/15 Louissa Rogers 29/5/15 (CAG) 4 2/6/15 Louissa Rogers Emer Campbell 5/6/15 5 5/6/15 Louissa Rogers DELWP FINAL Distribution Version Date Quantity Issued To 1 (Ch 1-3) 27/2/15 1 Louissa Rogers 1 (Ch 7-9) 12/3/15 1 Louissa Rogers 1 (Whole) 13/4/15 1 (electronic) Emer Campbell 2 17/4/15 1 (electronic) DELWP (Suzanne Witteveen, Susan Watson) 3 21/5/15 ~35 PSC, CAG 4 2/6/15 1 (electronic) Emer Campbell 5 5/6/15 1 DEWLP (FINAL) Document Management Printed: 23/06/2015 4:35:00 PM Last saved: 9/06/2015 5:05:00 PM File name: Loddon River EWMP.docx Authors: Louissa Rogers and Jon Leevers Name of Organisation: North Central CMA Name of Document: North Central CMA Region Environmental Water Management Plan for the Loddon River System Document version: Version 5 SharePoint link: NCCMA-63-41009 For further information on any of the information contained within this document contact:
    [Show full text]
  • 2010-11 Victorian Floods Rainfall and Streamflow Assessment Project
    Review by: 2010-11 Victorian Floods Rainfall and Streamflow Assessment Project December 2012 ISO 9001 QEC22878 SAI Global Department of Sustainability and Environment 2010-11 Victorian Floods – Rainfall and Streamflow Assessment DOCUMENT STATUS Version Doc type Reviewed by Approved by Date issued v01 Report Warwick Bishop 02/06/2012 v02 Report Michael Cawood Warwick Bishop 07/11/2012 FINAL Report Ben Tate Ben Tate 07/12/2012 PROJECT DETAILS 2010-11 Victorian Floods – Rainfall and Streamflow Project Name Assessment Client Department of Sustainability and Environment Client Project Manager Simone Wilkinson Water Technology Project Manager Ben Tate Report Authors Ben Tate Job Number 2106-01 Report Number R02 Document Name 2106R02_FINAL_2010-11_VIC_Floods.docx Cover Photo: Flooding near Kerang in January 2011 (source: www.weeklytimesnow.com.au). Copyright Water Technology Pty Ltd has produced this document in accordance with instructions from Department of Sustainability and Environment for their use only. The concepts and information contained in this document are the copyright of Water Technology Pty Ltd. Use or copying of this document in whole or in part without written permission of Water Technology Pty Ltd constitutes an infringement of copyright. Water Technology Pty Ltd does not warrant this document is definitive nor free from error and does not accept liability for any loss caused, or arising from, reliance upon the information provided herein. 15 Business Park Drive Notting Hill VIC 3168 Telephone (03) 9558 9366 Fax (03) 9558 9365 ACN No. 093 377 283 ABN No. 60 093 377 283 2106-01 / R02 FINAL - 07/12/2012 ii Department of Sustainability and Environment 2010-11 Victorian Floods – Rainfall and Streamflow Assessment GLOSSARY Annual Exceedance Refers to the probability or risk of a flood of a given size occurring or being exceeded in any given year.
    [Show full text]
  • Riverboundarydetermination Pdf 2.9 MB
    RIVERS AND THEIR IMPACT ON CADASTRAL BOUNDARIES By Peter S. Knights Land Investigation & Advice Section Office of Surveyor General Authorised by John R. Parker Surveyor General October 1996 SYNOPSIS A paper, demonstrating with the examples of case studies, the impact on cadastral boundaries of moving rivers. The paper emphasis the significance and importance of (a) the 1881 Order in Council by which land along some 280 rivers was permanently reserved , (b) the 1905 Water Act which clarified the term "bed and banks", and (c) the 1850 Separation Act which dealt with the Murray River as the State boundary. The role of the Surveyor General as an arbitrator is discussed as is the role of the surveyor as a planner and land manager. RIVERS AND THEIR IMPACT ON CADASTRAL BOUNDARIES The complexities and variations of the position of title boundaries abutting or adjacent to water courses are topics that often cause vexation to property owners, surveyors, solicitors and Crown land administrators. A surveyor, grappling with a re-establishment problem on the banks of the Freestone Creek (15 kilometres north west of Stratford) where shortages of 200 metres over entitlement are evident. Or wondering which of the many courses is the main flow of the Murray River through the Barmah Forest, must surely question the sanity or sobriety of the careers adviser of his/her High School who recommended surveying as a suitable and rewarding profession. There are so many variables that effect the problem that as a general rule each and every case must be treated on its own set of circumstances.
    [Show full text]
  • Estimating the Impacts of Climate Change on Victoria's Runoff Using A
    Estimating the Impacts of Climate Change on Victoria’s Runoff using a Hydrological Sensitivity Model Roger N. Jones and Paul J. Durack A project commissioned by the Victorian Greenhouse Unit Victorian Department of Sustainability and Environment © CSIRO Australia 2005 Estimating the Impacts of Climate Change on Victoria’s Runoff using a Hydrological Sensitivity Model Jones, R.N. and Durack, P.J. CSIRO Atmospheric Research, Melbourne ISBN 0 643 09246 3 Acknowledgments: The Greenhouse Unit of the Government of Victoria is gratefully acknowledged for commissioning and encouraging this work. Dr Francis Chiew and Dr Walter Boughton are thanked for their work in running the SIMHYD and AWBM models for 22 catchments across Australia in the precursor to this work here. Without their efforts, this project would not have been possible. Rod Anderson, Jennifer Cane, Rae Moran and Penny Whetton are thanked for their extensive and insightful comments. The Commonwealth of Australia through the National Land Water Resources Assessment 1997–2001 are also acknowledged for the source data on catchment characteristics and the descriptions used in individual catchment entries. Climate scenarios and programming contributing to this project were undertaken by Janice Bathols and Jim Ricketts. This work has been developed from the results of numerous studies on the hydrological impacts of climate change in Australia funded by the Rural Industries Research and Development Corporation, the Australian Greenhouse Office, Melbourne Water, North-east Water and the Queensland Government. Collaborations with other CSIRO scientists and with the CRC for Catchment Hydrology have also been vital in carrying out this research. Address and contact details: Roger Jones CSIRO Atmospheric Research PMB 1 Aspendale Victoria 3195 Australia Ph: (+61 3) 9239 4400; Fax(+61 3) 9239 4444 Email: [email protected] Executive Summary This report provides estimated ranges of changes in mean annual runoff for all major Victorian catchments in 2030 and 2070 as a result of climate change.
    [Show full text]
  • Mercury and Arsenic in Victorian Waters: a Legacy of Historical Gold Mining Publication 1637.1* December 2017 Report *This Replaces 1637 Issued November 2016
    Mercury and arsenic in Victorian waters: a legacy of historical gold mining Publication 1637.1* December 2017 Report *This replaces 1637 issued November 2016 Contents List of figures ......................................................................................................................................................................... 2 List of tables .......................................................................................................................................................................... 2 Executive summary ............................................................................................................................................................... 3 1. Introduction ................................................................................................................................................................... 4 1.1 Mercury, arsenic, and gold mining ....................................................................................................................... 4 2. Objectives ..................................................................................................................................................................... 5 3. Methods ........................................................................................................................................................................ 5 3.1 Study design .......................................................................................................................................................
    [Show full text]
  • Chapter 3. Landscape, People and Economy
    Chapter 3. Landscape, people and economy Department of Environment, Land, Water and Planning 3. Landscape, people and economy Victoria’s North and Murray Water Resource Plan applies to surface water resources in the Northern Victoria and Victorian Murray water resource plan areas, and groundwater resources in Goulburn-Murray water resource plan area. This chapter provides a brief description of the landscape, people and economic drivers in the water resource plan areas. Working rivers The rivers of this water resource plan area provide many environmental, economic, and social benefits for Victorian communities. Most of northern Victoria’s rivers have been modified from their natural state to varying degrees. These modifications have affected hydrologic regimes, physical form, riparian vegetation, water quality and instream ecology. Under the Basin Plan it is not intended that these rivers and streams be restored to a pre-development state, but that they are managed as ‘working rivers’ with agreed sustainable levels of modification and use and improved ecological values and functions. 3.1 Features of Victorian Murray water resource plan area The Victorian Murray water resource plan area covers a broad range of aquatic environments from the highlands in the far east, to the Mallee region in the far west of the state. There are several full river systems in the water resource plan area, including the Kiewa and Mitta Mitta rivers. Other rivers that begin in different water resource plan areas converge with the River Murray in the Victorian Murray water resource plan area. There are a significant number of wetlands in this area, these wetlands are managed by four catchment management authorities (CMAs): Goulburn Broken, Mallee CMAs, North Central and North East and their respective land managers.
    [Show full text]