Priority List 2013-14 of

Priority List 2013-14 submitted by Government of Arunachal Pradesh, vide letter dated 24.06.2013:

Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No.

Civil Secretariat

Construction of Civil Secretariat at (SH: Boundary 1 1 49.00 Wall, Power Supply, Internal Roads and Gap Funding)

2 2 Construction of District Secretariat at Kraa Dadi District HQ 10.00

Construction of District Secretariat at Siang Dist. HQ (Phase 3 3 10.00 I) Construction of District Secretariat at Lower 4 4 10.00 HQ

5 5 Construction of District Secretariat at Namsai District HQ 10.00

Health Service 6 1 Reconstruction of District Hospital, 25.00 a 7 2 Reconstruction of District Hospital, 25.00 b 8 3 Reconstruction of District Hospital, 25.00 c 9 4 Reconstruction of District Hospital, 25.00 d 10 5 Reconstruction of District Hospital, 25.00 e 11 6 Reconstruction of District Hospital, 25.00 f 12 7 Reconstruction of District Hospital, 25.00 g Modernisation and upgradation of medical equipment at 13 8 4.00 h Niba Hospital Infrastructure development of Health Department under 14 9 3.00 Miao Circle Education Infrastructure development of State University(1st 15 1 15.00 Phase)

16 2 Infrastructure Development of IGG College, Tezu 10.00

17 3 Infrastructure Development of Govt. college 10.00

18 4 Infrastructure Development of Govt. college, 10.00

19 5 Infrastructure Development of DNG college, Itanagar 10.00

Create PDF files with PDF Writer for Windows 8. This is an evaluation copy. Buy full version now. Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No.

Infrastructure Development of Abotani Secondary School at 20 6 15.00 Kochputu, Daporijo, Upper Subansiri

Infrastructure Development of VKV School at Pekamaring in 21 7 3.00 Power Setting up of State Load Despatch Centre (SLDC) under 22 1 25.00 Power Department

Construction of 132 KV Single circuit Transmission line from 23 2 Bomdila to Kalaktang including 132 KV SS at Tenzinggaon 15.00 with C/o 132 KV Bay (Expression at Bomdila) (Phase-I)

Construction of 33 KV Line from 220/132/33 KV Power Grid S/S at to Kanubari i/c providing and installation of 24 3 23.00 2X1.6 MVA, 33/11 KV S/S along with required accessories and instrument at Kanubari in

Construction of 11 KV distribution Network and Association 25 4 10.16 Feeders in Khimiyang EAC HQ and adjoining areas

PHE & WS

26 1 Providing water supply at Bameng Admn. HQ(PhaseI) 15.00

27 2 Augmentation of water supply for Borduria 5.00 Roads & Bridges

C/o Internal/Sectoral Township road at Tani Happa(New )(SH: Survey Investigation, Jungle clearance, 28 1 12.00 Formation cutting, pavement, CD work, CC Drain & Protection Work)

29 2 C/o road from Doimukh to Kimin via Jumpa(ph-I) 23.00

30 3 C/o road from Nyodu to Sebe Siru Village 19.00

31 4 C/o road from Pine grove to Kardo(20 km)Phase I 20.00

32 5 C/o road from Diche to Kache village(4 km) 5.00

33 6 C/o road from Chimpu-I to village Lutu-Linya(4km) 5.00

C/o road including RCC Bridge (span 250 mtr) over river 34 7 Nao-Dihing under ADC Hqs Bordumsa to connect Mudoi 20.00 Tinali under EAC Hqs Diyum (phase I)

Create PDF files with PDF Writer for Windows 8. This is an evaluation copy. Buy full version now. Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No.

35 8 Construction of raod from Nyorak to Nikte (7 km) 5.00

36 9 Construction of road from Geku to Mariyang 25.00

C/o road from Gensi EAC HQ to connect newly created Sibe 37 10 15.00 CO HQ under (45 km phase-I)

C/o road from Bana to Richukrong Admn. CO HQ via Kaya 38 11 15.00 Valley (30 km)(phase I) C/o Namshu, Khotim Yusung Gompa to Khalibok raod in 39 12 20.00 C/o road from Dudunghar to Momang cultural centre via 40 13 Maymey village and Dungsar village under Lumla Sub- 10.00 division 41 14 C/o road from PMGSY road to Khet vilage 10.83

C/o Rcc Bridge over Chengo river on Janam to Okhosum 42 15 5.00 road in between Nginu to Kambhua Noknu

C/o road from BRTF road point Baiunu-Nginu to Kaimoi 43 16 3.00 village C/o road from 2 km (CWC Points) Bonglang raod to Ket 44 17 12.60 village(8km) C/o raod from Chongkam to Meme via Namliang 45 18 15.00 i village(10km) 46 19 C/o Piyong-Jenglai-Wingko road(15km) 15.00 j

47 20 C/o road from Seppa HQ to Tassomora village (15km) 10.00

48 21 C/o road from Neelam to Pista, lower Subansiri 10.00

49 22 C/o road from Parsi-Parlo to Pipsorang circle HQ 20.00

C/o road from Bogne Mara to Lepajaring via Dagiam under 50 23 10.00 Taliha circle , Upper Subansiri 51 24 C/o road from Magopam to Bichom(ph-III) 15.00 C/o road to connect Rumgong ADC HQ with Kaying EAC 52 25 10.00 HQ(Ph-I) Sub-total-I 767.59

Additional projects included in Priority List for 2013-14 submitted vide letter dated 16.07.2013:

Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No.

Create PDF files with PDF Writer for Windows 8. This is an evaluation copy. Buy full version now. Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No. Roads & Bridges

C/o Linkh road from NH-52 to Niglok Industrial Growth 53 1 10.29 Centre via Lingka village (5km)

C/o road from Parsiparlo to Tali, Phase-II (C/o bridge over 54 2 12.00 Kumey river) C/o and improvement of raod from Maro to Baririjo(11km) 55 3 (SH: Widening RCC culvert, B/wall, R/wall and pavements 16.00 etc Education Infrastructure development of Govt. Middle School, 56 1 7.50 Yemsing IT Sector 57 1 Itanagar City Surveillance 18.65 Sub-total-II 64.44

Additional projects included in Priority List for 2013-14 submitted, vide letter dated 30.08.2013, by Planning Department, Government of Arunachal Pradesh:

Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No. Power

Upgradation, improvement and renovation of electrical 58 1 25.00 installations in West Kameng district

Improvement of power transmission & distribution system 59 2 13.82 under Miao Electrical Sub-Division

Construction of 132 kv S/C Transmission line from Rupai to 60 3 Manmow (Namsai) i/c 2 nos.132 kv Bay along with 5 MVA 84.66 33/11 KV Power sub station

Roads & Bridges Construction of road from Taljiparam to New Riba Govt. 61 1 Primary School and Health sub centre via Jiri Riba & new 5.00 Riba Construction of road from Patuk ADC Hq to Chote via 62 2 30.00 Mangio(20 km) Phase I Construction of road from Khonsa-Hukanjuri road to 63 3 10.00 Sumsipathar village @

Create PDF files with PDF Writer for Windows 8. This is an evaluation copy. Buy full version now. Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No.

Constsruction of road from NH-52A 6km near Lingalaya 64 4 4.00 Ashram to Mudirijo village,

65 5 Construction of Chayangtajo Township road (5 km) 7.00

Construction of road from Yaya to Kunglo village via Qungte 66 6 29.55 and Tar village (80km) Phase-I: 10 km

Construction of road from BRTF raod to Yigi Kaum via Darka 67 7 24.00 village(15km)

Constsruction of road from Lipu Bagra-Jeye Bagra road to 68 8 12.00 Nyorak village (7km) in West Siang district

Construction of road from Beak-rijo to Bogbak Hali via 69 9 48.40 Param, Paja, Jabiri, Jayi Hali village

Construction of 6 nos. bridges to provide connectivity to 70 10 33.00 Admn CQ Hq, Palling with District Hq

Construction of road from Kaimai village to Khela village(10 71 11 20.00 km)in Tirap district @

Construction of road from Riew village to Sissen village via 72 12 Begging, Mopit, Komsing Karo, Komsing Kumku & Pangi in 123.23

Education

73 1 Infrastructure development of Pado Middle School, Pado 4.00

74 2 Infrastructure development of Govt. College, Bomdila 10.00

PHE & WS 75 1 Providing water supply at Seijosa

76 2 Water Supply at Raga Township (for 0.66 MLD) 15.00

Augmentation of water supply system at Rajiv Gandhi 77 3 23.15 University, Rono Hills, Doimukh Urban Development Construction of Dormitory-cum-Lodge at Aalo near Nibo 78 1 7.00 Cottage Infrastructure Development

79 1 Infrastructure Development of Bomdila Monastic Complex 5.00

Create PDF files with PDF Writer for Windows 8. This is an evaluation copy. Buy full version now. Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No.

80 2 C/o 20 Bedded Hospital at Injan Village, $ 4.94

Construction of Mini secretariat at Newly created Longding 81 3 20.00 district Sub-total-III 558.75

Additional project included by State Govt. in Priority List 2013-14 vide letter dt. 30.10.2013:

Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No.

Development of Deomali-Magherita Road (Deomali-Dirok 82 1 20.68 portion)

Additional project included by State Govt. in Priority List 2013-14 vide letter dt. 09.12.2013:

Estimated Cost Sl. Sub-Sl. Name of project (Rs. crore) No. No.

83 1 e-Darbar for Virtual Citizen Connect 25.26 TOTAL 1436.72 $: Initial proposal of C/o Cultural cum Development Centre at Miao, Changlang has been replaced with C/o 20 Bedded Hospital at Injan Village, Kharsang vide letter dt. 28.10.2013

Note: a: Rs.27.05 crore as per Concept Paper; b: Rs.28.25 crore as per Concept Paper; c: Rs.25.58 crore as per Concept Paper; d: Rs.34.59 crore as per Concept Paper; e: Rs.33.38 crore as per Concept Paper; f: Rs.28.15 crore as per Concept Paper; g: Rs.31.80 crore as per Concept Paper; h: Rs.4.27 crore as per Concept Paper; i: Rs.14.95 crore as per Concept Paper; j: Rs.11.60 crore as per Concept Paper.