Secretary, SEAC-3 Chairman, SEAC-3 Minutes of 109Th SEAC-3
Total Page:16
File Type:pdf, Size:1020Kb
Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference Minutes of 109th SEAC-3 meeting held on 8-9-10 June, 2020 through Video Conference The tenure of SEIAA/SEAC‟s in the State of Maharashtra ended on 16th March 2020. The MoEF&CC informed to the Maharashtra SEIAA by an e-mail stating that, the tenure of SEIAA, Maharashtra has been extended up to 16.06.2020 In view of above communication and present pandemic situation of COVID-19, Maharashtra SEIAA directed SEAC-3 to appraise the proposals by using information technology facilities. Hence, SEAC-3 initiated to appraise the proposal received by the SEIAA through Videoconferencing technology from 8th June, 2020 to 10th June, 2020. All the members confirmed that they have received information pertaining to the proposals considered in this meeting through e-mail. Following members of SEAC-3 were present for videoconference. Shri. Anil Kale, IAS Rtd. Chairman 8-9-10 June, 2020 Dr. Shankar Vishwanath Member 8-9-10 June, 2020 Shri. Sudhir Yashwant Ghate Member 8-9-10 June, 2020 Dr. Rajesh B. Biniwale Member 8-9-10 June, 2020 Shri. Pradeepkumar P. Joshi Member 8-9-10 June, 2020 Shri. Ajay Dhumal Member 8-9-10 June, 2020 Dr. Ramesh Chillawar Member 8-9-10 June, 2020 Shri Dattatray Thorat Member 8-9-10 June, 2020 Shri. Joy S. Thakur Secretary 8-9-10 June, 2020 Chairman welcomed the members to the 109th SEAC III Meeting. Discussion Points: 1. The minutes of the earlier meeting were confirmed. 2. Agenda Items were taken up for consideration. ****** Secretary, SEAC-3 Chairman, SEAC-3 Page 1 of 63 Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference 08.06.2020 P.1 52170/2018 „Raheja Vistas Premiere‟ at S. no.37/3, 37/4, 27/1, 27/2, 27/3, 27/4, 27/5, 25/4, 26/1, Village Mohammad Wadi, Pune, by M/s Inorbit Malls (India) Pvt. Ltd. PP had submitted application for prior Environmental clearance for total plot area of 13,0877.97 m2, FSI area of 1,52,714.10 m2, Non FSI area of 1,26,760.64 m2 and total BUA of 2,79,474.74 m2. Brief information of the proposal is as below: Name of Project Residential Project : Raheja Vistas Premiere Project category 8(b) Type of Institution Private Project Proponent Name Mr. Nishikant D. Shimpi (Sr. Vice President) M/s. In Orbit malls (India) Pvt. Ltd. Communication Office No 101, Building No 7, Commerzone, Off address Airport Road, Samrat Ashok Path, Yerwada, Pune, Haveli,Pune-411006 Consultant Sneha Hi-Tech Products Pvt. Ltd. Applied for Amendment in EC Details of previous EC EC received vide no. SEIAA-EC-0000001454 dated 05.04.2019 Location of the project S.No. 37/3, 37/4, 27/1, 27/2, 27/3, 27/4, 27/5, 25/4, 26/1+9a, 26/2a+2b, Village: Mohammadwadi, Taluka: Haveli, Pune Latitude and Longitude Lat:18°28'8.88"N, Log: 73°54'32.76"E Total Plot Area (m2) 13,0877.97 sq.m. Deductions (m2) 29,773.94 sq.m. Net Plot area (m2) 1,01,104.03 sq.m. Proposed FSI area (m2) 1,52,714.10 sq.m. Proposed non-FSI area (m2) 1,26,760.64 sq.m. Proposed TBUA (m2) 2,79,474.74 sq.m. TBUA (m2) approved by Approved FSI is 2,83,343.92 sq.m. by PMC vide sanction no. CC/2627/19 Planning Authority till date dated 28.01.2020 Ground coverage (m2) & % 29,384.43 sq.m. (35.34%) Total Project Cost (Rs.) Rs. 658 Crores CER as per MoEF & CC circular dated Since amendment in project does not involve any additional project 01/05/2018 investment, CER Is not applicable as per point no. IX of MoEF & CC circular dated 01/05/2018. Proposed Configuration Building Name Configuration Height (m) T1A 5P+G+4 Floors 30 T1B 5P+G+6 Floors 38 T2A 5P+G+6 Floors 38 T2B 5P+G+4 Floors 30 T3 5P+G+4 Floors 30 T4 5P+G+4 Floors 30 T5 2P+G+18 Floors 70 T6 2P+G+18 Floors 70 Secretary, SEAC-3 Chairman, SEAC-3 Page 2 of 63 Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference T7 5P+G+27 Floors 100 T8 5P+G+27 Floors 100 T9 5P+G+27 Floors 100 T10 5P+G+27 Floors 100 T11A 5P+G+4 Floors 30 T11B 5P+G+4 Floors 30 T12 3P+G+18 Floors 70 T13 2P+G+18 Floors 70 Club House G+1 - The proposal was discussed on the basis of the documents submitted and presentation made by the proponent. The Committee observed that the proposal was considered in 70th, 74th & 77th SEAC-3 meeting. In 77th SEAC-3 meeting the proposal was previously appraised by SEAC-3 for FSI area of 1,52,714.10 m2, Non FSI area of 1,26,760.64 m2 and total BUA of 2,79,474.74 m2 and the proposal was recommended for grant of EC for aforesaid figures of FSI, non-FSI and TBUA. Then case was discussed in 151st & 162nd SEIAA meeting. As per decision taken in 162nd meeting of SEIAA, EC was granted vide no. SEIAA-EC-0000001454 dated 05.04.2019 restricting to total built up area of 1,45,517.65 m2. (FSI: 93,394.07 m2 & non FSI: 52,123.58 m2) as per sanction dated 21.02.2019 vide no.CC/3665/18. Further on 28.01.2020 PP had obtained revised sanction vide no. CC/2627/19 for total FSI area of 2,83,343.92 m2. On 09.03.2020, PP had applied through PARIVESH portal for issuing the EC for total built up area for which appraisal was done in 77th SEAC-3 meeting i.e. 2,79,474.74 m2. (FSI: 1,52,714.10 m2 and Non FSI: 1,26,760.64 m2). PP has informed that there is no change in project configuration and environmental parameters as per appraisal made by SEAC-3 in its 77th Meeting. During discussion following points emerged: (1) PP to revalidate NOCs viz. for Water Supply, Drainage, CFO, Garden, Solid waste management etc. if expired. (2) PP to envisage bio medical waste management plan, especially for disposal of masksetc. In view of above, the Committee decided to refer the proposal to SEIAA for further needful action. ****** Secretary, SEAC-3 Chairman, SEAC-3 Page 3 of 63 Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference P.2 145465/2020 Green County Phase-1 at S No 171/5,171/6A, 171/6B(P), 172/1(P), 172/6, 172/3, 172/4(P), Pune-Saswad Road, Fursungi, Pune by Anand Developers. PP had submitted application for prior Environmental clearance for total plot area of 25375.00 m2, FSI area of 36644.09 m2, Non FSI area of 18100.28 m2 and total BUA of 54744.37 m2. Brief information of the proposal is as below: Name of Project “Green County Phase-1” Project category 8(a) Type of Institution Private Project Proponent Name Mr. Nitin Suresh Malpani Regd. Office address 801, City Square, C.T.S. No. 1723, plot no.96, Behind Rahul Cinema Next to Zenith Complex,Shivajinagar,Pune-411 005 Consultant JV Analytical Services, Accreditation Number: ABET/EIA/1720/IA0022 Details of previous EC Vide No: SEAC-2016/C.R.424/TC-1 Dated: 03/05/2017 Location of the project S.No.171/5,171/6A, 171/6B(P),172/1(P),172/6,172/3,172/4(P), Pune Saswad Road, Village Fursungi, Tal – Haveli, Dist.- Pune 412307. Latitude and Longitude Longitude – 18°28‟52.53“ N , Latitude – 73°57„26.23“ E Total Plot Area (m2) 25375.00 m2 Deductions (m2) 70.40 m2 Net Plot area (m2) 25304.60 m2 Proposed FSI area (m2) 36644.09 m2 Proposed non-FSI area(m2) 18100.28 m2 Proposed TBUA (m2) 54744.37 m2 TBUA (m2) approved by FSI- 27941.26m2, Non FSI- 12925.11m2, Total= 40866.37 m2 Planning Authority till date Ground coverage (m2)& % 6790.48 m2 26.76% of total plot area (25375.00 m2) , 26.83% of net plot area (25304.60m2) Total Project Cost (Rs.) 720000000 CER as per MoEF& CC Activity Location Cost (Rs.) Duration circular dated 01/05/2018 Infrastructure 1)Anath Ashram Hadapsar- 6,00,000 2020-2021 creation for 2) Municipal School No. 81, sanitation Hadapsar- Infrastructure 1)Government PMC Urdu school, 12,00,000 2021-2022 creation for Hadapsar Gaon 2) Zilla Parishad electrification in Prathmik Shala,Hadapsar including solar power Rain Water 1}Government High School at 10,00,000 2022-2023 Harvesting Manter Wadi, Fursungi 2) ESI Hospital, Hadapsar Infrastructure 1) Zilla Parished Prathmik Shala at 8,40,000 2023-2024 creation for Hadapsar education 2) Pune Municipal Corporation School No 58 G at Hadapsar. Plantation in 1)PMC Garden at Hadapsar- 2)Nani 13,00,000 2020-2021 community areas nani park, Mundhwa kharadi road- Secretary, SEAC-3 Chairman, SEAC-3 Page 4 of 63 Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference Details of Building Configuration: Reason for Modification / Previous EC / Existing Building Proposed Configuration Change Building Configurat Height Building Configuratio Height Changes in DC rule Name ion (m) Name n (m) because earlier project is in PMRDA 37.46 37.46 Building A1 P+12 Building A1 P+12 Now in PMC.