The tenure of SEIAA/SEAC‟s in the State of ended on 16th March 2020. The MoEF&CC informed to the Maharashtra SEIAA by an e-mail stating that, the tenure of SEIAA, Maharashtra has been extended up to 16.06.2020

In view of above communication and present pandemic situation of COVID-19, Maharashtra SEIAA directed SEAC-3 to appraise the proposals by using information technology facilities. Hence, SEAC-3 initiated to appraise the proposal received by the SEIAA through Videoconferencing technology from 8th June, 2020 to 10th June, 2020. All the members confirmed that they have received information pertaining to the proposals considered in this meeting through e-mail.

Following members of SEAC-3 were present for videoconference.

Shri. Anil Kale, IAS Rtd. Chairman 8-9-10 June, 2020 Dr. Shankar Vishwanath Member 8-9-10 June, 2020 Shri. Sudhir Yashwant Ghate Member 8-9-10 June, 2020 Dr. Rajesh B. Biniwale Member 8-9-10 June, 2020 Shri. Pradeepkumar P. Joshi Member 8-9-10 June, 2020 Shri. Ajay Dhumal Member 8-9-10 June, 2020 Dr. Ramesh Chillawar Member 8-9-10 June, 2020 Shri Dattatray Thorat Member 8-9-10 June, 2020 Shri. Joy S. Thakur Secretary 8-9-10 June, 2020

Chairman welcomed the members to the 109th SEAC III Meeting.

Discussion Points: 1. The minutes of the earlier meeting were confirmed. 2. Agenda Items were taken up for consideration. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 1 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

08.06.2020 P.1 52170/2018 „Raheja Vistas Premiere‟ at S. no.37/3, 37/4, 27/1, 27/2, 27/3, 27/4, 27/5, 25/4, 26/1, Village Mohammad Wadi, , by M/s Inorbit Malls () Pvt. Ltd. PP had submitted application for prior Environmental clearance for total plot area of 13,0877.97 m2, FSI area of 1,52,714.10 m2, Non FSI area of 1,26,760.64 m2 and total BUA of 2,79,474.74 m2.

Brief information of the proposal is as below: Name of Project Residential Project : Raheja Vistas Premiere Project category 8(b) Type of Institution Private Project Proponent Name Mr. Nishikant D. Shimpi (Sr. Vice President) M/s. In Orbit malls (India) Pvt. Ltd. Communication Office No 101, Building No 7, Commerzone, Off address Airport Road, Samrat Ashok Path, Yerwada, Pune, Haveli,Pune-411006 Consultant Sneha Hi-Tech Products Pvt. Ltd. Applied for Amendment in EC Details of previous EC EC received vide no. SEIAA-EC-0000001454 dated 05.04.2019 Location of the project S.No. 37/3, 37/4, 27/1, 27/2, 27/3, 27/4, 27/5, 25/4, 26/1+9a, 26/2a+2b, Village: Mohammadwadi, Taluka: Haveli, Pune Latitude and Longitude Lat:18°28'8.88"N, Log: 73°54'32.76"E Total Plot Area (m2) 13,0877.97 sq.m. Deductions (m2) 29,773.94 sq.m. Net Plot area (m2) 1,01,104.03 sq.m. Proposed FSI area (m2) 1,52,714.10 sq.m. Proposed non-FSI area (m2) 1,26,760.64 sq.m. Proposed TBUA (m2) 2,79,474.74 sq.m. TBUA (m2) approved by Approved FSI is 2,83,343.92 sq.m. by PMC vide sanction no. CC/2627/19 Planning Authority till date dated 28.01.2020 Ground coverage (m2) & % 29,384.43 sq.m. (35.34%) Total Project Cost (Rs.) Rs. 658 Crores CER as per MoEF & CC circular dated Since amendment in project does not involve any additional project 01/05/2018 investment, CER Is not applicable as per point no. IX of MoEF & CC circular dated 01/05/2018.

Proposed Configuration Building Name Configuration Height (m) T1A 5P+G+4 Floors 30 T1B 5P+G+6 Floors 38 T2A 5P+G+6 Floors 38 T2B 5P+G+4 Floors 30 T3 5P+G+4 Floors 30 T4 5P+G+4 Floors 30 T5 2P+G+18 Floors 70 T6 2P+G+18 Floors 70

Secretary, SEAC-3 Chairman, SEAC-3 Page 2 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

T7 5P+G+27 Floors 100 T8 5P+G+27 Floors 100 T9 5P+G+27 Floors 100 T10 5P+G+27 Floors 100 T11A 5P+G+4 Floors 30 T11B 5P+G+4 Floors 30 T12 3P+G+18 Floors 70 T13 2P+G+18 Floors 70 Club House G+1 -

The proposal was discussed on the basis of the documents submitted and presentation made by the proponent.

The Committee observed that the proposal was considered in 70th, 74th & 77th SEAC-3 meeting. In 77th SEAC-3 meeting the proposal was previously appraised by SEAC-3 for FSI area of 1,52,714.10 m2, Non FSI area of 1,26,760.64 m2 and total BUA of 2,79,474.74 m2 and the proposal was recommended for grant of EC for aforesaid figures of FSI, non-FSI and TBUA.

Then case was discussed in 151st & 162nd SEIAA meeting. As per decision taken in 162nd meeting of SEIAA, EC was granted vide no. SEIAA-EC-0000001454 dated 05.04.2019 restricting to total built up area of 1,45,517.65 m2. (FSI: 93,394.07 m2 & non FSI: 52,123.58 m2) as per sanction dated 21.02.2019 vide no.CC/3665/18.

Further on 28.01.2020 PP had obtained revised sanction vide no. CC/2627/19 for total FSI area of 2,83,343.92 m2.

On 09.03.2020, PP had applied through PARIVESH portal for issuing the EC for total built up area for which appraisal was done in 77th SEAC-3 meeting i.e. 2,79,474.74 m2. (FSI: 1,52,714.10 m2 and Non FSI: 1,26,760.64 m2).

PP has informed that there is no change in project configuration and environmental parameters as per appraisal made by SEAC-3 in its 77th Meeting.

During discussion following points emerged: (1) PP to revalidate NOCs viz. for Water Supply, Drainage, CFO, Garden, Solid waste management etc. if expired. (2) PP to envisage bio medical waste management plan, especially for disposal of masksetc.

In view of above, the Committee decided to refer the proposal to SEIAA for further needful action. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 3 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.2 145465/2020 Green County Phase-1 at S No 171/5,171/6A, 171/6B(P), 172/1(P), 172/6, 172/3, 172/4(P), Pune-Saswad Road, Fursungi, Pune by Anand Developers. PP had submitted application for prior Environmental clearance for total plot area of 25375.00 m2, FSI area of 36644.09 m2, Non FSI area of 18100.28 m2 and total BUA of 54744.37 m2. Brief information of the proposal is as below: Name of Project “Green County Phase-1” Project category 8(a) Type of Institution Private Project Proponent Name Mr. Nitin Suresh Malpani Regd. Office address 801, City Square, C.T.S. No. 1723, plot no.96, Behind Rahul Cinema Next to Zenith Complex,Shivajinagar,Pune-411 005 Consultant JV Analytical Services, Accreditation Number: ABET/EIA/1720/IA0022 Details of previous EC Vide No: SEAC-2016/C.R.424/TC-1 Dated: 03/05/2017 Location of the project S.No.171/5,171/6A, 171/6B(P),172/1(P),172/6,172/3,172/4(P), Pune Saswad Road, Village Fursungi, Tal – Haveli, Dist.- Pune 412307. Latitude and Longitude Longitude – 18°28‟52.53“ N , Latitude – 73°57„26.23“ E Total Plot Area (m2) 25375.00 m2 Deductions (m2) 70.40 m2 Net Plot area (m2) 25304.60 m2 Proposed FSI area (m2) 36644.09 m2 Proposed non-FSI area(m2) 18100.28 m2 Proposed TBUA (m2) 54744.37 m2 TBUA (m2) approved by FSI- 27941.26m2, Non FSI- 12925.11m2, Total= 40866.37 m2 Planning Authority till date Ground coverage (m2)& % 6790.48 m2 26.76% of total plot area (25375.00 m2) , 26.83% of net plot area (25304.60m2) Total Project Cost (Rs.) 720000000 CER as per MoEF& CC Activity Location Cost (Rs.) Duration circular dated 01/05/2018 Infrastructure 1)Anath Ashram Hadapsar- 6,00,000 2020-2021 creation for 2) Municipal School No. 81, sanitation Hadapsar- Infrastructure 1)Government PMC Urdu school, 12,00,000 2021-2022 creation for Hadapsar Gaon 2) Zilla Parishad electrification in Prathmik Shala,Hadapsar including solar power Rain Water 1}Government High School at 10,00,000 2022-2023 Harvesting Manter Wadi, Fursungi 2) ESI Hospital, Hadapsar Infrastructure 1) Zilla Parished Prathmik Shala at 8,40,000 2023-2024 creation for Hadapsar education 2) Pune Municipal Corporation School No 58 G at Hadapsar. Plantation in 1)PMC Garden at Hadapsar- 2)Nani 13,00,000 2020-2021 community areas nani park, Mundhwa kharadi road-

Secretary, SEAC-3 Chairman, SEAC-3 Page 4 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Details of Building Configuration: Reason for Modification / Previous EC / Existing Building Proposed Configuration Change Building Configurat Height Building Configuratio Height Changes in DC rule Name ion (m) Name n (m) because earlier project is in PMRDA 37.46 37.46 Building A1 P+12 Building A1 P+12 Now in PMC. Building A2 P+8 26.10 Building A2 P+8 26.10 Building B1 P+12 37.46 Building B1 P+12 37.46 Building B2 P+8 26.10 Building B2 P+8 26.10 Building B3 P+8 26.10 Building B3 P+8 26.10 Building B4 P+8 26.10 Building B4 P+8 26.10 Building C1 P+8 26.10 Building C1 P+8 26.10 Building C2 P+12 37.76 Building C2 P+12 37.76 Amenity BP+GF+5 20.70 Amenity BP+GF+4 17.70 (commercial) (commercial) Total number of tenements Tenements- 479 Nos., Shops - 40 Nos Nursery, Multipurpose hall, Health Club- 21 Nos. Water Budget Dry Season (CMD) Wet Season (CMD) 3 3 Fresh Water 227.53 m /day Fresh Water 226.03 m /day 3 Recycled water 21.00m /day Recycled water for NA for Gardening Gardening 3 3 Recycled water 118.37m /day Recycled water for 118.37m /day for Flushing Flushing 3 3 Total 366.90 m /day Total 344.40m /day (One Time) (One Time) 3 3 Swimming Pool 3.50 m /day 2.00 m /day 3 3 Excess treated 168.78 m /day Excess treated 189.78m /day water water generation generation Water Storage Domestic UG tank Capacity :226.14m3 Capacity for Flushing(Treated) UG tank Capacity: 116.25 m3 Firefighting/UGT Fire UG tank Capacity :200 m3 Source of water Pune Municipal Corporation Rainwater Level of the Ground water table: 20-40 m BGL Harvesting Quantity and size of recharge pits: 13 Nos. (RWH) Details of UGT tanks if any: Domestic UG tank Capacity :226.14m3 Flushing(Treated) UG tank Capacity: 116.25 m3 Fire UG tank Capacity :200 m3 Sewage and Sewage generation in CMD: 308.15m3/day Wastewater STP technology: MBBR Capacity of STP (CMD): 315m3/day Solid Waste Type Quantity (kg/d) Treatment / disposal Management during Dry waste: 14.00 Kg/Day Send to Authorized Vendor Construction Wet waste: 21.00 Kg/Day Send to Authorized Vendor Phase Construction waste 35.00 Kg/Day Will be used for Leveling

Secretary, SEAC-3 Chairman, SEAC-3 Page 5 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Solid Waste Type Quantity (kg/day) Treatment / disposal Management during Operation Dry waste: 542.60 kg/day Handed over to Authorized Vendor Phase Wet waste: 760.90 kg/day Organic Waste Convertor Hazardous waste: NA NA Biomedical waste NA NA E-Waste 1602.00 Kg/Year NA STP Sludge (dry) 27.73 kg/day Will be used as manure after treatment in OWC Green Belt Total RG area (m2): 2706.53m2 Development Existing trees on plot: 141 Nos Number of trees to be planted: 194 Nos Number of trees to be cut: NA Number of trees to be transplanted: NA Power Source of power supply: MSEDCL requirement: During Construction Phase (Demand Load): 100 KW During Operation phase (Connected load): 1463.25KW During Operation phase (Demand load): 1328.56KW Transformer: 2 X 630KVA& 1X315 KVA DG set: 200KVA(1 No), Fuel used: HSD Details of • Solar water heating systems will be done for bathrooms. Energy saving • Solar lights will be provided for common amenities like Street lighting & Garden lighting. • LED based lighting will be done in the common areas, landscape areas, signage‟s, entry gates and boundary compound walls etc. • Auto Timer switches will be provided for Street lights, Garden lights, Parking & staircase Lights & other common area Lights, for saving electrical energy. • Water level controllers with timers will be used for Water pumps. • To create awareness to end consumer or flat owner, for using energy efficient light fittings like CFL, T5 Lamps & LED lights. • Detail Calculations & %of Saving: 18% Environmental Type Details Cost Management plan Capital Site Barricading, Personal Protective Equipment, Site Sanitation- budget during Mobile toilets. 30 Lakh Construction O&M Water for Dust Suppression, Air & Noise Monitoring, Tanker 10.00 phase Water for Construction & Labour, Water Monitoring, Disinfection- Lakh/Year Pest Control, First Aid Facilities, Health Check Up, Creches for

Children, Food for children. Environmental Component Details Capital (Rs.) O&M (Rs./Y) Management Storm Water NA NA plan Budget during Operation Sewage treatment 50.00 Lakh 3.60 Lakh/Year phase Water treatment NA NA RWH 15.00 Lakh 0.50 Lakh/Year Solid Waste 16.75 Lakh 4.29 Lakh/Year Dry Waste Management - 2.87 Lakh/Year Hazardous waste NA NA e-waste NA 0.50 Lakh/Year

Secretary, SEAC-3 Chairman, SEAC-3 Page 6 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Green belt development 27.00 Lakh 4.00 Lakh/Year Energy saving 26.00 Lakh 1.50 Lakh/Year Swimming Pool 26.00 Lakh 2.4 Lakh/Year Environmental Monitoring - 2.50 Lakh/year Disaster Management 278.70 Lakh 28.66 Lakh/Year Traffic Type Required as Actual Provided Area per parking (m2) Management per DCR 4-Wheeler 374 374 1.Open Parking-25m2 2.Covered Parking= 30m2 3.Basement Parking-35 m2 2-Wheeler 980 980 3.00 m2 Bicycles 831 831 1.40 m2 Details of Court cases / litigations w.r.t.the project and project location NA if any.

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

PP has satisfactorily complied with the points raised in 108th meeting of SEAC-3.

SEAC decided to recommend the proposal for prior environmental Clearance. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 7 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.3 145937/2020 Resi. & Comm. project at S.No 108/2/4, Wakad, Pune by Pantheon Asso. LLP. PP had submitted application for prior Environmental clearance for total plot area of 8340.00 m2, FSI area of 16563.75 m2, Non FSI area of 22366.52 m2 and total BUA of 38930.27 m2. Brief information of the proposal is as below: Name of Project “Residential and Commercial” by M/s Pantheon Associates LLP Project category 8(a)

Type of Institution Private Name Mr. Haresh Premchand Chandwani Project Proponent S NO 177/1+2, Shop No. 3, Sai paradise co-op. Hsg. Regd. Office address Society, Pimple Saudagar Pune. Consultant JV Analytical Services, Accreditation: NABET/EIA/1720/IA0022 Applied for New Project Details of previous EC NA Location of the project S.No 108/2/4, Wakad, Tal- Mulshi, Pune Latitude: 18°36'36.85"N Latitude and Longitude Longitude: 73°44'29.14"E Total Plot Area (m2) 8340.00 m2

Deductions (m2) 1562.42 m2 Net Plot area (m2) 6777.58 m2 Proposed FSI area (m2) 16563.75 m2 Proposed non-FSI area 22366.52 m2 (m2)

Proposed TBUA (m2) 38930.27 m2 TBUA (m2) approved 38930.27 m2 byPlanning Authority till (FSI Area: 16563.75 m2 + Non FSI Area: 22366.52 m2) date 1694.49 m2 Ground coverage (m2) & % 20.31 % of total plot area (8340.00 m2) 25.00 % of net plot area (6777.58 m2) Total Project Cost (Rs.) 980000000 Activity Location Cost (Rs.) Duration Implementation of Rainwater harvesting for Hinjewadi 1)Infrastructure Hospital at Hinjewadi, 1) 2020- 21 creation for PrathamikShala at Rahatani, 2) 2021-22 CER as per MoEF& CC Rainwater ZP School at Hinjewadi, Rs.25,00,0003) 2022-23 circular dated 01/05/2018 Harvesting Government School at 4) 2023 -24 Wakad&PimpriMahanagarPali 5) 2024 -25 ka - Khivansarapatil Hospital at Wakad - 25 Nos. of Pits. 2)Infrastructure Electrification & Solar street 1) 2021- 22 Rs.36,00,000 creation for lightning will be provided for 2) 2022- 23

Secretary, SEAC-3 Chairman, SEAC-3 Page 8 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Electrification PimpriChinchwadMahanagarP 3)2023 -24 include solar alikaPrathamicKanyaShala at 4) 2024 -25 power Wakad, Hinjewadi Hospital at Hinjewadi, Government School at Wakad& ZP School at Thergaon. Plantation will be done with safety jali at 1) SantSavtamaliUdyan at Wakad - 350 trees. 1) 2020- 21 3)Infrastructure 2) PCMC Garden at Wakad - 2) 2022-23 creation for 350 trees. Rs.24,00,0003) 2023 -24 Plantation in 3) 4) 202 community area DyanjyotiSavitribaiPhuleUdya 4 -25 n at KaspateVasti, Wakad - 350 trees. 4)Government School at Wakad - 150 trees Infrastructure creation for ZP School at Marunji, ZP School at Thergaon, PrathmikVidyalay at Thergaon, ZP School at 1) 2020- 21 Tathawade& ZP School at 4)Infrastructure 2) 2021-22 Hinjewadi. creation for Rs.30,50,0003) 2022-23 1) Books for Library - Education 4) 2023 -24 Minimum 650 Nos. 5) 2024 -25 2) Benches - 800 Nos. 3) Computers - 20 Nos. 4) 20 Toilets (10 Nos. for Gents & 10 Nos. for Ladies) 5) Projectors- 05 Nos. We will provide Ambulance to - 1) PimpriMahanagarPalika - KhivansarapatilHospital 1) 2021-22 5)Ambulance atWakad - 01 No. Rs.66,00,000 2) 2023 - 24

2)Hinjewadi Hospital at 3) 2024 -25 Hinjewadi - 01 No. 3) PCMC Hospital at Pimple Gurav - 01 No.. Provide Sanitation facility to - 1) PimpriChinchwadMahanagarP alikaPrathamicKanyaShala at Wakad : Toilets - 8 Nos. & 6)Infrastructure Wash basins - 4 Nos. 1) 2020 - 21 creation for 2) Government School at Rs.14,50,0002) 2022-23 Sanitation Wakad :Toilets - 8 Nos. & 3) 2024 -25 Wash basins - 4 Nos. 3) Hinjewadi Hospital at Hinjewadi : Toilets - 10 Nos. & Wash basins - 4 Nos.

Secretary, SEAC-3 Chairman, SEAC-3 Page 9 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Reason for Details of Building Configuration: Modificati on / Previous EC / Existing Building Proposed Configuration Change Building Height Building Height Configuration Configuration Name (m) Name (m) - - - Building A G+M+10 Fl 36.00 m NA - - - Building B B+P+P+12 Fl 42.00 m - - - Building C B+P+P+13 Fl 44.70 m - - - Building D B+P+P+13 Fl 44.70 m Proposed Tenements: 347 Nos Total number of tenements Shop- 08 Nos Dry Season (m3/day) Wet Season (m3/day) Fresh Water 162.97m3/day Fresh Water 162.97m3/day Recycled Recycled water for water for 10.00m3/day NA Gardening Gardening Swimming NA Swimming Pool NA Pool Water Budget Recycled water for 80.34m3/day Recycled water for Flushing 80.34m3/day Flushing 253.31m3/day (one 243.31m3/day(o Total Total time) ne time) Excess treated Excess treated water water 128.64 m3/day 138.64 m3/day Generation generation Water Storage Domestic water tank Capacity: 244.46 m3 Capacity for Flushing water tank Capacity: 135.53 m3 Firefighting/UGT Fire water tank Capacity: 300.00m3 Source of water Pimpri-Chinchwad Municipal Corporation (PCMC) Pre monsoon – 10 m to 18 m BGL Level of the Ground water table: Post monsoon – 5 m to 8 m BGL Size and no of RWH tank(s) and Not Applicable Quantity: Rainwater 08 Nos. (Dia. 2 m and 3 m height) with 6” Dia. 60 m deep Harvesting (RWH) Quantity and size of recharge pits: bore well via 1 No. of 2 m dia. 3 m deep de-silting chamber with O&G trap. Domestic water tank Capacity: 244.46 m3 Details of UGT tanks if any: Flushing water tank Capacity: 135.53 m3 Fire water tank Capacity: 300.00m3 Sewage generation in CMD: 218.98 m3/day Sewage and STP technology: MBBR Waste water Capacity of STP (CMD): 225 m3/day Solid Waste Type Quantity (kg/day) Treatment / disposal Management during Construction Dry waste: 14.00 Kg/day Send to Authorized Vendor

Secretary, SEAC-3 Chairman, SEAC-3 Page 10 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Phase Wet waste: 21.00 Kg/day Send to Authorized Vendor 35.00 Kg/day Will be used for Levelling Construction waste

Type Quantity (kg/day) Treatment / disposal Dry waste: 361 Kg/day Handed over to Authorized Vendor Wet waste: 530 Kg/day Organic Waste Convertor Solid Waste Hazardous NA NA Management during waste: Operation Phase Biomedical NA NA waste E-Waste 2.6 Kg/day Handed over to Authorized Vendor Used as manure after treatment in STP Sludge (dry) 34 Kg/day OWC Total RG area (m2): 753.06 m2 Existing trees on plot: NA Green Belt Number of trees to be planted: 105 Nos. Development Number of trees to be cut: NA Number of trees to be transplanted: NA Source of power supply: MSEDCL During Construction Phase (Demand 30 KW Load): During Operation phase (Connected 1464KW load): Power During Operation phase (Demand load): 788KW requirement: Transformer: 630 KVA x 1No. & 315 KVA x 1No.

DG set: 180 KVA - 01 No.&82.5 KVA – 01 No. Fuel used: HSD • Solar water heating systems will be done for bathrooms. • Solar lights will be provided for common amenities like Street lighting & Garden lighting. • LED based lighting will be done in the common areas, landscape areas, signage‟s, entry gates and boundary compound walls etc. Details of • Auto Timer switches will be provided for Street lights, Garden lights, Parking & staircase Energy saving Lights & other common area Lights, for saving electrical energy. • Water level controllers with timers will be used for Water pumps. • To create awareness to end consumer or flat owner, for using energy efficient light fittings like LED lights Type Details Cost Environmental Site Barricading, Personal Management plan Protective Equipment, Site budget during Capital Sanitation- Mobile toilets Construction 25 Lakh Phase

Secretary, SEAC-3 Chairman, SEAC-3 Page 11 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Water for Dust Suppression,

Air & Noise Monitoring,

Tanker Water for Construction

&Labour, Water Monitoring, O&M Disinfection- Pest Control, 10 Lakh/Year First Aid Facilities, Health

Check Up, Creches for

Children, Food for children. Capital O&M Component Details (Rs.)Lakh (Rs. in Lacs /Year) Storm Water NA NA NA Sewage treatment 64.00 12.20 Water treatment NA NA NA RWH 9.50 1.15 Swimming Pool NA NA NA Environmental Solid Waste Organic Waste 15.75 3.56 Management Convertor plan Budget during Dry waste - 2.08 Operation phase Management Hazardous waste NA NA NA e-waste - 0.50 Green belt development 17.00 2.00 Energy saving 80.00 1.60 Environmental - 2.50 Monitoring Disaster Management 171.73 39.64 Required as per Actual Area per parking Type DCR Provided (m2) Covered Parking- 30 m2 Traffic 4-Wheeler 180 Nos. 181 Nos. Management Basement Parking- 35m2 2-Wheeler 712 Nos. 713 Nos. 3.00 m2 Bicycles 700 Nos. 701 Nos. 1.4 m2 The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

PP has satisfactorily complied with the points raised in 108th meeting of SEAC-3.

SEAC decided to recommend the proposal for prior environmental Clearance. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 12 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.4 138049/2020 Proposed IT Building at S. No. 42, Hissa No. 1/1+2/1+3, , Haveli, Pune by M/s Aditya Shagun Developers. PP had submitted application for prior Environmental clearance for total plot area of 11,000.00 m2, FSI area of 28,727.78 m2, Non FSI area of 34,031.68 m2 and total BUA of 62,759.46 m2.

Brief information of the proposal is as below: Name of Project Proposed IT Building Project at S. No. 42, Hissa No. 1/1+2/1+3 Village: Baner, Taluka: Haveli, District: Pune, Maharashtra Project category 8a, B2 Type of Institution Private

Project Proponent Name M/s Aditya Shagun Developers

Regd. Office address B-14, Ground Floor, Mittal Court, Bund Garden Road, Camp, Pune Consultant Sneha Hi-Tech Products Pvt. Ltd. Applied for Environmental Clearance Details of previous EC NA Location of the project S. No. 42, Hissa No. 1/1+2/1+3 Village: Baner, Taluka: Haveli, District: Pune, Maharashtra Latitude and Longitude Latitude: 18°33‟2.85"N, Longitude: : 73°46‟24.52"E Total Plot Area (m2) 11,000.00 sq.m. Deductions (m2) 1,619.5 sq.m. Net Plot area (m2) 9,380.5 sq. m Proposed FSI area (m2) 28,727.78 sq. m Proposed non-FSI area(m2) 34,031.68 m2 Proposed TBUA (m2) 62,759.46 m2 TBUA (m2) approved by In process Planning Authority till date Ground coverage (m2) & % - Total Project Cost (Rs.) Rs 180 Cr. CER as per MoEF & CC Circular dated 01/05/2018 Total Project cost- Rs. 18000,00,000/- Green Field project, CER cost- Rs. 270,00,000/- Details of Building Configuration : Reason for Change

Previous EC / Existing Building Proposed Configuration Building Configuration Height Building Configuration Height Name (m) Name (m) NA NA NA 1 building B+G+P1+P2+P3+8 48.60 Office Floors

Total number of tenements IT offices, Total Users- 5312 nos.

Secretary, SEAC-3 Chairman, SEAC-3 Page 13 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Water Budget Dry Season (CMD) Wet Season (CMD) Fresh Water 109 Fresh Water 109 Recycled (flushing) 90 Recycled (flushing) 90

Recycled water 11 Recycled water 0 (Gardening) (Gardening) Swimming Pool 0 Swimming Pool 0 HVAC req. 80 HVAC req. 80 Total 290 Total 279 Waste water 177 Waste water generation 177 Generation

Water Storage Fire Fighting Tank 2 x 175 m3 Capacity for Firefighting / Raw water Tank 2 x 70 m3 UGT Domestic Tank 2 x 70 m3

Soft water tank 1 x 80 m3

Source of water PMC Rainwater Level of the Ground water table: 20-30 BGL Harvesting Size and no of RWH tank(s) and 55 KLD (RWH) Quantity: Quantity and size of recharge pits: 3 nos. Size of recharge pit – 3.5 m dia x 2.5 m Width Details of UGT tanks if any: Raw water: 2 x 70 cum Domestic water tank: 2 x 70 cum Soft water tank: 1 x 80 cum Sewage and Sewage generation in CMD: 177 m3/day Wastewater STP technology: MBBR Capacity of STP (CMD): STP : 200 m3/day

Solid Waste Type Quantity (kg/d) Treatment / disposal Management during Dry waste: 17.5 Kg/day Construction Phase Wet waste: 7.5 Kg/day Construction waste At actual Shall be utilized on site at maximum extent. Rest shall be handed over to authorized vendor Solid Waste Type Quantity (kg/d) Treatment / disposal Management during Dry waste: 637 kg/day Handed over to Authorized Agency Operation Phase Wet waste: 425 kg/day Shall be treated in OWC( OWC of 500 kg/Day capacity) Hazardous waste: - - Biomedical waste - E-Waste 32 Kg/day Handed over to Authorized Agency STP Sludge (dry) 17 Kg/day Dried & used as manure in landscaping

Secretary, SEAC-3 Chairman, SEAC-3 Page 14 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Green Belt Total RG area (m2): 938.05 m2 Development Existing trees on plot: 00 Number of trees to be planted: 118 nos. Number of trees to be cut: 0 Number of trees to be transplanted: 0 Power Source of power supply: MSEDCL requirement: During Construction Phase (Demand 75 KW Load): During Operation phase (Connected load): 2,996 KW During Operation phase (Demand load): 2,696 KW Transformer: 4 nos. X 1000 KVA DG set: 4 nos. X 1010 KVA

Fuel used: HSD

Details of 13.2 % Energy saving Environmental Pollution Control & Other Environment Infrastructure Capital Cost Management In Rs. Lakhs/annum plan budget during During Construction Phase: Construction Water for Dust Suppression phase 2.00 Site Sanitation , Disinfection & Safety 1.50 Environmental Monitoring 2.00 Health Check up 2.50 Environment Management Cell 8.04 Total (A) 16.04

Environmental Component Details Capital (Rs.) O&M (Rs./Y) Management plan Water Environment Rain Water Harvesting 15.0 2.0 Budget during Operation phase Water Environment Sewage Treatment 60.0 8.0 Plant Land Environment Organic Waste 36.0 3.0 Composting Land Environment Tree Plantation 12.0 1.5 Energy Energy saving 22.0 3.0 EMP Environment - 7.8 Management Cell

Basement Basement ventilation 20 3.5

Total - 165.0 28.8

Secretary, SEAC-3 Chairman, SEAC-3 Page 15 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Traffic Type Required as per Actual Provided Area per parking (m2) Management DCR 4-Wheeler 611 611 Basement –35 Sq.m. Podium –30 Sq.m. 2-Wheeler 1465 1465 Bicycles 488 488

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: 1. PP to submit details of UGT. 2. PP to obtain and submit following NOC‟s: (a) Water supply with quantity, (b) Drainage NOC. (c) Garden NOC.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 16 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.5 120796/2019 Homedale at Survey No. 19(P), DIAT Bypass Road, Near BP Petrol Pump, Khadakwasla, Pune by M/s. Om Shiv Sai Promoters & Developers. PP had submitted application for prior Environmental clearance for total plot area of 11800 m2, FSI area of 20128.76 m2, Non FSI area of 10944.33 m2 and total BUA of 31073.09 m2.

Brief information of the proposal is as below: Name of Project Homedale Project category Schedule 8(a) Category B2 Type of Institution Private Project Proponent Name M/s. Om Shiv Sai Promoters & Developers Applied for Expansion in Existing Project-New

Details of previous EC Yes. Environmental Clearance received vide EC Letter No. SEIAA- EC0000000634 dated 15th January 2019 for SEIAA-Statement-0000000968 as per SEIAA-Minutes-0000000855 Location of the project SurveyNo.19(P) ,DIAT Bypass Road, Near BP Petrol Pump, Village:Khadakwasla, Taluka: Haveli, District: Pune Latitude and Longitude 18026‟27.56”N 73046‟46.89”E Total Plot Area (m2) 11800 Deductions (m2) 304.5 Net Plot area (m2) 9770.6 Proposed FSI area (m2) 20128.76 (Residential + Amenity) Proposed non-FSI area (m2) 10944.33 Proposed TBUA (m2) 31073.09 TBUA (m2) approved by Planning Authority till date Ground coverage (m2) & % 46% Total Project Cost (Rs.) 540000000 CER as per MoEF & CC Activity Location Cost Duration circular dated 01/05/2018 (Rs.) Tree Plantation Shivane/Kirkitwadi 21.25 5 Yrs Solid Waste Shivane/Kirkitwadi 32.75 5 Yrs Management - - 54.0 - Details of Building Configuration : Reason for Previous EC / Existing Building Proposed Configuration Building Config. Height Building Config. Height (m) Name (m) Building A 2P+9 30.9 Building A 2P+11 38.15 Building B 2P+8 28 Building B 2P+11 38.15 Building C 2P+7 25.1 Building C 2P+11 38.15 Building D 2P+8 25.1 Building D 2P+10 35.25 Amenity Building GR+4 14.95 Amenity Building B+GR+4 14.95 Club House GR+1 7.15 Club House GR+1 7.15 Total number of tenements: 340

Secretary, SEAC-3 Chairman, SEAC-3 Page 17 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Water Budget Dry Season (CMD) Wet Season (CMD) Fresh Water 165.52 Fresh Water 165.52 Recycled 10 Recycled 0 Swimming Pool 0 Swimming Pool 0 Flushing 85.90 Flushing 85.90 Total 261.42 Total 251.42 Waste water 226.28 Waste water 226.28 generation generation Water Storage 609 Capacity for Firefighting / UGT Source of Grampanchayat Khadakwasla water Rainwater Level of the Ground water table: 17.5m BGL Harvestin Size and no of RWH tank(s) and N.A. g (RWH) Quantity: Quantity and size of recharge pits: Quantity:9Nos & Size:2.1m X 2.1m X 2m Details of UGT tanks if any: Domestic+Drinking 265 Flushing 144 Fire 200 Sewageand Sewage generation in 226.28 Wastewater CMD: STP technology: MBBR Capacity of STP (CMD): 235 Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: 3 Through authorised agency during Wet waste: 2 Through authorised agency Construction Phase Construction waste Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: 378 Handed over to Authorized Agency during Wet waste: 528.80 In-situ Composting Operation Hazardous waste: Negligible Negligible Phase Biomedical waste N.A. N.A. E-Waste 3.4 Handed over to Authorized Dismantler/Recycler STP Sludge (dry) 21.18 In-situ Composting Green Belt Total RG area (m2): 1152.12 (As per previous EC) Development Existing trees on plot: - Number of trees to be planted: 145 Number of trees to be cut: 0 Number of trees to be transplanted: 0 Power Source of power supply: MSEDCL requirement: During Construction Phase (Demand Load): 75 KW During Operation phase (Connected load): 1437 KW During Operation phase (Demand load): 830 KW

Secretary, SEAC-3 Chairman, SEAC-3 Page 18 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Transformer: 630 kVA X 1 Nos& 315 kVA X 2 Nos DG set: 125 kVA X 1 No and 40 kVA X 1 No Fuel used: HSD Details of  Water Pumps – Using high efficient equipments & BEE certified Motors Energy saving  Lifts- use of Variable speed drives  Use of LED for Common lighting Area  Efficient Basement ventilation system  Solar hot water system  Solar PV panels for renewable power generation

Environmental Type Details Cost Management Capital Rs. 8.0 Lacs plan budget O&M - during Construction phase Environmental Component Details Capital (Rs.) O&M (Rs./Y) Management Sewage treatment Waste Water Management 47 5.17 plan Budget RWH RWH Pits 2.6 0.11 during Operation OWC Biodegradable waste 10.65 2.65 phase management e-waste Handed over to - - Authorized Dismantler/Recycle r Green belt development Landscape Development 6.92 0.35 Energy saving Energy Conservation 50.33 2.03 Environmental Monitoring Pollution Control 0 4 Disaster Management 76.58 1.53 Traffic Type Required as per DCR Actual Provided Area per parking (m2) Management 4-Wheeler 77 77 12.5 2-Wheeler 436 436 2.0 Bicycles 436 436 0.7

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

PP has satisfactorily complied with the points raised in 103rd meeting of SEAC-3.

SEAC decided to recommend the proposal for prior environmental Clearance. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 19 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.6 118972/2019 Proposed Residential Building Construction project Mahaganesh at S. No. 29/1, C. S. No. 612 (P), Pimple Gurav, Taluka- Haveli M/s. Mahaganesh Developers. PP had submitted application for prior Environmental clearance for total plot area of 9600 m2, FSI area of 17302 m2, Non FSI area of 20542.22 m2 and total BUA of 37844.22 m2.

Brief information of the proposal is as below: Name of Project Proposed building Construction project “Mahaganesh” by Mahaganesh Developer

Project category B2 Type of Institution Private Project Proponent Name Ramesh Tukaram Jagtap Regd. Office address S. No. 27/1,Navecha Road, Near Pooja Hospital, Taluka- Haveli, District-Pune, ,Maharashtra-411061 Consultant Name: S G M Enviro (India) Pvt. Ltd. Applied for New Greenfield Project Details of previous EC NA Location of the project S. No. 29/1, C. S. No. 612 (P), Village: Pimple Gurav, Taluka- Haveli, District- Pune, Maharashtra Latitude and Longitude Latitude – 18035‟14.23”N, Longitude – 73049‟18.01”E Total Plot Area (m2) 9600 Deductions (m2) 2688 Net Plot area (m2) 6912 Proposed FSI area (m2) 17302 Proposed non-FSI area (m2) 20542.22 Proposed TBUA (m2) 37844.22 TBUA (m2) approved by 19974.39 m2, Plan Sanctioned By PCMC Vide Letter No. Planning Authority till date BP/PIMPLEGURAV/04/2020 DT. 29/01/2020. Ground coverage (m2) & % 20.18%, 1742.92 Sq.m Total Project Cost (Rs.) Rs. 105.29 Crores CER as per MoEF & CC circular Activity Location Cost Duration dated 01/05/2018 (Rs.) Renovation of existing Building, Construction of Mamta 50 2020-2025 All room & toilets Andh Provision of two water tank & two RO and its Annath 10 maintenance Kalyan Provision of solar hot water system & 8 No. of kendra, 10 Solar light Pimple Distribution of Alphabet set in Braille language Gurav, 3 , walking stick, to blind children‟s Pune, Maharashtr a Construction of Class room, reading hall, library Madhyami 29 2020-2025 room, lab, toilets and rest room k Vidyalay 50 No. of tree will be planted & Tree guard will PCMC, 3.5 be provided with its maintenance. Pimple 10 No of computer , 1 Projector, Library books Gurav 14.9 (150 No.s) will be provided Road, 10 No. of Solar Lights Sudarsan 4.5

Secretary, SEAC-3 Chairman, SEAC-3 Page 20 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Provision of One water tank & One RO and its Nagar, 6 maintenance Pimple Gurav, Pimpri Chinchwad, Maharashtr a, 411027 50 No. of solar street light Jijamata 16.5 2020-2025 150 No. of tree will be planted & Tree guard Garden, 9 will be provided with its maintenance. Pimple 30 No. of Seating arrangement will be provided Gurav 1.54

Details of Building Configuration : Reason for Previous EC / Proposed Configuration Modification / Existing Building Change Nil Building Name Configuration Height NA (m) Residential: Wing A (86 No. of flats) GP+PO+11 39.00 Residential: Wing B (86 No. of flats) GP+PO+11 39.00 Residential: Wing C (86 No. of flats) GP+PO+11 39.00 Residential: Wing D (86 No. of flats) GP+PO+11 39.00 Residential: MHADA (39 No. of flats) GP+10 33.00 1 Club house G + 1 6.45 Total number of tenements Existing: 0 Proposed : 344 Residential, 39 MHADA Water Budget Dry Season Resi. MHADA Wet Season (CMD) Resi MHADA (CMD) Fresh Water 155 18 Fresh Water 155 18 Recycled 97 9 Recycled 77 9 Swimming Pool 00 00 Swimming Pool 00 00 Flushing 77 9 Flushing 77 9 Total 252 27 Total 232 27 Waste water 209 24 Waste water 209 24 generation generation Water Storage Capacity for 25 CMD Each Resi. Build. & 20 CMD for MHADA Firefighting / UGT Source of water Pimpri Chinchwad Municipal Corporation Rainwater Level of the Gr. Pre-Monsoon: 18.00 m. to 22.50 m. BGL. (20.25 M. Average) Harvesting water table: Post Monsoon: 11.50 m. to 14.75 m. BGL. (13.13 M. Average) (RWH) RWH tank(s) NA Quantity and size Quantity: 5 No. (3 for roof top & 2 for surface run off) of recharge pits: Size: for surface runoff, Size- 2.25 m X 2.25 m X 1.75 m for roof top ,Size- 2.25 M X 2.25 M X 2 M Details of UGT Domestic: 58 CMD for Each Resi. Building & 26.5 CMD for MHADA Building tanks if any: Flushing: 86 CMD for Resi. Building & 9 CMD for MHADA Building Fire:200 CMD for Resi Building & 50 CMD for MHADA building Sewage and Sewage generation in CMD: 209 CMD from Resi. Building & 24 CMD from MHADA building Wastewater STP technology: MBBR technology Capacity of STP (CMD): 215 KLD for Resi. & 30 KLD for MHADA Resi. Solid Waste Type Quantity (kg/d) Treatment / disposal

Secretary, SEAC-3 Chairman, SEAC-3 Page 21 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Management Dry waste: 0.4 to 0.6 MT/day This material shall be used for back filling during and leveling of the plot Construction Wet waste: 50kg/ day Handed over to local planning authority Phase Construction waste Excavation quantity = approx Used for leveling & backfilling 3188.34 cum Solid Waste Type Quantity (kg/d) Treatment / disposal Management Dry waste: 383 Given to authorized recycler i. e SWaCH during Operation Wet waste: 516 kg/day form Resi. & Organic waste convertor of 550 kg/day for Phase 58.5 kg/day from MHADA resi. & 60 kg/day for MHADA building Building Hazardous waste: NA NA Biomedical waste NA NA E-Waste 5.24 kg/day Given to authorized recycler i. e SWaCH STP Sludge (dry) 18 kg/day Used for landscaping Green Belt Total RG area (m2): 960 Sq.m Development Existing trees on plot: 1 Number of trees to be planted: 130 Number of trees to be cut: 1 Number of trees to be transplanted: 0 Power Source of power supply: MSEDCL requirement: During Construction Phase (Demand Load): 30 KW During Operation phase (Connected load): 1110 KW During Operation phase (Demand load): 800 KW Transformer: 630 KVA – 1 No & 315 KVA -1 No. DG set: For MHADA Building – 82.5 KVA For Residential Building -125 KVA Fuel used: Diesel Details of Measures to reduce energy consumption : Energy saving Generally we have proposed high efficiency transformer, motors etc. to reduce losses. Electronic Ballasts and Energy efficient lamp source either triposphere or LED are proposed for common area & general lighting with automatic time based control to save power by switching ON & OFF the lights at appropriate time. The estimated saving in common lighting consumption is up to 20 % due to adopting above measures. Environmental Type Details Capital Cost (Lacs) O&M (Lacs) Management Drinking Water 1.00 0.10 plan budget Sanitation 12.50 0.75 during Health check up 1.00 0.25 Construction phase Labour Camp Management 3.00 0.50 Environmental Monitoring 1.89 -- Environmental Component Details Capital (Rs.) O&M (Rs./Y) Management Storm Water 450mm Dia and 200mm dia RCC storm 85.0 2.2 plan Budget water line during Sewage STP -215 KLD 30.0 10.0 Operation treatment STP -30 KLD 9.0 3.0 phase Water treatment NA NA NA RWH RWH System 6.25 0.25

Secretary, SEAC-3 Chairman, SEAC-3 Page 22 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Swimming Pool NA NA NA Solid Waste Organic waste convertor of 550 kg/day 12.00 2.00 OWC of 30 Kg/day 5 1.5 Hazardous waste NA NA NA e-waste NA NA NA Green belt Plantation 15.55 7.7 Energy saving Energy saving measures 47 0.94 Env. Monitoring -- -- 3.00 Disaster Management for flood, earthquake, 48.15 1.5 Appox. for each Management lightening & fire Traffic Type Required as per DCR Actual Provided Area per parking (m2) Management 4-Wheeler 189 220 2750 2-Wheeler 756 800 2400 Bicycles 756 800 1120 The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) Fire tender drive way shall be modified on the podium such that minimum 6 m wide ramp with more than 1:10 slope shall be available on both the side. (2) PP to submit cross section of both podia. (3) PP to submit approved plan for layout and lower level parking. (4) PP to submit parking statement showing total number of parking required and proposed as per DCR / Town Planning norms with adequate area per car as per norms. (5) PP to submit evacuation plan for entire project for occupants, visitors and as well as cars. (6) PP to submit co-ordinated master layout superimposing all environmental parameters. (7) PP to submit details of UGT. (8) PP to obtain and submit following NOC‟s: (a) Water supply with quantity, (b) e-waste management. (9) PP to submit indemnity bond indemnifying Environment Department, GoM from any legal consequences. PP requested for time to submit the information sought; after deliberations committee asked PP to comply with the observations and submit information to the committee for further discussion and consideration of SEAC. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 23 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.7 134605/2020 Proposed Residential Group Housing project at S. no. 145/2(P), 145/3(P), Ravet, Pune by M/s. Giritirtha Associates. PP had submitted application for prior Environmental clearance for total plot area of 14900 m2, FSI area of 25778.29 m2, Non FSI area of 26446.62 m2 and total BUA of 52224.91 m2.

Brief information of the proposal is as below: Name of Project Residential Group Housing project at S. no. 145/2(P), 145/3(P), Ravet, Pune by M/s. Giritirtha Associates Project Category B2 Type of institution Private Name of Project Proponent Mr. Somnath Bhondave & Mr. Kunal Bhondave Name of Consultant Ms. Sayali Jagtap Applied for New Details of Previous EC No Location of the project S. no. 145/2(P), 145/3(P), Ravet, Pune Taluka Haveli Village Ravet District Pune Latitude & Longitude - Latitude – 18.656172° N Longitude - 73.750495°E Total Plot Area (sq. m.) 14900 sq. m Deductions 2128.39 sq. m Net Plot area 12771.61 sq. m Proposed BUA (FSI+Non-FSI) (m2) 52224.91 sq. m FSI area (m2) 25778.29 sq. m Non FSI area (m2) 26446.62 sq. m Total built up area approved Applied Total ground coverage (m2) 2785.25 sq. m Ground-coverage Percentage (%) 21.80 % Estimated cost of the project (in Rs.) Rs. 103 Cr. CER Activity Location Cost Duration RWH Madhyamik Vidylaya , Nigadi Rs. 3.5 lakh 05 years Avenue plantation Existing 18 m & 24 m DP road at Ravet Rs. 46 lakh Solar street Existing 18 m, 12m & 24 m DP road at Ravet Rs. 55 lakh Number of buildings & its configuration: S. No. Building Name Number of floors Height (Mtrs) 1 Building A B+G+12 36.80 2 B P +13 42.00 3 C P +13 42.00 4 D P +13 42.00 Number of tenants and shops Residential : 440 Number of expected residents/users Residential : 2200, Commercial floating population : 234 Total Water Requirement Dry season: Source of water PCMC Fresh water(CMD): 202.68 KLD Recycled water-Flushing(CMD): 104.85 KLD Recycled water-Gardening (CMD): 12.12 KLD Swimming pool makeup(Cum): 0 Total Water Requirement(CMD): 319.65 KLD Firefighting-Underground water 350 KLD

Secretary, SEAC-3 Chairman, SEAC-3 Page 24 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

tank(CMD): Fire fighting-Over head water tank(CMD): 20 KLD each building Excess treated water 132.13 KLD Wet season: Source of water PCMC Fresh water(CMD): 202.68 KLD Recycled water-Flushing(CMD): 104.85 KLD Recycled water-Gardening (CMD): 0 Swimming pool makeup ( Cum): 0 Total Water Requirement(CMD): 307.53 KLD Firefighting-Under ground water 350 KLD tank(CMD): Fire fighting-Overhead water tank(CMD): 20 KLD each building Excess treated water 144.25 KLD Rain Level of the Ground water table: Post monsoon 3.00 meter Water Pre monsoon 7.00 meter Harvesting Size and no of RWH tank(s) and Quantity: NA (RWH) Location of the RWH tank(s): NA Quantity of recharge pits: 4 No. Size of recharge pits 2. No Pit 2*2*2meter and chamber 1*1*1 m : Bore well 0.160 meter diameter and 60 meter depth 2 No No Pit 2*2*2meter Budgetary allocation (Capital cost): 03,00,000 one time Budgetary allocation (O&M cost): RSs 20,000/ per year Details of UGT Domestic UG tank Capacity (cum) : 307.53 KLD tanks if any: Flushing tank Capacity(cum) 165.88 KLD Fire UG tank Capacity (cum) 350 KLD Sewage and Sewage generation in KLD: 276.78 KLD Waste water STP technology: MBBR technology Capacity of STP(CMD): 280 KLD Solid Waste Management Waste generation in Dry waste: 468.08 kg/day the operation Phase: Wet waste: 678.72 kg/day STP Sludge (Dry sludge): 24.91 kg/day Others if any: E- waste : 3.7 kg/day Mode of Disposal of Dry waste: To authorized vendor SWACH waste: Wet waste: Treatment through OWC STP Sludge (Dry sludge): Will be used as a manure Others if any: E-waste - To authorized vendor SWACH Green Belt Development Total RG area: 1468 sq. m (10 %) No of trees to be cut 0 Number of trees to be planted: 184 no‟s (Proposed 167 + Existing 17) ENERGY Source of power supply: MSEDCL During Construction Phase: (Demand Load) 35 kW DG set as Power back-up during construction phase 50 KVA During Operation phase (Connected load): 1966.06 KW During Operation phase (Demand load): 938.64 KW

Secretary, SEAC-3 Chairman, SEAC-3 Page 25 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Transformer: 2 x630 KVA DG set as Power back-up during operation phase: 160 KVA & 20 KVA Detail calculations & % of saving: S. no Energy Conservation Measures Saving% 1 Solar PV panels (SOLAR ENERGY - 21.72 % Outdoor Lighting / Street Lights) Environmental Management plan Budgetary Allocation Construction phase(with Break-up): Sr. Attributes Parameter Total Cost per annum 1 Air Erosion control – dust Rs. 1,06,000 /- suppression measures and barricading 2 Land Site Sanitation Rs. 26,500 /- 3 Health & safety Site Safety Rs.88,000 /- 4 Env. management Environmental Monitoring Rs. 1,20,000/- 5 Health & safety Disinfection and Health Check-ups Rs. 45,000 /- Total Operation phase(with Break-up): Sr Component Description Capital cost O&M cost (per yr) Rs. In Lacs 1 Sewage Treatment Plant 1 STP Rs. 21,50,000 /- Rs. 3,22,500 /- 2 Rain Water Harvesting 04 pits Rs. 3,00,000 /- Rs. 20,000 /- 3 Solid Waste Management 1 OWC Rs. 17,66,464 -/ - Rs. 4,81,920-/ 4 Green Belt Development 167 trees Rs. 30,31,000/- Rs. 1,76,172 /- 5 Energy Solar systeam Rs. 42,42,750 /- Rs. 2,12,137 /- 6 Environmental Monitoring - – Rs.8,90,000/- Parking details: Required Actual provided Area 4-wheeler 240 240 7200 sq. m 2 – wheeler 940 940 2820 sq. m Cycle 900 900 1260 sq. m

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

PP has satisfactorily complied with the points raised in 105th meeting of SEAC-3.

SEAC decided to recommend the proposal for prior environmental Clearance. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 26 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.8 126342/2019 Proposed Residential & Commercial Project “Navjyot Abha” at S.No. 150, 151; Lane No. 27A, Ganesh Nagar, Dhayari, Taluka Haveli, District Pune, Maharashtra by M/s Sumeru Buildcson Pvt. Ltd. PP had submitted application for prior Environmental clearance for total plot area of 12550 m2, FSI area of 32617.83 m2, Non FSI area of 15044.44 m2 and total BUA of 47662.27 m2.

Brief information of the proposal is as below: Proposed Residential & Commercial Project “Navjyot Abha” at S.No. Name of Project 150, 151; Lane No. 27A, Ganesh Nagar, Dhayari, Taluka Haveli, District Pune, Maharashtra by Sumeru Buildcon Pvt. Ltd Project category 8(a) B2 Type of Institution Private Mr. Vijay Arvind Raykar Name Director Project Proponent Regd. Office Address: S.No. 150, 151; Lane No. 27A, Ganesh address Nagar, Dhayari, Pune 411041 Maharashtra Consultant M/s. ULTRA TECH, NABET/EIA/1720/RA0094

Applied for New - Greenfield Project

Details of previous EC NA

Location of the project S. No. 150, 151; Lane No. 27A, Ganesh Nagar, Dhayari, Pune Latitude - 18027‟3.93” N Latitude and Longitude Longitude - 73048‟19.83” E Total Plot Area (m2) 12550 m2

Deductions (m2) 0771.58

Net Plot area (m2) 11778.42 m2

Proposed FSI area (m2) 32617.83 m2

Proposed non-FSI area (m2) 15044.44 m2

Proposed TBUA (m2) 47662.27 m2 TBUA (m2) approved by 47662.27 m2 Planning Authority till date 3215.90 m2 Ground coverage (m2) & %

Total Project Cost (Rs.) Rs.73.44 Crore

Activity Location Cost (Rs.) Duration CER as per MoEF & CC circular dated 01/05/2018 Details attached Details of Building Configuration : Reason for Change

Secretary, SEAC-3 Chairman, SEAC-3 Page 27 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Previous EC / Existing Proposed Configuration Building Heigh Building Config Building Height t Configuration Name uration Name (m) (m) B+ LG+UG+12 Residential (Commercial Shops NA &Commercial 42.15 in wing A at BLDG-A LG+UG+1st) GP +15th floor 48.75 BLDG-B & C NA NA NA GP+15th floor 48.75 BLDG-D GP+15th floor 48.75 BLDG-E Ground Club house - (Existing + Proposed) - NA

Proposed Residential Tenements – 564 Nos. Commercial Shops – 30 Nos. Total number of tenements

Total Population – 3380 Nos. Residential: - 2820 Nos. Commercial shops: 560 Nos. Dry Season (CMD) Wet Season (CMD)

Fresh Water 265 Fresh Water 265

Recycled Flushing 141 Recycled 141

Swimming Pool NA Swimming Pool NA Water Budget Flushing 141 Flushing 141

Gardening 12 Gardening 0

Total 418 Total 406 Waste water Waste water 365 365 generation generation Residential: Domestic UG tank Capacity: 400 m3 Flushing UG tank Capacity: 100 m3 Water Storage Fire UG tank Capacity: 500 m3 Capacity for

Firefighting / Commercial: UGT Domestic UG tank Capacity:17 m3 Flushing UG tank Capacity: -including residential m3 Fire UG tank Capacity: - NA Source of water Pune Municipal Corporation (PMC ) Rainwater Level of the Ground water table: 15.85 m Harvesting Size and no of RWH tank(s) and NA (RWH) Quantity:

Secretary, SEAC-3 Chairman, SEAC-3 Page 28 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Quantity and size of recharge pits: 6 Pits, 2 x 2 x 2.8 m Residential: Domestic UG tank Capacity: 400 m3 Flushing UG tank Capacity: 100 m3 Fire UG tank Capacity: 500 m3

Details of UGT tanks if any: Commercial: Domestic UG tank Capacity:17 m3 Flushing UG tank Capacity: -including residential m3 Fire UG tank Capacity: - NA Sewage generation in CMD: 365.00 Sewage and MBBR STP technology: Wastewater 1 x 375 KLD Capacity of STP (CMD): Type Quantity (kg/d) Treatment / disposal

Solid Waste Dry waste: 18 Total - 45 kgs/day - Composting Management method during Wet waste: 27 Construction Topsoil to be preserved & excavated Phase Excavation -45574 m3 earth material will be used for filling Construction waste of plinth area

Type Quantity (kg/d) Treatment / disposal Handed over to authorized Dry waste: 631 recycler for further handling & disposal purpose Through Mechanical Wet waste: 891 Solid Waste Composter (Smart OWC) Management Hazardous waste: NA during Operation Phase Biomedical waste NA Handed over to authorized recycler 5.4 kg/day E-Waste for further handling & disposal

purpose To be used as manure for STP Sludge (dry) 27.28 gardening purpose 2 2 Total RG area (m ): 1177.84 m Existing trees on plot: 6 nos. Green Belt Number of trees to be planted: 125 Nos Development Number of trees to be cut: NA

Number of trees to be transplanted: 9 nos.

Secretary, SEAC-3 Chairman, SEAC-3 Page 29 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Source of power supply: MSEDCL

During Construction Phase Demand Load): 75 kW

During Operation phase (Connected load): 3248 kW

During Operation phase (Demand load): 1678 kW

Power Transformer: 3 nos. x 630 kVA. requirement: 1 Nos. X 200 kVA DG set: 1 Nos. X 250 kVA Diesel - 1 Nos. x200 kVA34.4 lit./hr. @ 75 % loading Fuel used:

1 Nos. x250 kVA 42.6 lit./hr. @ 75 % loading Details of Energy 16.63% saving Environmental Type Details Cost Management plan Air & Noise and Water, Land budget during Capital Rs. 30.35 Lakh Biological and Socio Economic Construction phase O&M Included in above Capital (Rs.) in Component Details O&M (Rs. Lakh/Y) Lakh STP plant Sewage treatment 1 x 375 KLD 58.00 16.58

Water treatment - NA NA 6 nos. RWH RWH and Storm Water Pits and 7.98 1.2 network Environmental Swimming Pool NA NA Management plan Budget Solid Waste OWC 20.01 7.15 during Operation phase Hazardous waste NA NA Authorized e-waste vendor Green belt development Plantation 12.73 6.68 Solar and Energy saving 82.28 3.08 LED Environmental Through - 2.00 Monitoring laboratory Disaster Management Provided - Traffic Required as per Type Actual Provided No Area per parking (m2) Management DCR no

Secretary, SEAC-3 Chairman, SEAC-3 Page 30 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

4-Wheeler 647 647 As per Standard DCR

2-Wheeler 1362 1362 As per Standard DCR

Bicycles 647 647 As per Standard DCR

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) Parking for commercial areas to be physically separated and parking plan to be revised for basement indicating width of ramp and slope. Accordingly fire tender plan to be revised and cross sections to be provided. Basement ventilation plan and evacuation plan shall be accordingly revised. Also traffic impact studies shall be revised accordingly. (2) PP to submit basement approval plan. (3) PP to submit parking statement showing total number of parking required and proposed as per DCR / Town Planning norms with adequate area per car as per norms. (4) PP to submit 4-5 cross sections, showing the filling of land with existing ground level and proposed level after filling with available debris and actual quantity required for filling. (5) PP to submit co-ordinated master layout superimposing all environmental parameters. (6) PP to obtain and submit following NOC‟s: (a) CFO NOC, (b) solid waste / e-waste management. (c) Garden NOC.

PP requested for time to submit the information sought; after deliberations committee asked PP to comply with the observations and submit information to the committee for further discussion and consideration of SEAC. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 31 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.9 137956/2020 Residential Construction project t Gat. no.273 p, 274/1 p, 541 p, 542, 543, 545p, 546, 547, 548, 549, 550, 551, 552, 553, 555p, 556p, 558p, 560, 561, 567, 592 Pune Paud road, Pirangut, Pune by M/s. Pact Real Estate Pvt. Ltd. PP had submitted application for prior Environmental clearance for total plot area of 3,24,727.28 m2, FSI area of 86,960.97 m2, Non FSI area of 49,162.17 m2 and total BUA of 1,36,123.14 m2.

Brief information of the proposal is as below: Name of Project EC Amendment for Residential Construction project at Gut. no.273 p, 274/1 p, 541 p, 542,543,545p, 546, 547, 548, 549, 550, 551, 552, 553, 555p, 556p, 558p, 559 (p) 560,561,567,592, Pune Paud road, Pirangut, Pune by M/s Pact Real Estate Pvt. Ltd. Project category 8(a), B2 Type of Institution Private Project Proponent Name M/s Pact Real Estate Pvt. Ltd. Regd.Officeaddress Raheja Tower, BandraKurla Complex, Mumbai Consultant Sneha Hi-Tech Products Pvt. Ltd. Applied for Amendment Details o fpreviousEC SEAC-2016/CR-411/TC-2 dtd 6.01.2017 Location of the project Gut. no.273 p, 274/1 p, 541 p, 542,543,545p, 546,547,548,549,550,551,552,553,555p,556p,558p, 559 (p) 560,561,567,592, Pune Paud road, Pirangut, Pune LatitudeandLongitude Latitude: 18°29'49.80"N Longitude: 73°42'26.16"E TotalPlotArea(m2) 3,24,727.28 Deductions(m2) 1,37,815.22 NetPlotarea(m2) 1,86,912.06 ProposedFSIarea(m2) 86,960.97 Proposednon-FSIarea(m2) 49,162.17 ProposedTBUA(m2) 1,36,123.14 TBUA(m2)approvedby 86960.97 PlanningAuthoritytilldate Groundcoverage(m2)&% 24.6% TotalProjectCost(Rs.) Rs. 577 Cr CER as per MoEF& CC circular Dated01/05/2018 : proposing amendment in our project, total project cost remain same as per earlier EC dated 06.01.2017 vide no. SEAC-2016/CR-411/TC-2 i.e. Rs. 577 Crores. Further as per condition no. IX of above referred OM the CER is not applicable in case of amendment involving no additional project investment. Details of BuildingConfiguration: Reason for Modification/Cha nge Previous EC/Existing Building Proposed Configuration Building Configurati Height Building Configura Height Name on (m) Name tion (m) A1 to A6 G+1 8.28 A1-6 G+1 8.28 no change existing A- G+1 7.6 A- G+1 7.6 bldg 07,08,09,10,15,16 07,08,09,10,15 ,16 A11-14 G+1 8.28 A11-14 G+1 8.28

Secretary, SEAC-3 Chairman, SEAC-3 Page 32 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

A-21 G+1 7.85 A-21 G+1 7.85 A22-29 G+1 7.85 A22-29 G+1 7.85 A-36 G+1 7.55 A-36 G+1 7.55 TH-1 to 5 G+2 11.50 TH 1 to 5 G+2 11.50 Clubhouse Lower 11.2 Lower Gr 11.2 Gr+Upper Club house + Upper Gr+1st Gr + 1st Site office Lower Lower 7.6 gr.+Gr+Mez Site office gr.+Gr+M ez A18 -20 G+1 6.85 G+1 7.85 no change A18-20 G+1 7.85 A- G+1 7.65 A-30, 31, 32, 33, 30,31,32,33,34 34, 35 ,35 B1-38 G+1 7.85 B1-38 G+1 7.85 C-01 to 6, G+1 7.65 C-01 to 6, C 31 G+1 7.65 C 31 to 40 to 40 C7-30 G+1 7.85 C7-30 G+1 7.85 C41- 83 G+1 7.85 C41-C83 G+1 7.85 G+1 7.65 D1,2, D10-13, G+1 7.65 no change D1, D2, D10-13, D22-36, D39- D22-36, D39-42 42 D 3-9 G+1 7.85 D 3-9 G+1 7.85 D14-21 G+1 7.85 D14-21 G+1 7.85 D37-38 G+1 7.85 D37-38 G+1 7.85 D43-45 G+1 7.85 D43-45 G+1 7.85 D46-D52 G+1 7.85 D46-D5 G+1 7.85

TH 12 to 20 G+2 11.50 TH 12 to 20 G+2 11.50 TH15 G+2 11.50 TH165 G+2 11.50 Temporary glass Ground Temporary Ground house glass house Amenity Building Ground Amenity 1 Building 1 Ground Amenity Building Ground Amenity Ground 2 Building 2 PLOT B41-B-46 G+2 11.50 PLOT B41- 6.85 Proposed G+1 6.85 C84(NOVA)G 14.90 amendment 01 & G 02 G+1 PLOT C84-, C89 Twin Villa + TH 6-10 P+4 G+1 11.5 PLOT B39 7.85 Proposed PLOT B39,TH6- F1 to F26 - G+1 amendment T10 Twin Villa Total number of tenements No. of units – 392 nos. No. of users - 1960 nos. WaterBudget DrySeason(CMD) WetSeason(CMD) FreshWater 226 Fresh Water 226 Recycled (flushing) 88.2 Recycled (flushing) 88.2 Recycled water 160 Recycled water -

Secretary, SEAC-3 Chairman, SEAC-3 Page 33 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

(Gardening) (Gardening) SwimmingPool - Swimming Pool - Total 474.2 Total 314.2 Wastewater 283.1 Waste water 283.1 generation generation

WaterStorage Purpose UG Tank (m3) CapacityforFirefighting/UGT Zone 1 Zone2 Zone 3 Zone 4 Flushing 14.62 32.4 29.47 11.7 Domestic 29.25 64.8 58.9 73.4

Sourceofwater Grampanchayat/PMRDA-Tanker water Rainwater Level of the For Upper Elevations 12-15 m b.g.l. (Pre monsoons) Harvesting(RWH) Groundwate For Upper Elevations 8-12 m b.g.l. (Post monsoons) r table: For Lower Elevations 22-28 m (Pre monsoons) For Upper areas 20-25 m b.g.l. (Post monsoons) SizeandnoofRWHtank(s)andQu NA antity: Quantityandsizeofrechargepits: 28 nos. DetailsofUGTtanksifany: NA Sewageand SewagegenerationinCMD: 283.1 Wastewater STPtechnology: MBBR CapacityofSTP(CMD): 40 KLD, 2 STPs of 80 KLD, 90 KLD Solid Waste Type Quantity(kg/d) Treatment/disposal Management Dry waste: 17.5 Shall be handed over to authorized vendor during Wet waste: 7.5 Shall be treated in OWC provided for Construction operation phase Phase Construction waste At actual Utilized on site at maximum extent. Rest handed over to local body Solid Waste Type Quantity(kg/d) Treatment/disposal Management Drywaste: 392 Handed over to Authorized Agency during Wetwaste: 588 Treated in OWC Operation Phase Hazardous waste: - Biomedical waste - E-Waste 980 Kg/year Handed over to Authorized recycler for further handling & disposal purpose. STPSludge(dry) 15 kg/day Treated in OWC. Used as manure for gardening GreenBelt Development TotalRGarea(m2): 32479.72 Existingtreesonplot: 1637 nos Numberoftreestobeplanted: 2502 nos. Numberoftreestobecut: Nil Numberoftreestobetransplanted: - Power Sourceofpowersupply: MSEDCL DuringConstructionPhase(DemandLoad): 30 kW DuringOperationphase(Connectedload): 4509 kW DuringOperationphase(Demandload): 3101 kW

Secretary, SEAC-3 Chairman, SEAC-3 Page 34 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

DGset: 4 X 62.5 kVA & 1 X 160 kVA Fuelused: HSD Details of Energy saving 32%

Environmental Pollution Control & Other Environment Capital Cost Management plan budget during Infrastructure In Rs. Lakhs/annum Construction phase During Construction Phase: Water for Dust Suppression 2 Site Sanitation , Disinfection & Safety 10 Environmental Monitoring 2 Health Check up 2 Environment Management Cell 8.4 Total (A) 24.4 Environme Sr. No. Pollution Control & Other Capital Cost In Annual O & M Cost In ntal Environment Infrastructure Rs. Lakhs Rs. Lakhs/annum Manageme Total nt plan 1 Rain Water Harvesting 21.87 7.87 Budget during 2 Sewage Treatment Plant 135.20 40.84 Operationp 3 Organic Waste Composting 36.4 8.19 hase 4 Tree Plantation 1048.42 77.94 5 Energy saving 95.88 5.9 6 Environmental Monitoring - 4.0 7 Holding pond 26.05 5.21 8 Storm water lakes 75.47 7.5 9 Total 1439.29 157.45

Traffic Required as per DCR Actual Area per parking(m2) Management Provide d 4-Wheeler 673 673 25.00 2-Wheeler 1170 1170 Cycle 1170 1170

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP has submitted completion certificate for amount of Rs.100 Cr, thus the cost eligible for CER is Rs. 477 Cr. Hence, PP to implement the CER submitted for remaining project cost of Rs. 477 Cr. (2) PP to submit undertaking regarding control of nuisance due to allergic plants.

SEAC decided to recommend the proposal for prior environmental Clearance. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 35 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

09.06.2020 P.10 53068/2020 Project at S. NO 6/1 TO 6/6,7/2/1,7/2/2,9/1,9/2, Manjri, Pune by M/s Manjri Horse Breeders Farm Pvt. Ltd. PP had submitted application for prior Environmental clearance for total plot area of 165557.87 m2, FSI area of 173775.65 m2, Non FSI area of 202619.2 m2 and total BUA of 376394.85 m2.

Brief information of the proposal is as below: Name of Project Joyville Hadapsar Annex Type of institution Private Name of Project Proponent M/s. Manjri Horse Breeders Farm Pvt. Ltd. (PoAH - M/s. Joyville Shapoorji Housing Pvt. Ltd.) Type of Project Residential and Commercial New Project/Expansion in existing New project/modernization etc. Location of the project Land bearing S. NO 6/1 TO 6/6,7/2/1,7/2/2, 9/1,9/2,9/5 TO 9/20,9/23 TO 9/41,10/1 TO 10/8,10/10 TO 10/16 of village Shevalwadi, Haveli, Pune Taluka Haveli Village Shevalwadi Correspondance Name Mr. Jitesh Bonde, Additional G. M. Room No 70, Nagindas Master Road, Fort, Mumbai, 400 023 Area of the project Shevalwadi Total Plot Area (sq. m.) 165557.87 Deductions 9384.58 Net Plot Area (sq. m.) 156173.29 Proposed Built-Up Area (FSI & FSI Area (sq. m.) 173775.65 Non-FSI) Non-FSI Area (sq. m.) 202619.2 Total BUA Area (sq. m.) 376394.85 Total Ground Coverage (sq. m.) 35035.17 Ground-Coverage Percentage (%) 22% Estimated Cost of Project 1221 22. Number of Buildings & its Configuration Sr Building Name & Number Number of Floors Height (m) 1 Building Type 1 - Nos. 3,15,16,17,18,19,21 B+S+22 68 2 Building Type 2 - Nos. 4,6,8,9,10,12,20 B+S+22 68 3 Building Type 3 - Nos. 1,2,3,5,7,11,14 B+S+22 68 4 EWS Building Wing A & B G+11 35.85 5 EWS Building Wing C & D G+11 35.85 6 EWS Building Wing E & F G+12 38.8 6 Retail Building G 4.8 7 Creche G 5.7 8 Club House 1 G+1 7.05 9 Mini Club House 2 & 3 G 4.65 10 Fitness centre/Society office 3,4,5,6 G 4.65 Number of Tenants & Shops No of Tenaments 3358

Secretary, SEAC-3 Chairman, SEAC-3 Page 36 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Commercial Area 169.26 Number of Expected Residents Residential Users 16204 / Users Commercial Users 57 Right of Way (Width of the road from nearest fire station to the proposed building) 24m Road Turning radius for easy access of fire tender movement from all around the building excluding 9 the width for plantation Existing Structure (s) if any No Details of demolition with disposal (If applicable) N.A. 31. Production Details – Nil. 32. Total Water Requirement Dry Season Source of Water Grampanchayat Manjri/Irrigation Dept Fresh Water (CMD) 1460 Recycled Water - Flushing (CMD) 730 Recycled Water - Gardening (CMD) 94 Swimming pool Make -up (Cum) 0 Total Water Requirement (CMD) 2284 Firefighting Underground Water tank (CMD) As per NOC Firefighting Overhead Water tank (CMD) As per NOC Excess Treated Water 1147 Source of Water Grampanchayat Manjri/Irrigation Dept Fresh Water (CMD) 1460 Recycled Water - Flushing (CMD) 730 Recycled Water - Gardening (CMD) 0 Wet Season Swimming pool Make -up (Cum) 0 Total Water Requirement (CMD) 2195 Firefighting Underground Water tank (CMD) As per NOC Firefighting Overhead Water tank (CMD) As per NOC Excess Treated Water 1241 Details of Swimming Pool (if any) Yes. Swimming Pool with area = 595 sqm Rain Water Level of Ground Water Table 10-40m BGL Harevesting Size and No. of RWH Tank (s) and Quantity NA (RWH) Location of RWH Tank (s) NA Quantity of recharge Pits 30 Nos. Size of Recharge Pits 2.5m X 2.5m X 2m Budgetary Allocation (Capital Cost) Rs. 1575000 Budgetary Allocation (O&M Cost) Rs. 79000 per annum Storm Water Drainage Natural Water Drainage Pattern South to North Quantity of Storm Water 241 cum/day Size of SWD 600mm Sewage and Waste water Sewage Generation in KLD 1971 STP Technology MBBR Capacity of STP (CMD) 2000 Location & Area of the STP Shown on Plan Budgetary Allocation Rs. 16063000 (Capital Cost) (Electromechanical Only) Budgetary Allocation (O&M Cost) Rs. 9525000 per annum

Secretary, SEAC-3 Chairman, SEAC-3 Page 37 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

(Electromechanical Only) 37. Solid Waste Management Waste Generation in the Pre- Waste Generation 5 kg/day Construction and Disposal of Construction Through authorised agency Construction Phase Waste Debris Waste generation in Operation Phase Dry Waste 3247 kg/day Wet Waste 4864 kg/day Hazardous Waste Negligible Biomedical Waste (if any) N.A STP Sludge (dry sludge) 180.01 kg/day Others (if any) E Waste 22.35 kg/day Mode of Disposal Dry Waste Handed over to Authorized Agency Wet Waste In-situ Composting Hazardous Waste Negligible Biomedical Waste (if any) N.A STP Sludge (dry sludge) In-situ Composting Others (if any) E Waste Handed over to Authorized Dismantler/Recycler Area Requirement Location (s) Shown on Plan Area for Storage of Waste & other 220 sqm Material Area for machinery Considered in Above Area Budgetary Allocation (Capital Cost Capital Cost Rs. 8125000 and O & M Cost) O & M Cost Rs. 1125000 per annum Green Belt Development Total RG Area 15617.329 No. of Trees to be cut 10 No. of Trees to be planted 1352 List of Proposed Native Trees Elaborated Below Timeline for Completion of Till Completion of Project Plantation 45. Number and List of Trees Species to be Planted in the Ground Green Belt Total RG Area 15617.329 Development No. of Trees to be cut 10 No. of Trees to be planted 1352 List of Proposed Native Trees Elaborated Below Timeline for Completion of Plantation Till Completion of Project

48. Energy Power Requirement Source of Power Supply MSEDCL During Construction Phase (Demand Load) Minimum 100 kW DG Set as Power Back-up during Construction Ph 2 X 125 kVA During Operation Phase (Connected Load) 15040 kVA During Operation Phase (Demand Load) 9769 kVA Transformer 630 X 13 + 630 X 3 kVA

Secretary, SEAC-3 Chairman, SEAC-3 Page 38 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

DG Set as Power Back-up during OperationPhase 2 X 380 + 2 X 500 + 1 X 250 kVA Fuel Used HSD 49. Energy Saving by Non-Conventional Method Most of the common area & external lighting are proposed to work on high energy efficient lamps(LED) as specified in bureau of energy efficiency which again results in saving in general consumption Low loss Transformers due to which 6.22% losses are saved against conventional transformer. Power Capacitors are proposed for load power factor correction and to maintain a healthy power situation. This also results in less demand load factor for the project. Solar PV, Hot Water, Solar Street Lights, Energy Efficient Motors are proposed 51. Details of Pollution Control Systems Source Existing Pollution Control Systems Proposed to be installed Not Not Applicable Not Applicable Applicable Budgetary Allocation (Capital Cost Capital Cost Rs. 20392000 and O & M Cost) O & M Cost Rs. 600000 per annum 52. Environmental Management Plan Budgetary Allocation a) Construction Phase (with Break-up) Serial Attributes Parameter Total Cost per annum Number (Rs. In Lacs) 1 Water for Construction & labour Water Requirement 8 2 Site Sanitation & Safety Health & Safety 3 3 Environmental Monitoring Pollution Monitoring & 8 Control 4 Disinfection Health & Safety 3 5 Health Check-Up Health & Safety 3 b) Operation Phase (with Break-up) Serial Component Description Capital Cost Rs. In Lacs O&M Cost (Rs. In Number Lacs/yr) 1 Rain Water Harvesting RWH Pits 15.75 0.79 2 Sewage Treatment Plant Waste Water 160.63 95.25 Management 3 Organic Waste Solid Waste 81.25 11.25 Composting Management 4 Tree Plantation Landscape 65 7 Development 5 Energy Saving Energy Conservation 203.92 6 6 Environmental Pollution Control 0 10 Monitoring 53. Traffic Management Nos. of the junction to the main Shown on Master Layout road & design of confluence Parking Details Number and Area of Basement 36780.62 Number and Area of Podia 35035.17 Total Parking Area (including Stilt) 46072.67 Area per Car 12.5 Number of 2-Wheelers as approved by competent authority 5172

Secretary, SEAC-3 Chairman, SEAC-3 Page 39 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Number of 4-Wheelers as approved by competent authority 1053 Public Transport Available Width of all Internal Roads (m) Minimum 6

The PP was issued ToR in 103rd meeting of SEAC-3 for carrying out EIA studies. Accordingly PP has submitted EIA report. The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(b)B1.

During discussion following points emerged: (1) PP to revise CER considering following points:- (a) PP to reduce number of trees and revise per tree cost as Rs. 5000/- per tree. (b) PP to propose provision of dialysis units to Government Hospital. (c) PP to submit number of solar lights and RWH units to be provided. (d) Activity of improvement of sewerage system is job of local body hence not allowed. PP to propose provision of electric crematorium / ambulance etc. (2) PP to obtain NOC for water supply with quantity from competent authority. (3) PP to ensure that excess treated waste water will be disposed in sewer line provided by local authority. If the same is to be disposed in nearby nalla, PP shall ensure that treated effluent meets standards for disposal into inland surface waters prescribed by CPCB / MoEF&CC. In both cases, PP shall obtain NOC from competent authority before providing occupation to project. PP to submit undertaking accordingly.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 40 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.11 131313/2019 Residential cum commercial Construction project “ Yash Gracia S. No. 7/1, 7/2, 7/2/1 Dhanori , Haveli, Pune by M/s Akshay Enterprises. PP had submitted application for prior Environmental clearance for total plot area of 11100 m2, FSI area of 19782.99 m2, Non FSI area of 22419.82 m2 and total BUA of 42202.81 m2.

Brief information of the proposal is as below:

Name of Project Residential cum Commercial Project - Yash Gracia Project category 8a (B2) Type of Institution Private Project Proponent Akshay Enterprises “ YashElina” Business Bay, office no.301 -303 3rd floor, behind Maruti Mandir,, Canal Road, Kothrud Pune - 411038 Consultant Applied for New Details of previous EC NA Location of the project S. No. 7/1, 7/2, 7/2/1, Dhnori, Haveli, Pune Latitude and Longitude Latitude 18°36„53.84“ N Longitude 73°54„10.28“ E Total Plot Area (m2) 11100 Deductions (m2) 3826.78 Net Plot area (m2) 7273.22 Proposed FSI area (m2) 19782.99 Proposed non-FSI area (m2) 22419.82 Proposed TBUA (m2) 42202.81 TBUA (m2) approved by Planning Authority till date NA Ground coverage (m2) & % 2221.00 sq.m Total Project Cost (Rs.) 104 Cr. CER as per Activity Location Cost (Rs. In Duration MoEF & CC lakhs) circular dated Water supply (RO) Hospital, park 12 5 01/05/2018 Sanitation Providing toilets and School, Hospital 10 3 dustbins to schools and hospitals Solar Power School 3 4 Rainwater harvesting Training center, Road 18 2 Tree plantation Road side, Temple and 81 5 Training center Donation of safety kit With labour 32 5 department Details of Building Configuration : Reason for Change Previous EC / Existing Building Proposed Configuration Building Configuration Height Building Configuration Height NA Name (m) Name (m) NA NA NA A G + UP +2P +12 44.95 B B +G +UP +2P +12 44.95

Secretary, SEAC-3 Chairman, SEAC-3 Page 41 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

C B +G +UP +2P +12 44.95 D G + UP+2P+12 44.95 E P +UP +2P +12 44.95 Total number of tenements: 312 (Proposed) Residential – 312, Commercial – 32 shops

Water Budget Dry Season (CMD) Wet Season (CMD) Fresh Water 143 Fresh Water 143 Recycled 79 Recycled 75 Swimming Pool 0 Swimming Pool 00 Flushing 75 Flushing 75 Total 222 Total 218 Waste water 204 Waste water generation 204 generation Water Storage UGT - Capacity for Firefighting / Domestic Water Tank – 252 KLD, Flushing water tank – 755 KLD UGT Fire water tank –375 KLD Source of water PMC Rainwater Level of the Ground water table: Pre-Monsoon: 19-25m Harvesting Post Monsoon: 7 -15 m (RWH) Size and no of RWH tank(s) and Quantity: NA Quantity and size of recharge pits: 2 m X 2 m X 3 m & 4 Nos. pits

Details of UGT tanks if any: UGT - As in point no. 24 Sewage and Sewage generation in CMD: 204 Wastewater STP technology: MBBR Capacity of STP (CMD): 230 Solid Waste Type Quantity (kg/d) Treatment / disposal Manageme Dry waste: 20 Through Authorized vendor - SWACH nt during Constructio Wet waste: 30 Through Mechanized composting n Machine Phase Construction waste 4761.20 cum Filling on same site Solid Type Quantity (kg/d) Treatment / disposal Waste Dry waste: 339 Through Authorized vendor - Manageme SWACH nt during Wet waste: 486 Through Mechanized composting Operation Machine Phase Hazardous waste: NA -- Biomedical waste NA -- E-Waste Resi. – 780 Kg/yr. , Through Authorized vendour - SWACH Comm. – 180 Kg/yr. STP Sludge (dry) 16.73 Kg /day Green Belt Total RG area (m2): 728 Development Existing trees on plot: 17 Number of trees to be planted: 94 Number of trees to be cut: 17

Secretary, SEAC-3 Chairman, SEAC-3 Page 42 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Number of trees to be transplanted: NA Power Source of power supply: MSEDCL requirement: During Construction Phase (Demand Load): During Operation phase (Connected load): 1728 KW During Operation phase (Demand load): 880 KW Transformer: 630 KVA X 2 Nos.

DG set: 200 KVA X 1 Nos. Fuel used: 33 Liters/Hr. at 75% Loading Details of  Solar lights will be provided for common amenities like Street lighting & Garden Energy saving lighting.  LED based lighting will be done in the common areas, landscape areas, signage‟s, Entry gates and boundary compound walls etc.  Auto Timer Switches will be provided for Street lights, Garden lights, Parking & staircase Lights & Other Common Area Lights, for saving electrical energy.  Water Level Controllers With Timers will be Used for Water Pumps.  To create awareness to end consumer or flat owner, for using energy efficient light fittings like T5 Lamps & LED Lights. Detail calculations & % of saving: 20 % Environmenta Type Details Cost l Capital 1. Erosion Control 1.5 Manageme 2. Site Safety 1.0 nt plan 3. Site Sanitation 1.0 budget 4. Disinfection & Health Check up 1.5 during 5. Environmental Monitoring 1.30 Constructio O&M 1. Erosion Control 0.5 n phase 2. Site Safety 0.5 3. Site Sanitation 0.75 4. Disinfection & Health Check up 0.5 5. Environmental Monitoring 2.62

Environmenta Component Details Capital (Rs. In O&M (Rs. In l Lacs) Lcs /Y) Management Sewage treatment STP installation 50 12.22 plan Budget RWH Pits and Bore 5.00 0.5 during construction Operation Solid Waste OWC machine installation 14.75 3.11 phase Green belt development Plantation 31.05 0.63 Energy saving Energy saving measures 80.00 1.60 Environmental Monitoring Air, Water, soil and noise 1.30 2.62 monitoring Disaster Management Fire equiments etc. 59.15 8.97 Traffic Type Required as per DCR Actual Provided Area per parking (m2) Management 4-Wheeler 345 352 7166 2-Wheeler 703 703 2010 Bicycles 354 354 463.40

Secretary, SEAC-3 Chairman, SEAC-3 Page 43 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP to submit revised CER excluding schemes of individual benefit costing Rs. 32 Lakhs. Instead of that, PP to provide an ambulance costing Rs.32 Lakh to Government Hospital. (2) PP to revise fire tender movement plan (3) The Committee noted that UGT is proposed below building footprint and RCC structural columns of the building are located within the alignment of the UGT. PP to submit details of the treatment measures proposed for protecting the columns. (4) Commercial parking shall be physically separated from residential parking. (5) Fire tender movement shall be revised such that all entries to parking and ramps shall be clearly indicated. PP to submit cross sections at 4 different places. (6) PP to submit parking statement showing total number of parking required and proposed as per DCR / Town Planning norms with adequate area per car as per norms. (7) PP to submit evacuation plan for entire project for occupants, visitors and as well as cars. (8) PP to submit details of energy saving. (9) PP to submit details of UGT. (10) PP to obtain and submit following NOC‟s: (a) CFO NOC.

PP requested for time to submit the information sought; after deliberations committee asked PP to comply with the observations and submit information to the committee for further discussion and consideration of SEAC. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 44 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.12 132298/2019 Proposed IT building "Kratos Tower" at.Survey No. 265/2/1A/1A, Hinjewadi village, Mulshi, Pune by M/s Apus Realties. PP had submitted application for prior Environmental clearance for total plot area of 10,678.02 m2, FSI area of 31,420.85 m2, Non FSI area of 29,203.65 m2 and total BUA of 60,624.50 m2.

Brief information of the proposal is as below: Name of Project Proposed IT Building Project “Kratos Tower” Project category B Category, 8(a) Type of Institution Private Project Proponent  Name: M/s. Apus Realties (Mr. Ramesh Chhabria)  Address: M/s. Apus Realties D-2/3, Shivsrushti Apartment, S. No. 103/A, Bahiratwadi, Senapati Bapat Road, Pune – 411016. Name of Consultant  Name: Building Environment (India) Pvt. Ltd.  NABET Accreditation No.: NABET/EIA/1821/RA 0133 Applied for New Greenfield Project Details of Previous EC Not Applicable Location of the project Survey No. 265/2/1A/1A, Hinjewadi village, Taluka-Mulshi, District-Pune Latitude and Longitude Total Plot Area 10,678.02 Sq.M. Deductions 188.78 Sq.M. Net Plot Area 10,489.24 Sq.M. Proposed FSI area 31,420.85 Sq.M. Proposed Non FSI area 29,203.65 Sq.M. Proposed Total BUA 60,624.50 Sq.M. Total Built up area 60,624.50 Sq.M. from PMRDA vide letter no. BMU/C.R. No. 756/19-20/ Hinjewadi/ approved S. No. 265 (P) dated 22/10/2019 Ground Coverage 2775.07 Sq.M. & 26.45 % to net plot area Total Project Cost Rs. 125,00,00,000/- CER as per MoEF & CC circular dated 01/05/2018 Activity Location Cost (Rs.) Duration Approx. 1000 no‟s of Native Hill Slope, Hill 50,00,000/- Year 2021- tree plantation & its Top at 2022 to Year maintenance for 5 years at Godambewadi, 2025-2026 hill slope, Hill Top at Pune Godambewadi, Pune with consultation of forest dept. Install electric cremation Nande village 30,00,000/- Year 2021- machine at the Nande village Grampanchayat, 2022 to Year Grampanchayat, Taluka- Taluka-Mulshi, 2025-2026 Mulshi, Pune Pune Installation and Its Marunji 22,75,000/- Year 2021- Maintenance of Solar Street Grampanchayat, 2022 to Year lights (75 Nos) Marunji Taluka-Mulshi, 2025-2026 village, Taluka-Mulshi, Pune Pune with consultation of Marunji Grampanchayat Provide fully equipped Paud, Taluka- 30,00,000/- Year 2021- Ambulance (1 No) to the Mulshi, District- 2022 to Year Gramin Rugnalaya, (Govt. Pune 2025-2026

Secretary, SEAC-3 Chairman, SEAC-3 Page 45 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Hospital) at Paud, Taluka- Mulshi, District-Pune. Provide Solar powered Kasarsai, 20,00,000/- Year 2021- electrification (Solar PV, Taluka-Mulshi, 2022 to Year Solar powered Street lamps) Pune 2025-2026 to the campus of Zilha Parishad School, Kasarsai, Taluka-Mulshi, Pune (approx.. 1500 Sq.M. campus area) Provide Organic waste Mulkhed 35,00,000/- Year 2021- converter (OWC), 500kg/day village, Taluka- 2022 to Year capacity and maintenance for Mulshi, Pune 2025-2026 5 years with dry & wet waste dust bins to the Mulkhed village, Taluka-Mulshi, Pune

Details of Building Building Name Configuration Height Configuration IT Building B + LP + G + 13 50m

Total number of Proposed: Offices: 44 Nos , Shops: 8 Nos., Showrooms: 2 Nos., Restaurants: 1 No. tenements Expected Users: 4051 Nos. Water Budget Particular Dry Season Wet Season Fresh Water 87 KLD 87 KLD Recycled (Flushing) 71.5 KLD 71.5 KLD Recycled (Landscape) 18.3 KLD 0 KLD Swimming Pool NA NA Total 176.8 KLD 158.5 KLD Waste water generation 150 KLD 150 KLD

Water Storage Capacity • Domestic UG tank Capacity: 87 KLD for Fire Fighting/ UGT • Flushing UG tank Capacity: 135 KLD, Fire UG tank Capacity: 200 KLD Source of Water Hinjewadi Grampanchayat Rainwater Harvesting  Level of Ground Water Table: (RWH) Pre-Monsoon: 15m-20m BGL, Post Monsoon: 10m-12m BGL  Size & No. of RWH tanks and Quantity: NA  Quantity and size of recharge pits: 4 nos of recharge pits proposed with 2.5m x 2.5m x 3m  Details of UGT tanks: Domestic UG tank Capacity: 89 KLD + 89 KLD Flushing UG tank Capacity: 131 KLD, Fire UG tank Capacity: 200 KLD Sewage and Wastewater  Sewage Generation: 150 CMD, STP Technology: MBBR  STP Capacity: 150 CMD Solid waste management Type Quantity Treatment/ disposal during construction Dry waste Negligible Collect & disposed through authorized agency. phase Wet waste Negligible Provision of composting Construction Top Soil: Top soil will be reused for landscape purpose waste 318.68 within project site. Cu.M. Excavated debris will be will be reused for Debris: backfilling, levelling & plinth filling purpose. 16188.01 No disposal outside the project site will be Cu.M. takes place.

Secretary, SEAC-3 Chairman, SEAC-3 Page 46 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Solid waste management Type Quantity Treatment/ disposal during operation phase Dry waste 457 kg/day Will be collected & disposed by SWaCH Organization Wet waste 630 kg/day Treated in Organic waste composter and used as manure in landscape E-waste 4051 kg/year Will be collect & disposed by SWaCH Organization STP Sludge 26 kg/day Treated in OWC and used as manure in landscape

Green Belt Development  Total RG Area: 1585.47 Sq.M.  Existing trees on Plot: NA, Number of trees to be plant: 141 Nos.  Number of trees to be cut: NA, Number of trees to be transplant: NA Power Requirement  Source of power supply: MSEDCL  During Construction Phase (Demand Load): 250kVA  During Operation Phase (Connected Load): 6216kVA  During Operation Phase (Demand Load): 3420kVA  Transformer: 1 x 1600kVA & 2 x 1250kVA  DG Set: 4 x 1000kVA, Fuel Used: HSD Details of Energy Saving Total Energy Saving: 22.33 % Environment Management Plan during Sr. Parameter Total cost/year(Rs. Lakh) Construction phase 1 Personnel Protective Equipment 7.0 2 Site Sanitation Facility 5.0 3 Drinking water facility 10.0 4 Solid waste management 5.0 5 Health Check up 3.0 6 Awareness to workers or training 2.0 7 Environmental Monitoring 3.0 8 Disaster Management 25.0 TOTAL 60.0

Environment Management Plan Operation phase Sr. Component Details Capital O &M Cost No. Cost (Rs. Lakh) (Rs. Lakh) 1 Storm water -- NA NA 2 Sewage Treatment Plant STP of 28 7.17 150 KLD Capacity 3 Water Treatment NA NA NA 4 RWH 4 Nos of Recharge Pits 8.0 0.28 5 Swimming Pool NA NA NA 6 Solid waste OWC 14.75 3.07 7 Hazardous waste NA NA NA 8 E-waste Collection & Disposal with -- 0.15 authorized agency 9 Green Belt Development 141 No of Trees 17.84 1.40 10 Energy Saving 22.33 % Energy saving 211.2 1.5 11 Environment Monitoring Air, Water, Noise, Soil, STP, DG -- 5.0 set Monitoring 12 Disaster Management -- 90.5 12.45 13 Drainage line 500m 25 -- TOTAL -- 395.29 31.02

Secretary, SEAC-3 Chairman, SEAC-3 Page 47 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Traffic Management Type Required as per Actual Provided Area per DCR Parking 4-Wheeler 330 No. 330 No. 12.5 Sq.M. 2-Wheeler 939 No. 939 No. -- Cycles 939 No. 939 No. --

Total Parking Area: 7,317.60 Sq.M.

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP to submit integrated waste management plan. (2) PP to submit energy saving calculations. (3) PP to revise monitoring matrix for daily noise level monitoring during operation phase.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 48 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.13 134612/2020 Proposed residential and commercial project at Gat No.41/7, Plot A2, Bhoirwadi, Taluka–Mulashi, Pune by Priyanka Builders. PP had submitted application for prior Environmental clearance for total plot area of 11944 m2, FSI area of 19910.35 m2, Non FSI area of 21787.56 m2 and total BUA of 41697.91 m2.

Brief information of the proposal is as below:

Proposed residential and commercial project at Gat No.41/7, Plot A2, Bhoirwadi, Name of Project Taluka– Mulashi, Pune by Priyanka builders Project category Infrastructure and Miscellaneous Projects + CRZ Type of Institution Private Name Mr. Jagadish Patil, partner M/s. Priyanka Builders. Project Proponent 1001, 10th floor, Rama Equator, Near Samrat Chowk, Regd. Office address Pimpri, Pune Consultant Vke: environmental LLP Applied for New Greenfield Project Details of previous EC - Location of the project Plot No.41/7, Plot A2, Village - Bhoirwadi, Taluka - Mulshi, Pune Latitude and Longitude 18°35'9.92"N , 73°40'59.45"E Total Plot Area (m2) 11944 Deductions (m2) 0 Net Plot area (m2) 11944 Proposed FSI area (m2) 19910.35 Proposed non-FSI area (m2) 21787.56 Proposed TBUA (m2) 41697.91 TBUA (m2) approved by

Planning Authority till date Ground coverage (m2) & % 2767.41 m2 Total Project Cost (Rs.) 50,95,12,437/- Activit Location Cost (Rs.) Duration y Avenue It is proposed to plant trees 690249 2020 Plantation with tree guards around Bhoirwadi Gaon road, Bhoirwadi, which is around 5 km long. As proposed M/S Priyanka builders will plant 138 CER as per MoEF & CC circular trees. dated 01/05/2018 Provide fully It is proposed to provide 1 8000000 2022-2023 equipped fully equipped / Advanced Ambulance Life Support Ambulance vans van to Bhoirwadi Grampanchayat through Health department Z.P. Pune, 1 fully equipped / Advanced Life Support Ambulance van to PCMC Fire station, Hinjewadi

Secretary, SEAC-3 Chairman, SEAC-3 Page 49 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Phase III. The Ambulance services will be helpful during medical emergency. Provide Waste It is proposed to donate 1 1500000 2021 Picker Vans waste picker vans to Bhoirwadi Grampanchayat for Bhoirwadi area. The waste picker vans will be very helpful for Cleanliness. Details of Building Configuration: Reason for Change

Previous EC / Existing Building Proposed Configuration Building Configuration Height Building Height Configuration Name (m) Name (m)

Building A B+LP+UP+14 44.95

Building B B+LP+UP+14 44.95

Building C G+14 44.95 Parking B+LP+UP 4.30 building Residential: 416 Shops: 14 Total number of tenements Residential Tenants :2080 Commercial users: 177 Total Population:- 2257 Dry Season (CMD) Wet Season (CMD) Fresh Water 192 Fresh Water 192 Recycled water Flushing 98 Recycled water Flushing 98 Water Budget Swimming Pool 1 Swimming Pool 1 Recycled water Gardening 13 Recycled water - Gardening 00 Total 304 Total 291 Waste water generation 261 Waste water generation 261 75000 Ltrs. per building (A, B & C) & for Parking Water Storage Building 50000 Ltrs. Total 275000 Liters. Capacity for OHWT: 25000 Firefighting / Fire Fighting UGT – 275 CMD & OHWT – 75 CMD UGT Irrigation Department Source of water Level of the Ground water table: Pre-Monsoon: 7.00 m Post Monsoon: 5.5m Rainwater Size and no of RWH tank(s) and Quantity: NA Harvesting (RWH) Quantity and size of recharge pits: 9 no of pit of Size 1mx1mx1m below storm water inlet level with 60 m recharge bore well Details of UGT tanks if any:

Secretary, SEAC-3 Chairman, SEAC-3 Page 50 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Sewage generation in CMD: 261 Sewage and STP technology: MBBR Wastewater Capacity of STP (CMD): 265 Type Quantity (kg/d) Treatment / disposal Dry waste: Will be handed over to Authorized Solid Waste 8 Management vendor Wet waste: Will be handed over to Authorized during 12 Construction vendor Phase Construction waste The construction waste generated during construction shall be segregated, reused on site and surplus shall be led to scrap dealers for recycling. Type Quantity (kg/d) Treatment / disposal Dry waste: 443 Will be handed over to SWaCH Solid Waste Wet waste: Will be operated in OWC Management 642 during Hazardous waste: NA NA Operation Biomedical waste NA NA Phase E-Waste 3.334 (1217 kg/yr) will be handed over to authorized vendor STP Sludge (dry) 87 Will be operated in OWC Total RG area (m2): 1194.40

Existing trees on plot: 00 Green Belt Development Number of trees to be planted: 160 Number of trees to be cut: 00 Number of trees to be transplanted: 00 Source of power supply: MSEDCL During Construction Phase (Demand Load): 231.25 kW During Operation phase (Connected load): 1835.76 kW Power During Operation phase (Demand load): 993.48 kW requirement: Transformer: 2No- 630 kVA + 1No-315kVA DG set: 1no- 320 kVA & 1no 250 kVA Fuel used: HSD

Details of Total Energy Saving : i.e. ( 15.08 % Savings) /year Energy saving Energy saving due to solar :i.e. ( 11.89 % Savings)

Type Details Cost Erosion control – dust suppression measures, Air Environment 11,47,125 Environmental barricading and top soil preservation Management Land Labour Camp toilets & sanitation 4,80,000 plan budget Health and Safety Labour Safety Equipment‟s and training 4,00,000 during facility Disinfection and Health Check-ups 51000 Construction phase Environment Management Environmental Monitoring cell 1,70,000 Environment Environmental Monitoring 3,26,500 Total 25,74,625

Secretary, SEAC-3 Chairman, SEAC-3 Page 51 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Component Details Capital (Rs.) O&M (Rs./Y) Sewage treatment 1 STP – 265 KLD 71,00,000 10,50,000 RWH 9 Recharge pits 10,00,000 1,00,000 Environmental 21, 00,000 Swimming Pool Main Pool and Kids Pool 12000 Management plan Budget Solid Waste 1 OWC 16,75,000 61,305/- during Development & Operation Green belt development 7,66,317.50 45,583 phase maintenance of green area Energy saving Solar Hot water 43,50,000 1,68,000 Environmental Monitoring - - 1,85,600 Disaster Management 374,00,000 25,00,000 Type Required as per DCR Actual Provided Area per parking (m2) Traffic 4-Wheeler 126 372 12.5 Management 2-Wheeler 719 362 2 Bicycles 719 243 0.7

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP to obtain and submit CFO NOC.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 52 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.14 135604/2020 Aaiji Crystal at Survey No. 36/2/3/1, 36/2/2, 36/2/2/9, 36/67/Plot A, 67/1B/25/7, Dhanori, Haveli, Pune by M/s Aaiji Developers. PP had submitted application for prior Environmental clearance for total plot area of 7670.38 m2, FSI area of 15959.52 m2, Non FSI area of 9110.61 m2 and total BUA of 25070.13 m2.

Brief information of the proposal is as below: Name Aaiji Crystal category 8(a)- Building & Construction Project Type Private Name Suresh Choudhary Project Proponent 7A, Sunanda Apartment, Behind ICICI Bank, Vishrantwadi Regd. Office address Alandi Road, Haveli, Pune, Maharashtra-411015 MITCON Consultancy and Engineering Services Limited, Nabet Certificate No. Consultant NABET/EIA/1720/RA 0075 Valid till 16.06.2020 Applied for Fresh EC / New Greenfield Project Details of previous EC NA Location of the project Survey No. 36/2/3/1, 36/2/2, 36/2/2/9, 36/67/Plot A, 67/1B/25/7, Dhanori, Pune Latitude and Longitude 18°34'41.85"N 73°53'24.17"E Total Plot Area (m2) 7670.38 Deductions (m2) 1213.78 Net Plot area (m2) 6456.6 Proposed FSI area (m2) 15959.52 Proposed non-FSI (m2) 9110.61 Proposed TBUA (m2) 25070.13 TBUA (m2) approved Plans not approved yet Ground coverage (m2) & 1443.81 % 22.36 % Total Project Cost (Rs.) 41.0 Cr. CER as per MoEF & CC Activity Location Cost Duration circular (Rs.) dated 01/05/2018 Providing 12 Nos. of fresh water storage tanks of 2000 lits. each to: • Himgiri Vidyalay • Mahanagarpalika School 1.0 Within 3 • Saraswati Vidyalay Lakhs years Infrastructure • Pragati Garden creation for drinking • PMC Hospital, Tingre Nagar water supply • Kedarnath General Hospital Providing 35 public toilets at: • Airport Road 35.0 Within 3 • Vishrantwadi Chowk Lakhs years • Dhanori Road • Tingre Nagar Rain water harvesting facilities will be provided for following schools: • Himgiri Vidyalay Rain water 5.0 Within 3 • Mahanagarpalika School Harvesting Lakhs years • Saraswati Vidyalay • Kedarnath General Hospital • PMC Hospital, Tingre Nagar

Secretary, SEAC-3 Chairman, SEAC-3 Page 53 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

400 Nos. of native species will be planted along both sides of roadside of Avenue plantation, • Airport Road 6.0 Within 3 plantation in • Vishrantwadi Road Lakhs years community areas • Dhanori Road • Tingre Nagar Installation of 200 solar power street lights on: • Airport Road • Vishrantwadi Road • Dhanori Road Electrification • Tingre Nagar including installation 30.0 Within 3 • Alongside Vishrantwadi Lake of solar power street Lakhs years • Himgiri Vidyalay lights • Mahanagarpalika School • Saraswati Vidyalay • Pragati Garden • PMC Hospital, Tingre Nagar • Kedarnath General Hospital 300 Dust bins for dry & wet waste will be provided near: • Himgiri Vidyalay • Mahanagarpalika School • Saraswati Vidyalay Solid waste • Pragati Garden 5.0 Within 3 management • PMC Hospital, Tingre Nagar Lakhs years facilities • Kedarnath General Hospital • Airport Road • Vishrantwadi Road • Dhanori Road • Tingre Nagar • Vishrantwadi Lake Previous EC / Proposed Configuration Existing Building Height Building Name Configuration Details of Building (m) Configuration: Wing A B + LG + UG + 15 Floors 45.6 N NA Wing B B + LG + UG + 15 Floors 46.45 A Wing C B + LG + UG + 15 Floors 46.45 Wing D (MHADA) P + 7 Floors 22.8 Total number of Proposed: 204 Tenements tenements Dry Season (CMD) Wet Season (CMD) Fresh Water 143 Fresh Water 143 Recycled 51 Recycled 46 Swimming Pool 95.5 Swimming Pool 95.5 Water Budget Flushing 46 Flushing 46 Total 143 Total 143 Waste water 122 Waste water generation 122 generation MHA Water Storage Capacity OHT OHT OHT C Sr. Description of tank UGWT DA for Firefighting / UGT A BLDG B BLDG BLDG BLD

Secretary, SEAC-3 Chairman, SEAC-3 Page 54 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

G OHT 1 Domestic 138 cum 26 27 27 12. 0 2 Flushing 40 cum 13 13.5 13.5 6 3 Fire fighting 175 cum 20 20 20 20

Source of water PMC Pre-Monsoon: 13 m Level of the Ground water table: Post Monsoon: 12 m Size and no of RWH tank(s) and Quantity: NA Rainwater Quantity and size of recharge pits: 3 Nos. Harvesting (RWH) Domestic: 138 cum Details of UGT tanks if any: Flushing: 40 cum Fire-fighting: 175 cum Sewage generation in CMD: 122 Sewage and Wastewater STP technology: MBBR Capacity of STP (CMD): 125 Type Quantity (kg/d) Treatment / disposal Dry waste: 10 Will be handed over to Swach Will be composted on site in OWC & Solid Waste Management Wet waste: 15 manure will be used for gardening / during Construction Phase landscape Part will be used on site & balance will Construction waste 11778.4 m3 be disposed on other site for backfilling / site levelling Type Quantity (kg/d) Treatment / disposal Dry waste: 204 Will be handed over to Swach Will be composted on site in OWC & Wet waste: 306 manure will be used for gardening / Solid Waste Management landscape during Operation Phase Hazardous waste: NA - Biomedical waste NA - E-Waste 510 Kg/yr. Will be handed over to Swach STP Sludge (dry) 12.2 Will be composted on site Total RG area (m2): 799.84 Existing trees on plot: 21 Green Belt Development Number of trees to be planted: 110 Number of trees to be cut: 0 Number of trees to be transplanted: 0 Source of power supply: MSEDCL During Construction Phase (Demand Load): 30 KW During Operation phase (Connected load): 1269 KW During Operation phase (Demand load): 594 KW Power requirement: Transformer: 630 KVA x 1 No. & 315 KVA x 1 No. 200 KVA x 1 No. for Project & 10 DG set: KVA x 1 No. for MHADA building Fuel used: Diesel Details of Energy saving 161524 KWH / Annum Percentage of saving: 20 % Environmental Type Details Cost

Secretary, SEAC-3 Chairman, SEAC-3 Page 55 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

Management plan budget Water, Air & Noise Water for Dust Suppression 2 during Construction phase Solid Waste Management Collection, segregation, disposal, etc. 0.2 Environmental Monitoring Air, Water, Noise, Soil 1.0 Occupational Health, fire and PPE‟s to workers 2 Safety Site Sanitation Mobile toilets, Disinfection 0.5 Disinfection- Pest Control, First Aid Socio economic environment Facilities, Health Check Up, Creches for 2 Children, Food for children Component Details Capital (Rs.) O&M (Rs./Yr) Storm Water Development of storm water 10 0.2 line Sewage treatment STP 34 12 Water treatment - - - RWH RWH with recharge bores 3.6 0.6 Environmental Swimming Pool Swimming Pool 5 0.8 Management plan Solid Waste Solid Waste Management 20 0.2 Budget during Hazardous waste - - - Operation phase E-waste E-waste Management 0.2 0.1 Green belt Landscape / Greenbelt 10 0.2 development Development Energy saving Energy saving 26 0.52 Environmental Environmental Monitoring of 0 1.5 Monitoring Air, Water, Noise & Soil Disaster Disaster Management 130 5.2 Management Required as Type Actual Provided Area per parking (m2) per DCR Traffic 4-Wheeler 232 249 5135 Management 2-Wheeler 428 428 856 Bicycles 273 279 390.6

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP to obtain and submit CFO NOC.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 56 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

P.15 145364/2020 Expansion in "IT Park" at Plot No. 29 and PL-02, Hinjewadi, MIDC Area, Pune by M/s DLF Info Park (Pune) Limited PP requested to withdraw the application. The committee recommended to delist the application of PP vide Proposal Number -SIA/ MH/ MIS/ 145364/ 2020.

******

E.1 3304 Proposed Mix development project “ Raja Bahadur City centre” at F.P.No. 100+101/1, Sangamwadi, Pune by Raja Bahadur International Ltd. PP remained absent. The Proposal was deferred. ******

E.2 1239 Casa Grande at S.No.89/1,Aundh Ravet BRT Road, Opposite Nivrutti Lawns, Ravet, Pune by M/s Dolphin Buildcon. PP had submitted application for prior Environmental clearance for Total Plot Area: 15700m2 Total Built up Area (FSI): 54539.42m2 , Total Built up Area(NON FSI): 27930.26 m and Total Built up Area: 54539.42 m2.

The building configuration of the proposal is as below: Sr. Name of Type No. of Population No. of Floor No. Building 1 BHK 2 BHK 3 BHK Tenements 1. Wing-A B+G+Podium+15 - 90 28 118 590 2. Wing-B B+G+Podium+15 - 90 26 116 580 3. Wing-C B+G+Podium+15 - 90 28 118 590 4. MHADA P+8 38 - - 38 190

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP to revise CER by reducing plantation activity and provide two ambulances of Rs. 40 Lakh each. (2) PP to submit CFO NOC for commercial building.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 57 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

E.3 3529 Residential & Commercial development Project at Sr. No. 28/10/1, 28/10/2, 28/10/1/3, 28/10/3, 28/10/4, 28/10/5, 28/10/5A, 28/11/2, 28/12/2, 28/14, Ambegaon (bk), Haveli, Pune by M/s. Sai Shraddha Developers. PP had submitted application for prior Environmental clearance for total plot area of 10497.28 m2, FSI area of 16845.09 m2, Non FSI area of 12301.10 m2 and total BUA of 29146.19 m2.

The building configuration of the proposal is as below: Sr. Building Name & number Number of floors Height (m) 1 Commercial Shop (23 Shops) Ground floor --- 2 Wing A (105 Flats) BS+GR+ 2 parking + 15 floors 55.30 m (height up to GL) 3 Wing B (105 Flats) BS+GR+ 2 parking + 15 floors 55.30 m (height up to GL) 4 Club House G+ 1 6.45 m

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP to submit co-ordinated master layout superimposing all environmental parameters.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 58 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

10.06.2020 E.4 0293 Ishanya Mall at S. No. 190(part), 192(part), CTS number 2185-A, Plot No. – B, Shastri Nagar, Yerawada, Pune by M/s Deepak Fertilisers & petrochemicals Corp. Limited. PP had submitted application for prior Environmental clearance for total plot area of 59399.43 m2, FSI area of 33008.80 m2, Non FSI area of 62073.48 m2 and total BUA of 95082.28 m2. The building configuration of the proposal is as below: Sr. Name of Building No. of Floor Area in m2 Population 1. Building - 0 LG+UG+2 1806.66 154 2. Building - 1 LG+UG+3 13879.13 1453 3. Building - 2 LG+UG+3 11561.93 1272 4. Building – 3 & 4 LG+UG+3 11012.68 1539 5. Building - 5 LG+UG+1 6228.87 533 6. Building - 6 LG+UG+3 4828.79 370 7. Building - 7 LG+UG+2 4093.16 494 8. Engg. Building Ground floor 183.54 - Total Population 5815

The Committee noted that Show cause Notice/Proposed Directions u/s 5 of the Environment (P) Act, 1986 r.w. EIA Notification dated 14.09.2006 vide letter dated 31.01.2020 was withdrawn by Environment Department, GoM, vide letter no.No. Comp-2020/CR-01 /SEIAA February 18.02.2020. The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP to revise parking layout plan showing the number of parking required for multiplex as per DCR and provide in such a way that cars are able to manoeuvre independently as it is a multiplex public parking. Parking for commercial building shall be independent of multiplex building. PP to submit details of fire tender movement plan and basement ventilation plan. (2) PP to submit co-ordinated master layout superimposing all environmental parameters and UGT sections. (3) PP to obtain and submit following NOC‟s: (a) Water supply with quantity, (b) solid waste / e- waste management.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 59 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

E.5 2533 “AARIANA” at Gat No. 117 & 120, Somatane Phata, Maval, Pune by M/s Shreeji Developers. PP had submitted application for prior Environmental clearance for total plot area of 38400 m2, FSI area of 44619.71 m2, Non FSI area of 26109.05 m2 and total BUA of 70728.76 m2.

The building configuration of the proposal is as below: Wing A, B, C, D, E, F, G, H :- LP+UP+15, Wing I:-P+4, Row Houses – G+1

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP envisage biomedical waste management plan especially for waste / used masks.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

E.6 3402 "Liviano" S.No 18 H. No.1+2+3, S.No. 19 H.No. 1+2, Kharadi , Pune by M/s. Goel Ganga Landmarks LLP. PP had submitted application for prior Environmental clearance for total plot area of 32000 m2, FSI area of 59,510.54 m2, Non FSI area of 60544.17 m2 and total BUA of 120054 m2.

The building configuration of the proposal is as below: Building A : P+14 (49.03 m), Building B: P+13 (42.93 m), Building C: P+13 (42.93 m) Building D: P+13 (42.93 m), Building E: B+P+21 (66.75 m) , Building F: B+P+21 (66.75 m) Building G: B+P+21 (66.75 m), Club House P+G+1 (11.34 m).

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) PP to obtain and submit Aviation NOC. SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 60 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

E.7 3418 Residential and Commercial Project "Trinity" at S.no.46/1/2, 46/2/1/2, 46/2/1/3, 46/2/2, Pisoli, Pune by M/s Ganraj Infrastructure LLP. PP had submitted application for prior Environmental clearance for total plot area of 20,400 m2, FSI area of 28035.50 m2, Non FSI area of 30316.22 m2 and total BUA of 58351.72 m2. The building configuration of the proposal is as below: Building Name Configuration Height (m) WING A1 2P+G+11 36.00 WING A2 2P+G+11 36.00 WING A3 2P+G+11 36.00 Wing A4 4P + 10 35.02 Wing A5 4P + 10 38.55 Wing A6 4P + 10 38.55 Wing A7 4P + 10 39.00 Wing A8 4P + 10 38.40 Wing A9 4P + 10 38.40 Club House G + 1 7.65

The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(a)B2.

During discussion following points emerged: (1) Fire tender movement plan to be revised with uniform width of 6 m drive way by removing all projections etc. and streamlining all the curved portions with minimum radius of 9 m. (2) PP to submit parking statement showing total number of parking required and proposed as per DCR / Town Planning norms with adequate area per car as per norms. (3) PP to submit fire NOC.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 61 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

E.8 3350 “The Laureate Corporate Park” at CTS No. 2513 S. No. 129 Hissa No. 1C, Pune Alandi Road, Yerawada, Haveli, Pune , by Sky Realty Projects LLP. PP had submitted application for prior Environmental clearance for total plot area of 34101.93 m2, FSI area of 1,00,025.22 m2, Non FSI area of 1,16,915.86 m2 and total BUA of 2,16,941.08 m2.

Brief information of the proposal is as below:

Details of Building Configuration: Reason for Previous EC Proposed Configuration Modification / Change Building Configuration Height Building Configuration Height Change from residential Name (m) Name (m) to commercial. Also decrease in number of Residential B+G+1+23 100 Commercial 3B+LG+G+12 56.6 buildings and A-D configuration. Total number of tenements No. of offices: 46 Tower A- 23 Offices, Tower B- 23 Offices 10384 nos. Commercial users 984 No. Visitors Total Population: 11368 People The case was discussed on the basis of the documents submitted and presentation made by the proponent. All issues relating to environment, including air, water, land, soil, ecology, biodiversity and social aspects were examined. The proposal is appraised as category 8(b)B1.

During discussion following points emerged: (1) PP has agreed to provide Continuous Ambient Air Quality Monitoring Station (CAAQMS) as CER.

SEAC decided to recommend the proposal for prior environmental Clearance, subject to PP complying with the above conditions. ******

E.9 1033 Atria Grande at S. No. 2/2/1, 2/1/1, 6/3/4, Autade Handewadi, Haveli, Pune by Atria Constructions. PP / Consultant were unable to present the proposal due to technical / connectivity problems. The proposal was deferred. ******

Secretary, SEAC-3 Chairman, SEAC-3 Page 62 of 63

Minutes of 109th SEAC-3 meeting convened on 8-9-10 June, 2020 through Video Conference

E.10 3490 „The Nook‟ at S.No. 60/1-2, Behind D.Y. Patil College, Tathawade, Mulshi, Pune by by M/s Pyramid Developers. PP had submitted application for prior Environmental clearance for total plot area of 29144.64 m2, FSI area of 52178.30 m2, Non FSI area of 41335.47 m2 and total BUA of 93513.77 m2.

The Committee noted that the PP was issued Stop Work Notice vide directions u/s 5 of Environment (Protection) Act, 1986 vide no. SEAC-III-2014/CR-262/TC-3 dt.25.03.2015, which mentions that PP has constructed total BUA of 16846.99 m2 at site.

Further As per MoEF & CC notification dated 14.03.2017, PP has applied for grant of ToR to MoEF & CC on 14.06.2017 as Category „A‟ Project . The same was transferred to SEIAA, Maharashtra, on 12.03.2020 as Category „B‟ Project.

Now, PP has applied as per the MoEF&CC Notification dated 8/03/2018 and informed that the total constructed area on site till date is 30372.90 m2 ( FSI :-17765.41 m2 and non-FSI:- 12607.49 m2).

Thus it is prima facie observed that PP has continued construction activity even after receiving stop work directions u/s 5 of Environment (Protection) Act, 1986 on dt. 23.03.2015.

PP to clarify the difference between above mentioned two figures regarding actual construction work carried out till date with supporting documents. The proposal will be considered and appraised after receiving the same.

PP requested for time to submit the information sought; after deliberations committee asked PP to comply with the observations and submit information to the committee for further discussion and consideration of SEAC. ******