Instruction to the Tenderer
Total Page:16
File Type:pdf, Size:1020Kb
Supply, Installation, Testing and Commissioning of various ratings of UPS System without Battery Bank for SBI Branches and offices NIT NO:330/18-19 DATE:30.01.2019 SBI INFRA MANAGEMENT SOLUTIONS PVT LTD (WHOLLY OWNED SUBSIDIARY OF SBI) INVITES TENDERS ON BEHALF OF SBI LHO, HYDERABAD. IN A SINGLE BID THROUGH REVERSE AUCTION PROCESS. Contractors who are on the panel of SBI, Hyderabad Circle, (LHO) for UPS in the appropriate category are only eligible. (Contractors should submit proof of the same) FOR The Floowing branches/ Offices Sl Location Rating of Back-up Remarks-1 Remarks -2 No UPS 1) Janpahad under 1 No of 90Min Buy back of existing 3 Vendor has to quote RBO suryapet 5KVA KVA UPS for supply UPS 2) SBILD, 2 No of 5 60Min Buy back of existing 5 system only. SBI Lingampally KVA KVA UPS will supply 3) SBIRB, 1No of 60Min NEW VAH(battery Bank Lingampally 10KVA with rack). Old 4) Maitri Womens 1No of 3 120Min Buy back of existing 3 batteries will be College, Nalgonda KVA KVA UPS retained at site 5) Miryalaguda 1 no of 120Min Buy back of existing 2 branch, Nalgonda 2KVA KVA UPS Note: After finalization of successful bidder, Quantity may vary and vendor should be supplied as per requirement and please note that work orders will be placed separately. The Senior Vice president, SBI Infra Management Solutions Pvt. Ltd. Ground Floor, Adj Commercial Branch, SBI LHO campus, Bank Street, Koti, Hyderabad – 500 095 Phone:040-23466310/46 Page 1 of 42 Supply, Installation, Testing and Commissioning of various ratings of UPS System without Battery Bank for SBI Branches and offices NOTICE INVITING TENDER. (NIT) Contractors who are on the panel of SBI, Hyderabad Circle, (LHO) for UPS in the appropriate category are only eligible. (Contractors should submit proof of the same) 1. Name of the Work Supply, installation, testing and commissioning of various ratings of UPS systems for SBI branches and offices in the state of Telangana. 2. Estimated cost of work: Rs.3,20,000.00 plus GST as applicable 3. Earnest Money Deposit. (EMD) Rs. 4000/- all Drafts/BCs shall be in favour of “SBIIMS, Hyderabad”. Payable at Hyderabad. 4. Tender Cost Rs.500/- in favour of “SBIIMS, Hyderabad”. 5. Time of Completion: 30 DAYS. 6. Date of download of tender documents From 30.01.2019 to 15.02.2019 from Bank’s web site http://www.sbi.co.in under “ procurement news “. 7. Last date and time for submission of Date:15.02.2019 by 3.00 P.M. online e-tender. at https://etender.sbi 8. Date and Time of opening of e-Tenders: Date: 15.02.2019 at 3.10 P. M. (IST). Indicative Price bids will be (Technical Bid and Indicative Price Bid) opened at later date. 9. Date & Time of Reverse auction Will be communicated through registered mail. 10. Address of opening of tender Sr. Vice President, SBI Infra Management Solutions Pvt. Ltd., Office, Ground floor, Adj to commercial branch, SBI LHO campus, Bank Street, Kothi, Hyderabad – 500 095. Technical Bid of those firms / contractors who do not submit EMD shall be rejected. Representatives of Bidder may be present during opening of Bids. However Bids would be opened even in the absence of any or all the bidder’s representatives. 11. EMD & Tender cost to be submitted at: EMD should be submitted physically at above mentioned address before due date. Contact: Sr. Vice President / Vice President. 040- 23466346. [email protected] 12. Bidder Contact Details. Bidder to provide following information. 1) Name of Company. 2)Contact Person. 2) Mailing address with Pin Code. 4)Telephone number and Fax number. 5)Mobile Number and E-MAIL. 13. Agency for arranging online bidding. e-Procurement technologies Limited, Ahmedabad. Email id:- [email protected], [email protected], [email protected], [email protected] Primary Contact No:- 079-61200579/580/566/596/576/569/567, 9374519754 Alternate Contact No.:- Mr. Yashrajsinh Rathod:- 079/68136815, [email protected] 14. Initial Security Deposit 2% including EMD. in favor of AGM, Internal Audit Department, Hyderabad. Payable at Hyderabad. 15. Defects Liability Period 24 Months 16. Total Security Deposit 5 % of contract value including initial security deposit. 17. Liquidated Damages 0.50% per week subject to max 5%of the value of work 18. Validity 90 days 19. Payment 95% will be released against commissioning and remaining 5% will be released after defect liability period or against submission of BG 20. Comprehensive Annual Maintenance 3 years comprehensive AMC after completion of the 2-year Defect Contract Liability Period. Page 2 of 42 Supply, Installation, Testing and Commissioning of various ratings of UPS System without Battery Bank for SBI Branches and offices FORM OF TENDER To, Senior Vice President SBI Infra Management Solutions Pvt. Ltd., Ground Floor, Adj to Commercial branch, State Bank of India, LHO Campus Bank Street, Koti, Hyderabad- 500095 Dear Sir, Supply, Installation, Testing and Commissioning of various types & ratings of UPS for SBI Branches and Offices in the state of Telangana I/ We refer to the Notice Inviting e- Tender issued by you for the captioned work. 1. I/ We do hereby offer to perform, provide, execute, complete and maintain the works in conformity with Bill of Quantities, Drawings, Specification, Design, General and Special conditions of Contract, Instruction to Tenderers, etc. as contained in the tender documents for the sum as arrived and filled, at the respective rates quoted by me/us in the Schedule of Quantities and/or at any other sum and rate subsequently negotiated and accepted / agreed by the Bank andme/us. 2. I/ We have satisfied myself / our self as to the site conditions, examined site and drawings, and all aspects of tender documents / conditions and are acceptable to us. I/We do hereby agree, should this tender be accepted in whole or in part, to, A. Abide by and full-fill the terms, conditions and provisions of tender documents annexedhereto. B. Complete the work within stipulated completion time at no extra cost to the Bank. 3. I/We are enclosing herewith the Earnest Money Amount as mentioned in the NIT which amount is not to bear any interest. Should I / We fail to execute the Contract when called upon to do so I / We do hereby agree that this sum shall be forfeited by me/us to SBI Infra Management Solutions Pvt. Ltd.Technical bid withoutEMD shall be summarilyrejected& theirOnline price bid shall not beopened. 4. Percentage, if any, to be deducted from Bills and total amount to be retained : Total security deposit shall be 5% of the final value of the work. Out of this 2% of tender value (i.e. tender amount) s in the form of initial security deposit(ISD) which includes the EMD. Balance security deposit (i.e. 5% of final value of work less 2% of tender value already deposited as ISD) towards the work shall be deducted from the final by way of retention money. Page 3 of 42 Supply, Installation, Testing and Commissioning of various ratings of UPS System without Battery Bank for SBI Branches and offices 5. Time allowed for completion after the date of written order or date of handing over of the site (whichever is later) to commence the work :as specified in tender 6. I/We are submitting herewith duly filled up and signed tenders as per the followingdetails Page 4 of 42 Supply, Installation, Testing and Commissioning of various ratings of UPS System without Battery Bank for SBI Branches and offices SAMPLE BUISNESS RULE DOCUMENT BUISNESS RULE DOCUMENT OF ONLINE E-TENDERING FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OFVARIOUS TYPES & RATINGS OF UPS FOR SBI BRANCHES AND OFFICES IN THE STATE OF TELANGANA EMPLOYER NAME The Senior Vice President Circle Office SBI Infra Management Solutions Pvt. Ltd., State Bank of India Ground Floor, Adj to commercial Branch, SBI LHO campus,Bank Street, Koti, Hyderabad- 500095 E-TENDERINGAUCTION TO E-Procurement Technologies Ltd.(ETL) BE CONDUCTED BY B-705, Wall street II, Opposite Orient Club, Near Gujarat college, Ahmedabad- 380006, Phone: 079-40016826 Website Details: https://sbi.abcprocure.com/EPROC DATE & TIME OF E- As specified in the Tender TENDERING (A) Business rules for E-tendering DOCUMENTS ATTACHED (B) Terms & conditions of E-tendering (C) Process Compliance Statement (Annexure I) (D) Price Confirmation Letter (Annexure II) (E) Price break up (Annexure III) (F) Contact Information Bidding in the last minutes and seconds should be SPECIAL INSTRUCTIONS avoided in the bidders own interest Neither the Service Provider nor SBIIMSPL will be responsible for any lapses /failure on the part of the vendor, in such cases. Important Note:As per the new Inter-operability guidelines released by Controller of Certifying Authorities (CCA), the Secured Socket Layer (SSL) certificate for an E-tendering application is generated on a new algorithm, SHA2. Also, the Digital Signature Certificates that will be applicable for these platforms have to be SHA2 algorithm compliant. For the same, the users have to ensure that they have Windows XP (SP3) / Windows Vista / Windows 7 installed in their respective PC / Laptop. In case of Windows XP service pack -3, if you get any issue you can install the SSL patch, which is available at our download section of our e-Tender/e-E-tendering Portal and also at our corporate website www.E-tenderingtiger.net just below the label of “Download”. (A) Business rules for E-tendering: Against this Enquiry for the subject item/system with detailed scope of work as per our specification, SBIIMSPL may resort to “E-TENDERING PROCEDURE” i.e. ON-LINE BIDDING on INTERNET.