Scott Moore Senior Project Manager, Implementation
Total Page:16
File Type:pdf, Size:1020Kb
Scott Moore Senior Project Manager, Implementation PROFESSIONAL HISTORY Mr. Moore has seventeen years of experience in the construction industry, including thirteen in the energy and solar PV sector. He is a licensed electrical contractor in • 13 years in renewable energy California. As a senior project manager, Mr. Moore has implemented numerous PV • 17 years in the construction industry installations in California, Nevada and Hawaii for various solar EPCs, government agencies, military branches, utilities, school districts, and private clients. He provides invaluable project development insight and focus during conceptual design, system WORK EXPERIENCE specification, cost estimating, design review, construction management and contract closeout. Sage Energy Consulting During the development phase of a project, Mr. Moore’s strengths ensure that Senior Project Manager, contract specifications and requirements effectively drive design & engineering Implementation coordination, considering all disciplines, to execute the final program/project 2021–present plans. During construction, Mr. Moore’s diverse background enables him to adapt and understand potential conflicts and opportunities, and to then identify the best Sage Energy Consulting course of action to efficiently realize established client objectives. He understands Manager, Design & Construction the importance of closing out a contract, the nuances of what it takes to bring a 2015–2021 project to completion, and the need for rigorous document control throughout the project. Mr. Moore’s depth of knowledge and ability to communicate effectively are key attributes that he brings to each project team. Sunetric Commercial Project Manager 2013–2015 CERTIFICATIONS PV Design & Installation, Solar Living Institute Municipal Solar OSHA 10 Certification Commercial Project Manager C2 Motorized Mobile Platforms 2012–2013 C2 Slips, Trips and Falls R2 C1 Ladder Safety Awareness R2 RGS Energy C1 Fall Protection Awareness R Lead Commercial Installer & G1 Walking-Working Surfaces (Supervisors/Managers) Project Manager 2009–2012 REPRESENTATIVE PROJECT EXPERIENCE Matheson Solar Marin Clean Energy (MCE) Solar PV Installer & Electrician SolarOne 2008–2009 Richmond, CA • 2016 - Present This project was developed and eventually REGISTRATIONS & CERTIFICATIONS constructed on an oil-refinery brownfield landfill, otherwise useless acreage. Scott C10 Electrical Contractor License consulted and facilitated the designs California License #1042358 development of the project through closeout. The complexity of MCE SOLARONE was significant, from it being under an array of regulatory jurisdictions to the construction schedule being AFFILIATIONS accelerated, Scott worked with all project stakeholders to ensure that the California Solar Energy Industries final design specifications, environmental requirements, best practices in Association (CalSEIA) construction means, methods and safety were all adhered to. He is currently Solar Energy Industries Association (SEIA) conducting Commissioning Verification on this project. David Potovsky, 415.464.6652, [email protected] SCOTT MOORE | Senior Project Manager, Implementation REPRESENTATIVE PROJECT EXPERIENCE (CONTINUED) San Joaquin County 2014–present Sacramento Regional County Sanitation 2015–2019 District (Regional San) • 5+MW single-axis tracker ground-mount solar PV • 600 kW solar PV with EV charging at Corporate Yard • 4 MWp Solar Single-Axis Tracker • 4 MW solar PV at Sheriff’s Office and Stockton Airport • Power Purchase Agreement (PPA) Sage has assisted the County with energy projects at a variety Sage provided our full project services to Regional San for a 4-MWp of sites over the past six years, providing site evaluations, siting solar PPA project. The project was sized to meet environmental support, and energy and financial modeling, and supporting mitigation targets as part of a $1.6B plant upgrade. Sage also assisted the County through procurement, vendor selection, design with reviewing other District sites for renewable generation and review, construction, commissioning, and asset management. assessed the financial performance of a he local utility, SMUD. Mr. Mr. Moore provided construction and commissioning support Moore provided construction oversight and commissioning support to on multiple projects for the County. ensure the system met Regional San’s requirements and expectations. Jim Stone, 209.468.3031, [email protected] Steve Nebozuk, 916.876-6118, [email protected] San Francisco Public Utilities Commission 2018–2020 Kern High School District 2014–present • 900 kWp design of PV for Moscone Center • 24.5 MW of solar PV shade structures on 27 District sites • $80 Million in Savings Over 25 Years Sage is assisting the SFPUC and CleanPowerSF on a variety of energy projects. Thus far, Sage has performed feasibility Starting in 2014, Sage ran a competitive RFP process and assisted the assessments for energy projects at SFMTA’s Flynn bus facility District with vendor selection and contracting. Mr. Moore provided and the Moscone Convention Center; reviewed competitive construction support, commissioning oversight, and operational offers for CPSF wholesale RFOs; served as owner’s representative assistance for the multi-phase, multi-year project. Through Sage’s for an 80MW project; assisted with CPSF’s IRP; and is currently efforts, the District entered into a PPA with SunPower Corporation to designing 900 kWp of rooftop solar on the Moscone Center. design and build 24.5 MW of solar power systems at 27 KHSD sites. Mr. Moore is providing design and construction support for the Moscone project. Sage is currently managing the procurement process for a solar project at a new high school being built by the District.. Jamie Seidel, DER Manager, 415.554.1537, [email protected] Richard J. Ruiz, 661.827.3122, [email protected] Ventura County Community College District 2019–2020 San Diego Unified School District 2015–2020 • 8 MWp solar PPA on 3 sites • 15+ MWp of solar at 40 sites and growing • Four phases of end-to-end solar consulting, $80M in projects Sage is assisting VCCCD with an 8MWp solar project, including EV charger masterplanning at three community colleges in Ventura Sage is assisting SDUSD, the second-largest school district County. The solar project is third-party financed under a Power in California, with planning and implementation of their Purchase Agreement (PPA) to leverage federal tax credits. Sage bond-funded solar program. As construction manager, Mr. performed a feasibility analysis of the proposed project, assisted Moore is providing construction and commissioning support. VCCCD with contract negotiations, is currently acting as owner’s Now on the fourth phase of solar projects, Sage is also producing representative through design and construction, and will provide an energy masterplan, exploring various carbon and operational asset management of the operational systems. The project includes savings goals and strategies, including efficiency, onsite coordination with existing battery systems at each campus. generation, offsite generation, BESS, green tariffs, and more. David El Fattal, 805.652.5536, [email protected] Scott Thomas, Partner, ZTA, 619.528.1199 x11, [email protected] City of Seaside 2018–present Vista Unified School District 2014–present • 66 kWp solar PV canopy, design and project support • 6 MW, 22-site PPA The City contracted Sage to provide the design for a grid- Sage performed an investment-grade feasibility study, including connected solar PV parking canopy at City Hall. Sage determined tariff modeling, to identify sites that met the District’s requirements, the appropriate sizing and siting for the PV canopy and and submitted interconnection applications to ensure the maximum performed financial modeling for various scenarios. Sage helped projects savings. Sage organized a competitive bid process for the the City develop design and bid documents for its procurement 22-site 6 MW PV project, which included shade and canopy parking process, and submitted the utility interconnection application structures. Sage assisted the District with proposal review and for the project. Mr. Moore is providing construction support and contract negotiations with the highest-ranked proposer. Mr. Moore the system is expected to be operational and interconnected in is prociding support and oversight during the project’s design and November 2020. construction phases, and verifying commissioning and operation. Scott Ottmar, P.E., 831.899.6885, [email protected] John Wathen, 60.726.2170 x92704, [email protected].