Kudimaramath works for the 2019-20 year Sl.No 146 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 0-7-180 (L) and mile 0/5/0 to 0/8/0 of 2-2-380 (L) sub branches of 5-0-30 (L) branch canal of Unjalur distributory under the jurisdiction of the "M-8A Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi Taluk of District" Estimate Amount (Rs. In 28.00 Date of 26-6-2019 lakhs) commencement Expenditure w.r.t 90% of 24.98 Date of completion (If 12.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-8A Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 147 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 2-7-309 (R) sub branch of 5-0-30 (L) branch canal in Unjalur distributory under the jurisdiction of the "M-8B Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of " Estimate Amount (Rs. In 25.00 Date of 27-6-2019 lakhs) commencement Expenditure w.r.t 90% of 22.26 Date of completion (If 21.08.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-8B Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 148 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 10-1-40 (L) and 10-1-40 (R) branch canal in Unjalur distributory under the jurisdiction of the "M-9 Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 27.00 Date of 24-6-2019 lakhs) commencement Expenditure w.r.t 90% of 24.19 Date of completion (If 22.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-9 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

udimaramath works for the 2019-20 year Sl.No 149 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 2-1-380 (L) sub branch of 11-4-559 (L) branch canal in Unjalur distributory under the jurisdiction of the "M-10 Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 28.00 Date of 24-6-2019 lakhs) commencement Expenditure w.r.t 90% of 25.08 Date of completion (If 08.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-10 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 150 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in Kuranganpallam canal in Unjalur distributory under the jurisdiction of the "M-10A Keel Bhavani Kuranganpallam Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 29.50 Date of 24-6-2019 lakhs) commencement Expenditure w.r.t 90% of 26.22 Date of completion (If 04.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-10A Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 151 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures from mile13-3-480(L) and 15-0-375(L) Branch canal in Unjalur distributory under the jurisdiction of the "M-11A Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 26.00 Date of 24-6-2019 lakhs) commencement Expenditure w.r.t 90% of 23.26 Date of completion (If 12.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-11A Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 152 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 17-7-470 (L) and 19-0-180 (L) branch canal in Unjalur distributory under the jurisdiction of the "M-11B Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 27.50 Date of 27-6-2019 lakhs) commencement Expenditure w.r.t 90% of 24.55 Date of completion (If 22.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-11B Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 153 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 1-7-482 to 4-4-322 leftside parallel channel of 67-0-290 Poondurai distributory under the jurisdiction of the "M12 Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 25.00 Date of 03-7-2019 lakhs) commencement Expenditure w.r.t 90% of 22.35 Date of completion (If 08.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-12 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 154 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in mile 72-7-308(L) distributory and 0-1-328(R) sub branch of 70-1-394 distributory under the jurisdiction of the "M13 Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 25.00 Date of 20-7-2019 lakhs) commencement Expenditure w.r.t 90% of 22.34 Date of completion (If 28.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers M-13 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 155 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 2-1-166 (R) sub branch, 2-4-400(R) subbranch ,4-0-280(L) sub branch and in between mile 3/0/640 to 5/2/560 of 0-5-42 Kongudaiyampalayam branch of chennasamudram distributory under the jurisdiction of the "L-1 Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 27.00 Date of 29-7-2019 lakhs) commencement Expenditure w.r.t 90% of 21.10 Date of completion (If 17.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-1 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 156 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 0-7-580(R) sub branch, 1-6-0(R) sub branch , 3-4-140(L) sub branch and in between mile 3/4/0 to 5/5/200 of 1-4-644 Elumathur branch of chennasamudram distributory under the jurisdiction of the "L-2 Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 28.00 Date of 29-7-2019 lakhs) commencement Expenditure w.r.t 90% of 24.73 Date of completion (If 17.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-2 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 157 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 2-4-263(L) sub branch, 3-4-500(L) sub branch and in between mile 3/3/348 to 4/5/480 of 3-0-138 Kagam branch and 4-4-140 (R) branch of chennasamudram distributory under the jurisdiction of the "L-3 Keel Bhavani Murai Neer Pasana vivasigal sabai" in Lower Bhavani Irrigation system in Modakuruchi taluk of Erode District" Estimate Amount (Rs. In 26.00 Date of 29-7-2019 lakhs) commencement Expenditure w.r.t 90% of 23.03 Date of completion (If 17.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-3 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 158 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures from mile 5/0 to 7/2-440 of 5-3-360 (L) branch canal of Chennasamudram Distributory under the jurisdiction of the "L-4 Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" in Lower Bhavani Irrigation System in Taluk of Erode District. Estimate Amount (Rs. In 24.00 Date of 16-7-2019 lakhs) commencement Expenditure w.r.t 90% of 21.19 Date of completion (If 16.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-4 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 159 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 5-7-150 (R ) branch canal of Chennasamudram Distributory under the jurisdiction of the "L-5 Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" in Lower Bhavani Irrigation System in of Erode District. Estimate Amount (Rs. In 25.00 Date of 27-6-2019 lakhs) commencement Expenditure w.r.t 90% of 21.16 Date of completion (If 17.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-5 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 160 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 8-3-440 (R ) branch canal and 9-7-320 (L) branch canal of Chennasamudram Distributory under the jurisdiction of the "L-6 Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" in Lower Bhavani Irrigation System in Kodumudi Taluk of Erode District. Estimate Amount (Rs. In 27.00 Date of 08-07-2019 lakhs) commencement Expenditure w.r.t 90% of 24.08 Date of completion (If 27.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-6 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 161 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 11-4-254 (R) branch canal,11-4-544 (R) branch canal, 13-2-534 (R) branch canal, 14-2-291 (R) branch canal and 14-3-480 (L) branch canal of Chennasamudram Distributory under the jurisdiction of the "L-7 Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" in Lower Bhavani Irrigation System in Kodumudi Taluk of Erode District. Estimate Amount (Rs. In 26.00 Date of 08-07-2019 lakhs) commencement Expenditure w.r.t 90% of 23.04 Date of completion (If 17.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-7 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 162 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in 15-0-281 (L ) branch canal,15-5-643 (L) branch canal, 17-2-400 (L) branch canal, and 18-4-200 (R) branch canal of Chennasamudram Distributory under the jurisdiction of the "L-8 Keel Bhavani Murai Neer Pasana Vivasaigal Sabai" in Lower Bhavani Irrigation System in Kodumudi Taluk of Erode District. Estimate Amount (Rs. In 27.00 Date of 27-6-2019 lakhs) commencement Expenditure w.r.t 90% of 24.07 Date of completion (If 27.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-8 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 163 Name of work Clearing the jungles, removal of shoals and repairs to the sluices and cross masonry structures in distributories at mile 77/4-02 and 81/4-380 under the jurisdiction of the "L-9 Keel Bhavani Muraineer pasana vivasalgal sabai" in Lower Bhavani irrigation system in Modakuruchi and Perundurai Taluks of Erode District. Estimate Amount (Rs. In 23.00 Date of 12-07-2019 lakhs) commencement Expenditure w.r.t 90% of 20.55 Date of completion (If 24.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers L-9 Keel Bhavani Murai neer pasana vivasaigal sabai Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 164 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures under the jurisdiction of the "Kalingarayan Madhagu Pasana Vivasaigal Sabai no.1" in S S Agraharam Village in Erode taluk of Erode District " Estimate Amount (Rs. In 28.75 Date of 27-6-2019 lakhs) commencement Expenditure w.r.t 90% of 25.44 Date of completion (If 30.09.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers Kalingarayan Madhagu Pasana Vivasaigal Sabai no.1 Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 165 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures under the jurisdiction of the "Kalingarayan Madhagu Pasana Vivasaigal Sabai no.2" in Thasampudur Village in Modakkurichi taluk of Erode District " Estimate Amount (Rs. In 15.75 Date of 15-07-2019 lakhs) commencement Expenditure w.r.t 90% of 14.06 Date of completion (If 29.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers Kalingarayan Madhagu Pasana Vivasaigal Sabai no.2 Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 166 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures under the jurisdiction of the "Kalingarayan Madhagu Pasana Vivasaigal Sabai no.3" in Kangeyampalayam Village in Modakkurichi taluk of Erode District " Estimate Amount (Rs. In 28.10 Date of 10-07-2019 lakhs) commencement Expenditure w.r.t 90% of 25.12 Date of completion (If 29.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers Kalingarayan Madhagu Pasana Vivasaigal Sabai no.3 Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 167 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures under the jurisdiction of the "Kalingarayan Madhagu Pasana Vivasaigal Sabai no.4" in Kolanalli Village in Kodumudi taluk of Erode District " Estimate Amount (Rs. In 29.70 Date of 15-07-2019 lakhs) commencement Expenditure w.r.t 90% of 26.27 Date of completion (If 23.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers Kalingarayan Madhagu Pasana Vivasaigal Sabai no.4 Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 168 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures under the jurisdiction of the "Kalingarayan Madhagu Pasana Vivasaigal Sabai no.5" in Vadakkupudhupalayam Village in Kodumudi taluk of Erode District " Estimate Amount (Rs. In 21.00 Date of 10-07-2019 lakhs) commencement Expenditure w.r.t 90% of 18.51 Date of completion (If 29.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers Kalingarayan Madhagu Pasana Vivasaigal Sabai no.5 Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 169 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures under the jurisdiction of the "Kalingarayan Madhagu Pasana Vivasaigal Sabai no.6" in Kodumudi Village in Kodumudi taluk of Erode District" Estimate Amount (Rs. In 20.50 Date of 12-07-2019 lakhs) commencement Expenditure w.r.t 90% of 18.16 Date of completion (If 29.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers Kalingarayan Madhagu Pasana Vivasaigal Sabai no.6 Asssociation by which work has been executed

PHOTOS

Before Execution After Execution

Kudimaramath works for the 2019-20 year Sl.No 170 Name of work Clearing the jungles,removal of shoals and repairs to the sluices and cross masonry structures under the jurisdiction of the "Kalingarayan Madhagu Pasana Vivasaigal Sabai no.7" in Chennasamudram Village in Kodumudi taluk of Erode District" Estimate Amount (Rs. In 27.00 Date of 12-07-2019 lakhs) commencement Expenditure w.r.t 90% of 23.93 Date of completion (If 29.10.2019 Estimate Amount (Rs. In the work is in progress, lakhs) mention the probable date of completion) Clearing Jungle, Progress of work (% Work Completed Desilting and Sluice Completed) repair works, Shutter Nature of work Repair works, Bud Strengthening, Retaining wall, Drop

Name of the Farmers Kalingarayan Madhagu Pasana Vivasaigal Sabai no.7 Asssociation by which work has been executed

PHOTOS

The photos before execution and after execution should be in the same location & orientation.

Before Execution After Execution