E3 Consultores

CURRICULUM VITAE

August 2013

Guerrero No. 51 – 7. Col. Progreso Tizapán. Del. Álvaro Obregón. 01080, México D.F. MÉXICO Tel.: (55) 6394-0250 www.e3consultores.com

CURRICULUM VITAE

E3 CONSULTORES

Guerrero No. 51 - 7 Col. Progreso Tizapán Del. Álvaro Obregón, México 01080 D. F., MÉXICO Tel/Fax: +52 (55) 6394-0250 www.e3consultores.com

Environmental dimension emerge as a basic the characterization of environmental issue in any project or activity developed by problems but also in the engineering the public, social or private sector. Enterprises design, project supervision and that incorporate the environmental management, aiming at the proper and dimension would take advantage of more most economic solution, furnishing integral efficient processes, productivity increments, environmental services. Our company lower compliance costs and new market provides solutions to contamination opportunities. Therefore, those having this problems taking into account the clients vision will obtain significant advantages interests and financial situation, searching over those that do not consider it. for optimal recommendations based in economic and efficient technologies for the E3 CONSULTORES (E3 Consultants) is an industry. interdisciplinary group prepared to offer a professional support in order to comply with Our firm is part of G-TUR, a specialized the environmental protection challenges. E3 group in the development of tourist projects CONSULTORES is a 100% Mexican firm with affiliated at the Mexican National a wide experience in the Mexican Construction Industry Chamber (CMIC) environmental consulting and and also a validated company by the environmental engineering market, with a Construction Industry Foundation by a highly qualified staff prepared to offer certified process of the Quality environmental consulting and engineering Management Institute (QMI), ISO- services. Our company holds the “know 9001:2000, on the following items: how” and the necessary technology to fulfill and perform any kind of study or project  Administrative and Legal related with water, groundwater, air, soil Documentation and subsoil pollution prevention and  Enterprise Experience control as well as solid and hazardous  Financial Information wastes management.  Technical Capacity

E3 CONSULTORES is qualified not only to provide technical and scientific support in

1 E3 Consultores Curriculum vitae August, 2009

Our experience in environmental legislation policies, our company performed engineering and consulting embraces the an environmental cost-benefit analysis. following services: Our company was selected in order to Environmental Permitting and conduct the environmental feasibility Compliance studies for the new City international airport at the Tizayuca Valley Environmental Audits and Expertise in the state of Hidalgo. E3 CONSULTORES Environmental Risk Assessment prepared a diagnostic of the area and Environmental Impact Assessment evaluated the feasibility of the project from Strategic Studies, Environmental the environmental point of view. In Policies and Legislation addition, we provided technical support Management and Disposition of during the evaluation process in which Solid and Hazardous Waste environmental and academic institutions such as the Programa Universitario de Soil and Groundwater Remediation Medio Ambiente (University

Environmental Program) of the National The following section describes the span of Autonomous University of Mexico our services. (U.N.A.M) evaluated the Mexico city

airport alternatives.

ENVIRONMENTAL PERMITTING AND

COMPLIANCE ENVIRONMENTAL AUDITS AND EXPERTISE

E3 CONSULTORES offers legal environmental E3 CONSULTORES has been selected as an advice to national and international clients authorized company in order to perform within the Mexican territory in order to Environmental Audits under PROFEPA’s adapt and comply with recent and (Procuraduría Federal de Protección al upcoming regulations in environmental Ambiente), the Mexican government’s matters in Mexico and the world. Our federal environmental attorney, Terms Of services also include environmental Reference. permitting for new activities as well as enterprises in operation; we also perform Our company has also been selected by the environmental permitting covering most private sector in order to perform kinds of permits issued in the Mexican environmental audits in which in addition regulation. to prepare a detailed diagnostic of the

facilities and the productive processes,

defines the environmental compliance E3 CONSULTORES has been in charge of status, offering an advantage on efficient environmental cost-benefit analysis in processes, productivity increments, lower which environmental liabilities are also compliance costs and new market evaluated from the economic perspective. opportunities. E3 CONSULTORES audited, At the Coatzacoalcos River basin, a highly based on PROFEPA´s Terms Of Reference industrialized area in the Gulf coast in one of the largest Mexican companies order to design and suggest environmental

2 E3 Consultores Curriculum vitae August, 2009

managing hazardous wastes. In addition, wagons maintenance facilities in the state of our company performed under PROFEPA´s Mexico and Guanajuato; a tequila standards, several environmental audits for production plant in the state of Jalisco; sugar cane processing plants in Sinaloa, automobile air emissions verification Tabasco and Michoacán and for an centers in the Mexico Valley Metropolitan automotive assembly facility near Mexico Area and; asphalt emulsions facilities in the City. states of Veracruz, Oaxaca, Tabasco, Jalisco and San Luis Potosí, among others. Clients assisted by E3 CONSULTORES regarding environmental audits, ranges With respect to the Environmental Expertise from land owners through chemical, works, E3 CONSULTORES counts with petrochemical and thermoelectric plants personnel registered by the Colegio de consortiums. In property transactions our Biólogos de México A.C. (Mexican Biologists company has represented the interests of College) within the areas of Environmental buyers, sellers and third parties such as Impact and Audits. It is important to lawyers, real state and insurance indicate that only the professional Colleges companies. We had assisted clients in have the faculty to register experts in their developing bidding strategies to curb future scope of work. Within this line, several environmental problems, assessing the expertise testimony works have been made environmental issues of the site and on soil contaminated properties in the states advising the client in the better way to deal of Mexico and Veracruz, as well as for with the Mexican environmental legislation infrastructure demolition works affected by in order to land in a win/win situation. natural phenomena in Baja California Sur. Actually, we are developing several environmental audits for services companies, basically on the tourist sector, to ENVIRONMENTAL RISK ASSESSMENT comply with the PROFEPA´s new scheme of Environmental audit. E3 CONSULTORES experience in Industrial Safety and Risk Assessment embraces the Based on American Society for Testing and qualitative and quantitative management of Materials (ASTM) standards, basically risk in handling hazardous materials, safety procedures E 1527 ESA: Phase I ESA Process process engineering, fire protection and E 1903 ESA: Phase II ESA Process, we engineering and contingency plan have performed several internal development. Our company uses standard environmental audits for greenfields and methodologies such as HAZOP and IMEA brownfields as well as industrial and (What if? Fault Tree Analysis, Checklists services facilities including a food and Domino Effect), always adapting to the processing plant in Celaya, Guanajuato; a circumstance in order to obtain a quality wasted oil refining plant in Querétaro; an product and fulfill or exceed our client electro domestic appliances plant in the expectations. E3 CONSULTORES has carried state of México; a cement kiln plant in out several Risk Analysis for different Sonora; a maritime terminal in Altamira, facilities within the Mexican territory, Tamaulipas; a security equipment plant in including but not limited to: natural gas the Mexico City Metropolitan Area; rail pipelines, natural gas compression stations,

3 E3 Consultores Curriculum vitae August, 2009

petrochemical refineries, textile plants and ENVIRONMENTAL IMPACT ASSESSMENT pick-up truck bumpers manufacturing facilities. E3 CONSULTORES is highly qualified to perform Environmental Impact In addition, we developed a Risk Analysis in Assessments (EIA) by offering these studies order to determine the hydrocarbons spills for a wide range of industrial activities and potential effects on soil, subsoil, water and services. The high level of training and groundwater. Our company evaluated the experience of our employees allows us to geological characteristics of the site, current accomplish complex and involved land use, land use potential and defined assessments in time, efficiently and with no pollution plumes and migration factors to disregard for quality. Some of our groundwater sources used as drinking water professionals hold a register as expertise in supplies such as deep wells, using the Ground Environmental Impact Assessment by the Water Modeling System, GMS Software. Biologists College of Mexico, A.C.

E3 CONSULTORES has reached through Risk E3 CONSULTORES experience in EIA, on Studies and internal security improvements, Federal and local levels, includes: housing significant benefits on insurance coverage. developments project in the Mexico City Risk studies for highly risk activities and Metropolitan Area; a fertilizer production hazardous materials transportation and facility in the east coast; a highway in the management are mandatory in Mexico. In the states of Michoacán and Guerrero; tourist year 1996, our company concluded the Risk development projects in the Baja California Study and Accident Prevention Plan for a peninsula and at the Cancun- Tourist paint and solvent facility in the state of Corridor; a textile industrial park in the Querétaro and a wire manufacturing plant in state of Morelos; a steel foundry consortium the state of San Luis Potosí. In addition, we at the Pacific coast; an industrial park in the performed the Risk Analysis for a natural gas state of Guanajuato; a passengers train pipeline in the states of Guanajuato, Jalisco system in the state of Guanajuato and; and Aguascalientes, as well as the Risk natural gas pipelines in the states of Analysis for a textile facility in the state of Guanajuato, Jalisco, Aguascalientes and Morelos, a natural gas compression station in Tamaulipas, among many others. the state of Querétaro and a assembling A detailed list of the EIA´s performed by E3 facility for pick up bumpers manufacturing CONSULTORES is included in a list within process. Recently, our company concluded this document. the Risk Study for a natural gas pipeline and natural gas compression stations in the state of Tamaulipas and a Risk Analysis for a STRATEGIC STUDIES, ENVIRONMENTAL petrochemical facility in the state of POLICIES AND LEGISLATION Tamaulipas in order to increase its production capacity. Based on E3 CONSULTORES environmental experience, our company is highly qualified to conduct environmental planning studies. We have developed environmental planning studies for different clients and activities and

4 E3 Consultores Curriculum vitae August, 2009

therefore is able to integrate multidisciplinary established. The former ICF Kaiser Servicios teams in order to satisfy professional Ambientales was hired by the National requirements necessary for environmental Association of Chemical Industries planning studies. (Asociación Nacional de la Industria Química, ANIQ), and accepted by the then E3 CONSULTORES was in charge of the SEDESOL (now SEMARNAT), for Tehuantepec Isthmus environmental developing the project of the Mexican diagnostic used as a technical basis for an Official Norm (Norma Oficial Mexicana, ambitious development project. Under ICF NOM) for handling waste lubricant oil in Kaiser International coordination, our Mexico. company participated in the Colombian west coast environmental diagnostic required by In Mexico, E3 CONSULTORES coordinated a the national petroleum company and project in order to locate, design and concluded the environmental studies for the evaluate the environmental feasibility for a Panama’s north corridor. Recently, our hazardous waste landfill for a private client. company concluded the environmental In addition our company has offered characterization, the mangrove and the professional assessment and services to marine turtle’s special studies for a tourist remove, manage, treat, transport and consortium in the Mexican Caribbean. On this dispose solid and hazardous wastes. item, our company studies on the zone, has become a reference on Our company experience includes the environmental consulting, bringing an removal, transportation and disposal of adequate technical base for the developing of contaminated soils associated with a virgin oil sustainable master plans for this important spill in a highway; an ex-situ clean up project tourist corridor. for a waste oil spill and; the removal, segregation, transport and disposal of E3 CONSULTORES prepare too, the hazardous wastes in a rail yard maintenance environmental characterization and facility. diagnostic as a basis for the Ecological Zoning Program for the Tizayuca-Pachuca Regional E3 CONSULTORES experience also includes the Development Program. professional support and legal advice for hazardous wastes removal, transportation and final disposal. Recently, our company MANAGEMENT AND DISPOSITION OF obtained from the federal authorities the SOLID AND HAZARDOUS WASTE technology and procedures approval for a contaminated soil neutralization and ICF Kaiser Servicios Ambientales in bioremediation in an industrial facility in the coordination with ICF Kaiser International state of Querétaro. and under World Bank financial support performed a hazardous waste diagnostic in which the size of the toxic waste issue in Mexico, including level of hazardous waste stock and options for handling, recycling and disposal strategies and policies were

5 E3 Consultores Curriculum vitae August, 2009

SOIL, SUBSOIL AND GROUNDWATER contamination associated with heavy metals, REMEDIATION volatile organic compounds, acids, hydrocarbons spills and toxic chemicals E3 CONSULTORES counts with the associated with a non proper storage, Environmental Register KCAM 10900811 management and/or disposal. and with the Authorization for the Treatment of Hazardous Wastes In 1999, our company concluded two (Hydrocarbon Contaminated Soils) No. 9- projects associated with hydrocarbons 10-PS-V-82-2003 of the Mexican spills, one of them in a highway and a Environmental and Natural Resources second one at an industrial facility out of Secretariat (SEMARNAT). The Mexican order. In both cases our company obtained government through the Mexican National the approval from federal environmental Railway enterprise has awarded our authorities. Company in order to conduct the soil and groundwater evaluation, diagnostic and E3 CONSULTORES concluded recently the remediation at the San Luis Potosí Rail hydrocarbon contaminated soil remediation yards. In addition, our company has been for a 3,500 cubic meters volume at the selected by private companies in order to Mexican Railroads Yards in Ciudad Juárez, remove, transport and dispose Chihuahua, Mexico. Soil remediation was contaminated soils, as well as to treat in situ performed in three modules and different and ex situ contaminated soil. technologies including “Bioventing” and “Landfarming” were used. The Mexican E3 CONSULTORES has a wide experience in Environmental Attorney under Chihuahua remediation projects including: State representation (Delegación Federal de la Procuraduría Federal de Protección al Ambiente en • Contaminated site inspection and Chihuahua) released the site and E3 obtained preliminary evaluation; the approval as a cleaned-up site. • Field investigation development by determining the contamination degree and the potential impact on health and the environment; • Final conceptual design for clean up and remediation procedures in order to identify the best technical option that minimize costs and complies with legal and technical requirements, as well as with risks associated with health and the environment and; • Remediation System construction and implementation.

Projects related with soil, subsoil and groundwater remediation in which E3 CONSULTORES has participated, include

6 E3 Consultores Curriculum vitae August, 2009

WHO WE ARE.

MANAGER PARTNER

Germán Araneda Vázquez studied Biology at the Metropolitan Autonomous University campus Xochimilco, and holds a specialization in aquaculture supported by the PNUD/FAO/SUDEPE in Sao Paulo, Brazil. Mr. Araneda is also a postgraduate student in Ecology at the Biotic Resources Research Institute (INIREB) and the Ensenada’s Superior Studies and Research Center (CICESE). Mr. Araneda has a wide experience in the diagnostic and management of natural resources as well as in the formulation, execution and follow-up activities for a wide range of research programs. Mr. Araneda is the former Director of INDOART, Sustainable Development, a consulting enterprise from the Latin American Economic System (SELA) focused on rural communities environmental issues. Mr. Araneda has been involved in environmental restoration programs for affected areas as well as ecotourism projects at the southeast and the central part of the country in which he has coordinated non governmental organizations, social groups, and research and academic institutions. In addition Mr. Araneda has provided assessment for government agencies and private companies for sustainable development issues. Within E3 CONSULTORES, Mr. Araneda has been in charge of environmental impact assessments and Ecological Studies for tourist developments and power plant facilities. ([email protected]).

ASSOCIATES (KEY PERSONNEL)

Francisco González Medrano has a Master Medrano is actually and external advisor of in Science degree from the National several Governmental agencies and Autonomous University of Mexico (UNAM) Research Centers for Vegetation and was full time researcher at the Instituto Classification and Resource Management. de Biología (Biology Institute) of UNAM until 2002. He was titular professor of Jorge Palacios Lobato is an Industrial several classes including Natural Biochemical Engineer from the Autonomous Ecosystems and Environmental Restoration Metropolitan University, campus Iztapalapa items. He has written more than 40 works, and has a Master degree on Chemical three of which they have been awarded by Engineering from the same institution. Mr. the Botanical Society of Mexico, the Annual Palacios is a PROFEPA´s certified Prize Banamex in the Farming field and the Environmental Auditor on Hazardous Commission of Studies of the National Wastes and candidate to ISO14000 Leader Territory (today INEGI). It has directed 40 Auditor from the ANSI-RAB (American theses, three of which they have been National Standards Institute-Registrar awarded and gave more than 40 Seminaries Accreditation Board). Since 1992, Mr. Palacios of Undergraduate Research at the UNAM have been working with Environmental Site and UAM Universities. Mr. González Assessments, due diligences, risk studies,

1 E3 Consultores Curriculum vitae August, 2009

accident prevention programs as well as the Environment Secretariat of the Mexico environmental impact assessments for a wide City Government as well as an ESH variety of companies. He has experienced in technician for Lala Co. Within E3 contaminants dispersion models, as well as Consultores, Mr. Hernández has fire, explosion and spills consequences participated for the Annual Operation models such as SCRII, DEGADIS, ARCHIE, Cedule elaboration for General Motor Co. ALOHA and PHAST. plant at Mexico as well as in Phase I Environmental Site Assessments and in Sachiko Chiriguchi Murayama is a Environmental Impact Assessments for Biologist from the Mexico Autonomous energy and industrial projects. National University (UNAM). She has 20 years of experience in environmental studies; Norma Cruz López is a Biologist from the among the most relevant are Environmental Metropolitan Autonomous University Impact Statements for high tension electric campus Xochimilco. Ms. Cruz made some lines, highways and tourism developments; professional practices with the water environmental audits for public transport quality of the Atlangatepec Dam at the state lines, for the Mexico City Airport Terminal 2 of Tlaxcala and had earned Environmental and for the Morelia-Lazaro Cárdenas Education courses. She has recently been highway; ecologic ordinance studies and integrated to the E3 Consultores team for environmental diagnosis,; management Environmental Impact Assessments. programs for natural protected areas and ecotourism projects. Mrs. Chiriguchi participates as an environmental impact expert on the Perform of an Expert System project at the Instrument center of the UNAM.

Fredy Hernández Ramírez holds a Superior Technical degree on Environmental Technology from the Technological University of Nezahualcoyotl, State of Mexico. Mr. Hernández has wide experience in industrial wastewater biological and physical treatment, analysis and interpretation physical, chemical and biological parameters of water and in the development and interpretation of air emissions surveys calculations. He has worked as analyst at the Laboratorio Analitico Industrial (Analytical Industrial Laboratory) company, as an instrumentation technician and environmental inspector for discharges at

2 E3 Consultores Curriculum vitae August, 2009

OUR CLIENTS

We present some of our most representative clients:

Public sector

• Mexican National Railways • Mexico City Road and Communication Improvement Trust (FIMEVIC) • Federal District (Mexico City) Government • State of Chiapas Government • State of Hidalgo Government • Querétaro Municipality • Interior Secretariat (SEGOB) • Environmental and Natural Resources Secretariat (SEMARNAT)

Private sector

• Aditya Birla Group, India. • Gasoductos de Tamaulipas S. de R.L. de • AG Convertidora, S.A. de C.V. • Galicia Abogados, S.C. • AIG Consultants • GE Capital • Arenas Encantadas, S.A. de C.V. • GEA Power Cooling, Inc. • Atlantis • Geomatrix Consultants • Bachoco S.A. de C.V. • González Calvillo y Asociados, S.C. • Brasa Desarrollos, S.A. de C.V. • Grasas Nacionales S.A. de C.V. • Bufete Arrieta Lerdo de Tejada, S.C. • Groupe Metropolitain en Amenagement et • Burlington Industries Co. Transport • Burns Philp Co. • Grupo Aviomar • Caja Costarricense del Seguro Social • Grupo Azucarero México S.A. de C.V. • Célis Aguilar y Asociados, S.C. • Grupo BCBA • Comercial Metal Corporation. • Grupo Carrousel • Centro Mexicano de Derecho Ambiental, • Grupo Iberostar A.C. • Grupo ICA • Control de Erosión S.A. de C.V. • Grupo Integral de Desarrollo Inmobiliario, • Corporación GEO S. de R.L. de C.V. • Creel, García-Cuellar, Aiza y Enriquez, S.C. • Grupo Opción • Cytec de México S.A. de C.V. • Grupo Questro • DTZ Rockwood Asociados, LLC. • Grupo Rioboó • El Paso Co. • Grupo Urbi • Empresas Moldeadas de America • Halff & GC Ingeniería Tecnologías • Holland Knight Gallástegui-Lozano, S.C. • Empresas Turísticas Nacionales, S.A. de • Huntsman Corporation. C.V. • Ibarra, del Paso y Gallego, S.C. • Flex-n-Gate México S.A. de C.V. • Iberdrola, Energía Monterrey

1 E3 Consultores Curriculum vitae August, 2009

• ING Investors • Residencia Universitaria Panamericana, • Ingeniería de Tránsito y Transporte, S.A A.C. Inmobiliaria Karsa, S.A. de C.V. • Ritch Mueller, S.C. • Integrity Capital Co. • Royal Holiday • Intergen Co. • Santamarina y Steta S.C. • Ivax Pharmaceutical México S.A. de C.V. • SARE • Jáuregui, Navarrete, Nader y Rojas, S.C. • Siderúrgica Lázaro Cárdenas • Koch Industries Co. • SIGEA • Lomas Plaza, A.C. • Six Flags México S.A. de C.V. • Lutron Electronics, Inc. • Sordo Madaleno Arquitectos • M3 Resources de México, S.A. de C.V. • SRC de México S.A. de C.V. • Marhnos Proyectos • Sugar Refining • Mármoles de Tepeaca, S.A. de C.V. • Takata de México, S.A. de C.V. • Mettler Toledo Industries • Techint Co. • Marathon Oil Co. • Tejas Gas de Toluca S. de R.L. de C.V. • MBB Promotora, S.A de C.V. • Texaco S.A. de C.V. • Morgan Crucible Co. • The Home Depot México, S. de R.L. de C.V • NEPSA de México, S.A. de C.V. • The Kor Group, California. • Patronato de Apoyo al Centro de • Toshiba de México, S.A. de C.V. Integración Familiar, A.C. • Transalta • Proalfa S.A. de C.V. • TransCanada Pipelines Ltd. • Productos Texaco, S.A. de C.V. • Transportadora de Gas Natural de la • Prudential Real Estate Investors Huasteca, S. de R.L. de C.V. • Related Group, Miami . • Vera y Carvajal, S.C.

2 E3 Consultores Curriculum vitae August, 2009

PROJECT RELATION

We present some of the studies that E3 CONSULTORES has been developed for the Federal and local Mexican government and for the public and private industry:

Environmental Impact Assessments and related studies – Tourism.

• Environmental Impact Statement in its • Environmental Impact Assessment in Particular modality and a Justificatory its Particular modality for the Technical Study (JTS) for the Forest Construction and Operation of the Land Use Change for the Expansion of Viceroy Hotel in Zihuatanejo, Guerrero, the Celeste Beach & Spa Resort Project, México. located at the Municipality of Santa Maria Huatulco, Oaxaca, Mexico (IN • Environmental Impact Assessment in PROCESS). its Particular modality for the Construction and Operation of the W • Environmental Impact Statement on its Hotel in Acapulco, Guerrero, México. Particular modality for the residential project “La Paloma” located at Valle de • Environmental Impact Assessment in Bravo, State of Mexico (IN PROCESS). its Particular modality for the Construction and Operation of the W • Characterization and evaluation of the Hotel Beach Club in Acapulco, Sand Dunes System at the Puerto Los Guerrero, México. Cabos Resort, Baja California Sur. • Environmental Impact Assessment in • Unified Technical Study for the Forest its Particular modality for the Land Use change modality B and Remodeling and Expansion of The Environmental Impact Statement in its Tides Riviera Maya in Playa Carmen, Regional modality for the Construction Solidaridad municipality, Quintana and Operation of the Tuoristic Resort Roo, México. “Marinazul Golf & Resort” located nearby San Felipe town at the • Environmental Impact Assessment in Municipality of Ensenada, Baja its particular modality for the California, México. Construction and Operation of a Parking and a Services Area in a Hotel • Environmental Impact Assessment in in Ixtapa, José Azueta municipality, its Particular modality for the Guerrero, Mexico. Construction and Operation of the Centinelas Hotel & Residence project in Acapulco, Guerrero, México.

3 E3 Consultores Curriculum vitae August, 2009

• Environmental Impact Assessment in • Environmental Impact Report for the its Particular modality for the demolition of actual infrastructure at Construction and Operation of “The the plot “B” Cabo del Sol Master Tides” Hotel in , Condominium in Los Cabos, Baja Solidaridad municipality, Quintana California Sur, Mexico. Roo, Mexico. • Environmental Impact Assessment in • Environmental Impact Assessment in its Particular modality for the its Particular modality for the construction of Club Playa Sol 2nd phase construction of a cruise ship pier in in Cozumel municipality, Q. Roo. Playa del Carmen, Solidaridad municipality, , Mexico. • Environmental Impact Assessment in its General modality for the “Playasol • Environmental Modifications Program Beach Club” maritime dock in for the construction of a resort with Golf Cozumel, Quintana Roo. course at the Riviera Maya, Solidaridad municipality, Quintana Roo, Mexico. • Mangrove Characterization Study for “Puerto Cancún” project in Cancún, • Environmental Impact Assessment in Quintana Roo. its Particular modality and Technical Justificative Study for the construction • Environmental Characterization Study of a Resort with Golf Course located at for the Playa del Carmen maritime area the Mulegé municipality, Baja in Playa del Carmen, Q.Roo. California Sur, Mexico. • Environmental Characterization Study • Environmental Special Studies (coast for “Playa Sol, Beach Club” maritime and shore sections survey, bathymetric area in Cozumel, Quintana Roo. survey, tide studies, coastal sediment transport, biological characterization • Mangrove Special Study for a property and a coral rescue program) for the located at the Cancún-Tulum tourist construction of a cruise ship pier in corridor. Playa del Carmen, Solidaridad municipality, Q. Roo. • Environmental Characterization for a property located at the Cancún-Tulum • Vegetation diagnostic for a plot located tourist corridor for a tourist consortium at Acapulco municipality, Guerrero, and golf course master plan design. Mexico. • Marine Turtle Special Study for a • Integrated Environmental Management property located at the Cancún-Tulum Program for the Club Playa Sol in tourist corridor. Cozumel municipality, Quintana Roo, Mexico. • Mangrove Special Study for a property located at the the Cancún-Tulum tourist corridor.

2 E3 Consultores Curriculum vitae August, 2009

• Environmental Characterization for a • Environmental Impact Assessment in property located at the Cancún-Tulum its General modality for the Hotel tourist corridor for a 2,100 rooms Kristal, beach recovery and stabilization consortium master plan design. in Cancún, Quintana Roo.

• Environmental Impact Assessment in • Environmental Impact Assessment in its Preliminary modality for the its General modality for the pathway construction at the Azul development of the “Hotel HALFF & Ixtapa Hotel in Ixtapa-Zihuatejo, GC” in Mexico City. Guerrero. • Environmental Impact Assessment in • Environmental Impact Assessment in its General modality for “Villa Paraíso its General modality for a beach Hotel” at the Solidaridad municipality recovery and stabilization at the Fiesta in the State of Quintana Roo. Americana Hotel in Cancún, Quintana Roo. • Environmental Impact Assessment in • Environmental Impact Assessment in its General modality for the “Hotel its General modality for a maritime Suns Playa” development at the terminal for the "Atlantis Submarine" in Solidaridad municipality in the State of Cozumel, Quintana Roo. Quintana Roo.

• Environmental Impact Assessment in • Environmental Impact Assessment in its General modality for a beach its General modality for the Sheraton recovery and stabilization at the Coral Hotel, Holiday Hotel, Melía Cancún Beach Hotel in Cancún, Quintana Roo. Hotel and Cancún Beach Hotel beach recovery in Cancún, Quintana Roo. • Environmental Impact Assessment in its General modality for a Hotel at • Continuous Environmental Assessment "Torre Insurgentes", Distrito Federal. for “Fideicomiso ” a tourist development at the State of • Environmental Impact Assessment in Quintana Roo. its Preliminary modality for the Fishermen Village Hotel, beach • Environmental Evaluation for five recovery and stabilization in Playa del alternative sea ports to Long Beach, Carmen, Quintana Roo. California at the Mexican Pacific Coast.

• Environmental Impact Assessment in • Environmental Impact Assessment in its General modality for the Hotel its Intermediate modality for the “Costa Miramar, beach recovery and Baja” tourist consortium at La Paz, Baja stabilization in Cancún, Quintana Roo. California Sur.

3 E3 Consultores Curriculum vitae August, 2009

Environmental Impact Statements and related studies – Industry and Infrastructure.

• Environmental Impact Statement in its • Environmental Impact Assessment for Particular modality for the Construction the construction of an industrial battery and Operation of an Energy production recycled Plant located in Reynosa, Plant with Combined Cycle, located at Tamaulipas, Mexico. the Municipality of Pesquería, Nuevo León (IN PROCESS). • Preventative Report for the construction and operation of a carbon black plant • Environmental Prefeasibility Study for within the Integral Port Administration a Bypass road at Ciudad del Carmen, (API) at Altamira, Tamaulipas, Mexico. Campeche. • Justificative Technical Study for the • Vegetation Characterization for the forestry soil change use for the Grupo Mexico Intermodal Railroad exploitation of a travertine marble open Station at the Pedro Escobedo sky mine at Cerro Prieto, San Antonio Municipality, Nuevo León. Nanahuatipam municipality, Oaxaca, Mexico. • Environmental Impact Statement in its Regional modality for the Construction • Preventative Report for a dimmers and and Operation of the Platanarillo ballasts production plant at Chihuahua, Railway Bypass at the Municipality of Chih. Mexico. Tuxpan, Jalisco. • Environmental Management Program • Environmental Impact Statement in its for the exploitation of travertine marble Particular modality for the Construction open sky mine at Cerro Prieto, San and Operation of a Combined Cycle Antonio Nanahuatipam municipality, Thermo electrical Plant at the Oaxaca, Mexico. Municipality of San Luis de la Paz, Guanajuato • Environmental Impact Assessment study in its General modality for the • Modification of an Environmental construction of four vehicular tunnels Impact Statement in its Regional as part of the Eje 5 Poniente project in modality for the Manzanillo- Mexico City. Guadalajara Natural Gas Pipeline (340 km) at the States of Colima and Jalisco, • Environmental Impact Assessment in Mexico. its General modality for the construction of six vehicular bridges • Environmental Impact Assessment and along the Eje 3 Oriente at Mexico City. Technical Justificatory Study for the forestry land use change in a 35 Has. property at Monclova, Coahuila, Mexico.

1 E3 Consultores Curriculum vitae August, 2009

• Environmental Impact Assessment for • Environmental Impact Assessment in the construction of a natural gas its General modality for the pipeline from Naranjos, Veracruz; to construction of Plaza Patriotismo Mall Tamazunchale, S.L.P. in Mexico City.

• Environmental Impact Assessment in • Environmental Impact Assessment in its General modality for the its Particular modality for the regularization of Lomas Plaza Mall and construction and operation of a bakery Office Center. manufacturing facility in Izucar de Matamoros municipality, Puebla, • Environmental Impact Assessment in Mexico. its Particular modality for the exploitation of travertine marble in an • Environmental Impact Assessment in open sky mine at Cerro Prieto, San its General modality for the Antonio Nanahuatipam municipality, construction of one vehicular bridge Oaxaca, Mexico. and two levels vehicular crossing on the Fast way 5 West (Eje 5 Poniente). • Environmental Damages Evaluation in a property located at Ampliación • Environmental Impact Assessment in Calapa Ejido, San Antonio its General modality for the Nanahuatipam, Oaxaca, Mexico. construction of the second phase of the Mexico City “Speed Ways project” (San • Environmental Impact Assessment for Antonio – San Jerónimo). the construction of a vehicular bridge at the intersection of Ejército Nacional Av. • Environmental Impact Assessment in and Moliere Av. its General modality for the construction of Fray Servando and • Environmental Impact Assessment in Avenida del Taller vehicular bridges. its Particular modality for the wastewater discharge and construction • Environmental Impact Assessment in of two deep wells for a yeast and its General modality for the bakery product Plant in Atzala construction of Kristal Tower in Mexico municipality, Puebla, Mexico. City.

• Environmental Impact Assessment for • Environmental Evaluation for Great the construction and operation of a Lake Chemical Corporation de Mexico plastic printing plant in Ocoyoacac S.A. de C.V. municipality, State of Mexico, Mexico. • Environmental Diagnostics for seven • Perimetral noise study for Valladolid III house-building developments in the Electric Combined Cycle Central State of Mexico, Guanajuato, San Luis located in Ebtún, Valladolid, Yucatán, Potosi and Mexico City. Mexico.

2 E3 Consultores Curriculum vitae August, 2009

• Environmental Impact Assessment in • Environmental Impact and Social Brief its General modality for Mexico City’s for the Monterrey III Thermoelectric “Vías Rápidas” (“Speed Ways”) project. Plant. Study prepared in coordination with Vera, Burguete y Celis, S.C. • Environmental Prefeasibility Study for a liquefied natural gas plant at the • Environmental Impact Assessment in Tijuana municipality in Baja California its General modality for the Huimilpan Mexico. compression station.

• Environmental Damage Evaluation for • Forest Technical Study for the “El Bajío a former steel foundry facility at the Natural Gas Pipeline” land use change. Mexican railroads yards in San Luis Potosí, Mexico. • Environmental Impact Assessment in its General modality for a bumper • Environmental Impact Assessment in assembling plant in San José Iturbide, its General modality for a textile Guanajuato. industrial park in Huejutla, Hidalgo, Mexico. • Environmental Impact Assessment in its General modality for an industrial • Environmental Diagnostic for the building in San Pedro de los Pinos, Burlmex’s curtain manufacturing Mexico City. facility in Acámbaro, Guanajuato, Mexico. • Environmental Impact Assessment in its Preliminary modality for the • Land Use Forest Technical Study for Novotel Torre Insurgentes wastewater San Fernando´s natural gas pipeline treatment plant. and compression stations at the Reynosa, Méndez and San Fernando • Solid Wastes Management Program for municipalities in the state of the Novotel Torre Insurgentes project. Tamaulipas. • Environmental Impact Assessment in • Environmental Impact Assessment in its General modality for the “El Bajío its Particular modality for San Natural Gas pipeline”. Fernando´s natural gas pipeline and compression stations at the Reynosa, • Wastewater discharges, atmospheric Méndez and San Fernando emissions, solid wastes and dielectric municipalities in the state of oils Sampling and Analysis for "Tequila Tamaulipas. Tres Magueyes" Facility in Atotonilco El Alto, Jalisco. • Environmental Feasibility Study for the Mexico City complementary airport. • Environmental Impact Assessment in its Preliminary modality for the construction of a wastewater treatment plant at the Santa Fe II building.

3 E3 Consultores Curriculum vitae August, 2009

• Environmental Impact Assessment in • Environmental Impact Assessment in its Preliminary modality for the its Intermediate modality for the installation of a biological infectious development and construction of treatment unit. “Parque Opción Los Nogales” in San José Iturbide, Guanajuato. • Environmental Impact Assessment in its Intermediate modality for the • Environmental Impact Assessment in Guanajuato Interurban Rapid Train its General Modality for a Textile "Tren Rápido Interurbano de Industrial Park at the Emiliano Zapata Guanajuato (TRIG) Celaya-León". municipality in the State of Morelos.

• Environmental Impact Assessment in • Environmental Impact Assessment in its General modality for a steel facility its General modality for the Siderúrgica "Viga Trefilados" in the Lázaro Lázaro Cárdenas, Las Truchas Cárdenas, Michoacán municipality. (SICARTSA) carbon coque plant in the state of Michoacán. • Environmental Impact Assessment in its General modality for a mining • Environmental Impact Assessment in facility "El Tubo" in the Lázaro its General modality for the Siderúrgica Cárdenas, Michoacán municipality. Lázaro Cárdenas, Las Truchas (SICARTSA) desulphurization plant in • Environmental Impact Assessment in the state of Michoacán. its General modality for a building construction in Santa Fe. Distrito • Environmental Impact Assessment in Federal. its General modality for the Siderúrgica Lázaro Cárdenas, Las Truchas • Environmental, Health and Safety (SICARTSA) oxycupule oven plant in Audits for 14 car air emissions the state of Michoacán. verification centers at the Valley of Mexico. • Environmental Impact Assessment in its General modality for the Siderúrgica • Environmental Impact Assessment in Lázaro Cárdenas, Las Truchas its Preliminary modality for "Torre (SICARTSA) carbon injection plant in Manantial" building construction at the state of Michoacán. Alvaro Obregón, Distrito Federal. • Environmental Impact Assessment in • Noise Analysis for “Aceros DN” in San its General modality for the Siderúrgica Luis Potosí, S.L.P. Lázaro Cárdenas, Las Truchas (SICARTSA) air separation plant in the • Environmental Impact Assessment in state of Michoacán. its Preliminary modality for the “Auditorio Nacional” parking system in Mexico City.

4 E3 Consultores Curriculum vitae August, 2009

• Environmental Impact Assessment in its General modality for the Siderúrgica Lázaro Cárdenas, Las Truchas (SICARTSA) steel plant in the state of Michoacán.

• Environmental Impact Assessment in its General modality for the Infiernillo- Lázaro Cárdenas Highway at the states of Guerrero and Michoacán.

• Environmental Impact Assessment in its General modality for Industrias Troy’s phosphogypsum evaporation ponds in Minatitlán, Veracruz.

• Environmental Impact assessment in its Preliminary modality for the construction of “Centro CONFE” in México City.

• Environmental Impact Assessment in it Preliminary modality for “Hansi” housing development in México City.

• Environmental Diagnostic for the Tehuantepec Isthmus Integral Development Program and the proposed construction of the third refinery rail at the PEMEX ‘s Salina Cruz, Oaxaca refinery.

• Environmental Impact Assessment in its General modality for the Bellavista housing development in Atizapán de Zaragoza, State of Mexico.

• Environmental Impact Assessment in its General modality for the San Cristóbal de las Casas’s airport construction. A study prepared for the State of Chiapas.

5 E3 Consultores Curriculum vitae August, 2009

Risk Studies

• Risk Study for the Construction and • Risk Study Actualization for the Operation of a Combined Cycle Energy construction of the Tamazunchale Plant located at the Municipality of natural gas pipeline from Naranjos, Pesquería, Nuevo León (IN PROCESS). Veracruz to Tamazunchale, S.L.P.

• Accident Prevention Program (PPA) for • Risk Study level 2, Risk Analysis, for the Compression Station “Tuxpan” of the construction and operation of a the Manzanillo-Guadalajara Natural bakery manufacturing facility in Izucar Gas Pipeline System, located at Tuxpan de Matamoros municipality, Puebla, Muncipality, Jalisco Mexico.

• Risk Study for the Construction and • Risk Study Actualization, Zero level, for Operation of the Combined Cycle the natural gas duct “Palmillas-Toluca”. Thermoelectric Plant Located at the Municipality of San Luis de la Paz, • Risk Analysis in its Risk Analysis Guanajuato, Mexico. modality for the Huimilpan compression station. • Accident Prevention Program (PPA) for the Manzanillo-Guadalajara Natural • Risk Analysis study for the “El Bajío Gas Pipeline System, at the States of Natural Gas Pipeline”. Colima and Jalisco. • Risk Study Level 2 by the HAZOP • Risk Study for an Industrial Batteries method for the Ciudad Madero’s Recycle Plant in Reynosa, Tamaulipas, petrochemical plant natural gas use. Mexico. • Risk Analysis Actualization Study for • Accident Prevention Program for the the Burlington’s textile plant in Tamazunchale natural gas pipeline Yecapixtla, Morelos, Mexico. from Naranjos, Ver. to Tamazunchale, S.L.P., Mexico. • Risk Analysis Review and Actualization in its Risk Analysis modality for a • Risk Study for a carbon black Plant textile facility in the Yecapixtla, Morelos within the Integral Port Administration municipality. (API) at Altamira, Tamaulipas, Mexico. • Risk Analysis for Latincasa, a wire • Risk Study for an industrial battery manufacturing facility in San Luis recycle Plant located at Reynosa, Potosí, S.L.P. Tamaulipas.

2 E3 Consultores Curriculum vitae August, 2009

ASTM Environmental Site Assessments – Brownfields and Industry

• Phase I ESA´s at four different tourism • Phase I Environmental Site Assessment facilities and housing developments for Industrial Torres Marmex, S.A. de located at Monterrey, NL; Los Cabos, C.V. facilities in Tlalnepantla, state of B.C.S.; Chihuahua, Chih. and Saltillo, Mexico, Mexico. Coah., Mexico. • Phase I Environmental Site Assessment • Phase I ESA´s at eight different heavy for Cartonajes Estrella, S.A. de C.V. machinery sale points and maintenance facilities at the state of Hidalgo, Mexico. workshops located at Monterrey, N.L.; Lerma, State of Mexico; Zacatecas, Zac; • Phase I Environmental Site Assessment Tuxtla Gutierrez, Chis; Durango, Dur.; for an automotive mechanical Guadalajara, Jal.; Culiacán, Sin. and workshop. Torreón, Coah. Mexico. • Phase I Environmental Site Assessment • Phase II Environmental Site Assessment for a maquila plant in Hermosillo, and Soil Sampling for a Natural Gas Sonora, Mexico. Compression Station Facility Close-Up in Huimilpan, Querétaro, Mexico. • Phase 1 Environmental Site Asessments to four COPAMEX Group paper • Phase I Environmental Site Assessment production plants at Ecatepec and for a Tequila Production Plant in Huehuetoca, Estate of Mexico; Tepatitlán de Morelos municipality, Monterrey, Nuevo León; and Uruapan, Jalisco, Mexico. Michoacán, Mexico.

• Due Diligence for the Fortuna • Phase II Environmental Site Assessment Hydroelectric Complex at Chiriquí of a Pfizer pharmaceutical production province, Panamá. facility in Mexico City.

• Phase I Environmental Site Assessment • Phase I Environmental Site Assessment actualization for the Aluprint facility at for SRC de México facility in San Luis Potosi, S.L.P., Mexico. Guadalajara, Jalisco, Mexico.

• Phase I Environmental Site Assessment • Pollution Legal Liability study in three at the former facilities of Solectron locations of Tractebel-Digaqro for the Industry at Chihuahua, Chih., Mexico. distribution of natural gas in the Queretaro Area. • Phase I Environmental Site Assessment at Huhtamaki Packaging Mexicana, • Pollution Legal Liability (PLL) studies S.A. de C.V. at is facilities locate din for five FINSA Industrial Parks in Jiutepec, Morelos, Mexico. Monterrey, Saltillo, Los Mochis, Queretaro and Iztapalapa, Mexico City.

1 E3 Consultores Curriculum vitae August, 2009

• Phase I Environmental Audit for a • Phase I Environmental Audit for a cotton seed oil facility in Zapotlan passengers buses assembling facility in Municipality, Jalisco. Mexico City.

• Phase I Environmental Audits for • Phase I Environmental Audit for Texaco’s facilities in Aragón, Mexico “Tequila Tres Magueyes, Fábrica La City and Monterrey, Nuevo León, Primavera” plant in Atotonilco El Alto, Mexico. Jalisco.

• Phase I Environmental Site Assessment • Phase I Environmental Audits for two for the asphalt emulsion facility FYL’s rail cars maintenance workshops “Emulsiones Asfálticas del Altiplano, in Escobedo, Guanajuato and S.A. de C.V.” in San Luis Potosí, Huichapan, Hidalgo. Mexico. • Phase I Environmental Audit for • Phase I Environmental Audit for “Evenflo de México, S.A. de C.V.” Plant "Tequila 3 Magueyes, Fábrica La in Mexico City. Primavera" in Atotonilco El Alto, Jalisco. • Phase I Environmental Audit for “Mettler Toledo” sensors assembling • Phase I Property Transfer plant in Alphaville, Sao-Paulo, Brazil. Environmental Audit for "GATPE, Terminal de Productos Especializados, • Phase I Environmental Audit for S.A. de C.V." in the Altamira, “Básculas Mettler Toledo” weight scales Tamaulipas Industrial Port. plant in Mexico City.

• Phase I Property Transfer • Environmental Assessment for the Environmental Audit for "Rocol appropriate management and Mexicana, S.A. de C.V." in disposition of polychlorinated bifenils Azcapotzalco, Distrito Federal. for the Collective Transport System “METRO” • Phase II Property Transfer Environmental Audit for the facility • Environmental Audits under "Alce, Emulsiones Asfálticas de PROFEPA’s terms of reference for two Occidente, S.A. de C.V." in El Salto sugar cane plants at Benito Juárez, municipality, Jalisco, Mexico. Tabasco and Taretan, Michoacán.

• Phase I Property Transfer • Environmental Audit Supervision for Environmental Audit for "Alce, “Consorcio Industrial” in Tlanepantla, Emulsiones Asfálticas de Occidente, State of México. S.A. de C.V." in El Salto municipality, Jalisco,.

2 E3 Consultores Curriculum vitae August, 2009

• Phase I Environmental Audit for an industrial building at the state of Querétaro for the installation of Riverwood Corporation production plant.

• Phase I Environmental Site Assessment for “Cementos Del Yaqui” plant in Hermosillo, Sonora.

• Internal Environmental Audit for the Eurocar’s bus assembling plant at Tultitlán, State of Mexico.

• Phase I Environmental Audits for the Texaco’s waste oil refining plant at Querétaro and waste oil transfer plant at Ecatepec, State of Mexico.

• Environmental Audit under PROFEPA´s terms of reference for a solvent recycling and wasted oils recycling plant in the State of Mexico.

• Environmental Audit under the PROFEPA´s terms of reference for two sugar cane facilities at the State of Sinaloa.

• Phase I Environmental Audit for Bachoco, S.A. de C.V. in Celaya, Guanajuato.

ASTM Environmental Site Assessments – Greenfields and properties

• Phase I ESA at a 35 Has. property • Phase I Environmental Site Assessment located in Monclova, Coahuila, Mexico. for a green field in , Solidaridad municipality, Quintana Roo, • Phase I Environmental Site Assessment Mexico. for a green field in Tepic, Nayarit, Mexico.

3 E3 Consultores Curriculum vitae August, 2009

• Phase I Environmental Site Assessment • Phase I Environmental Site Assessments for a green field in Playa del Carmen, for two properties located at Mexico Solidaridad municipality, Quintana Roo, City and Tijuana, Baja California, Mexico. Mexico for housing developments.

• Phase I Environmental Site Assessment • Phase I Environmental Site Assessments for a green field in Bahía de Banderas, for properties at Tijuana, Baja Nayarit, Mexico. California; Puebla, Puebla; Monterrey, Nuevo León; Ixtapa, Guerrero and • Phase I Environmental Site Assessment Guadalajara, Jalisco, Mexico. for a green field in Ixtapa, José Azueta municipality, Guerreo, Mexico. • Phase I Environmental Site Assessments for different properties located at • Phase I Environmental Site Assessment Durango, Tamaulipas, Mexico City, for a green field in Coatzacoalcos, State of Mexico, Jalisco and Querétaro Veracruz, Mexico. states, Mexico.

• Phase I Environmental Site Assessment • Phase 1 Environmental Site for a green field in Atitalaquia, Hidalgo, Assessments for several properties Mexico. located in Huixquilucan and Calimaya, State of Mexico; Monterrey, Nuevo • Phase I Environmental Site Assessments León; Tijuana and Mexicali, Baja for six properties located in Acapulco, California and Mexico City. Guerrero; Calimaya and Tecamac, Estate of Mexico, Mexico for housing • Phase 1 Environmental Site development projects. Assessments for 4 properties located in Zumpango, Estate of Mexico and for • Phase I Environmental Site Assessments one plot at Reynosa, Tamaulipas, for two properties located in Emiliano Mexico. Zapata municipality, Morelos and Ixtapaluca, Estate of Mexico, Mexico. • Phase I Environmental Site Assessment of a 61 Has. plot located in Ixtapaluca, • Phase II and III Environmental Sites Estado de Mexico. Assessments for a property located in Puebla, Puebla. • Phase I Environmental Site Assessment of a 31 Has. coastal plot located in • Phase I Environmental Impact Acapulco, Guerrero, Mexico. Assessments for properties located in Torreón, Coahuila; Puebla, Puebla; and • Phase I Environmental Audit for a plot Toluca, State of Mexico. in Punta Mita, Nayarit.

• Phase I Environmental Audit for the Six Flags amusement park in Tlalpan, Mexico City.

2 E3 Consultores Curriculum vitae August, 2009

• Phase I Environmental Audit for a 58.71 hectares property in which a liquefied natural gas plant installation is evaluated.

• Phase I Environmental Site Assessment for the thermoelectric plant property in Palizada, Campeche Mexico. Study prepared in coordination with Vera, Burguete y Celis, S.C.

Soil Characterizations and Contaminated Soil Remediation

• Hydrocarbon soil remediation for the • Extraction, Recollection, Transport and concessed workshops of FNM in Final Disposition of polluted soils Ciudad Juarez, Chihuahua, Mexico. service (hydrocarbons, lubricant oils, used batteries and filters) from the ex- • Chemical wastes characterization at an facilities of Mexican National Railways industrial plant located at Monclova, located in Lechería, Estado de México. Coahuila, Mexico. • Sampling and Analysis for potential • Hydrocarbons soil remediation for a contaminateds at the KOA’s Trailer plot located in Mexico City. Park facility in Rosarito, Baja California, Mexico. • Soil and aquifer recharacterization on FNM workshops in Oriental, Puebla, • Soil, Subsoil and Groundwater Mexico. Characterization Study for the wastewater treatment lagoons area at • Soil characterization on facilities of the Cytec plant, located in Atequiza, Suministros Domésticos S.A. de C.V., Jalisco, Mexico. located in Mexico City, Mexico. • Removal, Separation and Disposal of • Soil Characterization on Nacional de contaminated soil and industrial Envases Plásticos S.A. de C.V. plot, hazardous wastes for the Mexico City located in Tlalnepantla, Estate of railroad terminal at Pantaco. Mexico, Mexico. • Soil Characterization Study and Noise • Soil Characterization on the facilities of Boundary Study for the Humilpan Proyecto Real 8 S.A. de C.V. located in compression station property in Tlalnepantla, Estate of Mexico, Mexico. Queretaro, Mexico.

3 E3 Consultores Curriculum vitae August, 2009

• Soil Characterization Study for an alchitran spill at the Caltzontzin, Michoacan, México Location.

• Neutralization and Stabilization of sulphuric acid contaminated soils at an industrial facility in Querétaro.

• Removal and Ex Situ Remediation of hydrocarbons contaminated soils at an industrial facility in the state of Querétaro, Mexico.

• Hydrocarbons Soil and Groundwater Remediation contract for the Mexican railroads yards in San Luis Potosí.

• Selection and Implementation of Remediation Technologies for hydrocarbons contaminated soils and groundwater at the FNM’s San Luis Potosí Rail Yard.

• Hydrocarbons Plumes Characterization studies for the Ferrocarriles Nacionales de Mexico’s San Luis Potosí Rail Yards.

Special Studies

• Special Study for the Vegetation • Development of an executive project for Characterization for the Beach Club of the management and control of leakage Centinelas Hotel and residences project and biogas for a property located at in Acapulco, Guerrero, Mexico. Nezahualcoyotl, State of Mexico, Mexico. • Vegetation Characterization of Las Pozas property at Zihuatanejo, Guerrero, • Evaluation of perimeter noise, Mexico. environmental labor noise and atmosphere emissions at the Valladolid • Cactaceae vegetation rescue program III Cycle Combined Central (CCC) in for a 35 Has. property located at Valladolid, Yucatan, Mexico. Monclova, Coahuila, Mexico.

2 E3 Consultores Curriculum vitae August, 2009

• Environmental expert opinion on a • Ecological Zoning Program for the wetland within the Cedros Jalisco Tizayuca’s Valley Regional Business Park in Tlaquepaque, Jalisco, Development Program. Mexico. • Environmental Feasibility study for the • Development of an executive project for complimentary Mexico City the management and control of leakage International Airport at Tizayuca, and biogas for a property located at Hidalgo, Mexico. Santa Fe, Mexico City, Mexico. • Vegetation Study for the “Parcela 29” • Landscape architecture project and property located at the Ejido Mazatlán, reforestation works for the green areas Rosarito, Baja California, Mexico. at a vehicular tunnel located in Ejercito Nacional Av. and Moliere Av., Miguel • Archeological Survey for the Hidalgo political delegation, Mexico construction of a natural gas pipeline City, Mexico. between Salamanca, Guanajuato and Aguascalientes, Mexico. • Legal Review on Environmental Matter, previous to the PROFEPA´s audit on • Air Transport and Air Quality Audit for Environmental Comply Certification for the Mexico City Metropolitan Area Club Playa Sol in Cozumel Valley. A study prepared in municipality, Quintana Roo, Mexico. coordination with ICF Consulting with World Bank funds. • Dasonomic study for a property located in Santa Fé, Mexico City, Mexico. • Feasibility Study for a soft shell crab facility in Tuxpan, Veracruz. • Hydrologic study for the Ensenada • Environmental Evaluation for the Verde stream, located in Acapulco, Environmental Protection Agency Guerrero, Mexico. (EPA) related with Mexican environmental legislation in marine • Evaluation of the National Disasters hydrocarbons spills. Fund (FONDEN) for 2004, in coordination with the Demographic, • Preparation of the proposed Mexican Urban and Environmental Studies Official Norm for wasted oils in Center of the Colegio de Mexico. coordination with the Mexican Chemical Industry Association (ANIQ) • Expert opinion of a polluted plot in and the National Institute of Ecology Zamora, Michoacán. (INE).

• Study of Perimeter Noise for the • Study to identify environmental sector Combined Cycle Energy Central business opportunities in Chile and “Valladolid III” at Ebtún, Valladolid, México. Yucatán, Mexico.

2 E3 Consultores Curriculum vitae August, 2009