Press Release

Total Page:16

File Type:pdf, Size:1020Kb

Press Release PRESS RELEASE Bombardier wins contract to supply 201 metro cars and signalling for the Agra-Kanpur Metro lines in India • 1.4 million daily riders will benefit from new metro services connecting the city clusters of Agra and Kanpur and iconic destinations including the Taj Mahal • Over 1000 MOVIA metro cars and 200 km of CITYFLO signalling ordered by India’s operators make this country one of Bombardier’s largest metro markets Berlin, July 6, 2020 – Rail technology leader Bombardier Transportation has received a Letter of Award (LoA) from India’s Uttar Pradesh Metro Rail Corporation (UPMRC) to build and deliver 201 metro cars and an advanced signalling solution for the Agra-Kanpur Metro projects. For the 30 km Agra Metro and the 32 km Kanpur Metro, Bombardier’s scope for the contract comprises 67 BOMBARDIER MOVIA metro three-car trainsets and the advanced BOMBARDIER CITYFLO 650 rail control solution. The Letter of Award is valued at approximately INR 2051 crore (245 million euro, $275 million US) and the customer has a provision to exercise an option of an additional 51 metro cars. Mr. Kumar Keshav, Managing Director, Uttar Pradesh Metro Rail Corporation (UPMRC), Lucknow (India), expressed his delight at having the Bombardier Consortium as an integrated Rolling Stock and Signalling System partner for the upcoming Metro projects. He said, “UPMRC has the responsibility of implementing the prestigious Kanpur and Agra Metro projects in the State of Uttar Pradesh in India in a very strict time frame. After achieving the distinction of completing the Lucknow Metro as the fastest implemented metro project in India in less than four and half years (36 days ahead of schedule), UPMRC is committed once again to replicating the same achievement in the delivery of the Kanpur and Agra Metro Projects. Manufacturing and supply of 67 high-end state-of-the art modern trainsets of three-cars each, manufactured in Savli, India by Bombardier, shall be a feather in “Make in India” dream of India.” He further stated that this partnership between UPMRC and Bombardier for delivering the Rolling Stock and Signalling System for Kanpur and Agra Metro Projects will prove to be a very satisfying experience for all the associated parties in implementing these world-class Metro Projects in short time. Rajeev Joisar, Managing Director for India at Bombardier Transportation, said, “Bombardier is honoured to have been chosen by Uttar Pradesh Metro Rail Corporation (UPMRC) for this highly collaborative project to deliver the rolling stock and advanced signalling system for the Agra and Kanpur metro projects. The new metro cars will be locally designed and built, and the rail control will be equipped by our project delivery teams in India. With this award, Bombardier becomes the only rail supplier in India chosen to deliver the broad portfolio of rail solutions for Indian customers in the segments of Metro and Commuter cars, Rail Equipment, Signalling Systems and Services.” He added, “We are very proud of the confidence bestowed on us by our new customer, UPMRC in India, to move millions of people daily with our trains and signalling solutions, and to be partners in delivering their vision of 'Moving People, Adding Values’. We look forward to bringing our innovative, safe and reliable mobility solutions to Agra and Kanpur’s citizens and to making a major positive impact on the local environment and economy.” The Agra and Kanpur metro rail projects will have two corridors each connecting major public nodes, tourist places including the Taj Mahal, and city cluster areas, resulting in a sustainable and reliable public transport system for the two cities. For the four million people in Kanpur and the two million people in Agra, the metro will bring improved connectivity and an enhanced passenger experience. The project will be executed in accordance with country’s ‘Make in India’ guidelines, with the trains being manufactured at Bombardier’s Savli and Maneja sites near Vadodara in India. The rolling stock will be designed at the Global Engineering and Technology Centre in Hyderabad, India. In India, Bombardier is one of the largest rolling stock providers and the largest signalling solution supplier to Delhi Metro, one of the world’s leading metro operators. Since 2007, 816 metro cars have been ordered and more than 140 km of metro lines have been equipped with Bombardier’s signalling technology. In addition to the CITYFLO 650 solution installed on Delhi’s lines 7 and 9, Delhi Metro lines 5 and 6 are equipped with Bombardier’s CITYFLO 350 signalling solution. This is the second major contract for Bombardier in India this year. In May 2020, Bombardier announced that it had won the contract to build and deliver 30 regional commuter trainsets of six-cars each and 10 intracity mass transit trainsets of three-cars each, together with 15 years of rolling stock maintenance for the Delhi-Ghaziabad-Meerut semi-high-speed rail corridor of the Regional Rapid Transport System (RRTS) from India’s National Capital Region Transport Corporation (NCRTC). About Bombardier Transportation in India With around 1,500 employees, Bombardier Transportation in India operates a railway vehicle manufacturing site and bogie assembly hall at Savli, near Vadodara, Gujarat. This is in addition to a propulsion system manufacturing facility at Maneja and Train Control and Management System (TCMS) centre at Atladara in Vadodara; a Rail Control Solutions centre for project delivery and product engineering and an Information Services India hub in Gurugram, Delhi NCR and an Engineering Centre in Hyderabad. It is a long standing partner of Indian Railways supplying propulsion equipment for their locomotives and Electric Multiple Units (EMUs). Bombardier also exports rail equipment from India to the company’s rolling stock projects all over the world. Bombardier helps to move around five million people daily in the 2 cities of Mumbai, Delhi and Kolkata and its propulsion systems equip locomotives that travel around 300,000 track kilometres daily on Indian Railways’ network. About Bombardier Transportation Bombardier Transportation is a global mobility solution provider leading the way with the rail industry’s broadest portfolio. It covers the full spectrum of solutions, ranging from trains to sub-systems and signalling to complete turnkey transport systems, e-mobility technology and data-driven maintenance services. Combining technology and performance with empathy, Bombardier Transportation continuously breaks new ground in sustainable mobility by providing integrated solutions that create substantial benefits for operators, passengers and the environment. Headquartered in Berlin, Germany, Bombardier Transportation employs around 36,000 people and its products and services operate in over 60 countries. About Bombardier With over 60,000 employees across two business segments, Bombardier is a global leader in the transportation industry, creating innovative and game-changing planes and trains. Our products and services provide world-class transportation experiences that set new standards in passenger comfort, energy efficiency, reliability and safety. Headquartered in Montréal, Canada, Bombardier has production and engineering sites in over 25 countries across the segments of Aviation and Transportation. Bombardier shares are traded on the Toronto Stock Exchange (BBD). In the fiscal year ended December 31, 2019, Bombardier posted revenues of $15.8 billion. News and information are available at bombardier.com or follow us on Twitter @Bombardier. Notes to editors For news, related material and photos, visit our newsroom at www.rail.bombardier.com/en/newsroom.html. Please subscribe to our RSS Feed to receive press releases or follow Bombardier Transportation on Twitter @BombardierRail. Bombardier, MOVIA and CITYFLO are trademarks of Bombardier Inc. or its subsidiaries. For information Media relations, India Global media relations Harsh Mehta [email protected] +91 98208 02228 [email protected] You can also contact one of our worldwide contacts for specific press inquiries. 3 4 .
Recommended publications
  • River Ganga at a Glance: Identification of Issues and Priority Actions for Restoration Report Code: 001 GBP IIT GEN DAT 01 Ver 1 Dec 2010
    Report Code: 001_GBP_IIT_GEN_DAT_01_Ver 1_Dec 2010 River Ganga at a Glance: Identification of Issues and Priority Actions for Restoration Report Code: 001_GBP_IIT_GEN_DAT_01_Ver 1_Dec 2010 Preface In exercise of the powers conferred by sub‐sections (1) and (3) of Section 3 of the Environment (Protection) Act, 1986 (29 of 1986), the Central Government has constituted National Ganga River Basin Authority (NGRBA) as a planning, financing, monitoring and coordinating authority for strengthening the collective efforts of the Central and State Government for effective abatement of pollution and conservation of the river Ganga. One of the important functions of the NGRBA is to prepare and implement a Ganga River Basin: Environment Management Plan (GRB EMP). A Consortium of 7 Indian Institute of Technology (IIT) has been given the responsibility of preparing Ganga River Basin: Environment Management Plan (GRB EMP) by the Ministry of Environment and Forests (MoEF), GOI, New Delhi. Memorandum of Agreement (MoA) has been signed between 7 IITs (Bombay, Delhi, Guwahati, Kanpur, Kharagpur, Madras and Roorkee) and MoEF for this purpose on July 6, 2010. This report is one of the many reports prepared by IITs to describe the strategy, information, methodology, analysis and suggestions and recommendations in developing Ganga River Basin: Environment Management Plan (GRB EMP). The overall Frame Work for documentation of GRB EMP and Indexing of Reports is presented on the inside cover page. There are two aspects to the development of GRB EMP. Dedicated people spent hours discussing concerns, issues and potential solutions to problems. This dedication leads to the preparation of reports that hope to articulate the outcome of the dialog in a way that is useful.
    [Show full text]
  • Kanpur Dehat
    State: Uttar Pradesh Agriculture Contingency Plan for District: Kanpur Dehat 1.0 District Agriculture profile 1.1 Agro-Climatic/ Ecological Zone Agro-Ecological Sub Region(ICAR) Central Plain Zone Agro-Climatic Zone (Planning Commission) Upper Gangetic Plain Region Agro-Climatic Zone (NARP) UP-4 Central Plain Zone List all the districts falling the NARP Zone* (^ 50% area falling in the Lakhimpur Kheri, Sitapur, Hardoi, Farrukhabad, Etawah, Kanpur, Kanpur zone) Dehat, Unnao, Lucknow, Rae Bareilly, Fatehpur and Allahabad. Geographical coordinates of district headquarters Latitude Longitude Altitude(mt) 26.28 N 80.20 E Name and address of the concerned ZRS/ZARS/RARS/RRS/RRTTS Mention the KVK located in the district with address Krishi Vigyan Kendra, Zonal Agricultural Research Station, Daleep Nagar, Kanpur Dehat Name and address of the nearest Agromet Field Unit(AMFU,IMD)for CSA Kanpur agro advisories in the Zone 1.2 Rainfall Normal RF (mm) Normal Rainy Normal Onset Normal Cessation Days (Number) (Specify week and month) (Specify week and month) SW monsoon (June-sep) 713.1 45 3nd week of June 4th week of September Post monsoon (Oct-Dec) 38.1 10 Winter (Jan-March) 37.1 10 - - Pre monsoon (Apr-May) 13.2 2 - - Annual 801.5 67 - - 1.3 Land use pattern Geographical Cultivable Forest Land under Permanent Cultivable Land Barren and Current Other of the district area area area non- pastures wasteland under uncultivable fallows fallows (Latest agricultural Misc.tree land statistics) use crops and groves Area in (000 ha) 315.0 262.8 5.8 29.8 0.4 4.3 2.7 16.2 21.5 12.4 1.4 Major Soils Area(‘000 ha) Percent(%) of total Deep, fine soils moderately saline and sodic 71.0 27 % Deep, loamy soils 55.2 21 % Deep, loamy soils associated with sandy soils 79.1 30 % and eroded 1.5 Agricultural land use Area(‘000 ha) Cropping intensity (%) Net sown area 221.9 132.2 % Area sown more than once 71.5 Gross cropped area 293.4 1.6 Irrigation Area(‘000 ha) Net irrigation area 155.8 Gross irrigated area 201.0 Rain fed area 66.1 Sources of irrigation (gross irr.
    [Show full text]
  • 10-Day Golden Triangle and Holy City Tour
    www.satguruun.com Contact us at [email protected] 10-DAY GOLDEN TRIANGLE AND HOLY om for more information and CITY TOUR booking! From USD 499 Per Personn Golden Triangle tour is one of the most popular travel packages of India. This tour covers the most popular travel destinations of India Delhi, Jaipur & Agra. Delhi, being the capital and also a historical city of India, has a lot to offer. Highlights: New Delhi & Old Delhi, Jaipur Pink City with Amber fort, Agra With TajMahal at Sunset or Sunrise, Varanasi Morning Boat ride Tour Features Includes: • Roundtrip Transfers from your Delhi hotel. • The above cost include services by air conditioned car. • Services of Local English Speaking Guide (Language speaking guide can be organized at a supplement cost) • Driver & fuel charges. Parking charges. • Aircon. Sleeper Class Train tickets from Agra /Varanasi. • Accommodation in Twin sharing Room including breakfast. (03 Star Hotels). Not included: • Camera charges are not included • Lunch /Dinner can be organized as per request (optional not included in above cost) • Flight Tickets Varanasi/Delhi can • Elephant Ride & Entrance Tickets. • Tips Taj Mahal Day By Day itinerary Golden Triangle tour is one of the most popular Afterwards visit the City Palace, the Palace of spiritually uplifting sight. Stay overnight travel packages of India. This tour covers the Winds. The RoyalObservatory which was at Hotel. most popular travel destinations of India Delhi, built by the Maharajah Jai Singh and shows Jaipur & Agra. Delhi, being the capital and also his passion for astronomy. Stay overnight at Day 09 VARANASI / DELHI (By Hotel. Flight) a historical city of India, has a lot to offer.
    [Show full text]
  • NOTICE INVITING TENDER (NIT) 1.1 GENERAL 1.1.1 Name of Work
    Contract KNPCC-02(R1): Construction of elevated viaduct and 9 Nos. elevated station (viz. IIT Kanpur Station, Kalyanpur Railway Station, SPM Hospital Station, Kanpur University Station, Gurudev Chauraha Station, Geeta Nagar Station, Rawatpur Railway Station, Lala Lajpat Rai Hospital Station & Motijheel Station) including special span on Priority Section of Corridor-1, Phase-I of Kanpur Metro at Kanpur, Uttar Pradesh, India. NOTICE INVITING TENDER (NIT) 1.1 GENERAL 1.1.1 Name of Work: Lucknow Metro Rail Corporation (LMRC) Ltd., who has been assigned to carry out interim works for Kanpur Metro Rail Project, invites open tenders from eligible applicants, who fulfill qualification criteria as stipulated in Clause 1.1.4 of NIT, for the work, “Contract KNPCC- 02(R1): Construction of elevated viaduct and 9 Nos. elevated station (viz. IIT Kanpur Station, Kalyanpur Railway Station, SPM Hospital Station, Kanpur University Station, Gurudev Chauraha Station, Geeta Nagar Station, Rawatpur Railway Station, Lala Lajpat Rai Hospital Station & Motijheel Station) including special span on Priority Section of Corridor-1, Phase-I of Kanpur Metro at Kanpur, Uttar Pradesh, India.” The brief scope of the work and site information is provided in ITT Clause A1 (Volume-1) & Employer’s Requirements (Volume–3) 1.1.2 Key details : Approximate cost of work Rs. 676.00 Crores Tender Security amount Rs. 6.76 Crores Completion period of the Work 21 months From 28.06.2019 to 19.07.2019 (between 09:30 Tender documents on sale: hrs to 17:30 hrs) on working days INR 23600/- (inclusive of 18% GST) (Demand Draft on a scheduled commercial bank Cost of Tender documents based in India in favour of “Lucknow Metro Rail Corporation Ltd”) payable at Lucknow Last date of Seeking Clarification: 22.07.2019 Pre-bid Meeting 22.07.2019 @ 1500 Hrs Last date of issuing addendum 26.07.2019 Date & time of Submission of Tender 12.08.2019 upto 15:00 Hrs.
    [Show full text]
  • List of Examination Centres for Even Semester Exam 2011 – 12 (MAY-2012) Sr
    List of Examination Centres For Even Semester Exam 2011 – 12 (MAY-2012) Sr. Code, Name and Address of List of Institutions whose student shall appear at the examination Code of Nodal Centre No. Examination Centres Centres for Theory Examination to which examination centre is attached 1 2 3 4 5 1 (001) Anand Engineering 1. (002) Faculty Of Engineering & Technology, Agra B. Tech 001 Agra College, Agra College, Agra 2. (006) Agra Public Institute Of Technology & B.Phar Computer Education (Deptt. Of Pharmacy), Agra 3. (243) College Of Pharmacy Agra, Agra B.Phar 4. (314) Sai Nath College Of Pharmacy,Agra B.Phar 5. (617) Uttam Institute Of Management Studies,Agra MBA 6. (659) Heritage Institute Of Hotel & Tourism,Agra BHMCT 2 (003)Babu Mohan Lal Arya 1. (004) R.B.S.College, Faculty Of Engg.& B.Tech 001 Agra Smarak Engg. College, Agra Technology,Agra Agra 2. (278) Aryan Institute Of Management And Computer MBA Studies,Agra 3. (338) K. P. Engineering College ,Agra B.Tech, MBA 4. (436) K. P. College Of Management,Agra MBA 3. (004) R.B.S.College, Faculty Of 1. (001) Anand Engineering College, Agra B.Tech, 001 Agra Engg. & Technology,Agra MBA,MCA 4. (005) Raja Balwant Singh 1. (003) Babu Mohan Lal Arya Smarak Engg. College, B.Tech, MBA 001 Agra College,Agra Agra 5. (064) Hindustan College Of 1. (317) Dhanwantri Institute Of Pharmacy,Mathura B.Phar 001 Agra Science & Technology, Mathura 2. (366) Nikhil Institute Of Engineering & B.Tech, MBA Management,Mathura 3. (394) College Of Business Studies,Agra MBA 4.
    [Show full text]
  • ORIGINAL ARTICLE Pissn 0976 3325│Eissn 2229 6816 Open Access Article
    ORIGINAL ARTICLE pISSN 0976 3325│eISSN 2229 6816 Open Access Article www.njcmindia.org ASSESSMENT OF MAGNITUDE AND THE CO-MORBIDITIES OF OVERWEIGHT AND OBESITY IN URBAN AND RURAL AREAS OF KANPUR Naresh Pal Singh1, Pankaj K Jain2, R P Sharma3, Suresh Chandra4, Seema Nigam4, Anamika Singh5 Financial Support: None declared Conflict of interest: None declared ABSTRACT Copy right: The Journal retains the copyrights of this article. However, reproduction of this article in the Background: Obesity is emerging as a global epidemic with part or total in any form is permis- growing threat to health in both developed and developing coun- sible with due acknowledgement of tries. It has become a major health concern for almost all the age the source. groups of the society. Objectives of the study is assess the preva- How to cite this article: lence and co-morbidities of overweight and obesity among per- Singh NP, Jain PK, Sharma RP, sons 15 years and above in urban and rural areas of Kanpur, UP. Chandra S, Nigam S, Singh A. As- Methods: For this cross-sectional study, multistage random sam- sessment of Magnitude and the Co- pling technique was used to select one colony in urban and one morbidities of Overweight and Obesity in Urban and Rural areas of village in rural area of Kanpur district. The desired sample size Kanpur. Natl J Community Med. was 2200. Detailed socio-demographic information was collected 2015; 6(1):1-5. on a pre-designed and pre-tested questionnaire. After anthropo- metric examination, Body Mass Index (BMI) was used to assess Author’s Affiliation: the overweight and obesity status.
    [Show full text]
  • ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr
    GOVERNMENT OF INDIA URBAN DEVELOPMENT LOK SABHA UNSTARRED QUESTION NO:672 ANSWERED ON:20.07.2016 Metro Rail Projects Kambhampati Dr. Hari Babu;Mohammed Shri Faizal P.P.;Senguttuvan Shri Balasubramaniam;Somaiya Dr. Kirit;Thomas Prof. Kuruppassery Varkey;Venugopal Dr. Ponnusamy Will the Minister of URBAN DEVELOPMENT be pleased to state: Will the MINISTER OF URBAN DEVELOPMENT be pleased to state: (a) the details of metro rail proposals received by the Government during the last three years and the current year, stretch and State/ UT-wise along with the estimated cost of each stretch; (b) the details of proposals cleared and lying pending stretch and State-wise, the reasons for pendency along with the time by which pending proposals are likely to be cleared; (c) the funds sanctioned, released and utilized during the above period for various projects, stretch and State/UT-wise; (d) the present status of various under construction and sanctioned metro rail stretches, stretch and city-wise and the time by which these are likely to be completed and operationalized; and (e) Whether various metro rail projects are going behind schedule and if so, the details thereof, stretch and city-wise and the details of cost escalated as a result thereof along with the steps taken/being taken to complete these projects within a reasonable period of time? Answer THE MINISTER OF STATE IN THE MINISTRY OF URBAN DEVELOPMENT (RAO INDERJIT SINGH) (a)& (b) : The details of metro rail proposals received/ cleared/pending during the last three years and the current year along with the names of stretch and the estimated cost stretch wise, State/UT-wise are given in Annexure-I & IA.
    [Show full text]
  • Current Condition of the Yamuna River - an Overview of Flow, Pollution Load and Human Use
    Current condition of the Yamuna River - an overview of flow, pollution load and human use Deepshikha Sharma and Arun Kansal, TERI University Introduction Yamuna is the sub-basin of the Ganga river system. Out of the total catchment’s area of 861404 sq km of the Ganga basin, the Yamuna River and its catchment together contribute to a total of 345848 sq. km area which 40.14% of total Ganga River Basin (CPCB, 1980-81; CPCB, 1982-83). It is a large basin covering seven Indian states. The river water is used for both abstractive and in stream uses like irrigation, domestic water supply, industrial etc. It has been subjected to over exploitation, both in quantity and quality. Given that a large population is dependent on the river, it is of significance to preserve its water quality. The river is polluted by both point and non-point sources, where National Capital Territory (NCT) – Delhi is the major contributor, followed by Agra and Mathura. Approximately, 85% of the total pollution is from domestic source. The condition deteriorates further due to significant water abstraction which reduces the dilution capacity of the river. The stretch between Wazirabad barrage and Chambal river confluence is critically polluted and 22km of Delhi stretch is the maximum polluted amongst all. In order to restore the quality of river, the Government of India (GoI) initiated the Yamuna Action Plan (YAP) in the1993and later YAPII in the year 2004 (CPCB, 2006-07). Yamuna river basin River Yamuna (Figure 1) is the largest tributary of the River Ganga. The main stream of the river Yamuna originates from the Yamunotri glacier near Bandar Punch (38o 59' N 78o 27' E) in the Mussourie range of the lower Himalayas at an elevation of about 6320 meter above mean sea level in the district Uttarkashi (Uttranchal).
    [Show full text]
  • Regional Office - U.P
    Regional Office - U.P. Pollution Control Board, Ghaziabad S.No. Name And Address Of The Products Hazardous HW Generating Streams HW Generation In Total Quantity Of HW In MTA (10) Remark Unit Manufactured In Waste (HW) As Per MTA As Per Quantity Of MTA Generating HW Process As Sch. 1 Sch. 2 Sch. 1 Sch. 2 Generation Landfillable Recyclable Incinerable Per Schedule In MTA 1 1 2 3 4 5 6 7 8 9=7+810 11 Closed Unit 1 BHAGWATI PHOSPH&ELEC 12 12.5 0.9 0.9 0.9000 0.0000 0.0000 SELF ENTERPRISES, PL(Ni&Cr) CLOSED S-28, SITE-4, SBD JOB WORK BASIS 2 F.M. PARTS & BREAK DISC 15 15.3 0 0 0.0000 0.0000 0.0000 SELF COMPONENT (P0 LTD, 31 CLOSED A LONI RD I.A. MOHAN NGR. 3 REINZ TALBROS LTD. , GASKET 15 15.3 0 0 0.0000 0.0000 0.0000 CLOSED 19,LONI Rd.MOHAN NGR JOINTING 4 GOOD LUCK INDUSTRY, H.F. ACID 17 17.1 120 120 120.0000 0.0000 0.0000 SELF CLOED 122, A.I.A., MOHAN NGR. 10 MT/D OWN REASONS 5 PANKAJ CHEMICALS, 80, H.F. ACID 17 17.1 0 0 0.0000 0.0000 0.0000 CLOSED R.I.A., MOHAN NGR., 6 ARISTRO PRINTERS P PRINTING OF 21 21.1 0.6 0.6 0.0000 0.0000 0.6000 SELF LTD., E-64, S.S. OF G.T. PAPERS CLOSED ROAD. 7 ASIA CHEMICAL, G.T. PAINTS & 21 21.1 6 6 0.0000 6.0000 0.0000 SELF ROAD, VARNISH CLSOED 8 ADDI INDUSTRIES, C-227, FABRIC 24 24.2 6 6 6.0000 0.0000 0.0000 SELF B.S.
    [Show full text]
  • Ground Water Scenario of Lakhimpur Kheri District, Up
    GROUND WATER SCENARIO OF LAKHIMPUR KHERI DISTRICT, U.P. (A.A.P.: 2012-2013) By Dr. D.S. Pandey Scientist 'D' CONTENTS Chapter Title Page No. DISTRICT AT A GLANCE ..................2 I. INTRODUCTION ..................5 II. CLIMATE & RAINFALL ..................5 III. GEOMORPHOLOGY & SOIL TYPES ..................6 IV. GROUND WATER SCENARIO ..................6 V. GROUND WATER MANAGEMENT STRATEGY ..................8 VI. GROUND WATER RELATED ISSUE AND PROBLEMS ..................9 VII. MASS AWARENESS PROGRAMME ..................9 PLATES: I. INDEX MAP OF LAKHIMPUR KHERI DISTRICT, U.P. II. PRE-MONSOON DEPTH TO WATER LEVEL MAP (MAY, 2012) OF LAKHIMPUR KHERI DISTRICT, U.P. III. POST-MONSOON DEPTH TO WATER LEVEL MAP (NOV. 2012) OF LAKHIMPUR KHERI DISTRICT, U.P. IV. DYNAMIC GROUND WATER RESOURCES OF LAKHIMPUR KHERI DISTRICT, U.P. V. GROUND WATER USER MAP, LAKHIMPUR KHERI DISTRICT, U.P. VI. ARSENIC AFFECTED AREA OF LAKHIMPUR KHERI DISTRICT, U.P. VII. Exploratory Tubewells (C.G.W.B.) For Arsenic Studies DISTRICT AT GLANCE 1. GENERAL INFORMATION i. Geographical Area (Sq. Km.) : 7680.00 ii. Administrative Divisions (as on 31.3.2005) Number of Blocks : 6/15 Number of Panchayat Villages : 1829 iii. Population (as on 2001 census) : 32,07,234 iv. Average Annual Rainfall (mm) : 1093.50 mm 2. GEOMORPHOLOGY Major Physiographic Units : Older & Younger Alluvium Major Drainages : Gomati & Ghaghra 3. LAND USE (Sq. Km.) a) Forest area (Sq. Km.) : 2321.54 b) Net area sown (Sq. Km.) : 4863.82 c) Cultivable area (Sq. Km.) : 4863.82 4. MAJOR SOIL TYPES : Sandy Loam 5. AREA UNDER PRINCIPAL CROPS (as on 2004-05) : 6984.20 6. IRRIGATION BY DIFFERENT SOURCES (Areas and Number of Structures) (Sq.Km.) Dugwells : 168 Tubewells / Borewells : 713 state tubewells & 108430 Private tubewells Canals : 641 Km.
    [Show full text]
  • S. No. Name & Address of Unit Regional Office Status of Authorisati
    Status of E-waste Recycling / Collection / Generation Units in the State of U.P. (As on 09.10.2018) S. Name & Address Regional Status of Status of Type Capacity No. of Unit Office Authorisati Registration (T/Annum) on & Validity 1 M/s Auctus -E Recycling Solutions Ghaziabad Grant Registered Collection, 1800 Pvt. Ltd., F-637, M.G. Road, 30.08.2019 Dismantle Industrial Area, Ghaziabad. 2 M/s Mahaluxmi Metal Alloys Ghaziabad Grant Registered Collection, 30000 (India) Pvt. Ltd., Modinagar, 22.05.2023 Dismantle, Ghaziabad. Recyclers 3 M/s N.K. Products, 58-59, M.G. Ghaziabad Refused Registered Collection, 9000 Road, Ghaziabad. 22.06.2016 Dismental 4 M/s Bharat Oil Co., E-18, Site-IV, Ghaziabad Grant Registered Collection, 4000 Sahibabad, Industrial Area, 16-05-18 Dismental Ghaziabad. 5 M/s Planet Green Recycling Pvt. Ghaziabad Grant Registered Collection, 1500 Ltd., G-129, Phase -1, M.G. Road, 23.08.2018 Dismental, Ghaziabad. Recyclers 6 M/s Rocket Sales, Plot No. 1-12, Ghaziabad Grant Registered Collection,, 300 I/A, M.G. Raod, Hapur. 27.08.2019 Dismental 7 M/s Arsh Recycling Pvt. Ltd., Plot Ghaziabad Grant Registered Collection, 15000 No. 203, UPSDIC, I/A, M.G. Road, 20.06.2023 Dismental Ghaziabad. 8 M/s Auctus Recycling Solutions Pvt. Greater Noida Grant Registered Dismental, 19500 Ltd.Habibpur, Greater Noida. 06.12.2021 Callection 9 M/s Khan Traders, B-5, site4, Panki Kanpur Grant Registered Collection, 7190 Industrial Area, Kanpur. 15-11-2020 Dismental 10 M/s Green Tech Rcycling, Khasra Meerut Grant Registered Collection, 1800 No.-645, Acchraunds, Bahdaurpur 12.01.2022 Dismental Road, Partapur, Meerut .
    [Show full text]
  • Chapter – 15 ENVIRONMENT and SOCIAL IMPACT ASSESSMENT
    Chapter – 15 ENVIRONMENT AND SOCIAL IMPACT ASSESSMENT Detailed Project Report for Rail Based Mass Transit System in Kanpur FINAL REPORT Chapter 15: Environmental and Social Impact Assessment 15. ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT 15.1 EXISTING SCENARIO 15.1.1 Environmental Baseline Data on land environment has been collected and compiled from various sources and during field surveys. Information about geology, hydrology, prevailing natural hazards like earthquakes etc have been collected from literature reviews and authenticated information made available by government departments. Water quality, soil quality, ambient air and noise environment in the surrounding areas were assessed primarily through field studies, and by undertaking monitoring and analysis of samples collected from field. Meteorological data was collected from Indian Meteorological Department (IMD). A scoping matrix was formulated to identify the attributes likely to be affected due to the development of proposed project and is presented in Table 15.1. The general environmental attributes pertaining to the proposed metro project along with parameters to be collected and its frequency are presented in Table 15.2. TABLE 15.1: SCOPING MATRIX ASPECT OF ENVIRONMENT LIKELY IMPACTS A. Land Environment Increased soil erosion Construction Phase Pollution by construction spoils Solid waste from worker colonies, construction sites B. Water Resources & Water Quality Water quality impacts due to disposal of wastewater from worker camps Construction Phase and construction sites,
    [Show full text]