National Symposium on Automation & Digital Transformation of Food & Beverage Industry 26th & 27th February 2016
Overviewing the Standards:
ISA 88 and ISA 95 1 Standards Certification Sunil S Shah, PhD
Education & Training Secretary, ISA Bangalore Section /20160226/Slide No. /20160226/Slide
Publishing [email protected] Symp
Conferences & Exhibits ISAB/F&B Basics of Modern Industrial Automation Sunil S Shah Academic: - B. E. (Chemical Engineering), Regional Engineering College (now NIT), Rourkela
- Ph. D. (Systems and Control Engineering), IIT- Bombay
Currently working with: - Owner of Startup, Communications, Diagnostics, and Controls/ CDC
Worked With: - GE Oil and Gas, Sr Product Manager (Global), Rotating Machinery Controls
- GE Global Research Center, Bangalore leading the Electromechanical Control Systems Lab
- CAD Center, Indian Institute of Technology- Bombay , Mumbai as Principal Research Engineer
- Davy Powergas India Pvt Ltd (now Kvaerner Powergas), Bombay as Principal Process Engineer 2
Association:
- Senior Member and Secretary (Bangalore Section), International Society of Automation (ISA) /20160226 /Slide No. No. /20160226 /Slide
Symp - Senior Member and Ex-Secretary, IEEE Control Systems Society, Bengaluru Chapter ISAB /F&B ISAB Basics ofAgenda Modern Industrial Automation
• Introducing Standards
• ISA’s Standards for Automation
• Overview and need for implementation
• ISA 88- Batch Control Systems
• ISA 95 - Enterprise - Control System Integration
• Path forward
3 • Developing the Standards Team
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsWhat of Modern is a Standard? Industrial Automation
. A “Standard” is an authoritative document, developed in accordance with a strict predefined methodology, embodying such principles as balance of interests and consensus and incorporating stringent review and documentation process . Special status- . RAGAGEP: Recognized and Generally Accepted Good Engineering Practice . Not regulatory: Can be adopted by regulatory body under the “general duty” clause- “The employer shall document that equipment/ process complies with RAGAGEP” . Source of Collective Wisdom
4 S T . Well implemented standards can lead to: A N D A . Productivity improvement R D S
/20160226 /Slide No. No. /20160226 /Slide . Savings
Symp ISAB /F&B ISAB BasicsWhy of Modern Standards? Industrial Automation
Reduce Confusion . Standards emphasize good practice . Long-term value when implementing continuous improvement projects . Standards outline . Common functions . Methods of interaction that are repeatedly used to accomplish associated tasks
Reduce Development Cost and Time-To-Market
5 . Standards promote the reuse of functions . Lead to a quick development and deployment
. Standard functions provides less risk, and reduces /20160226 /Slide No. No. /20160226 /Slide
the validation and commissioning effort
Symp ISAB /F&B ISAB BasicsWhy of Modern Standards? Industrial Contd… Automation
Reduces Maintenance . Standards breakdown complex functions into smaller pieces . Allow them to be managed on a smaller and simpler level . Low risk in additions or modifying smaller sections of the control code . Minimal effort to support continuous improvement projects
6 Reduces Total Cost of Ownership
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB
BasicsStandards of Modern -IndustrialThe Down Automation Side…
7
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsISA of ModernStandards Industrial Automation
. Developed in a collaborative and consensus-based process with participation from key stake holders- End users, Suppliers, … . NOT government regulations, rather voluntary documents . Often contracts between private entities include requirements to follow specific ISA standards . ISA is accredited by the American National Standards Institute (ANSI) to develop industry standards following approved processes . The current ISA standards portfolio: . >150 published standards, recommended practices and technical
reports 8
/20160226 /Slide No. No. /20160226 /Slide Visit
Symp www.isa.org/standards ISAB /F&B ISAB BasicsISA of ModernStandards Industrial- Global Automation Presence
. Substantial global participation: . 100 committees and subgroups . > 2000 participating organizations . > 3500 participating individuals from over 40 countries
. Extensive use of teleconferences and web meetings
9
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsKey of Modern ISA Standards Industrial Automation
. Process Instrumentation Symbols & Diagrams (ISA5) . Management of Alarms (ISA18) . Instrument Specification Forms (ISA20) . Fossil & Nuclear Power Plants (ISA77 and ISA67) . Functional Safety for the Process Industries (ISA84) . Batch Process Control (ISA88) . Enterprise-Control System Integration (ISA95) … . Industrial Automation & Control Systems Security (ISA99) . Wireless Systems for Automation (ISA100)
10 . Human-Machine Interface (ISA101) . Commissioning, Loop Checks, & Factory/Site Acceptance (ISA105)
. Procedure Automation for Continuous Process Operations (ISA106) /20160226 /Slide No. No. /20160226 /Slide
Symp . Intelligent Device Management (ISA108) ISAB /F&B ISAB BasicsISA of ModernStandards Industrial and AutomationGlobal Impact
. Several original ISA Standards are the basis of major International Electrotechnical Commission (IEC) standards: . IEC 62682: Management of Alarms (ISA18) . IEC 61511: Functional Safety (ISA84) . IEC 61512: Batch Control (ISA88) . IEC 62264: Enterprise Control-System Integration (ISA95)
. IEC 62443: Industrial Automation & Control Systems Security (ISA99) 11
Full Member
/20160226 /Slide No. No. /20160226 /Slide Symp
11 ISAB /F&B ISAB Basics of Modern Industrial Automation
ANSI/ISA-88 IEC 61512
Batch Control Systems
12
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsDefining of Modern Batch Industrial Process… Automation
Material Material Material Storage 1 Storage 2 Storage 3 Feed Feed Tank 1 Tank 2
CONTINUOUS
Minor Additions
Mixer Spray Spray Dryer 1 Dryer 2
BATCH 13 Packaging Line 1
/20160226 /Slide No. No. /20160226 /Slide Packaging Line 2
Symp DISCRETE ISAB /F&B ISAB BasicsTraditional of Modern Industrial Batch Operation… Automation
Enterprise Operations
Vendor-A Planning and Homemade Scheduling Excel Reports Application
Paper Copies of SOPs
Improvised rd 14 Modifications 3 Party Data Historian
/20160226 /Slide No. No. /20160226 /Slide Local Control System
Symp Multi Vendor & Varied Technologies ISAB /F&B ISAB BasicsTraditional of Modern Industrial Batch Operation… Automation
. No prescribed form of batch operation . Missing common terminology . Difficult to establish requirements . Labour and time intensive
. Difficult integrating different vendor offerings 15
BATCH
/20160226 /Slide No. No. /20160226 /Slide Symp
Everyone had their own standards ISAB /F&B ISAB BasicsNeed of Modern of the Industrial day… Automation
. Enterprise wide multi product portfolio . Local raw materials . Varied equipment configuration . Multi vendor control system platforms . Handle obsolescence Multi Plant Enterprise . Agile lab-to-market strategy Integration Integration
. Nimble merger of acquisitions 16
Agile Equipment Product /20160226 /Slide No. No. /20160226 /Slide Flexibility
Development
Symp ISAB /F&B ISAB BasicsIntroducing of Modern Industrial ISA-88.0x Automation …
. General guidelines developed specifically for batch industries: . Food and Beverage, Specialty chemicals, Pharmaceuticals, … . Model and methodology for designing and operating control systems for flexible manufacturing . Independent of the underlying control system (PLC, DCS, or IPC) . Independent of the underlying basic control algorithms . Enable with ease verified and validated recipe and automation changes . Provision to handle abnormal conditions/ situations
. Defines programming standards for batch control 17
. Widely adopted configuration standards for manufacturing
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsISA of -Modern88.0x Nomenclature…Industrial Automation
. ANSI/ISA-88.00.01-2010 Batch Control Part 1: Models and Terminology . ANSI/ISA-88.00.02-2001 S T A Batch Control Part 2: Data Structures and Guidelines for N D A R D Languages S . ANSI/ISA-88.00.01-2010 Batch Control Part 3: General and Site Recipe Models and Representation
. ANSI/ISA-88.00.04-2006 18 Batch Control Part 4: Batch Production Records
. ISA-88.00.05-Draft /20160226 /Slide No. No. /20160226 /Slide
Symp Batch Control Part 5: Implementation Models & Terminology for
ISAB /F&B ISAB Modular Equipment Control BasicsBenefits of Modern of Industrial ISA-88.0x Automation …
. Reduce cost of automating systems . Reduced life cycle engineering effort: . Reduced time to market . Improved flexibility . Improved process quality . Rapid batch recipe development
. Applied today around the world, with proven and identifiable benefits 19
/20160226 /Slide No. No. /20160226 /Slide ₹
Symp ISAB /F&B ISAB BasicsBenefits of Modern of Industrial ISA-88.0x Automation …
Core Benefit End-User Perspective Vendor Perspective
Accommodate more products Structured approach enables Improved with faster changeover time more options with quicker Flexibility with same equipment swapping of options
Quicker to New consumer products are New equipment is delivered to Market delivered to market faster end-users faster
Improving Modular library with easy replication 20 ROI
NPV Reinventing the wheel minimized
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsISA of Modern88.0x Philosophy Industrial Automation
Separation of the mind and the body
Recipes Physical Assets • Minimum set of information that • Manufacturing Plant uniquely defines the manufacturing • Equipment requirements of a product • Control System • Provides production information, • … formula, procedure, equipment
requirements 21
Independent Recipe Development /20160226 /Slide No. No. /20160226 /Slide
Symp Multiple Products- Same Equipment ISAB /F&B ISAB BasicsRecipe of Modern Model Industrial Automation
RECIPES
Header Information Administrative Information
Formula- Process Parameters Raw Materials, quantities, specifications, …
Procedure including Controls Process, operation strategy, …
Equipment Requirements MOC, Heating/ Cooling,… 22
Safety and Regulatory Safety and Compliance
compliance information,…
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsRecipe of Modern Types Industrial Automation
RECIPES
General Recipe Product specific process information
Site specific Site Recipe Information
Master Recipe Equipment Specific
Information 23 Batch ID, batch size, operator
Control Recipe and system specific information
/20160226 /Slide No. No. /20160226 /Slide Symp
Ensures Uniform Product Specification- Enterprise wide ISAB /F&B ISAB BasicsProcedural of Modern Industrial Model Automation
Procedural Model Procedure Procedure . Command the Procedure equipment in the physical model to perform a process task Unit Procedure
. Controls to direct the equipment’s actions to Operation perform process
oriented tasks 24
Phase
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsProcedural of Modern Industrial Model Automation
Procedure Procedure
Procedure . Detailed strategy for making a batch
. Consists of an ordered Unit Procedure sequence of unit procedures
Operation . Ex Bread Making,
Fortified Juice making 25
Phase
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsProcedural of Modern Industrial Model Automation
Unit Procedure Procedure . Consists of an ordered Procedure set of operations . Ensure a continuous production sequence within a unit Unit Procedure . One unit procedure in a unit at any time . Unit procedure Operation completed in a single unit . Ex 26 . Esterify Phase . Strip . Neutralize
/20160226 /Slide No. No. /20160226 /Slide . Filter
Symp ISAB /F&B ISAB BasicsProcedural of Modern Industrial Model Automation
Operation Procedure . An ordered set of Procedure phases that defines a major processing sequence . Takes the material Unit Procedure being processed from one state to another . Usually involved a Operation chemical or physical change to the material . Carried to completion 27 in a single unit Phase . Ex Charge, React,
Transfer,…
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsProcedural of Modern Industrial Model Automation
Phase Procedure . The smallest element of procedural control that Procedure can accomplish a process-oriented task . The logic or set of steps that make up a phase is Unit Procedure equipment specific, and not part of the recipe . Phases for the charge Operation operation are: Initialize Add material A at 20L/min
28 Add material B at 20L/min Mix for 20 minutes Phase . Usually the link to
/20160226 /Slide No. No. /20160226 /Slide equipment
Symp ISAB /F&B ISAB BasicsProcedural of Modern Industrial Model- AutomationFlow Sequence
Procedure
Unit Procedure
Operation
Phase Phase
Phase 29 Operation
/20160226 /Slide No. No. /20160226 /Slide Unit Procedure
Symp ISAB /F&B ISAB BasicsProcedural of Modern Industrial Model- AutomationConceptual Example
Procedure Examples Illustration
Procedure Make Product A Procedure Make Product B Unit Procedure Any set of Operations Unit Procedure 1 Unit Procedure 2 Unit Operation Filtration Reaction Unit Operation 1 Unit Operation 4
Distillation Unit Operation 2 Unit Operation 3 Solution Preparation
Phase Agitate Heat Cool Phase 1 Phase 3 Phase 5 Phase 7
30 Transfer Phase 4 Charge Phase 2 Phase 6 Phase 8
Recycle
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsPhysical of Modern Model Industrial Automation
Process Cell ENTERPRISE-SITE-AREA-… . A.K.A. Train Process Cell . Logical grouping of equipment required for production of one or Unit more batches
. May contain +1 grouping Equipment Module(s) of equipment
. May contain +1 batch at 31 a time
Control Module(s)
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB
BasicsProcess of Modern Cell Industrial- Example Automation
32
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsPhysical of Modern Model Industrial Automation
Unit ENTERPRISE-SITE-AREA-… . Usually centred on a major piece of process Process Cell equipment
. Frequently operates on, or contains the complete Unit batch
. Cannot operate on, or Equipment Module(s) contain more than one batch at a time
33 . May operate on, or Control Module(s) contain, only part of the
complete batch
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsPhysical of Modern Model Industrial Automation
Equipment Module ENTERPRISE-SITE-AREA-… . A collection of control Process Cell modules or other equipment modules
. Can carry out a finite Unit number of minor processing activities, i.e., phases
Equipment Module(s) . Contains all the necessary processing equipment to carry out 34 these processing
Control Module(s) activities
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsPhysical of Modern Model Industrial Automation
Control Module ENTERPRISE-SITE-AREA-… . A collection of sensors, Process Cell actuators, other control modules, and associated processing equipment Unit . Acts as a single entity from a control standpoint
Equipment Module(s) . Is the direct connection to the process through
its sensor and actuators 35
Control Module(s) . Procedures do not run
on control modules
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB
BasicsUnit, of Modern Equipment, Industrial and Automation Control Modules
36
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsConnecting of Modern Industrial Procedural Automation and Physical
Models
37
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB
BasicsTransitioning of Modern Industrial from AutomationAbstract to Physical…
38
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsExtending of Modern IndustrialS88… Automation
. S88.01 is not only for batch processes . Extendible for discrete and continuous industries . Continuous . Startup - Shutdown . Grade change . Discrete . Product Change
Packaging Line 1
39 Packaging Line 2
DISCRETE
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsSummarizing… of Modern Industrial Automation
. ISA 88 provides an excellent framework for developing batch systems . Separation of product information (recipes) from equipment capability is key to designing flexible systems . Applies to both automated and manually-controlled batches . Common set of terminology, definitions, data structures . Flexible guidelines that outline the base concepts to be used in a system design . Supports multi-use instances to minimize and simplify the coding using
40 modular functions
. The concept also applied to continuous processes, and discrete manufacturing
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsReferences of Modern Industrial and Further Automation Reading…
. Inflight Reading- Practical Batch Process Management, M Barker, J Rawtani . Heavy Reading- ISA.org (Standards Section- accessible to members) . Manufacturing Operations Management, D Brandl, P Owen . Web Surfing- blogs by D Brandl
. Web Surfing- WBF/ MESA publications
41
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB Basics of Modern Industrial Automation
ANSI/ISA 95/ IEC/ISO 62264 Enterprise - Control System
Integration
42
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsIT/ of OT Modern Defined Industrial Automation
Information Technology (IT), agglomeration of technologies for information processing. - Typically a network of computers and software required to operate an enterprise How much is my stuff worth?
43 Operation Technology (OT), focused on safe and secure physical value creation and manufacturing processes
/20160226 /Slide No. No. /20160226 /Slide Where is my stuff?
Symp ISAB /F&B ISAB BasicsIndependent of Modern Industrial Evolution Automation of IT/ OT
Business Systems Manufacturing Systems . Time Horizons . Time Horizons . Long-term view . Real-time view . Model detail . Model detail . Linear route structures . Complex routes with rework paths . Control emphasis . Control emphasis . Product cost and overall . Physical movement & profitability accountability . Modeling criteria: . Modeling criteria: . Accounting reference points . Material movement reference
. Has inventory value changed points 44 significantly? If not, don’t model . Does product stop moving? If not, separately don’t model separately
. View from the boardroom . View from the work center
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsSalient of Modern Features… Industrial Automation
Integration of business and manufacturing domains is challenging:
. Differing automation & IT cultures, knowledge bases
. Lack of consistent representation of data
. Differing “What is important?”
. Differing “Critical success factors”
Strong business drivers to integrate:
. Supply chain optimization
45 . Asset efficiency
. Agile manufacturing
/20160226 /Slide No. No. /20160226 /Slide . Available to promise & available to profit
Symp ISAB /F&B ISAB BasicsIT/ of OT Modern Gap… Industrial Automation
Years
Months Handled well by ERP systems Weeks
Days
Hours Gap of Unmet Needs
Minutes
Seconds
Handled well by 46
Milli/micro seconds DCS/PLC systems
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsIT/ of OT Modern Convergence Industrial Automation
Enterprise / Business Operations I Manufacturing T Operations . Harmonized IT and OT Strategies Management . Common governance and process models . Integrated Security Framework Control . Skilled Man Power Proficient in both IT and OT Converged Platform Devices O
47 T
Field
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsISA of Modern95 Mandate Industrial and Automation Scope
. Framework for integration projects . Separation of business processes from manufacturing processes . Focus on functions, not systems, organizations or individuals Business Planning & Logistics Plant Production Scheduling, Operational Management, …
ENTERPRISE Interface 95.01: Models and Terminology 95.01 & 2 95.02: Object Attributes
SITE 95.03: Activity Models of Manufacturing Operations Management 95.03 Dispatching Production, Detailed Production Scheduling, Reliability Assurance, ...
48 AREA AREA AREA /20160226 /Slide No. No. /20160226 /Slide
Symp CONTINUOUS BATCH DISCRETE PRODUCTION PROCESS PRODUCTION
UNIT CELL LINE ISAB /F&B ISAB BasicsISA of -Modern95.0x Nomenclature…Industrial Automation
. ANSI/ISA-95.00.01-2010 Enterprise-Control System Integration Part 1: Models and Terminology . ANSI/ISA-95.00.02-2010
S T ECS Integration Part 2: Object Model Attributes A N D A . ANSI/ISA-95.00.03-2013 R D S ECS Integration Part 3: Activity Models of MOM . ANSI/ISA-95.00.04-2012 ECS Integration Part 4: Objects and Attributes for MOM Integration
. ANSI/ISA-95.00.05-2013 49 ECS Integration Part 5: Business-to-Manufacturing Transactions
. ANSI/ISA-95.00.06-2014 /20160226 /Slide No. No. /20160226 /Slide
Symp ECS Integration Part 5: Messaging Service Model ISAB /F&B ISAB BasicsISA of Modern95.01 and Industrial 95.02 Automation
Enterprise Information Plant Production Scheduling, Operational Management, …
Production Product Production Production Capability Definition Schedule Performance Information Information (What to (What was Information crossing (What is (How to make make and made and the boundaries available a product) use) used) for use)
Manufacturing 50 Control Information Area Supervision, Production Planning,
Reliability, Assurance, …
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsISA of Modern95.03 Industrial Automation
Product Production Production Production definition capability schedule performance
Detailed production scheduling Production Production resource tracking management
Production Analysis dispatching
Product Production definition data management collection
Production
execution 51 Equipment and Process Operational Operational Equipment and Process Specific Production Rules Commands Responses Specific Data
Level 2 Process Control /20160226 /Slide No. No. /20160226 /Slide
Symp Manufacturing Operations Functions ISAB /F&B ISAB BasicsISA of Modern95.03… Industrial Automation
Maintenance Maintenance Maintenance Maintenance definition capability Request Response
Detailed Maintenance scheduling Maintenance Maintenance resource tracking management
Maintenance Analysis dispatching
Maintenance Maintenance definition data management collection
Maintenance
execution 52
Level 2 Equipment /20160226 /Slide No. No. /20160226 /Slide
Symp Maintenance Functions and so on… ISAB /F&B ISAB BasicsISA of Modern95 Manufacturing Industrial Automation Architecture
PLM ERP SCM CRM Enterprise application integration ANSI/ISA –95 Part 1 and 2 Object model information Product Product capability Product schedule Product response definition (what (what and how much (what to make and (what was made to make) is available to make) use) and used) ANSI/ISA –95 Part 3 Activity models of Manufacturing Operations Maintenance Inventory Quality
Production
53
Tracking
Definition
Execution
Scheduling
Dispatching
Data collectionData
/20160226 /Slide No. No. /20160226 /Slide
Performance Analysis Performance
Resource Management Resource Symp
Process Control (Field instruments, DCS, PLC, sensors, etc.) ISAB /F&B ISAB
BasicsPhysical of Modern Architecture Industrial Automation- ISA 88 & ISA 95 XML
DataBase Servers Level 3 Historian Domain Ctrl ERP Reporter DNS Site Connection VLAN Information Switch 2 way Firewall Network
Network Eng Tools
High Alarm Low Alarm Management Configuration MES Diag ToolsComm. Err. Domain Ctrl Router VLAN DNS Switch Server Server
Non operations tools and views into data Area Operations Information Network
Network Ethernet HMI Server Management High Alarm Low Alarm Comm. Err. Batch Router Historian HMI Level 2 Execution Collection Viewer Gateway OPC One Instance Per
54 Process Cell
Automation Network
Network Ethernet Management PLC DCS Embedded PC Packaged Equip
/20160226 /Slide No. No. /20160226 /Slide Router Level 1
Symp ISAB /F&B ISAB BasicsCommunication of Modern Industrial Language Automation and Models…
B2MML – XML Schemas for ISA S95 . XML schema- Agreement between businesses on expressing data
. Team from World Batch Forum (WBF) was formed to produce a set of XML schemas for the data models defined in ISA-95.00.01/2- B2MML
. B2MML provides a set of XML schemas based on ANSI/ISA-95
. B2MML may be used to integrate business with manufacturing systems
55
/20160226 /Slide No. No. /20160226 /Slide
Example B2MML Models
• Integrated execution systems are crucial for: • Reduced direct costs; increased productivity • Improved traceability; reduced “witch hunt” expense • Near-theoretical cycle times: customer responsiveness, reduced WIP inventory • Greater agility: smaller lot sizes, more premium products in the mix, happier customers, happier shareholders! • S95/88 defines the currency for manufacturing object and information exchange • Faster project implementation cycles
• Flexibility to integrate and realign as corporate structures change
56
/20160226 /Slide No. No. /20160226 /Slide
Symp ISAB /F&B ISAB BasicsPath of Modern Forward… Industrial Automation
Special Interest Group under ISA Bangalore Section Objectives: . Understanding and Implementing Standards . Customizing for Indian Conditions . Training . Go to team
Plans: . Regular meetings
. Workshops and Tutorial Sessions 57 . Participate in Global Meetings . Initial Focus- ISA88, ISA95, ISA99 and ISA100
/20160226 /Slide No. No. /20160226 /Slide . You are welcome- please drop a mail!
Symp ISAB /F&B ISAB BasicsReferences of Modern Industrial and Further Automation Reading…
. Inflight Reading- MES Guide for Executives, Bianca Scholten . Heavy Reading- ISA.org (Standards Section- accessible to members) . Getting Started with ANSI/ISA-95, Bob Mick . Manufacturing Operations Management, D Brandl, P Owen . Web Surfing- blogs by D Brandl
. Web Surfing- WBF/ MESA publications