APPENDIX C – Draft LIP3 Long Term Interventions up to 2041
ST03 - Long-term interventions up to 2041
Approx. Project Indicative cost Likely funding source Comments date
Healthy Streets Freight and Construction Traffic Management GLA, TfL, LB Croydon 2020- Growth Zone, South Construction consolidation Construction Consolidation Centre £5.0M 2025 London Partnership facility boroughs
2020- Micro- consolidation or micro-distribution centre £1.0M 2025
Traffic Reduction Strategy 2020- Survey work and Direct Traffic Restraint Mechanisms £5.0m LBC, TfL 2025 consultation programme
2019- Car Clubs expansion £1.0m LIP, S106 & Operators 2025
Walking & Cycling
Wellesley Road – removal of subway & new ped 2020-23 £1.5m Growth zone crossing
A232 Chepstow Rd/Addiscombe Rd 2018-21 £4.2m Growth zone
Cycle parking programme 2019-25 £1m S106, CIL
2019- Walking – pedestrian phases on all key junctions LIP, CIL, LBC 2025
2019- Growth Zone, TfL Cycling Network Delivery £20m 2025 Quietways, LIP, CIL, LBC
2019- GULCS, S106, CIL, LIP, Electric vehicle charging point programme £1.0 m Installation of 400 EVCPs 2022 LBC
Liveable Neighbourhoods / Public Realm
Growth Zone, CIL, LBC, Old Town masterplan 2018-22 £17.6m LIP
2020- Mid Croydon Public Realm £2.6m Growth Zone 2022
Purley Way OAPF Public Realm & Access 2020- TBC TBC Improvements 2040
2020- Purley Way gyratory TBC TBC 2030
TfL, GLA, Growth Zone, A23 Fiveways 2016-23 £88.8m CIL
Vision Zero
2020- Lombard Roundabout safety improvements TBC 2030
Northcote Road / Whitehorse Road jcn 2020- TBC improvements 2025
2019- London Road Corridor scheme Growth Zone 2023
Good public transport experience & New homes and jobs
Bus & tram schemes
2019- Multiple projects including Bus Priority Measures £12.8m Growth Zone, CIL, LIP, TfL 2030 corridor schemes
2018- Park Lane Gyratory £5.6 2021
Elmers End 2nd tram platform
East Croydon additional tram platform
New Addington 12tph – additional tram cars
Tram Network enhancements
George Street tram stop
Croydon to Morden improvements:
Wandle Flyover double tracking
Phipps Bridge double tracking Additional trams
Tram stabling & power upgrades – eastern satellite depot & Therapia Lane
Trams Beckenham Branch capacity enhancement
Tramlink extension – Crystal Palace £200m tbc
Brighton Road - Movement Corridor improvements
Mitcham Road / Roman Way corridor improvements
London Road corridor improvements
Rail & Overground
East Croydon Station rebuild
Brighton Mainline Upgrade
West Croydon Station rebuild
South London Metroisation
Waddon Station to be fully accessible
Norwood Junction to be made step free
New entrance/exit at Norbury Station
Bridge Strengthening
Bridges & structures:
. Tamworth Rd Cantilever Walkway . Blackhorse Lane (North & South) . Higher Drive - Bridge Replacement . St James (Spurgeons) Rd Bridge – Strength . College Road Decking – Essent. Maintenance . Park Lane Decking – Essent. Maintenance . Windmill (St James) Road Bridge Principal Road Network Maintenance