(Full Redevelopment Application), New Bedford Road, Luton

Total Page:16

File Type:pdf, Size:1020Kb

(Full Redevelopment Application), New Bedford Road, Luton AGENDA ITEM COMMITTEE: DEVELOPMENT CONTROL 9 DATE: 28th MAY 2020 SUBJECT: DEMOLITION OF EXISTING BUILDINGS WITHIN THE APPLICATION BOUNDARY AND ERECTION OF COLLEGE ACCOMMODATION (USE CLASS D1) AND ASSOCIATED ACCESS, CAR PARKING AND LANDSCAPING INCLUDING MARKING OUT OF SPORTS AREA, IMPROVEMENTS TO EXISTING GRASSED AREA PARALLEL TO NEW BEDFORD ROAD AND MAKING GOOD THE NEWLY EXPOSED GABLE OF THE EXISTING COLLEGE FOLLOWING DEMOLITION OF ADJOINING STRUCTURE. (APPLICANT: WEST HERTS COLLEGE) (APPLICATION NO: 20/00111/FUL) LOCATION: BARNFIELD COLLEGE, NEW BEDFORD ROAD, LUTON REPORT BY: HEAD OF DEVELOPMENT MANAGEMENT CONTACT OFFICER: CLIVE INWARDS 01582 546287 IMPLICATIONS: LEGAL COMMUNITY SAFETY EQUALITIES ENVIRONMENT FINANCIAL CONSULTATIONS STAFFING OTHER WARDS AFFECTED: BARNFIELD PURPOSE 1. To advise Members of a current application for planning permission and to seek their decision. RECOMMENDATION(S) It is recommended that: 2. The reasons for approval set out in this report are agreed; 3. That planning permission is granted, subject to the conditions as set out within ‘Appendix A’; 4. That planning permission is granted, subject to the satisfactory completion of a Section 106 Agreement to secure delivery of local labour during construction and a monitoring fee of £5,000. 5. That delegated authority is granted to the Head of Development Management to make minor alterations to the conditions, including adding and deleting conditions, following any Committee resolution to grant permission (should any be required); 6. That following any grant of permission that delegated authority is granted to the Head of Development Management to determine any subsequent planning applications related to this development both seeking minor material amendments to the development (Section 73 applications) or minor variations to the accompanying legal agreement (Section 106A applications): Conditions (‘Appendix A’) i. Time Limit for Commencement; ii. Approved Plans and Documents; iii. Construction Method Statement; iv. External Materials; v. Landscaping; vi. Tree Protection; vii. Landscape Management; viii. Surface Water Drainage Scheme; ix. Infiltration in Contaminated Ground; x. Surface and Foul Water Systems; xi. Travel Plan; xii. Off-site Highway Works; xiii. Electric Vehicle Charging Points; xiv. Remediation Strategy; xv. Validation Report; xvi. Contamination; xvii. Air Extraction; xviii. External Lighting; xix. Noise Mitigation; xx. Noise Limits; xxi. Construction of Sports Pitch; xxii. Use of Sports Pitch; xxiii. Community Use Agreement; xxiv. BREEAM ‘Good’ Rating; xxv. Interceptors; xxvi. Notification to Affinity Water; xxvii. CFA Piling; xxviii. Boundary Treatment; xxix. Ecological Mitigation; and xxx. Removal of PD Rights for Telecommunications Equipment REPORT The Site and Surroundings 7. The overall Barnfield College site comprises a roughly rectangular shaped area of land which is situated in the Barnfield area of the town, approximately 3km to the north of the town centre. The college site is bounded to the north by Barnfield Avenue, to the east by Old Bedford Road, to the south by residential properties in Kingsdown Avenue and to the west by New Bedford Road. Existing vehicular access is taken off of Barnfield Avenue. The application site itself comprises an ‘L’ shaped area of land which comprises some of the existing college buildings, the existing car park, part of the College’s playing fields and a strip of land at the western side of the site adjacent to New Bedford Road. The application site comprises an area of approximately 6.22 hectares. 8. There are a number of existing college buildings on the site, including the Caretaker’s House at the front of the site, and a significant amount of car parking on the northern part of the site. The existing playing fields extend to the east of the existing buildings up to Old Bedford Road. Fig. 1: Site Location Plan Relevant Planning History 9. A number of planning applications have been submitted on the College site relating to minor works, works to the car park, temporary classrooms and advertisement consent applications. However, the most significant applications are set out below. 10. 08/00172/OUT ‘Demolition of existing college and erection of new further education college with associated sports facilities, parking and access.’ Planning permission granted July 2008. This proposal incorporated new college buildings to the east of the existing built form, with five playing pitches laid out on a reduced area of playing field to the east and an extensive area of new landscaping with a stepped design, which included daylighting the River Lea, to the west of the new college buildings. The proposal was considered to be acceptable to Sport England and was considered to accord with the Luton Local Plan 2001-2011 in policy terms. It is understood that the planning permission was not implemented due to the financial crisis at the time and the permission therefore lapsed. 11. 12/00751/OUT ‘Proposed phased redevelopment to provide replacement college facility, new primary school, a new 88-bed care home facility, and up to 39 residential units together with associated parking and landscaping works’. Planning application withdrawn September 2012. This proposal incorporated residential development along the boundary of the site with Old Bedford Road and Barnfield Avenue, including a car home and primary school on the northern boundary. The proposal would have delivered seven new playing pitches in total, along with two artificial cricket wickets and changing facilities, on a reduced area of playing field. The reduced area of playing field was understood to have been acceptable to Sport England on the basis that the development would have brought significant benefits to sport. 12. However, the application was not supported by planning officers on the basis of housing density, loss of open space, over-provision of parking and lack of demonstrated need for the care home and primary school amongst other matters. 13. Pre-application advice was provided prior to the submission of the current planning applications. The Proposal 14. The proposed development comprises the demolition of existing buildings within the application boundary and the erection of new college accommodation (use class D1) and associated access, car parking and landscaping including marking out of a sports area, improvements to the existing grassed area parallel to New Bedford Road and making good the newly exposed gable of the existing college building following the demolition of the adjoining structure. 15. This full planning application seeks approval for two phases of works, referred to as Phase 1a and Phase 1c. 16. The development of the Phase 1a college building will necessitate the demolition of 907m2 of existing buildings prior to the erection of 4,400m2 of new college accommodation. Phase 1c would extend the building to the east by a further 6m, providing an additional 800m2 of teaching accommodation. The visual appearance of the eastern elevation would remain the same for both options 1a and 1c. The north and south elevations would remain consistent apart from the addition of another bay of classrooms to each side and a uniform architectural approach would be used across both phases. As part of this full planning application, the existing health and beauty building is also to be demolished as part of the creation of the linear park. Fig. 2: Proposed Site Plan 17. The redevelopment of the college facility will only be able to proceed with the provision of capital receipts for the applicant from the release of land for residential development (subject to the separate outline planning application 20/00108/OUT, which does not form part of the consideration of this application) as well as with external funding from the Local Enterprise Partnership. The applicant has stated that this two stage phasing strategy presents a more resilient approach reflecting potential funding timelines, whilst providing more certainty to the first stages of the transformation of the Barnfield College campus. All calculations, modelling and consultation have been based upon the larger footprint of 1a and 1c, including assessment of transport issues. 18. It is envisaged that Phase 1a and 1c would be followed by two further stages of redevelopment. The overall masterplan for the college site includes provision for a Phase 2 and potentially Phase 3 (located to the south of Phase 1a and 1c, following the demolition of the remaining existing accommodation). These would be subject to future planning applications and do not form part of this application. Phase 2 would provide teaching accommodation for construction and engineering students. Fig. 3: Proposed Phasing Plan (1a and 1c) 19. The site area for Phase 1 extends to 6.22ha which includes 2.6ha of the former playing field and 0.96ha of existing open space (the Linear Park), which would increase to 1.6ha following improvements and the removal of hardstanding. 20. The proposed Phase 1 building would be 5,200m2 (gross internal floor area) across a three to four storey building, which would extend to some 17.2m in height. 21. A total of 179 parking spaces would be provided on site, which would comprise a net reduction of 188 spaces, from the 367 car parking spaces currently available. This is intended to meet the requirements of the existing and future students and staff without encouraging access by the car due to an excess of parking provision. A total of 74 covered cycle parking spaces are currently provided on site and these would be retained as part of the redevelopment. The main vehicular access to the site would be from Barnfield Avenue, although further to the east than the existing access point. Existing accesses currently used would cease to be needed and the pavements would be made good in these locations. The proposed car park would serve staff and students and would provide for one-way circulation in a clockwise direction, to improve flow. It would also provide for a lay-by drop-off. 22. A new football pitch would be marked out on an area of former playing field to the east of the access road, with the intention that this pitch would be available for community bookings outside of College hours.
Recommended publications
  • ITEM NO: Location: Land to Rear of Putteridge High School and Community College Putteridge Road Offley Hertfordshire
    ITEM NO: Location: Land To Rear Of Putteridge High School And Community College Putteridge Road Offley Hertfordshire Applicant: Mr R Kirk Proposal: Retention of cricket wicket; fencing around pond and bunding along boundary as a variation to the approved use and landscaping (LPA refs: 08/02926/1, 12/00359/1DOC and 12/00532/1DOC). Ref. No: 18/02320/FP Officer: Kate Poyser Date of expiry of statutory period: 19.12.2018 Reason for Delay Delayed due to consultations and committee cycle. Reason for referral to committee This application has been called in for determination by the Planning Control by Cllr Barnard for the following reason: “If you intend to recommend approval with the condition that the plastic pitch is removed within 5 years, I believe that there is a clear reason for a committee debate, particularly as it contravenes planning policy.” Submitted Plan Nos 223 – FA-00-XX-DR-A-00001 rev P-0, 10000 S8 P0, 00002 S8 P0 1.0 Site History 1.1 08/02926/1 Change of use of agricultural land to playing fields and associated landscape areas were allowed at appeal, subject to conditions. 1.2 10/01497/1 and 17/01810/1 sought the variation of Condition 3 – hours of operation. The former was granted and the latter withdrawn. 1.3 12/00359/1DOC and 12/00532/1DOC Conditions 4 and 5, both relating to landscape details, were discharged. 1.4 17/02578/1 Variation of applications 12/00359/1DOC and 12/00532/1DOC pursuant to conditions 4 and 5 respectively (landscaping) of appeal decision APP/X1925/A09/2111993.
    [Show full text]
  • Barnfield Fernwood Free School Name: 2
    Fernwood Free School Application Free Schools in 2013 Application form Mainstream and 16-19 Free Schools Completing your application Before completing your application, please ensure that you have read the ‘How to Apply’ guidance carefully (which can be found here) and can provide all the information and documentation we have asked for – failure to do so may mean that we are unable to consider your application. The Free School application is made up of nine sections as follows: • Section A: Applicant details and declaration • Section B: Outline of the school • Section C: Education vision • Section D: Education plan • Section E: Evidence of demand and marketing • Section F: Capacity and capability • Section G: Initial costs and financial viability • Section H: Premises • Section I: Due diligence and other checks In Sections A-H we are asking you to tell us about you and the school you want to establish and this template has been designed for this purpose. The boxes provided in each section will expand as you type. Section G requires you to provide two financial plans. To achieve this you must fill out and submit the templates provided here. Section I is about your suitability to run a Free School. There is a separate downloadable form for this information. This is available here You need to submit all the information requested in order for your application to be assessed. Sections A-H and the financial plans need to be submitted to the Department for Education by the application deadline. You need to submit one copy (of each) by email to:[email protected].
    [Show full text]
  • Admission Arrangements with Effect from September 2021
    Admission Arrangements with effect from September 2021 The Chiltern Learning Trust is a multi-academy trust with eleven schools across Luton and Bedfordshire: Ardley Hill Academy Cedars Upper Challney High Challney High School School for Boys School for Girls Chiltern Academy Dallow Primary Denbigh High Lark Rise Academy School School Linslade School Marston Vale Middle Putteridge High School School 1 The proposed admission arrangements for each of the schools in the Chiltern Learning Trust are detailed in this document which apply to all applications received for September 2021 onwards. Places will be allocated using the criteria below for the following schools: ● Ardley Hill Academy, Dunstable ● Challney High School for Boys, Luton ● Challney High School for Girls, Luton ● Chiltern Academy, Luton ● Dallow Primary School, Luton ● Denbigh High School, Luton ● Lark Rise Academy, Dunstable ● Putteridge High School, Luton Children with an Education, Health and Care (EHC) plan naming the particular school will be admitted before the following oversubscription criteria applies: 1. Looked after children or children who were previously looked after but immediately afterwards became subject to an adoption, child arrangements or special guardianship order. 2. Children who appear to have been in state care outside of England and ceased to be in state care as a result of being adopted. 3. Children of staff currently employed at the school. 4. Children with siblings at the school who will still be attending the school at the proposed date of admission. 5. Children living closest to the school measured on straight line distance. Please note: For applications to either Challney High School for Boys or Challney High School for Girls, the sibling criterion will apply to siblings of pupils attending either school.
    [Show full text]
  • Latest News from Across the Trust Community Newsletter September 2018
    Latest News From Across The Trust Community Newsletter September 2018 Meet our new Trustees Page 5 Exam Success Page 6 First Day at Chiltern Academy Page 11 Updates on all schools Pages 8-11 LATEST NEWS FROM ACROSS THE TRUST Our Trust has grown and developed over time, but remains committed to a clear vision and values. While each school operates independently and has established relationships with the local community, it is important to know that the vision and values is what unites our schools in partnership and allows us to offer more support and opportunities to our communities. know what makes them happy and how to stay that Our Vision way; know the importance of humour; know how to look after themselves and live healthy fulfilling Our vision is to educate, empower and inspire lives and know how to support others and how they generations of children through a network of can contribute to making society a better place for outstanding schools that are recognised at a local, themselves, others and future generations. regional and national level as being the absolute benchmark in teaching and learning. The Trust will do this by offering them a first class education within each individual academy, and by Our schools will be recognised as the most forward offering outstanding enrichment opportunities which thinking and innovative organisations within the will offer them unique experiences and see them truly communities that they serve, and all children will stand apart from others. leave our care as well rounded individuals who have achieved high levels of academic success and are well prepared for life in modern Britain.
    [Show full text]
  • Secondary School Expansion Proposals Consultation Response Form - November 2009
    Secondary School Expansion Proposals Consultation Response Form - November 2009 Background The Council is proposing to enlarge nine secondary schools to accommodate Luton’s growing population. The schools identified for expansion are: • Ashcroft High School • Cardinal Newman Catholic School • Lealands High School • Stopsley High School • Challney High School for Boys • Denbigh High School • Icknield High School • Putteridge High School • Woodlands Secondary School (Special) Methodology o A formal consultation period ran from 9 November to 11 December 2009 during which a series of public consultation meetings were held to provide more information. o The Council was seeking the views of parents, staff, governing bodies and residents on the expansion proposals. o A copy of the Secondary School Expansion Proposal Document and questionnaire were available from the named schools and the Council’s website. Results o In total 46 questionnaires were returned, 26 online surveys, 12 paper surveys, and 8 letters and emails. o Comments were made regarding all of the 9 expanding schools but the majority of responses related to Icknield High School (41%) and Challney High School for Boys (33%). o The majority of respondents object to the Secondary School Expansion proposals. However, the objections expressed only related to 3 schools, Cardinal Newman Catholic School, Challney High School for Boys and Icknield High School. The majority of objections were received by local residents (93%). o The majority of responses came from local residents (76%). Just under a third of respondents (29%) were parents or parents of prospective pupils at one or more of the expanding schools. o The main concerns expressed by the respondents were about the traffic congestion and the illegal and obstructive parking.
    [Show full text]
  • Education Indicators: 2022 Cycle
    Contextual Data Education Indicators: 2022 Cycle Schools are listed in alphabetical order. You can use CTRL + F/ Level 2: GCSE or equivalent level qualifications Command + F to search for Level 3: A Level or equivalent level qualifications your school or college. Notes: 1. The education indicators are based on a combination of three years' of school performance data, where available, and combined using z-score methodology. For further information on this please follow the link below. 2. 'Yes' in the Level 2 or Level 3 column means that a candidate from this school, studying at this level, meets the criteria for an education indicator. 3. 'No' in the Level 2 or Level 3 column means that a candidate from this school, studying at this level, does not meet the criteria for an education indicator. 4. 'N/A' indicates that there is no reliable data available for this school for this particular level of study. All independent schools are also flagged as N/A due to the lack of reliable data available. 5. Contextual data is only applicable for schools in England, Scotland, Wales and Northern Ireland meaning only schools from these countries will appear in this list. If your school does not appear please contact [email protected]. For full information on contextual data and how it is used please refer to our website www.manchester.ac.uk/contextualdata or contact [email protected]. Level 2 Education Level 3 Education School Name Address 1 Address 2 Post Code Indicator Indicator 16-19 Abingdon Wootton Road Abingdon-on-Thames
    [Show full text]
  • Admission Arrangements with Effect from September 2019
    Admission Arrangements with effect from September 2019 The Chiltern Learning Trust is a multi-academy trust encompassing the following schools: ● Challney High School for Boys, Luton ● Challney High School for Girls, Luton ● Chiltern Academy, Luton (due to open in September 2018) ● Dallow Primary School, Luton ● Denbigh High School, Luton ● Marston Vale Middle School, Stewartby, Bedfordshire ● Putteridge High School, Luton The proposed admission arrangements for each of the schools are detailed in this document which would apply to all applications received from September 2019 onwards. 1 Places will be allocated using the criteria below for the following schools: ● Challney High School for Boys ● Challney High School for Girls ● Dallow Primary School ● Denbigh High School ● Putteridge High School Children with a Statement of SEN or EHC plan naming the particular school will be admitted before the following oversubscription criteria applies: 1. A looked after child or a child who was previously looked after but immediately afterwards became subject to an adoption, child arrangements or special guardianship order. 2. Children of staff currently employed at the school. 3. Children in the catchment area with siblings at the school who will be still be attending the school at the proposed date of admission. 4. Children living in the catchment area of the school. 5. Children who live outside of the catchment area with siblings at the school who will still be attending the school at the proposed date of admission. 6. On the shortest distance, measured in a straight line from the main front entrance of the school and the pupil’s home address which is measured from a point identified on the Local Land and Property Gazetteer.
    [Show full text]
  • Information Guide on How to Apply for a School Place in Luton
    In Year School Transfer Guide Information guide on how to apply for a school place in Luton 2017-2018 www.luton.gov.uk In-year School Transfer Guide for the academic year 2017/18 Translations Please contact the helpline on 01582 54 80 16, Monday to Friday between 9am and 4pm, if you need help to understand this guide. Bengali এই িনেদ'িশকা+ বুঝেত যিদ আপনার সাহােয6র pেয়াজন হয়, :সেkেt :সাম :থেক ?kবার সকাল 9টা :থেক িবেকল 4টার মেধ6 01582 54 80 16 নmের অ6াডিমশন :হlলাইেন অনুgহ কের :যাগােযাগ কrন। Punjabi ਜੇਕਰ ਤੁ ਹਾਨੂ ੰ ਇਸ ਗਾਈਡ ਨੂ ੰ ਸਮਝਣ ਿਵੱਚ ਮਦਦ ਚਾਹੀਦੀ ਹੈ ਤਾਂ ਿਕਰਪਾ ਕਰ ਕੇ ਐਡਮੀਸ਼ਨਸ ਹੈਲਪਲਾਈਨ ਨੂ ੰ 01582 54 80 16 'ਤੇ ਸੋਮਵਾਰ ਤ� ਸ਼ੁਕਰਵਾਰ ਤੱਕ 9 ਸਵੇਰ ਤ� 4 ਸ਼ਾਮ ਤੱਕ ਸੰਪਰਕ ਕਰੋ। Urdu اگر آپ کو اس گائیڈ کو سمجھنے کیلئے مدد درکار ہے، تو براہ کرم پیر تا جمعہ کو صبح 9 بجے سے شام 4 2 بجے کے درمیان 01582 54 80 16 پر داخلہ ہیلپ ﻻئن سے رابطہ کریں۔ Gujarati જો તમને આ મા��દ�શકા સમજવા માટે મદદની જ�ર હોય તો, કૃપા કરીને એડિમશન હે�પ�ા�ન નંબર 01582 54 80 16 પર સોમવારથી શુ�વાર વ��ે સવારે 9 થી સાંજે 4 વા�યા સુધી સંપક� કરો. Hindi यिद आपको इस माग셍दिश셍का को समझने मᴂ मदद चािहए तो, कृपया एडमीशन्स हेल्पलाइन नंबर 01582 54 80 16 पर सोमवार से शुक्रवार तक सुबह 9 बजे से शाम 4 बजे तक संपक셍 करᴂ। Somali Fadlan kala xiriir qadka Diiwaangelinta 01582 54 80 16, Isniinta illaa Jimcaha inta u dhaxeyso 9am iyo 4pm, haddii aad u baahantahay caawinta lagu fahmayo jaheyntaan.
    [Show full text]
  • 802 Bus Time Schedule & Line Route
    802 bus time schedule & line map 802 Stopsley - Luton Town Centre View In Website Mode The 802 bus line Stopsley - Luton Town Centre has one route. For regular weekdays, their operation hours are: (1) Luton Town Centre: 3:10 PM Use the Moovit App to ƒnd the closest 802 bus station near you and ƒnd out when is the next 802 bus arriving. Direction: Luton Town Centre 802 bus Time Schedule 13 stops Luton Town Centre Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 3:10 PM Putteridge High School, Stopsley Tuesday 3:10 PM Wood Green Road, Stopsley Wednesday 3:10 PM Collingtree, Stopsley Thursday 3:10 PM Jansel House, Stopsley Friday 3:10 PM Deep Denes, Round Green Saturday Not Operational Round Green Tavern, Round Green 370 Hitchin Road, Luton Hart Lane, Round Green 802 bus Info Direction: Luton Town Centre Jubilee Street, High Town Stops: 13 Trip Duration: 15 min Charles Street, High Town Line Summary: Putteridge High School, Stopsley, Wood Green Road, Stopsley, Collingtree, Stopsley, Jansel House, Stopsley, Deep Denes, Round Green, Burr Street, Luton Town Centre Round Green Tavern, Round Green, Hart Lane, Hitchin Road, Luton Round Green, Jubilee Street, High Town, Charles Street, High Town, Burr Street, Luton Town Centre, St St Marys Road, Luton Town Centre Marys Road, Luton Town Centre, Vicarage Street, St Mary's Road, Luton Luton Town Centre, Church Street, Luton Town Centre Vicarage Street, Luton Town Centre Vicarage Street, Luton Church Street, Luton Town Centre Church Street, Luton 802 bus time schedules and route maps are available in an o«ine PDF at moovitapp.com.
    [Show full text]
  • Barnfield College Relocation Project
    Barnfield College Relocation Project Strategic Outline Case (SOC) Version 0.8 17 May 2016 1 Document Management Version Author Description Issue Date 0.1 T Warrs Initial draft for review drawing on 3YDP and other information. 0.2 Tim Eyton-Jones Review and additions 8th Feb 2016 03 Tim Eyton-Jones Addition of sections 2.5, 10th Feb. ‘16 04 Tim Eyton-Jones Addition of sections 2.9, 2.11 and 3 15th Feb. ‘16 05 Lisa Milligan Editing 19 February Lisa Milligan Editing 20 February Lisa Milligan Editing 21 February 0.6 Trevor Warrs Options appraisal and other edits 06/04/16 0.7 Lisa Milligan Editing and writing 6/9 May 2016 0.7 Lisa Milligan Editing and writing 16/17 May 2016 0.7 Tim Eyton-Jones Editing and Writing 17/18 May 2016 0.8 Lisa Milligan Editing and Writing 18 May 2016 2 Contents Executive Summary . 5 Introduction . Key Drivers . Options . Affordability . Commercial & Management . 1. Introduction . 7 Background . Rationale . 2. Strategy . 8 Stakeholders . The Business Need . Organisational Overview . Key Objectives . Key Stakeholders . Existing provision . The Scope of the Proposal . Constraints . Dependencies . Expected Strategic Benefits . Strategic Risks . Critical Success Factors . 3. Options Appraisal . 20 Short-list of Options . Summary Financial Appraisal . Summary Non-financial Analysis Ranked Options 4. Affordability . 23 Budget (Capital and Revenue) . Expected Life of the Asset/Length of the Service Contract . Impact on the Income and Expenditure Account . Impact on the Balance Sheet . Impact on Cash Flow . NEW Updated Relocation Project SOC version 0.8 3of 26 09 November 2017 5. Commercial . Market Assessment .
    [Show full text]
  • School Funding and Social Justice
    SCHOOL COVER HDS.qxp 16/10/08 11:44 Page 1 School Funding and Social Justice At the moment revenue funding for English schools is a mess; a labyrinth built out of failed policy grants, out-of-date demographics and unnecessary “stability” measures. There is absolutely no need for the system to be this complicated. In this report we have identified three ways to make the system simpler. First we should move to a consistent national funding formula, rather than having a different formula for each local authority. Secondly, arbitrary central government grants should be merged into this formula. Thirdly, the formula should have just three elements for each pupil: an age-weighted base, an area cost adjustment and a premium for those pupils from more School Funding disadvantaged backgrounds. This last element is crucial. At the moment schools serving and Social Justice deprived communities do, typically, have more money than average. But this money is allocated in an entirely haphazard way, differently for each local authority and often through short-term A Guide to the Pupil Premium grants awarded by politicians eager for positive headlines. Instituting a consistent “pupil premium” would allow schools to plan their budgets around their admissions. Over time schools with large disadvantaged populations would be able to fund programmes to boost attainment, attract the best teachers and eventually middle class parents. Schools in better off areas would have an incentive to spread their nets wider, make their Sam Freedman and Simon Horner admissions more comprehensive and boost their budgets. New school providers entering the market, whether through the academies programme, or future Conservative / Liberal Democrat plans for supply-side reform, would have an incentive to set up in deprived communities, where real choice is needed most.
    [Show full text]
  • Latest News from Across the Trust Community Newsletter Autumn 2019
    Latest News From Across The Trust Community Newsletter Autumn 2019 Trust celebrates another fantastic year of GCSE Page 4 Page results Trust-wide sports day Page 5 Page School updates Page 8 Page LATEST NEWS FROM ACROSS THE TRUST TOGETHER TOWARDS EXCELLENCE AMBITION AND INSPIRATION Our Trust has grown and developed over time, but remains committed to a clear vision and values. While each school operates independently and has established relationships with the local community, it is important to know that the vision and values is what unites our schools in partnership and allows us to offer more support and opportunities to our communities. them happy and how to stay that way; know the Our Vision importance of humour; know how to look after themselves and live healthy fulfilling lives and know Our vision is to educate, empower and inspire how to support others and how they can contribute generations of children through a network of to making society a better place for themselves, outstanding schools that are recognised at a local, others and future generations. regional and national level as being the absolute benchmark in teaching and learning. The Trust will do this by offering them a first class education within each individual academy, and by Our schools will be recognised as the most forward offering outstanding enrichment opportunities which thinking and innovative organisations within the will offer them unique experiences and see them truly communities that they serve, and all children will stand apart from others. leave our care as well rounded individuals who have achieved high levels of academic success and are well prepared for life in modern Britain.
    [Show full text]