M.tA*m l, rr, sl t:,il1r:[rr\]ri,j. Form I

FORM I (r) BASTC TNFORMATTON

iti:: ii N*:rr=;5:,: lli,Wl}\*S."i*i\.l.R{NNh,\NltM 1 Name of the projects Estabtishment Canara lndustrial Area, at lra, Chelur, Balepuni and Kurnadu vittage, Bantwa[ (Thatuk), Dakshina (District). 2 S.No. in the schedute 7 (c) 3 Proposed capacity /area/tength/tonnage to be handted/command area/tease 237.00 Hectares (585.66 acres) area/number of wetts to be dritted 4 New/ Expansion /Modernization New 5 Existing Capacity/ Area etc. Nit 6 Category of Project i.e. 'A' or 'B' A 7 Does it attract the general condition? lf Yes, the project site is located within yes, ptease specify. 10 KM radius of lnterstate boundary of and Kerata. 8 Does it attract the specific condition? lf yes, ptease specify. No 9 Location lra, Chetur, Batepuni and Kurnadu viltage, Bantwa[ (Thatuk), (District). Ptot/survey/ Khasra.No Land Documents enctosed

Vittage lra, Chetur, Batepuni and Kurnadu vittage. Tehsil Bantwal Tatuk District Dakshina Kannada District State Karnataka 10 Nearest raitway station/airport atong with Bantwal Raitway station- 8.9 km - NE distance in kms (Aeriat Distance) direction Mangtore Bajpe airport - 18.5 km - NW direction 11 Nearest town, city, District Headquarters Bantwat(8.8 km) - North East direction atong with distance in kms. (Aerial Thokottu (13.3 km)- West direction Distance) Metkar (9.3 km) - North East direction Man galore( 1 7. 5km ) -NorthWest direction Mudipu (1.5 km) - South direction 12 Viltage Panchayats, zitla parished, municipa[ corporation, [oca[ lra, Chetur, Batepuni Vittage body(complete postal address with Panchayath tetephone nos. to be given) 13 Name of the appticant Karnataka lndustrial Area :7

i,iiiii i}S i...i. Executive Engineer .\.[ii.i "l**hrru l.*hs r . JGI.A.DiE*-*$dANGAl"ORE""".""*""."". s.!&ffim i ,)1\.l o, {jl?}r,rr;ri,ri Form I devetopment Board (KIADB, 14 Registered address Karnataka lndustriaI Area devetopment Board (KIADB)

Baikampady I ndustriaI Area, New - 575011

15 Address for correspondence Name CEO & Executive Member Designation (Owner/ Partner/CEO) CEO & Executive Member Address 14t3,2nd ftoor, naffi (RP) Buitding, Nrupathunga Road, Bangatore Pin Code 560 001 E-Mait kiadb@mait. kar. nic. in Tetephone No (080) 2221 5383, 2221 5069,2221 1 066 Fax No 080-22217702 16 Detaits of Atternative Sites Examined, if No any, Location of these sites shoutd be shown on a topo sheet. 17 Intertinked Projects Not Appticabte 18 Whether separate apptication of interlinked Not Appticabte project has been submitted?

19 lf yes, date of submission Not Appticabte 2A tf no, reason Not Appticabte 21 Whether the proposat invotves NO approvat/ctearance under: if yes, detaits of the same and their status to be given. (a) The Forest (Conservation) Act, 19gO? (b) The Witdtife (Protection) Act, 1972? (c) The C.R.Z Notification, 1991? 22 Whether there is any government order/ Land devetoped by Karnataka Poticy retevant/ retating to the site? lndustriaI areas Devetopment Board (KIADB) as per the fottowing poticies and acts Karnataka Export promotion Poticy & Karnataka lndustriaI poticy 2009-14 The Karnataka lndustrial Areas Devetopment Act, 1966. 23 Forest land invotved (hectares) Social Forest about 23.87 ha is tocated at the centre of the lndustria[ Area 24 Whether there is any titigation pending No against the and/ or tand in which the project is proposed to be set up? (a) Name of the Court (b) Case No. /?

s;,1;::::t rliit ey4lopment ( ffi,ir, , Executivetrxecuuve EnganeerEn n '1*i:irrru . Lli{ l l,:rhr K.I.A.D.B.. MANGAI ORF Kneffiffi L.iiI Li1 {ll),}r,r,,,!irt.< Form I (c) Order/ directions of the Courtjf any And its relevance with the proposed

(l!) Activity

1. Construction, oPeration or decommissioning of the Project involving actions, which wil[ cause physical changes in the tocality (topography, land use, changes in water bodies, etc.) ffi 1.1 Permanent temporary 'vul or Yes It has been proposed to devetop industrial change in land use, [and cover area in the land covered with shrubs & few or topography inctuding trees. increase intensity of land use (with respect to [oca[ land use ptan)

1.2 Clearance of existing [and, Yes No major clearance activities witt take vegetation and Buitdings? ptace. Onty minor activities witt be carried out to ctear shrubs and weeds. 1.3 Creation of new land uses? Yes Construction of lndustriaI Buitdings/Sheds, Roads etc witl be constructed. 1.4 Pre-construction Yes Soit/Geo-TechnicaI lnvestigation wherever investigations e.g. bore appticabte woutd be undertaken. Houses, soiI testing?

1.5 Construction works? Yes There witt be minimum construction activities [ike lndustriat Buitdings, Storage Rooms and Utitities. lt witt be done systematicatty, with economy of materials and with environmental care. 1.6 Demotition works? No No demotition works envisaged 1.7 Temporary sites used for No The majority of the workers witt be hired construction works or housing form nearby vittages. of construction workers? 1.8 Above ground buitdings, Yes Excavation works witt be carried structures out for or earthworks constructing the civil structures. Cut and inctuding [inear structures, fitt witt be required to the minimum cut and fitt or excavations extent. 1.9 Underground works mining or No No underground works inctuding tunneling? mining/tunneting is required. 1.10 Rectamation works? No Onty teveting of ground if required

rl'- , a.-L t # pment \l:il I'[*lin* l.;rhi offi

K.I.A.D.B., MANaALOR* ffi st*mm Wffir l..rrrd,]f crFp$il1ilr,riF\ Form I

1 .11 No No dredging Dredging? is expected to be invotved as part of this project. 1.12 Off shore structures? No No offshore structures required as part of this project. 1.13 Production and manufacturing Yes Since it is an industrial park the processes? production and manufacturing processes shatl be practiced by individual industries within the industrial estate. 1.14 Facitities for storage of goods Yes Storage facitities witt be provided by the or materiats? individuaI industries f or raw materiats, finished products and required fuets 1.15 Facitities for treatment or Yes Facitities witt be instatted for the disposaI of sotid waste or appropriate handting of sotid, liquid and tiquid efftuents? gaseous waste. Zero discharge concepts witt be adopted.

1.16 Facitities for long term No No long term housing of operational housing of operational workers are proposed at the site. workers?

1.17 New road, rail or sea traffic Yes The existing structures [ike roads witt be during Construction or improved and steps required witt be operation? undertaken. Required internal roads for the movement of men & materiat witt be constructed. 1.18 New road, rait, air waterborne No As mentioned in the section 1.17 or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Ctosure or diversion of No There witt not be any ctosure / diversion existing transport routes or of existing routs onty the existing road witl infrastructure leading to be widened and strengthened. changes in . Traffic movements? 1.20 New or diverted transmission Yes Power transmission [ine from the [ines or Pipetines? MESCOM/KPTCL witt be devetoped if necessary 1.21 lmpoundment, damming, No Not Appticabte culverting, realignment or other changes to the hydrotogy of watercourses or aquifers?

1.22 Stream crossings? No No 1.23 Abstraction or transfers of Yes Required amount of water witt be drawn

$a:. " :!.\ n{n{Gftzer { . .!ll{ Executive Engineer l'ler:}rru l,rrhs *"KT:ATD:B;I fiANGATORE* mffi xlqmm ffiffir'."*u"t rli,ir,'$,rr,,\ Form I water form ground or surface from Nethravathiriver. waters?

1.24 Changes in water bodies or No There witt be no change in water bodies or the land surface affecting the land affecting drainage or run off. drainage or run-off? Effective surface drainage/and naturaI runoff suitable measures woutd be taken. 1"25 Transport of personnel or Yes There witt be transportation of personne[ materiats f or construction, and Construction materiats during operation or construction phase, which witt be decommissioning? facititated through existing roads. During operation phase, internaI roads witt be devetoped for transportation. 1.76 Long-term dismantting or No Not appticabte decommissioning or restoration works?

1.77 Ongoing activity during No There witt be no decommissioning works. decommissioning which coutd have an impact on the environment? 1.28 lnftux of peopte to an area Yes No major inftux of peopte onty peopte either temporarity or from nearby vittages witl be emptoyed. permanentty? However few skitted and technical personne[ from outside area witl come and settte. Hence influx of peopte to an area witt be both temporarity and permanentty. 1.29 lntroduction of alien species? No There witl not be any introduction of atien species 1 .30 Loss of native species or No There witt be no [oss of species as the site genetic diversity? is an agriculturat/dry land. 1.31 Any other actions? No Onty eco-friendty activities tike tree ptantation witt be undertaken.

2. Use of Natural resources for construction or operation of the project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply):

Land especiatty undevetoped Proposed land is barren with degraded shrub in or agricuttural tand (ha) most of the area. Water (expected source & Require amount of water (2.27 MLD) witt be competing users) unit: MLD rawn from the surface & Ground water wit[ drawn through bore wetts f or the roposed industriaI area. Minerats (Mf) Mineral usaqe is not

- r4-1-c ( , I fillll!i , :ll)\ lopment Officer & s *. *ExEcutfvg"E?r gf n€er K.I.A.D.B., MANGALORE Kr&ffi* irai.i arilr.irilr',|.i{ Form I 2.4 Construction materiaI Yes Construction materiat tike cement, steet, stone, aggregates, and / soil bricks, sand etc witt be procured from [oca[ (expected source - Mf) deaters/supptiers from the nearby vittages. 2.5 Forests and timber (source - No Usage of timber witt be minimum during MT) construction phase for scaffotding etc., if at atl required 2.6 Energy including etectricity Yes The power requirement for the proposer and fuets (source, competing development is 43.92 MW. The source o users) Unit: fue[ (MT), power wilt be from Mangalore Electricitl energy (MW) Supply Company Limited (MESCOM)/KPTCL. 2.7 Any other natural resources No There is no need for any natural resources (use appropriate standard like mineral etc., units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

3.1 Use of substances or Yes Various raw materials required for the materiats, which are upcoming industries in the proposed hazardous (as per MSIHC industrial area are used for the rutes) to human heatth or manufacture of the proposed the environment (ftora, products. Required preventive fauna, and water suppties) measures (as per MSIHC rutes) witt be considered which are hazardous to human heatth or the environment (f[ora, fauna and water suppties) 3.2 Changes in occurrence of No Nit disease or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the wetfare of No Storage, transport, h;nAfing or peopte e.g. by changing production of any harmful product is tiving conditions? not envisaged from the proposed project. Thus no major adverse impacts on the human heatth/ environment are envisaged. 3.4 Vutnerabte groups of No There is no vulnerable group of peopte who coutd be people who could be affected by the affected by the project project. e.g. hospital patients, chitdren, the etderty etc. 3.5 Any other causes No Not appticabte

-.rk- - C- evetopment officer & Executive Engineer .{ll{.i l i.rhlr L"rri>s Jfr IA"D,fu $AAl'lG*66r,qg" K{AM& i-jad.,i {,FSMirrr!r:t Form I

4. Production of solid wastes during construction or operation or decommissioning (MT/month) ffi W ffi.t,W :1 4.1 Spoit, overburden or mine No No Spoit, overburden or mine wastes ii wastes envisaged due to the proposed proiect. 4.2 Municipal waste (domestic Yes MSW generated during construction and and or commercial operational phase of the proposed wastes) industrial area witl be segregated in to biodegradable and non biodegradabte and later it witt be disposed off and send to the authorized deater. 4.3 Hazardous wastes (as per No Hazardous waste generated during tlte Hazardous Waste proposed project activity witt be stored in Management Rules) the earn marked area and disposed offlhandover to the TSDF/ authorized deater (as per Hazardous waste Management Rutes,2008) 4.4 Other process industriaI Yes The upcoming individual industria[ process wastes wastes witt be treated and disposed as per the statutory norms. 4.5 Surptus product No Not appticabte 4.6 Sewage sludge or other The STP studge witt be used as rnanure for studge from effluent Yes the green bett devetopment. The ETp and treatment other process studge witt be disposed off to the authorized TSDF facititator. 4.7 Construction or Yes There witl not be any demotition waiG. demolition wastes Since basic infrastructure facitities are to be provided, the construction waste generated shatl be reused for laying roads and the recyctabte materiats shatt be sotd to recycters. 4.8 Redundant machinery or No Most of the equipments during equipment construction phase witt be hired 4.9 Contaminated soits No There is no source for contamination of other materials soits or other materiats. Apart from this a provision of soiI quatity monitoring shatI be made in the pre-construction, construction and post construction stage and suitabte measures shatl be taken if any contamination observed. 4.10 AgricutturaI wastes No Since no agricutturat actr'vities shatt be invotved, it is not envisaged here. 4.11 Other sotid wastes No None / -,/'L-=' c dlopment Officer & ,\lXl 'li.rhr* l.*irs Executive engineer-z Kt&#m l. j*'t r,r lltriri).rtrnlrii: Form I

Release of pottutants or any hazardous, toxic or noxious substances to air Kglnr ffiffi

W tike 5.1 Emissions f rom Yes Movement of construction vehictes combustion of fossil fuets lorries, trucks, dumpers, rotter, excavator, from stationarY or etc woutd resutt in air poltution. The DG mobite sources sets provided for construction equipments wit[ atso generate air pottutants like SO2, NOx.

Emissions from vehictes coutd be controlled by adopting regutar pottution checking of the vehictes and setection of proper ptant species and avenue ptantation atong the internal and arterial roads within the

5.2 Emissions from Yes The detaits of the different process production processes emissions of various industries witt be worked out and necessary control measures witt be suggested in the EIA RePort 5.3 Emissions from materiats Yes Emissions tike dust witt arise during handl.ing storage or construction activities which witt be transport arrested by water spraying periodicaIty. During transportation, the vehictes shatt be covered with tarpaulin. 5.4 Emissions from Yes lrtaximum construction works witt be done construction activities manuatty and with welt maintained inctuding ptant and equipments

5.5 Dust or odours from Yes Dust is tikety to be generated during -{ handting of materials construction, this witt be water sprinkted inctuding construction and tarpautin cover witt be provided over materials, sewage and stored raw material to reduce dust waste emission. As part of this project aerobic STP system shatt be provided, in which there shatl be good mixing of oxygen with the microorganisms which witt lead to minimum odour qeneration. 5.6 Emissions from No There is no incineration activities incineration of waste 5.7 Emissions from burning No M such activities witt be permitted of waste in open air e.g. stash materiats, construction debris 1,t

'B AI1,s' Iq Executive Engineer St'i ,.# -..$!"8#'[- - KI.A.D.B., MANGALORE 8 Kl&mm i.jr:n,,1 {r}irr!ir1,ri,:r Form I

5.8 Emissions from any other No No emissions from any other sources sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

". 1-:"rir'd:.1\.,^,. -" .,;ffi :\:i;,

+.,;#:t*t. w:+.' ffi ,ffi;ftry .\ $\'i\$ri: ^. .S& i #lu SE i d s i I i x l+l ri:.1 [r r {t-Iod d t L+..'' =,i:l:n ii:iriiir;lill i\,$.ililt",It ,Sffiffi:1H#L'..:;tmN.".ffi ' :-i,, N$NHf": #W" i"H6dJ'1ffiS;--*,"SHl +$effi -*, I- i *rffi; i'1.+. . i:,=:ir?,-ffi 6.1 From operation of Yes During the construction stage, expected noise equipment e.g., engines, levets shatl be in the range of 80-85 dB (A) ventilation plant, crushers which wit[ decrease with increase in distance as per the lnverse Square Law. Administrative as wetI as engineering contro[ of noise witt be imptemented. lsotation of noise generation sources and temporal differentiation of noise generating activities witt ensure minimum noise at receiver's end. To prevent any occupational hazard, earmuff / earptug shat[ be given to the workers working around or operating ptant and machinery emitting high noise levets. Use of such ptant or machinery shatl not be attowed during night hour. 6.2 From industrial or Yes As mentioned in 6.1 similar processes 6.3 From construction or No During the construction of the project demotition excavation, drilling and welding works at the site will generate the noise, vibration and dust emissions. These witt be temporary in nature. However care would be taken to prevent to curtail well below the applicable standards 6.4 From btasting or piting No No major btasting required for the proposed industriat area 6.5 From construction Yes Some amount of noise will be generated operationaI traffic from vehicular movement in the construction and operational phase. Noise generated due to traffic movement will be further minimized by plantation on the sides of internal roads, on the open spaces inside and around the periphery of whole complex. Proper maintenance of internal roads witl be carried out and informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. ,/ veloprnent *fficer & rLIF\TJS I .x\,1 1l {:rlllrrrr}irl,r\ Form I 6.6 From tighting or cooting No Does not arise. systems 6.7 From any other sources No No

7. Risks of contamination of land or water from retease of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

::. 1 ;' ;:a:: : f i: , vt ) ,'

7.1 From handling, storage, use Yes Proposed industria[ area handting and or spillage of hazardous storage techniques of hazardous materials materials will be differed from industry to industry and hence the appropriate procedures wil[ be adopted for handling, storage and use or while spitlage of hazardous materials as per MSIHC guidelines and procedures. 7.2 From discharge of sewage or No Trade Effluent generated from other effluents to water or lndustries will be treated by the land (expected mode and respective industries on zero tiquid place of discharge) discharge concept. 7.3 By deposition of po[lutants No Air potlution witl be form DG sets and emitted to air into the land Boiters. Adequate controt measures or into water approximating ESP and Stacks height witt be provided to disperse the pottutants as per MOEF euidetines. 7.4 From any other sources No No other potluting sources exist. 7.5 ls there a risk of long term No There wi[[ not be any long term build build up of pollutants in the up of pollutants in the environment environment from these from these sources. sources? 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

:

rriii . .l I-l, : ,'. t:tr,ii. : \qx\\::t11;i-11\;I-&a;-:i;::7i:lll-- :q N {".i".:9;4" 8.1 From exptosions, spittages, fires No No hazardous substances witt etc from storage, handting, use or be required either during production of hazardous construction or operation substances phases 8.2 From any other causes No No such causes 8.3 Coutd the project be affected No The area under study falls ir by natura[ disasters Zone-lll and Moderate Damage K;AMM 1_rnl.i ilill.irlxx,it;5 Form I causing environmental damage Risk Zone which is liable to MSK (e.g. floods, earthquakes, Vll, according to the lndian landslides, cloudburst etc)? Standard Seismic Zoning MaP. Suitable seismic coefficients in horizontal and vertical directions respectivelY, have tc be adopted white designing the structures. There are no possibilities of the proposed project site getting flooded as per records available.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locatity

SFa i*rffi ...'Effill; *.r:rl'. -"H

9.1 Lead to devetopment of No Nit supporting. utitities, ancittarY devetopment or devetopment stimutated by the project which coutd have impact on the environment e.g. r Supporting infrastructure Yes Supporting and ancittarY (roads, power suppty, waste or devetopment witt take Ptace, waste water treatment, etc.) which in turn witt imProve environment (e.9., ) Roads, power suppty, ptantation of trees, rainwater harvesting, storm water drains etc., Basic infrastructure witt be devetoped in the proposed area. Housing devetopment No The apptication is for layout approval onty. Extractive industry No The apptication is for Iayout approval onty. Suppty industry No The apptication is for Iayout approval onty. Other No The apptication is for Iayout approval onty. 9.2 Lead to after-use of the site, No No negative impact witt be which coutd have an impact on seen due to proposed the the environment activity /V-- -y'27o c c Der,Hopment Officer &

I'' Lh ffi._..** ddffiffi A!S&L,tj ffiI LflJ*! {}rr.{}rr,,)r;,'l Form I 9.3 Set a precedent for later Yes The proposed devetopment devetopments witl improve the existing socio economic background of the surrounding area. This witt make way forfuture devetoprnents. 9.4 Have cumutative effects due to No Not appticabte proximity to other exist'ing or ptanned projects with simitar effects

(Xll) EnvironmentalSensitivity

1 Areas protected under internationaI No No area protected under conventions, nationa[ or [oca[ internationaI conventions legistation for their ecotogicat, national or [oca[ landscape, cutturaI or other retated legislations for their value ecologicat, landscape, cuttural or other related vatue are present within 15 Km radius. 2 Areas which important for are or No Nit sensitive Ecotogicat reasons Wettands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Area used by protected, important or No There are no notified areas sensitive Species of ftora or fauna for used by protected breeding, nesting, foraging, resting, important or sensitive .: oyer wintering, migration species of ftora or fauna for breeding nesting foraging, resting, over wintering migration. 4 lnland, coastat, marine or Nethravathi 4 Km (N) underground waters (Aerial Distance) river Mangatpady 5 km (S) river

5 State, National boundaries (Aeriat lnterstate 2.7 km (SSE) Distance) boundary of Karnataka and kerata 6 Routes or facitities used by the pubtic No Nit for access to recreation or other

opment

lLrirtl{, i .i11. Executive Engineer L2 r ,iAr *t r.fi r6ar "fi **tr rert+*f*FEl [\tp4uffi i.tr1ri.rl {rt;,r,.r*r}rrr Form I tourist, pitgrim areas 7 Defense instattations No Nit 8 Densety poputated or buitt-up area Yes . lra 2 km - East (Aeriat Distance) direction r Bantwat 8.8 km North East direction I Area occupied by sensitive manmade Yes Somanatheshwara temple-2 land uses Hospitats, schoots, ptaces of km worship, community faci tities) Somayaji hospita[ - 14 km 10 Areas containing important, high No quatity or scarce resources (ground None water resources, surface resources, forestry, agricutture, fisheries, tourism, minerats) 11 Areas atready subjected to pottution No None envisaged environmenta[ damage. (those where existing [ega[ environmental standards are exceeded) 12 Areas susceptible to natural hazard No The area under study falls which could cause the project to in Zone-lll and Moderate present environmental problems Damage Risk Zone which is (earthquakes, subsidence, landslides, tiable to MSK Vll, according flooding erosion, or extreme or to the lndian Standard adverse climatic conditions) Seismic Zoning Map. Suitable seismic coefficients in horizontal and vertical directions respectively, have to be adopted while designing the structures. There are no possibitities of the proposed project site getting ftooded as per records avaitabte. rr'a--<- c. ,L & #vetoPment- Officer Executive Engineer- r[r.e.0.g., MANGALoRE

..\l:){ l '}i.cht* },r:hr