FORM – I (I) Basic information

1. Name of the Project “Prestige Palm Residences” Proposed Residential Development 2. Sl.No. in the schedule Serial No.8 (a) 3. Proposed capacity/area/length/tonnage Total site area –59,766.45 Sqmt to be handles/command area /lease/area (14 Acres 30.75 Guntas) / number of wells to be drilled Total built up area of the project is 31,914.025 Sqmt; consisting 101 Nos. of residential villas and a club house. 4. New/Expansion/Modernization New 5. Existing capacity/area etc NA 6. Category of project i.e., ’A’ or ‘B’ ‘B’ 7. Does it attract the general condition? If No yes, please specify 8. Does it attract the specific condition? If No yes, please specify 9. Location At Survey Nos. 321-2P1, 321-2P2, 323-1P & 323-3P Kotekar Village, Mangaluru Hobli, Mangaluru Taluk, Dakshina District. a. Plot/Survey/Khata No. Survey Nos. 321-2P1, 321-2P2, 323-1P & 323-3P b. Village Kotekar Village c. Thesil Mangaluru Taluk d. District District e. State 10. Nearest Railway station/Airport along Railway Station, which is around with distance in km. 6.0 km from the project site. Mangaluru City Railway station, which is around 13.0 km from the project site. Mangaluru International Airport is around 24.0 km from project site. 11. Nearest Town, City, District, Mangaluru Headquarters along with distance in km 12. Village Panchayath, Zilla Parishad, Village Panchayat Municipal Corporation, Local body (Complete local address with Telephone Nos. to be given) 13. Name of the Applicant Mr. Zaid Sadiq 14. Registered Address M/s. Prestige Estates Projects Limited, The Falcon House, No: 1, Main Guard Cross Road, Bengaluru-560 001.

1

15. Address for Correspondence: M/s. Prestige Estates Projects Limited , The Falcon House, No: 1, Main Guard Cross Road, Bengaluru-560 001. Name Mr. Zaid Sadiq Designation (Owner/Partner / CEO) Executive Director Address M/s. Prestige Estates Projects Limited , The Falcon House, No: 1, Main Guard Cross Road, Bengaluru-560 001. Pin code 560 001 E-mail [email protected] Telephone No. 080-25591080 Fax No. 080-25591945 16. Details of alternative sites examined, if No alternative sites were examined. any. Location of these sites would be shown on a Topo sheet 17. Interlined Projects No interlined projects 18. Whether separate application of No interlinked project has been submitted? 19. If Yes, date of submission -- 20. If No, reason Proposed project is a new individual project. 21. Whether the proposal involves approval / This proposal does not require approval/ Clearance under : if yes, Details of the clearance under Forest Act, Wild life Act & CRZ same and their status to be given Notification. The Forest (conservation) Act 1980? The wild life (protection) Act 1972? The C R Z Notification, 1991? 22. Whether there is any Government order / No Policy relevant / relating to the site? 23. Forest land involved (Hectares) No forest land involved. 24. Whether there is any litigation pending No against the project and / or land in which the project is propose to be set up? a) Name of the court b) Case No. c) Orders / directions of the court, if any and its relevance with the proposed project.

2

(II) Activity immediate 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details there of (with approximate Information/checklist Sl. No. Yes/No quantities/rates, wherever possible) confirmation with sources of information data 1.1 Permanent or temporary change No As per the Master Plan (Revision-II) 2021 in land use, land cover or (Final) Mangaluru local planning area, the topography including increase in proposed project site is designated as intensity of land use(with respect Residential zone. Also the land has been to local land use plan) converted to Residential purpose. Master Plan and land conversion is enclosed as Annexure 1(a) Page No.31-34. 1.2 Clearance of existing land, Yes Proposed site consists of coconut trees, vegetation and buildings? areca nut trees, jungle trees & palm trees; these will be cleared during site formation. 1.3 Creation of new land uses? No As per the Master Plan (Revision-II) 2021 (Final) Mangaluru local planning area, the proposed project site is designated as Residential zone. 1.4 Pre-construction investigations No A pre-construction investigation of soil will e.g. bore houses, soil testing? be carried out at the project site. 1.5 Construction work? No After obtaining the Environmental Clearance only construction work will be started. 1.6 Demolition work? No -- 1.7 Temporary sites used for No Labor requirement for the proposed project construction workers or housing is about 100Nos/day. The construction of construction workers? laborers will be sourced from nearby places; hence there is no provision of temporary housing for construction workers. 1.8 Above ground buildings, Yes Proposed project is coming up with 101 structures or earthworks Nos. of residential villas and a clubhouse including linear structures, cut which is sprawled across 19 buildings. Villas and fill or excavations (Building 2-19) with configuration of G+1UF and a club house (Building-1) with configuration of B+LGF+UGF. The maximum height of the building is 7.65m. Hence the

3

project involves excavation, construction of above ground buildings and landscaping. 1.9 Underground works including No Proposed project is a Residential mining or tunneling? Development. 1.10 Reclamation works? No Proposed project is a Residential Development. 1.11 Dredging? No Proposed project is a Residential Development. 1.12 Offshore structures? No Proposed project is a Residential Development. 1.13 Production and manufacturing No Proposed project is a Residential processes? Development. 1.14 Facilities for storage of goods or Yes The materials required for the purpose of materials? construction during the construction phase will be stored within the project site and the details of these materials are enclosed in Annexure – 2(b) Page No.43. During the operational phase, HSD lube oil & waste oil from the DG sets will be stored in leak proof containers on impervious floor in a designated place within the site premises. 1.15 Facilities for treatment or Yes During construction phase: disposal of solid waste or liquid During constructions phase, the domestic effluents? solid wastes will be minimal as there is no provision of labor colony; the generated domestic solid waste will be handed over to authorized vendors and the generated domestic sewage will be routed to septic tank and soak pit. During operation phase: During operation phase, the solid wastes will be collected by door to door collection; segregation of organic & recyclable wastes will be done. The segregated organic wastes will be further processed in organic waste converter and the recyclable wastes, Hazardous wastes & E-waste will be handed over to authorized waste recyclers. The domestic liquid effluents will be treated in a sewage treatment plant. Details of

4

treatment facilities are as in Annexure – 1(c) Page No.36-38. 1.16 Facilities for long term housing of No As local people will be hired for the routine operational workers? maintenance, no permanent facilities are proposed. 1.17 New road, rail or sea traffic No The existing road facility will be made use during construction or operation? of. 1.18 New road, rail, air waterborne or No The existing road facility will be made use other transport infrastructure of. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Traffic pattern in the approach road during transport routes or infrastructure construction and operation phase would be leading to changes in traffic minimal. movements? 1.20 New or diverted transmission No Electric power will be supplied by MESCOM lines or pipelines? from the existing transmission line. Water for operation phase shall be taken from 2 Nos. of existing Borewells/Village Panchayat. 1.21 Impoundment, damming, culver No Proposed project is a Residential ting, realignment or other Development. changes to the hydrology or watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing within the site 1.23 Abstraction or transfers of water Yes There are 2 Nos. of existing Borewells at the from ground or surface waters? project site. The construction water requirement will be sourced from existing Borewells. And the operational phase water requirement is through 2 Nos. of existing Borewells/Village Panchayat. 1.24 Changes in water bodies or the No Internal storm water drain with pre-cast land surface affecting drainage or perforated cover will be provided within the run-off? site in order to carry out the storm water in to the recharge pits to recharge the ground water and in case of worst rainfall excess will be routed to the external storm water. 1.25 Transport of personnel or Yes Raw materials for Construction will be materials for construction, transported by trucks and the trips are

5

operation or decommissioning? scheduled only during wee hours. 1.26 Long-term dismantling or No No such works are involved. decommissioning or restoration works? 1.27 Ongoing activity during No Proposed project is a Residential decommissioning which could Development. have an impact on the environment? 1.28 Influx of people to an area either Yes There will be a temporary influx of temporary or permanently? construction laborers, and this will be only for a short period until the completion of the construction work. The proposed project is a residential development. During operation phase, there will be a permanent influx of about 556 Nos. 1.29 Introduction of alien species? No There is no introduction of alien species. 1.30 Loss of native species or genetic No There is no loss of native species or genetic diversity? diversity. 1.31 Any other actions? No There are no any other causes from the project.

2. Use of natural resources for construction or operation of the project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details there of (with approximate Information/checklist Sl. No. Yes/No quantities/rates, wherever possible) confirmation with sources of information data 2.1 Land especially underdeveloped or No As per the Master Plan (Revision-II) 2021 agricultural land (ha) (Final) Mangaluru local planning area, the proposed project site is designated as Residential zone. Also the land has been converted to Residential purpose. Master Plan and land conversion is enclosed as Annexure 1(a) Page No.31- 34. 2.2 Water (expected source & Yes Construction Phase: competing users) unit: KLD Construction water requirement of 17.5 KLD and Domestic water amounting to 3.0 KLD will be met by existing

6

Borewells. Operational Phase: During operation phase, total water demand of 72 KLD will be met by 2 Nos. of existing Borewells/Village Panchayat. 2.3 Minerals(MT) No Proposed project is a residential development. 2.4 Construction materials– stone, Yes Constructional materials and its quantity aggregates and soil (expected are enumerated in Annexure – 2(b) Page source-MT) No.43 2.5 Forests and timber (source-MT) No -- 2.6 Energy including electricity and Yes Construction Phase: fuels (source, competing users)unit DG – 50 kVA 1 No. : fuel(MT),energy(MW) Fuel for DG- 10.47l/hr Operational Phase: Electricity –1,059 KW Transformers - 250 kVA x 6 Nos. DG set –380 kVA x 3 Nos. Fuel required for DG sets – 238.8 l/hr 2.7 Any other natural resources (use No There is no other natural source. appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details there of (with approximate Information/checklist Sl. No. Yes/No quantities/rates, wherever possible) confirmation with sources of information data 3.1 Use of substances or materials Yes Diesel & lube oil to be used for DG sets which are hazardous (as per MSIHC during power failure is stored within rules) to human health or the site. environment (flora, fauna, and Construction Phase water supplies) Diesel Consumption: 10.47 l/hr. Waste Oil Generation: 0.024l/running hour of DG Operation Phase Diesel Consumption: 238.8 l/hr. Waste Oil Generation: 0.55 l/running hour of DG

7

3.2 Changes in occurrence of disease or No Proposed project is a Residential affected disease vector (e.g. insect Development. or water borne diseases) 3.3 Affect the welfare of people e.g. by No Proposed project is a Residential changing living conditions? Development. 3.4 Vulnerable groups of people who No Proposed project is a Residential could be affected by the project e.g. Development. hospital patients, children, the elderly etc. 3.5 Any other causes No There are no any other causes.

4. Production of solid waste during construction or operation or decommissioning (MT/month) Details there of (with approximate Information/checklist Sl. No. Yes/No quantities/rates, wherever possible) confirmation with sources of information data 4.1 Spoil, overburden or mine wastes No Proposed project is a Residential Development. 4.2 Municipal waste (domestic and or Yes Construction Phase: commercial wastes) Project proponents are not going to provide any labour colony, so there would not be any domestic solid waste generation during construction. Operation Phase: Total Solid waste generation during operation phase is 261 kg/day (@0.47kg/person/day). Where 150 kg/day (@0.27kg/person/day) is the biodegradable waste and 111 kg/day (@0.2kg/person/day) is the non-biodegradable waste. 4.3 Hazardous wastes (as per Yes Waste oil from DG sets to the amount of hazardous waste management 0.55 l/running hour of DG, which will be rules) given to KSPCB, designated waste oil recyclers. 4.4 Other industrial process wastes No Proposed project is a Residential Development. 4.5 Surplus product No Proposed project is a Residential Development.

8

4.6 Sewage sludge or other sludge Yes Sludge from STP amounts to 3.25 kg/day from effluent treatment will be used as manure for the landscape. 4.7 Construction or demolition wastes Yes Construction debris amounting to 32 m3 and same will be used for roads and pavement formation. 4.8 Redundant machinery or No Redundant machinery or equipment will equipment not be used. 4.9 Contaminated soil or other No Proposed project is a Residential materials Development. 4.10 Agricultural wastes No The wastes from garden pruning and landscaping area such as dead leaves etc. shall be reused within the site for soil conditioning and manure. 4.11 Other solid wastes No There is no any other solid waste.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Details there of (with approximate Information/checklist Sl. No. Yes/No quantities/rates, wherever possible) confirmation with sources of information data 5.1 Emissions from combustion of Yes There will be emissions from the fossil fuels from stationary or combustion of HSD by the DG sets mobile sources during power failure. The estimated emissions from DG sets are in Annexure – 3(b) Page No.43. 5.2 Emissions from production No Proposed project is a Residential processes Development. 5.3 Emissions from material handling Yes There will be fugitive dust emissions including storage or transport during material handling including storage & transportation of construction materials. Suitable handling measures will be taken in order to avoid the emissions. 5.4 Emissions from construction Yes There will be fugitive dust emissions activities including plant and from transportation of raw materials equipment during the construction process. Construction process may also comprise emissions from concrete mixers, dozers, diesel pumps etc during construction. These equipments will be maintained

9

properly to have minimum impact. Quantities of emissions are enumerated Annexure – 3(a) Page No.43. 5.5 Dust or odors from handling of Yes There will be dust emission during materials including construction construction operation which will be materials, sewage and waste controlled by water sprinkling and by erecting barricades around the site. The sewage generated from the construction labourers will be routed to septic tank and soak pit. Solid wastes are handled using closed containers to avoid odour nuisance. 5.6 Emissions from incineration of No Proposed project is a Residential waste Development. 5.7 Emissions from burning of waste No Proposed project is a Residential in open air (e.g. slash materials, Development. construction debris) 5.8 Emissions from any other sources No Proposed project is a Residential Development.

6. Generation of noise and vibration and emissions of light and heat Details there of (with approximate Information/checklist Sl. No. Yes/No quantities/rates, wherever possible) confirmation with sources of information data 6.1 From operation of equipment e.g. Yes DG sets are the only noisy machinery engines, ventilation plant, crushers employed in the project, which will be located at the ground and will be housed inside the acoustic enclosures. 6.2 From industrial or similar processes No Proposed project is a Residential Development. 6.3 From construction or demolition Yes Construction works will be taken up only during day time to avoid the noise during night. Barricades will be provided around the site to partially curtail the noise. 6.4 From blasting or piling No No blasting or piling operations are envisaged. 6.5 From construction or operational Yes There will be noise generation due to traffic both construction and operational

10

traffic. 6.6 From lighting or cooling systems No No Cooling systems are proposed in the project. 6.7 From any other sources No Proposed project is a Residential Development.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Details there of (with approximate Information/checklist Sl. No. Yes/No quantities/rates, wherever possible) confirmation with sources of information data 7.1 From handling, storage, use or Yes HSD, fresh and used lube oils are stored spillage of hazardous materials in impervious tanks / containers and these containers are placed upon impervious floors in order to avoid soil contamination due to spillage, if any. The fuel required for the DG sets amounts to 238.8 l/hr. The waste oil generation from the DG sets would be 0.55 l/running hour of DG, which will be handed over to authorized waste oil recyclers. 7.2 From discharge of sewage or other No Sewage generated within the effluents to water or the land residential units will be treated up to (expected mode and place of applicable standards before using it for discharge) secondary purposes like flushing, gardening purposes. 7.3 By deposition pollutants emitted to No Proposed project is a Residential air into the land or into water Development. 7.4 From any other sources No Proposed project is a Residential Development. 7.5 Is there a risk of long term buildup No Proposed project is a Residential of pollutants in the environment Development. from these sources?

11

8. Risk of accidents during construction or operation of the project, which could affect human health or the environment Details there of (with approximate Information/checklist Sl. No. Yes/no quantities/rates, wherever possible) confirmation with sources of information data 8.1 From explosions, spillages, fires etc Yes Storage of HSD, fresh and used lube oil from storage, handling, use or is prone to dangers. Care is taken that production of hazardous substances. these are stored in closed tanks/ containers, away from any possible sources of ignition. 8.2 From any other causes No Proposed project is a Residential Development. 8.3 Could the project be affected by -- The Geological Survey of has natural disasters causing identified Mangaluru is a moderately environmental damage (e.g. floods, earthquake-prone urban center and earthquakes, landslides, cloudburst categorized the Mangaluru city in the etc) Seismic III Zone.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details there of (with approximate Information/checklist quantities/rates, wherever Sl. No. Yes/No confirmation possible) with sources of information data 9.1 Lead to development of supporting Yes The project will attract supporting facilities, ancillary development or facilities like schools, health centers, development stimulated by the community centers and other project which could have impact on commercial units which will be serving the environment e.g.: the day to day needs of the residents. -Supporting infrastructure (roads, Hence the project would be considered power supply, waste or waste water as a positive development which will treatment, etc.) lead to an increased employment. -Housing development -Extractive industries -Supply industries &other 9.2 Lead to after-use of the site, which No Many more projects could come up in could have an impact on the future. environment

12

9.3 Set a precedent for later No The surrounding area has already been developments in demand as a prime residential locality with many similar projects. Many more projects could come up. 9.4 Have cumulative effects due to Yes Many residential units and institutions proximity to other existing or already exist in the project planned projects with similar effects surroundings.

(III) Environmental sensitivity

Aerial distance (within Sl. No. Areas Name/identity 15Km) proposed project location boundary 1. Areas protected under No -- international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2. Areas which are important or i) Netravathi River i) 3.5 km sensitive for ecological reasons- wetlands, watercourses or other ii) ii) 5.0 km water bodies, coastal zone, biospheres, mountains, forests iii) Beach iii) 5.3 km

3. Areas used by protected, No -- important or sensitive species of flora and fauna for breeding, nesting, foraging, resting, over wintering, migration 4. Inland, coastal, marine or i) Someshwar Beach i) 5.0 km underground waters ii) iii)5.3 km 5. State, national boundaries Yes Karnataka & state boundary is at a distance of 5.2 km from the project site. 6. Routes or facilities used by the Yes NH 48 (Bengaluru- public for access to recreation or Mangaluru Highway) – other tourists, pilgrims areas 7.3 km from the project site. 7. Defense installations No -- 8. Densely populated or built up area Yes Mangaluru with a population

13

of 6,23,841 Nos. (2011 Census) 9. Areas occupied by sensitive man- Nitte University 400 m from the project site made land uses (hospitals, Kanachur Institute of 350 m from the project site schools, places of worship, Medical Science community facilities) K. S. Hegde Medical 900 m from the project site Academy Devaramane Temple 1.3 km from the project site 10. Areas containing important, high i) Netravathi River i) 3.5 km quality or scarce resources (ground water resources, surface ii) Someshwar Beach ii) 5.0 km resources, forestry, agriculture, fisheries, tourism, minerals) iii) Ullal Beach iii) 5.3 km 11. Areas already subjected to No Mangaluru is not subjected pollution or environmental to any major environmental damage (those where existing pollution. Secondary legal environmental standards are Ambient air quality data is exceeded ) enclosed in Annexure 1(d), Page No. 39. 12. Areas susceptible to natural Yes The Geological Survey of hazard which could cause the India has identified project to present environmental Mangaluru is a moderately problems (earthquakes, earthquake-prone urban subsidence, landslides, erosion, center and categorized the flooding or extreme or adverse Mangaluru city in the Seismic climatic conditions ) III Zone.

(IV). Proposed terms of reference for EIA studies NA

14