FORM – I (I) Basic Information

FORM – I (I) Basic Information

FORM – I (I) Basic information 1. Name of the Project “Prestige Palm Residences” Proposed Residential Development 2. Sl.No. in the schedule Serial No.8 (a) 3. Proposed capacity/area/length/tonnage Total site area –59,766.45 Sqmt to be handles/command area /lease/area (14 Acres 30.75 Guntas) / number of wells to be drilled Total built up area of the project is 31,914.025 Sqmt; consisting 101 Nos. of residential villas and a club house. 4. New/Expansion/Modernization New 5. Existing capacity/area etc NA 6. Category of project i.e., ’A’ or ‘B’ ‘B’ 7. Does it attract the general condition? If No yes, please specify 8. Does it attract the specific condition? If No yes, please specify 9. Location At Survey Nos. 321-2P1, 321-2P2, 323-1P & 323-3P Kotekar Village, Mangaluru Hobli, Mangaluru Taluk, Dakshina Kannada District. a. Plot/Survey/Khata No. Survey Nos. 321-2P1, 321-2P2, 323-1P & 323-3P b. Village Kotekar Village c. Thesil Mangaluru Taluk d. District Dakshina Kannada District e. State Karnataka 10. Nearest Railway station/Airport along Thokottu Railway Station, which is around with distance in km. 6.0 km from the project site. Mangaluru City Railway station, which is around 13.0 km from the project site. Mangaluru International Airport is around 24.0 km from project site. 11. Nearest Town, City, District, Mangaluru Headquarters along with distance in km 12. Village Panchayath, Zilla Parishad, Village Panchayat Municipal Corporation, Local body (Complete local address with Telephone Nos. to be given) 13. Name of the Applicant Mr. Zaid Sadiq 14. Registered Address M/s. Prestige Estates Projects Limited, The Falcon House, No: 1, Main Guard Cross Road, Bengaluru-560 001. 1 15. Address for Correspondence: M/s. Prestige Estates Projects Limited , The Falcon House, No: 1, Main Guard Cross Road, Bengaluru-560 001. Name Mr. Zaid Sadiq Designation (Owner/Partner / CEO) Executive Director Address M/s. Prestige Estates Projects Limited , The Falcon House, No: 1, Main Guard Cross Road, Bengaluru-560 001. Pin code 560 001 E-mail [email protected] Telephone No. 080-25591080 Fax No. 080-25591945 16. Details of alternative sites examined, if No alternative sites were examined. any. Location of these sites would be shown on a Topo sheet 17. Interlined Projects No interlined projects 18. Whether separate application of No interlinked project has been submitted? 19. If Yes, date of submission -- 20. If No, reason Proposed project is a new individual project. 21. Whether the proposal involves approval / This proposal does not require approval/ Clearance under : if yes, Details of the clearance under Forest Act, Wild life Act & CRZ same and their status to be given Notification. The Forest (conservation) Act 1980? The wild life (protection) Act 1972? The C R Z Notification, 1991? 22. Whether there is any Government order / No Policy relevant / relating to the site? 23. Forest land involved (Hectares) No forest land involved. 24. Whether there is any litigation pending No against the project and / or land in which the project is propose to be set up? a) Name of the court b) Case No. c) Orders / directions of the court, if any and its relevance with the proposed project. 2 (II) Activity immediate 1. Construction, operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details there of (with approximate Information/checklist Sl. No. Yes/No quantities/rates, wherever possible) confirmation with sources of information data 1.1 Permanent or temporary change No As per the Master Plan (Revision-II) 2021 in land use, land cover or (Final) Mangaluru local planning area, the topography including increase in proposed project site is designated as intensity of land use(with respect Residential zone. Also the land has been to local land use plan) converted to Residential purpose. Master Plan and land conversion is enclosed as Annexure 1(a) Page No.31-34. 1.2 Clearance of existing land, Yes Proposed site consists of coconut trees, vegetation and buildings? areca nut trees, jungle trees & palm trees; these will be cleared during site formation. 1.3 Creation of new land uses? No As per the Master Plan (Revision-II) 2021 (Final) Mangaluru local planning area, the proposed project site is designated as Residential zone. 1.4 Pre-construction investigations No A pre-construction investigation of soil will e.g. bore houses, soil testing? be carried out at the project site. 1.5 Construction work? No After obtaining the Environmental Clearance only construction work will be started. 1.6 Demolition work? No -- 1.7 Temporary sites used for No Labor requirement for the proposed project construction workers or housing is about 100Nos/day. The construction of construction workers? laborers will be sourced from nearby places; hence there is no provision of temporary housing for construction workers. 1.8 Above ground buildings, Yes Proposed project is coming up with 101 structures or earthworks Nos. of residential villas and a clubhouse including linear structures, cut which is sprawled across 19 buildings. Villas and fill or excavations (Building 2-19) with configuration of G+1UF and a club house (Building-1) with configuration of B+LGF+UGF. The maximum height of the building is 7.65m. Hence the 3 project involves excavation, construction of above ground buildings and landscaping. 1.9 Underground works including No Proposed project is a Residential mining or tunneling? Development. 1.10 Reclamation works? No Proposed project is a Residential Development. 1.11 Dredging? No Proposed project is a Residential Development. 1.12 Offshore structures? No Proposed project is a Residential Development. 1.13 Production and manufacturing No Proposed project is a Residential processes? Development. 1.14 Facilities for storage of goods or Yes The materials required for the purpose of materials? construction during the construction phase will be stored within the project site and the details of these materials are enclosed in Annexure – 2(b) Page No.43. During the operational phase, HSD lube oil & waste oil from the DG sets will be stored in leak proof containers on impervious floor in a designated place within the site premises. 1.15 Facilities for treatment or Yes During construction phase: disposal of solid waste or liquid During constructions phase, the domestic effluents? solid wastes will be minimal as there is no provision of labor colony; the generated domestic solid waste will be handed over to authorized vendors and the generated domestic sewage will be routed to septic tank and soak pit. During operation phase: During operation phase, the solid wastes will be collected by door to door collection; segregation of organic & recyclable wastes will be done. The segregated organic wastes will be further processed in organic waste converter and the recyclable wastes, Hazardous wastes & E-waste will be handed over to authorized waste recyclers. The domestic liquid effluents will be treated in a sewage treatment plant. Details of 4 treatment facilities are as in Annexure – 1(c) Page No.36-38. 1.16 Facilities for long term housing of No As local people will be hired for the routine operational workers? maintenance, no permanent facilities are proposed. 1.17 New road, rail or sea traffic No The existing road facility will be made use during construction or operation? of. 1.18 New road, rail, air waterborne or No The existing road facility will be made use other transport infrastructure of. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Traffic pattern in the approach road during transport routes or infrastructure construction and operation phase would be leading to changes in traffic minimal. movements? 1.20 New or diverted transmission No Electric power will be supplied by MESCOM lines or pipelines? from the existing transmission line. Water for operation phase shall be taken from 2 Nos. of existing Borewells/Village Panchayat. 1.21 Impoundment, damming, culver No Proposed project is a Residential ting, realignment or other Development. changes to the hydrology or watercourses or aquifers? 1.22 Stream crossings? No There is no stream crossing within the site 1.23 Abstraction or transfers of water Yes There are 2 Nos. of existing Borewells at the from ground or surface waters? project site. The construction water requirement will be sourced from existing Borewells. And the operational phase water requirement is through 2 Nos. of existing Borewells/Village Panchayat. 1.24 Changes in water bodies or the No Internal storm water drain with pre-cast land surface affecting drainage or perforated cover will be provided within the run-off? site in order to carry out the storm water in to the recharge pits to recharge the ground water and in case of worst rainfall excess will be routed to the external storm water. 1.25 Transport of personnel or Yes Raw materials for Construction will be materials for construction, transported by trucks and the trips are 5 operation or decommissioning? scheduled only during wee hours. 1.26 Long-term dismantling or No No such works are involved. decommissioning or restoration works? 1.27 Ongoing activity during No Proposed project is a Residential decommissioning which could Development. have an impact on the environment? 1.28 Influx of people to an area either Yes There will be a temporary influx of temporary or permanently? construction laborers, and this will be only for a short period until the completion of the construction work. The proposed project is a residential development. During operation phase, there will be a permanent influx of about 556 Nos. 1.29 Introduction of alien species? No There is no introduction of alien species.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    14 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us