Royal Train Duties
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Collision. Wrawby Junction. 1983-12-09
RAILWAY~NSPECTORATE DEPARTMENTOFTRANSPORT 2 MARSHAMSTREET LONDON SWIP 3EB 19th March 1985. I have the honour to report, for the information of the Secretary of State, in accordance with the Direc- tion of 21st December 1983 the result of my Inquiry into the collision between a freight train and apassenger train that occurred at about 18.18 on 9th December 1983 at Wrawby Junction, near Scunthorpe, in the Eastern Region of British Railways. 2. The 17.32 Cleethorpes to Sheffield 2-car Diesel Multiple Unit (DMU) passenger train was travelling along the Down Fast lineat about 5 mile/h when it was struck about midway along the right-hand side of the leading carriage by Locomotive No. 47299 which was hauling the 15.02 Drax to Lindsey freight train compris- ing 9 empty oil tank wagons. Because a track-circuit failure prevented a set of points from operating and the protecting signals from clearing, the signalman had hand-cranked the points to the Normal position. He failed to clamp them Normal as he should have done. Both trains had been called forward under caution but the freight train driver failed to stop at the signal box. His train was diverted at low speed into the side of the passenger train through the points that had, in the meantime, reset themselves to the Reverse position. 3 The leading vehicle of the DMU was derailed and turned onto its side, the trailing vehicle was derailed but remainedupright. There were 1 I passengerson the DMU and1 regret to report that on'eof them was killed instantly, the Emergency Services were quickly at the scene and 3 others were taken to hospital 2 of whom were discharged after treatment. -
Romanian Films
Coperta_RomFilm2020.pdf 2 07.02.2020 18:31:23 !"#$ % !"!" ROMANIAN FILMS !"#$ % !"!" ROMANIAN FILM PROMOTION !"#$ % & MINORITY CO'PRODUCTIONS !"#$ % #$ !"!" % !( MINORITY CO'PRODUCTIONS !"!" % )$ IN DEVELOPMENT * PRODUCTION * POST'PRODUCTION !"!" % ($ ROMANIAN FILMS INDEX % +& 2019 !GANG: ANOTHER KIND OF CHRISTMAS !GANG: UN ALTFEL DE CRĂCIUN Directed by: Matei Dima Screenplay: Radu Alexandru, Vali Dobrogeanu, Matei Dima Producers: Anca Truţă, Christmas is near and Selly, who has just Ştefan Lucian, Matei Dima met Corneliu Carafă, vanishes into thin air. Selly’s band colleagues first think that Cast: Selly, Diana Condurache, Gami, Pain, they should replace him with another Cosmin Nedelcu, Julia Marcan, Matei Dima singer, but soon it becomes apparent that Selly may very well be in danger. A great CONTACTS: Vertical Entertainment adventure begins! [email protected] $/ MIN NATIONAL RELEASE DATE: DECEMBER !+, !"#$ ARREST AREST Directed by: Andrei Cohn Screenplay: Andrei Cohn Producer: Anca Puiu Cast: Alexandru Papadopol, Iulian Postelnicu, András Hatházi, Sorin Cociș August, 1983. Architect Dinu Neagu, his wife and the two children spend a few Main Selection: Karlovy Vary IFF 2019 days on a nude beach near an industrial area. Dinu is arrested and taken to the Other films by the director: Bucharest police office, where he is put in Back Home (2015) a cell together with Vali, a collaborator of the Securitate. As days go by, things will CONTACTS: Mandragora get more and more absurd... [email protected] #!/ MIN NATIONAL RELEASE DATE: SEPTEMBER !", !"#$ PRODUCTION COMPANY: MANDRAGORA 4 BEING ROMANIAN: A FAMILY JOURNAL * JURNALUL FAMILIEI #ESCU Directed by: Şerban Georgescu Screenplay: Şerban Georgescu Producer: Şerban Georgescu The story of millions of Romanians who Cast: Ioana Pârvulescu, have ended up living between these Mihaela Miroiu, Sorin Ioniţă borders and having to stand each other: just the way things happen in every large Other films by the director: Cabbage, family. -
Download the Report Item 4
BOROUGH COUNCIL OF WELLINGBOROUGH AGENDA ITEM 4 Development Committee 17 February 2020 Report of the Principal Planning Manager Local listing of the Roundhouse and proposed Article 4 Direction 1 Purpose of report For the committee to consider and approve the designation of the Roundhouse (or number 2 engine shed) as a locally listed building and for the committee to also approve an application for the addition of an Article 4(1) direction to the building in order to remove permitted development rights and prevent unauthorised demolition. 2 Executive summary 2.1 The Roundhouse is a railway locomotive engine shed built in 1872 by the Midland Railway. There is some concern locally that the building could be demolished and should be protected. It was not considered by English Heritage to be worthy of national listing but it is considered by the council to be worthy of local listing. 2.2 Local listing does not protect the building from demolition but is a material consideration in a planning application. 2.3 An article 4(1) direction would be required to be in place to remove the permitted development rights of the owner. In this case it would require the owner to seek planning permission for the partial or total demolition of the building. 3 Appendices Appendix 1 – Site location plan Appendix 2 – Photos of site Appendix 3 – Historic mapping Appendix 4 – Historic England report for listing Appendix 5 – Local list criteria 4 Proposed action: 4.1 The committee is invited to APPROVE that the Roundhouse is locally listed and to APPROVE that an article 4 (1) direction can be made. -
Tglengarrians See King and I Queen on Royal Tour
VOL. Xivn—No. 21, Alexandria, Ont., Friday, May 26, 1939. $2.00 A YEAS tGlengarrians See King and i Queen on Royal Tour #8,000^at|Alexandria, Sunday, Give IN MAGNIFICENT SETTING CANADA GETS ROYAL SALUTE Whole Empire Heard His Majesty Monarchs Real Highland Welcome Speak From Winnipeg Wednesday '/V .- "■ ■- Flowers Presented by. Little Tots During Seven- 1 pill % .. Royal Visitors Given Warm Reception At All Minute Stop Here.—Queen Asks Ontario Points—Now Getting For Pipe Music x Prairie Welcome Winnipeg, May ^4—British subjects in the four corners of the world today Their Majesties King George VI and Queen Elizabeth came to Alex- heard King George, speaking from the centre of Canada in an Empire Day ad- andria Sunday afternoon and during- their seven-minute stop, here, won a dress, declare that spiritual dignity and material happiness of human life must be : lasting plaice in the hearts of over 8,000 wildly cheering subjects who hiad general before the Empire can claim to be of service to its own people and the assembled from every section of Glengarry and many outside points to do world. them honor. Throughout the entire visit and until the train was lost to view. He said the Empire’s wealth and power were but instruments, and the end was -Their Majesties remained on the observation platform plainly visible ta » all <(freedom, justice and peace in equal numbers for all, secure against attack from present. While yet retaining their regal bearing, the king and Queen dis- without and from within.”. played a warm, democratic friendliness as. -
Station Travel Plan - Barnetby Introduction
Station Travel Plan - Barnetby Introduction What is a Station Travel Plan? The Department for Transport defines a Station Travel Plan as: “A strategy for managing the travel generated by your organisation, with the aim of reducing its environmental impact, typically involving support for walking, cycling, public transport and car sharing”. TransPennine Express maintains Station Travel Plans for all 19 stations where they are currently the Station Facility Owner (SFO). Why Develop a Station Travel Plan? Up until March 2020 demand for rail continued to grow, with more and more people choosing to travel by rail each year. It is predicted that, post the COVID-19 pandemic, within the next 30 years demand for rail will more than double. TransPennine Express is at the heart of this growth, with double digit percentage growth in passenger journeys year on year historically, with a doubling of customer numbers since the franchise was established in 2004. With growth of this magnitude, it is important that alongside investing in new trains, operating more services and enhancing the customer experience, we are considerate of how customers travel to and from the station to access the railway network. Against the landscape of a changing culture towards private transport, with many millennials choosing not to own a car, and instead adopt solutions such as Uber, dockless bike hire and car sharing schemes, a Station Travel Plan allows operators to identify the developments which are required to keep pace with society. It also allows us to identify key areas of change, with the evident shift from internal combustion to electric cars and hybrids, we are able to set out plans for providing the infrastructure to support this shift. -
Accident. Settle. 1960-01-21
MINISTRY OF TRANSPORT RAILWAY ACCIDENTS Report on the Accident which occurred on 21st January 1960 near Settle in the London Midland Region British Railways LONDON : HER MAJESTY'S STATIONERY OFFICE 1960 CONTENTS Page INTRODUCTORY ...... ... ... ... ... ... ... ... ... ... ... 1 1. GENERAL DESCRIPTION ... ... ... ... ... ... ... ... ... 2 11. THE DAMAGE TO THE TRAINS ... ... ... ... ... ... ... ... 2 111. THE BRITANNIA LOCOMOTIVE ... ... ... ... ... ... ... IV. THE DAMAGE TO THE TRACK AND THE CAUSE OF THE DERAILMENT V. THE RUNNING OF THE EXPRESS ...... .. ... ... ... ... W. EVIDENCE ...... ... ... ... ... ... ... ... ... ... VII. CONCLUSIONS, REMARKS, AND RECOMMENDATIONS ... ... ... DRAWINGS Fig. 1. Map of the Midland route: Glasgow-Leeds. Fig. 2. Profile of the line: CarlisleSettle Junction. Fig. 3. The site of the accident. Fig. 4. The Down track at the point of derailment. Fig. 5. The Britannia locomotive: engine diagram. Fig. 6. The Britannia locomotive: end view showing presumed position of the displaced motion during overturning, and later when damaging the Down track. Fig. 7. The Britannia locomotive: detail of the right hand motion. Fig. 8. Front slide bar bolt before modification. Fig. 9. Front slide bar bolt after modification. PHOTOGRAPHS 1. The Britannia engine: the displaced right hand motion assembly. 2. The Down track at the point of derailment. 3. Front end of slide bar assembly before modification. 4. Front end of slide bar assembly after modification. MINISTRYOF TRANSPORT. BERKELEYSQUARE HOUSE, LONDON,W.1. 19th April 1960. I have the honour to report for the information of the Minister of Transport, in accordance with the Order dated 22nd January, the result of my Inquiry into the accident which occurred at about 1.48 a.m. on 21st January 1960 near Settle on the former Midland Railway route between England and Scotland in the London Midland Region, British Railways. -
Rail Operations Skills for the Twenty First Century
www.railwayoperators.co.uk Issue 47 | April 2021 THE BIANNUAL MAGAZINE FOR MEMBERS OF THE INSTITUTION OF RAILWAY OPERATORS IRO here for you, supporting your Rail operations skills development Within 24 hours of the first Covid lockdown being announced, IRO had for the twenty first “ungated” access to our Professional Operators Development (POD) tool, ensuring that it could be reached by everyone in rail and not just members and the employees of century corporate members. We predicted that online resources for self-development would be useful for those isolating or furloughed. We made them free Fiona Tordoff Rachel Heath and they have been widely taken up. Not only AIRO FIRO has IRO membership been increasing we have also experienced a growing number of enquiries coming through from engineers and Fiona Tordoff IRO’s CEO and Rachel Heath, IRO Midlands Area Chair reflect on the important other disciplines who are interested in joining. contribution made by operations to the success of our railways and the vital part our profession must Just before second lockdown, IRO launched Rail Academy (RA), offering online rail play in taking the rail industry forward… operations learning with unlimited potential Believe it or not Railway Operations is a more for customisation by employers, again putting established profession than many of us think - learning within arm’s reach of anyone working as old as the engineering disciplines that it sits in rail. alongside. Ever since the first railways were built, Because of restrictions, we moved our area operators and engineers have worked side by side, events programme online with free monthly and it is well over 200 years since the first rule book webinars broadcasting to regular audiences was published! of over two hundred people. -
The Sovereign Grant and Sovereign Grant Reserve Annual Report and Accounts 2017-18
SOVEREIGN GRANT ACT 2011 The Sovereign Grant and Sovereign Grant Reserve Annual Report and Accounts 2017-18 Presented to Parliament pursuant to Section 2 and Section 4 of the Sovereign Grant Act 2011 Ordered by the House of Commons to be printed 27 June 2018 HC 1153 © Crown copyright 2018 This publication is licensed under the terms of the Open Government Licence v3.0 except where otherwise stated. To view this licence, visit nationalarchives.gov.uk/doc/open- government-licence/version/3 Where we have identified any third party copyright information you will need to obtain permission from the copyright holders concerned. This publication is available at www.gov.uk/government/publications Any enquiries regarding this publication should be sent to us using the contact details available at www.royal.uk ISBN 978-1-5286-0459-8 CCS 0518725758 06/18 Printed on paper containing 75% recycled fibre content minimum. Printed in the UK on behalf of the Controller of Her Majesty’s Stationery Office. Produced by Impress Print Services Limited. FRONT COVER: Queen Elizabeth II and The Duke of Edinburgh visit Stirling Castle on 5th July 2017. Photograph provided courtesy of Jane Barlow/Press Association. CONTENTS Page The Sovereign Grant 2 The Official Duties of The Queen 3 Performance Report 9 Accountability Report: Governance Statement 27 Remuneration and Staff Report 40 Statement of the Keeper of the Privy Purse’s Financial Responsibilities 44 The Certificate and Report of the Comptroller and Auditor General to the Houses of 46 Parliament and the Royal -
Station Travel Plan Barnetby
Station Travel Plan Barnetby ____________________________________________________________________________________________________________________________________________________________ TransPennine Express. Station Travel Plan. Station. Version 1.1. Published 31/03/2017. Author: Charlie French, Transport Integration Manager TransPennine Express Station Travel Plans have been produced in line with guidance issued by the Association of Train Operators (ATOC). All information contained within the Station Travel Plan is correct as of the date of publishing. Station Travel Plans will be updated and republished on the anniversary of the publishing date above. Station Travel Plan Barnetby ______________________________________________________________________________________________ Introduction What is a Station Travel Plan? The Department for Transport defines as Station Travel Plan as: ‘A strategy for managing the travel generated by your organisation, with the aim of reducing its environmental impact, typically involving support for walking, cycling, public transport and car sharing’ Over the next two years, TransPennine Express is undertaking Station Travel Plans for the 19 stations where they are currently the Station Facility Owner (SFO). Why Develop a Station Travel Plan? Demand for rail is growing. More people are choosing to travel by rail and demand has risen to its highest point since 1920, and it is set to keep on rising, with predictions that demand will more than double within the next 30 years. This increase means that more and more people are travelling to and from our stations, with cars often being the number one choice for getting to/from the station, either parked up or for drop off/pick up. All of this meaning that car parking and suitable infrastructure for drop off/pick up is becoming a major issue for our customers. -
Network Rail Strategic Business Plan Control Period 4
Network Rail Strategic Business Plan Control Period 4 October 2007 Contents Contents Executive summary 1 1 The strategic context 20 2 The demand for rail 25 3 The industry strategy 33 4 Network Rail’s policies and strategies 52 5 Efficiency and input prices 84 6 Our plan for CP4 119 7 Expenditure and financing 171 8 Outputs 174 9 Options and sensitivities 194 10 Summary of future developments 201 Appendices 204 Network Rail October 2007 Strategic Business Plan 1 Executive summary summary Executive Executive summary The last review was therefore necessary to place the business on a secure financial footing so that The demand for both passenger and freight rail we could begin to address these problems services has increased dramatically over the last together with our industry partners in Control decade. Last year alone, total passenger Period 3 (CP3). demand increased by more than eight per cent and freight demand has also continued to grow Change is a gradual process not just in the strongly. railway but elsewhere as well. Despite this, we are approaching the 2008 periodic review from a Moreover, there is a clear consensus throughout very different position compared to the last the industry that demand growth from review. We always said that the early years of passengers and freight users will remain strong Network Rail were about stabilising the company for the foreseeable future. Increasing congestion while preparing for the further challenges ahead on roads and increasing environmental sensitivity and we have now largely completed the first two mean that rail should be well placed to continue phases of our three-phase transformation winning market share. -
Cycling ➔ • Walking ➔ • Public Transport ➔ • Road Access ➔ • Customer Analysis ➔ • Evaluation ➔ • Delivery ➔
Station Travel Plan Barnetby TransPennine Express. Station Travel Plan. Barnetby. Version 3. Published 31/03/2019 Contents TransPennine Express Station Travel Plans are produced in line with guidance issued by Rail • Introduction ➔ Delivery Group (RDG) formerly the Association of Train Operators (ATOC). • Process ➔ All information contained within the Station Travel Plan is correct as of the date of publishing. Station Travel Plans will be updated and republished on the anniversary of the publishing date. • Stakeholders ➔ Use the Dark Blue arrows to navigate to each section of the document. • Local Area ➔ • Accessing the Station ➔ • Cycling ➔ • Walking ➔ • Public Transport ➔ • Road Access ➔ • Customer Analysis ➔ • Evaluation ➔ • Delivery ➔ Station Travel Plan. Barnetby. Version 3. Published 31/03/2019 Introduction What is a Station Travel Plan? The Department for Transport defines as Station Travel Plan as: ‘A strategy for managing the travel generated by your organisation, with the aim of reducing its environmental impact, typically involving support for walking, cycling, public transport and car sharing’ TransPennine Express maintains Station Travel Plans for all 19 stations where they are currently the Station Facility Owner (SFO). Why Develop a Station Travel Plan? Demand for rail continues to grow, with more and more people choosing to travel by rail each year. It is predicted that within the next 30 years demand for rail will more than double. TransPennine Express is at the heart of this growth, with double digit percentage growth in passenger journeys year on year, with a doubling of customer numbers since the franchise was established in 2004. With growth of this magnitude, it is important that alongside investing in new trains, operating more services and enhancing the customer experience, we are considerate of how customers travel to and from the station to access the railway network. -
Review Notices
RAILWAYS ACT 1993 2018 PERIODIC REVIEW REVIEW NOTICE: STATION LONG TERM CHARGES TO: (1) the persons whose names are set out in Part 1 of Annex 1 to this Review Notice (the “Train Operators”); (2) the persons whose names are set out in Part 2 of Annex 1 to this Review Notice; (3) Network Rail Infrastructure Limited (“Network Rail”); and (4) the Secretary of State for Transport, the Scottish Ministers and the Treasury, together the “Addressees”. 1 General 1.1 This review notice (the “Review Notice”) is given in accordance with paragraph 4 of Schedule 4A to the Railways Act 1993 (the “Act”). 1.2 The Office of Rail and Road (“ORR”) has undertaken a review of: (a) the amount in respect of each station set out in the relevant annex of the Station Access Conditions which is referred to in the definition of “Long Term Charge” in the relevant Station Access Conditions (the “Long Term Charge”); and (b) the times at which, and the manner in which, those amounts are payable, (the “Review”). 1.3 ORR’s conclusions on the Review, and its reasons for those conclusions, are: (a) set out in a series of documents referenced in the document entitled “2018 periodic review final determination: Overview of approach and decisions – October 2018” and published by ORR on 31 October 2018, and in particular those documents referenced in Chapter 1 of that document1; and (b) hereby incorporated into this Review Notice. 1.4 By publishing this Review Notice and serving it on each of the Addressees, ORR is initiating the implementation of the Review.