DETAILS OF ONGOING SCHEMES FROM 50 CRORES & ABOVE Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto March upto March 2020 upto 2020 upto Progress in 2019 2019 reporting reporting Percentage( month month %)

G10 0612181 26 056 15-16 Const. of Special Stadium Phase-Ist at Dr Shakuntala Lucknow Lucknow 5066.57 4216.57 3950.92 300 512.45 31-Mar-16 95% 12.50 Misra National Rehabilitation University G02 2709044 27 092 10-11 Providing & Laying Peripheral Sewer Line Phase-III Greater Noida Greater Noida 5068.48 5048.17 5071.40 480 4.05 30-Oct-10 85% 4.40

G10 5012052 26 056 15-16 Installation for Artificial Body & Rehabilitation Centre at Dr Mohan Road Lucknow 5262.71 4549.68 4055.63 261.75 05-Feb-16 94% 12.50 Shakuntala Misra National Rehabilitation University

G02 4507302 45 023 07-08 Laying of Sewer Line at Greater Noida Express Noida Noida 5455.20 4876.50 5200.24 02-Oct-07 94% 4.40 Highway(Left Side) G10 2411796 24 088 15-16 Rajeev Awas Scheme Varanasi 5499.23 2495.93 2009.50 08-Jul-15 45% 12.50 G13 2109442 21 098 11-12 Const. of 1197 No. Houses under IHSDP Sadar Faizabad 5526.37 4521.12 4481.24 06-Jun-11 73% 0.00 G04 0411354 04 088 14-15 Rajeev Awas Scheme Meerut 5647.80 2014.58 2009.53 12-Dec-14 40% 12.50 G15 1111370 11 070 14-15 Const. of 1500 Nos. Residence under Aasra Scheme Sajari Kanpur Nagar 5760.28 4296.76 3160.99 326.08 24-Dec-14 67% 12.50 G08 5110754 51 088 13-14 Rajeev Awas Scheme Phase-I Raebareli Raebareli 6460.76 2373.66 2354.59 8.87 2363.46 01-Oct-13 44% 12.50 Nagar G13 47119 21 032 06-07 Const. of International Sports Stadium Faizabad Faizabad 7999.52 13156.46 12980.52 152.00 03-Jun-06 77% 12.50 G09 0808889 08 092 10-11 Const. of SPS, Raising main & Treatment Plant under Shastripuram Agra 7999.85 7673.17 7498.70 32.526 06-Aug-10 90% 12.50 External Sewerage Scheme at Shastripuram G14 3412944 34 077 18-19 Consrtuction of Multi purpose Hall cum examination centre Jaunpur Jaunpur 8611.29 3440.00 1354.25 263.38 25-Jun-18 15% 12.50 building at VBSPU G02 2508855 25 208 10-11 Const. of Homiopathic Medical College Aligarh Aligarh 8739.65 8551.81 8741.79 29-Jun-10 98% 12.50 G14 3807099 38 080 06-07 Const. of IT Base Engineering Collage Mirzapur Mirzapur 8868.08 3600.00 3600.00 29-Jan-07 35% 12.50 G14 1908192 19 033 08-09 Const. of Govt. Homiopathic Medical College Barhalganj Gorakhpur 8998.20 7714.58 7437.37 273.36 30-Nov-09 87% 12.50 G07 1209440 12 096 11-12 Laying of Sewer Line, Water Supply Scheme & Const. of Ghaziabad Ghaziabad 9483.43 836.38 826.94 06-Jun-11 25% 12.50 Drain at Khora Colony G02 27005 27 023 02-03 Laying of Sewer Line at Greater Noida Express Noida Noida 9833.40 8330.87 8589.85 03-Feb-03 95% 4.40 Highway(Right Side) G08 0610925 22 012 13-14 Urban Training & Research Center Gomti Nagar Lucknow 10943.00 10535.84 10534.10 0.50 11-Feb-14 95% 12.50 G06 0111472 54 007 14-15 Const. of Naveen District Jail Rampur Rampur 11684.03 2000.00 1786.06 26-Feb-15 15% 12.50 G13 4409283 21 064 10-11 Const. of International Ram Lilla Centre Ayudhya Faizabad 13233.77 347.86 227.95 28-Mar-11 65% 12.50 G02 2813106 28 012 18-19 Construction of training center(Phase-01) for Honorable Ghaziabad Ghaziabad 16867.74 10000.00 39.24 30.92 03-Jan-19 40% 12.50 Public Representatives G10 5513115 55 034 18-19 Construction of Government Medical College, Fatehpur Fatehpur Fatehpur 21249.56 4900.00 6.60 30.53 08-Feb-19 2% 5.00 G09 0813091 08 034 18-19 Construction of medical college at Etah Etah Etah 21684.83 5000.00 863.33 483.309 11-Dec-18 5.00 G15 2208489 15 024 09-10 Const. of Manyawar Sir Kashiram Ji Agricultural & Banda Banda 43384.44 35939.70 37735.04 48.26 15-Dec-09 96% 12.50 Technical University Total 259328.19 156419.64 134515.78 788.87 4782.58 DETAILS OF ONGOING SCHEMES FROM 25 CRORES TO 49.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto March upto March 2020 upto 2020 upto Progress in 2019 2019 reporting reporting Percentage( month month %)

G08 2911395 29 070 14-15 Const. of 369 Nos. Residence under Aasra Scheme Mohan Unnao 2522.67 2430.22 2430.21 15-Jan-15 94% 12.50 G14 1912063 19 036 15-16 Const. of 15 No. Court Room Gorakhpur Gorakhpur 2546.08 1000.00 1.09 12.50 G15 1511743 15 036 15-16 Const. of 11(G+2) Court Room & other External Works at Chitrkoot Chitrkoot 2574.93 5.00 2.79 12-Jun-15 12.50 District Court G06 5410967 54 009 13-14 Const. of Boundary Wall at Kabristan/Antesthi Sthal Rampur Rampur 2584.38 2584.38 2584.70 10-Mar-14 98% 12.50 G01 1811530 18 088 14-15 Rajeev Awas Scheme Moradabad Moradabad 2678.70 1916.04 1751.52 21.35 27-Mar-15 69% 12.50 G08 1310906 13 034 13-14 Const. of Type-4 Residential Bhawan at SGPGIMS SGPGIMS Lucknow 2695.03 2560.28 2580.81 9.36 30-Jan-14 75% 12.50 G10 2410111 24 012 12-13 Development works of Asshi Varanasi Varanasi 2727.75 426.00 106.00 23-May-12 15% 12.50 G09 0812906 08 201 17-18 Const. of Phase-A at Jawahar Navodaya Vidyalaya Kanshiram Kanshiram 2741.45 1717.07 1692.55 1.37 07-Apr-18 77% 4.00 Nagar Nagar G07 1212963 12 201 18-19 Construction of Phase-A works at JNV, Rasulpur, Distt.- Rasulpur Palwal 2795.63 1135.15 1133.46 240.17 434.913 27-Aug-18 65% 4.20 Palwal (HR) G14 1412155 14 009 15-16 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Deoria Deoria 2804.95 1000.00 999.99 31-Mar-16 80% 12.50 2015-16(Phase-1) G10 0611176 06 070 14-15 Const. of 780 Nos. Residence under Aasra Scheme Chunnu Lucknow 2840.41 2726.70 2522.69 10.65 19-Aug-14 90% 12.50 Kheda G09 3511564 35 088 14-15 Rajeev Awas Scheme Firozabad Firozabad 2856.38 903.58 901.44 31-Mar-15 42% 12.50 G10 2411647 24 036 15-16 Const. of 16 No. Court Room at District Nayalaya Varanasi Varanasi 2870.66 2727.13 2710.10 10.00 10-Jun-15 89% 12.50 G15 4811979 48 088 15-16 Const. of IN-C-Too Residence at Nagar Palika Parishad Hamirpur Hamirpur 2894.44 1209.90 1201.71 3.00 21-Dec-15 90% 12.50 under Asara Scheme G14 2009094 20 036 10-11 Const. of Non-Residential Building Sant Sant Kabir 2908.49 2908.47 2897.50 30-Nov-10 99% 12.50 Nagar Nagar G08 1310279 13 034 12-13 Extention & Fire-Fighting work in Main Hospital Bhawan at SGPGIMS Lucknow 2911.12 2543.61 1941.74 31.48 28-Dec-12 81% 12.50 SGPGIM G02 4513057 45 201 18-19 Construction of Navoday Vidyalaya Fajilka, Punjab(Phase Fajilka Fajilka 2926.40 537.03 300.59 145.86 194.44 02-Nov-18 21% 4.46 A) G04 3213161 32 201 18-19 Construction of Phase-A works at JNV Ratlam Ratlam 2961.66 274.10 0.00 212.51 08-Mar-19 7% 4.20 G15 1509146 15 208 10-11 Const. of Govt. Ayurvedic Degree College & Hospital Attra Banda 2967.23 2677.31 2672.37 18-Jan-11 80% 12.50 G14 1909692 20 098 11-12 Const. of 912 No. House under IHSDP Padrouna Kushinagar 2994.18 1346.05 975.56 10-Aug-11 97% 0.00 G01 1811526 18 088 14-15 Const. of RCC Drain & Jal Nikashi at Nagar Palika Amroha Amroha 3007.86 2406.28 2425.36 27-Mar-15 67% 12.50 Parishad G15 1008276 33 090 09-10 Solid Waste Management Works Allahabad Allahabad 3041.00 3041.78 2839.00 05-May-09 95% 0.00 G14 3412218 34 033 16-17 Const. of 100 Bedded Hospital Haraiya Basti 3046.17 1918.46 1916.64 07-May-16 58% 12.50 G07 4113165 41 201 18-19 Construction of Phase-A at JNV Dwarka Dwaraka 3101.88 309.66 208.98 0.52 08-Mar-19 1% 4.46 G07 4113164 41 201 18-19 Construction of Phase-A at JNV Morbi Morbi 3102.56 312.52 306.53 1.25 08-Mar-19 15% 4.46 G14 1909952 19 036 11-12 Const. of 24 No. Residences Type-IV for Judicial officer Gorakhpur Gorakhpur 3143.69 2648.11 2079.85 61.81 01-Aug-13 69% 12.50

G09 0812159 08 012 15-16 Const. of Drainage System, Dhanoli Agra Agra 3148.43 2000.00 1964.65 31-Mar-16 45% 12.50 G02 2511692 25 070 15-16 Const. of 456 Nos. Residence under Aasra Scheme Chhara Aligarh 3164.00 652.52 90.36 10-Jun-15 7% 12.50 G02 46014 45 023 02-03 Beautification of Express Highway Noida Noida 3173.87 2258.00 2077.22 23-Oct-02 65% 4.40 G09 3611852 36 088 15-16 Rajeev Awas Scheme Dadyapur Jhansi 3204.55 2062.46 1690.17 106.81 17-Aug-15 70% 12.50 G02 4310069 25 033 11-12 Const. of 100 Bedded Hospital Kashiram Kashiram 3358.20 3128.97 2767.53 39.67 30-Mar-12 92% 12.50 Nagar Nagar G02 2511693 25 088 15-16 Rajeev Awas Scheme Aligarh Aligarh 3449.00 2183.86 1357.73 103.22 10-Jun-15 45% 12.5 G08 3709141 51 098 10-11 Const. of 1028 No. House under IHSDP, Parsadepur Amethi Chhattrapati 3449.61 2001.38 1999.76 15-Jan-11 80% 0.00 Sahu Maharaj Nagar G01 3111864 31 088 15-16 Rajeev Awas Scheme Ghaziabad Ghaziabad 3468.88 1995.27 2062.53 54.522 15-Jun-15 48% 12.50 G15 1110777 11 070 13-14 Const. of Residence under Aasra Scheme Ghatampur Kanpur Nagar 3495.93 3495.93 2654.28 187.12 26-Oct-13 78% 12.50 G06 5412515 54 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Rampur Rampur 3531.02 2000.00 2083.28 26-Dec-16 78% 12.50 G02 2710244 45 009 12-13 Ala Hazrat Haj House Ghaziabad Ghaziabad 3577.09 3565.82 4189.58 200 73.42 19-Nov-12 77% 12.50 G02 4513005 45 201 18-19 Construction of Phase A of JNV, Gurudaspur Gurudaspur Punjab 3596.15 854.21 519.77 209.55 14-Sep-18 25% 4.46 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto March upto March 2020 upto 2020 upto Progress in 2019 2019 reporting reporting Percentage( month month %)

G10 0312265 03 033 16-17 Const. of 100 Bedded Sanyukt Hospital Ghosi Mau 3630.43 1800.00 1711.73 77.97 01-Jun-16 57% 12.50 G08 2912970 29 033 18-19 Construction of 100 beded hospital Bighapur Unnao 3642.83 1000.00 11.28 187.16 27-Aug-18 30% 12.50 G08 3709447 51 098 11-12 Const. of 1031 No. House under IHSDP Phase-III Raebareli Raebareli 3738.05 2219.02 2189.75 17-Jun-11 75% 0.00 G09 3511153 08 088 14-15 Rajeev Awas Scheme Agra Agra 3769.59 2259.92 2025.619 33.26 18-Jul-14 90% 12.50 G06 0112105 54 070 15-16 Const. of national Trainning Centre Rampur Rampur 3860.18 3647.16 3523.46 30.4 09-Mar-16 80% 12.50 G14 4213109 42 048 18-19 Construction of water sports complex and Lake Gorakhpur Gorakhpur 4012.00 1703.72 66.16 509.45 04-Jan-19 15% 12.50 entertainment project at Ramgarh Lake G15 1111191 11 070 14-15 Const. of 1044 Nos. Residence under Aasra Scheme Akbarpur Kanpur Dehat 4078.78 2709.96 2909.59 0.23 30-Aug-14 72% 12.50 G09 3512136 35 081 15-16 Const. of R.C.C. Frame Building in Lalitkala Sansthan at Agra Agra 4085.00 1753.95 1616.40 1083.44 231.80 20-Apr-18 70% 12.50 Dr. Bhim Rao Ambedkar Univarsity G10 0612045 06 054 15-16 Const. of Sanathagat Finance Directorate office building Lucknow Lucknow 4125.98 2900.00 2899.91 27-Jan-16 70% 12.50

G02 37060 02 105 05-06 Medical College Rudrapur Udham Singh 4131.60 4091.00 3960.99 26-May-05 58% 12.50 Nagar G15 1012918 10 080 17-18 Const. of Govt. Engineering College Pratapgarh Pratapgarh 4241.17 400 395 5 0.58 31-Mar-18 10% 12.50 G10 2610946 26 024 13-14 Const. of Agriculture Degree College Campus under Lakhimpur Lakhimpur Khiri 4295.47 4081.47 3881.60 36.23 22-Feb-14 87% 12.50 Agriculture & Technical University kanpur Khiri G14 1410062 14 036 11-12 Const. of 13 No. Court Room in District Court Gorakhpur Gorakhpur 4307.39 3698.11 2313.39 457.9 21-Mar-12 80% 12.50 G15 4811978 48 088 15-16 Const. of IN-C-Too Residence at Nagar Palika Parishad Mahoba Mahoba 4327.60 1684.38 1381.49 30.4 21-Dec-15 80% 12.50 under Asara Scheme G14 3412219 34 080 16-17 Const. of Govt. Enginreeing College Basti Basti 4346.75 1958.75 1952.06 7.23 07-May-16 38% 12.50 G06 3912148 39 080 15-16 Const. of Govt. Engineering College Gonda Gonda 4383.84 1918.11 1589.52 21.94 31-Mar-16 35% 12.50 G15 1107838 11 033 08-09 Const. of 100 Beded Hospital Kanpur Nagar Kanpur Nagar 4406.93 4227.25 4227.19 24-Jul-08 97% 12.50

G15 1513464 15 036 19-20 Construction of confrence hall, 02 Nos. VVIP suits and Thornhill Prayagraj 4599.88 1840 06-Sep-19 12.50 museum for the usage of Hon'ble High Court, Allahabad Road

G02 4712825 02 998 17-18 Construction of Indralok Residential Scheme Part-02 Haridwar Haridwar 4675.96 200.00 84.67 07-Dec-17 6.50 G10 2408235 24 090 08-09 Solid Waste Management Works Varanasi Varanasi 4867.73 4015.88 3586.17 31-Mar-09 80% 0.00

G08 5111081 51 088 14-15 Rajeev Awas Scheme Phase-II Raebareli Raebareli 4889.10 2899.31 2899.32 35.18 2897.82 06-Jun-14 75% 12.50

G02 2810167 28 036 12-13 Const. of 60 Residences of Type-5 for Judicial officers in Ghaziabad Ghaziabad 4972.15 5613.73 5832.31 21.42 29-Aug-12 97% 12.50 the district

Total 208250.84 124244.97 111697.65 3549.65 6310.75 DETAILS OF ONGOING SCHEMES FROM 15 CRORES TO 24.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G15 2210257 15 024 12-13 Drainage & Sewarage work at Manyawar Sir Kashiram Ji Banda Banda 1505.99 1200.00 1348.32 10-Dec-12 90% 12.50 Agricultural & Technical University G04 5509869 07 098 11-12 Const. of 306 No. House Under IHSDP Meerut 1508.80 995.77 995.51 12-Dec-11 98% 0.00 G15 1108202 11 098 08-09 Const. of 492 No. House under IHSDP Jhijhak Kanpur Dehat 1540.08 1377.66 1371.32 28-Mar-09 96% 0.00 G14 3809118 38 098 10-11 Const. of 656 No. House under IHSDP Ghorawal Sonbhadra 1542.00 1412.82 1354.47 3.512 27-Dec-10 84% 0.00 G09 0811642 08 070 15-16 Const. of 324 Nos. Residence under Aasra Scheme Agra Agra 1550.38 756.29 749.42 20-May-15 65% 12.50 G13 4911303 30 070 14-15 Const. of 396 Nos. Residence under Aasra Scheme Chhote Badaun 1558.50 1316.05 1245.00 44.73 18-Nov-14 89% 12.50 Sarkar G14 1907810 14 090 08-09 Solid Waste Management Works Gorakhpur Gorakhpur 1563.60 806.81 277.16 11-Feb-10 0.00 G15 4811959 48 088 15-16 Const. of IN-C-Too Residence at Nagar Panchayat under Sharila Hamirpur 1573.67 1180.17 1116.46 9.82 16-Dec-15 80% 12.50 Asara Scheme G14 1410996 14 038 13-14 Const. of R.C.C. Drain at Basundhra Turn to Turra Drain Gorakhpur Gorakhpur 1605.13 1605.13 1427.26 22.62 25-Mar-14 65% 12.50 G13 21100 21 081 05-06 Institute of Bio-Technology & Plant at Dr. Ram Manohar Faizabad Faizabad 1609.35 1668.39 1668.34 14-Feb-06 81% 12.50 Lohiya G02 4509440 45 096 11-12 Laying of Sewer Line & Const. of Drain at Khora Colony Ghaziabad Ghaziabad 1640.00 100.00 102.51 23-Sep-11 15% 12.50 G09 0113183 01 201 18-19 Construction of JNV, Kolar Phase-A Kolar Kolar 1690.78 0.00 0.00 08-Mar-19 4.45 G14 3808084 38 080 08-09 Const. of Polytechnic Aurai Bhadohi 1701.26 1843.17 1770.03 9.86 10-Feb-09 89% 12.50 G15 3310030 33 036 11-12 Const. of Administrative Bhawan at Hon'ble High Court Allahabad Allahabad 1705.00 3173.62 3173.52 01-Mar-12 82% 12.50 G15 1511965 15 070 15-16 Const. of 348 Nos. Residence under Aasra Scheme Banda Banda 1713.59 856.80 847.57 3.2 17-Dec-15 96% 12.50 G10 0310937 03 064 13-14 Const. of New Bhawan at Hariaud Kala Kendra Azamgarh Azamgarh 1717.73 900.00 784.41 41.36 22-Feb-14 69% 12.50 G01 1611406 16 090 14-15 Solid Waste Management Works Bijnor Bijnor 1727.44 0.00 0.00 16-Jan-15 12.50 G09 3513454 35 012 19-20 Construction of RCC drain from Devri road Sainik Vihar Tajpur Zone-2 Agra 1729.94 100 03-Sep-19 12.50 Mod, Ambedkar Vatika via Madhunagar, Naulakha Temple to Sadar Army Office G14 3413324 34 064 19-20 Construction of museum to protect the culture of Tharu Imliya Kodar Balrampur 1737.30 0.00 0.00 08-May-19 12.50 tribe G15 4811980 48 088 15-16 Const. of IN-C-Too Residence at Nagar Panchayat under Gohanda Hamirpur 1742.05 761.46 723.13 12.33 21-Dec-15 95% 12.50 Asara Scheme G10 5011927 26 056 15-16 Const. of Residential & Non-Residential Bhawan under Mohan Road Lucknow 1753.67 1665.98 1504.23 43.36 02-Nov-15 95% 12.50 Integrate Special Higher School in Campus for Dr. Shakuntala Mishra National Rehabilitation University G09 0113184 01 201 18-19 Construction of JNV, Kalaburgi Phase-A Kalaburgi Kalaburgi 1780.55 0.00 0.00 08-Mar-19 4.45 G10 0311903 03 056 15-16 Const. of Integrate Special Higher School Azamgarh Azamgarh 1808.61 1358.30 1236.42 40.58 03-Oct-15 84% 12.50 G10 0309961 03 036 11-12 Const. of 14 No. Court Rooms Ballia Ballia 1810.84 1720.30 1050.98 202.77 09-Jan-12 85% 12.50 G02 4512994 45 202 18-19 Construction of type A building of Kendriya Vidyalaya Malanjganj Malanjganj 1831.62 70.00 70.12 100 56.82 27-Aug-18 14% 7.00 Malanjganj G10 5012858 26 036 17-18 Construction of Office building at UP Rajya Vidhik Sewa Lucknow Lucknow 1840.90 736.36 33.03 90.54 14-Mar-18 5% 12.50 Pradhikaran G10 4709814 37 098 11-12 Infrasturctur work 768 No under BSUP, Aksth & Koniya Varanasi Varanasi 1842.50 1408.00 1036.06 16-Nov-11 64% 0.00 G10 0311904 03 056 15-16 Const. of Integrate Special Higher School Ballia Ballia 1851.02 1400.00 1410.07 6 03-Oct-15 85% 12.50 G14 3413326 34 077 19-20 Construction of laboratories at Atal Bihari Bajpai Institute of Jaunpur Jaunpu 1857.00 742.80 0.00 01-Jun-19 12.50 tourism and hospitality management work G13 4911659 49 070 15-16 Const. of 396 Nos. Residence under Aasra Scheme Rithora Bareilly 1881.47 956.17 863.17 36.61 10-Jun-15 90% 12.50 G04 3212335 32 202 16-17 Const. of Type-A School Building Chakoor Chakoor 1886.61 1220.00 1211.70 01-Aug-16 79% 12.50 G09 3611488 36 070 14-15 Const. of 348 Nos. Residence under Aasra Scheme Mauranipur Jhansi 1906.01 1833.55 1699.92 36.13 10-Mar-15 87% 12.5 G14 1909650 20 098 11-12 Const. of 544 House under IHSDP Pipiganj Gorakhpur 1907.58 853.98 841.40 03-Aug-11 97% 0.00 G08 3709921 51 098 11-12 Const. of 429 No. House Under IHSDP Phase-IV Raebareli Raebareli 1918.61 1098.43 1098.30 28-Dec-11 74% 0.00 G02 5209847 52 019 11-12 Const. of 220/132 KV Sub Station at Bah Agra Agra 1921.13 221.80 0.59 30-Nov-11 40% 12.50 G10 5010407 50 034 12-13 Const. of Hostal at KGMU KGMU Lucknow 1928.92 185.78 107.55 23-Mar-13 10% 12.50 G04 0412271 04 070 16-17 Const. of Shelter House Maliyana Meerut 1933.66 0.00 0.00 01-Jun-16 12.50 G02 4509044 45 023 10-11 Providing & Laying Peripheral Sewer Line Phase-III Greater Noida Greater Noida 1948.00 1340.98 1376.76 200 204.58 16-Mar-11 85% 4.40 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G08 3709751 51 098 11-12 Const. of 534 No. House under IHSDP, Musafirkhana Chhattrapati Chhattrapati 1992.38 745.04 744.38 24-Sep-11 40% 0.00 Sahu Maharaj Sahu Maharaj Nagar Nagar

G09 3513092 35 081 18-19 Construction of 1300 people capacity Chtrapatti Shivaji Agra Agra 2000.00 20.00 4.44 764.40 227.94 17-Dec-18 30% 12.50 Maharaj auditorium in University G01 3113124 31 18-19 Development work at Garhmukteshwar (Brajghat) Hapur Hapur 2002.89 119.48 79.59 42.76 20-Feb-19 8% G09 3611357 36 070 14-15 Const. of 372 Nos. Residence under Aasra Scheme Gursaraya Jhansi 2011.07 1934.84 1691.99 22.88 17-Dec-14 88% 12.50 G10 2407145 24 080 06-07 Const. of I.T. Govt. Polytechnic Dhanapur Chanduli 2016.42 1915.6 1886.89 28-Feb-07 90% 12.50 G14 1907871 14 033 08-09 Const. of 100 Beded T.B. Hospital Gorakhpur Gorakhpur 2040.54 2040.54 2040.50 22-Feb-12 75% 12.50 G02 2811430 28 036 14-15 Const. of Type-V, 14 No. Residential building of judicial Bagpat Bagpat 2060.04 783.70 528.70 1.44 02-Feb-15 50% 12.50 officers G10 2412632 37 070 16-17 Const. of 373 no. of residence of model 1,2,3,4 under Jaunpur Jaunpur 2076.76 114.14 114.14 28-Jan-17 50% 12.50 Ashara Awas Yojna G14 3412980 34 081 18-19 Construction of 36 Nos. type-4 residence Jaunpur Jaunpur 2099.08 839.63 833.52 839.63 145.09 27-Aug-18 40% 12.50 G06 4309035 43 098 10-11 Const. of 748 No. House under IHSDP Programme Kishni Mainpuri 2104.00 1482.85 1463.39 12-Oct-10 97% 0.00 G13 4410445 44 036 12-13 Const. of 24 No. Court Room Faizabad Faizabad 2119.23 1998.76 1877.26 93.81 30-Mar-13 66% 12.50 G10 2609746 26 036 11-12 Const. of 12 No. Court Room in Two Blocks Lakhimpur Lakhimpur Khiri 2127.01 1970.66 1389.25 54.26 22-Sep-11 86% 12.50 Khiri G06 4308196 43 098 08-09 Const. of 648 No. House under IHSDP(Phase-II) Chibramau Kannauj 2131.45 1917.64 1896.03 28-Mar-09 96% 0.00 G07 4107767 41 201 08-09 Const. of Phase-A works at JNV Ahemdabad Ahemdabad 2143.89 1811.39 2026.45 09-Jun-08 91% 7.00 G02 4513201 45 201 18-19 Construction of JNV Phase-B , Raigarh (Orissa), and Raigarh Raigarh 2148.11 205.24 0.31 208.81 14-Mar-19 12% 4.46 remaining work of Phase-A G06 5410966 54 012 13-14 Development & Renovation of Jheel under Naya Sawera Rampur Rampur 2152.20 2152.20 2153.76 10-Mar-14 90% 12.50 Nagar Vikas Yojana(Jail Road) G10 2613215 26 081 18-19 Construction of training and servicing facility center at Dr. Jankipuram Lucknow 2181.73 0.00 0.00 854.56 18-Mar-19 12.50 APJ Abdul Kalam Technical University Ext. G14 3412910 34 081 18-19 Const. of 204 Badded Boys Hostal at VVPU Campus Jaunpur Jaunpur 2227.17 890.86 723.03 890.86 166.41 29-May-18 20% 12.50 G02 2511691 25 055 15-16 Const. of Commercial Tax office Building Aligarh Aligarh 2244.57 2081.95 1882.27 107.74 10-Jun-15 87% 12.50 G15 4811901 48 070 15-16 Const. of 468 Nos. Residence under Aasra Scheme Mahoba Mahoba 2244.74 1795.80 1792.85 03-Oct-15 85% 12.50 G02 2707657 27 090 07-08 Solid Waste Management Works Meerut Meerut 2259.40 1536.06 900.77 31-Mar-08 50% 0.00 G06 5410328 54 090 12-13 Solid Waste Management Works Rampur Rampur 2270.00 7.00 3.47 18-Feb-13 20% 0.00 G10 0611175 06 088 14-15 Rajeev Awas Scheme Faizullahganj Lucknow 2292.79 1686.66 1443.40 20.06 19-Aug-14 90% 12.50 G13 2113099 21 007 18-19 Construction of transit hostel and barrock for the Police Ayodhya Ayodhya 2305.04 500.00 0.00 01-Jan-19 12.50 providing security to Ram Janm Bhoomi/ Babari Mosque

G09 1712134 17 064 15-16 Const. of Auditorium at Mathura to Vrindavan Mathura Mathura 2314.27 550.00 549.44 01-May-16 26% 12.50 G09 3611580 36 034 15-16 Extention of Operation Theater & Modelar O.T. at Medical Jhansi Jhansi 2314.79 2190.48 1884.26 18-Apr-15 86% 12.50 College G13 21101 21 081 05-06 Construction of Udhyan & Vanikiy at Dr. Ram Manohar Faizabad Faizabad 2366.90 2453.30 2453.19 14-Feb-06 76% 12.50 Lohiya G09 0812800 08 209 17-18 Replacement of Storm Drain while construction of six lane Agra Agra 2432.70 41.79 5.61 31-Jul-17 25% 12.50 road on at Dehi Agra section NH-2 between 20.500 and 200.00 KM G13 4408295 44 098 09-10 Const. of 393 No. House under IHSDP Faizabad Faizabad 2454.46 1876.51 1873.45 19-May-09 98% 0.00 G10 5310956 53 070 13-14 Const. of 504 Nos. Residence underAasra Scheme Sandila Hardoi 2467.02 1510.76 1503.88 03-Mar-14 62% 12.50 Total 131871.94 73939.44 66240.95 4059.96 1645.52 DETAILS OF ONGOING SCHEMES FROM 12 CRORES TO 14.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G14 1911766 19 070 15-16 Const. of 252 Nos. Residence under Aasra Scheme Gorakhpur Gorakhpur 1200.88 737.67 655.12 11.44 22-Jun-15 70% 12.50 G07 1209092 12 201 10-11 Const. of JNV Phase-B Works Tamenglong Tamenglong 1207.61 986.20 971.07 30-Nov-10 80% 7.00 G10 0312368 03 045 16-17 Const. of Bus Station & Dipo Workshop Mau Mau 1211.40 968.00 793.71 2.42 28-Sep-16 70% 12.50 G08 5110772 51 012 13-14 Const. of City Resorse Centre Raebareli Raebareli 1214.00 601.08 601.07 26-Oct-13 50% 12.50 G09 3607792 36 090 08-09 Solid Waste Management Works Jhansi Jhansi 1216.00 1018.70 608.00 23-Jun-08 62% 0.00 G10 2408379 37 090 09-10 Solid Waste Management Works Jaunpur Jaunpur 1220.39 610.20 535.55 74.45 28-Jul-09 42% 0.00 G09 1713117 17 029 18-19 Renovationa and beautification work of Govt. Park, Mathura Mathura 1222.82 900.00 99.43 91.7 13-Feb-19 25% 12.50 Jawahar Bagh, Mathura G04 0410310 07 009 12-13 Const. of Govt. Polytechnic Jatwara Muzaffar Nagar 1230.00 784.34 769.36 11-Feb-13 80% 12.50

G01 0910794 16 009 13-14 Const. of Govt. Polytechnice at Gopali Devband Saharanpur 1230.00 800.00 779.73 11-Nov-13 80% 12.50 G01 1611005 16 009 13-14 Const. of Govt. Polytechnice Syatema Bijnor 1230.00 775.81 673.07 52.24 27-Mar-14 58% 12.50 G01 1810314 18 009 12-13 Const. of 01 No. Govt. Polytechnic & 02 No. Hostal, Amroha Jyotibaphule 1230.00 765.29 752.36 3.9 13-Feb-13 75% 12.50 Sahaspur Nagar G14 3910429 34 009 12-13 Const. of Govt. Polytechnic & Hostal Tulshipur Balrampur 1230.00 787.92 787.79 0.10 25-Mar-13 50% 12.50 G06 3910380 39 009 12-13 Const. of Govt. Polytechnic & Hostal Hardatnagar Shravasti 1230.00 774.62 775.29 20-Mar-13 65% 12.50 Girant G13 4910492 49 009 13-14 Const. of Govt. Polytechnic Nababganj Bareilly 1230.00 798.77 792.07 24-Apr-13 65% 12.50 G06 0112258 54 009 16-17 Const. of Govt. Polytechnic Chamrahwa Rampur 1230.00 534.62 606.39 28-May-16 50% 0.00 G04 0912551 09 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Saharanpur Saharanpur 1232.41 616.20 596.38 02-Jan-17 47% 12.50 2016-17 G06 3012469 54 070 16-17 Const. of Pandal at Mohd. Ali University Rampur Rampur 1236.02 400.00 391.71 19-Dec-16 30% 12.50 G04 3212872 32 201 17-18 Construction of additional infrastructure at JNV, Pune Pune Pune 1238.27 0.00 0.00 31-Mar-18 4.46 G06 4310384 43 090 12-13 Solid Waste Management Works Chibramau Kannauj 1250.27 5.00 3.37 18-Mar-13 0.00 G08 1311405 13 034 14-15 Const. of New Diagnostic Block SGPGIMS Lucknow 1288.21 1163.07 982.26 60.13 16-Jan-15 85% 12.50 G08 1309353 13 078 11-12 Const. of Auditorium at U.P. Sainik School Campus Lucknow Lucknow 1296.59 1231.34 1268.71 02-May-11 90% 12.50 G02 2511947 25 070 15-16 Const. of 252 Nos. Residence under Aasra Scheme Soro Kasganj 1300.14 650.07 536.12 0.28 20-Nov-15 47% 12.50 G10 5010283 06 034 12-13 Installation of Fire-Hidrent System at KGMC KGMC Lucknow 1320.00 1254.00 1213.47 20.28 29-Dec-12 93% 12.50 G13 4911934 30 070 15-16 Const. of 276 Nos. Residence under Aasra Scheme Jalalabad Shahjahanpur 1346.75 756.33 601.00 48.64 20-Nov-15 75% 12.50 G02 27013 27 090 05-06 Solid Waste Management and Drainage in 10 Selected Ghaziabad Ghaziabad 1352.00 676.00 676.28 24-Dec-05 50% 0.00 Indian IAF(Hindon) G13 4912384 49 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Bareilly Bareilly 1354.06 677.03 676.04 03-Oct-16 49% 12.50 G10 0309963 03 036 11-12 Const. of 16 No. Residences Type-V for Judicial officer Ballia Ballia 1355.68 862.27 662.25 28.58 09-Jan-12 74% 12.50 G06 5410672 54 088 13-14 Rajeev Awas Scheme Rampur Rampur 1367.20 415.71 415.71 20-Aug-13 25% 12.50 G15 1508136 15 080 08-09 Const. of Govt. Polytechnic Manikpur Chitrakoot 1379.50 1310.05 1217.14 07-Mar-09 80% 12.50 G13 3013461 30 012 19-20 Construction of auditorium Shahjahanpur Shahjahanpur 1379.95 06-Sep-19 12.50

G14 1413321 14 033 19-20 Construction of 50 beded combined hospital building Bansgaon Gorakhpur 1389.58 204.33 0.00 30-Apr-19 0.00 G10 5312283 53 012 16-17 Const. of Auditoriuam, Banket Hall, Kitchen Block, Guest Maillani Sitapur 1398.33 559.00 413.72 22.72 10-Jun-16 38% 12.5 House Etc. at Nagar Panchyat G07 4107768 41 201 08-09 Const. of Phase-A works at JNV Roopwel Navsari 1402.69 1182.43 1218.08 09-Jun-08 99% 7.00 G14 2012578 20 012 16-17 Const. of Drain at Patkhola to DM office Sant Kabir Sant Kabir 1419.54 141.95 107.90 11-Jan-17 10% 12.50 Nagar Nagar G02 4509988 45 032 11-12 Const. of Kushti, Weightlifting Hall, Kabbadi, Boliwall, Gautum Gautum Budh 1424.77 2147.86 2175.57 25-Jan-12 65% 12.50 Basketwall & Boxing Game Budh Nagar Nagar G06 4311094 43 088 14-15 Rajeev Awas Scheme Sekhana Kannauj 1442.23 1026.35 937.07 16-Jun-14 78% 12.50 G09 3613290 36 077 18-19 Construction of Govt. College Mauranipur Jhansi 1447.14 0.00 0.00 30-Mar-19 G14 3809891 38 098 11-12 Const. of 451 No. House under IHSDP Duddhi Sonbhadra 1474.00 1493.03 1419.11 1.27 12-Dec-11 84% 0.00 G13 21102 21 081 05-06 Construction of fisheries at Dr. Ram Manohar Lohiya Faizabad Faizabad 1476.37 1564.92 1564.87 14-Feb-06 81% 12.50 G14 1911767 19 070 15-16 Const. of 185 Nos. Residence under Aasra Scheme Maheshar Gorakhpur 1487.88 441.12 376.94 1.85 22-Jun-15 78% 12.50 Total 52392.68 30621.28 27653.71 0.00 420.00 DETAILS OF ONGOING SCHEMES FROM 10 CRORES TO 11.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G08 2213129 22 012 18-19 Providing man power, T&P and consumables for Lucknow Lucknow 1000.00 100.00 1.65 100 24.64 16-Feb-19 15% 12.50 housekeeping and plants, pots manure etc for Arboriculture work for UTRC, Lucknow G07 1213211 12 201 18-19 Construction of Phase-B work at JNV, Jammu-II Jammu Jammu 1006.78 0.00 0.00 83.46 78.35 16-Mar-19 20% 4.46 G10 01133 03 012 05-06 Construction of Commercial Complex at Bara Garha Gaddaha Ballia 1007.17 481.52 479.12 24-Oct-05 55% 7.00 G14 3412532 34 007 16-17 Const. of residential and non-residential buildings at Haraiya Basti 1010.63 655.14 655.14 71.49 26-Dec-16 75% 12.50 Firestation Haraiya G10 5309191 53 098 10-11 Const. of 252 No. House under IHSDP Sandila Hardoi 1023.72 871.47 684.94 26.78 14-Feb-11 85% 0.00 G08 2912653 29 034 16-17 Const. of new hostel after demolistion of current building at Lucknow Lucknow 1026.99 590.29 501.86 37.15 16-Feb-17 64% 12.50 Rajkiya Mahavidyalaya G10 5012225 50 034 16-17 Const. of 200 Bedded Hostal at Govt. Takmil Utib & Lucknow Lucknow 1036.78 752.77 653.95 227.54 50.857 12-May-16 82% 12.50 Hospital G15 4806894 15 051 06-07 Const. of Collectorate Bhawan Banda Banda 1047.86 1220.19 1040.40 7.20 18-Aug-06 77% 12.50 G07 1208605 12 999 09-10 Const. of Food Park, Phase-B at Nilakuthi Nilakuthi Imphal 1072.33 365.27 367.01 27-Mar-10 35% 7.00 G13 4911304 30 070 14-15 Const. of 276 Nos. Residence under Aasra Scheme Bazirganj Badaun 1086.96 1086.96 1013.89 49.76 18-Nov-14 95% 12.50 G06 0807224 54 084 06-07 House Connecting work at Road Rampur Rampur 1099.83 30.00 30.59 16-May-07 90% 7.00 G14 3808440 38 090 09-10 Solid Waste Management Works Mirzapur Mirzapur 1100.87 698.48 722.05 14-Oct-09 60% 0.00 G14 2011780 20 070 15-16 Const. of 240 Nos. Residence under Aasra Scheme Bansi Siddharth 1116.25 1116.25 1029.95 04-Jul-15 90% 12.50 Nagar G04 5509868 07 098 11-12 Const. of 225 No. House under BSUP Kidwai Nagar Meerut 1128.01 665.38 646.37 12-Dec-11 95% 0.00 G08 3709309 51 098 11-12 Const. of 284 No. House under IHSDP, Bachhrawan Raebareli Raebareli 1140.37 658.63 658.19 31-Mar-11 80% 0.00 G10 5010683 50 070 13-14 Const. of 288 Nos. Residence under Aasra Scheme at Ramnagar Barabanki 1142.56 850.73 718.09 0.47 15-Mar-14 82% 12.50 TAC G14 1911770 19 070 15-16 Const. of 71 Nos. Residence under Aasra Scheme Bdhalganj Gorakhpur 1145.40 178.34 176.48 22-Jun-15 80% 12.50 G04 0412425 04 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Meerut Meerut 1159.73 579.87 577.17 15-Nov-16 62% 12.50 2016-17 G08 1311774 13 034 15-16 Const. of Residential Building for CBMR Under VVIP Guest SGPGIMS Lucknow 1172.30 1090.88 1080.00 7.88 25-Jun-15 92% 12.50 House G01 2708409 31 090 09-10 Solid Waste Management Works Loni Ghaziabad 1181.28 590.63 143.07 10-Sep-09 10% 0.00 G06 3012465 54 070 16-17 Renovation & Beutification of Talab for Mori Gate Plot No-8 Rampur Rampur 1193.40 50.00 0.00 19-Dec-16 0% 12.50 &9 G15 4811902 48 088 15-16 Const. of IN-C-Too Residence at Nagar Panchayat under Kurara Hamirpur 1197.25 1197.25 1135.62 14.36 03-Oct-15 80% 12.50 Asara Scheme G02 2511948 25 070 15-16 Const. of 240 Nos. Residence under Aasra Scheme Bhargain Kasganj 1198.35 1198.36 932.00 0.68 20-Nov-15 82% 12.50 G10 2409541 24 098 11-12 Const. of 420 No. Houses under IHSDP Ghazipur Ghazipur 1199.28 1071.38 1009.79 07-Jul-11 80% 0.00 Total 26494.10 16099.78 14257.33 411.00 369.61 DETAILS OF ONGOING SCHEMES FROM 9 CRORES TO 9.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G02 2811473 28 088 14-15 Rajeev Awas Scheme Muzaffar Muzaffar Nagar 912.55 574.32 568.96 10-Mar-15 68% 12.50 Nagar G02 2811524 28 036 14-15 Const. of 16 Residences of Judicial officers of Distt. Court Gautam Budh Gautam Budh 915.18 915.18 951.05 27-Mar-15 65% 12.50 Nagar Nagar G15 3312364 33 070 16-17 Const. of Nos. Residence under Aasra Scheme Sirathu Kaushambi 916.03 458.00 301.79 28-Sep-16 20% 12.50 G10 0612500 06 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal 2016- Lucknow Lucknow 919.33 459.66 275.29 21-Dec-16 80% 12.50 17 G02 2711981 27 009 15-16 Const. of Govt. Girls Degree College under MSDP Dashna Ghaziabad 921.59 468.14 458.96 21-Dec-15 55% 12.50 G10 2611484 26 045 14-15 Inpection & Cirtification Center Lucknow Lucknow 929.76 929.76 873.10 3.28 10-Mar-15 98% 12.50 G14 2010471 20 087 13-14 Const. of Type-I, II & III Residenc at Police Line Campus Khalilabad Sant Kabir 930.04 670.00 604.67 17-Apr-13 65% 12.50 Nagar G04 0411373 07 009 14-15 Const. of I.T.I Meerut 937.00 492.85 492.92 27-Dec-14 82% 12.50 G15 1108806 11 098 10-11 Const. of 204 No. House under IHSDP Sikandra Sikandra Kanpur Dehat 940.12 850.02 848.66 10-Jun-10 94% 0.00 G10 0312647 03 007 16-17 Const. of Residential/Nonresidential Building at Fire Martinganj Azamgarh 949.26 380.00 220.20 0.37 13-Feb-17 38% 12.50 Station, Martinganj G14 2010439 20 009 12-13 Const. of Boundary Wall at Kabristan/Antesthi Sthal Siddharth Siddharth 950.09 1369.73 1200.73 25-Mar-13 12.50 Nagar Nagar G14 1412634 14 077 16-17 Const. of international level hostel at DDU Gorakhpur Gorakhpur Gorakhpur 952.27 400.00 305.81 50.14 31-Jan-17 45% 12.50 University for Nepali students G08 3709252 51 098 10-11 Const. of 246 No. Houses under IHSDP, Lalganj Lalganj Raebareli 962.20 564.47 564.07 22-Mar-11 60% 12.50 G13 4411897 44 077 15-16 Const. of Guest House at Awadh University Faizabad Faizabad 966.44 1260.92 1272.65 51.805 40.48 29-Sep-15 100% 12.50 G09 0812981 08 209 18-19 Reestablishment of storm drain at National highway no. 02 Agra Agra 971.00 150.00 71.45 66.805 27-Aug-18 22% 12.50

G02 4513200 45 201 18-19 Construction of JNV Phase-B , Nayagarh ( Orissa) Nayagarh Orrissa 973.08 81.90 78.15 14-Mar-19 5% 4.46 G13 2112514 21 009 16-17 Const. of ITI Faizabad Faizabad 983.56 250.00 245.26 3.72 26-Dec-16 43% 12.50 G15 3312415 33 081 16-17 Const. of Auditorium at U.P. RajShree Tandon Open Allahabad Allahabad 988.34 741.00 689.99 247 431.39 24-Oct-16 19% 12.50 University Total 17017.84 11015.96 10023.70 298.81 596.19 DETAILS OF ONGOING SCHEMES FROM 8 CRORES TO 8.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage(%) 2019 month month

G04 4610231 07 009 12-13 Const. of 2 No. Hostel & Govt. Polytechnic Kotana Bagpat 800.00 800.00 738.11 15-Mar-13 80% 12.50 Bangar G04 4610559 07 009 13-14 Const. of Govt. Polytechnice Jasad Meerut 800.00 800.00 771.74 20-Jun-13 80% 12.50 G14 3908368 34 080 09-10 Const. of Residential/Non-Residential Bhawan at Govt. Balrampur Balarampur 800.00 1555.06 1555.02 3.31 08-Jul-09 70% 12.50 Polytechnic G10 2412866 24 033 17-18 Construction/upgradation of Pd. Deendayal Upadhyay Varanasi Varanasi 814.35 691.88 610.00 40 10-Apr-18 90% 12.50 hospital G14 1412883 14 012 17-18 Construction of Kanha Goshala and animal shelter Gorakhpur Gorakhpur 819.29 409.64 575.73 33.36 31-Mar-18 80% 12.50 G10 0309390 03 201 11-12 Const. of JNV Phase-A Ghazipur Ghazipur 821.95 739.97 729.32 20.71 1.63 11-May-11 99% 7.00 G07 4113166 41 201 18-19 Construction of Phase-B at JNV Ahmedabad Ahmedabad 822.49 0.00 0.00 08-Mar-19 4.46 G08 2912654 29 077 16-17 Const. of Sewage and Chamber at Lucknow University Lucknow Lucknow 824.56 800.00 718.13 16-Feb-17 98% 12.50 G06 3012340 54 009 16-17 Const. of Model Degree College at Tanda Tanda Rampur 827.80 413.94 406.39 04-Aug-16 46% 0.00 G01 1611104 16 009 14-15 Const. of 198 No. Anganbadi Bhawan Bijnor Bijnor 837.54 426.17 413.23 23-Jun-14 55% 12.50 G10 5308205 53 098 08-09 Const. of 252 No. House under IHSDP Biswa Sitapur 839.47 750.08 752.48 28-Mar-09 88% 0.00 G09 3611792 36 070 15-16 Const. of 144 Nos. Residence under Aasra Scheme Arech-I Jhansi 840.17 840.88 590.51 15.70 08-Jul-15 86% 12.50 G02 2708158 27 051 08-09 Const. of Residential Building G.B. Nagar Gautum Budh Gautum Budh 841.57 839.74 916.19 09-Mar-09 88% 12.50 Nagar Nagar G06 3012466 54 070 16-17 Renovation & Beutification of Talab for Mori Gate Plot No- Rampur Rampur 847.31 50.00 0.00 19-Dec-16 12.50 11&3 G08 2912892 29 007 17-18 Construction of residential/non residential building at Bighapur Unnao 849.86 260.79 258.78 28.42 31-Mar-18 34% 12.50 Firestation Bighapur G02 4513119 45 201 18-19 Construction of JNV Bargarh (Orrisa) Phase-B Bargarh Bargarh 853.82 75.26 0.00 72.94 13-Feb-19 12% 4.46 G02 0213301 02 077 18-19 Construction of building at Govt. College Puranpur Pilibhit 869.05 0.00 0.00 30-Mar-19 G15 1113389 11 077 19-20 Construction of Govt. Degree College Ghatampur Kanpur Nagar 870.93 31-Jul-19 12.50 G15 3310046 33 036 11-12 Furniture Purchase of New Maha adhivacta office Allahabad Allahabad 878.24 878.24 827.76 14-Mar-12 75% 2.00 G01 1811920 18 070 15-16 Const. of 185 Nos. Residence under Aasra Scheme Moradabad Moradabad 880.09 660.07 663.62 215.62 5.23 23-Oct-15 75% 12.50 G08 1312857 13 034 17-18 Construction of 134 beded hospital at old OPD at SGPGI Lucknow Lucknow 880.77 880.77 818.30 27.65 12-Mar-18 12.50

G14 2010350 20 009 12-13 Const. of Boundary Wall at Kabristan/Antesthi Sthal Sant Kabir Sant Kabir 885.36 885.37 960.21 0.61 04-Mar-13 12.50 Nagar Nagar G13 4907797 30 051 08-09 Re-Const. of Collectrate Bhawan Badaun Badaun 885.40 876.86 862.83 14.61 26-Jun-08 97% 12.50 G10 5310959 53 070 13-14 Const. of 192 Nos. Residence under Aasra Scheme Mohali Sitapur 886.45 533.12 540.03 03-Mar-14 60% 12.50 G15 1108201 11 098 08-09 Const. of 216 No.House under IHSDP Rashulabad Kanpur Dehat 888.70 807.30 806.19 28-Mar-09 91% 0.00 G09 3513485 35 007 19-20 Construction of fire station Fatehabad Agra 891.69 Total 22056.86 14975.14 14514.57 236.33 243.46 DETAILS OF ONGOING SCHEMES FROM 7 CRORES TO 7.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %) G08 2912531 29 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Lucknow Lucknow 706.59 478.11 494.74 69.8 26-Dec-16 84% 12.50 Line G15 0513040 05 034 18-19 Renovation work at emergency ward, ICU and general ward Kanpur Kanpur 708.99 354.49 331.74 170.16 94.48 24-Oct-18 18% 12.50 along with various works at OPD and electricity work at Officers residents at G.S.V.M. medical college G13 2112513 21 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Faizabad Faizabad 712.14 285.00 284.98 26-Dec-16 43% 12.50 Line G01 1813004 18 012 18-19 Construction of RCC drain under Nagriya Jal Nikashi Naugawan Amroha 713.45 309.30 8.78 14-Sep-18 5% 12.50 G10 0312453 03 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Azamagarh Azamagarh 716.44 286.00 230.81 16.19 28-Nov-16 45% 12.50 Line G02 2511006 25 009 13-14 Const. of 170 No. Anganbadi Bhawan Bulandshahar Bulandshahar 720.00 650.46 624.69 0.19 27-Mar-14 80% 12.50

G10 0613009 06 042 18-19 Resurfacing and related work at Govt. airport runway Amhat Sultanpur 721.28 721.28 381.95 23.01 26-Sep-18 60% 12.50 G14 3812608 38 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Mirzapur Mirzapur 724.59 251.22 85.48 12.06 18-Jan-17 15% 12.50 Line G04 0912542 09 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Saharanpur Saharanpur 727.31 463.68 336.64 29-Dec-16 50% 12.50 Line G10 5312560 53 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Sitapur Sitapur 729.56 290.00 281.09 11-Jan-17 50% 12.50 Line G02 2512658 25 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Aligarh Aligarh 729.69 346.39 370.19 17-Feb-17 59% 12.50 Line G15 0512597 05 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Kanpur Nagar Kanpur Nagar 730.12 490.00 376.35 10.23 16-Jan-17 74% 12.50 Line G10 0613008 06 042 18-19 Resurfacing and related work at Govt. airport runway Faizabad Faizabad 730.47 365.23 13.24 26-Sep-18 12.50 G15 1109319 11 024 10-11 Mordification of Farm at Shekhar Azad Agriculture Kanpur Kanpur Nagar 734.35 520.00 508.58 31-Mar-11 70% 12.50 University G09 3612527 36 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Jhansi Jhansi 734.83 593.45 516.75 134.58 14.7 26-Dec-16 79% 12.50 Line G06 2311393 43 070 14-15 Const. of 252 Nos. Residence under Aasra Scheme Atashu Auraiya 737.28 737.28 726.85 6.43 09-Jan-15 80% 12.50 G15 1512439 15 080 16-17 Const. of Director/faculty residence at Govt. Engg. College Atarra Banda 737.83 552.30 492.30 23.95 22-Nov-16 66% 12.50

G08 2911301 29 034 14-15 Const. of Residence at Govt. Takmil Uteeb College Lucknow Lucknow 738.13 701.13 341.33 0.35 18-Nov-14 48% 12.50 G01 1812637 18 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Moradabad Moradabad 740.02 384.74 380.78 86.92 15.25 01-Feb-17 53% 12.50 Line G14 3813427 38 077 19-20 Construction of Govt. Degree College Maghwan Mirzapur 741.88 02-Aug-19 12.50 G10 2612623 26 027 16-17 Strenghtening & Modernization of Deep Frozen Semen Majhara Lakhimpur 744.05 704.45 546.19 11.99 27-Jan-17 92% 12.50 Station, Majhra Khiri G10 0313185 03 077 18-19 Construction of Govt. Degree College Madhuban Mau 747.41 100.00 0.00 12-Mar-19 12.50 G10 2412628 24 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Varanasi Varanasi 748.38 499.00 499.00 28-Jan-17 70% 12.50 Line G06 4308104 43 098 08-09 Const. of 240 No. House under IHSDP Chibramau Kannauj 757.10 693.99 691.20 16-Feb-09 98% 0.00 G14 1912614 19 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Gorakhpur Gorakhpur 767.81 725.38 681.63 19-Jan-17 95% 12.50 Line G13 4912534 49 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Izzatnagar Bareilly 769.40 292.17 252.19 40.84 27-Dec-16 50% 12.50 Line G02 4512581 45 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Gautambudh Gautambudh 769.76 260.79 247.70 13-Jan-17 46% 12.50 Line Nagar Nagar G06 3912601 39 007 16-17 Const. of 200 Persons Capacity Multistory Barrack in Police Gonda Gonda 772.65 563.71 482.17 23.36 16-Jan-17 70% 12.50 Line G14 2013386 20 077 19-20 Construction of Govt. Degree College Dumariyaganj Siddharth 779.49 31-Jul-19 12.50 Nagar G10 0613038 06 012 18-19 Const. of Shed at Dubbaga Depo Lucknow Lucknow 782.57 691.28 445.46 74.29 23-Oct-18 70% 12.50 G13 4913446 49 007 19-20 Construction of residential/non-residential buildings at fire Dataganj Badaun 789.11 26-Aug-19 12.50 station G10 5310868 53 070 13-14 Const. of 192 Nos. Residence under Aasra Scheme Mohamadi Lakhimpur 789.53 789.53 629.16 51.27 30-Dec-13 83% 12.5 Khiri GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %) G06 3012467 54 070 16-17 Renovation & Beutification of Talab for Panbadiya Plot No- Rampur Rampur 796.30 280.79 291.15 19-Dec-16 38% 12.50 566/2,569/2 & 559/922 Total 24548.51 14381.15 11553.12 391.66 488.39 DETAILS OF ONGOING SCHEMES FROM 6 CRORES TO 6.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G15 3312418 33 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Allahabad Allahabad 605.39 605.39 535.60 24-Oct-16 90% 12.50 2013-14 G13 2110347 21 064 12-13 Const. of Theem park in International Ram Lilla Auydhya Faizabad 606.72 608.33 468.52 02-Mar-13 74% 12.50 Centre(Shankul) G14 2012577 20 012 16-17 Const. of Drain at Khalilabad Sugar Mille Sant Kabir Sant Kabir 609.32 60.93 54.14 11-Jan-17 11% 12.50 Nagar Nagar G10 5010289 06 034 12-13 Const. of Over Bridge Connect to KGMC to Quenmary KGMC Lucknow 610.51 610.51 536.63 10.54 16-Jan-13 91% 12.50 Hospital G06 5412372 54 009 16-17 Const. of 27 No. Primary School & 05 No. Upper Primary Rampur Rampur 611.00 265.57 298.62 30-Sep-16 45% 12.50 School G04 4613027 07 096 18-19 Construction of Sports Complex at Village Basauli, Chaprauli Baghpat 614.55 184.36 33.44 57.83 29-Sep-18 30% 12.50 Vikash Khand Chaprauli G13 4910666 30 009 13-14 Const. of I.T.I. at Kadar Chowk Badaun Badaun 619.53 298.02 295.09 16-Aug-13 55% 12.50 G10 2412627 24 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Varanasi Varanasi 620.05 310.02 310.00 28-Jan-17 61% 12.50 2016-17 G07 1212987 12 999 18-19 Construction of Indoor Training cum sports complex with Mantripukhari Mantripukhari 620.96 0.00 0.00 27-Aug-18 30% 6.00 allied services and development works for HQ IGAR(S) at Mantripunkhri G13 4910667 30 009 13-14 Const. of I.T.I. at Dehganwa Badaun Badaun 625.06 300.60 290.18 16-Aug-13 55% 12.50 G14 2012448 20 009 16-17 Const. of ITI Vikas Khand-Bhnvapur Budhikhasha Siddharthnagar 627.51 438.95 361.70 4.35 28-Nov-16 68% 12.50

G14 2012449 20 009 16-17 Const. of ITI Vikas Khand-Badhni Mankaora Siddharthnagar 627.51 438.95 403.46 8.94 28-Nov-16 72% 12.50

G14 2012450 20 009 16-17 Const. of ITI Vikas Khand-Mithval Mishliya Siddharthnagar 627.51 570.51 425.99 7.71 28-Nov-16 70% 12.50

G14 2012451 20 009 16-17 Const. of ITI Vikas Khand-SohratKhand Mahadeva Siddharthnagar 627.51 570.51 412.76 0.62 28-Nov-16 62% 12.50

G14 2012452 20 009 16-17 Const. of ITI Vikas Khand-Khuniyawa Pajoha Siddharthnagar 627.51 570.51 325.71 0.54 28-Nov-16 68% 12.50

G13 4912385 30 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Sahajahanpur Sahajahanpur 631.83 631.83 500.21 7.67 03-Oct-16 87% 12.50

G07 4113168 41 201 18-19 Special repair works at JNV Daman Daman Daman 633.12 0.00 0.00 08-Mar-19 4.46 G10 5012471 50 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Barabanki Barabanki 633.87 0.00 0.00 19-Dec-16 12.50 2016-17 G09 3611791 36 070 15-16 Const. of 120 Nos. Residence under Aasra Scheme Jhansi Jhansi 636.34 636.32 526.92 0.27 08-Jul-15 90% 12.50 G13 4912383 49 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Badaun Badaun 640.70 320.35 310.57 03-Oct-16 50% 12.50 G07 1212986 12 999 18-19 Construction of training shed with allied services and Somsai Somsai 644.25 2.38 0.00 116.61 122.303 27-Aug-18 45% 4.45 devp wks at Somsai G13 3709446 44 098 11-12 Const. of 180 No. House under IHSDP Koiripur Sultanpur 646.92 338.18 338.05 17-Jun-11 90% 0.00 G14 2107975 34 077 08-09 Extention of B. Forma IInd Floor at Veer Bahadur Singh Jaunpur Jaunpur 648.00 615.62 634.31 08-Dec-08 96% 12.50 Purvanchal University G07 1213317 12 999 19-20 Implementation of comprehensive sewage treatment Kalapet Pondicherry 650.00 0.00 0.00 50 5.955 30-Apr-19 0% 3.25 plant in Pondicherry university, Kalapet, Pondicherry G01 0707705 31 090 08-09 Solid Waste Management Works Sambhal Moradabad 655.09 415.31 325.74 01-Apr-08 46% 0.00 Nagar G15 1509145 48 008 10-11 Const. of Vikas Bhawan Chitrkoot Chitrakoot 656.61 656.61 651.56 18-Jan-11 65% 12.50 G14 1412291 14 012 16-17 Const. of RCC Drain at Mahadeva to Ramgarhtal Gorakhpur Gorakhpur 664.35 612.93 463.55 5.42 22-Jun-16 55% 12.50 G15 3312845 33 087 17-18 Construction of 200 people capacity multistorey building Allahabad Allahabad 667.05 600.34 577.88 15-Feb-18 12.50

G15 3312361 33 070 16-17 Const. of Nos. Residence under Aasra Scheme Allahabad Allahabad 667.72 220.26 104.70 28-Sep-16 98% 12.50 G06 5410654 54 009 13-14 Const. of 90 No. Anganbadi Bhawan Rampur Rampur 667.80 323.36 323.36 29-Jul-13 45% 12.50 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G09 0813103 08 034 18-19 Repairing and renovation of Emergency and other Agra Agra 671.21 335.61 142.14 52.81 01-Jan-19 55% 12.50 buildings at SN Medical College, Agra G10 5308206 53 098 08-09 Const. of 144 No.House under IHSDP Gopamau Hardoi 671.50 574.83 563.37 28-Mar-09 95% 0 G15 1113351 11 024 19-20 Construction of 100 beded girls hostel at Agri.& Tech. Kanpur Kanpur 678.63 15-Jun-19 12.50 University G10 0107786 03 090 08-09 Solid Waste Management Works Ballia Ballia 681.66 647.58 426.40 11-Jun-08 70% 0.00 G15 3312595 33 087 16-17 Const. of Administrative Building at Thana Kokhraj Allahabad Allahabad 690.44 299.79 259.53 39.54 13-Jan-17 32% 12.50 G15 0511093 05 088 14-15 Rajeev Awas Scheme Pokharpur Kanpur Nagar 690.45 467.79 332.29 96.42 16-Jun-14 65% 12.50 G10 2411954 37 070 15-16 Const. of 144 Nos. Residence under Aasra Scheme Madiyaho Jaunpur 691.78 657.19 618.22 21.31 03-Dec-15 85% 12.50 G15 3312414 33 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Allahabad Allahabad 692.73 692.72 688.66 24-Oct-16 85% 12.50 2016-17 G15 3312594 33 087 16-17 Const. of Administrative Building at Thana Manjhanpur Allahabad Allahabad 693.34 256.95 134.86 44.4 166.86 13-Jan-17 27% 12.50

G15 3312596 33 087 16-17 Const. of Administrative Building at Thana Puramufti Allahabad Allahabad 697.55 437.87 301.07 134.68 39.54 13-Jan-17 39% 12.50 Total 25883.57 15576.94 12975.22 345.69 648.63 DETAILS OF ONGOING SCHEMES FROM 5 CRORES TO 5.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %) G10 2412497 37 012 16-17 Const. of 750 Capacity Auditorium at Nagar Palika Jaunpur Jaunpur 500.00 500.00 0.00 19-Dec-16 12.50 Parishad G10 5311566 53 009 14-15 Const. of Govt. I.T.I Mishripur Hardoi 500.00 485.14 463.82 10.65 31-Mar-15 76% 12.50 G06 5411676 54 070 15-16 Const. of 96 Nos. Residence under Aasra Scheme Swar Rampur 502.38 502.38 501.56 10-Jun-15 73% 12.50 G01 1811190 18 070 14-15 Const. of Nos. Residence under Aasra Scheme Pandit Nagla Moradabad 502.61 502.61 424.60 10.64 30-Aug-14 92% 12.50 G10 5311155 53 070 14-15 Const. of 96 Nos. Residence under Aasra Scheme Tambour Sitapur 511.85 511.85 393.38 27.21 18-Jul-14 96% 12.50 G14 1413322 14 033 19-20 Construction of CHC chowk Maharajganj Gorakhpur 512.32 245.91 0.00 30-Apr-19 0.00 G10 2412629 37 012 16-17 Beautification work of Hussainabad Pond Jaunpur Jaunpur 518.38 259.00 238.18 18.32 28-Jan-17 57% 12.50 G15 1013366 10 201 19-20 Construction of additional room at JNV Prayagraj Prayagraj 523.43 23-Jul-19 4.00 G14 3412886 34 081 17-18 Interior and achestical work at Research and innovation Jaunpur Jaunpur 525.77 630.00 305.98 184.48 17-Apr-18 60% 12.50 center, Purvanchal university G06 5410375 54 009 12-13 Const. of Boundary Wall at Kabristan/Antesthi Sthal Rampur Rampur 528.48 523.48 537.50 12-Mar-13 99% 12.50 Sadar G14 3811422 38 033 14-15 CHC Madhupur Sonbhadra 529.32 529.32 433.61 9.744 27-Jan-15 87% 12.50 G01 3112236 31 012 16-17 Const. of Drain at Bulandsahar Road Tahsil Churaha to Hapur Hapur 529.66 200.00 180.46 25-Dec-16 43% 12.50 Madrsha Islamiya Chungi G15 3311846 33 012 15-16 Const. of Drain at Nimsrai Mundera, Zone No.-1 & Zone Allahabad Allahabad 533.61 533.61 522.52 17-Aug-15 98% 12.50 No.-3 in Allahabad City G13 2113061 21 064 18-19 Construction of 216 People capacity Auditorium in Ayodhya Faizabad 534.97 200.00 141.57 13-Nov-18 12.50 Ayodhya G15 3312168 33 081 15-16 Const. of 1st Floor in Administrative Bhawan at U.P. Allahabad Allahabad 535.60 250.90 250.09 133.9 91.08 31-Mar-16 66% 12.50 RajShree Tandon Open University G09 3611793 36 070 15-16 Const. of 84 Nos. Residence under Aasra Scheme Arech-II Jhansi 536.79 484.49 439.04 14.39 08-Jul-15 95% 12.50 G06 4313432 43 032 19-20 Construction of multipurpose hall and related work at Chibramau Kannauj 538.03 18-Aug-19 12.50 Village-Mighauli under Khelo G14 1912135 14 012 15-16 Const. of Nala at Chhawni Shifan to Sohraina Nahar at Gorakhpur Gorakhpur 538.26 269.00 262.47 8.93 21-Mar-16 60% 12.50 Nagar Palika Parishad G13 3012916 30 033 18-19 CHC Ishlam Nagar Budaun 538.96 221.49 250.98 264.79 39.82 29-May-18 55% 12.50 G01 3111735 31 070 15-16 Const. of 108 Nos. Residence under Aasra Scheme Gadhmuktesh Hapud 543.84 543.84 543.89 15-Sep-15 95% 12.50 war G09 3513484 35 007 19-20 Construction of fire station Kirawali Agra 543.89 G09 3611431 36 070 14-15 Const. of 108 Nos. Residence under Aasra Scheme Kotra Jalaun 545.10 545.10 459.83 0.26 02-Feb-15 92% 12.50 G13 4910282 49 009 12-13 I.T.I. Babrala Bareilly 545.73 512.08 451.02 0.03 28-Dec-12 75% 12.50 G10 5012146 50 033 15-16 CHC Shubeha Barabanki 547.90 547.90 530.29 2.291 31-Mar-16 95% 12.50 G02 5211651 52 019 15-16 33/11 KV Sub-Station & Electrification work at Yamuna Noida Noida 552.54 80.44 80.44 10-Jun-15 12.50 Expres at Sector-18 & 20 G14 3811424 38 033 14-15 CHC Sonbhadra 552.79 394.00 331.41 1.339 27-Jan-15 60% 12.50 G06 3912321 39 033 16-17 CHC Luxmanpur Shravasti 553.21 553.24 270.80 55.79 28-Jul-16 60% 12.50 G14 3812309 38 080 16-17 Const. of Main Building & WorkShop in Govt. Mirzapur Mirzapur 555.02 555.02 488.68 11.711 25-Jul-16 88% 12.50 Polytechnic G08 2912655 29 033 16-17 Const. of Samudayik Swasth Kendra Makhi Unnao Unnao Unnao 555.17 471.49 302.34 82.77 16-Feb-17 98% 12.50 G13 4412891 44 033 17-18 CHC, Dihadangupur Sultanpur Sultanpur 555.77 251.59 165.80 30.273 31-Mar-18 53% 12.50 G14 3413140 34 077 18-19 Establishment of 500 KW solar voltaic cell at different Jaunpur Jaunpur 556.13 389.29 43.25 07-Mar-19 12.50 buildings of VBSPU G07 4113169 41 201 18-19 Special repair works at JNV Porbandar Porbandar 557.77 0.00 0.00 08-Mar-19 4.46 G15 0511329 05 070 14-15 Const. of 120 Nos. Residence under Aasra Scheme Kanpur Kanpur 562.84 460.81 460.81 102.02 26-Nov-14 95% 12.50 G14 3413141 34 077 18-19 Drainage work at VBSPU Jaunpur Jaunpur 564.01 225.60 78.93 07-Mar-19 12.50 G01 1810801 18 070 13-14 Const. of 132 No.Residence under Aasra Scheme Dharmpur Moradabad 565.07 563.32 479.91 85.43 15.88 23-Nov-13 92% 12.50 G14 3812051 38 070 15-16 Const. of 120 Nos. Residence under Aasra Scheme Churk-Gurma Sonbhadra 566.05 283.03 268.09 1.012 05-Feb-16 50% 12.50 G14 1912287 19 092 16-17 Arrangement of Water Supply for Food Park at Sector- Gida Gorakhpur 570.90 394.02 328.16 1.37 01-Jun-17 85% 12.50 15 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %) G07 1212855 12 201 17-18 Construction of 0.50 unit dormitory for 92 boys students Mandi Mandi 573.25 272.03 385.21 158.93 0.196 27-Feb-18 98% 7.00 & 0.50 unit dormitory for 92 girls students without warden at JNV G04 3213058 32 201 18-19 Special repair and renovation work at Jawahar Navoday North Goa North Goa 574.61 216.12 188.80 02-Nov-18 70% 4.46 Vidyalaya, north Goa G02 4512277 45 009 16-17 Ala Hazrat Haj House(Old Building) Ghaziabad Ghaziabad 574.61 400.00 350.34 10-Jun-16 80% 12.50 G14 3911550 34 009 14-15 CHC Haraiya Balarampur 575.89 575.89 396.19 41.64 31-Mar-15 50% 12.50 G14 4213382 42 033 19-20 Strengthening of 105 nos. health subcenters into Health Gorakhpur Gorakhpur 577.50 31-Jul-19 12.50 & Wellness centre G13 4907698 30 090 08-09 Solid Waste Management Works Badaun Badaun 578.45 578.4355 450.32 12-May-08 70% 0.00 G14 3812352 38 033 16-17 CHC Sahganj Sonebhadra 581.15 581.15 333.28 24.63 15-Sep-16 60% 12.50 G10 5311156 53 070 14-15 Const. of 120 Nos. Residence under Aasra Scheme Bishwa Sitapur 581.33 495.59 468.38 85.59 66.47 18-Jul-14 95% 12.50 G07 1213214 12 201 18-19 Construction of retaining wall & land development work Reasi J&K 584.29 0.00 0.00 50.09 43.87 16-Mar-19 15% 4.46 at JNV, Reasi G14 2007790 34 090 08-09 Solid Waste Management Works Basti Basti 586.11 293.05 49.33 12-Jun-08 15% 0.00 G01 3113287 31 201 18-19 Repair and maintainance work at Sundargarh Orissa Sundergarh Sundergarh 586.56 0.00 0.00 108.43 78.75 09-Mar-19 10% G14 1411462 14 009 14-15 Const. of Boundary Wall at Kabristan/Antesthi Deoria Deoria 587.94 293.97 279.19 18-Feb-15 97% 12.50 Sthal(2013-14) G04 0912552 09 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Shamli Shamali 596.51 298.25 288.80 02-Jan-17 41% 12.50 Year-2016-17 Total 27492.35 17624.43 13819.23 1173.66 689.07 DETAILS OF ONGOING SCHEMES FROM 4 CRORES TO 4.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G07 1212799 12 203 17-18 Const. of 02 Doctor ESI dispensary with provision of 6 bed Abu Road Abu Road 400.00 25.00 0.00 18-Jul-17 3.48 facilities, branch office & staff quarter including A&E consultancy work at Abu Road G13 3013130 30 999 18-19 Construction of freedom fighter museem, Shahjahanpur Shahjahanpur Shahjahanpur 400.14 123.08 94.51 46.78 16-Feb-19 35% 5.00

G15 1508680 48 033 10-11 CHC Kamashin Banda 401.29 401.29 386.98 26-Apr-10 85% 12.50 G15 3311709 33 009 15-16 Const. of Boundary Wall at Kabristan/Antesthi Sthal(2014- Allahabad Allahabad 403.03 403.03 377.05 10-Jun-15 85% 12.50 2015) G13 4910493 49 009 13-14 CHC Meerganj Bareilly 405.18 392.78 391.64 2.97 24-Apr-13 75% 12.50 G13 4408883 44 033 10-11 CHC Kudebhar Sultanpur 406.51 321.39 320.12 26-Jul-10 86% 12.50 G15 3312842 33 070 17-18 Reconstruction of Asara home near BSNL office Allahabad Allahabad 410.48 263.80 263.09 15-Feb-18 12.50 G14 1411409 14 070 14-15 Const. of 65 Nos. Residence under Aasra Scheme Mahrajganj Mahrajganj 411.76 349.80 337.76 61.96 26.87 16-Jan-15 85% 12.50 G13 2112622 21 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal 2016- Ambedkar Ambedkar 412.06 206.03 196.39 21-Jan-17 45% 12.50 17 Nagar Nagar G02 2812810 28 023 17-18 Laying of rising main at Group housing/Builders at Sec-16 G.B.Nagar G.B.Nagar 412.17 711.32 703.54 7.78 23-Oct-17 98% 4.35 and 16B Greater Noida(west) G10 5307847 53 051 08-09 Const. of Hostel, Type-5,3 & other works in Raja Todermal Hardoi Hardoi 415.58 415.85 414.74 13-Aug-08 65% 12.50 Training Institute G15 3312592 10 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal 2016- Pratapgarh Pratapgarh 417.00 416.98 401.43 9.46 13-Jan-17 90% 12.50 17 G13 3013069 30 012 18-19 Renovation of Saheed Park & Tilak Park Shahjahanpur Shahjahanpur 417.80 68.53 0.41 22.50 14-Nov-18 16% 12.50

G14 1911772 19 070 15-16 Const. of 84 Nos. Residence under Aasra Scheme Sahjanwa Gorakhpur 417.96 219.59 197.25 0.35 01-Aug-15 82% 12.50 G14 2008609 20 033 10-11 CHC Bardpur Siddharthnagar 418.13 403.21 417.88 01-Apr-10 92% 12.50

G14 1908874 19 033 10-11 CHC Urua Gorakhpur 418.61 418.61 392.40 4.36 20-Jul-10 98% 12.50 G10 5311031 53 070 13-14 Const. of 84 Nos. Residence under Aasra Scheme Khairabad Sitapur 421.87 310.65 296.49 5.58 27-Mar-14 77% 12.50 G14 2008610 20 033 10-11 CHC Jogia Siddharthnagar 422.09 400.41 407.96 3.77 01-Apr-10 95% 12.50

G14 2012617 20 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal 2016- Saint Kabir Saint Kabir 423.82 352.82 93.72 19-Jan-17 12.50 17 Nagar Nagar G10 5310960 53 070 13-14 Const. of 96 Nos. Residence under Aasra Scheme Mahmudabad Sitapur 425.36 425.35 383.20 19.45 03-Mar-14 98% 12.50

G09 0813319 08 034 19-20 Construction of burn unit at S.N. Medical College Agra Agra 427.30 207.90 0.00 30-Apr-19 12.50 G13 4911609 49 070 15-16 Const. of 84 Nos. Residence under Aasra Scheme Deoraniya Bareilly 428.55 436.22 320.33 27.97 30-Apr-15 90% 12.50 G06 5412107 54 009 15-16 Const. of 60 No. Extra Class Room at 10 Different School Rampur Rampur 429.60 381.87 427.93 09-Mar-16 85% 12.50

G09 3611535 36 070 14-15 Const. of 84 Nos. Residence under Aasra Scheme Jalaun Jalaun 430.72 430.72 354.02 27-Mar-15 93% 12.50 G10 4710304 24 012 12-13 Fire Fighting works Varanasi Varanasi 432.00 329.97 329.97 08-Feb-13 96% 12.50 G01 1811831 18 070 15-16 Const. of 91 Nos. Residence under Aasra Scheme Mohalla Moradabad 432.91 432.91 432.52 01-Aug-15 82% 12.50 Dhkka G15 0511177 05 088 14-15 Rajeev Awas Scheme Harbansh Kanpur nagar 433.91 323.76 223.78 31.53 19-Aug-14 60% 12.50 Mohaal G06 5410756 54 070 13-14 Const. of 120 Nos. Residence under Aasra Scheme Chapta Rampur 435.82 435.82 438.52 08-Oct-13 60% 12.50 Colony G08 2913154 29 048 18-19 Tourism development work at Dwarikadhish temples Naimisaranya Sitapur 435.90 0.00 0.00 08-Mar-19 12.50 situated at Devdeveshwar and Kairona G06 02384 54 048 05-06 Mohd. Ali Johar Park Rampur Rampur 436.31 186.73 265.31 26-May-05 80% 12.50 G08 5112876 51 007 17-18 Construction of non-residential buildings Gauriganj Gauriganj Amethi 439.60 150.00 150.00 10.00 31-Mar-18 90% 12.50 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G14 1912961 19 034 18-19 Fire fighting and fire alarm work at BRD medical college Gorakhpur Gorakhpur 442.22 221.11 2.93 73.72 11-Jul-18 80% Gorakhpur G13 4912669 49 009 16-17 Const. of 79 No. of Aaganbadi centres Bareilly Bareilly 444.77 218.01 53.21 41.41 09-Mar-17 40% 12.50 G10 5308442 53 098 09-10 Const. of 108 No. House under IHSDP Shegahi Lakhimpur Khiri 448.69 402.32 395.27 21-Oct-09 98% 0.00 Bhedora G10 0313132 03 045 18-19 Construction of driving training institute (DTI), Azamgarh Azamgarh Azamgarh 450.24 229.00 0.00 16-Feb-19 12.50 G10 2408843 24 051 10-11 Reconst. Of Non-Residential Bhawan at Tehsil Sadar Sadar Varanasi 451.00 451.00 419.00 17-Jun-10 88% 12.50 G09 3612401 36 034 16-17 Const. of Solar Power Station at Medical College Jalaun Jalaun 452.15 114.10 50.00 21-Oct-16 5% 12.50 G01 1810942 18 009 13-14 Const. of ITI Mudhpandey Moradabad 453.00 220.86 224.37 22-Feb-14 50% 12.50 G10 2411646 24 036 15-16 Const. of 06 No. & 04 No. Residence Type-5 at Nayalaya Ghazipur Ghazipur 456.26 456.26 456.00 10-Jun-15 70% 12.50

G15 1012865 10 009 17-18 Construction of 100 beded hostel Pratapgarh Pratapgarh 460.00 199.84 173.13 30.16 47.07 31-Mar-18 85% 12.50 G01 1613187 16 009 18-19 Construction of Govt. Inter College Mohdpeer Bijnour 461.04 34.40 21.99 12.88 12-Mar-19 8% 12.50 Devmal G01 1613391 16 009 19-20 Construction of Govt. Inter College Kiratpur Bijnaur 461.04 31-Jul-19 12.50 G13 4913218 49 045 18-19 Construction of Driving Training Institute (DTI) Bareilly Bareilly 463.00 0.00 19-Mar-19 12.50 G04 0910793 09 009 13-14 Const. of ITI at Thana Bhawan Shamli Shamli 464.00 283.23 260.79 11-Nov-13 63% 12.50 G06 5412349 54 009 16-17 Const. of 43 Places Interlocking Road & Drain at Nagar Rampur Rampur 464.26 232.13 234.08 09-Sep-16 59% 12.50 Palika Parishad Areas G07 1213205 12 999 18-19 Construction of retaining wall near Bn store, MT and JCOs Moreh Manipur 470.97 0.00 0.00 31.43 32.03 16-Mar-19 65% 4.45 accn, near new mag building, new SM Bk, comdt. Residence as well as around Comdt. Residence at KLP Moreh, Manipur G04 0712398 07 009 16-17 CHC Fafunda Meerut 472.00 230.78 229.20 18-Oct-16 55% 12.50 G13 4912670 49 009 16-17 Const. of CHC Rithaura Bareilly Bareilly 472.15 229.50 229.84 0.35 09-Mar-17 50% 12.50 G10 0613339 06 070 19-20 Construction of Shelter home Atarauli Lucknow 472.36 06-Jun-19 12.50 G09 4609847 08 019 11-12 Const. of 220/132 KV Sub Station(civil Works) at Bah Agra Agra 473.73 125.00 134.89 31-Aug-11 20% 5.00 G09 3513093 35 081 18-19 Construction of Vishwakarma bhwan and second floor of Agra Agra 473.76 10.00 2.24 17-Dec-18 2% 12.50 adminstrative block in University G10 2613194 26 056 18-19 Construction of suitable hurdleless structure for Divyang Lucknow Lucknow 473.80 202.03 0.00 14-Mar-19 12.50 people at Pd. DDU State Village development training and research institution, Bakshi Ka Talab G04 0411394 04 009 14-15 Const. of Govt. Mahila Degree College Cival Khash Meerut 477.50 231.61 227.38 13-Jan-15 52% 12.50 G02 2511946 25 009 15-16 Const. of Govt. Degree College Atmad Sarai Bulanshahar 477.50 409.73 451.75 20-Nov-15 62% 12.50 G10 2611788 26 009 15-16 Const. of Govt. Girls Degree College Unnao Unnao 477.50 477.50 466.21 0.16 04-Jul-15 49% 12.50 G08 2911745 29 009 15-16 Const. of Science & Manviki Deptt. At Govt. Girls Degree Sitapur Sitapur 477.50 477.50 298.91 25.01 12-Jun-15 68% 12.50 College G06 3012422 54 012 16-17 Beautification & protection of Talab under Nagar Palika Rampur Rampur 478.00 200.00 189.89 24-Oct-16 50% 12.50 Parishad Jheel/Pokhar protection scheme G14 3812976 38 045 18-19 Construction of Driving Training Institute Mirzapur Mirzapur 479.54 192.22 30.51 27-Aug-18 18% 12.50 G15 3311880 33 070 15-16 Const. of 192 Nos. Residence under Aasra Scheme Fatehpur Fatehpur 481.87 458.01 412.71 23-Sep-15 40% 12.50 G13 4911022 30 009 13-14 Const. of Boundary Wall at Kabristan/Antesthi Sthal (Part-2) Shahjahanpur Shahjahanpur 482.95 482.96 450.24 27-Mar-14 96% 12.50

G06 5108410 39 087 09-10 Const. of Type-I(ordinary)-39, Type-1(Special)-28,Type-2 Bhinga Shravasti 483.36 483.36 479.73 10-Sep-09 55% 12.50 24No. & Type-4 02No. & S.P. Residence 01 No. at Police Line G06 4712324 54 009 16-17 Const. of Model School(Girls) Tanda Rampur 484.16 302.00 275.54 0.04 28-Jul-16 50% 12.50 G09 1712908 17 045 18-19 Const. of Driving Traning Institute(DTI) Mathura Mathura 485.22 188.38 95.31 15.24 25-May-18 41% 12.50 G10 0612501 06 012 16-17 Const. of RCC Drainage Alambagh Lucknow 486.95 303.33 207.55 135.00 26.79 21-Dec-16 45% 12.50 G04 0910795 09 009 13-14 Const. of ITI at Nanaini Sadholi Saharanpur Saharanpur 488.00 255.97 253.43 11-Nov-13 60% 12.50 G15 1108381 11 098 09-10 Const. of 132 No. House under IHSDP Shivly Kanpur Dehat 490.27 444.34 441.45 20-Aug-09 95% 0.00 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G15 3310029 33 036 11-12 Rain Water Harvesting Works at Hon'ble High Court Allahabad Allahabad 490.82 350.00 348.78 01-Mar-12 99% 12.50 G04 3213162 32 201 18-19 Construction of 0.50 unit boys dormitory for 96 students Dewas Dewas 492.41 0.00 0.00 08-Mar-19 4.20 with 1 No. warden residence & 0.625 unit girls dormitory for 120 students with 1 No. warden residence at JNV, Dewas

G09 1713020 17 064 18-19 Establishment of Geeta Research Institute and construction Mathura Mathura 492.78 100.00 101.52 27-Sep-18 32% 12.50 of building G10 5310532 26 034 13-14 Const. of Hospital, Hostal & Resedential Bhawan at Mati Lucknow 493.53 639.77 473.75 0.47 01-Aug-13 80% 12.50 Community Medicine & Public Health Department in Mati Center G10 2412343 24 033 16-17 CHC Medhi Chandauli 494.56 552.14 495.00 43.00 19-Aug-16 90% 12.50 G08 2910909 29 070 13-14 Const. of 96 Nos. Residence underAasra Scheme Rashulabad Unnao 494.79 494.78 363.10 17.66 06-Feb-14 75% 12.50 G14 2012050 20 012 15-16 Const. of Drain at Ushka Bazar Ushka Bazar Siddharth 494.80 431.36 391.46 05-Feb-16 90% 12.50 Nagar G14 1412572 14 012 16-17 Const. of Tow Side Drain at Nagar Palika Parishad under Noutanwa Mahrajganj 496.13 373.86 250.71 91.04 11-Jan-17 85% 12.50 Thuthibari Chauraha to Lohsipur G14 3811423 38 033 14-15 CHC Kon Sonbhadra 496.68 496.68 385.49 2.19 27-Jan-15 79% 12.50 G10 0613335 06 070 19-20 Construction of Shelter home Adilnagar Lucknow 496.99 06-Jun-19 12.50 G10 5010604 50 009 13-14 Const. of Govt. ITI Siroli Goshpur Barabanki 498.00 293.32 288.07 22-Jun-13 50% 12.50

G10 5010605 50 009 13-14 Const. of Govt. ITI Banikodar Barabanki 498.00 294.80 294.73 22-Jun-13 49% 12.50 G08 2912330 29 012 16-17 Chakrtirth Jal Purification & Butificaton at Naimisharad Sitapur Sitapur 499.27 294.64 235.21 9.34 28-Jul-16 60% 12.50 Total 35892.99 23033.24 19814.31 258.55 657.77 DETAILS OF ONGOING SCHEMES FROM 3 CRORES TO 3.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G10 0612673 06 012 16-17 Beautification of pond at Ismailganj Degree College Ismailganj Lucknow 300.00 150.00 49.90 28.81 16-Mar-17 30% 12.50 Ismailganj Ward-02 G01 1611194 16 009 14-15 Const. of Govt. Girls Inter College Meerapur Bijnor 300.00 300.00 292.25 30-Aug-14 94% 12.50 Bangar G01 1611561 16 009 14-15 Const. of Govt Balika Inter College Afjalgarh Bijnor 300.00 300.00 279.82 31-Mar-15 70% 12.50 G14 3812612 38 070 16-17 Const. of 60 Nos. under Aasara Scheme Kachwan Mirzapur 300.77 150.39 150.39 18-Jan-17 55% 12.50 G10 2611872 26 007 15-16 Const. of S.T.P at Police Training Centre Unnao Unnao 301.08 301.08 290.90 16-Sep-15 42% 12.50 G14 3413308 34 079 19-20 Construction of boundarywall and gate at 55 UPV Balrampur Balrampur 301.13 301.13 0.00 301.12 26-Apr-19 12.50 G07 4013043 12 201 18-19 Construction of RCC retaining wall works at JNV Doda Doda Doda 301.75 0.00 0.00 28.65 29-Oct-18 10% 4.46 (J&K) G04 0912161 09 009 15-16 Const. of Govt. Inter College, Habibpur Tapovan Vikas Saharanpur Saharanpur 301.96 257.95 222.67 31-Mar-16 74% 12.50 Khand-Sdholi Kdim G04 0912162 09 009 15-16 Const. of Govt. Inter College, Jhandvan Vikas Khand- Saharanpur Saharanpur 301.96 257.95 242.99 31-Mar-16 95% 12.50 Gangoh G04 0912195 09 009 15-16 Const. of Govt. Inter College Vankhera Vikas Khand- Saharanpur Saharanpur 301.96 150.98 140.93 31-Mar-16 50% 12.50 Nagla G04 0912196 09 009 15-16 Const. of Govt. Inter College Shapla Vikas Khand- Saharanpur Saharanpur 301.96 257.95 227.71 31-Mar-16 80% 12.50 Devband G04 0912197 09 009 15-16 Const. of Govt. Inter College Kailashpur Vikas Khand- Saharanpur Saharanpur 301.96 257.95 242.92 31-Mar-16 95% 12.50 Puvarka G04 0912342 09 009 16-17 Govt. Inter College at Kaloowala Jahanpud vikas khand- Saharanpur Saharanpur 301.96 150.98 139.04 19-Aug-16 50% 12.50 Muzaffrabad G04 0912706 09 009 16-17 Const. of Govt. Inter College at Shekhpura Kadim Saharanpur Saharanpur 301.96 150.99 0.00 31-Mar-17 12.50 G04 0412030 04 009 15-16 Const. of Model School Datavali Meerut 302.00 302.00 231.05 21.88 27-Jan-16 75% 12.50 Geshupur G04 0412031 04 009 15-16 Const. of Model School Pithlola Meerut 302.00 302.00 241.08 14.93 27-Jan-16 75% 12.50 G04 4612082 07 009 15-16 Const. of Model School(Boyes) Mukari Bagpat 302.00 302.00 152.80 26-Feb-16 50% 12.50 G04 4612083 07 009 15-16 Const. of Model School(Girls) Tanda Bagpat 302.00 302.00 149.61 26-Feb-16 50% 12.50 G01 1609991 16 078 11-12 Const. of Model School Bamnaula Bijnor 302.00 20.00 0.00 25-Jan-12 12.50 G01 1612356 16 009 16-17 Const. of Model School(Girls) Fatehpur Bijnor 302.00 302.00 258.42 4.91 15-Sep-16 82% 12.50 Zamal G01 1612437 16 009 16-17 Model Inter College Mandavar (Sau.Pur Devmal) for Bijnour Bijnour 302.00 302.00 218.27 14.07 22-Nov-16 74% 12.50 boys G01 1812093 18 009 15-16 Const. of Model School Galsua Amroha 302.00 302.00 245.97 7.01 01-Mar-16 93% 12.50 G01 1812222 18 009 16-17 Const. of Model School Tajpur Moradabad 302.00 302.00 254.11 07-May-16 80% 12.50 G01 1812315 18 009 16-17 Const. of Govt. Inter College at vikas khand-gajrola Amroha Papsane 302.00 141.76 141.66 25-Jul-16 50% 12.50 Khedan G01 1812444 18 009 16-17 Const. of Model School Tuglakabad Amroha 302.00 302.00 227.85 9.47 28-Nov-16 90% 12.50 G14 2012317 20 009 16-17 Const. of Model School Sohratgarh Siddharth 302.00 302.00 283.50 16.83 25-Jul-16 77% 12.50 Nagar G13 2110603 21 078 13-14 Const. of Model School Indhra Bhiwani Ambedkar 302.00 274.67 262.14 1.74 21-Jun-13 80% 12.50 Nagar G10 2612358 26 009 16-17 Const. of Model School(Boys) Lakhimpur Khiri Lakhimpur Khiri 302.00 302.00 258.32 4.19 15-Sep-16 87% 12.50

G10 2612359 26 009 16-17 Const. of Model School(Girls) Lakhimpur Khiri Lakhimpur Khiri 302.00 302.00 249.68 6.79 15-Sep-16 87% 12.50

G15 3310448 33 078 12-13 Const. of Model School Manjhanpur Kaushambi 302.00 269.50 267.73 30-Mar-13 98% 12.50 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G14 3809807 38 078 11-12 Const. of Model School Medardah Sonbhadra 302.00 302.00 302.00 16-Nov-11 80% 12.50 G14 3809808 38 078 11-12 Const. of Model School Bairampur Mirzapur 302.00 302.00 302.00 16-Nov-11 85% 12.50 G14 3809810 38 078 11-12 Const. of Model School Mahamalpur Mirzapur 302.00 302.00 302.00 16-Nov-11 85% 12.50 G06 3911819 39 009 15-16 Const. of Govt. Balika Inter College Haldharmau Gonda 302.00 148.11 135.06 131.85 0.08 23-Jul-15 50% 12.50 (Mollana) G06 3912065 39 009 15-16 Const. of Model School Bahraich Bahraich 302.00 298.62 238.63 5.13 09-Feb-16 75% 12.50 G06 3912078 39 009 15-16 Const. of Model School Huzoorpur Bahraich 302.00 298.62 293.68 0.15 19-Feb-16 100% 12.50 G13 4912305 49 009 16-17 Const. of Model School Meerganj Bareily 302.00 302.00 232.89 20.96 02-Jul-16 97% 12.50 G08 3709762 51 078 11-12 Const. of Model School Ashan Jagatpur Raebareli 302.00 270.20 256.73 10-Oct-11 66% 12.50

G10 5310339 53 009 12-13 Health Center (CHC) Foolbehad Lakhimpur Khiri 302.14 302.14 284.98 2.47 27-Feb-13 78% 12.50

G01 3113288 31 024 18-19 Construction of 2000 M.T. capacity godown, office and Bulandsehar Bulandsehar 302.15 0.00 0.00 150.00 30-Mar-19 road under National Agricultural Development Scheme 2018-19 G08 2910240 29 009 12-13 I.T.I. Malihabad Lucknow 303.11 287.48 287.05 19-Nov-12 85% 12.50 G06 3912151 39 009 15-16 Const. of Govt. Balika Inter College Hindunagar Gonda 304.46 148.10 140.56 31-Mar-16 50% 12.50 Khash G04 4611279 04 009 14-15 Const. of Govt. Inter College at Rashulpur Dhadai, Vikas Meerut Meerut 305.08 154.35 144.75 10-Nov-14 60% 12.50 Khand- G04 4611280 04 009 14-15 Const. of Govt. Inter College at Pachali, Vikas Khand- Meerut Meerut 305.08 235.15 194.35 59.71 34.84 10-Nov-14 75% 12.50 Saroorpur Khurd G10 5312813 53 012 17-18 Construction of drainage near Sankata Mandir Mahmudabad Sitapur 305.44 35.00 17.25 10-Nov-17 21% 12.50 Mahmudabad G10 2412290 37 070 16-17 Const. of Shelter House Meerganj Jaunpur 305.98 244.78 244.10 22-Jun-16 78% 12.50 G14 14031 14 051 1 Collectorate (Residential) Maharajganj Maharajganj 306.81 306.81 306.80 01-Mar-01 75% 12.50 G02 2711736 27 070 15-16 Const. of Shelter House Gautam budh Gautam budh 307.47 233.86 151.09 9.98 12-Jun-15 40% 12.50 Nagar Nagar G09 3613086 36 070 18-19 Shelter home near Govt. polytechnic, Jhashi Jhashi Jhashi 308.50 61.70 18.40 0.41 27-Nov-18 17% 12.50 G14 2010731 20 009 13-14 Const. of ITI Badarpur Siddharth 309.00 215.49 184.64 10-Sep-13 60% 12.50 Nagar G01 3112423 31 009 16-17 Const. of Govt. Inter College at Block-Dhoulana Hapur Hapur 310.00 152.40 148.96 10-Nov-16 50% 12.50 Shekhpur Kichara G14 1412831 14 078 17-18 Construction of Govt. Inter College at Village Sonaura Kaimpiyarganj Gorakhpur 310.23 250.23 199.02 28.94 08-Jan-18 70% 12.50 Bujurg G14 1412832 14 078 17-18 Construction of Govt. Inter College at Village Gopalganj Kaimpiyarganj Gorakhpur 310.23 250.23 204.94 16.88 08-Jan-18 85% 12.50

G04 0912555 09 009 16-17 Govt. Inter College Binpur Gangoh Saharanpur 310.77 152.34 149.84 11-Jan-17 50% 12.50 G04 0912556 09 009 16-17 Govt. Inter College Binpur Deykaura Saharanpur 310.77 287.29 280.36 11-Jan-17 95% 12.50 G14 2012345 20 009 16-17 Const. of Govt. Inter College Vikas Khand-Baghuli Vill- Khalilabad Sant Kabir 311.06 306.82 179.08 9.32 05-Sep-16 70% 12.50 Banolli Nagar G02 2510896 25 208 13-14 Const. of Office Building Jawan Aligarh 312.29 312.29 304.93 4.01 22-Jan-14 96% 12.50 G02 2510897 25 208 13-14 Const. of Office Building Gonda Aligarh 312.29 312.29 301.52 22-Jan-14 91% 12.50 G08 2911300 29 009 14-15 Const. of Govt. Inter College Ganeshpur Sitapur 312.91 289.38 247.77 12.75 18-Nov-14 95% 12.50 G10 5311238 53 009 14-15 Const. of Govt. Inter College at Vill-Lelkhurd, Vikas Sitapur Sitapur 312.92 312.90 275.70 22-Sep-14 98% 12.50 Khand-Mahmudabad G14 3813232 38 033 18-19 Construction of Trama Center Chandauli Chandauli 312.95 103.62 0.00 30-Mar-19 G10 5307289 53 051 07-08 Renovation of Collectrate Bhawan Lakhimpur Lakhimpur Khiri 313.48 313.48 300.37 13-Sep-07 80% 12.50 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G04 0712395 07 009 16-17 Const. of Govt. Inter College Vill.- Jadoda Vikas Khand- Muzaffarnagar Muzaffarnagar 315.00 153.99 151.96 18-Oct-16 50% 12.50 Sadar G01 1612382 16 009 16-17 Const. of Govt. Girls Inter College Saharanpur Saharanpur 315.00 157.50 154.34 137.44 03-Oct-16 50% 12.50 G01 1811973 18 009 15-16 Const. of Govt. Inter College Vikas Khand- Ashmoli Sahbazpur Shambhal 315.00 150.93 150.63 17-Dec-15 50% 12.50 Kala G01 1811974 18 009 15-16 Const. of Govt. Girls Inter College Vikas Khand- Shikanderpur Shambhal 315.00 146.90 145.97 17-Dec-15 50% 12.50 Pnwasha Sharai G01 1811975 18 009 15-16 Const. of Govt. Inter College Vikas Khand- Shambhal Shadeeranpur Shambhal 315.00 146.90 146.57 17-Dec-15 50% 12.50

G01 1812445 18 009 16-17 Const. of Govt. Inter College Vikash Khand Thakurdwara Moradabad 315.00 150.91 153.88 28-Nov-16 50% 12.50 Thakurdwara,at Ramuwala Ganesh G01 3111876 31 009 15-16 Const. of Govt. Inter College, vikas khand-Rajapur Nidouri Ghaziabad 315.00 154.48 137.15 28-Aug-15 50% 12.50 G14 3911556 34 009 14-15 Govt. Inter College Chohaterkala Balarampur 315.00 200.75 298.06 6.36 31-Mar-15 50% 12.50 G14 3911640 34 009 15-16 Const. of Govt. Inter College at Vikas Khand-Pachpedwa Pipriha Jumni Balarampur 315.00 154.42 154.01 20-May-15 50% 12.50

G15 4812014 48 009 15-16 Const. of Govt. Balika Inter College Ramnagar Mahoba 315.00 136.91 136.21 05-Jan-16 50% 12.50 G10 5012666 50 009 16-17 Const. of Govt. Girls Inter College Bhayara at Vikash Masauli Barabanki 315.00 136.91 72.05 35.00 13.71 08-Mar-17 45% 12.50 Khand Masauli G10 5012679 50 009 16-17 Const. of Govt. Girl Inter College at Vikash Khand Fatehpur Barabanki 315.00 0.00 0.00 31-Mar-17 15% 12.50 Fatehpur, Shahpur G10 0312299 03 009 16-17 Const. of Govt. Girls Inter College at Vill.-Dharnipur Azamgarh Azamgarh 316.56 158.28 154.56 02-Jul-16 54% 12.50 Block-Mirzapur G10 0312300 03 009 16-17 Const. of Govt. Girls Inter College at Vill.-Khurampur Azamgarh Azamgarh 316.56 158.28 150.45 02-Jul-16 51% 12.50 Block-Mohamadpur G04 0911096 09 009 14-15 Const. of Govt. Inter College Vikas Khand-Thana Palthedi Shamli 318.27 165.11 153.97 18-Jun-14 50% 12.50 Bhawan G04 3212871 32 201 17-18 Special repairing work at JNV, Buldhana Buldhana Buldhana 318.78 61.11 58.01 31-Mar-18 24% 4.46 G10 0312298 03 009 16-17 Const. of Govt. Girls Inter College at Vill.-Khujiyari Block- Azamgarh Azamgarh 319.21 159.61 156.19 02-Jul-16 54% 12.50 Mirzapur G10 0312301 03 009 16-17 Const. of Govt. Girls Inter College at Town-Sikthisha Azamgarh Azamgarh 320.53 160.27 153.03 02-Jul-16 53% 12.50 Mohammad Mubarakpur Block-Sathiya G14 1908454 19 033 09-10 CHC Jangalkodiya Gorakhpur 321.39 321.39 332.12 05-Nov-09 100% 12.50 G15 3313221 33 012 18-19 Construction of 03 Nos. Akhada/Ashrams (Phase-04) Prayagraj Prayagraj 321.39 160.69 160.69 19-Mar-19 12.50 under Kumbh-2019 G10 2408840 37 033 10-11 CHC Karnzakla Jaunpur 321.39 466.25 333.51 17-Jun-10 80% 12.50 G13 4911814 30 009 15-16 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Shahjahanpur Shahjahanpur 322.19 322.19 241.14 13-Jul-15 96% 12.50 2013-14 G14 3810829 38 070 13-14 Const. of Residence under Aasra Scheme Ahrora Mirzapur 322.50 304.50 245.02 12.65 05-Dec-13 88% 12.50 G04 0712794 07 012 17-18 Const. of Animal shelter home/Kanji house at Nagar Muzaffarnagar Muzaffarnagar 323.43 119.99 0.00 07-Jun-17 12.50 Palika Parishad Muzaffarnagar under Kanha Pashu Aashay Yojna G13 4407948 44 033 08-09 CHC Bhetua Sultanpur 323.96 318.34 313.00 10-Nov-08 90% 12.50 G06 0112106 54 070 15-16 Interlocking, Drainage, Drain & Other General Facility Rampur Rampur 324.67 0.00 0.00 09-Mar-16 0.00 works in Urban Minority Area 21 Scheme G14 3812302 38 009 16-17 Const. of Govt. Girls Inter College at Mamdevpur Bhadohi Sant Ravi Das 324.82 162.41 162.41 02-Jul-16 60% 12.50 Nagar G09 3608860 36 087 10-11 Const. of Residential/ Non-Residential Bhawan at Fair Garautha Jhansi 325.15 325.15 283.81 29-Jun-10 97% 12.50 Station G06 0112851 54 007 17-18 Construction of non-residential buildings of fire station Rampur Rampur 326.49 141.63 174.73 16-Feb-18 15% 12.50 Rampur GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G10 0312297 03 009 16-17 Const. of Govt. Inter College at Vill.-Jamudi Block- Azamgarh Azamgarh 326.85 163.42 140.37 02-Jul-16 53% 12.50 Sathiyawa G06 0112459 54 009 16-17 Inter Locking works in 19 Place at Nagar Palika Parishad Rampur Rampur 328.18 105.50 105.50 13-Dec-16 32% 12.50

G14 3911432 34 009 14-15 Const. of Govt. Inter College at Preriya Mizapur Utraolla Balarampur 329.31 155.08 154.74 04-Feb-15 45% 12.50 G14 3912447 34 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Balarampur Balarampur 330.67 659.77 655.95 2.23 28-Nov-16 80% 12.50 2016-17 G09 0813341 08 070 19-20 Construction of shelter home Jivani Mandi, Agra 332.68 133.07 06-Jun-19 12.50 Gadhapada G14 1912974 19 070 18-19 Construction of Shelter home at (125 beded) Gorakhpur Gorakhpur 333.94 107.58 67.48 23.97 27-Aug-18 54% 0.00

G01 1811328 18 009 14-15 Const. of Govt. Inter College at Vikas Khand- Moradabad Moradabad 334.07 152.51 151.52 26-Nov-14 50% 12.50 Moradabad(Sihali or Ganimatpur) G01 1811379 18 009 14-15 Const. of Govt. Inter College at Vikas Khand- Thakurdwara Moradabad 334.07 157.51 156.67 133.20 31-Dec-14 50% 12.50 Thakurdwara G01 1811380 18 009 14-15 Const. of Govt. Inter College at Vikas Khand-Dilari Dilari Moradabad 334.07 148.89 148.69 31-Dec-14 50% 12.50 G01 1811475 18 009 14-15 Const. of Govt. Inter College at Vikas Khand- Bhagatpur Moradabad Moradabad 334.07 150.89 149.28 03-Mar-15 50% 12.50 Tanda G01 1811671 18 009 15-16 Const. of Govt. Inter College at Vikas Khand-Dilari Moradabad Moradabad 334.07 310.65 309.39 10-Jun-15 87% 12.50 G10 0613338 06 070 19-20 Construction of Shelter home Chinhat Lucknow 336.71 06-Jun-19 12.50 G02 4511748 45 070 15-16 Const. of 72 Nos. Residence under Aasra Scheme Dadari Gautam Budh 340.22 283.52 275.51 12-Jun-15 93% 12.50 Nagar G14 2010732 20 009 13-14 Const. of ITI Etwa Siddharth 342.00 342.00 250.06 10-Sep-13 62% 12.50 Nagar G10 2412631 37 027 16-17 Const. of Kanji house under Kanha Pashu Aashay Jaunpur Jaunpur 342.22 342.22 198.11 38.02 28-Jan-17 70% 12.50 G08 2911345 29 070 14-15 Const. of 84 Nos. Residence under Aasra Scheme Bighapur Unnao 342.37 268.19 221.94 0.34 08-Dec-14 97% 12.50 G10 2607831 26 060 08-09 Const. of B/Wall, Repairing of Hostal & Electric Works at Lucknow Lucknow 343.15 343.15 326.44 23-Jul-08 90% 12.50 U.P. Sainik School G09 3613160 36 012 18-19 Construction of Shelter home Lalitpur Lalitpur 343.76 0.00 0.00 08-Mar-19 12.50 G09 1711630 17 070 15-16 Const. of 72 Nos. Residence under Aasra Scheme Hathras Hathras 344.36 172.30 172.29 -161.68 01-Feb-16 50% 12.50 G06 2312815 43 007 17-18 Const. of administrative building of Ajitmal Fire station Auraiya Auraiya 344.53 149.52 82.85 20-Nov-17 25% 12.50

G15 3312850 33 034 17-18 Upgradation of trama center at Swaruprani Nehru Allahabad Allahabad 344.70 344.70 247.63 15-Feb-18 12.50 hospital G04 0712860 07 009 17-18 Construction of Government Inter College Block- Muzzafarpur Muzzafarpur 345.00 33.78 29.88 05-May-17 32% 12.50 Shahpur G04 0712861 07 009 17-18 Construction of Government Inter College Block- Purkaji Muzzafarpur Muzzafarpur 345.00 33.78 30.64 2.64 16-Mar-18 15% 12.50

G10 5312643 53 009 16-17 Const. of Govt. girls inter college at Town Sahabad, Hardoi Hardoi 345.74 172.87 160.37 7.58 08-Feb-17 50% 12.50 Hardoi under MSDP G08 3711467 51 009 14-15 Const. of Govt. Inter College at Shukul Bazar Amethi Amethi 346.29 177.15 95.98 23-Feb-15 35% 12.50 G10 2411755 24 012 15-16 Butification of Pushkar Kund Varanasi Varanasi 346.35 346.35 337.38 16-Jun-15 96% 12.50 G15 1008416 33 051 09-10 Const. of Non-Residential Bhawan at Tehsil Handia Allahabad 346.39 310.68 275.54 15-Sep-09 92% 12.50 G15 1008741 33 033 10-11 CHC Saidabad Allahabad 347.98 346.38 324.98 18-May-10 90% 12.50 G06 3912967 39 009 18-19 Construction of Govt. Girls Inter College Babhanjot Gonda 348.00 75.78 24.46 0.43 27-Aug-18 20% 12.50 G06 5411132 54 009 14-15 Const. of Govt. Inter College at Saijni Nankar Rampur Rampur 348.31 7.88 316.50 10-Jul-14 12.50 G06 4308167 43 033 08-09 Repairing of old hospital & Const. of 30 Beded CHC Bardhpur Fatehgarh 348.43 328.66 328.58 17-Mar-09 75% 12.50 G04 0911950 09 009 15-16 Const. of Govt. Inter College Bhura Shamli 348.50 170.83 156.43 23-Nov-15 50% 12.50 G06 3012457 54 009 16-17 Const. of Govt. Inter College in vikas Khand- Bilashpur Mohd.Pur Rampur 348.70 174.30 168.95 13-Dec-16 45% 12.50 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G06 3012458 54 009 16-17 Const. of Govt. Inter College in vikas Khand- Mankra Rampur 348.70 174.30 169.38 13-Dec-16 40% 12.50 Chamrauwa G04 0712778 07 009 17-18 Const. of Govt. Inter College at village Bondra Parikshitgarh Meerut 348.72 170.70 27.74 7.26 24-May-17 17% 12.50 G04 0712779 07 009 17-18 Const. of Govt. Inter College at village Rukanpur Rajpura Meerut 348.72 170.70 0.00 24-May-17 12.50 G04 0912802 09 009 17-18 Const. of Govt. Inter College at Village Kutubpur Katubpur Saharanpur 348.72 151.51 143.81 22-Aug-17 50% 12.50 G04 0912921 09 009 18-19 Const. of Govt. Inter College Chandauli Saharanpur 348.72 0.00 47.64 04-Jun-18 25% 12.50 G02 2511931 25 009 15-16 Const. of 06 No. High Primary School to High School Kasganj Kasganj 348.72 234.01 221.09 5.63 20-Nov-15 56% 12.50

G10 2612405 26 009 16-17 Const. of Govt. Girls Inter College Vikas Khand- Lakhimpur Khiri Lakhimpur Khiri 348.72 174.35 166.54 0.15 24-Oct-16 50% 12.50 Kumbhi(Gola) G06 5412370 54 009 16-17 Const. of New Govet Inter College Rampur Rampur 348.72 151.56 159.38 30-Sep-16 50% 12.50 G06 5412371 54 009 16-17 Const. of New Govet Inter College Rampur Rampur 348.72 151.56 159.96 30-Sep-16 50% 12.50 G10 5310338 53 009 12-13 I.T.I. Dhorahra Lakhimpur Khiri 350.00 228.75 217.14 27-Feb-13 71% 12.50

G06 5410671 54 088 13-14 Const. of Musical Fountain at Campus Park Rampur Rampur 350.07 0.00 0.00 20-Aug-13 0.00 G14 3413139 34 077 18-19 Interior work of different laboratories under Prof. Jaunpur Jaunpur 351.32 140.52 15.61 110.69 07-Mar-19 12.50 Rajendra Singh(Rajju Bhaiya) in VBSPU G04 0911461 09 070 14-15 Const. of 72 Nos. Residence under Aasra Scheme Nanuta Saharanpur 352.30 283.55 253.17 18-Feb-15 90% 12.50 G10 2410547 24 081 13-14 Const. of Multipurpose Administrative Bhawan at Varanasi Varanasi 352.30 569.16 525.10 15-May-13 85% 12.50 Mahatma Gandhi Kashi Vidhayapith G09 3613087 36 070 18-19 Shelter home, near medical college, Jhashi Jhashi Jhashi 353.01 70.60 0.00 54.31 27-Nov-18 13% 12.50 G15 3312664 10 007 16-17 Const. of Non-residential building at Firestation Raniganj Raniganj Pratapgarh 353.04 247.90 242.80 68.56 23.74 03-Mar-17 90% 12.50

G08 13084 13 077 1 Construction of Central Library, Uttar Maharashtra Jalgaon Jalgaon 353.35 106.70 151.04 01-Apr-96 45% 12.50 Vidyapeeth (Maharastra) G14 1912973 19 070 18-19 Construction of Shelter home at Gorakhnath(127 beded) Gorakhpur Gorakhpur 353.58 117.68 112.74 0.65 27-Aug-18 50% 0.00

G06 3907291 39 051 07-08 Lekhpal Training School & Hostal Gonda Gonda 353.97 347.03 349.17 13-Sep-07 35% 12.50 G15 3312416 10 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Pratapgarh Pratapgarh 356.96 356.96 281.02 4.87 24-Oct-16 95% 12.50 2013-14 G02 2709819 27 051 11-12 Const. of Residential Building at Tehsil Shamli Prabudha 357.66 357.66 320.37 4.33 21-Nov-11 87% 12.50 Nagar G01 1811327 18 009 14-15 Const. of Govt. Inter College at Vikas Khand- Moradabad Moradabad 360.00 174.19 171.37 139.30 26-Nov-14 50% 12.50 Mundapandey G15 1012922 10 007 18-19 Const. of non-residential buildings at fire station Rampur Rampur Khas Pratapgarh 361.83 180.00 103.70 0.49 04-Jun-18 25% 12.50 Khas G10 0613337 06 070 19-20 Construction of Shelter home Sindhikheda Lucknow 364.98 06-Jun-19 12.50 G14 3910430 34 009 12-13 I.T.I. Katrashankar Balrampur 365.00 265.40 264.33 25-Mar-13 90% 12.50 G13 4910198 49 009 12-13 I.T.I. Bahedi Bareilly 365.00 250.10 257.55 17-Oct-12 75% 12.50 G06 1810313 54 009 12-13 I.T.I. Hasanpur Amroha Jyotibaphule 365.00 235.48 243.88 13-Feb-13 70% 12.50 Nagar G02 02267 02 024 02-03 Infrastructure Work, Agriculture and Industrial University Meerut Meerut 366.26 89.00 24.69

G14 2010636 20 048 13-14 Const. of Theem Park at Kapilvastu Kapilvastu Siddharth 366.92 258.78 258.78 23-Jul-13 68% 12.50 Nagar G06 1806844 54 012 06-07 Const. of R.C.C. Drain Amroha Jyotiba Phule 368.00 368.00 413.58 21-Jul-06 90% 12.50 Nagar G14 3806986 38 033 06-07 Const. of 100 Badedd Hospital Robertsganj Sonebhadra 368.23 340.33 432.69 10-Nov-06 95% 12.50 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto upto March 2020 upto 2020 upto Progress in March 2019 reporting reporting Percentage( 2019 month month %)

G14 1913116 19 034 18-19 Construction and decoration work in the newly Gorakhpur Gorakhpur 372.37 48.63 0.00 13-Feb-19 15% constructed Pharmacy building of BRD medical college

G10 5012334 50 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Barabanki Barabanki 373.19 315.65 298.85 30-Jul-16 60% 12.50 2015-16 G01 3110919 31 009 13-14 CHC Pilkhuwa Hapur 374.00 373.37 353.43 1.86 20-Jan-14 78% 12.50 G14 3911269 34 009 14-15 CHC Mahdeya Balarampur 374.14 179.29 179.05 30-Oct-14 45% 12.50 G14 3911270 34 009 14-15 CHC Rehrabazar Balarampur 374.14 187.10 186.52 30-Oct-14 45% 12.50 G01 3111486 31 009 14-15 CHC Faridpur Hapur 375.00 374.29 371.45 0.30 10-Apr-15 75% 12.50 G13 4907294 49 051 07-08 Const. of Residential Building at Tehsil Aonla Bareilly 375.00 370.60 235.84 40.97 13-Sep-07 88% 12.50 G10 0312174 03 009 15-16 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Azamgarh Azamgarh 376.42 188.21 188.21 31-Mar-16 50% 12.50 2014-15(Phase-III) G14 1412884 14 078 17-18 Construction of GIC at Grampanchayat Baashgaon Gorakhpur 377.24 227.24 188.59 31-Mar-18 60% 12.50 Rudain/Maghgaon G04 0911438 09 070 14-15 Const. of 72 Nos. Residence under Aasra Scheme Saharanpur Saharanpur 378.07 470.34 391.56 04-Feb-15 92% 12.50 G15 1508684 48 033 10-11 CHC Ramnagar Chitrakoot 378.13 378.13 373.30 26-Apr-10 85% 12.50 G10 5012540 50 077 16-17 Const. of Art faculty at Saint Kavi Baba Baijnath Govt. Harakh Barabanki 379.14 252.00 248.14 0.07 29-Dec-16 72% 12.50 PG Dgree College G15 3312638 33 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Fatehpur Fatehpur 380.67 190.33 181.15 08-Feb-17 65% 12.50 2016-17 G15 1508683 48 033 10-11 CHC Shivrampur Chitrakoot 380.77 380.77 374.07 26-Apr-10 90% 12.50 G02 2713452 27 201 19-20 Construction of 0.5 unit boys dormitory for 96 students Nalanda Nalanda 381.37 71.02 03-Sep-19 4.46 with 02 Nos. warden residence & boundary wall for additional infrastructure for additional input through special classes for JNV G15 3313292 33 034 18-19 Construction of Burn unit at Emergency Surgery Ward at Prayagraj Prayagraj 381.49 207.90 0.00 30-Mar-19 S.R.N. hospital attached to Medical College Prayagraj

G01 3113121 31 18-19 Construction of 120 capacity male barrack along with Bulansehar Bulansehar 382.48 162.35 34.32 18-Feb-19 10% circle wall G10 2609747 26 036 11-12 Const. of 08 No. Nyayik officre Residential Lakhimpur Khiri Lakhimpur Khiri 382.49 382.49 321.58 3.91 22-Sep-11 80% 12.50

G06 4712323 54 009 16-17 Const. of Model School(Boys) Tanda Rampur 385.07 302.00 287.57 2.18 28-Jul-16 50% 12.50 G04 0412410 04 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Sthal Year- Meerut Meerut 387.83 193.91 192.97 24-Oct-16 50% 12.50 2015-16 G09 3613157 36 012 18-19 Construction of shelter home at Urai medical college Urai Jhansi 388.70 65.74 29.19 24.68 08-Mar-19 20% 12.50 G14 1912971 19 064 18-19 Construction work at Ramgarh Taal Gorakhpur Gorakhpur Gorakhpur 389.00 238.70 237.44 0.52 27-Aug-18 80% 12.50 G01 1611131 16 070 14-15 Const. of 96 Nos. Residence under Aasra Scheme Sherkot Bijnor 390.13 390.13 364.65 10-Jul-14 94% 12.50 G06 5410832 54 078 13-14 Const. of Extra Class Room(RMSA) Rampur Rampur 391.23 299.33 296.15 09-Dec-13 90% 12.50 G07 1212982 12 999 18-19 Construction of 04 Nos SM Bk (G+3) for no. 02 Transit Jorhat Jorhat 392.42 0.00 0.00 27-Aug-18 4.45 Camp at Jorhat G01 1811322 18 009 14-15 Const. of 90 No. Anganbadi Bhawan at 6 No. Vikas Moradabad Moradabad 396.90 192.35 192.01 26-Nov-14 50% 12.50 Khand G09 3511723 35 070 15-16 Const. of Nos. Residence under Aasra Scheme Ashfabad Firozabad 399.42 199.71 198.60 12-Jun-15 45% 12.50 G14 2012649 20 012 16-17 Const. of Drain as per Master plan at Nagar Panchayat Siddharthnagar Siddharthnagar 399.85 177.77 148.17 6.37 13-Feb-17 50% 12.50 Uska Bazar under Nagariya Jal Nikasi Yojana 2016- 2017 Total 61103.44 39655.39 34795.82 1388.99 515.71 DETAILS OF ONGOING SCHEMES FROM 2 CRORES TO 2.99 CRORES Amount In Lacs GMno SCH CODE UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto March upto March 2020 upto 2020 upto Progress in 2019 2019 reporting reporting Percentage( month month %) G10 5010788 50 082 13-14 Const. of Boys Hostel Building at I.E.T Lucknow Lucknow 200.00 100.00 95.56 26-Oct-13 37% 12.50 Const. of Boundary Wall at Kabristan/Antesthi Sthal G14 3812609 38 009 16-17 2016-17 Bhadohi Bhadohi 200.04 100.02 95.89 18-Jan-17 50% 12.50 Establishment of pumping station and open drain for G13 4913153 49 012 18-19 water outlet at Delapir pond Bareilly Nagar Bareilly 201.19 50.30 0.00 08-Mar-19 12.50 Construction of 12 nos. Type-02 residences at district G09 1713024 17 007 18-19 jail Mathura Mathura 201.21 100.60 82.53 27-Sep-18 65% 12.50 Establishment of high tech seed testing laboratory at G04 0412893 04 024 17-18 RATDS Meerut Meerut 201.29 101.39 97.18 81.39 25.36 31-Mar-18 75% 12.50 Shelter home Choti Bisrat (Labaur Adda) G13 3013068 30 070 18-19 Shahjahanpur Shahjahanpur Shahjahanpur 201.52 80.60 0.00 14-Nov-18 12.50 G06 5410805 54 088 13-14 Const. of Interloking at Minority Areas Sahbad Rampur 203.78 173.96 173.96 26-Nov-13 85% 12.50 Const. of 100 beded girls hostel at Town Sahabad, G10 5312642 53 009 16-17 Hardoi under MSDP Hardoi Hardoi 205.88 102.94 100.37 08-Feb-17 50% 12.50 G10 24113 24 999 01-02 Construction of Shopping Complex in Benia Bagh Benia Bagh Varanasi 206.15 84.50 69.67 01-Aug-01 35% 12.50 G14 2013105 20 024 18-19 Construction of Agricultural Science Center Siddharthnagar Siddharthnagar 206.54 0.00 0.00 01-Jan-19 12.50 Const. of OBC Boys Hostal at Mohd. Ali Jouhar G06 3012284 54 047 16-17 University Rampur Rampur 207.00 114.26 113.14 10-Jun-16 55% Const. of 100 Bedded Balika Hostal at Govt. Inter G06 5412071 54 009 15-16 College Pahadi Rampur 208.07 114.33 120.30 15-Feb-16 45% 12.50 Const. of C.C. Road at Allahabad-Mirzapur Link Road G14 3812269 38 092 16-17 to Pantegra Nala Churaha Mirzapur Mirzapur 209.32 84.53 79.81 01-Jun-16 55% 12.50

G07 1213203 12 999 18-19 Construction of MT Accn for Assam Rifles at Lokra Lokra Assam 211.11 0.00 0.00 16-Mar-19 5% 4.45 G06 5411135 54 009 14-15 Const. of 50 No. Anganbadi Bhawan Bilasapur Rampur 211.50 147.30 136.73 4.63 10-Jul-14 45% 12.50 G10 5312964 53 027 18-19 Construction of Seed Laboratory Hardoi Hardoi 211.73 89.99 39.37 1.18 27-Aug-18 37% 12.50 Const. of Rain Basera for Halting Place No.-10 for 84 G08 5312282 29 012 16-17 Kosi Prikrma Marg at Vill-Kolahua Braithi Sitapur Sitapur 212.35 106.18 0.00 34.91 10-Jun-16 10% 12.50 Construction of drain from Betiyahata mandir to Sai complex and Sai complex to Mahewa G14 1412814 14 012 17-18 chungi sump pumping station Gorakhpur Gorakhpur 212.51 191.26 99.89 20.31 10-Nov-17 80% 12.50 Const. of underground pipeline and surface/L pipe G10 2412630 37 012 16-17 drain at Nagar Panchayat Badalapur, Jaunpur Badlapur Jaunpur 213.79 106.89 66.89 13.27 28-Jan-17 70% 12.50 Construction of Meedhakur Cluster under G09 3513360 35 096 19-20 Prasad ruburn mission Agra Agra 215.00 161.25 21-Jun-19 12.50 G13 4913175 49 012 18-19 Ashray Yojana Anwala Dhal Bareilly 215.54 86.22 0.00 08-Mar-19 12.50 G10 0610757 06 009 13-14 Const. of 51 No. Aaganbari Kendra Bhawan Lucknow Lucknow 215.73 215.73 117.53 14-Oct-13 50% 12.50 Const. of Boundary Wall at Kabristan/Antesthi Sthal G15 3312593 33 009 16-17 2016-17 Kaushambi Kaushambi 215.84 213.44 144.05 12.52 13-Jan-17 82% 12.50

G13 4913173 49 012 18-19 Ashray Yojana Nai Basti Bahedi Bareilly 217.14 86.86 0.00 08-Mar-19 12.50 Construction of Shelter home for 70 people under G09 1712868 17 070 17-18 Deendayal Antyoday Scheme Mathura Mathura 217.96 87.18 85.55 87.19 31-Mar-18 70% 12.50 G14 3912077 34 009 15-16 PHC Mahuadhani Balrampur 219.85 181.45 181.24 19-Feb-16 65% 12.50 G09 1711631 17 070 15-16 Const. of Shelter House Hathras Hathras 221.86 131.80 3.55 01-Jan-17 65% 12.50 Const. of 29 No. Computer Lab. Building in Upper G01 1811382 18 009 14-15 Primary School at 6 Different Vikas Khand Moradabad Moradabad 223.88 108.43 107.79 31-Dec-14 50% 12.50 G13 4910202 49 009 12-13 Govt. Inter College, (Block- Meerganj) Bahadurpur Bareilly 225.00 107.80 107.37 17-Oct-12 50% 12.50 G13 4910498 49 009 13-14 Const. of Govt. Inter College Shumali Bareilly 225.00 140.14 111.58 24-Apr-13 50% 12.50 GMno SCH CODE UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto March upto March 2020 upto 2020 upto Progress in 2019 2019 reporting reporting Percentage( month month %) Const. of Boundary Wall at Kabristan/Antesthi Sthal G10 5012470 50 009 16-17 Year-2015-16 Barabanki Barabanki 225.93 112.97 111.92 0.99 19-Dec-16 43% 12.50 Const. of Boundary Wall at Kabristan/Antesthi Sthal G10 0312175 03 009 15-16 Year-2015-16(Phase-IV) Azamgarh Azamgarh 227.14 113.57 111.72 31-Mar-16 52% 12.50

G13 4910812 49 009 13-14 I.T.I. Faridpur Bchare Bareilly 229.00 145.65 143.69 03-Dec-13 55% 12.50 Construction of 100 Person capacity Ashray Grih at G02 0212942 02 070 18-19 Nagar Palika Parishad Pilibhit Pilibhit Pilibhit 229.71 0.00 0.00 22-Jun-18 12.50 G13 4910199 49 009 12-13 I.T.I. Meerganj Bareilly 230.00 161.99 161.43 17-Oct-12 85% 12.50 G02 2511699 25 070 15-16 Const. of Shelter House Bulanshahar Bulanshahar 233.24 58.19 44.24 10-Jun-15 20% 12.50

G14 1911771 19 070 15-16 Const. of 96 Nos. Residence under Aasra Scheme Chauri-Chaura Gorakhpur 233.65 1.52 1.52 22-Jun-15 12.50

Construction of Shelter home at Najul Khand, Mohd. G10 5312835 53 070 17-18 Shekh Sarai (Kila Kadim) Old Sitapur under NULM Najul Khand Sitapur 233.65 93.46 87.08 17.83 29-Jan-18 70% 12.50

G09 3613089 36 070 18-19 Shelter home, near Baalkhandi Mandir, Kalpi, Jalaun Jhashi Jhashi 233.96 93.58 61.65 18.09 27-Nov-18 35% 12.50

Special Repairing work of Non-Residential Building G10 50001 50 081 1 and Hostels in Lucknow University Campus Lucknow Lucknow 234.00 204.98 213.32 01-Jan-98 12.50 Construction of 0.375 unit boys dormitory for 72 students with 1 No. warden residence & 0.125 unit girls dormitory for 24 students with 1 no. warden G04 3213163 32 201 18-19 residence at JNV, Mandsaur Mandsaur Mandsaur 234.85 0.00 0.00 08-Mar-19 4.20 Const. of Boundary Wall at Kabristan/Antesthi Sthal G14 1411661 14 009 15-16 Year-2014-15 Mahrajganj Mahrajganj 235.86 235.86 231.45 10-Jun-15 96% 12.50 G09 3612529 36 009 16-17 Const. of Govt. Girls Inter College Konch Urai Jalaun 236.00 118.00 118.00 26-Dec-16 30% 12.50 Const. of Nagar Vikas Vibhag Guest House at Nagar G06 3012468 54 012 16-17 Palika Parishad Rampur Rampur 238.27 238.27 0.00 19-Dec-16 12.50 Const. of Boundary Wall at Kabristan/Antesthi Sthal G15 3311777 10 009 15-16 Year-2014-15 Pratapgarh Pratapgarh 238.62 226.69 223.27 0.95 04-Jul-15 95% 12.50

G06 3911930 39 070 15-16 Const. of 264 Nos. Residence under Aasra Scheme Nababganj Gonda 238.72 255.58 186.87 0.54 06-Nov-15 75% 12.50 Const. of Boundary Wall at Kabristan/Antesthi Sthal G02 2512569 25 009 16-17 Year-2016-17 Kashganj Kashganj 240.00 116.82 119.82 11-Jan-17 60% 12.50 G10 26043 26 091 02-03 Dredging and Desilting work of Gomti River Lucknow Lucknow 240.00 90.00 92.18 19-Jan-03 9% 12.50 G14 3412979 34 070 18-19 Construction of Shelter home for 75 people Basti Basti 240.45 78.18 60.26 78.18 31.81 27-Aug-18 50% 12.50 G14 1913135 19 024 18-19 Construction work of Agriculture Science Center Belipaar Gorakhpur 241.04 196.68 0.00 20-Feb-19 Const. of C.C. Road at Pantegra Nala Churaha to G14 3812270 38 092 16-17 Moti Jheel Mirzapur Mirzapur 241.19 120.60 0.00 01-Jun-16 12.50

G10 0311624 03 070 15-16 Const. of 48 Nos. Residence under Aasra Scheme Lalganj Azamgarh 241.43 203.70 126.35 14-May-15 74% 12.50 G02 5209269 52 019 10-11 Const. of 33/11 KV Sub Station at Towan Hall Towan Hall Farrukhabad 241.96 225.79 228.74 25-Mar-11 60% 5.00

G10 5312568 53 009 16-17 Const. of 43 No. Aganbadi at 12 No. Primary School Mahmoodabad Sitapur 242.09 121.05 112.45 11-Jan-17 50% 12.50 G02 2813394 28 036 19-20 Construction of boundarywall at outer court Meerut Meerut 243.05 121.52 02-Aug-19 12.50 Const. of Boundary Wall at Kabristan/Antesthi Sthal G08 3710382 51 009 12-13 Year-2012-13 & 2013-14 Amethi Amethi 245.87 245.87 235.03 18-Mar-13 83% 12.50 G08 13141 13 092 04-05 Leaing of Trunk sewer line at basant kunj LDA Lucknow 247.20 57.36 54.17 06-Oct-04 25%

G13 4911113 49 009 14-15 Const. of Govt. Inter College at Vikas Khand- Bahedi Lalu Nagla Bareilly 247.50 118.61 118.60 01-Jul-14 50% 12.50 GMno SCH CODE UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto March upto March 2020 upto 2020 upto Progress in 2019 2019 reporting reporting Percentage( month month %) Const. of Govt. Girls Inter College at Vikas Khand- G13 4911114 49 009 14-15 Bahedi Mavi Kajiyana Bareilly 247.50 118.57 117.21 01-Jul-14 50% 12.50 Const. of Govt. Girls Inter College at Vikas Khand- G13 4911115 49 009 14-15 Nababganj Senthal Bareilly 247.50 237.00 215.95 13.17 01-Jul-14 90% 12.50 Const. of Govt. Inter College at Vikas Khand- G13 4911116 49 009 14-15 Tushapatti Tushapatti Bareilly 247.50 239.45 213.46 10.98 01-Jul-14 90% 12.50 Const. of Govt. Inter College at Vikas Khand- G13 4911117 49 009 14-15 Fatehganj Fatehpur Bareilly 247.50 118.56 114.52 01-Jul-14 50% 12.50 Const. of Govt. Inter College at Vikas Khand- G13 4911119 49 009 14-15 Nababaganj Faziaganj Bareilly 247.50 237.00 221.42 5.62 01-Jul-14 90% 12.50 Construction of Govt. Inter College at Village Dadera G13 2113226 21 078 18-19 (under CM's announcment) Dadera Ayodhya 247.54 0.00 0.00 27-Mar-19 12.50 G04 3212879 32 201 17-18 Special repair work at JNV, Bead Bead Nashik 248.42 47.62 44.58 31-Mar-18 8% 4.46

G06 3912968 39 009 18-19 Construction of Shelter home of 75 people capacity Bahraich Bahraich 250.05 42.48 11.78 9.99 27-Aug-18 30% 12.50 Const. of 48 Nos. Residence under Aasra Scheme at G06 5411499 54 070 14-15 Moh. Rashulpur Swar Rampur 250.18 250.18 249.32 16-Mar-15 86% 12.50 G08 5112583 51 070 16-17 Const. of Shelter House Munshiganj Raibareli 250.47 200.36 200.36 0.11 199.15 13-Jan-17 43% 12.50 G06 4306981 43 064 06-07 Const. of Museum Farrukhabad Farrukhabad 251.00 251.00 251.00 04-Nov-06 85% 12.50

G14 1911769 19 070 15-16 Const. of 48 Nos. Residence under Aasra Scheme Gola Gorakhpur 251.29 0.00 0.00 22-Jun-15 12.50 Construction of various buildings at Mental health G09 0813025 08 033 18-19 institute Agra Agra 251.75 100.70 0.00 100.70 27-Sep-18 12.50 G13 4913174 49 012 18-19 Ashray Yojana Faridpur Bareilly 253.20 101.28 0.00 08-Mar-19 12.50 G10 2610395 26 009 12-13 Const. of 31 No. PHSC Lucknow Lucknow 253.57 253.57 141.60 20-Mar-13 87% 12.50 Repairing of buildings& purchase of instruments in G10 0313134 03 080 18-19 Town Polytechnic, Ballia Ballia Ballia 253.71 0.00 0.00 16-Feb-19 12.50 G15 3312408 33 070 16-17 Const. of Shelter House Allahabad Allahabad 255.42 195.48 153.34 24-Oct-16 65% 12.50 G10 0313133 03 033 18-19 Construction of health & wellness center, Ballia Ballia Ballia 258.40 129.20 0.00 -129.20 16-Feb-19 12.50 G13 4408289 44 098 09-10 Const. of 72 No. House under IHSDP Goshiganj Faizabad 259.84 259.62 258.68 11-May-09 94% 0.00 G15 1506889 48 033 06-07 100 Beded Hospital(Residential/Non-Residential) Mahoba Mahoba 261.22 290.71 278.74 18-Aug-06 85% 12.50 G01 1611426 16 009 14-15 Const. of Govt. I.T.I Kalluwala Bijnor 262.00 131.03 128.43 27-Jan-15 50% 12.50 G04 3212873 32 201 17-18 Special repairing work at JNV, Amarawati Amarawati Amarawati 262.00 50.22 27.37 43.56 17.49 31-Mar-18 55% 4.46 G15 3312844 33 087 17-18 Construction of offecers mess at police lines Allahabad Allahabad 262.51 344.38 311.87 15-Feb-18 12.50 G10 5010684 50 009 13-14 Const. of Girls Inter College at Town Ichawli Barabanki Barabanki 264.98 129.77 129.70 15-Mar-14 40% 12.50 Const. of Govt. Girls Inter College at Vikas Khand- G10 5012341 50 009 16-17 Puredlye Vill.- Khetasarai Barabanki Barabnki 264.98 129.57 129.18 19-Aug-16 48% 12.50 Construction of Anganwadi Centres at Vikashkhand G08 5112954 51 009 18-19 Singhpur and Bahadurpur Amethi Amethi 265.20 44.20 44.20 30.77 30.77 30-Jun-18 20% 12.50 Establishment of 08 nos. Modular O.T. at surgery G15 0513307 05 034 18-19 ward of GSVM Medical College Kanpur Kanpur 267.49 267.49 0.00 30-Mar-19 12.50 G02 4210182 52 019 12-13 Const. of 33/11 KV Sub Station at Aroowa Aroowa Mathura 268.43 38.35 22.65 17-Sep-12 5.00 Construction of 0.5 Unit boys dormitory for 96 G02 2713453 27 201 19-20 students with 02 Nos. warden residence at JNV Ambala Ambala 268.78 49.80 03-Sep-19 4.20 Replacement of Asbestus roof by RCC slab at 09 G09 1713022 17 007 18-19 barrocks of district jail Mathura Mathura 269.07 134.54 38.65 27-Sep-18 28% 12.50 Shelter Home Badi Bisrat (Hannumat Dham), G13 3013070 30 070 18-19 Shahjahanpur Shahjahanpur Shahjahanpur 269.17 107.67 82.43 107.67 20.78 14-Nov-18 42% 12.50

Establishment of DG set for sudden electric supply in G08 1312998 13 034 18-19 newly constructed Library and Lecture hall SGPGI Lucknow 270.22 270.22 272.42 28-Aug-18 12.50 GMno SCH CODE UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto March upto March 2020 upto 2020 upto Progress in 2019 2019 reporting reporting Percentage( month month %) Const. of Boundary Wall at Kabristan/Antesthi Sthal G08 3712049 51 009 15-16 Year-2013-14 Raebareli Raebareli 272.97 136.49 136.33 05-Feb-16 50% 12.50 Construction of additional dormatry and warden G02 4513120 45 201 18-19 residence at JNV, Angul Angul Angul 273.30 21.27 0.00 18.75 13-Feb-19 8% 4.46 Const. of 100 Bedded Hostal in Bilashpur Degree G06 5412373 54 009 16-17 College Rampur Rampur 274.00 119.09 133.96 30-Sep-16 48% 12.50 G08 3709761 51 078 11-12 Const. of Model School Deeh Raebareli 275.00 271.21 263.57 10-Oct-11 85% 12.50 G09 3613159 36 201 18-19 Construction of JNV Guna Guna 277.01 0.00 0.00 08-Mar-19 12.50 G10 0313186 03 077 18-19 Construction of Govt. Inter College Sikandarpur Ballia 277.24 61.35 0.00 12-Mar-19 12.50 G14 1413320 14 078 19-20 Construction of GIC at Sishwa Siswa Maharajganj 277.24 61.35 0.00 30-Apr-19 0.00 G13 3013460 30 078 19-20 Construction of Govt. Inter College Sutha, Katra Katra Shahjahanpur 277.24 06-Sep-19 12.50 Construction of Govt. Inter College (Hon'ble CM G06 3913303 39 009 18-19 announcment) Tarabganj Gonda 277.24 0.00 0.00 30-Mar-19 G02 0210309 02 009 12-13 ITI Puranpur Pilibhit 277.27 264.24 262.64 08-Feb-13 68% 12.50

G14 3811724 38 070 15-16 Const. of 48 Nos. Residence under Aasra Scheme Bhadohi Bhadohi 277.82 250.58 250.58 12-Jun-15 90% 12.50 Const. of 23 Extra Class Room, Toilet Block, G15 0512386 05 009 16-17 Staircase etc at B.L. Bazar School Kanpur Nagar Kanpur Nagar 278.32 139.17 139.16 03-Oct-16 55% 12.50 Const. of 23 Extra Class Room, Toilet Block, G15 0512388 05 009 16-17 Staircase etc at Harishganj School Kanpur Nagar Kanpur Nagar 278.32 120.90 94.63 03-Oct-16 50% 12.50 Const. of 23 Extra Class Room, Toilet Block, G15 0512390 05 009 16-17 Staircase etc at Faithfullganj School Kanpur Nagar Kanpur Nagar 278.32 139.16 139.16 03-Oct-16 60% 12.50 G04 0710615 07 009 13-14 Const. of ITI Purkazi Muzaffar Nagar 279.00 215.00 184.22 09-Jul-13 45% 12.50 Construction of additional class rooms(upgrade into B G04 3212864 32 202 17-18 type building) at K.V.ISP Nasik road Nasik Nasik 279.46 0.00 0.00 31-Mar-18 7.00 G13 4408290 44 098 09-10 Const. of 84 No.House under IHSDP Bikapur Faizabad 282.02 282.02 278.62 11-May-09 86% 0.00 G13 3012853 30 070 17-18 Construction of Shelter home Shahjahanpur Shahjahanpur Shahjahanpur 282.87 130.62 118.26 32.06 12.38 16-Feb-18 92% 12.50 G15 0512911 05 034 18-19 Const. of Reception Hall at Medical College Kanpur Nagar Kanpur Nagar 283.24 141.62 140.49 67.98 49.62 29-May-18 65% 12.50 Installation of Gas Pipe Line in Moti lal Nehru Medical G15 3312362 33 034 16-17 College Allahabad Allahabad 283.68 375.60 374.03 28-Sep-16 90% 12.50 G02 2511694 25 070 15-16 Vikas Khand Agouta Bulanshahar 283.92 200.00 208.78 10-Jun-15 75% 12.50 G01 3113076 31 070 18-19 Construction of Shelter home Modinagar Ghaziabad 284.51 113.80 116.40 16-Oct-18 40% 12.50 G02 4210183 52 019 12-13 Const. of 33/11 KV Sub Station at Fatehpur Fatehpur Mathura 286.76 40.97 47.02 17-Sep-12 5.00 G14 3810156 38 038 12-13 Const. of 15 No. Community Center Mirzapur Mirzapur 288.30 288.30 270.25 16-Aug-12 90% 12.50 Const. of RCC drain at Mandu road in front of FCI G09 1712811 17 012 17-18 godown Hathras Hathras 289.66 144.83 0.00 17-Oct-17 12.50 Const. of Govt. Inter College Vill.-Himaupur, Vikas G01 3111446 31 009 14-15 Khand-Hapur Hapur Hapur 290.00 142.16 137.89 18-Mar-15 50% 12.50 Const. of Pumping Station & Nala Sumbell around Ala G02 4512344 45 012 16-17 Hajrat Haj House Ghaziabad Ghaziabad 290.32 145.16 110.77 3.00 24-Aug-16 70% 12.50 Const. of Boundary Wall at Kabristan/Antesthi G15 3311040 33 009 13-14 Sthal(2013-2014) Fatehpur Fatehpur 290.97 290.97 292.90 31-Mar-14 70% 12.50 Const. of 48 Nos. Residence under Aasra Scheme at G06 5411498 54 070 14-15 Kashipur Munshiganj Swar Rampur 292.32 246.60 248.20 44.80 24.81 16-Mar-15 96% 12.50 Sant Kabir Sant Kabir G14 2011203 20 009 14-15 Const. of 15 No. Anganbadi Bhawan Nagar Nagar 292.50 169.48 178.49 4.89 08-Sep-14 65% 12.50 G06 3912214 39 070 16-17 Const. of Nos. Residence under Aasra Scheme Bahraich Bahraich 294.26 257.98 212.54 3.17 26-Apr-16 75% 12.50 G08 2912793 29 009 17-18 Const. of 10 no. workshop at ITI building Unnao Unnao Unnao 295.00 0.00 0.00 27-May-17 12.50 G02 2510898 25 208 13-14 Const. of Office Building Iglas Aligarh 297.47 297.47 293.87 22-Jan-14 96% 12.50 Construction of Ashray Awas for 100 People under Ambedkar G13 2112924 21 070 18-19 Ashray Yojana Mohsinpur Nagar 297.63 119.52 72.37 12-Jun-18 12.50 GMno SCH CODE UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of Overall Rate of CODE CODE STATUS Cost Release Expenditure during 2019- during 2019- start Physical Centage upto March upto March 2020 upto 2020 upto Progress in 2019 2019 reporting reporting Percentage( month month %)

Construction of second and third floor of Girls hostel G10 2413079 24 081 18-19 at Mahatma Gandhi Kashi Vidhyapeethi, Varanasi Varanasi Varanasi 298.57 134.00 0.00 20-Nov-18 12.50 G14 3811835 38 009 15-16 Const. of Govt. Inter College Jalalpur Bhadohi 298.88 144.43 137.94 01-Aug-15 50% 12.50 Total 31443.17 17028.62 13575.64 878.77 605.97 DETAILS OF ONGOING SCHEMES FROM 1 CRORE TO 1.99 CRORES Amount In Lacs GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G04 4611278 04 009 14-15 PHC Kiwaye, Srdhna Meerut 100.00 49.02 42.10 10-Nov-14 95% 12.50 G13 4911444 49 009 14-15 PHC Faridpur Baheda Bareilly 100.00 98.04 95.21 11-Feb-15 70% 12.50 G14 3812333 38 012 16-17 Const. of Drain at Gopiganj Bhadohi Sant Ravidas 100.40 50.52 50.52 30-Jul-16 60% 12.50 Nagar G04 3213102 32 201 18-19 Repair and renovation of toilet block in 3 Nos. Bangluru Bangluru 100.92 35.55 16.88 01-Jan-19 35% 4.45 dormitories and 7 Nos. dormitories including electrical works and other miscellaneous work at JNV, Banglore G15 3313222 33 012 18-19 Construction of Peshwai Sthal under Akhadas of Prayagraj Prayagraj 101.31 50.65 47.55 19-Mar-19 12.50 Kumbh-2019 G10 5311970 53 036 15-16 Const. of 02 Residence of Type-5 at Distt. Chhibramau Kannauj 101.66 50.85 49.87 17-Dec-15 55% 12.50 Nyayalaya G15 4812550 48 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Hamirpur Hamirpur 102.03 102.03 55.47 02-Jan-17 78% 12.50 Sthal Year-2016-17 G07 1212983 12 999 18-19 Construction of 06 Nos Single JCO accn (G+3) in Imphal Imphal 102.13 30.82 31.36 8.57 8.72 27-Aug-18 65% 4.45 01 Block with development works and allied services for Assam Riffles G14 3813234 38 048 18-19 Beautification of Rahi Paryatak Awas Grih(Hotel Mirzapur Mirzapur 102.77 30.80 0.00 30-Mar-19 Jahanwi) G14 1411999 14 036 15-16 Const. of Canteen, Men/woman Common Hall & Gorakhpur Gorakhpur 103.86 51.93 38.24 31-Dec-15 60% 12.50 Libirary at Distt. Court Campus G02 2511937 25 070 15-16 Const. of Govt. High School at Bhujpura & Bhujpura Aligarh 104.00 45.20 24.69 6.99 20-Nov-15 60% 12.50 Rorawar G13 4909738 49 081 11-12 Const. of Groun floor Woman Hostel at MJPRKU Bareilly Bareilly 104.37 96.00 95.30 12-Sep-11 95% 12.50

G13 2112533 21 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Faizabad Faizabad 104.89 104.89 97.26 27-Dec-16 50% 12.50 Sthal 2014-15 G14 1911761 19 092 15-16 Const. of Road, Drain & Puliya at Food Park Sec- GIDA Gorakhpur 105.69 95.11 67.74 01-Sep-16 75% 12.50 13 FL Group G14 3812725 38 092 17-18 Const. of Weir at Oraighat drain of Village Sonbhadra Sonbhadra 105.70 105.70 96.20 02-May-17 70% 12.50 Mahalpur G10 2613191 26 056 18-19 Construction of suitable hurdleless structure for Lucknow Lucknow 107.65 53.83 0.00 14-Mar-19 12.50 Divyang people at Electricity Safety directorate, Vibhuti Khand G01 1810841 18 009 13-14 PHC Ancholi Shambhal 107.90 105.62 104.37 20-Dec-13 79% 12.50 G07 1213204 12 999 18-19 Construction of CSD Canteen and Eng. Stores for Lokra Assam 108.14 0.00 0.00 16-Mar-19 15% 4.45 AR Bn at Lokra G14 1908679 19 077 10-11 Const. of Boundary wall & Gate at Deen Dayal Gorakhpur Gorakhpur 108.92 98.46 97.79 26-Apr-10 80% 12.50 Upadhya Gorkhpur University G02 2813393 28 036 19-20 Construction of boundarywall at outer court Khurja Bulandsehar 108.94 108.94 02-Aug-19 12.50 G07 1212990 12 999 18-19 Construction of 08 Nos single JCOs Jorhat Jorhat 109.12 0.00 0.00 27-Aug-18 40% 4.45 accommodation for No. 02 transit camp at Jorhat

G04 4610932 07 009 13-14 Const. of 26 No. Anganbadi Bhawan Meerut Meerut 109.98 52.70 52.68 22-Feb-14 50% 12.50 G06 5410373 54 009 12-13 Const. of Boundary Wall at Kabristan/Antesthi Rampur City Rampur 110.00 110.00 109.20 12-Mar-13 98% 12.50 Sthal G06 5412322 54 092 16-17 Renovation & Butification for B-Amma Rampur Rampur 110.12 99.10 97.50 28-Jul-16 75% 12.50 Park(Cocodayl Park) GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G10 0312600 03 012 16-17 Infrastructure Facilities Development in Mohalla Azamgarh Azamgarh 110.46 55.23 0.00 16-Jan-17 12.50 Jalandhari Minority Area at Nagar Palika

G09 3613158 36 081 18-19 Construction of ITHM extension at Bundelkhand Bundelkhand Bundelkhand 111.27 57.44 0.00 08-Mar-19 12.50 University G13 3013458 30 078 19-20 Construction of Govt. Girls inter college Nawada Shahjahanpur Shahjahanpur 111.86 06-Sep-19 12.50 Darobast G14 1411178 14 036 14-15 Repairing of Nyalaya Bhawan Deoria Deoria 111.96 111.96 87.33 19-Aug-14 90% 12.50 G15 1007335 10 033 07-08 PHC Bhadri Pratapgarh 112.10 77.18 36.54 25-Dec-07 45% 12.50 G14 2011781 20 070 15-16 Const. of Shelter House Naugarh Siddharth 112.21 44.88 0.00 04-Jul-15 12.50 Nagar G04 0911082 09 009 14-15 Const. of 25 No. Anganbadi Bhawan Shamli Shamli 112.50 74.14 73.96 06-Jun-14 90% 12.50 G08 1313388 13 036 19-20 Construction of Director's residence at Judicial Gomti Nagar Lucknow 112.60 31-Jul-19 12.50 Training & Research Institute G01 1811828 18 070 15-16 Const. of 23 Nos. Residence under Aasra Sonakpur Moradabad 114.90 114.90 111.64 01-Aug-15 98% 12.50 Scheme G07 1212985 12 999 18-19 Provn of augmentation of electric service and pipe Charduar Charduar 115.33 43.63 52.91 27-Aug-18 95% 4.45 line at AR Bn at Charduar G15 10087 33 083 1 BRC (III) 15 Pratapgarh Pratapgarh 115.98 118.91 106.07 01-Dec-00 95% G10 2412926 24 027 18-19 Construction and upgradation work regarding Shahanshahpur Varanasi 116.86 285.99 0.00 13-Jun-18 12.50 Pasudhan Aarogya Mela at Shanshahpur Block Arajiline G06 3012420 54 084 16-17 Const. of Rampur Gate Tower Rampur Rampur 118.10 95.00 92.43 24-Oct-16 79% 12.50 G10 2412208 24 009 15-16 Const. of Boundary Wall at Kabristan/Antesthi Ghazipur Ghazipur 118.40 59.20 59.00 31-Mar-16 60% 12.50 Sthal Year-2015-16 G10 2411754 24 070 15-16 Const. of Shelter House Sikrol Varanasi 118.64 112.77 112.77 16-Jun-15 100% 12.50 G01 1611196 16 009 14-15 PHC Sherkot Bijnor 118.95 59.48 59.23 30-Aug-14 52% 12.50 G02 2813107 28 055 18-19 Establishment of two lifts at Tradetax department Greater Noida Greater Noida 118.95 70.00 43.54 48.95 12.26 03-Jan-19 45% 12.50 building, Surajpur G02 0213355 02 033 19-20 Regarding conversion of 15 nos. Subcenters into Paudhi Paudhi 120.00 40.00 20-Jun-19 12.50 Health & Wellness Centers G04 0713219 07 027 18-19 Construction of Cow Protection Center Muzzafarnagar Muzzafarnaga 120.00 50.00 0.00 19-Mar-19 12.50 r G14 4213384 42 027 19-20 Construction of Cow protection centre Hariharpur Khajni Gorakhpur 120.00 31-Jul-19 12.50

G02 25015 25 033 1 OPD in (CHC) Sikandarabad Bulandshahar 120.13 5.23 6.27 01-Jul-97 5% 12.50 G06 5411449 54 009 14-15 Const. of 06 No Toilet at Different Places in Rampur Rampur 120.33 53.54 52.51 11-Feb-15 48% 12.50 Tanda G15 3312639 33 087 16-17 Const. of Adminstative building Crime Branch Kaushambi Kaushambi 121.94 53.89 53.54 08-Feb-17 50% 12.50 G04 3213028 32 201 18-19 Special repair work at JNV, Ahmednagar Ahmednagar Ahmednagar 122.48 23.81 22.20 29-Sep-18 21% 4.46 G15 3313223 33 012 18-19 Construction of toilet blocks at Ganga, Yamuna, Prayagraj Prayagraj 122.55 61.00 29.23 19-Mar-19 12.50 campus of RTOU, Prayagraj

G14 2011660 20 070 15-16 Const. of Shelter House Gorkhal Sant Kabir 124.42 124.42 106.24 10-Jun-15 99% 12.50 Nagar G02 25019 25 064 1 Natyashala Atrauli Aligarh 124.65 49.00 43.13 01-Apr-99 75% G02 0212571 02 007 16-17 Const. of Residential Building in Crime Branch Pilibhit Pilibhit 124.81 60.76 60.50 11-Jan-17 60% 12.50 G14 3413138 34 077 18-19 Construction of 735 Mtr. Boundarywall in the Jaunpur Jaunpur 124.84 62.42 24.80 0.24 07-Mar-19 12.50 campus of VBSPU G01 1811827 18 070 15-16 Const. of 25 Nos. Residence under Aasra Sonakpur Moradabad 124.87 124.87 116.65 01-Aug-15 98% 12.50 Scheme GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G13 02014 49 064 1 Auditorium Building Awanla Bareilly 124.92 20.00 20.00 01-Sep-98 12.50 G15 3311706 10 009 15-16 Const. of 100 Bedded Hostal at Govt. Inter Pratapgarh Pratapgarh 125.00 62.50 61.75 10-Jun-15 47% 12.50 College G06 0112421 54 009 16-17 Const. of Hostel at Kashipur Govt. Inter College Rampur Rampur 125.00 62.50 56.37 24-Oct-16 50% 12.50

G06 3012296 54 009 16-17 Const. of 100 Bedded Girls Hostel at Vill- Rampur Rampur 125.00 62.50 62.10 02-Jul-16 50% 12.50 Rewadikala G02 2512657 25 007 16-17 Const. of Crime branch office building Aligarh Aligarh 125.65 108.36 89.53 17-Feb-17 90% 12.50 G14 34016 38 033 1 CHC Rajgarh Mirzapur 126.32 128.02 112.98 10-Dec-98 95% 12.50 G13 2112621 21 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Ambedkar Nagar Ambedkar 126.86 63.43 62.24 21-Jan-17 50% 12.50 Sthal 2015-16 Nagar G07 1213208 12 999 18-19 Construction of 10 Nos single JCOs accn for AR Charduar Assam 128.31 0.00 0.00 16-Mar-19 35% 4.45 Bn at Charduar G07 1212989 12 999 18-19 Construction of 02 Nos Type-5 married Jorhat Jorhat 128.91 0.00 0.00 27-Aug-18 35% 4.45 accomodation with allied services at Jorhat G15 3311775 33 070 15-16 Const. of Shelter House Kaushambi Kaushambi 129.19 129.20 121.14 04-Jul-15 60% 12.50 G13 4411591 44 070 15-16 Const. of 26 Nos. Residence under Aasra Nayaghat Faizabad 129.86 105.09 103.61 24.77 30-Apr-15 92% 12.50 Scheme Auydhya G14 4411841 34 081 15-16 Repairing & Painting work at Residential Campus Jaunpur Jaunpur 130.01 98.43 89.34 04-Aug-15 86% 12.50 Block-6 (DEFGHI) Type-II in Purvanchal University G14 14107 14 051 1 Campier Ganj, Tehsil Campier Ganj Gorakhpur 131.39 131.39 130.87 01-Sep-99 70% 12.50 G10 0613333 06 070 19-20 Upgradation of Shelter home Karehata Lucknow 132.17 06-Jun-19 12.50 G01 1812636 18 087 16-17 Const. of Non-Residential Bhawan at Crime Moradabad Moradabad 132.93 62.01 58.83 2.39 01-Feb-17 50% 12.50 Branch G02 2813224 28 024 18-19 Construction of administrative building at Shamli Shamli 133.49 50.00 0.00 27-Mar-19 12.50 agricultural science center G01 3113285 31 024 18-19 Construction of agricultural science center Bulandsehar Bulandsehar 133.49 35.00 0.00 35.00 30-Mar-19 SVBPAU G01 3113286 31 024 18-19 Construction of agricultural science center Hapur Hapur 133.49 0.00 0.00 64.14 30-Mar-19 SVBPAU G13 4913172 49 024 18-19 Construction of Adminstrative building at Dataganj Badaun 133.49 35.00 0.00 08-Mar-19 12.50 Agricultural Science Center under Sardar Vallabh Patel Agricultural University G10 2409543 24 201 11-12 Const. of Phase-B(Balance) Works at JNV Varanasi Varanasi 133.84 146.26 146.26 07-Jul-11 82% 12.50 G15 10073 33 078 1 District Education and Training Institute Civil Lines Allahabad 134.20 107.00 97.72 01-Aug-00 67% 12.50 G15 4809345 48 080 11-12 Const. of 60 Bededd Hostel at Govt. Polytechnic Hamirpur Hamirpur 134.82 133.87 109.67 4.62 30-Apr-11 80% 12.50

G15 4810830 48 012 13-14 Const. of Community Center Bhawan Hamirpur Hamirpur 136.70 136.70 127.93 12-Dec-13 85% 12.50 G14 2108515 34 076 09-10 Const. of Basket Ball, Tenis laan & Quyash Cort Jaunpur Jaunpur 137.52 50.00 49.75 15-Jan-10 50% 12.50 in Purvanchal University G15 4809892 48 036 11-12 Const. of Nayaik officer Residence for 06 No. Hamirpur Hamirpur 138.99 138.99 135.14 13-Dec-11 70% 12.50 Type-4 G10 2612103 26 033 15-16 Repairing for T.B. Hospital Thakurganj Lucknow 139.24 69.62 66.89 03-Mar-16 50% 12.50 G06 43005 43 033 1 CHC Orchha,Ghiror Mainpuri 139.88 152.51 139.49 01-Jul-96 80% 12.50 G01 1810315 18 009 12-13 I.T.I. Amroha Jyotibaphule 140.00 99.79 98.93 13-Feb-13 68% 12.50 Nagar G06 3912517 39 009 16-17 Const. of 50 bedded girls hostel at Govt. Girls Kaisarganj Gonda 141.12 69.18 66.63 0.10 26-Dec-16 50% 12.50 Inter College G06 3912518 39 009 16-17 Const. of 50 bedded girls hostel at Govt. Girls Balha Gonda 141.12 69.18 66.64 26-Dec-16 50% 12.50 Inter College Lakhiyapur GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G09 0813197 08 007 18-19 Construction of 200 KL capacity pond and related Etah Etah 141.98 0.00 0.00 100.00 14-Mar-19 20% 12.50 work at district Jail, Etah G10 2411756 24 033 15-16 PHC Kamalpur Chandauli 142.25 142.25 138.13 16-Jun-15 78% 12.50 G15 3312412 10 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Pratapgarh Pratapgarh 143.77 143.78 135.13 24-Oct-16 80% 12.50 Sthal Year-2015-16 G10 5310958 53 070 13-14 Const. of 48 Nos. Residence under Aasra Shahabad Hardoi 143.89 143.90 126.12 11.52 03-Mar-14 75% 12.50 Scheme G15 3312843 33 070 17-18 Reconstruction of Asara home, Haiza hospital Allapur Allahabad 144.06 82.12 81.57 15-Feb-18 12.50 Campus G15 3312167 33 081 15-16 Const. of 3rd Plant B/Wall at U.P. RajShree Allahabad Allahabad 144.77 130.29 130.29 31-Mar-16 90% 12.50 Tandon Open University G02 2511697 25 033 15-16 PHC Kahrolla Bulanshahar 146.71 136.17 121.85 10-Jun-15 96% 12.50 G02 2511696 25 033 15-16 PHC Rasoolpur Ritholi Bulanshahar 146.98 137.46 130.53 10-Jun-15 96% 12.50

G02 2511695 25 033 15-16 PHC Dastura Bulanshahar 147.14 136.17 131.32 10-Jun-15 96% 12.50 G06 5412710 54 012 16-17 Beautification of Samshan Ghat/Antheyesthi Sthal Jwala Nagar Rampur 147.16 73.58 0.00 31-Mar-17 12.50 near Kitply factory Jwala Nagar G07 1212988 12 999 18-19 Construction of Quarter Guard, Kote, Armoury and Imphal Imphal 147.25 0.00 0.00 33.20 33.80 27-Aug-18 65% 4.45 Armr shop with allied services and devp works for Transit Camp Minuthong, Imphal G04 0911509 09 070 14-15 Const. of Shelter House Dudhali Road Saharanpur 147.41 0.00 0.00 16-Mar-15 12.50 G10 2411797 24 009 15-16 Const. of 33 No. Anganbadi Bhawan Bhaduriya Ghazipur 148.50 74.25 74.25 08-Jul-15 48% 12.50 G14 3413007 34 033 18-19 Construction of 30 health and wellness centers Basti Basti 148.80 111.60 25.85 32.62 25-Sep-18 50% 12.50 under national health mission G10 5312558 53 009 16-17 PHC Bishwa Sitapur 149.00 74.50 64.12 11-Jan-17 50% 12.50 G10 5312559 53 009 16-17 PHC Mahmoodabad Sitapur 149.00 74.50 72.15 11-Jan-17 62% 12.50 G10 5312567 53 009 16-17 PHC Laharpur Sitapur 149.00 74.50 70.55 11-Jan-17 50% 12.50 G14 1911768 19 070 15-16 Const. of 24 Nos. Residence under Aasra Nagar Panchyat Gorakhpur 149.05 62.68 59.79 22-Jun-15 55% 12.50 Scheme Pipraich G15 1009322 33 201 11-12 Const. of JNV Phase-B Kaushambi Kaushambi 149.12 116.82 136.79 20-Apr-11 95% 7.00 G09 0813026 08 033 18-19 Repairing and renovation work at Mental health Agra Agra 149.40 59.30 49.55 59.30 29.05 27-Sep-18 50% 12.50 institute Agra G14 1412915 14 029 18-19 Const. of Vindhwashni Park at Lohiya Natur Park Gorakhpur Gorakhpur 150.00 112.62 66.32 9.24 29-May-18 60% 12.50

G14 1913060 19 081 18-19 Construction of toilets at various hostels of Deen Gorakhpur Gorakhpur 150.00 112.50 47.41 0.58 02-Nov-18 95% Dayal Upadhyay, Gorakhpur University G14 3810370 38 090 12-13 Solid Waste Management Works Bhadohi Sant Ravidas 150.00 56.00 20.69 12-Mar-13 12.50 Nagar G13 4913152 49 009 18-19 Construction of 09 Nos. Anganbadi Centers at Bareilly Bareilly 150.42 29.03 20.80 0.14 16.65 08-Mar-19 35% 12.50 Nawabganj and 14 Nos. at Fatehganj G14 1410997 14 080 13-14 Const. of 60 Bedded Hostal at Govt. Polytechnice Gorakhpur Gorakhpur 151.11 200.20 105.72 0.32 25-Mar-14 70% 12.50

G10 2613193 26 056 18-19 Construction of suitable hurdleless structure for Lucknow Lucknow 151.33 75.67 0.00 14-Mar-19 12.50 Divyang people at Matasya Nideshalaya, Faizabad road, Babuganj G14 3412348 34 012 16-17 Const. of Drain for Near Old Post office Jems Basti Basti 151.37 83.92 66.71 23.50 05-Sep-16 80% 12.50 Charch to Kuwano River G15 53170 05 045 05-06 Bus Terminal Phase-II Hardoi Hardoi 152.40 115.00 112.65 24-Aug-05 80% 12.50 G09 0813202 08 007 18-19 Construction of Kitchen and Circle wall at district Etah Etah 152.92 0.00 0.00 100.00 23.59 14-Mar-19 20% 12.50 jail GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G07 1212984 12 999 18-19 Provn of addition/alteration to existing road for AR Charduar Charduar 153.57 59.83 61.90 27-Aug-18 95% 4.45 Bn at Charduar G07 1213213 12 201 18-19 Construction of 0.25 unit girls dormitory with 1 Alwar Alwar 153.84 0.00 0.00 14.80 14.07 16-Mar-19 10% 4.20 nos. warden residence at JNV, Alwar G13 21099 44 032 05-06 Construction of Multipurpose Sports Hall Ambedkarnagar Ambedkar 153.98 153.98 152.53 48.34 19.00 24-Dec-05 90% 12.50 Nagar G08 1313094 13 034 18-19 Const. of 02 No. new Tubwell at SGPGI SGPGI Lucknow 154.44 154.44 0.00 45.98 28-Dec-18 30% 12.50 G02 5213112 52 033 18-19 Construction of 02 No. tubewell at SGPGI campus Lucknow Lucknow 154.44 100.00 0.00 45.98 03-Feb-19 38% 12.50 for water supply G15 3312058 10 012 15-16 Const. of Drain Sadar Prtapgarh 154.46 54.72 53.12 05-Feb-16 50% 12.50 G10 0613334 06 070 19-20 Upgradation of Shelter home Dewa Road Lucknow 158.57 06-Jun-19 12.50 G02 5212782 52 070 17-18 Const. of National Training Institute, Rampur Rampur Rampur 159.71 95.47 33.32 24-May-17 60% 12.50 G07 1213212 12 201 18-19 Construction of 0.25 unit girls dormitory with 1 Gurugram Gurugram 159.78 0.00 0.00 15.37 14.59 16-Mar-19 15% 4.20 nos. warden residence at JNV, Gurugram G01 1813142 18 009 18-19 Construction of Government Highschool at village Dingarpur Moradabad 160.37 0.00 0.00 23.24 15.72 08-Mar-19 12% 12.50 Mehmoodpur under multisectorial program

G01 1813143 18 009 18-19 Construction of Government Highschool at village Bilari Moradabad 160.37 0.00 0.00 23.24 0.53 08-Mar-19 10% 12.50 Sihali under multisectorial program G01 1813145 18 009 18-19 Construction of Government Highschool at village Moradabad Moradabad 160.37 0.00 0.00 08-Mar-19 0% 12.50 Salempur Bangar under multisectorial program

G01 1813146 18 009 18-19 Construction of Government Highschool at village Mundapandey Moradabad 160.37 26.21 0.00 26.20 26.11 08-Mar-19 15% 12.50 Mundapandey under multisectorial program

G01 1813147 18 009 18-19 Construction of Government Highschool at village Moradabad Moradabad 160.37 47.00 11.47 20.71 08-Mar-19 12% 12.50 Islamnagar under multisectorial program G01 1813361 18 009 19-20 Construction of Govt. Highschool under Moradabad Moradabad 160.37 01-Jul-19 12.50 multisectorial program at Village Umari G01 1813362 18 009 19-20 Construction of Govt. Highschool under Thakurdwara Moradabad 160.37 01-Jul-19 12.50 multisectorial program at Village Abdullapur Ledda G01 1813363 18 009 19-20 Construction of Govt. Highschool under Dillari Moradabad 160.37 01-Jul-19 12.50 multisectorial program at Village Gakkharpur G10 2609142 26 201 10-11 Repairing of JNV Raibarelli Raebareli 160.41 25.00 24.72 17-Jan-11 15% 7.00 G10 5012680 50 009 16-17 Const. of 01 hall, 02 toilet and 04 additional Fatehpur Barabanki 162.00 70.41 55.97 9.38 9.30 31-Mar-17 55% 12.50 Classrooms at Govt. Inter College Fatehpur G08 3711268 51 009 14-15 Const. of 36 No. Anganbadi Bhawan Amethi Amethi 162.00 81.00 79.36 30-Oct-14 50% 12.50 G07 4113167 41 201 18-19 Construction of 0.25 unit boys dormitory with 1 Rajsmand Rajsmand 162.15 0.00 0.00 24.08 18.99 08-Mar-19 18% 4.20 nos. warden residence at JNV G10 2411850 24 070 15-16 Const. of Shelter House Ghazipur Ghazipur 163.30 130.62 99.33 31.20 17-Aug-15 90% 12.50 G13 3013455 30 079 19-20 Construction of boundary wall at Basic school at Shahjahanpur Shahjahanpur 164.25 06-Sep-19 12.50 Various places G08 3712544 51 070 16-17 Const. of 50 bedded shelter home under NULM Amethi Amethi 164.55 131.64 131.64 12.91 97.78 02-Jan-17 80% 12.50

G07 1213210 12 201 18-19 Construction of RCC retaining wall, Brick Jammu Jammu 165.67 0.00 0.00 16.13 16-Mar-19 20% 4.46 boundary wall, RCC drain, stone pitching etc, at JNV-Jammu G07 1211859 12 999 15-16 Const. of Central Sewerage System for HQ Mantripukhri Mantripukh 166.11 0.00 0.00 27-Aug-15 10% 7.00 IGAR(South) at Mantripukhri GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G10 2613195 26 056 18-19 Construction of suitable hurdleless structure for Lucknow Lucknow 166.43 83.22 0.00 14-Mar-19 12.50 Divyang people at UP Setu Nigam, Lucknow

G07 1213207 12 999 18-19 Provn of area drainage, retaining wall from main Moreh Manipur 166.62 0.00 0.00 16-Mar-19 45% 4.75 gate to officers club for AR Bn at Moreh (Manipur)

G10 2413104 24 045 18-19 Construction of boundarywall and gate at Pindara Pindara 166.96 0.00 0.00 01-Jan-19 12.50 Nakateshwari Bhawani at tehsil Pindara G06 19080 54 078 05-06 Construction of Mohd. Ali Jouhar Govt. Model Rampur Rampur 167.00 30.50 28.84 31-Jan-06 20% 12.50 Montessorie school G06 3910431 39 009 12-13 Const. of Govt. Inter College Kajipura Bahraich 167.17 159.29 163.00 25-Mar-13 85% 12.50 G10 0613331 06 070 19-20 Upgradation of Shelter home Geetapalli Lucknow 167.28 06-Jun-19 12.50 G06 4313430 43 999 19-20 Construction of Police Chowki regarding Kannauj Thathia Kannauj 167.41 18-Aug-19 12.50 transportation safety at Agra-Lucknow Expressway G04 0712889 07 024 17-18 Repairing work of Sarojini, Nehru hostel type-1 Meerut Meerut 168.00 168.00 40.79 29.42 31-Mar-18 55% 12.50 A.B.C. hostel in University campus G09 36051 36 051 1 Tehsil(Residential) Madhogarh Jalaun 168.71 168.71 164.75 01-Jul-97 80% 12.50 G09 3513050 35 007 18-19 Construction of multipurpose hall at district jail Firozabad Firozabad 169.03 80.70 22.76 50.34 4.58 30-Oct-18 51% 12.50 Firozabad G14 2011204 20 009 14-15 Const. of 40 No. Anganbadi Bhawan Siddharth Nagar Siddharth 169.20 113.99 99.58 2.15 08-Sep-14 80% 12.50 Nagar G14 1912972 19 070 18-19 Construction of Shelter home at Gorakhnath(39 Gorakhpur Gorakhpur 169.55 55.94 54.18 0.23 27-Aug-18 40% 0.00 beded) G10 2412675 24 027 16-17 Breed conservation and upgradation of Argiline Varanasi 170.00 138.52 92.00 27-Mar-17 60% 12.50 indigenous cattle with srenghtening of Govt. Livestock Farms at Rajkiya Pashudhan aewam Krishi Prachetra Aarajiline G15 3312589 10 078 16-17 Const. of Girls Hostal at Aaspur, Devsara, Pratapgarh Pratapgarh 170.25 67.00 53.46 5.06 13-Jan-17 35% 12.50 Pratapgrah G02 2812464 28 012 16-17 Const. of Drain at word No-51 Navyoug Market Ghaziabad Ghaziabad 170.39 34.00 34.00 19-Dec-16 45% 12.50 G14 4412039 34 081 15-16 Painting & Repairing work at Formacy Building in Jaunpur Jaunpur 170.71 83.09 68.39 1.11 27-Jan-16 75% 12.50 Porvanchal University G06 4313435 43 999 19-20 Construction of Police Chowki regarding Agra Luhari Agra 171.40 18-Aug-19 12.50 transportation safety at Agra-Lucknow Expressway G15 1508639 15 078 09-10 Const. of Govt. Girls Inter College Manikpur Chitrakoot 171.96 171.96 171.65 31-Mar-10 60% 12.50 G06 2312965 43 070 18-19 Construction of Shelter home Auraiya Takiya Auraiya 173.51 0.00 0.00 27-Aug-18 12.50 G06 4313434 43 999 19-20 Construction of Police Chowki regarding Etawa Kudrail Etawa 174.14 18-Aug-19 12.50 transportation safety at Agra-Lucknow Expressway G04 0912553 09 009 16-17 Const. of Aaganbadi kendra of 31 no. places Saharanpur Saharanpur 174.53 68.89 64.46 11-Jan-17 50% 12.50 G15 3312057 33 036 15-16 Extention for Dispencery at Hon'ble High Court Allahabad Allahabad 174.54 83.97 23.79 05-Feb-16 10% 12.50 G13 4408710 44 078 10-11 Const. of Intermediate College Amaniganj Faizabad 174.75 171.96 146.25 05-May-10 25% 12.50 G15 3311737 10 070 15-16 Const. of Shelter House Pratapgarh Pratapgarh 174.87 69.95 69.80 12-Jun-15 55% 12.50 G06 4313433 43 999 19-20 Construction of Police Chowki regarding Pritampurwa, Unnao 175.75 18-Aug-19 12.50 transportation safety at Agra-Lucknow Devkhari Expressway G14 4412619 34 081 16-17 Installation of two no. tubewell,water supply works Faizabad Faizabad 175.93 73.31 66.28 21-Jan-17 40% 12.50 and inerconnection between two overhead tank at University Campus GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G15 0512387 05 009 16-17 Const. of 11 Extra Class Room, Toilet Block, Kanpur Nagar Kanpur Nagar 175.98 87.99 74.48 73.83 03-Oct-16 55% 12.50 Staircase, Store, Activities & Music Room etc at Meerpur Balika High Schooll G14 2012962 20 070 18-19 Construction of Ashray under Deen Dayal Khalilabad Saint Kabir 176.00 35.20 70.40 70.40 16-Jul-18 30% 12.50 Antyoday Yojna Mohalla- Titauwa, Ward no.- 04 Nagar

G09 0811905 08 070 15-16 Const. of Shelter House Etah Etah 176.58 70.63 68.94 0.23 05-Oct-15 80% 12.50 G04 4613056 07 032 18-19 Construction of drains at district jail, Baghpat Baghpat Baghpat 177.16 0.00 0.00 02-Nov-18 12.50 G01 1810924 18 009 13-14 Const. of 16 No. Primary Sub-Center Shambhal Shambhal 178.56 175.07 173.43 11-Feb-14 85% 12.50 G14 1911916 19 070 15-16 Const. of Shelter House Gorakhpur Gorakhpur 178.80 142.74 126.55 0.84 01-Feb-17 90% 12.50 G06 4313431 43 999 19-20 Construction of Police Chowki regarding Firozabad Firozabad 178.93 18-Aug-19 12.50 transportation safety at Agra-Lucknow Urawarhastaraf Expressway G01 1613001 16 070 18-19 Construction of 50 Beded shelter house Chandpur Bijnour 179.04 34.95 34.95 28-Aug-18 30% 12.50 G01 1613098 16 070 18-19 Construction of 50 bedded Shelter home Dhampur Bijnour 179.04 71.62 49.03 10.79 01-Jan-19 40% 12.50 G01 1812273 18 009 16-17 Const. of Govt. High School at Vikas Khand- Moradabad Moradabad 180.09 86.33 85.85 79.66 01-Jun-16 50% 12.50 Bhagarpur Tanda G15 4812072 48 012 15-16 Const. of Nala for House of Aneesh to Sub- Bajariya Mahoba 180.14 180.14 109.76 15-Feb-16 60% 12.50 Station at Nagar Palika Parishad G14 1913365 19 012 19-20 Construction of shelter homes for homeless under Kushinagar Kushinagar 180.92 01-Jul-19 12.50 Deen Dayal Antyodayy Urban Shelter house scheme G04 3212874 32 201 17-18 Special repairing work at JNV, Usmanabad Usmanabad Usmanabad 180.97 34.69 32.51 31-Mar-18 20% 4.46 G14 1411952 14 070 15-16 Const. of 36 Nos. Residence under Aasra Pipardeora Maharajganj 181.82 90.91 90.10 03-Dec-15 85% 12.50 Scheme G14 3910428 34 009 12-13 Const. of 52 No. Anganbadi Bhawan Balrampur Balrampur 182.00 168.33 130.19 12.65 25-Mar-13 65% 12.50 G14 3813231 38 070 18-19 Ashraya Scheme Vindhyachal Mirzapur 182.75 73.10 0.00 30-Mar-19 G10 2411644 24 036 15-16 Const. of 04 No. Residence Type-5 at Nayalaya Mohamadabad Ghazipur 182.94 182.94 182.94 10-Jun-15 70% 12.50

G01 1613096 16 070 18-19 Construction of 50 bedded Shelter home Kiratpur Bijnour 183.84 0.00 0.00 01-Jan-19 12.50 G09 3513428 35 033 19-20 Proposed addition of ramp and fire fighting Agra Agra 184.28 70.76 18-Aug-19 12.50 system for faculty building at IMHH Agra G01 1812095 18 070 15-16 Const. of 36 Nos. Residence under Aasra Gajroula Amroha 184.45 184.43 99.55 19.48 01-Mar-16 58% 12.50 Scheme G01 1812094 18 070 15-16 Const. of 36 Nos. Residence under Aasra Hasanpur Amroha 184.58 133.31 89.76 01-Mar-16 54% 12.50 Scheme G13 3013456 30 070 19-20 Construction of Shelter home Tilhar Shahjahanpur 184.87 06-Sep-19 12.50 G15 47095 33 033 04-05 CHC Maheshganj Pratapgarh 185.39 185.39 184.62 01-Sep-04 99% 12.50 G07 1213206 12 999 18-19 Provn of Hard standing and retaining wall as Pallel Manipur 186.04 0.00 0.00 16-Mar-19 35% 4.45 protective works at various locations of HQ 26 Sect AR at Pallel (Manipur) G15 3311779 33 070 15-16 Const. of Shelter House Fatehpur Fatehpur 186.16 156.19 154.40 04-Jul-15 86% 12.50 G13 4911606 49 070 15-16 Const. of 36 Nos. Residence under Aasra Bahedi Bareilly 187.80 192.49 145.93 23.04 30-Apr-15 88% 12.50 Scheme G02 0212943 02 070 18-19 Construction of 50 Person capacity Ashray Grih at Pilibhit Pilibhit 187.99 75.20 48.80 22-Jun-18 15% 12.50 Nagar Palika Parishad Bisalpur G06 3910627 39 009 13-14 Const. of 60 Bedded Girls Hostel at Govt. Shravasti Shravasti 188.27 155.62 155.12 13-Jul-13 100% 12.50 Polytechnice G09 3613088 36 070 18-19 Shelter home, Conch Jalaun Jhashi Jhashi 188.80 75.52 39.10 0.61 27-Nov-18 40% 12.50 G10 5011511 50 070 14-15 Const. of Shelter House Barabanki Barabanki 189.23 0.00 0.00 18-Mar-15 12.50 G04 0910228 09 009 12-13 Const. of Govt. Inter College Bhasrau Saharanpur 189.53 189.53 190.59 05-Nov-12 72% 12.50 GMno SCH UNIT DEPT SCH SCHNAME Locations District Sanctioned Total Total Release Expenditure Date of start Overall Rate of CODE CODE CODE STATUS Cost Release upto Expenditure during 2019- during 2019- Physical Centage March 2019 upto March 2020 upto 2020 upto Progress in 2019 reporting reporting Percentage( month month %)

G01 3112624 31 027 16-17 Breed conservation and upgradation of Babugarh Hapur 190.00 174.27 167.08 28-Dec-16 95% 12.50 indigenous cattle with srenghtening of Govt. Livestock Farms, Babugarh G07 1211863 12 999 15-16 Provision of Water Supply Scheme for AR Maram Maram 190.21 0.00 0.00 27-Aug-15 7.00 Battalion at Maram G04 4613053 07 032 18-19 Construction of 12 Nos. Type-02 residences at Meerut Meerut 190.23 162.63 10.29 8.71 02-Nov-18 15% 12.50 district jail, Meerut G10 2412207 24 009 15-16 Const. of Boundary Wall at Kabristan/Antesthi Varanasi Varanasi 190.89 190.89 95.44 31-Mar-16 75% 12.50 Sthal Year-2015-16 G10 0613336 06 070 19-20 Construction of Shelter home Umrao Hata Lucknow 192.45 06-Jun-19 12.50 G13 2112541 21 009 16-17 Const. of Boundary Wall at Kabristan/Antesthi Faizabad Faizabad 192.55 96.28 95.92 29-Dec-16 50% 12.50 Sthal 2014-15 G02 2513304 25 100 18-19 Construction of 12 nos. Type-2 residences at Aligarh Aligarh 192.78 0.00 0.00 30-Mar-19 district Jail G15 3311879 33 009 15-16 Const. of Boundary Wall at Kabristan/Antesthi Fatehpur Fatehpur 193.07 193.07 177.50 23-Sep-15 85% 12.50 Sthal Year-2014-15 G15 1511966 15 070 15-16 Const. of Shelter House Banda Banda 193.49 154.80 154.80 17-Dec-15 80% 12.50 G01 1810879 18 009 13-14 Const. of 15 No. Primary Sub-Health Centra Mooradabad Moradabad 193.65 193.66 188.85 10-Jan-14 98% 12.50 G14 3812351 38 061 16-17 Maintenance work of ITI Campus Mirzapur Mirzapur 193.73 193.72 155.81 13.30 09-Sep-16 85% 12.50 G09 3513047 35 007 18-19 Construction of 12 nos. type-2 residences at Agra Agra 193.75 93.12 46.55 66.57 26.29 30-Oct-18 52% 12.50 district jail, Agra G02 2810166 28 036 12-13 Const. of Residence of District Judge Ghaziabad Ghaziabad 193.91 198.55 212.15 29-Aug-12 95% 12.50 G13 4912013 30 009 15-16 Const. of Boundary Wall at Kabristan/Antesthi Shahjahanpur Shahjahanpur 194.51 162.36 155.57 04-Jan-16 80% 12.50 Sthal(Part-4) Year-2015-16 G06 2312557 43 027 16-17 Breed conservation and upgradation of Etawah Etawah 195.00 185.71 177.22 11-Jan-17 98% 12.50 indigenous cattle with srenghtening of Govt. Livestock Farms, Bhadavari & Jamunapari G02 4210181 52 019 12-13 Const. of 33/11 KV Sub Station at Paneegaon Paneegaon Mathura 196.41 28.06 37.50 17-Sep-12 5.00 G10 0613332 06 070 19-20 Upgradation of Shelter home Sadatganj Lucknow 196.73 06-Jun-19 12.50 G13 4411360 44 070 14-15 Const. of 36 Nos. Residence under Aasra Auydhya Faizabad 196.85 196.85 182.03 19-Dec-14 96% 12.50 Scheme G13 2113100 21 024 18-19 Renovation work of Agricultural Science Center, Masaudha Ayodhya 198.04 0.00 0.00 01-Jan-19 12.50 Masaudha, Ayodhya G13 2113225 21 024 18-19 Strenghtening of agricultural science center Masudha Ayodhya 198.04 161.59 0.00 27-Mar-19 12.50 G15 1008311 33 078 09-10 Cont. of Bhawan at Raj Mukt Vidhyalaya Prishad Allahabad Allahabad 198.17 100.00 99.71 25-May-09 60% 12.50

G02 4210180 52 019 12-13 Const. of 33/11 KV Sub Station at Mitholee Mitholee Mathura 199.12 28.45 30.22 17-Sep-12 5.00 G10 03135 03 087 03-04 Residential Building Police Line Azamgarh 199.16 199.16 198.33 31-Oct-03 77% 12.50 G09 3613090 36 081 18-19 Construction of Physiotherapy building, Jhashi Jhashi 199.95 99.97 0.00 27-Nov-18 12% 12.50 Bundelkhand University, Jhashi Total 33258.20 17000.56 13271.81 1248.26 734.63