Final Southern Corridor Regional Implementation Plan

Total Page:16

File Type:pdf, Size:1020Kb

Final Southern Corridor Regional Implementation Plan SOUTHERN CORRIDOR REGIONAL IMPLEMENTATION PLAN SOUTHERN CORRIDOR REGIONAL IMPLEMENTATION PLAN SOUTHERN CORRIDOR REGIONAL IMPLEMENTATION PLAN Professional Team COMPANY Discipline Contact Person Contact Details KIPD Town Planning Paul Kotze 011 888 8685 and Project Raeesa Soomar [email protected] Management Cassim [email protected] Kehilwe Modise [email protected] DEMACON Economic Hein Du Toit 012 460 7009 Planning Karien Louw [email protected] [email protected] ASEDA Civil and Kwaku 011 312 4070 Electrical Koranteng [email protected] Engineering Titus Saruro [email protected] EDS Traffic and Peter Purchase 012 991 1205 Transportation Mercia Prinsloo [email protected] Engineering [email protected] 2 SOUTHERN CORRIDOR REGIONAL IMPLEMENTATION PLAN Table of Contents INTRODUCTION ..................................................................................................................................... 14 1. INTRODUCTION ............................................................................................................................. 15 2. THE SOUTHERN CORRIDOR ........................................................................................................... 16 3. LIST OF PRIORITY PROJECTS .......................................................................................................... 17 MUNICIPAL OVERVIEW ......................................................................................................................... 20 4. SEDIBENG DISTRICT MUNICIPALITY OVERVIEW ........................................................................... 21 5. OVERVIEW OF LOCAL MUNICIPALITIES ......................................................................................... 22 5.1. EMFULENI LOCAL MUNICPALITY ........................................................................................... 22 5.2. MIDVAAL LOCAL MUNICPALITY ............................................................................................ 23 5.3. LESEDI LOCAL MUNICIPALITY ................................................................................................ 25 POLICY OVERVIEW ................................................................................................................................ 26 6. NATIONAL AND PROVINCIAL POLICY OVERVIEW ......................................................................... 27 6.1. THE 12 NATIONAL OUTCOMES (NATIONAL DEVELOPMENT PLAN) ...................................... 27 6.2. THE GAUTENG TEN PILLAR PROGRAMME ............................................................................ 29 6.3. THE GAUTENG SPATIAL DEVELOPMENT FRAMEWORK, 2030 (GDSF 2030) ......................... 32 6.4. THE GAUTENG CITY REGION INTEGRATED INFRASTRUCTURE MASTER PLAN , 2030 (GCR IIMP, 2030) ........................................................................................................................................ 35 6.5. COMMON CAUSE OF NATIONAL AND PROVINCIAL POLICY ................................................. 37 7. MUNICIPAL POLICY OVERVIEW ..................................................................................................... 39 7.1. SEDIBENG DM IDP ................................................................................................................. 39 7.2. SEDIBENG DM SDF ................................................................................................................ 41 7.3. EMFULENI LM IDP ................................................................................................................. 43 7.4. EMFULENI LM SDF................................................................................................................. 44 7.5. MIDVAAL LM IDP ................................................................................................................... 47 7.6. MIDVAAL LM SDF .................................................................................................................. 49 7.7. LESEDI LM IDP ....................................................................................................................... 50 7.8. LESEDI LM SDF ....................................................................................................................... 52 PROJECT ASSESSMENT .......................................................................................................................... 55 8. PROJECT ASSESSMENT MATRIX .................................................................................................... 56 8.1. PURPOSE OF ASSESSMENT MATRIX ..................................................................................... 56 8.2. DEVELOPMENT OF A WEIGHING TOOL ................................................................................. 56 8.3. WEIGHING CRITERIA ............................................................................................................. 58 8.4. PROJECT ASSESSMENT MATRIX – STATUS ASSESSMENT AND QUANTIFICATION ................ 61 9. PROJECT ASSESSMENT MATRIX RESULTS ..................................................................................... 63 10. PROJECT ASSESSMENT AND IMPLEMENTATION PLAN ............................................................. 66 10.1. BUDGET CALCULATION ..................................................................................................... 67 IMPLEMENTATION PLAN: SEDIBENG REGIONAL SANITATION SCHEME ............................................... 68 11. SEDIBENG REGIONAL SANITATION SCHEME (SRSS) .................................................................. 69 11.1. PROJECT OVERVIEW .......................................................................................................... 69 11.2. LOCALITY OF THE SCHEME ................................................................................................ 72 11.3. PROBLEM STATEMENT ...................................................................................................... 73 11.4. ASSESSMENT OF THE PROJECT ......................................................................................... 75 11.4.1. INSTITUTIONAL ADHERENCE ......................................................................................... 75 11.4.2. NEED FOR THE SEDIBENG REGIONAL SANITATION SCHEME ........................................ 75 11.4.3. SWOT ............................................................................................................................. 76 11.4.4. SOCIO ECONOMIC IMPACT ........................................................................................... 77 11.4.5. PRIORITY RATING .......................................................................................................... 77 11.5. IMPLEMENTATION FRAMEWORK ..................................................................................... 78 3 SOUTHERN CORRIDOR REGIONAL IMPLEMENTATION PLAN 11.6. SEQUENTIAL ACTIONS FOR IMPLEMENTATION AND BUDGET ......................................... 79 IMPLEMENTATION PLAN: R59 CORRIDOR ............................................................................................ 80 12. R59 CORRIDOR .......................................................................................................................... 81 12.1. PROJECT OVERVIEW .......................................................................................................... 81 12.2. LOCALITY ........................................................................................................................... 83 12.3. PROBLEM STATEMENT ...................................................................................................... 83 12.4. PROPOSED DEVELOPMENT INTERVENTIONS .................................................................... 84 12.5. ASSESSMENT OF PROJECT ................................................................................................. 88 12.5.1. CIVIL ENGINEERING SERVICES ....................................................................................... 88 12.5.2. SWOT ANALYSIS ............................................................................................................ 94 12.5.3. SOCIO - ECONOMIC IMPACT ......................................................................................... 95 12.5.4. STRATEGIC ALIGNMENT ................................................................................................ 96 12.5.5. PRIORITY RATING .......................................................................................................... 97 12.6. IMPLEMENTATION FRAMEWORK ..................................................................................... 98 12.6.1. TOWN PLANNING .......................................................................................................... 98 12.6.2. CIVIL AND ELECTRICAL ENGINEERING ........................................................................... 98 12.6.3. TRAFFIC ENGINEERING .................................................................................................. 99 12.6.4. ECONOMIC OUTPUT ..................................................................................................... 99 12.7. SEQUENTIAL ACTIONS FOR IMPLEMENTATION AND BUDGET ....................................... 100 IMPLEMENTATION PLAN: VEREENIGING FRESH PRODUCE MARKET PRECINCT ................................ 101 13. VEREENIGING FRESH PRODUCE MARKET (VFPM)PRECINCT .................................................. 102 13.1. PROJECT OVERVIEW .......................................................................................................
Recommended publications
  • A Survey of Race Relations in South Africa: 1968
    A survey of race relations in South Africa: 1968 http://www.aluka.org/action/showMetadata?doi=10.5555/AL.SFF.DOCUMENT.BOO19690000.042.000 Use of the Aluka digital library is subject to Aluka’s Terms and Conditions, available at http://www.aluka.org/page/about/termsConditions.jsp. By using Aluka, you agree that you have read and will abide by the Terms and Conditions. Among other things, the Terms and Conditions provide that the content in the Aluka digital library is only for personal, non-commercial use by authorized users of Aluka in connection with research, scholarship, and education. The content in the Aluka digital library is subject to copyright, with the exception of certain governmental works and very old materials that may be in the public domain under applicable law. Permission must be sought from Aluka and/or the applicable copyright holder in connection with any duplication or distribution of these materials where required by applicable law. Aluka is a not-for-profit initiative dedicated to creating and preserving a digital archive of materials about and from the developing world. For more information about Aluka, please see http://www.aluka.org A survey of race relations in South Africa: 1968 Author/Creator Horrell, Muriel Publisher South African Institute of Race Relations, Johannesburg Date 1969-01 Resource type Reports Language English Subject Coverage (spatial) South Africa, South Africa, South Africa, South Africa, South Africa, Namibia Coverage (temporal) 1968 Source EG Malherbe Library Description A survey of race
    [Show full text]
  • Traffic Impact Assessment Report
    DOCUMENT CONTROL SHEET Traffic Impact Assessment for Proposed Construction of the Orkney Document Solar Farm and associated infrastructure on the Remaining Extent of Title Portion 7 and Portion 21 of the farm Wolvehuis 114, North West Province Electronic TJ1701WC Reference Date 24 January 2017 This report documents a traffic impact assessment with the specific purpose of Short assessing the impact of the construction of the Orkney Solar Farm and associated Description infrastructure. Contact Stephen Fautley Person [email protected] Prepared for: Savannah Environmental (Pty) Ltd Prepared by Techso Techso (Pty) Ltd PO Box 35 The Innovation Hub 0087 Tel: 021 557 7730 E-mail: [email protected] Name Signature Date Compiled by: Stephen Fautley 24 January 2016 ( Pr. Tech Eng. - ECSA Reg # 200270171 ) Reviewed by 1 CONTENTS 1 PROJECT DESCRIPTION........................................................................................................................... 3 2 PURPOSE OF REPORT................................................................................................................................ 3 3 TRAFFIC SPECIALIST CREDENTIALS .................................................................................................. 3 4 IMPACT ASSESSMENT METHODOLOGY .............................................................................................. 4 4.1 DETERMINATION OF SIGNIFICANCE OF IMPACTS.......................................................................................... 4 4.2 IMPACT RATING SYSTEM ............................................................................................................................
    [Show full text]
  • 38636 2-4 Roadcarrierpp1 Layout 1
    Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID-AFRIKA Vol. 598 Pretoria, 2 April 2015 No. 38636 PART 1 OF 4 N.B. The Government Printing Works will not be held responsible for the quality of “Hard Copies” or “Electronic Files” submitted for publication purposes AIDS HELPLINE: 0800-0123-22 Prevention is the cure 501166—A 38636—1 2 No. 38636 GOVERNMENT GAZETTE, 2 APRIL 2015 IMPORTANT NOTICE The Government Printing Works will not be held responsible for faxed documents not received due to errors on the fax machine or faxes received which are unclear or incomplete. Please be advised that an “OK” slip, received from a fax machine, will not be accepted as proof that documents were received by the GPW for printing. If documents are faxed to the GPW it will be the sender’s respon- sibility to phone and confirm that the documents were received in good order. Furthermore the Government Printing Works will also not be held responsible for cancellations and amendments which have not been done on original documents received from clients. CONTENTS INHOUD Page Gazette Bladsy Koerant No. No. No. No. No. No. Transport, Department of Vervoer, Departement van Cross Border Road Transport Agency: Oorgrenspadvervoeragentskap aansoek- Applications for permits:.......................... permitte: .................................................. Menlyn..................................................... 3 38636 Menlyn..................................................... 3 38636 Applications concerning Operating Aansoeke aangaande
    [Show full text]
  • Gauteng Gauteng
    Gauteng Gauteng Thousands of visitors to South Africa make Gauteng their first stop, but most don’t stay long enough to appreciate all it has in store. They’re missing out. With two vibrant cities, Johannesburg and Tshwane (Pretoria), and a hinterland stuffed with cultural treasures, there’s a great deal more to this province than Jo’burg Striking gold International Airport, says John Malathronas. “The golf course was created in 1974,” said in Pimville, Soweto, and the fact that ‘anyone’ the manager. “Eighteen holes, par 72.” could become a member of the previously black- It was a Monday afternoon and the tees only Soweto Country Club, was spoken with due were relatively quiet: fewer than a dozen people satisfaction. I looked around. Some fairways were in the heart of were swinging their clubs among the greens. overgrown and others so dried up it was difficult to “We now have 190 full-time members,” my host tell the bunkers from the greens. Still, the advent went on. “It costs 350 rand per year to join for of a fully-functioning golf course, an oasis of the first year and 250 rand per year afterwards. tranquillity in the noisy, bustling township, was, But day membership costs 60 rand only. Of indeed, an achievement of which to be proud. course, now anyone can become a member.” Thirty years after the Soweto schoolboys South Africa This last sentence hit home. I was, after all, rebelled against the apartheid regime and carved ll 40 Travel Africa Travel Africa 41 ERIC NATHAN / ALAMY NATHAN ERIC Gauteng Gauteng LERATO MADUNA / REUTERS LERATO its name into the annals of modern history, the The seeping transformation township’s predicament can be summed up by Tswaing the word I kept hearing during my time there: of Jo’burg is taking visitors by R511 Crater ‘upgraded’.
    [Show full text]
  • Tender Bulletin No 3002 of 02-March-2018, Volume
    Government Tender Bulletin REPUBLIC OF SOUTH AFRICA Vol. 633 Pretoria, 2 March 2018 No. 3002 This document is also available on the Internet on the following web sites: 1. http://www.treasury.gov.za 2. http://www.info.gov.za/documents/tenders/index.htm 3. http:// ISSN 1682-4501 N.B. The Government Printing Works will 03002 not be held responsible for the quality of “Hard Copies” or “Electronic Files” submitted for publication purposes 9 771682 450001 AIDS HELPLINE: 0800-123-22 Prevention is the cure 2 No. 3002 GOVERNMENT TENDER BULLETIN, 2 MARCH 2018 TABLE OF CONTENTS TENDER INVITED FOR SUPPLIES, SERVICES AND DISPOSALS ............................................................. 13 SUPPLIES: GENERAL ......................................................................................................................................... 13 SUPPLIES: COMPUTER EQUIPMENT ................................................................................................................ 23 SUPPLIES: ELECTRICAL EQUIPMENT .............................................................................................................. 25 SUPPLIES: MEDICAL ........................................................................................................................................... 26 SUPPLIES: STATIONERY/PRINTING .................................................................................................................. 37 SERVICES: GENERAL ........................................................................................................................................
    [Show full text]
  • March 21–25, 2016
    FORTY-SEVENTH LUNAR AND PLANETARY SCIENCE CONFERENCE PROGRAM OF TECHNICAL SESSIONS MARCH 21–25, 2016 The Woodlands Waterway Marriott Hotel and Convention Center The Woodlands, Texas INSTITUTIONAL SUPPORT Universities Space Research Association Lunar and Planetary Institute National Aeronautics and Space Administration CONFERENCE CO-CHAIRS Stephen Mackwell, Lunar and Planetary Institute Eileen Stansbery, NASA Johnson Space Center PROGRAM COMMITTEE CHAIRS David Draper, NASA Johnson Space Center Walter Kiefer, Lunar and Planetary Institute PROGRAM COMMITTEE P. Doug Archer, NASA Johnson Space Center Nicolas LeCorvec, Lunar and Planetary Institute Katherine Bermingham, University of Maryland Yo Matsubara, Smithsonian Institute Janice Bishop, SETI and NASA Ames Research Center Francis McCubbin, NASA Johnson Space Center Jeremy Boyce, University of California, Los Angeles Andrew Needham, Carnegie Institution of Washington Lisa Danielson, NASA Johnson Space Center Lan-Anh Nguyen, NASA Johnson Space Center Deepak Dhingra, University of Idaho Paul Niles, NASA Johnson Space Center Stephen Elardo, Carnegie Institution of Washington Dorothy Oehler, NASA Johnson Space Center Marc Fries, NASA Johnson Space Center D. Alex Patthoff, Jet Propulsion Laboratory Cyrena Goodrich, Lunar and Planetary Institute Elizabeth Rampe, Aerodyne Industries, Jacobs JETS at John Gruener, NASA Johnson Space Center NASA Johnson Space Center Justin Hagerty, U.S. Geological Survey Carol Raymond, Jet Propulsion Laboratory Lindsay Hays, Jet Propulsion Laboratory Paul Schenk,
    [Show full text]
  • CURRENT FUTURE FLOWS Final Revision.Doc
    SEDIIBENG REGIIONAL SANIITATIION SCHEME A STUDY OF CURRENT AND EXPECTED FUTURE SEWER FLOWRATES TO DETERMIINE THE WASTEWATER TREATMENT CAPACITY REQUIREMENTS OF THE REGIION UP TO 2025 FINAL DRAFT NOVEMBER 2008 A STUDY OF CURRENT AND EXPECTED FUTURE SEWER FLOWRATES TO DETERMINE THE WASTEWATER TREATMENT CAPACITY REQUIREMENTS OF THE REGION UP TO 2025 CONTENTS Chapter Description Page 1 INTRODUCTION AND BACKGROUND 1 1.1 Background to the Study Area 1 1.2 Scope of the Study 1 1.3 Overview of the Existing Wastewater Treatment in the Region 3 2 AN EVALUATION OF FACTORS AND TRENDS INFLUENCING CURRENT AND FUTURE SEWER FLOWRATES 5 2.1 Current Demographics and Service Levels 5 2.1.1 Emfuleni Local Municipality 5 2.1.2 Midvaal Local Municipality 7 2.2 Population Growth Projections – Emfuleni and Midvaal 9 2.3 Future Land Use and Residential Developments 10 2.3.1 Emfuleni Local Municipality 10 2.3.2 Midvaal Local Municipality 11 2.4 Anticipated Improvements in Sanitation Levels of Service 12 2.4.1 Emfuleni Local Municipality 12 2.4.2 Midvaal Local Municipality 13 3 CALCULATIONS OF CURRENT AND FUTURE SEWER FLOW RATES 14 3.1 Calculation of Current Sewer Flows 14 3.1.1 Emfuleni Local Municipality 14 3.1.2 Midvaal Local Municipality 15 3.2 Calculation of Future Sewage Flow Rates 16 3.2.1 Emfuleni Local Municipality 16 3.2.2 Midvaal Local Municipality 17 3.2.3 Consolidated Future Sewage Flow Rates 18 4 CONCLUSIONS 20 Current and Future Sewer Flows Rev 01 Figures Figure 2.1 Emfuleni population distribution per settlement type ............................................
    [Show full text]
  • Protest May 2021
    National Crime Assist (NCA) REG NO 2018/355789/08 K2018355789 (NPC) PROTEST MAY 2021 www.nca247.org.za Fighting crime is what we do! 01 May 2021 MP - Secunda WC - Cape Town * CBD (peaceful march) GP - Kliprivier/Heidelberg, R59, Petrol Tanker set alight 02 May 2021 KZN - Durban * Warwick/Old Dutch rd (Taxi blockade) GP - Pretoria *Dr Swanepoel/ Dr vd Merwe str (road blocked with stones) 03 May 2021 KZN - Greytown > Mooiriver * TRP, Dwarsriver mine (all entrances blocked) GP - Midrand * c/o Klipriver dri/ Booysens rd GP – Vosloosrus * N3 LP - Vaalwater *R33, various locations (stone throwing, vehicle taken, violence, closing shops) (protestors tried to enter Police Station) EC - East London * Various roads closed (stone throwing, burning tyres) EC- Mdantsane * All entrys closed (burning tyres) KZN - Louwsburg / Vryheid, R69 * road closed (with rocks and branches) NC - Jan Kempdorp (town closed off) KZN – Richards Bay * N2, Closed (truck blocking road) KZN - Nseleni * N2, blocked at Zenith Estates NW - Brits * van Velden str (court protest) WC- Mitchels Plain * 10th Ave/ Charlie str GP - Bronkhorstspruit *Diamond Hill Plaza * N4 Bridge (Stone throwing) KZN - Durban * Broad str (Eff march, firing shots) * West str KZN - Eshowe * R66 LP Steelpoort * Minning Area MP Bethal/Morgenzon * R35, truck set alight, by ADTF protesters driver shot, luckily not serious. 04 May 2021 KZN - Eshowe * R66, 10km before Eshowe (burning tyres) WC – Cape Town * R300/N1 (7 taxi blocked road) *Botlary Rd (Paarl taxis blocking road) *c/o N7 / Malibongwe dr * M17,
    [Show full text]
  • Township Establishment Memorandum
    Memorandum: Proposed townships Wolmaransstad Extensions 17, 18 and 19 29 October 2015 MEMORANDUM PROPOSED TOWNSHIP ESTABLISHMENTS: WOLMARANSSTAD EXTENSION 17 ON A PORTION OF THE REMAINING EXTENT OF PORTION 2 OF THE FARM WOLMARANSSTAD TOWN AND TOWNLANDS NO. 184-HO AND WOLMARANSSTAD EXTENSION 18 ON A PORTION OF THE REMAINING EXTENT OF PORTION 2 OF THE FARM WOLMARANSSTAD TOWN AND TOWNLANDS NO. 184-HO AND WOLMARANSSTAD EXTENSION 18 ON A PORTION OF THE REMAINING EXTENT OF PORTION 2 OF THE FARM WOLMARANSSTAD TOWN AND TOWNLANDS NO. 184-HO CHAPTER 1: INTRODUCTION 1.1 INTRODUCTION Maxim Planning Solutions (Pty) Ltd (2002/017393/07) was appointed by the Department of Local Government and Human Settlements on 15 January 2015 through its project management unit i.e. Gobeng Consulting (Pty) Ltd to attend to the establishment of 2 500 integrated residential erven in Wolmaransstad to address the short term need for residential erven experienced in this urban complex and to alleviate the plight of landless people currently residing on vacant municipal and state owned land. Page 1 Memorandum: Proposed townships Wolmaransstad Extensions 17, 18 and 19 29 October 2015 This appointment is in response to a Business Plan submitted to the Department of Local Government and Human Settlements by the Maquassi Hills Local Municipality during November 2014 for funding from the Conditional Grant Business Plan 2014/2015 for the proposed development of 2500 integrated residential erven in Wolmaransstad. The development of the fore-mentioned 2500 integrated residential erven will comprise the first phase of the development of a total of ±4500 erven in Wolmaransstad of which 1500 will comprise the second phase and the remaining ±500 erven will comprise the third phase of this development.
    [Show full text]
  • Magistrates' Courts Act: Definition of Local Limits of Districts Created In
    STAATSKOERANT, 31 OKTOBER 2014 No. 38170 3 GOVERNMENT NOTICE DEPARTMENT OF JUSTICE AND CONSTITUTIONAL DEVELOPMENT No. 861 31 October 2014 MAGISTRATES' COURTS ACT, 1944 (ACT NO. 32 OF 1944): DEFINITION OF LOCAL LIMITS OF DISTRICTS CREATED IN RESPECT OF THE GAUTENG AND NORTH WEST PROVINCES I,Tshililo Michael Masutha, Minister of Justice and Correctional Services, acting under section 2 1(a) of the Magistrates' Courts Act, 1944 (Act No. 32 of 1944), hereby, with effect from 1 December 2014, in respect of the magisterial districts created in terms of Government Notice No. 43 of 24 January 2014, define the local limits of each such district as indicated in Schedules 1 and 2 respectively. Any amendment to the name of the district, sub-district or place of sitting under this Notice shall be applicable to the place appointed for the holding of a court for each regional division and all seats mentioned in the Schedule to Government Notice No. 219 of 27 February 2004. Given under my hand at on this the4")-\day of 0100 Qe Two Thousand and Fourteen. TM MASUTHA, MP (ADV) MINISTER OF JUSTICE AND CORRECTIONAL SERVICES This gazette is also available free online at www.gpwonline.co.za 4 Column Acreatedin CourtsColumnestablished B SCHEDULEfor 1: GAUTENG PROVINCEPoint-to-pointCo lum descriptions C No. 38170 2014 GAZETTE,31OCTOBER GOVERNMENT termsEkurhuleniNo.43Magisterial ofof 24 Central JanuaryGovernmentDistrict 2014GazettethePalm districts Ridge Startingproceed from in an the easterly intersection direction of the along N12 the Motorway N12 motorway, with the easternuntilit intersectsboundary ofwith Busoni the eastern Rock, This gazette isalsoavailable freeonline at boundary of Linmeyer Township.
    [Show full text]
  • Proposed Maize Wet Mill Plant, Vereeniging, Gauteng Province
    PROPOSED MAIZE WET MILL PLANT, VEREENIGING, GAUTENG PROVINCE Basic Assessment Report Erf 188 and a portion of Portion 237 of the farm Leeuwkuil 596 IQ Prepared for: Project Jordan Holding Company (Pty) Ltd GDARD Reference No.: Gaut 002/18-19/E2290 SLR Project No. 720.19124.00001 November 2018 For Interested and Affected Party Review Proposed Maize Wet Mill Plant, Vereeniging, Gauteng Province November 2018 DOCUMENT INFORMATION Title Proposed Maize Wet Mill Plant, Vereeniging, Gauteng Province Applicant Project Jordan Holding Company (Pty) Ltd Project Manager Alex Pheiffer Project Manager e-mail [email protected] Authority Reference No. GDARD: Gaut 002/18-19/E2290 SLR Project No. 720.19124.00001 Keywords Maize wet mill, Emfuleni, Sedibeng, Vereeniging, Basic Assessment, environmental authorisation, controlled emitter Report Date November 2018 Report Status For Interested and Affected Party Review REPORT COMPILATION REPORT COMPILED BY: Alex Pheiffer ………………………………………………… Alex Pheiffer Senior Environmental Consultant REPORT REVIEWED BY: Jonathan Crowther ………………………………………………… Jonathan Crowther EMPA: Operations Manager BASIS OF REPORT This document has been prepared by an SLR Group company with reasonable skill, care and diligence, and taking account of the manpower, timescales and resources devoted to it by agreement with Project Jordan Holding Company (Pty) for part or all of the services it has been appointed by the Client to carry out. It is subject to the terms and conditions of that appointment. SLR shall not be liable for the use of or reliance on any information, advice, recommendations and opinions in this document for any purpose by any person other than the Client. Reliance may be granted to a third party only in the event that SLR and the third party have executed a reliance agreement or collateral warranty.
    [Show full text]
  • Mobile Accommodation Solutions CC
    Mobile Accommodation Solutions CC Direction Instructions A view of 10 Top Road, Anderbolt, Boksburg, 1459, South Africa – Mobile Accommodation Solutions CC From Pretoria (North) Travel along the R21 highway towards Johannesburg – Southern Direction. At Johannesburg international R 24 1221 split carry on towards Boksburg on the R21. Before highway comes to an end turn left onto N12 Witbank highway heading east. Pass the Rondebult offramp. Next offramp – Atlas – take the 2nd offramp – Atlas Road Boksburg/Anderbolt. Drive along 360° bend – across the highway – carry on towards Boksburg/Anderbolt on Atlast Road (south) – 1,35km down Atlast Road. Cross over North Rand Road intersection (Renault car agency on your right hand side). Carry along Atlas crossing over another robot (Spar on your right hand side). At the next robot – Top Road – turn right. Carry down Top Road for 200m – Entrance on your right hand side – number 10 Top Road. From Vereeniging (South) Travel along the R59 towards Johannesburg – Northern Direction. Closer to Alberton take the highway split N12 Witbank/W3 PTA. Travel in an easterly direction towards Johannesburg. Pass Voortrekker offramp. Pass the N3 split to Durban. Carry on on the N1 Pretoria/N12 Witbank towards Johannesburg. Pass the PPC factory on your left hand side. Carry on straight on the N12/N1 PTA/Witbank highway. Pass van Buuren offramp. As you approach Gilloolys interchange take the R24/N12 O.R. Tambo Witbank slid way. Carry on on the R24/N12 – 1km the highway splits Keep right. Carry on with R24 towards Witbank Boksburg. Pass offramp to Edenvale, Kraft Road, Jet Park, R21 O.R.
    [Show full text]