NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage BLOCK B-EAST GOKUL PURI, BLOCK E-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK 1 C-MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 544 2650 KVA UNPLANNED 01-03-2020 00:14:27 01-03-2020 00:45:00 0:30 0.000525 MUs 2 MOSQUE-LAL KUAN BAZAR, MAIN BAZAR-KHUSH DIL CCK 582 1390 KVA UNPLANNED 01-03-2020 00:28:27 01-03-2020 01:00:00 0:31 0.0003875 MUs BLOCK M-JAGAT RAM PARK, BLOCK F-GURU ANGAD NAGAR WEST, BLOCK K-JAGAT RAM PARK, 3 BLOCK F-LALITA PARK LNR 0 2610 KVA UNPLANNED 01-03-2020 02:03:27 01-03-2020 02:55:00 0:51 0 MUs 4 BLOCK A-PRAKASH VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK E-PRAKASH VIHAR KWN 121 1980 KVA UNPLANNED 01-03-2020 02:34:27 01-03-2020 03:31:01 0:56 0.00021778 MUs 5 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 11 990 KVA UNPLANNED 01-03-2020 07:11:21 01-03-2020 07:49:25 0:38 0.00003167 MUs 6 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 11 630 KVA UNPLANNED 01-03-2020 07:19:55 01-03-2020 07:52:06 0:32 0.00002667 MUs 7 JHANDEWALAN FATTED FACTORY COMPLEX SRD 349 1980 KVA UNPLANNED 01-03-2020 14:32:29 01-03-2020 15:13:56 0:41 0.0003075 MUs

SUDARSHAN STEEL ROLLING MILL-RAM NAGAR EAST, RAM NAGAR-SILAMPUR, BLOCK 1-RAM 8 NAGAR EXTN., MAHAVEER (TRANSPORT)-RAM NAGAR EXTN., JAL BOARD-DDA FLATS DGN 1651 2610 KVA UNPLANNED 01-03-2020 14:37:29 01-03-2020 15:00:00 0:22 0.00006722 MUs BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK C-KHAJURI KHAS, BLOCK B-MUSTAFABAD (DAYALPUR), CLOCK C-BIHARIPUR, BLOCK D-OLD MUSTAFABAD, BLOCK A8-SADAT PUR, BLOCK F-MUSTAFABAD (DAYALPUR), BLOCK C- 9 MUSTAFABAD (DAYALPUR) KWN 863 0 KVA UNPLANNED 02-03-2020 10:46:00 02-03-2020 11:30:00 0:44 0.00122222 MUs BLOCK 32-HIMMATPURI, BLOCK 28-HIMMATPURI, BLOCK 20-HIMMATPURI, BLOCK 26- HIMMATPURI, BLOCK 35-HIMMATPURI, BLOCK 15-TRILOKPURI PHASE II, CL-CHILLA SARDA BANGAR VILLAGE, TRILOKPURI PHASE I-, HIMMATPURI-MAYUR VIHAR, KHICHRI PUR- 10 PHASE II, HIMMAT PURI-CHILLA VILLAGE MVR 855 3640 KVA UNPLANNED 02-03-2020 12:15:18 02-03-2020 13:09:51 0:54 0.001485 MUs MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA, FATEHPURI MASJID-, NAYA BAZAR-CHANDNI CHOWK, FATEHPURI-, KHARI BAWLI-NAYA BANS- 11 LAHORI GATE CCK 1605 3600 KVA UNPLANNED 02-03-2020 16:11:18 02-03-2020 17:03:00 0:51 0.0000425 MUs BLOCK K-WEST KARAWAL NAGAR, BLOCK B-NEW CHAUHAN PUR, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK A-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, PKT A4-BLOCK E, BLOCK B-KARAWAL NAGAR (DEHROTI), PKT D-BLOCK A, PKT B-BLOCK A, BLOCK D-WEST KARAWAL 12 NAGAR, BLOCK D-WEST KARAWAL NAGAR KWN 1114 630 KVA UNPLANNED 02-03-2020 17:06:18 02-03-2020 17:48:00 0:41 0.00146917 MUs

BLOCK T-BALJIT NAGAR, PREM NAGAR-BALJIT NAGAR, BLOCK T-PANJABI BASTI, DELHI MILK 13 SCHEM DMS-PREM NAGAR, RAILWAY COLONY-KARAMPURA, BLOCK F-PUNJABI BASTI PNR 1359 2970 KVA UNPLANNED 02-03-2020 17:24:18 02-03-2020 18:04:18 0:40 0.00052222 MUs

14 SHANKAR NAGAR EXTN-AZAD NAGAR, BLOCK X-RAJGARH COLONY, JHEEL-JHEEL KHURENJA KRN 190 3960 KVA UNPLANNED 03-03-2020 00:08:19 03-03-2020 00:21:00 0:12 0.00007333 MUs 15 BLOCK 1-BALBIR NAGAR, BALBIR NAGAR EXTN.-SILAMPUR DGN 36 990 KVA UNPLANNED 03-03-2020 07:02:42 03-03-2020 07:36:13 0:33 0.0000275 MUs BLOCK B-AMBEDKAR AWAS KALYAN SAMITI, GHAROLI VILLAGE-GHAROLI KONDLI, SEC C-MAYUR 16 VIHAR PHASE III, SEC D-MAYUR VIHAR PHASE III VSE 604 2250 KVA UNPLANNED 03-03-2020 10:05:00 03-03-2020 10:37:00 0:31 0.00060278 MUs 17 BIHARI COLONY-SHAHDARA JLM 270 990 KVA UNPLANNED 03-03-2020 10:16:14 03-03-2020 10:31:37 0:15 0.00002083 MUs 18 SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI NNG 1 990 KVA UNPLANNED 03-03-2020 10:37:35 03-03-2020 10:44:59 0:7 0.00001556 MUs 19 INDUSTRIAL AREA-PATPAR GANJ INDUSTRIAL AREA LNR 43 400 KVA UNPLANNED 03-03-2020 11:37:21 03-03-2020 11:42:30 0:5 0.00000694 MUs CHIKAMBARPUR-OLD SIMAPURI, SONIA GANDHI JJ CAMP-JHILMIL INDUSTRIAL AREA, GORAKH PARK WEST-SILAMPUR, SIYARAM-GHISA, LIG/MIG RES/NON COMM AREA-JEEVAN SARITA, RED 20 CROSS HOSPITAL CHIKAMBARPUR-OLD SIMAPURI DGN 699 0 KVA UNPLANNED 03-03-2020 11:50:20 03-03-2020 12:30:00 0:39 0.0008775 MUs THAKKAR BAPA NAGAR-BLOCK 16, BLOCK_1-DEV NAGAR, BLOCK_10B-DEV NAGAR, BAPA NAGAR- 21 ANAND PARBAT, BLOCK_14B-DEV NAGAR PNR 647 1980 KVA UNPLANNED 03-03-2020 18:38:00 03-03-2020 19:18:04 0:40 0.00055556 MUs

KATRA NAWAB-CHANDNI CHOWK, BALI MARAN-BARA DARI, FATEHPURI-KUCHA HASIRAM, TOWN 22 HILL-KATRA NEEL, TOWN HALL-KUCHA NATWA, MAIN BAZAR-KHUSH DIL CCK 2283 3960 KVA UNPLANNED 03-03-2020 19:01:20 03-03-2020 19:47:26 0:46 0.00060056 MUs

ROHITASH NAGAR EAST-SILAMPUR, KABUL NAGAR-ROHITASH NAGAR, BLOCK B-SHRI RAM NAGAR, SUDARSHAN STEEL ROLLING MILL-RAM NAGAR EAST, RAM NAGAR-SILAMPUR, GOVT SCHOOL NO- 23 2-DDA FLATS, BLOCK A-MANSAROWAR PARK, DELHI JAL BOARD-DDA FLATS DGN 86 1620 KVA UNPLANNED 04-03-2020 00:37:22 04-03-2020 00:57:00 0:19 0.00005278 MUs AGCR ENCLAVE-ANAND VIHAR, AGCR ENCLAVE-INSTITUTIONAL AREA, SHANTI VIHAR-KARKAR 24 DUMA, DDA FLATS-KARKAR DUMA JLM 328 0 KVA UNPLANNED 04-03-2020 01:15:21 04-03-2020 02:03:00 0:47 0.00049611 MUs 25 KABUL NAGAR-ROHITASH NAGAR, DWARKAPURI-NAVIN SHAHDARA DGN 130 3010 KVA UNPLANNED 04-03-2020 02:35:20 04-03-2020 03:15:00 0:39 0.0001625 MUs BLOCK E-JHILMIL-TAHIRPUR, BLOCK C- MOD PRIMARY SCHOOL-JHILMIL-TAHIRPUR, BLOCK P- 26 JHILMIL-TAHIRPUR DGN 395 990 KVA UNPLANNED 04-03-2020 07:48:39 04-03-2020 08:20:49 0:32 0.00015111 MUs LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA- SABHEPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA 27 VIHAR KWN 777 0 KVA UNPLANNED 04-03-2020 10:46:22 04-03-2020 11:25:00 0:38 0.00095 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, 28 BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR NNG 501 0 KVA UNPLANNED 04-03-2020 23:07:00 04-03-2020 23:45:00 0:38 0.00061222 MUs LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM 29 AREA-SONIA VIHAR KWN 319 0 KVA UNPLANNED 05-03-2020 00:04:00 05-03-2020 00:40:00 0:36 0.00037 MUs 30 BLOCK B-GAZIPUR DAIRY FARM, BLOCK A-GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM MVR 164 1030 KVA UNPLANNED 05-03-2020 00:18:00 05-03-2020 01:26:00 1:7 0.00035361 MUs BLOCK C-SHASTRI PARK, BLOCK Z-WELCOME COLONY, BLOCK N-NEW SILAMPURI PHASE I, BLOCK J- SILAMPUR COLONY, BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II, LIG/MIG RES/NON COMM AREA-SHASTRI PARK, JHUGI-NEW SILAMPURI PHASE I, ZERO PUSTA- 31 USMAN PUR, JAFFRABAD-MAUJ PUR YVR 112 4480 KVA UNPLANNED 05-03-2020 00:29:00 05-03-2020 01:20:00 0:51 0.00018417 MUs 32 DAMODER PARK- DGN 26 990 KVA UNPLANNED 05-03-2020 09:00:00 05-03-2020 09:28:00 0:27 0.0000225 MUs 33 BLOCK 5- SRD 39 990 KVA UNPLANNED 05-03-2020 13:33:30 05-03-2020 14:01:24 0:27 0.0000225 MUs 34 BLOCK T-OLD MUSTAFABAD, BLOCK D-OLD MUSTAFABAD, BLOCK T-NEHRU VIHAR KWN 37 1500 KVA UNPLANNED 05-03-2020 14:29:03 05-03-2020 14:35:47 0:6 0 MUs 35 PKT 6-NEW KONDALI, PKT 2-NEW KONDALI VSE 57 630 KVA UNPLANNED 05-03-2020 15:29:10 05-03-2020 16:08:09 0:38 0 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., JHEEL- JHEEL KHURENJA, BLOCK 11-GEETA COLONY, BLOCK 16-GEETA COLONY, BLOCK 14-GEETA 36 COLONY, SHIVPURI-JAGATPURI KRN 371 630 KVA UNPLANNED 05-03-2020 20:52:25 05-03-2020 21:20:00 0:27 0.0003225 MUs LALKUAN BAZAR-FRASH KHANA, FATEHPURI MASJID-CHANDNI CHOWK, NAYA BAZAR-CHANDNI 37 CHOWK, KHARI BAWLI-NAYA BANS- LAHORI GATE CCK 1605 3600 KVA UNPLANNED 05-03-2020 21:03:32 05-03-2020 21:51:00 0:47 0.00018278 MUs

BLOCK CN-AMBIKA VIHAR BLOCK - B&C, WEST KARAWAL NAGAR, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT D-SHIV VIHAR, PKT C-SHIV 38 VIHAR, BLOCK B-KARAWAL NAGAR (DEHROTI), BLOCK C-HARIJAN BASTI KWN 104 0 KVA UNPLANNED 05-03-2020 22:25:24 05-03-2020 23:10:00 0:44 0.00014667 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA-BLOCK B, YAMUNA FLOOD PLAINS-ANNPURNA MANDIR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG 39 RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 104 0 KVA UNPLANNED 05-03-2020 23:25:00 06-03-2020 00:20:00 0:54 0.00018 MUs

CHANDER NAGAR-KRISHNA NAGAR, GEETA COLONY, BLOCK A-KRISHNA NAGAR, BLOCK B- GHONDALI, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., JHEEL-JHEEL KHURENJA, BLOCK 11- 40 GEETA COLONY, BLOCK 16-GEETA COLONY, BLOCK 14-GEETA COLONY KRN 285 630 KVA UNPLANNED 05-03-2020 23:33:24 05-03-2020 23:48:12 0:14 0.00012833 MUs BLOCK A-MAYUR VIHAR PHASE III, SEC C-MAYUR VIHAR PHASE III, MAYUR VIHAR PHASE III, SEC D- 41 MAYUR VIHAR PHASE III, BLOCK A-MAYUR VIHAR PHASE III VSE 147 0 KVA UNPLANNED 06-03-2020 00:16:00 06-03-2020 00:40:00 0:24 0.00011333 MUs BLOCK D-NEW KONDALI, PKT 6-NEW KONDALI, PKT 2-NEW KONDALI, PKT 1-NEW KONDALI, BLOCK 42 B-NEW KONDALI, PKT 3-NEW KONDALI VSE 190 4540 KVA UNPLANNED 06-03-2020 00:38:24 06-03-2020 01:22:00 0:43 0.00026278 MUs SHAHDARA JLM, GOVT GIRLS SECONDARY SCHOOL-DDA FLATS, NEW VISWAS NAGAR-SHAHDARA, VISHWAS NAGAR-SHAHDARA, KASTURBA NAGAR-SHAHDARA, AMBEDKAR NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARA, SURAJMAL VIHAR-VIVEK VIHAR, DDA MIG FLATS-VIVEK VIHAR PHASE 43 II JLM 164 2020 KVA UNPLANNED 06-03-2020 01:14:23 06-03-2020 01:51:00 0:36 0.00019 MUs 44 BLOCK T-AHATA KEDARA, BLOCK J-AHATA KEDARA, DDA POLICE QTRS.-AHATA KEDARA PHG 414 4760 KVA UNPLANNED 06-03-2020 02:35:25 06-03-2020 03:10:00 0:34 0.00030222 MUs 45 VISHWAS NAGAR EXTN.-SHAHDARA JLM 67 400 KVA UNPLANNED 06-03-2020 03:50:00 06-03-2020 04:30:00 0:40 0.00006667 MUs TELI WARA-NAWAB GANJ, SIMLA MANDI GOODTRAN-RUI MANDI, SADAR BAZAR - RAM NAGAR, 46 SADAR BAZAR B G ROAD PHG 3353 3010 KVA UNPLANNED 06-03-2020 05:32:25 06-03-2020 06:07:00 0:34 0.00007556 MUs KHUREJI KHAS-SWASTHYA VIHAR, CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK C- PANDIT PARK, BLOCK B-GHONDALI, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., JHEEL- JHEEL KHURENJA, BLOCK 11-GEETA COLONY, BLOCK 6-GEETA COLONY, BLOCK 16-GEETA COLONY, BLOCK 18-GEETA COLONY, BLOCK 15-GEETA COLONY, BLOCK 14-GEETA COLONY, SHIVPURI- JAGATPURI, RASHID MARKET-JAGATPURI, JHEEL-GHONDALI, CHANDER NAGAR BLOCK D-KRISHNA 47 NAGAR EXTN. KRN 4950 630 KVA UNPLANNED 06-03-2020 07:09:25 06-03-2020 07:30:57 0:21 0.00025083 MUs BLOCK K-WEST KARAWAL NAGAR, BLOCK B-NEW CHAUHAN PUR, BLOCK C-BHAGAT SINGH 48 COLONY, PKT D-BLOCK A, PKT B-BLOCK A, BLOCK D-WEST KARAWAL NAGAR KWN 544 630 KVA UNPLANNED 06-03-2020 07:30:25 06-03-2020 08:07:00 0:36 0.00063 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK E-JAGATPURI EXTN., BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI, VILLAGE 49 SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 2262 0 KVA UNPLANNED 06-03-2020 09:10:25 06-03-2020 09:58:48 0:48 0.00349333 MUs 50 CHIKAMBARPUR-OLD SIMAPURI, BLOCK G-MANSAROWAR PARK YVR 203 400 KVA UNPLANNED 06-03-2020 10:16:11 06-03-2020 10:22:00 0:5 0 MUs PKT 6-NEW KONDALI, BLOCK B-MAYUR VIHAR PHASE III, PKT A1-MAYUR VIHAR PHASE III, BLOCK F- 51 KONDALI VILLAGE VSE 104 2880 KVA UNPLANNED 06-03-2020 12:22:26 06-03-2020 12:40:00 0:17 0.00005667 MUs DELHI GOVT. STAFF FLATS-PRESS ENCLAVE, GOVT FLAT-AJMERI GATE, BLOCK D-AJMERI GATE, LIG/MIG RES/NON COMM AREA-RAJ GHAT, RAILWAY COLONY-CONNAUGHT PLACE DRG, BLOCK E- 52 CONNAUGHT PLACE DRG DRG 68 1130 KVA UNPLANNED 06-03-2020 13:24:25 06-03-2020 14:05:08 0:40 0 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, MCD SCHOOL- 53 SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 691 630 KVA UNPLANNED 06-03-2020 14:12:26 06-03-2020 14:38:06 0:25 0.00055556 MUs L.I.G HOUSING NAND NAGARI-PKT E, D.S.I.D.C. COMPLEX-DTC DEPOT, KACHI MANDIR-BLOCK E4, BLOCK E3-KANSHIPUR, HARSH VIHAR SUB STATION-POLICE FARM, DELHI JAL BOARD MIG FLATS- POCKET A, GOVT.BOYS SEC.SCHOOL-POCKET A, BLOCK E5-NAND NAGARI, BLOCK E1-BUNKAR 54 VIHAR NNG 380 5130 KVA UNPLANNED 06-03-2020 14:41:26 06-03-2020 15:31:32 0:50 0.00061111 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., JHEEL- JHEEL KHURENJA, BLOCK 11-GEETA COLONY, BLOCK 16-GEETA COLONY, BLOCK 14-GEETA 55 COLONY KRN 294 630 KVA UNPLANNED 06-03-2020 16:37:25 06-03-2020 16:50:00 0:12 0.00011333 MUs 56 VIJAY PARK-, BLOCK C12-YAMUNA VIHAR, MAUJ PUR COMPLEX 1 YVR 207 4000 KVA UNPLANNED 06-03-2020 16:37:26 06-03-2020 17:03:00 0:25 0.00016667 MUs 57 BLOCK G-, BLOCK J & K-POCKET J&K DGN 155 3870 KVA UNPLANNED 06-03-2020 16:45:25 06-03-2020 17:38:00 0:52 0.00026 MUs SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK B-SHIV VIHAR, 58 PKT D-SHIV VIHAR, BLOCK C-HARIJAN BASTI KWN 104 0 KVA UNPLANNED 06-03-2020 17:25:26 06-03-2020 18:24:00 0:58 0.00019333 MUs 59 RAJENDRA BHAWAN-RAJENDRA PLACE, MIG FLATS-PRASAD NAGAR PNR 349 0 KVA UNPLANNED 06-03-2020 18:04:26 06-03-2020 19:01:00 0:56 0.00042 MUs BLOCK B-VINOD NAGAR EAST, BLOCK A-VINOD NAGAR EAST, BLOCK A-MANDAWALI, L.P. DESHBANDHU SOC-L.P. EXTENSION, J.J. COLONY-MOTHER DAIRY, MOTHER DAIRY-INDRAPRASTHA 60 EXTENSION LNR, BLOCK D-MANDAWALI VILLAGE LNR 423 5580 KVA UNPLANNED 06-03-2020 18:21:25 06-03-2020 19:00:00 0:38 0.00051722 MUs SUNDER PARK-SHAHDARA, BHOLA NATH NAGAR-SHAHDARA, TELIBARA-SHAHDARA, MAHARAM 61 NAGAR-SHAHDARA, BIHARI COLONY-SHAHDARA JLM 648 4000 KVA UNPLANNED 06-03-2020 18:30:00 06-03-2020 19:25:00 0:54 0.001125 MUs

BLOCK C-SHASTRI PARK, BLOCK N-NEW SILAMPURI PHASE I, BLOCK J-SILAMPUR COLONY, BLOCK B- NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II, JHUGI-NEW SILAMPURI PHASE I, 62 ZERO PUSTA-USMAN PUR, BALBIR NAGAR EXTN.-SILAMPUR, JAFFRABAD-MAUJ PUR YVR 138 4480 KVA UNPLANNED 06-03-2020 18:44:26 06-03-2020 19:35:00 0:50 0.00022222 MUs BLOCK G-DILSHAD COLONY, BLOCK F-DILSHAD COLONY, M.C.P. SCHOOL-POCKET O, DELHI JAL BOARD-POCKET I, BLOCK J & K-POCKET J&K, DDA FLATS-POCKET SG, SHAHNI DEV MANDIR- 63 POCKET SG DGN 2399 3870 KVA UNPLANNED 06-03-2020 21:17:26 06-03-2020 21:30:00 0:12 0.00004 MUs DARIBA KALA-KATRA MASHRU, CLOTH MARKET-CHURA WALAN, NEW LAJPAT RAI MARKET- CHANDNI CHOWK, GURUDWAR SHAB LAND-CHANDNI CHOWK, JAMA MASZID AREA-CHANDNI 64 CHOWK CCK 611 2610 KVA UNPLANNED 06-03-2020 22:48:00 06-03-2020 23:25:00 0:36 0.00015 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage BLOCK P-NEW SILAMPURI PHASE III, BLOCK C-SHASTRI PARK, SUBHASH PARK-GORAKH PARK, BLOCK N-NEW SILAMPURI PHASE I, BLOCK J-SILAMPUR COLONY, BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II, BLOCK M-BRAHM PURI, JAFFRABAD-MAUJ PUR, JHUGI-NEW SILAMPURI PHASE I, ZERO PUSTA-USMAN PUR, BLOCK B-MANUJPUR, TANKI ROAD-C-BLOCK 65 BHAJANPURA, JAFFRABAD-MAUJ PUR YVR 3957 4480 KVA UNPLANNED 06-03-2020 23:57:26 07-03-2020 00:40:00 0:42 0.00015167 MUs WEST AZAD NAGAR, BLOCK X-RAJGARH COLONY, BLOCK A-KRISHNA NAGAR, BLOCK D-KRISHNA 66 NAGAR, JHEEL-JHEEL KHURENJA, SHANKAR NAGAR-AZAD NAGAR KRN 4513 3240 KVA UNPLANNED 07-03-2020 00:09:26 07-03-2020 00:27:00 0:17 0.00007556 MUs

BLOCK J-SILAMPUR COLONY, JAFFRABAD-MAUJ PUR, BLOCK C-SHASTRI PARK, JHUGI-NEW SILAMPURI PHASE I, BALBIR NAGAR EXTN.-SILAMPUR, BLOCK B-NEW SILAMPURI PHASE II, BLOCK 67 N-NEW SILAMPURI PHASE I, ZERO PUSTA-USMAN PUR, BLOCK C-NEW SILAMPURI PHASE II YVR 95 4480 KVA UNPLANNED 07-03-2020 01:11:26 07-03-2020 01:50:00 0:38 0.00011611 MUs

BLOCK C-SHASTRI PARK, BLOCK A-NEW SILAMPURI PHASE IV, BLOCK N-NEW SILAMPURI PHASE I, BLOCK J-SILAMPUR COLONY, BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE 68 II, JHUGI-NEW SILAMPURI PHASE I, ZERO PUSTA-USMAN PUR, JAFFRABAD-MAUJ PUR YVR 3957 4480 KVA UNPLANNED 07-03-2020 02:29:26 07-03-2020 03:25:00 0:55 0.00018333 MUs

PAHAR GANJ PHG, S.R.T. NAGAR-ARYA NAGAR, SHEELA HOTEL-ARYA NAGAR, MOTHER DAIRY- 69 ARYA NAGAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE-CHANDNI CHOWK CCK PHG 142 0 KVA UNPLANNED 07-03-2020 03:06:27 07-03-2020 03:40:00 0:33 0.00010083 MUs

70 BLOCK A-YOJNA VIHAR, BLOCK B-YOJNA VIHAR, BLOCK C-VIGYAN VIHAR, BLOCK_C-SAVITA VIHAR JLM 155 4360 KVA UNPLANNED 07-03-2020 05:21:26 07-03-2020 06:15:00 0:53 0.000265 MUs BABARPUR EXTN.-BABAR PUR, VIJAY PARK-YAMUNA VIHAR, BLOCK C12-YAMUNA VIHAR, MAUJ 71 PUR COMPLEX 1, ADARSH MOHALLA-MAUJPUR YVR 363 4000 KVA UNPLANNED 07-03-2020 06:54:27 07-03-2020 07:40:00 0:45 0.000525 MUs BLOCK T-BALJIT NAGAR, BLOCK 29-WEST , BLOCK 30-, BLOCK L- 72 WEST PATEL NAGAR, BLOCK E-WEST PATEL NAGAR PNR 724 5940 KVA UNPLANNED 07-03-2020 07:35:27 07-03-2020 07:57:00 0:21 0.00032667 MUs VISHWAS NAGAR EXTN.-SHAHDARA, AGCR ENCLAVE-ANAND VIHAR, AGCR ENCLAVE- 73 INSTITUTIONAL AREA JLM 97 1030 KVA UNPLANNED 07-03-2020 09:47:28 07-03-2020 10:40:00 0:52 0.00008667 MUs 74 KOTLA-MAYUR VIHAR, KHICHRI PUR-PHASE II, KOTLA EXCT-PHASE II MVR 17 0 KVA UNPLANNED 07-03-2020 10:39:27 07-03-2020 10:50:00 0:10 0.00000556 MUs 75 BLOCK A-JHILMIL INDUSTRIAL AREA DGN 17 990 KVA UNPLANNED 07-03-2020 10:44:24 07-03-2020 11:17:51 0:33 0.00001833 MUs M.C.P. SCHOOL-POCKET O, BLOCK J & K-POCKET J&K, DDA FLATS-POCKET SG, POCKET M-DILSHAD GARDEN, POCKET N-DILSHAD GARDEN, BLOCK P-POCKET P, DDA QUARTERS-POCKET Q, FLORA DALE SECONDARY SCHOOL-POCKET R, FACTORY-DILSHAD GARDEN, BLOCK C- MOD PRIMARY 76 SCHOOL-JHILMIL-TAHIRPUR DGN 319 5700 KVA UNPLANNED 07-03-2020 16:10:27 07-03-2020 17:05:16 0:54 0.000555 MUs 77 AGCR ENCLAVE-INSTITUTIONAL AREA JLM 2 630 KVA UNPLANNED 07-03-2020 17:25:37 07-03-2020 18:19:26 0:53 0.00007361 MUs

DDA FLATS-ROUSE AVENUE, GOVIND BALLABH PANT HASPITAL-LN JPN COLONY, BSES OFFICE- TURKMAN MARG, ZAKIR HUSAIN P.G. EVENING COLLAGE-SKD BASTI, DEMOLISHED AREA-ROUSE 78 AVENUE, BLOCK D-AJMERI GATE, RAILWAY COLONY-CONNAUGHT PLACE DRG DRG 85 0 KVA UNPLANNED 07-03-2020 17:29:00 07-03-2020 18:25:00 0:56 0.00038889 MUs 79 BLOCK B-GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM MVR 527 1030 KVA UNPLANNED 07-03-2020 19:48:00 07-03-2020 22:13:00 2:25 0.00245694 MUs 80 BLOCK B-GAZIPUR DAIRY FARM, GAZIPUR DAIRY FARM, BLOCK A-GAZIPUR DAIRY FARM MVR 112 1030 KVA UNPLANNED 07-03-2020 22:15:00 07-03-2020 23:12:00 0:56 0.00020222 MUs DDA FLATS- MOTIAKHAN DUMP SCHEME-MOTIA KHAN, MOTIYA KHAN-SHAHI IDGAH COLONY, 81 SHAHI IDGAH-SADAR BAZAR - P.P QUARTERS, R.G. COMPLEX-MOTIA KHAN PHG 127 6340 KVA UNPLANNED 08-03-2020 05:23:28 08-03-2020 06:10:00 0:46 0.00005111 MUs BLOCK D-NEHRU VIHAR, BLOCK B-CHANDU NAGAR, CLOCK C-BIHARIPUR, BLOCK B-NEHRU VIHAR, 82 BLOCK A1-MUNGA NAGAR, BLOCK A-NEHRU VIHAR KWN 9 3520 KVA UNPLANNED 08-03-2020 07:12:29 08-03-2020 07:53:42 0:41 0.00001139 MUs

BLOCK I-ARAM BAGH, BLOCK III-ARAM BAGH, BLOCK C-ARAM BAGH, CHUNA MANDI-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ, NEW RATAN MARKET-PANCHKUIAN ROAD 83 RAILWAY COLONY, SHRI CHITRA GUPTA TEMPLE-PANCHKUIAN ROAD RAILWAY COLONY PHG 608 5890 KVA UNPLANNED 08-03-2020 09:14:28 08-03-2020 09:43:00 0:28 0.00036556 MUs 84 BLOCK J & K-POCKET J&K DGN 52 630 KVA UNPLANNED 08-03-2020 10:00:00 08-03-2020 10:24:00 0:24 0.00002 MUs 85 DAMODER PARK-DILSHAD GARDEN DGN 26 990 KVA UNPLANNED 08-03-2020 10:00:00 08-03-2020 10:24:00 0:24 0.00002 MUs ARYA NAGAR-ANAND VIHAR, VILL KARKARDOOMA-KARKAR DUMA, INSTITUTIONAL AREA BLOCK B- ALL DEAF & DUMB SOCIETY, DAYA NAND VIHAR-ANAND VIHAR, JAGRITI ENCLAVE-ANAND VIHAR, MINISTRY OF LABOUR & EMPLOYMENT-INSTITUTIONAL AREA, HOSPITAL AREA- 86 INSTITUTIONAL AREA JLM 52 0 KVA UNPLANNED 08-03-2020 10:01:29 08-03-2020 10:29:46 0:28 0.00004667 MUs

87 CHIKAMBARPUR-OLD SIMAPURI, HANSRAJ SCHOOL-POCKET H, MUKHRJI SCHOOL-POCKET L DGN 35 1030 KVA UNPLANNED 08-03-2020 10:53:29 08-03-2020 11:18:00 0:24 0.00002667 MUs BLOCK A-CHANDER VIHAR, BLOCK U-CHANDER VIHAR, BLOCK D-MANDAWALI VILLAGE, RAILWAY 88 COLONY-MANDAWALI VILLAGE LNR 432 630 KVA UNPLANNED 08-03-2020 12:43:29 08-03-2020 13:40:00 0:56 0.00077778 MUs IP STATE-PRAGATI MAIDAN, UNIVERSITY GRANT COMMISSION-ITO, MANEK BHAVAN- SALES TAX DEPARTMENT-FEROJ SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA-FEROJ SHAH KOTLA 89 STADIUM DRG 154 0 KVA UNPLANNED 08-03-2020 12:52:29 08-03-2020 13:50:00 0:57 0.00015833 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, SEWA DHAM- 90 MANDOLI NNG 570 0 KVA UNPLANNED 08-03-2020 22:46:29 08-03-2020 23:34:26 0:47 0.00086167 MUs DELHI POLICE BHAVAN-PAHARI BHOJLA, RAM MANDIR-KAMLA MARKET, GOVT.GIRLS SENIOR 91 SECONDARY SCHOOL-KAMLA MARKET, DDA FLATS-KALA MASZID DRG 116 0 KVA UNPLANNED 09-03-2020 07:25:18 09-03-2020 07:47:17 0:21 0.0000525 MUs 92 DAYANAND HOSPITAL-UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 894 630 KVA UNPLANNED 09-03-2020 07:21:58 09-03-2020 07:54:59 0:33 0.0001925 MUs 93 SANSAR COMPOUND-DILSHAD GARDEN, DELHI POWER SUPPLY-DILSHAD GARDEN DGN 173 990 KVA UNPLANNED 09-03-2020 07:27:31 09-03-2020 07:56:28 0:28 0.00015556 MUs 94 MOSQUE-LAL KUAN BAZAR, -KHUSH DIL CCK 220 990 KVA UNPLANNED 09-03-2020 07:35:18 09-03-2020 08:24:16 0:48 0.00022667 MUs

LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA 95 VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 380 0 KVA UNPLANNED 09-03-2020 14:20:21 09-03-2020 15:14:30 0:54 0.00066 MUs DAYANAND HOSPITAL-UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, SANSAR COMPOUND- 96 DILSHAD GARDEN, JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 1295 5220 KVA UNPLANNED 09-03-2020 14:29:19 09-03-2020 14:55:58 0:26 0.00108333 MUs SHIV VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT D-SHIV VIHAR, 97 BLOCK C-HARIJAN BASTI KWN 86 0 KVA UNPLANNED 09-03-2020 16:11:18 09-03-2020 16:40:41 0:29 0.00008056 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET 98 NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 181 2650 KVA UNPLANNED 10-03-2020 13:01:20 10-03-2020 13:43:09 0:41 0.00085417 MUs BLOCK C-MAN SINGH NAGAR, BLOCK A-KHAJURI KHAS, BLOCK H-OLD MUSTAFABAD, BLOCK C- MAHALAXMI ENCLAVE, BLOCK C-GOVIND VIHAR, BLOCK D-OLD MUSTAFABAD, BLOCK F- 99 BHAGIRATHI VIHAR KWN 95 6250 KVA UNPLANNED 10-03-2020 16:25:20 10-03-2020 17:03:09 0:37 0.00011306 MUs

100 PKT A-BLOCK E, PKT E-SADATPUR EXT-PUSTA AREA-K BLOCK, BLOCK D-WEST KARAWAL NAGAR KWN 104 0 KVA UNPLANNED 10-03-2020 17:24:00 10-03-2020 18:10:00 0:45 0.00015 MUs BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR, BLOCK B-KABIR NAGAR, BABA DA DARGA- 101 KARDAMPURI, BHIM RAO AMBEDKAR COLLAGE-JYOTI NAGAR NNG 7381 3600 KVA UNPLANNED 10-03-2020 20:03:21 10-03-2020 20:32:00 0:28 0 MUs PAHAR GANJ PHG, MULTANI DHANDA-SADAR BAZAR, S.R.T. NAGAR-ARYA NAGAR, BLOCK A-AMAR NAGAR, BLOCK L-RAM NAGAR, SHEELA HOTEL-ARYA NAGAR, ST. ANTONYS CHURCH SCHOOL- ARYA NAGAR, BLOCK C-AMAR NAGAR, SENIOR SECONDARY ENGINEER WORKSHOP N.R.OFFICE- 102 CHANDNI CHOWK CCK PHG 498 0 KVA UNPLANNED 10-03-2020 23:25:21 10-03-2020 23:53:00 0:27 0.00048 MUs SUBHASH PARK-GORAKH PARK, GORAKH PARK EAST-SILAMPUR, GORAKH PARK WEST-SILAMPUR, NEW JAFFRABAD-GORAKH PARK, BLOCK B-GORAKH PARK, SHIVAJI PARK-BALBIR NAGAR, OLDANPUR-NAVIN SHAHDARA, PANCHSHEEL PARK-NAVIN SHAHDARA, BABARPUR WEST-BABAR 103 PUR, ROHITASH NAGAR-SILAMPUR DGN 5061 3240 KVA UNPLANNED 11-03-2020 02:20:21 11-03-2020 03:17:00 0:56 0.00020222 MUs 104 SIYARAM-GHISA DGN 12 990 KVA UNPLANNED 11-03-2020 09:15:00 11-03-2020 09:40:00 0:24 0.00002 MUs

LIG/MIG RES/NON COMM AREA-SABHEPUR, BLOCK D-DLF ANKUR VIHAR, BLOCK H-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, BLOCK I-BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK- 105 SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 449 0 KVA UNPLANNED 11-03-2020 14:38:23 11-03-2020 15:22:23 0:44 0.00063556 MUs BABARPUR WEST-BABAR PUR NNG, BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.- 106 SILAMPUR NNG 475 4630 KVA UNPLANNED 11-03-2020 18:45:21 11-03-2020 19:35:54 0:50 0.00076389 MUs HOSPITAL AREA-INSTITUTIONAL AREA, MINISTRY OF LABOUR & EMPLOYMENT-INSTITUTIONAL AREA, INSTITUTIONAL AREA BLOCK B-ALL INDIA DEAF & DUMB SOCIETY, ARYA NAGAR-ANAND VIHAR, DAYA NAND VIHAR-ANAND VIHAR, JAGRITI ENCLAVE-ANAND VIHAR, VILL KARKARDOOMA- 107 KARKAR DUMA JLM 276 0 KVA UNPLANNED 12-03-2020 01:37:20 12-03-2020 02:18:00 0:40 0.00035556 MUs

BLOCK B-KABIR NAGAR, BLOCK A-JAGATPURI EXTN., BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK 108 A-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 0 0 KVA UNPLANNED 12-03-2020 08:45:23 12-03-2020 09:28:17 0:42 0 MUs 109 SARASWATI KUNJ- EAST END APPARTMENT-NEW VSE 121 3150 KVA UNPLANNED 12-03-2020 08:48:23 12-03-2020 09:05:00 0:16 0.00006222 MUs 110 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 3 990 KVA UNPLANNED 12-03-2020 09:39:58 12-03-2020 10:08:00 0:28 0.00001556 MUs 111 BLOCK 24-WEST PATEL NAGAR PNR 1 990 KVA UNPLANNED 12-03-2020 11:30:06 12-03-2020 12:07:03 0:36 0 MUs 112 TOWN HALL-KUCHA NATWA CCK 52 990 KVA UNPLANNED 12-03-2020 11:41:49 12-03-2020 12:15:03 0:33 0.00003667 MUs BLOCK F-WEST KARAWAL NAGAR, PKT A-BLOCK E, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK C- SADAT PUR, PKT E-SADATPUR EXT-PUSTA AREA-K BLOCK, BLOCK D-WEST KARAWAL NAGAR, 113 BLOCK D-WEST KARAWAL NAGAR KWN 181 0 KVA UNPLANNED 12-03-2020 14:17:24 12-03-2020 14:45:00 0:27 0.0001575 MUs BLOCK B-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK B-BHAGIRATHI VIHAR, BLOCK G- BHAGIRATHI VIHAR, BLOCK F-BHAGIRATHI VIHAR, BLOCK E-BHAGIRATHI VIHAR, BLOCK D- BHAGIRATHI VIHAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK C-BHAGIRATHI VIHAR, BLOCK F-BRIJ 114 PURI, BLOCK D-BRIJ PURI KWN 1808 5490 KVA UNPLANNED 12-03-2020 15:39:25 12-03-2020 16:35:00 0:55 0.00053472 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 115 EXTN., BLOCK D-HARSH VIHAR NNG 1893 0 KVA UNPLANNED 12-03-2020 15:47:00 12-03-2020 16:15:28 0:28 0.00033444 MUs 116 FATEHPURI-KUCHA HASIRAM, FATEHPURI-KHARI BAOLI CCK 181 2970 KVA UNPLANNED 12-03-2020 16:23:24 12-03-2020 17:02:00 0:38 0.00014778 MUs 117 IP STATE-PRAGATI MAIDAN DRG 42 990 KVA UNPLANNED 12-03-2020 17:50:27 12-03-2020 17:52:01 0:1 0.00000194 MUs 118 TOWN HILL-KATRA NEEL, TOWN HALL-KUCHA NATWA CCK 13 0 KVA UNPLANNED 13-03-2020 00:52:25 13-03-2020 01:30:00 0:37 0.00001028 MUs

BLOCK A-JHANDEWALAN, DARYA GANJ, LIG/MIG RES/NON COMM AREA-SHRIRAM COLONY D BOLCK, JHANDEWALAN FATTED FACTORY COMPLEX, DR. AMBEDKAR STADIUM-FEROJ SHAH KOTLA STADIUM, BLOCK A-AMAR NAGAR, BLOCK J-NABI KARIM, BAGICHI ALLUDDIN-SADAR BAZAR, ARAM NAGAR-SADAR BAZAR, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, RED FORT- CHANDNI CHOWK-RED FORT, LIG/MIG RES/NON COMM AREA-SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK L-AMAR NAGAR, DDA POLICE QTRS.-AHATA KEDARA, BLOCK B-SADAR BAZAR - RAM NAGAR, MSC-ARAM NAGAR, BLOCK K-ARAM NAGAR, TELEGRAPH OFFICE-KASHMERE GATE, NIGAM BODH GHAT CEMETRY-KASHMERE GATE, PART II-BLOCK E- 119 BLDGNAMERASTRIYA VIRJANAND ANDH KANYA MAHAVIDYALAYA PHG 2932 3240 KVA UNPLANNED 13-03-2020 03:40:25 13-03-2020 04:15:00 0:34 0.00020778 MUs 120 TOWN HALL-KUCHA NATWA, MAIN BAJAR-MALIWARA CCK 78 990 KVA UNPLANNED 13-03-2020 08:56:57 13-03-2020 09:11:00 0:14 0.00000778 MUs

121 VISHWAS NAGAR EXTN.-SHAHDARA, VISHWAS NAGAR, VISHWAS NAGAR EXTN.-SHAHDARA JLM 803 3280 KVA UNPLANNED 13-03-2020 09:03:00 13-03-2020 09:53:03 0:50 0.00129167 MUs BLOCK A-SHASTRI PARK, LIG/MIG RES/NON COMM AREA-SHASTRI PARK, YAMUNA VIHAR 122 YAMUNA FLOOD PLAINS YVR 1422 1390 KVA UNPLANNED 13-03-2020 09:36:49 13-03-2020 10:09:14 0:32 0.00024 MUs 123 BLOCK 6-GEETA COLONY, BLOCK 13-GEETA COLONY KRN 60 990 KVA UNPLANNED 13-03-2020 10:20:37 13-03-2020 11:02:39 0:42 0.00002333 MUs 124 BLOCK C-VINOD NAGAR WEST, BLOCK D-VINOD NAGAR WEST LNR 259 2610 KVA UNPLANNED 13-03-2020 11:03:00 13-03-2020 11:32:00 0:29 0.00024167 MUs LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, YAMUNA FLOOD PLAINS-ANNPURNA MANDIR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA 125 VIHAR KWN 717 0 KVA UNPLANNED 13-03-2020 11:06:00 13-03-2020 11:36:00 0:29 0.00026583 MUs 126 CL-CHILLA SARDA BANGAR VILLAGE MVR 0 400 KVA UNPLANNED 13-03-2020 13:25:52 13-03-2020 14:19:06 0:53 0 MUs PRATAP KHAND-JHILMIL COLONY, LABOUR COURT-SHIVA KHAND, GOVIND KHAND-JHILMIL 127 COLONY, JHILMIL COLONY BLOCK A JLM 1068 630 KVA UNPLANNED 13-03-2020 13:24:00 13-03-2020 13:55:10 0:31 0.00043917 MUs 128 DALLU PURA VSE- VSE, BLOCK B-DALLU PURA VSE VSE 841 630 KVA UNPLANNED 13-03-2020 14:19:52 13-03-2020 15:16:57 0:57 0 MUs 129 BLOCK B-MAYUR VIHAR PHASE III VSE 363 990 KVA UNPLANNED 13-03-2020 14:20:40 13-03-2020 15:17:54 0:57 0 MUs 130 BIHARI COLONY-SHAHDARA JLM 305 990 KVA UNPLANNED 13-03-2020 14:43:51 13-03-2020 14:49:38 0:5 0.00000694 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage BLOCK B-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK C-BRIJ PURI, SANT NIRANKARI BHAVAN-GANGA 131 VIHAR KWN, BLOCK D-BRIJ PURI KWN 501 4370 KVA UNPLANNED 13-03-2020 15:00:00 13-03-2020 15:36:00 0:36 0.00058 MUs 132 GANESH NAGAR SOUTH-INDRAPRASTHA EXTENSION LNR 1508 990 KVA UNPLANNED 13-03-2020 15:13:51 13-03-2020 15:26:40 0:12 0 MUs M.C.P. SCHOOL-POCKET O, BLOCK J & K-POCKET J&K, DDA FLATS-POCKET SG, POCKET M-DILSHAD GARDEN, BLOCK P-POCKET P, DDA QUARTERS-POCKET Q, FLORA DALE SECONDARY SCHOOL- 133 POCKET R, BLOCK C- MOD PRIMARY SCHOOL-JHILMIL-TAHIRPUR DGN 483 5700 KVA UNPLANNED 13-03-2020 17:29:26 13-03-2020 18:02:00 0:32 0.00049778 MUs 134 BLOCK A-MANDOLI EXTN., BLOCK D-MANDOLI EXTN. NNG 274 990 KVA UNPLANNED 13-03-2020 18:00:10 13-03-2020 18:16:53 0:16 0.00004444 MUs

BLOCK 10-KHICHRIPUR RESETTLEMENT COLONY BLOCK 5, BLOCK 4-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 6-KHICHRIPUR RESETTLEMENT COLONY, BLOCK 3-KHICHARIPUR BLOCK 1, BLOCK 9-KHICHRIPUR RESETTLEMENT COLONY BLOCK 9, BLOCK G-VINOD NAGAR EAST, BLOCK E-VINOD NAGAR EAST, BLOCK F-, BLOCK B-VINOD NAGAR EAST, BLOCK D-VINOD NAGAR EAST, BLOCK 19-KALYAN PURI, AMBEDKAR CAMP-KALYAN PURI, KALYAN VAS-KALYAN PURI, BLOCK 18-KALYAN PURI, BLOCK 17-KALYAN PURI, BLOCK 16-KALYAN PURI, BLOCK 12-KALYAN PURI, BLOCK A-VINOD NAGAR EAST, BLOCK C-VINOD NAGAR EAST, BLOCK B-VINOD NAGAR EAST, 135 MAYUR VIHAR PHASE II, KHICHARIPUR-GAZIPUR MVR 881 3010 KVA UNPLANNED 13-03-2020 21:55:26 13-03-2020 22:23:00 0:27 0.000765 MUs 136 SEWA DHAM-MANDOLI NNG 121 400 KVA UNPLANNED 14-03-2020 00:32:27 14-03-2020 01:10:00 0:37 0.00014389 MUs 137 VISHWAS NAGAR-SHAHDARA, EAST ROHTASH NAGAR-SHAHDARA JLM 387 990 KVA UNPLANNED 14-03-2020 05:14:00 14-03-2020 06:00:00 0:45 0.0000625 MUs BLOCK A-KANTI NAGAR NORTH BLOCK A, KANTI NAGAR SOUTH-AZAD NAGAR, SHANKAR NAGAR 138 WEST-AZAD NAGAR, BLOCK E-KRISHNA NAGAR KRN 224 4860 KVA UNPLANNED 14-03-2020 05:33:00 14-03-2020 06:23:00 0:49 0.00035389 MUs KHUREJI KHAS-SWASTHYA VIHAR, BRIJ PURI-SWASTHYA VIHAR, CHANDER NAGAR-KRISHNA NAGAR, SAROJINI PARK-GEETA COLONY, WEST LAXMI MARKET KHUREJI-ARAM PARK, SAROJINI 139 PARK-ARAM PARK KRN 224 1620 KVA UNPLANNED 14-03-2020 05:39:27 14-03-2020 05:54:00 0:14 0.00010111 MUs 140 RAJIV GANDHI SUPER STC HOSPITAL-GURU TEG BAHADUR ENCLAVE NNG NNG 587 0 KVA UNPLANNED 14-03-2020 06:26:27 14-03-2020 07:00:00 0:33 0.00062333 MUs

BLOCK F-INDIRA VIHAR, BLOCK B-CHAMAN PARK, BLOCK F-SHIV VIHAR, BLOCK E-INDIRA VIHAR, 141 BLOCK A-SHIV VIHAR, BLOCK F-INDIRA VIHAR, BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 717 630 KVA UNPLANNED 14-03-2020 09:54:27 14-03-2020 10:26:04 0:31 0.00071472 MUs VISHWAS NAGAR EXTN.-SHAHDARA, AGCR ENCLAVE-ANAND VIHAR, AGCR ENCLAVE- 142 INSTITUTIONAL AREA JLM 82 400 KVA UNPLANNED 14-03-2020 11:30:27 14-03-2020 12:28:00 0:57 0.00003167 MUs BLOCK B-NEW CHAUHAN PUR, DEEKSHA MAHILA COLLAGE-DAYALPUR EXTN., BLOCK B-NEHRU 143 VIHAR, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN. KWN 285 0 KVA UNPLANNED 14-03-2020 13:03:28 14-03-2020 13:53:00 0:49 0.00044917 MUs BLOCK F-ZERO PUSTA, BLOCK E-ZERO PUSTA, NAYAGAON-NEW KATWARA, BLOCK A-GHONDA PATTI, BLOCK H-GHONDA PATTI, BLOCK C-GHONDA PATTI, ZERO PUSTA-USMAN PUR, BLOCK J- KARTAR NAGAR, GAUTAM VIHAR-GHONDA, GAMRI-GHONDA, GHONDA PATTI, DELHI VIDHYUT 144 BROAD-ZERO PUSTA YVR 319 7600 KVA UNPLANNED 14-03-2020 14:56:00 14-03-2020 15:52:00 0:56 0.00057556 MUs SUBHASH PARK-GORAKH PARK, BLOCK Z-WELCOME COLONY, BLOCK G-SILAMPUR COLONY, BLOCK E-NEW SILAMPURI PHASE II, BLOCK B3-YAMUNA VIHAR, TANKI ROAD-C-BLOCK 145 BHAJANPURA, JAFFRABAD-MAUJ PUR YVR 4554 3600 KVA UNPLANNED 14-03-2020 15:15:28 14-03-2020 15:34:41 0:19 0.0002375 MUs 146 PKT B-CHITRAKOOT, G.B.SSS SCHOOL-GOKUL PURI NNG 130 2250 KVA UNPLANNED 14-03-2020 15:21:28 14-03-2020 16:15:22 0:53 0.00022083 MUs 147 CHAUHAN BANGAR-JAFFRABAD, JAFFRABAD-MAUJ PUR YVR 183 6020 KVA UNPLANNED 14-03-2020 16:39:28 14-03-2020 17:37:00 0:57 0.00074417 MUs BLOCK B-GOKUL PURI, G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D- 148 MEET NAGAR, BLOCK E-MEET NAGAR NNG 181 1620 KVA UNPLANNED 14-03-2020 17:32:28 14-03-2020 18:11:05 0:38 0.00022167 MUs PKT B-CHITRAKOOT, BLOCK D-ASHOK NAGAR, BLOCK A-MEET NAGAR, BLOCK B-ASHOK NAGAR, 149 BLOCK C-AMAR COLONY NNG 311 1620 KVA UNPLANNED 14-03-2020 19:11:28 14-03-2020 19:41:59 0:30 0.0003 MUs ROHITASH NAGAR EAST-SILAMPUR, RAM NAGAR-SILAMPUR, BLOCK 1-RAM NAGAR EXTN., BLOCK 150 1-BHAGWANPUR KHERA, DELHI JAL BOARD-DDA FLATS DGN 155 2610 KVA UNPLANNED 14-03-2020 22:00:29 14-03-2020 22:32:00 0:31 0.000155 MUs 151 ANAND PARBAT PNR 310 5620 KVA UNPLANNED 15-03-2020 00:58:28 15-03-2020 01:55:00 0:56 0.00037333 MUs

SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK A-ANUP 152 VIHAR, MCD SCHOOL-SABOLI COLONY, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 863 630 KVA UNPLANNED 15-03-2020 07:19:29 15-03-2020 07:58:42 0:39 0.00108333 MUs LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA- SABHEPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM 153 AREA-SONIA VIHAR KWN 855 0 KVA UNPLANNED 15-03-2020 09:37:29 15-03-2020 10:11:32 0:34 0.000935 MUs 154 PETROL PUMP-POCKET C DGN 1 990 KVA UNPLANNED 15-03-2020 10:30:07 15-03-2020 11:07:39 0:37 0.00003083 MUs KATRA NAWAB-CHANDNI CHOWK, TOWN HILL-KATRA NEEL, TOWN HALL-KUCHA NATWA, 155 GHANTA GHAR-KATRA ASRAFI CCK 58 990 KVA UNPLANNED 15-03-2020 14:19:33 15-03-2020 14:35:06 0:15 0.00000833 MUs 156 SUBHASH PARK EXTN.-GORAKH PARK, NEW JAFFRABAD-GORAKH PARK DGN 345 2610 KVA UNPLANNED 15-03-2020 15:39:30 15-03-2020 16:15:00 0:35 0.00038889 MUs SUNDER PARK-SHAHDARA, BIHARI COLONY-SHAHDARA, SHALIMAR PARK-SHAHDARA, VISHWAS 157 NAGAR JLM 173 4950 KVA UNPLANNED 15-03-2020 16:09:30 15-03-2020 16:53:18 0:43 0.00023889 MUs 158 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 164 630 KVA UNPLANNED 15-03-2020 18:04:41 15-03-2020 18:30:15 0:25 0.00013194 MUs 159 INDUSTRIAL AREA-ANAND PARBHAT PNR 1099 990 KVA UNPLANNED 16-03-2020 10:56:00 16-03-2020 11:42:00 0:45 0.0010625 MUs JYOTI COLONY-BALBIR NAGAR, BLOCK A-KABIR NAGAR, BLOCK B-KABIR NAGAR, BABA DA DARGA- KARDAMPURI, BLOCK B-DURGA PURI, BLOCK C-NORTH CHHAJUPUR, BLOCK M-DURGA PURI, 160 BLOCK B-JYOTI NAGAR NNG 440 990 KVA UNPLANNED 16-03-2020 12:42:19 16-03-2020 13:09:38 0:27 0.00093 MUs BLOCK B-KABIR NAGAR, BABA DA DARGA-KARDAMPURI, PKT C-BLOCK B, BLOCK A-HARIJAN BASTI, 161 BHIM RAO AMBEDKAR COLLAGE-JYOTI NAGAR NNG 924 4630 KVA UNPLANNED 16-03-2020 12:42:20 16-03-2020 13:13:49 0:31 0.00092139 MUs BLOCK N-NEW SILAMPURI PHASE I, BLOCK J-SILAMPUR COLONY, BLOCK G-SILAMPUR COLONY, BLOCK B-NEW SILAMPURI PHASE II, JHUGI-NEW SILAMPURI PHASE I, DSIDC COMPLEX-SEELAMPUR 162 YVR, JAFFRABAD-MAUJ PUR YVR 535 3180 KVA UNPLANNED 16-03-2020 13:55:00 16-03-2020 14:19:00 0:24 0.00041333 MUs 163 VISHWAS NAGAR JLM 24 990 KVA UNPLANNED 16-03-2020 15:37:59 16-03-2020 16:02:20 0:24 0 MUs 164 JHANDEWALAN FATTED FACTORY COMPLEX SRD 543 1980 KVA UNPLANNED 16-03-2020 15:39:19 16-03-2020 16:16:34 0:37 0.00043167 MUs 165 BLOCK A-SHASTRI PARK, YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 513 400 KVA UNPLANNED 16-03-2020 15:55:00 16-03-2020 16:53:24 0:58 0 MUs 166 BABARPUR EXTN.-BABAR PUR NNG 107 990 KVA UNPLANNED 17-03-2020 09:10:56 17-03-2020 09:40:24 0:29 0.00006444 MUs 167 BALBIR NAGAR EXTN.-SILAMPUR NNG 69 630 KVA UNPLANNED 17-03-2020 09:47:28 17-03-2020 10:08:21 0:20 0.00004444 MUs 168 BLOCK B-GHONDALI, BLOCK B-KRISHNA NAGAR BLOCK B, BLOCK D-GHONDALI KRN 312 0 KVA UNPLANNED 17-03-2020 10:59:26 17-03-2020 11:41:14 0:41 0.00002278 MUs BLOCK A-SHASTRI PARK, BLOCK C-SHASTRI PARK, LIG/MIG RES/NON COMM AREA-SHASTRI PARK, 169 YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 1421 1390 KVA UNPLANNED 17-03-2020 11:00:00 17-03-2020 11:31:05 0:31 0.00030139 MUs 170 PKT C-MAYUR VIHAR PHASE II MVR 17 990 KVA UNPLANNED 17-03-2020 11:35:44 17-03-2020 12:25:06 0:49 0.00002722 MUs 171 NEW LAJPAT RAI MARKET-CHANDNI CHOWK CCK 79 990 KVA UNPLANNED 17-03-2020 12:22:41 17-03-2020 12:59:49 0:37 0.00004111 MUs 172 BLOCK T-OLD MUSTAFABAD, BLOCK T-NEHRU VIHAR KWN 1 1500 KVA UNPLANNED 17-03-2020 13:17:06 17-03-2020 13:47:03 0:29 0 MUs 173 MIG FLATS-POCKET F & E, DDA MARKET PKT B & E-POCKET F & E DGN 81 400 KVA UNPLANNED 17-03-2020 14:36:28 17-03-2020 15:04:52 0:28 0.00002333 MUs BLOCK B1-NEW ASHOK NAGAR, BLOCK B-NEW ASHOK NAGAR VSE, NEW ASHOK NAGAR VSE- 174 VASUNDHARA ENCLAVE VSE VSE 475 0 KVA UNPLANNED 17-03-2020 15:06:19 17-03-2020 15:56:00 0:49 0.00074861 MUs THAKKAR BAPA NAGAR-BLOCK 16, P.G.D.A.V. SR. SCHOOL-, BLOCK 25-WEST 175 PATEL NAGAR, BLOCK 24-WEST PATEL NAGAR, BAPA NAGAR-ANAND PARBAT PNR 479 2970 KVA UNPLANNED 17-03-2020 17:58:21 17-03-2020 18:31:07 0:32 0.00032889 MUs

BLOCK L-SUNDER NAGRI, BLOCK M-SUNDER NAGRI, BLOCK O-SUNDER NAGRI, BLOCK C-SUNDER 176 NAGRI NNG, BLOCK A-RAJIV NAGAR NNG, BLOCK H-PREM NAGAR NNG, BLOCK E1-BUNKAR VIHAR NNG 492 5030 KVA UNPLANNED 17-03-2020 21:35:21 17-03-2020 22:32:13 0:56 0.00088667 MUs 177 MAYUR VIHAR EXTN. MVR 466 0 KVA UNPLANNED 18-03-2020 01:05:00 18-03-2020 01:55:00 0:49 0.000735 MUs 178 BLOCK 1-BALBIR NAGAR, BALBIR NAGAR EXTN.-SILAMPUR DGN 140 990 KVA UNPLANNED 18-03-2020 06:30:52 18-03-2020 07:01:38 0:30 0.00015833 MUs 179 R.G. COMPLEX-MOTIA KHAN PHG 65 990 KVA UNPLANNED 18-03-2020 11:30:00 18-03-2020 11:58:13 0:28 0.00003889 MUs 180 BLOCK B-SHASTRI PARK YVR 4 630 KVA UNPLANNED 18-03-2020 12:45:00 18-03-2020 13:12:00 0:27 0 MUs 181 NEW GOVIND PURA-JAGATPURI, BALDEV PARK-JAGATPURI KRN 275 990 KVA UNPLANNED 18-03-2020 14:02:54 18-03-2020 14:49:02 0:46 0.00002556 MUs KATRA NAWAB-CHANDNI CHOWK, FATEHPURI-KUCHA HASIRAM, TOWN HILL-KATRA NEEL, 182 GHANTA GHAR-KATRA ASRAFI CCK 957 3960 KVA UNPLANNED 18-03-2020 18:54:21 18-03-2020 19:50:00 0:55 0.00113056 MUs

183 BLOCK A-SHAKARPUR KHAS, BLOCK R&A-SHAKARPUR KHAS, SHAKARPUR EXTN.-SHAKARPUR KHAS LNR 26 3960 KVA UNPLANNED 19-03-2020 00:17:16 19-03-2020 01:13:00 0:55 0.00004583 MUs RAMESH PARK-NARAYAN NAGAR, BLOCK C-LALITA PARK, BLOCK A-LALITA PARK, PUSTA-LALITA 184 PARK LNR 181 990 KVA UNPLANNED 19-03-2020 02:06:00 19-03-2020 02:54:48 0:48 0.00028 MUs 185 ROHITASH NAGAR EAST-SILAMPUR DGN 26 630 KVA UNPLANNED 19-03-2020 09:05:00 19-03-2020 09:30:00 0:24 0.00002 MUs BLOCK B-VINOD NAGAR EAST, BLOCK A-VINOD NAGAR EAST, FAZALPUR-MANDAWALI VILLAGE, SABJI MANDI-GAZIPUR VILLAGE, BLOCK D-MANDAWALI VILLAGE, RAILWAY COLONY-MANDAWALI 186 VILLAGE LNR 535 4880 KVA UNPLANNED 19-03-2020 11:26:24 19-03-2020 12:20:29 0:54 0.00093 MUs BALI MARAN-BARA DARI, FATEHPURI-KUCHA HASIRAM, TOWN HILL-KATRA NEEL, LALKUAN BAZAR- 187 SIKRIWALAN- NEW HAUZ QAZI CCK 479 4590 KVA UNPLANNED 19-03-2020 11:47:24 19-03-2020 12:34:52 0:47 0.00048306 MUs 188 DAMODER PARK-DILSHAD GARDEN DGN 26 990 KVA UNPLANNED 19-03-2020 12:21:00 19-03-2020 12:45:00 0:24 0.00002 MUs 189 TOWN HALL-KUCHA NATWA CCK 52 990 KVA UNPLANNED 19-03-2020 13:50:56 19-03-2020 14:23:51 0:32 0.00006222 MUs BLOCK A-CHANDER VIHAR, FAZALPUR-MANDAWALI VILLAGE, BLOCK U-CHANDER VIHAR, BLOCK D- 190 MANDAWALI VILLAGE, RAILWAY COLONY-MANDAWALI VILLAGE LNR 406 1620 KVA UNPLANNED 19-03-2020 14:22:24 19-03-2020 15:10:14 0:47 0.00061361 MUs 191 BLOCK A-GURU RAMDAS NAGAR, GURU RAMDAS NAGAR-LAKSHMI NAGAR LNR 11 990 KVA UNPLANNED 19-03-2020 18:10:41 19-03-2020 18:17:04 0:6 0.00001667 MUs BLOCK C-MADHUBAN ENCLAVE, GANESH NAGAR-SHAKARPUR KHAS, GANESH NAGAR EXTN.- 192 SHAKARPUR KHAS LNR 445 630 KVA UNPLANNED 19-03-2020 18:15:47 19-03-2020 18:19:05 0:3 0.00000833 MUs BLOCK F-VISHWAKARMA PARK, VISHWAKARMA PARK-LAKSHMI NAGAR, RAMESH PARK-NARAYAN NAGAR, KISHAN KUNJ-SHASTRI NAGAR, YAMUNA FLOOD PLAINS- YAMUNA FLOOD 193 PLAINS, VISHWAKARMA PARK-KISHAN KUNJ LNR 990 400 KVA UNPLANNED 19-03-2020 23:30:00 20-03-2020 00:09:00 0:38 0.00006333 MUs PUSHPANJALI-ANAND VIHAR, ANAND VIHAR BLOCK A, JAGRITI ENCLAVE-ANAND VIHAR, BAHUBALI ENCLAVE-ANAND VIHAR, SHYAM ENCLAVE-ANAND VIHAR, SAINI ENCLAVE-ANAND VIHAR, DDA 194 FLATS-KARKAR DUMA JLM 414 1980 KVA UNPLANNED 20-03-2020 00:49:25 20-03-2020 01:25:00 0:35 0.00046667 MUs 195 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 8 630 KVA UNPLANNED 20-03-2020 08:52:00 20-03-2020 09:16:00 0:24 0.00002 MUs 196 SANSAR COMPOUND-DILSHAD GARDEN DGN 26 630 KVA UNPLANNED 20-03-2020 08:51:00 20-03-2020 09:18:00 0:27 0.0000225 MUs 197 BLOCK B-B-BLOCK SHRI RAM COLONY YVR 86 630 KVA UNPLANNED 20-03-2020 10:55:31 20-03-2020 11:10:19 0:14 0.00003889 MUs 198 FAZALPUR-MANDAWALI VILLAGE LNR 86 990 KVA UNPLANNED 20-03-2020 10:50:00 20-03-2020 11:10:03 0:20 0.00005556 MUs

BLOCK F-WEST KARAWAL NAGAR, PKT A-BLOCK E, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK B- SADATPUR EXT-PUSTA AREA-M BLOCK, BLOCK C-SADAT PUR, PKT A4-BLOCK E, PKT E-SADATPUR 199 EXT-PUSTA AREA-K BLOCK, BLOCK D-WEST KARAWAL NAGAR KWN 509 0 KVA UNPLANNED 20-03-2020 11:26:26 20-03-2020 11:56:00 0:29 0.00047528 MUs 200 BLOCK 38-OLD RAJENDRA NAGAR, SALWAN PUBLIC SCHOOL-OLD RAJENDRA NAGAR SRD 123 990 KVA UNPLANNED 20-03-2020 11:35:11 20-03-2020 12:01:53 0:26 0.00002889 MUs 201 YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 43 400 KVA UNPLANNED 20-03-2020 11:52:15 20-03-2020 11:59:39 0:7 0.00000972 MUs BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON 202 COMM AREA-NEW SILAMPURI PHASE II YVR 0 0 KVA UNPLANNED 20-03-2020 11:35:00 20-03-2020 12:13:19 0:38 0 MUs GOVT. GIRLS SENIOR SECONDARY SCHOOL-TURKMAN GATE, CHANDANI MAHAL-CHANDNI 203 CHOWK DRG 1487 1980 KVA UNPLANNED 20-03-2020 12:02:26 20-03-2020 12:43:00 0:40 0.00127778 MUs 204 SEC D-MAYUR VIHAR PHASE III, BLOCK E-KONDALI VILLAGE VSE 142 400 KVA UNPLANNED 20-03-2020 12:05:47 20-03-2020 12:36:09 0:30 0.00004167 MUs 205 BLOCK B-BHAGAT SINGH COLONY, BLOCK B-PRAKASH VIHAR KWN 103 990 KVA UNPLANNED 20-03-2020 12:11:35 20-03-2020 12:45:00 0:33 0 MUs 206 BLOCK F-NEHRU VIHAR KWN 0 990 KVA UNPLANNED 20-03-2020 12:14:56 20-03-2020 13:00:00 0:45 0 MUs BLOCK H-KRISHNA NAGAR, BLOCK F-KRISHNA NAGAR, BLOCK J-KRISHNA NAGAR EAST, JHEEL- 207 KRISHNA NAGAR BLOCK B KRN 461 630 KVA UNPLANNED 20-03-2020 13:00:11 20-03-2020 13:35:27 0:35 0 MUs 208 BLOCK A & B-VASUNDHARA ENCLAVE VSE 0 630 KVA UNPLANNED 20-03-2020 13:15:27 20-03-2020 13:31:58 0:16 0 MUs 209 BLOCK F VINOD NAGAR WEST-MOTHER DAIRY LNR 78 0 KVA UNPLANNED 20-03-2020 16:30:27 20-03-2020 17:25:00 0:54 0.000135 MUs

210 BSES 66 KV GRID S/STATION-COMMUNITY CENTRE YAMUNA VIHAR, JAFFRABAD-MAUJ PUR YVR 915 990 KVA UNPLANNED 20-03-2020 16:40:26 20-03-2020 17:30:00 0:49 0.00144278 MUs BLOCK D-NEW KONDALI, PKT 6-NEW KONDALI, PKT 2-NEW KONDALI, PKT 1-NEW KONDALI, PKT 3- NEW KONDALI, BLOCK B-MAYUR VIHAR PHASE III, PKT A1-MAYUR VIHAR PHASE III, BLOCK F- 211 KONDALI VILLAGE VSE 328 2880 KVA UNPLANNED 20-03-2020 18:23:27 20-03-2020 18:44:00 0:20 0.00021111 MUs

BLOCK WA&O-SHAKARPUR KHAS, BLOCK S-SHAKARPUR KHAS, BLOCK H-SHAKARPUR KHAS, BLOCK D-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK G-SHAKARPUR KHAS, GANESH NAGAR EXTN.-SHAKARPUR KHAS, BLOCK U-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK R&A- 212 SHAKARPUR KHAS, SHAKARPUR EXTN.-SHAKARPUR KHAS, LAKSHMI NAGAR BLOCK J&K LNR 5627 4950 KVA UNPLANNED 20-03-2020 21:53:27 20-03-2020 22:25:00 0:31 0.00097306 MUs BLOCK D-VINOD NAGAR WEST, GANESH NAGAR-SHAKARPUR KHAS, BLOCK WA&O-SHAKARPUR KHAS, BLOCK S-SHAKARPUR KHAS, BLOCK H-SHAKARPUR KHAS, BLOCK WA-SHAKARPUR KHAS, 213 BLOCK U-SHAKARPUR KHAS LNR 449 1980 KVA UNPLANNED 20-03-2020 21:53:28 20-03-2020 22:06:00 0:12 0.00017333 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 214 CHANDANI MAHAL-CHANDNI CHOWK DRG 660 1980 KVA UNPLANNED 20-03-2020 22:05:27 20-03-2020 23:00:15 0:54 0.000765 MUs 215 GANESH NAGAR-SHAKARPUR KHAS LNR 449 1980 KVA UNPLANNED 20-03-2020 22:11:00 20-03-2020 22:50:53 0:39 0.00056333 MUs

BLOCK A-JOHRI PUR, BLOCK B-BHAGIRATHI VIHAR, BLOCK E-GANGA VIHAR, BLOCK G-GANGA 216 VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR KWN 216 1620 KVA UNPLANNED 21-03-2020 01:10:26 21-03-2020 01:34:19 0:23 0.00015972 MUs CHAUHAN BANGAR-JAFFRABAD, BLOCK R-BRAHM PURI, BLOCK F-BRAHM PURI, BLOCK L-BRAHM 217 PURI, JAGJEET NAGAR-GHONDA, GAUTAM VIHAR-GHONDA YVR 337 6210 KVA UNPLANNED 21-03-2020 07:28:00 21-03-2020 08:28:00 1:0 0.00065 MUs HOSPITAL AREA-INSTITUTIONAL AREA, MINISTRY OF LABOUR & EMPLOYMENT-INSTITUTIONAL AREA, INSTITUTIONAL AREA BLOCK B-ALL INDIA DEAF & DUMB SOCIETY, ARYA NAGAR-ANAND VIHAR, DAYA NAND VIHAR-ANAND VIHAR, JAGRITI ENCLAVE-ANAND VIHAR, VILL KARKARDOOMA- 218 KARKAR DUMA JLM 69 0 KVA UNPLANNED 21-03-2020 09:15:28 21-03-2020 09:51:27 0:35 0.00007778 MUs

PUSHPANJALI-ANAND VIHAR, ANAND VIHAR BLOCK A, VILL KARKARDOOMA-KARKAR DUMA, DAYA NAND VIHAR-ANAND VIHAR, JAGRITI ENCLAVE-ANAND VIHAR, BLOCK D-ANAND VIHAR, SURYA NIKETAN-RISHAB VIHAR, BAHUBALI ENCLAVE-ANAND VIHAR, SHARAD VIHAR-ANAND VIHAR, 219 SHYAM ENCLAVE-ANAND VIHAR, SAINI ENCLAVE-ANAND VIHAR, DDA FLATS-KARKAR DUMA JLM 889 1980 KVA UNPLANNED 21-03-2020 09:29:27 21-03-2020 10:55:12 1:25 0.00243194 MUs 220 GORAKH PARK WEST-SILAMPUR, BLOCK B-GORAKH PARK, SHIVAJI PARK-BALBIR NAGAR DGN 127 990 KVA UNPLANNED 21-03-2020 09:35:00 21-03-2020 10:00:00 0:24 0.00002 MUs 221 DAV PUBLIC SCHOOL-KALA MASZID, DELHI POLICE BHAVAN-PAHARI BHOJLA DRG 0 990 KVA UNPLANNED 21-03-2020 09:48:00 21-03-2020 10:40:24 0:52 0 MUs 222 BLOCK A-GURU RAMDAS NAGAR LNR 44 990 KVA UNPLANNED 21-03-2020 10:12:00 21-03-2020 10:33:06 0:21 0.00005833 MUs 223 TOWN HILL-KATRA NEEL CCK 26 990 KVA UNPLANNED 21-03-2020 10:54:48 21-03-2020 11:30:00 0:35 0.00001944 MUs 224 PKT 4-PHASE I MVR 109 990 KVA UNPLANNED 21-03-2020 17:30:37 21-03-2020 17:39:22 0:8 0 MUs DEV PUBLIC SCHOOL-CHITRAKOOT, HARSH VIHAR SUB STATION-POLICE FARM, GTB MIG FLATS- 225 POCKET F, AMIG FLATS-POCKET A NNG 307 1260 KVA UNPLANNED 21-03-2020 17:48:29 21-03-2020 18:18:46 0:30 0.00000833 MUs PATPAR GANJ-SHASHI GARDEN, BLOCK F-PANDAV NAGAR, SAMASPUR-PANDAV NAGAR, PANDAV NAGAR MVR-SHAKARPUR MVR, MAYUR VIHAR YAMUNA FLOOD PLAINS, YAMUNA FLOOD PLAINS- 226 LAXMI NAGAR YAMUNA FLOOD PLAINS MVR 1062 400 KVA UNPLANNED 21-03-2020 19:53:28 21-03-2020 20:12:00 0:18 0.00011 MUs MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA, FATEHPURI MASJID-CHANDNI CHOWK, NAYA BAZAR-CHANDNI CHOWK, RAILWAY GODOWN-CHANDNI CHOWK, BLOCK T-NAYA 227 BAZAR CCK 91 4950 KVA UNPLANNED 22-03-2020 02:40:00 22-03-2020 03:30:00 0:49 0.00009528 MUs 228 BLOCK B-MOTHER DAIRY, JHUGGI JI COLONY-MOTHER DAIRY, SLUM-MOTHER DAIRY LNR 1361 2690 KVA UNPLANNED 22-03-2020 04:10:30 22-03-2020 05:00:00 0:49 0.00013611 MUs 229 GEETA COLONY, BLOCK 2-GEETA COLONY, BLOCK 1A-GEETA COLONY KRN 207 1030 KVA UNPLANNED 22-03-2020 16:33:31 22-03-2020 16:54:03 0:20 0.00013333 MUs 230 SARASWATI KUNJ- EAST END APPARTMENT-NEW ASHOK NAGAR VSE 713 3150 KVA UNPLANNED 22-03-2020 17:14:30 22-03-2020 18:05:06 0:50 0.00020833 MUs

BLOCK K-WEST KARAWAL NAGAR, BLOCK C-KARAWAL NAGAR, BLOCK B-KARAWAL NAGAR 231 (DEHROTI), BLOCK B-HARIJAN BASTI, PKT B-BLOCK A, BLOCK B-NEW CHAUHAN PUR KWN 216 3600 KVA UNPLANNED 23-03-2020 09:10:00 23-03-2020 10:03:00 0:53 0.00036806 MUs M.C.P. SCHOOL-POCKET O, BLOCK J & K-POCKET J&K, DDA FLATS-POCKET SG, POCKET M-DILSHAD GARDEN, DDA QUARTERS-POCKET Q, FLORA DALE SECONDARY SCHOOL-POCKET R, BLOCK C- 232 MOD PRIMARY SCHOOL-JHILMIL-TAHIRPUR DGN 570 5700 KVA UNPLANNED 23-03-2020 11:33:19 23-03-2020 12:02:52 0:29 0.00053167 MUs 233 TOWN HALL-KUCHA NATWA, MAIN BAJAR-MALIWARA CCK 55 630 KVA UNPLANNED 23-03-2020 13:25:38 23-03-2020 13:59:02 0:33 0.00003667 MUs 234 GOVT. QTRS-64 KHAMBA, DEMOLISHED AREA-ROUSE AVENUE DRG 123 990 KVA UNPLANNED 23-03-2020 13:59:00 23-03-2020 14:01:54 0:2 0.00000556 MUs 235 BLOCK H-WEST PATEL NAGAR, BLOCK J-WEST PATEL NAGAR PNR 97 990 KVA UNPLANNED 23-03-2020 14:16:04 23-03-2020 14:59:43 0:43 0.00034639 MUs 236 PKT B-MAYUR VIHAR PHASE II, PKT A-MAYUR VIHAR PHASE II MVR 74 630 KVA UNPLANNED 23-03-2020 17:04:14 23-03-2020 17:06:58 0:2 0 MUs BHOLA NATH NAGAR-SHAHDARA, TELIBARA-SHAHDARA, MAHARAM NAGAR-SHAHDARA, BIHARI 237 COLONY-SHAHDARA, SHALIMAR PARK-SHAHDARA JLM 501 4230 KVA UNPLANNED 23-03-2020 19:14:19 23-03-2020 20:13:00 0:58 0.00093444 MUs BLOCK A-JOHRI PUR, BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR, JOHRI ENCLAVE- BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR, 238 BHAGIRATHI VIHAR KWN 423 1390 KVA UNPLANNED 24-03-2020 08:41:20 24-03-2020 10:16:53 1:35 0.00129306 MUs 239 CHUNA MANDI-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ PHG 47 990 KVA UNPLANNED 24-03-2020 11:45:00 24-03-2020 12:15:00 0:29 0.00004028 MUs 240 RAGHUBARPURA NO 2-SEELAMPUR, BLOCK 10-RAGHUBARPURA NO 1 KRN 130 3370 KVA UNPLANNED 24-03-2020 13:10:21 24-03-2020 13:31:00 0:20 0.00008333 MUs 241 BLOCK D-SHIV VIHAR, BLOCK B-NEW CHAUHAN PUR KWN 173 990 KVA UNPLANNED 24-03-2020 13:54:00 24-03-2020 14:32:40 0:38 0.00021111 MUs BLOCK K-BRAHM PURI, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, GHONDA PATTI CHAUHAN, 242 JAFFRABAD-MAUJ PUR YVR 466 7590 KVA UNPLANNED 24-03-2020 14:13:21 24-03-2020 14:53:26 0:40 0.0006 MUs

BLOCK B3-OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL-CENTRAL RIDGE RESERVED FOREST, 243 WEST KAROL BAGH-CENTRAL RIDGE RESERVED FOREST, CENTRAL RIDGE RESERVED FOREST SRD 0 730 KVA UNPLANNED 24-03-2020 16:32:22 24-03-2020 17:00:49 0:28 0 MUs 244 EAST ROHTASH NAGAR-SHAHDARA JLM 52 990 KVA UNPLANNED 24-03-2020 16:28:00 24-03-2020 16:56:00 0:27 0.000045 MUs

BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PHASE I-SHIV VIHAR, BLOCK A-PRAKASH VIHAR, VILLAGE-KAMAL VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK F-BHAGAT SINGH 245 COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY KWN 691 0 KVA UNPLANNED 24-03-2020 16:30:00 24-03-2020 17:11:37 0:41 0.00091111 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, MCD SCHOOL-SABOLI COLONY, SABOLI 246 EXTN.-MANDOLI NNG 812 630 KVA UNPLANNED 24-03-2020 17:23:22 24-03-2020 18:11:18 0:47 0.00122722 MUs

BLOCK A-PREM VIHAR, PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK B- 247 SHIV VIHAR, PKT R-BLOCK A, PKT B-BLOCK B, PKT D-BLOCK B, BLOCK Q-SHIV VIHAR KWN 863 0 KVA UNPLANNED 24-03-2020 17:45:22 24-03-2020 18:55:27 1:10 0.00194444 MUs BLOCK D-VINOD NAGAR WEST, MANDAWALI FAZALPUR BLOCK B-JOSHI COLONY, ENGG ESTATE- MOTHER DAIRY, BHATHLA APARTMENT-MOTHER DAIRY, MITRA APPARTMENT-MOTHER DAIRY, SARANSH APARTMENT-MOTHER DAIRY, SHUBHAM APARTMENT-MOTHER DAIRY, PARADISE APPARTMENT-MOTHER DAIRY, BLOCK B-MOTHER DAIRY, PARIWAR APPARTMENT-MOTHER DAIRY, BHARAT APARTMENT-MOTHER DAIRY, BROTHER APPARTMENT-MOTHER DAIRY, 248 PANCHMAHAL APPARTMENT-MOTHER DAIRY LNR 561 4520 KVA UNPLANNED 24-03-2020 19:38:21 24-03-2020 20:35:00 0:56 0.00101111 MUs BLOCK K-WEST KARAWAL NAGAR, BLOCK B-NEW CHAUHAN PUR, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK 3A-SADAT PUR, BLOCK C-BHAGAT SINGH COLONY, PKT D-BLOCK A, PKT B-BLOCK 249 A, BLOCK D-WEST KARAWAL NAGAR KWN 328 630 KVA UNPLANNED 25-03-2020 05:36:22 25-03-2020 06:29:05 0:52 0.00054889 MUs 250 BLOCK A8-SADAT PUR, BLOCK C1-SADAT PUR, BLOCK F-SADAT PUR KWN 121 0 KVA UNPLANNED 25-03-2020 12:15:00 25-03-2020 13:12:04 0:57 0.00022167 MUs

251 VISHWAS NAGAR EXTN.-SHAHDARA, VISHWAS NAGAR EXTN.-SHAHDARA, VISHWAS NAGAR JLM 268 3280 KVA UNPLANNED 25-03-2020 12:15:00 25-03-2020 13:13:33 0:58 0.00049944 MUs 252 BLOCK B5-YAMUNA PUR (GONDA) BLOCK B YVR 17 990 KVA UNPLANNED 25-03-2020 13:34:19 25-03-2020 14:06:04 0:31 0.00001722 MUs BABARPUR EXTN.-BABAR PUR, VIJAY PARK-YAMUNA VIHAR, BLOCK C12-YAMUNA VIHAR, 253 JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1 YVR 268 4000 KVA UNPLANNED 25-03-2020 14:50:22 25-03-2020 15:15:14 0:24 0.00020667 MUs SABOLI EXTN.-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- 254 PRATAP NAGAR, SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 673 0 KVA UNPLANNED 26-03-2020 08:13:24 26-03-2020 08:43:07 0:29 0.00062833 MUs

CHIKAMBARPUR-OLD SIMAPURI, BLOCK A-OLD SIMAPURI, BLOCK H-OLD SIMAPURI, BLOCK B-OLD 255 SIMAPURI, BLOCK J & K-POCKET J&K, MCD-OLD SIMAPURI, GOVT. DISPENCERY-OLD SIMAPURI DGN 121 3340 KVA UNPLANNED 26-03-2020 09:29:00 26-03-2020 10:24:00 0:54 0.00021 MUs BLOCK A-SHAKARPUR KHAS, BLOCK G-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK R&A- 256 SHAKARPUR KHAS LNR 845 990 KVA UNPLANNED 26-03-2020 10:24:16 26-03-2020 10:37:18 0:13 0 MUs 257 DELHI GOVT. STAFF FLATS-PRESS ENCLAVE DRG 91 990 KVA UNPLANNED 26-03-2020 14:54:09 26-03-2020 15:07:15 0:13 0.00002528 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI, NEW MANDOLI 258 INDUSTRIAL AREA NNG 397 0 KVA UNPLANNED 26-03-2020 16:15:24 26-03-2020 16:39:56 0:24 0.00030667 MUs 259 G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI NNG 130 1890 KVA UNPLANNED 26-03-2020 17:38:00 26-03-2020 18:15:23 0:37 0.00015417 MUs

BLOCK D-, BLOCK B-SWASTHYA VIHAR, CHITRA VIHAR-SWASTHYA VIHAR, LAXMI 260 NAGAR COMMERCIAL COPLEX-SWASTHYA VIHAR, DEFENCE ENCLAVE-SWASTHYA VIHAR LNR 52 3240 KVA UNPLANNED 26-03-2020 21:37:25 26-03-2020 22:11:00 0:33 0.000385 MUs 261 BLOCK B4-YAMUNA VIHAR YVR 112 0 KVA UNPLANNED 27-03-2020 02:18:00 27-03-2020 03:03:00 0:45 0.0001625 MUs PKT R-BLOCK D, BLOCK D-OLD MUSTAFABAD, BLOCK B-OLD MUSTAFABAD, BLOCK M-OLD 262 MUSTAFABAD, BLOCK A1-MUNGA NAGAR KWN 440 4860 KVA UNPLANNED 27-03-2020 07:50:26 27-03-2020 08:14:36 0:24 0.00034 MUs 263 MAUJ PUR COMPLEX 1 YVR 189 990 KVA UNPLANNED 27-03-2020 08:00:00 27-03-2020 08:45:00 0:45 0 MUs JOHRI ENCLAVE-BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, BLOCK A-JOHRI PUR, TUNDA NAGAR-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, 264 BHAGIRATHI VIHAR KWN 242 1390 KVA UNPLANNED 27-03-2020 10:28:26 27-03-2020 10:46:56 0:18 0.00014 MUs 265 SANT NIRANKARI BHAVAN-GANGA VIHAR KWN KWN 604 0 KVA UNPLANNED 27-03-2020 14:18:00 27-03-2020 14:38:00 0:20 0.00038889 MUs BLOCK K-WEST KARAWAL NAGAR, PKT B-BLOCK B, BLOCK B-NEW CHAUHAN PUR, BLOCK F & G- BHAGAT SINGH COLONY, BLOCK 3A-SADAT PUR, BLOCK C-SHERPUR, BLOCK C-BHAGAT SINGH COLONY, BLOCK B-KARAWAL NAGAR (DEHROTI), PKT D-BLOCK A, PKT B-BLOCK A, BLOCK D-WEST 266 KARAWAL NAGAR, BLOCK A-HARIJAN BASTI KWN 397 630 KVA UNPLANNED 27-03-2020 20:27:26 27-03-2020 21:10:00 0:42 0.00053667 MUs

267 BLOCK T-AHATA KEDARA, SADAR BAZAR - RAM NAGAR, DDA POLICE QTRS.-AHATA KEDARA PHG 323 6340 KVA UNPLANNED 27-03-2020 23:25:00 27-03-2020 23:43:00 0:18 0.000125 MUs PATPAR GANJ-SHASHI GARDEN, BLOCK F-PANDAV NAGAR, BLOCK E-PANDAV NAGAR, PANDAV 268 NAGAR MVR-SHAKARPUR MVR MVR 276 5000 KVA UNPLANNED 28-03-2020 06:39:27 28-03-2020 07:00:00 0:20 0.00017778 MUs NAYA VISHWAS NAGAR-SHAHDARA, SHAHDARA JLM, GOVT GIRLS SECONDARY SCHOOL-DDA FLATS, NEW VISWAS NAGAR-SHAHDARA, VISHWAS NAGAR-SHAHDARA, KASTURBA NAGAR- SHAHDARA, AMBEDKAR NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARA, SURAJMAL VIHAR-VIVEK 269 VIHAR, DDA MIG FLATS-VIVEK VIHAR PHASE II JLM 380 2020 KVA UNPLANNED 28-03-2020 10:34:27 28-03-2020 11:32:00 0:57 0.00069667 MUs 270 MAYUR PLACE-MAYUR VIHAR MVR 86 0 KVA UNPLANNED 28-03-2020 12:03:28 28-03-2020 12:40:00 0:36 0.0001 MUs BLOCK B1-NEW ASHOK NAGAR, BLOCK B-NEW ASHOK NAGAR VSE, BLOCK A & B-VASUNDHARA 271 ENCLAVE VSE 466 2970 KVA UNPLANNED 28-03-2020 13:29:00 28-03-2020 14:25:00 0:56 0.00084 MUs BLOCK B-NEW ASHOK NAGAR VSE, BLOCK A & B-VASUNDHARA ENCLAVE, BLOCK A-DALLU PURA 272 VSE VSE 276 9730 KVA UNPLANNED 28-03-2020 13:29:00 28-03-2020 13:56:00 0:27 0.00024 MUs 273 TRILOKPURI PHASE I-MAYUR VIHAR MVR 86 100 KVA UNPLANNED 28-03-2020 16:44:46 28-03-2020 17:18:53 0:34 0.00009444 MUs

MOTIYA KHAN-SHAHI IDGAH COLONY, BLOCK T-AHATA KEDARA, SADAR BAZAR - RAM NAGAR, 274 SHAHI IDGAH-SADAR BAZAR - P.P QUARTERS, BLOCK T-SADAR BAZAR - RAM NAGAR PHG 207 400 KVA UNPLANNED 29-03-2020 05:06:30 29-03-2020 05:51:00 0:44 0.00019556 MUs 275 BLOCK B-EAST GOKUL PURI, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR NNG 509 2650 KVA UNPLANNED 30-03-2020 03:23:18 30-03-2020 03:40:00 0:16 0.00026222 MUs BLOCK T-BALJIT NAGAR, BLOCK A-COTTAGE, PATEL NAGAR POLICE STATION-WEST PATEL NAGAR, 276 SHADIPUR DEPOT-BALJIT NAGAR, DTC FLATS-SHADIPUR DEPOT PNR 349 1620 KVA UNPLANNED 30-03-2020 05:09:19 30-03-2020 06:03:00 0:53 0.0003975 MUs BLOCK D-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK B-BRIJ PURI, BLOCK C-BRIJ PURI, SANT NIRANKARI 277 BHAVAN-GANGA VIHAR KWN KWN 26 4370 KVA UNPLANNED 30-03-2020 05:40:00 30-03-2020 06:00:00 0:20 0.00001667 MUs 278 ANAND VIHAR BLOCK A JLM 104 990 KVA UNPLANNED 30-03-2020 08:52:53 30-03-2020 09:22:09 0:29 0 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, 279 BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK D-HARSH VIHAR NNG 829 0 KVA UNPLANNED 30-03-2020 09:42:00 30-03-2020 10:19:57 0:37 0.00098667 MUs GOVT. GIRLS SENIOR SECONDARY SCHOOL-TURKMAN GATE, CHANDANI MAHAL-CHANDNI 280 CHOWK DRG 295 0 KVA UNPLANNED 30-03-2020 10:09:19 30-03-2020 10:55:38 0:46 0 MUs GOVT. GIRLS SENIOR SECONDARY SCHOOL-TURKMAN GATE, SITARAM BAZAR-CHANDNI CHOWK, 281 CHANDANI MAHAL-CHANDNI CHOWK, RAM MANDIR-KAMLA MARKET DRG 427 3600 KVA UNPLANNED 30-03-2020 10:09:20 30-03-2020 10:43:35 0:34 0.00031167 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET 282 NAGAR NNG 846 2650 KVA UNPLANNED 30-03-2020 12:04:19 30-03-2020 12:48:57 0:44 0.00119778 MUs

OLD DELHI RAILWAY STATION-CHANDNI CHOWK, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, ZEENAT BARI-MORI GATE, RED FORT-CHANDNI CHOWK-RED FORT, RED FORT-VIJAY GHAT, 283 TELEGRAPH OFFICE-KASHMERE GATE, RAILWAY COLONY-KASHMERE GATE CCK 129 3600 KVA UNPLANNED 30-03-2020 12:39:00 30-03-2020 13:25:06 0:46 0.00012778 MUs BLOCK P-NEW SILAMPURI PHASE III, SUBHASH PARK-GORAKH PARK, JAFFRABAD-MAUJ PUR, 284 JAFFRABAD-MAUJ PUR YVR 440 3600 KVA UNPLANNED 30-03-2020 15:46:19 30-03-2020 16:31:28 0:45 0.0006375 MUs 285 GOVT. GIRLS SENIOR SECONDARY SCHOOL-TURKMAN GATE DRG 246 0 KVA UNPLANNED 30-03-2020 16:32:19 30-03-2020 17:03:21 0:31 0.00016361 MUs PRATAP NAGAR-PHASE I, PHASE I-MAYUR VIHAR, PANDAV NAGAR MVR-SHAKARPUR MVR, 286 KHICHRI PUR-PHASE II MVR 147 0 KVA UNPLANNED 31-03-2020 00:42:20 31-03-2020 01:06:00 0:23 0.00010861 MUs 287 PRATAP NAGAR-PHASE I, PHASE I-MAYUR VIHAR, KHICHRI PUR-PHASE II MVR 259 0 KVA UNPLANNED 31-03-2020 01:43:20 31-03-2020 02:38:00 0:54 0.00045 MUs 288 BLOCK A8-SADAT PUR, BLOCK F-SADAT PUR, BLOCK C1-SADAT PUR KWN 0 0 KVA UNPLANNED 31-03-2020 05:03:00 31-03-2020 05:34:46 0:31 0 MUs THAKKAR BAPA NAGAR-BLOCK 16, BLOCK 29-WEST PATEL NAGAR, P.G.D.A.V. SR. SCHOOL-EAST PATEL NAGAR, BLOCK A-WEST PATEL NAGAR, BLOCK 25-WEST PATEL NAGAR, BLOCK 38-WEST PATEL NAGAR, BLOCK 24-WEST PATEL NAGAR, BLOCK T-PANJABI BASTI, PROHIBITED AREA-ANAND 289 PARBAT, BAPA NAGAR-ANAND PARBAT PNR 26 2970 KVA UNPLANNED 31-03-2020 11:27:21 31-03-2020 12:13:00 0:45 0.000025 MUs KATRA NAWAB-CHANDNI CHOWK, NAI SARAK-KATRA ASRAFI, TOWN HILL-KATRA NEEL, TOWN 290 HALL-KUCHA NATWA, GHANTA GHAR-KATRA ASRAFI CCK 39 990 KVA UNPLANNED 31-03-2020 14:45:50 31-03-2020 15:19:03 0:33 0.00003667 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 291 PRATAP NAGAR-PHASE I, KHICHRI PUR-PHASE II, PHASE I-MAYUR VIHAR MVR 181 0 KVA UNPLANNED 31-03-2020 15:24:20 31-03-2020 16:40:00 1:15 0.0004375 MUs BLOCK M-SUNDER NAGRI, BLOCK E1-NAND NAGARI, BHARAT MATA MANDIR-JJ COLONY, BLOCK A4-NAND NAGARI, JANTA FLATS-NAND NAGARI, DELHI JAL BOARD MIG FLATS-POCKET A, BLOCK 292 E1-BUNKAR VIHAR NNG 112 3050 KVA UNPLANNED 31-03-2020 18:44:21 31-03-2020 19:35:29 0:51 0.00018417 MUs 293 PKT A-BLOCK E KWN 0 0 KVA UNPLANNED 31-03-2020 21:53:00 31-03-2020 22:38:37 0:45 0 MUs 294 SEWAGE TREATMENT PLANT-GHAROLI KONDLI VSE 0 0 KVA UNPLANNED 05-03-2020 16:13:00 05-03-2020 16:48:14 0:35 0 MUs AJMERI GATE-CHANDNI295 CHOWK, MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA, BALI MARAN-BARA DARI, DELHI VIDHYUTCCK BOARD-KATRA 2314 NEEL 990 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 14:33:44 4:33 0.0015925 MUs 296 BLOCK E-UTTARANCHAL COLONY, BLOCK D-HARSH VIHAR NNG 259 0 KVA UNPLANNED 07-03-2020 15:14:29 07-03-2020 16:13:32 0:59 0.00049167 MUs SABOLI EXTN.-MANDOLI, MCD SCHOOL-SABOLI COLONY, SABOLI VILLAGE-MANDOLI, SABOLI 297 EXTN.-MANDOLI NNG 604 630 KVA UNPLANNED 27-03-2020 20:32:00 27-03-2020 21:06:00 0:33 0.00064167 MUs 298 GAGAN VIHAR-JAGATPURI KRN 260 990 KVA PLANNED 03-03-2020 10:03:00 03-03-2020 14:46:34 4:43 0.00157222 MUs BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK H-SEWA DHAM, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E-MEET 299 NAGAR NNG 33 630 KVA UNPLANNED 14-03-2020 11:13:27 14-03-2020 12:05:32 0:52 0.00021667 MUs 300 CHETAN BASTI- BLOCK J-NEHRU NAGAR PNR 28 990 KVA UNPLANNED 16-03-2020 15:57:22 16-03-2020 16:51:00 0:53 0.00014722 MUs 301 BLOCK_35M-BEADON PURA, BLOCK_23-KRISHNA NAGAR, BLOCK_34P-KRISHNA NAGAR SRD 64 2000 KVA UNPLANNED 09-03-2020 12:42:43 09-03-2020 13:30:46 0:48 0.00013333 MUs WAZIRABAD, BLOCK J-KHAJURI KHAS EXTN., BLOCK F-KHAJURI KHAS EXTN., BLOCK G-KHAJURI 302 KHAS EXTN., BLOCK H-KHAJURI KHAS EXTN. KWN 1314 990 KVA UNPLANNED 06-03-2020 12:11:05 06-03-2020 13:10:37 0:59 0.00032778 MUs 303 CHOWK NAI BASTI-SADAR BAZAR, NAYA MOHALLA-KISHAN GANJ RS, SADAR BAZAR B G ROAD PHG 411 990 KVA PLANNED 17-03-2020 10:03:00 17-03-2020 13:47:20 3:44 0.00062222 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET 304 NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 432 2650 KVA UNPLANNED 30-03-2020 07:39:31 30-03-2020 08:03:45 0:24 0.00033333 MUs 305 SEWA DHAM-MANDOLI NNG 337 400 KVA UNPLANNED 14-03-2020 15:09:00 14-03-2020 16:06:00 0:56 0.00060667 MUs BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK B- SHIV VIHAR, PKT R-BLOCK A, PKT C-SHIV VIHAR, BLOCK D-PREM VIHAR, BLOCK A-SHIV VIHAR, 306 BLOCK Q-SHIV VIHAR KWN 535 0 KVA UNPLANNED 24-03-2020 17:04:07 24-03-2020 17:33:30 0:29 0.00049944 MUs 307 BLOCK T-OLD MUSTAFABAD KWN 173 1500 KVA UNPLANNED 04-03-2020 12:00:00 04-03-2020 12:21:39 0:21 0.00011667 MUs 308 CLOSED FACTORY-FARIDPURI, BLOCK 35-RAMJAS SPORTS COMPLEX PNR 405 400 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 14:22:39 4:22 0.00152833 MUs 309 PANDAV NAGAR BLOCK D-GANESH NAGAR, GANESH NAGAR SOUTH-INDRAPRASTHA EXTENSION LNR 181 630 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 14:30:00 4:30 0.001575 MUs 310 BLOCK A-SHASTRI PARK YVR 181 0 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 12:45:56 2:45 0.0009625 MUs

LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, BLOCK E-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG 311 RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 0 0 KVA UNPLANNED 14-03-2020 22:50:53 15-03-2020 03:09:35 4:18 0 MUs 312 DDA FLATS-MOTIA KHAN, MOTIYA KHAN-SHAHI IDGAH COLONY PHG 3 990 KVA UNPLANNED 03-03-2020 17:28:06 03-03-2020 18:06:33 0:38 0.00021111 MUs

BLOCK A-DILSHAD COLONY, BLOCK J-DILSHAD COLONY, BLOCK G-DILSHAD COLONY, BLOCK F- 313 DILSHAD COLONY, BLOCK J & K-POCKET J&K, JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 173 3870 KVA UNPLANNED 06-03-2020 18:49:36 06-03-2020 22:42:36 3:53 0.00129444 MUs 314 BLOCK A-SHASTRI PARK, BLOCK E-NEW SILAMPURI PHASE II YVR 181 0 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 12:44:57 2:44 0.00095667 MUs BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK B- SHIV VIHAR, PKT R-BLOCK A, PKT C-SHIV VIHAR, BLOCK A-SHIV VIHAR, BLOCK Q-SHIV VIHAR, 315 BLOCK H-SHIV VIHAR KWN 302 0 KVA UNPLANNED 18-03-2020 17:20:08 18-03-2020 17:34:18 0:14 0.00013611 MUs

316 BLOCK A-SHASTRI PARK, BLOCK C-SHASTRI PARK, BLOCK T-GAUTAM PURI, JAFFRABAD-MAUJ PUR YVR 43 0 KVA UNPLANNED 07-03-2020 13:47:31 07-03-2020 14:41:54 0:54 0.000075 MUs 317 BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI NNG 218 630 KVA UNPLANNED 30-03-2020 09:27:17 30-03-2020 10:11:38 0:44 0.00024444 MUs BLOCK B-GOVIND VIHAR, BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK C- KARAWAL NAGAR, BLOCK S-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV VIHAR, BLOCK D-PREM 318 VIHAR, BLOCK B-PREM VIHAR, BLOCK B-NEHRU VIHAR KWN 173 0 KVA UNPLANNED 25-03-2020 19:49:37 25-03-2020 20:31:20 0:41 0.00022778 MUs SABOLI EXTN.-MANDOLI, BLOCK C-HARSH319 VIHAR, BLOCK B-ANUP VIHAR, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI NNGCOLONY-MANDOLI, 181 SEWA DHAM-MANDOLI 400 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:38:54 4:38 0.00162167 MUs 320 PKT A-BLOCK A, PKT D-BLOCK A, PKT B-BLOCK A NNG 231 630 KVA UNPLANNED 16-03-2020 16:29:06 16-03-2020 17:21:23 0:52 0.00028889 MUs BLOCK C-MAN SINGH NAGAR, BLOCK B-MAN SINGH NAGAR, BLOCK G-BHAGIRATHI VIHAR, BLOCK F-BHAGIRATHI VIHAR, BLOCK E-BHAGIRATHI VIHAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK A-MAN 321 SINGH NAGAR KWN 514 630 KVA UNPLANNED 26-03-2020 21:19:58 26-03-2020 21:42:04 0:22 0.00018333 MUs JHILMIL INDUSTRIAL AREA322 BLOCK A-JHILMIL COLONY, SUBHASH PARK EXTN.-GORAKH PARK, BLOCK D-NEW SIMAPURI, BLOCK R- AADINATHDGN BHAWAN-POCKET 181 R 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 16:35:00 6:35 0.00230417 MUs 323 CHANDANI MAHAL-CHANDNI CHOWK DRG 272 990 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 15:20:05 5:20 0.00186667 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, CHAUHAN PATTI-VIJAY VIHAR, BADARPUR 324 KHADAR KWN 345 5235 KVA UNPLANNED 24-03-2020 16:43:47 24-03-2020 18:15:49 1:32 0.00102222 MUs BLOCK325 B-VINOD NAGAR EAST, BLOCK A-VINOD NAGAR EAST, BLOCK A-MANDAWALI, BLOCK B-PRIYADARSANI VIHARLNR 2472 990 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 13:52:11 3:52 0.00135333 MUs 326 BABARPUR WEST-BABAR PUR NNG, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1 YVR 897 630 KVA UNPLANNED 14-03-2020 13:37:42 14-03-2020 14:00:51 0:23 0.00012778 MUs BLOCK327 C-AMAR COLONY, BLOCK D-ASHOK NAGAR, BLOCK B-ASHOK NAGAR, BLOCK A-MEET NAGAR, PKT B-CHITRAKOOTNNG 173 1620 KVA PLANNED 17-03-2020 11:00:00 17-03-2020 17:43:49 6:43 0 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK 328 K-ANUP VIHAR, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 05-03-2020 08:24:50 05-03-2020 09:03:42 0:38 0.00031667 MUs 329 SABOLI COLONY-MANDOLI NNG 173 0 KVA UNPLANNED 20-03-2020 18:37:27 20-03-2020 19:10:26 0:32 0.00017778 MUs

BLOCK C-MAN SINGH NAGAR, BLOCK A-JOHRI PUR, BLOCK H-OLD MUSTAFABAD, MUSTAFABAD- MUNGA NAGAR, BLOCK B-MAN SINGH NAGAR, BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, BLOCK D-OLD MUSTAFABAD, BLOCK H-BHAGIRATHI VIHAR, BLOCK A-MAN SINGH NAGAR, 330 BLOCK B-JOHRI PUR, BHAGIRATHI VIHAR KWN 130 0 KVA UNPLANNED 10-03-2020 15:10:18 10-03-2020 16:03:00 0:52 0.00021667 MUs 331 SHIVAJI PARK-BALBIR NAGAR, BLOCK A-MANDOLI EXTN., BLOCK D-MANDOLI EXTN. NNG 247 990 KVA UNPLANNED 03-03-2020 12:11:21 03-03-2020 13:01:24 0:50 0.00020833 MUs BLOCK B-VINOD NAGAR EAST, BLOCK A-VINOD NAGAR EAST, BLOCK A-MANDAWALI, FAJALPUR- 332 MANDAWALI, BLOCK C-MANDAWALI VILLAGE LNR 86 990 KVA UNPLANNED 06-03-2020 08:47:00 06-03-2020 09:44:00 0:56 0.00015556 MUs 333 VILL KARKARDOOMA-KARKAR DUMA, SHANTI VIHAR-KARKAR DUMA JLM 312 990 KVA PLANNED 16-03-2020 11:03:00 16-03-2020 16:01:24 4:58 0.00248333 MUs 334 BLOCK B-CHANDU NAGAR, MUSTAFABAD-MUNGA NAGAR KWN 181 0 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 13:37:28 3:37 0.00126583 MUs BLOCK D-BRIJ PURI, BLOCK E-BRIJ PURI, BLOCK B-BRIJ PURI, BLOCK C-BRIJ PURI, SANT NIRANKARI 335 BHAVAN-GANGA VIHAR KWN KWN 0 4370 KVA UNPLANNED 02-03-2020 11:30:00 02-03-2020 11:58:41 0:28 0 MUs 336 SITARAM BAZAR-CHANDNI CHOWK, CHANDANI MAHAL-CHANDNI CHOWK DRG 1 630 KVA UNPLANNED 18-03-2020 12:48:22 18-03-2020 13:36:29 0:48 0.00006667 MUs 337 BLOCK C-HARSH VIHAR, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 173 0 KVA UNPLANNED 18-03-2020 17:52:02 18-03-2020 18:04:36 0:12 0.00006667 MUs 338 BLOCK E-SEWA DHAM, SEWA DHAM-MANDOLI NNG 259 400 KVA UNPLANNED 05-03-2020 21:40:18 06-03-2020 00:20:00 2:39 0.001325 MUs 339 SIR GANGA RAM HOSPITAL-CENTRAL RIDGE RESERVED FOREST SRD 1500 990 KVA UNPLANNED 02-03-2020 14:35:00 02-03-2020 14:52:00 0:17 0.00054778 MUs MAIN MARKET-KATRA340 DHOBI, SADAR BAZAR-RAJENDRA MARKET, KASHMIRI GATE-MORI GATE, GOVT OF N C T OFFICE-KASHMERECCK GATE 905 990 KVA PLANNED 05-03-2020 11:00:00 05-03-2020 13:20:58 2:20 0.00272222 MUs 341 BLOCK A-MAYUR VIHAR PHASE III, BLOCK A-MAYUR VIHAR PHASE III VSE 181 0 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 17:30:00 7:30 0.002625 MUs 342 BLOCK B5-NAND NAGARI, BLOCK B4-NAND NAGARI NNG 173 990 KVA UNPLANNED 04-03-2020 10:11:43 04-03-2020 12:40:01 2:28 0.00082222 MUs RADHE343 SHYAM PARK EXTN.-SWASTHYA VIHAR, BLOCK A-KRISHNA NAGAR, BLOCK D-KRISHNA NAGAR, BLOCK E-KRISHNAKRN NAGAR 181 990 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 14:13:18 4:13 0.00147583 MUs BLOCK C-GOKUL PURI, PKT C-BLOCK C, BLOCK B-GANGA VIHAR, BLOCK F-GANGA VIHAR, BLOCK E- 344 GANGA VIHAR KWN 259 990 KVA UNPLANNED 03-03-2020 11:16:38 03-03-2020 12:00:50 0:44 0.00036667 MUs CHAUHAN BANGAR-JAFFRABAD, BLOCK E-BRAHM PURI, JAFFRABAD-MAUJ PUR, JAFFRABAD-MAUJ 345 PUR YVR 506 990 KVA UNPLANNED 14-03-2020 11:33:42 14-03-2020 12:18:51 0:45 0.0000625 MUs 346 BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR, BABA DA DARGA-KARDAMPURI NNG 326 990 KVA UNPLANNED 28-03-2020 16:39:17 28-03-2020 16:56:05 0:16 0.00006667 MUs BLOCK WA&O-SHAKARPUR KHAS, BLOCK S-SHAKARPUR KHAS, BLOCK U-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS, BLOCK347 S-SCHOOL BLOCK, GANESH NAGAR-SHAKARPUR, BLOCK S1-SCHOOL BLOCK, BLOCK K-JAGAT RAM PARK, RAMESHLNR PARK-NARAYAN 604 NAGAR, YAMUNA 2610 FLOOD KVA PLAINS-LAXMI PLANNED NAGAR YAMUNA FLOOD 13-03-2020 PLAINS, 11:00:00 NEHRU ENCLAVE-SCHOOL 13-03-2020 18:21:00 BLOCK 7:21 0.003185 MUs 348 NAI SARAK-KATRA ASRAFI, TOWN HALL-KUCHA NATWA CCK 377 990 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 13:54:59 3:54 0.001365 MUs 349 BLOCK B- GROUP I FLATS-POCKET B DGN 2 630 KVA UNPLANNED 01-03-2020 18:00:00 01-03-2020 18:45:00 0:45 0.0002125 MUs LIG/MIG RES/NON COMM AREA-A-BLOCK350 SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMMKWN AREA-B-BLOCK 181 SONIA VIHAR 0 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 14:24:31 4:24 0.00154 MUs AZAD NAGAR EAST, WEST AZAD NAGAR,351 SHANKAR NAGAR EXTN-AZAD NAGAR, OLD SEELAMPUR, BLOCK X-RAJGARH COLONY, BLOCK A-KRISHNA NAGAR,KRN SHANKAR 604 NAGAR-AZAD NAGAR 3240 KVA PLANNED 06-03-2020 11:00:00 06-03-2020 14:56:00 3:56 0.00347444 MUs

LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK D-NEW CHAUHAN PUR, BLOCK C2-NEW 352 CHAUHAN PUR, BLOCK B-NEW CHAUHAN PUR, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN. KWN 86 990 KVA UNPLANNED 12-03-2020 15:23:30 12-03-2020 15:58:08 0:34 0.00009444 MUs 353 BLOCK_46-BEADON PURA, BLOCK_35M-BEADON PURA, BLOCK_23-KRISHNA NAGAR SRD 905 3980 KVA PLANNED 17-03-2020 11:00:00 17-03-2020 11:34:00 0:33 0.00018333 MUs BLOCK 5-OLD RAJENDRA NAGAR, BLOCK 13-OLD354 RAJENDRA NAGAR, BLOCK 12-OLD RAJENDRA NAGAR, BLOCK 7-OLD RAJENDRA NAGAR, BLOCK 6-OLD RAJENDRASRD NAGAR, BLOCK 272 B-OLD RAJENDRA 990 KVA NAGAR PLANNED 17-03-2020 10:00:00 17-03-2020 14:02:46 4:2 0.00141167 MUs 355 BLOCK A-AMAR NAGAR PHG 129 990 KVA UNPLANNED 06-03-2020 10:31:33 06-03-2020 11:22:13 0:50 0.00013889 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK 356 A-SEWA DHAM, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 440 0 KVA UNPLANNED 24-03-2020 21:03:00 24-03-2020 21:49:00 0:45 0.0006375 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK F-GOPAL PARK, BLOCK D-RAM357 NAGAR, BLOCK E-WEST CHANDER NAGAR, CHANDER NAGAR BLOCK D-SHASTRI PARK, BLOCK E-CHANDARKRN NAGAR, BLOCK 1482 F-RAM NAGAR, BLOCK 990 KVA D-CHANDAR NAGAR, PLANNED BLOCK F-CHANDAR 02-03-2020NAGAR 10:03:00 02-03-2020 13:58:00 3:55 0 MUs SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, SEWA DHAM- MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM- 358 MANDOLI NNG 863 0 KVA UNPLANNED 12-03-2020 14:48:30 12-03-2020 15:38:45 0:50 0.00138889 MUs 359 BLOCK H-BRAHM PURI, GHONDA PATTI CHAUHAN YVR 703 1500 KVA UNPLANNED 06-03-2020 10:41:23 06-03-2020 11:11:58 0:30 0 MUs 360 JHUGI-NEW SILAMPURI PHASE I, ZERO PUSTA-USMAN PUR YVR 787 990 KVA UNPLANNED 01-03-2020 23:47:32 02-03-2020 00:06:34 0:19 0.00007389 MUs LAXMI NAGAR COMMERCIAL COPLEX-SWASTHYA VIHAR, FAZALPUR-MANDAWALI VILLAGE, BLOCK 361 H-MANDAWALI VILLAGE LNR 173 990 KVA UNPLANNED 19-03-2020 15:10:00 19-03-2020 18:30:00 3:20 0.00111111 MUs 362 BLOCK 32-HIMMATPURI, BLOCK 33-HIMMATPURI, BLOCK 14-TRILOKPURI PHASE II, MAYUR VIHAR EXTN. MVR 793 630 KVA PLANNED 04-03-2020 11:03:00 04-03-2020 15:32:49 4:29 0 MUs 363 BLOCK B-ASHOK NAGAR, BLOCK E-ASHOK NAGAR NNG 183 990 KVA UNPLANNED 13-03-2020 12:47:41 13-03-2020 13:37:29 0:49 0.00013611 MUs

LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON 364 COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR KWN 173 0 KVA UNPLANNED 20-03-2020 10:16:51 20-03-2020 10:53:35 0:36 0.0002 MUs GURU ANGAD NAGAR EAST-SWASTHYA VIHAR, LAXMI NAGAR 365COMMERCIAL COPLEX-SWASTHYA VIHAR, BLOCK C-GURU ANGAD NAGAR WEST, BLOCK C-LALITA PARK, BLOCKLNR E-LAKSHMI NAGAR, 1070 BLOCK F-LALITA 990 PARK, KVA BLOCK E-LALITA PLANNED PARK 02-03-2020 10:00:00 02-03-2020 16:06:54 6:6 0.002135 MUs BLOCK 28-HIMMATPURI, BLOCK 25-TRILOKPURI PHASE II, BLOCK 14-TRILOKPURI PHASE366 II, BLOCK 15-TRILOKPURI PHASE II, BLOCK 24-TRILOKPURI PHASE II, BLOCK 13-TRILOKPURI PHASE II, TRILOKPURIMVR PHASE I-MAYUR 2250 VIHAR, TRILOKPURI 990 KVA PHASE II-MAYUR VIHAR, PLANNED KOTLA EXCT-PHASE 16-03-2020 II 10:03:00 16-03-2020 17:42:37 7:39 0 MUs 367 CL-CHILLA SARDA BANGAR VILLAGE, KHICHARIPUR-GAZIPUR, HIMMAT PURI-CHILLA VILLAGE MVR 181 630 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 16:24:02 6:24 0.00224 MUs 368 MANTOLA MOHALLA-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ PHG 272 630 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 12:10:39 2:10 0.00075833 MUs KABUL NAGAR-ROHITASH NAGAR, OLDANPUR-NAVIN SHAHDARA, PANCHSHEEL PARK-NAVIN SHAHDARA, DWARKAPURI-NAVIN SHAHDARA, BLOCK H-PRATAP PURA, BLOCK V-PRATAP PURA, 369 BLOCK S-PRATAP PURA, BLOCK T-PRATAP PURA DGN 224 990 KVA UNPLANNED 08-03-2020 13:40:00 08-03-2020 14:07:41 0:27 0.00015 MUs 370 BHAGIRATHI VIHAR KWN 130 400 KVA UNPLANNED 29-03-2020 13:06:57 29-03-2020 14:00:00 0:53 0.00022083 MUs 371 EAST ROHTASH NAGAR-SHAHDARA JLM 86 990 KVA PLANNED 04-03-2020 10:03:00 04-03-2020 13:23:00 3:20 0.00055556 MUs 372 BLOCK_B-VIVEK VIHAR PHASE II, JAWALA NAGAR-SHAHDARA JLM 84 630 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 14:00:00 4:0 0.00033333 MUs 373 FYAZ GANJ-NAWAB GANJ, HATHI KHANA-NAWAB GANJ, TELI WARA-NAWAB GANJ PHG 7 990 KVA PLANNED 04-03-2020 10:03:00 04-03-2020 14:12:11 4:9 0.00034583 MUs GEETA COLONY, BLOCK 2-GEETA COLONY, RANI GARDEN-GEETA COLONY, BLOCK374 13-GEETA COLONY, BLOCK 5-GEETA COLONY, BLOCK 7-GEETA COLONY, SAROJINI PARK-GEETA COLONY, BLOCKKRN 4-GEETA COLONY, 604 BLOCK 8-GEETA 4860 KVA COLONY, BLOCK 1A-GEETA PLANNED COLONY 18-03-2020 11:00:00 18-03-2020 12:55:00 1:55 0.00169306 MUs NEW LAHORE EXTENTION-SHASTRI375 NAGAR, NEW LAHORE-SUNDER PARK, SAROJINI PARK-GEETA COLONY, NEW LAHORE EXTENTION-SAROJINIKRN PARK 2014 630 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 14:23:47 4:23 0.00153417 MUs CHANDER NAGAR-KRISHNA376 NAGAR, BLOCK E-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., SHIVPURI-JAGATPURIKRN 513 990 KVA PLANNED 16-03-2020 10:03:00 16-03-2020 15:45:00 5:42 0 MUs

BHAGAT NAGAR-DAYALPUR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, LIG/MIG RES/NON COMM AREA-SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON 377 COMM AREA-G-BLOCK SONIA VIHAR KWN 173 0 KVA UNPLANNED 17-03-2020 09:03:10 17-03-2020 09:37:32 0:34 0.00018889 MUs 378 SUBHASH PARK-GORAKH PARK, BLOCK J-SILAMPUR COLONY, ZERO PUSTA-USMAN PUR YVR 43 400 KVA UNPLANNED 06-03-2020 16:25:00 06-03-2020 17:12:43 0:47 0.00006528 MUs 379 BABARPUR EXTN.-BABAR PUR, JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1 YVR 484 630 KVA UNPLANNED 14-03-2020 12:08:31 14-03-2020 12:37:34 0:29 0.00008056 MUs 380 BLOCK 10-RAM NAGAR, CHAND MOHALLA-RAJGARH COLONY, BLOCK 10-RAGHUBARPURA NO 1 KRN 288 990 KVA PLANNED 05-03-2020 10:03:00 05-03-2020 16:19:27 6:16 0.00052222 MUs 381 BLOCK A-CHANDER VIHAR, FAZALPUR-MANDAWALI VILLAGE, BLOCK U-CHANDER VIHAR LNR 181 630 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:45:00 4:45 0.0016625 MUs 382 GHONDA PATTI CHAUHAN, BLOCK C-GHONDA, BLOCK V-GHONDA PATTI CHAUHAN YVR 274 990 KVA UNPLANNED 06-03-2020 00:01:12 06-03-2020 00:29:17 0:28 0.00007778 MUs 383 NEW RAJDHANI ENCLAVE-GAGAN VIHAR, NEW RAJDHANI ENCLAVE BLOCK C-GAGAN VIHAR LNR 181 630 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 14:19:15 4:19 0.00151083 MUs 384 BLOCK A-SEWA DHAM, BLOCK B-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 173 0 KVA UNPLANNED 12-03-2020 08:11:11 12-03-2020 09:02:34 0:51 0.00028333 MUs BLOCK J-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV 385 VIHAR, BLOCK A-SHIV VIHAR, PKT W-BLOCK A KWN 130 0 KVA UNPLANNED 05-03-2020 09:07:07 05-03-2020 09:45:43 0:38 0.00015833 MUs BLOCK F-WEST KARAWAL NAGAR, BLOCK B-SADATPUR EXT-PUSTA AREA-M BLOCK, BLOCK E- SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT A3-BLOCK E, PKT E-SADATPUR EXT- 386 PUSTA AREA-K BLOCK, BLOCK D-WEST KARAWAL NAGAR KWN 259 630 KVA UNPLANNED 19-03-2020 12:32:07 19-03-2020 13:05:00 0:32 0.00026667 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage BLOCK A-AMAR COLONY, SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK D-HARSH VIHAR, BLOCK A- 387 HARSH VIHAR NNG 1887 0 KVA UNPLANNED 08-03-2020 18:12:15 08-03-2020 18:53:29 0:41 0.00034167 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK B-HARSH 388 VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR NNG 259 0 KVA UNPLANNED 14-03-2020 18:41:43 14-03-2020 19:35:57 0:54 0.00045 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK 389 A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR NNG 1418 0 KVA UNPLANNED 11-03-2020 15:10:00 11-03-2020 15:59:05 0:49 0.00040833 MUs

390 CHANDER NAGAR-KRISHNA NAGAR, BLOCK E-WEST CHANDER NAGAR, SHIVPURI-JAGATPURI KRN 195 990 KVA UNPLANNED 18-03-2020 16:30:00 18-03-2020 16:50:25 0:20 0.00001111 MUs

391 BLOCK 10-GANDHI NAGAR, MAHILA COLONY-SEELAMPUR, BLOCK 10-RAGHUBARPURA NO 1 KRN 17 990 KVA UNPLANNED 05-03-2020 10:57:00 05-03-2020 11:55:16 0:58 0.00003222 MUs

BLOCK A-MANDOLI EXTN., BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D- ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, SEWA 392 DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 518 0 KVA UNPLANNED 09-03-2020 17:17:17 09-03-2020 17:55:37 0:38 0.00063333 MUs 393 BLOCK A-SWASTHYA VIHAR, BLOCK B-SWASTHYA VIHAR LNR 167 990 KVA PLANNED 05-03-2020 11:03:00 05-03-2020 12:43:10 1:40 0.00027778 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH 394 VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK A-SEWA DHAM NNG 432 0 KVA UNPLANNED 13-03-2020 08:41:06 13-03-2020 09:19:24 0:38 0.00052778 MUs DARYA GANJ, DR. AMBEDKAR STADIUM-FEROJ395 SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA-VIKRAM NAGAR, LIG/MIG RES/NON COMMDRG AREA-FEROJ SHAH 259 KOTLA STADIUM 990 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 14:21:44 4:21 0.0015225 MUs 396 PANDAV NAGAR BLOCK D-GANESH NAGAR, GANESH NAGAR SOUTH-INDRAPRASTHA EXTENSION LNR 593 630 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 15:03:28 5:3 0.0017675 MUs GANESH NAGAR-SHAKARPUR KHAS, BLOCK H-SHAKARPUR KHAS, BLOCK D-SHAKARPUR KHAS, BLOCK A-SHAKARPUR397 KHAS, BLOCK G-SHAKARPUR KHAS, GANESH NAGAR EXTN.-SHAKARPUR KHAS, BLOCK A-SHAKARPUR KHAS,LNR BLOCK R&A-SHAKARPUR 842 KHAS, 990 SHAKARPUR KVA EXTN.-SHAKARPUR PLANNED KHAS, KRISHAN 06-03-2020 KUNJ-LAKSHMI 10:00:00 NAGAR 06-03-2020 16:03:50 6:3 0.0021175 MUs

398 BLOCK J-JYOTI NAGAR, PKT C-BLOCK A, PKT D-BLOCK A, PKT B-BLOCK A, BLOCK H-JYOTI NAGAR NNG 87 630 KVA UNPLANNED 07-03-2020 10:58:58 07-03-2020 11:34:28 0:35 0.00014583 MUs 399 BLOCK J-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK P-SHIV VIHAR KWN 86 25 KVA UNPLANNED 09-03-2020 15:02:32 09-03-2020 15:30:39 0:28 0.00007778 MUs 400 BLOCK B1-NEW ASHOK NAGAR, BLOCK B-NEW ASHOK NAGAR VSE VSE 493 990 KVA PLANNED 04-03-2020 11:03:00 04-03-2020 17:05:31 6:2 0.00100556 MUs

BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK A-ANUP VIHAR, BLOCK B-HARSH 401 VIHAR, SEWA DHAM-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 06-03-2020 02:10:00 06-03-2020 03:02:48 0:52 0.00072222 MUs SABOLI EXTN.-MANDOLI, MCD SCHOOL-SABOLI COLONY, SABOLI VILLAGE-MANDOLI, SABOLI 402 EXTN.-MANDOLI NNG 432 630 KVA UNPLANNED 24-03-2020 22:09:56 24-03-2020 22:20:00 0:10 0.00013889 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 403 EXTN., BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 259 0 KVA UNPLANNED 17-03-2020 15:50:09 17-03-2020 16:44:50 0:54 0.00045 MUs

404 TUNDA NAGAR-BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 173 990 KVA UNPLANNED 01-03-2020 09:58:23 01-03-2020 10:50:00 0:51 0.00028333 MUs 405 SIMLA MANDI GOODTRAN-RUI MANDI, SADAR BAZAR B G ROAD PHG 96 990 KVA PLANNED 19-03-2020 11:03:00 19-03-2020 14:03:00 3:0 0.00025 MUs 406 BALBIR NAGAR EXTN.-SILAMPUR NNG 86 630 KVA UNPLANNED 13-03-2020 19:03:00 13-03-2020 19:35:17 0:32 0.00008889 MUs 407 BLOCK J-SILAMPUR COLONY, JHUGI-NEW SILAMPURI PHASE I, ZERO PUSTA-USMAN PUR YVR 587 1600 KVA PLANNED 19-03-2020 10:03:00 19-03-2020 15:18:56 5:15 0.002625 MUs 408 BLOCK A-MAYUR VIHAR PHASE III, BLOCK A-MAYUR VIHAR PHASE III VSE 2486 0 KVA PLANNED 03-03-2020 11:03:00 03-03-2020 16:44:33 5:41 0 MUs

BLOCK F-NEHRU VIHAR, BLOCK J-SHIV VIHAR, PHASE I-SHIV VIHAR, SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK S-SHIV VIHAR, PKT X-SHIV VIHAR, PKT C- 409 SHIV VIHAR, BLOCK D-PREM VIHAR, BLOCK A-SHIV VIHAR, PKT W-BLOCK A KWN 86 0 KVA UNPLANNED 16-03-2020 17:03:20 16-03-2020 17:47:19 0:43 0.00011944 MUs ANNA410 NAGAR- D.T.C. BUS DEPOT-IPGCL, RAILWAY WORKSHOP-SANJAY AMAR COLONY, IP STATE-PRAGATI MAIDANDRG 439 990 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 15:02:21 5:2 0.00176167 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-MEET NAGAR, BLOCK A-EAST 411 GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR NNG 259 2650 KVA UNPLANNED 14-03-2020 21:25:26 14-03-2020 21:39:04 0:13 0.00010833 MUs BLOCK_5A-SAT NAGAR, BLOCK_2A-SAT412 NAGAR, BLOCK_15-KAROL BAGH WEST EXTENSION AREA, BLOCK_1A-REHAGAR PURA, BLOCK 4-KAROL SRDBAGH, BLOCK_1A-REHAGAR 1751 PURA 990 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 14:03:00 4:3 0.0014175 MUs GEETA COLONY, KUNDAN NAGAR-LAKSHMI NAGAR, ARAM PARK-GEETA COLONY, NEW LAHORE EXTENTION-SHASTRI413 NAGAR, NEW LAHORE EXTENTION-JJ COLONY, NEW LAHORE-SUNDER PARK, SAROJINI PARK-GEETA COLONY,KRN WEST LAXMI MARKET 1920 KHUREJI-ARAM 990 KVA PARK, SAROJINI PARK-ARAM PLANNED PARK, NEW LAHORE 20-03-2020 EXTENTION-SAROJINI 10:03:00 20-03-2020 PARK 13:10:12 3:7 0 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI, NEW MANDOLI 414 INDUSTRIAL AREA NNG 492 0 KVA UNPLANNED 24-03-2020 16:35:00 24-03-2020 17:22:00 0:47 0.00074417 MUs BLOCK X-RAJGARH COLONY, CHANDER NAGAR BLOCK C-PANDIT PARK, BLOCK A-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., JHEEL-JHEEL KHURENJA, BLOCK D-RADHEPURI 415 EXTENSION, JHEEL-GHONDALI KRN 17 990 KVA UNPLANNED 04-03-2020 13:15:00 04-03-2020 14:12:09 0:57 0.00003167 MUs BLOCK T-BALJIT416 NAGAR, BLOCK 33-WEST PATEL NAGAR, BLOCK 30-WEST PATEL NAGAR, BLOCK T-PANJABI BASTI, BLOCK F-PUNJABIPNR BASTI 3108 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 13:59:26 3:59 0.00139417 MUs BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, BLOCK B-MUSTAFABAD (DAYALPUR), CLOCK C-BIHARIPUR, BLOCK F-MUSTAFABAD417 (DAYALPUR), BLOCK C-MUSTAFABAD (DAYALPUR), BLOCK A-MUSTAFABAD (DAYALPUR), BLOCK D-MUSTAFABADKWN (DAYALPUR), 1274 BLOCK A-MUSTAFABAD 990 KVA (DAYALPUR), PLANNED LIG/MIG RES/NON 11-03-2020 COMM AREA-D-BLOCK-SONIA 10:00:00 11-03-2020 VIHAR 13:35:11 3:35 0.00179167 MUs BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 418 BLOCK A-HARSH VIHAR NNG 173 0 KVA UNPLANNED 17-03-2020 17:17:11 17-03-2020 17:57:34 0:40 0.00022222 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA- SABHEPUR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG 419 RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 518 0 KVA UNPLANNED 24-03-2020 16:42:36 24-03-2020 17:31:10 0:48 0.0008 MUs BLOCK C-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL- 420 HARSH VIHAR NNG 173 0 KVA UNPLANNED 02-03-2020 13:15:00 02-03-2020 13:46:25 0:31 0.00017222 MUs SUBHASH PARK-GORAKH PARK, BLOCK A-SILAMPUR COLONY,421 BLOCK G-SILAMPUR COLONY, BLOCK E-NEW SILAMPURI PHASE II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEWYVR SILAMPURI 512 PHASE II, DSIDC COMPLEX-SEELAMPUR 990 KVA YVR PLANNED 17-03-2020 09:03:00 17-03-2020 17:36:39 8:33 0.001425 MUs

BLOCK A-MEET NAGAR, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., POCKET A-JJ COLONY, BLOCK B-PRATAP NAGAR, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A- 422 EAST GOKUL PURI, BLOCK A-RAJIV NAGAR, BLOCK E-MEET NAGAR NNG 432 0 KVA UNPLANNED 06-03-2020 17:12:24 06-03-2020 19:39:00 2:26 0.00202778 MUs 423 BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, BLOCK R-PATEL VIHAR KWN 130 0 KVA UNPLANNED 13-03-2020 16:58:25 13-03-2020 17:56:11 0:57 0.0002375 MUs BLOCK C-HARSH VIHAR, SABOLI VILLAGE-MANDOLI, BLOCK B-PRATAP NAGAR, BLOCK D-HARSH 424 VIHAR, RAJEEV NAGAR-SEWA DHAM NNG 173 0 KVA UNPLANNED 20-03-2020 18:30:00 20-03-2020 19:10:09 0:40 0.00022222 MUs 425 SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK A-ANUP VIHAR NNG 173 0 KVA UNPLANNED 18-03-2020 16:00:48 18-03-2020 16:09:57 0:9 0.00005 MUs BLOCK A-TUKMIRPUR, BLOCK A-SADAT426 PUR, BLOCK 5C-SADAT PUR, BLOCK 3A-SADAT PUR, BLOCK 4C-SADAT PUR, BLOCK 1B-SADAT PUR, BLOCKKWN 4B-SADAT PUR, 181 PKT B-BLOCK A 990 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 15:07:53 5:7 0.00179083 MUs 427 BLOCK B-BHAGAT SINGH COLONY, BLOCK I-BHAGAT SINGH COLONY KWN 130 0 KVA UNPLANNED 04-03-2020 17:32:17 04-03-2020 17:59:05 0:26 0.00010833 MUs 428 BLOCK A-CHANDER VIHAR, FAZALPUR-MANDAWALI VILLAGE, BLOCK U-CHANDER VIHAR LNR 2804 630 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 13:17:49 3:17 0.00114917 MUs SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI EXTN.- 429 MANDOLI NNG 294 0 KVA UNPLANNED 24-03-2020 16:36:00 24-03-2020 17:22:00 0:45 0.000425 MUs 430 BLOCK E-NEW SILAMPURI PHASE II, MAUJ PUR COMPLEX 1 YVR 181 0 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 12:18:29 2:18 0.000805 MUs 431 BLOCK T-BALJIT NAGAR, SHADIPUR DEPOT-BALJIT NAGAR PNR 272 990 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 15:52:37 5:52 0.00205333 MUs 432 BLOCK C-KABIR NAGAR, BLOCK B-KABIR NAGAR NNG 164 990 KVA UNPLANNED 03-03-2020 15:37:08 03-03-2020 16:03:18 0:26 0.00010833 MUs 433 BLOCK F-INDIRA VIHAR, BLOCK C & D-INDIRA VIHAR KWN 130 0 KVA UNPLANNED 29-03-2020 16:57:46 29-03-2020 17:50:00 0:52 0.00021667 MUs 434 BLOCK C-HARSH VIHAR, BLOCK B-PRATAP NAGAR NNG 259 0 KVA UNPLANNED 08-03-2020 10:45:33 08-03-2020 11:15:08 0:29 0.00024167 MUs GHAROLI435 KONDLI, BLOCK B-MAYUR VIHAR PHASE III, BLOCK A-MAYUR VIHAR PHASE III, BLOCK A-MAYUR VIHAR PHASEVSE III 2170 0 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 17:40:00 7:40 0.00268333 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MEET NAGAR, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP 436 VIHAR, MCD SCHOOL-SABOLI COLONY, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 259 630 KVA UNPLANNED 14-03-2020 22:39:39 14-03-2020 23:13:40 0:34 0.00028333 MUs

LIG/MIG RES/NON COMM AREA-CHAWLA FARM, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON 437 COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 345 0 KVA UNPLANNED 24-03-2020 23:11:56 24-03-2020 23:52:35 0:40 0.00044444 MUs 438 AKSHARDHAM MANDIR LNR 49 990 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 16:34:00 6:34 0.00131333 MUs BLOCK A-PREM VIHAR, BLOCK CN-MANGALAM VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, 439 PKT A-BLOCK A, PKT C-SHIV VIHAR KWN 130 0 KVA UNPLANNED 28-03-2020 11:07:19 28-03-2020 12:40:47 1:33 0.0003875 MUs BLOCK 2B-DEV NAGAR, BLOCK 6B-DEV NAGAR, BLOCK 3-DEV440 NAGAR, BLOCK 7B-DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR-DEV NAGAR, BLOCK_8B-DEV NAGAR,PNR REHGAR PURA-DEV 905 NAGAR, KHALSA 3600 NAGAR-DEV KVA NAGAR PLANNED 06-03-2020 11:00:00 06-03-2020 14:38:50 3:38 0.00423889 MUs LIG/MIG RES/NON COMM AREA-VIJAY GHAT, RED FORT-CHANDNI CHOWK-RED FORT, RED FORT-VIJAY GHAT,441 LIG/MIG RES/NON COMM AREA-CHANDNI CHOWK-RED FORT, NIGAM BODH GHAT CEMETRY-KASHMERE GATE,CCK LIG/MIG RES/NON 0 COMM AREA-KASHMERE 0 KVA GATE, LIG/MIG PLANNED RES/NON COMM 16-03-2020 AREA-VIJAY 11:00:00 GHAT DRG 16-03-2020 12:44:00 1:44 0.00011556 MUs DURGA PARK442 COLONY-DALLU PURA, DALLU PURA VSE-VASUNDHARA ENCLAVE VSE, CITY APPARTMENT-VASUNDHARA ENCLAVEVSE VSE 126 1000 KVA PLANNED 13-03-2020 10:03:00 13-03-2020 16:25:50 6:22 0.00010611 MUs 443BLOCK B-JAGATPURI, BLOCK H-JAGATPURI, BLOCK B-JAGAT PURI, BLOCK K-JAGATPURI, BLOCK B-JAGATPURIKRN 629 990 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 14:02:13 4:2 0.00141167 MUs 444 FLORA DALE SECONDARY SCHOOL-POCKET R DGN 69 630 KVA UNPLANNED 23-03-2020 13:31:25 23-03-2020 14:00:54 0:29 0.00006444 MUs BLOCK B-AMBEDKAR445 AWAS KALYAN SAMITI, BLOCK A-MAYUR VIHAR PHASE III, SEC C-MAYUR VIHAR PHASE III, BLOCK A-MAYURVSE VIHAR PHASE 2162 III 0 KVA PLANNED 12-03-2020 11:03:00 12-03-2020 17:39:45 6:36 0.00055 MUs

G.B.SSS SCHOOL-GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A- 446 EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 320 630 KVA UNPLANNED 14-03-2020 18:44:40 14-03-2020 19:36:49 0:52 0.00014444 MUs 447 BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK D-HARSH VIHAR NNG 173 0 KVA UNPLANNED 13-03-2020 19:17:03 13-03-2020 19:33:00 0:15 0.00008333 MUs BLOCK H-KRISHNA NAGAR, BLOCK F-KRISHNA NAGAR, BLOCK J-KRISHNA NAGAR EAST, JHEEL- 448 KRISHNA NAGAR BLOCK B KRN 461 630 KVA UNPLANNED 20-03-2020 15:17:23 20-03-2020 16:10:29 0:53 0 MUs PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT C-SHIV VIHAR, PKT B-BLOCK B, PKT D-BLOCK B, BLOCK A-SHIV VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, BLOCK Q-SHIV 449 VIHAR KWN 578 0 KVA UNPLANNED 24-03-2020 16:47:03 24-03-2020 17:41:20 0:54 0.001005 MUs BLOCK450 G-VINOD NAGAR EAST, BLOCK E-VINOD NAGAR EAST, BLOCK F-VINOD NAGAR EAST, BLOCK C-VINOD NAGARMVR EAST 703 990 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 17:05:11 7:5 0.00247917 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., SHIVPURI- 451 JAGATPURI, BLOCK D-SOUTH ANARKALI COLONY KRN 513 990 KVA UNPLANNED 06-03-2020 18:39:37 06-03-2020 19:14:41 0:35 0.00006806 MUs BABARPUR WEST-BABAR PUR NNG, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A-RAJIV NAGAR, 452 BLOCK B-RAJIV NAGAR NNG 259 0 KVA UNPLANNED 05-03-2020 08:41:43 05-03-2020 09:33:05 0:51 0.000425 MUs BLOCK_31-KRISHNA NAGAR, BLOCK_21K-KRISHNA NAGAR, BLOCK_14A-KAROL BAGH WEST 453EXTENSION AREA, BLOCK_48D-NAIWALA, RAMA KRISHNA MISSION FREE T.B. CLINIC-BLOCK 18, BLOCK 8-KAROLSRD BAGH WEST EXTENSION 272 AREA, BLOCK_1A-REHAGAR 990 KVA PURA, PLANNED MCD ADARSH SCHOOL-BLOCK 06-03-2020 18 10:00:00 06-03-2020 15:19:02 5:19 0.00186083 MUs 454 KHUREJI KHAS-SWASTHYA VIHAR, RASHID MARKET-JAGATPURI KRN 181 990 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 13:15:46 3:15 0.0011375 MUs 455 PKT C-BLOCK C, BLOCK B-GANGA VIHAR, BLOCK F-GANGA VIHAR, BLOCK E-GANGA VIHAR KWN 181 990 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 14:25:32 4:25 0.00154583 MUs DDA FLATS-MOTIA KHAN, MULTANI DHANDA-SADAR BAZAR, BLOCK J-NABI KARIM, BAGICHI 456 ALLUDDIN-SADAR BAZAR, BLOCK D-MOTIA KHAN, MSC-ARAM NAGAR PHG 585 990 KVA UNPLANNED 01-03-2020 12:46:00 01-03-2020 13:25:00 0:38 0.00010556 MUs 457 MAUJ PUR COMPLEX 1 YVR 86 990 KVA UNPLANNED 01-03-2020 13:47:08 01-03-2020 14:38:22 0:51 0.00014167 MUs 458 BLOCK A-VINOD NAGAR EAST LNR 130 630 KVA UNPLANNED 21-03-2020 12:07:29 21-03-2020 13:03:01 0:55 0.00022917 MUs BLOCK 2B-DEV NAGAR, BLOCK_8A-SANT NAGAR, BLOCK 63-AJMAL KHAN459 PARK, BLOCK_3H-KRISHNA NAGAR, BLOCK_21K-KRISHNA NAGAR, BLOCK_30B-KRISHNA NAGAR, BLOCK_1A-REHAGARSRD PURA, 1871 BLOCK 12A-KAROL 990 BAGH, KVA BLOCK_1A-REHAGAR PLANNED PURA 12-03-2020 10:00:00 12-03-2020 14:19:00 4:19 0.00151083 MUs 460 DALLU PURA VSE-VASUNDHARA ENCLAVE VSE VSE 0 630 KVA PLANNED 05-03-2020 10:03:00 05-03-2020 14:29:42 4:26 0 MUs

BLOCK A1-NAND NAGARI, BLOCK A3-NAND NAGARI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, BLOCK A-ANUP VIHAR, SEWA 461 DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 06-03-2020 21:12:33 06-03-2020 21:24:16 0:11 0.00009167 MUs BLOCK E-ANARKALI COLONY NORTH, BLOCK B-SOUTH462 ANARKALI COLONY, BLOCK D-ANARKALI COLONY NORTH, BLOCK A-ANARKALI COLONY NORTH, BLOCK D-NEWKRN LAYALPUR 473 COLONY, BLOCK E-RAM 630 KVA NAGAR PLANNED 12-03-2020 10:03:00 12-03-2020 14:00:00 3:57 0 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, 463 BLOCK D-HARSH VIHAR NNG 1422 0 KVA UNPLANNED 11-03-2020 21:26:20 11-03-2020 21:45:56 0:19 0.00042222 MUs 464BLOCK B-AMBEDKAR AWAS KALYAN SAMITI, BLOCK A-MAYUR VIHAR PHASE III, SEC C-MAYUR VIHAR PHASE IIIVSE 927 0 KVA PLANNED 04-03-2020 11:03:00 04-03-2020 14:57:18 3:54 0 MUs OLD SEELAMPUR, GAGAN VIHAR-JAGATPURI, BLOCK H-JAGATPURI, BLOCK E-ANARKALI COLONY NORTH, BLOCK D-RAM NAGAR, BLOCK C-RADHEPURI EXTENSION, ARAM PARK-GEETA COLONY,465 BLOCK K-JAGATPURI, BLOCK B-JAGATPURI, BLOCK D-RADHEPURI EXTENSION, BLOCK E-RADHEPURI EXTENSION,KRN BLOCK D-ANARKALI 604 COLONY NORTH, 5100 BLOCKKVA A-ANARKALI PLANNEDCOLONY NORTH, BLOCK 05-03-2020 D-NEW LAYALPUR 10:29:00 COLONY, 05-03-2020 BLOCK F-NEW 14:03:00 LAYALPUR COLONY, 3:34 BLOCK C-RAM NAGAR, 0.00273444 BLOCK MUs E-RAM NAGAR 466 BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI NNG 173 400 KVA UNPLANNED 03-03-2020 11:43:17 03-03-2020 12:37:31 0:54 0.0003 MUs 467 INDUSTRIAL AREA-PATPAR GANJ INDUSTRIAL AREA LNR 181 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 15:25:47 5:25 0.00189583 MUs 468 BLOCK J-KARTAR NAGAR, GAMRI-GHONDA YVR 18 990 KVA UNPLANNED 03-03-2020 12:40:38 03-03-2020 13:34:54 0:54 0.00015 MUs

469 BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 86 0 KVA UNPLANNED 25-03-2020 08:55:56 25-03-2020 09:50:30 0:54 0.00015 MUs BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 470 NAGAR, BLOCK E-MEET NAGAR NNG 414 1620 KVA UNPLANNED 24-03-2020 16:33:00 24-03-2020 17:22:00 0:49 0.00065333 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage GEETA471 COLONY, BLOCK 5-GEETA COLONY, BLOCK 7-GEETA COLONY, BLOCK 4-GEETA COLONY, BLOCK 8-GEETA COLONYKRN 431 630 KVA PLANNED 03-03-2020 11:03:00 03-03-2020 14:40:00 3:37 0.00120556 MUs 472 BHAGAT NAGAR-DAYALPUR KWN 86 0 KVA UNPLANNED 19-03-2020 19:06:03 19-03-2020 19:28:08 0:22 0.00006111 MUs 473 CHANDER NAGAR BLOCK D-SHASTRI PARK KRN 0 990 KVA UNPLANNED 02-03-2020 12:45:19 02-03-2020 14:30:00 1:44 0 MUs 474 CHUNA MANDI-PAHAR GANJ, MANTOLA MOHALLA-PAHAR GANJ PHG 37 990 KVA UNPLANNED 02-03-2020 15:47:21 02-03-2020 16:20:00 0:32 0.00008889 MUs LIG/MIG475 RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHARKWN 181 0 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 14:19:58 4:19 0.00151083 MUs BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, BLOCK B-MUSTAFABAD (DAYALPUR), BLOCK M- NEHRU VIHAR, BLOCK F-MUSTAFABAD (DAYALPUR), BLOCK A-MUSTAFABAD (DAYALPUR), BLOCK D- MUSTAFABAD (DAYALPUR), BLOCK D-TUKMIRPUR, BLOCK B-DAYALPUR, BLOCK A-MUSTAFABAD 476 (DAYALPUR) KWN 1274 990 KVA UNPLANNED 10-03-2020 17:33:37 10-03-2020 18:01:36 0:27 0.0001125 MUs

BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A- 477 EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 691 2650 KVA UNPLANNED 27-03-2020 20:32:00 27-03-2020 21:06:00 0:33 0.00073333 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, 478 BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK D-HARSH VIHAR, BLOCK B-RAJIV NAGAR NNG 432 0 KVA UNPLANNED 29-03-2020 20:03:11 29-03-2020 20:48:28 0:45 0.000625 MUs BLOCK T-AHATA KEDARA, CHOWK NAI BASTI-SADAR BAZAR, SADAR479 BAZAR B G ROAD, SADAR BAZAR B G ROAD, SADAR BAZAR - RAM NAGAR, MODEL BASTI-SADAR BAZAR B G ROAD,PHG KABRISTAN-SADAR 618 BAZAR B G 990 ROAD, KVA SCHOOL-AHATA PLANNEDKEDARA 02-03-2020 10:00:00 02-03-2020 14:20:00 4:20 0.00151667 MUs HAUZ QAZI-CHANDNI CHOWK, SITARAM BAZAR-CHANDNI CHOWK, MOTIA MAHAL-CHANDNI 480 CHOWK DRG 301 990 KVA UNPLANNED 09-03-2020 11:35:55 09-03-2020 12:30:16 0:54 0.000075 MUs 481 SADAR BAZAR - RAM NAGAR PHG 65 400 KVA UNPLANNED 12-03-2020 11:35:00 12-03-2020 12:19:28 0:44 0.00006111 MUs 482 PRATAP KHAND-JHILMIL COLONY, LABOUR COURT-SHIVA KHAND JLM 212 630 KVA PLANNED 02-03-2020 10:03:00 02-03-2020 14:29:57 4:26 0.00073889 MUs BLOCK A-RAMA GARDEN, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV VIHAR, BLOCK B-PREM 483 VIHAR KWN 259 630 KVA UNPLANNED 03-03-2020 19:08:40 03-03-2020 19:54:23 0:45 0.000375 MUs DDA FLATS-ROUSE AVENUE, GOVT. QTRS-64 KHAMBA, MEER DARD H.S.-ROUSE AVENUE, 484 DEMOLISHED AREA-ROUSE AVENUE DRG 550 990 KVA UNPLANNED 14-03-2020 18:35:14 14-03-2020 18:57:10 0:21 0.00004667 MUs 485 BLOCK A-JHILMIL INDUSTRIAL AREA DGN 155 990 KVA UNPLANNED 08-03-2020 09:40:00 08-03-2020 10:15:00 0:35 0.000175 MUs BLOCK_31-KRISHNA486 NAGAR, BLOCK_3H-KRISHNA NAGAR, BLOCK_21K-KRISHNA NAGAR, BLOCK_48-KRISHNA NAGARSRD 272 630 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 13:32:00 3:32 0.00123667 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK D-HARSH 487 VIHAR NNG 613 0 KVA UNPLANNED 27-03-2020 20:31:00 27-03-2020 21:05:00 0:33 0.00065083 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C- ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI, SEWA 488 DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 21-03-2020 16:47:36 21-03-2020 17:33:53 0:46 0.00038333 MUs 489 BLOCK B-KANTI NAGAR NORTH BLOCK B, BLOCK A-KANTI NAGAR NORTH BLOCK A KRN 491 990 KVA PLANNED 16-03-2020 11:00:00 16-03-2020 14:15:00 3:15 0 MUs 490 BHOLA NATH NAGAR-SHAHDARA, BIHARI COLONY-SHAHDARA JLM 181 990 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 15:32:49 5:32 0.00193667 MUs 491 GHONDA PATTI CHAUHAN, BLOCK C-GHONDA, BLOCK V-GHONDA PATTI CHAUHAN YVR 198 990 KVA UNPLANNED 11-03-2020 13:06:43 11-03-2020 13:55:52 0:49 0 MUs

492 BLOCK A-MANDOLI EXTN., BLOCK D-HARIJAN BASTI EAST EXTN., ANUP VIHAR-MANDOLI NNG 86 0 KVA UNPLANNED 29-03-2020 14:55:12 29-03-2020 15:38:35 0:43 0.00011944 MUs SITARAM BAZAR-CHANDNI CHOWK, CHANDANI MAHAL-CHANDNI CHOWK, PATODI HOUSE- 493 CHANDNI CHOWK, MTNL TELEPHONE EXCHANGE-PATODI HOUSE DRG 483 990 KVA UNPLANNED 12-03-2020 12:07:30 12-03-2020 13:02:35 0:55 0.00006111 MUs

BLOCK A-HARIJAN BASTI, BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK B-ANUP VIHAR, BLOCK B-JAGAT PURI, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C- 494 AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 604 2650 KVA UNPLANNED 24-03-2020 22:12:46 24-03-2020 22:42:58 0:30 0.00058333 MUs 495 BLOCK F-NEHRU VIHAR, BLOCK B-CHANDU NAGAR, BLOCK Z-NEHRU VIHAR KWN 173 990 KVA UNPLANNED 08-03-2020 13:06:14 08-03-2020 14:00:00 0:53 0.00029444 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MEET NAGAR, SABOLI VILLAGE-MANDOLI, VILLAGE SABOLI- 496 SABOLI COLONY NNG 259 0 KVA UNPLANNED 19-03-2020 13:41:30 19-03-2020 14:09:28 0:27 0.000225 MUs 497 HAUZ QAZI-CHANDNI CHOWK, DAV PUBLIC SCHOOL-KALA MASZID DRG 106 990 KVA UNPLANNED 07-03-2020 11:17:58 07-03-2020 12:11:49 0:53 0.00007361 MUs 498 TELI WARA-NAWAB GANJ, SADAR BAZAR B G ROAD PHG 272 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 14:08:02 4:8 0.00144667 MUs 499 BLOCK E-RAJIV NAGAR, BLOCK B-HARSH VIHAR NNG 259 0 KVA UNPLANNED 07-03-2020 16:21:07 07-03-2020 17:16:46 0:55 0.00045833 MUs OLD SEELAMPUR, BLOCK D-AJIT NAGAR, RAGUWARPURA-SUBHASH MOHALLA II, SUBHASH MOHALLA-SEELAMPUR, BLOCK 9-KAILASH NAGAR, OLD SEELAMPUR DHRAM PURA, AJIT NAGAR- 500 KAILASH NAGAR, DHRAM PURA-KAILASH NAGAR KRN 665 990 KVA UNPLANNED 09-03-2020 11:06:04 09-03-2020 12:03:39 0:57 0 MUs RADHE SHYAM PARK-SWASTHYA VIHAR, GOVIND501 PURA OLD-SWASTHYA VIHAR, RADHE SHYAM PARK EXTN.-SWASTHYA VIHAR, OLD BRIJPURI-SWASTHYA VIHAR,KRN RADHEY PURI 1368 EXTENSION-ARJUN 990 NAGAR KVA WEST PLANNED 03-03-2020 10:00:00 03-03-2020 14:46:05 4:46 0.00166833 MUs 502 BLOCK A-NEW ASHOK NAGAR VSE 2445 1000 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 15:02:12 5:2 0.00176167 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 503 NAGAR, BLOCK E-MEET NAGAR NNG 432 2650 KVA UNPLANNED 31-03-2020 22:22:32 31-03-2020 23:15:00 0:52 0.00072222 MUs 504 BLOCK C-ARAM BAGH, BLOCK A-ARAM BAGH PHG 154 990 KVA PLANNED 19-03-2020 11:03:00 19-03-2020 14:07:17 3:4 0.00051111 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH 505 VIHAR, BLOCK A-RAJIV NAGAR, SEWA DHAM-MANDOLI NNG 518 0 KVA UNPLANNED 14-03-2020 17:26:56 14-03-2020 18:19:16 0:52 0.00086667 MUs

506 BANK OF BARODA-SABOLI COLONY, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 131 630 KVA UNPLANNED 01-03-2020 17:37:38 01-03-2020 17:52:03 0:14 0.00007778 MUs LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK 507 SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR KWN 173 0 KVA UNPLANNED 05-03-2020 12:09:08 05-03-2020 12:41:46 0:32 0.00017778 MUs 508 PETROL PUMP-POCKET C, SIYARAM-GHISA DGN 95 0 KVA UNPLANNED 22-03-2020 09:50:00 22-03-2020 10:38:00 0:47 0.00030028 MUs 509 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 6 630 KVA UNPLANNED 17-03-2020 17:14:10 17-03-2020 17:56:03 0:41 0.00018222 MUs PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK C-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT B-BLOCK B, PKT D-BLOCK B, BLOCK J-SHIV VIHAR, BLOCK Q-SHIV 510 VIHAR KWN 259 0 KVA UNPLANNED 01-03-2020 18:40:00 01-03-2020 19:30:00 0:49 0.00040833 MUs 511 VISHWAS NAGAR-SHAHDARA, SHAHDARA JLM JLM 143 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 13:50:00 3:50 0.00031944 MUs 512 ARAM NAGAR-SADAR BAZAR PHG 529 990 KVA UNPLANNED 06-03-2020 17:12:30 06-03-2020 17:28:19 0:15 0.00004167 MUs BLOCK A1-NAND NAGARI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK D-HARIJAN BASTI 513 EAST EXTN., BLOCK D-HARSH VIHAR NNG 682 0 KVA UNPLANNED 24-03-2020 16:35:00 24-03-2020 17:22:00 0:47 0.00103139 MUs 514 SABOLI COLONY-MANDOLI, SABOLI COLONY-MANDOLI NNG 173 0 KVA UNPLANNED 04-03-2020 13:26:11 04-03-2020 14:10:04 0:43 0.00023889 MUs 515 BLOCK 61-AJMAL KHAN PARK, BLOCK 52-AJMAL KHAN PARK, BLOCK 53-AJMAL KHAN PARK SRD 905 3600 KVA PLANNED 05-03-2020 11:00:00 05-03-2020 11:24:16 0:24 0.00030667 MUs 516 THAKKAR BAPA NAGAR-BLOCK 16, BLOCK_8B-DEV NAGAR, REHGAR PURA-DEV NAGAR PNR 0 630 KVA PLANNED 20-03-2020 11:03:00 20-03-2020 14:35:31 3:32 0 MUs BLOCK C-KABIR NAGAR,517 BLOCK A-KABIR NAGAR, BLOCK B-NORTH CHHAJUPUR, BLOCK E-NORTH CHHAJUPUR, PKT C-BLOCK B, BLOCKNNG A-NORTH CHHAJUPUR 2812 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 15:06:33 5:6 0.001785 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 518 GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 259 0 KVA UNPLANNED 08-03-2020 13:58:16 08-03-2020 14:56:22 0:58 0.00048333 MUs NEW GOVIND PURA-JAGATPURI, CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK C- PANDIT PARK, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., SHIVPURI-JAGATPURI, JHEEL- 519 GHONDALI KRN 1042 990 KVA UNPLANNED 14-03-2020 11:25:32 14-03-2020 13:56:19 2:30 0.00020833 MUs BLOCK D-ASHOK NAGAR, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, SEWA DHAM-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA 520 DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 18-03-2020 07:50:03 18-03-2020 09:22:31 1:32 0.00127778 MUs 521 TELIBARA-SHAHDARA, BIHARI COLONY-SHAHDARA, SUPER BAZAR-VIVEK VIHAR BLOCK A JLM 203 400 KVA PLANNED 12-03-2020 11:03:00 12-03-2020 14:05:00 3:2 0.00025278 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 522 EXTN., BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR NNG 259 0 KVA UNPLANNED 14-03-2020 23:44:24 15-03-2020 00:01:33 0:17 0.00014167 MUs 523 BLOCK B-NEW MODERN SHAHDARA, BLOCK B-JAGAT PURI, BLOCK C-NEW MODERN SHAHDARA DGN 17 630 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 15:41:54 5:41 0.00198917 MUs BLOCK 17-OLD RAJENDRA NAGAR, BLOCK 11-OLD RAJENDRA NAGAR, BLOCK 22-OLD RAJENDRA NAGAR, BLOCK 15-OLD RAJENDRA NAGAR, BLOCK 25-OLD RAJENDRA NAGAR, BLOCK 24-OLD RAJENDRA NAGAR, BLOCK 16-OLD RAJENDRA NAGAR, BLOCK 26-OLD RAJENDRA NAGAR, BLOCK 18-OLD RAJENDRA NAGAR, BLOCK 32-OLD RAJENDRA NAGAR, BLOCK 59-OLD RAJENDRA NAGAR, BLOCK 53-OLD RAJENDRA NAGAR, BLOCK 54-OLD RAJENDRA NAGAR, BLOCK 8-OLD RAJENDRA 524 NAGAR SRD 962 630 KVA UNPLANNED 20-03-2020 14:44:44 20-03-2020 15:40:00 0:55 0.00022917 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-UTTARANCHAL COLONY, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 525 NAGAR, BLOCK E-MEET NAGAR NNG 432 2650 KVA UNPLANNED 14-03-2020 19:38:01 14-03-2020 20:33:37 0:55 0.00076389 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D- 526 HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, BLOCK E-SEWA DHAM NNG 95 0 KVA UNPLANNED 24-03-2020 16:34:00 24-03-2020 17:22:00 0:47 0.00014361 MUs BLOCK C12-YAMUNA VIHAR, BLOCK C6-YAMUNA VIHAR, BLOCK C7-YAMUNA VIHAR, BLOCK C3- 527 YAMUNA VIHAR YVR 133 630 KVA UNPLANNED 11-03-2020 15:19:02 11-03-2020 16:07:55 0:48 0.00026667 MUs BLOCK A-BANK COLONY, BLOCK B-ANUP VIHAR, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, 528 ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 13-03-2020 15:50:00 13-03-2020 16:37:32 0:47 0.00065278 MUs 529 SUBHASH PARK EXTN.-GORAKH PARK DGN 165 630 KVA UNPLANNED 15-03-2020 18:13:34 15-03-2020 18:45:00 0:31 0.00013778 MUs 530 SEWA DHAM-MANDOLI NNG 60 400 KVA UNPLANNED 24-03-2020 21:03:00 24-03-2020 21:48:00 0:45 0.0000875 MUs BLOCK C-NEW SILAMPURI PHASE IV, BLOCK A-NEW SILAMPURI PHASE IV, SUBHASH PARK-GORAKH 531 PARK, ZERO PUSTA-USMAN PUR YVR 139 400 KVA UNPLANNED 06-03-2020 21:41:21 06-03-2020 22:35:00 0:53 0.00014722 MUs BLOCK 18-HIMMATPURI, BLOCK 25-TRILOKPURI PHASE II, BLOCK 14-TRILOKPURI PHASE532 II, BLOCK 15-TRILOKPURI PHASE II, BLOCK 24-TRILOKPURI PHASE II, BLOCK 13-TRILOKPURI PHASE II, TRILOKPURIMVR PHASE I-MAYUR 2250 VIHAR, TRILOKPURI 990 KVA PHASE II-MAYUR VIHAR, PLANNED KOTLA EXCT-PHASE 07-03-2020 II 11:00:00 07-03-2020 16:52:59 5:52 0 MUs

BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C-PATEL VIHAR, BLOCK U-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O- SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, BLOCK C-PRAKASH VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL 533 NAGAR, BLOCK A-SHIV VIHAR, BLOCK J-SHIV VIHAR, PKT W-BLOCK A, BLOCK Q-SHIV VIHAR KWN 259 0 KVA UNPLANNED 24-03-2020 20:35:17 24-03-2020 21:13:54 0:38 0.00031667 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D- HARIJAN BASTI EAST EXTN., NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, 534 ANUP VIHAR-MANDOLI NNG 604 0 KVA UNPLANNED 10-03-2020 15:08:48 10-03-2020 15:33:46 0:24 0.00046667 MUs 535 BLOCK C6-YAMUNA VIHAR, BLOCK C4-YAMUNA VIHAR, BLOCK C3-YAMUNA VIHAR YVR 144 990 KVA PLANNED 18-03-2020 10:03:00 18-03-2020 12:46:48 2:43 0.00036222 MUs 536 OLD SEELAMPUR KRN 55 630 KVA PLANNED 12-03-2020 10:03:00 12-03-2020 16:30:40 6:27 0 MUs BLOCK J-SUNDER NAGRI, BLOCK N-SUNDER NAGRI, BLOCK E1-NAND NAGARI, BLOCK A1-NAND NAGARI, BLOCK A4-NAND NAGARI, BLOCK B2-NAND NAGARI, BLOCK F1-BUNKAR VIHAR, BLOCK J- SUNDER NAGRI NNG, BLOCK E1-BUNKAR VIHAR, BLOCK G3-BUNKAR VIHAR, BLOCK F-BUNKAR 537 VIHAR NNG 212 990 KVA UNPLANNED 31-03-2020 13:52:33 31-03-2020 15:50:00 1:57 0.000325 MUs 538 MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA CCK 183 990 KVA PLANNED 01-03-2020 10:00:00 01-03-2020 15:24:46 5:24 0.00036 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 539 EXTN., BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 173 0 KVA UNPLANNED 30-03-2020 12:05:03 30-03-2020 12:57:25 0:52 0.00028889 MUs 540 GOVIND BALLABH PANT HASPITAL-LN JPN COLONY DRG 272 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 14:52:48 4:52 0.00170333 MUs

BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, POCKET A-JJ COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH 541 VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 2616 0 KVA UNPLANNED 05-03-2020 19:19:19 05-03-2020 19:59:03 0:39 0.00021667 MUs KATRA NAWAB-CHANDNI542 CHOWK, RAILWAY STATION-CHANDNI CHOWK, ZEENAT BARI-MORI GATE, MAIN BAZAR-KHUSHCCK DIL 272 990 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 13:54:28 3:54 0.001365 MUs 543 BLOCK C-BRIJ PURI, BLOCK D-BRIJ PURI KWN 173 3240 KVA UNPLANNED 01-03-2020 09:34:34 01-03-2020 09:54:00 0:19 0.00010556 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, BLOCK A-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, 544 SABOLI EXTN.-MANDOLI NNG 259 630 KVA UNPLANNED 14-03-2020 19:44:05 14-03-2020 20:08:41 0:24 0.0002 MUs FACTORY-DILSHAD GARDEN, DAMODER PARK-DILSHAD GARDEN, JHILMIL INDUSTRIAL AREA- 545 JHILMIL COLONY DGN 26 630 KVA UNPLANNED 18-03-2020 20:05:42 18-03-2020 21:01:11 0:55 0.00015278 MUs 546 SITARAM BAZAR-CHANDNI CHOWK DRG 1132 990 KVA PLANNED 05-03-2020 11:00:00 05-03-2020 15:12:04 4:12 0 MUs 547 BLOCK A-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK D-MEET NAGAR NNG 302 630 KVA UNPLANNED 04-03-2020 16:42:17 04-03-2020 17:25:32 0:43 0.00023889 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 548 BHOLA NATH NAGAR-SHAHDARA, BIHARI COLONY-SHAHDARA, SHALIMAR PARK-SHAHDARA JLM 181 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 17:05:43 7:5 0.00247917 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A- 549 HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 259 0 KVA UNPLANNED 06-03-2020 13:47:23 06-03-2020 14:11:21 0:23 0.00019167 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SABOLI COLONY-MANDOLI, SABOLI EXTN.- 550 MANDOLI NNG 319 0 KVA UNPLANNED 24-03-2020 21:05:00 24-03-2020 21:47:00 0:42 0.00043167 MUs BLOCK551 B-KANTI NAGAR NORTH BLOCK B, BLOCK A-KANTI NAGAR NORTH BLOCK A, BLOCK C-KANTI NAGAR NORTH BLOCKKRN C 3982 630 KVA PLANNED 14-03-2020 11:00:00 14-03-2020 14:29:00 3:29 0.00406389 MUs BLOCK 51-AJMAL KHAN PARK SRD, BLOCK 57-AJMAL KHAN552 PARK, BLOCK 63-AJMAL KHAN PARK, AJMAL KHAN PARK SRD-KAROL BAGH SRD, OPD. DR. N.C. JOSHI MEMORIALSRD HOSPITAL-JOSHI 905 ROAD, LIBERTY 5220CINEMA-KAROL KVA BAGH PNR PLANNED 02-03-2020 11:00:00 02-03-2020 13:07:00 2:7 0.00246944 MUs OLD DELHI RAILWAY553 STATION-CHANDNI CHOWK, BLOCK J-NABI KARIM, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, ZEENATCCK BARI-MORI 2334GATE 990 KVA PLANNED 14-03-2020 11:00:00 14-03-2020 14:21:00 3:21 0.00027917 MUs 554 INSTITUTIONAL AREA BLOCK B-ALL INDIA DEAF & DUMB SOCIETY, HOSPITAL AREA-INSTITUTIONAL AREA JLM 0 0 KVA PLANNED 03-03-2020 11:00:00 03-03-2020 13:55:44 2:55 0 MUs HANSRAJ SCHOOL-POCKET H, POCKET N-DILSHAD GARDEN, GTB MIG FLATS-POCKET D, BLOCK J- 555 DILSHAD GARDEN DGN 176 630 KVA UNPLANNED 15-03-2020 12:26:10 15-03-2020 12:45:24 0:19 0.00003167 MUs

BLOCK A-HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB 556 STATION-POLICE FARM, BLOCK C-SEWA DHAM, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 432 0 KVA UNPLANNED 25-03-2020 12:53:52 25-03-2020 13:44:07 0:50 0.00069444 MUs BLOCK B-EAST GOKUL PURI, BLOCK E-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK 557 C-MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 432 2650 KVA UNPLANNED 05-03-2020 22:40:00 05-03-2020 23:35:00 0:54 0.00075 MUs BLOCK A-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK A- 558 KHAJURI KHAS, CLOCK C-BIHARIPUR, BLOCK C-MUSTAFABAD (DAYALPUR) KWN 173 0 KVA UNPLANNED 20-03-2020 13:00:59 20-03-2020 13:36:29 0:35 0.00019444 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 559 EXTN., BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, ANUP VIHAR-MANDOLI NNG 1892 0 KVA UNPLANNED 22-03-2020 19:51:20 22-03-2020 20:23:47 0:32 0.00026667 MUs 560 DDA FLATS-MOTIA KHAN, BLOCK D-MOTIA KHAN PHG 75 990 KVA UNPLANNED 05-03-2020 17:36:48 05-03-2020 19:23:00 1:46 0.00029444 MUs 561 MOTIYA KHAN-SHAHI IDGAH COLONY, SADAR BAZAR - RAM NAGAR PHG 3 400 KVA PLANNED 13-03-2020 11:03:00 13-03-2020 15:24:13 4:21 0.0003625 MUs 562 BLOCK A-MEET NAGAR, BLOCK C-MEET NAGAR NNG 363 1620 KVA UNPLANNED 14-03-2020 15:08:00 14-03-2020 16:07:00 0:58 0.00067667 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK A-RAJIV NAGAR NNG, BLOCK B-PRATAP NAGAR, 563 BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-SEWA DHAM NNG 432 0 KVA UNPLANNED 08-03-2020 01:02:02 08-03-2020 01:21:10 0:19 0.00026389 MUs 564 SEWA DHAM-MANDOLI NNG 60 400 KVA UNPLANNED 24-03-2020 16:36:00 24-03-2020 17:22:00 0:45 0.0000875 MUs GEETA565 COLONY, KAILASH NAGAR, BLOCK 9-DHARAM PURA, BLOCK 9-KAILASH NAGAR, DHRAM PURA-KAILASH NAGARKRN 270 990 KVA PLANNED 06-03-2020 10:03:00 06-03-2020 14:39:49 4:36 0.00061333 MUs BLOCK G-DILSHAD COLONY, BLOCK B-NEW SIMAPURI, BLOCK E-OLD SIMAPURI,566 BLOCK J-OLD SIMAPURI, BLOCK F-OLD SIMAPURI, BLOCK G-OLD SIMAPURI, BLOCK C-OLD SIMAPURI, BLOCKDGN B-OLD SIMAPURI, 181 MCD-OLD SIMAPURI, 990 KVA GOVT. DISPENCERY-OLD PLANNED SIMAPURI 12-03-2020 10:00:00 12-03-2020 16:56:37 6:56 0.00242667 MUs BLOCK B-NEW CHAUHAN PUR, BLOCK C-KARAWAL NAGAR, BLOCK 3A-SADAT PUR, BLOCK A- 567 KARAWAL NAGAR (DEHROTI), BLOCK D-WEST KARAWAL NAGAR KWN 0 0 KVA UNPLANNED 14-03-2020 23:20:20 15-03-2020 00:11:57 0:51 0 MUs 568 BLOCK 3-DEV NAGAR PNR 272 990 KVA PLANNED 20-03-2020 10:03:00 20-03-2020 15:16:23 5:13 0.00182583 MUs

569 PKT W-BLOCK A, BLOCK D-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV VIHAR KWN 130 0 KVA UNPLANNED 24-03-2020 20:38:45 24-03-2020 21:37:07 0:58 0.00024167 MUs BLOCK C12-YAMUNA VIHAR, BLOCK C11-YAMUNA570 VIHAR, BLOCK C6-YAMUNA VIHAR, BLOCK C2-YAMUNA VIHAR, BLOCK C9-YAMUNA VIHAR, BLOCK C1-YAMUNAYVR VIHAR, 0BLOCK C8-YAMUNA 3600 VIHAR KVA PLANNED 21-03-2020 11:00:00 21-03-2020 12:05:46 1:5 0.00115556 MUs BLOCK N-VISHWAKARMA571 PARK, BLOCK F-VISHWAKARMA PARK, RAMESH PARK-LAKSHMI NAGAR, VISHWAKARMA PARK-LAKSHMI NAGAR,LNR BLOCK C-LALITA 1100 PARK 990 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 15:50:00 5:50 0.00204167 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK E-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SABOLI EXTN.- 572 MANDOLI, SEWA DHAM-MANDOLI NNG 173 0 KVA UNPLANNED 07-03-2020 13:08:57 07-03-2020 13:46:36 0:37 0.00020556 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D- 573 HARSH VIHAR, BLOCK A-RAJIV NAGAR, J.R. COMPLEX-SEWA DHAM, BLOCK E-SEWA DHAM NNG 259 0 KVA UNPLANNED 07-03-2020 11:34:44 07-03-2020 11:55:16 0:20 0.00016667 MUs DAYANAND HOSPITAL-UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN, BLOCK A- RESI FLATS- POCKET A, BLOCK B- GROUP I FLATS-POCKET B, DELHI JAL BOARD-POCKET C, MENTAL HOSPITAL- 574 UNIVERSITY COLLEGE OF MEDICAL SCIENCES DGN DGN 285 2250 KVA UNPLANNED 14-03-2020 15:24:00 14-03-2020 15:38:00 0:14 0.00012833 MUs DHARAM PURA-KAILASH575 NAGAR, BLOCK 9-SUBHASH MOHALLA_I, SUBHASH MOHALLA-SEELAMPUR, BLOCK 9-KAILASH NAGAR, GANDHIKRN NAGAR-KAILASH 1315 NAGAR 990 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 13:54:34 3:54 0.001365 MUs 576LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHARKWN 181 0 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 13:59:58 3:59 0.00139417 MUs 577 RAILWAY COLONY-CONNAUGHT PLACE DRG DRG 272 630 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 13:28:28 3:28 0.00121333 MUs SUBHASH PARK-GORAKH PARK, BLOCK I-BRAHM578 PURI, BLOCK O-BRAHM PURI, BLOCK K-BRAHM PURI, JAFFRABAD-MAUJ PUR, BLOCK B-GARI MANDU, GHONDAYVR PATTI CHAUHAN, 609 JAFFRABAD-MAUJ 990 KVA PUR PLANNED 07-03-2020 09:03:00 07-03-2020 13:35:00 4:32 0.00075556 MUs CHAUHAN579 BANGAR-JAFFRABAD, BLOCK B-NEW SILAMPURI PHASE II, JAFFRABAD-MAUJ PUR, JAFFRABAD-MAUJ YVRPUR 181 990 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 14:41:16 4:41 0.00163917 MUs BLOCK B-ANUP VIHAR, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, 580 SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI NNG 173 0 KVA UNPLANNED 04-03-2020 15:40:12 04-03-2020 16:27:56 0:47 0.00026111 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK E-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, BLOCK D-MEET NAGAR, SABOLI COLONY-MANDOLI, 581 SABOLI EXTN.-MANDOLI NNG 432 630 KVA UNPLANNED 06-03-2020 16:33:22 06-03-2020 19:35:00 3:1 0.00251389 MUs 582 BLOCK B-NEW SIMAPURI, BLOCK C-NEW SIMAPURI, BLOCK A-NEW SIMAPURI DGN 216 990 KVA UNPLANNED 13-03-2020 09:29:00 13-03-2020 10:24:03 0:55 0.00038194 MUs 583 BLOCK A-SHASTRI PARK YVR 181 0 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 12:18:59 2:18 0.000805 MUs 584 BLOCK T-ARAM NAGAR PHG 65 400 KVA UNPLANNED 09-03-2020 21:40:00 09-03-2020 22:38:00 0:58 0.00008056 MUs 585 DELHI JAL BOARD MIG FLATS-POCKET A, GOVT.BOYS SEC.SCHOOL-POCKET A NNG 279 990 KVA UNPLANNED 05-03-2020 23:04:41 05-03-2020 23:48:57 0:44 0.00036667 MUs DELHI JAL586 BOARD-JYOTI NAGAR, BABA DA DARGA-KARDAMPURI, BLOCK D-JYOTI NAGAR, BLOCK A-HARIJAN BASTI, PKTNNG H-BLOCK D 758 630 KVA PLANNED 23-03-2020 10:00:00 23-03-2020 10:44:06 0:44 0.00025667 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH 587 VIHAR NNG 345 0 KVA UNPLANNED 05-03-2020 03:13:06 05-03-2020 03:42:22 0:29 0.00032222 MUs BLOCK C-HARSH VIHAR, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK C-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C- ANUP VIHAR, BLOCK A-HARSH VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA 588 DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 06-03-2020 05:30:00 06-03-2020 06:14:58 0:44 0.00061111 MUs

BLOCK A-HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB 589 STATION-POLICE FARM, BLOCK C-SEWA DHAM, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 319 0 KVA UNPLANNED 14-03-2020 15:05:00 14-03-2020 16:04:00 0:58 0.00059611 MUs 590 RAGHUVIR PURA-KANTI NAGAR, OLD SEELAMPUR KRN 411 630 KVA PLANNED 03-03-2020 10:03:00 03-03-2020 12:57:40 2:54 0.00024167 MUs BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK E-SEWA DHAM, POCKET A-JJ COLONY, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK H-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH 591 VIHAR, RAJEEV NAGAR-SEWA DHAM NNG 259 0 KVA UNPLANNED 10-03-2020 19:48:46 10-03-2020 20:35:37 0:46 0.00038333 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH 592 VIHAR NNG 259 0 KVA UNPLANNED 15-03-2020 16:19:42 15-03-2020 17:13:08 0:53 0.00044167 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK H-SEWA DHAM, BLOCK A- UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C- 593 AMAR COLONY, BLOCK E-MEET NAGAR NNG 214 630 KVA UNPLANNED 01-03-2020 11:03:02 01-03-2020 11:47:36 0:44 0.00036667 MUs LIG/MIG RES/NON COMM AREA-A-BLOCK594 SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMMKWN AREA-A-BLOCK 220 SONIA VIHAR 0 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 14:00:00 4:0 0.0014 MUs 595 KHICHRI PUR-PHASE II MVR 181 630 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 11:20:49 1:20 0.00046667 MUs 596 FYAZ GANJ-NAWAB GANJ, TELI WARA-NAWAB GANJ PHG 79 990 KVA PLANNED 05-03-2020 10:03:00 05-03-2020 14:36:00 4:33 0.00037917 MUs BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL597 COLONY, BLOCK A-ANUP VIHAR, BLOCK A-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCKNNG A-EAST GOKUL 1651 PURI, BLOCK E-MEET 0 KVA NAGAR PLANNED 04-03-2020 10:00:00 04-03-2020 14:11:45 4:11 0.00146417 MUs 598 MAUJ PUR COMPLEX 1 YVR 174 630 KVA UNPLANNED 04-03-2020 13:24:37 04-03-2020 13:52:33 0:27 0 MUs 599 KASTURBA NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARA JLM 394 630 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 13:52:53 3:52 0.00032222 MUs 600 DARYA GANJ, LIG/MIG RES/NON COMM AREA-FEROJ SHAH KOTLA STADIUM DRG 272 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 13:46:22 3:46 0.00131833 MUs

601 BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR, JYOTI COLONY-BALBIR NAGAR NNG 323 630 KVA UNPLANNED 03-03-2020 12:17:23 03-03-2020 13:07:02 0:49 0.00027222 MUs PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C-KARAWAL NAGAR, SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, PKT R-BLOCK A, PKT F-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT A-BLOCK B, BLOCK D-WEST 602 KARAWAL NAGAR KWN 86 0 KVA UNPLANNED 23-03-2020 16:30:05 23-03-2020 17:12:48 0:42 0.00011667 MUs BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, PKT Y-SHIV VIHAR, BLOCK R-PATEL VIHAR, 603 BLOCK B-SHIV VIHAR KWN 86 0 KVA UNPLANNED 09-03-2020 16:20:22 09-03-2020 17:19:07 0:58 0.00016111 MUs ROHITASH NAGAR EAST-SILAMPUR, BLOCK 1-BALBIR NAGAR, BALBIR NAGAR EXTN.-SILAMPUR, 604 BLOCK A-PRATAP PURA DGN 220 630 KVA UNPLANNED 24-03-2020 17:49:09 24-03-2020 20:00:00 2:10 0.00065 MUs BLOCK A-PRAKASH VIHAR, BLOCK K-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK C-SHIV VIHAR, PKT A-BLOCK B, PKT B-BLOCK B, PKT D-BLOCK B, 605 BLOCK Q-SHIV VIHAR KWN 259 0 KVA UNPLANNED 08-03-2020 07:26:52 08-03-2020 08:10:00 0:43 0.00035833 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 606 EXTN., BLOCK D-HARSH VIHAR NNG 1892 0 KVA UNPLANNED 14-03-2020 15:05:00 14-03-2020 16:06:00 1:1 0.0004575 MUs KATRA NAWAB-CHANDNI CHOWK, GURUDWARA607 SISGANJ ROAD-CHANDNI CHOWK, LAJPAT RAI MARKET-CHANDNI CHOWK, BHAGIRATH PLACE-CHANDNI CHOWK,CCK MOR SARAY 355 COLONY-CHANDNI 400 KVA CHOWK PLANNED 12-03-2020 10:00:00 12-03-2020 14:24:28 4:24 0.00154 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK A-ANUP VIHAR, SEWA DHAM- 608 MANDOLI, RAJEEV NAGAR-SEWA DHAM, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 14-03-2020 22:38:13 14-03-2020 23:10:52 0:32 0.00026667 MUs 609 BLOCK C-SHASTRI PARK YVR 181 0 KVA PLANNED 25-03-2020 10:00:00 25-03-2020 14:09:09 4:9 0.0014525 MUs 610BLOCK B-AMBEDKAR AWAS KALYAN SAMITI, SEC C-MAYUR VIHAR PHASE III, PKT 5-MAYUR VIHAR PHASE IIIVSE 181 630 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 15:34:06 5:34 0.00194833 MUs JHANDEWALAN FATTED FACTORY COMPLEX, BLOCK 1E-JHANDEWALAN EXTENSION, BLOCK 4E- 611 JHANDEWALAN EXTENSION SRD 65 990 KVA UNPLANNED 15-03-2020 13:03:27 15-03-2020 13:56:06 0:52 0.00007222 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MEET NAGAR,612 BLOCK A-MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK E-SEWA DHAM, SEWANNG DHAM-MANDOLI, 181 SABOLI COLONY-MANDOLI 0 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 15:45:34 5:45 0.0020125 MUs BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK D-HARSH 613 VIHAR NNG 173 0 KVA UNPLANNED 01-03-2020 20:22:53 01-03-2020 21:14:07 0:51 0.00028333 MUs 614 M.C.P. SCHOOL-POCKET O, BLOCK P-POCKET P DGN 10 630 KVA PLANNED 18-03-2020 11:00:00 18-03-2020 15:03:00 4:3 0.001485 MUs 615 BLOCK J & K-POCKET J&K, BLOCK E- INDUSTRIAL FACTORY-POCKET C DGN 157 990 KVA PLANNED 16-03-2020 11:03:00 16-03-2020 16:45:07 5:42 0.00095 MUs BLOCK A-JAGATPURI EXTN., BLOCK A-B&C-JAGAT PURI, BLOCK D-JAGAT PURI, BLOCK A-EAST 616 GOKUL PURI NNG 549 630 KVA UNPLANNED 12-03-2020 12:03:38 12-03-2020 18:37:46 6:34 0.00218889 MUs BLOCK A-VIVEK VIHAR617 PHASE II, JHILMIL COLONY BLOCK A, JHILMIL COLONY BLOCK B, BLOCK E-JHILMIL COLONY BLOCK E, BLOCK D-JHILMILJLM COLONY BLOCK 67 D 990 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 14:44:21 4:44 0.00165667 MUs 618 BIHARI COLONY-SHAHDARA JLM 0 2970 KVA PLANNED 18-03-2020 11:00:00 18-03-2020 13:14:00 2:14 0.00037222 MUs GOVIND BALLABH PANT HASPITAL-LN JPN COLONY, GOVT. GIRLS SENIOR619 SECONDARY SCHOOL-TURKMAN GATE, CHANDANI MAHAL-CHANDNI CHOWK, DEMOLISHED AREA-ROUSEDRG AVENUE, RAM 121 MANDIR-KAMLA MARKET, 990 KVA DDA FLATS-KALA PLANNED MASZID 19-03-2020 10:00:00 19-03-2020 14:31:19 4:31 0.00158083 MUs

BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, 620 BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 86 0 KVA UNPLANNED 02-03-2020 17:10:00 02-03-2020 18:02:22 0:52 0.00014444 MUs 621 INDUSTRIAL AREA-PATPAR GANJ INDUSTRIAL AREA LNR 40 630 KVA PLANNED 26-03-2020 10:00:00 26-03-2020 13:31:48 3:31 0.00123083 MUs BLOCK J-SUNDER NAGRI, BLOCK L-SUNDER NAGRI, BLOCK N-SUNDER NAGRI, BLOCK O-SUNDER NAGRI, BLOCK B-SUNDER NAGRI NNG, BLOCK A1-NAND NAGARI, BLOCK C-SUNDER NAGRI NNG, GTB ENCLAVE POLICE BOOTH-JHILMIL-TAHIRPUR NNG, BLOCK A-RAJIV NAGAR NNG, BLOCK J- 622 SUNDER NAGRI NNG, BLOCK L-SUNDER NAGRI NNG NNG 86 990 KVA UNPLANNED 17-03-2020 22:30:00 17-03-2020 23:16:24 0:46 0.00012778 MUs 623 ROHITASH NAGAR EAST-SILAMPUR, BLOCK 1-RAM NAGAR EXTN. DGN 181 630 KVA PLANNED 28-03-2020 10:00:00 28-03-2020 12:33:00 2:33 0.0008925 MUs 624 BLOCK A-SHASTRI PARK, CHAUHAN BANGAR-JAFFRABAD, JAFFRABAD-MAUJ PUR YVR 86 400 KVA PLANNED 18-03-2020 10:03:00 18-03-2020 14:42:01 4:39 0.000775 MUs BLOCK D-NEHRU VIHAR, BLOCK F-NEHRU VIHAR, BLOCK B-CHANDU NAGAR, BLOCK A-NEHRU 625 VIHAR, BLOCK C-NEHRU VIHAR, BLOCK B-NEHRU VIHAR KWN 1579 1500 KVA UNPLANNED 03-03-2020 13:19:47 03-03-2020 14:08:41 0:48 0 MUs BALBIR NAGAR626 EXTN.-SILAMPUR, JYOTI COLONY-BALBIR NAGAR, BLOCK A-B&C-JAGAT PURI, BLOCK D-JYOTI NAGAR, BLOCKNNG D-JAGAT PURI 181 630 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 15:27:46 5:27 0.0019075 MUs

BLOCK A-VINOD NAGAR EAST, BLOCK J-VISHWAKARMA PARK, BLOCK A-GURU RAMDAS NAGAR, 627 BLOCK S1-SCHOOL BLOCK, BLOCK K-JAGAT RAM PARK, GURU RAMDAS NAGAR-LAKSHMI NAGAR LNR 86 990 KVA UNPLANNED 15-03-2020 07:30:00 15-03-2020 08:27:00 0:56 0.00015556 MUs 628 LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR KWN 181 0 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:20:00 3:20 0.00116667 MUs 629 BLOCK C-HARSH VIHAR, BLOCK D-HARSH VIHAR NNG 216 0 KVA UNPLANNED 19-03-2020 13:51:55 19-03-2020 14:27:42 0:35 0.00024306 MUs LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK D-TUKMIRPUR, PKT C-SHIV VIHAR, CHAUHAN PATTI-VIJAY VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK 630 SONIA VIHAR KWN 259 0 KVA UNPLANNED 24-03-2020 18:36:41 24-03-2020 19:17:46 0:41 0.00034167 MUs PUBLIC SCHOOL-BLOCK 31, BLOCK 23-WEST PATEL NAGAR, BLOCK 34-WEST PATEL NAGAR, BLOCK 32-WEST PATEL NAGAR, BLOCK 31-WEST PATEL NAGAR, BLOCK 28-WEST631 PATEL NAGAR, BLOCK 29-WEST PATEL NAGAR, BLOCK H-WEST PATEL NAGAR, BLOCK V-WEST PATEL NAGAR,PNR BLOCK Z-WEST 1300 PATEL NAGAR, 990 BLOCK KVA 25-WEST PATEL PLANNED NAGAR, BLOCK 24-WEST 03-03-2020 PATEL NAGAR, 10:00:00 PROHIBITED 03-03-2020 AREA-ANAND 15:33:00 PARBAT, BLOCK 5:33 26-WEST PATEL NAGAR 0.0019425 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BLOCK A-HARIJAN BASTI, G.B.SSS SCHOOL-GOKUL PURI, BHARAT MATA MANDIR-JJ COLONY, BLOCK A1-NAND NAGARI, SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK B-SEWA 632 DHAM, ANUP VIHAR-MANDOLI, RAJEEV NAGAR-SEWA DHAM NNG 432 0 KVA UNPLANNED 10-03-2020 16:29:21 10-03-2020 17:23:42 0:54 0.00075 MUs 633 BLOCK T-AHATA KEDARA PHG 57 400 KVA PLANNED 07-03-2020 10:03:00 07-03-2020 14:00:12 3:57 0 MUs COMMUNITY CENTRE-JAMA MASZID, MOTIA MAHAL-CHANDNI CHOWK, CHURI WALAN GALI- 634 CHANDNI CHOWK DRG 134 990 KVA UNPLANNED 13-03-2020 11:09:11 13-03-2020 12:02:32 0:53 0.00011778 MUs BLOCK C-KANTI635 NAGAR NORTH BLOCK C, WEST AZAD NAGAR, OLD SEELAMPUR, BLOCK X-RAJGARH COLONY, SHANKAR NAGAR-AZADKRN NAGAR 181 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 14:33:53 4:33 0.0015925 MUs BLOCK B-GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A-EAST 636 GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 259 630 KVA UNPLANNED 30-03-2020 18:41:04 30-03-2020 19:16:33 0:35 0.00029167 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, PKT W-BLOCK A, BLOCK C-KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R-BLOCK A, BLOCK A- 637 SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 216 0 KVA UNPLANNED 24-03-2020 05:32:25 24-03-2020 06:29:46 0:57 0.00039583 MUs PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK K- SHIV VIHAR, PKT R-BLOCK A, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK B-PREM 638 VIHAR KWN 86 0 KVA UNPLANNED 09-03-2020 13:32:52 09-03-2020 14:32:00 0:59 0.00016389 MUs KACHI MANDIR-BLOCK E4, BLOCK E3-NAND NAGARI, BLOCK639 E1-NAND NAGARI, BHARAT MATA MANDIR-JJ COLONY, BLOCK E3-KANSHIPUR, BLOCK E2-NAND NAGARI, BLOCKNNG E5-NAND NAGARI, 1581 GOVT.SARVODAY 630 KVAVIDHYALAYA-BLOCK PLANNED E5 02-03-2020 10:00:00 02-03-2020 15:32:33 5:32 0.00193667 MUs RAGHUVIR PURA-SHANKAR NAGAR,640 SHANKAR NAGAR EXTN-AZAD NAGAR, OLD SEELAMPUR, RAGHUBARPURA NO 2-SEELAMPUR, RAGHUVIR PURA-KANTIKRN NAGAR, 604 OLD SEELAMPUR 2970 KVA PLANNED 20-03-2020 11:00:00 20-03-2020 14:18:00 3:18 0.00737 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 641 NAGAR, BLOCK E-MEET NAGAR NNG 604 2650 KVA UNPLANNED 22-03-2020 12:22:55 22-03-2020 12:58:16 0:35 0.00068056 MUs BLOCK B-EAST GOKUL PURI, BLOCK E-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET NAGAR, BLOCK D-MEET 642 NAGAR NNG 259 2650 KVA UNPLANNED 01-03-2020 09:19:16 01-03-2020 10:12:12 0:52 0.00043333 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-EAST GOKUL PURI, BLOCK D-MEET 643 NAGAR NNG 259 630 KVA UNPLANNED 26-03-2020 14:33:20 26-03-2020 15:02:21 0:29 0.00024167 MUs 644 INDUSTRIAL AREA-PATPAR GANJ INDUSTRIAL AREA LNR 56 400 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:35:00 4:35 0.00160417 MUs SABOLI EXTN.-MANDOLI, BLOCK B-ANUP VIHAR, GTB MIG FLATS-POCKET F, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, MCD SCHOOL- 645 SABOLI COLONY, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI NNG 173 0 KVA UNPLANNED 18-03-2020 20:34:46 18-03-2020 21:25:30 0:50 0.00027778 MUs 646 ASHOKA NIKETAN-ANAND VIHAR JLM 181 990 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 16:31:20 6:31 0.00228083 MUs BHARTI COLONY-NIRMAN VIHAR, BLOCK C-NIRMAN VIHAR, BLOCK647 D-NIRMAN VIHAR, BLOCK B-NIRMAN VIHAR, BLOCK B-PREET VIHAR, GANESH NAGAR EXTN.-SHAKARPUR KHAS,LNR SHAKARPUR 604 EXTN.-SHAKARPUR 2970 KHAS, KVA BLOCK D-PREET PLANNEDVIHAR 06-03-2020 11:00:00 06-03-2020 12:35:35 1:35 0.00184722 MUs 648 DDA FLATS-ROUSE AVENUE DRG 328 630 KVA UNPLANNED 14-03-2020 16:27:32 14-03-2020 17:23:30 0:55 0.00010694 MUs

BLOCK B-KABIR NAGAR, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 649 GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A-RAJIV NAGAR NNG 2678 0 KVA UNPLANNED 13-03-2020 09:43:37 13-03-2020 10:31:47 0:48 0.00066667 MUs

BLOCK A-TUKMIRPUR, BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, PKT W-BLOCK A, BLOCK CN- MANGALAM VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK S-SHIV VIHAR, BLOCK D-SHIV VIHAR, PKT C- SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK C-HARIJAN BASTI, BLOCK V-O & P BLOCKS SHIV 650 VIHAR KARWAL NAGAR, BLOCK D-PREM VIHAR, BLOCK B-MAHALAXMI ENCLAVE KWN 130 0 KVA UNPLANNED 06-03-2020 08:06:47 06-03-2020 11:12:00 3:5 0.00077083 MUs 651 MULTANI DHANDA-SADAR BAZAR, S.R.T. NAGAR-ARYA NAGAR, BLOCK L-RAM NAGAR PHG 272 990 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 13:57:12 3:57 0.0013825 MUs OLD DELHI RAILWAY STATION-CHANDNI CHOWK, LIG/MIG RES/NON COMM AREA-VIJAY GHAT, BLOCK J-NABI KARIM,652 GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, ZEENAT BARI-MORI GATE, RED FORT-CHANDNI CHOWK-REDCCK FORT, RED 3293 FORT-VIJAY GHAT, 3600 TELEGRAPH KVA OFFICE-KASHMERE PLANNED GATE, RAILWAY 11-03-2020 COLONY-KASHMERE 11:00:00 11-03-2020GATE 13:04:00 2:4 0.00086111 MUs GEETA COLONY, BLOCK 5-GEETA 653COLONY, BLOCK 9-GANDHI NAGAR, BLOCK 8A-GEETA COLONY, BLOCK 4-GEETA COLONY, BLOCK 8-GEETA COLONY,KRN OLD GEETA 1109 COLONY-BLOCK 8A 400 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:40:00 4:40 0.00163333 MUs BLOCK E-ANARKALI COLONY NORTH, BLOCK A-KRISHNA NAGAR, BLOCK B-GHONDALI, BLOCK D-RAM NAGAR,654 CHANDER NAGAR BLOCK D-SHASTRI PARK, BLOCK D-RAM NAGAR EXTN., BLOCK A-ARJUN NAGAR WEST,KRN BLOCK B-BLOCK 452 K, BLOCK B-KRISHNA 0 KVANAGAR BLOCK B, BLOCK PLANNED F-RAM NAGAR, BLOCK 19-03-2020 K-KRISHNA 10:03:00 NAGAR 19-03-2020 14:00:00 3:57 0 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A-MANDOLI VILLAGE, SABOLI COLONY- MANDOLI, BLOCK E-SEWA DHAM, POCKET A-JJ COLONY, MCD SCHOOL-SABOLI COLONY, BLOCK D- 655 HARSH VIHAR, SABOLI EXTN.-MANDOLI NNG 173 400 KVA UNPLANNED 06-03-2020 17:21:23 06-03-2020 19:35:07 2:13 0.00073889 MUs LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, BLOCK B-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM 656 AREA-G-BLOCK SONIA VIHAR KWN 130 0 KVA UNPLANNED 23-03-2020 18:23:44 23-03-2020 18:51:05 0:27 0.0001125 MUs

BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D- 657 ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 518 0 KVA UNPLANNED 08-03-2020 22:38:21 08-03-2020 23:30:45 0:52 0.00086667 MUs BLOCK A-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK B-HARSH VIHAR, GOVT.CO. SEC. SCHOOL- HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB STATION-POLICE 658 FARM NNG 259 0 KVA UNPLANNED 04-03-2020 16:42:58 04-03-2020 17:20:20 0:37 0.00030833 MUs BLOCK A-PANDAV NAGAR, BLOCK A-GANESH NAGAR,659 BLOCK C-GANESH NAGAR, BLOCK E-GANESH NAGAR, PANDAV NAGAR BLOCK D-GANESH NAGAR, AKSHARDHAMLNR MANDIR, MADHU 409 VIHAR-INDRAPRASTHA 0 KVA EXTENSION PLANNED 05-03-2020 10:00:00 05-03-2020 14:10:00 4:10 0.00145833 MUs 660 BLOCK C1-NEW ASHOK NAGAR VSE 222 630 KVA PLANNED 02-03-2020 10:03:00 02-03-2020 14:47:58 4:44 0 MUs BLOCK D-RAM NAGAR, BLOCK D-RAM NAGAR EXTN., BLOCK D-RADHEPURI EXTENSION, BLOCK E-RADHEPURI661 EXTENSION, BLOCK D-ANARKALI COLONY NORTH, BLOCK C-NEW LAYALPUR COLONY, BLOCK D-NEW KRNLAYALPUR COLONY, 539 BLOCK A-NEW 1500 LAYALPUR KVA COLONY, BLOCK PLANNED C-RAM NAGAR, BLOCK 17-03-2020 E-RAM 10:03:00NAGAR 17-03-2020 13:32:45 3:29 0.00046444 MUs 662 ARAM NAGAR-SADAR BAZAR PHG 529 990 KVA PLANNED 12-03-2020 11:03:00 12-03-2020 14:42:38 3:39 0.00030417 MUs 663 MAIN BAZAR CHANDANI CHOWK-SISGANJ CCK 272 400 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 13:53:21 3:53 0.00135917 MUs SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK D- 664 HARSH VIHAR, BLOCK A-RAJIV NAGAR NNG 259 0 KVA UNPLANNED 15-03-2020 14:25:49 15-03-2020 15:16:46 0:50 0.00041667 MUs KHUREJI KHAS-SWASTHYA VIHAR, BRIJ PURI-SWASTHYA VIHAR, WEST LAXMI MARKET KHUREJI- 665 ARAM PARK KRN 385 990 KVA UNPLANNED 18-03-2020 15:39:00 18-03-2020 15:58:35 0:19 0.00001056 MUs COMMUNITY CENTRE-JAMA MASZID,666 SITARAM BAZAR-CHANDNI CHOWK, DAV PUBLIC SCHOOL-KALA MASZID, CHANDANI MAHAL-CHANDNI CHOWK,DRG CHURI WALAN 3445 GALI-CHANDNI CHOWK 990 KVA PLANNED 05-03-2020 11:00:00 05-03-2020 14:40:53 3:40 0 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, SEWA DHAM-MANDOLI, BLOCK K-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, 667 VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 604 630 KVA UNPLANNED 22-03-2020 19:14:18 22-03-2020 19:43:12 0:28 0.00054444 MUs BLOCK H-SHIV VIHAR,668 BLOCK K-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK M-SHIV VIHAR, PKT A-BLOCK B, BLOCK A-SHIV VIHAR, BLOCKKWN J-SHIV VIHAR 1459 0 KVA PLANNED 23-03-2020 10:00:00 23-03-2020 14:22:05 4:22 0.00152833 MUs 669 BLOCK 8A-GEETA COLONY, BLOCK 2A-GEETA COLONY KRN 202 630 KVA PLANNED 04-03-2020 10:33:00 04-03-2020 12:30:05 1:57 0.0000975 MUs GURUDWARA SISGANJ ROAD-CHANDNI CHOWK, BHAGIRATH PLACE-CHANDNI CHOWK, MOR 670 SARAY COLONY-CHANDNI CHOWK CCK 234 990 KVA UNPLANNED 04-03-2020 09:47:22 04-03-2020 10:40:34 0:53 0.00017667 MUs BLOCK671 B-SWASTHYA VIHAR, CHITRA VIHAR-SWASTHYA VIHAR, LAXMI NAGAR COMMERCIAL COPLEX-SWASTHYA VIHARLNR 604 0 KVA PLANNED 16-03-2020 11:00:00 16-03-2020 13:00:00 2:0 0.00233333 MUs 672 SADAR BAZAR - RAM NAGAR, SADAR BAZAR B G ROAD, SADAR BAZAR - RAM NAGAR PHG 1088 990 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 13:12:56 3:12 0.00112 MUs BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI EXTN., BLOCK B-PRATAP NAGAR, KABRISTAN-SABOLI 673 COLONY, ANUP VIHAR-MANDOLI, RAJEEV NAGAR-SEWA DHAM NNG 86 0 KVA UNPLANNED 25-03-2020 10:20:00 25-03-2020 10:58:16 0:38 0.00010556 MUs BLOCK B-G- BLOCK SONIA VIHAR EXTENSION, BLOCK D-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG 674 RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION KWN 259 0 KVA UNPLANNED 24-03-2020 19:23:10 24-03-2020 19:48:04 0:24 0.0002 MUs 675 BLOCK C-SURAJMAL VIHAR, SURAJMAL VIHAR-VIVEK VIHAR JLM 43 990 KVA PLANNED 06-03-2020 11:03:00 06-03-2020 13:03:21 2:0 0.00016667 MUs 676 OLD SEELAMPUR KRN 391 990 KVA PLANNED 19-03-2020 11:00:00 19-03-2020 15:43:06 4:43 0.00039306 MUs 677 DALLU PURA MVR-VASUNDHARA ENCLAVE MVR VSE 0 0 KVA UNPLANNED 02-03-2020 19:21:35 02-03-2020 19:31:00 0:9 0 MUs THAKKAR BAPA NAGAR-BLOCK 16,678 BLOCK 6B-DEV NAGAR, BLOCK 3-DEV NAGAR, BLOCK 7B-DEV NAGAR, BLOCK 12A-KAROL BAGH, KHALSA NAGAR-DEVPNR NAGAR, 1326BLOCK G-DEV NAGAR 990 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 15:09:32 5:9 0.0018025 MUs BLOCK T-BALJIT NAGAR, BLOCK L-WEST PATEL NAGAR, BLOCK M-WEST PATEL NAGAR,679 BLOCK N-WEST PATEL NAGAR, BLOCK R-WEST PATEL NAGAR, BLOCK S-WEST PATEL NAGAR, BLOCK T-WESTPNR PATEL NAGAR, 1688 BLOCK V-WEST PATEL 990 KVA NAGAR, INDUSTRIAL PLANNED AREA-ANAND PARBHAT 14-03-2020 10:00:00 14-03-2020 14:42:10 4:42 0.001645 MUs 680 SADAR BAZAR - RAM NAGAR PHG 272 400 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 13:40:54 3:40 0.00128333 MUs 681 VIVEK VIHAR BLOCK C JLM 522 990 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 16:20:00 6:20 0.00221667 MUs NEW USMANPUR-NEW KATWARA, MCD COLONY-NEW KATWARA,682 JAG JEEVAN NAGAR-NEW KATWARA-SHASTRI PARK, BLOCK K-BRAHM PURI, BLOCK B-BRAHM PURI, BLOCKYVR D-BHAJANPURA, 887 JAG JEEVAN NAGAR-NEW 990 KVA KATWARA GHONDA PLANNED 21-03-2020 10:00:00 21-03-2020 15:45:17 5:45 0.0020125 MUs BLOCK M-SUNDER NAGRI, BLOCK683 N-SUNDER NAGRI, BLOCK O-SUNDER NAGRI, BLOCK A-RAJIV NAGAR NNG, BLOCK J-SUNDER NAGRI NNG,NNG BLOCK K-SUNDER 1202 NAGRI NNG 990 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 14:44:06 4:44 0.00165667 MUs

684 BLOCK F-NEHRU VIHAR, BLOCK M-NEHRU VIHAR, BLOCK Z-NEHRU VIHAR, BLOCK T-NEHRU VIHAR KWN 23 990 KVA UNPLANNED 08-03-2020 09:51:16 08-03-2020 10:13:31 0:22 0.00012222 MUs G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK D-HARSH VIHAR, BLOCK A-EAST 685 GOKUL PURI, BLOCK E-MEET NAGAR NNG 284 630 KVA UNPLANNED 02-03-2020 15:55:04 02-03-2020 16:50:00 0:54 0.0003 MUs 686 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 6 630 KVA UNPLANNED 02-03-2020 14:50:00 02-03-2020 15:48:55 0:58 0.00032222 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK C-AMAR 687 COLONY NNG 432 0 KVA UNPLANNED 15-03-2020 17:50:18 15-03-2020 18:45:00 0:54 0.00075 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA- SABHEPUR, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, BLOCK B-G- BLOCK SONIA VIHAR EXTENSION, BLOCK D-TUKMIRPUR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, 688 LIG/MIG RES/NON COMM AREA-SONIA VIHAR KWN 259 0 KVA UNPLANNED 30-03-2020 10:15:09 30-03-2020 11:04:36 0:49 0.00040833 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 689 GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 259 0 KVA UNPLANNED 15-03-2020 11:34:37 15-03-2020 12:30:00 0:55 0.00045833 MUs BLOCK 4-KHICHRIPUR690 RESETTLEMENT COLONY, SHASHI GARDEN-MAYUR VIHAR, ACHARYA NIKETAN-SHASHI GARDEN, PATPAR GANJ-SHASHIMVR GARDEN 2427 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 16:32:12 6:32 0.00228667 MUs 691 BHAGAT NAGAR-DAYALPUR KWN 115 400 KVA UNPLANNED 27-03-2020 15:02:34 27-03-2020 15:30:54 0:28 0.00007778 MUs 692 PKT 4-PHASE I, MAYUR PLACE-MAYUR VIHAR, MAYUR VIHAR EXTN. MVR 328 3890 KVA UNPLANNED 16-03-2020 10:44:00 16-03-2020 10:56:00 0:12 0.00012667 MUs S.R.T. NAGAR-ARYA NAGAR, BLOCK A-AMAR NAGAR, BLOCK L-RAM 693NAGAR, BANGALA SAHIB ROAD-PANCHKUIAN ROAD RAILWAY COLONY, SHEELA HOTEL-ARYA NAGAR, SENIOR SECONDARYPHG ENGINEER 272 WORKSHOP 990 N.R.OFFICE-CHANDNI KVA CHOWK PLANNED CCK 05-03-2020 10:00:00 05-03-2020 14:40:00 4:40 0.00163333 MUs 694 PRATAP KHAND-JHILMIL COLONY, LABOUR COURT-SHIVA KHAND JLM 21 630 KVA PLANNED 04-03-2020 10:03:00 04-03-2020 13:50:00 3:47 0.00189167 MUs LAXMI NAGAR COMMERCIAL COPLEX-SWASTHYA VIHAR, BLOCK C-LALITA PARK, BLOCK E-LALITA 695 PARK LNR 48 990 KVA UNPLANNED 18-03-2020 01:38:03 18-03-2020 02:03:00 0:24 0.00006667 MUs 696 BLOCK T-BALJIT NAGAR, THAKKAR BAPA NAGAR-DEV NAGAR PNR 272 990 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 13:57:58 3:57 0.0013825 MUs BLOCK A4-NAND NAGARI, SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, MCD SCHOOL- 697 SABOLI COLONY, VILLAGE SABOLI-SABOLI COLONY NNG 173 0 KVA UNPLANNED 18-03-2020 18:18:35 18-03-2020 19:04:39 0:46 0.00025556 MUs 698 BLOCK A-MEET NAGAR, BLOCK C-MEET NAGAR NNG 466 1620 KVA UNPLANNED 24-03-2020 21:04:00 24-03-2020 21:47:00 0:42 0.00063 MUs 699 VISHWAS NAGAR EXTN.-SHAHDARA JLM 67 400 KVA PLANNED 12-03-2020 14:03:00 12-03-2020 16:09:00 2:6 0.000175 MUs BLOCK B-KABIR NAGAR, BLOCK B-NORTH CHHAJUPUR, BLOCK E-NORTH CHHAJUPUR, BLOCK A- 700 NORTH CHHAJUPUR, BLOCK C-NORTH CHHAJUPUR NNG 118 990 KVA UNPLANNED 04-03-2020 12:32:09 04-03-2020 13:24:26 0:52 0.00028889 MUs 701 SUBHASH PARK-GORAKH PARK, LIG/MIG RES/NON COMM AREA-SHASTRI PARK YVR 181 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 13:44:49 3:44 0.00130667 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI,702 SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK B-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLINNG COLONY-MANDOLI, 181 SEWA DHAM-MANDOLI 0 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 14:00:00 4:0 0.0014 MUs

SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, SEWA 703 DHAM-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SEWA DHAM-MANDOLI NNG 345 0 KVA UNPLANNED 18-03-2020 11:07:10 18-03-2020 11:45:08 0:37 0.00041111 MUs BLOCK B-NEW SILAMPURI PHASE IV, BLOCK B-NEW SIMAPURI, BLOCK J-SILAMPUR COLONY, JAFFRABAD-MAUJ PUR, JHUGI-NEW SILAMPURI PHASE I, ZERO PUSTA-USMAN PUR, BLOCK A-NEW 704 SIMAPURI YVR 151 400 KVA UNPLANNED 05-03-2020 02:23:09 05-03-2020 05:25:00 3:1 0.00050278 MUs BLOCK A-JOHRI PUR,705 TUNDA NAGAR-BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR,KWN BHAGIRATHI VIHAR 13 400 KVA PLANNED 17-03-2020 11:03:00 17-03-2020 15:15:42 4:12 0.0021 MUs BLOCK H-JAGATPURI,706 BLOCK E-ANARKALI COLONY NORTH, BLOCK B-JAGATPURI, BLOCK K-JAGATPURI, BLOCK B-JAGATPURI, EXTENTION-JAGATPURIKRN 815 990 KVA PLANNED 04-03-2020 11:30:00 04-03-2020 14:39:59 3:9 0.0002625 MUs 707 BLOCK 3-DEV NAGAR PNR 0 990 KVA PLANNED 19-03-2020 10:03:00 19-03-2020 16:32:12 6:29 0 MUs BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, BLOCK B-MUSTAFABAD (DAYALPUR), CLOCK C- 708 BIHARIPUR, BLOCK D-TUKMIRPUR, BLOCK B-TUKMIRPUR KWN 173 0 KVA UNPLANNED 04-03-2020 21:00:00 04-03-2020 22:20:00 1:19 0.00043889 MUs 709 MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA CCK 1692 990 KVA PLANNED 01-03-2020 10:00:00 01-03-2020 15:25:06 5:25 0.00036111 MUs BLOCK A-MEET NAGAR, BLOCK A-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, 710 BLOCK A-EAST GOKUL PURI, BLOCK E-MEET NAGAR NNG 259 630 KVA UNPLANNED 28-03-2020 11:33:56 28-03-2020 12:07:01 0:33 0.000275 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 711 SADAR BAZAR - RAM NAGAR, SADAR BAZAR - RAM NAGAR PHG 2716 990 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 14:05:00 4:5 0.00142917 MUs BLOCK E3-NAND NAGARI, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK A-ANUP VIHAR, SEWA 712 DHAM-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 03-03-2020 16:41:29 03-03-2020 17:16:58 0:35 0.00048611 MUs BLOCK713 1E-JHANDEWALAN EXTENSION, CINEMA-JHANDEWALAN EXTENSION, BLOCK 2E-JHANDEWALAN EXTENSIONSRD 272 990 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 14:14:12 4:14 0.00148167 MUs PART I- BLOCK R-NEW RAJENDRA NAGAR, BLOCK A-OLD RAJENDRA NAGAR,714 NORTH EXTENSION AREA- BLOCK B-OLD RAJENDRA NAGAR, SIR GANGA RAM HOSPITAL-CENTRAL RIDGE RESERVEDSRD FOREST, 905 JANKI DEVI COLLEGE-CENTRAL 400 KVA RIDGE RESERVED PLANNED FOREST 21-03-2020 11:00:00 21-03-2020 12:52:00 1:52 0.00062222 MUs 715 BLOCK H-OLD MUSTAFABAD, BLOCK T-OLD MUSTAFABAD, BLOCK D-OLD MUSTAFABAD KWN 181 1500 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 13:46:21 3:46 0.00131833 MUs BLOCK A-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK B-HARSH VIHAR, GOVT.CO. SEC. SCHOOL- HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB STATION-POLICE 716 FARM NNG 259 0 KVA UNPLANNED 04-03-2020 11:25:15 04-03-2020 11:57:56 0:32 0.00026667 MUs 717 GYAN KUNJ-WEST GURU ANGAD NAGAR, VISHWAKARMA PARK-KISHAN KUNJ LNR 403 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:45:00 3:45 0.0013125 MUs BLOCK718 F-NORTH CHHAJUPUR, PKT C-BLOCK B, BLOCK D-JYOTI NAGAR, BLOCK C-NORTH CHHAJUPUR, PKT H-BLOCKNNG D 181 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 13:47:45 3:47 0.00132417 MUs

BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK B-SEWA DHAM, SEWA DHAM-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI 719 EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 06-03-2020 16:32:50 06-03-2020 19:28:00 2:55 0.00243056 MUs 720 BLOCK B-ANUP VIHAR, BLOCK B-PRATAP NAGAR, BLOCK A-ANUP VIHAR NNG 86 0 KVA UNPLANNED 16-03-2020 20:06:11 16-03-2020 20:43:48 0:37 0.00010278 MUs FATEHPURI MASJID-CHANDNI CHOWK, NAYA BAZAR-CHANDNI CHOWK, KHARI BAWLI-NAYA BANS- 721 LAHORI GATE CCK 359 630 KVA UNPLANNED 02-03-2020 17:03:00 03-03-2020 00:00:27 6:57 0.00046333 MUs BLOCK O-BRAHM PURI, BLOCK M-BRAHM PURI, BLOCK K-BRAHM722 PURI, BLOCK R-BRAHM PURI, BLOCK N-BRAHM PURI, BLOCK P-BRAHM PURI, BLOCK E-BRAHM PURI, BLOCK L-BRAHMYVR PURI, BLOCK 811 J-BRAHM PURI, 990 GHONDA KVA PATTI CHAUHAN PLANNED 17-03-2020 11:03:00 17-03-2020 13:04:47 2:1 0.00033611 MUs 723 CLOSED FACTORY-FARIDPURI, KT COLONY-VOLTAS LTD, ARMY QTRS-ANAND PARBAT PNR 213 400 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 15:25:10 5:25 0.00189583 MUs 724 SUBHASH PARK-GORAKH PARK, BLOCK A-WELCOME COLONY YVR 526 630 KVA UNPLANNED 20-03-2020 11:54:48 20-03-2020 12:17:00 0:22 0.00003056 MUs BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, 725 BLOCK A-EAST GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 216 630 KVA UNPLANNED 16-03-2020 11:59:10 16-03-2020 12:53:56 0:54 0.000375 MUs 726 YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 86 630 KVA UNPLANNED 06-03-2020 08:23:02 06-03-2020 09:20:00 0:56 0.00015556 MUs BLOCK_34P-KRISHNA NAGAR, BLOCK_45-KRISHNA NAGAR,727 BLOCK_31-KRISHNA NAGAR, BLOCK_44O-KRISHNA NAGAR, BLOCK_3H-KRISHNA NAGAR, BLOCK_48-KRISHNASRD NAGAR, BLOCK_6-KAROL 694 BAGH WEST 990 KVA EXTENSION AREA PLANNED 07-03-2020 10:00:00 07-03-2020 12:39:19 2:39 0.0009275 MUs 728 PKT B-CHITRAKOOT, BLOCK D-ASHOK NAGAR NNG 181 990 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 13:41:03 3:41 0.00128917 MUs 729 BLOCK D-ANAND VIHAR, J J COLONY-ANAND VIHAR JLM 308 990 KVA PLANNED 05-03-2020 11:03:00 05-03-2020 15:40:00 4:37 0.00230833 MUs

BLOCK B-CHANDU NAGAR, BLOCK C-KARAWAL NAGAR, BLOCK A8-SADAT PUR, BLOCK F-SADAT 730 PUR, BLOCK C-MUSTAFABAD (DAYALPUR), BLOCK B-DAYALPUR, BHAJANPURA-DAYALPUR KWN 0 0 KVA UNPLANNED 20-03-2020 02:47:00 20-03-2020 03:45:52 0:58 0 MUs CHANDANI MAHAL-CHANDNI CHOWK, PATODI HOUSE-CHANDNI CHOWK, MTNL TELEPHONE 731 EXCHANGE-PATODI HOUSE DRG 483 990 KVA UNPLANNED 11-03-2020 09:51:09 11-03-2020 10:34:45 0:43 0.00005972 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN., SHIVPURI- 732 JAGATPURI, CHANDER NAGAR BLOCK D-KRISHNA NAGAR EXTN. KRN 513 990 KVA UNPLANNED 14-03-2020 08:11:05 14-03-2020 10:00:00 1:48 0.00018 MUs SABOLI VILLAGE-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK A-EAST GOKUL 733 PURI, BLOCK D-MEET NAGAR NNG 33 630 KVA UNPLANNED 12-03-2020 11:08:39 12-03-2020 12:00:50 0:52 0.00028889 MUs 734 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 475 1620 KVA UNPLANNED 18-03-2020 19:46:00 18-03-2020 20:03:00 0:17 0.00025972 MUs BLOCK B-NIRMAN VIHAR,735 GANESH NAGAR EXTN.-SHAKARPUR KHAS, SHAKARPUR EXTN.-SHAKARPUR KHAS, LAXMI NAGAR COMMERCIALLNR COPLEX-SWASTHYA 1496 VIHAR 990 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 13:28:09 3:28 0.00121333 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, POCKET A-JJ COLONY, BLOCK C- SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH 736 VIHAR NNG 432 0 KVA UNPLANNED 04-03-2020 19:03:02 04-03-2020 19:15:50 0:12 0.00016667 MUs G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK E-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C- 737 MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 604 2650 KVA UNPLANNED 14-03-2020 16:20:14 14-03-2020 16:58:04 0:37 0.00071944 MUs BAGICHI ALLUDDIN-SADAR BAZAR,738 BLOCK T-AHATA KEDARA, PHARI DHIRAJ-SADAR BAZAR, SADAR BAZAR - RAM NAGAR, SADAR BAZAR B G ROAD,PHG SADAR BAZAR 1724 - RAM NAGAR 990 KVA PLANNED 02-03-2020 09:03:00 02-03-2020 15:21:44 6:18 0 MUs

739 BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 86 0 KVA UNPLANNED 20-03-2020 20:20:00 20-03-2020 21:18:58 0:58 0.00016111 MUs BLOCK D-ASHOK NAGAR,740 BLOCK C-HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, GOVT.CO. SEC.NNG SCHOOL-HARSH 181 VIHAR 0 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 14:28:21 4:28 0.00156333 MUs BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, SUBHASH VIHAR-YAMUNA741 VIHAR, BLOCK B5-YAMUNA PUR (GONDA) BLOCK B, BLOCK C3-YAMUNA VIHAR, BLOCK B4-YAMUNA VIHAR, YVRBLOCK C-GHONDA, 604 BSES 66 KV GRID 4630 S/STATION-COMMUNITY KVA PLANNED CENTRE YAMUNA 17-03-2020VIHAR 11:00:00 17-03-2020 14:03:32 3:3 0.00355833 MUs 742 BLOCK B-MANUJPUR YVR 455 990 KVA UNPLANNED 04-03-2020 09:51:36 04-03-2020 10:09:50 0:18 0.000025 MUs

BHARAT MATA MANDIR-JJ COLONY, BLOCK A1-NAND NAGARI, SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BUDH VIHAR-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A- 743 HARSH VIHAR, BAPA NAGAR-ANAND PARBAT, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI NNG 345 400 KVA UNPLANNED 01-03-2020 07:40:32 01-03-2020 07:59:11 0:18 0.0002 MUs 744 SUBHASH PARK-GORAKH PARK, JAFFRABAD-MAUJ PUR, BLOCK D-BHAJANPURA YVR 86 990 KVA PLANNED 14-03-2020 09:03:00 14-03-2020 15:41:13 6:38 0.00110556 MUs BLOCK H-KRISHNA NAGAR, BLOCK A-KRISHNA745 NAGAR, BLOCK D-RAM NAGAR, BLOCK B-RADHEPURI EXTENSION, BLOCK D-RADHEPURI EXTENSION, JHEEL-GHONDALI,KRN 181 BLOCK C-RAM NAGAR 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 15:12:59 5:12 0.00182 MUs 746 BLOCK A-BANK COLONY NNG 208 0 KVA UNPLANNED 12-03-2020 20:49:46 12-03-2020 21:11:46 0:22 0.00012222 MUs BLOCK E-RAJIV NAGAR, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK A-RAJIV NAGAR, SEWA DHAM-MANDOLI, ANUP VIHAR- 747 MANDOLI, SEWA DHAM-MANDOLI NNG 604 0 KVA UNPLANNED 11-03-2020 10:01:01 11-03-2020 10:50:00 0:48 0.00093333 MUs BLOCK T-BALJIT NAGAR, PREM NAGAR-BALJIT NAGAR, BLOCK748 T-PANJABI BASTI, KHALSA NAGAR-DEV NAGAR, DELHI MILK SCHEM DMS-PREM NAGAR, DMS COLONY-PREM NAGAR,PNR RAILWAY 4681 COLONY-KARAMPURA, 2970 KVA BLOCK F-PUNJABI BASTI PLANNED 02-03-2020 11:00:00 02-03-2020 14:51:28 3:51 0.00449167 MUs SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, MCD SCHOOL- SABOLI COLONY, BLOCK D-MEET NAGAR, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI, 749 SABOLI EXTN.-MANDOLI NNG 432 630 KVA UNPLANNED 26-03-2020 15:45:32 26-03-2020 16:03:34 0:18 0.00025 MUs 750 MOSQUE-LAL KUAN BAZAR, CHAWRI BAZAR-KHUSH DIL CCK 272 990 KVA UNPLANNED 08-03-2020 22:54:00 08-03-2020 23:56:00 1:1 0.00035583 MUs BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV 751 NAGAR, ANUP VIHAR-MANDOLI, RAJEEV NAGAR-SEWA DHAM NNG 173 0 KVA UNPLANNED 20-03-2020 17:17:54 20-03-2020 18:11:52 0:53 0.00029444 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK F-GOPAL PARK, BLOCK H-KRISHNA NAGAR, BLOCK D-RAM NAGAR, BLOCK E-WEST CHANDER NAGAR, CHANDER NAGAR752 BLOCK C-KRISHNA NAGAR EXTN., CHANDER NAGAR BLOCK D-SHASTRI PARK, BLOCK E-CHANDAR NAGAR, BLOCKKRN D-RAM NAGAR 6936 EXTN., SHIVPURI-JAGATPURI, 3960 KVA BLOCK F-RAM PLANNED NAGAR, CHANDER 13-03-2020 NAGAR BLOCK 11:00:00 D-KRISHNA 13-03-2020 NAGAR EXTN., 14:09:38 BLOCK D-CHANDAR 3:9 NAGAR, BLOCK F-CHANDAR 0.000735 NAGAR MUs 753 LIG/MIG RES/NON COMM AREA-RAJ GHAT, RAILWAY COLONY-CONNAUGHT PLACE DRG DRG 272 630 KVA PLANNED 03-03-2020 10:03:00 03-03-2020 14:30:07 4:27 0.0015575 MUs 754 PATPAR GANJ-SHASHI GARDEN, BLOCK E-PANDAV NAGAR, PANDAV NAGAR MVR-SHAKARPUR MVR MVR 539 990 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 17:40:52 7:40 0.00268333 MUs 755 GAZIPUR DAIRY FARM MVR 86 400 KVA UNPLANNED 19-03-2020 15:13:00 19-03-2020 15:29:57 0:16 0.00004444 MUs BLOCK H-BRAHM PURI, JAGJEET NAGAR-GHONDA, GAUTAM VIHAR-GHONDA, GHONDA PATTI 756 CHAUHAN, BLOCK V-GHONDA PATTI CHAUHAN YVR 18 990 KVA UNPLANNED 29-03-2020 17:30:35 29-03-2020 18:01:08 0:30 0.00010833 MUs 757 VISHWAS NAGAR-SHAHDARA, AMBEDKAR NAGAR-SHAHDARA, VISHWAS NAGAR JLM 43 990 KVA UNPLANNED 20-03-2020 13:09:00 20-03-2020 13:52:08 0:43 0.00005972 MUs BLOCK 5-TRILOKPURI758 PHASE I, BLOCK 20-HIMMATPURI, BLOCK 19-HIMMATPURI, BLOCK 25-TRILOKPURI PHASE II, HIMMATPURI-MAYURMVR VIHAR 181 630 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 16:45:53 6:45 0.0023625 MUs 759 MAHILA COLONY-SEELAMPUR, CHAND MOHALLA-RAJGARH COLONY KRN 815 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:25:21 3:25 0.00119583 MUs 760 ARAM NAGAR-SADAR BAZAR PHG 529 990 KVA PLANNED 04-03-2020 11:03:00 04-03-2020 15:55:00 4:52 0.00040556 MUs

LIG/MIG RES/NON COMM AREA-SABHEPUR, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, BLOCK B-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG 761 RES/NON COMM AREA-E-BLOCK SONIA VIHAR KWN 130 0 KVA UNPLANNED 10-03-2020 23:32:47 11-03-2020 04:12:51 4:40 0.00116667 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 762 NAGAR, BLOCK E-MEET NAGAR NNG 863 2650 KVA UNPLANNED 03-03-2020 07:57:05 03-03-2020 08:20:01 0:22 0.00061111 MUs 763 BLOCK A- BHARTIYA BODH SABHA-HARDEV PURI, BLOCK A-NATHU COLONY NNG 86 990 KVA UNPLANNED 02-03-2020 19:18:25 02-03-2020 19:43:28 0:25 0.00006944 MUs 764 EAST ROHTASH NAGAR-SHAHDARA JLM 112 630 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 13:35:00 3:35 0.00029861 MUs BLOCK B-NIRMAN VIHAR,765 BLOCK B-PREET VIHAR, SHANKAR VIHAR-SWASTHYA VIHAR, BLOCK A-SWASTHYA VIHAR, DEFENCE ENCLAVE-SWASTHYALNR VIHAR 97 990 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 14:00:08 4:0 0.0014 MUs SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK A-EAST GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM- 766 MANDOLI NNG 432 0 KVA UNPLANNED 18-03-2020 07:54:32 18-03-2020 09:32:38 1:38 0.00136111 MUs 767 BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK D-MEET NAGAR NNG 173 0 KVA UNPLANNED 03-03-2020 15:26:04 03-03-2020 15:42:55 0:16 0.00008889 MUs NAI SARAK-JOGIWARA, KATRA NAWAB-CHANDNI CHOWK,768 CHAWRI BAZAR-KHUSH DIL, NAI SARAK-KATRA ASRAFI, TOWN HILL-KATRA NEEL, TOWN HALL-KUCHA NATWA,CCK MAIN BAJAR-MALIWARA, 1136 GHANTA 990 GHAR-KATRA KVA ASRAFI PLANNED 16-03-2020 10:00:00 16-03-2020 14:17:30 4:17 0.00149917 MUs 769 BLOCK_37J-BEADON PURA, BLOCK 5-KAROL BAGH, BLOCK 15A-KAROL BAGH SRD 272 990 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 13:06:30 3:6 0.001085 MUs BLOCK D-VINOD NAGAR WEST,770 FAZALPUR-MANDAWALI VILLAGE, BLOCK A-MANDAWALI, BLOCK D-MANDAWALI VILLAGE, RAILWAY COLONY-MANDAWALILNR 181 VILLAGE 0 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 14:22:16 4:22 0.00152833 MUs BLOCK 9-EAST PATEL NAGAR, BLOCK 25-EAST PATEL NAGAR, BLOCK 30-EAST771 PATEL NAGAR, RAJENDRA BHAWAN-RAJENDRA PLACE, BLOCK 13-KAROL BAGH, BLOCK 2-WEST PATEL NAGAR,PNR RADHA SWAMI 905 SAT SANG COMPLEX-RAJENDRA 2250 KVA PLACE, BLOCK PLANNED G-DEV NAGAR 18-03-2020 11:00:00 18-03-2020 15:36:00 4:36 0.00552 MUs PETROL772 PUMP-POCKET C, LIG/MIG RES/NON COMM AREA-JEEVAN SARITA, LIG/MIG RES/NON COMM AREA-KALANDERDGN COLONY 85 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 17:30:00 7:30 0.002625 MUs 773 BLOCK H-KRISHNA NAGAR, BLOCK C-KRISHNA NAGAR KRN 0 990 KVA UNPLANNED 23-03-2020 11:54:41 23-03-2020 12:18:45 0:24 0 MUs BLOCK A2-NAND NAGARI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. 774 SCHOOL-HARSH VIHAR NNG 2678 0 KVA UNPLANNED 11-03-2020 23:20:39 11-03-2020 23:52:19 0:31 0.00043056 MUs 775 BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR KWN 86 100 KVA UNPLANNED 05-03-2020 14:54:28 05-03-2020 15:34:23 0:39 0.00010833 MUs HANSRAJ SCHOOL-POCKET H, MUKHRJI SCHOOL-POCKET L, DDA QUARTERS-POCKET Q, FLORA DALE SECONDARY SCHOOL-POCKET R, SHAHNI DEV MANDIR-POCKET SG, SUNDAY TENT-JHILMIL- 776 TAHIRPUR DGN 418 630 KVA UNPLANNED 23-03-2020 12:07:33 23-03-2020 12:35:12 0:27 0.0001125 MUs

SABOLI EXTN.-MANDOLI, MCD SCHOOL-SABOLI COLONY, BLOCK D-HARSH VIHAR, BLOCK B-RAJIV 777 NAGAR, BLOCK D-MEET NAGAR, RAJEEV NAGAR-SEWA DHAM, VILLAGE SABOLI-SABOLI COLONY NNG 86 0 KVA UNPLANNED 27-03-2020 10:40:00 27-03-2020 11:29:28 0:49 0.00013611 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR 778 COLONY, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR NNG 259 1620 KVA UNPLANNED 02-03-2020 12:46:34 02-03-2020 13:40:00 0:53 0.00044167 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, SEWA DHAM- 779 MANDOLI, SABOLI COLONY-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 28-03-2020 00:43:24 28-03-2020 01:12:55 0:29 0.00040278 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., POCKET A-JJ COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH 780 VIHAR, BLOCK B-HARSH VIHAR NNG 173 0 KVA UNPLANNED 05-03-2020 10:26:59 05-03-2020 11:22:41 0:55 0.00030556 MUs GORAKH PARK EAST-SILAMPUR, BLOCK B-GORAKH PARK, SHIVAJI PARK-BALBIR NAGAR, OLDANPUR-NAVIN SHAHDARA,781 PANCHSHEEL PARK-NAVIN SHAHDARA, EAST ROHTASH NAGAR-SHAHDARA, BLOCK H-PRATAP PURA, BLOCK Y-PRATAPDGN PURA, BLOCK 2428 V-PRATAP PURA, 990 BLOCKKVA X-PRATAP PURA, PLANNED BLOCK C-PRATAP PURA, 13-03-2020 GOPAL 10:00:00 K.OIL DEPO.-PRATAP 13-03-2020 PURA 16:10:45 6:10 0.00215833 MUs

SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A- 782 ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 173 0 KVA UNPLANNED 21-03-2020 14:54:03 21-03-2020 15:47:39 0:53 0.00029444 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, POCKET A-JJ COLONY, BLOCK C-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 783 GOVT.CO. SEC. SCHOOL-HARSH VIHAR, J.R. COMPLEX-SEWA DHAM NNG 2643 0 KVA UNPLANNED 06-03-2020 11:56:51 06-03-2020 12:55:13 0:58 0.00032222 MUs SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SABOLI 784 COLONY-MANDOLI, ANUP VIHAR-MANDOLI NNG 173 0 KVA UNPLANNED 18-03-2020 21:37:49 18-03-2020 22:24:18 0:46 0.00025556 MUs BLOCK E-WEST PATEL NAGAR, BLOCK 15-WEST PATEL NAGAR, BLOCK B-WEST PATEL NAGAR, BLOCK785 16-WEST PATEL NAGAR, BLOCK 11-WEST PATEL NAGAR, BLOCK A-WEST PATEL NAGAR, BLOCK Z-WEST PATELPNR NAGAR, BLOCK 272 F-PUNJABI BASTI, 990 BLOCK KVA 25-WEST PATEL PLANNED NAGAR, BLOCK 24-WEST 17-03-2020 PATEL NAGAR 10:00:00 17-03-2020 13:23:23 3:23 0.00118417 MUs 786 BLOCK C-MEET NAGAR, BLOCK B-EAST GOKUL PURI, BLOCK A-EAST GOKUL PURI NNG 777 2650 KVA UNPLANNED 24-03-2020 21:04:00 24-03-2020 21:47:00 0:42 0.00105 MUs

BLOCK D-HARSH VIHAR, BLOCK E-SEWA DHAM, BLOCK B-SEWA DHAM, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, BLOCK E-RAJIV NAGAR, SABOLI COLONY-MANDOLI, BLOCK H- SEWA DHAM, BLOCK A-BANK COLONY, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, NEW MANDOLI INDUSTRIAL AREA, J.R. COMPLEX-SEWA DHAM, BLOCK A-MANDOLI VILLAGE, 787 BLOCK C-HARSH VIHAR, HARSH VIHAR SUB STATION-POLICE FARM NNG 104 0 KVA UNPLANNED 14-03-2020 15:06:00 14-03-2020 16:06:00 1:0 0.0002 MUs DELHI JAL BOARD MIG FLATS-POCKET A, AMIG FLATS-POCKET A, GOVT.BOYS SEC.SCHOOL- 788 POCKET A NNG 282 990 KVA UNPLANNED 20-03-2020 21:43:38 20-03-2020 22:06:26 0:22 0.00006111 MUs BLOCK D-AJIT NAGAR, DHARAM PURA-KAILASH NAGAR, BLOCK 9-DHARAM789 PURA, SUBHASH MOHALLA-SEELAMPUR, BLOCK 9-KAILASH NAGAR, AJIT NAGAR-KAILASH NAGAR, DHRAMKRN PURA-KAILASH 181 NAGAR, OLD SEELAMPUR, 400 KVA BLOCK 9-GANDHI PLANNED NAGAR 16-03-2020 10:00:00 16-03-2020 14:50:00 4:50 0.00169167 MUs 790 BLOCK T-BALJIT NAGAR, SHADIPUR DEPOT-BALJIT NAGAR PNR 1750 990 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 14:29:26 4:29 0.00156917 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK A- ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK B-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI 791 COLONY-MANDOLI, ANUP VIHAR-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 173 0 KVA UNPLANNED 12-03-2020 13:33:05 12-03-2020 13:56:37 0:23 0.00012778 MUs

BHARAT MATA MANDIR-JJ COLONY, BLOCK A1-NAND NAGARI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-MANDOLI EXTN., NEW MANDOLI INDUSTRIAL AREA, 792 DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR NNG 604 0 KVA UNPLANNED 26-03-2020 13:37:17 26-03-2020 14:06:07 0:28 0.00054444 MUs 793 SEWA DHAM-MANDOLI NNG 60 400 KVA UNPLANNED 27-03-2020 20:32:00 27-03-2020 21:07:00 0:35 0.00006806 MUs 794 BLOCK C-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 181 0 KVA PLANNED 23-03-2020 10:00:00 23-03-2020 10:39:17 0:39 0.0002275 MUs 795 RANI GARDEN-GEETA COLONY KRN 0 630 KVA PLANNED 17-03-2020 10:03:00 17-03-2020 17:00:31 6:57 0.00046333 MUs 796 M.C.P. SCHOOL-POCKET O, BLOCK P-POCKET P, BLOCK D-POCKET N DGN 86 630 KVA UNPLANNED 07-03-2020 18:18:07 07-03-2020 18:33:03 0:14 0.00003889 MUs 797 G.B.SSS SCHOOL-GOKUL PURI, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK D-HARSH VIHAR NNG 181 0 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 14:22:03 4:22 0.00152833 MUs 798 AGCR ENCLAVE-INSTITUTIONAL AREA JLM 6 400 KVA PLANNED 03-03-2020 11:03:00 03-03-2020 17:20:53 6:17 0.00052361 MUs BLOCK C-HARSH VIHAR, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR, 799 BLOCK B-RAJIV NAGAR NNG 259 0 KVA UNPLANNED 14-03-2020 13:42:16 14-03-2020 14:39:07 0:56 0.00046667 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET 800 NAGAR, BLOCK E-MEET NAGAR NNG 760 2650 KVA UNPLANNED 24-03-2020 16:32:00 24-03-2020 17:22:00 0:49 0.00119778 MUs 801 BLOCK A-JHILMIL INDUSTRIAL AREA DGN 173 990 KVA UNPLANNED 20-03-2020 15:30:00 20-03-2020 16:00:58 0:30 0.00016667 MUs SABOLI EXTN.-MANDOLI, MCD SCHOOL-SABOLI COLONY, SABOLI VILLAGE-MANDOLI, SABOLI 802 EXTN.-MANDOLI NNG 691 630 KVA UNPLANNED 24-03-2020 21:05:00 24-03-2020 21:47:00 0:42 0.00093333 MUs 803 BLOCK 11-GEETA COLONY KRN 181 990 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 14:22:33 4:22 0.00152833 MUs PKT804 4-PHASE I, SHASHI GARDEN-MAYUR VIHAR, ACHARYA NIKETAN-SHASHI GARDEN, PATPAR GANJ-SHASHI GARDENMVR 750 630 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 15:33:50 5:33 0.0019425 MUs 805 BLOCK B-MANUJPUR YVR 360 990 KVA UNPLANNED 04-03-2020 10:23:41 04-03-2020 10:43:31 0:19 0.00002639 MUs 806 GTB MIG FLATS-POCKET D, FLORA DALE SECONDARY SCHOOL-POCKET R DGN 443 400 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 14:40:50 4:40 0.00163333 MUs 807 SABOLI EXTN.-MANDOLI, MCD SCHOOL-SABOLI COLONY NNG 35 400 KVA UNPLANNED 19-03-2020 09:18:53 19-03-2020 10:05:31 0:46 0.00038333 MUs BLOCK 9-GANDHI808 NAGAR, BLOCK 9-GANDHI NAGAR, BLOCK 9-SUBHASH MOHALLA_I, BLOCK 9-KAILASH NAGAR, BLOCK 9-GANDHIKRN NAGAR 604 2990 KVA PLANNED 04-03-2020 11:00:00 04-03-2020 13:10:32 2:10 0.00252778 MUs 809 BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR NNG 86 0 KVA UNPLANNED 13-03-2020 15:27:25 13-03-2020 16:16:15 0:48 0.00013333 MUs BHARAT MATA MANDIR-JJ COLONY, JANTA FLATS-NAND NAGARI, BLOCK A-MANDOLI EXTN., 810 BLOCK D-MANDOLI EXTN., SABOLI EXTN.-MANDOLI NNG 259 2420 KVA UNPLANNED 24-03-2020 16:29:00 24-03-2020 17:22:00 0:53 0.00044167 MUs BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY,811 BLOCK H-SEWA DHAM, BLOCK A-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKULNNG PURI, BLOCK 181 D-MEET NAGAR, 0BLOCK KVA E-MEET NAGAR PLANNED 13-03-2020 10:00:00 13-03-2020 14:30:25 4:30 0.001575 MUs NEW GOVIND PURA-JAGATPURI,812 BLOCK 9-GANDHI NAGAR, SHIVPURI-JAGATPURI, BLOCK E-JAGATPURI, RASHID MARKET-JAGATPURI, KRNBALDEV PARK-JAGATPURI 1518 990 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 13:44:06 3:44 0.00130667 MUs 813 BLOCK C-KABIR NAGAR, BLOCK A-KABIR NAGAR, BLOCK B-KABIR NAGAR NNG 1541 990 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:45:13 4:45 0.0016625 MUs SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK D- 814 MEET NAGAR, VILLAGE SABOLI-SABOLI COLONY NNG 259 0 KVA UNPLANNED 01-03-2020 16:07:08 01-03-2020 16:51:43 0:44 0.00036667 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK D-HARSH 815 VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK A-RAJIV NAGAR NNG 518 0 KVA UNPLANNED 14-03-2020 16:26:02 14-03-2020 16:51:47 0:25 0.00041667 MUs SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI EXTN.- 816 MANDOLI NNG 432 0 KVA UNPLANNED 14-03-2020 16:19:30 14-03-2020 17:17:40 0:58 0.00080556 MUs RAGHUVIR817 PURA-SHANKAR NAGAR, OLD SEELAMPUR, RAGHUBARPURA NO 2-SEELAMPUR, RAGHUVIR PURA-KANTIKRN NAGAR 891 990 KVA PLANNED 13-03-2020 10:03:00 13-03-2020 13:08:48 3:5 0.00051389 MUs 818 VISHWAS NAGAR EXTN.-SHAHDARA, ARJUN NAGAR EAST-SHAHDARA JLM 148 0 KVA PLANNED 04-03-2020 11:00:00 04-03-2020 13:23:41 2:23 0.00019861 MUs 819 JAGRITI ENCLAVE-ANAND VIHAR JLM 1 990 KVA PLANNED 12-03-2020 10:03:00 12-03-2020 15:20:00 5:17 0.00264167 MUs LIG/MIG RES/NON COMM AREA-A-BLOCK SHRI RAM COLONY, BLOCK820 A-SHRI RAM COLONY, BLOCK B-B-BLOCK SHRI RAM COLONY, BLOCK C-SHRI RAM COLONY, BLOCK D-C-BLOCK SHRIKWN RAM COLONY, 278 LIG/MIG RES/NON 990 COMM KVA AREA-SHRI RAM PLANNED COLONY 12-03-2020 10:00:00 12-03-2020 13:03:00 3:3 0.0010675 MUs 821PHARI DHIRAJ-SADAR BAZAR, SADAR BAZAR - RAM NAGAR, SADAR BAZAR B G ROAD, SADAR BAZAR - RAM NAGARPHG 1089 990 KVA PLANNED 05-03-2020 10:03:00 05-03-2020 14:40:00 4:37 0 MUs THAKKAR BAPA NAGAR-BLOCK 16, BLOCK T-BALJIT NAGAR, BLOCK 15-EAST PATEL NAGAR, BLOCK G-COTTAGE, BLOCK 15-WEST PATEL NAGAR, BLOCK 16-WEST PATEL NAGAR, BLOCK 6-WEST822 PATEL NAGAR, RESTRICTED AREA MILITARY-WEST PATEL NAGAR, P.G.D.A.V. SR. SCHOOL-EAST PATEL NAGAR,PNR BLOCK A-WEST 453 PATEL NAGAR, BLOCK 1980 KVA Z-WEST PATEL NAGAR, PLANNED BLOCK 25-WEST 16-03-2020PATEL NAGAR, 10:03:00 BLOCK 24-WEST 16-03-2020 PATEL 16:49:51NAGAR, BLOCK Y-WEST 6:46 PATEL NAGAR, BAPA 0.00676667 NAGAR-ANAND MUs PARBAT BLOCK_3H-KRISHNA NAGAR,823 BLOCK_10A-BALMIKI COLONY, BLOCK_13B-BALMIKI COLONY, BLOCK 13-KAROL BAGH, BLOCK 4-KAROL BAGH,SRD BLOCK_1A-REHAGAR 272 PURA 990 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 14:24:06 4:24 0.00154 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, MCD SCHOOL-SABOLI COLONY, SEWA DHAM-MANDOLI, ANUP VIHAR- 824 MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 01-03-2020 15:13:50 01-03-2020 16:09:06 0:55 0.00076389 MUs 825 BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II YVR 86 0 KVA UNPLANNED 01-03-2020 14:05:22 01-03-2020 14:38:38 0:33 0.00009167 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL826 AREA, SEWA DHAM-MANDOLI, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLINNG COLONY-MANDOLI, 181 SEWA DHAM-MANDOLI 0 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 15:07:56 5:7 0.00179083 MUs 827 RAGHUVIR PURA-SHANKAR NAGAR, RAGHUVIR PURA-KANTI NAGAR KRN 1230 990 KVA PLANNED 12-03-2020 10:03:00 12-03-2020 13:21:53 3:18 0 MUs 828 KARKARDOOMA COMPLAX-KARKAR DUMA JLM 54 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:34:10 3:34 0.00124833 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK D-HARSH VIHAR, BLOCK A-RAJIV NAGAR, ANUP VIHAR- 829 MANDOLI NNG 259 0 KVA UNPLANNED 07-03-2020 09:37:48 07-03-2020 10:12:23 0:34 0.00028333 MUs

830 BLOCK 10-TRILOKPURI PHASE I, BLOCK 4-TRILOKPURI PHASE I, TRILOKPURI PHASE I-MAYUR VIHAR MVR 86 990 KVA UNPLANNED 24-03-2020 07:48:48 24-03-2020 08:47:00 0:58 0.00016111 MUs BLOCK J-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK C-GOVIND VIHAR, BLOCK H-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, BLOCK A-SHIV VIHAR, BLOCK H-SHIV 831 VIHAR KWN 130 0 KVA UNPLANNED 08-03-2020 21:50:25 08-03-2020 22:35:21 0:44 0.00018333 MUs

SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, DEEPAK MEDITECH-NEW MANDOLI 832 INDUSTRIAL AREA, J.R. COMPLEX-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI EXTN.-MANDOLI NNG 173 0 KVA UNPLANNED 08-03-2020 19:03:00 08-03-2020 19:53:56 0:50 0.00027778 MUs

SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI 833 INDUSTRIAL AREA, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 14-03-2020 20:09:35 14-03-2020 20:36:59 0:27 0.000225 MUs BLOCK B-VINOD NAGAR EAST, BLOCK A-VINOD NAGAR EAST, BLOCK G-SHAKARPUR834 KHAS, BLOCK R&A-SHAKARPUR KHAS, SHAKARPUR EXTN.-SHAKARPUR KHAS, BLOCK A-MANDAWALI,LNR MOTHER DAIRY-INDRAPRASTHA 604 1030 EXTENSION KVA LNR, BLOCK PLANNEDE-LALITA PARK 02-03-2020 11:00:00 02-03-2020 13:51:01 2:51 0.003325 MUs 835 BLOCK R- AADINATH BHAWAN-POCKET R, FLORA DALE SECONDARY SCHOOL-POCKET R DGN 181 990 KVA PLANNED 19-03-2020 11:00:00 19-03-2020 14:10:00 3:10 0.00110833 MUs BLOCK B-KABIR NAGAR, SABOLI EXTN.-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK E-MEET NAGAR, 836 SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 216 0 KVA UNPLANNED 08-03-2020 13:22:12 08-03-2020 13:57:59 0:35 0.00024306 MUs GHAROLI837 KONDLI, BLOCK B-KONDALI EXTN., BLOCK B-AMBEDKAR AWAS KALYAN SAMITI, SEC D-MAYUR VIHAR PHASEVSE III 181 630 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 15:53:39 5:53 0.00205917 MUs 838 BLOCK C-RADHEPURI EXTENSION, BLOCK E-RADHEPURI EXTENSION KRN 17 990 KVA UNPLANNED 17-03-2020 11:54:41 17-03-2020 12:49:22 0:54 0.00003 MUs 839BLOCK F-VINOD NAGAR EAST, BLOCK B-VINOD NAGAR EAST, KHICHRIPUR RESETTLEMENT COLONY-KHICHARIPURMVR 85 630 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 13:04:52 3:4 0.00035778 MUs 840 BLOCK_1-DEV NAGAR, BLOCK_10B-DEV NAGAR PNR 0 990 KVA PLANNED 16-03-2020 10:03:00 16-03-2020 14:40:00 4:37 0 MUs

BLOCK D-ASHOK NAGAR, G.B.SSS SCHOOL-GOKUL PURI, BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- SEWA DHAM, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-RAJIV NAGAR, BLOCK B-SEWA DHAM, 841 BLOCK A-SEWA DHAM, SABOLI COLONY-MANDOLI, SABOLI EXTN.-MANDOLI NNG 604 0 KVA UNPLANNED 10-03-2020 18:10:00 10-03-2020 19:04:44 0:54 0.00105 MUs 842 VISHWAS NAGAR JLM 61 990 KVA PLANNED 13-03-2020 10:03:00 13-03-2020 15:16:11 5:13 0.00104333 MUs BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT Y-SHIV VIHAR, BLOCK U-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT B-BLOCK B, PKT D-BLOCK B, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, BLOCK J-SHIV VIHAR, BLOCK Q-SHIV 843 VIHAR, BLOCK H-SHIV VIHAR KWN 216 0 KVA UNPLANNED 05-03-2020 22:56:00 05-03-2020 23:50:00 0:54 0.000375 MUs 844 DARYA GANJ DRG 272 990 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 15:45:54 5:45 0.0020125 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK H-SHIV VIHAR, BLOCK B-SHIV VIHAR, BLOCK D- 845 PREM VIHAR, BLOCK A-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 2543 0 KVA UNPLANNED 01-03-2020 16:08:55 01-03-2020 16:55:58 0:47 0.00019583 MUs CHAUHAN BANGAR-JAFFRABAD, BLOCK T-GAUTAM PURI, BLOCK I-BRAHM PURI, BLOCK R-BRAHM PURI, BLOCK Q-BRAHM PURI, BLOCK N-BRAHM PURI, BLOCK F-BRAHM PURI, BLOCK E-BRAHM PURI, BLOCK L-BRAHM PURI, JAGJEET NAGAR-GHONDA, GAUTAM VIHAR-GHONDA, JAFFRABAD- 846 MAUJ PUR YVR 1212 990 KVA UNPLANNED 21-03-2020 10:01:07 21-03-2020 10:54:08 0:53 0.00014722 MUs 847 BLOCK T-OLD MUSTAFABAD, BLOCK D-OLD MUSTAFABAD KWN 345 1500 KVA PLANNED 19-03-2020 11:03:00 19-03-2020 16:13:25 5:10 0.00344444 MUs BLOCK A-PREM VIHAR, PKT W-BLOCK A, BLOCK F-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK 848 A, PKT W-BLOCK A KWN 130 0 KVA UNPLANNED 10-03-2020 15:43:46 10-03-2020 16:21:11 0:37 0.00015417 MUs BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D- 849 BLOCK-SONIA VIHAR KWN 259 0 KVA UNPLANNED 27-03-2020 07:27:47 27-03-2020 08:26:00 0:58 0.00048333 MUs

850 GOVT. QTRS-64 KHAMBA, MEER DARD H.S.-ROUSE AVENUE, DEMOLISHED AREA-ROUSE AVENUE DRG 89 990 KVA UNPLANNED 11-03-2020 16:03:00 11-03-2020 16:52:00 0:49 0.00005444 MUs 851 CHANDANI MAHAL-CHANDNI CHOWK DRG 457 990 KVA UNPLANNED 05-03-2020 14:46:58 05-03-2020 15:37:00 0:50 0.00006944 MUs

852 BLOCK C-HARSH VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 173 0 KVA UNPLANNED 18-03-2020 13:44:01 18-03-2020 15:41:54 1:57 0.00065 MUs BLOCK N-VISHWAKARMA PARK, 853BLOCK J-VISHWAKARMA PARK, RAMESH PARK-LAKSHMI NAGAR, VISHWAKARMA PARK-LAKSHMI NAGAR, GURULNR RAMDAS NAGAR-LAKSHMI 1722 NAGAR 990 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 15:23:00 5:23 0.00188417 MUs G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C- 854 MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 104 630 KVA UNPLANNED 30-03-2020 11:52:50 30-03-2020 12:18:42 0:25 0.00010417 MUs

855 BLOCK B-NATHU PURA, BLOCK A-NATHU PURA, BLOCK B-ASHOK NAGAR, BLOCK E-ASHOK NAGAR NNG 1222 990 KVA UNPLANNED 14-03-2020 21:15:12 14-03-2020 21:23:16 0:8 0.00002222 MUs 856 TUNDA NAGAR-BHAGIRATHI VIHAR, BHARAT-AMBEDKAR NAGAR, TUNDA NAGAR-BHAGIRATHI VIHAR KWN 168 1500 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 13:45:00 3:45 0.0013125 MUs BLOCK B-EAST GOKUL PURI, BLOCK E-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK 857 E-MEET NAGAR NNG 259 630 KVA UNPLANNED 16-03-2020 13:58:52 16-03-2020 14:56:31 0:57 0.000475 MUs BLOCK C-NEW SILAMPURI PHASE IV, BLOCK A-NEW SILAMPURI PHASE IV, BLOCK D-NEW SILAMPURI PHASE IV, SUBHASH PARK-GORAKH PARK, BLOCK Z-WELCOME COLONY, BLOCK A- 858 WELCOME COLONY YVR 709 630 KVA UNPLANNED 09-03-2020 23:40:06 10-03-2020 00:30:48 0:50 0.00013889 MUs 859 BLOCK A-NATHU COLONY NNG 44 990 KVA UNPLANNED 06-03-2020 11:15:26 06-03-2020 12:12:00 0:56 0.00031111 MUs BHAGAT NAGAR-DAYALPUR, BLOCK C-KARAWAL NAGAR, BLOCK H-SHIV VIHAR, BLOCK B-BHAGAT SINGH COLONY, BLOCK H-BHAGAT SINGH COLONY, BLOCK C-BHAGAT SINGH COLONY, BLOCK I- 860 BHAGAT SINGH COLONY, BLOCK C-DLF ANKUR VIHAR KWN 130 0 KVA UNPLANNED 22-03-2020 13:33:56 22-03-2020 14:17:08 0:43 0.00017917 MUs 861 BLOCK A-GAZIPUR DAIRY FARM, BLOCK C-GAZIPUR DAIRY FARM MVR 181 630 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 16:18:30 6:18 0.002205 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, 862 BLOCK D-HARSH VIHAR NNG 319 0 KVA UNPLANNED 27-03-2020 20:31:00 27-03-2020 21:05:00 0:33 0.00033917 MUs BLOCK B6-NAND NAGARI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, BLOCK E-MEET NAGAR, SEWA DHAM-MANDOLI, ANUP 863 VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 06-03-2020 16:41:17 06-03-2020 19:37:00 2:55 0.00243056 MUs 864 BLOCK A-PREM NAGAR DGN DGN 86 630 KVA UNPLANNED 06-03-2020 13:17:35 06-03-2020 15:12:00 1:54 0.00031667 MUs 865 BLOCK A-SHAKARPUR KHAS, SHAKARPUR EXTN.-SHAKARPUR KHAS LNR 19 990 KVA UNPLANNED 28-03-2020 14:56:00 28-03-2020 15:30:00 0:33 0.00009167 MUs 866 BLOCK A-TUKMIRPUR KWN 130 100 KVA UNPLANNED 17-03-2020 13:49:09 17-03-2020 14:20:53 0:31 0.00012917 MUs KUCHA PATI RAM-CHANDNI CHOWK, CHAWRI BAZAR-CHANDNI867 CHOWK, COMMUNITY CENTRE-JAMA MASZID, HAUZ QAZI-CHANDNI CHOWK, DAV PUBLIC SCHOOL-KALA MASZID,DRG MOSQUE-LAL 816 KUAN BAZAR, 990 MOSQUE-KUCHA KVA PATI RAM PLANNED 01-03-2020 09:00:00 01-03-2020 17:26:23 8:26 0 MUs BLOCK J-VISHWAKARMA PARK,868 BLOCK A-GURU RAMDAS NAGAR, VISHWAKARMA PARK-LAKSHMI NAGAR, BLOCK K-JAGAT RAM PARK, GURU RAMDASLNR NAGAR-LAKSHMI 960 NAGAR 990 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 15:39:46 5:39 0.0019775 MUs BLOCK A-MANDOLI VILLAGE, SABOLI VILLAGE-MANDOLI,869 BLOCK B-ANUP VIHAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUPNNG VIHAR, SEWA DHAM-MANDOLI, 181 ANUP 0 KVA VIHAR-MANDOLI PLANNED 16-03-2020 10:00:00 16-03-2020 14:34:27 4:34 0.00159833 MUs

BLOCK C-MAN SINGH NAGAR, BLOCK H-OLD MUSTAFABAD, MUSTAFABAD-MUNGA NAGAR, 870 BLOCK B-MAN SINGH NAGAR, BLOCK H-BHAGIRATHI VIHAR, BLOCK A-MAN SINGH NAGAR KWN 130 0 KVA UNPLANNED 10-03-2020 16:13:00 10-03-2020 19:55:10 3:42 0.000925 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK K-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, BLOCK D-HARSH VIHAR, BLOCK D-MEET NAGAR, VILLAGE SABOLI-SABOLI COLONY, 871 SABOLI EXTN.-MANDOLI NNG 604 630 KVA UNPLANNED 01-03-2020 19:03:29 01-03-2020 19:38:39 0:35 0.00068056 MUs MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH872 KHANA, CHAWRI BAZAR-KHUSH DIL, FATEHPURI-KUCHA HASIRAM, NAYA BAZAR-CHANDNI CHOWK, FATEHPURI-KHARICCK BAOLI, KHARI 914 BAWLI-NAYA 990BANS- KVA LAHORI GATE PLANNED 19-03-2020 10:00:00 19-03-2020 14:32:47 4:32 0.00158667 MUs ZEENAT BARI-MORI GATE, KASHMIRI GATE-MORI873 GATE, CHABI GANJ-MORI GATE, AGRASHEN PLACE-KASHMERE GATE, GOVT OF N C T OFFICE-KASHMERECCK GATE, TELEGRAPH 649 OFFICE-KASHMERE 990 KVA GATE PLANNED 13-03-2020 10:00:00 13-03-2020 14:17:48 4:17 0.00149917 MUs 874 CHAUHAN BANGAR-JAFFRABAD, JAFFRABAD-MAUJ PUR YVR 135 630 KVA UNPLANNED 20-03-2020 11:16:32 20-03-2020 11:38:45 0:22 0.00003056 MUs 875 VISHWAS NAGAR EXTN.-SHAHDARA, VISHWAS NAGAR EXTN.-SHAHDARA JLM 466 990 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:20:00 4:20 0.00036111 MUs BLOCK 29-WEST PATEL NAGAR, BLOCK 8-WEST PATEL NAGAR, BLOCK 6-WEST PATEL NAGAR, BLOCK 3-WEST PATEL NAGAR, BLOCK 1-WEST PATEL NAGAR, BLOCK 7-WEST PATEL NAGAR, P.G.D.A.V. SR. SCHOOL-EAST876 PATEL NAGAR, BLOCK 11-EAST PATEL NAGAR, PATEL NAGAR POST OFFICE-EAST PATEL NAGAR, DAYANANDPNR MODEL SCHOOL(SECONDARY)-WEST 1243 990 KVAPATEL NAGAR, BLOCK PLANNED 25-WEST PATEL NAGAR, 03-03-2020 BLOCK 11:03:00 2-WEST PATEL 03-03-2020 NAGAR, BLOCK 16:29:25 X-WEST PATEL NAGAR, 5:26 BLOCK 12-WEST PATEL 0 MUs NAGAR, BLOCK 26-WEST PATEL NAGAR NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

BLOCK C-TUKMIRPUR, BLOCK A-PREM VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C- PATEL VIHAR, BLOCK A-HARIJAN BASTI, SHIV VIHAR, PKT Y-SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK C-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT D-SHIV VIHAR, BLOCK C- 877 HARIJAN BASTI, BLOCK D-HARIJAN BASTI, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 130 0 KVA UNPLANNED 06-03-2020 19:45:47 06-03-2020 20:23:00 0:37 0.00015417 MUs CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK F-GOPAL PARK, BLOCK E-WEST CHANDER NAGAR, CHANDER NAGAR BLOCK D-SHASTRI PARK, BLOCK E-CHANDAR NAGAR, BLOCK F- 878 RAM NAGAR, BLOCK F-CHANDAR NAGAR KRN 85 990 KVA UNPLANNED 11-03-2020 14:13:21 11-03-2020 14:54:25 0:41 0.00002278 MUs DURGA PARK COLONY-DALLU PURA, VARUN ENCLAVE-DALLU PURA, DALLU879 PURA VSE-VASUNDHARA ENCLAVE VSE, LIG/MIG RES/NON COMM AREA-DALLU PURA, DARSHAN HOSPITAL-DALLUVSE PURA VSE, 452 BLOCK A-DALLU 1000 PURA KVA VSE, BLOCK B-DALLU PLANNED PURA VSE 06-03-2020 10:03:00 06-03-2020 12:32:25 2:29 0 MUs BLOCK E-SUBHASH MOHALLA, CHRISTAN COLONY-KHABAS880 PURA, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK B-MANUJPUR, WEST GHONDA, BLOCK E-SUBHASHYVR MOHALLA, BLOCK 3174 C-BHAJANPURA, 990 BLOCK KVA D-BHAJANPURA PLANNED 13-03-2020 10:00:00 13-03-2020 17:10:53 7:10 0.00250833 MUs SABOLI EXTN.-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- 881 PRATAP NAGAR, SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 345 0 KVA UNPLANNED 05-03-2020 03:10:35 05-03-2020 03:25:09 0:14 0.00015556 MUs 882 G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A-EAST GOKUL PURI NNG 150 630 KVA UNPLANNED 01-03-2020 09:16:13 01-03-2020 09:45:17 0:29 0.00008056 MUs 883 DELHI JAL BOARD-POCKET I DGN 147 990 KVA PLANNED 16-03-2020 11:00:00 16-03-2020 14:28:45 3:28 0.00098222 MUs

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, YAMUNA FLOOD PLAINS-ANNPURNA MANDIR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON 884 COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR KWN 86 630 KVA UNPLANNED 12-03-2020 08:23:14 12-03-2020 09:07:10 0:43 0.00011944 MUs 885 BLOCK C-MEET NAGAR, BLOCK B-EAST GOKUL PURI, BLOCK A-EAST GOKUL PURI NNG 130 2650 KVA UNPLANNED 14-03-2020 15:10:00 14-03-2020 16:07:00 0:56 0.00023333 MUs 886 BLOCK D-BHAJANPURA, BLOCK E-SUBHASH MOHALLA YVR 72 990 KVA PLANNED 02-03-2020 11:03:00 02-03-2020 13:43:53 2:40 0.00022222 MUs 887 BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II YVR 0 0 KVA UNPLANNED 09-03-2020 09:40:00 09-03-2020 10:05:00 0:24 0 MUs 888 VISHWAS NAGAR EXTN.-SHAHDARA, ARJUN NAGAR EAST-SHAHDARA JLM 148 0 KVA PLANNED 07-03-2020 11:00:00 07-03-2020 11:21:46 0:21 0 MUs 889 BLOCK J-KARTAR NAGAR, GAUTAM VIHAR-GHONDA YVR 641 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 14:41:47 4:41 0.00163917 MUs BLOCK C-DURGA PURI, SHIV MANDIR-JYOTI NAGAR890 EAST, BLOCK B-DURGA PURI, MANSAROVAR PARK-DURGA PURI, BLOCK F-DURGA PURI, BLOCK E-JYOTI NAGARNNG EAST, BLOCK M-DURGA 1113 PURI, BLOCK 630 B-DURGA KVA PURI PLANNED 12-03-2020 10:00:00 12-03-2020 14:32:46 4:32 0.00158667 MUs KAILASH NAGAR, BLOCK 9-GANDHI NAGAR, BLOCK 9-DHARAM PURA, SHYAM COLONY-KAILASH 891 NAGAR SOUTH, YAMUNA RIVER-KAILASH NAGAR, BLOCK 9-GANDHI NAGAR KRN 31 990 KVA UNPLANNED 06-03-2020 00:32:27 06-03-2020 01:00:49 0:28 0.00002333 MUs 892 BLOCK A-MAYUR VIHAR PHASE III, BLOCK A-MAYUR VIHAR PHASE III VSE 181 0 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 13:42:48 3:42 0.001295 MUs COMMUNITY CENTRE-JAMA MASZID, SITARAM BAZAR-CHANDNI893 CHOWK, DAV PUBLIC SCHOOL-KALA MASZID, CHANDANI MAHAL-CHANDNI CHOWK, CHURI WALAN GALI-CHANDNIDRG CHOWK, 3439 DELHI POLICE 990BHAVAN-PAHARI KVA BHOJLA PLANNED 02-03-2020 11:00:00 02-03-2020 15:30:00 4:30 0 MUs SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA 894 DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 03-03-2020 18:45:00 03-03-2020 19:38:36 0:53 0.00073611 MUs 895 BLOCK 1-RAM NAGAR DGN 181 990 KVA PLANNED 04-03-2020 10:03:00 04-03-2020 16:10:00 6:7 0.00214083 MUs MOSQUE-LAL896 KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA, CHAWRI BAZAR-KHUSH DIL, KHARI BAWLI-NAYA BANS- LAHORICCK GATE 272 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 14:03:00 4:3 0.0014175 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SABOLI COLONY-MANDOLI, SABOLI EXTN.- 897 MANDOLI NNG 268 0 KVA UNPLANNED 27-03-2020 20:31:00 27-03-2020 21:05:00 0:33 0.00028417 MUs 898 PHASE I-MAYUR VIHAR MVR 77 630 KVA UNPLANNED 17-03-2020 21:31:19 17-03-2020 22:19:02 0:47 0.00006528 MUs 899 BLOCK C-HARSH VIHAR, BLOCK D-HARSH VIHAR NNG 259 0 KVA UNPLANNED 07-03-2020 12:11:50 07-03-2020 13:05:59 0:54 0.00045 MUs 900 ROHITASH NAGAR-SILAMPUR, BLOCK A-PRATAP PURA DGN 982 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 16:52:30 6:52 0.00240333 MUs

901 BLOCK A-PRAKASH VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK B-BHAGAT SINGH COLONY KWN 130 0 KVA UNPLANNED 18-03-2020 01:22:44 18-03-2020 01:50:18 0:27 0.0001125 MUs GGS INDRAPRASTHA UNIVERSITY-KASHMERE902 GATE, ZEENAT BARI-MORI GATE, KASHMIRI GATE-MORI GATE, CHABI GANJ-MORI GATE, GOVT OFCCK N C T OFFICE-KASHMERE 905 GATE 6570 KVA PLANNED 17-03-2020 11:00:00 17-03-2020 12:30:00 1:30 0.000525 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 903 EXTN., BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 216 0 KVA UNPLANNED 07-03-2020 17:32:27 07-03-2020 18:27:17 0:54 0.000375 MUs 904 SUBHASH PARK EXTN.-GORAKH PARK DGN 328 630 KVA UNPLANNED 17-03-2020 14:18:29 17-03-2020 14:48:28 0:29 0.00006444 MUs SUBHASH PARK-GORAKH PARK, BLOCK T-GAUTAM PURI, MCD COLONY-NEW KATWARA, BLOCK 905 C12-YAMUNA VIHAR YVR 141 400 KVA UNPLANNED 11-03-2020 20:09:54 11-03-2020 20:34:31 0:24 0.00005333 MUs 906 BLOCK A-TUKMIRPUR, BLOCK C-TUKMIRPUR, BLOCK D-TUKMIRPUR KWN 130 0 KVA UNPLANNED 06-03-2020 20:10:38 06-03-2020 21:35:00 1:24 0.00035 MUs LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG 907 RES/NON COMM AREA-D-BLOCK-SONIA VIHAR KWN 216 0 KVA UNPLANNED 10-03-2020 09:59:12 10-03-2020 10:50:00 0:50 0.00034722 MUs LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A- 908 BLOCK SONIA VIHAR KWN 130 0 KVA UNPLANNED 21-03-2020 13:48:12 21-03-2020 14:16:22 0:28 0.00011667 MUs CHANDER NAGAR BLOCK C-PANDIT PARK, BLOCK A-KRISHNA NAGAR,909 BLOCK B-GHONDALI, JHEEL-JHEEL KHURENJA, BLOCK D-RADHEPURI EXTENSION, BLOCK B-KRISHNA NAGARKRN BLOCK B, JHEEL-GHONDALI, 604 JHEEL-KRISHNA 2250 KVA NAGAR BLOCK PLANNED B 11-03-2020 11:00:00 11-03-2020 14:31:58 3:31 0.00269611 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, POCKET A-JJ COLONY, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK C-AMAR COLONY, BLOCK A-RAJIV NAGAR, BLOCK 910 A-SEWA DHAM NNG 432 400 KVA UNPLANNED 01-03-2020 09:47:21 01-03-2020 10:26:26 0:39 0.00054167 MUs BLOCK 57-AJMAL KHAN PARK, SWAMI RAMTIRTH NAGAR-JHANDEWALAN EXTENSION, BLOCK 52-AJMAL KHAN 911PARK, BLOCK_37J-BEADON PURA, BLOCK_47-BEADON PURA, BLOCK_48D-NAIWALA, BLOCK_27F-NAIWALA, BLOCKSRD A-JHANDEWALAN, 272 AJMAL KHAN 630 PARK KVA SRD-KAROL BAGH PLANNED SRD, VERUNALEYA DELHI 02-03-2020 JAL BOARD-JHANDEWALAN 10:00:00 02-03-2020 14:07:29 4:7 0.00144083 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 912 GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 432 0 KVA UNPLANNED 05-03-2020 21:19:13 05-03-2020 23:30:00 2:10 0.00180556 MUs 913 BSES OFFICE-TURKMAN MARG, BLOCK D-AJMERI GATE DRG 85 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 14:00:34 4:0 0.0014 MUs RAJIV COLONY-JHILMIL INDUSTRIAL AREA,914 SONIA GANDHI JJ CAMP-JHILMIL INDUSTRIAL AREA, INDIRA CAMP-JHILMIL INDUSTRIAL AREA, JHILMIL INDUSTRIALDGN AREA BLOCK 683 A-JHILMIL COLONY 990 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 16:46:16 6:46 0.00236833 MUs BLOCK 9-GANDHI NAGAR, BLOCK 10-GANDHI NAGAR, BLOCK 9-GANDHI NAGAR, BLOCK 9-KAILASH 915 NAGAR KRN 7 990 KVA UNPLANNED 02-03-2020 20:02:52 02-03-2020 23:22:21 3:19 0.00016583 MUs 916 BLOCK 1-BHAGWANPUR KHERA, BLOCK 1-RAM NAGAR DGN 181 990 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 15:55:00 5:55 0.00207083 MUs 917 BLOCK A-YOJNA VIHAR, BLOCK B-YOJNA VIHAR JLM 181 400 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 16:20:00 6:20 0.00221667 MUs 918 BLOCK 11-GEETA COLONY, BLOCK 14-GEETA COLONY KRN 0 0 KVA PLANNED 18-03-2020 10:03:00 18-03-2020 13:36:00 3:33 0.00011833 MUs CLOTH MARKET-CHURA WALAN, NEW LAJPAT RAI MARKET-CHANDNI CHOWK, GOVT. BOYS 919 SECONDARY SCHOOL-KUCHA ALAM, JAMA MASZID AREA-CHANDNI CHOWK CCK 129 2610 KVA UNPLANNED 07-03-2020 00:50:00 07-03-2020 00:57:44 0:7 0.00001944 MUs 920 BLOCK G-VINOD NAGAR EAST, BLOCK B-VINOD NAGAR EAST MVR 86 630 KVA UNPLANNED 06-03-2020 18:58:37 06-03-2020 21:08:05 2:9 0.00035833 MUs BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK A-ANUP VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 921 GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 173 0 KVA UNPLANNED 06-03-2020 07:30:00 06-03-2020 08:23:13 0:53 0.00029444 MUs 922 BLOCK D-ASHOK NAGAR NNG 181 990 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 14:35:49 4:35 0.00160417 MUs RAGUWARPURA-SUBHASH MOHALLA923 II, SUBHASH MOHALLA-SEELAMPUR, RAGHUBARPURA NO 2-SEELAMPUR, BLOCK 9-KAILASH NAGAR, GANDHIKRN NAGAR-KAILASH 604 NAGAR 1980 KVA PLANNED 16-03-2020 10:35:00 16-03-2020 13:48:00 3:13 0.00058972 MUs GURU TEG BAHADUR924 COMMUNITY CENTRE-PKT E, L.I.G HOUSING NAND NAGARI-PKT E, BLOCK C-HARSH VIHAR, POCKET B-GURU TEGNNG BAHADUR ENCLAVE 710 630 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 14:55:54 4:55 0.00172083 MUs BLOCK E-ZERO PUSTA, BLOCK B-SUBHASH MOHALLA, BLOCK E-SUBHASH MOHALLA, BLOCK 9- SUBHASH MOHALLA_I, SUBHASH VIHAR-YAMUNA VIHAR, BLOCK B5-YAMUNA PUR (GONDA) 925 BLOCK B, NORTH GHONDA, WEST GHONDA, BLOCK C-GHONDA YVR 799 990 KVA UNPLANNED 01-03-2020 00:30:00 01-03-2020 00:58:56 0:28 0.00007778 MUs PUSHPANJALI-ANAND926 VIHAR, JAGRITI ENCLAVE-ANAND VIHAR, SHYAM ENCLAVE-ANAND VIHAR, SAINI ENCLAVE-ANANDJLM VIHAR 181 990 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 15:55:35 5:55 0.00207083 MUs 927 NAYA VISHWAS NAGAR-SHAHDARA, VISHWAS NAGAR-SHAHDARA, AMBEDKAR NAGAR-SHAHDARA JLM 976 990 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 16:03:00 6:3 0.00020167 MUs BLOCK A-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK B-HARSH VIHAR, GOVT.CO. SEC. SCHOOL- HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB STATION-POLICE 928 FARM NNG 259 0 KVA UNPLANNED 20-03-2020 00:38:45 20-03-2020 00:53:53 0:15 0.000125 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI, NEW MANDOLI 929 INDUSTRIAL AREA NNG 466 0 KVA UNPLANNED 27-03-2020 20:32:00 27-03-2020 21:05:00 0:33 0.000495 MUs

BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, BLOCK K-ANUP 930 VIHAR, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 19-03-2020 18:10:09 19-03-2020 18:36:55 0:26 0.00021667 MUs 931 BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR NNG 181 400 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 14:48:39 4:48 0.00168 MUs 932 KATRA NAWAB-CHANDNI CHOWK, FATEHPURI-KUCHA HASIRAM, TOWN HILL-KATRA NEEL CCK 767 990 KVA PLANNED 05-03-2020 10:03:00 05-03-2020 13:53:19 3:50 0.00127778 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, POCKET A-JJ COLONY, BLOCK C-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B- HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, SABOLI EXTN.- 933 MANDOLI NNG 2643 0 KVA UNPLANNED 06-03-2020 09:28:33 06-03-2020 10:17:54 0:49 0.00068056 MUs 934 BLOCK D-BHAJANPURA YVR 43 990 KVA UNPLANNED 20-03-2020 12:57:00 20-03-2020 13:19:21 0:22 0.00003056 MUs HARIZAN935 BASTI-GAZIPUR VILLAGE, BLOCK A-GAZIPUR VILLAGE, D.S.I.D.C.-GAZIPUR VILLAGE, BLOCK K-GAZIPUR VILLAGELNR 825 990 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 17:15:14 7:15 0.0025375 MUs BLOCK C-RADHEPURI EXTENSION, KRISHNA NAGAR EAST BLOCK G-RADHEPURI, BLOCK B-RADHEPURI EXTENSION,936 BLOCK D-RADHEPURI EXTENSION, BLOCK E-RADHEPURI EXTENSION, BLOCK B-KRISHNA NAGAR BLOCK B, BLOCKKRN C-ARJUN NAGAR 604 WEST, KRISHNA 2250 NAGAR KVA EAST BLOCK E-RADHEPURI, PLANNED KRISHNA NAGAR 03-03-2020 EAST 11:00:00 BLOCK B-RADHEPURI 03-03-2020 14:50:30 3:50 0.00447222 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, MCD SCHOOL-SABOLI COLONY, BLOCK D- 937 HARSH VIHAR, J.R. COMPLEX-SEWA DHAM NNG 259 0 KVA UNPLANNED 07-03-2020 17:11:44 07-03-2020 18:10:00 0:58 0.00048333 MUs 938 SEC C-MAYUR VIHAR PHASE III VSE 181 630 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 13:54:38 3:54 0.001365 MUs 939 MCD COLONY-NEW KATWARA YVR 173 990 KVA PLANNED 21-03-2020 13:03:00 21-03-2020 13:30:53 0:27 0.00015 MUs 940 ANAND PARBAT PNR 20 990 KVA UNPLANNED 06-03-2020 13:54:14 06-03-2020 14:27:39 0:33 0 MUs 941 BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II YVR 0 0 KVA UNPLANNED 09-03-2020 17:10:00 09-03-2020 17:29:00 0:18 0 MUs PKT B-BLOCK B, WEST KARAWAL NAGAR, BLOCK C-KARAWAL NAGAR, BLOCK C-SHERPUR, PKT D- 942 BLOCK A, PKT B-BLOCK A, BLOCK D-WEST KARAWAL NAGAR KWN 130 0 KVA UNPLANNED 27-03-2020 21:30:00 27-03-2020 22:27:25 0:57 0.0002375 MUs 943 BLOCK C-RAJBIR COLONY VSE 181 630 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 14:42:54 4:42 0.00039167 MUs 944 BLOCK B-NATHU PURA, BLOCK A-NATHU PURA, BLOCK B-ASHOK NAGAR, BLOCK E-ASHOK NAGAR NNG 2581 990 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 14:39:56 4:39 0.0016275 MUs NAWAB945 GANJ-SADAR BAZAR, PHARI DHIRAJ-SADAR BAZAR, NAYA MOHALLA-KISHAN GANJ RS, SADAR BAZAR B G ROADPHG 272 990 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:13:00 4:13 0.00147583 MUs SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, MCD SCHOOL-SABOLI COLONY, BLOCK D- 946 MEET NAGAR, VILLAGE SABOLI-SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 259 630 KVA UNPLANNED 08-03-2020 13:00:25 08-03-2020 13:12:59 0:12 0.0001 MUs BLOCK A-OLD RAJENDRA NAGAR, NORTH947 EXTENSION AREA- BLOCK B-OLD RAJENDRA NAGAR, BLOCK B3-OLD RAJENDRA NAGAR, BLOCK 51-OLD RAJENDRASRD NAGAR, BLOCK 272 B-OLD RAJENDRA 630 NAGAR KVA PLANNED 18-03-2020 10:00:00 18-03-2020 14:03:00 4:3 0.0014175 MUs 948 BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK C-SEWA DHAM NNG 130 0 KVA UNPLANNED 17-03-2020 10:19:37 17-03-2020 11:01:27 0:41 0.00017083 MUs LIG/MIG RES/NON COMM949 AREA-A-BLOCK SHRI RAM COLONY, BLOCK D-C-BLOCK SHRI RAM COLONY, LIG/MIG RES/NON COMM AREA-SHRIKWN RAM COLONY 181 630 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:52:50 3:52 0.00135333 MUs 950 BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 173 0 KVA UNPLANNED 27-03-2020 09:26:20 27-03-2020 10:10:43 0:44 0.00024444 MUs BLOCK A-RAMA GARDEN, BLOCK A-HARIJAN BASTI, BLOCK C-KARAWAL NAGAR,951 BLOCK B-KARAWAL NAGAR (DEHROTI), FACTORY (KHASRA)-HARIJAN BASTI, BLOCK C-HARIJAN BASTI, BLOCKKWN B-HARIJAN BASTI, 918 BLOCK A-NEW CHAUHAN 990 KVA PUR, BLOCK B-NEW PLANNED CHAUHAN PUR 12-03-2020 11:00:00 12-03-2020 12:45:00 1:45 0.00204167 MUs BLOCK A-MANDOLI EXTN., BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK A-SEWA DHAM, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SABOLI 952 EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 07-03-2020 09:17:02 07-03-2020 09:56:40 0:39 0.00054167 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI, NEW MANDOLI 953 INDUSTRIAL AREA NNG 233 0 KVA UNPLANNED 24-03-2020 21:03:00 24-03-2020 21:47:00 0:44 0.00033 MUs BLOCK O-BRAHM PURI, BLOCK K-BRAHM PURI, BLOCK B-BRAHM PURI, JAFFRABAD-MAUJ PUR, 954 GHONDA PATTI CHAUHAN YVR 892 990 KVA UNPLANNED 18-03-2020 11:55:00 18-03-2020 12:45:48 0:50 0.00013889 MUs PKT A-BLOCK E, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK C-SADAT PUR, BLOCK D-WEST 955 KARAWAL NAGAR KWN 0 0 KVA UNPLANNED 04-03-2020 13:03:00 04-03-2020 13:08:00 0:5 0 MUs 956 COMMUNITY CENTRE-JAMA MASZID, MOTIA MAHAL-CHANDNI CHOWK DRG 146 990 KVA UNPLANNED 14-03-2020 12:52:58 14-03-2020 13:51:38 0:58 0.00008056 MUs BLOCK 25-TRILOKPURI PHASE II, BLOCK 14-TRILOKPURI PHASE II, BLOCK 95715-TRILOKPURI PHASE II, BLOCK 24-TRILOKPURI PHASE II, BLOCK 13-TRILOKPURI PHASE II, TRILOKPURI PHASE I-MAYURMVR VIHAR, 2382TRILOKPURI PHASE 990II-MAYUR KVA VIHAR, KOTLA PLANNED EXCT-PHASE II 13-03-2020 11:00:00 13-03-2020 16:32:25 5:32 0.00092222 MUs 958 VIGYAN LOK-ANAND VIHAR, KARKARDOOMA COMPLAX-KARKAR DUMA JLM 74 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:33:27 3:33 0.0012425 MUs 959 BLOCK D-ASHOK NAGAR NNG 552 990 KVA UNPLANNED 09-03-2020 12:38:30 09-03-2020 13:33:11 0:54 0.00045 MUs BLOCK M-JAGAT RAM PARK, BLOCK D-LALITA PARK, LAKSHMI NAGAR BLOCK960 L, RAMESH PARK-LAKSHMI NAGAR, BLOCK K-JAGAT RAM PARK, GURU RAMDAS NAGAR-LAKSHMI NAGAR,LNR BLOCK F-LALITA 1839 PARK, BLOCK J-LALITA 630 KVA PARK, BLOCK N-JAGAT PLANNED RAM PARK 16-03-2020 10:00:00 16-03-2020 15:35:00 5:35 0.00195417 MUs

BLOCK T-GAUTAM PURI, BLOCK E-SUBHASH MOHALLA, BLOCK P-BRAHM PURI, BLOCK D- 961 BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK E-SUBHASH MOHALLA, BLOCK D-BHAJANPURA YVR 43 990 KVA UNPLANNED 20-03-2020 13:28:07 20-03-2020 13:49:02 0:20 0.00002778 MUs 962 BLOCK J-NABI KARIM, SADAR BAZAR - RAM NAGAR, SADAR BAZAR - RAM NAGAR PHG 118 990 KVA PLANNED 12-03-2020 10:03:00 12-03-2020 14:18:53 4:15 0 MUs 963 BLOCK A-NEW ASHOK NAGAR, BLOCK B-NEW ASHOK NAGAR VSE VSE 86 990 KVA UNPLANNED 14-03-2020 17:04:09 14-03-2020 17:59:49 0:55 0.00015278 MUs PKT W-BLOCK A, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK U-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT R- 964 BLOCK A KWN 86 0 KVA UNPLANNED 12-03-2020 13:14:58 12-03-2020 13:56:44 0:41 0.00011389 MUs BLOCK F-PANDAV NAGAR,965 SAMASPUR-PANDAV NAGAR, BLOCK E-PANDAV NAGAR, CL-CHILLA SARDA BANGAR VILLAGE, PANDAV NAGARMVR MVR-SHAKARPUR 423 MVR 990 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 16:26:47 6:26 0.00225167 MUs

BLOCK B-KABIR NAGAR, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C- 966 ANUP VIHAR, SABOLI COLONY-MANDOLI, ANUP VIHAR-MANDOLI NNG 432 0 KVA UNPLANNED 12-03-2020 19:50:42 12-03-2020 20:22:46 0:32 0.00044444 MUs BLOCK967 B-KONDALI EXTN., BLOCK B-AMBEDKAR AWAS KALYAN SAMITI, BLOCK C-RAJBIR COLONY, BLOCK A-KONDALIVSE EXTN. 1487 990 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 16:10:57 6:10 0.00215833 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage HOSPITAL AREA-INSTITUTIONAL AREA, MINISTRY OF LABOUR & EMPLOYMENT-INSTITUTIONAL968 AREA, INSTITUTIONAL AREA BLOCK B-ALL INDIA DEAF & DUMB SOCIETY, ARYA NAGAR-ANAND VIHAR, DAYA NANDJLM VIHAR-ANAND 0 VIHAR, JAGRITI ENCLAVE-ANAND 0 KVA VIHAR, PLANNED VILL KARKARDOOMA-KARKAR 02-03-2020 DUMA 11:00:00 02-03-2020 15:33:30 4:33 0 MUs BLOCK A-BANK COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK B-HARSH VIHAR, 969 BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 173 0 KVA UNPLANNED 11-03-2020 18:59:34 11-03-2020 19:46:54 0:47 0.00026111 MUs BLOCK C-NEW KONDALI,970 BLOCK C1-NEW KONDALI, BLOCK C4-NEW KONDALI, BLOCK C3-NEW KONDALI, BLOCK B1-NEW KONDALI, BLOCKVSE B2-NEW KONDALI 181 630 KVA PLANNED 02-03-2020 10:00:00 02-03-2020 14:25:00 4:25 0.00154583 MUs 971 BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR NNG 130 630 KVA UNPLANNED 19-03-2020 09:36:12 19-03-2020 10:26:34 0:50 0.00020833 MUs 972 GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE CCK 149 990 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 14:12:31 4:12 0.00147 MUs 973 BLOCK B-MAYUR VIHAR PHASE III, PKT B6-MAYUR VIHAR PHASE III, PKT B7-MAYUR VIHAR PHASE III VSE 181 400 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 16:21:15 6:21 0.0022225 MUs 974 GOVT GIRLS SECONDARY SCHOOL-DDA FLATS JLM 118 630 KVA PLANNED 17-03-2020 10:03:00 17-03-2020 14:06:48 4:3 0.0003375 MUs BLOCK 10-TRILOKPURI975 PHASE I, BLOCK 7-TRILOKPURI PHASE I, BLOCK 9-TRILOKPURI PHASE I, BLOCK 8-TRILOKPURI PHASE I, TRILOKPURIMVR PHASE I-MAYUR 1272 VIHAR 630 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 17:25:54 7:25 0.00259583 MUs

BLOCK F-WEST KARAWAL NAGAR, PKT A-BLOCK E, BLOCK F & G-BHAGAT SINGH COLONY, BLOCK B- SADATPUR EXT-PUSTA AREA-M BLOCK, BLOCK C-KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA-BLOCK B, BLOCK E-SADAT PUR, BLOCK B-SADAT PUR, BLOCK C-SADAT PUR, PKT C-BLOCK E, PKT A1-BLOCK E, PKT A4-BLOCK E, PKT E-SADATPUR EXT-PUSTA AREA-K BLOCK, BLOCK D-WEST 976 KARAWAL NAGAR, BLOCK D-WEST KARAWAL NAGAR KWN 130 0 KVA UNPLANNED 02-03-2020 20:46:48 02-03-2020 21:23:40 0:36 0.00015 MUs BLOCK A-JAGATPURI EXTN., BLOCK C-JAGATPURI EXTN., MCD SCHOOL-BLOCK C3, BLOCK E- 977 JAGATPURI EXTN., BLOCK D-BLOCK C3, TYPE B QUARTERS-GTB STAFF COLONY NNG 744 990 KVA UNPLANNED 17-03-2020 11:37:35 17-03-2020 12:04:26 0:26 0.00007222 MUs BLOCK_21K-KRISHNA NAGAR, BLOCK 17-OLD RAJENDRA NAGAR,978 BLOCK 11-OLD RAJENDRA NAGAR, BLOCK 16-OLD RAJENDRA NAGAR, BLOCK 18-OLD RAJENDRA NAGAR, BLOCKSRD 53-OLD RAJENDRA 259 NAGAR, BLOCK 630 54-OLD KVA RAJENDRA NAGAR PLANNED 16-03-2020 10:03:00 16-03-2020 16:00:00 5:57 0.00198333 MUs 979AZAD NAGAR EAST, WEST AZAD NAGAR, SHANKAR NAGAR EXTN-AZAD NAGAR, RAGHUVIR PURA-KANTI NAGARKRN 181 990 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 14:18:36 4:18 0.001505 MUs 980 BLOCK A-MAYUR VIHAR PHASE III, SEC C-MAYUR VIHAR PHASE III VSE 926 0 KVA PLANNED 11-03-2020 11:03:00 11-03-2020 16:33:38 5:30 0 MUs 981 BLOCK C-HARSH VIHAR, BLOCK B-PRATAP NAGAR, BLOCK B-RAJIV NAGAR, RAJEEV NAGAR-SEWA DHAM NNG 181 0 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 14:05:02 4:5 0.00142917 MUs

LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM 982 AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G-BLOCK SONIA VIHAR KWN 130 0 KVA UNPLANNED 29-03-2020 13:03:00 29-03-2020 14:00:00 0:56 0.00023333 MUs BLOCK A-PRAKASH VIHAR, BLOCK E-PRAKASH VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK C-PRAKASH 983 VIHAR KWN 86 0 KVA UNPLANNED 08-03-2020 08:58:59 08-03-2020 09:40:00 0:41 0.00011389 MUs 984 BLOCK C-VINOD NAGAR WEST, BLOCK D-VINOD NAGAR WEST, BLOCK D-MANDAWALI VILLAGE LNR 302 2610 KVA PLANNED 04-03-2020 11:00:00 04-03-2020 14:18:00 3:18 0.001925 MUs BHAGIRATHI VIHAR, JAGDAMBA COLONY-BHAGIRATHI VIHAR, BLOCK Q-SHIV VIHAR, BLOCK A-SHIV 985 VIHAR, BLOCK C & D-INDIRA VIHAR, BHAGIRATHI VIHAR KWN 130 0 KVA UNPLANNED 29-03-2020 14:08:26 29-03-2020 15:01:24 0:52 0.00021667 MUs BLOCK A-PANDAV NAGAR, BLOCK J-VISHWAKARMA PARK, KARKARDOOMA COMPLAX-KARKAR DUMA, VIDHI APARTMENT-MOTHER986 DAIRY, KURMANCHAL NIKETAN-MOTHER DAIRY, INDER PRASTHA APARTMENT-MOTHER DAIRY, SAGAR SADAN-MOTHERLNR DAIRY, 84 AZAD APARTMENT-MOTHER 990 KVA DAIRY, PLANNED VRINDAVAN APARTMENT-MOTHER 11-03-2020 10:00:00 DAIRY, BLOCK 11-03-2020 A-MOTHER 13:50:00 DAIRY 3:50 0.00134167 MUs BLOCK_13A-BALMIKI COLONY,987 BLOCK 13-OLD RAJENDRA NAGAR, BLOCK 21-OLD RAJENDRA NAGAR, BLOCK 30-OLD RAJENDRA NAGAR, BLOCKSRD 38-OLD RAJENDRA 248 NAGAR 990 KVA PLANNED 04-03-2020 10:30:00 04-03-2020 16:55:05 6:25 0.00032083 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D- 988 HARSH VIHAR, BLOCK B-HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, BLOCK E-SEWA DHAM NNG 78 0 KVA UNPLANNED 27-03-2020 20:31:00 27-03-2020 21:05:00 0:33 0.0000825 MUs 989 PETROL PUMP-POCKET C, LIG FLATS-POCKET F & E DGN 181 990 KVA PLANNED 24-03-2020 10:00:00 24-03-2020 11:50:00 1:50 0.00064167 MUs 990 GEETA COLONY, BLOCK 9-GANDHI NAGAR KRN 745 990 KVA PLANNED 06-03-2020 14:52:00 06-03-2020 15:50:00 0:58 0.00032222 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A- 991 EAST GOKUL PURI, BLOCK D-MEET NAGAR NNG 49 630 KVA UNPLANNED 13-03-2020 18:04:58 13-03-2020 18:47:59 0:43 0.00023889 MUs

BLOCK B-EAST GOKUL PURI, BLOCK B1-NAND NAGARI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C- 992 MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR, RAJEEV NAGAR-SEWA DHAM NNG 863 2650 KVA UNPLANNED 13-03-2020 16:32:56 13-03-2020 17:23:49 0:50 0.00138889 MUs 993 NAYA MOHALLA-KISHAN GANJ RS, CHOWK NAI BASTI-SADAR BAZAR, SADAR BAZAR B G ROAD PHG 526 990 KVA PLANNED 03-03-2020 10:03:00 03-03-2020 13:02:08 2:59 0.00024861 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A- ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, 994 SEWA DHAM-MANDOLI NNG 345 0 KVA UNPLANNED 07-03-2020 18:10:00 07-03-2020 18:42:08 0:32 0.00035556 MUs 995 -SHASHI GARDEN MVR 181 400 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 13:27:28 3:27 0.0012075 MUs 996 ANAND VIHAR BLOCK A, ANAND VIHAR BLOCK C, JAGRITI ENCLAVE-ANAND VIHAR, ANAND VIHAR BLOCK B JLM 588 990 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 16:00:04 6:0 0.0021 MUs 997 SUBHASH PARK-GORAKH PARK YVR 0 630 KVA PLANNED 12-03-2020 09:03:00 12-03-2020 14:01:36 4:58 0.00041389 MUs

998 NAI SARAK-KATRA ASRAFI, MAIN BAZAR CHANDANI CHOWK-SISGANJ, TOWN HALL-KUCHA NATWA CCK 52 990 KVA UNPLANNED 12-03-2020 17:07:52 12-03-2020 17:59:51 0:51 0.00005667 MUs 999 BLOCK A-YOJNA VIHAR JLM 164 990 KVA PLANNED 19-03-2020 10:03:00 19-03-2020 12:49:00 2:46 0.00023056 MUs 1000 BLOCK C1-NEW ASHOK NAGAR, BLOCK E-NEW ASHOK NAGAR, BLOCK A & B-VASUNDHARA ENCLAVE VSE 604 2660 KVA PLANNED 04-03-2020 11:00:00 04-03-2020 17:07:17 6:7 0.00713611 MUs SABOLI EXTN.-MANDOLI, MCD SCHOOL-SABOLI COLONY, SABOLI VILLAGE-MANDOLI, SABOLI 1001 EXTN.-MANDOLI NNG 518 630 KVA UNPLANNED 21-03-2020 14:57:03 21-03-2020 15:34:07 0:37 0.00061667 MUs KONDALI VILLAGE-GHAROLI1002 KONDLI, SEC D-MAYUR VIHAR PHASE III, BLOCK F-KONDALI VILLAGE, KONDALI VILLAGE-GHAROLI KONDLI, VSEBLOCK A-DALLU 965PURA VSE 630 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 16:15:17 6:15 0.00083333 MUs 1003 CHANDER NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK C-KRISHNA NAGAR EXTN. KRN 272 990 KVA UNPLANNED 06-03-2020 12:45:09 06-03-2020 13:21:31 0:36 0.00002 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK E-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, 1004 SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 06-03-2020 12:16:00 06-03-2020 12:45:58 0:29 0.00040278 MUs 1005 MULTANI DHANDA-SADAR BAZAR, BLOCK C-AMAR NAGAR PHG 1469 630 KVA UNPLANNED 16-03-2020 12:15:00 16-03-2020 12:55:00 0:40 0.00005556 MUs 1006 LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, CLOCK C-BIHARIPUR KWN 181 0 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 14:10:00 4:10 0.00145833 MUs 1007 BLOCK A-BABU NAGAR, BLOCK C-MAHALAXMI ENCLAVE, BLOCK C-GOVIND VIHAR KWN 841 630 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 13:55:00 3:55 0.00137083 MUs BLOCK1008 H-KRISHNA NAGAR, BLOCK D-RAM NAGAR, BLOCK B-RADHEPURI EXTENSION, BLOCK D-RADHEPURI EXTENSIONKRN 604 1980 KVA PLANNED 23-03-2020 11:00:00 23-03-2020 12:35:00 1:34 0.00096611 MUs 1009 BLOCK B-VINOD NAGAR EAST, BLOCK A-MANDAWALI LNR 711 990 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 14:05:00 4:5 0.00142917 MUs CHAUHAN BANGAR-JAFFRABAD, BLOCK T-GAUTAM PURI, BLOCK I-BRAHM PURI, BLOCK R-BRAHM PURI, BLOCK H-BRAHM PURI, BLOCK F-BRAHM PURI, BLOCK E-BRAHM PURI, BLOCK L-BRAHM 1010 PURI, GAUTAM VIHAR-GHONDA, JAFFRABAD-MAUJ PUR YVR 6 630 KVA UNPLANNED 21-03-2020 09:05:52 21-03-2020 10:00:49 0:54 0.00015 MUs BLOCK H-GHONDA PATTI, BLOCK B-GARI MANDU, GAMRI-GHONDA, GHONDA PATTI, ARVIND 1011 NAGAR-GHONDA, WEST GHONDA, BLOCK V-GHONDA PATTI CHAUHAN YVR 0 6090 KVA UNPLANNED 19-03-2020 20:02:00 19-03-2020 20:08:20 0:6 0 MUs 1012 SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 259 400 KVA UNPLANNED 06-03-2020 14:05:08 06-03-2020 14:50:59 0:45 0.000375 MUs BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, 1013 BLOCK P-SHIV VIHAR KWN 86 0 KVA UNPLANNED 27-03-2020 21:34:12 27-03-2020 22:11:00 0:36 0.0001 MUs 1014 JAFFRABAD-MAUJ PUR YVR 173 630 KVA UNPLANNED 12-03-2020 11:50:28 12-03-2020 12:08:11 0:17 0.00009444 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, LIG/MIG RES/NON COMM AREA-SEWA DHAM, BLOCK C-ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK B- 1015 RAJIV NAGAR, RAJEEV NAGAR-SEWA DHAM NNG 2643 0 KVA UNPLANNED 06-03-2020 21:15:22 06-03-2020 21:48:14 0:32 0.00026667 MUs 1016 BLOCK J-NABI KARIM, SADAR BAZAR - RAM NAGAR PHG 62 990 KVA UNPLANNED 17-03-2020 00:10:00 17-03-2020 00:52:00 0:42 0.00005833 MUs 1017 PKT A-BLOCK E, PKT C-BLOCK E, PKT A4-BLOCK E, BLOCK D-WEST KARAWAL NAGAR KWN 130 0 KVA UNPLANNED 10-03-2020 18:10:00 10-03-2020 19:00:34 0:50 0.00020833 MUs 1018 VISHWAS NAGAR JLM 24 990 KVA PLANNED 03-03-2020 10:03:00 03-03-2020 14:06:00 4:3 0.000675 MUs VISHWAS NAGAR-SHAHDARA, KASTURBA NAGAR-SHAHDARA, BHOLA NATH NAGAR-SHAHDARA,1019 MAHARAM NAGAR-SHAHDARA, AMBEDKAR NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARA,JLM EAST ROHTASH 5933 NAGAR-SHAHDARA, 4590 ANAJ KVA MANDI- KASTOORBA-JAWALA PLANNED NAGAR 11-03-2020 11:00:00 11-03-2020 11:15:00 0:15 0.00014167 MUs BLOCK M-SUNDER NAGRI, SABOLI EXTN.-MANDOLI, BLOCK A-MANDOLI EXTN., BLOCK A- MANDOLI VILLAGE, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, POCKET A-JJ COLONY, BLOCK B-PRATAP NAGAR, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK C-ANUP VIHAR, BANK OF BARODA-SABOLI COLONY, MCD SCHOOL-SABOLI COLONY, ANUP VIHAR-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI 1020 EXTN.-MANDOLI NNG 173 0 KVA UNPLANNED 20-03-2020 10:20:15 20-03-2020 17:01:28 6:41 0.00222778 MUs 1021 BLOCK R-PATEL VIHAR, BLOCK D-HARIJAN BASTI, BLOCK B-HARIJAN BASTI KWN 49 0 KVA UNPLANNED 04-03-2020 18:12:49 04-03-2020 18:40:20 0:27 0.0001125 MUs 1022 BLOCK 15-EAST PATEL NAGAR, THAN SINGH NAGAR-ANAND PARBAT PNR 272 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 14:34:04 4:34 0.00159833 MUs BLOCK1023 9-DHARAM PURA, SHYAM COLONY-KAILASH NAGAR SOUTH, KAILASH NAGAR SOUTH, BLOCK 9-GANDHI NAGARKRN 210 630 KVA PLANNED 01-03-2020 10:00:00 01-03-2020 15:52:02 5:52 0.00146667 MUs 1024 BLOCK B-JYOTI NAGAR NNG 173 630 KVA UNPLANNED 06-03-2020 18:17:13 06-03-2020 19:10:53 0:53 0.00029444 MUs G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A- MEET NAGAR, BLOCK A-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST 1025 GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK E-MEET NAGAR NNG 604 2650 KVA UNPLANNED 13-03-2020 14:29:35 13-03-2020 15:24:06 0:54 0.00105 MUs BLOCK A-SHAKARPUR1026 KHAS, BLOCK S-SCHOOL BLOCK, BLOCK S1-SCHOOL BLOCK, BLOCK K-JAGAT RAM PARK, NEHRU ENCLAVE-SCHOOLLNR BLOCK 181 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 15:38:32 5:38 0.00197167 MUs BLOCK A1-NAND NAGARI, SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI EXTN.- 1027 MANDOLI NNG 432 0 KVA UNPLANNED 01-03-2020 13:45:43 01-03-2020 14:24:49 0:39 0.00054167 MUs 1028 MOTIYA KHAN-SHAHI IDGAH COLONY PHG 3 400 KVA PLANNED 02-03-2020 11:03:00 02-03-2020 14:22:08 3:19 0 MUs JAFFRABAD-MAUJ PUR, MAUJ PUR COMPLEX 1, GHONDA PATTI CHAUHAN, ADARSH MOHALLA- 1029 MAUJPUR, BLOCK E-SUBHASH MOHALLA YVR 947 990 KVA UNPLANNED 06-03-2020 17:29:35 06-03-2020 18:20:00 0:50 0.00013889 MUs 1030 SUBHASH PARK-GORAKH PARK, BLOCK N-NEW SILAMPURI PHASE I, JHUGI-NEW SILAMPURI PHASE I YVR 600 400 KVA PLANNED 17-03-2020 13:03:00 17-03-2020 16:39:50 3:36 0.0012 MUs 1031 BLOCK A & B-VASUNDHARA ENCLAVE VSE 106 630 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 14:11:23 4:11 0.00146417 MUs BLOCK A-MANDOLI EXTN., SABOLI VILLAGE-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-ANUP VIHAR, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, ANUP VIHAR-MANDOLI, 1032 SABOLI EXTN.-MANDOLI NNG 259 400 KVA UNPLANNED 08-03-2020 11:48:16 08-03-2020 15:09:48 3:21 0.001675 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 1033 NAGAR, BLOCK E-MEET NAGAR NNG 259 2650 KVA UNPLANNED 07-03-2020 15:22:23 07-03-2020 16:18:06 0:55 0.00045833 MUs DURGA PARK COLONY-DALLU PURA, DALLU PURA VSE-VASUNDHARA ENCLAVE VSE, MAYUR VIHAR 1034 PHASE III, BLOCK A-DALLU PURA VSE, BLOCK B-DALLU PURA VSE VSE 86 1000 KVA UNPLANNED 14-03-2020 17:09:41 14-03-2020 18:00:40 0:50 0.00013889 MUs 1035 SITARAM BAZAR-CHANDNI CHOWK DRG 1132 990 KVA PLANNED 03-03-2020 11:00:00 03-03-2020 15:12:43 4:12 0 MUs BABA DA DARGA-KARDAMPURI, BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 1036 NAGAR, BLOCK E-MEET NAGAR NNG 345 2650 KVA UNPLANNED 30-03-2020 16:42:42 30-03-2020 17:36:33 0:53 0.00058889 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., POCKET A-JJ COLONY, BLOCK C-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH 1037 VIHAR, BLOCK A-HARSH VIHAR NNG 173 0 KVA UNPLANNED 01-03-2020 13:11:28 01-03-2020 13:35:11 0:23 0.00012778 MUs BLOCK_26I-BEADON PURA, BLOCK_47-BEADON1038 PURA, BLOCK_25K-BEADON PURA, BLOCK_24N-BEADON PURA, AJMAL KHAN PARK SRD-KAROL SRDBAGH SRD, BLOCK 272 13-KAROL BAGH 990 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 14:00:00 4:0 0.0014 MUs 1039 MULTANI DHANDA-SADAR BAZAR, BLOCK C-AMAR NAGAR PHG 272 630 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 13:38:44 3:38 0.00127167 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D-ANUP VIHAR, SEWA DHAM- 1040 MANDOLI, SEWA DHAM-MANDOLI NNG 518 0 KVA UNPLANNED 17-03-2020 11:36:17 17-03-2020 12:15:02 0:38 0.00063333 MUs CHANDER1041 NAGAR-KRISHNA NAGAR, CHANDER NAGAR BLOCK F-GOPAL PARK, BLOCK E-WEST CHANDER NAGAR, SHIVPURI-JAGATPURIKRN 650 990 KVA PLANNED 20-03-2020 10:03:00 20-03-2020 15:10:00 5:7 0 MUs 1042 BLOCK B-CHANDU NAGAR, MUSTAFABAD-MUNGA NAGAR, BLOCK C-KARAWAL NAGAR KWN 173 0 KVA UNPLANNED 09-03-2020 00:01:07 09-03-2020 00:50:00 0:48 0.00026667 MUs GANESH NAGAR-SHAKARPUR KHAS, BLOCK G-SHAKARPUR KHAS, GANESH NAGAR EXTN.-SHAKARPUR1043 KHAS, BLOCK A-SHAKARPUR KHAS, SHAKARPUR EXTN.-SHAKARPUR KHAS, YAMUNA FLOOD PLAINS-LAXMILNR NAGAR 604 YAMUNA FLOOD 0 KVA PLAINS, DHURVA APPARTMENT-MOTHER PLANNED DAIRY 03-03-2020 11:00:00 03-03-2020 14:30:00 3:30 0.00408333 MUs 1044 BLOCK E-SUBHASH MOHALLA, BLOCK D-BHAJANPURA, WEST GHONDA YVR 86 990 KVA UNPLANNED 06-03-2020 18:47:44 06-03-2020 19:12:41 0:24 0.00006667 MUs

LIG/MIG RES/NON COMM AREA-A-BLOCK SHRI RAM COLONY, BLOCK F & G-BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA-MILAN GARDEN, LIG/MIG RES/NON COMM AREA- BALAJI MANDIR COLONY, BLOCK B-KHAJURI KHAS, BLOCK F-BHAGAT SINGH COLONY, BLOCK H- BHAGAT SINGH COLONY, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, BLOCK D-WEST KARAWAL NAGAR, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR, LIG/MIG RES/NON COMM AREA-E-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-SONIA VIHAR, 1045 LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION KWN 414 1030 KVA UNPLANNED 24-03-2020 16:43:10 24-03-2020 17:32:17 0:49 0.00065333 MUs 1046 BLOCK M-DURGA PURI, BLOCK B-DURGA PURI NNG 662 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:08:39 3:8 0.00109667 MUs 1047 MAUJ PUR COMPLEX 1 YVR 107 0 KVA UNPLANNED 20-03-2020 11:06:48 20-03-2020 11:38:02 0:31 0.00004306 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. 1048 SEC. SCHOOL-HARSH VIHAR NNG 432 0 KVA UNPLANNED 07-03-2020 21:00:16 07-03-2020 21:30:38 0:30 0.00041667 MUs 1049 BLOCK 23B-KAROL BAGH PNR, BLOCK 21B-KAROL BAGH PNR PNR 259 630 KVA PLANNED 16-03-2020 11:03:00 16-03-2020 17:36:33 6:33 0.00218333 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SABOLI COLONY-MANDOLI, SABOLI EXTN.- 1050 MANDOLI NNG 717 0 KVA UNPLANNED 14-03-2020 15:09:00 14-03-2020 16:05:00 0:56 0.00129111 MUs 1051 BLOCK B-NEW ASHOK NAGAR VSE VSE 3394 990 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 15:40:34 5:40 0.00198333 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, MCD SCHOOL- 1052 SABOLI COLONY, SABOLI EXTN.-MANDOLI NNG 259 630 KVA UNPLANNED 14-03-2020 18:15:42 14-03-2020 19:00:09 0:44 0.00036667 MUs BLOCK1053 15-KALYAN PURI, BLOCK 20-KALYAN PURI, BLOCK 19-KALYAN PURI, BLOCK 16-KALYAN PURI, BLOCK 18-KALYANMVR PURI 3 630 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 16:11:29 6:11 0.00216417 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 1054 KASTURBA NAGAR-SHAHDARA, BHOLA NATH NAGAR-SHAHDARA, TELIBARA-SHAHDARA JLM 790 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 15:08:33 5:8 0.00179667 MUs 1055 BABARPUR WEST-BABAR PUR NNG, BABARPUR EXTN.-BABAR PUR, BALBIR NAGAR EXTN.-SILAMPUR NNG 604 4630 KVA PLANNED 12-03-2020 11:00:00 12-03-2020 14:28:00 3:28 0.00127111 MUs BLOCK 8-WEST PATEL NAGAR, BLOCK 6-WEST PATEL NAGAR, BLOCK 3-WEST PATEL NAGAR, BLOCK 1-WEST PATEL NAGAR, BLOCK 7-WEST PATEL NAGAR, P.G.D.A.V. SR. SCHOOL-EAST1056 PATEL NAGAR, BLOCK 11-EAST PATEL NAGAR, PATEL NAGAR POST OFFICE-EAST PATEL NAGAR, DAYANANDPNR MODEL SCHOOL(SECONDARY)-WEST 1243 1980 KVA PATEL NAGAR, BLOCK PLANNED Z-WEST PATEL NAGAR, 16-03-2020 BLOCK 11:00:002-WEST PATEL 16-03-2020NAGAR, BLOCK 15:00:00 X-WEST PATEL NAGAR, 4:0 BLOCK 12-WEST 0.00306667PATEL NAGAR MUs 1057 SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI NNG 43 0 KVA UNPLANNED 27-03-2020 20:32:00 27-03-2020 21:05:00 0:33 0.00004583 MUs 1058 DALLU PURA MVR-VASUNDHARA ENCLAVE MVR VSE 95 0 KVA UNPLANNED 02-03-2020 19:17:24 02-03-2020 19:31:00 0:13 0.00003972 MUs 1059 BLOCK 25B-AJMAL KHAN PARK, BLOCK 27B-AJMAL KHAN PARK, BLOCK 23B-KAROL BAGH PNR PNR 199 630 KVA PLANNED 02-03-2020 11:03:00 02-03-2020 17:02:36 5:59 0 MUs GEETA1060 COLONY, BLOCK 2-GEETA COLONY, BLOCK 8A-GEETA COLONY, BLOCK 8-GEETA COLONY, BLOCK 1A-GEETA COLONYKRN 604 1030 KVA PLANNED 12-03-2020 11:00:00 12-03-2020 13:55:00 2:55 0.00223611 MUs 1061 BLOCK C2-NEW ASHOK NAGAR, BLOCK C1-NEW ASHOK NAGAR VSE 2118 990 KVA PLANNED 03-03-2020 10:03:00 03-03-2020 17:22:47 7:19 0 MUs BLOCK 6B-DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR-DEV NAGAR, BLOCK A-PUNJABI BASTI, MIG FLATS-PRASAD NAGAR,1062 THAKKAR BAPA NAGAR-DEV NAGAR, ST.MICHAELS JUNIOR SCHOOL-PRASAD NAGAR, DEPARTMENT OF TELECOMMUNICATIONS-PRASADPNR 905 NAGAR, 6570 BLOCK KVA 21B-KAROL BAGH PLANNED PNR, BAPA NAGAR-ANAND 02-03-2020 PARBAT, 11:00:00 KHALSA 02-03-2020NAGAR-DEV 14:52:09 NAGAR 3:52 0.00451111 MUs

BLOCK A-HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB 1063 STATION-POLICE FARM, BLOCK C-SEWA DHAM, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 388 0 KVA UNPLANNED 24-03-2020 16:35:00 24-03-2020 17:22:00 0:47 0.0005875 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, PKT C-BLOCK B, PKT W-BLOCK A, BLOCK C-KARAWAL NAGAR, BLOCK S-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT X-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV 1064 VIHAR, BLOCK D-PREM VIHAR, BLOCK D-WEST KARAWAL NAGAR KWN 86 0 KVA UNPLANNED 14-03-2020 20:31:25 14-03-2020 21:22:00 0:50 0.00013889 MUs BLOCK A-JAGATPURI EXTN., BLOCK C-JAGATPURI EXTN., BLOCK E-JAGATPURI EXTN., TYPE B 1065 QUARTERS-GTB STAFF COLONY NNG 19 990 KVA UNPLANNED 06-03-2020 10:19:11 06-03-2020 11:13:42 0:54 0.0003 MUs BLOCK T-BALJIT NAGAR, RESTRICTED AREA1066 MILITARY-FARIDPURI, SHADIPUR DEPOT-BALJIT NAGAR, DTC FLATS-SHADIPUR DEPOT, DELHI MILK SCHEM DMS-PREMPNR NAGAR, 905 DMS COLONY-PREM 3370 NAGAR KVA PLANNED 04-03-2020 11:00:00 04-03-2020 14:43:00 3:43 0.00408833 MUs 1067 BLOCK N-NEW SILAMPURI PHASE I YVR 173 400 KVA UNPLANNED 16-03-2020 16:14:29 16-03-2020 16:55:24 0:40 0.00022222 MUs 1068 SITARAM BAZAR-CHANDNI CHOWK, MOTIA MAHAL-CHANDNI CHOWK DRG 65 990 KVA UNPLANNED 16-03-2020 11:51:27 16-03-2020 12:46:33 0:55 0.00007639 MUs 1069 SITARAM BAZAR-CHANDNI CHOWK DRG 318 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 14:50:58 4:50 0.00024167 MUs 1070 BLOCK _A-SURAJMAL VIHAR JLM 329 630 KVA PLANNED 05-03-2020 11:03:00 05-03-2020 12:50:00 1:47 0.00014861 MUs NEW GOVIND PURA-JAGATPURI, GAGAN VIHAR-JAGATPURI, BLOCK F-BALDEV PARK EAST, CHANDER NAGAR BLOCK1071 F-GOPAL PARK, GALI NO-1-NEW LAYALPUR COLONY, BLOCK D-RAM NAGAR, BLOCK B-SOUTH ANARKALI COLONY,KRN BLOCK D-JAGATPURI, 311 BLOCK E-JAGATPURI, 0 KVA BLOCK D-SOUTH PLANNED ANARKALI COLONY, 18-03-2020 BLOCK F-NEW 10:03:00 LAYALPUR 18-03-2020 COLONY 13:54:17 3:51 0.00025667 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, PHASE I-SHIV VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK B- 1072 SHIV VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK A-SHIV VIHAR, BLOCK B-NEW CHAUHAN PUR KWN 130 0 KVA UNPLANNED 10-03-2020 14:14:48 10-03-2020 14:57:38 0:42 0.000175 MUs 1073 BABARPUR EXTN.-BABAR PUR NNG 86 630 KVA UNPLANNED 25-03-2020 16:03:30 25-03-2020 18:30:00 2:26 0.00040556 MUs 1074KONDALI VILLAGE-GHAROLI KONDLI, 3RD RD & PKT A 2-MAYUR VIHAR PHASE III, PKT A 2-MAYUR VIHAR PHASEVSE III 698 990 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 15:52:53 5:52 0.00205333 MUs BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK C-KARAWAL NAGAR, PKT Y-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK C-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK D-PREM VIHAR, 1075 BLOCK A-SHIV VIHAR KWN 216 0 KVA UNPLANNED 05-03-2020 20:53:20 05-03-2020 23:10:13 2:16 0.00094444 MUs 1076 BLOCK H-KRISHNA NAGAR KRN 181 990 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 14:34:55 4:34 0.00159833 MUs BLOCK H-OLD SIMAPURI, BLOCK C-OLD SIMAPURI, MCD-OLD SIMAPURI, GOVT. DISPENCERY-OLD 1077 SIMAPURI DGN 43 990 KVA UNPLANNED 14-03-2020 17:03:00 14-03-2020 17:54:50 0:51 0.00007083 MUs

BLOCK A-PREM VIHAR, BHAGAT NAGAR-DAYALPUR, BLOCK C-KARAWAL NAGAR, BLOCK D-NEW CHAUHAN PUR, BLOCK B-NEW CHAUHAN PUR, LIG/MIG RES/NON COMM AREA-NEW CHAUHAN 1078 PUR, BHAJANPURA-DAYALPUR, BLOCK D-WEST KARAWAL NAGAR, BHAGIRATHI VIHAR KWN 1047 0 KVA UNPLANNED 21-03-2020 17:45:50 21-03-2020 18:10:03 0:24 0.00006667 MUs 1079 DELHI JAL BOARD-POCKET C, FACTORY-DILSHAD GARDEN DGN 21 630 KVA UNPLANNED 14-03-2020 15:59:51 14-03-2020 16:16:06 0:16 0.00006667 MUs GORAKH1080 PARK EAST-SILAMPUR, GORAKH PARK WEST-SILAMPUR, NEW JAFFRABAD-GORAKH PARK, BLOCK A-PRATAPDGN PURA 181 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 16:30:14 6:30 0.002275 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, BLOCK D- 1081 MEET NAGAR, ANUP VIHAR-MANDOLI NNG 259 0 KVA UNPLANNED 01-03-2020 14:12:48 01-03-2020 15:07:11 0:54 0.00045 MUs 1082 TUNDA NAGAR-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, TUNDA NAGAR-BHAGIRATHI VIHAR KWN 171 990 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:01:14 4:1 0.00140583 MUs 1083 MANTOLA MOHALLA-PAHAR GANJ, AMRIT KAUR MARKET-PAHAR GANJ PHG 272 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 12:55:52 2:55 0.00102083 MUs BLOCK 5-OLD1084 RAJENDRA NAGAR, BLOCK 13-OLD RAJENDRA NAGAR, BLOCK 12-OLD RAJENDRA NAGAR, BLOCK 7-OLD RAJENDRASRD NAGAR 384 990 KVA PLANNED 05-03-2020 10:30:00 05-03-2020 16:47:22 6:17 0.00031417 MUs 1085 VISHWAS NAGAR-SHAHDARA, EAST ROHTASH NAGAR-SHAHDARA JLM 330 990 KVA PLANNED 13-03-2020 10:03:00 13-03-2020 15:25:10 5:22 0.00089444 MUs BLOCK_47-BEADON1086 PURA, BLOCK_14A-KAROL BAGH WEST EXTENSION AREA, AJMAL KHAN PARK SRD-KAROL BAGHSRD SRD 113 630 KVA PLANNED 16-03-2020 10:03:00 16-03-2020 12:35:00 2:32 0.00050667 MUs 1087BLOCK 9-KHICHRIPUR RESETTLEMENT COLONY BLOCK 9, KHICHARIPUR-GAZIPUR, BLOCK C-VINOD NAGAR EASTMVR 264 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 15:55:12 5:55 0.00207083 MUs PART II-BLOCK F-NEW RAJENDRA NAGAR, PART II-BLOCK J-NEW RAJENDRA NAGAR,1088 PART II- INDIAN AGRICULTURAL RESEARCH INSTITUTE-NEW RAJENDRA NAGAR, N.P.L. STAFF QTRS.-PART II-BLOCKSRD G, PART II- N.P.L. 272 QTRS.-NEW RAJENDRA 630 KVA NAGAR, BLOCK PLANNED 30-OLD RAJENDRA NAGAR 13-03-2020 10:00:00 13-03-2020 16:13:49 6:13 0.00217583 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 1089 GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A-RAJIV NAGAR, BLOCK B-RAJIV NAGAR NNG 259 0 KVA UNPLANNED 14-03-2020 21:24:29 14-03-2020 21:54:55 0:30 0.00025 MUs 1090 BIHARI COLONY-SHAHDARA JLM 43 990 KVA PLANNED 16-03-2020 11:03:00 16-03-2020 17:30:00 6:27 0.0005375 MUs 1091 AGCR ENCLAVE-ANAND VIHAR JLM 43 990 KVA PLANNED 23-03-2020 11:03:00 23-03-2020 14:18:28 3:15 0.00027083 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET 1092 NAGAR, BLOCK E-MEET NAGAR NNG 432 2650 KVA UNPLANNED 31-03-2020 23:28:24 31-03-2020 23:45:08 0:16 0.00022222 MUs BLOCK C-SURAJMAL VIHAR, BLOCK B-SURAJMAL VIHAR, BLOCK D-SURAJMAL VIHAR, BLOCK B- 1093 YOJNA VIHAR, BLOCK_C-SAVITA VIHAR, VISHWAS NAGAR EXTN.-SHAHDARA JLM 103 990 KVA UNPLANNED 07-03-2020 08:00:00 07-03-2020 09:46:28 1:46 0.00014722 MUs 1094 BLOCK T-BALJIT NAGAR PNR 272 400 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 12:38:41 2:38 0.00092167 MUs 1095 BLOCK A-MAYUR VIHAR PHASE III, BLOCK A-MAYUR VIHAR PHASE III VSE 2170 0 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 12:08:05 2:8 0.00074667 MUs SABOLI EXTN.-MANDOLI, MCD SCHOOL-SABOLI COLONY, SABOLI VILLAGE-MANDOLI, SABOLI 1096 EXTN.-MANDOLI NNG 673 630 KVA UNPLANNED 24-03-2020 16:32:00 24-03-2020 17:22:00 0:49 0.00106167 MUs 1097 BLOCK D-ASHOK NAGAR, BLOCK B-ASHOK NAGAR, BLOCK E-ASHOK NAGAR NNG 86 630 KVA UNPLANNED 30-03-2020 21:27:38 30-03-2020 22:18:15 0:50 0.00013889 MUs BLOCK A-PREM VIHAR, PKT W-BLOCK A, BLOCK C-KARAWAL NAGAR, BLOCK H-SHIV VIHAR, BLOCK 1098 S-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV VIHAR, PKT W-BLOCK A KWN 130 0 KVA UNPLANNED 23-03-2020 14:13:47 23-03-2020 14:37:49 0:24 0.0001 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY, BLOCK C-MEET 1099 NAGAR, BLOCK D-MEET NAGAR NNG 82 990 KVA UNPLANNED 01-03-2020 21:11:52 01-03-2020 22:02:44 0:50 0.00020833 MUs 1100 THAKKAR BAPA NAGAR-BLOCK 16, BLOCK_14B-DEV NAGAR PNR 259 990 KVA PLANNED 21-03-2020 10:03:00 21-03-2020 15:54:02 5:51 0.00195 MUs 1101 ARVIND NAGAR-GHONDA, GHONDA PATTI CHAUHAN YVR 86 1500 KVA UNPLANNED 28-03-2020 11:49:49 28-03-2020 12:30:00 0:40 0.00011111 MUs BLOCK J-SUNDER NAGRI, BLOCK L-SUNDER NAGRI, BLOCK O-SUNDER NAGRI, BLOCK C-SUNDER 1102 NAGRI NNG, BLOCK J-SUNDER NAGRI NNG NNG 86 990 KVA UNPLANNED 20-03-2020 20:30:00 20-03-2020 21:19:16 0:49 0.00013611 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 1103 EXTN., BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 1887 0 KVA UNPLANNED 08-03-2020 22:25:51 08-03-2020 22:47:16 0:21 0.000175 MUs BLOCK A-MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK D- 1104 MEET NAGAR, BLOCK E-MEET NAGAR NNG 302 630 KVA UNPLANNED 19-03-2020 11:44:34 19-03-2020 12:42:47 0:58 0.00032222 MUs

BLOCK X-RAJGARH COLONY, CHANDER NAGAR BLOCK C-PANDIT PARK, BLOCK A-KRISHNA NAGAR, JHEEL-JHEEL KHURENJA, BLOCK D-RADHEPURI EXTENSION, BLOCK B-KRISHNA NAGAR BLOCK B, 1105 BLOCK A-KRISHNA NAGAR BLOCK B, JHEEL-GHONDALI, JHEEL-KRISHNA NAGAR BLOCK B KRN 1292 990 KVA UNPLANNED 21-03-2020 12:13:00 21-03-2020 14:00:00 1:47 0.00008917 MUs BLOCK A-SILAMPUR COLONY, BLOCK G-SILAMPUR COLONY, BLOCK F- LIG/MIG RES/NON COMM 1106 AREA-NEW SILAMPURI PHASE II YVR 512 990 KVA UNPLANNED 19-03-2020 14:32:37 19-03-2020 15:10:17 0:37 0.00010278 MUs DDA FLATS-ROUSE AVENUE, ZAKIR HUSAIN P.G. EVENING COLLAGE-SKD BASTI, BAR COUNSIL OF INDIA-ROUSE AVENUE, RAILWAY COLONY-CONNAUGHT PLACE DRG, BLOCK E-CONNAUGHT PLACE 1107 DRG DRG 129 0 KVA UNPLANNED 01-03-2020 01:55:00 01-03-2020 02:11:10 0:16 0.00004444 MUs 1108 SADAR BAZAR - RAM NAGAR, SADAR BAZAR B G ROAD PHG 109 990 KVA PLANNED 14-03-2020 10:03:00 14-03-2020 13:22:33 3:19 0.00055278 MUs

SABOLI EXTN.-MANDOLI, BLOCK A-MEET NAGAR, BLOCK C-HARSH VIHAR, SABOLI COLONY- MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, ANUP VIHAR- 1109 MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 604 0 KVA UNPLANNED 14-03-2020 16:21:11 14-03-2020 17:38:00 1:16 0.00147778 MUs 1110 HARIZAN BASTI-GAZIPUR VILLAGE LNR 181 630 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 17:00:00 7:0 0.00245 MUs BLOCK 9-DHARAM PURA, SHYAM COLONY-KAILASH NAGAR SOUTH, BLOCK 9-KAILASH NAGAR, 1111 KAILASH NAGAR SOUTH, BLOCK 9-GANDHI NAGAR KRN 836 630 KVA UNPLANNED 08-03-2020 11:28:00 08-03-2020 12:25:56 0:57 0.00003167 MUs 1112 MAUJ PUR COMPLEX 1 YVR 86 990 KVA UNPLANNED 06-03-2020 21:13:37 06-03-2020 22:03:00 0:49 0.00013611 MUs

1113 KACHI COLONY-JAGJEET NAGAR, WEST GHONDA, YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 86 990 KVA UNPLANNED 03-03-2020 15:46:06 03-03-2020 16:05:12 0:19 0.00005278 MUs 1114 BLOCK 9-GANDHI NAGAR KRN 137 990 KVA UNPLANNED 19-03-2020 12:34:04 19-03-2020 13:30:00 0:55 0.00001528 MUs 1115 BLOCK A-KHAJURI KHAS, BLOCK G-KHAJURI KHAS EXTN. KWN 35 990 KVA UNPLANNED 09-03-2020 08:24:16 09-03-2020 08:52:32 0:28 0.00003111 MUs 1116 OLD SEELAMPUR, RAGHUVIR PURA-KANTI NAGAR, OLD SEELAMPUR KRN 17 990 KVA UNPLANNED 22-03-2020 06:57:13 22-03-2020 21:57:00 14:59 0.00049944 MUs BLOCK T-BALJIT NAGAR, CHETAN BASTI- BLOCK J-NEHRU NAGAR,1117 BLOCK 19-WEST PATEL NAGAR, PREM NAGAR-BALJIT NAGAR, BLOCK F-PUNJABI BASTI, BLOCK T-PANJABI BASTI,PNR BLOCK F-PUNJABI 905 BASTI, S.K. 4590TRANSPORT-ANAND KVA PARBHAT PLANNED 06-03-2020 11:00:00 06-03-2020 15:18:06 4:18 0.00501667 MUs 1118 INDUSTRIAL AREA-PATPAR GANJ INDUSTRIAL AREA LNR 90 630 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 15:00:00 5:0 0.00175 MUs BLOCK C-HARSH VIHAR,1119 BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC.NNG SCHOOL-HARSH 181 VIHAR 0 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 15:08:05 5:8 0.00179667 MUs 1120 FAZALPUR-MANDAWALI VILLAGE, BLOCK H-GAZIPUR VILLAGE LNR 1 400 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 13:50:00 3:50 0.00134167 MUs 1121 BLOCK G-KHAJURI KHAS EXTN. KWN 302 990 KVA UNPLANNED 21-03-2020 13:23:55 21-03-2020 13:47:49 0:23 0.00022361 MUs BLOCK 9-DHARAM PURA, RAGUWARPURA-SUBHASH MOHALLA1122 II, RAGHUBARPURA NO 2-SEELAMPUR, BLOCK 10-RAM NAGAR, CHAND MOHALLA-RAJGARH COLONY, OLD SEELAMPUR-SUBHASHKRN 3294 MOHALLA II, BLOCK 3370 KVA10-RAGHUBARPURA PLANNED NO 1 02-03-2020 11:00:00 02-03-2020 13:05:00 2:5 0.00243056 MUs BLOCK A-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 1123 NAGAR NNG 259 1620 KVA UNPLANNED 02-03-2020 11:04:25 02-03-2020 12:02:00 0:57 0.000475 MUs 1124BLOCK J-DILSHAD COLONY, BLOCK G-DILSHAD COLONY, BLOCK F-DILSHAD COLONY, HANSRAJ SCHOOL-POCKETDGN H 3425 990 KVA PLANNED 23-03-2020 10:00:00 23-03-2020 12:40:51 2:40 0.00093333 MUs BLOCK1125 B-B-BLOCK SHRI RAM COLONY, BLOCK C-SHRI RAM COLONY, AMBEDKAR NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARAJLM 324 630 KVA PLANNED 19-03-2020 11:00:00 19-03-2020 17:43:35 6:43 0.00055972 MUs 1126 DARYA GANJ DRG 181 990 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 14:35:16 4:35 0.00160417 MUs

SABOLI EXTN.-MANDOLI, BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK E-SEWA DHAM, BLOCK B-PRATAP NAGAR, BLOCK C-SEWA DHAM, BLOCK K- ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, MCD SCHOOL-SABOLI COLONY, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, BLOCK D-MEET NAGAR, SEWA DHAM-MANDOLI, SABOLI COLONY-MANDOLI, VILLAGE SABOLI-SABOLI COLONY, SABOLI 1127 EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 432 630 KVA UNPLANNED 05-03-2020 21:31:42 06-03-2020 00:25:00 2:53 0.00240278 MUs 1128 BLOCK_17A-KAROL BAGH WEST EXTENSION AREA, BLOCK 8-KAROL BAGH WEST EXTENSION AREA SRD 905 990 KVA PLANNED 07-03-2020 11:00:00 07-03-2020 12:31:00 1:31 0.00027806 MUs 1129 CHUNA MANDI-PAHAR GANJ, MANTOLA MOHALLA-PAHAR GANJ PHG 123 990 KVA UNPLANNED 06-03-2020 12:03:00 06-03-2020 12:51:10 0:48 0.00013333 MUs 1130 BLOCK H-KRISHNA NAGAR KRN 2 400 KVA PLANNED 17-03-2020 11:00:00 17-03-2020 13:32:17 2:32 0.00021111 MUs BLOCK C-MAN SINGH NAGAR, PKT R-BLOCK D, BLOCK B-MAN SINGH NAGAR, BLOCK H- 1131 BHAGIRATHI VIHAR, BLOCK A-MAN SINGH NAGAR KWN 130 0 KVA UNPLANNED 21-03-2020 19:15:47 21-03-2020 19:47:30 0:31 0.00012917 MUs 1132 PKT 4-PHASE I MVR 181 400 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 15:30:50 5:30 0.001925 MUs GORAKH PARK WEST-SILAMPUR,1133 BLOCK A-PRATAP PURA, BLOCK B-PRATAP PURA, BLOCK C-PRATAP PURA, BLOCK D-PRATAP PURA, GOPALDGN K.OIL DEPO.-PRATAP 1291 PURA 400 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 14:54:38 4:54 0.001715 MUs 1134 SEWA DHAM-MANDOLI NNG 345 400 KVA UNPLANNED 13-03-2020 15:03:16 13-03-2020 15:34:20 0:31 0.00034444 MUs SABOLI EXTN.-MANDOLI, SABOLI COLONY-MANDOLI, BLOCK D-MEET NAGAR, SABOLI COLONY- 1135 MANDOLI NNG 173 0 KVA UNPLANNED 31-03-2020 13:09:51 31-03-2020 14:00:54 0:51 0.00028333 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, SEWA DHAM- 1136 MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 26-03-2020 09:13:52 26-03-2020 09:34:25 0:20 0.00016667 MUs 1137 BLOCK_3H-KRISHNA NAGAR, RAMA KRISHNA MISSION FREE T.B. CLINIC-BLOCK 18 SRD 272 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 14:33:54 4:33 0.0015925 MUs LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN., BLOCK 2C-SADAT PUR, DEEKSHA MAHILA COLLAGE-DAYALPUR EXTN., BLOCK C2-NEW CHAUHAN PUR, BLOCK B-DAYALPUR, BLOCK E- 1138 DAYALPUR, LIG/MIG RES/NON COMM AREA-DAYALPUR EXTN. KWN 130 990 KVA UNPLANNED 18-03-2020 08:03:18 18-03-2020 09:00:00 0:56 0.00023333 MUs 1139 FYAZ GANJ-NAWAB GANJ, TELI WARA-NAWAB GANJ, PHARI DHIRAJ-SADAR BAZAR PHG 1002 990 KVA PLANNED 06-03-2020 10:03:00 06-03-2020 12:31:19 2:28 0.00020556 MUs 1140 BLOCK 1-BHAGWANPUR KHERA DGN 0 1980 KVA UNPLANNED 15-03-2020 13:55:00 15-03-2020 14:12:00 0:17 0 MUs BLOCK1141 A-JOSHI COLONY, MANDAWALI FAZALPUR BLOCK A-JOSHI COLONY, HASANPUR DEPOT BLOCK A-MOTHER DAIRYLNR 548 990 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 14:00:09 4:0 0.0014 MUs

BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH 1142 VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 432 400 KVA UNPLANNED 03-03-2020 14:11:23 03-03-2020 14:55:37 0:44 0.00061111 MUs 1143 BLOCK A-KANTI NAGAR NORTH BLOCK A KRN 181 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 13:57:58 3:57 0.0013825 MUs BLOCK 11/F-EAST PATEL NAGAR, BLOCK 30-WEST PATEL NAGAR, BLOCK K-WEST PATEL NAGAR, BLOCK E-WEST PATEL NAGAR, BLOCK B-WEST PATEL NAGAR, BLOCK 11-WEST PATEL NAGAR, PREM NAGAR-BALJIT NAGAR, MIG FLATS-PRASAD NAGAR, BLOCK Z-WEST PATEL NAGAR, BLOCK 2- 1144 WEST PATEL NAGAR, BLOCK X-WEST PATEL NAGAR PNR 0 990 KVA UNPLANNED 07-03-2020 10:42:20 07-03-2020 11:38:04 0:55 0 MUs MANEK BHAVAN- LOK SAMITI-FEROJ1145 SHAH KOTLA STADIUM, LIG/MIG RES/NON COMM AREA-FEROJ SHAH KOTLA STADIUM, MAMC AUDITORIUM-ROUSEDRG 272 AVENUE 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 14:56:19 4:56 0.00172667 MUs BLOCK D-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK C-AMAR 1146 COLONY, BLOCK B-EAST GOKUL PURI NNG 82 990 KVA UNPLANNED 15-03-2020 12:13:27 15-03-2020 13:05:03 0:51 0.00028333 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage

LIG/MIG RES/NON COMM AREA-CRPF CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA- BLOCK B, YAMUNA FLOOD PLAINS-ANNPURNA MANDIR, LIG/MIG RES/NON COMM AREA-A- BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-B-BLOCK SONIA VIHAR, LIG/MIG RES/NON 1147 COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR KWN 345 0 KVA UNPLANNED 24-03-2020 13:54:30 24-03-2020 14:16:13 0:21 0.00023333 MUs LAXMI NAGAR COMMERCIAL COPLEX-SWASTHYA VIHAR, BLOCK J-VISHWAKARMA PARK, BLOCK A- 1148 GURU RAMDAS NAGAR, BLOCK K-JAGAT RAM PARK LNR 103 990 KVA UNPLANNED 15-03-2020 06:10:11 15-03-2020 06:38:00 0:27 0.000075 MUs 1149 MOTIA MAHAL-CHANDNI CHOWK, NAI SARAK-JOGIWARA, CHAWRI BAZAR-KHUSH DIL CCK 310 3600 KVA UNPLANNED 08-03-2020 22:54:00 09-03-2020 00:24:00 1:30 0.0006 MUs BLOCK H-OLD MUSTAFABAD, BLOCK T-OLD MUSTAFABAD, BLOCK D-OLD MUSTAFABAD, BLOCK B- 1150 OLD MUSTAFABAD KWN 173 1500 KVA UNPLANNED 05-03-2020 13:05:31 05-03-2020 13:25:00 0:19 0.00010556 MUs LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-BALAJI MANDIR COLONY, BLOCK A-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-E-BLOCK 1151 SONIA VIHAR KWN 259 0 KVA UNPLANNED 24-03-2020 21:25:34 24-03-2020 21:49:00 0:23 0.00019167 MUs 1152 BLOCK _A-SURAJMAL VIHAR, SURYA NIKETAN-RISHAB VIHAR, BAHUBALI ENCLAVE-ANAND VIHAR JLM 416 990 KVA PLANNED 05-03-2020 14:03:00 05-03-2020 15:47:00 1:44 0.00014444 MUs 1153 BLOCK E-NEW SILAMPURI PHASE II YVR 86 990 KVA UNPLANNED 28-03-2020 18:00:31 28-03-2020 18:45:09 0:44 0.00012222 MUs 1154 BLOCK C-PANDAV NAGAR, BLOCK A-PANDAV NAGAR, BLOCK J-PANDAV NAGAR LNR 86 990 KVA UNPLANNED 04-03-2020 19:03:00 04-03-2020 22:10:00 3:7 0.00051944 MUs BLOCK 22-WEST PATEL NAGAR, BLOCK 23-WEST PATEL NAGAR, BLOCK 15-WEST1155 PATEL NAGAR, BLOCK 18-WEST PATEL NAGAR, BLOCK T-FARIDPURI, BLOCK 24-WEST PATEL NAGAR, BLOCKPNR 26-WEST PATEL 1802 NAGAR, RESTRICTED 990 KVA AREA MILITARY-ANAND PLANNED PARBAT 04-03-2020 10:00:00 04-03-2020 14:17:56 4:17 0.00149917 MUs LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK 1156 SONIA VIHAR, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA VIHAR KWN 173 0 KVA UNPLANNED 04-03-2020 18:40:00 04-03-2020 19:20:00 0:40 0.00022222 MUs ZAKIR 1157HUSAIN P.G. EVENING COLLAGE-SKD BASTI, DELHI GOVT. STAFF FLATS-PRESS ENCLAVE, PATODI HOUSE-CHANDNIDRG CHOWK 581 630 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 14:33:22 4:33 0.0015925 MUs BLOCK A-B&C-JAGAT PURI, BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK B-ANUP 1158 VIHAR, BLOCK A-EAST GOKUL PURI, BLOCK C-AMAR COLONY NNG 49 630 KVA UNPLANNED 20-03-2020 11:05:35 20-03-2020 17:05:22 5:59 0.00199444 MUs 1159 ANAND PARBAT PNR 36 990 KVA UNPLANNED 06-03-2020 13:27:00 06-03-2020 13:53:38 0:26 0.00007222 MUs 1160 JHILMIL COLONY BLOCK A, JHILMIL COLONY BLOCK B JLM 55 400 KVA PLANNED 17-03-2020 10:03:00 17-03-2020 13:38:51 3:35 0.00029861 MUs 1161MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA, BALI MARAN-BARA DARI, MAIN BAZAR-KHUSH DILCCK 272 990 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 14:08:41 4:8 0.00144667 MUs 1162 MAUJ PUR COMPLEX 1 YVR 173 990 KVA UNPLANNED 07-03-2020 12:22:18 07-03-2020 12:42:43 0:20 0.00011111 MUs 1163 BLOCK C-BRIJ PURI, BLOCK D-BRIJ PURI KWN 130 990 KVA UNPLANNED 02-03-2020 13:29:24 02-03-2020 14:03:26 0:34 0.00014167 MUs 1164 GORAKH PARK WEST-SILAMPUR, BLOCK A-PRATAP PURA, JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 181 990 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 15:43:00 5:43 0.00200083 MUs BLOCK K-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK N- SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT B-BLOCK B, PKT D-BLOCK B, BLOCK A-SHIV VIHAR, BLOCK J- 1165 SHIV VIHAR KWN 259 0 KVA UNPLANNED 04-03-2020 19:35:12 04-03-2020 20:32:00 0:56 0.00046667 MUs 1166 FYAZ GANJ-NAWAB GANJ, TELI WARA-NAWAB GANJ PHG 78 990 KVA PLANNED 19-03-2020 10:03:00 19-03-2020 14:03:00 4:0 0.00066667 MUs 1167 MOSQUE-LAL KUAN BAZAR DRG 52 630 KVA UNPLANNED 19-03-2020 12:36:38 19-03-2020 13:29:44 0:53 0.00005889 MUs SWAMI RAMTIRTH1168 NAGAR-JHANDEWALAN EXTENSION, CINEMA-JHANDEWALAN EXTENSION, S.R.T. NAGAR-JHANDEWALANSRD EXTENSION 272 630 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 15:06:46 5:6 0.001785 MUs 1169 BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK A-HARSH VIHAR NNG 86 0 KVA UNPLANNED 27-03-2020 18:48:36 27-03-2020 19:20:00 0:31 0.00008611 MUs MAYUR1170 VIHAR PHASE III, PKT B7-MAYUR VIHAR PHASE III, PKT B7 & B6-MAYUR VIHAR PHASE III, PKT B8-MAYUR VIHARVSE PHASE III 847 400 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 14:25:00 4:25 0.00154583 MUs THAKKAR BAPA NAGAR-BLOCK1171 16, BLOCK_1-DEV NAGAR, BLOCK_10B-DEV NAGAR, BLOCK A-PUNJABI BASTI, BAPA NAGAR-ANAND PARBAT,PNR BLOCK_14B-DEV 905 NAGAR 1980 KVA PLANNED 19-03-2020 11:00:00 19-03-2020 13:13:53 2:13 0.00251222 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SEWA DHAM-MANDOLI, NEW MANDOLI 1172 INDUSTRIAL AREA NNG 518 0 KVA UNPLANNED 14-03-2020 15:03:00 14-03-2020 16:05:00 1:1 0.00101667 MUs BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, SEWA DHAM- 1173 MANDOLI NNG 345 400 KVA UNPLANNED 12-03-2020 11:53:16 12-03-2020 12:36:06 0:42 0.00046667 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D- 1174 HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 345 400 KVA UNPLANNED 05-03-2020 06:51:23 05-03-2020 07:45:04 0:53 0.00058889 MUs 1175 BLOCK_23-KRISHNA NAGAR, BLOCK_34P-KRISHNA NAGAR SRD 64 2000 KVA UNPLANNED 12-03-2020 09:29:02 12-03-2020 09:50:00 0:20 0.00008333 MUs 1176 LIG/MIG RES/NON COMM AREA-CHAWLA FARM KWN 0 630 KVA UNPLANNED 20-03-2020 12:24:54 20-03-2020 14:30:00 2:5 0 MUs 1177 SIYARAM-GHISA, RED CROSS HOSPITAL CHIKAMBARPUR-OLD SIMAPURI DGN 181 630 KVA PLANNED 26-03-2020 10:03:00 26-03-2020 12:38:38 2:35 0.00090417 MUs BHOLA1178 NATH NAGAR-SHAHDARA, TELIBARA-SHAHDARA, MAHARAM NAGAR-SHAHDARA, BIHARI COLONY-SHAHDARAJLM 181 630 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 15:05:00 5:5 0.00177917 MUs 1179 FYAZ GANJ-NAWAB GANJ, HATHI KHANA-NAWAB GANJ PHG 65 990 KVA PLANNED 11-03-2020 10:03:00 11-03-2020 14:00:03 3:57 0.00032917 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 1180 BLOCK A-HARSH VIHAR NNG 1418 0 KVA UNPLANNED 11-03-2020 16:48:40 11-03-2020 17:26:33 0:37 0.00041111 MUs SUBHASH PARK-GORAKH PARK, BLOCK A-WELCOME 1181COLONY, BLOCK J-SILAMPUR COLONY, BLOCK A-SILAMPUR COLONY, BLOCK G-SILAMPUR COLONY, BLOCK F- LIG/MIGYVR RES/NON 181COMM AREA-NEW 990 SILAMPURI KVA PHASE II PLANNED 16-03-2020 10:00:00 16-03-2020 16:20:17 6:20 0.00221667 MUs 1182 BLOCK D-AJIT NAGAR, BLOCK 9-KAILASH NAGAR KRN 450 990 KVA PLANNED 04-03-2020 10:03:00 04-03-2020 16:26:53 6:23 0.00053194 MUs VINOD NAGAR EAST-INDRAPRASTHA1183 EXTENSION, MEENA APPARTMENT-MOTHER DAIRY, BLOCK E-MADHU VIHAR, BLOCK B-MOTHER DAIRY, AGGARWALLNR PLAZA-MOTHER 604 DAIRY 5480 KVA PLANNED 18-03-2020 11:00:00 18-03-2020 15:16:37 4:16 0.00497778 MUs

SABOLI EXTN.-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA 1184 DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 12-03-2020 11:39:52 12-03-2020 12:28:32 0:48 0.0004 MUs 1185 BLOCK T-AHATA KEDARA, BLOCK T-SADAR BAZAR - RAM NAGAR PHG 272 990 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 14:05:00 4:5 0.00142917 MUs 1186 BHOLA NATH NAGAR-SHAHDARA, BIHARI COLONY-SHAHDARA, VISHWAS NAGAR JLM 2137 990 KVA PLANNED 19-03-2020 11:03:00 19-03-2020 17:44:29 6:41 0.00055694 MUs 1187 BABARPUR EXTN.-BABAR PUR, BLOCK C-KABIR NAGAR NNG 185 990 KVA UNPLANNED 11-03-2020 20:15:00 11-03-2020 21:01:57 0:46 0.00012778 MUs 1188 MOTIYA KHAN-SHAHI IDGAH COLONY PHG 3 400 KVA PLANNED 05-03-2020 11:03:00 05-03-2020 14:57:00 3:54 0.000325 MUs SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BUDH VIHAR-SEWA DHAM, 1189 BLOCK C-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 173 0 KVA UNPLANNED 19-03-2020 12:01:15 19-03-2020 12:54:00 0:52 0.00028889 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, GTB HOSPITAL-UNIVERSITY COLLEGE OF MEDICAL SCIENCES NNG, BLOCK C-SEWA DHAM, BLOCK A- SEWA DHAM, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH 1190 VIHAR, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 06-03-2020 10:23:10 06-03-2020 11:09:13 0:46 0.00038333 MUs BALBIR NAGAR EXTN.-SILAMPUR, JYOTI COLONY-BALBIR NAGAR,1191 BLOCK A-KABIR NAGAR, BLOCK B-NORTH CHHAJUPUR, BLOCK F-NORTH CHHAJUPUR, BLOCK E-NORTH CHHAJUPUR,NNG BLOCK A-NORTH 1672 CHHAJUPUR, 990 BLOCK KVA C-NORTH CHHAJUPUR PLANNED 13-03-2020 10:00:00 13-03-2020 14:28:10 4:28 0.00156333 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B- UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET 1192 NAGAR, BLOCK E-MEET NAGAR NNG 432 2650 KVA UNPLANNED 03-03-2020 18:00:00 03-03-2020 18:38:18 0:38 0.00052778 MUs BLOCK I-BRAHM PURI, BLOCK B-BRAHM PURI, JAFFRABAD-MAUJ PUR, ARVIND NAGAR-GHONDA, 1193 GHONDA PATTI CHAUHAN YVR 86 1500 KVA UNPLANNED 19-03-2020 14:55:46 19-03-2020 15:48:07 0:52 0.00014444 MUs BLOCK C-HARSH VIHAR, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK A-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK D- HARSH VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA 1194 DHAM-MANDOLI NNG 345 0 KVA UNPLANNED 07-03-2020 07:30:00 07-03-2020 07:51:56 0:21 0.00023333 MUs

BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, BLOCK C-KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK S- SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, PKT R-BLOCK A, PKT C- 1195 SHIV VIHAR, BLOCK A-SHIV VIHAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 130 0 KVA UNPLANNED 16-03-2020 14:41:26 16-03-2020 15:18:02 0:36 0.00015 MUs 1196 PAHAR GANJ PHG, ARAM NAGAR-SADAR BAZAR, BLOCK T-ARAM NAGAR PHG 6 400 KVA UNPLANNED 09-03-2020 22:46:00 09-03-2020 23:33:00 0:47 0.00006528 MUs 1197 DAMODER PARK-DILSHAD GARDEN DGN 86 990 KVA UNPLANNED 07-03-2020 14:50:50 07-03-2020 15:43:03 0:52 0.00014444 MUs 1198 MULTANI DHANDA-SADAR BAZAR, BAGICHI ALLUDDIN-SADAR BAZAR PHG 18 990 KVA PLANNED 17-03-2020 11:03:00 17-03-2020 14:18:49 3:15 0.00054167 MUs

SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK 1199 C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 12-03-2020 08:00:00 12-03-2020 08:45:20 0:45 0.000625 MUs BLOCK H-GHONDA PATTI, BLOCK C-GHONDA PATTI, JAFFRABAD-MAUJ PUR, BLOCK C- BHAJANPURA, GAMRI-GHONDA, ARVIND NAGAR-GHONDA, WEST GHONDA, BLOCK C-JAI PRAKASH 1200 NAGAR YVR 130 630 KVA UNPLANNED 19-03-2020 17:00:18 19-03-2020 17:57:09 0:56 0.00023333 MUs 1201 BLOCK T-AHATA KEDARA, SADAR BAZAR B G ROAD PHG 167 990 KVA PLANNED 04-03-2020 10:03:00 04-03-2020 13:25:00 3:22 0 MUs SABOLI VILLAGE-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D- ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM- 1202 MANDOLI NNG 173 0 KVA UNPLANNED 06-03-2020 07:40:00 06-03-2020 08:24:41 0:44 0.00024444 MUs BLOCK B-SUBHASH MOHALLA,1203 VIJAY PARK-YAMUNA VIHAR, MAUJ PUR COMPLEX 1, NORTH GHONDA, BSES 66 KV GRID S/STATION-COMMUNITYYVR CENTRE YAMUNA 181 VIHAR 990 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 15:48:27 5:48 0.00203 MUs AMBEDKAR NAGAR INDUSTRIAL AREA-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, LAXMI GARDEN- 1204 AMBEDKAR NAGAR, BHARAT-AMBEDKAR NAGAR KWN 542 0 KVA UNPLANNED 31-03-2020 12:45:42 31-03-2020 13:35:00 0:49 0.00013611 MUs 1205 OLD SEELAMPUR, SUBHASH MOHALLA-SEELAMPUR, OLD SEELAMPUR DHRAM PURA KRN 694 990 KVA PLANNED 02-03-2020 10:03:00 02-03-2020 15:03:00 5:0 0 MUs 1206 BLOCK C2-NEW ASHOK NAGAR, BLOCK C1-NEW ASHOK NAGAR, BLOCK B-ASHOK NAGAR VSE 2117 990 KVA PLANNED 14-03-2020 10:00:00 14-03-2020 14:55:53 4:55 0.00172083 MUs BLOCK B-SURAJMAL VIHAR, BLOCK E-JHILMIL COLONY BLOCK E, BLOCK1207 D-JHILMIL COLONY BLOCK D, ESI HOSPITAL-JHILMIL COLONY BLOCK C, ITI QUARTERS-IT STAFF COLONY, YAMUNAJLM SPORTS COMPLEX-VIVEK 0 VIHAR, 1980 SURAJMAL KVA VIHAR-VIVEK PLANNED VIHAR 16-03-2020 11:00:00 16-03-2020 14:50:00 3:50 0.00217222 MUs

BLOCK A-HARSH VIHAR, BLOCK A-SEWA DHAM, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB 1208 STATION-POLICE FARM, BLOCK C-SEWA DHAM, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 380 0 KVA UNPLANNED 27-03-2020 20:31:00 27-03-2020 21:05:00 0:33 0.00040333 MUs

PKT C-BLOCK B, PKT W-BLOCK A, BLOCK C-KARAWAL NAGAR, BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK C-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT 1209 A-BLOCK A, PKT C-SHIV VIHAR, PKT A-SHIV VIHAR, BLOCK A-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 130 0 KVA UNPLANNED 22-03-2020 09:59:12 22-03-2020 10:57:00 0:57 0.0002375 MUs 1210 AGCR ENCLAVE-ANAND VIHAR, HARGOBIND ENCLAVE-ANAND VIHAR JLM 181 990 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 15:19:53 5:19 0.00186083 MUs 1211 BLOCK B-NEW SILAMPURI PHASE II, BLOCK C-NEW SILAMPURI PHASE II YVR 181 0 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 13:31:52 3:31 0.00123083 MUs 1212 BALMIKI BASTI-FEROJ SHAH KOTLA STADIU, DARYA GANJ DRG 277 990 KVA PLANNED 04-03-2020 10:00:00 04-03-2020 15:50:19 5:50 0.00204167 MUs BHOLA NATH NAGAR-SHAHDARA, BIHARI COLONY-SHAHDARA, SHALIMAR PARK-SHAHDARA, EAST 1213 ROHTASH NAGAR-SHAHDARA, VISHWAS NAGAR, SHAHDARA JLM JLM 86 990 KVA UNPLANNED 06-03-2020 21:30:00 07-03-2020 01:25:00 3:55 0.00065278 MUs 1214 TOWN HALL-KUCHA NATWA, MAIN BAJAR-MALIWARA, DELHI PUBLIC LIBARARY-KUCHA NATWA CCK 1087 630 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 14:00:00 4:0 0.0014 MUs 1215 BLOCK D-MANDAWALI VILLAGE, RAILWAY COLONY-MANDAWALI VILLAGE LNR 1511 630 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 10:50:00 0:49 0.00028583 MUs BLOCK M-SUNDER NAGRI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK D- 1216 HARSH VIHAR, SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI NNG 259 0 KVA UNPLANNED 01-03-2020 09:13:54 01-03-2020 09:48:34 0:34 0.00028333 MUs BLOCK A-MEET1217 NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK B-UTTARANCHAL COLONY, BLOCK A-EAST GOKUL PURI, BLOCKNNG E-MEET NAGAR 181 0 KVA PLANNED 18-03-2020 10:00:00 18-03-2020 15:35:42 5:35 0.00195417 MUs 1218 BLOCK H-MANDAWALI VILLAGE LNR 2 400 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 13:15:00 3:15 0.0011375 MUs

GORAKH PARK WEST-SILAMPUR, BLOCK B-GORAKH PARK, SHIVAJI PARK-BALBIR NAGAR, BLOCK 1- 1219 BALBIR NAGAR, BALBIR NAGAR EXTN.-SILAMPUR, SHAHDRA METRO STATION-SHAHDARA DGN DGN 102 990 KVA UNPLANNED 13-03-2020 00:00:00 13-03-2020 00:32:15 0:32 0.00016889 MUs NEW GOVIND PURA-JAGATPURI, CHANDER NAGAR BLOCK F-GOPAL PARK, BLOCK D-RAM NAGAR, ARAM PARK-GEETA COLONY,1220 BLOCK 9-GANDHI NAGAR, SHIVPURI-JAGATPURI, BLOCK E-JAGATPURI, RASHID MARKET-JAGATPURI, BALDEVKRN PARK-JAGATPURI, 4627 BLOCK E-RADHEPURI 0 KVA EXTENSION, WEST PLANNED LAXMI MARKET KHUREJI-ARAM 19-03-2020 PARK,11:00:00 SAROJINI 19-03-2020PARK-ARAM 14:07:00 PARK 3:7 0.00301278 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK D- ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR- 1221 MANDOLI, SEWA DHAM-MANDOLI NNG 604 0 KVA UNPLANNED 12-03-2020 09:58:02 12-03-2020 10:53:55 0:55 0.00106944 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D-HARSH VIHAR, BLOCK B-HARSH 1222 VIHAR, BLOCK A-HARSH VIHAR, BLOCK B-RAJIV NAGAR NNG 259 0 KVA UNPLANNED 14-03-2020 20:44:32 14-03-2020 21:14:25 0:29 0.00024167 MUs 1223 BLOCK B-SADAR BAZAR - RAM NAGAR PHG 45 990 KVA UNPLANNED 02-03-2020 13:03:28 02-03-2020 13:45:03 0:41 0.00005694 MUs 1224 BLOCK F-INDIRA VIHAR, BLOCK C & D-INDIRA VIHAR KWN 130 0 KVA UNPLANNED 23-03-2020 22:46:00 23-03-2020 23:45:50 0:59 0.00024583 MUs BLOCK J-SHIV VIHAR, BLOCK A-PREM VIHAR, PKT C-BLOCK B, BLOCK C-KARAWAL NAGAR, BLOCK Q- SHIV VIHAR, BLOCK H-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK T-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK B-SHIV VIHAR, PKT A-BLOCK A, PKT R-BLOCK A, PKT C-SHIV VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK A-SHIV VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - 1225 B&C, BLOCK Q-SHIV VIHAR KWN 1381 0 KVA UNPLANNED 24-03-2020 20:59:39 24-03-2020 21:53:21 0:53 0.00235556 MUs BLOCK C-TUKMIRPUR, BLOCK H-WEST KARAWAL NAGAR, PKT B-BLOCK B, BLOCK B-NEW CHAUHAN PUR, BLOCK 3A-SADAT PUR, PKT D-BLOCK B, BLOCK D-BHAGIRATHI VIHAR, BLOCK H- SHIV VIHAR, BLOCK C-SHERPUR, BLOCK K-KARAWAL NAGAR (DEHROTI), PKT D-BLOCK A, PKT E- 1226 BLOCK A, BLOCK D-WEST KARAWAL NAGAR KWN 130 0 KVA UNPLANNED 06-03-2020 20:06:35 06-03-2020 20:54:35 0:47 0.00019583 MUs SUBHASH PARK-GORAKH PARK, BLOCK J-SILAMPUR COLONY, BLOCK E-NEW SILAMPURI PHASE II, BLOCK T-GAUTAM PURI, LIG/MIG RES/NON COMM AREA-SHASTRI PARK, ZERO PUSTA-USMAN 1227 PUR, GHONDA PATTI CHAUHAN YVR 345 3830 KVA UNPLANNED 07-03-2020 12:19:43 07-03-2020 12:53:33 0:33 0.00036667 MUs 1228 SABOLI COLONY-MANDOLI, SABOLI VILLAGE-MANDOLI NNG 173 0 KVA UNPLANNED 09-03-2020 09:37:19 09-03-2020 10:06:43 0:29 0.00016111 MUs BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, SHIV VIHAR, BLOCK D-SHIV VIHAR, 1229 BLOCK R-SHIV VIHAR, BLOCK CN-AMBIKA VIHAR BLOCK - B&C KWN 130 0 KVA UNPLANNED 27-03-2020 19:12:45 27-03-2020 19:56:25 0:43 0.00017917 MUs 1230 PART II- INDIAN AGRICULTURAL RESEARCH INSTITUTE-NEW RAJENDRA NAGAR SRD 84 990 KVA PLANNED 03-03-2020 10:30:00 03-03-2020 15:24:18 4:54 0.00032667 MUs BLOCK E-G- BLOCK SONIA VIHAR EXTENSION, LIG/MIG RES/NON COMM AREA-C-BLOCK SONIA 1231 VIHAR, LIG/MIG RES/NON COMM AREA-D-BLOCK-SONIA VIHAR KWN 173 0 KVA UNPLANNED 20-03-2020 14:32:38 20-03-2020 15:03:55 0:31 0.00017222 MUs 1232 IP STATE-PRAGATI MAIDAN DRG 272 990 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 13:53:30 3:53 0.00135917 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage 1233 BLOCK B-SUBHASH MOHALLA, VIJAY PARK-YAMUNA VIHAR, BLOCK C-GHONDA YVR 264 990 KVA UNPLANNED 25-03-2020 09:49:58 25-03-2020 10:25:16 0:35 0.00004861 MUs BLOCK I-WELCOME COLONY, BLOCK J-SILAMPUR COLONY, BLOCK T-GAUTAM PURI, JAFFRABAD- 1234 MAUJ PUR YVR 215 990 KVA UNPLANNED 07-03-2020 15:31:31 07-03-2020 16:21:36 0:50 0.00006944 MUs 1235 FATEHPURI MASJID-CHANDNI CHOWK, NAYA BAZAR-CHANDNI CHOWK, KATRA BARYAN-BARA DARI CCK 527 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 13:49:41 3:49 0.00133583 MUs BLOCK B-VINOD1236 NAGAR EAST, BLOCK A-MANDAWALI, L.P. DESHBANDHU SOC-L.P. EXTENSION, MOTHER DAIRY-INDRAPRASTHALNR EXTENSION LNR 620 990 KVA PLANNED 17-03-2020 10:00:00 17-03-2020 14:22:01 4:22 0.00152833 MUs 1237 BLOCK D-HARSH VIHAR NNG 259 0 KVA UNPLANNED 28-03-2020 13:59:49 28-03-2020 14:45:08 0:45 0.000375 MUs 1238 LIG/MIG RES/NON COMM AREA-SHASTRI PARK YVR 898 630 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 11:39:16 1:39 0.0005775 MUs 1239 BLOCK C9-YAMUNA VIHAR YVR 109 990 KVA UNPLANNED 18-03-2020 15:08:27 18-03-2020 15:37:08 0:28 0.00007778 MUs BLOCK C1-NEW ASHOK1240 NAGAR, BLOCK A-NEW ASHOK NAGAR, BLOCK D-NEW ASHOK NAGAR, BLOCK B-NEW ASHOK NAGAR VSE, BLOCKVSE D-NEW ASHOK 1517 NAGAR 0 KVA PLANNED 11-03-2020 10:03:00 11-03-2020 15:30:29 5:27 0.0019075 MUs 1241S.R.T. NAGAR-ARYA NAGAR, BLOCK L-RAM NAGAR, SHEELA HOTEL-ARYA NAGAR, MOTHER DAIRY-ARYA NAGARPHG 272 990 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 13:56:16 3:56 0.00137667 MUs SABOLI EXTN.-MANDOLI, MCD SCHOOL-SABOLI COLONY, SABOLI VILLAGE-MANDOLI, SABOLI 1242 EXTN.-MANDOLI NNG 423 630 KVA UNPLANNED 14-03-2020 15:10:00 14-03-2020 16:07:00 0:56 0.00076222 MUs BLOCK1243 A8-SADAT PUR, BLOCK F-SADAT PUR, BLOCK C-MUSTAFABAD (DAYALPUR), PKT C1-SADATPUR EXT-PUSTA AREA-KKWN BLOCK 181 0 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 14:25:06 4:25 0.00154583 MUs 1244 VIJAY PARK-YAMUNA VIHAR YVR 505 990 KVA UNPLANNED 19-03-2020 10:58:48 19-03-2020 11:46:34 0:47 0 MUs 1245 BABARPUR EXTN.-BABAR PUR NNG 31 630 KVA UNPLANNED 24-03-2020 19:08:57 24-03-2020 19:57:14 0:48 0.0004 MUs BLOCK E-SUBHASH MOHALLA, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK E-SUBHASH 1246 MOHALLA, BLOCK D-BHAJANPURA YVR 69 990 KVA UNPLANNED 15-03-2020 11:56:52 15-03-2020 12:43:05 0:46 0.00010222 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C- ANUP VIHAR, BLOCK D-HARSH VIHAR, BLOCK A-RAJIV NAGAR, J.R. COMPLEX-SEWA DHAM, BLOCK 1247 E-SEWA DHAM NNG 259 0 KVA UNPLANNED 01-03-2020 17:22:41 01-03-2020 17:39:56 0:17 0.00014167 MUs

BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK B-UTTARANCHAL COLONY, BLOCK A- 1248 EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 691 1620 KVA UNPLANNED 14-03-2020 16:27:05 14-03-2020 17:24:19 0:57 0.00126667 MUs 1249 NEW GOVIND PURA-JAGATPURI, BLOCK D-JAGATPURI, BALDEV PARK-JAGATPURI KRN 275 990 KVA UNPLANNED 04-03-2020 15:35:14 04-03-2020 16:24:17 0:49 0.00002722 MUs 1250 BLOCK D-NEW KONDALI VSE 181 400 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 13:44:20 3:44 0.00130667 MUs BLOCK A-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, 1251 BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR NNG 86 0 KVA UNPLANNED 12-03-2020 04:19:13 12-03-2020 04:46:16 0:27 0.000075 MUs 1252 BLOCK C-TUKMIRPUR, BLOCK D-TUKMIRPUR, BLOCK B-TUKMIRPUR KWN 181 630 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 12:34:35 2:34 0.00089833 MUs BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK C-PATEL VIHAR, BLOCK CN-MANGALAM VIHAR, BLOCK A-HARIJAN BASTI, PKT Y-SHIV VIHAR, BLOCK R-PATEL VIHAR, PKT D-SHIV VIHAR, BLOCK C- HARIJAN BASTI, BLOCK D-HARIJAN BASTI, BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK CN- 1253 AMBIKA VIHAR BLOCK - B&C KWN 86 0 KVA UNPLANNED 29-03-2020 18:15:16 29-03-2020 19:03:00 0:47 0.00013056 MUs 1254 DDA FLATS-BLOCK A DGN 557 630 KVA PLANNED 18-03-2020 13:03:00 18-03-2020 15:57:43 2:54 0.00048333 MUs 1255 BLOCK J-KARTAR NAGAR, GAMRI-GHONDA, BLOCK B-KARTAR NAGAR YVR 18 990 KVA UNPLANNED 03-03-2020 10:20:08 03-03-2020 10:59:36 0:39 0 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK D-HARSH 1256 VIHAR NNG 639 0 KVA UNPLANNED 24-03-2020 21:07:00 24-03-2020 21:49:00 0:42 0.00086333 MUs BLOCK 9-GANDHI NAGAR, BLOCK 10-GANDHI NAGAR, BLOCK 9-GANDHI NAGAR, BLOCK 9-KAILASH 1257 NAGAR KRN 325 990 KVA UNPLANNED 15-03-2020 13:16:41 15-03-2020 14:13:00 0:56 0.00003111 MUs PHASE I-DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR-DEV NAGAR,1258 BLOCK B-PRASAD NAGAR, RAJENDRA BHAWAN-RAJENDRA PLACE, ST.MICHAELS JUNIOR SCHOOL-PRASADPNR NAGAR, DEPARTMENT 905 OF TELECOMMUNICATIONS-PRASAD 0 KVA PLANNED NAGAR 13-03-2020 11:00:00 13-03-2020 13:34:00 2:34 0.00149722 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D- 1259 HARSH VIHAR, BLOCK A-HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, BLOCK E-SEWA DHAM NNG 432 0 KVA UNPLANNED 06-03-2020 00:23:51 06-03-2020 00:59:43 0:35 0.00048611 MUs 1260 JHILMIL INDUSTRIAL AREA-JHILMIL COLONY DGN 377 2970 KVA PLANNED 24-03-2020 11:00:00 24-03-2020 13:10:00 2:10 0.00252778 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK B-SEWA DHAM, BLOCK H-SEWA DHAM, BLOCK C- SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A- 1261 RAJIV NAGAR NNG 1887 0 KVA UNPLANNED 05-03-2020 17:06:12 05-03-2020 18:00:06 0:53 0.00073611 MUs 1262 SADAR BAZAR - RAM NAGAR, SADAR BAZAR B G ROAD PHG 424 990 KVA PLANNED 03-03-2020 10:00:00 03-03-2020 13:39:52 3:39 0.0012775 MUs 1263 PKT 4-PHASE I, KOTLA-MAYUR VIHAR, PATPARGANJ-SHASHI GARDEN MVR 1228 630 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 16:10:22 6:10 0.00102778 MUs SABOLI EXTN.-MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B- PRATAP NAGAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI 1264 COLONY-MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 12-03-2020 06:48:02 12-03-2020 07:34:15 0:46 0.00063889 MUs 1265 YAMUNA VIHAR YAMUNA FLOOD PLAINS YVR 0 400 KVA UNPLANNED 04-03-2020 10:00:00 04-03-2020 10:27:00 0:27 0 MUs 1266 PKT C-BLOCK A, PKT D-BLOCK A, PKT B-BLOCK A NNG 87 630 KVA UNPLANNED 06-03-2020 18:15:50 06-03-2020 19:14:33 0:58 0.00032222 MUs BLOCK A-JOHRI PUR, AMBEDKAR NAGAR INDUSTRIAL AREA-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR, JAGDAMBA COLONY-BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, WEST 1267 KARAWAL NAGAR, BLOCK B-JOHRI PUR KWN 130 400 KVA UNPLANNED 05-03-2020 23:10:44 06-03-2020 00:08:00 0:57 0.0002375 MUs BLOCK E-RAJIV NAGAR, BLOCK A-BANK COLONY, BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, SEWA DHAM-MANDOLI, BLOCK A-ANUP VIHAR, SEWA DHAM-MANDOLI, ANUP VIHAR-MANDOLI, SEWA 1268 DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 05-03-2020 21:22:22 06-03-2020 00:15:00 2:52 0.00238889 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-AMAR COLONY, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET 1269 NAGAR, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 345 2650 KVA UNPLANNED 06-03-2020 17:28:48 06-03-2020 20:16:00 2:47 0.00185556 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, LIG/MIG RES/NON COMM AREA-SABHEPUR, 1270 CHAUHAN PATTI-VIJAY VIHAR KWN 173 2120 KVA UNPLANNED 30-03-2020 09:21:34 30-03-2020 09:48:40 0:27 0.00015 MUs 1271 SADAR BAZAR - RAM NAGAR, SADAR BAZAR B G ROAD PHG 272 630 KVA PLANNED 13-03-2020 10:00:00 13-03-2020 13:50:32 3:50 0.00134167 MUs SHIVAJI PARK-BALBIR NAGAR, BLOCK A-MANDOLI EXTN., MCD SCHOOL-MANDOLI EXTN., BLOCK D- 1272 MANDOLI EXTN. NNG 470 990 KVA UNPLANNED 11-03-2020 12:37:37 11-03-2020 13:08:40 0:31 0.00008611 MUs 1273 LIG/MIG RES/NON COMM AREA-SABHEPUR, CHAUHAN PATTI-VIJAY VIHAR KWN 139 630 KVA UNPLANNED 14-03-2020 18:33:32 14-03-2020 19:14:50 0:41 0.00011389 MUs

1274 BLOCK F-ZERO PUSTA, BLOCK E-ZERO PUSTA, LIG/MIG RES/NON COMM AREA-ZERO PUSTA YVR 1033 990 KVA UNPLANNED 06-03-2020 18:21:30 06-03-2020 19:02:12 0:40 0 MUs 1275 MOSQUE-LAL KUAN BAZAR, LALKUAN BAZAR-FRASH KHANA CCK 183 990 KVA PLANNED 08-03-2020 10:00:00 08-03-2020 14:59:22 4:59 0.00033222 MUs 1276 JOHRI ENCLAVE-BHAGIRATHI VIHAR, JOHRI ENCLAVE-BHAGIRATHI VIHAR, BHAGIRATHI VIHAR KWN 68 0 KVA PLANNED 07-03-2020 10:00:00 07-03-2020 13:10:04 3:10 0.00110833 MUs

BLOCK A-RAMA GARDEN, BLOCK A-HARIJAN BASTI, BLOCK A-PRAKASH VIHAR, BLOCK D-SHIV VIHAR, BLOCK D-HARIJAN BASTI, BLOCK B-HARIJAN BASTI, LIG/MIG RES/NON COMM AREA-NEW 1277 CHAUHAN PUR, BLOCK A-NEW CHAUHAN PUR, BLOCK B-NEW CHAUHAN PUR KWN 130 0 KVA UNPLANNED 10-03-2020 15:15:00 10-03-2020 15:44:50 0:29 0.00012083 MUs SEWA DHAM-MANDOLI, BLOCK B-ANUP VIHAR, SABOLI COLONY-MANDOLI, SABOLI EXTN.- 1278 MANDOLI NNG 0 0 KVA UNPLANNED 17-03-2020 18:17:00 17-03-2020 18:29:56 0:12 0 MUs GHAROLI KONDLI,1279 BLOCK A-MAYUR VIHAR PHASE III, SEC C-MAYUR VIHAR PHASE III, MAYUR VIHAR PHASE III, BLOCK A-MAYURVSE VIHAR PHASE III 0 0 KVA PLANNED 06-03-2020 11:03:00 06-03-2020 17:50:42 6:47 0 MUs BLOCK D-HARSH VIHAR, BHARAT MATA MANDIR-JJ COLONY, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB STATION-POLICE FARM, NEW 1280 MANDOLI INDUSTRIAL AREA NNG 458 0 KVA UNPLANNED 14-03-2020 15:05:00 14-03-2020 16:05:00 1:0 0.00088333 MUs BLOCK B-EAST GOKUL PURI, BLOCK A-MEET NAGAR, BLOCK E-UTTARANCHAL COLONY, BLOCK A- 1281 EAST GOKUL PURI, BLOCK D-MEET NAGAR, BLOCK E-MEET NAGAR NNG 214 630 KVA UNPLANNED 19-03-2020 13:29:56 19-03-2020 13:56:25 0:26 0.00021667 MUs 1282 ROHITASH NAGAR EAST-SILAMPUR, BLOCK 1-BALBIR NAGAR DGN 219 630 KVA UNPLANNED 14-03-2020 13:03:00 14-03-2020 13:40:00 0:36 0.0001 MUs BLOCK 5-OLD RAJENDRA NAGAR, BLOCK 27-OLD RAJENDRA NAGAR, BLOCK1283 29-OLD RAJENDRA NAGAR, BLOCK 28-OLD RAJENDRA NAGAR, BLOCK 53-OLD RAJENDRA NAGAR, BLOCK 20-OLDSRD RAJENDRA 272NAGAR, SALWAN PUBLIC 990 KVA SCHOOL-OLD RAJENDRA PLANNED NAGAR 11-03-2020 10:00:00 11-03-2020 14:17:00 4:17 0.00149917 MUs BLOCK D-HARSH VIHAR, BHARAT MATA MANDIR-JJ COLONY, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK C-HARSH VIHAR, HARSH VIHAR SUB STATION-POLICE FARM, NEW 1284 MANDOLI INDUSTRIAL AREA NNG 0 0 KVA UNPLANNED 24-03-2020 21:03:00 24-03-2020 21:49:00 0:45 0 MUs PANCHKUIAN1285 ROAD RAILWAY COLONY-PAHAR GANJ, CHOWK NAI BASTI-SADAR BAZAR, SADAR BAZAR B G ROAD, SADAR BAZARPHG B G ROAD 26 990 KVA PLANNED 02-03-2020 10:03:00 02-03-2020 14:02:38 3:59 0.00033194 MUs 1286 BLOCK C-MEET NAGAR, BLOCK B-EAST GOKUL PURI, BLOCK A-EAST GOKUL PURI NNG 432 2650 KVA UNPLANNED 17-03-2020 15:52:21 17-03-2020 16:11:53 0:19 0.00026389 MUs LIG/MIG RES/NON COMM AREA-CHAWLA FARM, BADARPUR KHADAR, LIG/MIG RES/NON COMM 1287 AREA-G- BLOCK SONIA VIHAR EXTENSION KWN 8 100 KVA UNPLANNED 12-03-2020 19:02:23 12-03-2020 19:35:00 0:32 0.00013333 MUs SABOLI COLONY-MANDOLI, BLOCK B-SEWA DHAM, SEWA DHAM-MANDOLI, SABOLI COLONY- 1288 MANDOLI NNG 173 400 KVA UNPLANNED 23-03-2020 13:03:48 23-03-2020 13:44:46 0:40 0.00022222 MUs BLOCK A-MANDOLI EXTN., BLOCK B-ANUP VIHAR, BLOCK E-SEWA DHAM, POCKET A-JJ COLONY, 1289 SEWA DHAM-MANDOLI, SEWA DHAM-MANDOLI, SABOLI EXTN.-MANDOLI NNG 173 0 KVA UNPLANNED 14-03-2020 09:00:00 14-03-2020 09:55:06 0:55 0.00030556 MUs PKT W-BLOCK A, BLOCK U-SHIV VIHAR, BLOCK D-SHIV VIHAR, BLOCK K-SHIV VIHAR, BLOCK F-SHIV VIHAR, BLOCK L-SHIV VIHAR, BLOCK S-SHIV VIHAR, BLOCK O-SHIV VIHAR, BLOCK M-SHIV VIHAR, BLOCK N-SHIV VIHAR, PKT A-BLOCK A, PKT C-SHIV VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK V-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, PKT B-BLOCK B, PKT D-BLOCK B, BLOCK J-SHIV VIHAR, 1290 BLOCK Q-SHIV VIHAR, BLOCK H-SHIV VIHAR KWN 388 0 KVA UNPLANNED 06-03-2020 08:33:36 06-03-2020 09:32:24 0:58 0.000725 MUs BLOCK 32-WEST PATEL1291 NAGAR, BLOCK 24-SARVODAYA KANYA VIDYALAYA, BLOCK E-WEST PATEL NAGAR, BLOCK B-WEST PATEL NAGAR,PNR BLOCK F-PUNJABI 272 BASTI 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:37:45 3:37 0.00126583 MUs BLOCK E-SUBHASH MOHALLA, BLOCK D-BHAJANPURA, BLOCK C-BHAJANPURA, BLOCK E-SUBHASH 1292 MOHALLA, BLOCK C-BHAJANPURA, BLOCK D-BHAJANPURA YVR 86 990 KVA UNPLANNED 15-03-2020 20:02:56 15-03-2020 20:26:50 0:23 0.00006389 MUs SUBHASH1293 PARK-GORAKH PARK, GORAKH PARK WEST-SILAMPUR, NEW JAFFRABAD-GORAKH PARK, ROHITASH NAGAR EAST-SILAMPURDGN 1276 630 KVA PLANNED 19-03-2020 10:30:00 19-03-2020 16:10:00 5:40 0.00198333 MUs PKT 3-PHASE I, BLOCK A-PHASE I, BLOCK 36-HIMMATPURI, BLOCK 34-HIMMATPURI, BLOCK 26-HIMMATPURI, BLOCK 35-HIMMATPURI, PKT B-MAYUR VIHAR PHASE II, PKT F-MAYUR VIHAR PHASE II, BLOCK G-VINOD NAGAR EAST, BLOCK E-VINOD NAGAR1294 EAST, PKT C-MAYUR VIHAR PHASE II, BLOCK E-PANDAV NAGAR, BLOCK 21-KALYAN PURI, AMBEDKAR CAMP-KALYANMVR PURI, 1050KALYAN VAS-KALYAN 630 PURI, KVA BLOCK 18-KALYAN PLANNED PURI, BLOCK C-VINOD 16-03-2020 NAGAR 10:03:00EAST, BLOCK B-VINOD 16-03-2020 NAGAR 17:30:19 EAST, MAYUR VIHAR 7:27 EXTN., BLOCK 18-KALYAN 0 MUsPURI, VINOD NAGAR EAST-INDRAPRASTHA EXTENSION, KHICHRI PUR-PHASE II DARIBA KALA-KATRA MASHRU, GURUDWARA SISGANJ ROAD-CHANDNI1295 CHOWK, LAJPAT RAI MARKET-CHANDNI CHOWK, BHAGIRATH PLACE-CHANDNI CHOWK, HARI RAM MARKET-CHANDNICCK 1086 CHOWK, MOR SARAY 990 COLONY-CHANDNI KVA CHOWK PLANNED 18-03-2020 10:00:00 18-03-2020 14:08:14 4:8 0.00144667 MUs BLOCK J-SILAMPUR COLONY, BLOCK A-SILAMPUR COLONY, BLOCK B-NEW SILAMPURI PHASE II, 1296 BLOCK C-NEW SILAMPURI PHASE II YVR 769 990 KVA UNPLANNED 31-03-2020 23:31:33 31-03-2020 23:55:46 0:24 0.00003333 MUs SABOLI EXTN.-MANDOLI, BLOCK E-RAJIV NAGAR, BLOCK B-ANUP VIHAR, BLOCK1297 B-PRATAP NAGAR, BLOCK C-NORTH CHHAJUPUR, BLOCK A-SEWA DHAM, BLOCK D-ANUP VIHAR, BLOCK K-ANUPNNG VIHAR, BLOCK 181 A-ANUP VIHAR, BLOCK 0 KVA C-ANUP VIHAR, ANUP PLANNED VIHAR-MANDOLI 06-03-2020 10:00:00 06-03-2020 14:27:47 4:27 0.0015575 MUs BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK A-ANUP VIHAR, SEWA DHAM- 1298 MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 02-03-2020 21:14:42 02-03-2020 21:38:52 0:24 0.00033333 MUs PAHAR GANJ1299 PHG, MANTOLA MOHALLA-PAHAR GANJ, PANCHKUIAN ROAD RAILWAY COLONY-PAHAR GANJ, KASERU WALAN-PAHARPHG GANJ 272 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:04:05 3:4 0.00107333 MUs 1300 BLOCK 11-GEETA COLONY, BLOCK 6-GEETA COLONY, BLOCK 13-GEETA COLONY KRN 60 990 KVA PLANNED 13-03-2020 10:03:00 13-03-2020 15:06:14 5:3 0.00042083 MUs 1301 GAGAN VIHAR-JAGATPURI KRN 416 990 KVA PLANNED 21-03-2020 10:03:00 21-03-2020 13:40:39 3:37 0.00060278 MUs 1302 SADAR BAZAR - RAM NAGAR PHG 47 990 KVA UNPLANNED 08-03-2020 13:27:23 08-03-2020 13:57:48 0:30 0.00004167 MUs 1303 CHANDER NAGAR BLOCK D-SHASTRI PARK KRN 0 990 KVA UNPLANNED 12-03-2020 10:57:20 12-03-2020 11:30:00 0:32 0 MUs MUSTAFABAD-MUNGA NAGAR, BLOCK E-G- BLOCK SONIA VIHAR EXTENSION, BLOCK A1-MUNGA NAGAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMM AREA- 1304 B-BLOCK SONIA VIHAR KWN 130 0 KVA UNPLANNED 28-03-2020 20:27:47 28-03-2020 21:10:00 0:42 0.000175 MUs 1305 BLOCK B-MANUJPUR, GAMRI-GHONDA YVR 13 990 KVA UNPLANNED 16-03-2020 22:29:08 16-03-2020 23:27:29 0:58 0.00016111 MUs MAIN BAZAR CHANDANI CHOWK-SISGANJ, DARIBA KALA-KATRA MASHRU, NEW LAJPAT RAI MARKET-CHANDNI CHOWK, GURUDWAR SHAB LAND-CHANDNI CHOWK, JAMA MASZID AREA- 1306 CHANDNI CHOWK CCK 234 1620 KVA UNPLANNED 06-03-2020 23:40:00 07-03-2020 10:54:42 11:14 0.00280833 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR, 1307 GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK A-RAJIV NAGAR NNG 259 0 KVA UNPLANNED 07-03-2020 13:22:23 07-03-2020 14:06:53 0:44 0.00036667 MUs NAYAGAON-NEW KATWARA, BLOCK R-BRAHM1308 PURI, BLOCK P-BRAHM PURI, BLOCK F-BRAHM PURI, BLOCK T-AHATA KEDARA, JAGJEET NAGAR-GHONDA, JAGYVR JEEVAN NAGAR-NEW 2428 KATWARA 630 GHONDA KVA PLANNED 05-03-2020 11:03:00 05-03-2020 13:46:55 2:43 0.00045278 MUs 1309 BLOCK 9-GANDHI NAGAR, BLOCK 9-SUBHASH MOHALLA_I KRN 695 990 KVA PLANNED 02-03-2020 10:03:00 02-03-2020 17:52:53 7:49 0 MUs 1310 BLOCK A-VIVEK VIHAR, BLOCK_C-SAVITA VIHAR JLM 389 990 KVA PLANNED 12-03-2020 10:00:00 12-03-2020 17:32:00 7:32 0.00263667 MUs 1311 DDA FLATS- MOTIAKHAN DUMP SCHEME-MOTIA KHAN, R.G. COMPLEX-MOTIA KHAN PHG 6 990 KVA UNPLANNED 08-03-2020 13:06:06 08-03-2020 13:35:00 0:28 0.00003889 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK E-RAJIV NAGAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, SABOLI COLONY-MANDOLI, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK E-SEWA DHAM, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-SEWA DHAM, BLOCK H-SEWA DHAM, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, BLOCK D- 1312 HARSH VIHAR, J.R. COMPLEX-SEWA DHAM, BLOCK E-SEWA DHAM NNG 86 0 KVA UNPLANNED 24-03-2020 21:06:00 24-03-2020 21:48:00 0:42 0.00011667 MUs CHAUHAN BANGAR-JAFFRABAD, BLOCK R-BRAHM PURI, BLOCK F-BRAHM PURI, BLOCK L-BRAHM 1313 PURI, JAGJEET NAGAR-GHONDA, GAUTAM VIHAR-GHONDA YVR 345 6210 KVA UNPLANNED 23-03-2020 12:50:00 23-03-2020 12:58:00 0:8 0.00008889 MUs AJMERI GATE-CHANDNI CHOWK, NAI SARAK-JOGIWARA, KATRA NAWAB-CHANDNI CHOWK,1314 CHAWRI BAZAR-KHUSH DIL, GGS INDRAPRASTHA UNIVERSITY-KASHMERE GATE, KASHMIRI GATE-MORI GATE,CCK CHABI GANJ-MORI 1102 GATE, GOVT OF 990 N CKVA T OFFICE-KASHMERE PLANNED GATE, MAIN BAZAR-KHUSH 02-03-2020 DIL 10:00:00 02-03-2020 14:03:30 4:3 0.0014175 MUs 1315 BLOCK B-MAN SINGH NAGAR, BLOCK D-OLD MUSTAFABAD KWN 181 990 KVA PLANNED 23-03-2020 10:00:00 23-03-2020 12:42:03 2:42 0.000945 MUs BLOCK B-NEW SILAMPURI PHASE II, BLOCK E-NEW SILAMPURI PHASE II, BLOCK1316 F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, JANTA COLONY-VIVEK VIHAR, BLOCK D- LIG/MIGYVR RES/NON COMM 181 AREA-NEW SILAMPURI 0 KVA PHASE II, JAFFRABAD-MAUJ PLANNED PUR 11-03-2020 10:00:00 11-03-2020 15:14:53 5:14 0.00183167 MUs 1317 BLOCK_1A-REHAGAR PURA, BLOCK 13-KAROL BAGH, BLOCK 12-REHGAR PURA SRD 905 1980 KVA PLANNED 14-03-2020 11:00:00 14-03-2020 11:47:00 0:47 0.00080944 MUs

BLOCK B-GOVIND VIHAR, BLOCK C-MAHALAXMI ENCLAVE, BLOCK C-GOVIND VIHAR, BLOCK C- 1318 PREM VIHAR, BLOCK D-PREM VIHAR, BLOCK B-PREM VIHAR, BLOCK B-MAHALAXMI ENCLAVE KWN 155 990 KVA UNPLANNED 17-03-2020 13:42:12 17-03-2020 14:31:44 0:49 0.000245 MUs CLOSED FACTORY-FARIDPURI, BLOCK 20-WEST PATEL NAGAR, BLOCK D-WEST PATEL NAGAR,1319 BLOCK O-WEST PATEL NAGAR, BLOCK 35-RAMJAS SPORTS COMPLEX, BLOCK T-FARIDPURI, BLOCK 38-WEST PNRPATEL NAGAR, 1866BLOCK 26-WEST PATEL 630 NAGAR,KVA RESTRICTED PLANNED AREA MILITARY-ANAND 06-03-2020 PARBAT 10:00:00 06-03-2020 14:22:56 4:22 0.00152833 MUs GORAKH PARK WEST-SILAMPUR, NEW JAFFRABAD-GORAKH PARK, BLOCK B-GORAKH PARK, 1320 BABARPUR WEST-BABAR PUR DGN 0 3240 KVA UNPLANNED 14-03-2020 10:20:00 14-03-2020 10:52:05 0:32 0 MUs NoCapacity of Number of Distribution Consumers Transformer (in Whether Planned or Sr. No. Area Affected Division Affected KVA). Unplanned Outage From DateTime To DateTime Duration (Hrs:Mins) Unserved (MU) due to Outage SOC SCHOOL-CONNAUGHT PLACE DRG, DEMOLISHED AREA-ROUSE AVENUE, DEEN DAYAL UPADAHYA SCHOOL-CONNAUGHT PLACE DRG, BLOCK E-CONNAUGHT PLACE DRG, GANDHI 1321 SHANTI PRATISTHAN STAFF FLATS-CONNAUGHT PLACE DRG DRG 129 630 KVA UNPLANNED 13-03-2020 09:55:24 13-03-2020 10:43:42 0:48 0.00013333 MUs SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-BANK COLONY, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK C-SEWA DHAM, BLOCK D- 1322 HARSH VIHAR, BLOCK B-HARSH VIHAR, BLOCK A-HARSH VIHAR NNG 432 0 KVA UNPLANNED 05-03-2020 21:20:45 05-03-2020 23:20:00 1:59 0.00165278 MUs BLOCK 1B-DEV NAGAR, BLOCK1323 6B-DEV NAGAR, BLOCK_1A-REHAGAR PURA, PHASE I-DEV NAGAR, MATA RAMESHWARI NEHRU NAGAR-DEV NAGAR,PNR KHALSA NAGAR-DEV 2277 NAGAR 990 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 13:03:00 3:3 0.0010675 MUs 1324 LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR KWN 276 0 KVA UNPLANNED 03-03-2020 14:34:21 03-03-2020 15:13:14 0:38 0.00033778 MUs BLOCK D-MEET NAGAR, BLOCK A-EAST GOKUL PURI, BLOCK C-MEET NAGAR, BLOCK C-AMAR 1325 COLONY, BLOCK B-EAST GOKUL PURI NNG 82 990 KVA UNPLANNED 18-03-2020 10:30:14 18-03-2020 11:19:58 0:49 0.00027222 MUs BLOCK CN-AMBIKA VIHAR BLOCK - B&C, BLOCK Z-O & P BLOCKS SHIV VIHAR KARWAL NAGAR, BLOCK C-PATEL VIHAR, SHIV VIHAR, BLOCK R-PATEL VIHAR, BLOCK A-MANGALAM VIHAR, BLOCK C- SHIV VIHAR, BLOCK C-HARIJAN BASTI, BLOCK D-HARIJAN BASTI, BLOCK CN-AMBIKA VIHAR BLOCK - 1326 B&C KWN 130 0 KVA UNPLANNED 28-03-2020 11:41:53 28-03-2020 12:55:00 1:13 0.00030417 MUs BLOCK F-SHIV VIHAR, BLOCK P-SHIV VIHAR, BLOCK C-SHIV VIHAR, BLOCK A-SHIV VIHAR, BLOCK H- 1327 SHIV VIHAR KWN 86 0 KVA UNPLANNED 18-03-2020 17:46:53 18-03-2020 18:41:28 0:54 0.00015 MUs BLOCK E-NEW SILAMPURI PHASE1328 II, BLOCK F- LIG/MIG RES/NON COMM AREA-NEW SILAMPURI PHASE II, BLOCK D- LIG/MIG RES/NON COMMYVR AREA-NEW SILAMPURI 181 PHASE II 0 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 13:05:57 3:5 0.00107917 MUs

BLOCK A-BANK COLONY, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK A- 1329 ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI EXTN.-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 07-03-2020 11:44:08 07-03-2020 11:56:27 0:12 0.00016667 MUs 1330 ANAND VIHAR BLOCK A, ANAND VIHAR BLOCK C, ANAND VIHAR BLOCK B JLM 14 990 KVA PLANNED 02-03-2020 11:03:00 02-03-2020 15:39:18 4:36 0.00038333 MUs

BLOCK D-ASHOK NAGAR, BLOCK A-MEET NAGAR, SABOLI COLONY-MANDOLI, SABOLI VILLAGE- MANDOLI, BLOCK B-ANUP VIHAR, NEW MANDOLI INDUSTRIAL AREA, BLOCK B-PRATAP NAGAR, BLOCK A-SEWA DHAM, SEWA DHAM-MANDOLI, BLOCK D-ANUP VIHAR, BLOCK K-ANUP VIHAR, BLOCK A-ANUP VIHAR, BLOCK C-ANUP VIHAR, SEWA DHAM-MANDOLI, SABOLI COLONY- 1331 MANDOLI, ANUP VIHAR-MANDOLI, SEWA DHAM-MANDOLI NNG 432 0 KVA UNPLANNED 06-03-2020 15:19:54 06-03-2020 15:53:12 0:33 0.00045833 MUs 1332 BLOCK C2-YAMUNA VIHAR, BLOCK C1-YAMUNA VIHAR, BLOCK B2-YAMUNA VIHAR YVR 81 630 KVA PLANNED 19-03-2020 10:00:00 19-03-2020 14:16:49 4:16 0.00149333 MUs 1333KASTURBA NAGAR-SHAHDARA, TELIBARA-SHAHDARA, MAHARAM NAGAR-SHAHDARA, JAWALA NAGAR-SHAHDARAJLM 0 4630 KVA PLANNED 17-03-2020 11:00:00 17-03-2020 14:12:01 3:12 0.00133333 MUs BLOCK L-SUNDER NAGRI, BLOCK M-SUNDER1334 NAGRI, BLOCK O-SUNDER NAGRI, BLOCK C-SUNDER NAGRI NNG, BLOCK A-RAJIV NAGAR NNG, BLOCK H-PREMNNG NAGAR NNG, 604 BLOCK E1-BUNKAR 5030 VIHAR KVA PLANNED 19-03-2020 11:00:00 19-03-2020 13:06:08 2:6 0 MUs GOVT. QTRS-64 KHAMBA,1335 GOVIND BALLABH PANT HASPITAL-LN JPN COLONY, MEER DARD H.S.-ROUSE AVENUE, DEMOLISHED AREA-ROUSEDRG AVENUE 1567 990 KVA PLANNED 05-03-2020 10:00:00 05-03-2020 14:22:35 4:22 0.00152833 MUs 1336BLOCK G-SILAMPUR COLONY, BLOCK T-GAUTAM PURI, JAG JEEVAN NAGAR-NEW KATWARA-SHASTRI PARK YVR 504 400 KVA PLANNED 11-03-2020 10:00:00 11-03-2020 13:55:37 3:55 0.00137083 MUs

HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST 1337 EXTN., BLOCK D-HARSH VIHAR, BLOCK A-RAJIV NAGAR, RAJEEV NAGAR-SEWA DHAM NNG 259 0 KVA UNPLANNED 29-03-2020 22:26:45 29-03-2020 23:15:50 0:49 0.00040833 MUs

BLOCK D-NEHRU VIHAR, BLOCK F-NEHRU VIHAR, BLOCK B-CHANDU NAGAR, MUSTAFABAD- 1338 MUNGA NAGAR, BLOCK A-NEHRU VIHAR, BLOCK C-NEHRU VIHAR, BLOCK B-NEHRU VIHAR KWN 4846 3520 KVA UNPLANNED 09-03-2020 11:53:00 09-03-2020 12:28:00 0:35 0 MUs 1339 SEWA DHAM-MANDOLI NNG 173 400 KVA UNPLANNED 17-03-2020 14:24:52 17-03-2020 15:12:17 0:47 0.00026111 MUs BLOCK C-SURAJMAL1340 VIHAR, BLOCK A-VIVEK VIHAR, BLOCK B-VIVEK VIHAR, TELEPHONE EXCHANGE-TELEPHONE COLONY, JANTA COLONY-VIVEKJLM VIHAR 373 630 KVA PLANNED 06-03-2020 10:00:00 06-03-2020 16:47:54 6:47 0.00237417 MUs SABOLI EXTN.-MANDOLI, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK A-MANDOLI VILLAGE, BLOCK A-BANK COLONY, BLOCK B-PRATAP NAGAR, BLOCK B-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK H-SEWA DHAM, BUDH VIHAR-SEWA DHAM, BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK A-HARSH VIHAR, GOVT.CO. SEC. SCHOOL-HARSH VIHAR, BLOCK B-SEWA DHAM, ANUP VIHAR-MANDOLI, 1341 RAJEEV NAGAR-SEWA DHAM NNG 432 0 KVA UNPLANNED 09-03-2020 18:27:20 09-03-2020 19:16:00 0:48 0.00066667 MUs PKT 3-PHASE I, BLOCK A-PHASE I, BLOCK 36-HIMMATPURI, BLOCK 34-HIMMATPURI, BLOCK 26-HIMMATPURI, BLOCK 35-HIMMATPURI, PKT B-MAYUR VIHAR PHASE II, PKT F-MAYUR VIHAR PHASE II, BLOCK G-VINOD NAGAR1342 EAST, PKT C-MAYUR VIHAR PHASE II, BLOCK E-PANDAV NAGAR, BLOCK 21-KALYAN PURI, AMBEDKAR CAMP-KALYANMVR PURI,1226 KALYAN VAS-KALYAN 630 PURI, KVA BLOCK 18-KALYAN PLANNED PURI, BLOCK C-VINOD 06-03-2020 NAGAR 11:03:00EAST, MAYUR VIHAR 06-03-2020 EXTN., 17:51:04 BLOCK 18-KALYAN PURI, 6:48 VINOD NAGAR EAST-INDRAPRASTHA 0.00113333 MUs EXTENSION, KHICHRI PUR-PHASE II BLOCK 1343A-VIVEK VIHAR, BLOCK B-VIVEK VIHAR, VIVEK VIHAR BLOCK C, SUPER BAZAR-VIVEK VIHAR BLOCK A, BLOCK D-VIVEKJLM VIHAR 181 990 KVA PLANNED 20-03-2020 10:00:00 20-03-2020 16:44:39 6:44 0.00235667 MUs 1344 G.B.SSS SCHOOL-GOKUL PURI, BLOCK B-EAST GOKUL PURI, BLOCK A-EAST GOKUL PURI NNG 284 630 KVA UNPLANNED 03-03-2020 19:45:43 03-03-2020 20:40:00 0:54 0.00015 MUs GORAKH1345 PARK EAST-SILAMPUR, BALBIR NAGAR EXTN.-SILAMPUR, BLOCK 1-BALBIR NAGAR, BALBIR NAGAR EXTN.-SILAMPURDGN 437 990 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 15:23:01 5:23 0.00188417 MUs BHARAT MATA MANDIR-JJ COLONY, HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, NEW MANDOLI INDUSTRIAL AREA, DEEPAK MEDITECH-NEW MANDOLI INDUSTRIAL AREA, 1346 SEWA DHAM-MANDOLI, BLOCK D-HARSH VIHAR NNG 604 0 KVA UNPLANNED 07-03-2020 14:36:23 07-03-2020 15:08:53 0:32 0.00062222 MUs 1347 BLOCK K-BRAHM PURI, BLOCK B-BRAHM PURI, BLOCK Q-BRAHM PURI YVR 315 990 KVA UNPLANNED 09-03-2020 15:05:40 09-03-2020 15:38:09 0:32 0.00004444 MUs HARSH VIHAR SUB STATION-POLICE FARM, BLOCK C-HARSH VIHAR, BLOCK D-HARIJAN BASTI EAST EXTN., BLOCK C-SEWA DHAM, BLOCK A-SEWA DHAM, BLOCK D-HARSH VIHAR, BLOCK B-HARSH 1348 VIHAR, BLOCK A-HARSH VIHAR NNG 259 0 KVA UNPLANNED 04-03-2020 18:32:01 04-03-2020 18:51:45 0:19 0.00015833 MUs 1349 BLOCK E-OLD SIMAPURI, BLOCK F-OLD SIMAPURI, BLOCK A-OLD SIMAPURI DGN 197 630 KVA PLANNED 18-03-2020 10:03:00 18-03-2020 15:03:00 5:0 0.00083333 MUs 1350BLOCK A-GANESH NAGAR, BLOCK C-GANESH NAGAR, GANESH NAGAR SOUTH-INDRAPRASTHA EXTENSION LNR 1769 990 KVA PLANNED 21-03-2020 10:00:00 21-03-2020 13:45:00 3:45 0.0013125 MUs BLOCK A-PRAKASH VIHAR, BLOCK E-PRAKASH VIHAR, BLOCK D-PRAKASH VIHAR, BLOCK C-PRAKASH 1351 VIHAR, BLOCK C-DLF ANKUR VIHAR KWN 259 0 KVA UNPLANNED 24-03-2020 10:29:22 24-03-2020 11:13:07 0:43 0.00035833 MUs LIG/MIG RES/NON COMM AREA-CRPF1352 CAMP SONIA VIHAR, LIG/MIG RES/NON COMM AREA-A-BLOCK SONIA VIHAR, LIG/MIG RES/NON COMMKWN AREA-A-BLOCK 20 SONIA VIHAR 400 KVA PLANNED 16-03-2020 10:00:00 16-03-2020 14:22:24 4:22 0.00152833 MUs 1353 SEWA DHAM-MANDOLI NNG 259 400 KVA UNPLANNED 25-03-2020 20:48:04 25-03-2020 21:03:52 0:15 0.000125 MUs

1354 HARIZAN BASTI-GAZIPUR VILLAGE, BLOCK H-GAZIPUR VILLAGE, BHARAT GAS-GAZIPUR VILLAGE LNR 11 1530 KVA UNPLANNED 11-03-2020 17:14:00 11-03-2020 17:33:00 0:18 0 MUs