References Book of HERA Group

Design, construction, operation:

• Leachate Treatment Plants LEACHATE Treatment Plant of COLL CARDUS W.T.C.

LOCATION INVESTMENT COLL CARDUS –VACARISSES -

CLIENT STAR UP HERA TRATESA 1997 -

PROJECT EXPANDED & UPGRADED Conception, Construction, IN : 2008 Operation FLOW: PRODUCTION 250 m³/day

DESIGN, INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM DESCRIPTION OF THE LEACHATE TREATMENT PLANT IN THE COLL CARDUS WTC (Waste Treatment Centre), IN VACARISSES, Barcelona.

Extension and Renewal of the plant: in 2007 -2008 with BMR modules

Sector of Operation WWP : Reverse Osmosis Technology

Daily flow: 250 m³/day

Services given: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment for cleaning and irrigation of paths and roads of Coll Cardus W.T.C.

Pal treatment Modules Leachate treatment plant Reverse Osmosis Modules

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of the “ QUEIXAS” Landfill site Galicia

LOCATION INVESTMENT CERCEDA Galicia - Spain CLIENT STAR UP SOGAMA 2002 - 2012

PROJECT Extension and Conception & Construction, Repowering: Operation 2009 FLOW: PRODUCTION 520 m³/day

DESCRIPTION DESING, INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE QUEIXAS LANDFILL, Community of Galicia, Spain. • Extension and Renewal of the plant in 2009.

Sector of Operation WWP : Reverse Osmosis Technology

Flow Plant 1 180 m³/day Flow Plant 2 180 m³/day Flow Plant 3 in November 2009, an extension of the existing treatment plant of 80 m³/day to 160 m³/day was achieved.

Total daily flow treated: At present 520 m³/day

Scope of services : Supply, installation, assembly, commissioning and operation, technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate Treatment Plant Reverse Osmose Modules

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

LEACHATE Treatment Plant of the W.T.C. in TOLEDO

LOCATION INVESTMENT TOLEDO. Spain

CLIENT STAR UP OXIMINOR, S.L. 2007

PROJECT Conception & Construction, Operation

FLOW: PRODUCTION 24 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT OF THE WASTE TREATMENT CENTER IN

TOLEDO, SPAIN.

Sector of Operation WWP : Reverse Osmosis Technology Two Containerized Plants

Total daily flow treated : 24 m³/day

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Containerized plant for leachate treatment Containerized Reverse Osmosis

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

LEACHATE Treatment Plant of SOBRADOS LANDFILL

LOCATION INVESTMENT SOBRADO DOS MONXES (LA CORUÑA), Spain CLIENT STAR UP SERVICE GESTÁN, S.A. 2008 PROJECT Conception & Construction, Operation

FLOW: PRODUCTION 144 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT OF THE WASTE TREATMENT CENTER OF THE LANDFILL LOCATED IN SOBRADOS, AUTHORISED AND MANAGED BY ASPIAS CENTRE, Community of Galicia.

Sector of Operation WWP : Reverse Osmosis Technology

Total daily flow treated : 144m³/day

Scope of services: Supply, installation, assembly, commissioning, Operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment plant Reverse Osmose Modules

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of BELLVER Landfill

LOCATION INVESTMENT BELLVER DE CERDANYA (GIRONA), Spain

CLIENT SART UP SERVICE Waste Agency of 1999 - 2010

PROJECT Conception & Construction, Operation FLOW: PRODUCTION 50 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT OF THE REGIONAL LANDFILL in the CERDANYA, Community of Catalonia, Spain.

Sector of Operation WWP : Reverse Osmosis Technology

Daily Flow: 50 m³/day

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate Treatment Plant

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

LEACHATE Treatment Plant of the W.T.C. of U.T.E. VALLORO

. LOCATION INVESTMENT (Barcelona), Spain

CLIENT STAR UP U.T.E. VALLORO 2010 PROJECT Conception & Construction, Operation FLOW: PRODUCTION 70 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT OF THE WASTE TREATMENT CENTRE OF U.T.E. VALLORO, located in GRANOLLES, Community of Catalonia, Spain.

Sector of Operation WWP : Reverse Osmosis Technology.

Total daily flow treated : 70m³/day

Scope of services: Supply, installation, assembly, commissioning, operation, and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment BOD5: 25 mg/l COD: 500 mg/l

Leachate treatment plant Membranes

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of ALCALA DE HENARES LANDFILL (Madrid)

LOCATION INVESTMENT ALCALA DE HENARES (MADRID), Spain

CLIENT START UP U.T.E VERDEHENARES 2005 PROJECT Conception & Construction, Operation FLOW: PRODUCTION 10 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLED LANDFILL OF ALCALÁ DE HENARES – (MADRID) Spain.

Sector of Operation WWP : Reverse Osmosis Technology.

Total daily flow treated : 10 m³/day (two units of 5m³ each one)

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit 2nd. Leachate Treatment Unit

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment of the W.T.C. RECIPLASA - Castellon

LOCATION INVESTMENT ONDA (CASTELLON), Spain

CLIENT START UP RECIPLASA 2004 PROJECT Conception & Construction, Operation FLOW: PRODUCTION 100 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLLED LANDFILL OF ONDA - (CASTELLON) Spain.

Sector of Operation WWP : Reverse Osmosis Technology.

Daily flow : 100m³/day

Scope of services: Supply, installation, assembly, commissioning and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate Treatment Unit Reverse Osmosis Modules

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

LEACHATE Treatment plant of the WTC in PEÑAFIEL

LOCATION INVESTMENT CAMPO DE PEÑAFIEL (VALLADOLID), Spain

CLIENT START UP RESIN RESIDUOS INDUSTRIALES 2004

PROJECT Conception & Construction, Operation

FLOW: PRODUCTION 100 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE WASTE TREATMENT CENTRE OF PAÑAFIEL – VALLADOLID (Spain)

Sector of Operation WWP : Reverse Osmosis Technology.

Daily flow: 100 m³/day

Scope of services: Supply, installation, assembly, commissioning and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit Osmosis Membranes

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of LANDFILL of « NUEVA RENDIJA» Madrid

LOCATION INVESTMENT NUEVA RENDIJA – ALCALA DE HENARES (MADRID), Spain CLIENT START UP U.T.E VERDEHENARES 2005

PROJECT Conception & Construction, Operation FLOW PRODUCTION 10 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLLED LANDFILL OF NUEVA RENDIJA – (MADRID) Spain

Sector of Operation WWP : Reverse Osmosis Technology.

Total daily flow treated : 10 m³/day (two units of 5m³ each one)

Scope of services: Technology supply , installation, assembly, commissioning and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit Treatment Unit

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of the new W.T.C. of FERVASA

LOCATION INVESTMENT QUART DE POBLET (VALENCIA), Spain CLIENT STAR UP HORNILLOS OBRA UTE, 2007 (SUFI, HORLESA, CYES)

PROJECT Transfer & Construction Operation- Commissioning FLOW: PRODUCTION 100 m³/día

DESCRIPTION TRANSFER OF THE EXISTING LEACHATE TREATMENT PLANT OF THE NEW SITE. INSTALLATION AND COMMISIONING OF THE REVERSE OSMOSIS SYSTEM IN THE NEW TREATMENT CENTER OF FERVASA IN VALENCIA, SPAIN .

Sector of Operation WWP : Reverse Osmosis Technology.

Daily flow : 100m³/day

Scope of services: Technology transfer, installation, assembly, commissioning and technical assistance of the leachate treatment plant and wastewater treatment plant in the new site.

Reject: to natural environment

Leachate treatment Unit Reverse Osmosis modules

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment of the controlled LANDFILL in MONTSIA Region (Tarragona)

LOCATION INVESTMENT MONTSIA (TARRAGONA), Spain

CLIENT STAR UP G.B.I. Services of 2008 Municipal Landfill of Montsia

PROJECT Conception & Construction, Operation FLOW: PRODUCTION 85 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLLED LANDFILL OF «MONTSIA REGION» (Tarragona) Spain.

Sector of Operation WWP : Reverse Osmosis Technology.

Total daily flow treated : 85m³/day

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit Osmosis Membranes

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment of the controlled LANDFILL in « CAN MATA » (Barcelona)

LOCATION INVESTMENT HOSTALETS DE PIEROLA (Barcelona) Spain

CLIENT STAR UP CESPA GR, S.A. 2007 PROJECT Conception & Construction, Operation FLOW: PRODUCTION 85 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLLED LANDFILL of «CAN MATA» in HOSTALETS DE PIEROLA (Barcelona)

Sector of Operation WWP : Reverse Osmosis Technology.

Total daily flow treated : 85m³/day

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit Osmosis Membranes

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of the LANDFILL of PINTO

LOCATION INVESTMENT PINTO, (Madrid) Spain CLIENT START UP VERTRESA 2001

PROJECT Conception & Construction, Operation FLOW: PRODUCTION 25 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLLED LANDFILL of PINTO, Community of Madrid.

Technology applied: Reverse Osmosis

Daily Flow : 25m³/day

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit Osmosis Membranes

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of the LANDFILL of ARGALARIO

LOCATION INVESTMENT ARGALARIO Spain

CLIENT SERVICE IHOBE 2007 – 2009

PROJECT Conception & Construction, Operation

FLOW: PRODUCTION 240 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLED LANFILL OF ARGALARIO – LINDANE SAFETY CELL -.

Sector of Operation WWP : Reverse Osmosis Technology.

Technology applied: SBR (Sequential Biological Reactor), Reverse Osmosis and carbon filters system for the reduction of HCH (Lindane).

Daily flow : 240m³/day

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit Reverse Osmosis Modules

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of the LANDFILL in SALAMANCA

LOCATION INVESTMENT GOMECELLO (SALAMANCA), Spain CLIENT STAR UP W.T.C. SALAMANCA U.T.E. 2006

PROJECT Conception & Construction, Operation FLOW: PRODUCTION 100 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLLED LANDFILL of SALAMANCA– Community of Castile and Leon

Sector of Operation WWP : Reverse Osmosis Technology.

Technology applied: Physical-chemical treatment + Reverse Osmosis

Daily Flow : 100m³/day, (5m³/h.)

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject to natural environment

Leachate treatment Unit Physical-Chemical Treatment

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of the LANDFILL in PALAUTORDERA

LOCATION INVESTMENT SANTA MARIA DE PALAUTORDERA, (Barcelona) Spain CLIENT IN SERVICE CESPA, GESTION DE RESIDUOS S.A Since 1999 Renewal and extension of the plant in 2008 PROJECT Conception & Construction, Operation

FLOW: PRODUCTION 120 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLLED LANDFILL OF SANTA MARIA DE PALAUTORDERA (Barcelona) Catalonia.

Sector of Operation WWP : Reverse Osmosis Technology. – In 2008 The Extension and renewal of a previous unit was done.

Daily flow : 120m³/day

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit Leachate treatment modules

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 LEACHATE Treatment Plant of the LANDFILL OF SAKANA

LOCATION INVESTMENT SAKANA (NAVARRE), Spain

CLIENT IN SERVICE SAKANA MANCOMMUNITY Since 1997

PROJECT Conception & Construction, Operation

FLOW: PRODUCTION 10 m³/day

DESCRIPTION INSTALLATION, OPERATION OF THE REVERSE OSMOSIS SYSTEM OF THE LEACHATE TREATMENT PLANT IN THE CONTROLLED LANDFILL OF SAKANA – Community of Navarre

Sector of Operation WWP : Reverse Osmosis Technology.

Daily flow : 10m³/day

Scope of services: Supply, installation, assembly, commissioning, operation and technical assistance of the leachate treatment plant and wastewater treatment plant.

Reject: to natural environment

Leachate treatment Unit Osmosis Membranes

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 References Book of HERA Group

Design, construction, operation of: Urban Wastewater Treatment Plants. . Sewage Plants: Biological System and BRM System - Bio Membrane Reactor SEWAGE STATION OF AGAETE – GRAN CANARIA Island

INVESTMENT: LOCATION AGAETE Gran Canary Island – Canarias- Spain

CLIENT COMMISSIONING DRACE MEDIOAMBIENTE 2010

SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Plant 1,000 m³/day 5,000 equivalent inhabitants

Project done to increase the capacity of the existing urban wastewater DESCRIPTION treatment plant in the village of AGAETE, Gran Canary island (Canary Islands), carried out in 2009-2010, given the need of increasing the treatment capacity of the existing plant due to significant and seasonal variations of the flow.

Capacity 1,000 m³/day, (5.000 equivalent inhabitants)

Technology applied for the treatment: • Biological Treatment (activated sludge) • Membranes Bioreactor (BRM)

Scope of services provided: Dimensioning of the technical design for the extension project of the wastewater plant. Supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant.

Technical Data: Nr. of cartridges 2, 400 units COD peak (input) 2,400 mg/l COD (output) 50 mg/l BOD5 peak (input) 1,200 mg/ BOD5 (output) 5 mg/

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION OF AGULO – Gomera Island

LOCATION INVESTMENT: AGULO Gomera Island –Canary Islands- Spain

CLIENT COMMISSIONING Government of the Canary Islands 2009 Cabildo Insular Canario

SECTOR: CONSTRUCTOR URBAN WASTEWATER SATOCAN Society

FLOW: Wastewater PLANT 470 m³/day 2,350 equivalent inhabitants

DESCRIPTION Project done to increase the capacity of the existing urban wastewater treatment plant in the village of AGULO, in the Gomera island (Canary Islands), realised in 2007-2009, given the need of increasing the treatment capacity of the existing plant due to significant and seasonal variations of the flow, with the special characteristic of having a small surface available in a place with a difficult access.

Capacity: 470 m³/day, (equivalent inhabitant)

Technology applied for the treatment: • Biological Treatment (activated sludge) • Membranes Bioreactor (BRM)

Scope of services provided: Dimensioning of the technical design for the extension project of the sewage plant. Supply and installation of three submerged Membrane Bio Reactor modules (BRM). Supply of electromechanical parts and piping. Commissioning of the plant.

MBR PLANT DATA PERFORMANCE DATA

Size of tanks 3,7 x 3,5 x 4,5 Input Output L x W x H (m) CDO (mg/l) 600 125 Volume (m3) 59 BDO (mg/l) 300 25 Nr. of membrane chambers 1

Nr. of membrane modules 3 un. x EK 400 SS (mg/l) 400 35

Nr. of cartridges 1.200u Sludge time (days) 24

Total Surface 960 m2 MLSS (kg MLSS/m3) 10 (m2 membrane)

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION OF VILANOVA de CEIRA -

LOCATION: INVESTMENT VILA NOVA DE CEIRA PORTUGAL CLIENT COMMISSIONING Alexandre Barbosa Borges S.A 2011

SECTEUR: CONSTRUCTEUR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater treatment 240 m³/day 1,200 equivalent inhabitants)

DESCRIPTION Urban wastewater treatment plant of the village of Vilanova de Ciera, in Portugal, carried out in 2011.

Capacity : 240 m³/day, (1,200 equivalent inhabitants)

Technology applied for the treatment: • Membrane Bio Reactor (BRM)

Scope of services provided : • Conception of the station, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant.

Technical Data: Nr. of cartridges 2,400 units COD peak (input) 2,400 mg/l COD (output) 50 mg/l BOD5 peak (input) 1,200 mg/ BOD5 (output) 5 mg/

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION OF GOLF RESORT LA TORRE– Murcia

INVESTMENT LOCATION Golf Resort LA TORRE Saint Javier- Murcia - Spain CLIENT START UP Polaris World Group 2007 SECTOR: CONSTRUCTOR URBAN WASTEWATER INTERSA Society

FLOW: Wastewater Plant 6,816 m³/day 34,080 equivalent habitants

DESCRIPTION Sewage plant for the wastewater treatment of the complex POLARIS GOLF RESORT LA TORRE in the Community of Murcia, carried out in 2007.

The golf resort centre is located in the region of Murcia, one of the areas of Spain where the water scarcity is very marked. Therefore, the reuse of the wastewater was a key goal for Polaris World Group

Capacity: 6,816 m³/ day (flow rate) , (34,080 equivalent inhabitants)

Technology applied for the treatment: • Membrane Bio Reactor (BRM)

Scope of services provided : • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant.

Purpose: Reuse of treated wastewater.

DATA MBR STATION PERFORMANCE DATA

Size of tanks 11 x 5 x 5 m Input Output L x W x H (m) Flow rate (m3/d) 6.816 Nr. of membrane chambers 2 COD (mg/l) 450 50 BDO (mg/l) 200 10 Nr. of membrane modules 38 x EK 400 SS (mg/l) 200 <2 Nr. of membrane modules 16.000 Time of sludge (days) 20-30 Total Surface 12.000 (m2 membrane installed) MLSS (kg MLSS/m3) 15,6

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION OF GOLF RESORT EL VALLE– Murcia

LOCATION INVESTMENT Golf Resort EL VALLE Murcia - Spain CLIENT START UP Polaris World Group 2009 SECTOR: CONSTRUCTOR URBAN WASTEWATER INTERSA Society

FLOW: Wastewater Treatment 1,400 m³/day Plant 7,000 equivalent inhabitants

DESCRIPTION Sewage plant for the wastewater treatment of the complex POLARIS GOLF RESORT EL VALLE in the Community of Murcia, realized in 2009. After the experience of La Torre Golf Resort, Polaris World Group and INTERSA have again chosen the BRM membrane technology for the remediation of the irrigation water of El Valle Golf Resort.

Capacity: 1,400 m³/day , (7,000 equivalent inhabitants)

Scope of services provided : Dimensioning of the project. Supply and installation of three submerged Membrane Bio Reactor modules (BRM). Supply of electromechanical parts and piping. Commissioning of the plant.

DATA OF THE MBR PLANT • Effluent discharge limit : BOD5 5 mg / l • BRM tank volume: 320 m³ • Number of processing lines : 2 units • Number of membrane modules: 14 un. KUBOTA EK400 • Total surface area of membranes installed: 2,500 m² • Nr. of Sludge thickener thank whit 1 unit ES100 KUBOTA membranes: • Total surface of installed membranes 80m² in the sludge thickener thank Purpose: Reuse of treated wastewater.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION OF GOLF RESORT ILLESCAS

LOCATION: INVESTMENT GOLF RESORT ILLESCAS (TOLEDO), Spain

CLIENT START UP SPA SERVICIOS Y PROCESOS 2007 AMBIENTALES S.A SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 1,400 m³/day Plant 7,000 equivalent inhabitants

DESCRIPTION Urban sewage plant for the wastewater treatment of the complex GOLF RESORT ILLESCAS MANOR, in Toledo, (SEÑORIO DE ILLESCAS), Community of Castille-La Mancha, Spain, carried out in 2007.

Capacity : 1,400 m³/day , (7,000 equivalent inhabitants)

Technology applied for the treatment: • Membrane Bio Reactor (BRM)

Scope of services provided : • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant.

Technical Data Nr. of cartridges: 3,200 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION OF GOLF RESORT: CONDADO DE ALHAMA

LOCATION: INVESTMENT Golf Resort CONDADO DE ALHAMA (MURCIA), Spain CLIENT START UP Polaris World Group 2008

SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 9,600 m³/day Plant 48,000 equivalent inhabitants

DESCRIPTION Urban sewage plant for the wastewater treatment of the complex GOLF RESORT CONDADO de ALHAMA, of Polaris World Group, in the Community of Murcia, Spain, carried out in 2008.

Capacity : 9,600 m³/day, (48,000 equivalent inhabitants)

Technology applied for the treatment: • Membrane Bio Reactor (BRM)

Scope of services provided : • Conception, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant.

Technical Data Nr. of cartridges: 20,000 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION OF GOLF RESORT : HACIENDA RIQUELME INVESTMENT LOCATION: GOLF RESORT RIQUELME MURCIA -Spain

CLIENT START UP LA GENERALA 2007 HACIENDA RIQUELME

SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 1,800 m³/day Plant 9,000 equivalent inhabitants

DESCRIPTION Urban sewage plant for the wastewater treatment of the complex GOLF RESORT of DOMAINE RIQUELME, of Polaris World Group, in the Community of Murcia, Spain, carried out in 2007

Capacity : 1,800 m³/day, (9,000 equivalent inhabitants)

Technology applied for the treatment: • Membrane Bio Reactor (BRM)

Scope of services provided : • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM) • Commissioning of the plant.

Technical Data Nr. of cartridges: 4,000 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION OF THE HOUSING APARTMENTS: CAMPO DE VUELO INVESTMENT LOCATION:

TORREPACHECO Murcia - Spain

CLIENT START UP DEPURE 2007

SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 750 m³/day Plant 3,750 equivalent inhabitants

DESCRIPTION Urban sewage plant for the wastewater treatment of the housing apartments CAMPO DE VUELO, of Polaris World Group, located in Torrepacheco urbanisation, in the Community of Murcia, Spain, carried out in 2007 .

Capacity: 750 m³/day , (3,750 equivalent inhabitants)

Technology applied for the treatment: • Membrane Bio Reactor (BRM)

Scope of services provided : • Conception, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant.

Technical Data Nr. of cartridges: 1,600 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION OF THE HOUSING APARTMENTS : LOS CAÑARES and LA TERCIA REAL

INVESTMENT LOCATION: TORREPACHECO Murcia -Spain

CLIENT START UP DEPURE 2004

SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 3,000m³/day Plant 15,000 equivalent inhabitants

DESCRIPTION Urban sewage plant for the wastewater treatment of the housing apartments LOS CAÑARES and LA TERCIA, located in the Torrapacheco urbanisation, in the Community of Murcia, Spain, carried out in 2004.

Capacity : 3,000 m³/day , (15,000 equivalent inhabitants)

Technology applied for the treatment: • Membrane Bio Reactor (BRM)

Scope of services provided : • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant.

Technical Data Nr. of cartridges: 6,400 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION OF THE HOUSING APARTMENTS: MAR MENOR INVESTMENT LOCATION: TORREPACHECO Murcia - Spain

CLIENT START UP INTERSA 2008

SECTOR CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 1,920 m³/day Plant 9,500 equivalent inhabitants

DESCRIPTION Urban sewage plant for the wastewater treatment of the housing apartments MAR MENOR in Torrepacheco, located in the Community of Murcia, Spain, carried out in 2008.

Capacity : 1,920 m³/day, (9,500 equivalent inhabitants)

Technology applied for the treatment: • Membrane Bio Reactor (BRM)

Scope of services provided : • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant.

Technical Data Nr. of cartridges: 4,150 units COD (input): 450 mg/l BOD5 (input): 200 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION OF MURILLO DE RIO LEZA (Logroño)

LOCATION INVESTMENT Murillo de Rio Leza La Rioja- Spain

CLIENT START UP Wastewater Consortium 2002 of La Rioja SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 704m³/day Plant 3,520 equivalent inhabitants

DESCRIPTION New urban sewage Plant for the wastewater treatment of the Municipality of Murillo de Rio Leza, in the Community of La Rioja, carried out in 2002.

In the year 2000, the Region had the need of having a wastewater treatment plant to treat the effluents from this locality. In that way, the Consortium for Water and Residues of La Rioja ordered to HERA AMASA the construction of this sewage station.

Technology applied for the treatment : Trickling filter with a sand bed filter, as the best solution for the wastewater treatment.

Capacity: 704 m³/ day (average flow rate) , (3,520 equivalent inhabitants)

Scope of supply: Trickling filter, conventional bacterial bed with a gravel bed. Biological stages : a sieve + two biological treatments Biological bed + three secondary stages. Plant commissioning.

Design Parameters: BOD5 = 250 mg/l COD = 450 mg/l MES = 330 mg/l TOTAL PHOSPHORUS = 30 mg/l N - NTK = 8 mg/l

Reject limits: BOD5 = <25 mg/l COD = <125 mg/l MES = <35 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION OF PUIGPUNYENT, Mallorca Island

LOCATION INVESTMENT Puigpunyent Palma de Majorca (Balearic Islands)

CLIENT START UP ABAQUA (Balearic Water Agency and 2007 Environmental Quality )

SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 232 m³/day Plant 1,160 equivalent inhabitants

DESCRIPTION Project done to increase the capacity of the existing wastewater treatment plant in the Municipality of Puigpunyent , Palma de Majorca, Balearic Islands, Spain, carried out in 2006-2007. • This is the second system designed by HERA with the MBR technology for ABAQUA company, with the purpose of increasing the capacity of the existing sewage plant. • The feasibility for the extension of the facility without affecting the normal operation of the plant was the reason to apply this technology for this site. • The need for land is limited and few civil engineering requirement are needed: only the module BRM needs foundations. • The new facility also provides high quality water output, ready to be reused for irrigation of a next golf course.

Capacity: 232m³/ day (average flow rate) , (1,160 equivalent inhabitants)

Scope of services provided : • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM) . Commissioning of the plant.

Technical data: • Effluent reject limits: BOD5 25 mg / l • BRM Tank contents : 22,83 m³ with two treatment lines • Number of membrane modules : 4 units KUBOTA ES200 = 800 cartridges • Total membrane surface installed: 640 m²

The effluents have from now the appropriate water quality suitable to be reused as irrigation water without the need of a tertiary treatment after the biological stage.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION OF RIBAFRECHA (La Rioja)

LOCATION INVESTMENT Ribafrecha La Rioja- Spain CLIENT START UP Consortium for Water and Wastes 2003 of La Rioja SECTOR: CONSTRUCTOR URBAN WASTEWATER HERA AMASA

FLOW: Wastewater Treatment 455m³/day Plant 2,275 equivalent inhabitants

New urban sewage Plant for the wastewater treatment of the Municipality of Ribafrecha, DESCRIPTION in the Community of La Rioja, carried out in 2003.

In the year 2001, the village had the need of having a wastewater treatment plant to treat the effluents from this locality . In that way, the Consortium for Water and Residues of La Rioja ordered to HERA AMASA the construction of this sewage station.

Technology applied for the treatment : Trickling filter with a sand bed filter, as the best solution for the wastewater treatment of Ribafrecha.

Capacity 455 m³/ day (average flow) , (2,275 equivalent inhabitants)

Scope of supply: Trickling filter, conventional bacterial bed with a gravel bed. Biological stages : a sieve + two biological treatments Biological bed + three secondary stages. Plant Commissioning

Design Parameters: BOD 5 = 500 mg/l COD =1.000 mg/l C MES = 450 mg/l TOTAL PHOSPHOROUS = 34 mg/l N - NTK = 14 mg/l

Reject limits: BOD5 = <25 mg/l COD = <125 mg/l MES = <35 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION of Riells i Viabrea,

INVESTMENT LOCATION Riells i Viabrea Girona (Catalonia) Spain

CLIENT START UP Water Catalan Agency –(ACA) 2005

SECTOR: CONSTRUCTOR URBAN WASTEWATER OMS –SACEDE

FLOW: Wastewater Treatment 5,160 m³/day Plant 25,800 equivalent inhabitants

DESCRIPTION Project for the construction of the urban sewage treatment plant in the Municipality of Riells i Viabrea, Girona, (Catalonia Community), carried out in 2005.

Technology applied for the treatment: Submerged Membranes Bio Reactor(BRM), given the interest of the Catalan Water Agency (ACA) for the BRM technology that offers the possibility of water reuse.

• Services provided: • Construction of the new plant, without demolition of the existing tanks. • Installation and commissioning of the MBR reactor, where the membrane modules were placed in portable tanks, located by side of the old sewage treatment plant. • Perfect disinfection of the effluent for reuse as irrigation water, without need of tertiary treatment. • Adaptation to significant flow changes.

• Capacity: 5,160m³/ day (flow maximum ) , (25,800 equivalent inhabitants)

Thanks to the contribution of the oxygen resulting from the aeration of the MBR module, there was no need for additional aeration in the biological reactor.

DATA OF THE MBR STATION PERFORMANCE DATA Input Output Size of tanks 8 x 4 x 5 m. Flow rate (m3/d) 2,600 L x W x H (m) Nr. of membrane chambers 2 Max. Flow rate (m3/d) 5,600 CDO (mg/l) 760 50

Nr. of membrane modules 14 x EK400 BOD (mg/l) 310 15

SS (mg/l) 270 <5 Nr. of membrane modules 5,600 Tiempo de los fangos (días) 20-30 Total Surface 4,480 (m2 membrane installed) MLSS (kg MLSS/m3) 10-15

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION of RIU SEC,

LOCATION INVESTMENT SABADELL Barcelona (Catalonia) Spain

CLIENT START UP Water Catalan Agency–(ACA) 2009 and Municipality of Sabadell

SECTOR PROJECT CONSTRUCTOR URBAN WASTEWATER DRACE MEDIO AMBIENTE. Extansion of the Urban Wastewater Treatment Plant FLOW: Wastewater Treatment 35,000 m³/day Plant 175,000 equivalent inhabitants

DESCRIPTION Extansion project to increase the capacity of the urban sewage station « Riu Sec » (Dry River), existing in the town of SABADELL (Barcelona) Spain, carried out in 2008 -2009.

The reasons of the Catalan Water Agency to install the MRB membrane reactor were the need to build "a compact and fast plant" capable of accommodating the process of removing nutrients (anaerobic and aerobic reactors), do not stop the operation of the existing plant during construction, to be able to reuse the effluent with an output quality equivalent to that of one tertiary system, and a cheap maintenance service. • Capacity: 35,000 m³/ day , (175,000 equivalent inhabitants) Services provided: Design and supply of the membrane modules . Commissioning of the membrane BRM modules. Technical data : The largest Bioreator of Europe. : The installation of approximately 61,440 m² is based on two independent chambers consisting, in turn, in a network of other chambers, as follows: • 4 anaerobic chambers. • 8 pre-treatment chambers. • 8 membrane chambers. • Nr. of membrane modules = 192 EK 400 • Nr. of Cartridges = 76,800 units • Total surface = 61,440 m² installed membranes) • Number of chambers= 16 • Volume of the chambers network = 524,26 m³

PERFORMANCE DATA Input Output BOD (mg/l) 356 5

SS (mg/l) 213 2

Total Nitrogen (mg/l) 58 10

Total P (mg/l) 10 2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION of VALLDEMOSA - Mallorca Island

LOCATION SECTOR Valldemossa URBAN WASTEWATER Palma Majorca (Balearic Island) Spain

CLIENT START UP ABAQUA: Water Balearic Agency) 2007 And Environmental Quality

PROJECT: CONSTRUCTOR Expansion of the Urban Wastewater SEARSA Treatment Plant

FLOW: Wastewater Treatment 850 m³/day Plant 4,250 equivalent inhabitants

DESCRIPTION Expansion project to increase the capacity of the urban wastewater treatment plant existing in the Municipality of Valldemossa, Palma de Mallorca, Balearic Island, Spain, carried out in 2006-2007.

ABAQUA choose the MBR technology developed by Hera for this project because it was the only technology capable of providing an appropriate extension of the existing installation in the bioreactor, with a minimum of civil works.

The plant must also absorb significant and seasonal variations in the flow

Capacity: 850m³/day (mean flow ) , (4,250 equivalent inhabitants)

Services provided: Design and supply of the membrane modules . Commissioning of the membrane BRM modules. Technical data : • Effluent reject limits: : BDO5 10 mg / l • BRM tank contents : 94,78 m³ with tow treatment lines • Number of membrane modules: 4 units KUBOTA EK400 =1.600 cartridges • Total membranes surface installed: 1,280 m²

The effluent have from now an output quality suitable for irrigation use without tertiary treatment after the biological stage.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION of PULPI - (Almería)

LOCATION SECTOR PULPI URBAN WASTEWATER (ALMERIA) Spain

CLIENT START UP ACCIONA AGUAS S.A.U 2008

PROJECT: CONSTRUCTOR Sewage Plant with BRM Modules HERA AMASA

FLOW: Wastewater Treatment 1,000 m³/day Plant 5,000 equivalent inhabitants

DESCRIPTION SEWAGE STATION Project - Construction of the urban wastewater treatment plant in the village of PULPI (Almeria) Community of Andalusia, carried out in 2008

Capacity 1,000 m³/day , (5,000 equivalent inhabitants)

Applied technology for the treatment: • Biological Treatment (activated sludge) • BRM Membrane Bioreactor

Services Provided: • Design of the sewage station, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant

Technical Data: Nº of cartridges : 2,400 units Reject: < 160 mg/l DCO

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION of LORIGUILLA (Valencia)

LOCATION SECTOR LORIGUILLA URBAN WASTEWATER (VALENCIA ) Spain

CLIENT START UP TECNICAS VALENCIAS DEL AGUA, S.A. 2010 (TECVASA)

PROJECT: CONSTRUCTOR Sewage Plant with BRM Modules HERA AMASA

FLOW: Wastewater Treatment 1,000 m³/day Plant 5,000 equivalent inhabitants

DESCRIPTION SEWAGE STATION Project - Construction of the urban wastewater treatment plant in the village of LORIGULLA , Community of Valencia, carried out in 2010

Capacity 1,000 m³/day , (5,000 equivalent inhabitants)

Applied technology for the treatment: • Biological Treatment (activated sludge) • BRM Membrane Bioreactor

Services Provided: • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant

Technical Data: Nº of cartridges : 2,800 units Reject: BOD5 5 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION of VALLADA PARK (Valencia)

LOCATION SECTOR PARK of VALLADA URBAN WASTEWATER (VALENCIA ) Spain

CLIENT START UP TECIMED 2009

PROJECT: CONSTRUCTOR Sewage Plant with BRM Modules HERA AMASA

FLOW: Wastewater Treatment 900 m³/day Plant 4,500 equivalent inhabitants

DESCRIPTION SEWAGE STATION Project - Construction of the urban sewage treatment plant in VALLADA Park, Community of Valencia, realised in 2009.

Capacity 900 m³/day , (4,500 equivalent inhabitants)

Applied technology for the treatment: • BRM Membrane Bioreactor

Services Provided: • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant

Technical Data: Number of cartridges: 3,200 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION of DJIBOUITI - Africa

LOCATION SECTOR DJIBOUTI URBAN WASTEWATER Republic of Djibouti - Africa

CLIENT START UP PIASA 2009

PROJECT: CONSTRUCTOR Sewage Plant with BRM Modules HERA AMASA

FLOW: Wastewater Treatment 36 m³/day Plant

DESCRIPTION SEWAGE STATION Project – Design and Construction of the urban wastewater treatment plant of DJIBOUTI, Republic of Djibouti, Africa, carried out in 2009.

Capacity : 36 m³/day ,

Applied technology for the treatment: • BRM Membrane Bioreactor

Services Provided: • Design, supply and installation of the submerged Membrane Bio Reactor modules (BRM). Commissioning of the plant

Technical Data: Number of cartridges : 75 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 References Book of HERA Group

Design, construction, operation of:

Industrial Wastewater Treatment Plants • BRM – Membranes Bio reactor system

SEWAGE STATION for INDUSTRIAL WASTEWATER of UCPP CAN TORRELLA - VACARISSES

LACATION: CONSTRUCTOR VACARISSES (Barcelona) HERA AMASA Catalonia - Spain

CLIENT START UP Urbanity Entity for Conservation of the 2011 Partial Plan of the Industrial Polygon Can Torrella

INDUSTRIAL SECTOR: Industrial Park

FLOW: Wastewater Treatment 300 m³/day Plant

DESCRIPTION SEWAGE STATION UCPP CAN TORRELLA: Treatment plant for the wastewater from the industrial management process of the Industrial Park of Can Torrella in Vacarisses, Barcelona, Catalonia, carried out in 2011.

Technology applied for the treatment: • Physical- chemical Treatment + • Biological Treatment (activated sludge) • Membrane Bioreactor Module (BRM)

Treatment capacity : 300m³/ day (average flow)

Services provided : Design, civil engineering, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM membrane modules.

Technical Data: Number of Cartridges: 1,200 (with the possibility of increasing this number to 1,600 installed cartridges) DCO (input): 750 mg/l BOD5 (input): 350 mg/l Reject to: Sewerage network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE PLANT for INDUSTRIAL WASTEWATER of GOMA CAMPS’ PAPER FACTORY

LOCATION: CONSTRUCTOR LA RIBA (Tarragona) HERA AMASA Catalonia -Spain

CLIENT START UP GOMÁ CAMPS, S.A. 2011

INDUSTRIAL SECTOR : Wastewater Treatment Industrial Paper Mill Plant

FLOW: 960 m³/day

DESCRIPTION SEWAGE STATION of GOMA CAMPS, and Repowering of Biological Treatment plant for the wastewater from the industrial management process of Goma Capms‘ paper factory, located in LA RIBA (Tarragona), Catalonia Community, carried out in 2011.

Technology applied for the treatment: • Physical - chemical Treatment + • Biological Treatment (activated sludge) • Membrane Bioreactor Module (BRM)

Treatment capacity : 960m³/ day (mean flow)

Services provided: Design, civil engineering, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM membrane modules.

Technical Data: Number of Cartridges: 3,600 units DCO (input): 3,000 kg/j BOD5 (input): 1.300 mg/l DCO (output): ≤ 100 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION of the LECHEATE TREATMENT PLANT of COLL CARDUS W.T.C.

LOCATION: CONSTRUCTOR COLL CARDÚS Site HERA AMASA Vacarisses (Barcelona) -Spain CLIENT START UP HERA TRATESA 2008

INDUSTRIAL SECTOR: Waste Treatment Centre LECHEATE

FLOW: Wastewater Treatment 300 m³/day Plant

DESCRIPTION SEWAGE Station for the treatment of the wastewater process coming from the waste leachate management of HERA TRATESA society, in COLL CARDUS Waste Treatment Centre, located in Vacarisses, -Barcelona- Catalonia Community, carried out in 2008.

Technology applied for the treatment: • Physical - chemical Treatment + • Biological Treatment (activated sludge) • Membrane Bioreactor Module (BRM)

Treatment capacity : 300m³/ day (mean flow)

Services provided: Design, civil engineering, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM membrane modules.

Technical Data: • Number of Cartridges 1,200 units • Reject to: The natural environment to clean up site roads and irrigation of green spaces

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION of the LECHEATE TREATMENT PLANT of BURGOS ECOPARCK

LOCATION: CONSTRUCTEUR BURGOS HERA AMASA Spain CLIENT START UP FOMENTO DE CONSTRUCCIONES 2008 Y CONTRATAS: (FCCC)

INDUSTRIAL SECTOR: Wastewater Treatment Waste Treatment Centre Plant LECHEATE

FLOW: 112 m³/day

SEWAGE Station for the treatment of the wastewater process coming from the

DESCRIPTION waste leachate management of the Waste Treatment Centre : ECOPARC site in

BURGOS, Castilian - Leon Community, Spain.

Technology applied for the treatment: • Physical - chemical Treatment + • Biological Treatment (activated sludge) • Membrane Bioreactor Module (BRM)

Treatment capacity : 112m³/ day (mean flow)

Services provided: Design, civil engineering, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM membrane modules. Technical Data: • Number of Cartridges 450 units • Reject to: The natural environment

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER of VICENTE AGUILAR

LOCATION: CONSTRUCTOR MASSAFALSAR (Valencia) HERA AMASA Spain

CLIENT START UP MAGMA TRATAMIENTOS S.L.U 2008

INDUSTRIAL SECTOR: Wastewater Treatment WASTE MANAGEMENT Plant

FLOW: 200 m³/day

DESCRIPTION SEWAGE STATION of VICENTE AGUILAR: Treatment plant for the wastewater from the industrial management process of the company VICENTE AGUILAR and SON, S.L., located in the village of Massalfasar, Region of Valencia, Spain, carried out in 2006-2008.

Technology applied for the treatment: • Physical - chemical Treatment + • Biological Treatment (activated sludge) • Membrane Bioreactor Module (BRM)

Treatment capacity : 200m³/ day (mean flow)

Services provided: Design f the station, civil engineering, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM membrane modules.

Technical Data: Number of Cartridges 1,000units COD (input): 10,000 mg/l BOD5 (input): 4,000 mg/l Reject to : Sewerage network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER of HEBRON Factory

LOCATION: CONSTRUCTOR HERA AMASA Barcelona - Spain

CLIENT START UP HEBRON, S.A. 2004

INDUSTRIAL SECTOR: Wastewater Treatment CHEMICAL Plant

FLOW: 200 m³/day

DESCRIPTION HEBRON SEWAGE STATION: Plant for the treatment of wastewater coming from the industrial process of chemical manufacturing of the company HEBRON S.A., located in the village of LA LLAGOSTA, Barcelona Community of Catalonia, carried out in 2003-2004.

Technology applied for the treatment: • Physical - chemical Treatment • Biological Treatment (activated sludge) • Decanter • Membrane Bioreactor Module (BRM)

Maximum treatment capacity : 200m³/ day

Services provided: Design, civil engineering, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM membrane modules. Technical Data: BODO5: 2,050 mg/l COD: 3,000 mg/l Reject to: Sewerage network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER of MYRURGIA

LOCATED in : CONSTRUCTOR BARCELONA City HERA AMASA Spain CLIENT START UP MYRURGIA, S.A. 2004

INDUSTRIAL SECTOR : Wastewater Treatment COSMETIC Plant

FLOW: 50 m³/day

DESCRIPTION MYRURGIA SEWAGE STATION: Plant for the treatment of wastewater from the industrial process of the selective cosmetic company MYRURGIA, S.A., located in BARCELONA, carried out in 2003-2004.

Technology applied for the treatment: • Physical - chemical Treatment • Biological Treatment (activated sludge) • Membrane Bioreactor Module (BRM)

Treatment capacity : 50m³/ day (mean flow)

Services provided: Design, civil engineering, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM membrane modules. Technical Data : • Nº of cartridges : 300 units • BOD5 (input): 2.250 mg/l • COD (input): 4.500 mg/l • COD (output): <160 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER of KINESIA

LOCATION: CONSTRUCTOR VACARISSES (Barcelona) HERA AMASA Catalonia -Spain

CLIENT START UP KINESIA , S.A. 2004

INDUSTRIEL SECTOR: EXTENSION OF THE COSMETIC SEWAGE STATION: 2008

FLOW: Wastewater Treatment 140 m³/day Plant

DESCRIPTION KINESA SEWAGE STATION: Plant for the treatment of wastewater from the industrial process of the selective cosmetic company KINESIA S.A., located in VACARISSES (Barcelona), carried out in 2003-2004 and expanded in 2008.

Technology applied for the treatment: • Anoxic Basin • Membrane Bioreactor Module (BRM)

Treatment capacity : 140m³/ day (average flow)

Services provided : Design for the extension of the existing Sewage Station, civil works. Installation, assembly, commissioning and maintenance of the BRM membrane modules. Technical Data : Nr. of Cartridges 450 units BOD5 (input): 1.200 mg/l COD (output): 2.500 mg/l Nitrogen (NH4) (input): 120 mg/l Nitrogen (NO3) (output): < 40 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER – COTY

CONSTRUCTOR LOCATION: HERA AMASA GRANOLLERS (Barcelona) p Catalonia –Spain

CLIENT START UP COTY ASTOR , S.A. 2007

INDUSTRIAL SECTOR: EXTENSION OF THE COSMETIC SEWAGE STATION: 2009

FLOW: Wastewater Treatment 250 m³/day Plant

DESCRIPTION COTY SEWAGE STATION: Plant for the treatment of wastewater coming from the industrial process of the selective cosmetic company COTYASTOR, S.A., located

in GRANOLLERS (Barcelona), carried out in 2007 and expanded in 2.009

Technology applied for the treatment :

• Biological Treatment (activated sludge) • Membrane Bioreactor Module (BRM)

Treatment capacity : 250m³/ day (mean flow)

Services provided : Design for the extension of the existing Sewage Station built in 2002 by HERA AMASA of 100 m³/day and 400 cartridges, civil engineering, project management of the expanded plant. Installation, supply, assembly, commissioning and maintenance of the BRM membrane modules.

Technical Data : Nr. of installed cartridges: : 1,000 units at present Reject to : Sewerage network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER - GAL

LOCATION: CONSTRUCTOR ALCALÁ DE HENARES HERA AMASA (Madrid) Spain

CLIENT START UP PERFUMERIAS GAL , S.A. 2004

INDUSTRIAL SECTOR : Wastewater Treatment COSMETIC Plant

FLOW: 30 m³/day

DESCRIPTION GAL SEWAGE STATION: Plant for the treatment of wastewater coming from the industrial process of the cosmetic company PERFUMERIAS GAL, S.A., located in ALCALA DE HENARES (Madrid), carried out in 2003-2004.

Technology applied for the treatment : • Physical - chemical Treatment • Biological Treatment (activated sludge) • Dehydration of sludge (press filter) • Membrane Reactor Module (BRM)

Treatment capacity : 30m³/ day (mean flow)

Services provided : Design, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM modules and the Physical Chemical Station

Technical Data: COD: 3,050 mg/l Reject to : Sewerage network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER – HOLDFOOD

LOCATION: CONSTRUCTOR HERA AMASA (Barcelona) Catalonia -Spain

CLIENT START UP HOLDFODD , S.L. 2006

INDUSTRIAL SECTOR: Wastewater Treatment FOOD Industry Plant

FLOW: 150 m³/day

DESCRIPTION SEWAGE STATION of HOLDFOOD: Plant for the treatment of wastewater coming from the industrial process of the food company HOLFODD, S.L. based on semi-finished products for bakery and biscuits, located in Olsesa de Montserrat, (Barcelona), carried out in 2005 -2006.

Technology applied for the treatment : • Physical - chemical Treatment • Biological Treatment (activated sludge) • Dehydration of sludge (press filter) • Membrane Reactor Module (BRM)

Treatment capacity : 150m³/ day (mean flow)

Services provided : Design, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM modules and the Physical Chemical Station Technical Data: Nr. of cartridges: 600 units BOD5 (input): 4,000 mg O2/l COD (input): 9,000 mg O2/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER of COOKING CRUSTACES

LOCATION: CONSTRUCTOR GIRONA HERA AMASA Catalonia - Spain CLIENT START UP INAGUA WATER ENGINEERING 2008

INDUSTRIAL SECTOR: Wastewater Treatment FOOD Industry Plant

FLOW: 80 m³/day

DESCRIPTION SEWAGE PLANT for the treatment of the wastewater coming from the industrial seafood cooking process, located in the city of GIRONA (Community of Catalonia) carried out in 2008.

Technology applied for the treatment : • Membrane Reactor Module (BRM)

Maximum treatment capacity : 80m³/ day

Services provided : Design, Supply of the BRM membrane modules. .

Technical Data: Nr. of cartridges: 600 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER : MIQUEL TORRES WINERY

LOCATION: CONSTRUCTOR VILAFRANCA DEL PENEDES HERA AMASA (Barcelona) Catalonia - Spain CLIENT START UP BODEGAS MIGUEL TORRES 2009 - 2011

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 1,248 m³/day peak flow

MIQUEL TORRRES SEWAGE STATION: Plant for the treatment of the wastewater DESCRIPTION coming from the wine, brandies and liquor production process of the WINERY an VINEYARDS MIQUEL TORRES, located in Vilafranca del Penedes, (Community of Catalonia) carried out in 2009- 2011. Protected Designation of Origin PENEDÉS.

Technology applied for the treatment : • Membrane Reactor Module (BRM)

Project DEMETER : Research Program “Consortium Estratégico National de Investigación Técnica” (CENIT) (Strategic National Consortium of Technical Research)

Maximum treatment capacity : 1,248m³/ day (peak flow)

Services rendered: Design of the station, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM modules Recovery process of purified wastewater for irrigation purpose Technical Data : Peak flow : 1,248 m³/d Maximum flow : 400 l/h Nr. of cartridges : 25 units

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER : SEÑORIO DE ULIA WINERY

LOCATION: CONSTRUCTOR La Bastida HERA AMASA LA RIOJA – Spain CLIENT START UP BODEGAS MARQUÉS DE CARRIÓN 2008 WINERY AND VINEYARDS INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 60 m³/day (peak flow)

DESCRIPTION SEÑORIO DE ULIA SEWAGE STATION : Plant for the treatment of the wastewater coming from the wine and cava production process of the WINERY AND VINEYARDS SEIGNEURY of ULIA – MARQUES OF CARRION, located in the village of LA BASTIDA , LA RIOJA Community, carried out in 2007 -2008.

Technology applied for the treatment : • Biological Treatment (activated sludge) • Membrane Reactor Module (BRM)

Maximum treatment capacity: 60m³/ day (peak flow)

Services rendered : Design, civil works, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM modules

Technical data: Nr. of cartridges: 300 units Peak flow : 60m³ COD (input): 20,000 mg/l Reject to: Sewerage network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER : VIÑA ARAIZ WINERY

LOCATION: CONSTRUCTOR HAZA HERA AMASA Burgos - Spain CLIENT START UP WINERY AND VINEYARDS 2007 MARQUES DE CARRION INDUSTRIAL SECTOR : Wastewater Treatment WINE Production Plant

FLOW: 30 m³/day (peak flow)

DESCRIPTION VIÑA ARAIZ SEWAGE STATION : Plant for the treatment of the wastewater coming from the wine production process of the ARAIZ WINERY AND VINEYARDS –MARQUIS OF CARRION, located in the village of HAZA, (BURGOS) carried out in 2006-2007. Protected Designation of Origin RIBERA DEL DUERO.

Technology applied for the treatment : • Biological Treatment (activated sludge) • Membrane Reactor Module (BRM)

Maximum treatment capacity : 30m³/ day (peak flow)

Services rendered : Design of the plant, civil works, supply of membrane modules Installation, assembly, commissioning and maintenance of the BRM modules

Technical data: Nr. of cartridges: 100 units Peak flow : 32m³ COD peak (input): 12,000 mg/l COD (output): <160 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER – JAUME SERRA WINERY

LOCATION: CONSTRUCTOR VILANOVA I LA GELTRU HERA AMASA Catalonia - Spain CLIENT START UP CAVES JAUME SERRA 2005

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 80 m³/day (peak flow)

DESCRIPTION JUAME SERRE SEWAGE STATION: Plant for the treatment of the wastewater coming from the wine and cava production process of the WINERY JAUME SERRA, located in Vilanova i la Geltrú (Barcelona) –Catalonia, carried out in 2005.

Technology applied for the treatment : • Biological Treatment (activated sludge) • Membrane Reactor Module (BRM)

Maximum treatment capacity: 80m³/ day (peak flow)

Services rendered : Design of the plant, civil works, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM modules

Technical data: Nr. of cartridges : 300 units Peak flow : 80m³ COD peak (input): 15,000 mg/l O2/d COD (output): <60 mg/l O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER – BURGO VIEJO WINERY

LOCATION: CONSTRUCTOR ALFARO HERA AMASA LA RIOJA - Spain

CLIENT START UP BODEGA BURGO VIEJO 2003

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 19.14 m³/day (peak flow)

SEWAGE STATION BURGO VIEJO : Plant for the treatment of the wastewater coming DESCRIPTION from the wine production process of the WINERY BURGO VIEJO, located in the village of ALFARO -LA RIOJA-, carried out in 2003. Protected Designation of Origin LA RIOJA

Technology applied for the treatment : • Biological Treatment (activated sludge) • Membrane Reactor Module (BRM)

Maximum treatment capacity: 19.14m³/ day (peak flow )

Services rendered : Design of the plant, civil works, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM modules.

Technical data: Nr. of cartridges : 75 units Peak flow : 80m³ COD peak (input): 6,000 mg/l O2/d COD (output): <160 mg/l O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER – DINASTIA VIVANCO WINERY

LOCATION: CONSTRUCTOR BRIONES HERA AMASA LA RIOJA - Spain

CLIENT START UP WINERY DINANSTIA VIVANCO 2003

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 80 m³/day (peak flow)

DESCRIPTION SEWAGE STATION DINASTIA VIVANCO: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of VIVANCO DINASTY, located in the village of BRIONES , (Logroño) -LA RIOJA-, carried out in 2003. Protected Designation of Origin LA RIOJA

Technology applied for the treatment : • Biological Treatment (activated sludge) • Membrane Reactor Module (BRM)

Maximum treatment capacity: 80m³/ day (peak flow)

Services rendered : Design of the plant, civil works, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM modules.

Technical data: Nr. of cartridges: 300 units Peak Flow : 80m³ COD peak (input): 15,000 mg/l O2/d COD (output): <60 mg/l O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER SAINT MIGUEL WINERY

LOCATION: CONSTRUCTOR AUSEJO HERA AMASA LA RIOJA - Spain

CLIENT START UP BODEGA SAN MIGUEL 2003

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 43 m³/day (peak flow)

DESCRIPTION SEWAGE STATION SAN MIGUEL: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of SAN MIGUEL , located in the village of AUSEJO, -LA RIOJA-, carried out in 2003.

Technology applied for the treatment : • Biological Treatment (activated sludge) • Membrane Reactor Module (BRM)

Maximum treatment capacity: 43m³/ day (peak flow)

Services Rendered: Design of extension of the existing sewage plant, civil works, supply of membrane modules. Installation, assembly, commissioning of the new plant and maintenance of the BRM modules.

Technical data: Nr. of cartridges : 200 units Peak Flow : 43m³ COD peak (input): 10,000 mg/l O2/d. COD (output): <60 mg/l O2 BDB5 (input) 5,000 mg/l Reject: Sewerage network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIALWASTEWATER- CARLOS SERRES WINERY

LOCATION: CONSTRUCTOR HARO HERA AMASA LA RIOJA - Spain

CLIENT START UP BODEGA CARLOS SERRES 2003

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 20 m³/day (peak flow)

DESCRIPTION SEWAGE STATION CARLOS SERRESL: Plant for the treatment of the wastewater coming from the wine production process of the WINERY CARLOS SERRES, located in the town of HARO, -LA RIOJA-, carried out in 2003. Protected Designation of Origin LA RIOJA.

Technology applied for the treatment : • Biological Treatment (activated sludge) • Membrane Reactor Module (BRM)

Maximum treatment capacity: 20m³/ day (peak flow)

Services rendered: Design of the existing sewage plant, civil works, supply of membrane modules. Installation, assembly, commissioning and maintenance of the BRM modules.

Technical data: Nr. of cartridges : 75 units Peak flow : 20m³ COD peak (input): 6,000 mg/l O2/j COD (output): <160 mg/l O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER- MARQUES DE CARRION WINERY

LOCATION: CONSTRUCTOR BRIONES HERA AMASA LA RIOJA - Spain

CLIENT START UP BODEGAS MARQUES of CARRION 2003

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: EXTENSION OF THE 15 m³/day peak flow PLANT

DESCRIPTION SEWAGE STATION MARQUES DE CARRION: Plant for the treatment of the wastewater coming from the wine and cava production process of the WINERY MARQUIS OF CARRION, located in the village of BRIONES, -LA RIOJA-, carried out in 2003.

Technology applied for the treatment : • Biological Treatment (activated sludge) • Membrane Reactor Module (BRM)

Maximum treatment capacity: 15m³/ day (peak flow)

Services Rendered: Design and extension of the existing sewage plant, civil works, supply of membrane modules. Installation, assembly, commissioning of the new plant and maintenance of the BRM modules.

Technical data: Nr. of cartridges : 50 units Peak flow: 15m³ COD peak (input): 15,000 mg/l O2/d COD (output): <160 mg/l O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 References Book of HERA Group

Design, construction, operation of: Industrial Wastewater Treatment Plants • Physical - Chemical Treatment • Conventional Biological Treatment and Activated Sludge SEWAGE STATION for INDUSTRIAL WASTEWATER - SOGAMA

LOCATION: CONSTRUCTOR CERCEDA HERA AMASA LA CORUÑA - Spain

CLIENT START UP SOGAMA, S.A. 2001- 2005

INDUSTRIAL SECTOR: EXTENSION OF THE WASTE & LEACHATE Treatment PLANT Total : 3 plants

FLOW: Wastewater Treatment 375 m³/day Plant

DESCRIPTION SEWAGE STATION SOGAMA: Plant for the treatment of the wastewater coming from the incineration process and waste treatment management of the of the society SOGAMA, S.A. located in the village of Cerceda, (La Coruña) Community of Galicia, carried out in 2001 and in 2005.

Technology applied for the treatment : • Biological Treatment (activated sludge) • Physical-chemical Treatment

Maximum treatment capacity : (MSR) physical-chemical plant + biological treatment: 100 m3/day Biological Plant : 75 m3/day Physical-chemical plant: 200 m3/day

Services Rendered: Design and extension of the existing sewage plant, equipment supply. Installation, assembly, commissioning and maintenance of the THREE sewage stations.

Technical Data: Reject: Sewerage network Reject: To natural environment

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER – DOÑA JUANA

LOCATION: CONSTRUCTOR DOÑA JUANA HERA AMASA COLOMBIA (Bogota)

CLIENT START UP UASP 2001 BOGOTA TOWN HALL

INDUSTRIAL SECTOR: OPERATED by HERA: Waste & LEACHATE Treatment From 2001 to 2011

FLOW: Wastewater treatment 8 l/s - 700 m³/day plant CAPACITY EXTENSION: 2011 Flow: 21 l/s. 1,814m³/day

SEWAGE STATION : DOÑA JUANA: Plant for the treatment of the wastewater and leachate DESCRIPTION from the waste treatment management of DOÑA JUANA landfill, located in the city of

Colombia, (Bogota), carried out in 2000 - 2001 and operated by HERA until 2011.

Technology applied for the treatment : • Biological Treatment (activated sludge) • Physical -chemical Treatment • Deshydratation of sludge

Maximum treatment capacity : 700 m3/day – Currently Capacity: 1,814 m3/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning and maintenance of the station Reject: To natural environment

Capacity Expansion: In 2011 was made the extension of the daily processing capacity by installing an SBR reactor in the storage tanks and increasing the capacity of the leachate storage basins. Installation of a new line of physical-chemical treatment with a processing capacity of 13 l / s and an improvement in the ventilation system of the original STL reactor by installing high capacity diffusers. The plant is now treating a flow rate of 1, 814 m³ / day

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER – LA CASA CHOCOLATES

LOCATION: CONSTRUCTOR ZARAGOZA HERA AMASA Spain

CLIENT: START UP LA CASA, S,A, 2004

INDUSTRIAL SECTOR: FOOD Industry

FLOW: Wastewater Treatment 32 m³/day Plant

DESCRIPTION SEWAGE STATION LA CASA: : Plant for the treatment of the industrial wastewater from the production process of chocolates, bonbons, pastry and confectiory of the society LA

CASA, S.A., located in ZARAGOZA, Community of Aragon, carried out in 2003-2004.

Technology applied for the treatment : • Physical-chemical Treatment

Maximum treatment capacity : 32 m³/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data: BOD5: 7,800 mg/l COD: 12,900 mg/l Reject Sewerage Network (DC. 38/2004 Government of Aragon)

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER – EL COTO WINERY

LOCATION: CONSTRUCTOR OYON HERA AMASA La Rioja - Spain

CLIENT: START UP CONSORCIO DE AGUAS DE RIOJA 2007 ALAVESA –(Water Consortium of La Rioja) INDUSTRIAL SECTOR: WINE Production

FLOW: Wastewater Treatment 186 m³/day Plant

DESCRIPTION SEWAGE STATION EL COTO: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of EL COTO, located in

the village of OYON, -LA RIOJA-, carried out in 2007.

Technology applied for the treatment : • Physical-chemical Treatment • Conventional Biological treatment: Activated sludge

Maximum treatment capacity : 186 m³/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data: Reject Sewerage Network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER – Cooperative WINERY

LOCATION: CONSTRUCTOR La GRANADA DEL PENEDÉS HERA AMASA Barcelona –Spain

CLIENT: START UP COOPERATIVA LA GRANADA 2002

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 100 m³/day, peak flow

SEWAGE STATION LA GRANADA: Plant for the treatment of the wastewater coming from DESCRIPTION the wine and cava production process of the WINERY of COOPERATIVE LA GRANADA, located in the village of LA GRANADA, PANADES REGION, carried out in 2002. Protected

Designation of Origin PENEDES

Technology applied for the treatment : • Physical-chemical Treatment • Conventional Biological treatment: Activated sludge

Maximum treatment capacity : 100 m³/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data: CDO peak (input): 3,000 ppm O2 / day CDO (output): < 125 ppm O2 Reject Sewerage Network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER – EL COTO WINERY

LOCATION: CONSTRUCTOR LA GUARDIA HERA AMASA La Rioja - Spain

CLIENT: START UP CONSORCIO DE AGUAS DE RIOJA 2007 ALAVESA –(Water Consortium of La Rioja) INDUSTRIAL SECTOR: WINE Production

FLOW: Wastewater Treatment 293 m³/day Plant

DESCRIPTION SEWAGE STATION EL COTO: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of EL COTO, located in

the village of LA GUARDIA, -LA RIOJA ALAVESA-, carried out in 2006-2007.

Protected Denomination of Origin LA RIOJA

Technology applied for the treatment : • Physical-chemical Treatment • Conventional Biological treatment: Activated sludge • Sludge dehydration by centrifugation

Maximum treatment capacity : 293 m³/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data: CDO peak (input): 12,000 mg/l BOD5: 7,000 mg/ Reject Sewerage Network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER PATERNINA WINERY

LQ

LOCATION: CONSTRUCTOR VILLOSLADA DE CAMEROS HERA AMASA LA RIOJA - Spain

CLIENT: START UP BODEGAS FEDERICO 2003 PATERNINA S.A.

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 75 m³/day peak flow

DESCRIPTION SEWAGE STATION PATERNINA: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of FEDERICO PATERNINA,

located in the village of VILLOSLADA DE CAMEROS – La Rioja, carried out in 2003.

Protected Denomination of Origin PATERNINA

Technology applied for the treatment : • Physical-chemical Treatment • Conventional Biological treatment: Activated sludge • Sludge dehydration by centrifugation

Maximum treatment capacity : 75m3/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data: COD peak (input) 10,100 ppm O2/d COD (output) <1,000 ppm O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER BARRIO DE LA ESTACION WINERY

LOCATION CONSTRUCTOR HARO BARRIO DEHER ALA AMASA ESTACIÓN La RIOJA- Spain

CLIENT: START UP BODEGAS MANCOMUNIDAD DEL 2000 BARRIO DE LA ESTACION

INDUSTRIAL SECTOR: Wastewater WINE PRODUCTION Treatment Plant

FLOW: 525 m³/día máximo

SEWAGE STATION: BARRIO DE LA ESTACION: Plant for the treatment of the DESCRIPTION wastewater coming from the wine production process of the WINERY and VINEYARDS of the MANCOMMUNITY BARRIO DE LA ESTACIO, located in the town of HARO, LA

RIOJA, carried out in the year 2000.

. Associated Wineries: BODEGAS BILBAINAS, C.V.N.E., GÓMEZ CRUZADO, IBAIONDO, MUGA, RIOJA ALTA, RIOJA SANTIAGO, RODA

Technology applied for the treatment : • Physical-chemical Treatment • Conventional Biological treatment: Activated sludge

Maximum treatment capacity: 525 m3/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data: COD peak (input) 5,520 ppm O2 /day COD output < 125 ppm O2 Reject: Sewerage network

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER ROYAL NAJERA WINERY

LQ

LOCATION: CONSTRUCTOR NAJERA HERA AMASA LA RIOJA - Spain

CLIENT: START UP BODEGA REAL DE NAJERA 2002

INDUSTRIAL SECTOR: Wastewater treatment WINE PRODUCTION and Extension of the plant

FLOW: 56m³/day peak

DESCRIPTION SEWAGE STATION OF NAJERA: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of the ROYAL NAJERA

WINERY, located in the town of NAJERA, LA RIOJA, carried out in 2002. Protected

Denomination of Origin LA RIOJA

Technology applied for the treatment : • Physical-chemical Treatment • Conventional Biological treatment: Activated sludge

Maximum treatment capacity : 56m3/day

Services rendered: Design of and extension the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical data: COD peak (input): 10,100 ppm O2/day COD (output): <1,000 ppm O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER DOMECQ WINERY

LQ

LOCATION: CONSTRUCTOR EL CIEGO HERA AMASA LA RIOJA ALAVESA- Spain

CLIENT: START UP BODEGAS DOMECQ 2002

INDUSTRIAL SECTOR: Wastewater Treatment WINE PRODUCTION Plant

FLOW: 40 m³/day maximum

SEWAGE STATION DOMECQ WINERY: Plant for the treatment of the wastewater DESCRIPTION coming from the wine production process of the WINERY and VINEYARDS of DOMECQ WINERY, located in the village of EL CIEGO, LA RIOJA, carried out in 2002. Protected Denomination of Origin LA RIOJA

Technology applied for the treatment : • Conventional Biological treatment: Activated sludge

Maximum treatment capacity : 40m3/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data: COD peak (input) 7,900 ppm mg/l COD (output) <160 mg/l Reject: To natural environment

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

SEWAGE STATION for INDUSTRIAL WASTEWATER BINCO WINERY

LQ

LOCATION: CONSTRUCTOR LA RIOJA - Spain HERA AMASA

CLIENT: START UP BODEGA COOPERATIVA DE BINCO 2002

INDUSTRIAL SECTOR: Wastewater Treatment WINE PRODUCTION Plant

FLOW: 56 m³/day, peak flow

DESCRIPTION SEWAGE STATION OF BINCO: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of BINCO INTERLOCAL

WINERY, located in LA RIOJA, carried out in 2002.

Technology applied for the treatment : • Conventional Biological treatment: Activated sludge

Maximum treatment capacity : 56 m³/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data : COD peak (input) 9,000 mg/l - 504 kg/day COD (output) <1,000 ppm Reject: To natural environment

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER of PATERNINA WINERY

LQ

LOCATION: CONSTRUCTOR HARO HERA AMASA LA RIOJA - Spain

CLIENT: START UP BODEGAS FEDERICO 2002 PATERNINA S.A.

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 75 m³/day, peak flow

DESCRIPTION SEWAGE STATION PATERNINA: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of FEDERICO PATERNINA,

located in the village of HARO – La Rioja, carried out in 2002.

Protected Denomination of Origin PATERNINA

Technology applied for the treatment : • Physical-chemical Treatment • Conventional Biological treatment: Activated sludge • Sludge dehydration by centrifugation

Maximum treatment capacity : 75m3/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data : COD peak (input) 10,100 ppm O2/d. COD (output) <1,000 ppm O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER of VALBORNEDO WINERY

LQ

LOCATION CONSTRUCTOR Navarrete HERA AMASA LA RIOJA - Spain

CLIENT: START UP COOPERATIVE SOCIETY 2002 VINICOLA DE VALBORNEDO

INDUSTRIAL SECTOR: Wastewater Treatment WINE Production Plant

FLOW: 14.7 m³/day, peak flow

DESCRIPTION SEWAGE STATION OF VALBORNEDO : Plant for the treatment of the wastewater coming from the wine production process of the WINERY AND VINEYARDS of the COOPERATIVE SOCIETY SEIGNEURY of VALBORNEDO, located in the village of Navarrete , LA RIOJA Community, carried out in 2002.

Technology applied for the treatment : • Conventional Biological treatment: Activated sludge

Maximum treatment capacity : 14.7m3/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data : COD peak (input) 73.5 Kg/j COD (output) <160 ppm

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER LA ENCINA WINERY

LQ

LOCATION: CONSTRUCTOR BRIÑAS HERA AMASA LA RIOJA - Spain

CLIENT: START UP LA ENCINA BODEGAS Y VIÑEDOS 2003

INDUSTRIAL SECTOR: Wastewater Treatment WINE PRODUCTION Plant

FLOW: 3.1 m³/day maximum

DESCRIPTION SEWAGE STATION LA ENCINA: Plant for the treatment of the wastewater coming from the wine production process of the WINERY and VINEYARDS of LA ENCINA, located in

the village of BRIÑAS – La Rioja, carried out in 2003.

Technology applied for the treatment : • Conventional Biological treatment: SBR Activated sludge- • Sequential Biological Reactor

• Maximum treatment capacity : 3.1m3/day

Services rendered: Design of the sewage plant, civil works, equipment supply. Installation, assembly, commissioning of the plant.

Technical Data : COD peak (input) 10,000 ppm O2/day COD (output) <160 ppm O2

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 References Book of HERA Group

Design, construction, operation of: Industrial Wastewater Treatment • Anaerobic Treatment • Ultrafiltration Treatment ANAEROBIC SEWAGE STATION OF ALIER

LQ

LOCATION: CONSTRUCTOR ROSSELLO HERA AMASA LLEIDA - Spain

CLIENT: START UP ALIER, S.A. 2007

INDUSTRIAL SECTOR: Wastewater PAPER MILL Treatment Plant

FLOW: 10,000 m³/day

DESCRIPTION ANAEROBIC SEWAGE STATION: Plant for the treatment of wastewater coming from the production process of paper, pulp, paperboard of the society ALIER, S.A., located in

the municipality of ROSELLO, province of Lleida, (Catalonia Community), carried out in 2006-2007.

Technology applied for the treatment : • Anaerobic biological treatment

Treatment capacity : 10,000 m³/day – mean flow

Services rendered: Design of the anaerobic sewage plant, equipment supply. Installation of the anaerobic biological treatment, assembly, commissioning of the plant.

Technical Data : BOD5: 6,720-15,400 kg/l COD: 1,500-3,300 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 SEWAGE STATION for INDUSTRIAL WASTEWATER ULTRAFILTRATION TREATMENT

LQ

LOCATION: CONSTRUCTOR Vilafranca del Penedes HERA AMASA BARCELONA - Spain CLIENT: START UP BODEGAS MIGUEL TORRES 2010 - 2013

INDUSTRIAL SECTOR PILOT PLANT WINE PRODUCTION ULTRAFILTRATION SYSTEM

FLOW : Wastewater Treatment Plant 1,248 m³/day – peak flow

DESCRIPTION ULTRAFILTRATION SEWAGE STATION: Pilot Plant for the treatment of the wastewater coming from the wine, brandies and liquor production process of the WINERY an VINEYARDS MIQUEL TORRES, located in the municipality of Vilafranca del Penedes, (Community of Catalonia) Project carried out in 2010-2013. Protected Designation of Origin PENEDÉS.

Technology applied for the treatment : • ULTRAFILTRATION

Project: DEMETER : Research Program “Consortium Estratégico National de Investigación Técnica” (CENIT) (Strategic National Consortium of Technical Research)

Maximum treatment capacity : 1,248m³/ day (peak flow)

Services rendered: Project Design, assembly, commissioning and maintenance of the Ultrafiltration pilot plant

Purpose: Develop the wastewater recovery process by means of the ultrafiltration technology

DBO5: 6.720-15.400 kg/l DQO: 1.500-3.300 mg/l

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 References Book of HERA Group

Design, construction, operation of: Urban Wastewater Treatment Plants • Biological Treatment: BIOCLERE Tricking filter BIOCLERE BIOLOGICAL TRICKLING FILTER

LQ

LOCATION: CONSTRUCTOR Mountain shelter HERA AMASA ORDINO - ANDORRA

CLIENT: STAR UP: ECOTENIC 2001

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 13m³/day 65 equivalent inhabitants

DESCRIPTION BC-31 BIOCLERE Unit

Bioclere , is a biological trickling filter for the treatment of wastewater generated by small towns and small separated population settlements and scattered villages.

This is a modular technology easily extensible, integrated into the surrounding environment or it can be designed for underground installation in a minimum surface.

Typical applications of this biological biofiltre are small residential centres, hotels, food factories, camping, residences, mountain shelters, chalets, rural gest houses, service areas.

This compact system includes: Imhoff Tank, Decanter, Biofilter, supplemented with a pumping system and electrical control.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

LQ

LOCATION: CONSTRUCTOR GIRONA HERA AMASA Spain

CLIENT: START UP 2000

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 31m³/day 210 equivalent inhabitants

DESCRIPTION BC-90 BIOCLERE UNIT for a small population settlement

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 31m³/day 210 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Sky Mountain shelter HERA AMASA PORT AINE Sky mountain GIRONA- Spain

CLIENT START UP ECOTECNIC 2005

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 13m³/day 65 equivalent inhabitants

DESCRIPTION BC-30 BIOCLERE UNIT for a sky mountain shelter

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity :13 m³/day 65 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning. Thermally protected unit.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Sky Mountain shelter HERA AMASA SAETE –ANDORRA

CLIENT START UP ECOTECNIC 2005

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 13m³/day 65 equivalent inhabitants

BC-30 BIOCLERE UNIT for a sky mountain shelter DESCRIPTION

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity :13 m³/day 65 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning. Thermally protected unit.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77

BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR SKY mountain Station HERA AMASA GRAU ROIG- ANDORRA

CLIENT START UP ECOTECNIC 2002

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 54 m³/day 360 equivalent inhabitants

DESCRIPTION BC-9O BIOCLERE UNIT for a mountain sky station

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 54 m³/day 360 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning. Thermally protected unit.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONTRUCTOR Mountain Sanctuary HERA AMASA NURIA VALLEY- Gerona -Spain

CLIENT: STAR UP 2001

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 60 m³/day 360 equivalent inhabitants

2 BIOCLERE BC-9O UNITS , settlement with seasonal wastewater peaks: DESCRIPTION summer, winter.

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 60 m³/day 360 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. Assembly and commissioning. Thermally protected unit.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Mountain Station HERA AMASA Municipality: LESCUARRE HUESCA - Spain

CLIENT: START UP 2005

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 136 m³/day 530 equivalent inhabitants

DESCRIPTION

2 BIOCLERE BC-9O UNITS , settlement with seasonal wastewater peaks.

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 136 m³/day 530 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning. Thermally protected unit.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Mountain Shelter HERA AMASA BACHIMAÑA HUESCA -Spain

CLIENT: STAR UP ECOTECNIC 2006

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 13m³/day 65 equivalent inhabitants

DESCRIPTION

BC-30 BIOCLERE UNIT for a sky mountain shelter

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity :13 m³/day 65 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning. Thermally protected unit.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Mountain shelter HERA AMASA BIELSA – HUESCA - Spain

CLIENT: START UP 2001

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 13m³/day 65 equivalent inhabitants

DESCRIPTION BC-30 BIOCLERE UNIT for a sky mountain shelter

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity :13 m³/day 65 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning. Thermally protected unit.

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

LOCATION CONSTRUCTOR Municipality : LA PINYA HERA AMASA VALL D’EN BAS VALLEY – GIRONA – Spain

CLIENT: START UP 2001

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 27m³/day 180 equivalent inhabitants

DESCRIPTION 1 BIOCLERE BC 90 UNIT for a populated settlement with seasonal wastewater peaks. Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 27 m³/day 180 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Municipality: Hostalets d’en Bas HERA AMASA Vall d’en Bas Valley -Gerona Spain

CLIENT START UP 2002

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 53 m³/day 350 equivalent inhabitants

DESCRIPTION 2 BIOCLERE BC-90 UNITS for a populated settlement with seasonal wastewater peaks.

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 53 m³/day 350 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Municipality: BOHOYO HERA AMASA Sierra de Gredos Mountains (Ávila) -Spain

CLIENT: START UP 2002

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 420 m³/day 2,100 equivalent inhabitants

DESCRIPTION 2 BIOCLERE UNITS BC-4.0/6 for a populated settlement with seasonal wastewater peaks. Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 420 m³/day 2,100 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Municipality: GUISANDO HERA AMASA Sierra de Gredos Mountains (Avila) Spain

CLIENT: START UP 2002

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 420 m³/day 2,100 equivalent inhabitants

2 BIOCLERE UNITS BC-4.0/6 for a populated settlement with seasonal DESCRIPTION wastewater peaks.

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 420 m³/day 2,100 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply, assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Municipality: EL HORNILLO HERA AMASA Sierra de Gredos Mountains (Avila) - Spain

CLIENT: START UP 2002

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 300 m³/day 1,500 equivalent inhabitants

2 BIOCLERE UNITS BC-4.0/4 for a populated settlement with DESCRIPTION seasonal wastewater peaks.

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 300 m³/day 1,500 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Municipality: NAVATEJARES HERA AMASA Sierra de Gredos Mountains (Ávila) Spain

CLIENT START UP 2002

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 100 m³/day 500 equivalent inhabitants

DESCRIPTION 1 BIOCLERE UNITS BC-4.0/6 for a populated settlement with seasonal wastewater peaks.

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 100 m³/day 500 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Municipality: HOYOS DEL HERA AMASA COLLADO Sierra de Gredos Mountains (Ávila) -Spain

CLIENT START UP 2002

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 40 m³/day 200 equivalent inhabitants

DESCRIPTION 1BIOCLERE UNIT BC- 90 for a population settlement.

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 40 m³/day 200 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Municipality: SAN JUAN DE HERA AMASA GREDOS Sierra de Gredos Mountains (Avila) -Spain

CLIENT START UP 2003

SECTOR: Wastewater Treatment URBAN SEWAGE Plant Plant

CAPACITY: 240 m³/day 1,200 equivalent inhabitants

DESCRIPTION 2 BIOCLERE UNITS BC-4.0/4 for a population settlement with seasonal wastewater peaks.

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 240 m³/day 1,200 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

LOCATION CONSTRUCTOR Rural Cottage : GARCÍA HERA AMASA AVILA - Spain

CLIENT STAR UP GARCIA GUESTHOUSE 2003

SECTOR : Wastewater Treatment RURAL TOURISM Plant

CAPACITY: 70 m³/day 350 equivalent inhabitants

DESCRIPTION 2 BIOCLERE UNIITS BC-90 : Rural Guesthouse

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 700 m³/day 350 equivalent inhabitants

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

PORT

LOCATION: CONSTRUCTOR Galletas GULLON Factory HERA AMASA Town : Aguilar de Campoo Palencia- Spain

CLIENT: Galletas Gullón START UP 2000

SECTOR : Wastewater Treatment FOOD -BISCUITS Plant

CAPACITY: 180 m³/day

DESCRIPTION 1 BIOCLERE UNIT BC-90 : WASTEWATER PLANT for the treatment of the water from biscuits production process of GALLETAS GULLON Factory

Technology applied for the treatment Bioclere Biological trickling Biofilter

Maximum treatment capacity : 180 m³/day

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning

HERA HOLDING HERA HOLDING www.heraholding.com Office in Barcelona Office in Madrid c/ Numancia, 185, 6th floor Isla de Hierro, nº 7, 1st floor [email protected] 08034 Barcelona 28701 San Sebastián de los Reyes, Madrid Telf. 93 205 10 10 Telf. 91 736 21 77 BIOCLERE BIOLOGICAL TRICKLING FILTER

LOCATION: CONSTRUCTOR MAS TINELL WINERY HERA AMASA Vilafranca de Penedés – Barcelona - Spain

CLIENT: START UP Cavas Mas Tinell 2000

SECTOR : Wastewater Treatment WINE PRODUCTION Plant

CAPACITY: 5 m³/day 25 equivalent inhabitants

DESCRIPTION 1 BIOCLERE UNIT BC-90 : WASTEWATER PLANT for the treatment of the rinsing water process and wine bottles uncorking of MAS TINELL WINERY

Technology applied for the treatment

Bioclere Biological trickling Biofilter

Maximum treatment capacity : 5 m³/day

Services rendered: Design of the biological treatment plant, equipment supply. assembly and commissioning