Dehradun to Moradabad Roadways Bus Time Table
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
District Saharanpur 82
BASE LINE SURVEY IN THE MINORITY CONCENTRATED DISTRICTS OF UTTAR PRADESH (A Report of Saharanpur District) Sponsored by: Ministry of Minority Affairs Government of India New Delhi Study conducted by: Dr. R. C. TYAGI GIRI INSTITUTE OF DEVELOPMENT STUDIES SECTOR-O, ALIGANJ HOUSING SCHEME LUCKNOW-226 024 CONTENTS Title Page No DISTRICT MAP – SAHARANPUR vi EXECUTIVE SUMMARY vii-xii CHAPTER I: OUTLINE OF THE STUDY 1-3 1.1 About the study 1 1.2 Objective of the study 2 1.3 Methodology and Sample design 2 1.4 Tools 3 CHAPTER II: DEVELOPMENT STATUS IN SAHARANPUR DISTRICT 4-19 2.1 Introduction 4 2.2 Demographic Status 5 2.3 Demographic Status by Religion 6 2.4 Structure and Growth in Employment 7 2.5 Unemployment 8 2.6 Land Use Pattern 9 2.7 Coverage of Irrigation and Sources 10 2.8 Productivity of Major Crops 10 2.9 Livestock 11 2.10 Industrial Development 11 2.11 Development of Economic Infrastructure 12 2.12 Rural Infrastructure 13 2.13 Educational Infrastructure 14 2.14 Health Infrastructure 15 2.15 Housing Amenities in Saharanpur District 16 2.16 Sources of Drinking Water 17 2.17 Sources of Cooking Fuel 18 2.18 Income and Poverty Level 19 CHAPTER III: DEVELOPMENT STATUS AT THE VILLAGE LEVEL 20-31 3.1 Population 20 3.2 Occupational Pattern 20 3.3 Land use Pattern 21 3.4 Sources of Irrigation 21 3.5 Roads and Electricity 22 3.6 Drinking Water 22 3.7 Toilet Facility 23 3.8 Educational Facility 23 3.9 Students Enrollments 24 3.10 Physical Structure of Schools 24 3.11 Private Schools and Preferences of the People for Schools 25 3.12 Health Facility -
Head Post Office, Katchery Road, Bahraich-271801 Head Post Office, Veer Vinay Chowk, Balrampur
Sr. No. POPSK ADDRESS AMETHI Head post office, Near Bus Station, Amethi-227405 AZAMGARH | 2 Head Post Office, Civil line, Azamgarh-2760001 BAHRAICH Head Post Office, Katchery Road, Bahraich-271801 BALLIA Head Post Office, Harpur Middhi Road, District Court Ballia - 277001 BALRAMPUR Head Post Office, Veer Vinay Chowk, Balrampur- 271201 GONDA Head Post Ofice, Jail Road, Gonda- 271001 MAU Head Post Office, Near Railway Crossing Mau - 275101 PRATAPGARH Head Post Office, Pratapgarh- 230001 8 RAEBAREL Head Post Office, Ghantaghar, Raebareli- 229001 SITAPUR Head Post Office, Sitapur- 261001 10 SULTANPUR Head Post Office, G N Road, Civil Line, Sultanpur-228001 |11 UNNAO Head Post Office, Civil Lines, Near Railway Station, Unnao- 209801 12 JAUNPUR Head Post Office, Alfastinganj, Near Jaunpur Kotwali, Jaunpur- 222001 13 Head Post Office Chunar, Dargah Sharif Station Road, Tammanpatti - 14 CHUNAR 231304 FAIZABAD Head Post Office, Civil Lines Faizabad - 224001 |15 DEORIA Head Post Office Deoria, Sadar Taluk, Deoria 274001 16 Head Post Office Jhansi, In front ofJhansi Hotel, Sadar Bazar, Jhansi JHANSI 17 284001 ALLAHABAD Head Post Office, S.N. Marg Civil Lines, Allahabad 18 Head Post Office Ghazipur, In front of Opium Factory, Mahuwabagh, GHAZIPUR Ghazipur- 233001 19 Head Post office Near Fatehpur Railway Crossing, Behind BSNL FATEHPUR Building, Police Line Fatehpur 212601 20 21 AMBEDKAR NAGAR Head Post Office, SH-5, Moradabad Mohall, Akbarpur,- 224122 22 BANDA BANDA HEAD OFFICE, NEAR BANGALIPURA - 210001 23 HAMIRPUR HAMIRPUR HEAD OFFICE, NEAR BUS STAND-210301 | 24 BHADOHI Bhadohi Mukhya Dakghar, Bhadohi - 221401 25 SIDDHARTHNAGAR HEAD POST OFFICE, TETRI BAZAR, NAUGARH, SIDDHARTHNAGAR, | 272207 (DOMARIYAGANJ) 26 MAHARAJGANJ HEAD POST OFFICE, WARD NO. -
Temporal Change in Tree Species Composition in Palampur Forest
2019 Status Report Palampur Palampur Forest Division Temporal Change in Tree Species Composition in Palampur Forest Division of Dharamshala Forest Circle, Himachal Pradesh Harish Bharti, Aditi Panatu, Kiran and Dr. S. S. Randhawa H. P. State Centre on Climate Change (HIMCOSTE), Vigyan Bhawan near Udyog Bhawan, Bemloe Shimla-01 0177-2656489 Table of Contents Introduction ............................................................................................................................................ 4 Forests of Himachal Pradesh........................................................................................................................ 5 Study area and method ....................................................................................................................... 7 District Kangra A Background .................................................................................................................. 7 Location & Geographical– Area ................................................................................................................. 8 Palampur Forest Division- Forest Profile................................................................................................ 9 Name and Situation:- .................................................................................................................................. 9 Geology: ......................................................................................................................................................... 11 -
Electrification
Railway Electrification I Executive Summary of Railway Electrification With a view to reduce the Nation’s dependence on imported petroleum based energy and to enhance energy security of the Country, as well as to make the Railway System more eco- friendly and modernized, Indian Railways have been progressively electrifying its rail routes. Upto March 2016, 23,555 Route kilometers which is 35.32% of the total Railway network has been electrified. On this electrified route 64.80% of freight traffic & 51.30% of Passenger traffic is hauled with fuel cost on electric traction being merely 38.70% of the total traction fuel cost on Indian Railways. In XIIth plan(2012-17), the target has been further enhanced to 6,500 RKms, out of which, 5,772 RKms have been electrified in the last four years of XIIth plan i.e. (in 2012-16) as against the proportionate target of 5,200 RKms. II Plan Period wise Progress of Railway Electrification S.No Plan Period RKM Electrified 1. Pre-Independence - 1925-1947 388 2. 1st Five Year Plan - 1951-56 141 3. 2nd Five Year Plan - 1956-61 216 4. 3rd Five Year Plan - 1961-66 1,678 5. Annual Plan - 1966-69 814 6. 4th Five Year Plan - 1969-74 954 7. 5th Five Year Plan - 1974-78 533 8. Inter Plan - 1978-80 195 9. 6th Five Year Plan - 1980-85 1,522 10. 7th Five Year Plan - 1985-90 2,812 11. Inter Plan - 1990-92 1,557 12. 8th Five Year Plan - 1992-97 2,708 13. -
Dharamshala – Dalhousie -Amritsar
REPORT ON SHANTINIKETAN- AN EXCURSION CUM LEARNING TOUR Chandigarh- Manali - Dharamshala – Dalhousie -Amritsar 07-17 FEBRUARY, 2020 The Institute organized Shantiniketan- an Excursion Cum Learning Tour to Chandigarh- Manali - Dharamshala – Dalhousie -Amritsar from 07-17 February, 2020. 57 students of various PG programs accompanied by four faculty members and one staff member. Dr. Vipin Choudhary, Dr. Sopnamayee Acharaya, Dr. Shailshri Sharma, Prof. Pranay Karnik and Mr. Devendra Sen visited the beautiful places of Manali, Amritsar and Dalhousie, India. February 7-8, 2020- Chandigarh The students gathered at Indore railway station and boarded train from Indore to Ambala at 12:30 pm. The group reached Ambala at around 8.30 am on February 8, 2020 and Proceed towards Chandigarh. After taking breakfast and rest till lunch group visited Rock Garden and Sukhna Lake. The group started for Manali from Chandigarh by Bus and traveler after dinner and reached Manali at 9 am on February 9, 2020. February 9-11, 2020 – Manali After lunch at 2:30pm the group proceeds to visit the local places of Manali by local vehicles. Everybody enjoyed the shopping at Mall road of Manali on Feb 9, 2020 evening. On Feb 10, 2020 after breakfast the group proceeds to visit Sholang Valley. Students enjoyed ice and various adventures activities in Sholang and returned back to hotel by evening. A bonfire with light music has been arranged in the resort along with dinner. After dinner, the students rested overnight in the hotel. February 11-12, 2020 – Dharamshala Reached Dharmshala through Kulu on 11 Feb, 2020. Students Visited Kulu and enjoyed river rafting and travelled by road to Dharmshala. -
Kangra, Himachal Pradesh
` SURVEY DOCUMENT STUDY ON THE DRAINAGE SYSTEM, MINERAL POTENTIAL AND FEASIBILITY OF MINING IN RIVER/ STREAM BEDS OF DISTRICT KANGRA, HIMACHAL PRADESH. Prepared By: Atul Kumar Sharma. Asstt. Geologist. Geological Wing” Directorate of Industries Udyog Bhawan, Bemloe, Shimla. “ STUDY ON THE DRAINAGE SYSTEM, MINERAL POTENTIAL AND FEASIBILITY OF MINING IN RIVER/ STREAM BEDS OF DISTRICT KANGRA, HIMACHAL PRADESH. 1) INTRODUCTION: In pursuance of point 9.2 (Strategy 2) of “River/Stream Bed Mining Policy Guidelines for the State of Himachal Pradesh, 2004” was framed and notiofied vide notification No.- Ind-II (E)2-1/2001 dated 28.2.2004 and subsequently new mineral policy 2013 has been framed. Now the Minstry of Environemnt, Forest and Climate Change, Govt. of India vide notifications dated 15.1.2016, caluse 7(iii) pertains to preparation of Distt Survey report for sand mining or riverbed mining and mining of other minor minerals for regulation and control of mining operation, a survey document of existing River/Stream bed mining in each district is to be undertaken. In the said policy guidelines, it was provided that District level river/stream bed mining action plan shall be based on a survey document of the existing river/stream bed mining in each district and also to assess its direct and indirect benefits and identification of the potential threats to the individual rivers/streams in the State. This survey shall contain:- a) District wise detail of Rivers/Streams/Khallas; and b) District wise details of existing mining leases/ contracts in river/stream/khalla beds Based on this survey, the action plan shall divide the rivers/stream of the State into the following two categories;- a) Rivers/ Streams or the River/Stream sections selected for extraction of minor minerals b) Rivers/ Streams or the River/Stream sections prohibited for extraction of minor minerals. -
Directorate of State Transport, Haryana Spo/He Dated: /5
Directorate of State Transport, Haryana 30-Bays Building, 2no FIoor, Sector_17, Chandigarh DTC (Storcs) 0172-2709809; E_Mail tD: _ d([email protected] To l. Senior Mechanical Engineer, Govt. central workshop, chandigarh. 2, All General Managers, Haryana Roadways. 3. Deputy Transport Controllers, Haryana Roadways Central Workshop, Hisar& Karnal. 4. Flying Squad officer, Haryana Roadways, Inter State Bus Terminal, Delhi. 5. General Manager, Driver Training lnstitute, Murthal (Sonipat). Memo No. SpO/He Dated: /5 - tz ^Ie Subject: Promoting of Digital payment - cashless Transactions. As you are aware that the Govt. of India I Haryana have resolved to make the financial transactions in State Transport Department, Haryana cashless and a few steps have already been initiated at different level of Covt. Authorities. In orderto promote cashless transaction in the department, the,following proposals of the office have been approved by competent authorities which are as under:- I' An online application for Driving Training Fees Payment has been developed to make payment online on e-Gras. All concerned officers are advised to accept Driving Training Fee payment through online payment system only i.e. epqv.hrtransporl.in. No physical cash transaction is allowed. 2. College / Institutes / Schools, General and Employees Bus Pass Payments to be processed online only on web addressi.e, epav.hrtransport.in. No physical cash transaction is allowed. 3. The collection of rented shops and other rented facilities at bus stands to be processed only on web address i.e. epov.hrtransport.in. No physical cash transaction is allowed. 1"he cornpliance report must be conveyed to this office within three days from the c1ate of this letter. -
2012* S. No. Year State Region Reason 1. 2017 Jammu And
INTERNET SHUTDOWNS IN INDIA SINCE 2012* S. Year State Region Reason No. 1. 2017 Jammu Pulwama Mobile Internet services were suspended yet again in Pulwama and district of Kashmir on 16 th August, 2017 to prevent rumour Kashmir mongering after a Lashkar commander was killed in a gunfight with the security forces. 2. 2017 Jammu Kashmir Mobile and broadband Internet services were suspended in the and Valley Kashmir valley in the morning of 15 th August, 2017 as a Kashmir precautionary measure on Independence Day. Services were reportedly restored later in the day. 3. 2017 Jammu Shopian, Internet services were suspended in Shopian and Kulgam district and Kulgam of Kashmir on 13 th August, 2017 to prevent the spreading of Kashmir information after three Hizbul Mujahideen militants including the operations commander, and two army men were killed in an encounter. 4. 2017 Jammu Pulwama Internet services were suspended in Pulwama district of Kashmir and on 9 th August, 2017 as a precautionary measure after three militants Kashmir were killed in a gunfight with the Government forces in the Tral township. However, the services on state-owned Bharat Sanchar Nigam Limited remained functional. 5. 2017 Jammu Baramulla Mobile Internet services were suspended in Baramulla district of and Kashmir as a precautionary measure on 5th August, 2017 after Kashmir three LeT militants were killed in an encounter with the security forces in the Sopore town of the district. 6. 2017 Jammu Kashmir Mobile Internet services were suspended yet again across Kashmir and Valley on 1st August, 2017 as a precautionary measure fearing clashes Kashmir after the killing of Lashkar-e-Toiba commander Abu Dujana and his aide in an encounter with the security forces. -
Gradation List of Class Iii Employees for the Year 2018 of Ghaziabad Judgeship Under Rule 464 of G.R
GRADATION LIST OF CLASS III EMPLOYEES FOR THE YEAR 2018 OF GHAZIABAD JUDGESHIP UNDER RULE 464 OF G.R. (CIVIL) as on 01.01.2018. SL. Name and address of the Date of Permanent post Acting Date of entering Date of Qualification of Remarks NO. Official birth held by the appointment, if in service promotion the official Official any 1 2 3 4 5 6 7 8 9 (GRADE OF Rs. 15600-39100) (Pay Band – Rs. 5400) Sri Ashwani Kumar Central Nazir C.A.O. 1 G-290, Govindpuram Gzb 22.04.1958 16.05.1977 01.01.2014 B.Com. (L.J.U. NO. 11256) 16.07.1992 (01.01.2014) (GRADE OF Rs. 9300-34800) (Pay Band – Rs. 4600) Suits Clerk Sri Rajendra Kr. Sharma-I A.O. D.J., Gzb 2 02.01.1959 II ACJ(SD),Gzb 07.12.1978 30.05.2014 B.Com. (L.J.U. NO. 11248) G-51, Rajnagar, Sec.-23,Gzb (30.05.2014) 16.07.1992 Sri Umesh Kumar Misc. Clerk 105, Kaila Walan, Ghaziabad A.O. Family Court, (L.J.U. NO. 12021) 3 10.02.1960 III ACJ(SD), Gzb 02.03.1979 30.05.2014 Intermediate Gzb (30.05.2014) 16.07.1992 (GRADE OF Rs. 9300-34800) (Pay Band- Rs. 4200) Ahalmad-II, Central Nazir, Sri Sunil Dutt B.Sc., LL.B. 4 15.03.1961 C.J.M. Ghaziabad D.J. Court, Gzb 03.09.1979 01.11.2003 (L.J.U. NO. 12026) Vill. Dundahera, Gzb 16.07.1992 (28.05.2012) Sri Bhushan Ahalmad-I M/R ADJ- 12 5 Vill. -
Section-VIII : Laboratory Services
Section‐VIII Laboratory Services 8. Laboratory Services 8.1 Haemoglobin Test ‐ State level As can be seen from the graph, hemoglobin test is being carried out at almost every FRU studied However, 10 percent medical colleges do not provide the basic Hb test. Division wise‐ As the graph shows, 96 percent of the FRUs on an average are offering this service, with as many as 13 divisions having 100 percent FRUs contacted providing basic Hb test. Hemoglobin test is not available at District Women Hospital (Mau), District Women Hospital (Budaun), CHC Partawal (Maharajganj), CHC Kasia (Kushinagar), CHC Ghatampur (Kanpur Nagar) and CHC Dewa (Barabanki). 132 8.2 CBC Test ‐ State level Complete Blood Count (CBC) test is being offered at very few FRUs. While none of the sub‐divisional hospitals are having this facility, only 25 percent of the BMCs, 42 percent of the CHCs and less than half of the DWHs contacted are offering this facility. Division wise‐ As per the graph above, only 46 percent of the 206 FRUs studied across the state are offering CBC (Complete Blood Count) test service. None of the FRUs in Jhansi division is having this service. While 29 percent of the health facilities in Moradabad division are offering this service, most others are only a shade better. Mirzapur (83%) followed by Gorakhpur (73%) are having maximum FRUs with this facility. CBC test is not available at Veerangna Jhalkaribai Mahila Hosp Lucknow (Lucknow), Sub Divisional Hospital Sikandrabad, Bullandshahar, M.K.R. HOSPITAL (Kanpur Nagar), LBS Combined Hosp (Varanasi), -
Congress Participants
CONGRESS PARTICIPANTS "COMPAGNIA TRASPORTI LAZIALI" SOCIETÀ REGIONALE S.P. A. Italy 9292 - REISINFORMATIEGROEP B.V. Netherlands AB STORSTOCKHOLMS LOKALTRAFIK - STOCKHOLM PUBLIC TRANSPORT Sweden AB VOLVO Sweden ABB SCHWEIZ AG Switzerland ABG LOGISTICS Nigeria ABU DHABI DEPARTMENT OF TRANSPORT United Arab Emirates ACCENTURE Germany ACCENTURE Finland ACCENTURE Canada ACCENTURE Singapore ACCENTURE BRAZIL Brazil ACCENTURE BRISBANE Australia ACCENTURE SAS France ACTIA AUTOMOTIVE France ACTV SOCIETÀ PER AZIONI Italy ADDAX- ASSESORIA FINANCEIRA Brazil ADNKRONOS Italy ADV SPAZIO SRL Italy AESYS - RWH INTL. LTD Germany AGENCE BELGA Belgium AGENCE FRANCE PRESSE France AGENCE METROPOLITAINE DE TRANSPORT Canada AGENZIA CAMPANA PER LA MOBILITÀ SOSTENIBILE Italy AGENZIA ESTE NEWS Italy AGENZIA MOBILITA E AMBIENTE E TERRITORIO S.R.L. Italy AGENZIA PER LA MOBILITÀ ED IL TRASPORTO PUBBLICO LOCALE DI MODENA S.P.A. Italy AGETRANSP Brazil AIT AUSTRIAN INSTITUTE OF TECHNOLOGY GMBH Austria AJUNTAMENT DE BARCELONA Spain AKERSHUS FYLKESKOMMUNE - AKERSHUS COUNTY COUNCIL Norway AL AHRAME Egypt AL FAHIM United Arab Emirates AL FUTTAIM MOTORS United Arab Emirates AL RAI MEDIA GROUP-AL RAI NEWSPAPER Kuwait ALBERT - LUDWIGS - UNIVERSITÄT FREIBURG INSTITUT FÜR VERKEHRSWISSENSCH Germany ALCOA WHEEL AND TRANSPORTATION PRODUCTS Hungary ALEXANDER DENNIS LIMITED United Kingdom ALEXANDER DENNIS Ltd United Kingdom ALLINNOVE Canada ALMATY METRO Kazakhstan ALMATYELECTROTRANS Kazakhstan ALMAVIVA SPA Italy ALSTOM France ALSTOM MAROC S.A. Morocco AMBIENTE EUROPA Italy AMERICAN PUBLIC TRANSPORTATION ASSOCIATION USA ANDHRA PRADESH STATE ROAD TRANSPORT CORPORATION India APAM ESERCIZIO S.P.A. Italy ARAB UNION OF LAND TRANSPORT Jordan AREA METROPOLITANA DE BARCELONA Spain AREP VILLE France ARIA TRANSPORT SERVICES USA ARRIVA (ESSA ALDOSARI) United Arab Emirates ARRIVA ITALIA S.R.L. -
Haryana Roadways Engineering Corporation.Ltd., Gurgaon
Haryana Roadways Engineering Corporation.Ltd., Gurgaon 6th Milestone Delhi-Jaipur Highway Behrampur road Khandsa, Gurgaon Phone - 0124-2215660, 2215389 E-mail: [email protected] NOTICE INVITING E-TENDER Online E-tenders are hereby invited for the following store materials for fabrication of bus bodies: Sr. Name of Group/Item Approx value EMD Value Sources of Purchase No. (Rs. In lacs) (Rs. In lacs) 1 Mig Wire 0.8mm 25.00 0.50 M/s ESAB India Ltd. or M/s Ador Welding or their authorized dealer or distributors, M/s Maruti Weld, M/s Varun Electrodes Pvt. Ltd., M/s GEE Ltd. 2 Perforated Polythene etc. 04.00 0.08 Manufacturer/General Supplier 3 . Mig Welding Spare Parts 03.00 0.06 M/s L& T Ltd. OR their authorized of L & T make. deal ers/distri butors. 4 Synthetic Based Rubber 03.00 0.06 M/s Piddilite Industries Ltd./M/s Adhesive. Polygel Technologies India Pvt. Ltd. OR their authorized dealers/RC firms with ASRTU. 5 Tinted Toughened 16.00 0.32 Firm should have current rate Glass 5mm thickness contract with ASRTU or Dark Green and manufacture having in house Toughened Glass clear facility of Horizontal Toughening 5 mm. Plant and ISO 9001 meeting specification No.. IS;2553:1992 tt i' axirli 6 Water Proof Paper and 05.00 • 0.10 Authorized dealers/distributors of M/s Sandor'Disc etc. ' Carborandum Universal/Mico Bosch make. 7 Electric Welding Rod 09.50 0.19 M/s ESAB India Ltd. or M/s Ador 3.15mm'x 350mm Welding or their, authorized dealer or distributors, M/s Maruti Weld, M/s Varun Electrodes Pvt.