Here to Download the Entire Ombudsman Investigation Into The
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Attachments Table of Contents
ATTACHMENTS TABLE OF CONTENTS FORESHORE LICENCE APPLICATION Fenit Harbour, Tralee, Co. Kerry ATTACHMENT CONTENTS Attachment A Figure 1 proximity to sensitive shellfish areas Attachment B B.1 Sediment Chemistry Results Attachment B.1(I) Dumping at Sea Material Analysis Reporting Form Attachment B.1(II) Copies of the laboratory reports Attachment B.1(III) Comparison to Irish Action Level B.2 Characteristics /Composition of the Substance or Material for Disposal Attachment B.2 Sediment Characterisation Report (AQUAFACT, 2018) Attachment C Assessment of Alternatives Attachment D D.1 Purpose Of The Operation D.2 Loading Areas D.3 Details Of The Loading Operations Attachment E E.1 DUMPING SITE SELECTION E.2 GENERAL INFORMATION E.3 DETAILS OF THE DUMPING OPERATION Attachment E.1(I) Attachment E.2(I) Marine Benthic Study Fenit Harbour Dredging and Disposal Operations (Aquafact 2018) Attachment F F.1 Assessment of Impact on the Environment Appendix 1 Assessment of Risk to Marine Mammals from Proposed Dredging and Dumping at Sea Activity, Fenit Harbour, Co. Kerry. Appendix 2 Underwater Archaeological Impact Assessment Report Fenit Harbour and Tralee Bay, Co. Kerry. Appendix 3: Nature Impact Statement Attachment G G.1 Monitoring Programme Attachment-A FIGURE 1 SHELLFISH WATERS FORESHORE LICENCE APPLICATION Fenit Harbour, Tralee, Co. Kerry Legend Foreshore Licence Area Shellfish Area 5091m Proposed Dump Site 4 89m Fenit Harbour Map Reproduced From Ordnance Survey Ireland By Permission Of The Government. Licence Number EN 0015719. 0 1.5 3 km Ü Project Title: Fenit Harbour Client: Kerry County Council Drawing Title: Foreshore Licence and Shellfish Areas Drawn: JK Checked: CF Date: 15-10-2019 Scale (A4): 1:85,000 Attachment-B MATERIAL ANALYSIS DUMPING AT SEA PERMIT APPLICATION Fenit Harbour, Tralee, Co. -
Ballincollig Bypass Road Project Final Report On
BALLINCOLLIG BYPASS ROAD PROJECT FINAL REPORT ON ARCHAEOLOGICAL EXCAVATION Greenfield 4 Licence No: 02E0432 PREPARED BY ED DANAHER CORK ARCHAEOLOGICAL CONSULTANCY SERVICES LIMITED COUNTY COUNCIL Mr. J. Matson, B.E., County Engineer, Cork County Council, County Hall, Cork. PROJECT DETAILS Project Archaeological Excavation Archaeologist Ed Danaher Client Cork County Council, County Hall, Co. Cork. Road Scheme N22 Ballincollig Bypass Site Greenfield 4 Townland Greenfield Parish Kilnaglory Nat. Grid Ref. 15750, 06980 RMP No. N/A Licence No. 02E0432 Planning Ref. N/A Project Date 22nd April 2002 Report Date 20th November 2002 Archaeological Consultancy Services Ltd. Ballincollig Bypass, Greenfield 4 NON-TECHNICAL SUMMARY The N22 Ballincollig By-Pass scheme involves the construction of a new dual carriageway between Bishopstown (Ballinaspig More townland) and Ovens (Knockanemore townland) and covers an area of 750,000 square metres. A programme of advance archaeological investigation was undertaken prior to construction under licence number 01E0546 and involved excavating a 2m wide test trench along the centre line of the proposed route with offset trenches to the edge of the road-take every 25m on alternate sides. In addition to the five sites of archaeological potential identified through the archaeological impact assessment, eleven sites identified during the course of this investigation were subsequently excavated. With this phase of the project completed, March 2002 saw the commencement of the topsoil removal which was accompanied by a programme of archaeological monitoring of same under licence number 02E0058. During this monitoring, an isolated feature was exposed within the townland of Greenfield consisting of a small oval-shaped pit filled by a black charcoal-stained soil and heat-shattered stone. -
Natura Impact Statement
NATURA IMPACT STATEMENT IN SUPPORT OF THE APPROPRIATE ASSESSMENT FOR THE DRAFT DINGLE PENINSULA VISITOR EXPERIENCE DEVELOPMENT PLAN for: Fáilte Ireland 88-95 Amiens Street Dublin 1 by: CAAS Ltd. 1st Floor 24-26 Ormond Quay Dublin 7 DECEMBER 2019 Appropriate Assessment Natura Impact Statement for the Dingle Peninsula Visitor Experience Development Plan Table of Contents Section 1 Introduction .................................................................................................... 1 1.1 Background ....................................................................................................................... 1 1.2 Legislative Context ............................................................................................................. 1 1.3 Approach ...........................................................................................................................1 Section 2 Description of the VEDP .................................................................................. 3 Section 3 Screening for Appropriate Assessment ........................................................... 6 3.1 Introduction to Screening ................................................................................................... 6 3.2 Identification of Relevant European sites .............................................................................. 6 3.3 Assessment Criteria and Screening ...................................................................................... 9 3.4 Other Plans and Programmes ........................................................................................... -
For Inspection Purposes Only. Consent of Copyright Owner Required for Any Other Use
For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 26-07-2013:11:38:28 For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 26-07-2013:11:38:28 For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 26-07-2013:11:38:28 For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 26-07-2013:11:38:28 Kerry County Council – Waste Water Discharge Licence Application for Ardfert Agglomeration. ___________________________________________________________________________________ Assessment of Impact on Receiving Surface or Ground Water EXISITNG ENVIRONMENT River Tyshe Flow Calculations There are no flow monitoring stations along the River Tyshe. Consequently in order to determine the long-term run-off from each of the catchments at the possible discharge points, an average annual rainfall of 1336mm is assumed. This is the average rainfall on the Feale catchment, which is the closest catchment to the River Tyshe with recorded data. The catchment lies in Hydrometric Area 23 in which the estimated annual losses due to evapo-transpiration are 490mm. Thus, the average annual run-off is 1336 – 490 = 846mm/annum, which is equivalent to an average daily flow (ADF) (846 x 1.0 x 106) (1000 x 365.25) = 2,316 m3/d/km2 (0.027 l/s/km2) of catchment area. In the absence of recorded river dry weather and 95 percentile flow data, it is necessary to attempt to calculate what the flows might be for the River Tyshe using the estimated average daily flow. -
Audit Maritime Collections 2006 709Kb
AN THE CHOMHAIRLE HERITAGE OIDHREACHTA COUNCIL A UDIT OF M ARITIME C OLLECTIONS A Report for the Heritage Council By Darina Tully All rights reserved. Published by the Heritage Council October 2006 Photographs courtesy of The National Maritime Museum, Dunlaoghaire Darina Tully ISSN 1393 – 6808 The Heritage Council of Ireland Series ISBN: 1 901137 89 9 TABLE OF CONTENTS 1. INTRODUCTION 4 1.1 Objective 4 1.2 Scope 4 1.3 Extent 4 1.4 Methodology 4 1.5 Area covered by the audit 5 2. COLLECTIONS 6 Table 1: Breakdown of collections by county 6 Table 2: Type of repository 6 Table 3: Breakdown of collections by repository type 7 Table 4: Categories of interest / activity 7 Table 5: Breakdown of collections by category 8 Table 6: Types of artefact 9 Table 7: Breakdown of collections by type of artefact 9 3. LEGISLATION ISSUES 10 4. RECOMMENDATIONS 10 4.1 A maritime museum 10 4.2 Storage for historical boats and traditional craft 11 4.3 A register of traditional boat builders 11 4.4 A shipwreck interpretative centre 11 4.5 Record of vernacular craft 11 4.6 Historic boat register 12 4.7 Floating exhibitions 12 5. ACKNOWLEDGMENTS 12 5.1 Sources for further consultation 12 6. ALPHABETICAL LIST OF RECORDED COLLECTIONS 13 7. MARITIME AUDIT – ALL ENTRIES 18 1. INTRODUCTION This Audit of Maritime Collections was commissioned by The Heritage Council in July 2005 with the aim of assisting the conservation of Ireland’s boating heritage in both the maritime and inland waterway communities. 1.1 Objective The objective of the audit was to ascertain the following: -
The Kerry Way Self Guided | Free Download
The Kerry Way: Self-Guided How to plan your multi-day backpacking trip around Ireland’s scenic Ring of Kerry Many are familiar with the beautiful Ring of Kerry in County Kerry, Ireland, but far fewer are aware that the entire route can be walked instead of driven. Despite The Kerry Way’s status as one of the most popular of Ireland’s National Waymarked Trails, I had more difficulty finding advice to help me prepare for it than I did for hikes in Scotland and the United Kingdom. At approximately 135 miles, it’s also the longest of Ireland’s trails, and in retrospect I’ve noticed that many companies who offer self-guided itineraries actually cut off two whole sections of the route - in my opinion, some of the prettiest sections. In honor of completing my own trek with nothing but online articles and digital apps to guide the way, I thought I’d pay it forward by creating my own budget-minded backpacker’s guide (for the WHOLE route) so that others might benefit from what I learned. If you prefer to stay in B&Bs rather than camping or budget accommodations, I’ve outlined how you can swap out some of my choices for your own. Stats: English Name: The Kerry Way Irish Name: Slí Uíbh Ráthaigh Location: Iveragh Peninsula, County Kerry, Ireland Official Length: 135 miles (217 km), but there are multiple route options Completion Time: 9 Days is the typical schedule High Point: 1,263ft (385m) at Windy Gap, between Glencar and Glenbeigh Route Style: Circular Loop Table of Contents: (Click to Jump To) Preparedness: Things to Consider Weather Gear Amenities Currency Language Wildlife Cell Service Physical Fitness Popularity Waymarking To Camp or Not to Camp? Emergencies Resources Getting There // Getting Around Route // Accommodations Preparedness: Things to Consider WEATHER According to DiscoveringIreland, “the average number of wet days (days with more than 1mm of rain) ranges from about 150 days a year along the east and south-east coasts, to about 225 days a year in parts of the west.” Our route along the Iveragh Peninsula follows the southwest coast of Ireland. -
283 Bus Time Schedule & Line Route
283 bus time schedule & line map 283 Currans Community Centre →Tralee, Denny Street View In Website Mode The 283 bus line (Currans Community Centre →Tralee, Denny Street) has 3 routes. For regular weekdays, their operation hours are: (1) Currans Community Centre →Tralee, Denny Street: 7:30 AM - 9:40 AM (2) Tralee, Tralee Bus Station →Tralee, Denny Street: 2:00 PM (3) Tralee, Tralee Bus Station →Tralee, Tralee Bus Station: 5:00 PM Use the Moovit App to ƒnd the closest 283 bus station near you and ƒnd out when is the next 283 bus arriving. Direction: Currans Community Centre →Tralee, 283 bus Time Schedule Denny Street Currans Community Centre →Tralee, Denny Street 13 stops Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 7:30 AM - 9:40 AM Currans Community Centre Tuesday 7:30 AM - 9:40 AM Currow, Currow Church Wednesday 7:30 AM - 9:40 AM Farranfore, Kerry Airport Thursday 7:30 AM - 9:40 AM Aherns Pharmacy Friday 7:30 AM - 9:40 AM Firies (Osullivans Shop) Saturday 7:30 AM - 9:40 AM Ballyƒnane Crossroads Poulawaddra, Farmers Bridge 283 bus Info Direction: Currans Community Centre →Tralee, Tralee, Killerisk Manor Kerry Denny Street Killerisk Road, Tralee Stops: 13 Trip Duration: 75 min Tralee, Tralee General Hospital Line Summary: Currans Community Centre, Currow, Currow Church, Farranfore, Kerry Airport, Aherns Clash (It South Campus) Pharmacy, Firies (Osullivans Shop), Ballyƒnane Crossroads, Poulawaddra, Farmers Bridge, Tralee, Tralee, Institute Of Technology Tralee Killerisk Manor Kerry, Tralee, Tralee General Hospital, -
Report to Members Blarney Macroom Municipal District Local Area Plan
Report to Members Blarney Macroom Municipal District Local Area Plan Public Consultation Draft Chief Executive’s Opinion on the Issues Raised by Submissions and Recommended Amendments. 6th March 2017 Cork County Council Planning Policy Unit 1 Document Verification Page 1 of 1 Job Title: Report to Members Document Title: Blarney Macroom Municipal District Draft Local Area Plan Public Consultation Document Ref: Revision Date Filename: Description: This report sets out the Chief Executive’s Opinion and Recommendations on the issues raised in the submissions received on the Public Consultation Draft of the Blarney Macroom Draft Local Area Plan Prepared Drawn Checked by Approved by by by 1.0 March Name FG/PM AF PM ML Cork County Council Planning Policy Unit 2 3 Blarney Macroom Local Area Report to Members on Pre‐draft Public Consultation Plan Review This report focuses on the submissions and observations received from the public following publication of the Blarney Macroom Municipal District Local Area Plan Public Consultation Draft, which sets out the planning framework for the development of the Municipal District up to 2023. The report summarises the outcome of this consultation process which was carried out in line with Section 20(3) of the Planning & Development Acts and will inform the preparation of the various amendments to the Blarney Macroom Municipal District Local Area Plan. Appendix A of the report includes a list of the submissions received relevant to the Municipal District while Appendix B details the proposed amendments to the plan following consideration of the issues raised in the submissions and other pertinent issues. -
Interim Works EIA Screening Report F01 03 December 2019
ENVIRONMENTAL IMPACT ASSESSMENT SCREENING REPORT Ballyvourney and Ballymakeera FRS Interim Works CP19008RP0002 Ballyvourney and Ballymakeera FRS Interim Works EIA Screening Report F01 03 December 2019 rpsgroup.com REPORT Document status Version Purpose of document Authored by Reviewed by Approved by Review date 3 December F01 Final Karen Dineen Michelle Bennett Michelle Bennett 2019 Approval for issue Michelle Bennett 3 December 2019 © Copyright RPS Group Limited. All rights reserved. The report has been prepared for the exclusive use of our client and unless otherwise agreed in writing by RPS Group Limited no other party may use, make use of or rely on the contents of this report. The report has been compiled using the resources agreed with the client and in accordance with the scope of work agreed with the client. No liability is accepted by RPS Group Limited for any use of this report, other than the purpose for which it was prepared. RPS Group Limited accepts no responsibility for any documents or information supplied to RPS Group Limited by others and no legal liability arising from the use by others of opinions or data contained in this report. It is expressly stated that no independent verification of any documents or information supplied by others has been made. RPS Group Limited has used reasonable skill, care and diligence in compiling this report and no warranty is provided as to the report’s accuracy. No part of this report may be copied or reproduced, by any means, without the written permission of RPS Group Limited. Prepared by : Prepared for : RPS Cork County Council Innishmore, Ballincollig Coastal Management & Flood Projects Dept., Co. -
Kerry Scheme Details 2019.Xlsx
Organisation Name Scheme Code Scheme Name Supply Type Source Type Population Served Volume Supplied Scheme Start Date Scheme End Date Kerry County Council 1300PUB1032 An Baile Mór PWS 012D PWS Mixture 825 543 01/01/2009 00:00 Kerry County Council 1300PUB1027 An Clochán PWS 028D PWS GR 170 152 01/01/2009 00:00 Kerry County Council 1300PUB1034 An Daingean PWS 030D PWS Mixture 1723 1861 01/01/2009 00:00 Kerry County Council 1300PUB1037 An Fheothanach PWS PWS GR 210 137 01/01/2009 00:00 Kerry County Council 1300PUB1111 An Ghráig/Cloichear PWS 043D PWS Mixture 86 106 01/01/2009 00:00 21/05/2019 00:00 Kerry County Council 1300PUB1042 An MhÃn Aird No. 1 PWS (060D) PWS Mixture 396 456 01/01/2009 00:00 Kerry County Council 1300PUB1116 An MhÃn Aird No. 3 PWSS (090D) PWS Mixture 576 458 01/01/2009 00:00 Kerry County Council 1300PUB1044 An MhuirÃoch/ Baile Breach PWS 063D PWS Mixture 527 455 01/01/2009 00:00 Kerry County Council 1300PUB1029 Annascaul PWS 002D PWS GR 453 154 01/01/2009 00:00 Kerry County Council 1300PUB1002 Ardfert PWS GR 2394 1286 01/01/2009 00:00 Kerry County Council 1300PUB1022 Aughacasla PWS 005D PWS Mixture 342 268 01/01/2009 00:00 Kerry County Council 1300PUB1031 Baile An Fheirtéaraigh PWS 011D PWS GR 465 353 01/01/2009 00:00 Kerry County Council 1300PUB1030 Baile Na Bhfionnúrach PWS 006D PWS Mixture 58 26 01/01/2009 00:00 20/12/2019 00:00 Kerry County Council 1300PUB3002 Ballintermon 003D PWS GR 240 148 01/01/2014 00:00 Kerry County Council 1300PUB1001 Ballyheigue PWS Mixture 2466 2842 01/01/2009 00:00 Kerry County Council -
Tralee Bay and Magharees Peninsula, West to Cloghane SAC (Site Code 2070) Conservation Objectives Supporting Document -Coastal Habitats
Tralee Bay and Magharees Peninsula, West to Cloghane SAC (site code 2070) Conservation objectives supporting document -coastal habitats NPWS Version 1 October 2013 Table of Contents Page No. 1 Introduction 3 2 Conservation objectives 6 3 Perennial vegetation of stony banks 7 3.1 Overall objective 7 3.2 Area 7 3.2.1 Habitat extent 7 3.3 Range 8 3.3.1 Habitat distribution 8 3.4 Structure and Functions 8 3.4.1 Functionality and sediment supply 8 3.4.2 Vegetation structure: zonation 9 3.4.3 Vegetation composition: typical species & sub-communities 9 3.4.4 Vegetation composition: negative indicator species 10 4 Saltmarsh habitats 10 4.1 Overall objectives 11 4.2 Area 11 4.2.1 Habitat extent 11 4.3 Range 12 4.3.1 Habitat distribution 12 4.4 Structure and Functions 13 4.4.1 Physical structure: sediment supply 13 4.4.2 Physical structure: creeks and pans 13 4.4.3 Physical structure: flooding regime 14 4.4.4 Vegetation structure: zonation 14 4.4.5 Vegetation structure: vegetation height 14 4.4.6 Vegetation structure: vegetation cover 14 4.4.7 Vegetation composition: typical species & sub-communities 15 4.4.8 Vegetation composition: negative indicator species 16 5 Sand dune habitats 16 5.1 Overall objectives 18 5.2 Area 19 5.2.1 Habitat extent 19 5.3 Range 20 5.3.1 Habitat distribution 20 5.4 Structure and Functions 20 5.4.1 Physical structure: functionality and sediment supply 20 5.4.2 Physical structure: hydrological & flooding regime 22 5.4.3 Vegetation structure: zonation 22 1 5.4.4 Vegetation structure: bare ground 23 5.4.5 Vegetation composition: -
KRA Submission on GA0003 and DA0003 to A.Wps
Kilcolgan Residents Telephone: +353-87-2804474 Association Email: [email protected] c/o Island View Web: www.safetybeforelng.com Convent Street Listowel Kilcolgan Residents Association County Kerry Safety before LNG 7 October 2008 Protecting the Shannon Estuary and KILCOLGAN RESIDENTS ASSOCIATION & SAFETY BEFORE LNG Submission on proposed Shannon LNG Natural Gas Pipeline and proposed compulsory acquisition of lands thereon from Kilcolgan, County Kerry to Foynes, County Limerick 7 October 2008 An Bord Pleanála, 64 Marlborough Street, Dublin 1. By Email only to: bord@Pleanála.ie Re: GA0003 - Gas pipeline to connect Shannon LNG Terminal at Ralappane, Co. Kerry to existing natural gas network at Leahys, Co. Limerick and DA0003 - Application for an acquisition order for the Shannon LNG Terminal at Tarbert, Co. Kerry to the Bord G áis Eireann Network at Foynes, County Limerick Dear Sir / Madam, The Kicolgan Residents Association represents nearby residents of the proposed LNG regasification terminal and people with close family and economic ties to the area. The ‘Safety Before LNG’ group represents people from both Kilcolgan and the wider community and is advocating responsible strategic siting of LNG terminals in areas which do not put people’s health and safety in danger. See attached signed submissions by Ms. Kathy Sinnott M.E.P1 and Mr. Tony Lowes for “Friends of the Irish Environment”2 on whose behalf this submission is also, therefore, being made. We are hereby formally objecting to the proposed Shannon LNG Natural Gas pipeline and compulsory acquisition order, referenced above, in their entirety, on health, safety, environmental and strategic planning grounds. In May 2006 Shannon LNG, a subsidiary of the American Hess Corporation, announced an option to purchase, subject to planning, the lands at Kilcolgan owned by Shannon Development, of which Councillor John Brassil was a director, to construct an LNG terminal for a price believed by us to be in the region of 28.1 million euros3.