Lawrlwytho'r Atodiad Gwreiddiol

Total Page:16

File Type:pdf, Size:1020Kb

Lawrlwytho'r Atodiad Gwreiddiol 09/07/2013 Street History Report Page 1 of 3 Effective: 12/11/2010 to 12/11/2012 DisplayAction Officer: Yes Street: Locko Lane, Hardstoft (3300526) Street: Locko Lane, Hardstoft (3300526) Locality: Clay Cross, Derbyshire Area: Bolsover District Condition Survey Defect No: Description Log Date Location Defect Type Class. Organisation Status Job No. Section: 1,001.00 Road No. - Locn.: QH - Locko Ln, Hardstoft C/Way Type: Highway Inspection Area: Bolsover District Batch: 214849 - Inspection Batch Route: 049N - QH - Wsngtn to Nth Wfld Officer: Karl Rix Date: 23/08/2012 10:16:36 No actionable defects found Batch: 213634 - Inspection Batch Route: 049N - QH - Wsngtn to Nth Wfld Officer: Karl Rix Date: 08/05/2012 10:13:16 No actionable defects found Batch: 212837 - Inspection Batch Route: 049N - QH - Wsngtn to Nth Wfld Officer: Karl Rix Date: 20/02/2012 11:28:11 No actionable defects found Batch: 212716 - Inspection Batch Route: Ad Hoc Inspection North Officer: Karl Rix Date: 09/02/2012 10:18:49 241707 several potholes in carrigeway 09/02/2012 heading from main tibshelf road. one carriageway pothole Internal Committed 1040544 approx 100 metres past & opposite ivy cottage, one on bridge past green lane and two approx 200 metres before & opposite headland farm Batch: 211801 - Inspection Batch Route: 049N - QH - Wsngtn to Nth Wfld Officer: Karl Rix Date: 10/11/2011 10:00:30 No actionable defects found Batch: 211737 - Inspection Batch Route: Ad Hoc Inspection North Officer: Karl Rix Date: 04/11/2011 11:52:00 239470 clear full length of ditch and entrance to 04/11/2011 past ivy cottage heading downhill dr-ditch needs clearing Internal Uncommitted 1038341 pipe Batch: 210982 - Inspection Batch Route: 049N - QH - Wsngtn to Nth Wfld Officer: Karl Rix Date: 10/08/2011 09:09:44 237841 10/08/2011 approx 50feet before the bridge going carriageway pothole Internal Committed 1036751 towards danesmoor Batch: 210327 - Inspection Batch Route: 049N - QH - Wsngtn to Nth Wfld Officer: Steve Pugh Date: 22/05/2011 13:01:43 No actionable defects found Batch: 209712 - Inspection Batch Route: Ad Hoc Inspection North Officer: Richard Scott Date: 23/03/2011 08:44:25 234356 numerous actionable defects approx 8 23/03/2011 from green lane on locko through narrows carriageway pothole Internal Committed 1033367 Batch: 209339 - Inspection Batch Route: 049N - QH - Wsngtn to Nth Wfld Officer: Richard Scott Date: 16/02/2011 13:04:40 233351 16/02/2011 numerous potholes in carrigeway carriageway pothole Internal Uncommitted 1032371 Batch: 208529 - Inspection Batch Route: Ad Hoc Inspection North Officer: Richard Scott Date: 23/11/2010 14:47:40 231154 carriage way pothole 23/11/2010 prior to guard rails on lhs towards five pits carriageway pothole Internal Committed 1030211 trail Batch: 208515 - Inspection Batch Route: 049N - QH - Wsngtn to Nth Wfld Officer: Richard Scott Date: 23/11/2010 10:23:57 No actionable defects found Customer Services Enquiry No: Reg 12... Logged by: System Agent 2 on: 06/01/2012 16:07 Officer: Street Lighting Admin Service: SL - Street Light Subject: light out Classification: Street Lighting Enquiry Ref: AULT HUCKNAL Desc.: Location Reg 12.4 & Reg 13 Personal Data Contact: Report generated by : Hilary Boyack 15:50:57 09/07/2013 Street History Report Page 2 of 3 Effective: 12/11/2010 to 12/11/2012 DisplayAction Officer: Yes Street: Locko Lane, Hardstoft (3300526) Customer Services Enquiry No: Reg 12.... Logged by: System Agent 2 on: 24/02/2011 08:31 Officer: Nicole Highfield Service: Maintenance Damage/Defect Subject: 3 day pothole Classification: Rapid Response Teams Desc.: Description: Various potholes on a mile stretch of road Any other details: Location: Locko Lane in Lower Pilsley. Starting from just before the road meets Green Lane, Contact: right up to just before the road meets the B6039. Plot Number: 1,000.00 Feature Id - Location: Not in use Feature Type: Highway Inspection Job Number: Reg 12... Maintenance Management Job No. Description Location Officer Priority Job Status Entered Completion Works Order Section: 1,000.00 Road No. - Locn.: Not in use C/Way Type: Highway Inspection Area: Bolsover District Reg 12.... 3 day pothole - Description: Locko Lane in Lower Pilsley. Richard Robinson xCat 1 - three days Job fully completed 24/02/2011 28/02/2011 Act. RR11/233066 Various potholes on a mile Starting from just before the road stretch of road Any other details: meets Green Lane, right up to (Enquiry Reg 12.... just before the road meets the B6039. Section: 1,001.00 Road No. - Locn.: QH - Locko Ln, Hardstoft C/Way Type: Highway Inspection Area: Bolsover District Reg 12.... makesafe collapsing culvert locko lane pilsley junction with Alan Tulloch xCat 2 - one month Job fully completed 01/09/2010 06/01/2011 Act. (carriageway edge deterioration) green lane (RRT job 1028793 Arrow boards out kerbs/side of road collapsed into river. Cones out aswell) Reg 12.... carriage way pothole prior to guard rails on lhs towards N - Stonegravels 4 xCat 1 - 24 hours Job fully completed 23/11/2010 24/11/2010 Act. RR11/227626 (carriageway pothole) five pits trail Reg 12.4 ... carriageway pothole numerous potholes in carrigeway Richard Scott xCat 2 - one month Job fully completed 16/02/2011 06/01/2012 Act. RRege g1 21..4.. ...numerous actionable defects from green lane on locko through Richard Robinson xCat 1 - three days Job fully completed 23/03/2011 24/03/2011 Act. RR11/235029 approx 8 (carriageway pothole) narrows Reg 12.... carriageway pothole approx 50feet before the bridge N - Stonegravels 1 xCat 1 - three days Job fully completed 10/08/2011 10/08/2011 Act. RR12/241400 going towards danesmoor Reg 12.... clear full length of ditch and past ivy cottage heading downhill Karl Rix xCat 2 - one month Job fully completed 04/11/2011 20/03/2012 Act. entrance to pipe (dr-ditch needs clearing) Reg 12.... several potholes in carrigeway heading from main tibshelf road. N - Stonegravels 1 xCat 1 - three days Job fully completed 09/02/2012 13/02/2012 Act. RR12/249061 (carriageway pothole) one approx 100 metres past & opposite ivy cottage, one on bridge past green lane and two approx 200 metres before & opposite headland farm Section: 10,001.00 Road No. - Locn.: 12-04-01-23 - B6039 / Locko Lane and Hardstoft Road - Junction / vCis/iWbialityy Timyppero: v- eEmveidnetns ce-based Casualty Red Area: Bolsover District 1200090 Lee Wright xAnnual programme 5 Job completed 16/04/2012 13/04/2012 Act. 1200091 Chris Allwood xAnnual programme 3 Job assigned to Officer 16/04/2012 26/10/2012 Est. 1200092 Richard Dawson xAnnual programme 1 Job record created 16/04/2012 1200093 Bob Binns xAnnual programme 2 Job issued to 16/04/2012 01/03/2013 Est. Contractor Report generated by : Hilary Boyack 15:50:57 09/07/2013 Street History Report Page 3 of 3 Effective: 12/11/2010 to 12/11/2012 DisplayAction Officer: Yes Street: Locko Lane, Hardstoft (3300526) Report generated by : Hilary Boyack 15:50:57 .
Recommended publications
  • Michelle Smith Eversheds LLP Bridgewater
    Michelle Smith Our Ref: APP/R1010/A/14/2212093 Eversheds LLP Bridgewater Place Water Lane LEEDS LS11 5DR 12 March 2015 Dear Madam TOWN AND COUNTRY PLANNING ACT 1990 (SECTION 78) APPEAL BY ROSELAND COMMUNITY WINDFARM LLP: LAND EAST OF ROTHERHAM ROAD, BOLSOVER, DERBYSHIRE APPLICATION REF: 12/00159/FULEA 1. I am directed by the Secretary of State to say that consideration has been given to the report of the Inspector, Paul K Jackson BArch (Hons) RIBA, who held a public local inquiry which opened on 4 November 2014 into your client’s appeal against the decision of Bolsover District Council (the Council) to refuse planning permission for a windfarm comprising 6 wind turbines, control building, anemometer mast and associated access tracks on a site approximately 2.5km south of Bolsover between the villages of Palterton and Shirebrook, in accordance with application reference 12/00159/FULEA, dated 25 April 2012. 2. On 20 June 2014 the appeal was recovered for the Secretary of State's determination, in pursuance of section 79 of and paragraph 3 of Schedule 6 to the Town and Country Planning Act 1990, because it involves a renewable energy development. Inspector’s recommendation and summary of the decision 3. The Inspector recommended that the appeal be dismissed and planning permission refused. For the reasons given below, the Secretary of State agrees with the Inspector’s conclusions except where indicated otherwise, and agrees with his recommendation. A copy of the Inspector’s report (IR) is enclosed. All references to paragraph numbers, unless otherwise stated, are to that report.
    [Show full text]
  • Legacy Subsurface Data Onshore UK 1
    PREPRINT: Legacy subsurface data onshore UK 1 “Paucity of legacy oil and gas subsurface data onshore United Kingdom: implications for the 2 expansion of low carbon subsurface activities and technologies” 3 4 Mark T Ireland1*, Rachel Brown1, Miles P. Wilson2, Paul B. Stratesky3, and Richard Davies1 5 1Newcastle University, School of Natural and Environmental Sciences, Drummond Building, 6 Newcastle Upon Tyne, NE1 7RU. 7 2Durham University, Department of Earth Sciences, Science Site, Durham, DH1 3LE 8 3Department of Social Sciences & Languages, Northumbria University, Newcastle upon Tyne, UK 9 *[email protected] 10 11 This manuscript has been submitted for publication in JOURNAL OF THE GEOLOGICAL 12 SOCIETY. The manuscript has not yet undergone peer review. Subsequent versions of this 13 manuscript may have different content if accepted and the final version will be available via the 14 “peer-reviewed Publication DOI” link. 15 Please feel free to contact the corresponding author directly to provide any constructive feedback. 16 1 PREPRINT: Legacy subsurface data onshore UK 17 Title: Paucity of legacy oil and gas subsurface data onshore United Kingdom: implications for the 18 expansion of low carbon subsurface activities and technologies 19 20 Mark T Ireland1*, Rachel Brown1, Miles P. Wilson2, Paul B. Stratesky3, and Richard Davies1 21 1Newcastle University, School of Natural and Environmental Sciences, Drummond Building, 22 Newcastle Upon Tyne, NE1 7RU. 23 2Durham University, Department of Earth Sciences, Science Site, Durham, DH1 3LE 24 3Department of Social Sciences & Languages, Northumbria University, Newcastle upon Tyne, UK 25 *[email protected] 26 MTI - https://orcid.org/0000-0001-9777-0447 27 28 Running title: Legacy subsurface data onshore UK 29 30 Abstract 31 The decarbonisation of energy systems to achieve net zero carbon emissions will likely see the rapid 32 development of carbon capture and storage, energy storage in the subsurface and geothermal energy 33 projects.
    [Show full text]
  • D534 LA10 Tibshelf to Shuttlewood (Midlands)
    June 2018 | www.hs2.org.uk In your area Tibshelf to Shuttlewood | LA10 LA10 to Leeds High Speed Two (HS2) is the Government’s planned M1 Shuttlewood new high speed railway. Calow A6192 High Speed Two Limited Arkwright HS2 Phase 2b A632 Town is the company responsible Long Bolsover Duckmanton for developing and A632 Cock Alley Carr Vale promoting the UK’s new Scarcliffe Sutton Scarsdale high speed rail network. In Palterton Temple July 2017, the Government Normanton A617 Stony confi rmed the route for Heath Grassmoor Houghton Holmewood Glapwell the next phase of HS2: North New Wingfield Doe Lea Crewe – Manchester and Stainsby Houghton A617 A6175 West Midlands – Leeds Rowthorne (Phase 2b). Hardwick Hall Hardstoft Teversal Skegby Tibshelf Stanton Hill N to Birmingham Introduction This information has been produced by HS2 Ltd to update you about the route from Tibshelf to Shuttlewood. It includes: • a summary of the proposed route in your area and how the design has developed since July 2017; • what we are currently working on and what we will be consulting on later in the year; • the benefi ts that HS2 will bring to your area; • how to fi nd out more about the project; and • how to get in touch with us. Page 1 of 8 The route of the proposed scheme from Tibshelf to Shuttlewood The route follows the M1 corridor from Tibshelf Services to Woodthorpe Road at Shuttlewood. The Tibshelf to Shuttlewood community area covers approximately 14km of the route beginning at the parish boundary between Blackwell and Tibshelf to the east of the M1, passing northwards beneath the B6014 Mansfield Road before crossing beneath the M1 to the west side of the motorway.
    [Show full text]
  • Lecture Venue
    Circular 436 March 2019 Registered Charity No: 503617 President: Mike Allen www.emgs.org.uk SPRING 2019 LECTURE PROGRAMME Saturday, 13th April 2019 – 6,00 pm Dr Tony Waltham and Dr Noel Worley – Derbyshire Blue John Revisited LECTURE VENUE Indoor meetings are now held in the School of Geography on the Nottingham University campus which is in the Sir Clive Granger Building. Enter the University by the North Entrance, off the A52, and follow signs to the main Visitor Car Park. As you enter the car park, the Sir Clive Granger building is on your left. The Society is indebted to the School of Geography at the University, who are sponsoring our lectures, for the use of these facilities. Saturday, 13th April 2019 – 6,00 pm Speakers: Dr Tony Waltham and Dr Noel Worley Derbyshire Blue John Revisited Blue John fluorite is one of the few minerals that can be claimed as unique to Britain. The banded purple and yellow colouring of the material extracted from Treak Cliff at Castleton cannot be matched by fluorite that is known from anywhere else in the world. The reason for its rarity lies in the unusual geology of the reef limestone of Treak Cliff. When cut and worked into ornaments or jewellery, Blue John is beautiful. The definitive book on Derbyshire Blue John was written 20 years ago by Trevor Ford, but has long been out of print. A new, up-dated and improved edition has been prepared for publication by the Society. In the two-part lecture, Tony Waltham presents an overview of Blue John, its mining and its uses as a decorative stone.
    [Show full text]
  • GEOSCIENTIST the Fellowship Magazine of the Geological Society of London UK / Overseas Where Sold to Individuals: £3.95
    SCIENTIST GEO VOLUME 26 NO 2 u MARCH 2016 u WWW.GEOLSOC.ORG.UK/GEOSCIENTIST The Fellowship Magazine of the Geological Society of London UK / Overseas where sold to individuals: £3.95 [ READER O SEE BOOKS AND ARTS, P23 FF ER ]! Hardstoft Britain’s first oilfield PARIS ACCORD HOLMES’S GONGS VOTE! VOTE! VOTE! Mike Daly on the implications Cherry Lewis on Arthur A record 17 people for oil – Online Holmes’s eleven medals standing in Council election 15-17 November 2016 Petroleum Geoscience ExCeL, London Collaboration Showcase Call for Papers The PESGB, Petroleum Group and AAPG SUGGESTED THEMES CONVENORS: (European Region) are co-organising the INCLUDE: Petroleum Geoscience Collaboration 1LFN6FKRÚHOG Showcase (PGCS) as part of PETEX Petroleum systems University of Aberdeen 2016. The PGCS showcases the business 6 challenges addressed by collaborative Stratigraphy and James Churchill 6 research projects, enables researchers sedimentology BG Group to demonstrate societal and economic EHQHÚWVIURPWKHLUUHVHDUFKDQGSURYLGHV 6 Reservoir geology and Jonathan Craig a forum for post-doctoral, PhD and MSc ENI engineering presentations. 6 Structural geology and Neil Grant ConocoPhilips The showcase provides an excellent basin evolution opportunity for industry and academia to 6 Geophysical imaging .DWLH,UHODQG meet, get inspired and demonstrate the BG Group value of collaborative applied research. and interpretation There will be ample opportunity for 6 Unconventional Jenny Omma graduates and potential future employers energy and carbon Rocktype to connect. This year the PGCS will also include extended poster sessions at which sequestration Douglas Paton applicant’s research will be displayed within University of Leeds 6 Analogue and the main events hall for all attendees to view.
    [Show full text]
  • Conventional Oil and Gas Background Paper
    DERBYSHIRE AND DERBY MINERALS LOCAL PLAN Towards a Minerals Local Plan: Spring 2018 Consultation Background Paper Conventional Oil and Gas December 2017 Contents Page 1 Introduction and Background 1 2 National and Local Policy and Guidance 1 3 Geology 7 4 Regulatory System 9 5 Licensing of Oil and Gas Exploration and development 15 6 Exploration, Assessment, Working and Reclamation 17 7 Economic, Social and Environmental Issues 20 8 Production, Consumption and Reserves 24 9 Other Issues 26 Glossary of Hydrocarbon Related Terms 30 References 33 1 Introduction and Background 1.1 This is one of a series of papers providing background, supporting information to accompany the preparation of the new Minerals Local Plan. The new Plan will include strategies and policies concerning the winning and working of hydrocarbon based energy minerals. This paper provides information about oil and gas obtained from conventional sources whilst corresponding papers focus on unconventional sources such as gas from coal and shale gas. The production of separate papers reflects the issues that have been raised in previous consultation exercises and the views expressed to the County and City Councils in response to publicity for individual planning applications. Some of the issues and legislative provisions are common to all three forms of hydrocarbon developments and therefore there is some level of duplication in the papers but this is necessary to ensure that each one provides a comprehensive review of the issues for those who read them individually. 1.2 Oil and gas (forms of hydrocarbons) are important sources of energy in the UK where they are primarily used as fuel, although some components are also used as a raw material for the petro-chemical industry and in the manufacturing of drugs and plastics.
    [Show full text]
  • Derbyslure. [ KELLY's
    36 ATLOW. DERBYSlURE. [ KELLY'S . Wall Letter Box in Rectory wall cleared at 3.30 p.m. dren; average attendance, 18; mpported by 8ubscripo- week days only. Letters through A~hborne arri....e tion; William Dunnett, master; a Sunday school is about 9.30 a.m. Hognaston is the nearest money .:Jrder aho held here office & Ashborne the nearest telegraph office Carriers.-Bnrdis, to Del'by, every fri.; Walker, ttt National School (mixed), erected in 1863, for 60 cllil- A,hborne, ~ut Sheldon Rev. James, Rectory Edwards John, farmer Riley Thomas, farmer Booth John, farmer Fearn J osiah, farmer Tomlinsol1 Thos. farmer, Hall fields Burdis Thomas, farmer Heaton Edward, farmer Twigge Geo. "'illiam, farmer, Shayl' COX on George, farmer Hill Robert, farmer Twigge J n. Geo. farmer, Atlow Ir.oat Coxon Mary (Mrs.), farmer & miller Lamb William, wheelwright Walker ~Iary Ann (Mrs.), farmer (water), Atlow mill Melland John, farmer, Atlow Wen \Ynolley Joseph, farmer AULT HUCKNALL (or Hault Haucknall) is a ment, hung as to its upper walls with fine Gobelins widely scattered village and parish with a station at tapestry; it contains a statue of Mary Queen of Scots, by Rowthorne, on the Doe Lea branch of the 1.fidland rail- Westmacott, a full length figure of Henry VIII. and way, 3~ miles from Clay Cross station on main line of oYer the fire-place the arms of the countess: on the .Midland railway, 7 miles south-east from Chesterfield first floor is the chapel, partly hung with tapestry, fur­ Ilnd 5!. north-~est from ManSlfield. The parish inclu.des rushing examples of very early embroidery: the pre­ Hardwlck, Stamsby, Hardstoft, Rowthorne and Astwlth.
    [Show full text]
  • NSGGA Bulletin
    Bulletin of the North Staffordshire Group of the Geologists’ Association Number 126 : April 2019 NSGGA Dates for Your Diary Sunday May 5 GeoMaps Rock! at Biddulph Grange Sunday May 26 Field Trip: Hardstoft/Eakring Oil Wells Wednesday June 12 (Evening) Field Trip: Duckmanton Geology Trails Joint with EMGS – contact EMGS to attend Sunday 14 July Field Trip: Titterstone Clee, Shropshire Weekend 20-22 September Field Weekend: Mid-Wales Additionally, Ian Stimpson is leading field trips that you might be interested in with other organisations. Please apply to attend through the relevant organisation Saturday May 11 Field Trip: Cannock Chase with OUGS Saturday May 18 Field Trip: Froghall Wharf with NW Group GSL Weekend July 27-28 Field Trip: Anglesey with EMGS Sunday 20 October Field Trip: Apedale as part of GA Conference Summer Field Programme 2019 Each person attending field meetings does so at their own risk. The NSGGA has public liability insurance through a GA insurance policy that also carries limited personal accident cover for members attending meetings or field trips. Non-members pay £2 to cover temporary membership giving them insurance cover. A field fee of £2 per head is normally charged for members and non- members to cover the leader’s expenses. Hard hats & hi-vis jackets should be taken on all fieldtrips. Friday 20th to Sunday 22nd September 2019 NSGGA Field Weekend to Mid-Wales Dr Lucy Muir & Dr Joe Botting This weekend field excursion will explore the interesting geology of Mid-Wales, especially the Builth Inlier. The itinerary is provisional but should include an evening introduction on Friday, Radnorshire Museum (£1 charge), Llanfair Quarries with dolerite and mudstones with exceptionally well preserved fossils (graptolites, trilobites & sponges) and the volcanic sequence at Shaky Bridge.
    [Show full text]
  • Chapter 2 Spatial Context Chapter
    DERBYSHIRE AND DERBY MINERALS LOCAL PLAN Towards a Minerals Local Plan: Spring 2018 Consultation CHAPTER 2 SPATIAL CONTEXT December 2017 Introduction 2.1 Derbyshire is renowned for its stunning and diverse landscapes, which underpin a valuable leisure and tourism industry. The underlying mineral resources have, to a large degree, helped shape these landscapes. The county is a national leader in minerals production, exhibiting a wealth and diversity of important mineral resources, which bring significant benefits to the area and the UK as a whole, in terms of jobs and economic prosperity and the many products derived from minerals which underpin our modern way of life. Appropriately restored mineral sites have also been of benefit to the environment and biodiversity interests and from the new uses which have been made of restored sites. Mineral development can also bring negative impacts, particularly in terms of the social and environmental impact of extracting the minerals. 2.2 Derbyshire and Derby cover a total area of 983 square miles (including the area of the Peak District National Park (PDNP) which lies within Derbyshire). The Plan area (as shown on Map 1) does not include the PDNP, which covers much of the north-west of the county. Within the county of Derbyshire, there are eight district and borough councils; Amber Valley Borough, Bolsover District, Chesterfield Borough, Derbyshire Dales District, Erewash Borough, High Peak District, North East Derbyshire District and South Derbyshire District. Derby City is a unitary authority, situated in the southern part of the Plan area. 2.3 Map 1 gives a broad picture of the geography of Derbyshire and Derby.
    [Show full text]
  • North Derbyshire Collieries
    28/01/2009 [email protected] NORTH DERBYSHIRE COLLIERIES http://Myweb.tiscali.co.uk/colliery | by A N Bridgewater North Derbyshire Collieries North Derbyshire Collieries. When I started preserving the history of a few of the collieries and Ironworks that I came across, namely Barlow Monkwood and The Arkwright Adelphi, little did I know how many others I would come across in the fullness of time. As I worked with the „Back to the Future Group‟ at Arkwright to preserve the history of the village and in my case the Adelphi Ironworks before the bulldozers moved on the opencast site, the list of collieries I wanted to know about grew. I thought that I would be able pluck a book off the shelves at the library and find out who owned and worked the old collieries shown on the local Ordnance Survey maps and mentioned in the Derbyshire Times and Derbyshire Courier. Unfortunately the book does not exist. There is a little information available on older Derbyshire collieries so I have set out to catalogue and document this information and expand on it to the neglect of the larger collieries which have had many books written about them. I make no apologies for my neglect of the newer, larger collieries. I have tried to outline areas of mining along with individual mines; I have also tried to find where they were by extracting a grid reference for as many of the individual mines as was possible. The Coal Authority at Mansfield has the Abandonment plans for most, but not all collieries since 1850 but these do not give one the full picture.
    [Show full text]
  • Minerals Resource Information for Development Plans Derbyshire
    BRITISH GEOLOGICAL SURVEY TECHNICAL REPORT WF/95/3 Mineral Resources Series Mineral Resource Information for Development Plans Derbyshire: Resources and Constraints D E Highley, and D G Cameron Contributors: D J Harrison, D P Piper and S Holloway Planning Consultant: J F Cowley, Mineral & Resource Planning Associates This report accompanies the 1:100 000 scale map: Derbyshire Mineral Resources Cover photograph Godkin opencast coal site, near Heanor, Derbyshire. 1984. British Geological Survey photographs No GS110. This report is prepared for the Department of the Environment. (Contract PECD7/1/443) Bibliographic Reference Highley, D E, and Cameron, D G. 1995. Mineral Resource Information for Development Plans Derbyshire : Resources and Constraints. British Geological Survey Technical Report WF/95/3 © Crown copyright Keyworth, Nottingham British Geological Survey 1995 BRITISH GEOLOGICAL SURVEY The full range of Survey publications is available from the BGS British Geological Survey Offices Sales Desk at the Survey headquarters, Keyworth, Nottingham. Keyworth, Nottingham NG12 5GG The more popular maps and books may be purchased from BGS- 0115–936 3100 Fax 0115–936 3200 approved stockists and agents and over the counter at the e-mail: sales @bgs.ac.uk www.bgs.ac.uk Bookshop, Gallery 37, Natural History Museum (Earth Galleries), BGS Internet Shop: Cromwell Road, London. Sales desks are also located at the BGS www.british-geological-survey.co.uk London Information Office, and at Murchison House, Edinburgh. The London Information Office maintains a reference collection Murchison House, West Mains Road, of BGS publications including maps for consultation. Some BGS Edinburgh EH9 3LA books and reports may also be obtained from the Stationery Office 0131–667 1000 Fax 0131–668 2683 Publications Centre or from the Stationery Office bookshops and agents.
    [Show full text]
  • Ash Lea Farm Hardstoft | Chesterfield | Derbyshire | S45 8AE
    Ash Lea Farm Hardstoft | Chesterfield | Derbyshire | S45 8AE Ash Lea Farm Cover.indd 3 12/03/2019 14:32 ASH LEA FARM Ash Lea Farm Cover.indd 4 12/03/2019 14:32 Set within approaching 10 acre grounds, commanding stunning far reaching views; a detached farmhouse with adjoining annex, boasting an idyllic rural location yet positioned within a short drive of the M1 motorway and surrounding commercial centres. A delightful property ideal for those with an equestrian interest; offering spacious versatile accommodation with retained period features, tucked away in a little known private hamlet, enjoying a position directly overlooking the grounds and adjoining countryside beyond. The grounds include fenced off paddocks, an outdoor arena and gardens whilst boasting stables, two barns, a courtyard and an oversized double garage. Ash Lea Farm Pages.indd 1 12/03/2019 14:30 Ash Lea Farm Pages.indd 2 12/03/2019 14:30 We’ve been so happy here for the past thirty-two years, but we don’t want to get to the stage that we can’t look after it properly anymore, so we’ve decided that the time is right to downsize,” says John. “It’s a wonderful place to live whether you like horses or not.” Ash Lea Farm Pages.indd 3 12/03/2019 14:30 Ground Floor An entrance porch to the front aspect of the property opens to the living room which offers generous proportions and immediately displays original retained period features including exposed timbers and an impressive recessed inglenook fireplace with feature stone surround which is home to a wood burning stove that sits on a flagged hearth.
    [Show full text]