2019 Provincial Construction Program Highway & Water Management Projects
Total Page:16
File Type:pdf, Size:1020Kb
2019 Provincial Construction Program Highway & Water Management Projects The Government of Alberta is investing in highway and water management infrastructure to improve safe travel on Alberta’s highways, connect communities, and help keep Albertans working. The projects will enhance transportation safety, support major trade corridors to improve travel for commercial carriers, and provide irrigation for the agriculture sector and flood mitigation protection for Alberta communities. The 2019 Construction Program includes: • Major capital projects scheduled for the next four years (2019-20 to 2022-23) • Capital maintenance and renewal (bridge construction and highway rehabilitation) projects scheduled for the next three years (2019-20 to 2021-22) • Water management infrastructure projects scheduled for the next three years (2019-20 to 2021-22) • Slide repair projects scheduled for the next year (2019-20) This program includes planning, design and construction work to reflect the life cycle of projects. The 2019 Provincial Construction Program is subject to change. Projects may move on or off the construction program based on emerging needs, changing construction schedules, or available funding. Minor safety-related improvements may be added as identified, generally in conjunction with larger projects. The work is defined as: • Planning – planning studies and the preliminary analyses completed for major capital projects • Design – project management and hiring engineering consultant(s) to design the project (may include work to complete tender preparation) • Construction – occurs when the project design has been completed, a tender awarded and a contractor hired to build the project October 2019 | Page 1 Glossary @ ................................................................... At Ave. ............................................................... Avenue Bdry. .............................................................. Boundary BF 74817 or (74817-02) .............................. Bridge File Number CNR .............................................................. Canadian National Railway CP…………………………………………... Capital Project for water management projects CPR ............................................................... Canadian Pacific Railway Cr. .................................................................. Creek Cty ................................................................. County E .................................................................... East EB or EBL ..................................................... Eastbound or Eastbound Lane ECL ............................................................... East Corporate (or City) Limit EID ................................................................ Eastern Irrigation District FN .................................................................. First Nation G/S ................................................................ Grade Separation Structure Hwy. .............................................................. Highway Incl. ................................................................ Includes Imp. ............................................................... Improvement Int. .................................................................. Intersection Intersection Improvements .......................... Adding/extending acceleration/deceleration tapers or lanes. May involve lighting. Jct. ................................................................. Junction LNID .............................................................. Lethbridge Northern Irrigation District LR .................................................................. Local Road N .................................................................... North NB or NBL ..................................................... Northbound or Northbound Lane NCL ............................................................... North Corporate (or City) Limit PAR ............................................................... Park Access Road Riv. ................................................................ River Rd. or Rds. .................................................... Road or Roads Repaving ....................................................... Resurfacing an existing paved road Rge. ............................................................... Range S .................................................................... South SB or SBL ..................................................... Southbound or Southbound Lane SCL ............................................................... South Corporate (or City) Limit sel. ................................................................. Selective Six-laning ...................................................... Adding two lanes to a four-lane twinned highway SMRID .......................................................... St. Mary's River Irrigation District SRA ............................................................... Safety Rest Area St. .................................................................. Street SV .................................................................. Summer Village Tr. .................................................................. Trail Twp................................................................ Township UAR ............................................................... Urban Approach Road VIS ................................................................. Vehicle Inspection Station W ................................................................... West WB or WBL ................................................... Westbound or Westbound Lane WCL .............................................................. West Corporate (or City) Limit WID ............................................................... Western Irrigation District October 2019 | Page 2 Highway Project / Location Description Status Primary Purpose Tributary to Bow River Replace culvert Design Major trade corridor culvert on Hwy. 1, 2 km south of Exshaw (74661-1) Jumpingpound Creek Bridge Bridge deck rehabilitation Design Major trade corridor on Hwy. 1, 16 km southwest of Cochrane (74355-2) Hwy. 40 over Hwy. 1 Bridge deck rehabilitation Design Major trade corridor Interchange, at Seebe (76660-1) WID Irrigation Canal Bridge Replace bridge Design Major trade corridor, on Hwy. 1 near Strathmore Enhance public safety (79535-1) South Saskatchewan River Bridge deck rehabilitation Design Major trade corridor Bridge on Hwy. 1, at Medicine Hat (78572-1) Between Hwy. 36 to 2 km 19 km of repaving Design Major trade corridor west of Hwy. 875 Between 1 km east of Hwy. 22 km of repaving Design Major trade corridor 561 and Hwy. 901 Wildlife overpass and fencing Wildlife mitigation Design Enhance public safety on Hwy. 1 west of Hwy. 1X Hwy. 1 and 22 interim Intersection improvement Design Major trade corridor, configuration on interchange Enhance public safety Intersection improvement at Signalization Design Major trade corridor, Eagle Butte Road in Dunmore Enhance public safety Hwy. 563 over Hwy. 1 Bridge deck rehabilitation Construction Major trade corridor interchange, 2 km west of Calgary (75933-1) WID irrigation canal bridge Replace bridge Construction Major trade corridor, on Hwy.1 near Strathmore Enhance public safety (73052-1) Interchange upgrade on Interchange upgrade Design Enhance public safety Hwy. 1A at northwest boundary of Cochrane (84151-1) and bridge replacement at Bighill Creek on Hwy. 1A at north boundary of Cochrane (521- 1) Between Hwy. 1X to east of 30 km of widening and Design Enhance public safety Old Fort Creek and east of repaving Old Fort Creek to 7 km west of Hwy. 40 Various improvements on Various improvements Planning Major trade corridor, Deerfoot Trail Enhance public safety Remove and replace rocker Miscellaneous bridge work Design Major trade corridor bearing and legs (73949-1) Watercourse culvert on Hwy. Replace culvert Design Major trade corridor 2 near Leduc (75617-1) October 2019 | Page 3 Highway Project / Location Description Status Primary Purpose Hwy. 53 interchange, 5 km Bridge deck rehabilitation Design Major trade corridor west of Ponoka (75651-2) (75651-1) Little Bow River Bridge on Bridge deck rehabilitation Design Major trade corridor Hwy. 2, 5 km southeast of High River (northbound lane) (9469-1) (9469-2) Hwy. 2 Over CNR, at Replace bridge Design Major trade corridor, Morrinville (76054-1) Enhance public safety West Prairie River Bridge on Bridge deck rehabilitation Design Major trade corridor Hwy. 2, at High Prairie (13821-1) North Innisfail interchange 1 km of repaving Design Major trade corridor upgrade: interchange ramps, and Bluebird/Range Road 283 service roads Install traffic signals at 88 Signalization Design Major trade corridor, Street in the Town of Slave Enhance public safety Lake Between west of Hwy. 688 to Repaving Design Major trade corridor east of Peace River (East Hill) Between Hwy. 566 to the 10 km of repaving Design Major trade corridor City of Airdrie Between 14 km north of 14 km of repaving Design Major trade corridor Hwy. 49 to Hwy. 49 Between the US Border to 23 km of repaving Design Major trade corridor 2.5 km north of Hwy. 501 Between 1 km north of Hwy. 17 km of repaving Design Major trade corridor 509 and 2 km south of Hwy. 511 Between Hwy. 2 to Saddle Wildlife mitigation Design Major trade corridor, River and Hwy. 43 at Hwy. 59 Enhance public safety west of Spirit River - animal detection system High tension cable barrier