Bicycle Strategy
Total Page:16
File Type:pdf, Size:1020Kb
City of Greater Shepparton Bicycle Strategy Prepared by PTY LTD ACN 006 881 867 November 2000 Shepparton Bicycle Strategy 26-07-11 1 FOREWORD Parklinks Pty Ltd. 2 Shepparton Bicycle Strategy 26-07-11 them into newly developing areas. The 2 EXECUTIVE network includes: SUMMARY Shepparton Priority routes for 35 Km The City of Greater Shepparton is a Shepparton other routes for 18 Km major provincial City with a Mooroopna Priority routes of 7.7 population of 56,000 people of which Km and 2.8 Km other routes. 26,000 live in Shepparton, 7,700 in Tatura Priority Routes for 4 Km Mooroopna and 4000 in Tatura. and other routes of 4 Km Actions in Murchison The area is growing through the Other actions include Bike and Bus success of the food industry in the network, Bicycle safe suburbs, review region. The terrain is flat and the road of Footpath cycling network, End of system is set out in blocks around the Journey facilities and Mountains bike extensive farmland. or BMX investigations. Shepparton has a proud history of An off road shared path network is also providing cycling facilities and has recommended with the focus on co excellent marked bicycle lanes. ordinated planning along the Goulburn Shepparton was at the forefront on and Broken Rivers and Murchison to trialling footpath cycling. Rushworth rail trail. Most shared path development including the Victoria This strategy was developed through a Lake paths would stem from this process of consultation with the review. Council and agencies. An open public consultation process was also used Touring and Training Circuits have with a number of community forums, been identified to provide a facility for meetings and access to the consultants. racing cyclists and to start to build a touring cycle focus in the area. The Public consultation indicated a very strong interest in development of Other actions recommended include a Shared Path along Verney Road with maps, signs, activities and events, nearly 30 direct contacts from enforcement support and support for residents. There was also interest in the successful cycling clubs in the bicycle facilities in Tatura, Dobson City. Estate and Kialla. A work Program identifying the cost The strategy recommends development and timing for the works is shown. of Planning, design, maintenance and co ordination actions to provide a The strategy recommends works: focus on cycling. Recommendations on road for $1M over ten years, are made on treatment of Shared Path materials, linemarking and shared path development of $1.9M roundabouts. not including the Goulburn River other actions costing$78,500. An on road network has been identified which uses the existing A monitoring and review process is bicycle lanes and joins and extends recommended. Parklinks Pty Ltd. 3 Shepparton Bicycle Strategy 26-07-11 3 TABLE OF CONTENTS 1 FOREWORD ......................................................................................... 2 2 EXECUTIVE SUMMARY ...................................................................... 3 3 TABLE OF CONTENTS ........................................................................ 4 4 TABLE OF FIGURES ........................................................................... 6 5 INTRODUCTION ................................................................................... 7 City of Greater Shepparton .................................................................................................................. 7 VicRoads ............................................................................................................................................. 7 6 CITY OF GREATER SHEPPARTON .................................................... 8 6.1 Population ................................................................................................................................. 8 6.2 Council ...................................................................................................................................... 8 6.2.1 Infrastructure. ................................................................................................................... 8 6.2.2 Design Services ................................................................................................................ 9 6.2.3 Environmental Services .................................................................................................... 9 6.2.4 Tourism ............................................................................................................................. 9 6.2.5 Leisure Services ................................................................................................................ 9 6.2.6 Planning Department ...................................................................................................... 10 7 RESEARCH AND CONSULTATION .................................................. 11 7.1 Cycle Safety............................................................................................................................. 11 7.2 Community Consultation ...................................................................................................... 13 7.3 Review of Previous Bicycle Strategies .................................................................................. 13 7.4 Saddle Survey of existing facilities ........................................................................................ 13 8 CYCLING GROUPS............................................................................ 14 8.1 Bicycle Victoria ....................................................................................................................... 14 8.2 North-East Cycling Group .................................................................................................... 14 8.3 Shepparton Cycling Club ...................................................................................................... 14 8.4 Trans-Shepparton Cycling Group, ....................................................................................... 15 8.5 Greater Shepparton Cycling Club Inc. ................................................................................ 15 9 OTHER AGENCIES ............................................................................ 16 9.1 VicRoads ................................................................................................................................. 16 Parklinks Pty Ltd. 4 Shepparton Bicycle Strategy 26-07-11 9.2 Community Road Safety Council ......................................................................................... 16 9.3 Goulburn Broken Catchment Management Authority....................................................... 16 9.4 Parks Victoria ......................................................................................................................... 17 9.5 Goulburn Murray Water ....................................................................................................... 17 9.6 Victoria Police ......................................................................................................................... 17 10 DEVELOPMENT ACTIONS ................................................................ 18 10.1 Planning, Design and Co ordination ..................................................................................... 18 10.1.1 Planning requirements .................................................................................................... 18 10.1.2 Council Bicycle Liaison ................................................................................................. 19 10.1.3 Maintenance Standards ................................................................................................... 19 10.1.4 Design Standards ............................................................................................................ 19 10.2 On Road Network .................................................................................................................. 26 10.2.2 Shepparton Priority Routes ............................................................................................. 26 10.2.3 Shepparton Other Routes ................................................................................................ 30 10.2.4 Mooroopna Priority Routes ............................................................................................ 30 10.2.5 Tatura Priority Routes ..................................................................................................... 30 10.2.6 Murchison Actions.......................................................................................................... 31 10.2.7 Bike and Bus Network .................................................................................................... 32 10.2.8 Bicycle Safe Suburbs ...................................................................................................... 32 10.2.9 Footpath Cycling Network ............................................................................................. 32 10.2.10 End of Journey Bicycle facilities .................................................................................... 33 10.2.11 Mountain Bike and BMX Circuits .................................................................................. 33 10.3 Off Road Shared Paths .......................................................................................................... 34 10.4 Touring and Training Routes ...............................................................................................