Sri Lanka 2017 Dec  Area = 65,610 sq. km.  Population = 21.2 million  Per Capita GDP US$ 3,835  GDP US$ 81.3 Billion  GDP Growth 4.4% Silk Route Sri Lanka AH 43, AH 44 AH in Sri Lanka

 AH 43  Agra,…..Thalaimannar, Mannar, Medawachchi, Galkulama , , , Ambepussa , , , Matara   AH 44  Dambulla – Habarana – (A6) AH 43

Mathara Bridge ( AH 43) Kelaniya Flyover ( AH 43) Road and Road Transport Road Network 116,000 km

 National Highways 12,320 km  Provincial Roads 15,975 km  Rural Roads 83,765 km  Other roads 4,000 km  Road density 1.76 km/sq. km Expressway network

170 Km Overview of Transportation

 Total vehicle population is 7.1 million (as at September 2017)  Annual growth of all vehicle population is 8-12%  Transport sector contribution to GDP is 11%  Average speed of road network is 40 km/hr Urban Transportation

 Colombo Metropolitan Region (CMR) is the main urban center  There are six main corridors towards Colombo City  Population in Colombo is about 900,000  Daily traffic entering into CMR is over 350,000  Active vehicle fleet is 784,836 in CMR Public Transport in CMR

 Mainly Buses and rail  School vans, Office vans, taxies and three- wheelers also provide passenger transport  Modal share of bus, rail & three-wheelers accounts 75% of total passenger km  Buses - 90.5%  Rail - 7.2%  Three-wheelers - 2.3% Port Access Elevated Highway

 Four lane elevated highway from Colombo Port to Expressway Network  Length 5.8 km  Funded by ADB( SASEC) Outer Circular Highway (JICA Project)

 Connects three Expressways  Air port Exp.  Southern Exp.  Northern Exp. Outer Circular Expressway Southern Expressway New Kelani Bridge (Air Port) Expressway Rail and Rail Transport

 Network : 1,450 km  Total passenger –km : 7.5 million (annual)  Passenger usage : 136 million passengers /anum

Colombo Suburban Railway Project

 Feasibility study under ADB financing  Implementation will star in 2019  Design speed is 100 km/hr.  Stage I – 105 km will be electrified Section Length – 160 km Section Length – 120 km Trains operate at 100 Existing Speed – 50 km/h km/h Will be Rehabilitated for 100 km/h Reconstruction Project operation In the procurement stage Competed in 2015

Section Length – 110 km Section Length – 40 km Trains Operate at 100 Existing Speed – 60 km/h km/h Will be Rehabilitated for 100 km/h Reconstruction Project operation got completed in 2014 In the procurement stage

72 New The Area under ADB Funded Track km Con. “Colombo Suburban Railway ” The Area under ADB Project Funded “Colombo EoI Called for – (1) Pre Feasibility Suburban Railway ” from Rambukkana to Kadugannawa, Project (2) Feasibility and Detailed Design Existing Speed – 80 from Kadugannawa to ( with km/h Double Track from Kadugannawa to Will be rehabilitated for Katugastota) New 100 km/h Electrification EoI Called Track – 105 km Con. Project commenced in New Track 2016 Constructi on Section Length – 105 km Trains operate at 90 km/h Rehabilitation Project Competed in 2012 Ports in Sri Lanka

 Port of Colombo  Port of Galle  Port of Magam Ruhunupura (Hambanthota)  Port of Trincomalee  Port of Kankasanthurai  Port of Oluvil International Shipping Routes Ports Expansion Program

 The Colombo port is currently being expanded to the international standard to be one of the best serviceable ports in the South Asia Region Port of Colombo

 Ship Arrivals – 4,405 ships in 2016  Container throughput (TEU’s) – 4.5 million (from Jan. to Sep. 2017)  Total cargo handled – 65.7 million Tonnes TOTAL SHIP ARRIVALS

2016 2017 2012 2013 2014 2015 2016 Jan-Sept Jan-Sept % Colombo 3,870 3,667 3,742 4,197 4,405 3,320 3,221 -3 34 139 335 295 281 217 183 -15.7 Trincomalee 161 134 127 164 216 158 176 11.4 Galle 161 134 127 164 216 74 67 -9.5 KKS-Point Pedrou 44 48 34 32 25 17 55 223.5

TOTAL CARGO HANDLED (TONNES)

2016 2017 2012 2013 2014 2015 2016 Jan-Sept Jan-Sept %

Colombo 61,669,554 63,481,952 70,794,189 73,717,623 81,878,899 61,103,356 65,705,165 7.5 Hambantota 19,716 118,579 474,012 292,581 354,646 268,710 173,349 -35.5 Trinco 421,673 206,540 393,977 541,777 771,457 2,552,456 2,918,560 14.3 Galle 421,673 206,540 393,977 541,777 771,457 577,466 540,315 -6.4 KKS-Point Pedrou 59,814 49,347 21,204 31,685 26,544 20,442 20,347 -0.5 Colombo Port Hambanthota Port Aviation and Airport Development

 Bandaranaike International Airport Development Project ( JICA funded)  Package A : New Terminal Building  Procurement stage  Package B : Remote Apron and Taxiways  Construction works are ongoing  Investment – Rs. 6 Billion (400 Million US$) Proposed Bandaranaike Airport Lay out Plan-Proposed Apron E

32 Mattala Rajapaksa International Airport Trade facilitation Thank You