Water Resources on Environment: Rajya Sabha (Till Monsoon Session) 2013-14 – Part-I
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Projects of Andhra Pradesh and Telangana in Krishna Basin
PROJECTS OF ANDHRA PRADESH AND TELANGANA IN KRISHNA BASIN Ujjaini FRL: +1630'/ 117.24 TMC Rajiv Bhima LIS Kalwakurthy LIS 20 TMC Priyadarshini Jurala Project 40 TMC Nagarjunasagar Reservoir (Common) FRL : + 1045' / 9.66 TMC AMRP LIS FRL + 590'/ 312.05 TMC MDDL: +510' Palamuru Ranga Reddy LIS - 90 TMC Parallel Canal MDDL: + 1033' 30 TMC Live Storage : 181 TMC Live storage: 6.798 TMC Presently from NSP foreshore River Dindi LIS - 30 TMC Koilsagar Bhakta Ramadasu LIS Munneru LIS SLBC Tunnel/AMRP Scheme Bhima LMC 40 TMC Musi Paleru Munneru 0.00 Km 0.00 Srisailam Reservoir (Common) River FRL: + 885'/ 215.81 TMC 518 Km 518 MDDL (Irr) : +854'/ Live storage : 89.29 TMC 590 Km 590 1295 Km 1295 1212 Km 1212 MDDL (Power):+ 834'/ Live storage: 53.851 TMC Km 1401 1253 Km 1253 1216 Km 1216 1152 Km 710 Km 710 BENGAL RIVER KRISHNA 790 Km BAY OF BAY Mahabaleswar Vaikuntapuram 775Km KC Canal 985 Km 985 Barrage 31.90 TMC RMC 1107 Km Veligonda Project Thumilla LIS Sunkesula Barrage At an altitude Muchumarri HNSS LIS FRL: + 800.52'/ 53.85 TMC TMC 3.07 of : 4,385 ft Naguladinne LIS Gundrevula Reservoir LIS MDDL: +703.08'/ Live Storage: 43.50 TMC Project Rajolibanda Diversion 40 TMC above the sea Almatti Dam Almatti level Scheme RDS Canal Guru-Raghavendhra LIS Pothireddipadu Regulator 57.05'/ + 1615'/ 37.64 TMC 37.64 + 1615'/ 15.90 TMC At an elevation of : 0 ft Hagari River SRMC + 1705'/ 129.72 TMC 129.72 + 1705'/ FRL: FRL: Prakasam Barrage Prakasam Banacacherla Complex Regulator FRL: Narayanapur Dam Narayanapur New LIS in FRL: + 175' /45.5 TMC /45.5 + 175' -
258 MAN ASSEMBLY COSTITUENCY Assembly Polling Centre Polling Centre Appointment of B.L.O
258 MAN ASSEMBLY COSTITUENCY Assembly Polling Centre Polling centre Appointment of B.L.O. constituency No. Building Tahsil Designati No Name No Name Village Name Name Office Name Address Telephone Particular Name on 123 4 5 6 7 8 9 10 11 12 13 Man 1 Sripalavan Sripalavan Talathi Tahsil Office 1 258 Assembly 2 Khandyachiwadi Khandyachiwadi Man L.R.SHINDE Talathi Varugad 9921066798 Office Man constituency 3 Ghodyachiwadi Ghodyachiwadi 2 MograleTalathi Mograle Tahsil Office 2 Man P B Nale Talathi Tondale 9423322117 8 TondaleOffice Tondale Man Shinganapur/ Grampanch Shinganapur/ Gramseva B DO office P S Shingnapu 3 3 To 5 Man V N Pawar 9422690925 Thombarewadi ayat office Thombarewadi k Man r 6 HastanpurTalathi Hastanpur Gramseva B DO office P S anbhulewa 4 Man R M Toraskar 9890774215 7 PachawadOffice Pachawad k Man sdi 11 Kalaskarwadi Kalaskarwadi Grampanch Tahsil Office 5 12 Khokade Khokade Man D N Katkar Talathi Kulakjai 02165/248369 ayat office Man 15 Gadewadi Gadewadi 13 to 14 KulakjaiTalathi Kulakjai Gramseva B DO office P S 6 Man S S Bhosale Kulakjai 9423020327 40 BiteOffice Bite k Man 16 JadhavwadiTalathi Jadhavwadi Tahsil Office 7 Man N N Ghadage Talathi Bijawadi 9226641380 17 YelewadiOffice Yelewadi Man Grampanch Gramseva B DO office P S 8 18 to 19 Bijawadi Bijawadi Man B B Bosale Bijawadi 9421119631 ayat office k Man 20 RajwadiTalathi Rajwadi Tahsil Office 9 Man M S Karve Talathi Rajwadi 9975378981 21 AnbhulewadiOffice Anbhulewadi Man 22 ThadaleTalathi Thadale Tahsil Office Shingnapu 10 Man H P Kole Talathi 9421910622 27 DangirewadiOffice Dangirewadi Man r 23 to 24 Mohi Mohi Talathi Tahsil Office 11 Dangirewadi Dangirewadi Man N S Shine Talathi Mohi 9423803146 26 Office Man (Mohi) (Mohi) 25 KhutbavTalathi Khutbav Tahsil Office 12 Man S J Mule Talathi Bhalwadi 9423863937 59 to 60 BhalwadiOffice Bhalwadi Man Assembly Polling Centre Polling centre Appointment of B.L.O. -
The Report Has Been Laid on the Table of the State Legislature Assembly
Report of the Comptroller and Auditor General of India on Management of Irrigation Projects Government of Maharashtra Report No.3 of 2014 TABLE OF CONTENTS Reference Paragraph Page No. Preface vii Executive Summary ix Chapter 1 Introduction State Profile 1.1 1 Functions and organisational structure 1.2 3 Acts, policies, directives and recommendations 1.3 4 governing the functioning of the Department Audit scope and methodology 1.4 6 Audit objectives 1.5 7 Audit criteria 1.6 7 Previous audit findings 1.7 7 Acknowledgement 1.8 8 Chapter 2 Planning and Financial Management Planning 2.1 9 Non-preparation of State Water Resource Plan 2.2 9 Non-preparation of annual and five year 2.3 13 development plans Governor’s directives for backlog removal not 2.4 13 followed Non-prioritisation of projects 2.5 15 Financial management 2.6 21 Chapter 3 Project Execution and Contract Management Project Execution 3.1 25 Non-obtaining of environment and forest 3.2 26 clearances Contract management 3.3 47 Monitoring 3.4 54 Chapter 4 Dam Safety and Quality Control Introduction 4.1 59 Inspection of dams 4.2 59 Quality checks by Maharashtra Engineering 4.3 63 Research Institute Quality checks through Quality Control 4.4 65 Organisation Man power shortage 4.5 69 Chapter 5 Project Performance Introduction 5.1 71 Project Performance 5.2 71 Management of Irrigation Projects Chapter 6 Levy and Collection of Water Charges Introduction 6.1 97 Arrears of water charges 6.2 97 Audit findings 6.3 98 Chapter 7 Conclusion and Recommendations Conclusion 7.1 103 Recommendations 7.2 104 Reference APPENDICES Appendix Page No. -
Live Storage Capacities of Reservoirs As Per Data of : Large Dams/ Reservoirs/ Projects (Abstract)
LIVE STORAGE CAPACITIES OF RESERVOIRS AS PER DATA OF : LARGE DAMS/ RESERVOIRS/ PROJECTS (ABSTRACT) Completed Under Construction Total No. of No. of No. of Live No. of Live No. of Live No. of State/ U.T. Resv (Live Resv (Live Resv (Live Storage Resv (Live Total No. of Storage Resv (Live Total No. of Storage Resv (Live Total No. of cap data cap data cap data capacity cap data Reservoirs capacity cap data Reservoirs capacity cap data Reservoirs not not not (BCM) available) (BCM) available) (BCM) available) available) available) available) Andaman & Nicobar 0.019 20 2 0.000 00 0 0.019 20 2 Arunachal Pradesh 0.000 10 1 0.241 32 5 0.241 42 6 Andhra Pradesh 28.716 251 62 313 7.061 29 16 45 35.777 280 78 358 Assam 0.012 14 5 0.547 20 2 0.559 34 7 Bihar 2.613 28 2 30 0.436 50 5 3.049 33 2 35 Chhattisgarh 6.736 245 3 248 0.877 17 0 17 7.613 262 3 265 Goa 0.290 50 5 0.000 00 0 0.290 50 5 Gujarat 18.355 616 1 617 8.179 82 1 83 26.534 698 2 700 Himachal 13.792 11 2 13 0.100 62 8 13.891 17 4 21 J&K 0.028 63 9 0.001 21 3 0.029 84 12 Jharkhand 2.436 47 3 50 6.039 31 2 33 8.475 78 5 83 Karnatka 31.896 234 0 234 0.736 14 0 14 32.632 248 0 248 Kerala 9.768 48 8 56 1.264 50 5 11.032 53 8 61 Maharashtra 37.358 1584 111 1695 10.736 169 19 188 48.094 1753 130 1883 Madhya Pradesh 33.075 851 53 904 1.695 40 1 41 34.770 891 54 945 Manipur 0.407 30 3 8.509 31 4 8.916 61 7 Meghalaya 0.479 51 6 0.007 11 2 0.486 62 8 Mizoram 0.000 00 0 0.663 10 1 0.663 10 1 Nagaland 1.220 10 1 0.000 00 0 1.220 10 1 Orissa 23.934 167 2 169 0.896 70 7 24.830 174 2 176 Punjab 2.402 14 -
Vijayawada Delhi Lucknow Bhopal Raipur Chandigarh Persons with Disabilities Growth ’23 Onwards: Cea at T20 Wc Bhubaneswar Ranchi Dehradun Hyderabad *Late City Vol
Follow us on: @TheDailyPioneer facebook.com/dailypioneer RNI No.APENG/2018/764698 Established 1864 ANALYSIS 7 MONEY 8 SPORTS 11 Published From URGENT NEED TO EMPOWER INDIA TO WITNESS 6.5-7% INDIA, PAK IN SAME GROUP VIJAYAWADA DELHI LUCKNOW BHOPAL RAIPUR CHANDIGARH PERSONS WITH DISABILITIES GROWTH ’23 ONWARDS: CEA AT T20 WC BHUBANESWAR RANCHI DEHRADUN HYDERABAD *LATE CITY VOL. 3 ISSUE 242 VIJAYAWADA, SATURDAY, JULY 17, 2021; PAGES 12 `3 *Air Surcharge Extra if Applicable BELLAMKONDA SRINIVAS' CHATRAPATI REMAKE TAKES OFF { Page 12 } www.dailypioneer.com PULITZER PRIZE WINNER INDIAN REUTERS NATIONAL AWARD-WINNING ACTOR T-SERIES MD BHUSHAN KUMAR BOOKED ED SAYS BANKS CONSORTIUM GETS OVER PHOTOGRAPHER KILLED IN KANDAHAR SUREKHA SIKRI PASSES AWAY AT 75 FOR RAPE; INNOCENT, SAYS COMPANY RS 792 CR IN MALLYA LOAN DEFAULT CASE ulitzer Prize-winning Indian photojournalist Danish eteran actor Surekha Sikri, known for her work in films umbai police have registered a case against T-Series' he State Bank of India-led consortium that lent loans to fugitive Siddiqui, employed with Reuters, was killed while repo- "Mammo", "Badhaai Ho" and TV show "Balika Vadhu", died on managing director Bhushan Kumar, son of music baron late businessman Vijay Mallya on Friday received Rs 792.11 crore in its Prting in Afghanistan's Kandahar on Thursday night.c Mr VFriday morning at the age of 75 following a cardiac arrest, her MGulshan Kumar, for allegedly raping a woman on the promise Taccounts after some shares, earlier attached under the anti-money Siddiqui was riding along with the Afghan Special Forces, and agent said. -
Jurala Reservoir Inflow & Outflow
Artificial Intelligence in Water Resources Sector A.RADHA KRISHNA M Tech (IIT Madras), MIE, DIM (IGNOU) Deputy Director, ISWR, WRD ARTIFICIAL INTELLEGENCE IN APWRD WELCOME APHRDI, Bapatla 27 FEB 2019 ARTIFICIAL INTELLEGENCE IN APWRD My Mentors ARTIFICIAL INTELLEGENCE IN APWRD Contents Water Resources of AP – Existing Scenario Major Processes in the Department Advent of Artificial Intellegence Allied Subjects : Bigdata, Block Chain Areas of Implementation ARTIFICIAL INTELLEGENCE IN APWRD Beas Floods - 2014 Location of Larji Dam On Beas river Maximum flow, caution boards, alarm system ARTIFICIAL INTELLEGENCE IN APWRD Beas Floods - 2014 Thalaut : place of incident 21 Km down stream of larji dam ARTIFICIAL INTELLEGENCE IN APWRD My Latest Treasures ARTIFICIAL INTELLEGENCE IN APWRD Artificial Intelligence is a way of making a computer, or a robot, or a text software think intelligently, in the similar manner the intelligent humans think Reasoning Problem solving Perception Learning Planning, Ability to manipulate and move objects ARTIFICIAL INTELLEGENCE IN APWRD ARTIFICIAL INTELLEGENCE IN APWRD BLOCK CHAIN The Internet of Things (IoT) is the network of physical devices embedded with electronics, software, sensors, actuators, and connectivity which enables these objects to connect and exchange data ARTIFICIAL INTELLEGENCE IN APWRD ARTIFICIAL INTELLEGENCE IN APWRD e-Pragati AP Government Initiative towards Digital Governance ARTIFICIAL INTELLEGENCE IN APWRD 1 One Government 2 Single Entry, Multiple Use Disintermediation and e- e-Pragati 3 -
Integrated State Water Plan for Lower Bhima Sub Basin (K-6) of Krishna Basin
Maharashtra Krishna Valley Development Corporation Pune. Chief Engineer (S.P) W.R.D Pune. Integrated state water Plan for Lower Bhima Sub basin (K-6) of Krishna Basin Osmanabad Irrigation Circle, Osmanabad K6 Lower Bhima Index INDEX CHAPTER PAGE NO. NAME OF CHAPTER NO. 1.0 INTRODUCTION 0 1.1 Need and principles of integrated state water plan. 1 1.2 Objectives of a state water plan for a basin. 1 1.3 Objectives of the maharashtra state water policy. 1 1.4 State water plan. 1 1.5 Details of Catchment area of Krishna basin. 2 1.6 krishna basin in maharashtra 2 1.7 Location of lower Bhima sub basin (K-6). 2 1.8 Rainfall variation in lower Bhima sub basin. 2 1.9 Catchment area of sub basin. 3 1.10 District wise area of lower Bhima sub basin. 3 1.11 Topographical descriptions. 5 1.11 Flora and Fauna in the sub basin. 6 2.0 RIVER SYSTEM 2.1 Introduction 11 2.2 Status of Rivers & Tributaries. 11 2.3 Topographical Description. 11 2.4 Status of Prominent Features. 12 2.5 Geomorphology. 12 2.6 A flow chart showing the major tributaries in the sub basin. 13 3.0 GEOLOGY AND SOILS 3.1 Geology. 16 3.1.1 Introduction. 16 3.1.2 Drainage. 16 3.1.3 Geology. 16 3.1.4 Details of geological formation. 17 K6 Lower Bhima Index 3.2 Soils 18 3.2.1 Introduction. 18 3.2.2 Land capability Classification of Lower Bhima Sub Basin (K6). -
Pre-Feasibility Report Proposed Ajansara Barrage Project for Lift
PRE-FEASIBILITY REPORT PROPOSED AJANSARA BARRAGE PROJECT M/s. Vidharbha FOR LIFT IRRIGATION CAPACITY:TOTAL 30004 CCA Irrigation Development at Village Ajansara, Taluka Hinganghat, District Wardha, Maharashtra Corporation (VIDC) STUDY PERIOD PROPOSED AJANSARA BARRAGE PROJECT FOR LIFT IRRIGATION FOR TOTAL 30004 CCA AND 24000 ICA AT VILLAGE AJANSARA, TALUKA HINGANGHAT, DISTRICT WARDHA, MS INDEX BY M/S. VIDHARBHA IRRIGATION DEVELOPMENT CORPORATION (VIDC) INDEX Sr. No. Particular Page No. 1 Executive Summary 1 2 INTRODUCTION OF THE PROJECT/ BACKGROUND 6 INFORMATION 2.1 Identification of project 6 2.2 Brief History of nature of the project 7 2.3 Need for the project and its importance to the country and 7 region 2.4 Benefit of Project 9 3 PROJECT DESCRIPTION 10 3.1 Type of project including interlinked and interdependent 10 projects, if any 3.2 Regulatory Frame Work 10 3.3 Location (map showing general location, specific location, 11 and project boundary & project site layout) with coordinates 3.4 Details of alternate sites considered and the basis of 21 selecting the proposed site, particularly the environmental considerations gone into should be highlighted 3.5 Size or magnitude of operation 21 3.6 Project description with process details (a schematic 21 diagram/ flow chart showing the project layout, components of the project etc. 3.6.1 Design Feature of Head Work 21 3.6.2 Rolled Filled Earth Dam 22 3.6.3 Barrage 23 3.6.4 Design of Barrage 23 3.6.5 Foundation of Barrage 23 4 IRRIGATION PLANNING 24 4.1 Existing and Proposed Facilities in Command Area 24 4.2 Existing and Proposed Cropping Patterns 24 4.3 Soil Survey 24 4.4 Evaporation Losses 25 5 SURVEY AND INVESTIGATION 25 5.1 Topographical Survey & Investigation 25 5.2 Survey for Barrage 25 5.3 Submergence Survey 25 5.4 Canal and Command Area Survey 25 5.5 Survey for Construction Material 25 5.6 Geotechnical Investigation 26 6 PROJECT HYDROLOGY 26 6.1 General Climate and Hydrology 26 6.2 Hydrological Data 27 6.2.1 Catchment Area 27 SMS Envocare Ltd. -
Committee on Government Assurances (2011-2012)
21 COMMITTEE ON GOVERNMENT ASSURANCES (2011-2012) (FIFTEENTH LOK SABHA) TWENTY FIRST REPORT REVIEW OF PENDING ASSURANCES PERTAINING TO MINISTRY OF WATER RESOURCES Presented to Lok Sabha on 16 May, 2012 LOK SABHA SECRETARIAT NEW DELHI May, 2012/Vaisakha, 1934 (Saka) CONTENTS PAGE Composition of the Committee (2011-2012) (ii) Introduction (iii) Report 1-20 Appendices Appendix-I - Questions and the Answers 21-57 Appendix-II - Extracts from Manual of Practice & Procedure in the Government 58-60 of India, Ministry of Parliamentary Affairs, New Delhi Appendix-III - Status of USQ No. 4355 dated 7 May, 2007 regarding 61 Restructuring of Brahmaputra Board as received from the Ministry of Water Resources. Appendix-IV - Implementation Report of USQ No. 2281 dated 15 December, 62-105 2008 regarding Maintenance of Dams. Appendix-V - Implementation Report of USQ No. 1766 dated 04 August, 106-125 2010 regarding Dams in the Country. Annexures Annexure I- Minutes of the Sitting of the Committee held on 11 April, 2012. 126-128 Annexure II- Minutes of the Sitting of the Committee held on 26 April, 2012. 129-131 Annexure III- Minutes of the Sitting of the Committee held on 14 May, 2012. 132-133 COMPOSITION OF THE COMMITTEE ON GOVERNMENT ASSURANCES* (2011 - 2012) Shrimati Maneka Gandhi - Chairperson MEMBERS 2. Shri Hansaraj Gangaram Ahir 3. Shri Avtar Singh Bhadana 4. Shri Kantilal Bhuria 5. Shri Dara Singh Chauhan 6. Shri Bansa Gopal Chowdhury 7. Shri Ram Sundar Das 8. Smt. J. Helen Davidson 9. Shri Bijoy Krishna Handique 10. Sardar Sukhdev Singh Libra 11. Shri Ramkishun 12.# Rajkumari Ratna Singh 13. -
District Census Handbook, Nagpur, Part-B, Part a & B, Series-28
CENSUS OF INDIA 2001 SERIES-28 MAHARASHTRA DISTRICT CENSUS HANDBOOK Part - A & B NAGPUR DISTRICT PART-B VILLAGE & TOWN DIRECTORY ~ VILLAGE AND TOWNWISE PRIMARY CENSUS ABSTRACT ~.,~ & ~ PEOPLE ORIENTED Samir Kumar Biswas of the Indian Administrative Service Director of Census Operations, Maharashtra Product Code Number Contents Pages Foreword IX Preface XI Acknowledgements Xlll District Map XV District Highlights - 200 I Census XVII Important statistics in the District xviii Ranking ofTahsils in the District xx Statements 1 - 9 Statement 1 - Name of the headquarters of distrk<t/tahsil, their rural urban status and distance from district headquarters, 20'0 i xxi i Statement 2 - Name of the headquarters of district/C.D. Block, their rural urban status and distance from district headquarters, 2001 xxii Statement 3 - Population of the District at each Census from 1901 to 2001 XXI1l Statement 4 - Area, Number of villages/towns and population in district and tahsil, 2001 XXIV Statement 5 - C.D. Block wise number ofvillages and rural population, 2001 xxx Statement 6 - Population of Urban Agglomerations/Towns, 2001 XXXI Statement 7 - Villages with population of 5,000 and above at C.D. Block level as per 2001 Census and amenities available XXXII Statement 8 - Statutory towns with population less than 5,000 as per 2001 Census and amenities available xxxiv Statement 9 - Houseless and Institutional population ofTahsils, Rural and Urban, 2001 XXXVI Analytical Note (i) History and scope of the District Census Handbook 3 (ii) Brief History of the District -
(SCR) Status of Projects
SOUTH CENTRAL RAILWAY STATUS OF TARGETED & NON TARGETED PROJECTS As on 01.10.20 NEW LINES Name of Project: MANOHARABAD - KOTHAPALLI, 151.36 Km (PH -11, New lines) S C Railway Name of Project: MANOHARABAD - KOTHAPALLI, 151.36 Km (PH -11, New lines) S C Rly SNAP SHOT OF FULL PROJECT Year of Inclusion 2006 - 07 Month & year of Final Sanction July, 2016 Project falling in (Railway) South Central Railway Project falling in (States) Telangana Executing Agency CAO ( C ) SCR ROR ( + %) (+) 0.16 % Length of Complete Project 151.36 km 1373.74 Cr Latest anticipated Cost of Project (Original sanc 1160.47 Cr. + 213.26 Cr MM ) Up to date Expenditure of full project 460.93 Cr. (Rly: 400.93 Cr + State: 60.00 Cr) Physical Progress of full Project (%) 25 % Financial Progress of full Project (%) 39 % Outlay 2020-21 (in Cr.) 79.00 Cr. Manoharabad-Gajwel(31.071 km) CRS authorisation Length of Project already Commissioned (km) received on 19.06.2020 and workman special run on 26.08.20. Mar, 25 (Subject to handing over of land & deposition Likely TDC of complete project (Month & Year) of 1/3rd share by Telangana Govt) Name of Project: MAHABUBNAGAR - MUNIRABAD, (PH - 11, New lines) S C Railway SCR portion: DEVARAKADRA - KRISHNA, 65.74 Km Name of Project: MAHABUBNAGAR - MUNIRABAD, (PH - 11, New lines) S C Railway SCR portion: DEVARAKADRA - KRISHNA, 65.74 Km SNAP SHOT OF FULL PROJECT Year of Inclusion 1997 - 98 Month & year of Final Sanction January, 2012 Project falling in (Railway) South Central Railway Telangana (SCR portion 65.74 km), Project falling in (States) Karnataka (SWR portion, 161.675km) Executing Agency CAO ( C ) SCR & CAO ( C ) SWR ROR ( + %) (+ ) 3.49 % Length of Complete Project 16+65,74 NL,81.74 (SCR portion) 243.50 Complete project (Overall: Rs 3421.35 Cr) Latest anticipated Cost of Project 907.71 Cr. -
257 Koregaon Assembly Constituency
List of polling station for 257 Koregaon legislative Assembly Constituency Sr No. Whether for all voters of Locality of Building in which it will Polling Areas or men only or Polling Polling Station be located women only Station 1 2 3 4 5 Zilla Parishad School, Varchi aali, Near Kaleshawari 1 Mardhe Mardhe, Southside mandir, Ramoshi vasti, Beghar For All Votors Room No. 1 vasti Zilla Parishad School, Khalchi aali, Baoudha vasti, 2 Mardhe Mardhe, Southside For All Votors Matang vasti Room No. 3 Kadam vasti, Yadhav mala, Surup Zilla Parishad School, mala, Near marathi school, Khandobachi 3 Gove Westside Room Khandoba mala, Bhiroba mandir For All Votors Wadi No. 4 near, near hanuman mandir, salvan, mala salvan Mohite wada, Kalubai mandir, Bagal vasti, Koli vasti, Padak vasti, Zilla Parishad School, Near marathi school, Thote 4 Gove West side Room N0. 1 For All Votors godown, Near godawn, Boudha Gove vasti, Lohar road, Paritwada, Koliwada Boudha vasti, Khandu appacha Zilla Parishad School, mala, Indira nagar, Yadhav mala, 5 Gove West side Room N0. 3 For All Votors Jamdar wada, Kalubai mandir, Gove Near janubai mandir, Zilla Parishad School, Ramoshi vasti, Kumbhar vasti, 6 Malgaon South side Room No.1 Bagal chock, Vittal mandir, Near For All Votors Malgaon Grampanchayt, Near parilwada Zilla Parishad School, Mandal parishad, Dengen aali, 7 Malgaon South side Room No.3 For All Votors Chauthai aali, Bhoudha vasti Malgaon Gurav aali, Near padubai mandir, Zilla Parishad School, Patilwada, Near mashid,Chaubhar 8 Malgaon Eastern side Room vasti,Mathi vasti, Karande For All Votors No.1 Malgaon vasti,Near sawata mali mandir, Akara hissa vasti Magan wada, Darekar vasti, Near laxmibai mandir, Near mashid, Zilla Parishad School, Mane vasti, Peth vasti, khapayi 9 Malgaon Eastern side Room For All Votors shakun wada,Indira hissa,Akara No.3 Malgaon hissa, Malivarchi vasti, Patlacha wada Zilla Parishad School, 10 Banwadi Dudhanwadi Room No.