Etihad Rail 2F1 O & M Depot Project Overview
Etihad Rail 2F1 O & M Depot Project | Overview | 1 Overview KEY INFORMATION
Item Details
Project Name Contract D0201 | Pck. 2F1 | D&B of Rail O&M Facility / Depot
Description Design, build, with options for maintenance of the facilities of main depot at Al Faya
Purpose Light and heavy maintenance of Etihad Rail network fleet of rolling stock
Location Al Faya, Abu Dhabi, 20 mins drive towards Sewihan from Abu Dhabi airport
Design Contractor Design, construction, installation, testing and commissioning
Client Etihad Rail Company PJSC (Etihad Rail)
D&B Contractor 55% Vinci / 45% BICC-Leighton Contracting
Project Design Team egis (PMC), Jacobs (Eng.), interfaces: Pck. 2B China Rail / Ghantoot JV | Pck. 2S Hitachi
Contract type Fixed Price Lump Sum, with milestone payments
Duration 1,184 days with milestones
Commencement date 5 January 2020
Etihad Rail 2F1 O & M Depot Project | Overview | 2 Overview TEAMS
EMPLOYER
PMC THE ENGINEER
D&B CONTRACTOR
LEAD DESIGNER ENGINEERING
ARCHITECT ARCHITECT, RAILWAY/SYSTEM SAND MITIGATION ENVIRONMENTAL ENGINEER OF ASSURANCE AND WASTE RECORD MANAGEMENT
Etihad Rail 2F1 O & M Depot Project | Overview | 3 Overview CLIENT - ETIHAD RAIL
▪ Etihad Rail, UAE rail construction authority ▪ To build 1,200 km passenger & freight rail network for the UAE, and connect to KSA, Oman ▪ Chairman HH Sheikh Theyab bin Mohamed bin Zayed Al Nahyan ▪ Stage 1 AED 3.6 bil. 264 km freight line awarded 2011. Now complete and operating. ▪ Stage 2 Pck. A AED 1.5 bil. awarded March 2018, Pck. B & C AED 4.4 bil. awarded June 2019 ▪ Ongoing tenders: Package D (mainline), F2 (freight) ▪ Current or forthcoming tenders: rolling stock, systems ▪ To come (after 2020): Stage 3 - under client design
Etihad Rail 2F1 O & M Depot Project | Overview | 4 Overview LOCATION
Oman
Dubai
Qatar
Abu Dhabi Al Faya Depot
Ruwais
Stage 1
Saudi UAE Oman
Etihad Rail 2F1 O & M Depot Project | Overview | 5 Technical AL FAYA LOCATION
Abu Dhabi Dubai
Airport
Khalifa City B Sweihan Road
Roundabout
Google Maps Driving times: Riyad City North - 29 mins from Leighton office - 43 mins from Vinci office Paved, dual rd. - 36 mins from Etihad Rail - 34 mins from Jacobs Mussafah - 58 mins from Jebel Ali - 75 mins from BICC HQ
Substation Al Faya Depot Plot
Etihad Rail 2F1 O & M Depot Project | Overview | 6 Design PROJECT LAYOUT
Interfacing 2B Contractor Track Gate House 3 Train Wash 3 Provisioning Building 9 10 12 5 Hazmat P-Way Yard Waste Facility Provisioning 4 Store Switches Building 1 Substation 13 Intake Administration Building Maintenance 7 Substation P-way Building 8 Truck park Maintenance Building Helipad Mech 6 14 15 11 Yellow Plant Facility plant 2 Substation Administration Building
BUILDINGS OTHER Key Interfaces
1. Administration Building 7. Mechanical Plant 13. P-Way Yard • 2B Mainline (China State) 2. Maintenance Building 8. Intake Substation 14. Truck Parking • 2S Systems (Hitachi) 3. Provisioning Building 9. Gate House 15. Helipad 4. Hazmat Store 10. Train Wash Facility 16. 2F1 Track 5. Distribution Substation 11. Yellow Plant Facility 6. Maintenance Substation 12. Waste Management Facility
Dead end Interfacing 2B Contractor Track Reception and departure In and out Berthing In and out cripple lane
Reception and departure Future Berthing Dead end cripple lane
Provisioning Building Train Wash Provisioning Building
PaintPaint, & blasting blast YellowYellow plant plant Dead end cripple lane WagonPaint, light blast maintenance Storage P-way Paint, blast Wagon heavy maintenance BogiePaint, workshop blast Paint, blast Loco light maintenance Locos - heavy Loco heavy maintenance
Etihad Rail 2F1 O & M Depot Project | Overview | 7 Design DEVELOPED BUILDING RENDERS
Administration Building
Main Maintenance workshop
Carpark viewed from Administration Building
Etihad Rail 2F1 O & M Depot Project | Overview | 8 Technical PLANNED PROCUREMENT
Subcontract Packages Supply
▪ Earthworks ▪ Rail, rail fasteners, switches and crossings ▪ Structures & buildings ▪ Ballast, sleepers, concrete, reinforcement ▪ Trackworks ▪ Specialist equipment, lifting jacks, gantry cranes ▪ Wagon shop cranes, slings, straps and chains ▪ Power & other utilities ▪ Air extractors, lathes, axle crack detector ▪ Building MEP ▪ Wagon lifting spreader beam, wheel balancer ▪ Bogie assembling bench, trailer for forklift ▪ Stub seat and bore lathe ▪ Bearing on/off press, coupler crack detection ▪ Paint and blast shop, workshop jacks, crane, stands ▪ Loco battery charger, hydraulic fluid cycling/filtration trolley ▪ Coolant recovery system, workshop access staging ▪ Loco roof access platform ▪ Workshop painting facility, air extraction system ▪ Depot protection system ▪ Fuel, sand, fluid dispensers and storage ▪ Mobile hydraulic jacking and slewing equipment ▪ Forklifts, tag readers and LAN connection ▪ Fall-arrest systems, lifting jacks, gantry cranes ▪ Wheel-set storage
Etihad Rail 2F1 O & M Depot Project | Overview | 9 Technical SUMMARY PROGRAM
Etihad Rail 2F1 O & M Depot Project | Overview | 10