Inter-Refineries IRP-II Pipeline Project, UAE Application: - Integrated Telecommunication Systems for 500km Pipeline Project

Case Study

System Highlights

The CCTV systems offered by L&T ensured a 24*7 coverage of the entire length of the pipeline. A combination of the fixed & PTZ CCTV’s ensured a coverage of the entire corridor across day as well as night Introduction To meet the requirement of a high availability of transport backbone, Oil Refining Company (Takreer) constructed the Phase II of the Inter Refinery L&T provided SDH transmission Pipeline (IRP- II) Project to transport refined hydrocarbon products using a network of equipment equipped with 500 km of pipelines. redundant units for critical traffic. The transport backbone was This network of pipelines was constructed between Refinery Division (RRD), equipped & configured with path ADNOC Distribution Depot, Abu Dhabi Refinery (ADRD), Depot and Abu (optical) diversity. The Fibre optic Dhabi International Airport (ADIA). based SDH transport backbone with STM-64 i.e. 10 Gbits/s GS E&C, Korea worked on the project as an EPC contractor and Tebodin Ltd. bandwidth was given at 16 lent its services as the PMC. locations while the one with STM- 16 i.e. 2.5 Gbits/s at 9 locations.

A state-of-the-art Access Control L&T Electrical & Automation as a System Integrator System was commissioned to secure the SV locations and Shuweihat area. L&T Electrical & Automation was awarded the role of the Telecommunication System Integrator to provide services of Design Engineering, Supply, Assembly, Inspection, The star topology LAN at various Testing and Commissioning for the project. office locations provided the IP layer of connectivity across the The 500km pipeline route comprised of 24 stations. L&T interconnected these 24 office locations of the project. locations through a 2x24 core fiber SDH backbone using STM-16 and STM-64 Optical The Telephones were extended Multiplexer equipment. from the EPABX system in Mussafah to all the remote For the security and surveillance along the pipeline, L&T commissioned a state of the art locations to allow for effective Solar powered CCTV system along the length of the pipeline. These cameras were based communication amongst the working people. on Day & Night operations, 365 days a year from all manned and unmanned locations.

Solution

The systems delivered: • Transmission System • CCTV System • Telephone Equipment • PA System • Access Control System • LAN system

L&T Electrical & Automation FZE P.O. Box 262158, Free Zone, Dubai, UAE Phone: +971 4 8131900 Fax: +971 4 8131999 Website: www.Larsentoubro.com