United States Government Printing Office SUPERINTENDENT OF DOCUMENTS Washmgton, D C 20402 Postage and Fees Pad OFFICIAL BUSINESS U S Government Prlnhng 0ffv.X Penalty Ior pwate use. $xX 375 Congresstonal Record SECOND CLASS NEWSPAPER (USPS 087-390) H.4578 ’ C.QNGRESSIONAL RECORD - HOUSE June 28, 1983 H.J. Res. 273: Mr. BOUND. Mr. W~.XMAN. gress which states the following .after the the Congress BPPrOres the regulation which Mr. OBERSTAR,Mr. BEDELL. Mr. BONER of resolving clause: “That the Congress ap- was promulgated by the-consumer Product Tennessee, Mr. OWENS. Mr. DAUB, Mr. Proves the consumer product safety rule Safety Commission under section of CONTE. Mr. RAHALL; Mr. GRAY, Mr. VANDER which was promulgated by the Consumer the Federal Hazardous Substances Act with JACT. Mr. TRAKLER,and Mr. Vxrrro. Product Safety Commission with respect to respect to and which was transmitted H. Con. Res. 107: Mr. KASICH. Mr. and which was transmitted to the Con- to the Congress on “. with the blank AUCOIN. Mr. CARPER,and Mr. SIZHFIJER. gress on “, with the blank spaces spaces being filled in appropriately: and . H. Con. Res. 118: Mr. FISH. Mr. LANTOS. being filled in appropriately: (3) in the case of a regulation promulgat. Mr. KILDEE. Mr. SOLARZ. Mr. BRITT. Mr. (2) in the case of a regulation promulgat- ed under section 4 of the Flammable Fabrics BEDELL. Mr. RANGLZ, Mr. DYMALLY. Mr. ed under section 2(q)(l) or 3te) of the Feder- Act, means a joint resolution of the Con- STUDDS. Mr. FOCLIETPA, Mr. BERMAN, Mr. al Hazardous Substances Act, means a joint gress which states the following after the CARR. Mr. TORRICELL~.Mr. MCNULTY, Mr. resolution of the Congress which states the resolving clause: “That the Congress ap- SCKEUER.Mr. SWIFT, Mr. LOWRY of Wash- following after the resolving clause: “That proves the regulation which was promulgat- ington, Mr. HERTELof Michigan, Mr. MORRI. the Congress approves the regulation which ed by the Consumer Product Safety Com- SON of Connecticut, Mr. PENNY, Mrs. Kxn- was promulgated by the Consumer hoduct mission under section 4 of the Flammable NELLY. Mr. BONKER. Mr. DICKS. and Mr. Safety Commission under section of Fabrics Act with respect to and which PR~~~~ARD. the Federal Hazardous Substances Act with was transmitted to the Congress on H. Res. 191: Mr. BEDELLand Ms. SNOWE. respect to and which was transmitted “, with the blank spacesbeing filled in to the Congress on “, with the blank appropriately. spaces being filled in appropriately: and PETITIONS; ETC. (3) ln the case of a regulation promulgat- Under clause 1 of rule XXII, peti- ed under section 4 of the Flammable Fsbrics CONFERENCE REPORT ON H.R. tions and, papers were laid on the Act, means a joint resolution of the Con- 3132 Clerk’s desk and referred as follows: gress which states the following after the 150. By the SPEAKER: Petition of the resolving clause: “That the Congress ap- Mr. BEVILL submitted the following Massachusetts Conference of the United proves the regulation which was promulgat- conference report and statement on Church of Christ, Framingham. Mass., rela- ed by the Consumer Product Safety Com- the bill (H.R. 31321 making appropri- tive to the Opera Company of Boston and mission under section 4 of the Flammable ations for energy and water develop- the Philippines; to the Committee on For- Fabrics Act with respect to and which was transmitted to the Congress on **, ment for the fiscal year ending Sep- eign Affairs. tember 30, 1984, and for other pur- 151. Also, petition of the City Council, with the blank spaces being filled in appro- Cleveland, Ohlo, relative to extended unem- priately. poses. (To the Shelby amendment h‘i the nature ployment benefits; to the Committee on CONFERENCEREPORT (II. REPT. No. 98-2721 Ways and Means. -- of a substitute.1 152. By Mr. JONES of North Carolina: Pe- -At the end of the matter proposed to be The committee of conference on the disa- tition of the Mexico Beach Town Council. inserted by the amendment insert the fol- greeing votes of the two Houses on the Fla.. relative to the Outer Continental LOWing: amendments of the Senate to the bill (H.R. Shelf; jointly. to the Committees on Mer- APF-ROVALOr RllT,% 31321 making appropriations for energy and chant Marine and Fisheries and Interior Sec. 3. (al No funds appropriated to the water development for the fiscal year and Insular Affairs. Consumer Product Saftey Commission for ending September 30. 1984, and for other fiseal year 1984, 1985, or’ 1986 under the y-~~ses, having met, after full and free amendment made by section 2 of this Act conference. have agreed to recommend and AMJZNDMENTS may be used to place in effect a consumer do recommend to their respective Houses as product safety rule under the Consumer follows: Under clause 6 of rule XXIII, pro- That the Senate recede from Its amend- posed amendments were submitted- ag Product Safety Act, a regulation under sec. 15. 19, 20, 33. 34. follows: tion 2(qXll or 3(e) of the Federal Hazardous ments numbered 4. 5, 8. 11, Substances Act, or a regulation under se& 38. and 39. HA 2688 tion 4 of the Flammable Fabrics Act which That the House recede from its disagree. By Mr. LElVITAS: rule or regulation is published in final form ment to the amendments of the Senate -bage 20. insert after li$-6 the follow& by the Commission after the date of the en- numbered 12. 28. 29, 31, 36. and 41. and APPROVALOF RULES actment, of thissubsection but before Octo- agree to the same. ~‘Sxo. 16. (a) No funds appropriated to the ber 1, 1986. unless a joint resolution approv- - Amendment numbered 1: Consumer Product Safety Commission for ing such rule or regulation has been en- That the House recede from its disagree- fiscal Year 1984. 1985. 1986. 1987. and 1988 acted. ment to the amendment of the Senate num- under the amendment made by section 2 of

,

i’ I: I, *j’ I i ,:, ’ ‘i ‘I . ‘1 i j ,I’\ \

;/ II

:I;,- .

j ;‘I Ii z

I !

j, / /

: ,

I _ I

#

/

. 28, 1983 CONdRESSIONAL RECORD - HOUSE H 4581 ’ OF BUDGET ESTINATES CONFERENCE ALLOUANCE CT GENERAL INVESTIGATIONS - STATE AND PROJECT INVESTIGATIONS PLANNING INVESTIGATIONS PLANNING ______,____---L------______------,-.------a------m---e_-

ALABARA

ALABbKA-COOSA RIVER EELOU CLAIBOKNE LtD....o*.*+a.o*e. 459.000 we- 459?000 (M) ------80~000 (N) BAYOU LA BATRE ...... 700.0~0 --- P00l000 (N) HOBILE HARBOR DEEPENING (CPtE) ...... ------600 IO00 .(FCI THREE RILE CREEK (CPtE) ...... ------1,3001000 (N) UILLIAtI PhCON OLlVER LOCK AND DIM (CPtEI...... *.**o** .

ALASKA w-m em- 1501000 --- (SPI BETHEL BANK STABILIZATION (CPtEI ...... (FDPI RIVERS AND HARBORS ...... 3001000 --- 400,000 --c (FDp) StIALL HYDROPOULR ...... eootooo w-e eoo*ooo mm- w-w 3001000 --- IN) SOUTHCENTRAL DEEP-DRAFT NAVIGATION ...... 200~000

ARIZONA

e-e w-w 300 9 000 (FCI HOLBROOKt LITTLE COLORADO RIVER (CPtEI ...... --- (FDpI GILA RIVER t TRIBUTIRIES, HOGALES UASH# tTZ t NR.....* . 200,000 --- 200,000 (FDP) GILA RIVER AND TRIBUThRIES . LZ 8 NH ...... 530~000 630rOOO

ARKANSAS

------2001000 (FDP) ARKANSAS RIVER BhSINv AR t OK...... ~...*....*.*~..~*~ ...... (FDP) ARKANSAS RIVER VICINITY OF FT SKITH - VAN BUREN 142vOOO --- 142rOOO (N) ARKANSAS RIVER t TRIBS HYDROPOUER t OTHER PURPOSES9 AR t OK ...... 422,000 --- 422vOOO --- 100t000 --- -(FDP) CLARKSVILLE ...... 100~000 --- 700rQ00 --- (FCI FOURCHE BAYOU IR THE VICINITY OF LITTLE ROCK (CPtEI a.. 7oovooo --- me- RCKINNEY BAYOUS AR t TX ...... 2709000 270*000 (FC) ------NORTH LITTLE ROCK (DARK HOCLOY) (CPtE)...... ~...~ . 100l000 (FCI ------(FDPI ~OUACHITA RIVER BllSINv AR t CA...... ~ ...... 696tOOO 696rOOO ------2JOIOOO --- (COT(P) RED RIVER BASIN, AR? TX* LA t OK...... ~ . (CORP) RED RIVER BELOU DENISON DfiN, AR, LA* OK t TX (AUTH ------RPTS) ...... 4601000 460,000 m-m ------(HI UHITE RIVER ...... 300,000 ------.-- (MB RED RIVER WTERUAYI SHREVEPORT LA TO VICINITY INDEX AR 490,000

CALIFORNIA --- (FBPI I\LAHEDA CREEK, UPPER B&SIN ...... 175~000 1759000 ------(FDP) ANTELOPE VALLEY ...... 100~000 (FC) CACHE CREEK (CPLEI ...... 300~000 --- 300* 000 --- (FDP) CALIENTE CREEK INTERIM ...... --- 5001000 ------(FDPI CALLEGUAS CREEK ...... 2509000 ------(SPECI COAST OF CALIFt STORK &ND TIDAL WIVES ...... 750,000 lrOOOtOOO ------(FC) COTTONUOOD CREEK ...... 4r000f000 4r0001000 ------(FDP) DRY CREEK INTERIH ...... 300r000 ------(FC) GOLETL AND VICINITY ...... 350rooo 350,000 .... ------(FDP) GUADALUPE RIVER...... ~ 1701000 265rOOO ... --- (FDPI LOS ANGELES COUNTY DRAINAGE AREA REVIEU ...... B20*000 &!orooo --‘- (N) , LOS ANGELES AND LONG BEACH HARBORS (INCL SAN PEDRO --- BAY nODEL) ...... 2561000 256vOOO --- (FC) RORRISON CREEK STREAH GROUP (PHASE II ...... 1,000~000 --- 1,0001000 ------m-e tN) NOYO RIVER AND HARPOR (CHANNEL EXTENSION)...?L...... 91,000 91,000 !N) NGYO RIVER AND HARPOR (BREAKUATER) ...... --- lB4vOOO -r- 1841000~~,..;.~- (N) OAKLAND INNER HARBOR, (CPtEI; ...... ------200,000 ------(FCI REDBANK AND FRNCHER CREEKS XCPtEI ...... 1#5001000 , 115001000 _. (N) REDONDO BEACH HARDOR (KING HARBORI...... t. ------851000 me- --- (FDPI SACRATIENTO RIVER t TRIM (BANK PROT t EROS CONTROL) ... 139~000 139rooo ------(N) SACRARENTO RIVER DEEPUATER SHIP CHANNEL (CPtEI ...... l1700r000 --- (FDPI SAN FRANCISCO B&Y SHORELINE ...... 6001000 600rOOO ------(FDP) SAN JOARUIN RIVER BASIN ...... , 250rOOO --- (FDP) SAN LUIS OEISPO COUNTY ...... 1501000 _ --- (FDP) SANTI\ bNA RIVER t ORANGE COUNTY ...... 1221000 122rooo --- (FDPI SANTA BARBARA COUNTY STREAKS ...... 325rooo 325,000 --- (FC) SANTA ANA RIVER (CPtEI ...... 2t300rOOO 21600r000 ------(N) SUNSET HARBOR ...... 501000 ------(FDP) UALNUT CREEK BASIN ...... 100~000 ---

COLORADO

(FCI ARK 9 I TRIBS ABOVE J.W. DAKr FOUNTbIN CREEK AT --- PUEBLO (CP;E) ...... 300r000 300r000 ------(FCI ARK R t TRIPS ABOVE JOHN RARTIN DAR (PHASE II ...... 140r000 140~000 ------(FDP) FOUNTAIN CREEK AND TRIBUTARIESI NORTH OF PUEBLO ...... 2001000 200~000 --- _- H 4584 CONGRESSIONAL RECORD - HOUSE June 28, 198 * * TYPE OF BUDGET ESTItlATES CONFERENCE ALLOUANCE 3; PROJECT GENERAL INUESTIGATIONS - STATE AND PROJECT INUESTiGATIONS PLANNING INVESTIGATIONS 4’ ______--_------^------. ..__----_------m______PLANHINR

HISSISSIPPI

(FDP) NISSISSIPPI GULF COAST AREA 11.,..*...... ------.300~000 --- .(N) IiISSISSIPPI SOUND AND ADJACENT AREAS, NS I AL.....rr.t 76,000 --- 761000 -em (Nb PASCAGOULA HARBOR ...... 253~000 --- 253~000 --w (FDP) PASCAGDULA RIVER BASIN, HS t AL.,..,...... 305rooo --- 305,000 --- (FDP) PEARL RIVER RASINr HS I LA ..I.,,,.....,...... ,.,..,,,, 900,000 --- lr2001000 --- (SPEC, TENNESSEE-TOHPIGBEE UATERUAY SPECIAL STUDY~ IiS, ALv TN I KY..,.....,...... ,,...... ;..;...... 628,000 --- 626,000 (N) UOLF AND JORDAN RIUERS..,....,.~...... r....r...r...., 41rooo --- 411000 (N) YAZOO RIVER.,,.....,...... ,...... --- 100,000 ---

HISSOURI

(FC) HANNIBAL ...... --- 150,000 --- (FC) WERANEC RIVER DASIN (FLOOD COHTROL) ...... ------.- --- /.’ --- (SPEC) KERAHEC RIVER DASIN (WATER SUPPLY) ...... -- 200,000 (FDP) OSAGE RI’JER ...... --- 100~000 --- .__--- ‘-‘ODP 1 ST LOUIS HETROPOLITAN AREA, MO L IL...... ~ ...... ~~?490,000 11490~000 (FDPl STE GENEVIEVE ...... 1001000 --- 1001000 (FCl YEARS CREEK, JEFFERSON CITY (PHASE Xl ...... 1001000 --- 100,000 (FDP) UHITE RIVER BASIN COUNTY LINE LAKE ...... 250,000 250~000

HONTAHA NEVAD)

(FDPI TRUCKEE ~EADOUS,.,,,.,.,.,....,,...,,..,...... 100?000 --- lOOtOOO --- (FDP) LAS VEGAS UAW t TRIDUTARIES ,,...... ,.11...,.1..1. ------100?000 --- (FDP) VIRGIN RIVER I TRIBUTARIES~ HOAPA VALLEY.....,...... ------100l000 ---

NEU HAWSHIRE

(Nl PORTSNOUTH HARBOR I PISCATAGUA RIVER, NH t tlE (CPtE).r _-- --- 3001000 (FDP) UINNIPESAUKEE RIVER .,~l...,,.,~,.,...... ~...... 07PPOO -me 87vOOO

NEU JERSEY

(N) DELAUARE RIVER IN THE,VICINITY OF CARDEN...... 5OPOOO --- (N) DELAUARE RIVER COWREHENSIVE NAVIGATION STUDYI NJ, PA t DE.....,...... ,.,...... ,...... 950r000 --- 950,000 (FC) PASSAIC RIVER,DASIN STUDY, NJ t NY (PHASE I).....I.... 1,535~000 --- lr535Pooo (FC) RAHUAY RIVER, ROBINSON’S DRANCH~ CITY OF RAHYAY (CPtE) 150r000 --- 150,000 (FC) RAHUAY RIV BASIN, RAHYAY I VAN UINKLES BR-SPRINGFIELD (CPIEl ,..,,...... I...I...... 11...... 1...... 340~000 --- 340?000

HEU nEXIC0

(FC) ALBUOUERGUE NORTH DIVERSION CHANNEL SIUDY...... --- 300,000 (FCI RIO GRANDE t TRIBUTARIES (HIDDEL RIO GRANDE TO BELEN). --- 500P000 --- (FDP) RIO GRANDE AND TRIPUTARIESI NH t CO.....,...... 150r000 1501000 I (FC) SANTA FE RIVER AND ARROYO~~ASCARAS...... ,....,...... 156,000 --- 156~000

KU YORK

(N, ARTHUR KILL CHANNEL* HOULAND HOOK HARINE TERHINAL..... 155,000 --- 1551000 (Nl DUFFALO HARBOR ...... *...... 335,000 --- 335rooo (FDPl DELAUARE RIVER DASINr NY, PA t NJ (ICE JAHST...... 100,000 --- 1001000 (N) KILL VAN KULL t NEUARK DAY CHANNELS, NY t NJ (CPtE)... --^ --- 1?000~000 (WI JONES INLET AND FREEPORT LONG ISLAND....,...... ,.... 43,000 43rooo (FCl IIANARONECK AND SHELDRAKE RIVERS, VILLAGE OF KAtlARONECK (CPtE) . ..I...... ,,,.,.,...... 250~000 --- 250,000 (N) KORICHES INLET . ..I...... ‘...... ,...... ------__' (N) NY HARBOR AND ADJACENT CHANNELS, NY t NJ...... 1,300~000 --- lr800r000 (FDPl OSUEGO RIVER UATERSHED ,,.,,...... I.,~,,,,...... 175,000 --- 175rooo tN, SAINT LAURENCE SEAUAYt ADDITIOHAL LOCKS...... 200,000 --- 200,090 (N) SHINNECOCK INLET ...... *...*...... ------

NORTH CAROLINA

(Nl CAPE FEAR RIVER ACHE TO FAYETTEVILLE...... ;...., 110,000 --- llO?OOO (FDP) NEUSE RIVER .,~,,.I,,,,.~..,,.....,,,...... 325~000 --^ 325,000 (FDPl ROANOKE RIVER SOUTH BOSTON AND VICINITY, NC I VAea.... 340,000 --- 340,000 (SPl UEST ONSLOU BEACH AND HEY RIVER INLET...... ,...... ------100,000

NORTH DAKOTA

(FDP) RED RIVER OF THE NORTH, ND t nN ...... 761,000 --- (FC) SHEYENNE RIVER ...... --- 200~000 June 28, 1983 CONGRESSIOiJAL RECORD - HOUSE ti ii85 TYPE OF BUDGET ESTIHATES CONFERENCE ALLGUAWE PROJECT GENERAL INVESTIGATIONS - STATE AND PROJECT INVESTIGATIONS PLANNING INVESTIGATIONS PLANNING __------_----_-_--_-______--.------.-.

OHIO

(FCI CENTRAL OHIO AT RELSORVILLE (CPZE)...... ~ ... ------200r000 (FDP) CENTRAL DHIO SURVEY ...... l2OlOOO --- t2orooo (FCI CENTRAL OHIO SURVEY AT LOGAN (CPIE)...... ~. 315*000 --- 315,000 (N) CLEVELAHD HARBOR (PHASE I) ...... 1251000 --_ 125rOOO (FDP) CUYAHOGA RIVER BASIN ...... 153*000 --- 1531000 ------(N) GALLXFOLIS LOCKS AND DAH, OH t YV (CFIEI ...... --- 701000 --- ;-- (WI GENEVA-ON-THE-LAKE HARPOR ...... -o- '50rooo (FDP) HIAHI RIVER, LITTLE KIARI RIVER AND nILL CREEK BASIN . . 195r000 --- . ll9stooo --- (FCI WSKINGUtY RIVER DASIN SURVEY AT KILLBUCK (CPtE) ...... 1001000 _-_ . 1001000 --- (FCI WJSKlNGUti RIVER BASIN SURVEY AT tlANSFlELD (CPIE) ...... 205tOOO --- -- 205,000 --- (FCI REND PEACH - HOUARD FARKS AREA ...... em- 1701000 170rooo

OKLAHOHA

ARKANSAS RIVER t TRIBUTARIESI SOUTHCENTRAL AND (COHP I SOUTHEAST AREAS OF OKLAHOHA...... ~ .. em- --- 200~000 m-e (FDP) CANADIAN’RIVER t TRIBUTARIES* OK* TXI t NH ...... ------250~000 --- (FCI PARKER LAKE (CPtEI ...... ------.100?000 --- (FDPI POTEAU R‘IVER . OK 1 AR ...... 109I000 --- 1091000 --- ARK-RED RIVER CHLORIDE CONTROL SOLAR POND STUDIES OK t 1SFEC) TX...... ~ ...... --- 200r000

OFEGON

(N) BONNEVILLE NAVIGATION LOCK, OR t YA ...... ------2.400r000 --- (HI CO~UliBIA R COAL EXPORT ASTORIA ...... E30.000 --- 830*000 - --- (Nl COGUILLE RIVER AND PAR ...... 148,000 --- 148,000 --- (HP) HCNARY LOCK AHD DAK (SECOND FOUERHOUSEIr OR t UA (CftE) ...... 1 r500r000 --- 11500~000 (COHP) NILLAHETTE RIVER BASIN (CONPREHENSIVE STUDY) ...... 120,000 --- 120,000

FENNSYLVANIA-

(FDFI ALLEGHENY RIVER PASIN ...... 651000 --- Sir000 ---

FUERTO RICO

...... 212.000 --- 212*000 (FDP) LA PLATA RIVER ANII TRIFUTAHIES --- (FDP) RIO GRANDE DE LOIZA ...... 9otooo 901000

SOUTH CAROLINA --- (FDPI GILLS CREEK ...... i1 -o.... 4521000 452,000 ...... _-- --- 1501000 (N) CHARLESTON HARBOR (CPtE) I__- --,,.-

SOUTH DAKOTA

(FBP) EASTERN SD AND UPPER PIG SlOUX RIVER1 SD k IA ...... 220rooo 2201000 (HP) GREGORY COUNTY HYDROELECTRIC FUKPEB STORAGE FACILITY 2.000I000 --- 21000r000 --- (WI (CFIET ...... _.------(FOP) MISSOURI RIVER, SD, NE, HD I MT...... ~~..~.~ .. 7457 000 745,000 (FDFI UESTERH DAKOTAS REGION OF SD ...... 150~000 --- 150.000

TENNESSEE --- (FDF) KETROFOLITAN REGION GF NASHVILLE ...... 95,000 --- 255~000 .;- .: * .

CONGRESSIONAL RECORD - HOUSE ’ June 28, 1983

TYPE OF BUDGET ESTIIIATES CONFERENCE ALLOUANCE PROJECT _ GENERAL INVESTIGATIONS - STATE AND PROJECT INVESTIGATIONS * PLANNING INUESTIGATIONS PLANNING ___-__-___----___------______-______------______------______-_^___------

TEXAS --- (FOP) BRAZOS RlVER AND TRIBUTARIES ...... 250rooo 250 IO00 --- (FDP) BUFFALO BAYOU AND TRIBUTARIES TX ...... 8501000 850,000 ------(FDP) CAliERON COUNTY* MARLINGEN ...... 100?000 ------(FC) CLEAR CREEK ...... 152,000 152~000 m-e --- (FDP) COLORADO RIVER AND TRIBUTARIES ...... 3009 000 330,000 --- (FC) COLORADO RIVER I TRIRS, BOGGY CR AT-AUSTIN (CPtE) ..... 100t000 100I000 --- m-e. --- (FDP) DICKINSON PAYOU ...... 27OPOOO e-e. --- (N) GALVESTON RAY AREA NAVIGATION STUDY ...... 168,000 1681000 --- w-e (FDP) JOHNSON CREEK9 ARLINGTON ...... -~! ...... 120,000 120r000 - --- (FC) LAKE YICHITA~ HOLLIDAY CREEK AT UICHITA FALLS (CPtE) . . 2001000 425rOOO ------(FDP) LITTLE CYPRESS CREEK, TX t LA ...... 4001000 400,000 _-- --- (FC) HILLICAN LAKE ...... 200r000 200,000 --- _-- ...... 200,000 tN) NECHES RIVER AND TRIBUTARIES SALT UATER PARRIER m-e --- (SP) PLEASURE ISLAND AT. PORT ARTHUR ...... 1401000 --- 125rooo (FBP) PINE ISLAND BAYOU UATERSHED ...... --- -tFDP), RED RIVER t TRIES AROVE DENISON DAtl TX, OK, Nti ...... --7 25OrOOO + (FDP.! ’ SAN JACINTO RIVER AND TRIBUTARIES ...... 300,000 300?000 --- 400,000 --- 4001000 --CnPT-. TOYN BLUFF HYDROPOUER...... ~ .. --- (FC) TRINITY RIVER PROJECT ...... 238,000 238~000 (FC) UPPER UHITE OAK BAYOU t TRIPS, VICINITY OF HOUSTON ------(FC) (CPtE) ...... 4oovooo 4007000

UTAH

(FIW) COLORADO RIVER t TRIRS, ABOVE LEE FERRY* UT , AZ, COP --- NN t YY..,....,...,.,..,...... l ,*...... *. 373; 000 373rooo --- 1 (FDP) JORDAN RIVER PASIN..,...... '~, ,...... * 1101000 110,000 I t ‘VIRGINIA --- (FDP) CHOUAN RIVER* VA t NC ,,,...,,..,~,,,..,...... ~...... 2731000 273,000 --- 21000~000 (N) NORFOLK HARBOR (DEEPENING) (CPCE).,...... ,~....,.....’ 2?000~000 -em ------RICHHOND (CPtE)...,...,...... ,...... lr000,000 (FC) w-w --- (N) YORK AND PAWNkEY RIVERS ,.,,..,,.,..~,...,..I...... 207~000 207,000 ‘, ,’ UASHINGTON --- (NJ BLAIR t SITCUll UATERUAYS (CPtE) ,,,,.,,,.~.,.,...~.~... 140?000 --- (FDP) CHEHALIS RIVER t TRIES ,,,.,~,,,..,,,,,....,.....~..... 250?000 ------(FC) CHEHALIS RIVER AT SOUTN ABERDEEN-COSHOPOLIS (CPtE).... 200,000 e-e --- we- GRAYS HARBOR* CHEHALIS,.AND HOOUIAN RIVERS (CPLE)...... 500 * 000 (N) --- _-- ,,.,..,..,,.,.....**..,...... 100,000 ~00~000 (FDP) HILL CREEK BASIN STUDY --- _-- ,,.,.,,..,...1...... ll 350,000 500r000 (COHP) PUGET SOUND AND ADJACENT UATERS --- w-v (N) SNOHOIIISH RIVER tNAVIGATION) ,,,...,~.,.,.,,,.,...... 200~000 200r000

UEST VIRGINIA v-e (FDP) WYANDOTTE RIVER BASIN , VICINITY OF LOGAN AND HULLENS. 330?000 330?000 (CONP) KANAUHA BASIN CONPREHENSIVE (AUTHORIZATION REPORTS), ------U’J, VA t ~C..,,,..,,..,.,...... ,...... ~...... 275,000 275,000 --- (Mb KANAUHA LIVER .,.,.,,,.,..,,...... ~,,...... ,...-.. 700,000 700,000

UISCONSIQ

(N) GREEN BAY HARHOR ...... t...... 65,000 --- 851000 --- 1FC) STATE ROAD AND EBNER COUCEES .,*..,,..,..,,...,.,,,.... 350rooo --- 3501000 --- _-- (FW ) UISCOH5IN RIVER, PORTAGE ...... 5FJrooo 58rOOO

‘REVIEU OF AUTHORIZED PROJECTS --- RESiUDY OF DEFERRED PROJECTS ...... 200,000 465.00.0 ------_-- LUKFATA LAKE* OK (HYDROPOUER STUDY)...... ~~ . (265,000) ------REVIEU OF CONPLETED PROJECTS ...... 5501000 525rooo m-m --- MOJA’JE RIVER, CALIF ...... ~2001000) 12601000~ ...... --- w-e f265vOOO) PINE CREEK LAKE, OK (HYDROPOUER STUDY) --- REUIEU FOR DEAUTHORIZATIOH ...... 150r000 150*000 - -v-e__-- -_------__-_____ --______---..------e-- TOTAL...... ,...... ,..... 9ootooo 18140,000 IEP.DIIIIxI*I=I =DPIIIDI=s=3 =I===------*I=x==o i==lS=clL.=== ,. L:..’ b. e-m _-- .: .,l COORDINATION-STUDIES UITH OTHER AGENCIES...... ,..,... 5~300,000 5r300,000 i-j..:> .?.. June 28,1983 CONGRESSIONAL RECORD ,’ HOUSE Ii4587

TYPE OF BUDGET ESTIMATES CONFERENCE ALLOUANCE PROJECT GERERAL INVESTI6ATIONS - STATE AND PROJECT IRVESTI6ATIONS PLANNING INVESTIGATIONS PLANNING --_----_-_____--_--_------me___ .;;-” COLLECTION AND STUDY OF BASIC DATA

-8 STREAN GAGING (U.S. GEOLOGICAL SURVE.r).~....~.rr...... 470rooo --- 470rooo --- 5.; .- ‘4 FRECIPSTATION STUDIES (NATIONAL UEATHER SERVICE)...,., 2959 000 -em 295,000 m-e i INTERNATIONAL UATER STUDIES *..1.,*.,.,....*.*...;...,. 100I000 m-v 1001000 ( --- +;;t FLOOD PLAIN NANAGENENT SERVICES...... ,.... 615001000 --- 6tS00,000 -me HYDROLOGIC STUDIES ,,,,,.,,,....I...... I,. 235*000 --- 235rOOO --- i. SCIENTIFIC AND TECHNICAL INFORNATION CEWTERS....lr.... 120rOQO -em 120r000 --- ..I --- _;.,

RESEARCH AND DEVELOPRENT ...... **...... *...*....* 22looo*ooo --- 22~2501000 --- LLSECSI==LII=I= =I===------=------LILLlfPPllle=.= LE==P=l=SE==

SUBTOTAL.,...~,.....~....,...,,,...,..‘.~... lOle36SvOOO 101435rooo 127*235rOOO 13r325vOOO

REDUCTION FOR ANTICIPATED SAVINGS AHD SLIPPAGE...... -1r400l000 -6t750rOOO ===TE=E==----__------____----cs======:======t15CLEIS EIL=Z=E1C=s=

TOTAL GENERAL INVESTIGATIONS...,...... 1101400r000 133~810,000 =SIE==SI-_----E--_--- E==EPECEI==r ------=es=cr______s===szsc====5 f .

TYPE OF ‘FROJECTl (N) NAVIGATION (FC) FLOOD CONTROL . (BE) BEACH EROSION CONTROL (HP, WULTIPLE-PURPOSEI INCLUDING POUER (FDFI FLOOD DAWAGE PREVENTION (SPI SHORELINE PROTECTION (SFECI SF’ECIAL (COttP I COGPREHENSIVE (PHASE I) AUTHORIZED FOR PHASE I STAGE OF ADVANCE ENGINEERINO AND DESIGN IN THE UATER RESOURCES DEVELOPGENT ACT OF 1974 OR 1976, (CPIEI CONTINUATION OF PLANNING AND ENGINEERING

_- ‘_//-/

_. :

. ._ .- CONGRESSIONAL RECORD - HOUSE June28, 1983 Construction, general In approving this language, the conferees for a water intake structure and $500,000 Amendment No. Arxxov&atg are in agreement that no funds from this for recreation facilities. $884.104.000 for constru%on gene appropriation shall be used to construct any conference agreement includes stead of 5882.829.000 as proposed by the expansion of the currently authorized chan- $7gzOO for the Burns Waterway Small House and $885,779,000as proposed by the nel dimensions of, or to build duplicate locks Boat Harbor, Indiana, and $700.000 for the Senate. for, the existing Black Warrior-Tombigbee Cedar Island-Keaton Beach, Fla., projects The conferees are aware of the proposal Waterway south of Demopolis, Ala., to ac- under Section 107. Small Navigation Proj- to require increased cost sharing on the commodate traffic increases on the Black ects: $2.000,000 for the Key Biscayne. Fla., Blue River Channel Improvement, MO.. and Warrior-Tombigbee Waterway anticipated project under Section 103, Small Beach Canaveral Harbor, Fla.. projects. Congress to be generated by completion of the Ten- Erosion Control Projects: SL300,OOOfor the has funded these projects for construction nessee-Tombigbee Waterway. It is not the Paauau Stream, Hawaii. project and. since 1979 and 1964. respectively. and the intent of the conferees to restrict necessary $500.000 for the Salyersville. KY., project conferees reaffirm their past position that operation. maintenance, restoration, or re- under Section 205. Small Flood Control once the decision on construction is made, habilitation on the exfsting. authorized Projects; $125.000 for the Maple River, local cooperation is set h accordance with Black Warrior-Tombigbee’Watenvay. Mich.. project under section 208. Small the authorizing document. Therefore, the -The conferees are aware of Congressional Snagging and Clearing Projects; S5.200.000 Committee directs the Corps of Engineers testimony on the need to construct access for the Miaml Harbor Bayfront Park. Fla.. to proceed with construction of these proj- points and recreation facilities on the Oua- and $300.000 for the John H. Bankhead. ects on that basis. 4 chita and Black Rivers in the vicinity of the Ala.. project under the Recreation at Com- The conferees concur with the House and Felsenthal National Wildlife Refuge, Arkan- pleted Projects category. Senate Committee repbrts in funding the sas, in the Felsenthal Pool. Testimony indi- The conferees direct that no upfront fi- Tennessee-Tombigbee Water project from cates significant prior commitments to local nancing or cost sharing of projects under available fun&. This action is not intended interests to provide access roads, boat the small’continuing authority programs be to show any decrease in the rate of activity ramparecreation and sanitary facilities. Ac- implemented until Congress fully considers leqling-,to a scheduled September 1965 cordingly. the conferees have included and addressessuch “innovative financing”. *open-to-navigation date. During the House funds in the bill for the Corps to proceed Amendment No. 3: Restores language pro- debate, it was stipulated that the remaining with this work consistent with prior com- posed by the House and stricken by the cost to complete the project for navigation mitments. Senate amended to read as follows: and related features was $202.000.000. Of In connection with the Pearl River that amount, $180.000.000is from the avail- project, the Committee ls aware of possible , of which $5.200,000shall be made available able deferred funds, and the remaining economic, real estate, and induced drainage for the Miami Harbor. Bayfront Park $22.000.000,if needed. from unobligated bal- problems in other reaches associated with project, Florida; and., in addition, notwith- ances. Further, the conferees are agreed to providing flood protection at the Jackson standing any other provtsion of law, the following language which was included reach first. Therefore, in the development $10.000.000, to remafn available until es ln the Senate Bill: of the improvements for flood protection pen&d, for the Yatesville Lake constnrction No funds under this heading shall be used for the Jackson, Mississippi. area, the Corps project for further study or construction or in any shall carefully consider and minimize the Amendment No. 4: Deletes language pro- fashion for a federally funded waterway adverse impacts of these works on other posed by the Senate relating to the Tennes- which extends the Tennessee-Tombigbee reaches of the Pearl River. see-Tombigbee project. project south from the city of Demopolls, The funds included in the bill. for the The funds appropriated are to be allo- Alabama Sardis Lake, Okla.. project include $509.000 cated as shown in the following table: :.. ; , 2.-.. 5. . zg $&. . __ :.. _’ -,:- “.<~y :(,a:i +- .:- .p;:<.g “II1‘ .12-,‘: ,7 :A ig . $2.

V ’ :. k-,3 ,: ’ in, June 28, 1983 CONGRESSIONAL RECORD - HOUSE H 4&9 . Trrc of Budget Conference ProJect Constructionr General - State and rroject l stiaate allouance -_-__------~--- , ALABfwA

(N) TENNESSEE TOHBIGBEE UATERUAYv AL t HS,...... , --- (N) FRANKLIN FERRY BRIDGE, JEFFERSON COUNTY...,,...... lreOOlOOO

ALASKA

(FC) CHENA RIVER LAKES....,.,,.....~I.~~.....;.,,...... ~. 8r000t000 81000~000 (N) KAKE HARBOR,....~...~.,.~...... ~....,.,.,~,,,,,.,,..., 501000 5OIOOO (HP) SNET7ISHAtl 3RD F’OUER UNIT ...... I...... --- 4~0001000

ARIZONA

(FC) INDIAN BEND bfA$y ,,...... ~,,...,..,,,,,,.,,~...... ~.. 3r8041000 3r6041000 (FC) PHOENIX AND VICINITY (STAGE 2 I REtlAINING YORK)...... 8,500t000 81500r000

ARKANSAS

(N) HCCLELLAN-KERR ARK RIVER NAVIGATION SYSTEti LOCKS AND DAtlS, AR t OK....,...... ,,,...,...... 5,570~OOO 5,5701000 (WI OUACHITA t BLACK RIVERS, AR t LA ,.,I.,*....,...,,.,,., 9,200rOOO 12~700,000 (FC) RED RIVER EMRGENCY BANK PROTECTIONS ARt LA* OK 1 TX.. me- 6~800,000

CALIFORNIA

(N) BODEGA BAY ,,,,.~.....,....,...l,,,,,.,,,,,.,...~,.,... 5oovooo --- (FC) CUCAtlONGA CREEK ,.....*.....*..l...... ,....*.....**.... 2rPOOrOOO 2t9OOvOOO (FC) DRY CREEK (UARtl SPRINGS) LAKE AND CHANNEL.,,...... , 12~ooovooo 12r000~000 (FC) FAIRFIELD VICINITY STREAtlS l ,...*..1.....,.,,...,..,.,* 320,000 320rOOO (BE) IHPERIAL BEACH ...... 1.~.....*..*...... *...... 2~000t000 (FC) LACDA LOS ANGELES RIVER CHANNEL (REHAB) . . . ..*...*..... 51000,000 (FC) LOUER SAN JOAQUIN RIVER...... ,.,,~.....,.~~. 2r500,000 (FC) HERCED COUNTY STREAMS.,....,...... ,,...,,....,..,... --- tnr, NEU hELONES LAKE l .,.1,....,..1....~,,,,..,~~...,...... 7;300,000 (FC) ‘SACEAttENlO RIVER BANK PROTECTION ,,....,.....,..,*..... 21500,000 (FC) SACRA~~ENTO RIVE_R* CHICO LANDING TO RED BLUFF...... m-v 2,oooiooo ,I' (FC) SACRAtlENTO RIVER 1 HAJOR AND HINOR TRIBUTARIES...... 200,000 200,000 (N) SAN FRANCISCO BAY TO STOCKTON ..*...... ,...... 8r0001000 910001000 (FC) SAN JACINTO RIVER LEV L BAUTISTA CRK CHANNEL....‘...... 6r573rOOO ~61573lOOQ (FC) SAN LUIS REY RIVER 1.1,....*1...... ,,.,,,...... 900I000 (BE) SURFSIDE-SUNSET t HEUPORT PEACH.....,.,...... 3~800r000 3~8Oor000 (FC-) SUEETUATER RIVER.,.....,...... ,...,...... ~.. --- 2r000~000 (FC) UALNUT CREEK ,~.,...1,.1,.,1.,,...,,~.~...,,~....,..... 4~700~000 4~700r000 (FC) UILDCAT t SAN PABLO CREEKS ,,,..,,,...... I,,....,..... 320rooo 320rooo

COLORADO

(FC) CHA~FIELD LAKE .,...,....*,,,.1...... ,,....**.*.,.*...~ 2r0001000 2r000~000

CONNECTICUT ._. (FC) NEU LONDON HURRICANE PARRIER ,,*,.,..,.,..*,...*,,.*... 825rOOO 825,000 , _--- -;' ,/‘- DELAWARE _. (FC) DELAUARE COAST REACH EROSION CONTROL I HURRICANE PROT. 7751000 775*000

FLORIDA

(BE) BROUARD COUNTY (REIHB) ,,~.....,,,.,,,~,,,,,,.....,,,.~ 41600,000 4,600;000 (Ml CANAVERAL HARBOR ,..,I~,I,~.~.~...I.,,~..,..~...~.~..~~ --- 3r000,000 (FC) CENTRAL t SOUTHERN FLORIDA .,.,,,,,,..,..,,,.,.,..1..1. 11~100~000 11?100#000 (FC) DADE COUNTY ,,.,~*.....,II.,.,..~..I,~.1~1.~.I...... 3gotooo 300r000 (BE) DUUAL’ COUNTY ,,,,,..,,.~.,.,.I.~,.~.,~.,...,~~.~...... lr500Y000 1~500,000 (FC) FOUR RIVER BASINS l ~...,*..,,.t,,o.,,,,..,,..,...111.. 51000~000 3~0001000 (BE) PALM BEACH CO* HARTIN-LAKE UORTHv SO. LK UORTH-RROUARD (REIHB) ,,,,,,,,,.‘.....~,“.,.~,“‘II. 2~300,000 2rJOOtOOO (BE) PINELLAS COUNTY..,.,..,.,.....,.....,...~...... ~,~~ 7001000 7001000 (N) TAHPA HARBOR-RAIN CHANNEL ...... I...... 17,000~000 17t000~000

GEORGIA

(tip) HARTUELL LAKE UPPER AND LOUER DIVERSION DAHSt GA I SC (HAJOR REHAB)...... ,...... 2r600~000 (HP) RICHARD B. RUSSELL DAR AND LAKE9 GA t SC .*...,...*.‘... 51r500r000 (Iv) UALTER F. GEORGE LOCK AND DAII (MAJOR REHAE)r GA I; AL.. lotoooIooo

. CONGRESSIONAL RECORD - HOUSE June -%

Twe of Budget _ Conference Project Construction, General - State and rroject estimate 1 al louance ---______-______------

HAUAI I

(HI BARBERS FOINT HARBOR, DAHIJ ...... l.. 18f000,000 18r000,000 tFC) KAHOHA STREAH ..,,....ll.,...... ,...... 5~000~000 e-w tN, KAHULUI HARBOR, HAUI (REHAB) . . ..1...~....,~...~..~~,,., 660,000 660,000

IDAHO \ (HP) DYORSHAK DAH:AND ...... *...111~t...... 4r000P000 4r000?000 , (iIF) LEYISTON - CLARKSTON BRIDGE? ID t UA . ..*****..*.t..,,, --- 640,000 i ILLINOIS

(FC) EAST $1. LOUIS AND VICINITY . . . ..*...... ;,...... , 2,bOOvOOO 2vbOOrOOO (Ml ILLINOIS YAlEWAY LOCKPGRT LtD (REHABI.,....,..,...., 9lQ00,000 9~000~000 (HI ILLINOIS UATERUAYv BRANDON ROAD LID (REHAB).....,..... 1 bvOO?,vOOO 6~0001OOb (FC) KASKASKIA ISLAND DRAINAGE AND LEVEE DISTRICT...... , 3~5POrooo 3~500t000 _’ ’ (HI KASKASKIA RIVER NAVIGAiiON ...... *... 51500?000 51500,000 -,:-I’ ( LOCK AND DAH NO 26, HISSISSIFFI RIVER, ALTONI IL I HO. j ..-x- (Ml 53~800r000 53~800,000 (HI LOCKS AND DAH 53, IL t KY (REHAB) .,rr...r...... , 500t000 500~000 (Ml LOCKS AND DAK 52r IL t KY (REHAB)...... ,,..,....,,.. i,O29,000 lvO29,OOO (FC) IICGEE CREEK DRAINAGE AND LEVEE DISTRICT .*..**..t....*, 5,bOOtOOO SvbOO,OOO (FC) HILAN ...... 4~830r000 1’ ; (FC) ROCKFORD ...... 1~500~000 (N) SHITHLAND LOCKS AND DAH, IL? IN L KY ...... 820 a00 I /I (FC) UOOD RIVER DRAINAGE AND LEVEE DISTRICT ...... 1~500,000

INDIANA

(FCI EVANSVILLE ..~...I,1O...,l...... ,,~...... ,.,...,,. 2~100,000 2~100~000 IOWA

(FC) BETTENDORF ...... **.I...... *...... *...... * 3rG00r000 3rBOOvOOO (FC) CORALVILLE LAKE ..*...... *....I...... ~.....*.... 3,000,000 3r000,000 (FC) DAVENFORT~...... ~..~r..,...r,...... ,...... 1~200,000 -we (FC) LITTLE SIOUX RIVERI.....,...... ,...... 300r000 300,000 (FC) HISSOURI RIVER LEVEE SYSTEM, IAv NE1 KS t HO..,....,.. lrlOo?OOO lr100,000 (FC) SAYLORVILLE LAKE ..,.,..t.,...... ,....,,* 1eBbOvOOO 510001000 (FC) UATERLOO,...... ,...r..,...... ,...... 2~000,000 2~000~000

KANSAS

(FC) EL DORADO LAKE ...... b,BOO,OOO b,BOO,OOO

KENTUCKY

(FC) BIG SOUTH FORK NATIONAL RIVER t RECREATION AREAS KY t TN ...... 10~5001000 10,500r000’ (FC) CAVE RUN LAKE ...... 11360r000 lr360~000 (HF.) LAUREL RIVER LAKE ...... 700~000 700,000 (FC) FAINTSVILLE LAKE ...... 3~300,000 3r300,000 (FC) SOUTHUESTERN JEFFERSON COUNTY ...... b~OOOvOO0 6r0001000 (FC) TAYLORSVILLE LAKE ...... 4~4OO~OOO 4~400,000 (FC ‘) YATESVILLE LAKE ...... --- 10~000~000

LOUISIANA

(FC BAYOU BODCAU AND TRIBUTARIES ...... 400~000 400r000 (FC LAKE FONTCHARTRAIN AND VICINITY (HURRICANE PROTECTIONS 16~800rOOO 16~8001000 (FC LAROSE TO GOLDEN HEADOU (HURRICANE PROTECTION) ...... 5~700r000 5r700,000 (N) LELAND BOUHAN LOCK (REPLACEHENT) ...... iOv325~000 10~3251000 (N) MISSISSIPPI RIVER - GULF OUTLET ...... 5001000 500P000 (Ml HISSISSIFFI RIVERv BATON ROUGE TO THE GULF OF HEXICO . . 800,000 800,000 (FC HORGAN CITY AND VICINITY (HURRICANE PROTECTION) ...... 280~000 280~000 (FC NEU ORLEANS TO VENICE (HURRICANE PROTECTION) ...... 4r400,000 4*400?000 (N) RED RIVER UATERUAY --MISSISSIPPI RIVER TO SHREVEPORT . . 63~700,000 631000,000

MINE

(HI JONESPORT HARBOR ...... 25,000 25~000

HICHIGAN

(FC) SAGINAU RIVER ...... --- 500?000 - June 28, 1983 . C~NGRESSI~NALRECORD -HOUSE H 4591 Type of Budget Conference FroJect Constructions General - StJte and rroJect - JStiJJtJ JllOUJWX’ ------

MARYLAND

(Ml BALTIMORE HARBOR t CHANNELSv HD t VA (SO FT PROJECT) . . lr200r000 lr200~0OO

HINNESOTA 9 (FC) BASSETT CREEK ...... 6~000t000 --- (FC) BIG STONE LAKE, YHETSTONE RIVER* HN t SD ...... 1.750,000 lr750~000 (FC) WNKATO t NORTH HANKATO ...... 7,200,OOO 7,200rOOO (FC) ROSEAU RIVER ...... --- 250~000 1FCl UINONA ...... 2vbOOrOOO 2,600rOOO HISSISSIFFI

(FC) FEARL RIVER VICINITY OF JACKSONv MISS ...... --- 16t000,000 (FC) TOHBIGBEE RIVER AND TRIBUTARIE,S, MS t AL ...... lr400r000 1~400,000

HISSOURI

(FC) BLUE RIVER CHANNEL InYROVEHENT ...... --- 210001000 (HP) CLARENCE CANNON DAH AND HARK TUAIN LAKE ...... ilrb30rOOO 11,630vOOO (nP) HARRY S. ‘TRUtlkN DAH AND RESERVOIR ...... 8~000,000 819001000 (FCI LITTLE BLUE RIVER CHANNEL ...... 3~700,000 3r700,000 (FC) LITTLE PLUE RIVER LAKES ...... 9~900~000 91900r000 (FC1 LONG BRANCH LAKE ...... 300r000 300~000 ' (N) HISS RIVER BTUN THE OHIO L HO RIVERS (REG UORKS), no I IL ...... 212001000 _ 2~2001000 HONTkNA

(FC) GREAT FALLS ...... 2.000,000 2~000~000 (t!Pb LIBBY AODITIONAL UNITS ...... 2r600vOOO 2,600rOOO

NEBRASKA

(FC) FAFILLION CREEK AND TRIBUTARIES LAKES ...... 41400P000 4~400r000

NEU JERSEY

(WI BARNEGAT INLET ...... 2101000 (FC) ELIZARETH RI&R FLOOD CONTROL PROJECT ...... 4~800vOOO 4,000r000

NEU YORK

(BE) EAST ROCKAUAY INLET TO ROCKAYAY INLET AND JAHAICA BAY. 3~200vOOO 3v200rOOO (FC) ELLICOTT CREEK ...... 6007000 --- (FC) FIRE ISLAND INLET TO HONTAUK POINT, LONG ISLAND ...... --- 5001000 (N) IRONDEOUOIT BAY ...... 110~000 110~000 !N) NY HARBOR COLLECTION t REtlOVAL DRIFT PROJECT, NY t NJ. 1r3001000 3r0001000 . NORTH CAROLINA

(HI AIUU-REYLACEHENT OF FEDERAL.HIGHUAY BRIDGES ...... 1~500r000 lr5001000 --<,;;: (FC) B. EVERETT JORDAN DAtl AND LAKE ...... 8~200rOOO 8,200r000 (FC) FALLS LAKE.~.;...... ; .. 4r300,000 41300r000 (Mb HANTEO (SHALLOUBAG) BAY...... ; ...... 500?000 -t (FC) RAN@LEI(AN LAKE ...... 2~700rOOO ---

NORTH DAKhTA

(FC) LAKE DARLINGI SOURIS RIVER ...... lrOOOtOOO 1v0007000

OHIO

(FC) HILL CREEK ...... 1ovooo,ooo 10~0001000~ (FC) HUSKINGUH RIVER LAKES (DAH SAFETY ASSURANCE) ...... 3r200,OOO 3*200rOOO (FC) HUSKINGLM RIVER LAKES (REHAB) ...... 113001000 11300r000 (FC) NEUARK ...... 300r000 300r000 (FC) POINT PLACE ...... 2f500~000 2r5~0~000

OKLAHOtlA

(FC) ARCADIA LAKE ...... 8r300,000 8,3901000 (FC) SARDIS LAKE ...... lrOOOtOOO (FC) SKIATOOK LAKE ...... llrOOOlOOO ._. .~

.

H 4592 CONGRESSIONAL RECORD ie HOUSE ’ June28 , Typeo f Budget ., Conference Project Cons+,ruction, General - Statc’and Project estimate allowance

______-______------______eWV------._-_------

OREGON

(HP) BONNEVILLE SECOND FOUERHOUSE, OR t UA,..,,.....*.....* 18,500,000 18~5oovooo (tlP1 JOHN DAY LOCK AND DAtl, LAKE UtlATILLAt OR B W(\...... 4r500,000 13P800P000 (FCI LOUER COLUKBIA RIVER BASIN BANK PROTECTIONt OR t WA.., 2,000~000 210001000 (W) SIUSLAU RIVER AND BCLR~CONT INUATION;..,...l...... ~.~. e-w 5,600,000 (FC) UILLOW CREEK LAKE HEPFNER,,...,,,.,,,,,,....,,...... zr9441000 2r944,ooo (FC1 UILLAUETTE RIVER BASIN BINK FROTECTION,,,t**...... ,... 700,000 700,000

-..PENNSYLVANIA w (N) EllSWORTHLOCKS AND DMr OHIO RIVER o(AJOR REHAB) ...... 7r400,000 7,4do,ooo (FC) KINZUA DAM AND ALLEGHENY RESERVOIR, PA I NY (HAJOR REHC\Bl...... 3~200,000 3r200rOOO (N) FlONTGOllERYLOCKS AND DAllt OHIO RIVER (tl&JOR REHAB).... 3,700,000 3,7001000 .- (BE) PRESOUE ISLE ...... lr240~,000 990,000 WYOKING VALLEY, PA (REtiEDIAL UGRKl (DEF COR) 2~80.0:000 21800rOOO ’ (FC) ...... /_/-- _ .- PUERTO RICO I (N) PONCE HiRBOR...... 25,000 25~000 (FC) FORTUGUESAND RUCANA RIVERS ...... 25P000,000 25r0001000

SOUTH CAROLINA

(N) COOPERR IVER, CHARLESTONHARBOR ...... 9~800~000 9~800,000 tN) LITTLE RIVER INLET, SC t.NC ...... 1,761,OOO 11761POOO

TEXAS

(FC) ARKANSAS-RED RIVER B&SINS CHLORIDE’CONTROL(AREA VIII) 3v329vOOO 3,329.000' (FC) COOPER LAKE AND CHANNELS...... --- 250rooo IN) CORFUS CHRISTISH IP CHANNEL (1968 6x7) ...... 9?200,000 91200,000 (BE) CORFUS CHRIS71 BEACH (RESTORATION PROJECT)...... 995,000 995tooo (FCl EL FASO...... 4~550~000 4r5501000 (N) FREEFORTHARBOR ...... 751000 751000 (N) FREEPORTHARBOR (RELOChTION OF NORTH JETTY) ...... 3v350~000 --- (FCl HIGHLAND BAYOU...... 100?000 100,000 (FCl JOE FOOL LAKE (FORMERLYLAKEV IEW LUKE)...... 22~800,000 22r800~000 (N) KOUTH OF COLORADOR IVER ...... --- 21500?000 (FC) RAY ROBERTSLAKE ...... 42rOOOvOOO 42,OOOvOOO (FC) RED RIVER LEVEES 1 BANK’S TAB. BELOU DENNISON DAti TX, hR I LA...... I ...... lt6001000 LFC) SAN ANTONIO CHANNEL IHPROVEMENT...... 6,500,000 6r500~000 (FC) SClN GABRIEL RIVER ...... i, ...... 250r000 250r000 (FCl TnYLORS BAYOU...... 2,bOOvOOO 3r1001000 (FCl VlNCE.AND LITTLE VINCE PAYOUS...... ~ ..... 3,000~000 310001000 (FCl WALLlSVILLE LAKE ...... 100?000

VIRGINIA

(FC) VIRGINIA BEACH STREAM, CANAL NO TUO...... 11211,000 --- (PEI VIRGINIA BEACH, VA (1962HOD IFICATION(REIHB)) ...... 430rooo 4301000

UASHINGTON

(LIP) CHIEF JOSEPH DAD ADDITIONAL UNITS...... 16r700,OOO (N) LAKE WASHINGTONSH IP CANAL (REHAB)..,...... 3r720vOOO (HFl LOUER GRANITE DAD, UA.,I...... ,,*.....,...... *...... w-e (LIP) LOWERSNAKE RIVER FISH AND WILDLIFE COtlFENSATION~W &p . ORIID ...... 1...... 18~700,000 20?0001000 (FCl UiLL CREEK LAKE (REtlAB) ...... I...... 1,500r000 lr5001000

UEST VIRGINIA

(FC) BEECH FORK LAKE.....,...,,,...,...... ,..~.;.~..~ 2~000~000 21000f000 (FCl BURNSVILLE LAKE..r.r...... rrr...tt...... ~...... ~ 750,000 750,000 (FCl LEVISA 8 TUG FORKS OF BIG SANDY RVR t CUKPERLANDRVRr UVP VA t KY,.,...,,.,..,.....,.....,,..,...... ~~. 600,000 3,600~000 (FC) R D BAILEY LAKE...,,,,...,...... ,...,...... 2v3OOvOOO 2,300~000 (FC) STONEUALLJACKSON LAKE ..,,.,....,,,...,,,,,,.,*,....,. 26~000~000 2610001000 ‘June 28, 1983 CONGRESSIONAL RECORD - HOUSE H-4593 Trre of Budget Conf eienc; Project Constructionv General - Statcand project estimate allowance ______^------

,. HISCELLANEOUS

SHALL NAVIGATION FROJECTS (SECTI(li1 107)...... ,.... 2v300,OOO 3r000~000 HITIGATION OF SHORE DAHAGES A77RIBU7ABLE 70 NAV PROJ \ (SECTION 1111 r.r...*....**r.r...... ,;...... ,.., 550.000 550,000 SHALL BEACH EROSION CONTROL PROJECTS (SECTION 103).... t r800,OOO 3,800rOOO SHALL PROJECTS FOR FLOOD CONTROL I RELATED PURPOSES (SECTION 205~.....:...... ,....,...,~..,.~...,.... 16r4001000 1713001000 EhERGENCY STREAtiBANK X SHORELINE FRO7EC7ION,(SECTION 14~...... ~..~..~...... ,.,,...... ,.,, 4~0001000 4r000,000 SHALL SNAGGING t CLEIIRING PROJECTS (SECTION 2081....+. .250rooo 3751006 RECREATION FACILITIES AT COHFLETED PROJECTS...... ,, 810061000 13~500f000 AQUATIC PLANT CONTROL (1965 ACTl...... ,..,.;...... ,., 5r000,000 5rOb~),ooo EhFLOYEES COMPENSATION...... ,.,..,,...... 9,4do,ooo 9~400~000 REDUCTION FOR ANTICIFATED SAVINGS AND SLIPPAGE...... ,. -139s446,0,00 -110,446~OOO FUNDS AVAILABLE FROtl FY 1983 UEFERRAL...... -40~000~000 -me = ==II==P==P====

TOTAL CONS~RUC~IONI GENERAL...... ,...... 820r700vOOO 894,104,OOO ===3=L-======z ------iz---___ ------I

TYPE OF PROJECT: (N) NAVlGATION (FC! FLOOD CONTROL (PFb BEACH EROSION CONlHOl. (MF) tiUL7IFLE-PURPOSE* INCLUDING POUER

,,-/;-

. CONGRESSIONAL RECORD - HOUSE Revolving Fund

Amgndment No. 5: Appropriates $9,500,000 as proposed by the' House for a Corps of Engineers' learning facility and restores the House language.

Flood Control, Mississippi River and Tributaries, Arkansas, Illinois, Kentucky, Louisiana, Mississippi, Missouri, and Tennessee

Amendment No. 6: --Appropriates $300,480,000 for Flood Control, Mississippi River and Tributaries, Arkansas, Illinois, Kentucky, Louisiana, Mississippi, Missouri, and Tennessee instead of $310,330,000 as proposed by the House and $297,960,000 as proposed by the Senate. _

.- The Committee is aware of the value of the lower lpde at Sardis Lake '-2 --- and that such lake could be maintained for- fishiny and boating without retarding the flow from the reservojr. Therefore, the Corps is directed to plan, design, and construct the works necessary to maintain desirable water levels in the lower lake without adversely impacting the drainage of.flodd water from the upper lake. The Committee is also aware of sedimentation problems occurring in parts of the lower lake-and Upper Little Tallahatchie River and directs the Corps to determine if removal of such material is feasible at this time to fulfill the purposes of the project.

'The funds appropriated are to be allocated as shown in the following table: . TYPC ol Budget Conference ProJect Flood Control, Mississippi River and Tributaries estimate allouance ______-_---_------

‘.. GENERAL INVESTIGATIONS

SURVEYS: GENERAL STUDIES: (FDF) BOEUF-TENSAS BASIN, AR t LA...... ,,...,,,..... 185rOOO 985rOOO (FDP) LARTO LAKE-SALINE AREAt LA.,....,....,...,...,,.. --- 240,000 (FDF) ST. FRANCIS RIVER.BASIN BELOW UAFFAFELLO LAKEI AR t nO..,.,...... ,...,.....,...... 585,000 585,000 (FDF) MYFIELD CREEK AND TRIBUTARIESt KY ..*...... *.,..t 320 1000 320rOOO (FDF) ATCHAFALAYA BASIN (WATER t LAND RESOURCES)r LA.., 235rOOO 350,000 (FDP) YAZOO RIVER BASIN, WS....,,...... 225 I 000 d 900~000 (FDP) fiISSISSIFFI AND LOUISIANA ESTUARINE AREAS...... --- 60,000 (SPEC) HISSISSIPFI RIVERt EAST BANK NATCHEZ AREA...,.... --- 150r000 (COtiF) EASTERN -ARKANSAS REGION COHPRENSIVE STUDY.....,.. --- 100t000 COLLECTION AND STUDY OF BASIC DATA...... ,...... 260,000 260,000 ADVANCE ENGINEERING AND DESIGN: (FC) EASTERN RAFIDES 1 SOUTH CENTRAL AVOYELLES...... --- 280,000 (FC) L’ANGUILLE RIVER BASIN1 AR....,,...... ,...... 300,000 500,000 (FC) HISSISSIFPI DELTA REGION SALIHITY CONTROL STRUCTURE, LAt.r.r,...... r..,...,..,....~..r 800,000 lr200,000 -_-___-______----______-__-_ SUPTOTAL, GENERAL INVESTIGATIONS...... ,...... 2~910,000 5~930rooo E=II===I======S S==S=L===II===E r CONSTRUCTION

(FC) CHANNEL 1tlFROVEtlEN7~ AR, IL, KY? LA, tlS, HO t TN‘...... 52r000,000 52~0001000 (FC) tlISSISSIPP1 RIVER LEVEES, AR, IL, KYr LA? tiS, HO* t TN 27rOOO~OOO 271000,000 (FC) ST. FRANCIS BASIN, AR I MO ...... I...... 4?400,000 4~4001000 (FC) TENSAS BASIN* AR t LA: (14,840#000) (14~840,000) BOEUF AND TENSAS RIVERS? EXCEFT LAKE CHICO7 PUt(FING PLANT ..,...... ~....I,...... 800,000 800,000 BOEUF AND TENSAS RIVERS9 LAKE CHICOT FUHFING PLANT llr950,000 * 111950,000 RED RIVER BACKUATER AREAI EXCEPT TENSAS COCODRIE FUIIPING PLANT...... ,...... ,. 1~300,000 11300r000 RED RIVER BACKWATER AREA* TENSAS COCODRIE PUMPING PLANT ,,,,...... ~...... 790,000 790,000 (FC) TENSAS WILDLIFE REFUGE ,,,t,..,,,...,.,,.....,.,..~.... --- 15?000~000 (FC) .REELFOOT LAKE - LAKE NO. 91 KY t TN....r..r...rt.~.,.. 30,000 30rooo (FC) ATCHAFALAYA BASIN, LA..t.....r..+~.,....r.r....r...r... 231800r000~ 23r800,OOO ,?:. I f .. June 28,1983 * CONGR&SSION+L RECORD - HOUSE h 4595 ,‘; ‘, ,j& Type of Buddet Conference <; Project Flood Control, tiississiwi River and Tributaries estimate al louance 1, 1 ,---;--,----,-,----,--,,------, ,?’ !

(FC) BAYOU COCODRiE AND TRIBUTARIES, LAt.,.ll,.,..,,I.,..., 3oorooo 300P000 (FC) LOVER RED RIVER-SOUTH BANK LEVEES, LA,...... 600l000 600rOOO (FCl OLD RIVER9 LA ,,.I,,.,..,,,,,~,,.,,...,I..,...... ,. 65r9401000 651940~000 (FC) YAZOO BASIN# MS: (14r340r000) (26,BOOrOOO) BIG SUNFLOUER RIVER .,.,....1....,1..1...... ~.,.... 3~324,000 31324,000 GREENWOOD ,.,,,,1,.,,,.,,,.,*1,...... ~...... 290 9 000 290 ~000 WIN STEH,.,..,..,....,...... ~...... ~..I~.I,.... 613~000 613fOOO TRIBUlARIES: EXCEPT ASCALHORE-TiPPO AND O~POSSUH BAYOUS., a... 3?032~000 5,792,000 _ ASCALHORE~TIPPO AND OFFOSSUH BAYOUS...... 1,698,000 4,09BrOOO UPPER YAZOO PROJECTS (FORHERLY AUXILIARY CHANNEL). 4;236,000 5rB36rOOO YAZOO BACKUATER ,.,,.....*,..,,...,...... 1,.... 1,1471000 41047100~ Y&ZOO BACKWATER FUWING PLANT....,...... --- 2~000f000 (FC) UEST TENNESSEE TRIBUTARIES, TN,.,.,..,.,.,,...... 2r7001000 2r7001000 -----_-___-____ ------SUBTOTALt CONSTRUCTION .,...... ,,...,,,,,.,.,,,.. 205~950~000 ==I====3=5EL===

hAINTENANCE

(FC) BOEUF-TENSAS BASIN* AR AND LA ...... 273,000 2731000 (FC) UNITE RIVER BACKUATER, AR ...... 640rOOO 640,000 (FC) WIJPPING, AR* ILv KY* LA, MS9 HO I TN ...... 9orooo 90,000 (FC) tlISSISSIPP1 RIVER LEVEES, AR, ILt KYI LA, HS, HO 1 TN. 16rBG6~000 16t886,OOO (FC) NORTH BANK, ARKANSAS RIUERv AR ...... 177rooo 177,000 (FC) SOUTH BANK, ARKANSASsRIVERq AR ...... 290rOOO 2901000 (FC) ST. FRANCIS RIVER BASIN, AR I n0 ...... 3r92OrOOO 3,925,000 (FC) ATCHAFALAYA BASIN, LA ..i ...... 4r7951000 4,795,000 (FC) BAYOU COCODRIE t TRIBUTARIES, LA ...... 531000 53,000 (FC) BONNET CARRE SPILLUAY, LA ...... 242,000 242rOOO (FC) LOUER RED RIVER+ SOUTH BANK LEVEES, LA...... ; ...... 264,000 264,000 (FC) OLD RIVER LA ...... 4,772rOOO 4~772,000 (FC) RED RIVER BACKYATER AREA, LA ...... 195~000 195,000 (FC) ARKABUTLA LAKEI MS ...... 1,663,000 1~663,000 (FC1 BIG SUNFLOUER RIVER, tlS ...... 147rooo 147rooo (FC) ENID LAKE, HS ...... 1*996,000 lr996,OOO (FC) GREENWOODr HS ...... 4031000 403~000 (FC) GRENABA LAKE1 tlS ...... 2,399rOOO 2,399,OOO (FC) YAZOO BASIN, HAtN FTEH! flS ...... l...~ ..... lr0G3r000 1 r033rooo 1FC) SARDIS LAKEg MS ...... 2,61GfOOO 2~61BtOOO (FC) YAZOO PASIN* TRIBUTARIES, MS ...... 894rOOO 894rOOO (FC) UHITTINGTON AUXILIARY CHANHELt HS ...... 236,000 236 P000 (FC) YAZOO BACKUATER, HS ...... 202,000 202 ) 000 (FC) YAZOO CITY, M ...... 2479000 247,000 (FC) YAPPAPELLO LAKEI tl0 ...... 1~460r000 1,460,000 (FC) REVETnENT AMP DIKES ...... 29rOOOrOOO 29*000,000 (FC) DREDGING ...... 201000f000 20~000~000 INSPECTION OF COMPLETED UORKS ...... 400,000 400 t 000 (FC) ------o-___ -_------_--__-- . SUBTLi?AL, tlAINTENANCE ..,,..,,...,..,....I...... 95f345,OOO 95~345~000 ==:I =====p:======l===l=E==ID= . ._. ._e- .-’ REDUCTION FOR ANTICIPATED SAVINGS? SLIPPAGE, AN@ UNORLIGATED BALANCES ,,,,...,,.I..,..,...,...,.,.,..~ -14,205,000 -34,205,000 / =I=P=3====L==== ------5====e------

TOTAL* FLOOD CONTROL, HISSISSIF.PI RIVE5 t TRIBUTARIES. 290r000,OOO 300~4801000 ==r======l====L ======5=

TYPE’.OF STUDY OR PROJECT: (FC) FLOOD CONTROL (FIIF’) FLOOD DAIIAGE FREVENTION H 4596 CONGRESSIONAL RECORD - HOUSE June 98, Operation and Maintenance

Amendment No. 7: Appropriates $1,184,492,000 instead of $1,215,032,000 as proposed by the House and $1,170,620,000 as proposed by the Senate.

Amendment No. 8: Restores language proposed by the House and stricken by the Senate earmarking $319,000 for the Dismal Swamp Canal, Virginia and North Carolina.

The funds are to be ._allocated as shown in the following tab le; .,. Type of Budget Conference Project Operation and Haintenance - State and rroJect estimate allowance _____-_-__---__---__------I__------_----_------___-______

ALABAHA

(N) ALABAMA-COOSA RIVERS ...... 4,443?000 5~5001000 ./_z---.- (N) BAYOU CODEN ...... -.* ...... 225~000 2251000 (N) BAYOU LA BATRE CHANNEL ...... --- 500r000 (N) BLACK UARRIOR t TOtiBIGBEE RIVERS ...... 91814rOOO 131000~000 (N) BON SECOUR ...... m-w 300 IO00 (N) FLY CREEK ...... --- la9fooo (N) GULF INTRACOASTAL UATERUAY (HOBILE DISTRICT) ...... 2,695rOOO 5~00~,000 (N) MILLERS FERRY LOCK t DM-UILLIAH ‘BILL’ DANNELLY LAKE. 2r963vOOO 3r500?000 (N) MOBILE HARBOR ...... 3r893~000 5~0001000 (N) PER0100 PASS ...... --- lr000,000 (N) REHOVAL OF AQUATIC GROUTH ...... 60,000 60?000 (HP) ROBERT F. NENRY LOCK t DAH ...... 2~423,000 3~000,000 (Hi TENNESSEE-TOHBIGBEE UATERUAYv AL L HS ...... 7~201rOOO 7~201,000

ALASKA

(N) ANCHORAGE HARBOR ...... 1,790ro00 117901000 (FC) CHENA RIVER LAKES ...... 708,000 708rOOO (N) DILLINGHAtl SHALL BOAT HARBOR ...... 495tooo 495 IO00 (N) HOMER HARBOR...... t ...... 3701000 370,000 (N) KINQ CO& HARBOR ...... 920~000 920,000 (N) NINILCNIK SHALL BOAT HARBOR ...... 345rooo 345,000 (Mb NOHE. HARBOR ...... C ...... 883,000 883 9 000 (N) SNAGGING ...... 181000 18,000

ARIZONA

(FC) ALAN0 LAKE ...... 632~000 632,000 (FC) PAINTED ROCK DAH ...... 622 r 000 .622,000 (FC) UHITLOU RANCH DA!! ...... 6451000 645,000

ARKANSAS

(MP) FEAUER LAKE ...... 1~908~000 1,90f3,000 (MY) BLAKELY tlOUNTAIN DAHv LAKE OUACHITA ...... 2~7.59~000 2,769,OOO (FC) BLUE NOUNTAIN LAKE ...... 533?000 533,000 (tip) BULL SHOALS LAKE ...... 2r97SrOOO 2r975fooo (HP) DARDANELLE LOCK t DAtl ...... 2~927rOOO 3r9?7,000 (HP) DEGRAY LAKE ...... 2r648r000 2r648,OOO (FC) DEGUEEN LAKE ...... 515rooo 515rooo (FC) DIERKS LAKE ...... 5271 oqo 5271000 (FC) GILLHAH LAKE ...... 414vooo 414,000 (HP) GREERS FERRY LAKE ...... 2~238~000 2~368~000 (N) HELENA HARBOR ...... 330,000 330r’)QO (N) HCCLELLAN-KERR ARK RIVER NA’JIGATION SYSTEH LOCKS I’ DAHSv AR t OK ...... 141a66rooo 14r866rOOO (FC) HILLUOOD LAKE ...... 1,253,000 lr253.000 (HP) NARROUS BAti - LCIKE GREESON ...... 21.3151000 21315~0’30 (FC) NI.HROD LAKE ...... SG9YOOO 5891000 (HP) NORFORK LAKE ...... 11874rOOO lr874~000 ‘CM) OSCEOLA HARBOR ...... 650,000 650~000 (N). OUACHITA 1 BLACK RIVERS9 AR I LA ...... 3,675rOOO 3~675,000 (HP) OZARK-JETA TAYLOR.LOCK 1 DAH ...... 4~026,000 4,026,OOO I (N) UHITE RIUER ...... 21090,000 2~090,000 CONGRESSIOiVAL RECORD - HOUSE H 4597 Type of PudSet Conference Project Operation rnd’Haintenance - State and project estimate allowance ------,-,-,,,---,--,,,,-,------,-^------~------

CALIFORNIA

(FCl BLACK BUTTE LAKE ...... lt530,000 1~530~000 (FCI BUCHANAN DAK - HI ‘J . EASTli4N LAKE ...... 1,073,000 lr073r000 (FCl COYOTE VALLEY DAK (LAKE ~EHDOCINO) ...... 1*497,000 11497rooo ' (N) SAN FRANCISCO HARBOR t BAY (DRIFT REKOUALI ...... 115431000 ltS43rOOO (FCI DRY CREEK (UARtl SPRINGS) LAKE X CHANNEL ...... 1 r555rooo l,S53rOOO (FC) FARKINGTON DAn ...... 133POOO 133vooo (FCl HIDDEN DAK - HENSLEY LAKE.....: ...... 11037r000 lt037r000 (N) HUHEOLDT HARBOR I BAY .., ...... 3,503,ooo 31503r000 (FC) ISABELLA LAKE ...... 2~704,000 2r704rOOO . (FCI LOS ANGELES COUNTY DRAINAGE AREA ...... 2~708~000 2~706~000 (N) LOS ANGELES-LONG BEACH HARBORS MODEL..~...... , 125~000 704,000 (N) LOS ANGELES-LONG BEACH HARBORS,.,..r,~.~~,...,...,.... 70rooo 720~000 (FCI HERCED COUNTY STREAK GROUP ...... 135tooo 135,000 (FC) HOJAVE RIVER DAH...... ; ...... 542,000 542,000 (N) HORRO BAY HARBOR ...... -a- 750~000 ( N ). tiOSS L4NDING HARBOR ...... 676?000 676~000 (FCl NEU HOGAN LAKE ...... 998rOOO 9981000 (HP) NEU MELONES LAKE (DOUNSTREAH CHANNEL) ...... 531rooo 531,000 (N) NOYO RIVER t HARBOR ...... 413,000 4131000 (N) OAKLAND HARBOR...... ~ ...... 1~929~000 lr929,OOO (N) OCEANSIDE HARBOR ...... eootooo eootooo (N) PETALUFIA RIVER ...... 11000~000 1~0001000 (FCI PINE FLAT LAKE ...... 1~527,000 1~527~000 (N) RICHtiOND HARBOR ...... 1~912~000 1,912;000 (II) SACRAMNTO RIVER (30 FT PROJECT) ...... 2r543rOOO zr5431000 (N) SACRAKENTO RIVER SHALLOU DRAFT CHANNEL ...... 93,000 93rooo tN) SACRAMENTO RIVER t TRIES (DEBRIS CONTROL) ...... 721,000 721~000 (N) SAN DIEGO H4RBOR (ZUNIGA JETTY) ...... 500,000 500r000 (N) SAN FRANCISCO BAY -- DELTA t!ODEL STRUCTURE ...... 11141~000 lll4lrooo (N) SAN DIEGO RIVER 4ND tlISSION RAY...... 545,000 545,000 (N) SAN FRANCISCO HARBOR ...... 2~332,000 2~332,000 (N) SAN LEANDRO BAY ...... --. 400,000 (N) SAN PABLO BAY I HARE ISLAND STRAIT ...... brb33.000 61633,000. (N) SAN JOAQUIN RIVER ...... 200,000 _ 200,000 ,:' (FC) SANTA ANA RIVER BASIN ...... 2~197~000 2~197,000 tN, SANTA CRUZ HARBOR ...... S19POOO '519,000 (N) SANTA BARBARA HARBOR ...... 11110~000 1~1101000 (FC) SUCCESS LAKE O;...... ~..; ...... 986~000 986~000 tN) SUISUN BAY CHANNEL ...... 732,000 732rOOO (FC) TERIIINUS DAtl (LAKE KAUEAH) ...... lr158~000 lt15Bt@OO (N) YUBA RIVER ...... 25~000 25~000

COLOR4PO

(FCl BEAR CREEK LAKE ...... 3si1000 3s1,ooo (FC) CHATFIELD LAKE ...... 456rOOO 4Sb,OOO (FCI CHERRY CREEK LAKE ...... PS5~000 9551000 (FCI JOHN MARTIN RESERUOIR...... ; ...... 761,000 7blrOOO (FC) TRINIDAD LAKE ...... 493rooo 493,000

_ CONNECTICUT I/?- -;-- , (FCl BLACK ROCK L&E ,,.,,,1..,,...... 1.ll...... I... 21brOOO 21brOOO - (FC) COLEBROOK RIVER LAKE...... ~..~..,...... 177rooo 1771000 (.N ) CONNECTICUT RIVER BELOU HARTFORI~...,.,,,,...,...... , lr452rOOO 1,452,OOO (FC) HANCOCK @ROOK LAKE.,.I....~....~c..,....~....~.,.,,.,, 10br000 106r000 (FC) HOP BROOK LAKE ,,,,,,,,...*..,...... ,.,~.,.,.I.,...,., 347,000 347rooo (FC) MANSFIELD HOLLOU LAKE ,*,,,*.1.*.~.,,1..1....,...*,,.... 206 IO00 206,000 (N) NEU HAVEN HARBOR ,,,,,.,.,~~.,...,I.1.~...... 2rb29tOOO 2~6291000 (FCl NORTHFIELD BROOK LAKE ,,,,,,,...I,.,.,,...,,.1,,...... 159,000 lS9,OOO (N) STAtlFORb HURRICANE BIIRRIER ,.,1..1....,..1.....,.,11... 101~000 101,000 (FC) THOKASTON DAK ,,..,,.,.;o,,...,...... ,*...... ,...... 257~000 257,000 (FCI UEST THOWSON LAKE...... ,..,...,....,,.....~...... ,,.. 3091000 309 v 000

DELAUARE ,- (N) INDIAN RIVER INLET t BAY ,...11..,,..1.*,.,...... ,,,,,. 3srooo 35lOOO (N) INTRACOASTAL UATERUAY, DELAUARE RIVER TO CHESIFEAKE BAY, DE L ED,..,...... ,..,.,...... ,.,,....,,..., 8r126r000 8,126~000 (N) IUU CHINCOTEAGUE PAY TO DELAUARE BAY .****.I...,.....4* 12,000 12vooo (N) UILHINGTON HARBOR ,,,,...... ,.I...... ,...,....,,...,., lr627~000 lrb27vOOO . DIST OF COLUiiBIA

(N) POTOKAC t ANACOSTIA RIVERS (DRIFT REHOUAL).....,....., 572rOOO 572,000 ; . . - _ . /1: :. ‘-: -.‘ .. ,- m.:>,..( . . _-

H 4598 CONGRESSIONAL RECORD - HOUSE June 28, 19 Type of Huddet Conference Project Operation and Haintenance - State and project estimate allowance ______------FLORID4

(NJ 4FALACHICOLA BAY ...... 103r000 103~000 (N) CANAVERAL HARBOR ...... Zrb07rOOO 2~607,000 (N) CENTRAL t SOUTHERN FLORID4 ...... 4r1451000 4,145,000 (N) ’ CHARLOTTE HARBOR ...... 1,245rOOO 745rooo (N) CROSS-FLORID4 BARGE CAN4L ...... 239,000 1,200,000 (N) E4ST PASS CH4NNEL ...... 626rOOO 626,000 (N) FERNANDINA HARBOR ...... 1 ~G10~000 1,810~000 (N) INTRAcO4STAL UATERUAY,.JACKSONVILLE TO HIAHI ...... lrb19rOOO lr519.000 (N) JACKSONVILLE HARBOR ...... 2P7llrooo 2~711~000 IN) OKEECHOBEE YATERUAY ...... 1,7321000 1 r732,doo (N) P4NAHA CITY HARBOR ...... --- lrOOOlOOO (N) PENSACOLA~H4RBOR ...... 88’3,000 880r000 (N) PORT ST. JOE HARBOR ...... 1 r73ir000 lr731rOOO (N) REHOVAL OF AOUbTIC GROUTH ...... 2~102?OOG 2~102~000 (N) T4tiPA HARBOR ...... C ...... 8,225r0,80 I 8~225~000 I’- -. ----, GEORGIA

(np) ALLATOONA LIKE ...... 4rOOl too0 4,001?000 (N) AP4LACHICOLAv CHATTAHOOCHEE t FLINT RIVERSI GA.ALtFL . . 4,050,000 4~050~000 (N) ATLLNTIC INTRACOISTAL UATERUAY (SAVANN4H DISTRICT) .... 712,000 712~000 cn, BRUNSUICK HARBOR ...... 3r462rOOO 4rl31,OOO (HP) BUFORD DAH t LAKE SIDNEY LANIER ...... 4r40Gr000 4~406~000- (tiPI CARTERS LAKE ...... 2r012~000 21012,000 (HP) CLARKS HILL LAKEI GA t SC ...... 3,831,000 3rG31,OOO (tlF) HARTUELL LAKE ...... 3~759rooo 3r759~000 (tiPI JIH UOODRUFF LOCK I DAn, GA 1 FL ...... 310311000 3~0311000 tnp) RICHARD B. RUSSELL D4n 8 LAKE, ~4 L sc ...... 944,000 944,000 (N) SAV4NNAH HARBOR ...... 9~211rOQO 8r911,000 (N) SAV4NNAH RIVER EELOU AUGUSTA ...... lbbr.OOO 166~000 tnp) UALTER F. GEORGE LOCK t DAtir GA I AL ...... 3,340,000 3,340rooo (HP) UEST FOINT LAKEv GA L AL ...... 3~452,000 3~452,000

IDAHO -._ (nFI ALBENI FALLS DA~..,.,...... i...... ,****.**..*...I 2,013rOOO 2~013,000 (ItPI DuoRsH4~ DAn B RESERVOIR..,...... ,..,.....*...** 5~282~000 Sr282rOOO (FC) LUCKY PEAK LAKE....~.....,...... ,...... *..*..*.. 939,000 939rooo

. ILLINOIS

(N) CALUIIET HARBOR t RIVER (DIKED DISPOS4L 1 I IL L IN,..... 4,000,000 4r0001000 (FC) CARLYLE LAKE ,,..,,...,l,..,..,...l.... ,,.*...*.**.*.. 2,180r000 2rl80,000 (N) CHICAGO HARBOR (DIKED DISPOSAL).,..... ,,,,,...I...... 700r000 700r000 (N) CHIC4GO RIVER (DIKED DISFOS4L) ...... 770,000 776,000 (N) CHICAGO RIVER ...... 380?000 3809 000 (FCI FARt! CREEK ...... 102r000 1021000 (HI ILLINOIS UATERUAY, IL L 1N (NCD) ...... lOr329~000 LO,329,000 ,(N) ILLINOIS UATERU4Y (LnVD PORTION) ...... 1?135,000 1~135~000 (N) KASK4SKIA RIVER N4VIGATION ...... 910l000 910?000 (FC) LAKE SHELBYVILLE ...... 21685rOOO 2r585rOOO (N) HILL CREEK L SOUTH SLOUGH ...... 35rooo 35 IO00 (N) UISS RIV RTUN HISSOURJ RIV t HINNEAPOLIS? IL, HNt Ult L IA (NCD) ...... 44~620,000 44,620,000 (Nf HISSISSIFF’I RIVER BTN OHIO L HISSOURI RIVERS ...... 8v76br0’30 8,766vOOO (N) HISS RI’J BTUN il0 RIVER t tlINNEAPOLIS (LMVB) ...... 5r545rooo 5r545r003 (N) hOUTH OF SANGANON RIVER ...... 23~000 23,000 (N) NORTH BRANCH CHICAGORIVER DEBRIS REHOVCIL...... --- 150~G00 (FCI REND LAKE ...... 11740r000 1?740~000 (N) UAUKEGAN HARBOR (DIKED PISPOSAL) ...... 374 rooo 374,000 (N) UAUKEGAN H4RBOR ...... 659~000 659,OOQ

INDIAN4

(FC) BROOKVILLE LfiKE ,,.,..,~,,,.,,,,,..,,,,...... ,...... 4blrOOO 461,000 (FC) CAOLES HILL LAKE ,,~,,,.,,.,.,,,,t~,,.,*,....,.,t...... 384,000 384,000 (FC) CECIL il. HARDEN LAKE .,,,.,,.~,,,,,,..,,,...,.,,,...~.. 591rooo 5911000 (FC) HUNTINGTON LAKE ,.,~~,.,,..,,,,...... ,...... ,...... 545,000 545,000 (N) INDIANA HARBOR (BIKED DISFOSAL.) l .t.,*...... ,..*.....*. 400*000 400,000 (N) i tiXCHIG4N CITY HARBOR ,,,,1,,.,,,,.,,.1,,,..,..,,....~.. 21.000 2lsOOO (FCI HISSISSINEUA LAKE ,,t~,,,,,,,~,,,,,,,,,.,..,...,,...... 461,000 461,000 (FC) IIONROE LAKE ,,,.,,~~,.~,,.,,...,.*~....,.,...... ~...I.. 424 ~000. 424,000 (FC) PATOKA LAKE...... ,,..,..,.,,.,,.,...... ,...... ~~. 449,000 449,000 (FC) SALAliOHIE LAKE .~....~..~..‘.,.,...,,,,..,.,.,,~,..,,.~ 387 rooo 387rOOO ,. r ‘. ,, : , . ‘\ ,..,.: .,., ‘_ ., ‘.I”:.. June 28,1983 CONGIW3XmAL WORD r-.,HOUSE, H-4599: $ TYPC of Cudaet Operation and Maintenance - State and rroJect Contcrencc -$ ; Project cstieotr / sllouancc .‘ ------___------T------mm______

1OUA

(FC) CORALVILLE LAKE .,,.,,,.,,,.I,...... ~~..,,,..,,,,~,. 2,303rOOO 2r363rOOO (MS llISSGURI RIVER, KENSLERS BEIID* NE ‘TO SIOUX C’IT’fr IbtNE s71000 57,000 (N) _.-----IiISSOURI . RIVER..~ - ‘SIOUX CITY TO BDUTH, It! t NE....,.... 9r447~000 31447,000 (FCF .RATHBUN LAKE ...... **..~.~...... *...... 1 f312rooo -1,312rOOO (FC# UED ROCK DAn -

(FCT CLINTON LAKE ...... lr092rOOO lr092,OOO - (FC) COUNCIL GROVE LAKE ...... 604r000 6~41000 (FC) EL DORADO LhKE ...... 311~000 311 v.000 (FC) ELK CITY L~KE..~.~ ...... 530*‘000 5301000 (FC) FALL RIVER LbKE...... 5381000 538,000 (FC) HILLSDALE LAKE...... ;...... ~ ... 421rooo 421tOOO (FC) JOHN REDnOND DAn 1 RESERVOIR ...... 6087 000 608,000 (FC) KANOFOLIS LAKE..~...... ~ ...... 1,072r000 1~072,000 (FC.) nARION LAKE...... 5859000 585 I 000 (FC) nELVERN LAKE...... ! ...... 11094~000 1?094~000 (FC) .HILFORD LAtiE ...... lrlOOIOOO lr100,000 (FC) FEARSDN - SKUBITZ BIG HILL LAKE ...... 503,000 503rooo (FC) PERRY LIKE ...... 1~424~000 1,424vOOO (FC) FOnONA LAKE ...... 1*3041000 1,304r000 (FC) TORONTO LAKE ...... 252rooo 252rooo (FC) TUTTLE CREEK LI\KE ...... lrS55?000 lr155rOOO (FC) YlLSON LAKE ...... 1.025rOOO 1,025,000 KENTUCKY

(tiF) BARKLEY DAn - LAKE PARKLEY ...... 3,825.000 3r825rOOO (FC) BARREN RIVER LAKE ...... 872,00@ 872rOOO (FC) BUCKHORN LAKE ...... 761~000 761?000 (FC:T CARR FORK LAKE ...... 7B11000 781rOOO (FCI CAVE RUN LAKE ...... 497rODO 497rooo (FC) DEYEY LAKE ...... 9bS1000 965,000 (FC) FISHTRAP LAKE .. ..~...I...... 1 ...... 7lO~QOO 710t000 (FC) GRAYSON LAKE ..*...... ~..t ...... 915~ODD 915,000 (N) GREEN tiND BARREN .RIVERSp KY t TN ...... 1~276~000 1,276rOOO (FC) -GREEN RIVER :L’AKE...... 3 ...... 902,000 902rOOO (N) HICKI(AN HARBOR...... l...... ” ...... 300r000 300,000 (N) KENTUCKY RIVER ...... *...... I....~ ...... 960 rvoo 980,000 tnF,, LAUREL RIVER LAKE ...... 743,000 7431000 (FCF iif+RTINS FORK CAKE...... 463tOOO 46?1000

(FC) nIDDLESBOR0 ,.4t*...... 37,000 37rooo (FC) ‘NOLIN LAKE ..41...... 979,000 979 r 000 (N) OHIO RIVER OFEN CHANNEL UORK...... 8v210~0DO 8r210,OOO (HI OHIO RIVER LOCKS B DMS ...... 12r053rOOO 12*128~000 (FC) ftTINTSVILLE ,LAKE ...... s3or 000 530rooo ., (FC-T ROUGH RIVER LLKE ...... 94brOOO 946~000 (FC) TAYLORSVILLE LAKE ...... ’ 375rooo 37srooo ( nw YOLF CREEK Dtd - LAKE CunDERLtaND ...... 3r38bvOOO 3r38brOOO .-_ _-- .--,/ ’ LOUISIANA .’

(N) AlCHAFALbYA RhER L BAYOUS CHENEI BDEUF \ BLACK.,..... 7r000~000 7,000~000 -

IN) BARATARIA BAY UATERUAY ...... 3r000~000 3,000?000 (FC) BAYOU BODCAU RESERVOIR ...... 815rOOO 81SrOOO BAYOU RIGOLETTE ...... --- 500 D000 (N) BAYOU TECHE ...... 2101000 2101000 (FC) ChDDO LAKE ...... 2451000 245?000 (N) CALCRSIEU RIVER t PASS ...... -13~762~000 13r762,OOO (N) FRESHUbTER BIlYOU ...... 2,020~000 2~020~000 (N) GULF INTRACOASTAL UATERWAY...... 12,470vOOO 12~r47OrOOO fN) HOUtiA NAVIGATION CANAL ...... 31000,000 3~0001000 (N) LAKE PROVIDENCE HARBOR...... 343rooo 3431009 (N) nADlSON FARISH PORT ...... 398,000 398rOOO (N) nERMENTAU RIVER ...... 700,000 7001000 (N) FlISSISSIFPI RIVER GULF OUTLET ...... 8v480rOOO 81480rOOO (N) IiISSISSIYFI RIVER OUTLETS AT VENJCE...... ~ ...... 1,~00,000 lrOOOtOOO (N) HISSIS,SIFfI RIVERI BATON ROUGE TO THE.GUCF...... i .. 26v428rOOO 28~000~000 (N) PEARL RIVER ...... -..* ...... 1701voo 170,000 (N) ’ RED RIVER YATERUAY ‘HISSISSIFFI RIVER TO SHREVEf0RTii.i 1r075~000 1~07sr000 (Ml REHOVAL OF ADUATIC ,GROUTH,,,,.....,*.,*.,,,,..,,....., 1,200 fVD0 1,200r000 tFC WLLtiCE LAKE ...... “...... ,,...... 18S7000 .185r 000 (N) YATERUAY FROn IUU TO BAYOU DULAC ...... I...... 640r000 640r000 - - :

H 4600 CONGRESSIONAL RECORD - HOUSE

‘I Type of Dudget, Conference Project Operation and naintenance - State and project estimate allouance __-______------I * MARYLAND 1 (N) BALTINORE HARBOR (DRIFT REMOVAL),.....,,,...... ,..,. 241vOOO (HZ BALTIiiORE HARBOR t CHANNELS . . . ..1...... *...... 171459#000 171459,000 (HI BALTItiORE HARBOR (PREVENTION OF OBSTRUCTI-VE DEPOSITS!. 481rOOO 48lsOOO (FC) PLOOtlINGTON LAKEv MD t UV ...... 7701000 770,000 (HI CHESTER RIVER ...... 391,000 391,000 (N) CUliPERLANDr MD AND RIDGELEY, U’Jp ilD t UV ...... 52,090 52,000 (N) OCEAN CITY HARBOR t INLET AND SINEFUXENT BAY ...... 1,400,000 1,4G0~000 . (N) UICOtilCO RIVER ...... t...... ~ ...... 88OIOOO 880,000

IiASSACHUSETTS

(FC) BARRE FALLS DAn ...... 219,000 (FC) BIRCH HILL DAM ...... 275 I 000 (FC) BUFFUNVILLE LAKE ...... /267,000 (N) CAPE COD CANAL ...... /'6~8ObvOOO (N) CHARLES RlVER,NATURAL VALLEY STORAGE AREA ...... 32,000 32rOOO (FC) CONANT BROOK DAR ...... 1...... ~~.....! .... 62,000 62,000 (FC) EAST BRlfiFlELD LAKE ...... 1951000 195~000 (N) FALL RIVER HARBOR, HA t RI ...... lv722,OOO lr722rOOO (FC) HODGES VILLAGE DAtl ...... 246,060 24brOPO (FC) KNIGHTVILLE DAti ...... 774 7 000 7741000 (FC) LITTLEVILLE LAKE ...... 252,000 2s21000 (FC) NEU BEDFORD9 FAIRHAVEN t ACUSHtjEl HURRICANE BARRIER ... 1,339vooo 1~339,000 (FC) TULLY LAKE ...... 232 rOO0 232rOOO (FC) YESTVILLE LAKE ...... 226,000 226,000 (FC) UEST HILL DAtl ...... 200,000 200 t 000 HICHIGAN

(N) ARCADIA HARBOR ...... 3srooo 351000 (N) AU SABLE HARBOR ...... 19IOOO 19*000 (N) BIG BAY HARBOR ...... 17,000 17,000 (N) BLACK RIVER FORT HURON ...... 31,000 31,000 o() BLACK RIVER HARBOR ...... 17,000 17,000 (N) CHANE,LS IN LAKE ST. CLAIR ...... 1,415~000’ 1,41s*ooo ( N l .CHARLEVOIX HARBOR ...... 24,000 24,000 (N) CHEBOYGAN HARBOR ...... 114,000 114tooo (N) CLINTON HARBOR ...... 261000 2btOOO (N) DETROIT RIVER ...... 51286,000 5,286~000 (N) DETROIT RIVER (DIKED DISPOSAL) ...... 829rOOO 829 to00 (N) EAGLE HARBOR ...... 17rooo 17,000 (N) FRANKFORT HARBOR ...... 2221000 2229 000 (N) GRAND HAVEN HARBOR t GRAND RIVER ...... 2729000 272rOOO (N) GRAND TRAVERSE BAY HARBOR ...... 276,000 276,000 (N) HAtUlOND BAY HARBOR ...... 391000 391000 (N) HARRISONVILLE HARBOR ...... 341000 34rooo (N) HOLLAND HARBOR ...... 2,371rOOO 2,371,OOO (N) INLAND ROUTE ...... 84rOOO 84rOOO (N) KAUKAULIN RIVER ...... --- 2501000 (N) KEUEENAU UATERUAY ...... 521000 52,000 tN) LELAND HARBOR ...... 2OIOOO 207000 (N) LEXINGTON HARBOR ...... 22rooo 2zr 000 (N) LITTLE LAtiE HARBOR ...... 4brOOO 46,000 (N) LUDINGTON HARBOR ...... 464,000 464rOOO tN) BINISTIOUE HARBOR ...... 22rooo 221000 (N) NANISTEE HARBOR ..; ...... 190,000 2901000 (N) tlENOl+INEE HARBOR’(DlKED DISPOSAL) ...... 841000 84,000 (N) HENOillNEE HARBOR ...... 5681000 568*000 (N) HONROE HARBOR ...... 1~154,000 lr1s4r000 (N) IIONROE HARBOR (DIKED DISPOSAL) ...... 9I000l000 9.Looo,ooo (N) NUSKEGON HARBOR ...... 556,000 5561000 (N) NEU BUFFALO HARBOR ...... 67,000 67vOOO (N) ONTONAGON HARBOR ...... 42,000 427000 (N) FENTUAJER HARBOR ...... 381000 38rOOO (N) POINT LOOKOUT HARBOR ...... 32,000 32,000 (N) FORT SANILAC HARBOR ...... 233rOOO 233,000 (HI FORT AUSTIN ...... 21rooo 21,000 (N) FRESOUE ISLE HARBOR ...... 237 t 000 237rOOO tN) ROUGE RIVER (DIKED DISPOSAL) ...... 334rooo 334 t 000 (N) ROUGE RIVER ...... 868,000 868tOOO (N) SAGINAU RIVER ...... 143,000 1431000 (N) SAGINAU RIVER (DIKED DISPOSAL) ...... 238rOOO 238,000 (HI SAUGATUCK HARBOR ...... 38rOOO ‘38,000. (N) SEBEUAING RIVER ...... 20,000 20,000 .- . ” -’Junj 2f, ~19i.i .’ CONGl$ESSIONAL RECORD - HOUSE H 4601 $ rrrc of. Budset Conference I Project Operation and tiaintenance - State and ProJect estimate al looance :i : ------_--____------_-______t_i L- tn, SOUTH HAVEN HARBOR...... 279,000 2791000 .5 (N) ST. JOSEPH HARBOR OIKED DISPOSAL.) ...... 821000 82,000 _- (NF) ST. NARYS RIVER ...... 9?00B~0.00 9r008,OOO G& ...... 846,000 846,000 .^ (N) ST. JOSEPH HARBOR .* ! (N) ST. CLAIR RIVER ...... 11948~000 lr948,OOO ‘, (N) YHITE LAKE HARBOR...... 44rooo 441000

-.

. HINNESOTA

._ I’

.?. (FC) PIG STONE LAKE.AND UHETSTONE RIVER+ IiN S SD ...... 113rooo. 113?000 -

r (N) DULUTH-SUPERIOR HARBOR, HN t YI...~...... ~ ...... 2,171vOOO 2,171~OOO (WI GRAND HARAIS HARBOR ...... 21 ?OOO 21?000 :-. . (FC) LAC QUI FARLE.LAKE ...... 271rOOO 271rOOO IN) HINNESOTA RIVER ...... 200,000 200,000 (FC.1 ORUELL LAKE ...... 158rOOO 158rOOO (FC) RED LAKE RESERVOIR ...... 51rooo 51,000 ,- (N) RESERVOIRS AT HEADUATERS OF llISSISSIFFI RIVER ...... 1,329rOOO 1,329,000 (N) ST. CROIX RIVER, tlN t UI ...... 150,000 150,000 tlISSISSIFFI

(N) PILOXI HARPOR...... 7531000 7531000 (N) GULFFORT HARBOR...... - ... lv890rOOO lt89OvOOO (FC) .OKATIBPEE LAKE ...... 684rOOO 684.000 (Nf FASCAGOULA HARPOR...... 2r874rOOO 2,874rOOO (N) ROSEDALE HARROR...... 303 IO00 ‘303r000, (N) UOLF AND JORDAN RIVERS ...... --- -350roco nISSOUR1

o() CARUTHERSVILLE irARBOR ...... 27SrOOO .275v 000 (RF) .CLARENCE CANNON DAtl I RESERVOIR...... lr9151000 1V9?5Y 000 (FC-I CLEARUATER L4KE ... ..I...... l~r2001ow 1 r’200r000 (HF.) HARRY SI TRUMAN DAt! AND RESERVOIR...... + ...... 3,684,000 3r684tOOO (FC) LONG BRANCH .LAKE ...... 439rooo 439,000 (FC) HERANEC FARK LAKE ...... r~*- ...... 465,000 465,000 (N) NEY MADRID HARBOR...... 12,000 1.2tooo (FC) FOHNE DE TERRE LAKE ...... 1.3141000 lr314vOOO (FC1 ShITHVILLE LAKE...... ~ ...... 553,000 553rooo (HP) STOCKTON LAKE...... ~ ...... 1,929*000 1,929,000 (IiF, TABLE ROCK LAKE ...... 2r467~000 2r467rOOO

MONTANA

(RF) FORT PECK LAKE ...... 2v677,OOO 21677,000 (IiF) L.IBRY DAtl (LAKE KOOCANUSA) ...... ~..1..~ ...... 2,926vOOO 2,9261000

NEBRASKA

(HP1 GAVINS POINT DAN - LEUIS AND CLARK LAKE* NE S SD ...... 3,3501000 3,3501000 (FC) HARLAN COUNTY .LAKE ...... lrlS8,OOO lv158rOOO (FC) PAPILLION CREEK 1 TRIBUTARIES-LAKES ...... 2081000 208vOOO (FCI SALT CREEK AND TRIRUTARIES LAKES ...... 431vooo 431,000 ‘/---.--- r*- ,/ NEVADA

(FC) HARTIS CREEK CAKE* NV I CA ,...,,,.,,..,....*.,...... 821hOO 821vOOO (FC) PINE $ hATHEW CANYONS LAKE ,,....,,...... ,,...... *...x 240*000 240rOOO

NEY HAtlFSHIRE

(FC) BLACKMATER DAM...... 196,000 196,000 (FC) EDUARD HACDOUELL LAKE ...... 237,000 237,000 (FC) FRANKLIN FALLS 94W ...... J...... - ...... 335,000 335rooo (FC) .HOPKINTON-EVERETT LAKES ...... 5841’000 584?00() (FC) OTTER, PROOK LAKE ...... 351,000 351 rooo (N) .FORTStlOUTH HARBOR t FISCATAQUA .RIVER ...... 4971000 497,000 (FC) SURRY HOUNTAIN ,LAKE ...... ‘589,000 589rOOO

NEU JERSEY

(N) .aBSECON INLET. . ..a ,,.-.,,...... ‘...... *... ..,..,..,.,. 1, 12SfOOO ‘288,000 (N) BARNEGAT INLET ,,,I.~,...... ~...... 1 ...... *..*.*.. 4851000 485 t 000 (N) CDtlANSEY RIVER ..a. *,., I, .*. .‘...... ‘.-....~I.. ,v, ., ,, , ,. , ,, --- 300r000 (HI COLD SPRING INLET .**,*,,* . . . . . * . .. . .I . . . . . *.*~I. . . . . * ,.., 350r000 3sor000 (N) DELAUARE RIVER* PtlILAOELFHIA ;M dM SE& U.h f% * DE.. 22.9246 6000 22r246,OOO H 4602 CONGRJZSSIONAL RECORD - HOUSE

Type of Budget Conference Froject Operation and Maintenance - State and Project esti;$te allowance ______------

(Nb DELAUARE RIVER, PHILADELPHIA T0 TRENTON, NJ L PA ...... 3v712rooo 3i712rOOo tN, KEYFORT HARBOR ...... --- 83OiOOo (N) KATAYAN CREEK ...... --- 21oiooo ., tN, NEU JERSEY IUU ...... 24OiOOO 74OiOOO (N) NEUARK BAYi HACKENSACK 1 FASSAIC RIVERS ...... 913731000 9r373iooo (N) RARITAN RIVER ...... 31163iOOO 3~163rOOO (N) SALEM RIVER ...... --- 500r000 NEU HkXICO

(FCl ABIQUIU DAn ...... 8371000 837~000 (FC) COCHITI LAKE;;- ...... 9941000 994,000 (FC) CONCHAS LAKE ...... 772iOOO 772,000 (FCI GALISTEO DAN ...... 105r000 1051006 (FC1 JEIIEZ CANYON DAN ...... 200r000 200,000 (FC) SANTA ROSA DAtl t LAKE ...... 463rOOO 463,000 (FC) TUO RIVERS DAN...... ~ .. 146iOOO 146rOOO / NEU YORK .- (FC) ALMOND LAKE ...... 2ooiooo 200?000 (FC) ARKFORT DAN ...... 133iooo 133,000 (N) BAY RIDGE t RED HOOK CHANNELS ...... 736,000 736iOOO (N) BLACK ROCK CHANNEL t TONAUANDA HARBOR ...... 945iooo 945iooo (N) BUFFALO HARBOR ...... 21220i000 2i22oiooo (FC) EAST SIDNEY LAKE ...... 2431000 -2431000 (N) HUDSON RIVER ...... liO601000 1~060r000- (N) LAKE HONTAUK HARBOR ...... 24OiOOO 240,000 (FC) HT. HORRIS LAKE...... ~ ...... 915,000 915iooo (N) NARROUS OF LAKE CHAHFLAIN ...... 281000 28,000 (HI NEU YORK HARBOR ...... 8r392iOOO 8r392iOOO (N) NEU YORK AND NEU JERSEY CHANNELSi-NY S-NJ ...... 51450i000 6iOOOiOOO (NJ .NEU YORK HARBOR DRIFT REnOVAL ...... 1~890r000 lr89OiOOO (FC) HEY YORK HARBOR (PREVENTION OF ~BSTRIJCTIVE DEPOSITS) . . 462,000 462,000 (N) OSUEGO HARBOR ...... 390r000 39oiooo (N) ROCHESTER HARBOR ...... 905~000 9051000 (FC) SOUTHERN NEU YORK FLOOD CONTRDL PROJECTS ...... 3831000 383,000 (FCI UHITNEY POINT LAKE ...... 2871000 287,000

NORTH CAROLINA

(N) ATLANTIC INTRACOASTAL UATERUAY (UILtiINGTON DISTRICT) . . 3i889iOOO 3r889iOOO (FC) Be EVERETT JORDAN DAK t LAKE ...... 852,000 852,000 (N) BEAUFORT HARBOR ...... 2931000 293,000 (N) CAFE FEAR RIVER ABOVE UlLtlINGTON ...... 412rOOO 412,000 (N) CHANNEL FROII BACK SOUND TO LOOKOUT BIGHT ...... 359rooo 3591000 (FC) FALLS LAKE ...... 8231000 823,000 (N) LOChUOODS FOLLY RIVER ...... 2oiooo 20?000 (HI KANTEO (SHALLOUPAG) BAY ...... 2i116iOOO 2i116iOOO (N) KOREHEAD CITY HARBOR ...... 3i731iooo 3r731iooo (N) SILVER LAKE HARBOR ...... 480rOOO 48OiOOO (FC) U. KERR SCOTT DAH t RESERVOIR ...... 969,000 969iOOO (N) UILMINGTON HARBOR ...... 3i614,OOO 3i614iOOO

NORTH DAKOTA

(FC BOUNAN - HALEY LAKE ...... 167,000 167rOOO (tIPi GARRISON DANr LAKE SAKAKAUEA ...... 51333rooo 5r333iooo (FC) HOtItlE LAKE AND DAn ...... 69,000 69,000 -. (FC) LAKE ASHTABULA t BALDHILL DAN ...... 8881000 888rOOO (FC) FIFESTEll LAKE ...... 307,000 307rOOO

OHIO

(FC) ALUH CREEK LAKE ...... 43oiooo 4301000 (N) ASNTABULA HARBOR ...... 920,000 920rooo (N) ASHTABULA HARBOR.LDIKED DISPOSAL) ...... 1r400i000 1i4ooiooo (FC) BERLIN LAKE ...... 11126iOOO 1r126*000 (FC) CAESAR CREEK LAKE ...... 516,000 5161000 (FC) CLARENCE J. BROUN OAn ...... 4681000 468,000 (Ii) CLEVELAND HARBOR ...... 4i74oiooo 4r740iooo 665,000 a. (HI CONNEAUT HARBOR ...... 665iOOO . (FC) 'DEER CREEK LAKE ...... 7401000 740rooo I:: (FC) DELAUARE LAKE ...... 51oiooo 5101000 i k (FCl DILLON LAKE ...... 485,000 485,000. (N) : FAIRPORT HARBOR ...... 655,000 655,000 : tN) HURON HAREOR...~ ...... 915iooo 915.9000 i Juni 28,1983 CONGiESSIONAL RECORD - HOUSE H 4603 /, Trpeof Bud*ct Conference I FroJect Operation and tiaintenance - State arld project estimate .. allowance ------______.______-_-__------._-______--______

(N) LORAIH HARBOR ...... 1?240f000 lr240,OOO (FC) nbSSILLON ...... 15,000 15rooo (FC), nxcHAEL J, KIRU~N Dmi t RESERVOIR...... ; ...... 605,000 605rOOO ,(FC) nOSOUlT0 CREEK LAKE ...... 643,000 643,000 (FC) MJSKINGUM RIVER RESERVOIRS ...... 3~635,000 3?635POOO (FC) NEUARK ...... 15rooo 157000 ’ (FL?) NORTH BRANCH OF KOKOSINGRIVER LAKE...... 135POOO 135rooo (FC) FAINT CREEK LAKE...... ~ ...... 665,000 665,000 (FC) ROSEVILLE ...... 15~000 15rooo (N) SANDUSKY HARBOR ...... 745rooo 745,000, (N) TOLEDO HARBOR ..... -...... 3r580,OOO 3,580,000 (FC) TOn JENKINS DAn...... i ...... 265,000 265,000 (FC) YEST FORK 0~ nxLL CREEK LAKE ...... 3091000 3091000 (FC) YILLIbM H. HARSHR LAKE ...... L...... ” ...... 481,000 481,000

OKLAHOHA -- _. (FC) BIRCH LAKE ...... 5&000 559 9000 ---, (tlF) BROKEN POU LI\KE..;...... ~~ ...... 1,043~000 1P0431000 (FC) CANTON LAKE ...... 8791000 879,000 (FC) COPAN LAKE ...... 407rOOO 407,000 (HP) EUFAULA LAKE ...... 2rb80,OOO 2rb80~000 tFC) FORT SUPPLY LAKE ...... 561,000 561,000 tnr, FORT GIBSON LaKE ...... 2~703,000 2~703~000 (FC) GREAT SALT PLAINS LAKE ...... 309POO@ 309~000 (FC) HEYBURN LAKE ...... 425~000 425,000 (FC) HUGO LAKE ...... 842.000 E42rOCO (FC) HULAH LAKE ...... 737rooo 737rOG) (FC) KAU LAKE ...... 1~126~000 1~12brOOC’ (Jw) KEYSTONE LAKE ...... 2,414.MO 2r414rOOO (FC) OOLOGAH LAKE ...... 111071000 11107rOOO (FC) OPTIHA LAKE ...... t...... 537 v000 537 1000 (FC) PENSACOLA RESERVOIR - LAKE 0F THE CHEROKEES ...... 36,000 36,000 (FC) FINE CREEK LAKE ...... 6071000 647,000 (nF) ROBERT 3. KERR LOCK? DAn I’RESERVOIR...... ~. 2,110,000 21110~000 . (FC) SARDIS LAKE ...... 440rooo 440rooo (tiPI TENKILLER FERRY LAKE ...... 2r490vOOO 2~490~000 (FC) UAURIKA LAKE ...... 711 rooo 711~000 (IiP) UEBBERS FALLS LOCK t DAn ...... 2r061r000 2vOblvOOO ' tFC) UISTER LAKE ...... 5371000 ; 537rooo

OREGON

(FC) APPLEGATE LAKE ...... 506r000 5ObrOOO (FC) BLUE RIVER LUKE ...... 157,000 157rooo (FC) PONNEUILLE LOCK t @An ...... 10~365vOOO 10,365rOOO (N) CHETCO RIVER ...... 3831000 383,000 (N) COLUnPIA RIVER AT THE HOUTH, OR t UA ...... 6,5471000 6,547vOOO (N) coos BUY ...... 2~283,000 2~283~000 (N) COOS t nILLICOnb RIVERS ...... 14B~OOO 148~000 IN) COQUILLE RIVER ...... 431 rooo 431 rooo (FC) COTTAGE GROVE LAKE ...... 655,000 655,000 (JiP) COUGAR LAKE ...... lr037r000 1 ro37,ooo (N) DEFOE BAY ...... 128POOO 128~000 (nv) FETROIT LAKE ...... 1?407,000 lr407,000 (FC) BORENA LAKE ...... 5001000 500r000 (FC) FALL CREEK LAKE ...... 2951000 295rooo \ (FC) FERN RIDGE DAn t LAKE ...... 678,000 678rOOO (tip) GREEN PETER-FOSTER LAKES ...... 1~695~000 1,685,000 tnr) HILLS CREEK LAKE ...... 630,000 630,000 (twb JOHN DA’LL~CK AND DAnI LAKE utiaTILLA, 0R t ua ...... 9,999POOO 91999,000 cnr, LOOKOUT POINT LAKE ...... 2,4261000 2,426rOOO (niz) LOST CREEK LAKE ...... 2~700~000 2r700,OOO (np) HCNARY LOCK t DAn, LAKE UALLULA? OR t UI) ...... llr240~000 llr240,OOO (N) FORT ORFORD ...... 163~000 . 213,000 ROGUE RIVER HARBOR AT CDLD BEICH...... ~. 5O31000 5031000 (N) SIUSLAU Ri’JER ...... 1~372,000 1,372~000 (NJ SKIPANON CHANNEL ...... 430,000 4301000 tN, TILLAnOOK BAY t BAR ...... 218,000 218,000 (N) UnFOUA RIVER ...... 770,000 770,000 (N) . UILLAnETTE RIVER BASIN BANK FROTECTION ...... * .. 45,000 45~000 (FC) UILLOU CREEK LAKE ...... 95~000 95,000 ” (N) UILLAnETfE RIVER AT UILLMETTE FACLS...... ~~..~. 423~000 4231000 (N) UILLAHETTE RIVER ABOVE PORTLAND t YAnHILL RIVER ...... 6,000 61000 (N) YAOUINA BAY AND HARBOP...... lrl75~000 11175r000 (N) YAOUIHI) RIVER ...... 755r 000 755IOOO . H 4604 ’ CONGRESSIONAL RECORD - HOUSE June 28; 1983

TYPC of Buddet Conference Project Operation and Haintenance - State and rroject estimate ‘- allowance ----__--______------PENNSYLVANIA (HI ALLEGHENY RIVER ...... 3P274.000 3r274,OOO (FC) ALVIN R. BUSH bAti ...... ?PbrQO@ 296.000 (FC) AYLESUORTH CREEK LAKE ...... 112,000~ 112r000 (FC) BELTZVILLE LAKE ...... 368-9000 368,000 (FC) BLUE tlARSH LAKE ...... 989tOOO 989vOOO tFC) CONEtlAUGH RIVER LAKE ...... 716,000 7161000 (FC) COUANESGUE LAKE...... 6OBg000 608?000 (FC) CROOKED CREEK LAKE ...... 11290,000 1,290rOOO (FC) CURUENSVILLE LAKE ...... 408~000 408vOOO (FC) EAST BRANCH CLARION--C;IVFR LAhE...... !:::::: 666,000' bbbr000 (N) ERIE HARBOR...... ~ ...... 635rOOO 635rOOo (FC) FOSTER JOSEFH SAYERS DAti t RESERVOIR ...... 463tOOO 463rOOO (FC) FRANCIS E. UALTER DAH...... , ...... 346,000 3461000 (FC) GENERAL EDGAR JAM/IN DAM t RESERVOIR ...... 102r000 102,000 (FC) JOHNSTOUN ...... 2lrOOO 211000 .- (FC) KINZUA DAH t ALLEGHENY RESERVOIR, PA t NY ...... lr107,000 1r1071000 (FC) LOYALHANNA LAKE ...... lt138’rOOO ls138,OOO (FC) tlAHONING CREEK LAKE ...... 534,000 534,000 Z’-‘_ A---, (N) HOHONGAHELA-YOUGHIOGHENY RIVER BASINr PA, UV t Rn;.,,, 10~5.74r000 10,574r000 (N) OHIO RIVER LOCKS t DAtlS ...... 8,30~,000 Br303~000 (FC) PROHPTON LAKE ...... 18IrOOO 181,000 (FE) PUNXSUTAUNEY ...... 7r000 7rooo (FC) RAYSTOUN LAKE ...... 1~615r000 Isb15~000 (N) SCHUYLKILL RIVER ...... 1,721,OOO 1~721 ,?gO (FC) SHENANGO RIVER LAKE ...... 1,281,000 lr281,OOO (FC) STILLUATER LAKE ...... 173,000 173rooo (FC) TIOGR - HAHnOND LAKES ...... 942,000 942,000 (FCk TTONESTA LAKE ...... 958,000 958rOOO (FC) UNION CITY LAKE ...... 5451000 5451000 (FC) UOODCOCK CREEK LAKE ...... 836,000 83brOOO (FC) YORK, INDIAN ROCK DAIl ...... 335,000 335.000 t FC) YOUGHIOGHENY RIVER LAKE ...... lr4409000 lr440v000 SOUTH CAROLINA

(N) ATLANTIC INTRACOASTAL UATERUAY (CHARLESTON DISTRICT) . . 2r250,ooo 2v25OsOOO (N> CHARLESTON HARBOR ...... 5*950,000 5~95OfOOO (N) COOPER RIVEP, CHARLESTON HARBOR ...... 250 IO00 250 P000 (N) FOLLY RIVER ...... 130~000 130,000 (N) GEOKGETOUN HARBOR ... .; ...... 2rb00,OOO 2rb00,OOO (N) LITTLE RIVER INLET, .SC t NC ...... t ~200rQoo lr200,000 (N) HURRELLS INLET ...... 23@rOOO 230r000 (N) SHIFYARD RIVER ...... bOOIO@O b@O~OM) SOUTH DAKOTA

(UP1 BIG BEND DAM - LAKE SHARF’E ...... 3s515.00’) 31515~000 (FC) COLD BROOK LAKE ...... 142rooo 142r000 (FC) COTTONUOOB SPRINGS LAKE ...... 141rooo 1411000 (tip) FGRT RANDALL DAti, LAKE FRAMClS CASE ...... 6*689,000 6rb89rOOO (FC) LAKE TRAVERSE AHD BOIS BE SIOUX, SD t UN ...... 194 vr)oo 19.!,000 (tw) GAHE DAtIt LAKE OAHE, SBpd.nD ...... 5p4eer000 5r4e8~0r30 TENNESSEE

ttlrj CENTER HILL LAKE ...... 2v747rOOO 2~747~000 (IIF) CHEATHAH CLOCK t DAH ...... 2r299vOOD 2v299,OOO (IIF) CORDELL HULL DAH t RESERVOIR ...... 2s3.27~000 2,327,OOO (t4F) DALE HOLLOU LAKE ...... 2v084.000 2vO84,OOO (tw) 3. PERCY PRIEST DAH t RESERVOIR ...... lr72brOOO lt726rOOO (FC) OLD HICKORY LOCK t DAfi ...... 4~4531000 4r453*000 (N) TENNESSEE RIVER ...... 5r013~000 5~0131000 (N) UOLF RIVER HARBOR ...... 530~000 53OfOOO TEXAS

(FC) AQUILLA LAKE...... ,,...... ,,...... a... l .1.., ..a 516rOOO 51bwOOO (FC) ARKANSAS-RED RIVER FASINS CHLORIDE C:DNTROL AREA B t** 263vOOO 263vOOO (FC) BARDUELL LAKE....,....,...... ****...... 498,000 498,000 (FC) BELTON LAKE .*....*...... ,, ...... *. . ..i.. .I. lr123,OOO lv123~000 (FC) BENBROOK LAKE....,,...... ,.,. .**..., ..,.I. ..I 704rooo 704vooo (N) BRAZOS ISLAND HARBOR...... ,...... ,. *....*, **.,,* ..* 20,000 20rooo (FC) BUFFALO BAYOU t TRIBUTARIES.....;...... *.*,. **. 807,000 807rOOO (FC) CANYON LAKE ...... t...... 6381000 638rOOO (N) CORPUS CHRIST1 SHIP CHANNEL (1968 W.....: ...... 4r74brOOO 4,746rOOO ... (WI DENISON DAli - LAKE TEXWAt TX t OK ...... 5r 191~000 5r191,OOO (FC) FERRELLS BRIDGE DAR - LAKE 0’ THE PINES ...... 1,259,000 1~259~000. (N) FREEPORT HARBOR ...... 3r299~000 3v299,OOO - . ‘14 /:,,:I :’

CONGRESSIONAL RECORD - HOUSE H 4605 $; . ;-, Type of Pudset Conference r; Project Operation and Maintenance - State adProject estimate ‘I al louance _’ ___---______------__-_----- _____-______------

tN) GALVESTON HARBOR t CHANNEL ...... 3r978vOOO 3r978,OOO . (FC) GRANGER LAKE ...... 495,000 495,000 (FCl GRAPEVINE LAKE ...... lr550~000 1,550,000 (N) GULF INTRACOASTAL YATERUAY ...... 131993rooo 13r993,OOO (FC) HORDS CREEK LAKE ...... 687,000 687tOOO I (N) HOUSTON SHIP CHANNEL ...... 12r962~000 12r962rOOO (FC) LAKE KEtlP ...... 336,000 3361000 (FCl LAUON LAKE ...... 1~598sOOO 1,598rOOb (FC) LEUISVILLE DAK ...... 2r915,OOO 2v915vOOO (N) RATAGORDA SHIP CHANNEL ...... 1,007,000 1,007?000 (FC) NAVARRO HILLS LAKE ...... 807,000 807 r 000 (FC) NORTH SAN GABRIEL LAKE ...... 5231000 -” 523,000 (FCl 0, C. FISHER DAK t LAKE ...... 5oorooo 500~000 (FC) PAT HAYSE LAKE ...... 5071cJoo 507,000 (FCl PROCTGR LAKE ...... 763.000 763rOOO (N) SABINE-NECHES UATERUAY ...... 9v922rOOO 9v922vOOO (BP) SAH RAYBURN DAK t RESERVOIR ...... 2,,2’57,000 2,257,OOO (FC) SOtlERVILLE LAKE ...... -’ 866,OOO 866rOOO trc, STILLHOUSE.HOLCOY DAK ...... ~.....~ ... 672vOOO 67?rOOO (N) TEXAS CITY CHANNEL ...... 2~J50,OOO 2v35OvOOO (RF) TOUR BLUFF DAi4 t B.A. STEINHAGEN LAkE ...... 6881000 6RBvOOO (N) TRINITY RIVER K TRIPS-CHANNEL TO LIPERlY ...... 7,000 620,000 (FC) UACO LAKE ...... 1~2971000 lr2971000 (FC) UALLIS’JILLE PROJECT - TRINITY RIVER ...... 65~000 55,000 (tlP1 UHITNEY LAKE ...... lr136,OOO 1~136~0.00 (FC) URIGHT PATMAN DAD B LAKE ...... 893,000 893,000

VERMONT

(FC) BALL liOU.NTAIN LAKE ,~,,,.~I.~,.,,,,..,..,.,,,,.,.....~. 369vOOO 369,000 TFCl NORTH SPRINGFIELD LAKE .*...1...... ,...,...... * 300,ood 300,000 (FC) NORTH MRTLAND LAKE ,.,,...,,,..,,,.,...*.*,,,...,....* 366,000 3661000 (FC) TOUNSHEND LAKE ,.,~,~.,,,,,.,,.,,,.,.,.,..,~,.,...... 39bvOOO 396,000 (FC) UNION VILLAGE DAN ,.,~.1,..~,.~~,...... ~...... ~. 275,000 275,000

VIRGINIA

tN) ATLANTIC INTRACCMST~L Uh!ERU~Y ...... 1,3991000 lv399,OOO (N) - CHINCOTEt+OUE INLET ...... 9071000 907,000 (FC) GATHRIGHT DAtl AND LAKE tlOOliAD ...... 877rOOO 877rOOO (N) HMPTON ROADSc NORFOLK B NEUPORT NEU HARBOR (DRIFT REIIOUAL) ...... 1801000 180~000 (N) JAtlES RIVER ...... 3r049~000 31049,000 (FC) JOHN U. FLANNAGAN DAtl ! RESERVGIR .,,..,,.,..,,,.,I..,. 63OfOOO 630,000 (IiPb JOHN H. KERR DAN ; RESERVOIR, VA t NC.;...... 4,003~000 4,003,000 (N) NORFOLK HARBOR .,...,.,,.~,,,,..,.I....,,,.....,,.....~ 7,278rOOO 7,278,000 (N), NORFOLK HARFOR (PREVENTION OF OBSTRUCTIVE DEPOSITS)... 256 P000 25brOOO (FC) NORTH FORK OF POUNb LAKE..,.,...,..,.,.,.,....,.....,. 445,000 445,000 (NY) PHILPOTT LAKE .,.,,,,,.,,,.,.,.,,.....l,l....1.,,...... 1,354,000 lf354?000 tN, UATERUAY ON THE COAST OF VIRGINIA ,...I.,....,.,,....., 1471000 1471000

UASHINGTGN

(tlP1 CHIEF JOSEPH DAN ,.,,.,..,,,,,.1,.,.,..,,,l,l.~,,...... 4,97sr’ooo 4,975vooo (N) COLUtlBIA RIVER AT BAKER BAY .,.~.,,..,,,,,.,..,,,,..... 127rOOO 127rOOO (N) COLUfiBIA AND LUR UILLAHETTE RIVS BELOU ‘JANCVR t PORTI OR t UII ,1.,..,,,.,,,,,,I..,t,..I.....,.,.....o...., llr858~000 2lr178~000 (N) ’ COLUHBIA RIVER BETUEEN VANCOU’JERt UA t THE DALLES..... 701,000 701 too0 (N) COLUliBIA RIVER BETUEEN CHINOOK I SAND IS* UA 1 OR...., 249vOOO 249,000 (N) EVERETT HARPOR 1 SNOHOKISH RIVER ...... 850rOOO 850.000 (N) GRAYS HARBOR t CHEHALIS RIVER ...... 31755r000 3r755rooo (FC) HOUARD A. HANSON RESERVOIR ...... 407,000 407r000 (IIP) ICE HARBOR LOCK t DAK ...... 4,021~000 4r021r000 (N) LAKE UASHINGTON SHIP CANAL ...... 2,478vOOO 2147Bvoqo (HP1 LITTLE GOOSE LOCK 1 DAK, LAKE BRYAH...... ,.,.,.... 4v027rOOO 4r0271000 (HP) LOUER GRANITE LOCK AND DAK, UA I I@ ,.,...,,..,.,,..,~. 5,078vOOO 5,07B,OOO (MP) LOWER HONUHENTAL LOCK K DAN *.*...... ,.*...... ,.... 3v2331000 3,233,000 (FC) HILL CREEK LAKE ,.,,.,,,,,..,,,...... ,,...... ,.,...,.. 365fOOO 365rOOO (FCl HUD IiOUNTAIN DAH ,,,.,,,,,,.,,,~....,.,,,.I...... ,.,~, 800.000 8001000 iN) PT TOUNSEND BOAT BASIN 1 UN CONNECT PT TOWNSEND t OAK EAY...,,...... ,*..,.,.,,,.,...**...,..,., 240,000 240,000 (N) PUGET SOUND t ITS TRIBUTARY UATERS...... ,...... 65BrOOO 058 to00 (HI DUILLAYUTE RIVER .,,,.,,,,..,,.....,.,,~I.*l..,.1.1..1. 3801000 3D0,OOO (NY SEATTLE HARPOR ,.,.,.,.....,...... ,,.....,,.,.I.... 7151000 715,000 H:4606 CONGRESSiONAL RECORD - HOUSE

Tree of I BVdeet Conference Project Operation and tlaintenance - State and project ertieate allouance ---me -A------‘------

. (N) STILLAGLUIISH RIVER ...... 1001000 100,000 (N) SUINONISH CHANNEL ...... 330,000 330100(1 (N) TACOHA - FUYALLUP RIVER ...... bOrOO0 60~000 (FC) THE DALLES LOCK t DAHt LAKE CECILOr UA t OR ...... 8r110,OOO 811101000 (N) UILLAPA RIVER . HARBOR t NASELLE RIVER ...... 18brOOO 186rOOO (FC) UYNOOCHEE LAKE ...... 732fOOO 732~000

UEST VIRGINIA :

(FC) BEECH FORK LAKE ...... 595rooo 5951000 (FC) BLUESTONE LAKE ...... 898,000 898,000 (FC)- BURNSUILLE LAKE ...... 760r000 7601000810,000 x. (FC) EAST LYNN LAKE ...... 8101000 (FCT ELKINS ...... 61000 6,000 i (WI KANAUHA RIVER ...... 5,631rOOO 5,631rOOO tN) OHIO RIVER LOCKS AND DAHS ...... 9~821~000 9r821rOOO (FC) R. D, BAILEY LAKE ...... 8859000 885,000 (FC) SUKHERSVILLE LAKE ...... lr043r000 1,043r000 (FC) SUTTON LAKE ...... lrll8rOOO 11118~000 (N) TYSART LAKE ...... 754,000 7541000

UISCONSIN ’

(N) ASHLAND HARBOR ...... 423rooo 423,000 (FC) EAU GALLE RIVER LAKE ...... 311rooo 311rooo (N) FOX RIVER ...... 82brOOO 826.000 (N) GREEN BAY HARBOR ...... 1~1601000 lri60r000 (NJ GREEN BAY HARBOR (BIKED DISPOSAL) ...... 81~000 81~000 (N) KENOSHA HARBOR ...... 173rooo 173,000 (N) KEUAUNEE HARBOR ...... 519~000 519rooo (N) LAFARGE LAKE ...... 21rooo 21,000 (NJ HANITOUAC HARBOR ...... 419rooo 419,000 (HI KILMAUKEE HARBOR ...... 553rooo 553,000 (N) OCONTO HARBOR ...... 219000 21rooo (N) PORT UING HARBOR ...... 19IOOO 19,000 (N) PORT UASHINGTON ...... 378,400 378~000 (N) RACINE HARBOR ...... 71vooo 71,000 (N) SHEBOYGAN RIVER ...... 181*1)00 181rcOO (N) STURGEON BAY (DIKED DISPOSAL) ...... 71000 7,000 (N) STURGEGN BAY .. ..t...... ~ ...... -57,000 571goo (N) TV0 RIVERS HARBOR ...... 27rooo 27~000

HISCELLANEOUS

ENVIRONUENTAL AND UATER QUALITY OPERATIONAL STUDIES.,, 3~3851000 3r385,OOO INSFECTION OF COHPLETED UORKS ...... 6*2961000 6~296~000 SCHEDULING FLOOD CONTROL RESERVOIR OPERATIONS ...... 2r042rOOO 2~042,000 XONITQR COMPLETED COASTAL PROJECTS ...... 900I000 90QrOOO RIVER ICE MANAGEMENT ...... lr500r000 lr500,000 REPAIR9 EVALUATION* MAINTENANCE AND REHABILITATION RESEARCH (RENR) ...... _. 910r000 910I000 PROTECTION OF NAVIGATION ,/ RENO’JAL OF S&KEN VESSELS AND OBSTRUCTIONS ...... 2,130rOOO 2r130,OOO PROTECTION9 CLEARING AND STRAIGHTENING CHANNELS (SECTION 3) ...... r..~...... 1001000 100~000 GENERAL REGULATORY FUNCTIONS ...... 49~5001000 49~5001000 .FROJECT CONDITION SURVEYS ...... 6r214rOOO br214,OOO SURVEILLANCE OF NORTHERN BOUNDARY UATERS ...... 1~850rOOO lv850rOOO

‘tlOPILIZATIQN FLANNING ...... 5r000~000 5r000,000

REDUCTION FOR ANTICIPATED SAVINGS AND SLIPPAGE ...... --- -10~000~000 /

TOTAL ...... I...... 1r161#300r000 lr184r492rOOO =I======I=E==l ======E===== TYPE OF PROJECT: (N) NAVIGATION (FC) FLOOD CONTROL (IiF, WLTIPLE-FURPOSEs INCLUDING FOUER CONGRESSIONAL ‘RECORD’- HOUSk . 'k4607

.: L. ,:-. L~ITLE .II-;:-DEPARTMENTOF-THE‘INTCR'IOR' ..__ _. -.- --8UREAU:OF-.RE(=1_AMATION-- .--- -.- .~-

General Investigations:

. . Amendment No. 9: Appropriates $33.831.000 instead of $34,431,000 as proposed by the House and $31,981,000 as proposed by the Senate.

Amendment No. 10: Provides that $33,161,000 is to be derived from the :reclamation fund instead,of $33,761,000 as proposed by the House and $31,361,000 as proposed by the Sena.te.

Amendment~No. 71: Deletes language proposed by the Senate relating to the reimbursement of costs of advanced planning studies.

The funds are to,be allocated as shown in the. following table:

PROJECT TITLE BUDGET . CONFERENCE ESTIflATE ALLOUANCE ------,------GENER(IL IN’JESTIGATIGNS

ARIZONA

LOUER COLORADO RIVER Y(ITER CGNSU.CEFFICIENT USE PROG.. 400r000 4001000

CALIFORNIA

(\LL MERICAN CANAL RELOCATION ...... 135,000 13SrOOO CENTRAL VALLEY; DELTA DIVISION, KELLOGG UNIT REFORNULATION ...... 353 IO00 353,000 FISH AND YILDLIFE HhNAGEMENT STUDY ...... 350rooo 350*000 NEY HELGNES CONVEYANCE SYSTEM...... i. 150,000 1501000 SHASTA DAN ENLARGEMENT ...... --- 11850,000 SANTA MARGARITA ...... 180~000 180~000 LGUER COLORADO WATER SUPPLY STUDY ...... 150~000 150ro00

COLORADO

‘ PROGRAll.RELATED ENGINEERING AND SCIENTIFIC STUDIES.... 4r7651000 4,765,000

IDAHO

BOISE PROJECT POYER &ND HODIFICATIGH STUDY...... 300,000 3009 000 HINIDOKA PRGJECTvNORTN SIDE PUMPING DIVISION EXTEN..., 225~000 225,000 PALISADES PROJECTr PALISADES POYERPLANT ENLARGENENT.,. 50rooo 50rooo

HONTANA -_ CROY CREEK INDIAN RESERVATION AREA . . ..I...... *.*...*,, 150~000 1501GGo HUNGRY WORSE PGUERPMNT ENLARGE.% HEREGULATING RESV,,, y 145rooo 145rooo HARIAS-IIILK PRGJECi . ..I...,,~.,...... ~.I...... ,,,~ 150r000 150,000

NEBRASKA .

PLATTE RIVER U4TER USE GPTIONS.,.....~...... ,..,..., 150r000 150r000 PRAIRIE BEND UNIT (P-SHBF) ...... 2501000 250 0 000 REPUPLICAN RIVER PASIN UATER tiANAGE?ENT STUDYtP-SHPF). 130,000 1301000

NEVADA

DEEP-CARBONATE AGUIFER INVESTIGATION...... ,.,, 30,000 30,000

NEU MEXICO

LAKE MEREDITH SALINITY CONTROL...... ~....,...,...... 300r000 3001000

OREGON

fARHERS IRRIGATION DISTRICT ...... 215rooo 21s1000 SILETZ RPSIN ...... --- 200,000 ROGUE RIVER BASINP GRANTS P4SS DIVISION ...... 5rooo 5,000 UHATILLA BOSIN.....~ ...... 260~000 260,000 UPPER JOHN DAY ...... 150,000 --- . 4-l4tjot? ‘i’i 1 : CQ~GRESSION.AL- RECORD =:HhJSE~ ,< 1, .‘. ih.&> 24 PROJECT TITLE ,_ _-.. BUDGET CONFERENCE ,. ‘. .: . . -:.-. ESTItlATE (ILLWANCE ’ ------: ------_ _

SOUTH DAKOTA

LME AHDES-YMNER UNIT ,,,1,.1...1....1*...... *. 150,000 ~300r000 CENTRAL SOUTH DAKOTA MATER STUDIES (P-StiBP)...... ,.. 4501000. 450tooo. RAPID CITY MATER SUPPLY . ..I...... 75~000 7SPOOO SOUTH DAKOTA YATER DELIVERIES STUDY (P-StLBFle...r....e 400*000 4001000

TEXAS

TEXAS BASIN, BEDIM RESERVOIR.:...... 150,000 150r000 TEXAS BASINv BIG SANDY...~...... , 150r000 150,000 TEXAS BASINt BON UEIR...... ,,.., 701000 70,000 TEXAS BASIN, COLUHBUS BEND RLI UATER SUPPLY.STUDY...,. 350,000 350~000 .TEXAS BASINt SAN JACINTO RIVER BASIN *I.*.,...*....,.,, 150t000 : 150r000

: UTAH

CRSP POUER PEMING CAPOCITY ...... l..L..l....l...... 6601000 6601000 UASATCH FRONT TOTAL UATER tlANASERENT ****...*,...*,,*,I 450rooo 450,000

UASHINGTON

YAKIIIAt CLE ELUH AND TTETON POUERFLANTS ...... *..I.+ GOrOoo 801000 YAKIRA RIVER BASIN UATER ENHANCEIIENT I...i ,..... * ,,,,,I lr025,000 11025,000

UYOHING

BLUE HOLES RESERVOIR.....~...,.,.,..,,...... ,...,, 100,000 1001000 GUERNSEY DIItl POUERPLANT ENLARSE~ENT,.,...... ,,...,. 60~000 60,000 NORTH PLATTE RIVER HYDROELECTRIC STUDY (P-SMBP)..,.... 195,000 195rooo UIND HYDROELECTRIC ENERGY PROJECT...... ,.,.. 1~200r000 1~200,000 .,

VARIOUS

COLORADO RIVER WATER GUALITY’IHPROVEHENT PROGRAR..,,,. 4*4101OOQ 4~4101000 CRUOIPt LOYER SUNNISON UATER SYSTEMS...,.,.,.,....,... 530,000 530,000 GENERAL ENGINEERING AND RESEARCH: ATROSPHERIC UATER RESOURCES HANAGEtLENT PROGRAM....., 4?715,000~ 5~365~000 GENERAL PLANNING STUDIES ...... 11...... *.*.. 420~000 4?9vOOO NfYTIGNAL UATER RESEARCH ...... ~I...... 470rooo 470rooo SPECIAL IN’JESTISATIONS: ENVIRONWEWTI\L AND INTERAGENCY COORD, ACTIVITIES.,... 3~165~000 3t165~000 * m INVESTIGATIONS OF EXISTING PROJECTS *...**.*.1**....1 672,000 672,000 RINOR YORK IN CONNECTION UITH COHPLETED FROJ.INVEST. 460,000 4601000 PRINT REPORTS ...... I~....*...*...... 351000 351000 TECHNICAL ASSISTANCE TO STATES .*.,...... *..I.*., 1~550,000 lr550r000 PROJECTS NOT YET IDENTIFIED ...... l...~...I...... 35,000 351000

PAY RAISE ALLOUANCE . . . ..1...... 11...1...... *....., 661,000 k611000 .; 1i %I!.; GENERAL REDUCTION DUE TO SLIPPAGEI SAVINGS fi’. AND CARRYOVER BALANCES ...... ~...... , m-m .I

[email protected], i983 CONbRESSIONAIi RECORD - HOUSE I-i’46il9 Constt7&ion~p*ram .. “:“- ’ No appropriation, fund, or autbority.~ %iiUable lo enable the Secretary of the Inte- Amendment fi&’ ‘!‘,I*: -Appr&riat& under this heading shall be used for con- rior &I begZnuwrk on rehabilitating the Ve- $683.818.000for the construction program struction of features of the Garrison Diver- Zurde Community Ditch Project, New as proposed by the Senate instead of sion Unit in North Dakota affecting waters &?xico, in accordance with the Federal i&c- $696.538.600as proposedby the House. flowing into through chemical pol- Zan&iOn Laws (Act of June 17, 1902, 32 lution introduction of foreign biota. de- Stat 788. and Acts amendaton, thereof or The conference report includes a total of’ structively increasing or decreasingquantity 545.360.000 for the McGee Creek..; Ql$la.k suppZement+ry thqeto) for the purposes of project. including $5.000.000for roads ssso- and/or rate of‘flow, or in any other harmful diverting and conveying water to irrigated ciated with the project. way. project lands. The principal features of the Amendment No. 13: Appropriates. Amendment No. 16: Reported in technical project shall consist of improvements such $10.000.000for the Tucson Division in&ad’ disagreement. The managers on the part Of us the instaZZation of more permanent diver- of Sl5.006,000as proposedby the House and the House will offer a motion to recede and sion and headgates,wasteways. arroyo restores House language stricken by the concur in the amendment of the Senate siphons, and concrete lining of ditches in State. which provides that not to exceed $20.000 order tn improvqirrigation efficiency. con- Amendment No. 14: Provides that shall be available to initiate a rehabilitation sent water, irnd reduce operation and $165.600.000shall. be available for transfers and betterment program with the Twin maintenance costs. The cost of the rehabili- to the Lower Colorado River Basin Develop- Falls Canal Company. tation wiU be nonreimburseable and con- ment F’und instead of $179.000.000ss pro- Amendment No. 17: Reported in technical structed features wiZZ be turned over to the posed by the House and $155.600,000as pm- disagreement. The managers on the part of appropriate entity for operation and main- posedby the Senate. the House will offer a motion to recedeand tenance Amendment No. 15: Deletes language pro- concur in the amendment of the Senate posed by the Senate relating to Garrison Di- with an amendment as follows: The managers on the part of the Senate version Unit. I In lieu of the matter proposed by said will move to concur In the amendment Of While the conferees have agreed to delete amendment, insert the following: the House to the amendment of the Senate. the Senate bill language, the conferees . Provided further, That of the amount The funds are to be allocated as shown in direct that: h&n appropriated $3,000.000 shall be the following table:

.. . . , : CONGRESSIONAL RECORD +I-iOW!S’E ‘- : :June.28,:19j3 2,

. .I PROJECT TITLE BUGGET CONFERENCE ESTIMTE ALLOYANCE ~ ----___-______--_------) . CONSTRUCTION PROGRAFT

CONSTRUCTION AND REHAEILITATION~

ARIZONA

HEADGATE ROCK HYDROELECTRIC PROJECT 4EIA)..,...e.r...rr 11,000,000

CALIFORNIA

CENTRAL VALLEY PROJECTt SACRAHENTO RIVER DIVISION .,...I~.~..,,,.,...,~,..,.., 12~300,000 12,300,OOO SAN LUIS UNIT ,,,,.~l,.t~.,.,,.~,,,~.,~..,,,,~,I..,,,I 3v103r000 3t603rOOO AUBURN-FOLSOH SOUTH UNIT: AUBURN AREA FACILITIES.rrr....r...... ,....,..... 212501000 2,2so,ooo ALL OTHER AUBURN-FOLSOM SOUTH UNIT FACILITIES....r 705,000 70stoGG RISCELLANEOUS PROJECT PROGRAHS...r.....,.....,.....r 2r645,OOO 21645*000 SAN FELIPE DIVISION l ..r~..rrr....i..,,.ri....~..~.r.r 72,360,000 72o36OvOOO TRINITY RIVER DIVI GRASS VALLEY CREEK -DEBRIS DAN.... --- 45orooo

COLORADO

FRYINGP(\N-ARKANSAS PROJECT ,I,....,,,..,.,.,,,,,,,,,,., 6~863eOOO 7,463rOOO SIN LUIS VALLEY PROJECT, CLOSED BASIN DIVISION...,.... 1s*155r000 151155,000

NEU HEXICO

ERANTLEY PROJECT ...... ‘.*.....I...... 12~694rOOO 121694,000 VELARDEt N, GEX. UATER DIVERSION 619. REPAIR...... , e-v 3r000,000

OKLAHORA - MCGEE CREEK PROJECT .,..,,,,..,,,.....,...... 40*610,000 45r36OvOOO

TEXAS

ARERICAN CANAL EXTENSiOR. RIO GRANDE PROJECT...a.e...e --- 450,000 NUECES RIVER PROJECT ,,~1.,,,..,.~,,..,,,...~..~.~....~ 811031000 81103,000

UASHINGTON

CHIEF JOSEPH DAR PROJECT, OROUILLE-TONASKET UNIT...... 13,430.000 13r430t000 COLUHBIA BASIN PROJECT: IRRiGATION FACILTTIES I,,,.,..,,,,.,...... ,...... ~ 171170t000 17t1701000 THIRD PDUERF’LANT ,,,,,..,,,l,,,~,,.,,,~...... ~ll~ 38~590*000 381590~000

PICK-SLOAN HISSOURI BASIN PROGRAti ,. NEBRASKA

NORTH LOUP DIVISION ,,,,,,,~.,,,,,....,,~.,,.,.~,..,... 321420~000 ;2,420,000 O’NEILL UNIT.,..,..,...,.,...,...... ,~.... 1,570rooo --- _. __--- NORTH DAKOTA / GARRISON DIVERSION UNIT ,,,,..,...... ,.1...... *. 22,330,OOO 22,330rOOO

SOUTH DAKOTA /

UEB RURAL DEVELOPMENT PROJECT I,.,...... ~...,,.,,,,,,.. --- 4~000~000

l UYOtiING --y

BUFFALO BILL DAH NODIFICATION...... ,...... ,., 3t0001000 --- RIVERTON UNIT .,,.,,...I,,...... ~....,...,,, 5r900,000 5,900,000 VARIOUS

DRAINAGE AND MINOR CONSTRUCTION BELLE FOURCHE PROJECT* SOUTHDAKOTA...... ,...... 800~000 900#000 BOISE PROJECT, FAYETTE @IVISIONv IDAHO...... 9901000 99or000 BUFFALO RAPIDS PROJECT, nONTANA..,...... ,.,....r 61rOOO 61,000 CHIEF JOSEPH DAR PROJECTvUHITESTONE COULEE UNIT, UA. 725rOOO 725rOOO EDEN PROJECT9 UTAH ,.,.I.,,,...,.,.I.~1...,,...I,..~. 300,000 3oovooo GILA PROJECT* ARIZONA..,,..,...... ,....~...... ,.... 1,000,000 1r000,000 ‘KLAHATH PROJECT, OREGON-CALIFORNIA.,,...~,,,,,,,,.., 3roo4roo0 3~GO4,OOO LITTLE UOOD RIVER-PROJECT* IDAHO...... ,.~,; 80,000 90,000 6 fu" 98, 1983 CONGRESSIONAL RECORD c HOUSE H&-jli, .I, ,,. .I . . ‘(1, 5 :I.,; PROJECT TITLE B&ET CONFERENCE ESTIHATE ALLOUANCE --______r______------I. HISCELLANEOUS ENGINEERING SERVICE9...... ,....-;; 101000 10I000 I HOUNTAIN PARK PROJECT* OKLAHORA ..,.....*.*I...***I.. 1001000 100~000 ,.:. .<.. loo,ooo~ . ..‘.!.’ ,I PALRETTO BEND PROJECTr TEXAS ,.*...... r.t$ii;i. “_ L 100f000 RECREATION FACILITIES AT EXISTING RESERVOIRSvVAR.... 7rOOG 7r000 SAN ANGELO PROJECT9 TUIN BUTTES DANr TEXAS...... 500~000 1 fsoo~ooo / SOUTHERN NEVADQ PROJECT, NEVADA ...... t. 937,000 937r000,~ .! TUALATIN PROJECT* OREGONi....~...... ,.,..;.. 1*150r000 11150,000 / UASHITA BASIN PROJECT, FOSS DARr OKLAHOHA...... ,.,.. lr300,000 1~300~000 UASHOE PROJECTt CALIFORNIA-NEVADA o...... ,....,,.,,, 1rG18r000 l~e181000 UEBER BASIN PROJECT* UTAH ...... 1...... *....*...... 350 9 000 350,000 1 :

UNITS OR DIVISIONSI PICK-SLOAN HISSOURI BASIN PRGGRAH: EAST BENCH UNIT, ...... ~...... ~I...... 50,000 50.000 -FARUELL LIMIT, NEBRASKA .Il.,..~...... ,i..,.....,,., 700,000 700,000 OAHE UNIT* SOUTH DAKOTA ...... I...... 50~000 50~000 OUL CREEK UNITI UYOHING ...... I...... 50,000 50.000

SUBTOTALI DRAINAGE AND MINOR CONSTRUCTION...,..... 1i70829000 1510G2~000 SAFETY OF DAM PROGRAFTS: BOISE PROJECT, BLACK CANYON DAHr IDAHO...... ,.... 200r000 200~000 tiINIDOKA PROJECTv ISLAND PARK DAN, IDAHO...... ,..., 1 r900,000 1,900~000 .H,INIDOKA PROJECT% JACKSON LAKE DAK* UYOHING...... ,, 200r000 200r000 NEULANDS PROJECT9 LAHONTAN DAHr NEVADA...,.,..,.,... 3*412rOOO 3r412rOOO NORTH PLATTE PROJECT, GUERNSEY DAfl, UYOHING...,..... 2v19OvOOO 2~1?01000 ORLAND PROJECT* STONY GORGE DAK, CALIFORNIA.,.,.,,,. . 4r750r000 41750r000 RAPID VALLEY PROJECT, DEERFIELD DAHr SOUTH DAKOTA... 306~000 306~00~ SALT RIVER PROJECTv STEUART HTN. DAHr ARIZONA...... 100,000 ,100~000 suw RIVER PROJECT, GIBSON DAH( HONTANA...... ,.,... 100l000 100.v000 SUN RIVER PROJECT, UILLOU CREEK DAM, HONTANA...... 300,000 3001000 DEPARTMENT DAK SAFETY FROGRAn.....,...... ; 700r 000 700t000 HOOIFICATION REPORTS AND PRECONSTRUCTION PLANNING... 3rS85Pooo 3~5851000 ------_- -- - -.-.------SUBTOTAL* SAFETY OF DAIS..,...... ,...... ,..... 17r743r000 17r743,ooo

REH4BTLITATIOH AND BETTERRENT: CARLSBAD PROJECT* NEU HEXICO....,..,...... 224,000 224~000 GRAND VALLEY PROJECT9 ORCHARD MESA DIVISIONI COLO.. 34GrOOO 348tOOO HARLINGEN IRRIGATION DISTRICTt TEXAS...... 800,000 800,000 MILK RIVERi GLASGOU DIVISIONt MONTANA.,...,;...... 11ovooo 110I000 NEULANDS PROJECT* NEVADA *...... *..~.~...*..*.... 500r000 500~000 ‘OKANOGAN PROJECTv OKANOGAN IRRIGATION DISTRICT* UA.. 3*210,000 3,210sDOO P-SHEP, FRENCHHAN-CAHBRIDGE DIVISIONI NEBRASKA...... 610f000 610~000 P’SIIBP~ HELENA VALLEY~UNIT, HONTANA...... ,...... 300l000 30.0,000 SALT RIVER PROJECT,ROOSEVELT UTR. CONSV. DIST.vAR.,. 11200r000 1~2001000 SHOSHONE FROJECTt FRANNIE OIVISIONt UYOHING,...... 1001000 100l000 SHOSHONE PROJECT, HEART tWNTAIN DIVISIONv UYOXING.. 1~000~000 1~000~000 SHOSHONE PROJECT9 UILLUOOD DIVISIONI UYOHING....,... 150r000 150r000 STRAUBERRY VALLEY PROJECT, UTAH ..,...ll...... ,... 664,000 664 rooo SUN RIVER PROJECT, FT. SHAU DIVISIONI MINTANA....,.. 100,000 100?000 SUN RIVER PROJECTv GREENFIELDS DIVISIONI HONTANA..,, lr200,000 lt200r000 , TUCUHCARI PROJECT, NEU MEXICO,....:,-...... ,,.,.. 300r000 300~000 //-- -2 UNCOMPAHGRE PROJECT, COLORADO....,.,..,....,....,r.. 650,000 650r000 YAKIKA PROJECT, GROIUDVIEU IRRIGATION DISTRICTI UA.., 100,000 200~000 -. YAKIflA PROJECTI GRANGER IRRIGATION DISTRICTI UA..... 100I000 100~000 YAKIilA PROJECT, OUTLOOK IRRIGATION BISTRICTt UA.,,.. lr361,OOO lr361~000 YAKIHA PROJECTI SUNNYSIDE BOARD OF CONTROL? UA...... 200,000 200l000 YAKIliA PROJECT, SUNNYSIDE VALLEY IRRIGATION DIST, UA 200,000 200r00(1 YAKIHA PROJECT, YAKItlA-TIETON IRRIG. DIST.,UA,.,.... 2:‘~200,000 22r200r000 .1. ------______---__ SUBTOTALt REHABILITATION AND BETTERHENT OF EXISTING PROJECTS ...... I...... 35r727vOOO 3sr7271000 =I====P=I==EP== P=ZS=CcT=L~==:=

TOTAL* CONSTRUCTIGN AN@ RFHABILITATIGN.,,,....., 399*750r000 388~930,000 =5E==E5==z===== 1=3=1=113=52=1=

COLORAGO RIVER STORAGE PROJECT

UPfER COLORADO RIVER BASIN FUND

P4RTICIPATING PROJECTS

COLORADO : i DALLAS CREEK PROJECT . ..~r.r...*r,.....~...... ~*r.. 16~200r000 : l61200r000 DOLORES PROJECT ,.....,...,....,...... ~.... 37~200rOOO 37r200rOOO

~_.. .._-- H 4612 CONGRESSIONAL RECORD - HOUSE June 28,1983 PROJECT TITLE BUDGET CONFERENCE ESTIMATE ALLOUANCE ---______------______-___------?------. ;. UTAH

CENTRAL UTAH PROJECT, BONNEVILLE UNITI...... II...... 101rb07rOO0 101,607,000 CENTRAL UTAH PROJECT8 JENSEN.UNIT . ..~~.,.,.,,.~..~11I. lt725,OOO 1,725rOOO CENTRAL UTAH PROJECT* UINTAH UNITr 1PRECON. PLANNING). 55OPO~O 550 8 000 CENTRAL UTAH PROJECT, UPALCO UNIT...... 2f015,000 21015,000

VARIOUS

DRAINAGE AND MINOR CONSTRUCTION: UPPER COLORADO RIVER BASIN FURD: MODIFICATIONS I ADDITIONS TO COHPLETED FACILITIESa 1,056,‘000 1~056r000 PARTICIPATING PROJECTS: / LYMAN PROJECT* UTAH ,.,,..,,,,,,.....,,....,,...... 251rooo 251 too0 SEEDSKADEE PROJECTr UYOHING...... ~....*...~ 5oovooo 500r000

RECREATIONAL AND FISH AND UICDLIFE FACILITIES: RECREATIONAL FACILITIES ,,,.....,,,..,..,.~,,,,...... 6.389vOOO 6,389~000

FISH AND UILDLIFE FACILITIES ,,.,..,*....,..,...... lr227,00(i lv227tOOO j ___e_-___e______------. 7 TOTAL, COLORADO .RIVER STORAGE PROJECT ,.* ...... 168~720~000 168~720,000 ==131=IP1P=s=== =PI==x=------_-_-----

COLORADO RIVER -BASIN PROJECT

CENTRAL ARIZONA PROJECT

ARIZONA

CENTRAL ARIZONA-UATER DEVELOPMENT . ..r~.,....,*,.....,. 155~600~000 165r600,000 CENTRAL ARIZONA PROJECTIHON-INDIAN DISTR. SYSTEMS..... 10,000~000 20r000~000 _..__^______-m-s TOTAL, CENTRAL ARIZONA PROJECT ,...... I.,,,,..... 165rb00,000 1B5,600r000 PIPI===rllTPIIB =ileEx13======

COLORADO RIVER BASIN SALINITY CONTROL PROJECTS

TITLE II COLORADO x._

GRAND VALLEY UNIT ,.,.,,.,,,,.,..,~...~*...... ~...... 31915?000 3?915?000 PARADOX VALLEY UNIT ,..,,..,,,,,.,..,*....*...... ** 6rOb8,OOO 6t068r000

NEVADA

LAS VEGAS UASH UNIT ,.,.,~.,,,,...~..~.~...... I..~.. 1?075,000 1?075?000

VARIOUS * TITLE I HEASURES BELOU IKfERIAL DAN ,,,..1...,,...... I.. 21~872,000 21rB72rOOO -______I______-- TOTAL, COLORADO RIVER BASIN SALINITY CONTROL P,RBJECTS ,,*,,,,,,,~.,,I.,..*,...... 2 32.930,OOO 32,930rOOO 1ZII------z=------rzlDIDII=l------_

PAY RAISE ALLOUANCE ...... ‘...... “... 5v388rOOO 5,3861000

GERERAL REDUCTION BUE TO SLIPPAGEI SAVINGS t&D CARRYOVER PALANCES ,,,..,,.,,.,,...,.1...... ,... -6Sr000~000 -87,750,OOO 5Z=.==*Ex=SI== x==*------L4__---_----

TOTAL, CONSTRUCTION PROGRAH ,~.,I,,,..,.,...... 699,3881000 693v81BrOOO 3=3=xD=flr=r=lx xzxI===r5==I=5zP Jugc28; 1983 CONGRESSIONAL~ RECORD -; l%X.k3E - I> H4613 ;j Loan Program 11: / Amendment No. 18: Appropriates $45,OOO,OOO fob, the loan program instead of $52,97o,ooo as proposed by the House and $40,500,000 as proposed by the g; Senate. I g; ;1, Amendment No. 19: Provides a limitation of .$51,802,000 for gross ‘. i: , .I obligations for the principal amount of direct loans as .T’ I! 1, proposed by the House instead of $43,332,000 as proposed by the Senate. r: /’ .I :. i The funds,are to.be allocated as shown in the following table: t . . ‘, * .;; : PROJECT .TITLE BUDGET CONFERENCE ESTIMATk ALLOU4NCE ______------i------~------

LOAN PROGRAH

ARIZONA

ROOSEVELT IRRIGATION DISTRICT...,,...... ;.... 31200,000 3s20OrOOO

CALIFORNIA

COLUSA COUNTY YATER,DISTRICT ,.,.*I...... *...... 2sOOOiOOO 2iooosooo EASTERN liUNICIPAL.UATER DISTRICT NO. Z...... ,...... 3*181rOOO 3*1a1r000 FALLBROOK PUBLiC UTILITY DISTRICT ,*I.,*....,.*,*.,,,., 3*220,000 “3*220rOOO GLIDE IRRIGATION DISTRICT ...... 1*...... **... lv694~000 1,694rdOO .: GLENN-COLUSA IRRI6ATIOfl DISTRICT...... :,...... ltooolooo 11000l000 ,., Ifi. OAKDbLE IRRIGATION DISTRICT. ,,,,.,,..I....,.,,...,,,... 11500,000 . .:;I RAHONA WNICIPAL UATER DISTRICT .,,...... ,.,.I.,... 4r5801000 4f580,OOO ‘. SAN BENITO CO. UATER C0NSERV.t FLOOD CONTROL DIST..... 6~800r000 6r800P000 i : YUBA COUNTY UATER AGENCY ,,,,...... ,,,,,.,..,..... 3r0001000 6rOOOlOOO ‘, :. NEBRASKA

,CENTRAL ~~BR.PUB~IC POWER 1 I.D.-PHELPS SYSTEH-IHPROV. 3r167,000..: 3,187sOOO -. :

: ORECON

.,. GALESVILLE PROJECT ,.,.,.,,,,.,.*...I.,.,.,*...... --- 41000~000 , * TEXA$

HIDALGO CO. UATER:CON.t IHPROV. DIST. MO.1 (EDI+‘URG). lr148~000~ lr146rOOO: -. HIDALGO COUNTY IRRIGATION DISTRICT NO.2 (SAN JUAN).... 2r500~000 2r500.000 ., FELTA LAKE IRRIGATION DISTRICT...... 21700rOOO 2,700tOOO

UASHINGTON .- _A COLUtlBIA IRRIGdTIO.!4 DISTRICT .,...... I...... 2,306rOOO 2r306rOOO ___- -. ,/ VAR J.OUS

CONSTRUCTION COST INCREASES l ,,..,,,..,...... ,*...... 1,152rooo 1,152rOOO ADMINISTRATION OF LOAN F’ROGRAH ,,,,..,,....*.,....,.,.. 832,000 832rOOO (_ UNDISTRIBUTED REDUCTION BASED ON ANTiCIFATED DELAYS... -1~0009000 -6.0001000 ------______---- TOTAL9 LOAN FROGRM ,,,,,,,.,...I.I.....~tl..1.*. 41rs00r000 45,0001000 SI======f=l=:l= e==er=------.--.____w---- H 4614 . CONGRESSIONAL RECORD - HOUSE June28. 1983 General adminfstratfve e.zpense~ ment activities, and funds are available as consistent with the overall increase in work- Amendment No. * Appropriates specified In the Senate Report for advanced load. The conference allowance includes S53.750.000 for general ‘Llnlstrative ex- torodial concepts and for fusion systems en- S30,OOO.OOOfor m warhead production penm m Proposed by the House instead of gineering activitJes. facilities. Obligation of these funds is con- $53.400.000Bs PrOPoSedby the Senate. Supporting n&arch and technical analysis tingent UPon approvals required in Senate TITLE III-DEPARTMENT OF ENERGY The conferees agree that, prior to obliga- Rept. No. 98-153. The $5.000.000 reduction The sunmar~ table at the end of this title tion of funds provided for the National in unobligated balances should be applied sets forth the conference agreement with Center for Advanced Materials. the Vitreous against the total Production and Surveil- respect to individual appropriations, pro- State Laboratory and the National Center lance program. grams and activities for the Department for Chemical Research, the Department of Materials Producliox-The conference al. Energy shall conduct a technical review and lowamze includes S60,000.000 for Special ISO- Enemy SUPPLY, research and development approve each project. tape Separation and S7.500,OOOfor the hoc- activiHes ess Facility Modifications at Purex The Amendment No. 21: Appropriates (Deferral) Conference includes $140,000.000 for en- S1.951.609.000 for Energy Supply, Research ,Amendment No. 22: Reported in technical riched material ss proposed by the Senate. and Development Activities. Instead of disagreement. The managers on the part of Defense Waste and By-products Manage- S1.964.209.000 ss proposed by the House and the House will offer a motion to recede and rnent-The conference allowance includes 31.943.7OQ.000as proposed by the Senate. concur In the amendment of the Senate 515.600.000 for the by-product and benefi- overtumlng a portion of proposed Deferral cial use program. Solar Energy No. 83-72. Solar Them Energy Systems.-The con- Amendment No. 25: Reported in technical ferees agree to provide $6.000,000 for de- Uranium supply and enrichment activities disagreement. The managers on the part of tailed design of one central solar power re- The conferees agree to the following allo- the House will offer a motion to recede and ceiver under the House-stipulated condi- cation of funding within the appropriations concur in the amendment of the Senate, tions. No funds are available for salt gradi- available for uranium supply and enrich- with an amendment ss follows: ent research. UP to $2.000,000 may be used ment: Delete the matter stricken by said amend- for the thermal energy storage program ment and insert the following: identified in the House Report. . Provided, That notwfthstanding any Wind Energy Syslenu-The conferees 0th provision oJ law, no Junds may be ob- sgree with the Senate Report lariguage con- ligated or apended &ft.er the date oJ enact- cerning MOD 5A and 5B funding allocations menl 4 tlh Act Jo? Project 82-O-109 unless and the wind systems comprehensive pro- “Gme clcdqmt). $106wJ.aaa cmslnwtion.._.__...I - -....-._. 572:ooo,ooo the President certifies to Congress that- gram management plan. us lechmbgy..-.--.---. - .--. “y$cg (1) JOT each 155mm nuclear weapon pro. Biomass and Alcohol #%&.--The confer- AJs&!pm!k -.-.-...-._... , , duced an e&sting 155mm nuclear weapon ees agree to Provide S4.000.000 for regional _-__--._ UnRiuaReroura AsTGenl....--..-...... -.-- ---_._ shall be removed Jrom the stockpile and per- biomass energy programs. manently dfsmanUed; and Ocean Enemy .St&ems.~The conferees scbtolal~.-~~~~-~~~- 7Kt$oo.om7357w.m cm itemsNol ia crahera --..--.-.. 1.499.3w.ow1.499306 wo (2) Jonnul notification has been received agree that funds are avaIlable for only fed- from the North Atlantic Treaty Organfza- bility studies of open-cycle systems and ldtl-...- - .--. -. 23(o.Mo.ooo2235,oaa.oMI tion nation fn which such weapons are $1.500,000 Is available for cold water pipe re- search. sought to be deployed that such nation has Electric Energy &&ems.-The conference The conferees &cur with the Senate In approved replacement oJ e&sting 155mm regard to prdcarement of baseline centri- nuclear weapons wfth the new 155mm nucle- agreement provides for me deep sea cable ar weapon. Project under the euldance of the Senate fuge machines and with the House in regard RePort. to continuatlgn of the uranium resource as-. The managers on the part of the Senate sessment program at a reduced level. ’ Nuclear Fission will move to concur In the amendment of Breeder Reactor Sus&ms.-The conference General scfence and research activfties the House to the amendment of the Senate. 8greement provides SCOOO.OOQfor design ac- Amendment No. 23: Appropriates The coni-ce includes $50,000,000 for tivitles on the breeder reactor engineering $638,250,000 for General Science and Re- Project 82-D-109. 155mm artillery fired Lest facility. search Activities Instead of $643,250,000prc+ atomic projectile production facilities. The Remedial Action Program-The conferees posed by the House and $635.250.000 89 pro- conference agreement. would prohibit the direct that the Department give priority to posed by the Senate. obligation of the funds pending a hesiden- the undertaking of a decbntamlnation re-, conference ‘d allowatlce tial certification. search and development project Involving $3%0.000 for the linear collider??~~ Amendment No. i6: Reported ln technical the following sites and their vicinity proper- Stanford Linear Accelerator Center and disagreement. The managers on the part of ties, and has added funds to initiate the $5.000,000 for the Colliding Beam Accelera- the House will offer a motion to recede and work: $2.000.000 for the site and vicinity tor funded under the ISABELLA project. concur In the amendment of the Senate, Properties In Wayne/Pequanak, New Jersey; The allowance.also includes funding for with an amendment as follows: S~.OOO.OOOfor the site and vicinity proper- LAMFF and Bkvalac BS described ln House In lieu of the matter proposed by said ties In Maywood, New Jersey: $500.000 for Rept. No. 98-217. the’ conferees agree with amendment, insert the following: the site and vicinity properties near Albany. the provisions for muon catalysis and nucle- None oJ the Junds approptlaled by this New York; and $500.000 for the former ar data file as proposed by the Senate but Act, or by any other Act, or by any other pro- Cotter Corp. site at tstty Avenue, Hazel- direct that these activities be included under the Energy Supply. Research and De- vision 4 law shall be available JOT the pur- wood, Missouri. pose oJ restarting the L-Reactor at the Sa- C’mmercial Nuclear Waste-The confer- velopment Activities account. vannah River Planf Afken, South Carolina, ees agree that SS,SOO,OOOls available for the Atomic energy deJense activities until the Department oJ Ene+gy completes subseabed waste program in fti year 1984. Amendment No. Appropriates an Environmental Impact Statement pursu- Environment . S6.547.875.000 for Atomtc?Energy Defense ant to section lO.?(Z)ICI oJ the National En- LigufJi~d Gas Fuels Sajety Test Facility.- Activities Instead, of 56.558.375.000 as pro- viromnenlal Polfcy Act oJ 1969 and until The conferees agree that the Department posed by the House and $6.500.875.000 as fssued a discharge permit pursuant to the should proceed immediately to select a site proposed by the Senate. Federal Water Pollution Control Acl I33 and initiate construction on the Liquified Research Development and Test.--The V.S.C. 1251. eL seq.1 as amended which Gaseous Fuels Safety Test Facility using conference allowance includes $7.000.000 for pennil shall incotporale the terms and con- funds available in fiscal year 1983 and fiscal buffer land acquisition at LLNL as proposed ditions provided in Ule Memorandum oJ Vn- year 1984. Additional funding requirements by the House and $5.600.000 for the- new derstanding entered inlo between the De- shall be submitted with the fiscal year 1985 detonator facility at LANL as proposed by partvwnl of Energy and the State oJ South budget request if additional construction the Senate. Also included is $23.500,000 for Carolina dated April 27, 1983. relating lo funding is determined e0 be necessary. the nuclear test facilities revitalization studies and mitigation prognrms associated prolect. ‘wifJa such restart. For purposes oJ this para- Magnetic Fusion Inertial Confinemenl Fusion.-The con- graph the term “‘restarting” shall mean any The conferees agree that the Adminlstra- ference allowance includes $145.000,000. aclivfty related Lo the operation oJ t.he L-Re- tion shall consider including funding In the The increase over the budget shall be ap- actor that would achfeve criticality, gener- fiscal year 1985 budget submission for aneu- plied proportionately over the 1983 levels. ate Jfssion products within the reactor, dfs- tronix fusion activities for consideration by Production and Surveillance-The. con- charge cooling water Jrom nuclear oper- the Congress. Of the funds available, ference allowance includes $1.666.915.009 ationa directly or indirectly into S.?eelCreek. 82.000.000 is for operating expenses on Elmo for operating expenses which represents an or result in cooling system testing dis- Bumpy Torus to continue concept develop. increase of $192.415.000 over 1983 which is charges which aceed the volume. Jreguencv

-. . . 7 . ‘-‘-: .. . ST-,-’ .; yi- , : , . ..: ‘. .-, I.:i,‘*>14. Ju& i8, ‘i&ii co NGRESSIONAL RECORD-HO&E .’ . , HS461$ and duration if test dischargea conducted’ DEPARTMENTALADMINISTRATION CONSTRUCTION. REHABILITATION. OPFZRATIO~ prior to June 28,1963. Amendment No. * Appropriates ALSP M~~~NNANCE. WESTERN AREA POWER Consistent with the Natfonat Environ- $366,056.000 for Departzntal Administra. ADNXMSTRATZON mental Policy Act ti 1969, and in consulta- ’ Amendment No. 32: tfon with State officials of Souul Carolina tlon Instead of $371.056,000 as proposed by Appropriates and Georvis the preparation and comple- the House and $361.056.000 as proposed by 8194.630.000 for ConstructIon. Operation tion of the Environmental Impact State- the Senate. and Maintenance, Western Area Power Ad- ment called for in the preceding paragraph The conferees agree that $500.000 shall be ministration instead of 5184.630.000 as pro- shall be expedited The Secretary of Energy available for the Council of Energy Re- posed by the House and $204,630.000 as pro- MY reduce the public comment perfod, source Tribes. Dosed by the Senate except that such period shall not be reduced Amendment No. 28: Inserts language pro- - FEDERAL- EMmor REJXILATORY COM+SION to kw than thirty days, and the Secte‘taty posed by the Senate changing “iuch that shall Provide hti Record 4/ Decision, based the” to “so as to result in a” for purposes of Salariesand expenses . + upon the com~lekd Environmental Impact clarification. Amendment No. 33: Appropriates Statement. not sooner than December 1. Amendment No. 29: Insert8 language pro- $89.582;000 as proposed by the House in- 1983, and not later thun Januaw 1,1984. posed by the Senate changing “not be great- stead of $94.582.000 as proposed by the The managers on the part of the Senate er” to “estimaki at not more” for p&&es Senate. will move to concur in the amendment of Of clarification. Amendment No. 34: Indentifies the House to the amendment of the Senate. Amendment Identifies $29,582.000 8~ proposed by the House in- The conference agreement would require $156.437.000 lnstea~f 816::31000 as pro. stead of $34.582.000 as proposed by the the preparation of a Environmental Impact posed by the House and $1&3i.000 pf pro- Senate as the final estimated arjpropriation Statement as required by the Senate, but posed by the Senate Bs the fina1 estimated for the Federal Energy Regulatory Commis- would allow GRembr to-be loaded with un- appropriation for Departmental Administra- sion. irradiated fuel and continue with nonnu- tion. Amendment No. 35: Restores language clear flow testing pending the completion of POWER~XARKJZTING AD~~I~~I~TRAX~NS proposed by the House, amended to delete the Environmental Impact Statement. The B0NNsX’ILL.ZPOWER ADXINISTlUl ’lON FUND reference to the’ “Fifteenth Congressional conferees agree that this amendment notes- District” and references the Counties of tab&h a precedent with regard to future de- Amendment No. 31: Deletes House lan- Merced. Ma&ma. Madera and Presno ln cisions concerning compliance with the No- guage restricing the use of npw bormwing California of that Distrlc_t. tional Environmental Policy Act,. authority. , 1

.; -i : -i: H.-&l6 i <, _. _.,-.-- CONGRES~IvO’UL RECQRI&:HO&JSE~ . ;. :. : - ~~J~iie&?~- $983 . . . JC : . ; 1 --. _ ‘. Bud?ret :. -, canrr~ence ----‘-----‘-‘-----‘--‘------~~----~------,------estimate l llouance ENERGY.SUPPLY RESEARCH 6ND DEVELOPFLENT ;c. SOLAR ENERGY I II Solar awlications - .,’ ^ A, Solar buildind enersn .&teas r.,...rrt.r....*.. 8~375 17~200

C. Photovoltaic enerdy systems \

OPeratin exPensesrr.;..rl~.....~~.~...... ,... 32,700 499700 - .Constructian..~lt~t~...~~,....,~~.~~.~..~~...,, -r- 1,500 ------VW ------__ Subtotal, Photovaliaic ,enerdY systems ..*o,,.*..,. 321700 i 511200

0, Solar themal energy swsteis _‘.

Operating ewenses . ..1.1...... *1...... *.... 131325 338750 Capital l auiP~entc.....~l...r..r,l.,,,..,.,..,...., ------e250m ------_---_____71750 - Subtotal, Soiar theraal eiwrdu sYstem.+rlrtt.r... 13,575 411500

El Biomass and alcohol ener?lY systems

OPeratin eXPensesr..,...... ,....,...... 17,300 29,000

Fe Uind enerrlv srsteas * - Operating expenses ...... 1..1..1.1.1..*...... 81600 26,500

0. Ocean energy systems

Operating exrens~s.llrr...r~..,.,,.,...,.,,... --- 7rooo ------__ ---..------__ Subtatalt Solar aPPlicatians.,,~~~...~,,,,...,.., 80r550 1727400 - .- (Operatln9 excenses).,,....,.,,..,..,.,..,.,, (80,300) (163,lSOi. (Plant and Capital )l.~~ll...l..,.lll....,...,.., (250)- (91250) II. Other solar energy . 4. Ikterna‘tional solar l nerdY Prodram - OE.;..... --- lVOO0

B. Solar technolanr transfer - OE ..*.*,.,...*.I,, 3,100 3r250

E. Program support - OE .,...... I11...... 1....,,, --- lrOO0

F. Program direction - OE ..,...... ,..,..,.*,,,. 3r009 6,000 . . ------__ --_____c______Subtotal, Other solar enerdv ...... I.... 61109 111250

-General redvction.,..,.....,....,.;r,.....,....., --- -5vooo ___ -.-_. ------__-______TOTAL, SOLAR ENERGY....,;...,.....,.,.,.,,..,...... 86.659 . /’ 178,650 (Operatins expenses) .I...... ~...... ,...... ,, (867409) (174,400) (Flant and Capital ) I...... *.....~...~...... ,,. (250) (9,250) (General reduction) .,...... -...... ll,....,.,..,,,,, --- (-5,000) ,’ GEOTHERHAL

I. Hydrothermal industrialization

Operating expenses- ...... r.r...... --- 2,000

._ II. Geopressured resaurces

Operating expenses ...... )I...... --- 5~000

III. Geothermal technolo?LY development

Operatlnd exPensesl,~...~~.~rr.r...,...... ,,,... lSr059 '211459 -' : :

IV. Program direction - OE..,~...1...~...... ,...... 494 1tOOQ -.------..------__-______TOTAL* GEGTHERt+AL ...... I...... 13tS53 291459 . . . .; . . y.2 :, .‘. i *,._ : : .-, __ . ‘I, -,-..I .‘. ,‘>C. .. ., ,. ‘, ‘,;.‘;;‘ .’ :, 1_ . . _- ; ,’ J ;I Jupe 28,1983 CONGRESSION&’ REdORD - HOUSE H 4617 -. Buddet Contotence - ‘_ QStihatQ allowance _---____-__--_------____-- -__------,

101010 HYDROPOUER :---: 2 ,, 101015 I. Saall scale hydrorowcr develorment - OE...*n..ee. 500 --- 101040 II. Prowar direction - GE,..,,,..,,....,...,.,...... 250 _------_---_----__-___ --- 101050 TOTAL, HYDROPOUER ,,.~,,,,,.,.,,....,.~..,...~.~~...... 750

lOlO ELECTRIC ENERGY SYSTEIIS AND-STORAGE

101100 I. Electric Qner?lY SYS$CIS .

101105 A. Electric field effects research

101110 Oreratinil Qx*enses....~.rrr...... ,. 6,600 3rooo 101130 R. Reliability research.

101135 OPeratin Q~renses...~r...... I...... ,,...... ;.’ 6rOOO 3,500

101145 C. Systems technolody,...... ,....,....,..,..,... --- 11rsoo

101180 b, PrOfraa direction - OE,...~...... ,,.,.,...,... 102 500 ------___--__ ------.!’ 101185 SubtotalrElQctric enQrdY SYstems....~~~..~.~~..~~ l?r702 18,500 i I 1, - 101215 II. Encrsr Storage SYStQms 2 ,i’ 101220 A. Battery rtora?lQ ,.; ‘3 10122s Operating l xpcn~~~...... ~~~.i.~,.....,...,.... 14,000 18,000 3

*:,.; 101245 8. Thcrmak and mechanical storrde ‘. ‘k ‘i 101250 Operatin* Q~rQnsQs...... ~...rl.r....,.,...,.,..r --- 7tooo m.7‘1 ;t -.r 101270 C. Prosram.dircction - OE...... ~.....,~...~...~~. 200 700 : ------__------___--__---_--- -3 101275 ., Subtotal* Ener?lv storadc SYStemS.....~~.~~....~~~ 14,200 251700 .:: ----es --__--______-______--- . -.. TOTAL, ELECTRIC ENERGY SYSTEMS ‘AND ‘STORAGE...... ,..... 26~902 44,200 ? 101300 .\ 101350 NUCLEAR

101355 I. Converter reactor ..:

101360 A. Hidh temperature reactor tQchnoTodY

101365 Operatin* QKrQnsQs.,.l....r....,...,...... q-2 30rooo ------___-______- 101375 Subtotal, Hish temrcraturt reactor technolosu+.,* m.._ 3OfOOO __-- .--.._ 101380 B. Liz& water reactor SYStQmS

101385 Operating l ~pen~Q~,..,,..l~.~~...... ,..,,.~~.~ 15rooo lV,SOO > 101400 C, ThrQQ Rile Island activities . . .I Oteratind QXrensQs,Ir.,....~.~...~+.~~~,~~~~.. 33,000 3.~1000 101405 . 101410 Capital QoUirmQr,t...r...... 41000 4rooo --__----______101415 Subtotal, Three Hile Island activities...... 371000 37,000

1014?0 D. Advanced reactor systems 101425 Gperatind exrenses ,,,,,...,..I...... 41990 ’ 4,980 .I 101440 E. FroSram direction - OE...... t .I lrl90 lr190 ------_--_--- ______--- 101445 Subtotalt Converter reactor ,...... ,..,...... 5Br 170 92.670 I *_ :. 101450 . (Operating Qwenses) ...... L. (54,170) . (88.670) 101455 (Plant and Capital 1 ...... (4rOOO) (4rOOO)

-,’ .: . . q ,”

--.-_ .

I .: : ~ : Cq~~RESsIONqL,~RE.CORD .&HOUSE y ‘. ’ 8.1 -.$&.e 28, J98;9! .I :

DudlQt ContQrQncQ . cstimatc al lovance ------i------

II. Commercial nuclear uaste 1. Terminal isolation

,Oreratin?r l xPenses.r...t...0~0~0.00*.~*.0.., 41700 4,700 2. Yastc systems ttchnolo’u

OPeratinS eXrensQsI,~.~r~~;..~~~~~~~~~,~~~, 91440 9,440 Capital ceuirmentI,.r...... ~.~.....,....I .360 360 ..----.-----L------_--______Subtotal, Yaste systems technology...... ,,.,. . P?DOO 9veoo 3. Uaste treatment technolodr

Ohratind Qxrenses~~~.r~~O.~.~.~~~...... 51600 -51600 Capital l ~uiPmenttr...... ~.~.~.....,..., 600 600 Construction! 04-N-105 General Plant rroJects...... ,r+ 11400 lr400 ii..---.------,------I-----.--- Subtotalr DaSte treatment teChnolo9x...... 7r600 71600 4..Pro?lram direction - OEll..,.....;l...,..,,. 480 480 ------_----- Subtotalr Commercial nuclear uaste.;,...,...... , 22,580 221580 (Operating exPensesl.,..r.,...... 42Or220) (20,220) (Plant and Capital l,ll.l.....l,.,.....,l....,.., (2r360) (21360) III. Remedial action 1. Manasement of surplus radioactivity contaminated DOE facilities

OPeratin exrenses...rr.,....,,.,...... ; 15r360 15r360 -Capital eo.uirment ,. , ..;. ..a . . . *. l t,.... . 0. . . . *. 140 140 ------s-L ------Subtotalr hatiadem,Qntr ~1 surrius radioactivity . .contaminated DOE tacilities.....O... 15r500 l&O0 2, Remedial action tar former DOE contractors installation HED/AEC sites

Oreratinj cxrensesr...r.,r....r.....I....,.. 11,700 lbv700 Capital eQ(IZPment.t..r...... ~~,,. 300 300 ------Subtotal* Remedial action for. former DOE cant installation tfED/AEC sites...... ,.. 12,000 17rooo . . 3. Grand Junction remedial action OE*...... e.. I?500 1,500 4. Remedial aCtiOn tOr inactiVQ Uranium mill tailins sites ,,- Oreratind~xrenses.,..,....,...... ,. 271125 279 125 Capital eouiraent...l,..l,l.,,....,.,..,.,. 775 775 ------Subtotalt Remedial action for ina&tivc uranium mill tailing sites...... ,. 27;900 27,900 I 5. Yest Valley Oreratins exPQnses,r.l,.r.rr.,.,,,...... , 36rOOO 361000 6. Prodrar direction - OE,..ll,.,.~l,.,,....., 1 *Of!!. IlOGS ------^------_---_----- Subtotalr Remedial-action,...... ,... 93.985 98r985 (Oreratind expenses) ..,,L..,.lI...*.....*.,...... (92t770) (97,770) (Plant and Carltal 1 ..,,,,,.,,.~...... ‘,...~...~.. (lr2151 flr215) Jlini .%,I983 CONGRESSIONAL RECORD - HOUSE Budget Conference cstiaatc allouancc L -_---__---__--__-_-_------_____-___--_------______^______------

I IV. Nuclear fuel crcle ., i 1 A. Spent fuel technoloslu i OperatiM l xrenses..~.t...... ,...... *.~~ 4,500 41500 \ Capital eauirment ,,,~,.~~~...~..,,~**,...... ~. 500 P ------,..--2!!~- ! Subtotalr Spent fuel technoloiY,....r...,...... ~ 51000 5rooo i 8, Fuel cycle RZD ;i ‘ . 4 OperatinrI expense*,.....l.,..~~..~~~~,.~~.~~~. 311385 31 t 385 -4 Capital eauirncnt .,,.,,.....*...i*...... *... 49000 4,006 ! _------_------______---_-__ 1 Subtotal, Fuel cycle RIDI.,r...,.l~,...~...~l,..~ 35r385 35,385 ? C. Prodram direction - OE...... l,....,.....,~,.. 1,422 11422 1 -----e--v------___-----__---- Subtotal* Wuclear fuel cYcle...... ~...~~~ .llrD07 41,607

(Operating l xPenses)..,.~l...r,...,,...... ~~...~. (379307) (3793071 (Plant and Capital l,..,.,,~.,l.,.....~.,.....~~. (4rSOOl (415001

V. Advanced nuclear svsters

6, Space and terrestrial applications

Oreratind exPenseS.~..~..~.,~~~,,~.~.....~~~~. 30,135 30,135 Capital eauireent ,..,..~.,,,..;,...... ~,.... 2,600 21600 ------. em--_-- ____--__-____-- Subtatalr Space and terrestrial arr ,l ications,,.,. 32r735 32~735

D. Prosraa direction - OE...+l.e... 4 ..11....1...* 1.370. 11370 ; ---_--..-----__- -_----_---__--- Subtotal* Advanced nuclear systems...... *...** 34rlOS 34r105

(OperatiM expenses) ...... (3115051 (31,5051 (Plant and Capital 1 ...... (2r6001 (2,600) . . VI. Breeder react& system

4, Lfouid netal tast breeder reactor

DPeratind eXPenses..~..r..I...r...... ~l~.l~~. 255,600 2639600 Capital eauiorent .*...**...,,,.*.,,.*.,..,..... 191100 21,100 Construction: 84-N-101 General plant protects...,.....,.... ttooo 11000

84-N-102 Hods. to.reactors.rr....,...,.....,. 4,DOO 41000

83-N-334 SateWards t sec. Assessr imp.,AHL~IHEL~Id~;..,....,...,..... irooo lrOO0

78-6-C Safety research eweriacntal facilitvr INELr Idaho t&-E, Long-lead procurement and limited construction onlY)l.r..,..,...... 11100 11100

78-b-E Lieuid metal endineerind center l oditicationsc liauid metal endineerind centerr Santa Susanar Calitornia (A-E and long-lead procurement only) ll*..*...,4,.4..*1 ‘St000 SIOOO

78-6-F Fuels t materials examination facilitvr richland, UA...... ~..‘~...... ,...~. --- 4,000 .------_ . ------, Subtotalr Construction...,...... ,,,,....,.~... 12rioo 16~100 .------__---______Subtotal, Liauid metal tart breeder reactor...*.. 286,800 3001800

6’. Clinch River Breeder Reactor demonstration-OE. 270,025 me- CONGRESSION+L RECORD - HOUSE June 28, 1983 \_ .; ’ Buddet Conference estimate allowance ------=------______------6. Yiter cooled breeder reactor

Operating l xeanses ...... ~...... 359 500 351500 1.. .:_: ..::.. ..::’ D. Prosrae direction - OE ...... 10,200- 10,200 ------^------______Subtotal, Breeder reactor sustees . . . ..I...... *.,, 602~525 34bwSOO

(Operatinr l xrenses)..r...~..,,....~~~..,,....,,, (571,325) (3091300) (Plant and Capital )~~.~Il~..~..~..~~~.~...t.,,,. (31,200) (37r2001 ------e------v ------__ TOTAL9 NUCLEAR...... ,...... 853,172 636,647

(Operatins expenses) . . . ..I...... *....~...... 18072971 (584,77’11 (Plant and Capital l,..,.ll..l...... ,t.,,~,...... ~.,. (45rG751 (51,875)

ENVIRONtiENT

I. Overview and assesssent

Oreratind l XPenses...r....,.,I,....,,...,,. 301400 301400 Capital l ouiP~ent...... ,...,. lrb00 1fbOO Construction - LGF test facility...... ,.. 3rooo 1rOOO ------_--____-______Subtotalr Overview and assessment.,...... 35,000 331000

II. 8iolodical and environmental research

OF..ratind l xPenses,r~....~...l...... 157r900 1711900 Capital eeuireent ...... ll...... 79700 7,700 Construction: 84-ER-133 General plant rro.iects...... ltOo0 ’ 1,000 ------Subtotal, Diolodical and environ. research.... 166,600 lGO1600

III. Prodraa direction - OE . . . ..I......

A. Overview and assessment - PD...... 5r375 5r375 B+~~Bio+ 5nd l nva research - PD.,...... ,,.. 3~600 3,600 ------Subtotal, Prodran direction - OE.,l...o.....,. 8,975 81975 -______-______Total, Environment ,...,...... ,...... *~.. 210,575 222~575

(Oreratind expenses) ,,,...,...,.,.,,..I.....,..*. (197,275) (211,275) (Plant and Capital 1 I..,...,...... (13,300) (11#300)

FUSION ._ I. Wasnetic tusion

A. Confinement sv,s’tees

Oreratins l xrenses~.r....I.l....,,.,,,...... 186,050 186,050 Capital l euireent..,,l,...I.t.t..,r..r.trt,,,1 201650 20,650 Construction1 .,.GO-hF-3 EBT Proof of principal •x~p.,..l.l..r, --- 2rooo ------e-___ ----__------Subtotal, Confinement systems...... ,...... ,,... 20bt700 208 P700 B. Develoraent and technolozir .

Oreratind exPenses~~~l...l~r..~~~~~.,~...r~ll. _ 77r310 78,310 Capital l auireent *1,.....*.,,.*..,....,...,,,, 7r740 7r740 ------me ______Subtotalr Develoreent and technolo~u...... 851050 8brOSO C. Applied plasea physics

Greratind l xpenses,...... ~...,...... 76,040 76.790 Capital l auirment ,,,,,..I.,*..*...,...,..,..,. fir060 5,060 ------mm -______Subtotalr Applied plasma l hYsics...,,,..,.,,..~.. GlrlOO 81,850 ilune 28; 1983. CONGRESSFONAL RECORD - IdOUSE ‘. H 46il’ ’ Budget Contirencc l stlm8te allouance -----______------

De Planninr and troJeets . . GPer8tind exPenses,,..t,r~~~~~....,....,~..... 48r700 48,700 Capital l aulPIent.....l..~~~..~,.....~...,...~ 49350 4,350 Construction: 84-GPP General plant projects...... ,....,.... 6tSOO 6rSoO

78-3-A tIirror fusion test facilitr+.0..~.... 30t000 3orooo

. ------.----- Subtotqit Construction.,.;,...... 3&1500 ’ -36,500 ------Subtotalc Planninrl and proJectsr..r.....~..o~~.~~ 89,550 89,550

E. Prodram direction - OE..,....,.....,...... 4~600 4,600 ------_------____-..-- Iota1 r Fusion ,,,.,,.,...11...... ,.,..~...~...... 467,000 470,750 , (Operatins expenses) ,,,,.,...... ,,..,,...... (392~700) (3941450) (Plant and Capital 1 ,,,,,.,..I.,...,,,...,...... (7413001 (76,300)

SUPPORTING RESEARCH AND TECHNICAL ANALYSIS

I. Basic l nerdv sciences

A. Nuclear sciences I

Operatins exFenses....lr.,...r..*...... ~.~..* 37,900 3/1900 / Capital l auirment ~,,,.,.1,~~,.~.~~~...~.~..~.~ 2tlSO 2* 150 : Construction: 5 :. ,. E4-ER-141 A 1 P ,,,.,I.*.,...*...... *...... ‘; 270 .‘- 270 1 , ------_-- --d------Subtotal, Nuclear sciences.,.lr...r...... 40t320 409 320 B. Materials sciences .! .Oreratind l xrenses ...... j2SrllO 125,110 Carital eauirment ...... 121780 12~780 ‘-? Construction: \ ,. .‘. G4-ER-111 N S L S ...... 2,500 21500

84-ZR-112 National center for l dv materials.. 2Sr900 31000

,’ 84-ER-l;l A I i ,,,,,.,,,,,....,,,...... ,...I 640 640

84-ER-142 General plant rrojects...l.l....l,I 300 300

84-ER-14 Vitreous State Laboratory,.,...... --- srooo

84-ER-15 National Center for : _. Chemical Research .,.,..,,*,..*,,,I,...... ,..,...... --- 5,000 __-- --.I,-

./.------‘------_----_- Subtotalr Construction..,.,,,.....,..,,,....,, 29,340 161440 ____----____^-______------Subtotalr Materials sciences..,.,...... ,,..,..... 167t230 1541330 8.

, i’ C. Chemical sci.ences

Dreratind l xPenses.,.~~~~.~~..~~~~.~~~..~~~~~~ 7S?500 75,500 Capital eauiraent ,,,1..,...,,,,.,...... ,..... 6,520 6,520 Construction: G4-ER-141 A I F....,,.....,..,,...... ,.... 350 350

G4-ER-142 General plant rroJects,.ll..l...... 100 100 ------_------__---- . Subtotalt Construction...... ,,..~~ 450 450

, --- ______-__ Subtotalr Chemical sciences.....,.....,...... * 829470 82,470 y 4622 CONGRl%SIONAL RECORD 4 HOUSE 1983

Budget. Conterence estiaatc allouance ---_------_-_____------

D. Endineerinsr l atheaaticalr and seosciences

Oreratinrl expenses ,.,,,.,,..,....I...... 331670 331670 Carital l aui?ment ,,,,,,,,.,...... ,..*...... 2rlZO 2,120 ______--__ Subtotal, EndineerinSr math.9 and geosciences.... 35,790 35,790

Et Advanced enersu rrojects

Operating ex?enses,..~~~...~.~~..*~~~~.~~~~*~* 9,100 PI100 Capital l aui?ment ,,,,,,,..,...... *. 310 310 ------______----- Subtotalr Advanced cnerlty ?rojects..,...... 91410 99410

F. Piolodical enerfy research

Operating ex?enses....,,,i....,,~.,.,,,,,,~,,. 10,580 101580 Capital eauirrent . . ..1.11..~11.1....,.,,,,.,,. 400 400 ------w- ______Subtotalr BiolcMical enerdv research,,,,,.,,,..,. 101980 101980

G. Prosram direction - OEl..,..,l,,.....,..l..... 3r970 3,970 ------w-w ------Subtotalr Rasic energy sciences....,...... ,..... 350,170 337~270

(Operatin l xPenses).,,,,.,I...... ,.....~tr,..... (2951E30) (295,830)- (Plant and Capital ) ..1,,1...1.....111..*.*...**. (S4r340) (41,440)

II. Enerrfr oversillhtr research anal%. I Univ su??ort

A. Enersly research analysis - OE

1. Assessment ?rO~ectsllllrl....,...... 2~869 2,869

A+ University research support - OF

2. University reactor fuel assistance....,.... 1,500 if500 3. University laboratory COOP. ?rosram...... 3r500 3r500 5, Enerdr l an?ouer assessment ?rosr~ml...+..r.r 270 270 6. Education and trainin4,,....,...... 200 200 ------___-_-_ ------_---_--__ Subtolalt University research support - OE...... 59470 sr470

C. Un’iversitr research instrumentation ..*....*... 6~000 41000

b. Program direction and oversillht - OE,...... 3,400 3r 400 ------_-_-______Subtotalr Enersr oversidhtr res aimalrr t Univ SW 179739 15r739 III, Multi-Prograa facilities I. --- Construction: 84-CR-101 Rehtb; old utilities (LPL)...... i,ooo 1,000 .

84-ER-102; Coolind uater facilitut Restor. (ORNC) .,...... ,...;...... *. 600 600

,‘84-EH-103 Road repair (various locations).... 3,000 3rooo _. 84-ER-104 Facilities support Pro.kcts (various locations) ,..*...*...... **. 41000 41000

83-E-308 Rep ?oucr SY~~INEL~LLNLIORNL~RL..... 7r988 7~988

83-E-309 Electronics fac,r ANL...... +....,.. 49150 4r150

83-E-310 Utility re?laceaents...... 7,500 71500 . 83-E-311 Emergency response center, ORNL..... 2.200 2r 200

82-E-301 300 area uti1itie.s tHEDL)....+...... 4r400 4,400 -. 82-E-302 Sicurit’y facility (ANL)..,...... 2~300 2,300

RZ-E-305 Traffic safety improvements (HEDL).. 800 800 - .._. Q 1983 CONGRESSIONAL RECORD - HOUSE H 4623 Budset Conference estimate allowance --_--_-__-___-__r______I______------

81-E-325 Ener4v Technolo4r Lab (Sandial.,..,. 11600 3,100

80-ES-11 Idaho Latr Facility tINEL)~.++..,.... 11062 1,062 ------_------_ Subtotal, h:lti-rrodraa facilities...... ,.... 40,600 42~100 ------e-_-e_ -_--______Total? Suarortin4 research and tech. analrsis.... 408~509 395r ro9

(Oreratins eXPer~ses).~r...... ,...... ,~.,....~ (313,569) (311r5691 (Plant and Capital )..,.....,.,.l.....I...... ,., (94,940) (83~540)

POLICY AND IMNAGEMENT

1, Policy and hanadement

A. Policy and l ana4erent - GE - ER.....,...... 515 1~288

B. Folicr and aanalement - GE - NE...,,,.,.,...,, lr370 lr868

C. Policy and aanagcaent - OE - EP . . ..*....,,...* 900 19611

U. Policy and ranaseaent - GE - CRE...... ,. 970 970 ------e-- --_-_____-____^ Sobtotalr Policy and aanaderent...... ,...... ,. 31755 51737

ENERGY APFLICATIONS

I* Technical Intoraation Center

Operating e~*enses...r..r.,l~~~~~~,~..~..~.~, 139300 151200 Capital eauiracnt 1...... ,.....11...... ,..., 800 800 ------v-w --_-______Subtotal, Technical Inforaation Center ...... 14,100 16,000

11. In-house eneras l abasement OPeratins e~~enses,.,...I.l,.~,,...... ,,.... 11200 lV200 Construction: 84-A-601 hods for enerdr Htrt,, various locations....l...... ,..,..... 11,500 11~500

84-A-662 Residual ener4s awlications.....,... --- 1~332

82-A-603 LlrSL Hot water distribution.,,...... 1,700 1 r700 ------_--__-______Subtotalr Construction.....,...... 131200 14~532 ------^-----_--__- Subtotals In-house enerllr aana4eaent...... , 141400 15*732 _. (OPeratin exrenses) ..,..,1.....,....I,..,..,,.,, tl,zoo) (lt200) (Plant and Carjtal ) ,,I,..*....,1...... ,..,,.., - (131200) (14,532) ,/ III. Plant engineerins and desi%n * Construction: 82-C-601 Plant engineering and desim...... ; lrOO0 lrOO0 .A. ------z.----- _-______Subtotal, Energy applications.,...... ,...... 29,500 32,732

(Operating expenses) ,..,.,....I...... (14VSOOl (lbr400) (Flant and Capital )...,...... ,...... (lSr000) (161332) -----_---_--___ _-_____-______SUBTOTAL, ENERGY SUPPLY RESEARCH AND DE’JELOPHENT...... 2~099,625 2r016~609

(OPeratin exrenses) ,,.,.,,*..,...... ,.....,.,..., (lr855v960) (lv773rOlZ) (Plant and Capital 1 ..,,..,,..,....,.,.,...,,.,,....,. (243~665) (2489597)

kd.iust&ents:

FY 1983 deferrals carried forward.,...... ,.....,...,.. --- -bSrOOO ------TOTAL, ENERGY SUFPLY RESEARCH AND UEVELOPUENT...... 2~0991625 1,9511609

-.^

-.--““d”- .- ., <1,.

: ,,?,& r ‘1 H .4&i : , CONG.RESSIONi$L.RECORD - HOUSE June 28,,1983 : i$# .I Budset Conference :. ,.’ estimate allowance ___-______------___-______------. . -

(OperatinS l ~renses).,..,,,5,...... ~~~.~.~~~~~~~~~~..~~ (lr70810121 (Plant and Capital b.,~~.,,,...,,,,I.,,....1....~...~. i24ErS971 (General reduction) .,,.,~~,.,...,...... ~.~...I...... (-5rOOO)

URANIUH ENRICWENT

I. Uranium cnrichaent activities

A. Gaseous diffusion and orerations support

Oreratin9 e~~enses.~~~~.~..~~~~~~..~~~~~.~.~~~ 1,400r400 It400t400 Capital enuirment .,,.,..,,,,,.~.,,...,.,.....~ 9l900 91900 Construction: 84-N-401 General plant Projects....,...... 139300 13*300

84-N-402 UF6 cylinders ...... 4,000 4rooo

84-N-403’Intermediate sas removal ...... ir700 lr700

84-N-404 Fouer systems protection imrr...,..r 31000 3,000

84-N-405 Utilities urdradinrir Phase III...... 6,000 61000

83-N-401 Ref. of elec, circuit breaker Gas dif. Plant, Portsroutht Ohio...... 7rooo 71000 -

83-N-402 Comrli. uith toxic sub. Control act, alas dif. rlantsl.l.,.~.~~.l..~~~ iOlOO0 10~000

83-N-405 Utilities ureradin?rr _,.: Phase II+ srs.. dif. rlant.....~,.,...~,..~.~~ 10*000 lQIOO0

82-R-413 Ihf UF6 contain;ent.,.ll.,....~..... PI000 ~9.1000

82-R-416 Env/safetr l ods..,.1...,...... ,,, 39500 3,500 ’ ,._ 81-R-506 Environaental protection and safety improvements, Fhase I GGF’s.,..,..,...~....~~ 31500 : 39500 ;. ; ,’ ------w-e ----___------Subtotal* Construction ,,~~,,,,,,,~,,~1.,...... 1 717000 .. 71roqo .. ,.. : __--_-_-___---- __-----_------Subtotal, Gaseous diffusion orerations and SUPPO‘ 1,481,300 .lt481,300 ~, .. ._ B, Gaseous centrifuge operations and support

OPeratirA e~~enses.,.,,...,.,,,....,,~.,..,,.. 106~400 117,400 Capital l auirment .,.,..,,~,,.,,,~.,,,,,,...,,. 39400 : 31400 Construction: 76-9-G Enriched Uranium rroducticn facilitut fortsmouthr OH .I...... ,...... ,.... 572rOOO 546~000 __- - ,I= ,------L------y----- Subtotal, Gas centrifuge operations and support. 681 r800 6661800

C. Program direction - OE...... ,,..ll.._.....,.... 39900 3,‘900

B, edvanced isotore separation technolodr

Operating e~censes...... l.,,...,..,~..,....,. 59r90G 89~900 Capital eeuirment .,,....,1....,..,.*....,...*. 9lSOO 99500 Construction:. 84-N-406 General plant rrojects...... ,.. 1,200 lr200

84-N-407 Development I demonstration . nodule (design only) ..,,,.,,,,,,...1...,,,,,. 29400 21400 ..

Subtotalr Construction ,,,...,..,....,,....*... 3,600 31600 .,

------__------Suhtotalr,Advanced isotope separation t,echnolo?lr 73rooo lO3tOOO

General reduction ,~,,,.,,.I.,,,,,.....~~...... --- -231000 ----m--_-_------_----- Subtotal, Uranium enrichrent activities...+....+. 2r240rOOO 21232,000

, - p,

* ‘” ;;. t; June 28,19&Y . CONGRESSIONAL RECORD - HChJSE H 4625 Buddet Conference -estimate- allouance ------__------*' (Operatind cxPenses+ ..~I...... (1,570r600) (11611,600) (Plant and Capital. )‘...l.r...... ‘.r...... ~.**. (669,400) (643,400)' : (General reduction) . ..r...... ri.....;...... --- (-23,000)'

It. Uranium resource assessment

A. Assessment program

Operating expenses...ll....,,,...... ,...... ,. --- 3,000 ------.._-______-______Total 1 Uranium enrichment . . ..II.....IIl...... I...... 2~240,000 29235rOOO

IIt. Offsettins revenues

OPeratinS expenses...... -11570,600 -1~5651600 Cspital eauipeent...... ,...... -229800 -22~800 Construction ...... *...... -646,600 -646~600 ------__ ----____-______SlJbtOtJl I Offsetting revenues...... -2r240~000 -2,235rooo -+ ---..--..------__ -----_-__-_____ ” ._f i .,[ij‘. TOTAL* URANIUil ENRICHHEN ...... ------

*, .; !Oreratind e::Per.ses) ...... (1~570~600) (lr614V600) (Plant and Capital ) ...... I. ( (669,400) (643~400) ‘:I (General reduction) ...... (-2srOOO) *.; !Gross reven.Jes) ...... (-2~235~000) - : . GENERAL SCIENCE AN@ RESEARCH j . .:- : . .’ i , 1. Hish energy physics .T . _. G! A. Fhusics research .a’-q Operatind expenses ...... 101,500 99,500 i G;’ .T’ P. Facililr operations . . ; . .-: Operating eXPe..ses ...... 166,000 161~000 . . .*\ . Capital eauiparnt ...... 481000 481000 Construction: ;ai 84-ER-131 RIP...... ; ...... 9lOOO 9lOOO . ill 1 I G4-Eli-132 Gf'f ...... 7,000 7,000 : 84-ER-133 SLAC linear collider (SLC) ...... 40,000 321000 ::.* W-F-?06 Tevatron II ...... 13,000 13rooo

,i 81-E-218 levatron I ...... 20,000 iOlOO0

I 78-10-R Intersectin stors9e accelerator __-- J- (Isabelle) Brookhaven national labt NY ...... --- 51000 ,.= ------‘- Subtotal 7 Construction...... 89,000 861000 ------Subtotal I Facility orerations...... 303,000 295~000 -. 1 -’ C. High energy technologr

OreratIng expenses...... ,...... 82,000 B2rOOO

P. Other crr,ital eouiPrent - CE.,...... 3,500 31500 9 ------___------Subtotal. High energy phrsics...... 490,000 480r000 11,.

i (Operating errenses)..,...... (3491500) (342r500) . I (t’lant and Capital !...... ,...... (140,500) (137,500)

. I* II. Nuclear physics ..:. i G! -1 .A, .r A. liedium energy rhvsics

59rooo 62,000

&< -4 ‘. di i 2, 1.. I..1 I!!-.* ;z+ *;.’: CdNGRESSIONAL RECORD .A HOUSE. . June 28, 1983 i ;.jj $i.” .‘, Budget Conference ;$ estimate allowance ------~------I’ . 8. H;avr ion phrsics ‘,.. _ 1 I, ., Operating ex.-mses ,,....,,,.I....,...... I~.... 47.000 47rooo

C, Lou energy rhrsics

Operating exPenses~.~..,..,..,,..~...~.~r.~~., 13,000 13,000

0. Nuclear theory OPeratirltl ewenses ,,i...... ~. 9tooo 91000 Capital eRuiP~er~t...... ,..,...,....~*.....~~ 101500 lOf500 Construction: 84-ER-110 Univ Accel Upgrade,.,,.,.,...... 8rOOO 8tOOb

84-ER-121 AIF ,...,...... ~...*..I...... ~.~. 3,500 3,500

84-ER-122 GFF....,...... ,...... ,. 21200 2r200

______--_----_ ------r Subtotal Co..struction..~ ...... 24~200 24 I 200

E. Other capital eauipment - CE ...... 800 800 ______-___ ------Subtotal. Nuclear phrsics ...... 15SrOOO 1561000

(Orerating expenses) ...... (128~000) (i31,OOO) - (Plant and Capital ) ...... (25rOOO) ~251000)

III. General Science Program direciion - OE....,...... 2,250 2r2SO

______-__ _-e-m------TOTAL, GENERAL SCIENCE AND RESEARCH...... ,.....,,... 6451250 638r 250

_ (OPeratiM expenses)...... ,,.....,..,.,. (4791750) (475,750)

4TOflIC ENERGY DEFENSE ACTIVITIES

I. Yearons activities A. Research, develoraent and testinlr

1. Research and development

OPeretinrt eXPenses...... ,l.....lr.,....,..,... 7149480 7149480 Capital eccuiruent ...... *...... 68w800 68*800 Construction: 84-D-101 General plant projectsr various locations ..,.,.,....l.~...~....~.~.~.~..~.~~~ 201000 16rOOO

84-D-102 Radiation Hardened Intedbted Circuit Lahr SNL~...... , --- 29000 ,,= 84-D-103 Hardened central guard force facilxtrt LANL ,,,I..,...... ,,....,...... 600 600

84-D-104 Nuclear materials storage facilitrr CANL ...... 700 700

83-D-199 Puffer lahd acauisition LLNL.,,..... --- -_ 7,000

82-O-144 Sirulation technology laboratory. SNLA,,...... ,.....,...... 81000 81000

82-D-150 Uearons materials research and develorhent facility9 LLNL...... ,...,..,..... 2~900 29900

82-D-152 New detonator facilitrr CANL....,... --- 51600

78-16-G Radioactive lisuid waste iwroverentr LAN1.t NH ,,,~,...,...,,.,...,,..,...1~...... 39500 31500 _-_____-__--___ -____---___-___ Subtotal* Construction .I.,.,,...,...,...**.... 351700 46,300 -___---_------______--___ Subtotalt Research and development...... ,.... 818~980 829 P580 F&k,: June. ;Z&‘;.-1983. : CONGRESSIONAL RECORD LHOUSE’: ’ : ; i .;. .. s ; : .h J I :.s Budget -. l$ - Conference ._ , estimate allowance r ---__-______------2, Testing Operating expenses ...... -...... 475,900 4759900 Capital ea?rirrent ...... I...... 39,zzoo 391600 4 Construction: si 84-b-191 General Plant ero.iectsr various 4 location5 1...... **.,.*...*..,..,.,,,, 7rlOO 6~ 100 r; 84-D-107 Nuclear test facilities revitaliz- 3 ation, variolJs locatioos ..I~~~.~~~..~.~.~..~ 301500 23,500 I ------..---‘------_------___ 41._,. Suhtotal Con5tructior~,r~rr.rlrl.1..~.l~.~...., 45,600 29,600 * ----w----v------? SlJbtot31, Testi~~,,,,,.,rl,.l,...,..,..... 561~100 545,100 .L.8 . -7 -----v------_-_-----_____ -< Subtotal7 Research? development and testin5...... 1~380.080 lr374~680

B. Inertial confinement fusion

Orerating expenses ...... L.... 127~100 1451000 Carital~eaui~~ent...... ,...,...... ,,.... 11,800 111800 Construction: . 81-D-101 Particle bear fusion accelerator-II SNLt Nil .I...,..,,,...... ,...... ,.,, 121900 12,900

Subtotal* Iaertial confinement fusion.,...,.,.... 151 r800 169500

C. Production and surveillance

OFeratin5 exrenses~.~~~..~~~~~,,,,.....,.,.,., lr779,715 Capital eauiement ,....,...,,,,,..1...I,.,,,,,, 114r400 Construction: 84-O-111 General Plant Projects ...... 29~500 23~000

84-D-112 TRIDENT II uarhead Production facilities, various locations l~.,~,..m.,..,, 191300 19,300

84-8-113 Antisubmarine warfare/standoff uee-on warhead prod facsf var locations -...., 171600 --- 84-D-114 Consolidated nonnuclear ranufactur- in5 fscilitrt Sock5 Flats9 CO .,...... ,,.. 24,100 24,100

84-D-115 Electrical system exeansionf Cantex Flahtr Amarillor TX 1.....,.,,,,...... ,,,~ 11500 lJ500 84-D-117 Inert asseablr I test facility F’antex Flantr ArarilloJ TX ...... 1,500 1,500 84-O-118 High explosive 5lJbasseablr facilitrr Fantex Flantt Aaarillor TX ,.LI,.,. 7,000 .-_ 7,000 /-r--;T-- 84-D-119 Railroad track. replacement and uFgradeJ,,,‘Pantex F’lantt harillot TX , , , , , . . . . 800 800 _. 84-D-120 Explosive cowonent test facility, timrnd Laboratorrt liiarisburs* OH ,,.,,..,.... 13rlOO 3,100

1. 84-D-121 SafeelJards and security upgrade, RocCr Flats9 CG,...... ,.,.~.,,. ~10~000 10I000 83-b-124 Standard rissile-2 (W-23 warhead rroduction facilities, various locations,,... 31000 87-D-134 SENTRY (LOADS) warhead rrodvction fzcilitet various locations l,,...... I.,l.. 16,300 67-D-10:? Utilities II enuip restorationr reFl3ce 6 uegradet fhase III? var tocations.. 229.200 185rOOO 82-D-100 N~rclear uearor~s stockFile iarrove- awatt various locatioc,j ...... I...... 4,000 4,000 k?-b-109 155m artillery fired atouic &;ro.jectile (AF(\F) rrod fats, var locations . . 50 IO00 50f000 .

.- H, 4628 CONGRESSIONAL RECORD - HOUSE June28, 1983. Rudset Conference estimate allouance ------;------. 82-D-111 Interactive graphics s~sterr various locations 09H auth FY82)...... ,.... 18,600 ’ -8r600

82-b-146 Weapons prod X rrod surrort fats, various locations I...... I...,,,....~.~,~,,.., 14r2do .14r200

81-D-115 NX warhead rrod facsr various locatior~s...... ,...... ,..,.,,.,....,.,,,. 30rooo 301000 81-D-120 Control of effluents t Pollutants, Y-12 Plant, Oak Riddee TN...... ,...... ,,. 11000 ‘. i?OOO

Unoblisated balances..l.r.....l...,.....,.... --- -5,000 ------______Subtotal, Constructior~...... ,,,,. 4901700 378,100 ------v-m_ ----______Suhtotalr Production and surveillance...... ,., 2~3849815 ?#lslr415

Il. Prodram directiou Operating ex*enses

1. UeaPorIs prosraa ...... *...... ,..... 551930 55r930 ------______Subtotal9 Ueapons activities..,..,,....,...... 3r9721625 3~751~725

(OPeratin* expenses) ...... 1.....*...... (3~153~123) (3r058~2251 (Plant and Capital- I ...... *...... (819rSOOl (693~5001 11. Haterials Production A. Reactor orerations Oreratind expenses...... ,...... 4971745 4841245 Construction: 83-D-180 Facility storazie l odificationsr various locations ...... I...... 61500 .* ---

83-D-146 Uater zollutiort controlr FlWCv Fernaldr Ohio, ...... *...... *...... 4,000 it000 82-D-126 Reactor safety and reliabilitvt various locatior,s....,...... 6,000 61060 El-II-142 Steaa transfer header, Savannah River flant, SC.,..,...... ,,..,.,...... 7,400 : 7,400 ---_-___-__-___ __-_____-_____- Subtotal, Construction...,...... 23.900 171400 ------_------5?1,645 501~645 Suhtotalr Reactor oFcrations...... -_ P. frocessin?l of nuclear materials Operatin* expenses - PrbGessinrr of nut. mat... 287,595 - 287,595 Operating expenses - Special isotore Sep. res 40rooo 60,000 &______-__------Subtotal Operatinr exrerlses...... r..;.. 327,595 3471595 Construction: 84-B-130’.Hodilication Processind facility I suhstatiordr Savannah River, SC. h . ..*...... 5,600 ._ 5,600 84-D-135 Frocess Facility Rodifications Purex +*..,.,....,..*,..,...+...... --- 7r500 . E3-D-142 Fuel dissolver-off-gas transfer and treatment srstcnr IFF’F, INELw II!...... 4-v 100 4rlOO 82-D-201 Special plutonium recover* facsr F- chea serarations area, Savannah River? SC...+ 26~000 ; 26,000

81-b-131 Reeote analytical facility up¶rade and exransiont- IFPFt INELv ID...... 2,000 2rooo ------_- Subtotalr Construction...... 371700 45~200 :, ------_------.-,-- +-- -.f-y- Subtctalr Frocessins of nuclear l aterialr...... 3651295 392~793 c.P ’ e, . . . . .,. .Juti: 28,%‘83. : * - i. 1. H 4629 rb’ i, Buddet Conference - estimate alliuance ------______------.------_--_____ C, SuPPortin services

OPeratin expenses . . . ..~...... l....,,,, 212,860 207,960 Construction: 84-D-125 General Plant Projects ..I...... ,., ~31.000 28,000 84-D-126 Plant ensineerind and design ..,,,.. 2,000 1,000 83-DA138 Purex canyon 2 dissolve< filter systems iwroverentsc Richland, UA..I..+.II.. 8~500 8,500 &3-D-147 Pollution discharse eliaination, Savannah Rivert SClt..~.~l.~..~l~~.l,~~..~~,, 21000 2,000 83-D-148 Non-radioactive hazardous waste ranaferentv Savannah River, SC~...... ,....,... i.000 , 31000 82-D-118 N-reactor Plant security and surveillances Richlandt UA. . . ..~...... I...,. 21400 2,400 82-D-124 Restoratiora of Production cap- abilities. Phases II I 1119 var locations .,, 118~600 104~600 82-D-127 Saleguards improvements, Savannah River Flantt SC. . . ..~...... I 7,000 7,009 82-D-128 Plant Perimeter security systems urdrader IFFFt INELt IDAHO. . . ..I...... 3,000 3,000 82-D-136 Fuel Processing facilities updrade, IFPFt INELr Idaho . ..~..11...... ,..,,,,,,, 18rOOO 18,000 ------_ -_--______SubtoLalp Construction .I...... *.,~.,,,,. 195~500 177r500 -.------m-..------^______Subtota1.c Supporting services ..*...*..,.,.,I,,.,, 408~360 385~460

>. D. Enrached l ater~als...... l...... ,...... ,,.. 70rooo 1401000 E. Capital eauipaent ...... *...... 102~500 98~500 F. Program direction ...... 17,500 17,500 ----____-______------__---- Subtotal* Materials Prod.Jction ...... 1~485,300 11535r900

(OPeratin expenses) ...... (1~125~700) (1,197r300) (Plant and Capital ) ...... (359,600) (338,600) I II. Defense waste and by-products l a.n?geaent A. Interim uastepanaserent / Operating expenses ...... I...I...... 2211026 221,026 Constructionl 84-D-150 General .Plaht Projects,-various locations . ..~.,l,l...... ,..,,...... ,...,,. 257 830 22,830 c 83-b-157 Additional radioactive waste stora9e facilities7 Richland, UA .I...... ,...... ,, 31 A00 31,000

82-N-103 Uaste handling t isolation facst Richlandt UA,...... ,,.,,.,,, 3,570 3,5;0 8?-N-107 Rail rePlacement/Hanford railroad, Richlandr UA.I...... ,...... ,., 3,000 3,000 El-T-104 Radioactive waste fats. improves.9 ORNL.. Oak Ridge* TN...... I...... 4rooo 4,000 ------s-e ----______Subtotalt Construction...... ‘...... ,.... 67~400 64,400

; i

--.-----e------m ------____---_ Subtotal, Interi* waste .ana9e.entl;..*.....r...., 288 t 426 285,426 Ii 4630 CONGRESIONAL RECOkD+ HOUSE., June !38,1383 , Buddet .Contcrcncc estimate l llauance ___-c------_---_____------____---____--______------__------II------_------

B. Lens-term uastc l anadement technolosv

Gperatind l YPenses,.,..,r....,,,...... ~~.. 641604 641604 .:’ Construction: j ,d 81-l-105 Defense waste Processind t?cilitiesr i . Savannah Rivert SC...... *...... 142,000 142~000 ------__------&-- > Subtotal* Lond-term uaste l anade$ent technolodu.. 20Ar 604 206~604 ,; C. Terminal storade

Operatind l XransCs..I...,.,,~.~....,,.,.....~. 20r800 2oraoo ConstructionL 77-13-F Yaste isolation pilot rlantr Delaware Basinr Southeastr Nn.,...... ,...... ~~. 591300 59,300 ______-______e-e-v Subtotalr Terminal storade,...,,...... 80r 100 aor 100 8. Brr.roducts.and Beneticial use

Orcratind l wenses ,,..*..,.,.,.,,....,.,...,.. -- 10t000 Construction: 84-D’200 Brrroductr beneticial use demo rlantr various locations...... --- s~o_oo E. Capital cnuiraent ,,,.,,,,~..1l...... 33 rvoo 349500 F. Prodrar direction ..11...... *..1...... 29470 2,470 ------____- ______--- Subtotal* Dctensc uactc 5 by-products l anadebent. A11 ~500 A24rlOO

(OPeratin l xPen5a5) ,,,I.,.,,.,..~.,.~...... ~ t308*900) (31Br900) (Plant and Capital ) ,....*.,...... *...... *.. (302rAOO) (305,200) . IV. Naval reactor5 dcvclorbent A. Plant devclorment

OPeratin l xrenses ,,,.,,...... ,...... 59,000 59tooo. B. Reactor development

DreratinS l Xrense5...... ,... 188~800 18a1800 Con5truction: 84-N-101 General plant rro.iect.5 ..+.....++++. 2,500 2,500 83-N-102 Additions to radioactive materials laboratorvr Schenectady, NY...... +. 6,500 6,500 82-N-111 Materials tacilitur Savannah River* __-- SC. . ..II..~*.....,,,,.,.....,,.,,,,...*..... > 70rooo 70rooo / 81-T-112 hods. and additions to rrototrre fac5~ various locations...... 241000 24,000 * ------______------Subtotal, Cor,strJctior,...... ,...... 103r000 103,000 4. ------,------______-_-_ Subtotal, Reactor development...... ,,.,...,. 291,800 291rBOO C. Reactor operation and evaluation

Operating l xPen5es...,1...,lr,.,,,1,..,,...... 112~000 112r000 D. Enriched material ...... 12orooo --- E. Capital l auirment ...... 20 PO00 20rooo . F. Prosram direction ...... 101200 10,200 ______-__ ------Subtotal, Naval reactor5 development ...... 613,000 493!000 (Oreratind expenses) ...... (4901000~ t3701000~ (Plant and Capital 1 ...... t 123rOOO) (123~000)

.-. June 28,1983 CONGRESSIONAL RECORD - HOUSE . Buddet Conference estimate allouance ------;------

v. Other atoric enerdr defense activities

A. Veritickion and control technolozlr

Operating e~per~s~s,..r.i.~.r.rr.r.r.rr...rr... 57r 150 57,150 Capital enuipment ,.,..,,,.1,,,..,.1.,,.,...... 1,750 11750 ‘Program direction ,,...,...~..,.~...... 21750 2,750 ___-______- Subtotalt Uetilication and control frchnolodu.. 6 * Al*650 61,650

‘P. Nuclear safeduards and security

Operating eXPenses,..,,....~,l...~~.,..l..~~~~ 419650 41,650 Capital l auiraent ,,,...... ~.,....,...... 4*000 4rOOO Program direction ...... 6.350 6~350 ______---____------Subtotal Nuclear safeguards and security ...... * 52.000 52rOOO

(Operatins expenses) ,,....,.,..,~.,....,,,...,... (48,000) (48~000) (Plant and Capital 1 .,.....,,..,,..,...,,,,,..,.. (4rOOO) (4rOOO)

C. Security investigations - OE.....*...... 291500 291500 ______^ ______---- Subtotal Other atomic enerdr defense activities.. 1431150 143i750 ______------TOTAL, ATOMIC ENERGY DEFENSE (rCTIVlTIES,...,...... 69825~575 69547,875

(Operating expenses) ..,,,I.,,...... ~...... L5rZlSrI25) 45r081~825) (Plant and Capital 1 ...... (l,AlO1450~ ila4AAr050) . DEPARTliENT6L ADllINISTRATION

f. Office ol the Secretary - Salaries and expenses

A. plfice of the Secretary . . . ..~...... (.~.~...... A47 954 8. Other e~Penses,..r..rl....,...,....,,..,.,..,. 280 _ 348 ------___----- Subtotal, Office of the Secretary - OF...... + 927 1~302

il. General l anageaent - salaries

A. Board ot Contract kpPeals....l...... rt,.,...~~ 261 261 8. General Counsel .,..~,,,,~,,,,,1,,,,,..,,,..~,. 8,727 109795 C. Inspector General .,.,...,...,,,,....,..,,..... 7,071 7r071 D. A/S Hanjseaent t Adainistratipn..,...... 28r 799 36~660 E, A/S Con9.t Interdov. t Public Aflairs...... 11990 48818 498 -F, b/S Conservation and Reneucble Energr.....,..‘, 441 _ - 6. Regional / OPcratx%ns offices.,...... 46~529 57,569 __-- -- H. Policy, Planning t AnalYsis.,....tt...r...... 1,323 19940 I. 1/S Interiiational Aflairs...... ,..... 19170 11872 _. J+ Office ol liinoritr Economic ImPactr...... +,.. 429 429 ------_____------Subtotalt Salaries...... ~...... ;.....*..,...... 969740 121,913

111; General management - other expenses

A, Other salary exdenser . OE ...... _ 6.422 8r 800 B. Benefits ...... 141491 17,662 C, Travel ...... 49816 5,178 b. Services ...... 100,536 1101642 E. Uorkaens corpensatio ...... 11387 lr387 F. Minority Economic Impact studies ...... l#lOO 1,100 G. CaPital.ea.JiP..ent ...... 41981 4~981 _____-_____--__ _---- _ _ ------Subtotalr Other expenses .,.,,.,..,..,....1.*.**.. 1331733 1471750 (Operating expenses) ,.,.,...... ,.....,...... (128,752) (142~769)

IV. Prbdrar Support

A. Folic~ analysis and system studies - OF..+.~*** 3rsoo 3r500

8. !nter$overnmental and Institutional Relations

Public Affairs - OE ..,..,*,,.I..**,...... 150 .’ 150 :. C.. International Policy Studies - OE...... t. 250 250

D,: Cost of udrk for others..l....~...;~..,~,...~,, 1161191 116rl91

------______‘Subtotalr’Fro¶ram suPPort.~~..,r..~..~~....~~~~.~ 120rO91 120~091

V. miscellaneous revenues~..~,~..~.~.~~~..~~~.~~~~~~ -2099619 -209~619

FT 1983 Deferred balance carried foruard.l,...... --- -251000 ------__--______--__--- < TOTAL, DEFARTKENTAL AD~lNISTRATION...... ,.....~. 1411872 156t437

(OPeratins exPensesI ...... (346r5101 f3611075I (Hiscellaneous revenues) ...... f-20996191 (-209,619) (Plant and Capital ) ...... (49981) (4r9SJI

ALASKA FOUER ADKIGISTRATION - OFERATION AND . : tlAINTENANCE

I. Fouer l arketina - Alaska Fouer Adrinistration A. OPeratin -ex?enses ...... 21469. 2,469 8. General investigation ...... 100 100 .. D. Program direction ...... 641 641 _ E. Emergency fund ...... --a 200 ------TOTAL ALASKA FOUER ADMINISTRATION ...... 3,210 31410 crrr.rr..rrmr.G ZZE SEEIPEIDIIEC ‘“BONNEVILLE FOUER ADtlINISTRATION

1, Fouer marketins - Bonneville Administration..+..;.. 203i500 : .123;400 --- Fermanent authority to borrou,...... ~~~~~~o f201rlOOI __------____-- ____-_------TOTAL BONNEVILLE FOUER AD~INISTRATION.,.,..,...... ~... 203,500 123r400 LIILIICrScze==E 215=CJ=EDISlr=D I SOUTHEASTERN FOUER ADKINISTRATION - OFERATION AND IIAINTENANCE

I. Fouer marketin - Southeastern rouer administration A. Operating and l aintenance,...*,....*,,~~o**~~*oo 1,751 1,751 D, Purchase rower and wheelins ,,,,..~.~.....~.....1. 181843 18,843 __T____------______------_.-.. -- r. ,,I**.,.*...... > 201594 20,594 TOTAL SOUTHEASTERN FOYER ADHINISTRATION __---_ ./’ PS=IicILEE==EI=D ==ICSPEE=------SOUTHUESTERN FOYER ADttINISTRATION - OPERATION AND HAINTENANCE >

I. Fouer marketins - Southuestern Fouer Administration A.‘breration and maintenance .~..~..;...l....~.,..~ 9,800 91800 B. Purchase rouer and uheelin~.,..,...... ,...,..... 22r729 22,729 C. Construction ,...,1...... ,..~...,,.....,,,,..... 3,700 3,700 ------______TOTAL SOUTHUESTERN FOUER ADMINISTRATION...... ,.... 36,229 36~229 PI=5EI=I=SD==PI *EEEDEII==------UESTERN AREA FOUER ADNINISTRATIGN - CONSTRUCTION, REHARILITATIONr OPERATION AND HAINTENANCE

1. Power marketing - Uestern Area Power Administration AS Construction and rehabilitation,...... ,,... 70~767 709767 B. System operation and l ainter~ance,.,,.,,,,,~,,,., 729863 72,863 C. Purchase rouer and uheelirtd...~,.,.,...... ,. 68$00 68,000 Unobli-tiated bala~es..r.~..l...l...... ,,.... --- -25,000 ------mm ______TOTAL UESTERN AREA POUER AD~INISTRATION.,...... 1..,~, 219,630 1949630 =IEI==IIIOZE33t II=====* IftZ5-C H 4633

.-. :. . . . Budget Conlerence .- estimate. al louance .______-______------

EtlERGENCY FUND - WESTERN AREA FOUER ADfiINlSYRATION y-y ~ rer9encu fund ,...... ~~...1....*.~,...... ,..,,.,,. 500 500 L==I===DII=IEII 15111111=1=111=

?%TRL, WESTERN AREA FOUER ADHINISTRATION .I.*...... *.. 220,130 195r130 I=IPEPI==P==IDI DIII=fEllf===PI .FEDERAL ENERGY REGULATORY COMIISSION

I. Gil pipeline regulation ...... 6,682 6r602

II. Natural ?las regulation A. fireline certificate re~ulatio ...... 15,644 151644 8. Fireline rat! rellulation ...... 14,062 141062 C- Producer certificate regulation ...... 2,478 2,478 b. Producer rate regulation ...... 3r837 3,837 . E. Uellhead Pricing ...... 7,498 79498 ------. ----_-_-______Subtotalt Natural gas relrulation ...... 43,519 43,519

XII. Hvdro PoUer liccnsina ...... ~....~I...... ,.,,, 24,707 248707

IV. Electric rowr reslJlation..,...... 19rb74 191674

General reduction ..I,.....~,.....I,..~.I,,,,,,,...*,,,, --- =stooo -----_--_-__-_- -_--___---_____ SUPTOTAL~ FEDERAL ENERGY REGULATORY COllt4ISSION...,.... 941582 891582

Adjustments:

Less offsetting revenues....,..~..~..*..,.~.~~.~~~..~~ -60,000 -601000 ---_---_------L------m TOTAL, FERC AFTER REVENUES,,,.,.....,...*...... - 34~582 29rS82 =II=IsPII=PI=I= ====EEEEILPS==I

NUCLEAR UASTE DISPOSAL FUND

1. Nuclear waste disposal fund ...... I...... 30brb75 306r 675 ------e ------_____-__ TGTAL NUCLEAR UASTE DISPOSAL FUND ...... 1..1.~....,,.,, 3069675 3Obe675 ==PIa====50==tE =====I======

GEOIHERXAL RESOURCES DEVELOPWENT FUND

III. Interest differential Fauments .**.*...... 2,000 2,000 U. Program direction ...... *.I...... *...... ~ 100 100 . -----.------mm ----_-----_____ TOTAL GEbHERHAL RESOURCES PEVECOFHENT FUND....,...... 2~100 29 100 _. ==I=l=====Lttlx =P======II===I _. ‘., .I . . 1.

,. ,.- H 4634 CONGRliSSIONAL RECORD -.HOtJh? - (’ -’ d&ii 28, ‘198;s .,,$j *.. . TITLE IV-IN~ELPENDEZNT AGENCIES CONFERENCEAGREEMENT N;%$zzj;;t tobligat1ons.l) %..i APPALACHIANR~;Io~~N. COHWISSION _ . .fkcal Year .‘” m-or-1 .* Salaried and expense.9 1963. . .. . i ...... $14.535,691.000 ! Amendment No. 36: Appropriates ‘yg$H ctdefeiKe Budget estimates of new S2.700.006 .as ‘proposed by the Senate in- w+ :, (obliga~!ona+) authqrfty, ,, stead’ Of ‘$2,SO0;000 Bs prbposeil” by ‘the fiscal y&r 1984 ., ...... k.:.:. <’ i4,610;671.000 HOIN?. wllMlNvEslII~ House bill. fiscal year 1984 :. 14.180.003.000 Wakrescwcs: FUNDS APPROPRIATED TO THE .l'Rkm%& cdumtia@am ad Ramoic...... -. “-...... _....___.__..... Senate” bill, fix& y&r NWbA al Pi&.widclardng Dam...-....~ 1984 ...... I.... ;i . . . . .j 14,170,853,000 Appalachian Regional Devekqnnent Afstll andlmpovnnmta -...... - ._^.. ” . ‘:B ‘::% mowams lSdmd!WSlmWrar: Conference agreement ReYratiikilitks ...... _.~.-.._....-..--... fiscal year 1984 ,...... 144.307.045,000 Amendment No. 37: Apropriates tandklwtn theLaker ..._...._..._...... ~.-.-. $I45.000.006 for Appalachian Regional De- If 1D Conference agreement f@ nsarrte* Ydbw CM Pai ._...... _._._.2 ._., cijmpared with: velopment Programs instead of $150,000,000 ccmrmMityRsaam~lti~~pevm ._ as Proposed by the House and $125,000,000 ktmJtll faclllll~-~~-~ “~~~ 610 610. New budget tobliga- as ~nmosed by the Senate. main gmldatii unil _.._I. -...; _-...._.._,..,.___,-..-.-.- ..---...... tional) authority, fiscal Amendment No. faitrmd wk. c24 le$acmd- .-.. I ..-._-.... year 1983 ...... -228.646.000 3aQmim lwlili2ff unil ...... _._. I ..__.._ g iz ,.,:- $106.606.000 for the Appi&hianED%E water pmim amild fadiik.s . . -_._._ 500 Budget estimates of new ment Highway System as proposed by the FhA kditim staa Wtii ._._._...___.___. (obligational) authori- House instead of $f%O.OOO.OOOss proposed by hleqpffwjent k&a pmn..-- ,..--. -. i$ !E ctlomue alnmmia plant. ..-.----...-.-..-_.-... '710 ty, fiscal year 1984...?... -303.626.000 theSenate. Rep(acemenls impcwnmtl md pollutiln House bill. fiscal year Nu- RE~UUTORY COU%ISSION abatmwnl afd suppd la%ws...... -.. 1.g 1984 ...... - ...... , + 127.042,900 Alllmlw~ kAitii.--..- _.._.__.....,..,._ ‘% L 3.013 3.013 Salarks and eqen.se3 Gmecalsewi facifli . .._...” ..-I-._.__.....-.._. - Senate bill, fiscal year Amendment No. 39: Appropriates 34twl, cacital ln~~l.... - . “.-.- 34,755 34.155 1984 A.1...... -e136.192,000 [ 5465.800.000 ss proposed by the House ln- TOM B~~ILL. stead of $466.800,000 as proposed by the Lfmsfs Senate. The conference allowance includes Nalml IesNfm: LINDY IMRS. -1 Boccs. wata momus ...... ” ...... _...._..“,, 2,920 2,9M BILtquFmL& no fund.+ for the Nuclear Data Link. ltezemir tyJtan llp?lah ...... “ .” .-_,,. T~rm~ssm VALLKY ADTHORIT~ land and kmt Esnluca .- .-.. . _ .. . ‘f4zt ‘I::: VIC Fuxo, WRS WATKINS; Tennessee Valley Auihortty fund 7JYsI?FY.$::::~:: 2j.l; 2& B& BONES. Amendment No. 40: Provides $125,500.000 folmiic md bm!mily Ieaw~ for Tennessee Valley Authority Fund in- fclmmk reswroes ..I .-...... -...--...... - 8.160 ‘yg JAMIE L Wnmm~ stead of $125.950,006 as proposed by the ccmmily refoMces ...” -.” .--..---.. Jam T. MYERS, bgepttmelt$wm devdqmd.. ..-...... -...... ” %! $955 kyk.md $122,500.000 as proposed by the ltaacml~ferilrilW~~ --....- -..._.- - _... 2$615 28,615 VIRGINIA SHITH. i, -...--.- . .._.- ...... ” 6.;;; 6,:;s” Rep&nzmmfnps.-The conferees agree Cereal rcrviar .__.___L__.____._.~..~...,...,...~.~..... Emon ROD, SILVIO 0. corm5 that TVA shall submit to the Committees subtotal e%@axa..-. -._..- ..-.-.--.” . .. . 81,745 30.145 on appropriations of the House of Repre- (except amendments .. sentatives and the Senate all changes to the lfndxated ndudDR .._.-.._...__..._. - _.-.-... -. - 14,OilIl _I.__._.__._, 2. 3. 12). budget justification material submitted to Manager3 on the Part af the House 125.500 the Congress or the base tsbles included in MARK 0. l%mmLD. House, Senate or Conference report on FINNICING J&A.MCCLURE, annual appropriations messures and take no &3pialiom ...... _..__.L...... ~...~...~...~... 1a.229 action on stich changes until 30 days after UnoMtgatedbake cmkd loward .._.- ___~______::$z 47271 JAKE Gm. notifying the Committees. Changes of 10 lot24 hlawiiy ..-._ ...-...... -.-._. - .-...-.. 108.500 ’ 125.500 TllADcocHRAN, percent or more to any program, project or JAMES.tBDNOR, ectlvity a?e to be submitted. Any item me,,- ’ M metotal fting kf fii pa 1984~($125.soo,a@l),37271.W tioned in either Committee’s report shall be $anbedahJfrm(undrawmpiatedia(bcalyuc1wnd175.229.wo ~SERT WTRN, considered an “Item of Special Interest,” nwq9rc4rialiireqwsledinCou~l964. MACKM~TTINGLY. .' arid shall be subject to these reprogram- PETB v. DoMENIcr. ming reguirements irrespective of the other TITLE V-GENERAL PROVISIONS J. Br~m~n JOHNSTON, criteria In addition, all new starts or pro- Amendment No. 41: Deletes language-pro- JOHN C. STEXNIS. gram cancellations are to be submitted as a posed by the House providing for a 3 per- reprogramming action. cent general reduction in various programs ROBERT C. Bym, The conferees are encouraged by recent in the bill. ERNrm F. HOLLINGS, progress in achieving financial participation CONPERRNCB TOTAL-WITH COMPARISONS WALTERD. HUDDLESTON, In the Northern Alabama Coal Gasification QUKNTIN BUR~ICK. The total new budget (obligational) au- * Project and hope .that the Synthetic Fuels thority for the fiscal year 1984 recommend- JIM SASSER, Corporation will proceed to an early deci- ed by the Committee of Conference, with Manners on the Piid 0J the Senate. sion. comparisons to the fiscal year 1983 amount, The following table summarizes the con- the 1984 budget e&m&es. and the House ference agreement on the TVA program: and Senate bills for 1984 follow: :-

-.

~--