SJSM Church Camp: 16 – 19/20 June 2014

A. Via Car (self-drive)

a. On Day of Departure to Bukit Gambang Resort (Mon 16 June)

1. General Notes  Ensure that you have all your valid travel documents with you.  Journey from Bahru to Bukit Gambang Resort (BGR) is approximately 350km via the North-South Highway and Yong Peng / / Muadzam Shah / BGR trunk-road.  The entire road journey including lunch and toilet breaks should take approximately 6 hours.  Leave early. Drive safely. Overtake with care. Keep within the speed limit. Drivers should take frequent breaks along the journey.  Plan to be at Bukit Gambang Resort by 4.00pm on Mon 16 June.

Johor Bahru to Bukit Gambang Resort

Drive Route Page 1 of 6 SJSM Church Camp: 16 – 19/20 June 2014

2. Phase 1: Proceed to Causeway or Tuas 2nd Link to clear Singapore CIQ and CIQ.  via Causeway (Woodlands): Sultan Iskandar CIQ, or  via 2nd Link (Tuas): Sultan Abu Bakar CIQ

3. Phase 2: Journey to Yong Peng (100km)  After clearing Sultan Iskandar CIQ (via Causeway) or Sultan Abu Bakar CIQ (via 2nd Link), head towards North-South Highway (E2).  Travel on North-South Highway in the direction of KL for approximately 100km before exiting @ Exit 242 (Yong Peng Selatan)  After toll plaza, turn LEFT onto Jalan Besar and head towards Yong Peng town center.  Recommended to break for lunch at Yong Peng.

Phase 2: Journey to Yong Peng (100km)

Sultan Iskandar CIQ via Causeway

Sultan Abu Bakar CIQ via Tuas 2nd Link

Drive Route Page 2 of 6 SJSM Church Camp: 16 – 19/20 June 2014

4. Phase 3: Yong Peng to Segamat (75 km)  From Yong Peng, travel NORTH towards Segamat via Jalan .

Phase 3: Yong Peng to Segamat (75km)

Drive Route Page 3 of 6 SJSM Church Camp: 16 – 19/20 June 2014

5. Phase 4: Segamat to Muadzam Shah (80km)  After leaving Segamat, o lookout for Petronas Station on the left. Recommended toilet break at Petronas Station. o lookout for blue “Kuantan” road-sign. Turn RIGHT at traffic junction after road-sign.  Travel about 80km towards Muadzam Shah

Phase 4: Segamat to Muadzam Shah (80km)

Turn right at traffic junction

“Kuantan” road sign

Petronas Station

Drive Route Page 4 of 6 SJSM Church Camp: 16 – 19/20 June 2014

6. Phase 5: Muadzam Shah to BGR (80km)  At Muadzam Shah, recommended toilet break.  Continue for about 80km.  Look out for “KL Left, Kuantan Right” road-sign on the left.  Look out for “EXIT 251” road-sign. Turn LEFT, towards KL.  Travel 2km, look out for “BGR 2km ahead” road-sign.  Look out for “BGR turn RIGHT” road-sign. Turn RIGHT into BGR.

“BGR turn RIGHT” road sign

EXIT 251 road sign “BGR 2km ahead” road sign

“KL Left, Kuantan Right” road sign

Phase 5: Muadzam Shah to BGR (80km)

Drive Route Page 5 of 6 SJSM Church Camp: 16 – 19/20 June 2014

b. On Day of Return to Singapore (Thu 19 June | Fri 20 June)  Back-track from BGR to Muadzam Shah to Segamat to Yong Peng.  Recommended lunch break at Segamat.  At Yong Peng, reconnect with North-South Highway and travel SOUTH toward JB / Singapore.

c. IN THE EVENT OF CAR BREAK-DOWN  If you are an AAS member o contact the AAS Malaysian affiliate for tow-truck service. More information on Roadside Assistance Services in Malaysia is available at: http://www.aas.com.sg/?show=content&showview=7&val =428

 If NOT an AAS member o contact your own auto insurance Malaysian affiliate for tow-truck service. Please check for relevant contact numbers before leaving for Malaysia. OR o (only on North-South Highway) use the roadside Emergency Telephones, or contact PlusLine @ 1800-88- 0000 for tow-truck service (known as PLUS Ronda).

Drive Route Page 6 of 6