WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 1 18.1.2010 2009-10 Fixing of High Mast Lights GEN Siddulur 100000 MPDO, 49995 49995 99990 Completed (2Nos) Vikarabad 2 18.1.2010 2009-10 Fixing of High Mast Lights GEN Pulusumamidi Vikarabad 100000 MPDO, 49995 49995 99990 Completed (2Nos) Vikarabad 3 18.1.2010 2009-10 Fixing of High Mast Lights GEN Pulmaddi Vikarabad 100000 MPDO, 49995 49995 99990 Completed (2Nos) Vikarabad 4 18.1.2010 2009-10 Fixing of High Mast Lights GEN Gottimukkala Vikarabad 100000 MPDO, 49995 49995 99990 Completed (2Nos) Vikarabad 5 18.1.2010 2009-10 Fixing of High Mast Lights GEN Turmamidi Bantwaram 100000 MPDO, 49995 49995 99990 Completed (2Nos) Bantwaram 6 18.1.2010 2009-10 Fixing of High Mast Lights GEN Bantwaram Bantwaram 100000 MPDO, 49995 49995 99990 Completed (2Nos) Bantwaram 7 18.1.2010 2009-10 Fixing of High Mast Lights GEN Barwad Bantwaram 100000 MPDO, 49995 49995 99990 Completed (2Nos) Bantwaram 8 18.1.2010 2009-10 Laying of CC Road GEN Ennaram Bantwaram 100000 MPDO, 50000 49993 99993 Completed Bantwaram 9 18.1.2010 2009-10 Fixing of High Mast Lights ( GEN Marpally Marpally 200000 MPDO, 99990 99990 199980 Completed 4Nos) Marpally 10 18.1.2010 2009-10 Fixing of High Mast Lights GEN Patloor Marpally 100000 MPDO, 49995 49995 99990 Completed (2Nos) Marpally 11 18.1.2010 2009-10 Fixing of High Mast Lights GEN Kalkhoda Marpally 100000 MPDO, 49995 49995 99990 Completed (2Nos) Marpally 12 18.1.2010 2009-10 Fixing of High Mast Lights GEN Kotmarpally Marpally 100000 MPDO, 49995 49995 99990 Completed (2Nos) Marpally 13 18.1.2010 2009-10 Fixing of High Mast Lights GEN Dharur Dharur 100000 MPDO, Dharur 49995 49995 99990 Completed (2Nos) 14 18.1.2010 2009-10 Fixing of High Mast Lights GEN Kerelly Dharur 50000 MPDO, Dharur 24997 24998 49995 Completed 15 18.1.2010 2009-10 Fixing of High Mast Lights GEN Nagasamunda Dharur 50000 MPDO, Dharur 24997 24998 49995 Completed r 16 18.1.2010 2009-10 Fixing of High Mast Lights GEN Mominpet Mominpet 100000 MPDO, 49995 49995 99990 Completed (2Nos) Mominpet 17 18.1.2010 2009-10 Fixing of High Mast Lights GEN Tekulapally Mominpet 100000 MPDO, 49995 49995 99990 Completed (2Nos) Mominpet 18 18.1.2010 2009-10 Fixing of High Mast Lights GEN Yenkathala Mominpet 100000 MPDO, 49995 49995 99990 Completed (2Nos) Mominpet 19 18.1.2010 2009-10 Fixing of High Mast Lights GEN Yenkepally Mominpet 100000 MPDO, 49995 49995 99990 Completed (2Nos) Mominpet 20 18.1.2010 2009-10 Formation of Road from GEN Marpally Marpally 100000 MPDO, 47835 47836 95671 Completed Kalkhoda (V) to Bantwaram Marpally (V) 21 18.1.2010 2009-10 Laying of CC Road with side GEN Haridaspally Dharur 200000 MPDO, Dharur 100000 99506 199506 Completed drains WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 22 14.2.2010 2009-10 Laying of CC Road in SC SC Saireddyguem Kandukur 500000 MPDO, 250000 250000 500000 Completed Cololny Kandukur 23 14.2.2010 2009-10 C/o compound wall to GEN Shivareddypet Vikarabad 500000 MPDO, 250000 250000 500000 Completed Muslim grave yard Vikarabad 24 14.2.2010 2009-10 C/o compound wall to GEN Vikarabad Vikarabad 500000 MPDO, 250000 250000 500000 Completed Muslim grave yard Vikarabad 25 1.3.2010 2009-10 Laying of drinking water GEN Saibrundavan Serilingamp 400000 MD,HMWS&SB 200000 200000 Progress pipeline Colony ally , 26 1.3.2010 2009-10 Laying of drinking water GEN Miyapur Serilingamp 1800000 MD,HMWS&SB 900000 900000 Progress pipeline ally , Hyderabad 27 1.3.2010 2009-10 Laying of drinking water GEN Sudershannag Serilingamp 600000 MD,HMWS&SB 300000 300000 Progress pipeline ar ally , Hyderabad 28 1.3.2010 2009-10 Providing borewell with GEN Mallanguda & Serilingamp 500000 MD,HMWS&SB 0 Not Started motor Gutla ally , Hyderabad Bebumpet 29 11.4.2010 2010-11 C/o Weterinay Hospital GEN Nallagandla Serilingamp 500000 EE, PRI 250000 239456 489456 Completed Building in Sy.No.84, ally Divn.Hyd.R.R.D Nallagandla ist 30 13.4.2010 2010-11 Water Treatment Plant(De- GEN Lemoor Kandukur 200000 EE, RWS, 100000 100000 200000 Completed fluoride Plant) Hyderabad 31 13.4.2010/ 2010-11 Water Treatment Plant(De- GEN Dasarlapally Kandukur 200000 EE, RWS, 100000 100000 Progress 1.7.11 fluoride Plant) Hyderabad 32 13.4.2010 2010-11 Water Treatment Plant(De- GEN Dibbadaguda Kandukur 200000 EE, RWS, 100000 91719 191719 Completed fluoride Plant) Hyderabad 33 13.4.2010 2010-11 Water Treatment Plant(De- GEN Pulimamidi Kandukur 200000 EE, RWS, 100000 100000 200000 Completed fluoride Plant) Hyderabad 34 13.4.2010 2010-11 Water Treatment Plant(De- GEN Nedunoor Kandukur 200000 EE, RWS, 100000 86388 186388 Completed fluoride Plant) Hyderabad 35 13.4.2010 2010-11 Water Treatment Plant(De- GEN Ameerpet Maheshwar 200000 EE, RWS, 100000 100000 200000 Completed fluoride Plant) am Hyderabad 36 13.4.2010 2010-11 Water Treatment Plant(De- GEN Mansanpally Maheshwar 200000 EE, RWS, 100000 100000 Progress fluoride Plant) am Hyderabad 37 13.4.2010 2010-11 Water Treatment Plant(De- GEN Maheshwaram Maheshwar 200000 EE, RWS, 100000 100000 Progress fluoride Plant) am Hyderabad 38 13.4.2010 2010-11 Water Treatment Plant(De- GEN Gatlupalli Maheshwar 200000 EE, RWS, 100000 100000 Progress fluoride Plant) am Hyderabad 39 13.4.2010 2010-11 Water Treatment Plant(De- ST Peedamma Maheshwar 200000 EE, RWS, 100000 100000 200000 Completed fluoride Plant) Thanda H/o am Hyderabad Chinnatoopra 40 13.4.2010 2010-11 Water Treatment Plant(De- GEN Wadiguda, Saroornaga 200000 EE, RWS, 100000 100000 Progress fluoride Plant) Jalpally GP r Hyderabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 41 13.4.2010 2010-11 Water Treatment Plant(De- GEN Sriram Nagar Saroornaga 200000 EE, RWS, 100000 97643 197643 Completed fluoride Plant) Colony H/o r Hyderabad Jalpally 42 13.4.2010 2010-11 Water Treatment Plant(De- GEN Kothapet, Saroornaga 200000 EE, RWS, 100000 87030 187030 Completed fluoride Plant) Errakuntla GP r Hyderabad

43 13.4.2010 2010-11 Water Treatment Plant(De- GEN Pahadisharief Saroornaga 200000 EE, RWS, 100000 100000 200000 Completed fluoride Plant) r Hyderabad 44 13.4.2010 2010-11 Water Treatment Plant(De- GEN Balapur Saroornaga 200000 EE, RWS, 100000 79064 179064 Completed fluoride Plant) r Hyderabad 45 13.4.2010 2010-11 Water Treatment Plant(De- GEN Kokapet Rajendrana 200000 EE, RWS, 100000 70000 170000 Completed fluoride Plant) gar Hyderabad 46 13.4.2010 2010-11 Water Treatment Plant(De- GEN Puppalguda Rajendrana 200000 EE, RWS, 100000 70000 170000 Completed fluoride Plant) gar Hyderabad 47 13.4.2010 2010-11 Water Treatment Plant(De- GEN Bandlaguda Rajendrana 200000 EE, RWS, 100000 70000 170000 Completed fluoride Plant) gar Hyderabad 48 13.4.2010 2010-11 Water Treatment Plant(De- GEN Narsingi Rajendrana 200000 EE, RWS, 100000 70000 170000 Completed fluoride Plant) gar Hyderabad 49 13.4.2010 2010-11 Water Treatment Plant(De- GEN Hydershakote Rajendrana 200000 EE, RWS, 100000 70000 170000 Completed fluoride Plant) gar Hyderabad 50 13.4.2010 2010-11 Water Treatment Plant(De- GEN Jukal Shamshaba 200000 EE, RWS, 100000 100000 Progress fluoride Plant) d Hyderabad 51 13.4.2010 2010-11 Water Treatment Plant(De- GEN Malkaram Shamshaba 200000 EE, RWS, 100000 100000 Progress fluoride Plant) d Hyderabad 52 13.4.2010 2010-11 Water Treatment Plant(De- GEN Palmakul Shamshaba 200000 EE, RWS, 100000 100000 Progress fluoride Plant) d Hyderabad 53 13.4.2010 2010-11 Water Treatment Plant(De- GEN Peddashapur Shamshaba 200000 EE, RWS, 100000 100000 Progress fluoride Plant) d Hyderabad 54 13.4.2010 2010-11 Water Treatment Plant(De- GEN Shamshabad Shamshaba 200000 EE, RWS, 100000 100000 Progress fluoride Plant) d Hyderabad 55 13.4.2010 2010-11 Water Treatment Plant(De- GEN Mudimyala Chevella 200000 EE, RWS, 100000 93931 193931 Completed fluoride Plant) Hyderabad 56 13.4.2010 2010-11 Water Treatment Plant(De- GEN Chanvelly Chevella 200000 EE, RWS, 100000 94550 194550 Completed fluoride Plant) Hyderabad 57 13.4.2010 2010-11 Water Treatment Plant(De- GEN Chevella 200000 EE, RWS, 100000 100000 Progress fluoride Plant) Hyderabad 58 13.4.2010 2010-11 Water Treatment Plant(De- GEN Janwada Shankarpall 200000 EE, RWS, 100000 100000 Progress fluoride Plant) y Hyderabad 59 13.4.2010 2010-11 Water Treatment Plant(De- GEN Mahalingapura Shankarpall 200000 EE, RWS, 100000 100000 Progress fluoride Plant) m y Hyderabad 60 13.4.2010 2010-11 Water Treatment Plant(De- GEN Shankerpally Shankarpall 200000 EE, RWS, 100000 100000 Progress fluoride Plant) y Hyderabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 61 13.4.2010 2010-11 Water Treatment Plant(De- GEN Medipally Moinabad 200000 EE, RWS, 100000 100000 Progress fluoride Plant) Hyderabad 62 13.4.2010 2010-11 Water Treatment Plant(De- GEN Kethireddypall Moinabad 200000 EE, RWS, 100000 100000 Progress fluoride Plant) y Hyderabad 63 13.4.2010 2010-11 Water Treatment Plant(De- GEN Kanakamamidi Moinabad 200000 EE, RWS, 100000 100000 Progress fluoride Plant) Hyderabad 64 13.4.2010 2010-11 Water Treatment Plant(De- GEN Pulimamidi Nawabpet 200000 EE, RWS, 100000 94600 194600 Completed fluoride Plant) Hyderabad 65 13.4.2010 2010-11 Water Treatment Plant(De- GEN Ekmamidi Nawabpet 200000 EE, RWS, 100000 96267 196267 Completed fluoride Plant) Hyderabad 66 13.4.2010 2010-11 Water Treatment Plant(De- GEN Ellakonda Nawabpet 200000 EE, RWS, 100000 80519 180519 Completed fluoride Plant) Hyderabad 67 13.4.2010 2010-11 Water Treatment Plant(De- GEN Madduru Shabad 200000 EE, RWS, 100000 100000 Progress fluoride Plant) Hyderabad 68 13.4.2010 2010-11 Water Treatment Plant(De- GEN Nagarkunta Shabad 200000 EE, RWS, 100000 100000 Progress fluoride Plant) Hyderabad 69 13.4.2010 2010-11 Water Treatment Plant(De- GEN Erravelly Shabad 200000 EE, RWS, 100000 100000 Progress fluoride Plant) Hyderabad 70 28.4.2010 2010-11 Providing I HP Motor for GEN Brahmanpally Doma 120000 EE, RWS&S 60000 60000 120000 Completed existing borewell Divn.Pargi 71 28.4.2010 2010-11 Providing 5 HP Motor for GEN Dirsampally Doma 60000 EE, RWS&S 30000 30000 60000 Completed exixting borewll Divn.Pargi 72 28.4.2010 2010-11 Providing 2 HP Motor for GEN Mallepally Doma 40000 EE, RWS&S 20000 19610 39610 Completed existing borewll Divn.Pargi 73 28.4.2010 2010-11 Providing 5 HP Motor for GEN Bompally Doma 60000 EE, RWS&S 30000 30000 60000 Completed existing borewll Divn.Pargi 74 28.4.2010 2010-11 Providing 2 HP Motor for GEN Mangampeta Gandeed 90000 EE, RWS&S 45000 45000 90000 Completed existing borewll Divn.Pargi 75 28.4.2010 2010-11 Providing 2 HP Motor for GEN Reddypally Gandeed 40000 EE, RWS&S 20000 19610 39610 Completed existing borewll GP H/o Divn.Pargi Chennaipally 76 28.4.2010 2010-11 Providing 2 HP Motor for GEN Bomkunta Gandeed 40000 EE, RWS&S 20000 19610 39610 Completed existing borewll Divn.Pargi 77 28.4.2010 2010-11 Providing 2 HP Motor for GEN Nancherla Gandeed 40000 EE, RWS&S 20000 19392 39392 Completed existing borewll Divn.Pargi 78 28.4.2010 2010-11 Providing 2 HP Motor for GEN Veerapur Kulkacherla 40000 EE, RWS&S 20000 17790 37790 Completed existing borewll Divn.Pargi 79 28.4.2010 2010-11 Providing borewell with 5 HP GEN Dadapur Doma 200000 EE, RWS&S 100000 99105 199105 Completed motor Divn.Pargi 80 28.4.2010 2010-11 Providing 2 HP Motor for GEN Sangaipally Gandeed 40000 EE, RWS&S 20000 19610 39610 Completed existing borewll Divn.Pargi 81 28.4.2010 2010-11 Providing 2 HP Motor for GEN Mohammadab Gandeed 200000 EE, RWS&S 100000 100000 200000 Completed existing borewll ad Divn.Pargi WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 82 28.4.2010 2010-11 Providing 2 HP Motor for GEN Gandeed Gandeed 80000 EE, RWS&S 40000 39841 79841 Completed existing borewll Divn.Pargi 83 28.4.2010 2010-11 Providing 2 HP Motor for GEN Ramnagar Kulkacherla 90000 EE, RWS&S 45000 44030 89030 Completed existing borewll Divn.Pargi 84 28.4.2010 2010-11 High Mast Light GEN Mujahidpur Kulkacherla 100000 MPDO, 50000 49903 99903 Completed Kulakcherla 85 28.4.2010 2010-11 High Mast Light GEN Kanmankalva Kulkacherla 100000 MPDO, 50000 49903 99903 Completed Kulakcherla 86 28.4.2010 2010-11 High Mast Light GEN Dhadapur Doma 100000 MPDO, Doma 50000 49903 99903 Completed 87 28.4.2010 2010-11 High Mast Light GEN Kistapur Doma 100000 MPDO, Doma 50000 49903 99903 Completed 88 28.4.2010 2010-11 High Mast Light GEN Mangampeta Gandeed 100000 MPDO, 50000 49902 99902 Completed Gandeed 89 28.4.2010 2010-11 High Mast Light GEN Julapally Gandeed 100000 MPDO, 50000 49902 99902 Completed Gandeed 90 28.4.2010 2010-11 High Mast Light GEN Kondapur Gandeed 100000 MPDO, 50000 49902 99902 Completed Gandeed 91 28.4.2010 2010-11 High Mast Light GEN Shaikpally Gandeed 100000 MPDO, 50000 49902 99902 Completed Gandeed 92 28.4.2010 2010-11 High Mast Light GEN Venkatreddyp Gandeed 100000 MPDO, 50000 49902 99902 Completed ally Gandeed 93 28.4.2010 2010-11 High Mast Light GEN Gadsingapur Pargi 100000 MPDO, Parigi 50000 49903 99903 Completed 94 28.4.2010 2010-11 High Mast Light GEN Parigi Pargi 100000 MPDO, Parigi 50000 49903 99903 Completed Sidhanthi Colony 95 28.4.2010 2010-11 High Mast Light GEN Peddaumenth Puduru 100000 MPDO, Pudur 50000 49902 99902 Completed al 96 28.4.2010 2010-11 High Mast Light GEN Kankal Puduru 100000 MPDO, Pudur 50000 49902 99902 Completed 97 28.4.2010 2010-11 High Mast Light GEN Medpally Puduru 100000 MPDO, Pudur 50000 49902 99902 Completed 98 17.5.2010 2010-11 Construction of Sama Khana GEN Rallaguda Shamshaba 500000 EE., APEWIDC 241107 241107 Progress Community Hall at Hazrath d Sufi Khaja Mohd. Bahauddin Ali Nizami Chisti Faizi Dargah at sy.No.363,

99 5.6.2010 2010-11 Erection of High Mast light GEN Mohammadab Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at SC colony, ad Gandeed

100 5.6.2010 2010-11 Erection of High Mast light GEN Mohammadab Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at Rajive ad Gandeed Gandhi statue in 101 5.6.2010 2010-11 Erection of High Mast light GEN Mohammadab Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at BC colony, ad Gandeed WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 102 5.6.2010 2010-11 Erection of High Mast light GEN Mohammadab Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at Kindi ad Gandeed Geri, Mohammadabad (V), 103 5.6.2010 2010-11 Erection of High Mast light GEN Mohammadab Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at ad Gandeed Kanchanpally (V), G.P.Mohammadabad, 104 5.6.2010 2010-11 Erection of High Mast light GEN Mohammadab Gandeed 100000 MPDO, 49952 49951 99903 Completed with 33 height at Gandhi ad Gandeed Statue in Mohammadabad (V), 105 5.6.2010 2010-11 Erection of High Mast light SC Vennached Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at New SC Gandeed colony, in 106 5.6.2010 2010-11 Erection of High Mast light GEN Vennached Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at Temple, in Gandeed Vennached (V), 107 5.6.2010 2010-11 Erection of High Mast light GEN Vennached Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at K.Jafer (H) Gandeed , in Vennached (V), 108 5.6.2010 2010-11 Erection of High Mast light GEN Vennached Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at Gandeed Pinjarigadda , in Vennached (V), 109 5.6.2010 2010-11 Erection of High Mast light GEN Vennached Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at Sai Ram Gandeed colony, in Vennached (V), 110 5.6.2010 2010-11 Erection of High Mast light GEN Vennached Gandeed 100000 MPDO, 50000 49903 99903 Completed with 33 height at Kotha Gandeed Madiga, in Vennached (V), 111 11.7.2010 2010-11 Drinkinking Water Pipe Line GEN Old Serilingamp 180000 MD,HMWS&SB 87443 87443 Progress to Sai Brundavan Colony Lingampally ally , Hyderabad (opp.MMTS) 112 23.7.2010 2010-11 Providing of High Mast lights GEN 60000 MPDO, Yalal 30000 29266 59266 Completed at .G.P Building, Rasnam GP Rasnam 113 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29646 59646 Completed at Hanuman Temple, Pagidiyal Pagidiyal 114 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29266 59266 Completed at Hanuman Temple, Nagasamande Nagasamander r WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 115 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29266 59266 Completed at Masjid, GP, Kamalpur 116 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29456 59456 Completed at Hanuman Temple, Raghapur GP, Raghapur 117 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29646 59646 Completed at Near GP office, Kokat GP, Kokat 118 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29456 59456 Completed at Hanuman Temple, Kokat GP Kokat 119 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29456 59456 Completed at School, Muddaipet GP, Muddaipet 120 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29361 59361 Completed at PWD Road & Busstop. Agganur GP, Agganur 121 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 175000 MPDO, Yalal 87500 87448 174948 Completed at Laxminarayanpur X Road. Agganur GP, Agganur 122 23.7.2010 2010-11 Providing of High Mast lights GEN Yenikepally Yalal 60000 MPDO, Yalal 30000 29646 59646 Completed at Near Rajiv Gandhi Statchu . Yenikepally GP, 123 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29456 59456 Completed at Near GP office, Pyarkampally GP Pyarkampally 124 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29646 59646 Completed at Near Hanuman Temple, Bennur GP Bennur 125 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 60000 MPDO, Yalal 30000 29266 59266 Completed at PWD Road Chowrasta ,Yalal GP Yalal 126 23.7.2010 2010-11 Providing of High Mast lights GEN Yalal 175000 MPDO, Yalal 87500 87448 174948 Completed at Choudi of Yalal GP, Yalal 127 23.7.2010 2010-11 Providing Imax Light Fittings GEN 175000 MPDO, 87500 79845 167345 Completed at Main Street corner Basheeraba Basheerabad Basheerabad d 128 23.7.2010 2010-11 Providing Imax Light Fittings SC 60000 MPDO, 30000 27425 57425 Completed at SC Colony Basheerabad Basheeraba Basheerabad GP Basheerabad d WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 129 23.7.2010 2010-11 Providing Imax Light Fittings ST 60000 MPDO, 30000 27425 57425 Completed at ST Colony Basheerabad Basheeraba Basheerabad Basheerabad d 130 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at PWD Chowrasta, Reddy Basheeraba Basheerabad Ganapur GP d Ganapur 131 23.7.2010 2010-11 Providing Imax Light Fittings GEN Kashimpur 60000 MPDO, 30000 27425 57425 Completed at PWD Chowrasta, Basheeraba Basheerabad Kashimpur d 132 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at Busstop, Jeevangi Basheeraba Basheerabad Jeevangi d 133 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at Chavidi, Yekmai Basheeraba Basheerabad Yekmai d 134 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at Bus Stop, Mailwar Basheeraba Basheerabad Mailwar d 135 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at School Chowrasta, Basheeraba Basheerabad Navalga Navalga d 136 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at Hanuman Temple, Basheeraba Basheerabad Navangi Navangi d 137 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at Bojyanaik Thanda, Basheeraba Basheerabad Navalga Navalga d 138 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at ZPHS School, Basheeraba Basheerabad Damarched Damarched d 139 23.7.2010 2010-11 Providing Imax Light Fittings ST 60000 MPDO, 30000 27425 57425 Completed at Nandyanaik Tanda, Basheeraba Basheerabad Damarched Damarched d 140 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at Hanuman Temple of Basheeraba Basheerabad Bahaddurpur(Badlapur), d Khasimpur . Khasimpur 141 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at Hanuman Temple of Basheeraba Basheerabad Kamsanpally, Mailwar . d Mailwar WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 142 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at Hanuman Temple, Basheeraba Basheerabad Inderched Inderched d 143 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at G.P. Office, Korviched Basheeraba Basheerabad Korviched d 144 23.7.2010 2010-11 Providing Imax Light Fittings GEN 60000 MPDO, 30000 27425 57425 Completed at PWD Road, Vaddera Basheeraba Basheerabad Colony Korviched d Korviched 145 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 100000 MPDO, 50000 50000 100000 Completed near Bus stand Peddemul Peddemul Peddemul 146 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 100000 MPDO, 50000 50000 100000 Completed near Bus stand Kotpally . Peddemul Kotpally 147 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 100000 MPDO, 50000 50000 100000 Completed village chowrasta Thattepally Peddemul Thattepally 148 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 100000 MPDO, 50000 50000 100000 Completed near Ooradamma Temple Peddemul Nagulapally Nagulapally 149 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 100000 MPDO, 50000 50000 100000 Completed near Bus stand Mambapur Peddemul Mambapur 150 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 100000 MPDO, 50000 50000 100000 Completed near Vivekananda statue Peddemul Kandanelly Kandanelly 151 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Near MPDO Office, Peddemul Peddemul Peddemul 152 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Rudraram Rudraram Peddemul 153 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Indole Indole Peddemul 154 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Marepally Marepally Peddemul 155 23.7.2010 2010-11 Providing High Mast Light at GEN Jangam Peddemul 60000 MPDO, 30000 30000 60000 Completed Jangam Peddemul 156 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Rukmapur Rukmapur Peddemul 157 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Regondi Regondi Peddemul WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 158 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Gazipur Gazipur Peddemul 159 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Buddaram Buddaram Peddemul 160 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Kondapur Kondapur Peddemul 161 23.7.2010 2010-11 Providing High Mast Light at GEN Peddemul 60000 MPDO, 30000 30000 60000 Completed Mansanpally Mansanpally Peddemul 162 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur 175000 Commissioner, 84137 83575 167712 Completed Shivaji chowk Junction, in Municiality Municiality Tandur Tandur Muncipality Municiality 163 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 175000 Commissioner, 84137 83574 167711 Completed Peoples Degree College Municiality Municiality Tandur Junction, in Tandur Municiality 164 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 175000 Commissioner, 84137 83623 167760 Completed William Moon High School Municiality Municiality Tandur Junction, in Tandur Municiality 165 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 175000 Commissioner, 84137 84084 168221 Completed Opp Bus Stand Junction, in Municiality Municiality Tandur Tandur Municiality 166 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 175000 Commissioner, 84137 84084 168221 Completed Near D.S.P Office, in Tandur Municiality Municiality Tandur Municiality 167 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 65000 Commissioner, 31253 24626 55879 Completed Near Ambedkar Park Municiality Municiality Tandur Junction, in Tandur Municiality 168 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 65000 Commissioner, 31253 24626 55879 Completed Near Pochamma Gadda Municiality Municiality Tandur Junction, in Tandur Municiality 169 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 65000 Commissioner, 31253 24626 55879 Completed Near Vijaya Vidyalaya Municiality Municiality Tandur school Junction, in Tandur Municiality 170 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 65000 Commissioner, 31253 24626 55879 Completed near Gadi Junction, in Municiality Municiality Tandur Tandur Municiality 171 23.7.2010 2010-11 Fixing of High Mast lights at GEN Tandur Tandur 65000 Commissioner, 31253 24626 55879 Completed Near Vinayaka Chowk Municiality Municiality Tandur Junction, in Tandur Municiality 172 23.7.2010 2010-11 Providing Imax Light Fittings GEN Aionally Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed at Masjid, Aionally (V) Tandur (M),RR.Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 173 23.7.2010 2010-11 Providing Imax Light GEN MItabaspally Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed Fittings,at Hanuman Temple, MItabaspally (V) Tandur (M), RR.Dist. 174 23.7.2010 2010-11 Providing Imax Light GEN Changole Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed Fittings at G.& Office Changole 175 23.7.2010 2010-11 Providing Imax Light Fittings GEN Tandur 175000 MPDO, Tandur 83062 82790 165852 Completed at Karankote (V) 176 23.7.2010 2010-11 Providing Imax Light Fittings GEN Karankote Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed at Bangaramma Temple, Karnakote 177 23.7.2010 2010-11 Providing Imax Light Fittings GEN Malkapur Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed at Near Masjid, Malkapur

178 23.7.2010 2010-11 Providing Imax Light Fittings GEN Kothalapur Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed at Main Road, Kothalapur

179 23.7.2010 2010-11 Providing Imax Light Fittings, GEN Kothalapur Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed at Renuka Yellamma gudi, Kothlapur 180 23.7.2010 2010-11 Providing Imax Light Fittings, GEN Gowthapur Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed at Hanuman Temple, Gowthapur 181 23.7.2010 2010-11 Providing Imax Light Fittings, GEN Ogipur Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed at Sangameshwara Temple, Ogipur

182 23.7.2010 2010-11 Providing Imax Light Fittings, GEN Khantapur Tandur 60000 MPDO, Tandur 29980 29404 59384 Completed at Ambedkar Statue Khantapur 183 23.7.2010 2010-11 Providing Imax Light GEN Allapur Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed Fittings,at G.P , Allapur 184 23.7.2010 2010-11 Providing Imax Light Fittings, GEN Gowthapur Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed at Chowrastha Gowthapur

185 23.7.2010 2010-11 Providing Imax Light GEN Gingurthi Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed Fittings,Near G.P., Gingurthi

186 23.7.2010 2010-11 Providing Imax Light Fittings, GEN Sirigirpet Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed Near G.P. Sirigirpet WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 187 23.7.2010 2010-11 Providing Imax Light Fittings, GEN Gunthabaspall Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed At School, Gunthabaspally y

188 23.7.2010 2010-11 Providing Imax Light GEN Kota Baspally Tandur 60000 MPDO, Tandur 29980 29917 59897 Completed Fittings,at PWD Road, Kurva Nrasappa (H) Kota Baspally

189 23.7.2010 2010-11 Providing Imax Light Fitting GEN Belkatoor Tandur 60000 MPDO, Tandur 29980 29404 59384 Completed at Main Road, Belkatoor 190 26.7.2010 2010-11 Laying of CC Road GEN Singapur Shankarpall 500000 MPDO, 250000 250000 500000 Completed y Shankarpally 191 12.9.2010 2010-11 Balance work of GEN Shankarpally Shankarpall 500000 EE, PRI 250000 250000 500000 Completed Construction of Ambedkar y Divn.Hyd.R.R.D Bhavan ist 192 30.10.2010 2010-11 Excavation of surplus GEN Saroornagar Saroornaga 435000 EE.,North 217500 217500 435000 Completed channels & Laying of RCC r Tanks Division, SOCKET AND SPIGOT Hyd. PIPES 700 mm dia (NP2 class) from Pedda Cheruvu to Mantrala cheruvu from Km.0.00 to Km.0.180 of Saroornagar 193 30.10.2010 2010-11 Pedda Cheruvu to Mantrala GEN Saroornagar Saroornaga 435000 EE.,North 217500 217500 435000 Completed cheruvu from Km.0.180 to r Tanks Division, Km.0.360 of Saroornagar Hyd.

194 30.10.2010 2010-11 Pedda Cheruvu to Mantrala GEN Saroornagar Saroornaga 435000 EE.,North 217500 217500 435000 Completed cheruvu from Km.0.360 to r Tanks Division, Km.0.540 of Saroornagar Hyd.

195 30.10.2010 2010-11 Pedda Cheruvu to Mantrala GEN Saroornagar Saroornaga 435000 EE.,North 217500 215066 432566 Completed cheruvu from Km.0.540 to r Tanks Division, Km.0.720 of Saroornagar Hyd.

196 30.10.2010 2010-11 Pedda Cheruvu to Mantrala GEN Saroornagar Saroornaga 435000 EE.,North 217500 130307 347807 Completed cheruvu from Km.0.720 to r Tanks Division, Km.0.900 of Saroornagar Hyd.

197 30.10.2010 2010-11 Pedda Cheruvu to Mantr- ala GEN Saroornagar Saroornaga 435000 EE.,North 217500 211055 428555 Completed cheruvu fromKm0.900 to r Tanks Division, Km.1.080 of Saroornagar Hyd. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 198 30.10.2010 2010-11 Pedda Cheruvu to Mantrala GEN Saroornagar Saroornaga 390000 EE.,North 195000 149905 344905 Completed cheruvu from Km.1.080 to r Tanks Division, Km.1.200 and construction Hyd. of Head Walls and Fluem section of Saroornagar

199 30.10.2010 2010-11 Laying of Pipe Line at HMT GEN Shamshiguda Balanagar 3000000 MD,HMWS&SB 1500000 1500000 Progress Hills , Hyderabad 200 31.12.2010 2010-11 Laying of CC Road in GEN Kandukur 200000 EE, PRI 100000 100000 Progress Manyaguda, Nedunur GP Divn.Hyd.R.R.D Nedunoor ist 201 31.12.2010 2010-11 Construction of S.C GEN Kandukur 200000 EE, PRI 100000 100000 200000 Completed Community Hall, Lemur Divn.Hyd.R.R.D Village, Lemoor ist 202 31.12.2010 2010-11 Construction of Compound GEN Kandukur 200000 EE, PRI 100000 100000 200000 Completed Wall to Khabrasthan Divn.Hyd.R.R.D (Graveyard) at Dasarlapally ist (V) Dasarlapally 203 31.12.2010 2010-11 Laying of CC Road in SC Kandukur 200000 EE, PRI 100000 100000 200000 Completed Mohammad Nagar SC Divn.Hyd.R.R.D Colony , Debbadaguda GP, ist Debbadaguda 204 31.12.2010 2010-11 Formation of CC Road in BC GEN Kandukur 200000 EE, PRI 100000 100000 200000 Completed Colony, Akulamailaram GP, Divn.Hyd.R.R.D Akulamailaram ist 205 10.1.2011 2010-11 Laying of CC Road from GEN Bandlaguda Rajendrana 990000 EE, PRI 474398 359203 833601 Completed Chevella Road to P&T gar Divn.Hyd.R.R.D Colony, ist 206 27.2.2011 2010-11 Construction of CC Road SC Tnagutur GP, Shankarpall 200000 MPDO, 100000 100000 200000 Completed From SC Colony to BC y Shankarpally Colony 207 27.2.2011 2010-11 Construction of side drain GEN Gajulagudem Shankarpall 200000 MPDO, 97750 97640 195390 Completed from Anganwadi Building to GP y Shankarpally GP 208 27.2.2011 2010-11 Construction side drain from SC Ramanthapura Shankarpall 200000 MPDO, 97750 97750 195500 Completed SC Colony to m y Shankarpally Ramanthapuram GP 209 27.2.2011 2010-11 Construction of Community GEN Ragulapally Shankarpall 200000 MPDO, 95500 95107 190607 Completed Hall GP y Shankarpally 210 27.2.2011 2010-11 Construction of side drain SC Chendippa GP Shankarpall 200000 MPDO, 97750 97750 195500 Completed from SC Youth Building to y Shankarpally Parvedha Pentaiah House WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 211 27.2.2011 2010-11 Construction of side drain GEN Mahalingapura Shankarpall 200000 MPDO, 97750 97750 195500 Completed from P.Narsimha House to m GP y Shankarpally Hanuman Temple 212 27.2.2011 2010-11 Construction of side drain SC Kondikal GP Shankarpall 200000 MPDO, 97750 97750 195500 Completed from SC Colony to Masjid y Shankarpally 213 27.2.2011 2010-11 Construction of side drain GEN Mokila GP Shankarpall 200000 MPDO, 97750 97750 195500 Completed from Osman House to y Shankarpally N.Mallesh House 214 27.2.2011 2010-11 Construction of Side drain GEN Kothapally GP Shankarpall 200000 MPDO, 97750 97750 195500 Completed from M.Chandraiah House to y Shankarpally Primary School 215 27.2.2011 2010-11 Construction of CC Road GEN Shankarpally Shankarpall 200000 MPDO, 100000 99897 199897 Completed from Vishnupanthulu y Shankarpally Satyanarayana to Chevella Road 216 12.4.2011 2010-11 Balance work of construction GEN Ravulapally Chevella 300000 MPDO, 150000 150000 Progress of GP BUILDING Chevella

217 12.4.2011 2010-11 Costruction of Underground GEN Kandwada Chevella 200000 MPDO, 100000 100000 Progress drainage Chevella 218 12.4.2011 2010-11 Balance work of GEN Damarigidda Chevella 100000 MPDO, 50000 50000 Progress Construction of DWACRA Chevella Building 219 12.4.2011 2010-11 Construction of CC Road GEN Chandanvelli Shabad 200000 MPDO, Shabad 100000 100000 200000 Completed

220 12.4.2011 2010-11 Construction of CC Road. GEN Pothughal Shabad 200000 MPDO, Shabad 100000 100000 200000 Completed

221 12.4.2011 2010-11 Construction of CC Road. GEN Eligondaguda Shabad 200000 MPDO, Shabad 100000 100000 200000 Completed

222 12.4.2011 2010-11 Construction of CC Road GEN Amadapur Moinabad 200000 MPDO, 95698 95698 191396 Completed Moinabad 223 12.4.2011 2010-11 Construction of CC Road GEN Kethireddypall Moinabad 200000 MPDO, 95754 95754 191508 Completed y Moinabad 224 12.4.2011 2010-11 Construction of CC Road GEN Moinabad Moinabad 200000 MPDO, 95698 95698 191396 Completed Moinabad 225 12.4.2011 2010-11 Construction of CC Road GEN Ekmamidi Nawabpet 200000 MPDO, 100000 100000 200000 Completed Nawabpet 226 12.4.2011 2010-11 Construction of CC Road GEN Meenapalli Nawabpet 200000 MPDO, 100000 99189 199189 Completed Nawabpet 227 12.4.2011 2010-11 Construction of CC Road GEN Chinchilpet Nawabpet 200000 MPDO, 100000 100000 200000 Completed Nawabpet 228 12.4.2011 2010-11 Construction of CC Road GEN Maharajpet Shankarpall 200000 MPDO, 100000 100000 200000 Completed y Shankarpally WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 229 12.4.2011 2010-11 Construction Ambedkar GEN Shankarpally Shankarpall 500000 EE, PRI 250000 250000 500000 Completed Building y Divn.Hyd.R.R.D ist 230 18.4.2011 2010-11 Strengthening of drinking GEN Kukatpally Serilingamp 1000000 MD,HMWS&SB 500000 500000 Progress water supply to Srinivasa ally , Hyderabad Nagar(Beside Vivekananda Nagar Colony) Kukatpally 231 6.6.2011 2011-12 Telephone Exchange to Bus GEN Pargi Town Pargi 500000 MPDO, Parigi 250000 499875 Completed Depot. Central Lighting at Pargi Town 249875 232 6.6.2011 2011-12 Bus Depot. To Charminar GEN Pargi Town Pargi 250000 MPDO, Parigi 125000 250000 Completed Café,Central Lighting 125000 233 6.6.2011 2011-12 SBH ADB Branch to K GEN Pargi Town Pargi 250000 MPDO, Parigi 125000 250000 Completed Raghu Mohan Reddy House – Central Lighting at Pargi Town 125000 234 16.07.2011 2011-12 Providing Central Lighting GEN Kottalagudem Vikarabad 90000 EE, PRI 45000 44572 89572 Completed System (2 No's) Divn.Vikarabad 235 16.07.2011 2011-12 Providing Central Lighting GEN Dhannaram Vikarabad 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 236 16.07.2011 2011-12 Providing Central Lighting GEN Burantahapall Vikarabad 45000 EE, PRI 22500 22286 44786 Completed System y Divn.Vikarabad 237 16.07.2011 2011-12 Providing Central Lighting GEN Burgupally Vikarabad 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 238 16.07.2011 2011-12 Providing Central Lighting GEN Vikarabad 90000 EE, PRI 45000 44572 89572 Completed System Chittampally Divn.Vikarabad 239 16.07.2011 2011-12 Providing Central Lighting GEN Madanpally Vikarabad 45000 EE, PRI 22500 22286 44786 Completed System (2 No's) Divn.Vikarabad 240 16.07.2011 2011-12 Providing Central Lighting GEN Girigit Pally-1 Vikarabad 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 241 16.07.2011 2011-12 Providing Central Lighting GEN Thanda -1 Vikarabad 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 242 16.07.2011 2011-12 Providing Central Lighting GEN Naranpur Vikarabad 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 243 16.07.2011 2011-12 Providing Central Lighting GEN Peelaram Vikarabad 90000 EE, PRI 45000 44572 89572 Completed System Divn.Vikarabad 244 16.07.2011 2011-12 Providing Central Lighting GEN Kukkinda Dharur 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 245 16.07.2011 2011-12 Providing Central Lighting GEN Avusupally Dharur 45000 EE, PRI 22500 22286 44786 Completed System (2 No's) Divn.Vikarabad 246 16.07.2011 2011-12 Providing Central Lighting GEN Kondapur Dharur 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 247 16.07.2011 2011-12 Providing Central Lighting GEN Munnuru Dharur 45000 EE, PRI 22500 22286 44786 Completed System Somaram Divn.Vikarabad 248 16.07.2011 2011-12 Providing Central Lighting GEN Haridaspally Dharur 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 249 16.07.2011 2011-12 Providing Central Lighting GEN Chinthakunta Dharur 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 250 16.07.2011 2011-12 Providing Central Lighting GEN Mominkalan Dharur 90000 EE, PRI 45000 44572 89572 Completed System Divn.Vikarabad 251 16.07.2011 2011-12 Providing Central Lighting GEN Allipur Dharur 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 252 16.07.2011 2011-12 Providing Central Lighting GEN Ebbannur Dharur 45000 EE, PRI 22500 22286 44786 Completed System (2 No’s) Divn.Vikarabad 253 16.07.2011 2011-12 Providing Central Lighting GEN Kondapur Dharur 45000 EE, PRI 22500 22286 44786 Completed System Kalan Divn.Vikarabad 254 16.07.2011 2011-12 Providing Central Lighting GEN Guru Dhotla Dharur 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 255 16.07.2011 2011-12 Providing Central Lighting GEN Nagasamunde Dharur 45000 EE, PRI 22500 22286 44786 Completed System r Divn.Vikarabad 256 16.07.2011 2011-12 Providing Central Lighting GEN Kothlapur Marpally 90000 EE, PRI 45000 42187 87187 Completed System Divn.Vikarabad 257 16.07.2011 2011-12 Providing Central Lighting GEN Ghanpur Marpally 45000 EE, PRI 22500 21061 43561 Completed System Divn.Vikarabad 258 16.07.2011 2011-12 Providing Central Lighting GEN Buchanpally Marpally 45000 EE, PRI 22500 21126 43626 Completed System (2 No’s) Divn.Vikarabad 259 16.07.2011 2011-12 Providing Central Lighting GEN Damastapur Marpally 45000 EE, PRI 22500 21100 43600 Completed System Divn.Vikarabad 260 16.07.2011 2011-12 Providing Central Lighting GEN Peddapur Marpally 45000 EE, PRI 22500 21126 43626 Completed System Divn.Vikarabad 261 16.07.2011 2011-12 Providing Central Lighting GEN Veerlapally Marpally 45000 EE, PRI 22500 21126 43626 Completed System Divn.Vikarabad 262 16.07.2011 2011-12 Providing Central Lighting GEN Beerole Bantwaram 45000 EE, PRI 22500 21126 43626 Completed System Divn.Vikarabad 263 16.07.2011 2011-12 Providing Central Lighting GEN Nagsanpally Bantwaram 45000 EE, PRI 22500 21126 43626 Completed System Divn.Vikarabad 264 16.07.2011 2011-12 Providing Central Lighting GEN Salbathapur Bantwaram 45000 EE, PRI 22500 21126 43626 Completed System Divn.Vikarabad 265 16.07.2011 2011-12 Providing Central Lighting GEN Zinnaram Bantwaram 45000 EE, PRI 22500 21126 43626 Completed System Divn.Vikarabad 266 16.07.2011 2011-12 Providing Central Lighting GEN Rampur Bantwaram 45000 EE, PRI 22500 21126 43626 Completed System Divn.Vikarabad 267 16.07.2011 2011-12 Providing Central Lighting GEN Rompally Bantwaram 45000 EE, PRI 22500 21126 43626 Completed System Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 268 16.07.2011 2011-12 Providing Central Lighting GEN Mekavanampa Mominpet 90000 EE, PRI 45000 44572 89572 Completed System lly Divn.Vikarabad 269 16.07.2011 2011-12 Providing Central Lighting GEN Kolkunda Mominpet 90000 EE, PRI 45000 44572 89572 Completed System Divn.Vikarabad 270 16.07.2011 2011-12 Providing Central Lighting GEN Amradi Kurdu Mominpet 45000 EE, PRI 22500 22286 44786 Completed System (2 No’s) Divn.Vikarabad 271 16.07.2011 2011-12 Providing Central Lighting GEN Cheemaldhari Mominpet 45000 EE, PRI 22500 22286 44786 Completed System (2 No’s) Divn.Vikarabad 272 16.07.2011 2011-12 Providing Central Lighting GEN Chakrapally Mominpet 45000 EE, PRI 22500 22286 44786 Completed System Divn.Vikarabad 273 16.07.2011 2011-12 Providing Central Lighting GEN Velchal Mominpet 90000 EE, PRI 45000 44572 89572 Completed System Divn.Vikarabad 274 16.07.2011 2011-12 Providing Central Lighting GEN Morangpally Mominpet 90000 EE, PRI 45000 44572 89572 Completed System Divn.Vikarabad 275 16.07.2011 2011-12 Providing Central Lighting GEN Izra Mominpet 45000 EE, PRI 22500 22286 44786 Completed System (2 No’s) Chittampally Divn.Vikarabad 276 16.07.2011 2011-12 Providing Central Lighting GEN Govindapur Mominpet 45000 EE, PRI 22500 22286 44786 Completed System (2 No’s) Divn.Vikarabad 277 16.07.2011 2011-12 Providing Central Lighting GEN Ramnath Mominpet 45000 EE, PRI 22500 22286 44786 Completed System Gudpally Divn.Vikarabad 278 21.7.2011 2011-12 Providing of high mask GEN Mailaram Dharur 90000 EE, PRI 45000 44572 89572 Completed lighting system - 2Nos Divn.Vikarabad 279 21.7.2011 2011-12 Providing of high mask GEN Station Dharur Dharur 45000 EE, PRI 22500 22286 44786 Completed lighting system Divn.Vikarabad 280 21.7.2011 2011-12 Providing of high mask ST Rampur Dharur 45000 EE, PRI 22500 22286 44786 Completed lighting system Thanda Divn.Vikarabad 281 21.7.2011 2011-12 Providing of high mask GEN Amtharam Dharur 45000 EE, PRI 22500 22286 44786 Completed lighting system Divn.Vikarabad 282 21.7.2011 2011-12 Providing of high mask GEN Gattepally Dharur 45000 EE, PRI 22500 22286 44786 Completed lighting system Divn.Vikarabad 283 21.7.2011 2011-12 Providing of high mask GEN Tharigopula Dharur 90000 EE, PRI 45000 44572 89572 Completed lighting system - 2Nos Divn.Vikarabad 284 21.7.2011 2011-12 Providing of high mask GEN Sarpampally Dharur 45000 EE, PRI 22500 22286 44786 Completed lighting system Divn.Vikarabad 285 21.7.2011 2011-12 Providing of high mask GEN Kothapally Bantwaram 90000 EE, PRI 45000 42252 87252 Completed lighting system - 2Nos Divn.Vikarabad 286 21.7.2011 2011-12 Providing of high mask GEN Kareempur Bantwaram 45000 EE, PRI 22500 21126 43626 Completed lighting system Divn.Vikarabad 287 21.7.2011 2011-12 Providing of high mask GEN Ennaramla Bantwaram 90000 EE, PRI 45000 42252 87252 Completed lighting system - 2Nos Divn.Vikarabad 288 21.7.2011 2011-12 Providing of high mask GEN Mailaram Vikarabad 90000 EE, PRI 45000 44572 89572 Completed lighting system - 2Nos Devrampally Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 289 21.7.2011 2011-12 Providing of high mask GEN Peerampally Vikarabad 45000 EE, PRI 22500 22286 44786 Completed lighting system Divn.Vikarabad 290 21.7.2011 2011-12 Providing of high mask GEN Pendli Vikarabad 45000 EE, PRI 22500 22286 44786 Completed lighting system Madugu Divn.Vikarabad 291 21.7.2011 2011-12 Providing of high mask GEN Narayanpur Vikarabad 45000 EE, PRI 22500 22286 44786 Completed lighting system Divn.Vikarabad 292 21.7.2011 2011-12 Providing of high mask GEN Dhyacharam Vikarabad 45000 EE, PRI 22500 22286 44786 Completed lighting system Divn.Vikarabad 293 21.7.2011 2011-12 Providing of high mask GEN Komsatpally Marpally 90000 EE, PRI 45000 42252 87252 Completed lighting system - 2Nos Divn.Vikarabad 294 21.7.2011 2011-12 Providing of high mask GEN Pamchalingal Marpally 90000 EE, PRI 45000 21126 66126 Completed lighting system - 2Nos Divn.Vikarabad 295 21.7.2011 2011-12 Providing of high mask ST Shapur Marpally 45000 EE, PRI 22500 21100 43600 Completed lighting system Thanda Divn.Vikarabad 296 21.7.2011 2011-12 Providing of high mask GEN Durgam Mominpet 90000 EE, PRI 45000 44572 89572 Completed lighting system - 2Nos Cheruvu Divn.Vikarabad 297 21.7.2011 2011-12 Providing of high mask GEN Amradi Kalan Mominpet 90000 EE, PRI 45000 44572 89572 Completed lighting system - 2Nos Divn.Vikarabad 298 21.7.2011 2011-12 Providing of high mask GEN R.Gudpally Mominpet 45000 EE, PRI 22500 22286 44786 Completed lighting system Divn.Vikarabad 299 27.07.2011 2011-12 Laying of GEN Yellammaban Serilingamp 4300000 G.M(E) O&M 0 Not Started 200mmdia/100mmdia DI da ally Division No-IX, distribution water supply HMWS&SB- network lines tapping from Kukatpally, existing 300 mmdia Feeder Main of Yellammabanda for water supply in Ujjani Mahankali Nagar and Venkata Papaiah Nagar Near Shamshiguda (V) Serlingmpally.

300 27.07.2011 2011-12 Laying of C.C Road at ST Urentithendi Peddemul 100000 EE, PRI 50000 49845 99845 Completed Urentithendi Tanda Divn.Vikarabad 301 27.07.2011 2011-12 Construction of C.D work at GEN Girmapur Peddemul 200000 EE, PRI 100000 99005 199005 Completed Girmapur Divn.Vikarabad 302 27.07.2011 2011-12 Construction side drain at ST Kandanelly Peddemul 150000 EE, PRI 75000 74978 149978 Completed Kandanelly tanda Tanda Divn.Vikarabad 303 01.08.2011 2011-12 Extension of pipe line at GEN Peddemul Peddemul 150000 EE, RWS&S 112500 112500 Progress Peddemul Divn.Pargi 304 27.07.2011 2011-12 Laying of C.C Road in GEN Chandra Tandur 100000 EE, PRI 50000 49993 99993 Completed Chandravancha Vancha Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 305 27.07.2011 2011-12 Laying of C.C Road in GEN Sirigiripet Tandur 200000 EE, PRI 100000 98914 198914 Completed sirigiripet Divn.Vikarabad 306 27.07.2011 2011-12 Laying of C.C Road in GEN Mitabaspally Tandur 150000 EE, PRI 75000 67411 142411 Completed Mitabaspally Divn.Vikarabad 307 27.07.2011 2011-12 Laying of C.C Road in GEN Allapur Tandur 100000 EE, PRI 50000 50000 100000 Completed Allapur Divn.Vikarabad 308 27.07.2011 2011-12 Laying of C.C Road at GEN Chennaram Yalal 100000 EE, PRI 50000 49960 99960 Completed B.C.Colony Divn.Vikarabad 309 27.07.2011 2011-12 Laying of C.C.Road GEN Juntipally Yalal 100000 EE, PRI 50000 49864 99864 Completed B.C.Colony, Pagdiya Divn.Vikarabad 310 27.07.2011 2011-12 Metaling of road from GEN Mallaredypally Yalal 300000 EE, PRI 150000 147342 297342 Completed Agnoor to Mallaredypally Divn.Vikarabad 311 27.07.2011 2011-12 Laying of CC Road at GEN Basheeraba 100000 EE, PRI 50000 49879 99879 Completed Kamsanpally(B) Kamsanpally( d Divn.Vikarabad B 312 27.07.2011 2011-12 Laying of CC Road at GEN Khasimpur Basheeraba 100000 EE, PRI 50000 49183 99183 Completed Khasimpur d Divn.Vikarabad 313 27.07.2011 2011-12 Laying of CC Road at GEN Gottighurd Basheeraba 100000 EE, PRI 50000 49734 99734 Completed Gottighurd d Divn.Vikarabad 314 27.07.2011 2011-12 Laying of CC Road at ST Damarched Basheeraba 100000 EE, PRI 50000 49295 99295 Completed S.T.Colony, Damarched. d Divn.Vikarabad 315 27.07.2011 2011-12 Laying of CC Road at GEN Mantatti. Basheeraba 100000 EE, PRI 50000 50000 Progress Mantatti. d Divn.Vikarabad 316 27.07.2011 2011-12 Laying of CC Road at Reddy GEN Ganapur Basheeraba 100000 EE, PRI 50000 49391 99391 Completed Ganapur. d Divn.Vikarabad 317 27.07.2011 2011-12 Laying of CC Road from GEN Tandur Tandur 300000 EE, PRI 150000 149894 299894 Completed Vimalamma House to Babu Divn.Vikarabad House , Tandur Town, Bit-I

318 27.07.2011 2011-12 Laying of CC Road from GEN Tandur Tandur 300000 EE, PRI 150000 148733 298733 Completed Vimalamma House to Babu Divn.Vikarabad House , Tandur Town, Bit-I

319 2.8.2011 2011-12 60 number of benches for GEN Tandur Tandur 100000 MPDO, Tandur 100000 100000 Completed three class rooms with metal structure – size 4x3 width wooden seater and table @ Rs.1666/- each(Urdu Medium Degree College) WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 320 2.8.2011 2011-12 Wiring of three class rooms GEN Tandur Tandur 50000 MPDO, Tandur 50000 50000 Completed general lighting / fans and computerization of class rooms(Urdu Medium Degree College). 321 29.8.2011 2011-12 Laying of CC road from Miraj GEN Tandur Town Tandur 1200000 EE, PRI 600000 600000 Progress Stone to New Tandur Edga. Divn.Vikarabad

322 3.9.2011 2011-12 Construction of Ambedkar GEN Nawabpet Nawabpet 1000000 EE, PRI 500000 500000 Progress Bhavan (Community Hall) at Divn.Hyd.R.R.D Nawabpet Mandal Head ist quarters 323 11.12.2011 2011-12 Laying of drinking water GEN Guttala Serilingamp 3000000 G.M(E) O&M 0 Not Started pipeline to Mastan Nagar, Begumpet ally Division No-VI, Guttala HMWS&SB- Begumpet.Serilingampally Jubliee Hills, Mandal Hyd. 324 17.11.2012 2011-12 CC Road in Lemur Village, SC Lemur Kandukur 200000 EE, PRI 150000 50000 200000 Completed Kandukur Mandal Divn.Hyd.R.R.D ist 325 17.11.2012 2011-12 CC Road in Saraswathiguda GEN Saraswathigud Kandukur 200000 EE, PRI 150000 50000 200000 Completed H/o Agarmiyaguda (V) a Divn.Hyd.R.R.D Kandukur (M) ist

326 23.11.2011 2011-12 CC Road in GEN Simmalavanik Kandukur 200000 EE, PRI 150000 50000 200000 Completed Simmalavanikunta unta Divn.Hyd.R.R.D (Cheemalavanikunta) H/o ist Timmapur (V) Kandukur (M)

327 23.11.2011/ 2011-12 Laying of CC Road in SC Thimmapur Kandukur 200000 EE, PRI 200000 200000 Completed 09.09.2012 Simmalavanikunta H/o Divn.Hyd.R.R.D Timmapur (V) Kanduur (M) ist (Bit-II) 328 23.11.2011/ 2011-12 Laying of CC Road in SC Madhapur Kandukur 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Madhapur (V) Kandukur (M) Divn.Hyd.R.R.D ist 329 23.11.2011/ 2011-12 Laying of CC Road in SC Turkaguda Kandukur 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Turkaguda H/o Begumpet Divn.Hyd.R.R.D (V) Kandukur (M) ist 330 23.11.2011/ 2011-12 Laying of CC Road in SC Katikapalli Kandukur 200000 EE, PRI 150000 49759 199759 Completed 09.09.2012 Katikapalli H/o Rachaluru (V) Divn.Hyd.R.R.D Kandukur (M) ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 331 23.11.2011/ 2011-12 Laying of CC Road in SC Dhannaram Kandukur 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Dhannaram H/o Pulimamidi Divn.Hyd.R.R.D (V) Kandukur (M) ist

332 23.11.2011/ 2011-12 Laying of CC Road in SC Gummadivali Kandukur 200000 EE, PRI 150000 42989 192989 Completed 09.09.2012 Gummadivali (V) Kandukur Divn.Hyd.R.R.D (M) ist 333 23.11.2011/ 2011-12 Laying of CC Road in ST Akulamailaram Kandukur 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Akulamailaram(V) Kandukur Divn.Hyd.R.R.D (M) ist 334 23.11.2011/ 2011-12 Laying of CC Road in SC Meerkhanpet Kandukur 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Meerkhanpet (V) Kandukur Divn.Hyd.R.R.D (M) ist 335 23.11.2011/ 2011-12 CC Road in Porandla (V) SC Porandla Maheshwar 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Maheshwaram (M) am Divn.Hyd.R.R.D ist 336 23.11.2011/ 2011-12 CC Road in Harshaguda (V) ST Harshaguda Maheshwar 200000 EE, PRI 150000 26306 176306 Completed 09.09.2012 Maheshwaram (M) am Divn.Hyd.R.R.D ist 337 23.11.2011/ 2011-12 CC Road in Gollur (V) SC Gollur Maheshwar 200000 EE, PRI 150000 43059 193059 Completed 09.09.2012 Maheshwaram (M) am Divn.Hyd.R.R.D ist 338 23.11.2011/ 2011-12 CC Road Kollapadakal (V) ST Kollapadakal Maheshwar 200000 EE, PRI 150000 150000 Progress 09.09.2012 Maheshwaram (M) am Divn.Hyd.R.R.D ist 339 23.11.2011/ 2011-12 CC Road in Chinna Toopra ST Chinna Maheshwar 200000 EE, PRI 150000 40094 190094 Completed 09.09.2012 (V) Maheshwaram (M) Toopra am Divn.Hyd.R.R.D ist 340 23.11.2011/ 2011-12 CC Road in Kalvakol (V) SC Kalvakol Maheshwar 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Maheshwaram (M) am Divn.Hyd.R.R.D ist 341 23.11.2011/ 2011-12 CC Road in Dubbacherla (V) SC Dubbacherla Maheshwar 200000 EE, PRI 150000 42402 192402 Completed 09.09.2012 Maheshwaram (M) am Divn.Hyd.R.R.D ist 342 23.11.2011/ 2011-12 CC Road in Mohabbath ST Mohabbath Maheshwar 200000 EE, PRI 150000 49482 199482 Completed 09.09.2012 Nagar (V) Maheshwaram Nagar am Divn.Hyd.R.R.D (M) ist 343 23.11.2011/ 2011-12 CC Road in Akanpalli (V) SC Akanpalli Maheshwar 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Maheshwaram (M) am Divn.Hyd. R.R.Dist 344 23.11.2011/ 2011-12 CC Road in Saradar Nagar SC Saradar Nagar Maheshwar 200000 EE, PRI 150000 20702 170702 Completed 09.09.2012 (V) Maheshwaram (M) am Divn.Hyd.R.R.D ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 345 23.11.2011/ 2011-12 CC Road in Sirigiripuram (V) ST Sirigiripuram Maheshwar 200000 EE, PRI 150000 49640 199640 Completed 09.09.2012 Maheshwaram (M) am Divn.Hyd.R.R.D ist 346 23.11.2011/ 2011-12 CC Road in Maharajpet (V) SC Maharajpet Shankarpall 125000 EE, PRI 93750 93750 Progress 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 347 23.11.2011/ 2011-12 CC Road in Dhobipet (V) ST Dhobipet Shankarpall 125000 EE, PRI 0 0 Not Started 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 348 23.11.2011/ 2011-12 CC Road in Balkapuram (V) SC Balkapuram Shankarpall 125000 EE, PRI 93750 93750 Progress 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 349 23.11.2011/ 2011-12 CC Road in Poddatur (V) ST Poddatur Shankarpall 125000 EE, PRI 93750 93750 Progress 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 350 23.11.2011/ 2011-12 CC Road in Parveda (V) SC Parveda Shankarpall 75000 EE, PRI 56250 18716 74966 Completed 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 351 23.11.2011/ 2011-12 CC Road in Tangutur (V) ST Tangutur Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 352 23.11.2011/ 2011-12 CC Road in Kothapally (V) SC Kothapally Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 353 23.11.2011/ 2011-12 CC Road in Ravulapally (V) ST Ravulapally Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 354 23.11.2011/ 2011-12 CC Road in Gajulagudem SC Gajulagudem Shankarpall 75000 EE, PRI 56250 18249 74499 Completed 09.09.2012 (V) Shankarpally (M) y Divn.Hyd.R.R.D ist 355 23.11.2011/ 2011-12 CC Road in ST Laxmareddygu Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 Laxmareddygudem (V) dem y Divn.Hyd.R.R.D Shankarpally (M) ist 356 23.11.2011/ 2011-12 CC Road in SC Alamkhangud Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 Alamkhangudem (V) em y Divn.Hyd.R.R.D Shankarpally (M) ist 357 23.11.2011/ 2011-12 CC Road in Ramanthauram ST Ramanthaura Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 (V) Shankarpally (M) m y Divn.Hyd.R.R.D ist 358 23.11.2011/ 2011-12 CC Road in Masanigudem SC Masanigudem Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 (V) Shankarpally (M) y Divn.Hyd.R.R.D ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 359 23.11.2011/ 2011-12 CC Road in Phatepuram (V) ST Phatepuram Shankarpall 75000 EE, PRI 56250 17797 74047 Completed 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 360 23.11.2011/ 2011-12 CC Road in Mirjagudem (V) SC Mirjagudem Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 361 23.11.2011/ 2011-12 CC Road Ervagudem (V) ST Ervagudem Shankarpall 75000 EE, PRI 56250 56250 Progress 09.09.2012 Shankarpally (M) y Divn.Hyd.R.R.D ist 362 09.12.2011 2011-12 Augmentation of PWS GEN Kalwakurthy Kalwakurthy 500000 Dist.Collector, 500000 500000 Completed Scheme Mahaboobnaga r 363 09.12.2011 2011-12 Drilling of Borewell and GEN Kalwakurthy Kalwakurthy 500000 Dist.Collector, 500000 500000 Completed Pump Sets Mahaboobnaga r 364 23.11.2011/ 2011-12 CC Road in Amdapur (V) SC Amdapur Moinabad 130000 EE, PRI 97500 97500 Progress 09.09.2012 Moinabad (M) Divn.Hyd.R.R.D ist 365 23.11.2011/ 2011-12 CC Road in Chanda Nagar ST Chanda Nagar Moinabad 150000 EE, PRI 112500 37500 150000 Completed 09.09.2012 (V) Moinabad (M) Divn.Hyd.R.R.D ist 366 23.11.2011/ 2011-12 CC Road in Chilkur (V) SC Chilkur Moinabad 150000 EE, PRI 112500 112500 Progress 09.09.2012 Moinabad (M) Divn.Hyd.R.R.D ist 367 23.11.2011/ 2011-12 CC Road in ST Chinnamangal Moinabad 130000 EE, PRI 97500 97500 Progress 09.09.2012 Chinnamangalaram (V) aram Divn.Hyd.R.R.D Moinabad (M) ist 368 23.11.2011/ 2011-12 CC Road in Medipalli (V) SC Medipalli Moinabad 130000 EE, PRI 97500 97500 Progress 09.09.2012 Moinabad (M) Divn.Hyd.R.R.D ist 369 23.11.2011 2011-12 Provision of Water Filter in ST Moinabad Moinabad 130000 EE, RWS, 0 Not Started Moinabad (Village & Mandal) Hyderabad , RR Dist. 370 23.11.2011/ 2011-12 CC Road in Murthujaguda SC Murthujaguda Moinabad 100000 EE, PRI 75000 75000 Progress 09.09.2012 (V) Moinabad (M) Divn.Hyd.R.R.D ist 371 23.11.2011/ 2011-12 CC Road in Nagireddyguda ST Nagireddygud Moinabad 130000 EE, PRI 97500 32500 130000 Completed 09.09.2012 (V) Moinabad (M) a Divn.Hyd.R.R.D ist 372 23.11.2011/ 2011-12 CC Road in SC Peddamangal Moinabad 150000 EE, PRI 112500 112500 Progress 09.09.2012 Peddamangalaram (V) aram Divn.Hyd.R.R.D Moinabad (M) ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 373 23.11.2011/ 2011-12 CC Road in Qudbuddinguda ST Qudbuddingud Moinabad 100000 EE, PRI 75000 75000 Progress 09.09.2012 (V) Moinabad (M) a Divn.Hyd.R.R.D ist 374 23.11.2011/ 2011-12 CC Road in Tholkatta (V) SC Tholkatta Moinabad 100000 EE, PRI 75000 23547 98547 Completed 09.09.2012 Moinabad (M) Divn.Hyd.R.R.D ist 375 23.11.2011/ 2011-12 CC Road in (V) SC Pamena Chevella 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Chevella (M) Divn.Hyd.R.R.D ist 376 23.11.2011/ 2011-12 CC Road in Gundala (V) ST Gundala Chevella 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Chevella (M) Divn.Hyd.R.R.D ist 377 23.11.2011/ 2011-12 CC Road in Chenvally (V) SC Chenvally Chevella 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Chevella (M) Divn.Hyd.R.R.D ist 378 23.11.2011/ 2011-12 CC Road Ravulapally (V) ST Ravulapally Chevella 200000 EE, PRI 150000 50000 200000 Completed 09.09.2012 Chevella (M) Divn.Hyd.R.R.D ist 379 23.11.2011/ 2011-12 Formation of Road in SC Malkapur Chevella 150000 EE, PRI 112500 37408 149908 Completed 09.09.2012 Malkapur (V) Chevella (M) Divn.Hyd.R.R.D ist 380 23.11.2011/ 2011-12 CC Road in Damaragidda ST Damaragidda Chevella 150000 EE, PRI 112500 37500 150000 Completed 09.09.2012 (V) Chevella (M) Divn.Hyd.R.R.D ist 381 23.11.2011/ 2011-12 CC Road in Antaram (V) SC Antaram Chevella 150000 EE, PRI 0 0 Not Started 09.09.2012 Chevella (M) Divn.Hyd.R.R.D ist 382 23.11.2011/ 2011-12 Laying of CC Road in SC Chandanvelly Shabad 200000 MPDO, Shabad 150000 50000 200000 Completed 09.09.2012 Chandanvelly (V), Shabad Mandal, RR Dist. 383 23.11.2011/ 2011-12 Laying of CC Road in Solipet ST Solipet Shabad 200000 MPDO, Shabad 150000 50000 200000 Completed 09.09.2012 (V) Shabad Mandal, RR Dist.

384 23.11.2011/ 2011-12 Laying of CC Road in SC Thallapally Shabad 200000 MPDO, Shabad 150000 50000 200000 Completed 09.09.2012 Thallapally (V) Shabad Mandal, RR Dist. 385 23.11.2011/ 2011-12 Laying of CC Road in SC Bhongirpally Shabad 300000 MPDO, Shabad 300000 Completed 09.09.2012 Bhongirpally (V) Shabad Mandal, RR Dist. 386 23.11.2011/ 2011-12 Laying of CC Road in ST Dusurakunta Shabad 200000 MPDO, Shabad 150000 50000 200000 Completed 09.09.2012 Dusurakunta (V) Shabad Thanda Mandal, RR Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 387 23.11.2011/ 2011-12 Laying of CC Road in SC Nagarunta Shabad 200000 MPDO, Shabad 150000 150000 Progress 09.09.2012 Nagarunta (V) Shabad Mandal, RR Dist. 388 23.11.2011/ 2011-12 Laying of CC Road in ST Rudraram Shabad 200000 MPDO, Shabad 0 0 Not Started 09.09.2012 Shabad Village&Mandal, RR Dist.. 389 23.11.2011/ 2011-12 Laying of CC Road in SC Shabad Shabad 200000 MPDO, Shabad 150000 150000 Progress 09.09.2012 Shabad Village&Mandal, RR Dist.. 390 23.11.2011/ 2011-12 CC Road in Palmakula (V) SC Palmakula Shamshaba 500000 EE, PRI 375000 123598 498598 Completed 09.09.2012 Shamshabad (M) d Divn.Hyd.R.R.D ist 391 23.11.2011/ 2011-12 CC Road in Peddashapoor SC Peddashapoor Shamshaba 400000 EE, PRI 394376 394376 Completed 09.09.2012 (V) Shamshabad (M) d Divn.Hyd.R.R.D ist 392 23.11.2011/ 2011-12 CC Road in Jukkal (V) SC Jukkal Shamshaba 300000 EE, PRI 225000 75000 300000 Completed 09.09.2012 Shamshabad (M) d Divn.Hyd.R.R.D ist 393 23.11.2011/ 2011-12 CC Road in Peddagolkonda SC Peddagolkond Shamshaba 300000 EE, PRI 225000 74924 299924 Completed 09.09.2012 (V) Shamshabad (M) a d Divn.Hyd.R.R.D ist 394 23.11.2011/ 2011-12 CC Road in Peddatoopra (V) SC Peddatoopra Shamshaba 200000 EE, PRI 150000 150000 Progress 09.09.2012 Shamshabad (M) d Divn.Hyd.R.R.D ist 395 23.11.2011 2011-12 Provision of Water Filter in GEN Peddatoopra Shamshaba 200000 EE, RWS, 0 Not Started Peddatoopra (V) d Hyderabad Shamshabad (M), RR Dist.

396 23.11.2011/ 2011-12 CC Road in Narkuda (V) SC Narkuda Shamshaba 500000 EE, PRI 375000 125000 500000 Completed 09.09.2012 Shamshabad (M) d Divn.Hyd.R.R.D ist 397 23.11.2011/ 2011-12 CC Road in Kotwalguda (V) SC Kotwalguda Shamshaba 300000 EE, PRI 225000 75000 300000 Completed 09.09.2012 Shamshabad (M) d Divn.Hyd.R.R.D ist 398 23.11.2011/ 2011-12 CC Road in Malkaram (V) SC Malkaram Shamshaba 400000 EE, PRI 300000 97673 397673 Completed 09.09.2012 Shamshabad (M) d Divn.Hyd.R.R.D ist 399 23.11.2011/ 2011-12 CC Road in Ramanjapur (V) SC Ramanjapur Shamshaba 300000 EE, PRI 225000 225000 Progress 09.09.2012 Shamshabad (M) d Divn.Hyd.R.R.D ist 400 23.11.2011/ 2011-12 CC Road in Shankarapuram SC Shankarapura Shamshaba 300000 EE, PRI 225000 62784 287784 Completed 09.09.2012 (V) Shamshabad (M) m d Divn.Hyd.R.R.D ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 401 23.11.2011/ 2011-12 CC Road in Muchintala (V) SC Muchintala Shamshaba 300000 EE, PRI 225000 225000 Progress 09.09.2012 Shamshabad (M) d Divn.Hyd.R.R.D ist 402 23.11.2011/ 2011-12 Laying of CC Road in SC Dargakhalishk Rajendrana 600000 EE, PRI 450000 146260 596260 Completed 09.09.2012 han gar Divn.Hyd.R.R.D ist 403 23.11.2011/ 2011-12 Laying of CC Road in SC Manikonda Rajendrana 500000 EE, PRI 375000 125000 500000 Completed 09.09.2012 gar Divn.Hyd.R.R.D ist 404 23.11.2011/ 2011-12 Laying of CC Road in SC Narsingi Rajendrana 700000 EE, PRI 525000 175000 700000 Completed 09.09.2012 gar Divn.Hyd.R.R.D ist 405 23.11.2011/ 2011-12 Laying of CC Road in SC Himayathnaga Rajendrana 700000 EE, PRI 525000 175000 700000 Completed 09.09.2012 r gar Divn.Hyd.R.R.D ist 406 23.11.2011/ 2011-12 Laying of CC Road in SC Puppalguda Rajendrana 500000 EE, PRI 375000 375000 Progress 09.09.2012 gar Divn.Hyd.R.R.D ist 407 23.11.2011/ 2011-12 CC Road in Gurramguda (V) SC Gurramguda Saroornaga 400000 EE, PRI 300000 99493 399493 Completed 09.09.2012 Saroornagar (M) r Divn.Hyd.R.R.D ist 408 23.11.2011/ 2011-12 CC Road in Almasguda (V) SC Almasguda Saroornaga 400000 EE, PRI 300000 99589 399589 Completed 09.09.2012 Saroornagar (M) r Divn.Hyd.R.R.D ist 409 23.11.2011/ 2011-12 CC Road Bandangpet (V) SC Bandangpet Saroornaga 400000 EE, PRI 300000 99032 399032 Completed 09.09.2012 Saroornagar (M) r Divn.Hyd.R.R.D ist 410 23.11.2011/ 2011-12 CC Road in Nadergul (V) SC Nadergul Saroornaga 400000 EE, PRI 300000 99564 399564 Completed 09.09.2012 Saroornagar (M) r Divn.Hyd.R.R.D ist 411 23.11.2011/ 2011-12 CC Road in Kurmalguda (V) SC Kurmalguda Saroornaga 300000 EE, PRI 225000 74892 299892 Completed 09.09.2012 Saroornagar (M) r Divn.Hyd.R.R.D ist 412 23.11.2011/ 2011-12 CC Road in Kothapet (V) SC Kothapet Saroornaga 500000 EE, PRI 375000 375000 Progress 09.09.2012 Saroornagar (M) r Divn.Hyd.R.R.D ist 413 23.11.2011/ 2011-12 CC Road in Pahadisharief SC Pahadisharief Saroornaga 500000 EE, PRI 375000 123047 498047 Completed 09.09.2012 (V) Saroornagar (M) r Divn.Hyd.R.R.D ist 414 23.11.2011/ 2011-12 CC Road in Jelpally (V) SC Jelpally Saroornaga 300000 EE, PRI 225000 74757 299757 Completed 09.09.2012 Saroornagar (M) r Divn.Hyd.R.R.D ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 415 23.11.2011/ 2011-12 Laying of CC Road in SC Kojavanampall Nawabpet 200000 MPDO, 150000 150000 Progress 09.09.2012 Kojavanampally (V) y Nawabpet Nawabpet (M) 416 23.11.2011/ 2011-12 Laying of CC Road in ST Chinchalpet Nawabpet 200000 MPDO, 150000 50000 200000 Completed 09.09.2012 Chinchalpet (V) Nawabpet Nawabpet (M) 417 23.11.2011/ 2011-12 Laying of CC Road in SC Yellakonda Nawabpet 200000 MPDO, 150000 50000 200000 Completed 09.09.2012 Yellakonda (V) Nawabpet Nawabpet (M) 418 23.11.2011/ 2011-12 Laying of CC Road in ST Ekmamidi Nawabpet 200000 MPDO, 150000 50000 200000 Completed 09.09.2012 Ekmamidi (V) Nawabpet (M) Nawabpet

419 23.11.2011/ 2011-12 Laying of CC Road in SC Madireddypall Nawabpet 200000 MPDO, 150000 50000 200000 Completed 09.09.2012 Madireddypally (V) y Nawabpet Nawabpet (M) 420 23.11.2011/ 2011-12 Laying of CC Road in ST Ekmamidi Nawabpet 200000 MPDO, 150000 50000 200000 Completed 09.09.2012 Ekmamidi (V) Nawabpet (M) Nawabpet

421 23.11.2011/ 2011-12 Laying of CC Road in SC Nawabpet Nawabpet 200000 MPDO, 150000 50000 200000 Completed 09.09.2012 Nawabpet (V) & (M) Nawabpet 422 23.11.2011/ 2011-12 Laying CC Road in ST Menapally Nawabpet 100000 MPDO, 75000 25000 100000 Completed 09.09.2012 Menapally Kalan (V) Kalan Nawabpet Nawabpet (M) 423 23.11.2011/ 2011-12 Laying of CC Road in SC Kandukur Kandukur 200000 EE, PRI 150000 43749 193749 Completed 09.09.2012 Kandukur (V&M) Divn.Hyd.R.R.D ist 424 20.01.2012 2011-12 Installation of High Mast GEN Chakalpally Kulkacherla 70000 EE, PRI 52500 17500 70000 Completed Lights Chakalpally (V) Divn.Vikarabad Kulkacherla (M) 425 20.01.2012 2011-12 Installation of High Mast GEN Kothapally Kulkacherla 70000 EE, PRI 52500 17500 70000 Completed Lights Kothapally (V) Divn.Vikarabad Kulkacherla (M) 426 20.01.2012 2011-12 Installation of High Mast GEN Kanmankalva Kulkacherla 70000 EE, PRI 52500 17500 70000 Completed Lights Kanmakalva (V) Divn.Vikarabad Kulkacherla (M) 427 20.01.2012 2011-12 Installation of High Mast GEN Bogarampally Kulkacherla 70000 EE, PRI 52500 17500 70000 Completed Lights Bogarampally (V) Divn.Vikarabad Kulkacherla (M) 428 20.01.2012 2011-12 Installation of High Mast ST Kothapally Kulkacherla 70000 EE, PRI 52500 17500 70000 Completed Lights Kothapally Tanda (V) Tanda Divn.Vikarabad Kulkacherla (M) WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 429 20.01.2012 2011-12 Installation of (2) High Mast ST Advenkatapur- Kulkacherla 140000 EE, PRI 105000 35000 140000 Completed Lights Advenkatapur- 2 2 Tandas Divn.Vikarabad Tandas (V) Kulkacherla (M)

430 20.01.2012 2011-12 Installation of High Mast GEN Bandelkacherl Kulkacherla 70000 EE, PRI 52500 17500 70000 Completed Lights Bandelkacherla (V) a Divn.Vikarabad Kulkacherla (M) 431 20.01.2012 2011-12 Installation of High Mast GEN Bomreddypally Kulkacherla 70000 EE, PRI 52500 17500 70000 Completed Lights Bomreddypally (V) Divn.Vikarabad Kulkacherla (M) 432 20.01.2012 2011-12 Installation of High Mast GEN Peerampally Kulkacherla 70000 EE, PRI 52500 17500 70000 Completed Lights Peerampally (V) Divn.Vikarabad Kulkacherla (M) 433 20.01.2012 2011-12 Installation of High Mast GEN Ananthreddyp Doma 70000 EE, PRI 52500 17500 70000 Completed Lights Ananthreddypally(V), ally Divn.Vikarabad Doma (M)

434 20.01.2012 2011-12 Installation of High Mast GEN Kondayapally Doma 70000 EE, PRI 52500 17500 70000 Completed Lights Kondayapally(V), Divn.Vikarabad Doma (M) 435 20.01.2012 2011-12 Installation of High Mast GEN Ganjipally Doma 70000 EE, PRI 52500 17500 70000 Completed Lights Ganjipally(V), Doma Divn.Vikarabad (M) 436 20.01.2012 2011-12 Installation of High Mast GEN Rakonda Doma 70000 EE, PRI 52500 17500 70000 Completed Lights Rakonda(V), Doma Divn.Vikarabad (M) 437 20.01.2012 2011-12 Installation of High Mast GEN Mylaram Doma 70000 EE, PRI 52500 17500 70000 Completed Lights Mylaram(V), Doma Divn.Vikarabad (M) 438 20.01.2012 2011-12 Installation of High Mast GEN Deshaipally Gandeed 70000 EE, PRI 52500 17500 70000 Completed Lights Deshaipally(V), Divn.Vikarabad Gandeed (M) 439 20.01.2012 2011-12 Installation of (2) High Mast GEN Nancherla Gandeed 140000 EE, PRI 105000 17500 122500 Completed Lights Nancherla(V), Divn.Vikarabad Gandeed (M) 440 20.01.2012 2011-12 Installation of (2) High Mast GEN Gandweed Gandeed 140000 EE, PRI 105000 17500 122500 Completed Lights Gandweed(V), Divn.Vikarabad Gandeed (M) 441 20.01.2012 2011-12 Installation of High Mast GEN Balsurgonda Gandeed 70000 EE, PRI 52500 17500 70000 Completed Lights Balsurgonda(V), Divn.Vikarabad Gandeed (M) WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 442 20.01.2012 2011-12 Installation of High Mast GEN Pagdyal Gandeed 70000 EE, PRI 52500 17500 70000 Completed Lights Pagdyal(V), Gandeed Divn.Vikarabad (M) 443 20.01.2012 2011-12 Installation of High Mast GEN Kaplapur Gandeed 70000 EE, PRI 52500 17500 70000 Completed Lights Kaplapur(V), Divn.Vikarabad Gandeed (M) 444 20.01.2012 2011-12 Installation of High Mast GEN Janampally Gandeed 70000 EE, PRI 52500 17500 70000 Completed Lights Janampally(V), Divn.Vikarabad Gandeed (M) 445 20.01.2012 2011-12 Installation of High Mast GEN Jakkalapally Gandeed 70000 EE, PRI 52500 17500 70000 Completed Lights Jakkalapally(V), Divn.Vikarabad Gandeed (M) 446 20.01.2012 2011-12 Installation of High Mast GEN Komireddypall Gandeed 70000 EE, PRI 52500 17500 70000 Completed Lights Komreddypally(V), y Divn.Vikarabad Gandeed (M) 447 20.01.2012 2011-12 Installation of High Mast GEN Pudigurthi Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Pudigurthi (V) Pudur Divn.Vikarabad (M) 448 20.01.2012 2011-12 Installation of High Mast GEN Kandlapally Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Kandlapally (V) Pudur Divn.Vikarabad (M) 449 20.01.2012 2011-12 Installation of High Mast GEN Gongupally Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Gongupally (V) Pudur Divn.Vikarabad (M) 450 20.01.2012 2011-12 Installation of High Mast GEN Chenchupally Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Chenchupally (V) Divn.Vikarabad Pudur (M) 451 20.01.2012 2011-12 Installation of High Mast GEN Yenkepally Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Yenkepally (V) Pudur Divn.Vikarabad (M) 452 20.01.2012 2011-12 Installation of High Mast GEN Medekonda Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Medekonda (V) Pudur Divn.Vikarabad (M) 453 20.01.2012 2011-12 Installation of High Mast GEN Chinthapally Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Chinthapally (V) Divn.Vikarabad Pudur (M) 454 20.01.2012 2011-12 Installation of High Mast GEN Peddammenth Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Peddammenthal (V) al Divn.Vikarabad Pudur (M) 455 20.01.2012 2011-12 Installation of High Mast GEN Pudur Puduru 70000 EE, PRI 52500 17500 70000 Completed Lights Pudur (V) Pudur (M) Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 456 20.01.2012 2011-12 Installation of High Mast GEN Barkathpally Pargi 70000 EE, PRI 52500 17500 70000 Completed Lights Barkatpally (V) Pargi Divn.Vikarabad (M) 457 20.01.2012 2011-12 Installation of High Mast GEN Ibrahimpur Pargi 70000 EE, PRI 52500 17500 70000 Completed Lights Ibrahimpur (V), Pargi Divn.Vikarabad (M) 458 20.01.2012 2011-12 Installation of High Mast GEN Thondapally Pargi 70000 EE, PRI 52500 17500 70000 Completed Lights Tondapally (V), Pargi Divn.Vikarabad (M) 459 20.01.2012 2011-12 Installation of High Mast GEN Sayedpally Pargi 70000 EE, PRI 52500 17500 70000 Completed Lights Syedpally (V), Pargi Divn.Vikarabad (M) 460 20.01.2012 2011-12 Installation of High Mast GEN Raghavapur Pargi 70000 EE, PRI 52500 17500 70000 Completed Lights Raghavapur (V) Pargi Divn.Vikarabad (M) 461 26.02.2012 2011-12 Providing Borewell with GEN Raviryal Maheshwar 125000 EE, RWS, 125000 125000 Completed Pump set near Gayathri am Hyderabad Temple, Raviryal Village, Maheshwaram Mandal, R.R.Dist., 462 16.05.2012 2012-13 Government Junior College, GEN Vikarabad Vikarabad 312000 Dist.Vocational 312000 312000 Completed Urdu Medium, Vikarabad, Education R.R.Dist., Officer, RR.Dist

463 16.05.2012 2012-13 Government Junior College, GEN Vikarabad Vikarabad 312000 Dist.Vocational 312000 312000 Completed Telugu Medium, Vikarabad, Education R.R.Dist., Officer, RR.Dist

464 04.08.2012 2012-13 High Mast lights at Godam GEN Godam Guda Dharur 110000 EE, PRI 82500 27500 110000 Completed Guda (V) (2.Nos) Dharur (M) Divn.Vikarabad RR Dist. 465 04.08.2012 2012-13 High Mast lights at GEN Jaidupally Dharur 110000 EE, PRI 82500 27500 110000 Completed Jaidupally (V) Dharur (M) RR Divn.Vikarabad Dist.(2Nos) 466 04.08.2012 2012-13 High Mast lights at Momin GEN Momin Kurdu Dharur 55000 EE, PRI 41250 13750 55000 Completed Kurdu (V)Dharur (M) RR Divn.Vikarabad Dist. 467 04.08.2012 2012-13 High Mast lights at Rajapur GEN Rajapur Dharur 55000 EE, PRI 41250 13750 55000 Completed (V)Dharur (M) RR Dist. Divn.Vikarabad 468 04.08.2012 2012-13 High Mast lights at GEN Nagaram Dharur 110000 EE, PRI 82500 27500 110000 Completed Nagaram(V) (2.Nos) Dharur Divn.Vikarabad (M) RR Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 469 04.08.2012 2012-13 High Mast lights at Kummari GEN Kummari Pally Dharur 55000 EE, PRI 41250 13750 55000 Completed Pally (V)Dharur (M) RR Dist. Divn.Vikarabad

470 04.08.2012 2012-13 High Mast lights at Ampally GEN Ampally Dharur 55000 EE, PRI 41250 13750 55000 Completed (V) Dharur (M) RR Dist. Divn.Vikarabad 471 04.08.2012 2012-13 High Mast lights at Ampally ST Ampally Dharur 55000 EE, PRI 41250 13750 55000 Completed Thanda Dharur (M) RR Dist. Thanda Divn.Vikarabad

472 04.08.2012 2012-13 High Mast lights at P.C.M ST P.C.M Thanda Dharur 55000 EE, PRI 41250 13750 55000 Completed Thanda Dharur (M) RR Dist. Divn.Vikarabad

473 04.08.2012 2012-13 High Mast lights at ST Jeedigadda Dharur 55000 EE, PRI 41250 13750 55000 Completed Jeedigadda Thanda, Dharur Thanda Divn.Vikarabad (M) RR Dist. 474 04.08.2012 2012-13 High Mast lights at GEN Sharigadda Dharur 55000 EE, PRI 41250 13750 55000 Completed Sharigadda (V)Dharur (M) Divn.Vikarabad RR Dist. 475 04.08.2012 2012-13 High Mast lights at Urenti ST Urenti Thanda Dharur 55000 EE, PRI 41250 13750 55000 Completed Thanda (V)Dharur (M) RR Divn.Vikarabad Dist. 476 04.08.2012 2012-13 High Mast lights at Bikya ST Bikya Nayak Dharur 55000 EE, PRI 41250 13750 55000 Completed Nayak Thanda(V)Dharur (M) Thanda Divn.Vikarabad RR Dist. 477 04.08.2012 2012-13 High Mast lights at Dornal GEN Dornal Dharur 110000 EE, PRI 82500 27500 110000 Completed (V)(2.Nos)Dharur (M) RR Divn.Vikarabad Dist. 478 04.08.2012 2012-13 High Mast lights at Dornal ST Dornal Dharur 55000 EE, PRI 41250 13750 55000 Completed Thanda (V)Dharur (M) RR Thanda Divn.Vikarabad Dist. 479 04.08.2012 2012-13 High Mast lights at ST D.K.Thanda Dharur 55000 EE, PRI 41250 13750 55000 Completed D.K.Thanda (V)Dharur (M) Divn.Vikarabad RR Dist. 480 04.08.2012 2012-13 High Mast lights at GEN Haridaspally Dharur 55000 EE, PRI 41250 13750 55000 Completed Haridaspally (V)Dharur (M) Divn.Vikarabad RR Dist. 481 04.08.2012 2012-13 High Mast lights at Kotha ST Kotha Dharur 55000 EE, PRI 41250 13750 55000 Completed Thanda(Mailaram) Thanda(Mailar Divn.Vikarabad (V)Dharur (M) RR Dist. am) 482 04.08.2012 2012-13 High Mast lights at Ooru ST Ooru Mandari Dharur 55000 EE, PRI 41250 13750 55000 Completed Mandari Thanda (Mailaram) Thanda Divn.Vikarabad (V)Dharur (M) RR Dist. (Mailaram) WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 483 04.08.2012 2012-13 High Mast lights at GEN Kukkinda Dharur 55000 EE, PRI 41250 13750 55000 Completed Kukkinda(V)Dharur (M) RR Divn.Vikarabad Dist. 484 04.08.2012 2012-13 High Mast lights at Ausupally GEN Avusupally Dharur 55000 EE, PRI 41250 13750 55000 Completed (V)Dharur (M) RR Dist. Divn.Vikarabad

485 04.08.2012 2012-13 High Mast lights at GEN Gaddamidi Dharur 110000 EE, PRI 82500 27500 110000 Completed Gaddamidi Gangaram Gangaram Divn.Vikarabad (V)(2.Nos)Dharur (M) RR Dist. 486 04.08.2012 2012-13 High Mast lights at GEN Rudraram Dharur 55000 EE, PRI 41250 13750 55000 Completed Rudraram(V)Dharur (M) RR Divn.Vikarabad Dist. 487 04.08.2012 2012-13 High Mast lights at GEN Dhramapur Dharur 55000 EE, PRI 41250 13750 55000 Completed Dhramapur (V)Dharur (M) Divn.Vikarabad RR Dist. 488 04.08.2012 2012-13 High Mast lights at Allapur GEN Allapur Dharur 55000 EE, PRI 41250 13750 55000 Completed (V)Dharur (M) RR Dist. Divn.Vikarabad 489 04.08.2012 2012-13 High Mast lights at Kerelly GEN Kerelly Dharur 110000 EE, PRI 82500 27500 110000 Completed (V) (2.Nos)Dharur (M) RR Divn.Vikarabad Dist. 490 04.08.2012 2012-13 High Mast lights at Dharur GEN Dharur Dharur 110000 EE, PRI 82500 27500 110000 Completed (V)& (M)(2.Nos) RR Dist. Divn.Vikarabad 491 04.08.2012 2012-13 High Mast lights at Kondapur GEN Kondapur Dharur 55000 EE, PRI 41250 13750 55000 Completed (V)Dharur (M) RR Dist. Divn.Vikarabad

492 04.08.2012 2012-13 High Mast lights at Munnuru GEN Munnuru Dharur 55000 EE, PRI 41250 13750 55000 Completed Somaram (V)Dharur (M) RR Somaram Divn.Vikarabad Dist. 493 04.08.2012 2012-13 High Mast lights at Allipur GEN Allipur Dharur 55000 EE, PRI 41250 13750 55000 Completed (V)Dharur (M) RR Dist. Divn.Vikarabad 494 04.08.2012 2012-13 High Mast lights at Ebbanur GEN Ebbanur Dharur 55000 EE, PRI 41250 13750 55000 Completed (V)Dharur (M) RR Dist. Divn.Vikarabad

495 04.08.2012 2012-13 High Mast lights at GEN Kacharam Dharur 55000 EE, PRI 41250 13750 55000 Completed Kacharam (V)Dharur (M) RR Divn.Vikarabad Dist. 496 04.08.2012 2012-13 High Mast lights at GEN Bacharam Dharur 55000 EE, PRI 41250 13750 55000 Completed Bacharam (V)Dharur (M) RR Divn.Vikarabad Dist. 497 04.08.2012 2012-13 High Mast lights at Kamala ST Kamala Naik Dharur 55000 EE, PRI 41250 13750 55000 Completed Naik Thanda (V)Dharur (M) Thanda Divn.Vikarabad RR Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 498 04.08.2012 2012-13 High Mast lights at Narsapur GEN Narsapur Dharur 55000 EE, PRI 41250 13750 55000 Completed (V)Dharur (M) RR Dist. Divn.Vikarabad

499 04.08.2012 2012-13 High Mast lights at ST Thimmanagar Dharur 55000 EE, PRI 41250 13750 55000 Completed Thimmanagar Thanda Thanda Divn.Vikarabad (V)Dharur (M) RR Dist. 500 04.08.2012 2012-13 High Mast lights at ST Laxminagar Dharur 55000 EE, PRI 41250 13750 55000 Completed Laxminagar Thanda Thanda Divn.Vikarabad (V)Dharur (M) RR Dist. 501 04.08.2012 2012-13 High Mast lights at Station GEN Station Dharur Dharur 55000 EE, PRI 41250 13750 55000 Completed Dharur (V)Dharur (M) RR Divn.Vikarabad Dist. 502 04.08.2012 2012-13 High Mast lights at Rampur ST Rampur Dharur 55000 EE, PRI 41250 13750 55000 Completed Pedda Thanda (V)Dharur Pedda Thanda Divn.Vikarabad (M) RR Dist. 503 04.08.2012 2012-13 High Mast lights at Rampur ST Rampur China Dharur 55000 EE, PRI 41250 13750 55000 Completed China Thanda (V)Dharur (M) Thanda Divn.Vikarabad RR Dist. 504 04.08.2012 2012-13 High Mast lights at GEN Nagaamunder Dharur 55000 EE, PRI 41250 13750 55000 Completed Nagaamunder (V)Dharur (M) Divn.Vikarabad RR Dist. 505 04.08.2012 2012-13 High Mast lights at GEN Bantwaram Bantwaram 110000 EE, PRI 82500 27500 110000 Completed Bantwaram (V) & (M)(2.Nos) Divn.Vikarabad RR Dist 506 04.08.2012 2012-13 High Mast lights at GEN Yacharam Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Yacharam (V) Bantwaram Divn.Vikarabad (M) RR Dist. 507 04.08.2012 2012-13 High Mast lights at GEN Nurullapur Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Nurullapur (V) Bantwaram Divn.Vikarabad (M) RR Dist. 508 04.08.2012 2012-13 High Mast lights at GEN Sulthanpur Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Sulthanpur (V) Bantwaram Divn.Vikarabad (M) RR Dist. 509 04.08.2012 2012-13 High Mast lights at GEN Sulthanpur Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Salbathapur (V) Bantwaram Divn.Vikarabad (M) RR Dist. 510 04.08.2012 2012-13 High Mast lights at Rompally GEN Rompally Bantwaram 55000 EE, PRI 41250 13750 55000 Completed (V) Bantwaram (M) RR Dist. Divn.Vikarabad

511 04.08.2012 2012-13 High Mast lights at GEN Thorumamidi Bantwaram 110000 EE, PRI 82500 27500 110000 Completed Thorumamidi (V) (2.No’s) Divn.Vikarabad Bantwaram (M) RR Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 512 04.08.2012 2012-13 High Mast lights at GEN Baswapur Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Baswapur (V) Bantwaram Divn.Vikarabad (M) RR Dist. 513 04.08.2012 2012-13 High Mast lights at Enkepally GEN Enkepally Bantwaram 55000 EE, PRI 41250 13750 55000 Completed (V) Bantwaram (M) RR Dist. Divn.Vikarabad

514 04.08.2012 2012-13 High Mast lights at Rampur GEN Rampur Bantwaram 55000 EE, PRI 41250 13750 55000 Completed (V) Bantwaram (M) RR Dist. Divn.Vikarabad

515 04.08.2012 2012-13 High Mast lights at GEN Kankanalapall Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Kankanalapally (V) y Divn.Vikarabad Bantwaram (M) RR Dist. 516 04.08.2012 2012-13 High Mast lights at ST Malshettipally Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Malshettipally Thanda (V) Thanda Divn.Vikarabad Bantwaram (M) RR Dist. 517 04.08.2012 2012-13 High Mast lights at Jinnaram GEN Jinnaram Bantwaram 55000 EE, PRI 41250 13750 55000 Completed (V) Bantwaram (M) RR Dist. Divn.Vikarabad

518 04.08.2012 2012-13 High Mast lights at Birol (V) GEN Birol Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Bantwaram (M) RR Dist. Divn.Vikarabad 519 04.08.2012 2012-13 High Mast lights at GEN Nagasanpally Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Nagasanpally (V) Divn.Vikarabad Bantwaram (M) RR Dist. 520 04.08.2012 2012-13 High Mast lights at ST Nagasanpally Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Nagasanpally Thanda (V) Thanda Divn.Vikarabad Bantwaram (M) RR Dist. 521 04.08.2012 2012-13 High Mast lights at GEN Mothkupally Bantwaram 110000 EE, PRI 82500 27500 110000 Completed Mothkupally (V) (2Nos) Divn.Vikarabad Bantwaram (M) RR Dist. 522 04.08.2012 2012-13 High Mast lights at GEN Mangaraspally Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Mangaraspally (V) Divn.Vikarabad Bantwaram (M) RR Dist. 523 04.08.2012 2012-13 High Mast lights at GEN Nagwaram Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Nagwaram (V) Bantwaram Divn.Vikarabad (M) RR Dist. 524 04.08.2012 2012-13 High Mast lights at ST Nagwaram Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Nagwaram Thanda (V) Thanda Divn.Vikarabad Bantwaram (M) RR Dist. 525 04.08.2012 2012-13 High Mast lights at Barwad ST Barwad Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Bantwaram (M) Thanda Divn.Vikarabad RR Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 526 04.08.2012 2012-13 High Mast lights at Madgul ST Madgul Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Bantwaram (M) Thanda Divn.Vikarabad RR Dist. 527 04.08.2012 2012-13 High Mast lights at Mala GEN Mala Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Somaram (V) Bantwaram Somaram Divn.Vikarabad (M) RR Dist. 528 04.08.2012 2012-13 High Mast lights at GEN Madhavapur Bantwaram 55000 EE, PRI 41250 13750 55000 Completed Madhavapur (V) Bantwaram Divn.Vikarabad (M) RR Dist. 529 04.08.2012 2012-13 High Mast lights at GEN Bopnaram Bantwaram 110000 EE, PRI 82500 27500 110000 Completed Bopnaram (V)(2.Nos) Divn.Vikarabad Bantwaram (M) RR Dist. 530 04.08.2012 2012-13 High Mast lights at Patha GEN Patha Mominpet 55000 EE, PRI 41250 13750 55000 Completed Kolkonda(V) Mominpet (M) Kolkunde Divn.Vikarabad RR Dist. 531 04.08.2012 2012-13 High Mast lights at Bal GEN Balreddyguda Mominpet 55000 EE, PRI 41250 13750 55000 Completed Reddy Guda (V) Mominpet Divn.Vikarabad (M) RR Dist. 532 04.08.2012 2012-13 High Mast lights at Kesaram GEN Kesaram Mominpet 110000 EE, PRI 82500 27500 110000 Completed (V) (2.Nos)Mominpet (M) RR Divn.Vikarabad Dist.

533 04.08.2012 2012-13 High Mast lights at Mominpet GEN Mominpet Mominpet 165000 EE, PRI 123750 41250 165000 Completed (V) &(M) (3.Nos) RR Dist. Divn.Vikarabad

534 04.08.2012 2012-13 High Mast lights at GEN Chendrayaupa Mominpet 55000 EE, PRI 41250 13750 55000 Completed Chendrayaupally (V) lly Divn.Vikarabad Mominpet (M) RR Dist. 535 04.08.2012 2012-13 High Mast lights at Anradi GEN Anradi Kurdu Mominpet 55000 EE, PRI 41250 13750 55000 Completed Kurdu (V) Mominpet (M) RR Divn.Vikarabad Dist. 536 04.08.2012 2012-13 High Mast lights at Cheenal GEN Cheenal Mominpet 55000 EE, PRI 41250 13750 55000 Completed Dhary (V) Mominpet (M) RR Dhary Divn.Vikarabad Dist. 537 04.08.2012 2012-13 High Mast lights at GEN Devarawpally Mominpet 110000 EE, PRI 82500 27500 110000 Completed Devarawpally (V) (2.Nos) Divn.Vikarabad Mominpet (M) RR Dist. 538 04.08.2012 2012-13 High Mast lights at Makta ST Makta Thanda Mominpet 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Mominpet (M) Divn.Vikarabad RR Dist. 539 04.08.2012 2012-13 High Mast lights at ST Suddodka Mominpet 55000 EE, PRI 41250 13750 55000 Completed Suddodka Thanda (V) Thanda Divn.Vikarabad Mominpet (M) RR Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 540 04.08.2012 2012-13 High Mast lights at Madigi ST Madigi Thanda Mominpet 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Mominpet (M) Divn.Vikarabad RR Dist. 541 04.08.2012 2012-13 High Mast lights at Meka ST Meka Mominpet 55000 EE, PRI 41250 13750 55000 Completed Vanampally Thanda (V) Vanampally Divn.Vikarabad Mominpet (M) RR Dist. Thanda 542 04.08.2012 2012-13 High Mast lights at Mitya ST Mitya Naik Mominpet 55000 EE, PRI 41250 13750 55000 Completed Naik Thanda (V) Mominpet Thanda Divn.Vikarabad (M) RR Dist. 543 04.08.2012 2012-13 High Mast lights at Somla ST Somla Naik Mominpet 55000 EE, PRI 41250 13750 55000 Completed Naik Thanda (V) Mominpet Thanda Divn.Vikarabad (M) RR Dist. 544 04.08.2012 2012-13 High Mast lights at Guttamidi ST Guttamidi Mominpet 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Mominpet (M) Thanda Divn.Vikarabad RR Dist. 545 04.08.2012 2012-13 High Mast lights at Malla GEN Malla Reddy Mominpet 55000 EE, PRI 41250 13750 55000 Completed Reddy Guda (V) Mominpet Guda Divn.Vikarabad (M) RR Dist. 546 04.08.2012 2012-13 High Mast lights at GEN Burugupally Mominpet 55000 EE, PRI 41250 13750 55000 Completed Burugupally (V) Mominpet Divn.Vikarabad (M) RR Dist. 547 04.08.2012 2012-13 High Mast lights at Kaslabad ST Kaslabad Mominpet 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Mominpet (M) Thanda Divn.Vikarabad RR Dist. 548 04.08.2012 2012-13 High Mast lights at ST Pallegutta Mominpet 55000 EE, PRI 41250 13750 55000 Completed Pallegutta Thanda (V) Thanda Divn.Vikarabad Mominpet (M) RR Dist. 549 04.08.2012 2012-13 High Mast lights at Mominpet GEN Mominpet Mominpet 55000 EE, PRI 41250 13750 55000 Completed Kikkareedy Bav (V) Kikkareedy Divn.Vikarabad Mominpet (M) RR Dist. Bav 550 04.08.2012 2012-13 High Mast lights at Lalsingh ST Lalsingh Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Vikarabad (M) Thanda Divn.Vikarabad RR Dist. 551 04.08.2012 2012-13 High Mast lights at GEN Dhannaram Vikarabad 110000 EE, PRI 82500 27500 110000 Completed Dhannaram (V) (2.Nos) Divn.Vikarabad Vikarabad (M) RR Dist. 552 04.08.2012 2012-13 High Mast lights at GEN Kamareddygu Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Guda (V) da Divn.Vikarabad Vikarabad (M) RR Dist. 553 04.08.2012 2012-13 High Mast lights at ST Dhannaram Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Dhannaram Thanda (V) Thanda Divn.Vikarabad Vikarabad (M) RR Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 554 04.08.2012 2012-13 High Mast lights at GEN Gudupally Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Gudupally (V) Vikarabad (M) Divn.Vikarabad RR Dist. 555 04.08.2012 2012-13 High Mast lights at ST Burugtupally Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Burugtupally Thanda (V) Thanda Divn.Vikarabad Vikarabad (M) RR Dist. 556 04.08.2012 2012-13 High Mast lights at GEN Girigitpally Vikarabad 110000 EE, PRI 82500 27500 110000 Completed Girigitpally (V) (2.Nos) Divn.Vikarabad Vikarabad (M) RR Dist. 557 04.08.2012 2012-13 High Mast lights at ST Jambapur Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Jambapur Thanda (V) Thanda Divn.Vikarabad Vikarabad (M) RR Dist. 558 04.08.2012 2012-13 High Mast lights at GEN Madanpally Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Madanpally (V) Vikarabad Divn.Vikarabad (M) RR Dist. 559 04.08.2012 2012-13 High Mast lights at GEN Chenchupally Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Chenchupally (V) Vikarabad Divn.Vikarabad (M) RR Dist. 560 04.08.2012 2012-13 High Mast lights at GEN Yerravally Vikarabad 110000 EE, PRI 82500 27500 110000 Completed Yerravally (V) (2.Nos) Divn.Vikarabad Vikarabad (M) RR Dist. 561 04.08.2012 2012-13 High Mast lights at GEN Chintthala Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Chintthala Boda (V) Boda Divn.Vikarabad Vikarabad (M) RR Dist. 562 04.08.2012 2012-13 High Mast lights at Pathur GEN Pathur Vikarabad 55000 EE, PRI 41250 13750 55000 Completed (V) Vikarabad (M) RR Dist. Divn.Vikarabad 563 04.08.2012 2012-13 High Mast lights at Madgul ST Madgul Vikarabad 55000 EE, PRI 41250 13750 55000 Completed Chinthapally Thanda (V) Chinthapally Divn.Vikarabad Vikarabad (M) RR Dist. Thanda 564 04.08.2012 2012-13 High Mast lights at Patloor GEN Patloor Marpally 55000 EE, PRI 41250 13750 55000 Completed (V) Marpally (M) RR Dist. Divn.Vikarabad 565 04.08.2012 2012-13 High Mast lights at GEN Kotmarpally Marpally 55000 EE, PRI 41250 13750 55000 Completed Kotmarpally (V) Marpally (M) Divn.Vikarabad RR Dist. 566 04.08.2012 2012-13 High Mast lights at GEN Buchupally Marpally 55000 EE, PRI 41250 13750 55000 Completed Buchupally (V) Marpally (M) Divn.Vikarabad RR Dist. 567 04.08.2012 2012-13 High Mast lights at ST Damstarpur Marpally 55000 EE, PRI 41250 13750 55000 Completed Damstarpur Thanda (V) Thanda Divn.Vikarabad Marpally (M) RR Dist. 568 04.08.2012 2012-13 High Mast lights at Narsapur GEN Narsapur Marpally 55000 EE, PRI 41250 13750 55000 Completed (V) Marpally (M) RR Dist. Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 569 04.08.2012 2012-13 High Mast lights at Narsapur ST Narsapur Marpally 55000 EE, PRI 41250 13750 55000 Completed China Thanda (V) Marpally China Thanda Divn.Vikarabad (M) RR Dist. 570 04.08.2012 2012-13 High Mast lights at Narsapur ST Narsapur Marpally 55000 EE, PRI 41250 13750 55000 Completed Pedda Thanda (V) Marpally Pedda Thanda Divn.Vikarabad (M) RR Dist. 571 04.08.2012 2012-13 High Mast lights at GEN Pilligundla Marpally 110000 EE, PRI 82500 27500 110000 Completed Pilligundla (V) (2.Nos) Divn.Vikarabad Marpally (M) RR Dist. 572 04.08.2012 2012-13 High Mast lights at Gundla GEN Gundla Marpally 55000 EE, PRI 41250 13750 55000 Completed Marpally (V) Marpally (M) RR Marpally Divn.Vikarabad Dist. 573 04.08.2012 2012-13 High Mast lights at GEN Thummalapall Marpally 110000 EE, PRI 82500 27500 110000 Completed Thummalapally (V) (2.Nos) y Divn.Vikarabad Marpally (M) RR Dist. 574 04.08.2012 2012-13 High Mast lights at GEN Dargulapally Marpally 55000 EE, PRI 41250 13750 55000 Completed Dargulapally (V) Marpally Divn.Vikarabad (M) RR Dist. 575 04.08.2012 2012-13 High Mast lights at Bikal (V) GEN Bikal Marpally 110000 EE, PRI 82500 27500 110000 Completed (2.Nos) Marpally (M) RR Divn.Vikarabad Dist. 576 04.08.2012 2012-13 High Mast lights at GEN Mallikarjunagir Marpally 55000 EE, PRI 41250 13750 55000 Completed Mallikarjunagiri (V) Marpally i Divn.Vikarabad (M) RR Dist. 577 04.08.2012 2012-13 High Mast lights at Marpally ST Marpally Marpally 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Marpally (M) RR Thanda Divn.Vikarabad Dist. 578 04.08.2012 2012-13 High Mast lights at Patloor ST Patloor Marpally 55000 EE, PRI 41250 13750 55000 Completed Thanda (V) Marpally (M) RR Thanda Divn.Vikarabad Dist. 579 04.08.2012 2012-13 High Mast lights at GEN Kudugunta Marpally 55000 EE, PRI 41250 13750 55000 Completed Kudugunta (V) Marpally (M) Divn.Vikarabad RR Dist. 580 04.08.2012 2012-13 High Mast lights at GEN Thimmapur Marpally 55000 EE, PRI 41250 13750 55000 Completed Thimmapur (V) Marpally (M) Divn.Vikarabad RR Dist. 581 04.08.2012 2012-13 High Mast lights at Sirpuram GEN Sirpuram Marpally 110000 EE, PRI 82500 27500 110000 Completed (V) (2.Nos) Marpally (M) RR Divn.Vikarabad Dist. 582 04.08.2012 2012-13 High Mast lights at Rampur GEN Rampur Marpally 55000 EE, PRI 41250 13750 55000 Completed (V) Marpally (M) RR Dist. Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 583 04.08.2012 2012-13 High Mast lights at GEN Jamshedpur Marpally 55000 EE, PRI 41250 13750 55000 Completed Jamshedpur (V) Marpally Divn.Vikarabad (M) RR Dist. 584 04.08.2012 2012-13 High Mast lights at ST Gurramgattu Marpally 55000 EE, PRI 41250 13750 55000 Completed Gurramgattu Thanda (V) Thanda Divn.Vikarabad Marpally (M) RR Dist. 585 04.08.2012 2012-13 High Mast lights at ST Jujugubbadi Marpally 55000 EE, PRI 41250 13750 55000 Completed Jujugubbadi Thanda (V) Thanda Divn.Vikarabad Marpally (M) RR Dist. 586 04.08.2012 2012-13 High Mast lights at Allapur GEN Allapur Marpally 55000 EE, PRI 41250 13750 55000 Completed (V) Marpally (M) RR Dist. Divn.Vikarabad 587 04.08.2012 2012-13 High Mast lights at Kolkoda GEN Kolkoda Marpally 55000 EE, PRI 41250 13750 55000 Completed (V) Marpally (M) RR Dist. Divn.Vikarabad 588 04.08.2012 2012-13 Laying of CC Road in GEN Mominkalan Dharur 500000 EE, PRI 375000 125000 500000 Completed Mominkalan (V) Dharur (M) Divn.Vikarabad RR Dist. 589 04.08.2012 2012-13 Laying of CC Road in GEN Rampur Bantwaram 500000 EE, PRI 375000 125000 500000 Completed Rampoor (V) Bantwaram (M) Divn.Vikarabad RR Dist. 590 04.08.2012 2012-13 Laying of CC Road in GEN Balreddyguda Mominpet 500000 EE, PRI 375000 375000 Progress Balreddyguda (V) Mominpet Divn.Vikarabad (M) RR Dist. 591 04.08.2012 2012-13 Laying of CC Road in Patha GEN Patha Mominpet 500000 EE, PRI 375000 375000 Progress Kolkunde (V) Mominpet (M) Kolkunde Divn.Vikarabad RR Dist. 592 04.08.2012 2012-13 Construction of compound GEN Thorumamidi Bantwaram 500000 EE, PRI 375000 125000 500000 Completed wall to Muslim Graveyard at Divn.Vikarabad

593 04.08.2012 2012-13 Construction of Compound GEN Kothagadi Vikarabad 350000 EE, PRI 262500 262500 Progress wall to Muslim Graveyard in Divn.Vikarabad Kothagadi (V) Vikarabad (M) RR Dist. 594 04.08.2012 2012-13 Conustruction of Bus sand in GEN Gudipally Vikarabad 200000 EE, PRI 200000 200000 Completed Gudipally (V) Vikarabad (M) Divn.Vikarabad RR Dist. 595 04.08.2012 2012-13 Construction of Cattle Shed GEN Vikarabad Vikarabad 200000 EE, PRI 0 Not Started in Anantha Padmanaba Divn.Vikarabad Chenchu colony in Vikarabad (V)&(M) RR Dist.

596 04.08.2012 2012-13 Drinking Water Sump in GEN Nagasamunde Dharur 600000 EE, RWS&S 0 Not Started Nagasamunder (V) Dharur r Divn.Pargi (M) RR Dist. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 597 04.08.2012 2012-13 Drinking Water Sump in GEN Velchal Mominpet 600000 EE, RWS&S 0 Not Started Velchal (V) Mominpet (M) Divn.Pargi RR Dist. 598 04.08.2012 2012-13 Construction of Balance GEN Zinnaram Bantwaram 500000 EE, PRI 375000 125000 500000 Completed work of 4 vent RCC Slab Divn.Vikarabad Culvert on road from Zinnaram to Mailaredevarampally, BIT No:-1 599 04.08.2012 2012-13 Construction of Balance GEN Zinnaram Bantwaram 500000 EE, PRI 375000 125000 500000 Completed work of 4 vent RCC Slab Divn.Vikarabad Culvert on road from Zinnaram to Mailaredevarampally, BIT No:-2 600 04.08.2012 2012-13 Construction of Balance GEN Zinnaram Bantwaram 500000 EE, PRI 375000 125000 500000 Completed work of 4 vent RCC Slab Divn.Vikarabad Culvert on road from Zinnaram to Mailaredevarampally, BIT No:-3 601 04.08.2012 2012-13 Construction of Balance GEN Zinnaram Bantwaram 500000 EE, PRI 375000 125000 500000 Completed work of 4 vent RCC Slab Divn.Vikarabad Culvert on road from Zinnaram to Mailaredevarampally, BIT No:-4 602 04.08.2012 2012-13 Construction of Balance GEN Zinnaram Bantwaram 500000 EE, PRI 375000 125000 500000 Completed work of 4 vent RCC Slab Divn.Vikarabad Culvert on road from Zinnaram to Mailaredevarampally, BIT No:-5 603 05.08.2012 2012-13 Construction of Compound GEN Chevella Chevella 1000000 EE, PRI 750000 750000 Progress Wall to Khabrasthan Divn.Hyd.R.R.D (Greveyard) in Chevella ist Village & Mandal, RR Dist. 604 03.09.2012 2012-13 Construction of Compound GEN Kalwakurthy Kalwakurthy 500000 Dist.Collector, 500000 500000 Completed wall for Muslim Burial Mahaboobnaga Ground r 605 03.09.2012 2012-13 Construction of Compound GEN Kalwakurthy Kalwakurthy 500000 Dist.Collector, 500000 500000 Completed wall for Hindu Burial Ground Mahaboobnaga and Shed r WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 606 09.09.2012 2012-13 Digging of Borewell Near GEN Amradi Kalan Mominpet 100000 EE, RWS&S 0 Not Started Masjid Divn.Pargi 607 09.09.2012 2012-13 Laying of CC Road from GEN Mekavanampa Mominpet 500000 EE, PRI 375000 375000 Progress Hanuman Mandir to K lly Divn.Vikarabad Laxman House 608 09.09.2012 2012-13 Construction of Compound GEN Tekulapally Mominpet 500000 EE, PRI 375000 121832 496832 Completed wall to Graveyard at Divn.Vikarabad 609 10.09.2012 2012-13 Laying of CC Road in GEN Mominkalan Dharur 500000 EE, PRI 0 Not Started Divn.Vikarabad 610 10.09.2012 2012-13 Laying of CC Road in GEN Balreddyguda Mominpet 500000 EE, PRI 0 Not Started Divn.Vikarabad 611 10.09.2012 2012-13 Construction of Compound GEN Kothagadi Vikarabad 350000 EE, PRI 0 Not Started wall to Muslim Graveyard in Divn.Vikarabad

612 10.09.2012 2012-13 Construction of Cattle Shed GEN Vikarabad Vikarabad 200000 EE, PRI 0 Not Started in Anantha Padmanaba Divn.Vikarabad Chenchu colony .

613 10.09.2012 2012-13 Construction of compound GEN Tekulapally Mominpet 500000 EE, PRI 0 Not Started wall to Graveyard at Divn.Vikarabad 614 10.09.2012 2012-13 Construction of Compound GEN Amradi Kalan Mominpet 200000 EE, PRI 0 Not Started Wall to Muslim Graveyard at Divn.Vikarabad

615 10.09.2012 2012-13 Construction of Compound GEN Kesaram Mominpet 300000 EE, PRI 225000 44506 269506 Completed wall to Muslim Graveyard, Divn.Vikarabad 616 10.09.2012 2012-13 Laying of CC Road in SC GEN Kesaram Mominpet 500000 EE, PRI 375000 124102 499102 Completed Colony Divn.Vikarabad 617 10.09.2012 2012-13 Construction of Compound GEN Mohammadab Gandeed 200000 MPDO, 150000 150000 Progress wall to Muslim Graveyard, ad Gandeed 618 10.09.2012 2012-13 Laying of CC Roads from GEN Mohammadab Gandeed 300000 MPDO, 225000 225000 Progress M.Narsimhulu house to ad Gandeed Tirumala chary House. 619 10.09.2012 2012-13 Construction of Community GEN Mohammadab Gandeed 200000 MPDO, 150000 150000 Progress Hall at ad Gandeed 620 10.09.2012 2012-13 Construction of Compound GEN Nancherla Gandeed 200000 MPDO, 150000 50000 200000 Completed Wall to Muslim graveyard at Gandeed

621 10.09.2012 2012-13 Construction of Compound GEN Chevella Chevella 1000000 EE, PRI 0 Not Started wall to Khabrasthan Divn.Hyd.R.R.D (Greveyard) ist 622 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Vittalapur Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 623 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Chakalipally Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D ist 624 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Salveed Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D ist 625 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Yelikacharla Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Bandi Divn.Hyd.R.R.D ist 626 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Kamunipally Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D ist 627 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Anantha Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Sagar Divn.Hyd.R.R.D ist 628 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Eeppapally Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D ist 629 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Rampur Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Chenchu Divn.Hyd.R.R.D Colony, ist 630 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Maktavenkata Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed pur Divn.Hyd.R.R.D ist 631 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Malkapur Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D ist 632 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Chenchu Kulkacherla 55000 EE, PRI 41250 13750 55000 Completed Ramreddypally colony, Divn.Hyd.R.R.D ist 633 06.10.2012 2012-13 GEN Nizampetmedi Puduru 55000 EE, PRI 41250 13750 55000 Completed pally Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 634 06.10.2012 2012-13 GEN Angadi Puduru 55000 EE, PRI 41250 13750 55000 Completed Chittempally Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 635 06.10.2012 2012-13 GEN Turkaenekapa Puduru 55000 EE, PRI 41250 13750 55000 Completed lly Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 636 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Manneguda Puduru 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 637 06.10.2012 2012-13 GEN Chenugomulu Puduru 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 638 06.10.2012 2012-13 GEN Mamidipally Puduru 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 639 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Kistapur Doma 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D ist 640 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Donga Doma 55000 EE, PRI 41250 13750 55000 Completed Yennekapally Divn.Hyd.R.R.D ist 641 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Batla Doma 55000 EE, PRI 41250 13750 55000 Completed Chandram Divn.Hyd.R.R.D Thanda ist 642 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Mallepally Doma 55000 EE, PRI 41250 13750 55000 Completed Thanda, Divn.Hyd.R.R.D ist 643 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Gumdal Doma 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D ist 644 06.10.2012 2012-13 GEN Dirsampally Doma 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 645 06.10.2012 2012-13 GEN Dadapur Doma 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 646 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Sondapur Pargi 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D ist 647 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Ibrahimpur Pargi 55000 EE, PRI 41250 13750 55000 Completed Thanda, Divn.Hyd.R.R.D ist 648 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Rangapally Pargi 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D ist 649 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Narayanapur Pargi 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D ist 650 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Nazeeranad Pargi 55000 EE, PRI 41250 13750 55000 Completed Thanda, Divn.Hyd.R.R.D ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 651 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Shaikpally Gandeed 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D ist 652 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Mohammadab Gandeed 55000 EE, PRI 41250 13750 55000 Completed ad Divn.Hyd.R.R.D ist 653 06.10.2012 2012-13 Fixing of High Mast Lights in GEN Bapankunta Gandeed 55000 EE, PRI 41250 13750 55000 Completed Thanda, Divn.Hyd.R.R.D ist 654 06.10.2012 2012-13 GEN Rusampally Gandeed 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 655 06.10.2012 2012-13 GEN Chinna Gandeed 55000 EE, PRI 41250 13750 55000 Completed Warwall Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 656 06.10.2012 2012-13 GEN Jinnaram Gandeed 55000 EE, PRI 41250 13750 55000 Completed Thanda, Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 657 06.10.2012 2012-13 GEN Rangareddypa Gandeed 55000 EE, PRI 41250 13750 55000 Completed lly Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 658 06.10.2012 2012-13 GEN Panchangula Gandeed 55000 EE, PRI 41250 13750 55000 Completed Thanda Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 659 06.10.2012 2012-13 GEN Sangaiahpally Gandeed 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 660 06.10.2012 2012-13 GEN Mangampet Gandeed 55000 EE, PRI 41250 13750 55000 Completed Thanda, Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 661 06.10.2012 2012-13 GEN Chinnaiahpally Gandeed 55000 EE, PRI 41250 13750 55000 Completed Fixing of High Mast Lights in , Divn.Hyd.R.R.D Chenchu colony ist 662 06.10.2012 2012-13 GEN Mokariabad Gandeed 55000 EE, PRI 41250 13750 55000 Completed Divn.Hyd.R.R.D Fixing of High Mast Lights in ist 663 06.10.2012 2012-13 Construction of Compound GEN Neelapally Basheeraba 500000 EE, PRI 375000 375000 Progress wall to Gundam tank near d Divn.Vikarabad Ekambari Temple 664 06.10.2012 2012-13 Laying of CC Road and GEN Kashimpur Basheeraba 300000 EE, PRI 225000 73130 298130 Completed Drain in d Divn.Vikarabad 665 06.10.2012 2012-13 Laying of CC Road and GEN Navalga Basheeraba 300000 EE, PRI 0 Not Started Drain in d Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 666 06.10.2012 2012-13 Laying of CC Road and GEN Jeevangi Basheeraba 300000 EE, PRI 225000 74984 299984 Completed Drain in d Divn.Vikarabad 667 06.10.2012 2012-13 Laying of CC Road and GEN Mailwar Basheeraba 300000 EE, PRI 225000 225000 Progress Drain in d Divn.Vikarabad 668 06.10.2012 2012-13 High Mast Lights near GEN Neelapally Basheeraba 100000 EE, PRI 75000 75000 Progress Ekambari Temple 2Nos d Divn.Vikarabad 669 06.10.2012 2012-13 Laying of CC Road and GEN Basheerabad Basheeraba 500000 EE, PRI 375000 375000 Progress Drain in d Divn.Vikarabad 670 06.10.2012 2012-13 Laying of CC Road and GEN Navalga Basheeraba 200000 EE, PRI 150000 49991 199991 Completed Drain d Divn.Vikarabad 671 06.10.2012 2012-13 Fixing of High Mast Lights GEN Sankireddypall Tandur 65000 EE, PRI 48750 48750 Progress y Thanda Divn.Vikarabad 672 17.11.2012 2012-13 Fixing of High Mast Lights GEN Sankireddypall Tandur 65000 EE, PRI 48750 48750 Progress y Divn.Vikarabad 673 17.11.2012 2012-13 Fixing of High Mast Lights GEN Gingurthy Tandur 65000 EE, PRI 48750 48750 Progress thanda Divn.Vikarabad 674 17.11.2012 2012-13 Metaling Road in GEN Gundladadgu Tandur 200000 EE, PRI 0 Not Started Thanda, Divn.Vikarabad 675 17.11.2012 2012-13 Laying of CC Road from GEN Sayed Hotel, Tandur 200000 EE, PRI 0 Not Started Kashinath House to Ogipur Divn.Vikarabad 676 17.11.2012 2012-13 Metaling Road from GEN Kothalapur Tandur 300000 EE, PRI 0 Not Started Gingurthy Divn.Vikarabad 677 17.11.2012 2012-13 Laying of CC Road in GEN Rampur Tandur 200000 EE, PRI 199977 199977 Completed Thanda Divn.Vikarabad 678 17.11.2012 2012-13 Laying of CC Road in GEN Gouthapur Tandur 200000 EE, PRI 198790 198790 Completed Divn.Vikarabad 679 17.11.2012 2012-13 Construction of Compound GEN Tandur Tandur 500000 EE, PRI 375000 375000 Progress wall to Greave yard Near Municipality, Divn.Vikarabad William Moon High School, 680 17.11.2012 2012-13 Construction of B-1 GEN Tandur Tandur 400000 EE, PRI 300000 300000 Progress Compound wall to Grave Divn.Vikarabad Yard Near Police Station 681 17.11.2012 2012-13 Construction of B-2 GEN Tandur Tandur 400000 EE, PRI 300000 300000 Progress Compound wall to Grave Divn.Vikarabad Yard Near Police Station 682 07.10.2012 2012-13 Construction of Side Drains GEN Kalkhoda Marpally 320000 MPDO, 240000 80000 320000 Completed Marpally 683 07.10.2012 2012-13 Laying of CC Road GEN Kalkhoda Marpally 600000 MPDO, 450000 117484 567484 Completed Marpally 684 07.10.2012 2012-13 Laying of CC Road from GEN Kankal Puduru 150000 EE, PRI 112500 112500 Progress P.Kurva Narsimulu house to Divn.Vikarabad K.Mallaiah House WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 685 07.10.2012 2012-13 Construction of side drains GEN Pudugurti Puduru 150000 EE, PRI 112500 37444 149944 Completed from water tank Gattupally Divn.Vikarabad Chinnamma house, 686 07.10.2012 2012-13 Laying of CC Road From GEN Chenugomulu Puduru 150000 EE, PRI 112500 112500 Progress Police station to BC Colony Divn.Vikarabad

687 07.10.2012 2012-13 Laying of CC Road from GEN Umethulu Puduru 150000 EE, PRI 112500 112500 Progress Satram Bhavi to backside of Divn.Vikarabad Primary School 688 07.10.2012 2012-13 Laying of CC Road from GEN Pudur Puduru 150000 EE, PRI 112500 112500 Progress Athif House to A.Ananthaiah Divn.Vikarabad House, at Puduru Vilage&Mandal, RR Dist

689 07.10.2012 2012-13 Laying of CC Road from GEN Chilapur Puduru 300000 EE, PRI 225000 225000 Progress Adireddy house to Divn.Vikarabad Gramachavidi at Chilapur Village, Pudur Mandal, RR Dist., 690 07.10.2012 2012-13 Laying of CC Road from C GEN Kistapur Doma 200000 EE, PRI 150000 49870 199870 Completed Ramachandraiah house to Divn.Vikarabad U.Bichaiah House at Kistapur Village, Doma Mandal, RR District. 691 07.10.2012 2012-13 Laying of CC Road from GEN Doma Doma 200000 EE, RWS&S 0 Not Started Mangali Tirupathaiah house Divn.Pargi to GP Drinking water Bore a

692 07.10.2012 2012-13 Construction of Side Drains GEN Rakonda Doma 200000 EE, PRI 150000 150000 Progress from Tirupahtiah house to Divn.Vikarabad Main road, at 693 07.10.2012 2012-13 Construction of Compound GEN Dadapur Doma 400000 EE, PRI 300000 300000 Progress wall to Venkata Kavya Divn.Vikarabad Graveyard at 694 07.10.2012 2012-13 Laying of cc Road from GEN Yenkapally Doma 200000 EE, PRI 150000 49381 199381 Completed Damodar Reddy house to Divn.Vikarabad Ramchandra Reddy Houset WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 695 07.10.2012 2012-13 Laying of CC Road from GEN Ram Singh Kulkacherla 200000 EE, PRI 150000 50000 200000 Completed Primary School to Laxman Thanda Divn.Vikarabad House at Ram Singh Thanda Village, Kulkacherla Mandal, RR District.

696 07.10.2012 2012-13 Construction of Side Drains GEN Kulkacherla Kulkacherla 200000 EE, PRI 150000 150000 Progress from Shivaraju House to ST Divn.Vikarabad Hostel at Kulkacherla Village & Mandal, RR District.

697 07.10.2012 2012-13 Laying of CC Road from GEN Ramreddypall Kulkacherla 200000 EE, PRI 150000 49196 199196 Completed Allapur Village to Yedula y Divn.Vikarabad Yellaiah Bhavi at Ramreddypally Village, Kulkacherla Mandal, RR District. 698 07.10.2012 2012-13 Laying of CC Road from GEN Bandi Kulkacherla 200000 EE, PRI 150000 49925 199925 Completed Puri. Laxmaiah house to Yelkacharla Divn.Vikarabad Pasam Chenna Reddy house 699 07.10.2012 2012-13 Laying of CC Road in the GEN Bomreddypally Kulkacherla 200000 EE, PRI 150000 49563 199563 Completed Village Divn.Vikarabad 700 07.10.2012 2012-13 Laying of CC Road from GEN Madipal Kulkacherla 200000 EE, PRI 150000 48838 198838 Completed Vaddera Colony to Balraju Divn.Vikarabad House at Village, Kulkacherla Mandal, RR District. 701 07.10.2012 2012-13 Provision of water filter GEN Kanmankalva Kulkacherla 200000 EE, RWS&S 187500 187500 Progress Divn.Pargi 702 07.10.2012 2012-13 Laying of CC Road from BC GEN Kanchanpaly Gandeed 200000 EE, PRI 150000 49571 199571 Completed Colony to Prathap Reddy Divn.Vikarabad land 703 07.10.2012 2012-13 Laying of CC Road in at GEN Komireddypall Gandeed 200000 EE, PRI 150000 150000 Progress Komireddypally y Divn.Vikarabad 704 07.10.2012 2012-13 Laying of CC Road from GEN Jinnaram Gandeed 200000 EE, PRI 150000 150000 Progress R&B Road to Kurva Divn.Vikarabad sangham office 705 07.10.2012 2012-13 Laying of CC Road from GEN Mangampeta Gandeed 200000 EE, PRI 150000 49610 199610 Completed M.Chinna Chandraiah house Divn.Vikarabad to Edi Sambasivudu house WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 706 07.10.2012 2012-13 Laying of CC Road from Bal GEN Jangamreddyp Gandeed 200000 EE, PRI 150000 49894 199894 Completed Reddy House to ally Divn.Vikarabad K.Hanumaiah house 707 07.10.2012 2012-13 Construction of Compound GEN Sheikpally Gandeed 200000 EE, PRI 150000 150000 Progress wal to Graveyard at Divn.Vikarabad Sheikpally (V) Gandeed (M) RR Dist., 708 07.10.2012 2012-13 Construction of Side drains GEN Mohammadab Gandeed 150000 EE, PRI 112500 112500 Progress from K.Vemlatesh house to ad Divn.Vikarabad E.Ramulu house 709 07.10.2012 2012-13 Laying of CC Road Culvert GEN Kondapur Gandeed 400000 EE, PRI 300000 99781 399781 Completed from Kondapur to Divn.Vikarabad Mansurpally 710 07.10.2012 2012-13 Laying of CC Road from GEN Pargi Pargi 300000 EE, PRI 225000 74700 299700 Completed Sulthannagar Community Divn.Vikarabad Hall to Thayar House 711 07.10.2012 2012-13 Laying of CC Road from GEN Pargi Pargi 200000 EE, PRI 150000 49031 199031 Completed P.Prakash House to Divn.Vikarabad L.Narsimhulu House 712 07.10.2012 2012-13 Construction of Compound GEN Sayedpally Pargi 300000 EE, PRI 225000 75000 300000 Completed wall at Muslim Graveyard Divn.Vikarabad 713 17.11.2012 2012-13 Laying of CC road in GEN Kotepally Peddemul 150000 EE, PRI 112500 34862 147362 Completed Divn.Vikarabad 714 17.11.2012 2012-13 Laying of CC road in GEN Jangam Peddemul 150000 EE, PRI 112500 112500 Progress Divn.Vikarabad 715 17.11.2012 2012-13 Laying of CC road in GEN Kandanelly Peddemul 150000 EE, PRI 112500 37072 149572 Completed Divn.Vikarabad 716 17.11.2012 2012-13 Laying of CC road in Gt. GEN Gazipur Peddemul 150000 EE, PRI 112500 112500 Progress Divn.Vikarabad 717 17.11.2012 2012-13 Laying of CC road in Indole GEN Indole Peddemul 150000 EE, PRI 112500 112500 Progress (V) near Lingamaiah Divn.Vikarabad Temple, 718 17.11.2012 2012-13 Laying of CC road in t. GEN Mansanpally Peddemul 150000 EE, PRI 112500 37498 149998 Completed Divn.Vikarabad 719 17.11.2012 2012-13 Laying of CC road in GEN Pashapur Peddemul 150000 EE, PRI 112500 112500 Progress Divn.Vikarabad 720 17.11.2012 2012-13 Laying of CC road in GEN Rukmapur Peddemul 150000 EE, PRI 112500 36567 149067 Completed Divn.Vikarabad 721 17.11.2012 2012-13 Laying of CC road in GEN Jairam Peddemul 100000 EE, PRI 75000 75000 Progress Thanda Divn.Vikarabad 722 17.11.2012 2012-13 Laying of CC road in GEN Devanoor Yalal 100000 EE, PRI 75000 24419 99419 Completed Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 723 17.11.2012 2012-13 Laying of CC road in GEN Gorepally Yalal 100000 EE, PRI 75000 24450 99450 Completed Divn.Vikarabad 724 17.11.2012 2012-13 Laying of CC road in Yalal GEN Yalal Yalal 100000 EE, PRI 75000 24477 99477 Completed Divn.Vikarabad 725 17.11.2012 2012-13 Laying of CC road in GEN Sangemkurdu Yalal 100000 EE, PRI 75000 24345 99345 Completed Divn.Vikarabad 726 17.11.2012 2012-13 Laying of CC road in GEN Bennur Yalal 200000 EE, PRI 150000 46646 196646 Completed Divn.Vikarabad 727 17.11.2012 2012-13 Laying of CC road in Amber GEN Bennur Yalal 200000 EE, PRI 150000 45490 195490 Completed Pet GP, Divn.Vikarabad 728 17.11.2012 2012-13 Laying of Cc Road In GEN Perkampally Yalal 100000 EE, PRI 75000 24718 99718 Completed Perkampaly Thanda GP, Divn.Vikarabad 729 17.11.2012 2012-13 Laying of CC Road in GEN Doulapur Yalal 100000 EE, PRI 75000 24635 99635 Completed Mukunda Pur G.P, Divn.Vikarabad 730 17.11.2012 2012-13 Layintg of CC Road in GEN Thimmaipally Yalal 100000 EE, PRI 75000 24219 99219 Completed Divn.Vikarabad 731 17.11.2012 2012-13 Laying of CC Road in GEN Kokat Yalal 100000 EE, PRI 75000 24991 99991 Completed Divn.Vikarabad 732 17.11.2012 2012-13 Laying of CC Road in GEN Raghavapur Yalal 100000 EE, PRI 75000 24976 99976 Completed Raghavapur Old BC Divn.Vikarabad Colony, 733 17.11.2012 2012-13 Construction of Compound GEN Pargi Pargi 300000 EE, PRI 225000 74921 299921 Completed wall at Smashanawatika of Divn.Vikarabad Mudiaj Community Opp Bus stand 734 17.11.2012 2012-13 Laying of CC Road at GEN Pargi Pargi 300000 EE, PRI 225000 73321 298321 Completed Laxmaiah House to Divn.Vikarabad Avadhootha House Near Bharpet 735 17.11.2012 2012-13 Laying of CC Road at GEN Pargi Pargi 300000 EE, PRI 225000 75000 300000 Completed Venkataiah House to Divn.Vikarabad Manikyam House near Maisamma Temple 736 17.11.2012 2012-13 Construction of Side Drains GEN Barkathpally Pargi 200000 EE, PRI 150000 150000 Progress & Laying of CC Road from Divn.Vikarabad Ramreddy to Sai reddy House 737 17.11.2012 2012-13 Fixing of High Mast Lights at SC Naskal Pargi 100000 EE, PRI 75000 25000 100000 Completed SC Vada Divn.Vikarabad 738 17.11.2012 2012-13 Fixing of High Mast Lights at GEN Pargi Pargi 100000 EE, PRI 75000 25000 100000 Completed Bhavani Hotel, Hyderabad Divn.Vikarabad Road, WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 739 17.11.2012 2012-13 Fixing of High Mast Lights at GEN Thondapally Pargi 100000 EE, PRI 75000 25000 100000 Completed Thondapally Village, Pargi Divn.Vikarabad Mandal, RR District. 740 17.11.2012 2012-13 Laying of CC Road at GEN Sayedpally Pargi 200000 EE, PRI 150000 49029 199029 Completed Parmesh House in Divn.Vikarabad 741 17.11.2012 2012-13 Laying of CC Road from GEN Pargi Pargi 200000 EE, PRI 150000 49038 199038 Completed Anoop Reddy to Market Divn.Vikarabad Road 742 06.12.2012 2012-13 Construction of Culvert CD GEN Kondapur Gandeed 210000 EE, PRI 157500 51474 208974 Completed Road in Divn.Vikarabad 743 29.12.2012 2012-13 Construction ofn Compound GEN Erragadapally Pargi 300000 EE, PRI 225000 74871 299871 Completed wall Muslim Graveyard Divn.Vikarabad

744 29.12.2012 2012-13 Construction of Side Drains GEN Roopkhanpet Pargi 200000 EE, PRI 199040 199040 Completed Divn.Vikarabad 745 29.12.2012 2012-13 Construction of Side Drains GEN Mohammadab Gandeed 300000 EE, PRI 225000 225000 Progress in KRR Colony, Near New ad Divn.Vikarabad Bus Stand, Mohammadabad Village, Gandeed Mandal.

746 29.12.2012/ 2012-13 Fixing of High Mast lights- 7 GEN Kondapur Gandeed 500000 MPDO, 551250 551250 Progress 08.12.2013 in Balsurgonda, Gandeed Mansoorpally Thanda, Venkatreddypally, peddawarval, Reddypally, Gandeed, Kondapur Villages in Mohammadabad Village, Gandeed Mandal.

747 18.02.2013 2012-13 Formation of CC road from GEN Ennaram Bantwaram 500000 EE, PRI 375000 125000 500000 Completed Ghanavoni Narsimulu House Divn.Vikarabad to Chapala balaiah, Ennaram Village, Bantwaram Mandal. 748 18.02.2013 2012-13 Formation of CC Road from GEN Kothapally Bantwaram 500000 EE, PRI 375000 125000 500000 Completed Bandu Ramaiah House to Divn.Vikarabad Naredudem Reddy House, Kothapally Village, Bantwaram Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 749 18.02.2013 2012-13 Formation of CC Road on GEN Ennaram Bantwaram 300000 EE, PRI 225000 75000 300000 Completed Village main road, Ennaram Divn.Vikarabad Village, Bantwaram Mandal.

750 18.02.2013 2012-13 Construction of Compound GEN Kukkinda Dharur 500000 EE, PRI 375000 125000 500000 Completed wall to Kabarsthan, Divn.Vikarabad Kukkindha Village, Dharur Mandal. 751 18.02.2013 2012-13 Construction of Compound GEN Dhornal Dharur 500000 EE, PRI 375000 375000 Progress wall to Muslim Grave yard, Divn.Vikarabad Dhornal Village, Dharur Mandal. 752 18.02.2013 2012-13 Construction of CC Road GEN Chinthakunta Dharur 300000 EE, PRI 225000 75000 300000 Completed Kothakurva Mallaiah house Divn.Vikarabad to Lingam Kista Reddy house, Chinthakunta Village, Dharur Mandal. 753 18.02.2013 2012-13 Construction of Bus Stand, GEN Mailaram Dharur 200000 EE, PRI 0 Not Started Mailaram Village, Dharur Divn.Vikarabad Mandal. 754 18.02.2013 2012-13 Construction of Side Drains GEN Avusupally Dharur 500000 EE, PRI 497512 497512 Completed and CC Road, Avusupally Divn.Vikarabad Village, Dharur Mandal.

755 18.02.2013 2012-13 Copnstruction of CC Road, GEN Chttampally Dharur 300000 EE, PRI 225000 225000 Progress Rala Chittampally Village, Divn.Vikarabad Dharur Mandal. 756 18.02.2013 2012-13 Construction of Side Drains GEN Naga Dharur 500000 EE, PRI 375000 375000 Progress and CC Road from Main Samudram Divn.Vikarabad road to Pirala Masjid, Naga Samudram Village, Dharur Mandal. 757 18.02.2013 2012-13 Formation of road from Boini GEN Naga Dharur 500000 EE, PRI 375000 122512 497512 Completed Bichappa house to Bande Samudram Divn.Vikarabad China Ananthi house, Mangali venkatappa Hous to Hotel Hanumamma house, Naga Samundaram Village, Dharur Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 758 18.02.2013 2012-13 Formation of CC road near GEN Munnuru Dharur 500000 EE, PRI 375000 125000 500000 Completed Gram Panchayat on Main Somaram Divn.Vikarabad road to village road, Munnuru Somaram Village, Dharur Mandal. 759 18.02.2013 2012-13 Construction of Side Drains GEN Kondapur Dharur 500000 EE, PRI 375000 375000 Progress and CC Road from Dulakadi Kalan Divn.Vikarabad Balaiah house to Hanuman Mandir, Kondapur Kalan, Dharur Mandal.

760 18.02.2013 2012-13 Formation of CC road from GEN Gattepally Dharur 500000 EE, PRI 375000 122706 497706 Completed Culvert to Darga, Gattepally Divn.Vikarabad Village, Dharur Mandal.

761 18.02.2013 2012-13 Construction of Minority GEN Alampally Vikarabad 500000 EE, PRI 0 Not Started Community Hall, Alampally Divn.Vikarabad Village, Vikarabad Mandal. 762 18.02.2013 2012-13 Construction of Bus Stand GEN Girigetpally Vikarabad 250000 EE, PRI 187500 62500 250000 Completed between Kottamgattu Divn.Vikarabad Thanda & Jambapoor Thanda, Girigetpally Village, Vikarabad Mandal. 763 18.02.2013 2012-13 Construction of Bus Stand, GEN Madanpally Vikarabad 200000 EE, PRI 150000 50000 200000 Completed Madanpally Village, Divn.Vikarabad Vikarabad Mandal. 764 18.02.2013 2012-13 Formation Metal Road from GEN Madgul Vikarabad 500000 EE, PRI 375000 375000 Progress Tekula Biru Thanda to Chittampally Divn.Vikarabad Madgulachitampally, Madgul Chittampally Village, Vikarabad Mandal. 765 18.02.2013 2012-13 Formation of road from GEN Madanpally Vikarabad 500000 EE, PRI 375000 125000 500000 Completed Madanpally to Chenchupally, Divn.Vikarabad Madanpally Village, Vikarabad Mandal. 766 18.02.2013 2012-13 Formation of CC Road from GEN Brurgupally Vikarabad 500000 EE, PRI 375000 122512 497512 Completed Village to Dharga, Divn.Vikarabad Burugupally Village, Vikarabad Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 767 18.02.2013 2012-13 Formation of CC Road from GEN Erravelly Vikarabad 500000 EE, PRI 375000 125000 500000 Completed Erukala Chinnaiah House to Divn.Vikarabad Hanuman Mandir, Erravelly Village, Vikarabad Mandal.

768 18.02.2013 2012-13 Formation of CC Road from GEN Dhannaram Vikarabad 500000 EE, PRI 375000 122512 497512 Completed Azeemuddin house to Divn.Vikarabad Kuntala Pentaiah House, Dhannaram Village, Vikarabad Mandal. 769 18.02.2013 2012-13 Construction of Side Drains GEN Mailadevaram Vikarabad 100000 EE, PRI 75000 25000 100000 Completed from Molla sharif house to pally Divn.Vikarabad Doreti Narsaiah house, Mailardevarampally Village, Vikarabad Mandal. 770 18.02.2013 2012-13 Construction of CC Road GEN Narayanpur Vikarabad 500000 EE, PRI 375000 122512 497512 Completed from PWD road to Divn.Vikarabad Maisamma Temple, Narayanpur Village, Vikarabad Mandal. 771 18.02.2013 2012-13 Construction of CC Road in GEN Pulmaddi Vikarabad 500000 EE, PRI 375000 125000 500000 Completed Pulmaddi Village, Vikarabad Divn.Vikarabad Mandal. 772 18.02.2013 2012-13 Construction of CC Road GEN Kamareddygu Vikarabad 500000 EE, PRI 375000 122512 497512 Completed from Goondla Parvathamma da Divn.Vikarabad house to Sawala Hanmanth Reddy house & Hanuman Mandir to Kista Reddy House, Kamareddyguda Village, Vikarabad Mandal.

773 18.02.2013 2012-13 Installation of Mineral Watr GEN Madanpally Vikarabad 500000 EE, RWS&S 0 Not Started Plant at Govt.Civil Hospital Divn.Pargi in 774 18.02.2013 2012-13 Installation of 1000 LPH GEN Kerella Dharur 240000 EE, RWS&S 0 Not Started Mineral Waer Plant in Divn.Pargi 775 18.02.2013 2012-13 Installation of 1000 LPH GEN Dharur Dharur 240000 EE, RWS&S 0 Not Started Mineral Water Plant in Divn.Pargi 776 22.02.2013 2012-13 Formation of CC Road from GEN Patloor Marpally 500000 EE, PRI 375000 375000 Progress Boini Chandraiah House to Divn.Vikarabad Near Darga, Patloor Village, Marpally Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 777 22.02.2013 2012-13 Formation of CC Road from GEN Panchalingal Marpally 400000 EE, PRI 300000 95776 395776 Completed Village to near Edga Divn.Vikarabad 778 22.02.2013 2012-13 Construction of Compound SC Mominpet Mominpet 500000 EE, PRI 375000 125000 500000 Completed wall to SC graveyard in Divn.Vikarabad Mominpet Village, & Mandal.

779 22.02.2013 2012-13 Formation of road from GEN Telulapally Mominpet 200000 EE, PRI 0 Not Started Suddodukala thanda to Divn.Vikarabad Tekulapally Village, Mominpet Mandal. 780 22.02.2013 2012-13 Construction of CC road GEN Tekulapally Mominpet 300000 EE, PRI 225000 225000 Progress from Siva nagaiah House to Divn.Vikarabad near hanuman Mandir, Tekulapally Village, Mominpet Mandal. 781 22.02.2013 2012-13 Formation of road near GEN Yenkathala Mominpet 200000 EE, PRI 150000 49820 199820 Completed Hanuman Mandir to Divn.Vikarabad Gangaram, Yenkathala Village, Mominpet Mandal. 782 22.02.2013 2012-13 Construction of CC road in GEN Dhary Mominpet 300000 EE, PRI 225000 225000 Progress Cheemal Dhary Village, Divn.Vikarabad Mominpet Mandal. 783 22.02.2013 2012-13 Construction of CC Road GEN Durgam Mominpet 300000 EE, PRI 225000 73507 298507 Completed from Kotha Telugu Ravindra Cheruvu Divn.Vikarabad house to Dwaraka Mahila Building, Durgam Cheruvu Village, Mominpet Mandal.

784 22.02.2013 2012-13 Construction of CC road, GEN Govindapur Mominpet 200000 EE, PRI 0 Not Started Govindapur Village, Divn.Vikarabad Mominpet Mandal. 785 22.02.2013 2012-13 Construction of CC Road, GEN Ramnath Mominpet 200000 EE, PRI 194958 194958 Completed Ramnath Gudupally Village, Gudupally Divn.Vikarabad Mominpt Mandal. 786 22.02.2013 2012-13 Construction of CC Road, GEN Amradi Kurdh Mominpet 300000 EE, PRI 225000 225000 Progress Amradi Kurdh Village, Divn.Vikarabad Mominpet Mandal. 787 22.02.2013 2012-13 Construction of CC Road GEN Mekavanampa Mominpet 500000 EE, PRI 375000 122939 497939 Completed from T.Kanthamma house to lly Divn.Vikarabad near K.Anandam House, Mekavanampally Village, Mominpet Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 788 02.03.2013 2012-13 Construction of Kalyana GEN Mohammadab Gandeed 1000000 EE, PRI 750000 750000 Progress Mandapam ad Divn.Vikarabad 789 17.03.2013 2012-13 Construction of Compound GEN Tandur Tandur 500000 EE, PRI 375000 375000 Progress wall to Vijaya Vidyalaya High Divn.Vikarabad School 790 17.03.2013 2012-13 Construction of Compound GEN Bonnamma Tandur 500000 EE, PRI 375000 375000 Progress wall Minorities Graveyard temple Divn.Vikarabad near old Tandur, 791 25.03.2013 2012-13 Laying of CC Road from B GEN Mekavanampa Mominpet 500000 EE, PRI 375000 122848 497848 Completed Manaiah house to B lly Divn.Vikarabad Buchaiah House 792 25.03.2013 2012-13 Laying of CC Road from GEN Mekavanampa Mominpet 500000 EE, PRI 375000 120607 495607 Completed Brahman House to B lly Divn.Vikarabad Janardhan House 793 25.03.2013 2012-13 Construction of Side Drains GEN Mohammadab Gandeed 200000 EE, PRI 150000 49546 199546 Completed from ST Hostel to Kavali ad Divn.Vikarabad bachanna House, 794 25.03.2013 2012-13 Construction of Side Drains GEN Mohammadab Gandeed 200000 EE, PRI 150000 48983 198983 Completed from kavali Bachanna House ad Divn.Vikarabad to Muslim Graveyard,

795 25.03.2013 2012-13 Construction of Side Drains GEN Mohammadab Gandeed 200000 EE, PRI 150000 48956 198956 Completed from Bheema Chary to ad Divn.Vikarabad M.Goverdhan House,

796 25.03.2013 2012-13 Augmentation of Water GEN Sheikpally Gandeed 200000 EE, RWS, 150000 49790 199790 Completed Supply & Hamlets in Hyderabad Sheikpally 797 25.03.2013 2012-13 Construction of Compound GEN Doma Doma 200000 EE, PRI 0 Not Started wall to Hindu Graveyard Divn.Vikarabad 798 25.03.2013 2012-13 Construction of Side Drains SC Peerampally Kulkacherla 200000 EE, PRI 199816 199816 Completed in SC Colony Divn.Vikarabad 799 25.03.2013 2012-13 Construction of Side Drains GEN Bongrampally Kulkacherla 200000 EE, PRI 199979 199979 Completed in Bongrampally Divn.Vikarabad 800 25.03.2013 2012-13 Additional Room for SC SC Gangaram Vikarabad 340000 EE, PRI 0 Not Started Community Hall, Gangaram Divn.Vikarabad Village, Vikarabad Mandal

801 04.05.2013 2012-13 Completion of road from GEN Ravulapally Marpally 500000 EE, PRI 375000 125000 500000 Completed R&B road to Harijanawada Divn.Vikarabad via Majjid WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 802 04.05.2013 2012-13 Construction of one vent GEN Ravulapally Marpally 500000 EE, PRI 497668 497668 Completed RCC Culvert at Village Divn.Vikarabad Entrance and improvement to high school road and Temple road with CC Roads

803 04.05.2013 2012-13 Laying of CC Road from GEN Doma Doma 200000 EE, PRI 150000 50000 200000 Completed Mangali Tirupathaiah house Divn.Vikarabad to GP Drinking water Bore

804 25.03.2013 2013-14 Construction of Culvert on GEN Mansoorpally Gandeed 300000 MPDO, 225000 225000 Progress road from Mansoorpally to Gandeed Kondapur Village- Mansoorpally(V), Gandeed mandal 805 25.03.2013 2013-14 Construction of Culvert on GEN Kondapur Gandeed 300000 MPDO, 225000 225000 Progress road in Kondapur Village, Gandeed Gandeed Mandal 806 25.03.2013 2013-14 Formation and Metalling of GEN Mohammadab Gandeed 200000 MPDO, 150000 150000 Progress road from R&B road to ad Gandeed K,Hashvardhan farm house at Mohammadabad Vilage, Gandeed mandal 807 20.04.2013 2013-14 Augmentation of PWS GEN Marchal Kalwakurthy 125000 Dist.Collector, 125000 125000 Completed Scheme Mahaboobnaga r 808 20.04.2013 2013-14 Augmentation of PWS GEN Timmiraspally Kalwakurthy 200000 Dist.Collector, 200000 200000 Completed Scheme Mahaboobnaga r 809 20.04.2013 2013-14 Augmentation of PWS GEN Raghupati pet Kalwakurthy 125000 Dist.Collector, 125000 125000 Completed Scheme Mahaboobnaga r 810 20.04.2013 2013-14 Augmentation of PWS GEN panjugal Kalwakurthy 150000 Dist.Collector, 150000 150000 Completed Scheme Mahaboobnaga r 811 20.04.2013 2013-14 Augmentation of PWS GEN venkatapur Kalwakurthy 65000 Dist.Collector, 65000 65000 Completed Scheme Mahaboobnaga r 812 20.04.2013 2013-14 Augmentation of PWS GEN Jeedipally Kalwakurthy 65000 Dist.Collector, 65000 65000 Completed Scheme Mahaboobnaga r WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 813 20.04.2013 2013-14 Augmentation of PWS GEN Bakkara Kalwakurthy 65000 Dist.Collector, 65000 65000 Completed Scheme Mahaboobnaga r 814 20.04.2013 2013-14 Augmentation of PWS GEN Turkalapally Kalwakurthy 65000 Dist.Collector, 65000 65000 Completed Scheme Mahaboobnaga r 815 20.04.2013 2013-14 Augmentation of PWS GEN Mukurala Kalwakurthy 65000 Dist.Collector, 65000 65000 Completed Scheme Mahaboobnaga r 816 20.04.2013 2013-14 Augmentation of PWS GEN Ramagiri Kalwakurthy 75000 Dist.Collector, 75000 75000 Completed Scheme Mahaboobnaga r 817 20.04.2013 2013-14 Augmentation of PWS GEN Moin Mohalla Shamshaba 75000 EE, RWS, 56250 56250 Progress Scheme d Hyderabad 818 20.04.2013 2013-14 Augmentation of PWS GEN Ahmed Nagar Shamshaba 75000 EE, RWS, 56250 56250 Progress Scheme d Hyderabad 819 20.04.2013 2013-14 Augmentation of PWS GEN Hameedullahn Shamshaba 75000 EE, RWS, 56250 56250 Progress Scheme, Chilla House agar d Hyderabad Mubarak 820 04.05.2013 2013-14 Construction of Compound GEN Mucherla Kandukur 500000 MPDO, 375000 375000 Progress Wall to ZP High School in Kandukur 821 04.05.2013 2013-14 Formation & Leveling of road GEN Saireddy guda Kandukur 200000 MPDO, 200000 200000 Completed from Anantharam Reddy Kandukur House to Village Main Road in 822 04.05.2013 2013-14 Construction of Social GEN Ravulapally Marpally 0 EE, PRI 0 Cancelled Welfare Building Meeting Divn.Vikarabad Hall, Kitchen Shed and Dining Hall Compound wall with all amities,(Esatimated Cost Rs.25,00,000)

823 11.05.2013 2013-14 Formation and metalling of GEN Sirpura Marpally 500000 MPDO, 375000 375000 Progress road from Siripuram to Marpally Narsapur , Bit-1, 824 11.05.2013 2013-14 Formation and metalling of GEN Sirpura Marpally 500000 MPDO, 375000 375000 Progress road from Siripuram to Marpally Narsapur , Bit-2, 825 11.05.2013 2013-14 Formation and metalling of GEN Kalkhoda Marpally 500000 MPDO, 375000 375000 Progress Road from R&B road to Marpally Laxmamala colony WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 826 11.05.2013 2013-14 Construction of Compound GEN Mominpet Mominpet 500000 MPDO, 375000 0 375000 Progress wall to Minority Graveyard, Mominpet Bit No.1 827 11.05.2013 2013-14 Construction of Culvert(CC GEN Rampur Bantwaram 500000 MPDO, 500000 500000 Completed Works) on road from Bantwaram Rampur to Kothapally, Bit No.1, 828 11.05.2013 2013-14 Laying of CC road in internal GEN Chittempally Dharur 500000 MPDO, Dharur 375000 375000 Progress Village, 829 20.05.2013 2013-14 Construction of Compound GEN Gadriyal Gandeed 400000 EE, PRI 300000 300000 Progress wall to Kalyana Mantapam Divn.Vikarabad 830 20.05.2013 2013-14 Laying of drinking water GEN Asbestos Hills Kukatpally 5000000 G.M(E) O&M 0 Not Started pipeline Asbestos Hills colony Division No-IX, Colony, Kukatpally Division, HMWS&SB- 123 of GHMC, Kukatpally, Serlingampally 831 20.05.2013 2013-14 Metaling road in Rachakatta GEN Rachakatta Peddemul 300000 EE, PRI 225000 225000 Progress Thanda, Rachakatta Village, Divn.Vikarabad Peddemul Mandal,

832 20.05.2013 2013-14 Construction of work, GEN Indole Peddemul 500000 EE, PRI 375000 125000 500000 Completed Community Hall in Indole Divn.Vikarabad Village, Peddemul Mandal. 833 20.05.2013 2013-14 Metaling road from High GEN Indur Peddemul 300000 EE, PRI 225000 225000 Progress School to Peddawagu, Indur Divn.Vikarabad Village, Peddemul Mandal.

834 20.05.2013 2013-14 Laying of CC Road in Atkur GEN Atkur Peddemul 200000 EE, PRI 199938 199938 Completed Thanda, Atkur Village, Divn.Vikarabad Peddemul Mandal. 835 20.05.2013 2013-14 Construction of CD Work GEN Hanumapur Peddemul 500000 EE, PRI 0 0 Not Started and formation of Road from Divn.Vikarabad Buddaram to Hanumapur, Hanumapur Village, Peddemul Mandal. 836 20.05.2013 2013-14 Laying of CC Road in GEN Kotepally Peddemul 300000 EE, PRI 225000 73468 298468 Completed Kotpally Village, Peddemul Divn.Vikarabad Mandal. 837 20.05.2013 2013-14 Laying of CC Road in SC SC Gazipur Peddemul 200000 EE, PRI 199833 199833 Completed Colony Gajipur Village, Divn.Vikarabad Peddemul Mandal. 838 20.05.2013 2013-14 Metaling Road from GEN Peddemul Peddemul 500000 EE, PRI 375000 375000 Progress Buddaram to Rudra Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 839 20.05.2013 2013-14 Community Compound wall SC Basheerabad Basheeraba 200000 EE, PRI 150000 150000 Progress in SC wada, Basheerabad d Divn.Vikarabad Village & Mandal.

840 20.05.2013 2013-14 Laying of CC Road in 12th GEN Basheerabad Basheeraba 200000 EE, PRI 198304 198304 Completed wada in Basheerabad Villag, d Divn.Vikarabad Basheerabad Mandal.

841 20.05.2013 2013-14 Construction of Side Drains SC Manthagoud Basheeraba 150000 EE, PRI 149971 149971 Completed in SC Wada in d Divn.Vikarabad Manthangoud, Village, Basheerabad Mandal. 842 20.05.2013 2013-14 Laying of CC Road in SC SC Nawandgi Basheeraba 100000 EE, PRI 99505 99505 Completed Wada in Nawandgi Village, d Divn.Vikarabad Basheerabad Mandal.

843 20.05.2013 2013-14 Laying of CC Road from GEN Basheerabad Basheeraba 100000 EE, PRI 99107 99107 Completed Shekar Tailor house to d Divn.Vikarabad Shankaraiah House in Basheerabad Village & Mandal. 844 20.05.2013 2013-14 Balance work for GEN Basheerabad Basheeraba 150000 EE, PRI 0 Not Started G.P.Building in Basheerabad d Divn.Vikarabad Village & Mandal.

845 20.05.2013 2013-14 Laying of CC Road in Valya ST Valya Naik Basheeraba 100000 EE, PRI 0 Not Started Naik Thanda, in Valya Naik Thanda d Divn.Vikarabad Thanda Village, Basheerabad Mandal. 846 20.05.2013 2013-14 Laying of CC Road in SC SC Allapur Basheeraba 100000 EE, PRI 99390 99390 Completed Colony in Allapur Village, d Divn.Vikarabad Basheerabad Mandal. 847 20.05.2013 2013-14 Laying of Pipe line in SC SC Ekkmai Basheeraba 100000 EE, RWS&S 100000 100000 Completed Wada in Ekkmai Village, d Divn.Pargi Basheerabad Mandal. 848 20.05.2013 2013-14 Laying of Pipe line in SC SC Parshanaik Basheeraba 150000 EE, PRI 0 Not Started Wada in Parshanaik d Divn.Vikarabad Thanda, Basheerabad Mandal. 849 20.05.2013 2013-14 Laying of Pipe line in Valiya ST Valiya naik Basheeraba 100000 EE, PRI 0 Not Started Naik Thanda, Basheerabad Thanda d Divn.Vikarabad Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 850 20.05.2013 2013-14 Laying of Pipe line in SC SC Gotikakurdu Basheeraba 100000 EE, PRI 0 Not Started Colony in Gotikakurdu d Divn.Vikarabad Village, Basheerabad Mandal. 851 20.05.2013 2013-14 Laying of Pipe line in ST ST Korviched Basheeraba 100000 EE, PRI 0 Not Started wada in Korviched Village, d Divn.Vikarabad Basheerabad Mandal. 852 20.05.2013 2013-14 Laying of CC Road from GEN Mitabaspally Tandur 200000 EE, PRI 150000 49722 199722 Completed Kruva Anjillappa house to Divn.Vikarabad T.Hanumappa House in Mittabasupally Village, Tandur Mandal. 853 20.05.2013 2013-14 Laying of CC Road from GEN Sirigiripet Tandur 200000 EE, PRI 199668 199668 Completed Ravula Nimbanna house to Divn.Vikarabad Ramesh House in Sirigirpet Village, Tandur Mandal.

854 20.05.2013 2013-14 Laying of CC Road from GEN Veerisittypally Tandur 200000 EE, PRI 198731 198731 Completed Premier School to Divn.Vikarabad Pochamma temple in Veerisittypally Village, Tandur Mandal. 855 20.05.2013 2013-14 Laying of CC Road from in GEN Mysamma Tandur 200000 EE, PRI 199552 199552 Completed Mysamma thanda, Thanda Divn.Vikarabad Mysamma Thanda Village, Tandur Mandal. 856 20.05.2013 2013-14 Laying of CC road from 2nd GEN Gingurthy Tandur 200000 EE, PRI 150000 49828 199828 Completed ward BC Colony to Divn.Vikarabad Gingurthy, Gingurthy Village, Tandur Mandal. 857 20.05.2013 2013-14 Laying of CC Road in SC SC Kothalapur Tandur 200000 EE, PRI 199789 199789 Completed Colony in Kotlapur Village, Divn.Vikarabad Tandur Mandal. 858 20.05.2013 2013-14 Laying of CC Road in BC GEN Inelly Tandur 200000 EE, PRI 199647 199647 Completed Colony in Inelly Village, Divn.Vikarabad Tandur Mandal. 859 20.05.2013 2013-14 Laying of CC Road from GEN Tandur town Tandur 500000 EE, PRI 499556 499556 Completed seetharampet Divn.Vikarabad Pandurangam Temple Comman to D.Archana House, Tandur Town, Tandur Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 860 02.06.2013 2013-14 Laying of CC Road from GEN Lemur Kandukur 500000 MPDO, 375000 375000 Progress Goundla Kamalamma House Kandukur to Mangali Tirupati House in BC Colony, Lemur Village, Kandukur Mandal, RR Dist.,

861 02.06.2013 2013-14 Laying of CC Road from GEN Lemur Kandukur 500000 MPDO, 0 Not Started Bashmoni Pandu House to Kandukur S.Ram Reddy House in BC Colony, Lemur Village, kandukur Mandal, RR Dist.,

862 26.06.2013 2013-14 Construction of Community GEN Vikarabad Vikarabad 1000000 EE, PRI 750000 750000 Progress Hall near Non- Divn.Vikarabad Gazetted Officer's Bhavan

863 08.07.2013 2013-14 Contribution towards relief GEN Uttarkhand Uttarkhand 1000000 District 1000000 1000000 Completed and rehabuilitation work in Magistrate, uttarkhand Rudraprayag District. 864 11.08.2013 2013-14 Providing 11 KV XLPE 3 GEN Saroornagar Saroornaga 275000 DE, Operation, 243915 243915 Completed core 185 sq.mm power cable r APCPDCL, of 180 mts from H.No.11-7- Saroornagar, 50 P.No:’C’103, Huda colony RR Dist., to 100KVA DTR C-Type Huda Colony-I, Saroornagar.

865 21.09.2013 2013-14 Construction of Mahila SC Bhikshapathi Serilingamp 1200000 Dy.Commission 900000 900000 Progress Bhavan in SC Colony in Nagar ally er, GHMC, Bhavan Bhikshapathi nagar, Serlingampally Circle 866 21.09.2013 2013-14 Construction of Mahila SC Miyapur Serilingamp 1200000 Dy.Commission 0 Not Started Bhavan in SC Colony in New ally er, GHMC, Colony, Miyapur, Serlingampally Circle 867 21.09.2013 2013-14 Construction of Mahila SC Kondapur Serilingamp 1200000 Dy.Commission 0 Not Started Bhavan in SC Colony in ally er, GHMC, Maseedbanda, Kondapur Serlingampally Circle 868 27.10.2013 2013-14 Formation and metalling of SC Chinchalpet Nawabpet 500000 MPDO, 375000 375000 Progress road in SC Colony in Nawabpet Chinchalpet WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 869 21.09.2013 2013-14 Laying of CC road SC SC Chinchalpet Nawabpet 500000 MPDO, 375000 375000 Progress Colony to BC Colony in Nawabpet 870 22.09.2013 2013-14 Laying of CC road in BC GEN Kanmankalva Kulkacherla 200000 EE, PRI 150000 150000 Progress Colony in Divn.Hyd.R.R.D ist 871 22.09.2013 2013-14 Laying of CC road in SC SC Kanmankalva Kulkacherla 200000 EE, PRI 150000 150000 Progress Colony in Divn.Hyd.R.R.D ist 872 22.09.2013 2013-14 Construction of BC GEN Kanmankalva Kulkacherla 200000 EE, PRI 150000 150000 Progress Community Hall in Divn.Hyd.R.R.D ist 873 20.10.2013 2013-14 Laying of CC road in GEN Veereddypally Tandur 200000 EE, PRI 150000 150000 Progress veereddypally GP GP Divn.Vikarabad 874 20.10.2013 2013-14 Laying of CC Road in GEN Chengeshpur Tandur 200000 EE, PRI 199688 199688 Completed Chengeshpur Divn.Vikarabad 875 20.10.2013 2013-14 Laying of CC road from GEN Kothalapur Tandur 200000 EE, PRI 150000 49956 199956 Completed PWD road to Yellamma Divn.Vikarabad temple in kothalapur GP, Tandur Mandal, 876 20.10.2013 2013-14 Laying of CC Road in GEN Akkampally Yalal 200000 EE, PRI 150000 150000 Progress Divn.Vikarabad 877 20.10.2013 2013-14 Laying of CC road from GEN Allapur Tandur 200000 EE, PRI 150000 49730 199730 Completed PWD Main road to Allapur Divn.Vikarabad 878 21.10.2013 2013-14 Laying of CC road bit-I, In ST Madanpally Shamshaba 500000 EE, PRI 0 Not Started ST Colony at Kotha Thanda d Divn.Vikarabad H/o Madanpally, Shamshabad Mandal 879 21.10.2013 2013-14 Laying of CC road bit-II, In ST Madanpally Shamshaba 500000 EE, PRI 0 Not Started ST Colony at Kotha Thanda d Divn.Vikarabad H/o Madanpally, Shamshabad Mandal 880 21.10.2013 2013-14 Laying of CC road bit-I, In ST Ramanjapur Shamshaba 500000 EE, PRI 0 Not Started ST Colony at Ramanjapur, d Divn.Vikarabad Shamshabad Mandal 881 28.10.2013 2013-14 Laying of CCRoad in SC SC Allawada Chevella 200000 EE, PRI 150000 50000 200000 Completed Wada at Allawada Village, Divn.Hyd.R.R.D ist 882 28.10.2013 2013-14 Laying of CCRoad in SC SC Narayan Chevella 100000 EE, PRI 75000 25000 100000 Completed Wada at Narayan Dasguda Dasguda Divn.Hyd.R.R.D Village, Chevella Mandal ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 883 28.10.2013 2013-14 Laying of CCRoad in SC SC Kowkuntla Chevella 200000 EE, PRI 150000 150000 Progress Wada at Kowkuntla Village, Divn.Hyd.R.R.D Chevella Mandal ist 884 28.10.2013 2013-14 Laying of CCRoad in SC SC Mudimyala Chevella 200000 EE, PRI 150000 50000 200000 Completed Wada at Mudimyala Village, Divn.Hyd.R.R.D Chevella Mandal ist 885 28.10.2013 2013-14 Laying of CCRoad in SC SC Pamena Chevella 200000 EE, PRI 150000 50000 200000 Completed Wada at Pamena Village, Divn.Hyd.R.R.D Chevella Mandal ist 886 28.10.2013 2013-14 Laying of CCRoad in SC SC Thallaram Chevella 200000 EE, PRI 150000 50000 200000 Completed Wada at Thallaram Village, Divn.Hyd.R.R.D Chevella Mandal ist 887 28.10.2013 2013-14 Laying of CCRoad in SC SC urella Chevella 200000 EE, PRI 150000 150000 Progress Wada at Urella Village, Divn.Hyd.R.R.D Chevella Mandal ist 888 28.10.2013 2013-14 Laying of CCRoad in SC SC Earlapally Chevella 200000 EE, PRI 150000 150000 Progress Wada at Earlapally Village, Divn.Hyd.R.R.D Chevella Mandal ist 889 28.10.2013 2013-14 Laying of CCRoad in SC SC Chevella 300000 EE, PRI 225000 75000 300000 Completed Wada at Kandawada Divn.Hyd.R.R.D Village, Chevella Mandal ist 890 28.10.2013 2013-14 Laying of CCRoad in SC SC Basthepur Chevella 200000 EE, PRI 150000 50000 200000 Completed Wada at Basthepur Village, Divn.Hyd.R.R.D Chevella Mandal ist 891 28.10.2013 2013-14 Laying of CCRoad in SC SC Kammeta Chevella 200000 EE, PRI 150000 50000 200000 Completed Wada at Kammeta Village, Divn.Hyd.R.R.D Chevella Mandal ist 892 28.10.2013 2013-14 Laying of CCRoad in SC SC Chevella 200000 EE, PRI 150000 50000 200000 Completed Wada at Kummera Village, Divn.Hyd.R.R.D Chevella Mandal ist 893 28.10.2013 2013-14 Laying of CCRoad in SC SC Madikattu Chevella 200000 EE, PRI 150000 150000 Progress colony at Madikattu Village, Divn.Hyd.R.R.D Chevella Mandal ist 894 28.10.2013 2013-14 Laying of CCRoad in SC SC Singappaguda Chevella 200000 EE, PRI 150000 50000 200000 Completed Wada at Singappaguda Divn.Hyd.R.R.D Village, Chevella Mandal ist 895 28.10.2013 2013-14 Laying of CCRoad in SC Ibrahimpally Chevella 200000 EE, PRI 150000 150000 Progress SCcolony at Ibrahimpally Divn.Hyd.R.R.D Village, Chevella Mandal ist 896 28.10.2013 2013-14 Laying of CCRoad in ST ST Chevella Chevella 400000 EE, PRI 300000 100000 400000 Completed colony at Chevella Village Divn.Hyd.R.R.D and Mandal ist WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 897 28.10.2013 2013-14 Metal and CC Road in ST ST Antharam Chevella 400000 EE, PRI 300000 300000 Progress wada at Antharam Village, Divn.Hyd.R.R.D Chevella Mandal. ist 898 28.10.2013 2013-14 Laying of CCRoad in ST ST Gollapally Chevella 300000 EE, PRI 225000 225000 Progress Wada at Gollapally Village, Divn.Hyd.R.R.D Chevella Mandal ist 899 08.12.2013 2013-14 Laying of CC Road in ST Kanekulkunta Gandeed 500000 EE, PRI 375000 375000 Progress Kanekulkunta Thanda, Thanda Divn.Vikarabad Gandeed Mandal, 900 08.12.2013 2013-14 Laying of CC Road in ST Mansurpally Gandeed 500000 EE, PRI 375000 375000 Progress Mansurpally Thanda, Thanda Divn.Vikarabad Mansurpally (V) Gandeed Mandal. 901 08.12.2013 2013-14 Laying of CC Road in ST Pudur Puduru 300000 EE, PRI 0 Not Started Maisammabanda Thanda Divn.Vikarabad (ST) in 902 08.12.2013 2013-14 Laying of CC Road in ST Pudur Puduru 300000 EE, PRI 0 Not Started Chinnabanda Thanda (ST) Divn.Vikarabad in 903 08.12.2013 2013-14 Laying of CC Road in ST Pudur Puduru 200000 EE, PRI 150000 150000 Progress Chenchupally (ST) in Divn.Vikarabad 904 08.12.2013 2013-14 Laying of CC Road in ST Pudur Puduru 200000 EE, PRI 150000 49366 199366 Completed Thirumalapur Thanda (ST) Divn.Vikarabad in 905 08.12.2013 2013-14 Fixing of High Mast Lights-2, GEN Kusumasamu Kulkacherla 210000 MPDO, 157500 0 157500 Progress dram Kulakcherla Agraharam 906 08.12.2013 2013-14 Fixing of High Mast Lights-1 GEN Doma Doma 105000 MPDO, 0 0 Not Started Gandeed 907 04.01.2014 2013-14 Fixing of High Mast Light – GEN Sarpanpally Dharur 65000 EE, PRI 48750 16250 65000 Progress 1, Sarpanpally Village, Divn.Vikarabad Dharur Mandal. 908 04.01.2014 2013-14 Fixing of High Mast Light – GEN Kurdhu Dharur 65000 EE, PRI 48750 16250 65000 Progress 1, Kondapur Kurdhu Village, Divn.Vikarabad Dharur Mandal. 909 04.01.2014 2013-14 Fixing of High Mast Light – GEN nagaram Dharur 65000 EE, PRI 48750 16250 65000 Progress 1, Nagaram Village, Dharur Divn.Vikarabad Mandal. 910 04.01.2014 2013-14 Fixing of High Mast Light – GEN Mominkalan Dharur 65000 EE, PRI 48750 16250 65000 Progress 1, Momin Kalan Village, Divn.Vikarabad Dharur Mandal. 911 04.01.2014 2013-14 Fixing of High Mast Light – GEN Dharur Dharur 100000 EE, PRI 75000 25000 100000 Progress 1, Dharur Village & Mandal. Divn.Vikarabad WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 912 04.01.2014 2013-14 Fixing of High Mast Light – GEN Sriramnagar Vikarabad 65000 EE, PRI 48750 16250 65000 Progress 1, Sriram Nagar Thanda & Thanda Divn.Vikarabad Vikarabad Mandal. 913 04.01.2014 2013-14 Fixing of High Mast Light – GEN Kompally Vikarabad 130000 EE, PRI 97500 32500 130000 Progress 2, Kompally Village, Divn.Vikarabad Vikarabad Mandal. 914 04.01.2014 2013-14 Fixing of High Mast Light – GEN Athelly Vikarabad 130000 EE, PRI 97500 32500 130000 Progress 2, Athelly Village, Vikarabad Divn.Vikarabad Mandal. 915 04.01.2014 2013-14 Fixing of High Mast Light – GEN Nagayapur Vikarabad 65000 EE, PRI 48750 16250 65000 Progress 1,Near Maisammagudi, Divn.Vikarabad Nagayapur Village, Vikarabad Mandal. 916 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Rampur Bantwaram 130000 EE, PRI 97500 32500 130000 Progress 2, Rampur Village, Divn.Vikarabad Bantwaram Mandal. 917 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Rompally Bantwaram 65000 EE, PRI 48750 16250 65000 Progress 1, Rompally Village, Divn.Vikarabad Bantwaram Mandal. 918 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Thimmapur Bantwaram 65000 EE, PRI 48750 16250 65000 Progress 1,Thimmapur Village, Divn.Vikarabad Bantwaram Mandal. 919 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Bopunaram Bantwaram 65000 EE, PRI 48750 16250 65000 Progress 1, Bopunaram Village, Divn.Vikarabad Bantwaram Mandal. 920 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Bantwaram Bantwaram 100000 EE, PRI 75000 25000 100000 Progress 1,Bantwaram Village and Divn.Vikarabad Mandal. 921 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Damastapur Marpally 130000 EE, PRI 97500 32500 130000 Progress 2, Damastapur Village & Divn.Vikarabad Marpally Mandal. 922 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Mogiligundla Marpally 130000 EE, PRI 97500 32500 130000 Progress 2, Mogiligundla Village & Divn.Vikarabad Marpally Mandal. 923 04.01.2014 2013-14 Fixing of High Mast Lights GEN Ravulapally Marpally 195000 EE, PRI 146250 48750 195000 Progress –3, Ravulapally Village & Divn.Vikarabad Marpally Mandal. 924 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Thimmapur Marpally 65000 EE, PRI 48750 16250 65000 Progress 1, Thimmapur Village & Divn.Vikarabad Marpally Mandal. 925 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Kudugunta Marpally 65000 EE, PRI 48750 16250 65000 Progress 1, Kudugunta Village & Divn.Vikarabad Marpally Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 926 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Komshettpally Marpally 65000 EE, PRI 48750 16250 65000 Progress 1, Komshettpally Village & Divn.Vikarabad Marpally Mandal. 927 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Veerlapally Marpally 130000 EE, PRI 97500 32500 130000 Progress 2, Veerlapally Village & Divn.Vikarabad Marpally Mandal. 928 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Chimaladari Mominpet 130000 EE, PRI 97500 32500 130000 Progress 2, Chimaladari Village & Divn.Vikarabad Mominpet Mandal. 929 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Kariabad Mominpet 65000 EE, PRI 48750 16250 65000 Progress 1, Karlabad Village & Divn.Vikarabad Mominpet Mandal. 930 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Lachiram Naik Mominpet 65000 EE, PRI 48750 16250 65000 Progress 1, Lachiram Naik Thanda & Thanda Divn.Vikarabad Mominpet Mandal. 931 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Mekavanampa Mominpet 65000 EE, PRI 48750 16250 65000 Progress 1, Meka Vanampally Village lly Divn.Vikarabad & Mominpet Mandal.

932 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Marpally Marpally 100000 EE, PRI 75000 25000 100000 Progress 1, Marpally Village & Divn.Vikarabad Mandal. 933 04.01.2014 2013-14 Fixing of High Mast Lights – GEN Patloor Marpally 100000 EE, PRI 75000 25000 100000 Progress 1, Patloor Village & Marpally Divn.Vikarabad Mandal. 934 08.01.2014 2013-14 Balance work at Minority GEN Kareempur Bantwaram 200000 MPDO, 0 0 Not Started Community hall at Bantwaram 935 08.01.2014 2013-14 Laying of CC Road From Sd GEN Kareempur Bantwaram 200000 MPDO, 0 0 Not Started Hussain house to G Bantwaram Moinuddin house at 936 08.01.2014 2013-14 Laying of CC Road in ST ST Regundi GP Peddemul 200000 EE, PRI 0 Not Started Colony, Chenchunagar, Divn.Vikarabad Regundi GP, Peddamul Mandal. 937 08.01.2014 2013-14 Laying of CC Road in ST ST Rachakatta Peddemul 200000 EE, PRI 0 Not Started Colony, Rachakatta Thanda, Thanda Divn.Vikarabad Peddamul Mandal.

938 08.01.2014 2013-14 Laying of CC Road in ST ST Siddhannama Peddemul 200000 EE, PRI 0 Not Started Colony, Siddhannamadugu dugu Divn.Vikarabad Thanda, Peddamul Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 939 09.01.2014 2013-14 Construction of Additional GEN Vikarabad Vikarabad 500000 EE, PRI 0 Not Started Room to Community Hall Divn.Vikarabad near TNGOs Union Building premises in 940 08.01.2014 2013-14 Laying of CC road in ST ST Renlagada Yalal 150000 EE, PRI 112500 37500 150000 Completed Colony, Renlagada Thanda, Thanda Divn.Vikarabad Yalal Mandal. 941 08.01.2014 2013-14 Laying of CC road in ST ST Nagasamundr Yalal 200000 EE, PRI 150000 50000 200000 Completed Colony,Nagasamudram am Divn.Vikarabad Village, Yalal Mandal. 942 08.01.2014 2013-14 Laying of CC road in ST ST Thupparlagad Yalal 150000 EE, PRI 112500 112500 Progress Colony, Thupparlagada a Thanda Divn.Vikarabad Thanda, Yalal Mandal. 943 08.01.2014 2013-14 Laying of CC road in ST ST Mukundapur Yalal 200000 EE, PRI 150000 49958 199958 Completed Colony, Mukundapur Thanda Divn.Vikarabad Thanda, Yalal Mandal. 944 08.01.2014 2013-14 Laying of CC road in ST ST Kothalapur Tandur 300000 EE, PRI 225000 74990 299990 Completed Colony, Kottalapur Village, Divn.Vikarabad Tandur Mandal 945 08.01.2014 2013-14 Laying of CC road in ST ST Antharam Tandur 200000 EE, PRI 199253 199253 Completed Colony, Antharam Thanda, Thanda Divn.Vikarabad Tandur Mandal. 946 08.01.2014 2013-14 Laying of CC Road in ST ST Kupankot Basheeraba 100000 EE, PRI 0 Not Started Colony in Kupankot Thanda, Thanda d Divn.Vikarabad Bashirabad Mandal, RR Dist., 947 08.01.2014 2013-14 Laying of CC Road in ST ST Mailvar Basheeraba 150000 EE, PRI 0 Not Started Colony Mailvar Thanda, Thanda d Divn.Vikarabad Bashirabad Mandal, RR Dist., 948 08.01.2014 2013-14 Laying of CC Road in ST ST Korviched Basheeraba 150000 EE, PRI 112500 112500 Progress Colony Korviched Thanda, Thanda d Divn.Vikarabad Bashirabad Mandal, RR Dist., 949 08.01.2014 2013-14 Fixing of High Mast Light-1 ST Banapur Yalal 75000 EE, PRI 56250 56250 Progress in Banapur Thanda, Yalal Thanda Divn.Vikarabad Mandal, 950 08.01.2014 2013-14 Fixing of High Mast Light – ST Mukundapur Yalal 75000 EE, PRI 56250 56250 Progress 1, in Mukundapur Thanda, Thanda Divn.Vikarabad Yalal Mandal. WORK WISE REPORT OF SRI.S.JAIPAL REDDY HON'BLE MP (LS), CHEVELLA Sl.No. Consent Dt Year Name of the Work SC/ST/ Village Mandal Estimated Executing Ist 2nd TOTAL Status of GEN Cost Agency instalment instalment Amount (In Work ( In Rs) Amount Amount Rs.) (In Rs.) (In Rs.) 951 08.01.2014 2013-14 Fixing of High Mast Light – ST Madananthap Peddemul 75000 EE, PRI 56250 56250 Progress 1, in Madananthapur ur Divn.Vikarabad Thanda, Peddamul Mandal.

952 08.01.2014 2013-14 Fixing of High Mast Light-1, ST Marepally Peddemul 75000 EE, PRI 56250 56250 Progress in Marepally Thanda, Thanda Divn.Vikarabad Peddamul Mandal. 953 08.01.2014 2013-14 Fixing of High Mast Light – ST Peddemul Peddemul 75000 EE, PRI 56250 56250 Progress 1, in Peddemul Thanda, Thanda Divn.Vikarabad Peddemul Mandal. 954 08.01.2014 2013-14 Fixing of High Mast Light – ST Athkur Thanda Peddemul 75000 EE, PRI 56250 56250 Progress 1, in Athkur Thanda, Divn.Vikarabad Peddemul Mandal. 955 08.01.2014 2013-14 Fixing of High Mast Light – ST Siddhanna Peddemul 75000 EE, PRI 56250 56250 Progress 1, in Siddhanna Thanda, Thanda Divn.Vikarabad Peddemul Mandal. 956 08.01.2014 2013-14 Fixing of High Mast Light – ST Omlanaik Peddemul 75000 EE, PRI 56250 56250 Progress 1, in Omlanaik Thanda, Thanda Divn.Vikarabad Peddemul Mandal. 957 08.01.2014 2013-14 Fixing of High Mast Light – ST Jairam Peddemul 75000 EE, PRI 56250 56250 Progress 1, in Jairam Thanda, Thanda Divn.Vikarabad Peddemul Mandal. 958 08.01.2014 2013-14 Fixing of High Mast Light – ST Pashapur Peddemul 75000 EE, PRI 56250 56250 Progress 1, in Pashapur Thanda, Thanda Divn.Vikarabad Peddemul Mandal. 959 10.11.2013 2013-14 Laying of CC Road from B GEN Saraswathigud Kandukur 750000 MPDO, 0 Not Started Narsimha House to M a Kandukur Jangaiah House in , 960 11.01.2014 2013-14 Laying of CC Road from GEN Ravulapally Marpally 200000 EE, PRI 199829 199829 Completed PWD ROAD TO Temple Divn.Vikarabad road at 961 11.01.2014 2013-14 Laying of CC Road in GEN Thimmapur Marpally 500000 EE, PRI 500000 500000 Completed Thimapur village Marpally Divn.Vikarabad Mandal, RR Dist. 962 11.01.2014 2013-14 Side Burms to Harijana GEN Ravulapally Marpally 100000 EE, PRI 100000 100000 Completed Wada road in Divn.Vikarabad Total 192949000 112262758 32462486 144425244