Written Answers 342 Orissa and Bihar for Imparting Industrial Training To
Total Page:16
File Type:pdf, Size:1020Kb
341 Written Answers BHADRA 7, 1918 (SAKA) Written Answers 342 Orissa and Bihar for imparting industrial training to women There is no proposal to open new ITIs for Women under the World Bank assisted Vocational Training Project. during the current year in Bihar. (b) The number of existing Industrial Training Institutes B. Name of Scheme : Introduction of New Trades in the for Women in the above States, location-wise and institutes existing Women ITIsA/Vings." proposed to be opened during the current year are given in the enclosed Statement SLNo. Location of Insitute (c) The States do not get financial assistance directly Orissa from the World Bank. The Central Government is reimbursed by the World Bank for the expenses incurred on approved 1. Cuttack schemes in terms of the credit agreement. Fifty per cent of 2. Anandapur the expenditure incurred by the States on approved schemes in borne by the Central Government. State-wise expenditure Bihar incurred so far on the two schemes for woman’s training in the States of Orissa and Bihar, as per the information 1. Ranchi furnished by the concerned States, is Rs. 372.515 lakh and 2. Dumka Rs. 90.347 lakh respectively. (d) As per the information furnished by the concerned [Translation] States, the number of women trained so far is 795 and 305 in Orissa and Bihar respectively. The number of women T.V. Studio, Bihar proposed to be trained during 1996*97 is 261 and 704 in Orissa and Bihar respectively. 3467. SHRI RADHA MOHAN SINGH : SHRI RAJIV PRATAP RUDY : STATEMENT Will the Minister of INFORMATION AND A. Name of Scheme : “Establishment of New ITIs/ BROADCASTING be pleased to state: Wings for Women (a) whether a studio was inaugurated on March 15, 1996 at the Doordarshan Kendra, Patna; SI.No. Location of Institute (b) if so, the expenditure incurred on the construction of Orissa the studio; 1. Umerkote (c) whether the studio has now been closed; 2. *Chhatrapur (d) if so, when and the reasons therefor; and 3. *Baragarh 4. *Bolangir (e) the steps taken by the Government to ensure proper telecast and production of local programmes? 5. Dhenkanal 6. Boudh THE MINISTER OF CIVIL AVIATION AND MINISTER OF INFORMATION AND BROADCASTING (SHRI C.M. Bihar IBRAHIM) : (a) Yes, Sir. 1. Siwan (b) An expenditure of Rs. 2251.71 lakhs has been 2. Muzaffarpur incurred on TV studio, Patna upto June, 1996. 3. Arra (c) to (e). The power supply available, at present, at DDK, 4. Chaibaqsa Patna is not adequate for smooth functioning of the new studio set up. Besides, staff sanction for the permanent studio set 5. Motihari up is yet to be accorded by the competent authority and the 6. Darbhanga available staff for the interim studio set up at Patna is not sufficient for normal operation of the new studio. Production 7. Gaya and telecast of local programmes by the new studio set up 8. Hazaribagh would depend upon availability of uninterrupted power supply and sanction of full complement of staff for the permanent •proposed to be opened during the current year. studio set up at DDK, Patna..