Tumkur Lok Sabha constituency presently comprises of eight Legislative Assembly segments which are Turuvekere, Chiknayakanhalli, Koratagere, Tumkur Rural, Madhugiri, Gubbi, Tumkur City, Tiptur. Important railway stations of Tumkur Lok Sabha constituency are Kardi, Gubbi, Tumkur, Tiptur railway stations.
New Line & Electrification Works / Projects Completed Cost in Crores. • Nelamangala to Shravanabelagola New line commissioned in March 2017. ₹ 65 Works / Projects in Progress Cost in Crores. • Doubling between Arsikere to Tumkur is in progress. ₹ 490 Works / Projects Planned Cost in Crores. • New Railway line from Tumkur to Chitradurga to Davangere is in progress ₹ 1801 • Electrifications of 95 Kms between Tumkur and Arsikere is planned. ₹ 114 • Electrifications of 21 Kms between Yesvantpur and Tumkur of Bengaluru ₹ 25 Hubballi main line is planned.
New Trains and Stoppages • Train No.22695/82653 Yesvantpur to Jaipur Weekly Express, stoppage at Tumkur station. • Train No.16587/16588 Yesvantpur to Bikaner Bi-Weekly Express, stoppage at Tumkur station and Tiptur station. • Train No.18111/18112 Tatanagar to Yesvantpur Weekly Express, stoppage at Tumkur station. • Train No.14805/14806 Yesvantpur-Barmer weekly express given new stoppage at Tumkur station
• Train No.12777/12778 Hubli-Kochuveli weekly express given new stoppage at Tumkur station • Train No.17325/17326 Hubballi - Mysuru, Vishwamanava Daily Express via KSR Bengaluru, stoppage at Tumkur station. • Train No.16578/16577 Harihar Yashvanthpur Tri weekly intercity express. Stoppages at Tumkur and Tiptur Stations. • Train No.17325/17326 Hubli to Mysore Vishwamanava express introduced on 23.05.2017 and regular service commenced from 24.05.2017. • Train No.16229/16230 Mysuru - Varanasi Bi-Weekly Express. Stoppage at Tumkur station. • Train No.16579/16580 Yesvantpur-Shimoga Town Bi-Weekly Express. Stoppages at Tumkur and Tiptur stations. • Train No.16581/16582 Yesvantpur - Shivamogga Tri-Weekly Express. Stoppage at Tumkur and Tiptur Stations.
Passenger Amenities Works / Projects Completed Cost in Lakhs • Boundary wall Fencing of prevent encroachment on railway land Tiptur ₹ 39.9 • Raising and Extension of Rail Level platforms at Hirehalli, Kyatasandra Stations. ₹ 36.0 • Provision of Low Level Platform shelter in Gubbi, Banasandra, Nittur, Sampige ₹ 21.0 Road, Karadi, Kumsi and Mallasandra stations. • Granite platform benches provided at Tiptur station. ₹ 6.2 • Auto announcement system provided at Tiptur station. ₹ 4.9 TUMKUR LOKSABHA CONSTITUENCY.
Works / Projects in Progress Cost in Lakhs • Provision of Bituminous approach road at Nittur, Banasandra, Adihalli, Karadi ₹ 20.4 and Sampige Road stations is under progress. • Replacement of neon sign board by LED glow sign board at Tumkur Station ₹ 11.0 • provision of LED fittings at stations, circulating area etc. ₹ 2.0 • Providing facilities for differently abled persons at Tiptur station is under ₹ 1.0 progress. Works / Projects planned Cost in Lakhs • Provision of Solar street light system at approach roads of Tiptur and Tumkur ₹ 7.0 stations is planned.
Traffic Facilities Works/ Projects Completed Cost in Lakhs • Road under Bridge Constructed near Hirehalli completed. ₹ 5800 • Remodelling of Tumkur Yard ₹ 1500 • Additional running line commissioned at Kardi station. ₹ 420.9 • Additional running line commissioned at Gubbi station. ₹ 420.9 • Two Subways in lieu of Level Crossing Gates Numbering 52 and 76 between ₹ 372.6 Gubbi and Tiptur stations completed. • Subway in lieu of Level Crossing Gate Number 75 at between Banasandra and ₹ 221.5 Karadi stations completed. • Subway in lieu of Manned Level Crossing No. 112 between Banavera and ₹ 221.5 Devanur stations completed. • Subway in lieu of Level Crossing Gate Number 43 between Tumkur and ₹ 216.8 Mallasandra stations completed. • Subway in lieu of Level Crossing Gate Number 45 between Tumkur and ₹ 216.8 Mallasandra stations completed. • Subway in lieu of Level Crossing Gate Number 54 between Gubbi and Nittur ₹ 216.8 stations completed. • Subway in lieu of Level Crossing Gate Number 56 at between Gubbi and Nittur ₹ 216.8 stations completed. • Subway in lieu of Level Crossing Gate Number 65 between Nittur and Sampige ₹ 216.8 Road stations completed. • Subway in lieu of Level Crossing Gate Number 74 between Banasandra and ₹ 216.8 Karadi stations completed. • Road under Bridge Constructed near Hirehalli completed. ₹ 58.0 Works/ Projects in progress Cost in Lakhs • Road Over Bridge with subway at Tiptur in lieu of level crossing gate no. 84 is ₹ 1500 being constructed. • Road Under Bridge near Honnavalli in lieu of Level crossing gate no. 91 is being ₹ 160 constructed. • Provision of Height Gauge for subway No.24 between Banasandra and Karadi ₹ 10.8 stations is under progress. Works/ Projects planned Cost in Lakhs • Road Over Bridge in lieu of Level Crossing Gate No. 84 with Subway at Tiptur is ₹ 1500 planned. • Subway in lieu of Level Crossing Gate Number 66 between Sampige and ₹ 500 Ammasandra stations is planned. TUMKUR LOKSABHA CONSTITUENCY.
• Subway in lieu of Level Crossing Gate No. 91 between Honavalli and Adihalli ₹ 200 stations is planned. • Subway in lieu of Level Crossing Gate Number 80 between Kardi and Tiptur ₹ 200 stations is planned. • Subway in lieu of Level Crossing Gate Number 11 between Bansandra and Kardi ₹ 200 stations is planned. • Subway in lieu of Level Crossing Gate Number 63 between Nittur and Sampige ₹ 100 Road stations is planned.
Additional Facilities Works/ Projects completed Cost in Lakhs • Provision of ground level water reservoir of One lakh litres capacity done at ₹ 19.5 Tumkur and Ammasandra stations. Works/ Projects in progress Cost in Lakhs • Reconstruction of 10 units of Staff Quarters at Gubbi is under progress. ₹ 60.5 • Provision of Diesel Generating sets at Tiptur station is under progress. ₹ 4.7 Works/ Projects planned Cost in Lakhs • Replacement of existing stone slab Bridges with RCC slab in 13 between ₹ 61.9 Mysuru and Arsikere and between Tumkur and Arsikere Junction is planned. • Provision of Diesel Generating sets at Tiptur Stations is planned. ₹ 18.9 • Improvements to underground drainage arrangements at Mallasandra, Gubbi, ₹ 12.9 Nittur, Ammasandra, Banasandra, Karadi, Honnavalli Road, Adihalli, Banavar, Devanur and Ballekere stations is planned
List of Projects / works commissioned at various Railway stations coming under Tumakuru Lok Sabha Constituency
Assembly Constituencies
Under Bengaluru Division - Tumakuru City & Tumakuru Rural Under Mysuru Division - Chikkanayakanahalli, Tiptur, Turvekere, Koratagere, Gubbi and Madhugiri
Raising and Extension of Rail Level Platforms Hirehalli Station
New Stoppages Provided Train At Mysuru – Varanasi – Mysuru Bi-weekly Express Newly introduced Yesvantpur – Shivamogga – Yesvantpur Bi-weekly Express Jaipur – Yesvantpur – Jaipur Weekly Express Bikaner – Yesvantpur – Bikaner Bi-weekly Express Yesvantpur – Tatanagar – Yesvantpur Weekly Express Tumakuru Newly introduced Yesvantpur – Harihar – Yesvantpur Tri-weekly Express Newly introduced Mysuru – Hubballi – Mysuru Vishwamanava Express Yesvantpur – Barmer – Yesvantpur Weekly Express Hubballi – Kochuveli – Hubballi Weekly Express
Amenities at Stations Station Amenities Cost (Rs.)
Hirehalli & Kyatsandra Raising and Extension of Rail level platforms 36 Lakhs