LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP123367091 Metro Orange Line Landscape and Irrigation System Maintenance

Total Page:16

File Type:pdf, Size:1020Kb

LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP123367091 Metro Orange Line Landscape and Irrigation System Maintenance LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP123367091 Metro Orange Line Landscape and Irrigation System Maintenance Bids Out: 05/14/12 Total 16 Bids Opened: 06/21/12 Total 7 Marina Landscape Complete Landscape Care, Inc. Far-East Landscape Conejo Crest Landscape Advertisement Date(s): 05/14/12 Newspaper: LA Daily News THREE YEAR BASE UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST Col. A- Col. B- Col. A- Col. B- Col. A- Col. B- Col. A- Col. B- FACILITY/LOCATION MONTHLY ANNUAL MONTHLY ANNUAL MONTHLY ANNUAL MONTHLY ANNUAL A. BUSWAY STATIONS (Weekly Service Required) 1. North Hollywood Station $340.16 $4,081.92 $420.00 $5,040.00 $280.00 $3,360.00 $46.00 $552.00 2. Laurel Canyon Station $174.26 $2,091.12 $420.00 $5,040.00 $250.00 $3,000.00 $291.00 $3,492.00 3. Valley College Station $155.09 $1,861.08 $375.00 $4,500.00 $260.00 $3,120.00 $190.00 $2,280.00 4. Woodman Station $287.53 $3,450.36 $375.00 $4,500.00 $280.00 $3,360.00 $215.00 $2,580.00 5 Van Nuys Station $156.84 $1,882.08 $420.00 $5,040.00 $240.00 $2,880.00 $91.00 $1,092.00 6. Sepulveda Station $162.07 $1,944.84 $420.00 $5,040.00 $300.00 $3,600.00 $293.00 $3,516.00 7. Woodley Station $218.41 $2,620.92 $375.00 $4,500.00 $260.00 $3,120.00 $317.00 $3,804.00 8. Balboa Station $156.85 $1,882.20 $420.00 $5,040.00 $270.00 $3,240.00 $99.00 $1,188.00 9. Reseda Station $160.32 $1,923.84 $375.00 $4,500.00 $260.00 $3,120.00 $207.00 $2,484.00 10. Tampa Station $183.56 $2,202.72 $375.00 $4,500.00 $220.00 $2,640.00 $342.00 $4,104.00 11. Pierce College Station $187.04 $2,244.48 $375.00 $4,500.00 $210.00 $2,520.00 $129.00 $1,548.00 12. De Soto Station $188.79 $2,265.48 $375.00 $4,500.00 $220.00 $2,640.00 $288.00 $3,456.00 13. Canoga Station $132.44 $1,589.28 $420.00 $5,040.00 $210.00 $2,520.00 $299.00 $3,588.00 14. Warner Center Station $214.93 $2,579.16 $525.00 $6,300.00 $260.00 $3,120.00 $372.00 $4,464.00 15. Sherman Way Station $55.76 $669.12 $300.00 $3,600.00 $260.00 $3,120.00 $321.00 $3,852.00 16. Roscoe Station $47.63 $571.56 $300.00 $3,600.00 $240.00 $2,880.00 $390.00 $4,680.00 17. Nordoff Station $34.85 $418.20 $300.00 $3,600.00 $320.00 $3,840.00 $482.00 $5,784.00 18. Chatsworth Station $212.60 $2,551.20 $300.00 $3,600.00 $330.00 $3,960.00 $240.00 $2,880.00 BUS WAY STATION TOTAL $36,829.56 $82,440.00 $56,040.00 $55,344.00 UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST Col. A- Col. B- Col. A- Col. B- Col. A- Col. B- Col. A- Col. B- FACILITY/LOCATION MONTHLY ANNUAL MONTHLY ANNUAL MONTHLY ANNUAL MONTHLY ANNUAL B. PARK AND RIDE LOTS (Weekly Service Required) 1. North Hollywood Station Parking Lot $369.44 $4,433.28 $900.00 $10,800.00 $320.00 $3,840.00 $86.00 $1,032.00 2. Van Nuys Station South East Park/Ride Lot # 1 $2,207.34 $26,488.08 $750.00 $9,000.00 $250.00 $3,000.00 $514.00 $6,168.00 3. Van Nuys Station South East Park/Ride Lot # 2 $2,134.73 $25,616.76 $1,050.00 $12,600.00 $270.00 $3,240.00 $572.00 $6,864.00 4. Van Nuys Station North West Park/Ride Lot # 1 $627.35 $7,528.20 $825.00 $9,900.00 $200.00 $2,400.00 $385.00 $4,620.00 5. Van Nuys Station North West Park/Ride Lot # 2 $992.14 $11,905.68 $900.00 $10,800.00 $210.00 $2,520.00 $506.00 $6,072.00 6. Sepulveda Station Park/Ride Lot $12,290.46 $147,485.52 $900.00 $10,800.00 $168.00 $2,016.00 $5,587.00 $67,044.00 7. Balboa Station Park/Ride Lot $2,453.63 $29,443.56 $750.00 $9,000.00 $200.00 $2,400.00 $521.00 $6,252.00 8. Reseda Station Park/Ride North West Lot $1,428.96 $17,147.52 $900.00 $10,800.00 $150.00 $1,800.00 $627.00 $7,524.00 9. Reseda Station Park/Ride South East Lot $1,344.15 $16,129.80 $750.00 $9,000.00 $150.00 $1,800.00 $916.00 $10,992.00 10. Reseda Station Park/Ride South West Lot $947.99 $11,375.88 $900.00 $10,800.00 $150.00 $1,800.00 $805.00 $9,660.00 11. Pierce College Station Park/Ride Lot $2,892.77 $34,713.24 $750.00 $9,000.00 $170.00 $2,040.00 $772.00 $9,264.00 12. Canoga Station Park/Ride Lot $5,951.68 $71,420.16 $750.00 $9,000.00 $310.00 $3,720.00 $874.00 $10,488.00 13. Sherman Way Station Park/Ride Lot $975.88 $11,710.56 $900.00 $10,800.00 $270.00 $3,240.00 $918.00 $11,016.00 14. Chatsworth Station Park/Ride Lot $4,281.65 $51,379.80 $900.00 $10,800.00 $290.00 $3,480.00 $2,340.00 $28,080.00 PARK AND RIDE LOTS TOTAL $466,778.04 $143,100.00 $37,296.00 $185,076.00 Page 1 of 8 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY BID TABULATION Bid No: OP123367091 Metro Orange Line Landscape and Irrigation System Maintenance Bids Out: 05/14/12 Total 16 Bids Opened: 06/21/12 Total 7 Marina Landscape Complete Landscape Care, Inc. Far-East Landscape Conejo Crest Landscape Advertisement Date(s): 05/14/12 Newspaper: LA Daily News UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST UNIT RATES/ANNUAL COST Col. A- Col. B- Col. A- Col. B- Col. A- Col. B- Col. A- Col. B- FACILITY/LOCATION MONTHLY ANNUAL MONTHLY ANNUAL MONTHLY ANNUAL MONTHLY ANNUAL C. RIGHT OF WAY PORTIONS (Weekly Service Required) 1. North Hollywood Station to Laurel Canyon / Valley Village Station East (including planting in exterior fenced area) $581.69 $6,980.28 $1,425.00 $17,100.00 $2,300.00 $27,600.00 $2,401.00 $28,812.00 2. Laurel Canyon / Valley Village West to Corteen (including planting in exterior fenced area $213.88 $2,566.56 $1,275.00 $15,300.00 $1,200.00 $14,400.00 $1,590.00 $19,080.00 3. Corteen to Whitsett Ave. (including planting in exterior fenced area) $128.26 $1,539.12 $1,425.00 $17,100.00 $1,200.00 $14,400.00 $305.00 $3,660.00 4. Whitsett Ave. to Bellaire Ave. (including planting in exterior fenced area) $335.71 $4,028.52 $1,350.00 $16,200.00 $1,500.00 $18,000.00 $250.00 $3,000.00 5. Bellaire Avenue to Coldwater Canyon (including planting in exterior fenced area) $366.23 $4,394.76 $1,350.00 $16,200.00 $1,100.00 $13,200.00 $238.00 $2,856.00 6. Coldwater Canyon to Chandler (including planting in exterior fenced area) $294.20 $3,530.40 $1,350.00 $16,200.00 $1,300.00 $15,600.00 $291.00 $3,492.00 7. Chandler to Ethel Ave. $16.58 $198.96 $1,425.00 $17,100.00 $1,400.00 $16,800.00 $271.00 $3,252.00 8. Ethel Ave. to Valley College Station East (excluding areas behind sound wall) $83.34 $1,000.08 $1,350.00 $16,200.00 $2,600.00 $31,200.00 $730.00 $8,760.00 9. Valley College Station West to Woodman Station East & West $963.38 $11,560.56 $1,575.00 $18,900.00 $2,900.00 $34,800.00 $2,608.00 $31,296.00 10. Woodman Station to Hazeltine Ave. $447.97 $5,375.64 $1,275.00 $15,300.00 $1,200.00 $14,400.00 $1,566.00 $18,792.00 11. Hazeltine Ave. to Van Nuys Station East & West $257.28 $3,087.36 $1,575.00 $18,900.00 $1,100.00 $13,200.00 $1,043.00 $12,516.00 12. Van Nuys Station to Kester Ave. $378.64 $4,543.68 $1,275.00 $15,300.00 $1,200.00 $14,400.00 $1,149.00 $13,788.00 13. Kester Ave. to Sepulveda Blvd. Station $299.82 $3,597.84 $1,425.00 $17,100.00 $2,500.00 $30,000.00 $1,201.00 $14,412.00 14. Sepulveda Station East & West to Woodley Station East $1,382.57 $16,590.84 $1,575.00 $18,900.00 $2,400.00 $28,800.00 $2,869.00 $34,428.00 15, Woodley Station West to Balboa Station East & West $1,350.06 $16,200.72 $1,575.00 $18,900.00 $2,300.00 $27,600.00 $2,713.00 $32,556.00 16.
Recommended publications
  • Joint Development Program
    POTENTIAL JOINT DEVELOPMENT SITES North Hollywood: 17.40 Acres Universal City: 12.00 Acres Metro Orange Line Sepulveda Station: 12.48 Acres Chatsworth Metrolink Station: 12.00 Acres Metro Gold Line Eastern Extension: Various Parcels Taylor Yard: 23.00 Acres Blue Line Artesia Station 6.4 acres Bus Divisions (Div. 7; El Monte) Metro Orange Line Balboa Station 2.2 acres Vermont/Beverly 0.5 acre Vermont/Sunset 0.7 acre North Hollywood Station Metro Red Line Site Description The project site consists of two separate parcels adjacent to Metro Red Line North Hollywood Station: • Parcel 1 is located east of Lankershim Boulevard and bounded by Cumpston Street on the north, South Chandler Boulevard on the south and Fair Avenue on the east. It consists of approximately 10.45 acres and is currently used for the North Hollywood Station entrance, a 14-bay bus layover site and a 1,101-space auto parking surface lot. •Parcel 2 is located west of Lankershim Boulevard and bounded by South Chandler Boulevard on the north, Bakman Avenue on the west and Weddington Avenue on the south. It is approximately 1.8 acres and currently serves Metro construction-related uses. Though not directly connected to Metro Red Line, this parcel can be directly linked to the station through an existing knockout panel. North Hollywood Station Metro Red Line Zoning • Parcel 1: C2-2D-CA • Parcel 2: C4-2D-CA • Parcel 3: PF • Parcel 4: C21a Area Context Located in the North Hollywood Redevelopment Project Area Major projects in the area include: • NoHo Academy completed in 1991 - a mixed-use project including an eight-story office and retail building, the Academy of Television Arts and Sciences entertainment complex, and a 250-unit multi-family residential project • NoHo Commons - a 23-acre mixed-use project consisting of approximately 1.2 million square feet (sf) including 810 residential units, 228,000 s.f.
    [Show full text]
  • Transit Service Plan
    Attachment A 1 Core Network Key spines in the network Highest investment in customer and operations infrastructure 53% of today’s bus riders use one of these top 25 corridors 2 81% of Metro’s bus riders use a Tier 1 or 2 Convenience corridor Network Completes the spontaneous-use network Focuses on network continuity High investment in customer and operations infrastructure 28% of today’s bus riders use one of the 19 Tier 2 corridors 3 Connectivity Network Completes the frequent network Moderate investment in customer and operations infrastructure 4 Community Network Focuses on community travel in areas with lower demand; also includes Expresses Minimal investment in customer and operations infrastructure 5 Full Network The full network complements Muni lines, Metro Rail, & Metrolink services 6 Attachment A NextGen Transit First Service Change Proposals by Line Existing Weekday Frequency Proposed Weekday Frequency Existing Saturday Frequency Proposed Saturday Frequency Existing Sunday Frequency Proposed Sunday Frequency Service Change ProposalLine AM PM Late AM PM Late AM PM Late AM PM Late AM PM Late AM PM Late Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl R2New Line 2: Merge Lines 2 and 302 on Sunset Bl with Line 200 (Alvarado/Hoover): 15 15 15 20 30 60 7.5 12 7.5 15 30 60 12 15 15 20 30 60 12 12 12 15 30 60 20 20 20 30 30 60 12 12 12 15 30 60 •E Ğǁ >ŝŶĞϮǁ ŽƵůĚĨŽůůŽǁ ĞdžŝƐƟŶŐ>ŝŶĞƐϮΘϯϬϮƌŽƵƚĞƐŽŶ^ƵŶƐĞƚůďĞƚǁ
    [Show full text]
  • Los Angeles Orange Line
    Metro Orange Line BRT Project Evaluation OCTOBER 2011 FTA Report No. 0004 Federal Transit Administration PREPARED BY Jennifer Flynn, Research Associate Cheryl Thole, Research Associate Victoria Perk, Senior Research Associate Joseph Samus, Graduate Research Assistant Caleb Van Nostrand, Graduate Research Assistant National Bus Rapid Transit Institute Center for Urban Transportation Research University of South Florida CCOOVVEERR PPHHOTOOTO LLooss AAnnggeelleess CCoouunnttyy MMeettrrooppololiittanan TTransransppoorrttaattioionn AAuutthhoorriittyy DDIISCSCLLAAIIMMEERR TThhiis ds dooccuumemennt it is is inntteennddeed ad as a ts teecchhnniiccaal al assssiissttaanncce pe prroodduucctt. I. It it is dsiiss ssdeemmiinnaatteed udnn ddueer tr thhe sepp oosnnssoorrsshhiip opf tf tohhe Ue..SS U.. DDeeppaarrttmemennt ot of Tf Trraannssppoorrttaattiioon in in tn thhe ie inntteerreesst ot of if innffoorrmamattiioon enxxcc ehhaannggee. T. Thhe Uenn iittUeed Sdttaa Sttees Gsoo vvGeerrnnmemennt atss ssauumemes nso nlo liiaabbiilliittyy ffoor ir itts cs coonntteenntts os or ur usse te thheerreeooff. T. Thhe Ue Unniitteed Sd Sttaattees Gs Goovveerrnnmemennt dtoo eeds nsoo tn et ennddoorrsse perroo pdduucctts osf mfo aa nnmuuffaaccttuurreerrss. T. Trraadde oerr o mamannuuffaaccttuurreerrss’ n’ naamemes as appppeeaar her herreeiin sn soolleelly by beeccaauusse te thheey ayrre a ceoo nncssiiddeerreed edssss eeennttiiaal tl to tohh et oebb jjeeoccttiivve oef tf tohhiis rs reeppoorrtt.. Metro Orange Line BRT Project Evaluation OCTOBER 2011 FTA Report No. 0004 PREPARED BY Jennifer Flynn, Research Associate Cheryl Thole, Research Associate Victoria Perk, Senior Research Associate Joseph Samus, Graduate Research Assistant Caleb Van Nostrand, Graduate Research Assistant National Bus Rapid Transit Institute Center for Urban Transportation Research University of South Florida 4202 E. Fowler Avenue, CUT100 Tampa, FL 33620 SPONSORED BY Federal Transit Administration Office of Research, Demonstration and Innovation U.S.
    [Show full text]
  • Value-Add Opportunity
    52-U NIT A PA RTMENT B U ILDING TARZANA, CALIFORNIA RESEDA GARDENS $10,500,000 www.ResedaGardens.com FOR MORE INFORMATION, PLEASE CONTACT: LAURIE LUSTIG-BOWER Executive Vice President Lic 00979360 +1 310 550 2556 [email protected] KADIE PRESLEY WILSON Senior Sales Director Lic 01476551 +1 310 550 2575 [email protected] VALUE-ADD OPPORTUNITY SOUTH EASTERN EXPOSURE SANTA PACIFIC MONICA OCEAN ENCINO VENTURA BLVD 101 TARZANA RESEDA PARK LAKE VICTORY BLVD RESEDA BLVD 5 EXECUTIVE SUMMARY www.ResedaGardens.com 6 EXECUTIVE SUMMARY CBRE, Inc., as exclusive agent, is pleased to present for sale Reseda Gardens, a value-add 52-unit apartment property located in the San Fernando Valley neighborhood of Tarzana, just one mile north of famous Ventura Boulevard. The Property, with address 6251-67 Reseda Boulevard, is priced below replacement cost at $10,500,000 and has significant upside potential. Built in 1960, the Property has been owned by the same family for almost 20 years. The current ownership upgraded a handful of units with new laminate flooring and paint and was able to achieve significantly higher rents. If a buyer were to upgrade the units further and bring all the tenants to market, the upside potential is approximately 28% and the cash-on-cash return would be approximately 5%. Reseda Gardens features a sparkling swimming pool and a well-manicured lawn in a courtyard- OPPORTUNITY HIGHLIGHTS style building. It has a desirable unit mix of mostly one and two bedroom units with a handful of three • Priced Below Replacement Costs bedrooms as well.
    [Show full text]
  • January 2015
    metro.net Metro Orange Line Connections h s a W h s a a Hansen Dam n DEVONSHIRE ST DEVONSHIRE ST DEVONSHIRE ST 5 a W s u r S Chatsworth Station u a lb t i ARLETA AVG Metro Rapid Stop n 405 W W O a Chatsworth Station L S O D METROLINK GLENOAKS BL O E LAUREL CYN BL D Metro Rapid Line TOPANGA CYN BL CYN TOPANGA TOPANGA CYN BL CYN TOPANGA N M LASSEN ST LASSEN ST LASSEN ST A N S Metro Orange Line T SAN FERNANDO RD CHATSWORTH A A T Station VA V E TAMPA AV TAMPA Sepulveda Metro Orange Line CORBIN AV ZELZAH AV F WILBUR AV RESEDA BL RESEDA PLUMMER ST PLUMMER ST PLUMMER BL BALBOA ST PLUMMER ST ARLETA W DE SOTO AV DE SOTO WOODLEY AV WOODLEY Y WINNETKA AV SEPULVEDA BL SEPULVEDA Metro Rail Station VINCENNES ST TERRA BELLA ST Northridge East CanyonARLETA Channel AV SUN AMTRAK/METROLINK 27 Fashion CSUN NORTH HILLS VALLEY Metro Red Line Center NORTHRIDGE NORDHOFF ST AV DARBY NORDHOFF ST NORDHOFF ST OSBORNE ST Transfers SAN DIEGO FWY Nordhoff Station Metrolink h SHELDON ST NORDHOFF ST Northridge Station s a PANORAMA W Amtrak 5 Bull Creek BRANFORD ST PARTHENIA ST PARTHENIA ST PARTHENIA ST CITY Parking a 15-0989 ©2014 LACMTA m H WEST HILLS i o CHASE ST O DEC 2014 Subject to Change c L a L P ROSCOE BL Roscoe Station ROSCOE BL ROSCOE BL Y W TUXFORD ST O O Sun Valley Station METROLINK D Aliso Canyon Wash Aliso Canyon SAN FERNANDO RD STRATHERN ST STRATHERN ST F STRATHERN ST W Y DE SOTO AV DE SOTO Van Nuys Station Tujunga Wash FlyAway WHITSETT AV Bus Terminal NUYS BL VAN WHITE OAK AV WHITE OAK TAMPA AV TAMPA VARIEL AV VARIEL WOODLAKE AV WOODLAKE WOODLAKE AV
    [Show full text]
  • Metro Public Hearing Pamphlet
    Proposed Service Changes Metro will hold a series of six virtual on proposed major service changes to public hearings beginning Wednesday, Metro’s bus service. Approved changes August 19 through Thursday, August 27, will become effective December 2020 2020 to receive community input or later. How to Participate By Phone: Other Ways to Comment: Members of the public can call Comments sent via U.S Mail should be addressed to: 877.422.8614 Metro Service Planning & Development and enter the corresponding extension to listen Attn: NextGen Bus Plan Proposed to the proceedings or to submit comments by phone in their preferred language (from the time Service Changes each hearing starts until it concludes). Audio and 1 Gateway Plaza, 99-7-1 comment lines with live translations in Mandarin, Los Angeles, CA 90012-2932 Spanish, and Russian will be available as listed. Callers to the comment line will be able to listen Comments must be postmarked by midnight, to the proceedings while they wait for their turn Thursday, August 27, 2020. Only comments to submit comments via phone. Audio lines received via the comment links in the agendas are available to listen to the hearings without will be read during each hearing. being called on to provide live public comment Comments via e-mail should be addressed to: via phone. [email protected] Online: Attn: “NextGen Bus Plan Submit your comments online via the Public Proposed Service Changes” Hearing Agendas. Agendas will be posted at metro.net/about/board/agenda Facsimiles should be addressed as above and sent to: at least 72 hours in advance of each hearing.
    [Show full text]
  • 242 Trips at Ventura and Winnetka Monday Through Friday 242
    Monday through Friday Effective Jun 27 2021 243 Northbound on Winnetka (Approximate Times) WOODLAND HILLS WINNETKA NORTHRIDGE CHATSWORTH PORTER RANCH 1 2 4 6 8 Ventura & Winnetka Winnetka & Vanowen Nordhoff & Corbin Mason & Devonshire Rinaldi & Town Center 5:30A 5:35A 5:44A 5:51A 5:57A 6:30 6:35 6:44 6:51 6:57 7:30 7:36 7:45 7:53 7:59 8:30 8:36 8:46 8:54 9:00 9:30 9:36 9:46 9:54 10:00 10:30 10:36 10:46 10:54 11:00 11:30 11:36 11:47 11:55 12:01P 12:30P 12:36P 12:47P 12:55P 1:01 1:30 1:36 1:47 1:55 2:01 2:30 2:36 2:47 2:55 3:01 3:30 3:36 3:47 3:54 4:00 4:30 4:35 4:45 4:52 4:58 5:30 5:35 5:45 5:52 5:58 6:30 6:35 6:45 6:52 6:58 7:30 7:35 7:45 7:52 7:58 8:30 8:35 8:45 8:52 8:58 Monday through Friday 243 Southbound on Winnetka (Approximate Times) PORTER RANCH CHATSWORTH NORTHRIDGE WINNETKA WOODLAND HILLS 8 6 4 2 1 Rinaldi & Town Center Mason & Devonshire Nordhoff & Corbin Winnetka & Vanowen Ventura & Winnetka 5:25A 5:35A 5:44A 5:54A 6:00A 6:25 6:35 6:44 6:54 7:00 7:25 7:35 7:44 7:54 8:00 8:24 8:34 8:43 8:53 9:00 9:24 9:34 9:43 9:53 10:00 10:24 10:34 10:43 10:53 11:00 11:24 11:34 11:43 11:53 11:59 12:25P 12:35P 12:43P 12:53P 1:00P 1:25 1:35 1:43 1:53 2:00 2:24 2:35 2:43 2:53 3:00 3:24 3:35 3:43 3:53 4:00 4:24 4:35 4:43 4:53 5:00 5:24 5:35 5:43 5:53 6:00 6:27 6:36 6:44 6:54 7:00 7:28 7:37 7:45 7:54 8:00 8:28 8:37 8:45 8:54 9:00 Note: Southbound trips continue as Northbound 242 trips at Ventura and Winnetka Monday through Friday 242 Northbound on Tampa (Approximate Times) WOODLAND HILLS RESEDA NORTHRIDGE PORTER RANCH 1 3 5 7 8 Ventura & Winnetka
    [Show full text]
  • Increasing Bus Transit Ridership: Dynamics of Density, Land Use, and Population Growth
    Increasing Bus Transit Ridership: Dynamics of Density, Land Use, and Population Growth Final Report May 2005 Metrans Project Project Group Dr. Tridib Banerjee Principal Investigator Dr. Dowell Myers Co-Principal Investigator Dr. Clara Irazabal Co-Principal Investigator Deepak Bahl, Associate Director USC Center for Economic Development Lu Dai, Research Assistant David Gloss, Research Assistant Amrith Raghavan, Research Assistant Navin Vutha, Research Assistant School of Policy, Planning, and Development University of Southern California Los Angeles, CA 90089-0626 Disclaimer The contents of this report reflect the views of the authors, who are responsible for the facts and the accuracy of the information presented herein. This document is disseminated under the sponsorship of the Department of Transportation, University Transportation Centers Program, and California Department of Transportation in the interest of information exchange. The U.S. Government and California Department of Transportation assume no liability for the contents or use thereof. The contents do not necessarily reflect the official views or policies of the State of California or the Department of Transportation. This report does not constitute a standard, specification, or regulation. ii Abstract The study explores the possibilities of revitalizing existing urban communities, increasing transit ridership, decreasing jobs-housing imbalance, and mitigating the impacts of sprawl from transit corridor development or TCD, a variant of the more general class of TOD or transit-oriented development. We present findings of a study that focuses on the relationship between transit ridership and density and mixed land use developments along major arterial corridors in Los Angeles. Our research focuses on Ventura Boulevard and Vermont Avenue as a comparative study of two heavily subscribed transit corridors.
    [Show full text]
  • Table of Contents
    Educational Master Plan Los Angeles Valley College Table of Contents Section Page Acknowledgements i Executive Summary iii Presidents’ Message v Chapter 1. Introduction Introduction ............................................................................................1 Context ...................................................................................................1 Planning Methodology ...........................................................................6 Chapter 2. Strategic Research Introduction .......................................................................................... 11 Environmental Scan .............................................................................12 Internal Scan ........................................................................................29 Chapter 3. Key Planning Statements Introduction ..........................................................................................39 LA Valley College Core Commitments .................................................39 LA Valley College Vision Statement .....................................................41 LA Valley College Mission Statement ..................................................41 Chapter 4. Design for the Future Introduction ..........................................................................................42 Goals, Objectives and Strategies .........................................................43 Chapter 5. Facilities and Space Analysis Introduction ..........................................................................................75
    [Show full text]
  • I've Travelled a Lot on Amtrak Over the Years. At
    I’ve travelled a lot on Amtrak over the years. At one time or another I’d taken most of the major trains that head west: the California Zephyr, the Southwest Chief, and the Empire Builder. There was one branch of the Amtrak map, though, that I’d never taken. That was the Sunset Limited, the once grand old train that runs across the bottom of the country on the old Southern Pacific tracks. I’ve always wanted to take that train, and the wish would finally be granted on this trip. My main vacation in 2016 would take me to Los Angeles. I haven’t been to that city in a decade, yet when I stepped off the train platform at Union Station it seemed like I’d just been there yesterday. Everything was wonderfully familiar. L.A. is not a city I know really well (like Chicago), but it’s still a place that feels like home. It was good to get back there—to return to some old favorite places and to check out some things I hadn’t seen before. While our trip wouldn’t officially begin until tomorrow, I’m starting my re-cap today. My sister Margaret, who would accompany me on this vacation, came over to my place around 1:30pm. The bulk of the day was spent working with her laptop computer. She wanted to install Windows 10 on the machine before the free upgrade offer expired. When I upgraded my two computers a year ago, all the necessary programs downloaded in the background for days or weeks prior to the changeover.
    [Show full text]
  • Orange Line Transit Neighborhood Plans Community Workshop & Initial Concepts: Summary of Comments November and December 2017
    ORANGE LINE TRANSIT NEIGHBORHOOD PLANS COMMUNITY WORKSHOP & INITIAL CONCEPTS: SUMMARY OF COMMENTS NOVEMBER AND DECEMBER 2017 Executive Summary The Orange Line Transit Neighborhood Plans (TNP) project aims to develop land use, zoning, and design regulations for the neighborhoods surrounding five Metro Orange Line stations in the south San Fernando Valley: North Hollywood, Van Nuys, Sepulveda, Reseda, and Sherman Way. The study area generally includes the corridors and some residential areas within a 15-minute walk or ½-mile radius of each station. During the first phase of the public planning process, in the first half of 2016, the Los Angeles Department of City Planning hosted four community workshops to identify opportunities to enhance neighborhoods surrounding transit stations, as well as several other small focus groups with specific stakeholder groups. Staff gathered input from the general public, including community residents, business owners, employees, transit users, and other participants about their thoughts, ideas, and concerns for the future of their neighborhood as it develops around transit, summarized here. Using the comments received through the first phase of outreach, in combination with station area context, existing City plans and policies, demographic analysis, and planning best practices, staff developed initial land use and zoning concepts for targeted changes in development rights and design regulations. These initial concepts were presented at two community workshops, on November 2, 2017 from 6-8:30 p.m.at the San Fernando Valley Arts & Cultural Center in Tarzana, and on November 15, 2017 from 6-8:30 p.m. at Van Nuys City Hall. Following these meetings, materials were made available online and staff solicited additional comments through the end of December.
    [Show full text]
  • Framework of Sustainable Transit Communities
    FRAMEWORK OF SUSTAINABLE TRANSIT COMMUNITIES OFFICE OF THE MAYOR, CITY OF LOS ANGELES FEBRUARY 2011 This is a project for the City of Los Angeles (City) with funding provided by the Southern California Association of Governments’ (SCAG) Compass Blueprint Program. Compass Blueprint assists Southern California cities and other organizations in evaluating planning options and stimulating development consistent with the region’s goals. Compass Blueprint tools support visioning efforts, infill analyses, and marketing and communications programs. The preparation of this report has been financed in part through grant(s) from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), U.S. Department of Transportation (DOT) in accordance with the provision under the Metropolitan Planning Program as set forth in Section 104(f) of Title 23 of the U.S. Code. The contents of this report reflect the views of the author, who is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of SCAG, DOT, or the State of California. This report does not constitute a standard, specification, or regulation. SCAG shall not be responsible for the City’s future use or adaptation of the report. FRAMEWORK OF SUSTAINABLE TRANSIT COMMUNITIES OFFICE OF THE MAYOR, CITY OF LOS ANGELES FEBRUARY 2011 TABLE OF CONTENTS 1 INTRODUCTION 3 OVERVIEW OF THE FRAMEWORK 4 Mix and Vitality of Uses 9 Well-Defined Sense of Place 11 Walkability and the Pedestrian Realm 14 Multimodal
    [Show full text]