ATTACHMENT 4 Participant Involvement Program Appendices W to X

Part 4 of 5 Appendix W November 2017 Open House Materials

Page 2 Page 3 Page 4 Page 5 Page 6 WELCOME TO EDF EN ’S OPEN HOUSE

Today you will be able to meet the team, learn more about the Project CYPRESS WIND POWER PROJECT and get answers to your questions.

Page 7 EDF EN CANADA

Wind 1 680 MW Solar Put into Service, under Construction or in

Development WIND & SOLAR 1 374 MW (350 000 homes) Commissioned Capacity 224 MW (54 900 homes) Under Construction 82 MW (20 100 homes) In Development

OPERATIONS & MAINTENANCE

1 061MW Wind >$3.5 billion invested in Canada since 2008 516 MW Solar

Page 8 EDF ENERGIES NOUVELLES

A WORLD LEADER IN RENEWABLE ENERGY

21countries throughout North America, South America, Europe, Africa, the Middle East, and India > 3,000 employees

Page 9 is changing the mix of power generation to include a larger portion of renewable energy in the province - including wind and solar.

In March 2017, the Alberta Electric System Operator WHAT IS THE (AESO) launched the Renewable Electricity Program (REP) – a competitive procurement program intended to encourage the AESO development of 5,000 MW by 2030. RENEWABLE ELECTRICITY The REP will administer a series of competitions. Round 1 of the program started in 2017 and the Project is interested in this PROGRAM? program.

The first round of the REP competition includes the procurement of up to 400 MW of renewable electricity for projects that will be operational by December 1, 2019.

More information can be found at www.aeso.ca

Page 10 WHY DID WE PICK THIS PROJECT SITE?

ALBERTA’S WIND RESOURCE

Close proximity to existing transmission

Strong wind resource

Supportive local community Compatible with existing agricultural use Compatible with existing agricultural use

Solas Energy Consulting Inc.

Page 11 PROJECT AND COMMUNITY ENGAGEMENT TIMELINE

Page 12 ALBERTA’S RENEWABLE ENERGY APPROVAL PROCESS

Step 7

The AUC issues its decision. Options the AUC may consider for:

Needs applications from the Alberta Electric System Operator: ▪ Approval of applications. ▪ Return to the Alberta Electric System Operator with suggestions. Step 5* ▪ Denial of application. Step 3 The AUC issues a notice of hearing, Step 1 * Facilities applications: if it was not already issued in Step The AUC issues a notice of ▪ Approval of application. three. Public consultation by the application or notice of ▪ Approval of application with conditions. ▪ Continued opportunity for applicant. hearing. ▪ Denial of application. consultation and negotiation with the applicant.

Step 8 Step 2 Step 4* Step 6* Step 9 Interested parties submit filings to Public Hearing Options to appeal decision Application filed with the Approvals, construction the AUC with any outstanding or ask the AUC to review its Alberta Utilities Commission and operation of facility, if issues or objections. If the AUC decision. (AUC) . approved. does not receive any submissions, the application will be reviewed and a decision may be made without a hearing.

*Denotes opportunity for public involvement.

Page 13 Global Installed Wind Capacity 2000-2015 WHY WIND MAKES SENSE

Wind energy reduces dependence on other forms of electricity MW= Clean power generation that contribute to greenhouse gas emissions. 1 ~ 300 homes Turbine

= 25 Households Local job Contractors, suppliers and local businesses benefit from the Every 1 000 MW of new wind energy drives $2.5 opportunities direct and indirect economic activity the project brings to the billion in investments, creates 10 500 person- years of employment, and provides enough clean local economy. power for over 300 000 Canadian homes. Clear air Wind energy emits no greenhouse gas during the production of Source: CanWEA http://windfacts.ca/community-property electricity.

Water Wind turbines do not use water to produce electricity. conservation

Predictable Wind generated electricity prices are fixed and stable, unlike pricing natural gas or oil which have volatile and unpredictable pricing.

Page 14 In 2014, Health Canada commissioned a $1.2 million study on the potential impacts of wind turbines on human health. A hardcopy of the key findings brochure is available. Please ask any EDF EN Canada staff for a copy.

HEALTH ▪ Illness and disease No evidence was found to support a link between CANADA exposure to wind turbine sound and any of the self- STUDY: reported illnesses and/or chronic conditions. WIND ▪ Stress No association was found between the multiple TURBINE measures of stress and exposure to wind turbine NOISE AND sound. ▪ Sleep HEALTH No association between wind turbine sound and self- STUDY reported or measured sleep quality. ▪ Annoyance and quality of life No association was found with any significant changes in reported quality of life, or with overall quality of life and satisfaction with health.*

Ontario Chief Medical Officer’s 2010 report which concluded: There is “no scientific evidence of any direct causal link between wind turbines and adverse health effects.”

Page 15 *Assessed using the World Health Organization’s Quality of Life Scale. “The Board finds there is no evidence to According to CANWEA, allow the Board to conclude that since the studies have consistently construction of the wind farm properties on shown there is no causal what [the landowner] defines as the west relationship between side of the Island have sold for less than wind farms and negative properties on the east side.” impacts on property values. (Source: Assessment Review Board. File No: WR WIND AND 113994. Municipality: Township of Frontenac Islands) PROPERTY VALUES

In 2014, MPAC (Municipal Property Assessment Corporation) performed a study that looked at all properties close to 1 157 turbines in total, and concluded that “there is no statistically significant impact on sale prices of residential properties in these market areas resulting from proximity to an industrial wind turbine.” (Source: Municipal Property Assessment Corporation)

Page 16 Well sited wind projects should have minimal impacts upon local bird and bat populations.

■ Working closely with Alberta Environment and Parks, EDF EN Canada Development will undertake significant bird and bat studies to quantify potential risks and develop mitigation tools to ensure sustainable AVIAN development. ■ Potential impact on birds, bats and raptors will be considered in the IMPACTS Environmental Evaluation. ■ A multi-year post-construction wildlife monitoring program will be “It is estimated that each undertaken to determine the actual Project effects. year more than 10 000 migratory birds are killed in A report published in Avian Conservation & Ecology stated: Toronto between the hours of 11:00 p.m. and 5:00 a.m. “Overall…the effects of collisions, nest mortality, and lost in collisions with brightly lit habitat on birds associated with Canadian wind farms office towers.” appear to be relatively small compared to other sources of Source: www.flap.org mortality.”

Source: Zimmerling, R. J., Pomeroy, A.C., d’Entremont, M. V., and Francis, C.M. (2013)

Page 17 ■ Support of local landowners is paramount to EDF EN Canada’s success. We work diligently to ensure our neighbors have a full understanding of the proposed projects. ■ Well-designed wind energy projects complement farming activity with minimal disruption. ■ We work very closely with our landowners to have project infrastructure fit with IN HARMONY current and future land use. WITH AGRICULTURE

Page 18 EDF EN Canada commenced environmental studies in 2016. Studies that will be completed in 2017 include:

▪ Wildlife – birds, bats and other wildlife ENVIRONMENTAL ▪ Wetlands AND TECHNICAL ▪ Noise Impact Assessment ACTIVITIES ▪ Historical Resources UNDERWAY Throughout the development of the Project, we will work closely with Wind power project Alberta Environment and Parks to ensure a robust understanding of the design includes consideration of impacts site. on wildlife and vegetation.

Page 19 ▪ All wind energy projects must meet Alberta Utilities Commission (AUC) Rule 012: Noise Control.

▪ The Noise Impact Assessment will be completed for all residences and NOISE IMPACT dwellings within 1.5 kilometres of ASSESSMENT the Project. ▪ The study will include the noise from the Project and other operational and proposed facilities nearby.

▪ The results of the Noise Impact Assessment were used to determine the final turbine layout.

▪ The resulting noise contours are available on the Infrastructure, Shadow Flicker, and Noise Maps for Options A and B.

Page 20 EDF EN Canada values the long-term benefits of working with the local community. If the Project is approved, the local community will benefit from:

▪ Employment opportunities during the construction and operation phases of the Project MUNICIPAL ▪ Contract opportunities for local businesses AND LOCAL ▪ Local investments into hospitality and construction services during COMMUNITY the development, construction and operation phases of the Project BENEFITS ▪ Tax revenues throughout the life of the Project

Page 21 ■ Direct benefits The Project will result in increased job opportunities for the local area. Some of these job opportunities may include:

Surveying Earthwork activities Civil engineering Maintenance of vehicle fleet LOCAL Mechanical work Maintenance paths Electrical work ECONOMIC Snow removal Road construction Other related services BENEFITS Transportation equipment

■ Indirect benefits Increased spending on goods and services during the operations and construction phases.

Page 22 ACCESS ROAD & TURBINE PAD

Construction Phase - 5 acres / turbine

A temporary turbine pad area of about 80m diameter will be created at each turbine location, in order to deliver all the required turbine components on each turbine pad.

Operational Phase – approximately 0.25 to 0.5 acres / turbine

After construction, the access road width and the turbine pad will be reduced to limit impacts on agricultural use. Access road and turbine pad during Turbine pad after operation construction Page 23 TURBINE FOUNDATION & COLLECTION SYSTEM CONSTRUCTION

■ The turbines will be installed on top of a buried, cast-in-place reinforced concrete foundation.

Foundation excavation. Diameter approx. 20 m Reinforcing steel installation. Between 40-50 tons of rebar Each foundation requires approx. 400-600 m3 of concrete.

■ The electrical system will consist of underground cables or overhead lines and a Project collector substation. Ploughing, trenching, and directional drilling will be used to install underground cables. The cabling will be buried at a depth that will not interfere with normal agricultural practices.

Substation connecting a project to a Buried collection system transmission line

Page 24 TURBINE ASSEMBLY

Transportation of turbine Tower assembly components 6 to 7 tower Approximately 12 trucks are sections. required for delivery of a complete turbine.

Blade assembly Nacelle installation The blades will be The nacelle weighs attached to the hub on about 65 tons. the ground or lifted one at a time onto the hub.

Page 25 OPERATION AND MAINTENANCE BUILDING & PERMANENT METEORLOGICAL TOWERS

■ An operation and maintenance (O&M) building will be built to allow operators to maintain the turbines and house spare parts. ■ Wind speed, wind direction, temperature and humidity will be measured by permanent meteorological towers. At least one permanent meteorological tower will remain on site for the duration of the Project.

Page 26 DEVELOPER EDF EN Canada Inc. PROJECT NAME Cypress Wind Power Project HOST MUNICIPALITIES CONTRACT CAPACITY Up to 235.2 MW

PROJECT ENERGY The Project will generate sufficient electricity to DESCRIPTION power up to 70,000 homes

Located on approximately 12,500 acres of privately LOCATION owned land

Each turbine will be linked to the Project collector substation by a collector system that will be underground, wherever practical. The location of the ELECTRIC SYSTEM Project collector substation has not been determined at this time.

The Project will be interconnected to the 240 kilovolt INTERCONNECTION (kV) transmission system in the area that is operated by AltaLink.

Page 27 Starting in 2016, we have continued to consider your feedback and have developed two project layouts. These are for the two proposed turbine models: Option A and Option B. We will file only one turbine model in the AUC application.

New Project updates include:

UPDATES ▪ Turbine Options A and B – Selected the Vestas SINCE APRIL V136 4.2 MW and the Gamesa G132 3.465 MW models 2017 OPEN ▪ Visual Simulations – Images for what the HOUSE Project may look like are available for review for Option A and Option B. ▪ Environmental Studies – Field work will be complete in 2017. ▪ Changes to the Project boundary – Reduced to minimize impact on the community. ▪ Shadow Flicker Analysis – Results are available in the Infrastructure, Shadow Flicker, and Noise Maps for Option A and Option B. ▪ Noise Impact Assessments – Noise contours are available in the Infrastructure, Shadow Flicker, and Noise Maps for Option A and Option B.

Page 28 ■ Wind Turbines – Vestas Turbines – Blades (68 metres) Blade Length 68 metres – Hub Height (82 metres) (223 feet) TYPICAL PROJECT – Rotor Diameter (136 metres) INFRASTRUCTURE – Foundation – Capacity (4.2 megawatts)

TURBINE OPTION A: ■ Access Roads Hub Height VESTAS V136 4.2 MW 82 metres ■ Temporary Laydown Area (269 feet) ■ Collector System ■ Project Collector Substation ■ Operation and Maintenance Building ■ Temporary and Permanent Meteorological Towers

Page 29 ■ Wind Turbines – Gamesa Turbines – Blades (66 metres) Blade Length 66 metres – Hub Height (84 metres) (217 feet) TYPICAL PROJECT – Rotor Diameter (132 metres) INFRASTRUCTURE – Foundation – Capacity (3.465 megawatts)

TURBINE OPTION B: ■ Access Roads Hub Height GAMESA G132 84 metres ■ Temporary Laydown Area (276 feet) 3.465 MW ■ Collector System ■ Project Collector Substation ■ Operation and Maintenance Building ■ Temporary and Permanent Meteorological Towers

Page 30 Based on public consultation and studies including environmental studies, constraints analyses, and wind resource assessments, we have selected Turbine Option A and Turbine Option B. Each Turbine Option is illustrated in the Infrastructure, Shadow Flicker and Noise maps.

TURBINE Turbine Option A Turbine Option B OPTION A Turbine Model Vestas V136 4.2 Gamesa G132 3.465 AND Turbine Capacity (MW) 4.2 3.465 Rotor Diameter TURBINE 136 132 OPTION B (metres) Hub Height 82 84 (metres) Blade Length 68 66 (metres) Number of Turbine 56 61 Locations Total Project Capacity 235.2 211.37 (MW)

Page 31 ▪ Shadow flicker is caused when the turbine blades cast a shadow on nearby residences.

▪ Residences within 2km of the project were considered in the SHADOW shadow flicker. FLICKER ▪ The worst-case scenario was evaluated, and does not account for ANALYSIS the orientation of windows or mitigation from nearby trees or structures.

▪ The shadow flicker results are presented on a color scale that correlates with the anticipated worst-case annual hours of shadow flicker. These are available on the Infrastructure, Shadow Flicker, and Noise Maps for Options A and B.

Page 32 THANK YOU FOR ATTENDING

Your feedback is important to us A WORLD Did you fill out a feedback form ? LEADER IN RENEWABLE ENERGY CONTACT US PHONE: 844-55-EDF-EN / 844-553-3336 WEBSITE: www.edf- en.ca/project/cypress- wind-power-project/

Page 33 Before

After

.! .! .! 23 Legend: Title: Notes: 35 36 .! 31 20 32 33 Photomontage: Location 9 (G132) Photographs taken with Canon ESO 5D Mk II camera and Canon 16 ! 8 .! .! 21 . 24 Photo Location EF24-70mm f/2.8L lens set at 50 mm. Panoramic view compiled .! 62 .! 25 Client: from multiple individual photographs. Photomontage simulated 3 .! Panorama Field of !. !. .! .! 9 13 .! .! using Siemens-Gamesa G132 3.465 MW turbine with rotor 26 View (approximate) !. !. Cypress Wind Project !. !. !. !. !. diameter of 132 m and hub height of 84 m using 61 turbine .! 4 28 !. 26 10 25 30 29 28 .! 27 Project Lands !. !. !. !. locations (Layout Lv07). 2 .! 17 .! !. !. ! 29 !. !. .! .! . .! Proposed Turbine !. !. !. 61 11 !. !. !. !. Data Sources: 5 .! Location !. !. !. Datum: NAD 83 .! .! .! 14 18 Township Road 104 30 !. !. Populated places, roads, Alberta Township System, and municipal .! !. !. Projection: UTM Zone 12N 12 .! .! 31 )" Residence !. !. !. .! 41 !.

boundaries from AltaLIS, licensed under the Open Government TWP 10 UV N.T.S. 23 6 .! 19 20 Scale: .! .! 32 Major Highway !. Licence – Alberta. !.!. !. 19 !. !. !. .! .! .! Road !. !. !. !. !. !. Date: 2017-11-09 1 7 33 .! !. 51 Township Line !. !. !. Version: 1 34 !. !. 41 .! 38 16 !. !. UV WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability 14 13 18 17 Section Line !. !. !. !. or responsibility for the accuracy, completeness or usefulness of any results or any information contained .! Prepared By: WSP Canada Inc. 50 39 .! .! in this figure and use or reliance thereof. The figure is intended to be used in its entirety and solely for the 54 .! .! 37 35 Quarter-section UV515 Author: S. Schnick purpose of this project. No excerpts may be taken to be representative of the findings in the assessment. .! 53 Line The use and interpretation of this figure and any other data contained therein to make any investment or .! Reviewed: A. Louro acquisition decisions of any nature is solely the responsibility of the client for which WSP will not be liable. Range Road40 .! 36 Approved: R. Istchenko The distribution, modification, publication of this figure is not permitted without prior written agreement .! from WSP, and WSP and its affiliates disclaim all liability for such distribution, modification or publication. RGE 4 W4M RGE 3 .!W4M Page 34 Before

After

.! .!

Title: Notes: 35 36 31 32 33 Legend: Photomontage: Location 9 (V136) 53 ! Photographs taken with Canon ESO 5D Mk II camera and Canon 42 .! . 5 .! 20 Photo Location EF24-70mm f/2.8L lens set at 50 mm. Panoramic view compiled 9 .! 46 Client: from multiple individual photographs. Photomontage simulated .! 3 .! Panorama Field of !. !. 1 40 .! View (approximate) using Vestas V136 4.2 MW turbine with rotor diameter of 136 m .! !. Cypress Wind Project .! 54 .! 7 !. !. !. and hub height of 82 m using 56 turbine locations (Layout Lv08). 26 25 30 29 28 !. !. .! Project Lands !. 8 .! 50 10 !. !. !. .! !. !. Data Sources: 39 .! .! .! 41 .! Proposed Turbine !. !. !. !. Populated places, roads, Alberta Township System, and municipal 18 Location !. !. !. Datum: NAD 83 .! .! Township Road 104 !. !. boundaries from AltaLIS, licensed under the Open Government 12 .! !. !. !. 51 .! .! 14 )" Residence !. !. Projection: UTM Zone 12N 41 !. Licence – Alberta. TWP 10 23 2 24 19 20 .! UV !. !. !. Scale: N.T.S. .! .! 55 Major Highway !. 56 !. !. 52 .! 6 !.!. !. !. .! .! Road !. !. !. !. !. !. Date: 2017-11-09 11 16 58 !. .! 48 .! Township Line !. !. !. Version: 1 ! 45 !. 17 . !. 17 16 Section Line !. !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability 14 13 18 .! !. !. or responsibility for the accuracy, completeness or usefulness of any results or any information contained 19 .! 22 Prepared By: WSP Canada Inc. 4 47 .! in this figure and use or reliance thereof. The figure is intended to be used in its entirety and solely for the .! 23 .! .! Quarter-section UV515 Author: S. Schnick purpose of this project. No excerpts may be taken to be representative of the findings in the assessment. .! The use and interpretation of this figure and any other data contained therein to make any investment or 24 28 21 Line 41

A. Louro Range Road40 UV Reviewed: acquisition decisions of any nature is solely the responsibility of the client for which WSP will not be liable. .! .! .! 13 Approved: R. Istchenko The distribution, modification, publication of this figure is not permitted without prior written agreement .! from WSP, and WSP and its affiliates disclaim all liability for such distribution, modification or publication. RGE 4 W4M .! RGE 3 W4M Page 35 10 11 12 7 8 9 9 10 11

T11 - R4 T11 - R3

CYP 30

41

3 2 6 5 4 4 3 2 1

CYP 06 CYP 29 Township Rd 110 Township Rd 110 CYP 31 Township Rd 110 15 22

CYP 05

23 Range 40 Rd

33 34 35 36 16 31 32 33 34 35 CYP 32 24 20 21

8 62

25

Range 43 Rd 9 13

Range42 Rd 3 26 CYP 03

CYP 28

4 27 26 30 29 28 27 28 27 26 25

10 28

CYP 25 2 17 29

Township Rd 104 Township Rd 104 Township Rd 104 30 CYP 23 61 5 11

18 41 14 31 CYP 04 CYP 26 12 23 20 21 22

19 19 Range35 Rd 21 22 23 24 32 CYP 22 6 CYP 02

CYP 27 T10 - R3

33 7 CYP 24 1 CYP 34

T10 - R4 34 CYP 21 CYP 33 CYP 07

CYP 01 Range 40 Rd 51 15 14 18 17 16 16 15 14 13 38 CYP 19

37 35 50 39 CYP 20 54 CYP 08 Township Rd 102 53

Range Rd43 36

52

41 49 40

CYP 18 10 11 CYP 09 7 8 9 9 10 11 12 48

57 47 42

CYP 35 46

43 CYP 16 41 CYP 15

56 59 44

4 3 2 1 6 60 5 45 4 3 2 55 CYP 14

CYP 11

CYP 10

Township Rd 100 515 Township Rd 100 CYP 12

CYP 13 Range40 Rd 34 35 31 32 33 33 Turbine Location v7 - Gamesa G13234 - 3.465MW Project Boundary 35 36

Project Substation Parcels and Land Owners

O&M and Laydown Yard Ag Building

38.3 dBA Sound Contour Distribution Lines

Occupied Residence Water Wells

Abandoned Residence Oil & Gas Active Well CYP 17

Worst Case Shadow Flicker Oil & Gas other wells Hours per Year Pipeline

0 Stream 26 29 28 27 27 26 25 30 28 Native Prairie

CouleesT9 - (Estimated)R4 0 - 8 T9 - R3 524 Wetlands 41 Redcliff Class 1 8 - 15 41a 41a Class 2 523 Medicine Hat41 Class 3+ 15 - 30 41 1 1 County/Municipal District 3 Township Over 30 Section 21 22 23 Range 41 Road 19 20 21 Access Road 22 Within 2km 23 24

Paved Road Within 800m

Gravel Road 515 41 Unimproved Road 887

Collection Line

Cypress Hills 514 Provincial 0 0.5 1 2 3 4 5 Park Kilometers Source:Source 1 YYYY, Source YYYY 2 |G:\Projects\CAN_Alberta\Cypress_Wind\05_GIS\052_MapDocs\SitePlan_v7_E_Size_Gamesa_Cypress.mxd craig.weber by 11/10/2017 Updated | Last PROJECT OVERVIEW ~ Cypress Wind Project | Alberta

Page 36 10 11 12 7 8 9 9 10 11

T11 - R4 T11 - R3

CYP 30

41

3 2 6 5 4 4 3 2 1

CYP 06 CYP 29 Township Rd 110 Township Rd 110 CYP 31 Township Rd 110

49 43

CYP 05 Range 40 Rd

33 34 35 36 31 32 33 34 35 CYP 32

5

53

42

20

46

9

Range 43 Rd Range42 Rd CYP 03 3

40 CYP 28 7 1

27 26 30 54 29 28 28 27 26 25

8

39 CYP 25 50 10 41

Township Rd 104 Township Rd 104 Township Rd 104 CYP 23 18 51

12

14 41 55 CYP 04 CYP 26

23 20 21 56 22

19 Range35 Rd 21 22 23 24 2 CYP 22 52 CYP 02

CYP 27 T10 - R3 6

11 16 CYP 24 T10 - R4 CYP 34

CYP 21

CYP 33 45 CYP 07 58

48

CYP 01 Range 40 Rd

15 14 18 17 17 16 16 15 14 13

22 CYP 19

19 4 47 21 CYP 20

23 CYP 08 Township Rd 102

24 13 28

Range Rd43

29 25 27 11 8 9 CYP 18 10 10 11 12 CYP 09 7 9 26

44

57 31

CYP 35 32

CYP 16 41 38 CYP 15 35

36 34

4 3 2 1 6 5 4 3 2 33 37 CYP 14

CYP 11

CYP 10

Township Rd 100 515 Township Rd 100 CYP 12

CYP 13

Turbine Location v8 - Vestas V136 - 4.2 MW Project Boundary Range40 Rd 34 35 Project Substation Parcels and Land Owners 31 32 33 33 34 35 36 O&M and Laydown Yard Ag Building

Occupied Residence Distribution Lines

Abandoned Residence Water Wells

38.3 dBA Sound Contour Oil & Gas Active Well Worst Case Shadow Flicker Oil & Gas other wells CYP 17 Hours per Year Pipeline

Stream 0 Native Prairie 27 26 Coulees (Estimated) 30 29 28 28 27 26 25 0 - 8 Wetlands T9 - R4 Class 1 524 T9 - R3 41 8 - 15 Class 2 Redcliff

Class 3+ 41a 41a 523 15 - 30 County/Municipal District Medicine Hat41 1 Township 41 1

Over 30 Section 3

Within 2km Collection Lines Within 800m 21 22 23 Range 41 Road 19 20 Access21 Roads 22 23 24 Access Roads

Paved Road 515 41 Gravel Road 887

Unimproved Road

Cypress Hills 514 Provincial 0 0.5 1 2 3 4 5 Park Kilometers Source:Source 1 YYYY, Source YYYY 2 |G:\Projects\CAN_Alberta\Cypress_Wind\05_GIS\052_MapDocs\SitePlan_v8_E_Size_Vestas_Cypress.mxd craig.weber by 11/10/2017 Updated | Last PROJECT OVERVIEW ~ Cypress Wind Project | Alberta

Page 37 Before

After

.! 32 23 Notes: 34 35 36 .! 31 20 Legend: Title: 8 16 .! .! Photomontage: Location 3 (G132) Photographs taken with Canon ESO 5D Mk II camera and Canon .! 21 24 .! 62 .! Photo Location EF24-70mm f/2.8L lens set at 50 mm. Panoramic view compiled 3 .! .! 13 .! Client: from multiple individual photographs. Photomontage simulated .! 9 Panorama Field of !. !. !. using Siemens-Gamesa G132 3.465 MW turbine with rotor .! View (approximate) !. Cypress Wind Project 27 26 4 25 30 29 28 !. !. !. !. !. diameter of 132 m and hub height of 84 m using 61 turbine 10 !. .! .! Project Lands !. !. !. !. locations (Layout Lv07). 17 Range Road42 .! 2 ! .! !. . 29 !. !. !. 5 11 Proposed Turbine !. !. !. 61 .! !. .! .! .! 18 Township Road 104 Location !. !. !. !. Data Sources: 14 31 !. !. !. Datum: NAD 83 12 .! .! .! !. !. Populated places, roads, Alberta Township System, and municipal ! !. Projection: UTM Zone 12N . 20 )" Residence !. !. !. 22 23 6 .! 19 !. boundaries from AltaLIS, licensed under the Open Government TWP 10 .! Scale: N.T.S. 19 Road !. Licence – Alberta. !.!. !. .! .! !. !. !. Township Line !. !. 1 7 !. !. !. !. Date: 2017-11-09 !. 51 Section Line !. !. !. Version: 1 .! !. Range Road43 15 14 13 18 17 38 !. 41 .! Quarter-section !. !. !. UV WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability 50 39 .! !. !. !. Prepared By: WSP Canada Inc. or responsibility for the accuracy, completeness or usefulness of any results or any information contained 54 .! .! Line in this figure and use or reliance thereof. The figure is intended to be used in its entirety and solely for the .! 515 Range Road40 53 UV Author: S. Schnick purpose of this project. No excerpts may be taken to be representative of the findings in the assessment. .! A. Louro The use and interpretation of this figure and any other data contained therein to make any investment or Reviewed: acquisition decisions of any nature is solely the responsibility of the client for which WSP will not be liable. .! 52 Approved: R. Istchenko The distribution, modification, publication of this figure is not permitted without prior written agreement .! .! .! from WSP, and WSP and its affiliates disclaim all liability for such distribution, modification or publication. RGE 4 W4M RGE 3 W4M Page 38 Before

After

34 35 36 31 32 Title: Notes: 53 ! Legend: 42 .! . 5 Photomontage: Location 3 (V136) Photographs taken with Canon ESO 5D Mk II camera and Canon .! 20 9 .! Photo Location EF24-70mm f/2.8L lens set at 50 mm. Panoramic view compiled .! Client: .! 3 Panorama Field of from multiple individual photographs. Photomontage simulated 1 40 .! !. !. .! View (approximate) using Vestas V136 4.2 MW turbine with rotor diameter of 136 m .! 54 !. Cypress Wind Project 27 26 25 30 .! 29 !. !. !. and hub height of 82 m using 56 turbine locations (Layout Lv08). !. !. 8 .! 39 50 10 Project Lands !. .! !. !. !. .! .! !. !. Data Sources: 18 .! Proposed Turbine !. !. !. !. .! .! Township Road 104 !. !. Populated places, roads, Alberta Township System, and municipal 12 .! 55 Location !. !. !. Datum: NAD 83 51 ! .! !. !. !. boundaries from AltaLIS, licensed under the Open Government . )" !. Projection: UTM Zone 12N 22 23 2 24 19 20 Residence !. !.

Licence – Alberta. TWP 10 ! Scale: N.T.S. . .! !. !. !. 52 Road !. !. .! .! !.!. !. !.!. Township Line !. !. !. 11 16 58 !. !. !. Date: 2017-11-09 .! 48 !. .! Section Line !. !. !. Version: 1 17 !. Range Road43 13 18 17 15 14 .! !. !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability 19 Quarter-section !. 4 47 .! !. !. Prepared By: WSP Canada Inc. or responsibility for the accuracy, completeness or usefulness of any results or any information contained .! 23 .! .! Line in this figure and use or reliance thereof. The figure is intended to be used in its entirety and solely for the .! 515 Range Road40 UV Author: S. Schnick purpose of this project. No excerpts may be taken to be representative of the findings in the assessment. 24 28 The use and interpretation of this figure and any other data contained therein to make any investment or .! ! Reviewed: A. Louro . 29 UV41 acquisition decisions of any nature is solely the responsibility of the client for which WSP will not be liable. ! Approved: R. Istchenko The distribution, modification, publication of this figure is not permitted without prior written agreement .! .! . from WSP, and WSP and its affiliates disclaim all liability for such distribution, modification or publication. RGE 4 W4M RGE 3 W4M Page 39 Before

After

.! .! .! 6 .! 32 Title: Notes: 19 Legend: Photomontage: Location 6 (G132) Photographs taken with Canon ESO 5D Mk II camera and Canon .! 33 .! .! Photo Location EF24-70mm f/2.8L lens set at 50 mm. Panoramic view compiled 1 7 .! 34 Client: from multiple individual photographs. Photomontage simulated 51 Panorama Field of .! .! .! ! using Siemens-Gamesa G132 3.465 MW turbine with rotor 14 13 18 17 38 16 15 View (approximate) .! . Cypress Wind Project .! .! .! .! .! .! diameter of 132 m and hub height of 84 m using 61 turbine 50 39 .! .! .! 54 .! .! 35 Project Lands .! .! .! .! locations (Layout Lv07). .! 37 .! .! .! .! .! 52 ! Proposed Turbine .! .! .! 53 . 36 .! .! .! 41 40 Location .! .! .! .! Data Sources: .! .! .! .! Datum: NAD 83 .! 49 .! 10 .! .! Populated places, roads, Alberta Township System, and municipal 10TWP 11 12 7 8 9 .! Projection: UTM Zone 12N .! )" Residence .! .! .! boundaries from AltaLIS, licensed under the Open Government 48 47 42 .! Scale: N.T.S. .! .! .! Major Highway .! Licence – Alberta. 57 43 41 .!.! .! .! 46 UV .! .! .! .! Minor Highway .! .! 59 56 .! .! .! .! Date: 2017-11-10 .! .! 60 .! .! 2 1 6 .! .! 4 3 Road .! .! .! Version: 1 55 .! 44 .! .! 41 Range Road40 45 ! .! .! UV WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability Township Line . .! .! .! Prepared By: WSP Canada Inc. or responsibility for the accuracy, completeness or usefulness of any results or any information contained 515 in this figure and use or reliance thereof. The figure is intended to be used in its entirety and solely for the UV Section Line UV515 Author: S. Schnick purpose of this project. No excerpts may be taken to be representative of the findings in the assessment. Township Road 100 The use and interpretation of this figure and any other data contained therein to make any investment or Quarter-section Reviewed: A. Louro acquisition decisions of any nature is solely the responsibility of the client for which WSP will not be liable. TWP 9 TWP 33 34 Approved: R. Istchenko The distribution, modification, publication of this figure is not permitted without prior written agreement Line from WSP, and WSP and its affiliates disclaim all liability for such distribution, modification or publication. RGE 4 W4M RGE 3 W4M Page 40 Before

After

.! .! 2 .! 52 Title: Notes: 56 .! 6 Legend: Photomontage: Location 6 (V136) Photographs taken with Canon ESO 5D Mk II camera and Canon .! .! Photo Location EF24-70mm f/2.8L lens set at 50 mm. Panoramic view compiled 11 16 58 .! 48 .! 45 Client: from multiple individual photographs. Photomontage simulated 17 .! Panorama Field of !. !. using Vestas V136 4.2 MW turbine with rotor diameter of 136 m 14 13 18 .! 17 16 15 View (approximate) Cypress Wind Project 19 .! 22 !. !. !. and hub height of 82 m using 56 turbine locations (Layout Lv08). 47 .! !. .! 23 .! .! Project Lands !. !. 4 .! !. !. !. !. 24 28 21 !. !. Data Sources: .! .! .! 13 .! Proposed Turbine !. !. !. !. 25 29 !. !. Populated places, roads, Alberta Township System, and municipal 27 .! Location !. !. !. Datum: NAD 83 .! 26 .! !. TWP TWP 10 7 8 9 10 !. !. boundaries from AltaLIS, licensed under the Open Government 11 12 .! )" Residence !. Projection: UTM Zone 12N 57 !. !. Licence – Alberta. 31 .! !. !. !. Scale: N.T.S. .! .! Major Highway !. 32 44 41 !. !. .! UV !.!. !. !. Minor Highway !. !. !. 38 .! 36 .! 35 !. !. !. Date: 2017-11-08 .! .! !. 2 1 6 5 4 3 Road !. !. !. Version: 1 34 .! .! 33 !.

Range Road40 !. !. !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability 37 Township Line !. !. Prepared By: WSP Canada Inc. or responsibility for the accuracy, completeness or usefulness of any results or any information contained 515 in this figure and use or reliance thereof. The figure is intended to be used in its entirety and solely for the UV Section Line UV515 Author: S. Schnick purpose of this project. No excerpts may be taken to be representative of the findings in the assessment. Township Road 100 A. Louro The use and interpretation of this figure and any other data contained therein to make any investment or Quarter-section UV41 Reviewed: acquisition decisions of any nature is solely the responsibility of the client for which WSP will not be liable. TWP TWP 9 Approved: R. Istchenko The distribution, modification, publication of this figure is not permitted without prior written agreement Line from WSP, and WSP and its affiliates disclaim all liability for such distribution, modification or publication. RGE 4 W4M RGE 3 W4M Page 41 Before

After

2 1 6 5 4 3 Title: Notes: Legend: Photomontage: Location 7 (G132) Photographs taken with Canon ESO 5D Mk II camera and Canon Photo Location EF24-70mm f/2.8L lens set at 50 mm. Panoramic view compiled TWP 11 22 Township Road 110 15 .! .! Client: from multiple individual photographs. Photomontage simulated Panorama Field of !. !. using Siemens-Gamesa G132 3.465 MW turbine with rotor .! 23 View (approximate) !. !. Cypress Wind Project 35 36 .! 31 20 32 33 !. !. !. !. !. diameter of 132 m and hub height of 84 m using 61 turbine 16 !. 8 .! .! 21 .! 24 Project Lands !. !. !. !. locations (Layout Lv07). .! 62 .! !. 25 !. !. !. 3 .! .! Proposed Turbine !. !. !. .! .! 9 13 .! !. !. !. !. Data Sources: .! 26 Location !. !. !. Datum: NAD 83 !. !. Populated places, roads, Alberta Township System, and municipal .! !. !. Projection: UTM Zone 12N 26 4 10 25 30 29 28 28 .! 27 )" Residence !. !. !. boundaries from AltaLIS, licensed under the Open Government .! .! !. Scale: N.T.S. 2 17 Major Highway !. Licence – Alberta. .! .! .! 29 !.!. !. TWP TWP 10 61 !. !. !. 5 11 Road !. .! .! .! 14 18 Township Road 104 .! 30 !. !. Date: 2017-11-08 .! !. !. !. 12 .! .! 31 Township Line !. 1 .! !. !. !. Version: 23 6 .! 19 20 32 41 !. !. 41 .! .! UV Section Line !. !. !. UV WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability 19 !. !. !. Prepared By: WSP Canada Inc. or responsibility for the accuracy, completeness or usefulness of any results or any information contained .! in this figure and use or reliance thereof. The figure is intended to be used in its entirety and solely for the .! .! 33 Quarter-section UV515 Author: S. Schnick purpose of this project. No excerpts may be taken to be representative of the findings in the assessment. 7 The use and interpretation of this figure and any other data contained therein to make any investment or 1 .! 34 Line Reviewed: A. Louro acquisition decisions of any nature is solely the responsibility of the client for which WSP will not be liable. Approved: R. Istchenko The distribution, modification, publication of this figure is not permitted without prior written agreement .! from WSP, and WSP and its affiliates disclaim all liability for such distribution, modification or publication. RGE 4 W4M RGE 3 W4M Page 42 Before

After

2 1 6 5 4 3 Title: Notes: Legend: Photomontage: Location 7 (V136) Photographs taken with Canon ESO 5D Mk II camera and Canon Photo Location EF24-70mm f/2.8L lens set at 50 mm. Panoramic view compiled TWP 11 Township Road 110 .! .! Client: from multiple individual photographs. Photomontage simulated 49 43 Panorama Field of !. !. using Vestas V136 4.2 MW turbine with rotor diameter of 136 m View (approximate) Cypress Wind Project 35 36 31 32 33 !. !. and hub height of 82 m using 56 turbine locations (Layout Lv08). 53 !. !. 42 .! .! 5 Project Lands !. !. .! 20 !. !. !. !. 9 .! 46 !. !. Data Sources: .! .! Proposed Turbine !. !. !. !. .! 3 !. !. Populated places, roads, Alberta Township System, and municipal 1 40 .! Location !. !. !. Datum: NAD 83 .! .! 7 !. !. boundaries from AltaLIS, licensed under the Open Government .! 54 " !. !. Projection: UTM Zone 12N 26 25 30 .! 29 28 ) Residence !. !. Licence – Alberta. !. Scale: N.T.S. 8 .! 39 50 10 !. !. .! .! .! .! 41 Major Highway !. !. !. !. !.!. TWP TWP 10 18 !. .! .! Township Road 104 Road !. !. !. .! 41 !. !. !. Date: 2017-11-08 12 Range Road40 51 .! UV !. .! 14 Township Line !. !. !. Version: 1 2 !. 23 24 19 20 55 .! 56 !. .! .! Section Line !. !. !. WSP and its affiliates do not make any warranty, either expressed or implied, or assume any legal liability !. !. or responsibility for the accuracy, completeness or usefulness of any results or any information contained .! 6 Prepared By: WSP Canada Inc. ! 52 in this figure and use or reliance thereof. The figure is intended to be used in its entirety and solely for the .! . Quarter-section UV515 Author: S. Schnick purpose of this project. No excerpts may be taken to be representative of the findings in the assessment. 11 16 58 Line The use and interpretation of this figure and any other data contained therein to make any investment or .! 48 .! 45 41 Reviewed: A. Louro acquisition decisions of any nature is solely the responsibility of the client for which WSP will not be liable. .! UV Approved: R. Istchenko The distribution, modification, publication of this figure is not permitted without prior written agreement .! from WSP, and WSP and its affiliates disclaim all liability for such distribution, modification or publication. RGE 4 W4M RGE 3 W4M Page 43 Page 44 Page 45 Page 46 Page 47 Page 48 Page 49 Page 50 Page 51 Page 52 Page 53 Page 54 Appendix X November 2017 Open House Advertisements

Page 55 12–Cypress Courier, The 40 Mile County Commentator, Bow Island, Alberta, Tuesday, October 31, 2017 German Canadian Association of Alberta celebrates 50 years

By Justin Seward German culture alive about who we are, what Commentator/Courier and going,” said we are and why we Cleveland. want to keep our club Drinks, music and a It was in 1960 that a going.” performance by the group of Germans President of the Calgary-based started the club and German Canadian Schuhplattler made for carried it right through Association of Alberta a great evening of until they became older , Anne Marie Juravel, socialization for 175 and to a time where said it was wonderful guests at German someone else could to celebrate 50 years in Canadian Harmony take it on. different parts of the Hall in Redcliff as a “It’s our goal to offer province. part of the 50th activities, to offer din- She said it is of anniversary of the ners like we have been advantage to have a German Canadian tonight to promote that German Canadian Association of Alberta German culture that Harmony Hall in a on Oct. 28. dates back to the small town. Linda Cleveland, 1920s,” said Cleveland. “I think the small who is a board member However, the num- town feel is a really of the German ber of attendees with a wonderful gemut- Canadian Harmony German background lichkeit (German trans- Club of , has been low because lation for the feeling of said this a milestone of people becoming warmth and friendli- for the association seniors and not com- ness),” said Juravel. because they promote ing to the social func- “It’s certainly is a German culture to tions that are put on big advantage for the ensure their language through the hall. different generations of continues, while hand- “It would be nice German heritage ing out a scholarship to have younger people because the hall itself COMMENTATOR/COURIER PHOTO BY JUSTIN SEWARD those students who who don’t even have to has been in existence study German and for be German,” she said. since 1960 and this par- A PIECE OF GERMANY: Andy Maddison and Reiss Kruger of Schuhplattler out of Calgary arm others who are pursu- “They could be any ticular club has been wrestle during the “Bankl Tanz” (bench dance) during the 50th celebrations for the German ing an education. culture come out to our the member of our Canadian Association of Alberta at the German Canadian Harmony Hall in Redcliff on Oct. 28. “It’s all to keep that functions, learn a bit club since 1972.” SI Day enhances teachers learning strategies

By Justin Seward process of putting the new consultations together Commentator/Courier for this year . But I do know they’ll provide travel- ing out to schools and provide opportunities for par- Eagle Butte High School hosted 220 Prairie Rose ents, students and all of our teachers and school School Division (PRSD) teachers and additional staff leaders to contribute to the next steps for Prairie for a School Improvement Day to give them the Rose.” opportunity to connect with one another, share ideas PRSD FNMI (First Nations, Metis, Inuit)/Senator about classroom practices and learning from col- Gershaw School teacher Cory Schiebelbein gave an leagues on Oct. 27. overview to a full classroom of teachers about the There were different learning sessions including Alberta government and Alberta Teachers different grade levels and subject matter and PRSD’s Association’s mandate for standard knowledge on goal is to plan the mini-seminars that best fit the First Nations perspectives so their history can be teacher’s learning strategies for the school year. taught properly in Canada. “It’s a professional learning day because it’s actu- He focused more in-depth on the residential ally about learning and advancing our skills,” said school system because there are still facts that PRSD assistant superintendent Reagan Weeks. Canadians still do not understand. “Teachers work towards honing their craft and “It can almost be a shock,” he said. every year they’re in front of students in the class- “It’s a whole new aspect of actual facts and actual room and today is just a part of that process.” truth that did happen, whether some people want to PRSD’s vision with Student Improvement Day believe that or not. It’s a real part of history that egies is to have them in conjunction with the COMMENTATOR/COURIER PHOTO BY JUSTIN SEWARD was glossed over and we never talked about and board’s strategic vision. we’re just trying to get it out there so everybody can “We’re just concluding a three-year education LEARNING NEW IDEAS: PRSD FNMI teacher Cory Schiebelbein move forward.” plan now and so as we go into this year we’ll looking talks First Nations studies with Senator Gershaw School teacher He said there is not a big population of first to sort through what our next goals are,” said Stan Tiffen during Student Improvement day on Oct. 27 at Eagle nations students in PRSD but for those that are, are Weeks. Butte High School. willing to identify now in the schools what their sta- “We do have a new superintendent. He is in the tus is which is positive step.       COMMUNITY COMMUNITY OPEN HOUSE OPEN HOUSE We believe being responsible in business also We believe being responsible in business also means being responsible to the community that means being responsible to the community that hosts our project. hosts our project. We want to hear from you. We want to hear from you. Join us at our second community open house Join us at our second community open house to take part in the conversation about our to take part in the conversation about our proposed Cypress Wind Project and get updated proposed Red Rock Wind Project and get information about the Project. If approved, updated information about the Project. If the 250 MW Project would be located in approved, the 250 MW Project would be located Cypress County, near the hamlet of Dunmore. in the County of Forty Mile near the hamlet of . The community open house will take place on: The community open house will take place on: THURSDAY, NOVEMBER 16 WEDNESDAY, NOVEMBER 15 from 5 – 8 p.m. from 5 – 8 p.m. Irvine & District Agricultural Society Seven Persons Community 207 Francis St., Irvine, AB Association Mildred St, Seven Persons

Comments & Questions: Comments & Questions: [email protected] [email protected]

Page 56 The 40 Mile County Commentator, Bow Island, Alberta, Tuesday, November 7, 2017—5 National Senior Safety Week is Nov. 6-12 ly one of the most at-risk inactive while treating an Council discusses groups. Regular physical injury or strain helps no Canada Safety Council activity can provide a list one. Thoughts of reduced of health benefits includ- -If you find yourself stress and activity levels go ing strengthened muscles unable to participate in cer- SMRID setbacks hand in hand with the idea and bones, enhanced bal- tain activities due to health of retirement, whether the ance and fewer aches and ailments – joint problems, job you’re leaving has been pains from movement. for instance, or arthritis – ❖ Continued from P3 CARRIED. interesting, motivating, The Canadian Physical consult with a physician MOVED that Mr. Wes dull or mind numbing. A Activity Guidelines recom- who can help determine Hollingsworth be appointed as the lifetime of hard work and mend brisk walking and what exercise will work for Mr. McGarry left the meeting. County’s Municipal Supervisor effec- perseverance has finally bike riding as examples of your specific needs. Farm Safety tive April 1, 2018 and placed on Step 1 paid off, allowing for a moderate intensity activi- - If you’re homebound, Councillor Hughson informed of the Municipal Supervisor salary lifestyle that suits you – ties, but this category can there are still ways to stay Council that the F.C.S.S. Committee grid. freedom from the grind of also include dancing, play- active. Walk or march on had completed a photo book on the CARRIED. daily life, freedom to live in ing sports, going on hikes, the spot. Get equipment to rural Farm Safety Program that was swimming, and working in help you exercise from COUNTY – INFORMATION ITEMS a way that speaks to you. held at Foremost School and the November 6 – 12 is the garden. your bed. Lift small Development Officer’s Plainview Colony in June 2017. They National Senior Safety Staying active can take amounts of weight to keep Report provided a complimentary copy to Week, and the Canada many forms and a motivat- your upper-body muscles Development Permits Issued the County. Safety Council would like ed individual should have and joints strong. – September 15, 2017. Update North Forty Mile Land Fill to take this opportunity to no problem finding an - If you’re unable to APPLICATIONS TO Councillor Wikkerink informed remind seniors of the activity that’s enjoyable. meet the 150 minute mark- FOR Council the North Forty Mile Waste importance of staying Getting Started er set by the Canadian LOCATION The saying “You can’t Physical Activity Commission has ordered a scale for active. Too often, retire- PERMITTED USES: ment leads to a sedentary teach an old dog new Guidelines at first, that’s the land fill. The scale will be built 2017-74 Grain SW- lifestyle spurred by a lack tricks” doesn’t apply here – okay! Limited exercise is in approximately four weeks from a 13-08-09-W4 of necessity to stay active. even an older adult who’s better than none at all. Do company out of Pincher Creek and Bins By the Numbers… had a relatively sedentary what you can and what Pahl’s Earthmoving will perform the 2017-75 Dairy SW- According to Statistics life to date will benefit from you’re comfortable with initial dirt work. heightened physical activi- until you reach a point 36-04-12-W4 Barn Canada, only 13 per cent of Mr. Nathan Ogden, County men and 11 per cent of ty. It’s never too late to get where you can meet the 2017-78 Farm Shop/ Development Officer present in the women between 60 and 79 started. And it doesn’t have guidelines regularly. Lot 3 Block 1 meeting. years old met the Canadian to be daunting, either: Remember, strengthen- Garage Plan Councillor Wikkerink inquired as Physical Activity guide- - Take a walk around the ing the body can help avoid 1710519 (P/N of NW- to the placement of SMRID risers lines. These include 150 block a few times a week. future ailments. Strong 10-07-05-W4) and what the setbacks are in relation minutes (2.5 hours) of mod- -Start at a slower, com- joints and bones can reduce DISCRETIONARY USES: to private property. SMRID rules erate-to-vigorous intensity fortable pace until you’re the likelihood of falls, frac- 2017-58 Crop indicate placement of risers to be 6 aerobic physical activity comfortable with it, and tures and outright breaks. Input Lot 1 Block 1 then increase the intensity Take proactive steps to mit- or 8 meters from private property. weekly. This is achievable FacilityPlan with less than a half hour or duration. igate these health concerns He noted setback requirements for a 9710652 of daily activity! - Don’t push yourself too before they become a reali- pivot point is 12 to 15 meters from SE- And while seniors aren’t hard. Exercise is only help- ty, and you’ll find a much private property. 34-10-11-W4 alone in not meeting these ful when you’re able to do higher quality of life wait- Mr. Ogden advised there has been 2017-69 Second Lot guidelines, they’re certain- it. Forcing yourself to be ing for you. no changes in the agreement with 46A Block C the County and SMRID. Trailer 40 Mile Park Mr. Ogden to confirm distance of (P/N of SE- setbacks and SMRID risers outlined OUR READERS say: 28-08-11-W4) in the County/SMRID Agreement. 2017-71 Scale House, Mr. Ogden left the meeting. Reynolds thanks Rieger for work at the Commentator SE-23-11-11-W4 Moved to go “In Camera.” Scale, Berm, CARRIED. To the Editor of the Forty Mile munities of the County of Forty Mile Recycling Area MOVED to Come “Out of Camera.” County Commentator and she will be missed. Our Town CARRIED. The news that Editor Jamie Rieger Council has enjoyed working with 2017-72 Solar Energy Items Discussed: CARB Legal has been promoted to a new position at Jamie and very much appreciate the SE-15-10-12-W4 Options and Administration Staff the is bittersweet indeed. coverage she has given our meetings. Facility MOVED approval to retain In her six years here in Bow Island she This promotion is very well Reynolds Mirth Richards & Farmer has worked very hard to cover the deserved and the management of the 2017-73 Solar Energy Barristers and Solicitors as the Town, County and Village events and Alta Newspaper Group is to be con- NW-13-08-12-W4 County of Forty Mile’s legal counsel news. We have active communities gratulated for seeing that and I hope Facility on CARB matters. and I am sure it has been nearly they know there are big shoes to fill at impossible to get to everything and the Commentator. Most importantly, I CARRIED. 2017-76 Private Solar stay on top of all that's going on, but congratulate Jamie for receiving this MOVED that Mr. Keith Bodin be NE-13-11-10-W4 Jamie worked very hard to try and do promotion but please know that we are appointed as an Associate Energy Generation just that. On top of doing the report- sorry to see you go. Thank you, Jamie Administrator for the County of MOVED that the meeting adjourn ing and writing she has been responsi- for all your hard work and being part Forty Mile No. 8 effective April 1, at 11:44 A. M. ble for laying out the paper, all with a of our community for the past 6 years. 2018 and placed on Step 1 of the cur- CARRIED. deadline looming every week. She Best wishes rent salary grid. really has been a booster for the com- Mayor Gordon Reynolds       COMMUNITY COMMUNITY OPEN HOUSE OPEN HOUSE We believe being responsible in business also We believe being responsible in business also means being responsible to the community that means being responsible to the community that hosts our project. hosts our project. We want to hear from you. We want to hear from you. Join us at our second community open house Join us at our second community open house to take part in the conversation about our to take part in the conversation about our proposed Cypress Wind Project and get updated proposed Red Rock Wind Project and get information about the Project. If approved, updated information about the Project. If the 250 MW Project would be located in approved, the 250 MW Project would be located Cypress County, near the hamlet of Dunmore. in the County of Forty Mile near the hamlet of Seven Persons. The community open house will take place on: The community open house will take place on: THURSDAY, NOVEMBER 16 WEDNESDAY, NOVEMBER 15 from 5 – 8 p.m. from 5 – 8 p.m. Irvine & District Agricultural Society Seven Persons Community 207 Francis St., Irvine, AB Association Mildred St, Seven Persons

Comments & Questions: Comments & Questions: [email protected] [email protected]

Page 57 PRAIRIE POST - Friday, November 10, 2017 - 15 FCC reports see growth for Canada’s agriculture exports CONTRIBUTED the Growth Potential of Key Sectors. plants used for perfumery,crustaceans, exports – beef, chocolate, bread, fruit and The landmark report, released in pulses, fresh fish and bovine animals nuts, and pork – were also among the Canada is about to strengthen its February,notes that Canadian agriculture (includes cattle and bison). fastest-growing food exports in the world. position as one of the world’s top already employs 2.1 million workers and Canada exports several commodities Canada may be particularly well-poised to agriculture and agri-food trading nations, accounts for 6.7 per cent of the country’s that were both highly-valued global exploit opportunities to grow exports of according to a pair of reports issued by gross national product (GDP). exports in 2016 and among the world’s canola oil, beef, pork, chocolate and bread. Farm Credit Canada. Agriculture commodity exports fastest-growing exports between 2007 and Aside from ranking Canadian “Our optimism comes from a unique set In 2016, Canada had the world’s fifth 2016. These were pulses, soybeans, and agricultural commodity and of circumstances where demand for both highest total export values, behind the fresh fish exports. manufactured food exports, the FCC trade Canada’s agriculture commodities and United States, China, the Netherlands and Manufactured food exports reports examine Canada’s comparative manufactured food products continues to Brazil. Canadian operations exported Canadian businesses exported $19.1 advantage in agriculture and food exports. grow,” said J.P.Gervais, chief agricultural $24.6 billion worth of agricultural billion worth of manufactured food This reveals sectors for which Canada has economist for FCC. “The stars are aligned commodities, accounting for 6.3 per cent products, accounting for 3.2 per cent of the an edge over other exporters. for an industry that is already strong and of the world’s total food exports, valued at world’s total food exports. Although “When Canada’s reputation as a has the potential to grow in a highly $461.8 billion (all trade figures are Canada ranks 11th in total food export consistent producer of high-quality,safe competitive world market.” reflected in U.S. dollars). values, several of its food exports agriculture commodities and food Canada was the world’s fifth largest The top three exporters (United States, experienced some of the world’s fastest products is combined with growing world exporter of agriculture and the 11th China and the Netherlands) together growth over the past decade. demand and our comparative advantage largest exporter of manufactured food accounted for 35.2 per cent of world Total global exports of food products on so many key exports, the future looks products in 2016, according to the FCC’s agriculture commodity exports in 2016. reached $602.5 billion in 2016. The pretty bright for Canadian agriculture,” trade ranking reports. Canada fell from third in 2012 due to the Netherlands, the U.S. and Germany were Gervais said. “Our reports confirm that agriculture is growing presence of China and Brazil in the top exporters, a ranking they’ve FCC is Canada’s leading agriculture and will continue to be a major world markets. maintained since 2010. lender, with a healthy loan portfolio of contributor to Canada’s growth and Canada ranked among the world’s top The three countries together accounted more than $31 billion. Our employees are prosperity,”said Gervais, echoing of the three leaders in no fewer than 11 for 24.9 per cent of world food exports in dedicated to the future of Canadian findings the Advisory Council on agricultural export commodities: canola 2016. agriculture and its role in feeding an ever- Economic Growth’s report, Unleashing seed, wheat, rye, oats, buckwheat, flax, Several of Canada’s top-dollar food growing world. 41319898 • 10/31/2017 41319897 • 10/31/2017 COMMUNITY COMMUNITY OPEN HOUSE OPEN HOUSE We believe being responsible in business also We believe being responsible in business also means being responsible to the community that means being responsible to the community that hosts our project. hosts our project. We want to hear from you. We want to hear from you. Join us at our second community open house Join us at our second community open house to take part in the conversation about our to take part in the conversation about our proposed Cypress Wind Project and get updated proposed Red Rock Wind Project and get information about the Project. If approved, updated information about the Project. If the 250 MW Project would be located in approved, the 250 MW Project would be located Cypress County, near the hamlet of Dunmore. in the County of Forty Mile near the hamlet of Seven Persons. The community open house will take place on: The community open house will take place on: THURSDAY, NOVEMBER 16 WEDNESDAY, NOVEMBER 15 from 5 – 8 p.m. from 5 – 8 p.m. Irvine & District Agricultural Society Seven Persons Community 207 Francis St., Irvine, AB Association Mildred St, Seven Persons

Comments & Questions: Comments & Questions: [email protected] [email protected]

Page 58