Tender: NIT NO.- 14/BD-I/PHE/2019-2020 1
Total Page:16
File Type:pdf, Size:1020Kb
Tender: NIT NO.- 14/BD-I/PHE/2019-2020 1. General Information Type NIT Category Mode OFFLINE Method Open Tender District MURSHIDABAD Inviting Authority Executive Engineer, Berhampur Division I Tender Id NIT NO.- 14/BD-I/PHE/2019-2020 Memo No 1520 / BD-I Memo Date 27-12-2019 Description Extension of pipe line of different places w/s scheme under Berhampore Division-I, P.H.E. Dte. Estimated Work Value - 2. EMD (Earnest Money Deposit) Details Executive Engineer, Berhampore, Exempted? No Fee Type Demand Draft Payable To Berhampore Division– Payable At Murshidabad I, PHE Dte. 3. Critical Dates Tender Publish Date 27-12-2019 06:00 PM Sale/Submission Start Date Download Start Date Sale/Download End Date 15-01-2020 02:00 PM Last Date of Application 07-01-2020 02:00 PM Last Date of Permission 10-01-2020 05:00 PM Last Date of Submission 15-01-2020 02:00 PM Tech Bid Opening Date Tech Bid Uploading Date Fin Bid Opening Date 15-01-2020 04:00 PM Time Uploading Bid Date Time 4. Pre-bid Meeting Details Date Venue Address 5. Work Details Sl No Description Estimated Cost (Rs.) Completion Time EMD (Rs.) Extension of pipe line of different dia different mouzas BENIYAGRAM ZONE- 1 II (PART-B) Water Supply Scheme under Raghunathganj Sub Division, under 1,03,716.00 15 Days 2,200.00 Berhampore Division-I, P.H.E. Dte. Extension of new pipeline by 90 mm dia UPVC pipe at different branch line 2 of Sharmapara of Hatinagar Water Supply Scheme under Berhampore 3,24,396.00 15 Days 6,600.00 Division-I, P.H.E. Dte. (Part-B) Extension of pipe line of different dia different mouzas BENIYAGRAM ZONE- 3 I (PART-F) water supply scheme under Raghunathganj Sub Division, under 59,509.00 15 Days 1,300.00 Berhampore Division-I, P.H.E. Dte. New laying of extension pipeline by 90 mm dia UPVC pipe at Pataleswar 4 Mandir of Hatinagar Water Supply Scheme under Berhampore Division-I, 3,06,804.00 15 Days 6,400.00 P.H.E. Dte. Extension of new pipeline by 90 mm dia UPVC pipe at Karbala road from RMC more (Chalpatti) to Pachim Railline and Construction of SSP at 5 3,15,167.00 15 Days 6,500.00 different pin point site at Sharmapara of Hatinagar Water Supply Scheme under Berhampore Division-I, P.H.E. Dte. (Part-A) Extension of UPVC Pipe Line from existing pipeline to Natungram and Natungram to gabtala more crossing New Naldahari of Bansgara (Lalgola) 6 4,37,690.00 15 Days 9,000.00 Water Supply Scheme which is not covered by existing distribution system, under Berhampore Division-I, P.H.E. Dte. Laying of damaged Pipe Line from existing pipeline having Node of N394 to 7 Durga Mandir(N190) in Sundalpur of Chaighari G.P. of Habipur water 4,89,807.00 15 Days 9,900.00 Supply Scheme under Berhampore Division-I, P.H.E. Dte. Extension of new pipe line 75 mm dia UPVC pipe inbetween Manindranagar G.P. & Manindranagar Girls High School field, Old UBI bank near Nimtala & 8 3,02,406.00 15 Days 6,300.00 at Sonimandir (Manindranagar) of Hatinagar Water Supply Scheme under Berhampore Division-I, P.H.E. Dte. Extension of different dia. UPVC Pipe Line in Balorampur, Gabtala more of 9 BANSGARA (Lalgola) Water Supply Scheme Which is not covered by existing 3,78,763.00 15 Days 7,800.00 distribution system, under Berhampore Division-I, P.H.E. Dte. Extension of UPVC Pipe Line from existing pipeline( In between node-8 and node-9) in Field Para, Node-7 towards Kalohali of DIGHA water Supply 10 4,90,155.00 15 Days 10,000.00 Scheme Which is not covered by existing distribution system, under Berhampore Division-I, P.H.E. Dte. Extension of UPVC Pipe Line from existing pipeline (In between node-2 and node-3) in Masjid Para & (In between node-5 and node-7) in Bagan Para of 11 2,78,802.00 15 Days 5,800.00 DIGHA Water Supply Scheme which is not covered by existing distribution system, under Berhampore Division-I, P.H.E. Dte. 6. Attachments Sl No File Name 1 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-04.pdf 2 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-02.pdf 3 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-10.pdf 4 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-01.pdf 5 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-05.pdf 6 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-11.pdf 7 NIT 14 B.D.-I_P.H.E._2019_20.pdf 8 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-08.pdf 9 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-06.pdf 10 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-03.pdf 11 WBF 2911(ii).pdf 12 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-09.pdf 13 NIT 14 B.D.-I_P.H.E._2019_20_SCHEDULE_SL. NO.-07.pdf.