March 12, 2018

CERTIFICATE 26499

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 166 West 125th Street, southeast corner of 7th Avenue and West 125th Street, , submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 7356-A, B, C & D of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26500

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 244 East 86th Street, southwest corner of 2nd Avenue and East 86th Street, Manhattan, submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 4472-C, D, E & F of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26501

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical newsstand, 617 Pacific Street, southwest corner of Flatbush Avenue and Atlantic Avenue, , submitted by the Department of Consumer Affairs and the Department of Transportation, represented by exhibits 5645-H & I of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26502

RESOLVED That the Design Commission, having considered a final report for the conservation of Alexander Hamilton (circa 1940) by Adolph Alexander Weinman, Museum of the City of New York, Manhattan, submitted by the Department of Cultural Affairs, represented by exhibits 1592-AU, AV & AW of record in this matter, hereby gives to the same unanimous final approval.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26503

RESOLVED That the Design Commission, having considered a final report for the conservation of DeWitt Clinton (circa 1940) by Adolph Alexander Weinman, Museum of the City of New York, Manhattan, submitted by the Department of Cultural Affairs, represented by exhibits 1592-AX, AY & AZ of record in this matter, hereby gives to the same unanimous final approval.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26504

RESOLVED That the Design Commission, having considered designs for the reconstruction of the Rugby Branch of the Brooklyn Public Library, 100 Utica Avenue, Brooklyn, submitted by the Department of Design and Construction, represented by exhibits 4821-P, Q, R & S of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 12, 2020.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26505

RESOLVED That the Design Commission, having considered designs for the relocation of a weather monitoring station, Shaft 18, Kensico Reservoir, Westlake Drive, Valhalla, Mount Pleasant, Westchester County, submitted by the Department of Environmental Protection, represented by exhibits 5544-AA & AB of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26506

RESOLVED That the Design Commission, having considered designs for the restoration of a pond and construction of a bioretention area, , Merrick Boulevard and Baisley Boulevard, Jamaica, , submitted by the Department of Environmental Protection and the Department of Parks & Recreation, represented by exhibits 3975-AO, AP, AQ & AR of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26507

RESOLVED That the Design Commission, having considered designs for the installation of a marquee and LED screen, including escalators and a balcony enclosure, the Palace Theater, 1568 Broadway, Manhattan, submitted by the Department of Transportation, represented by exhibits 5719-D, E, F, G, H, I & J of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that if any revisions to the design are required after DOB review, the revised design will be submitted to the Commission for review per standard procedure.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26508

RESOLVED That the Design Commission, having considered designs for the construction of an ADA lift, stoop, and fencing, 347 Greene Avenue, Brooklyn, submitted by the Department of Transportation, represented by exhibits 7357-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26509

RESOLVED That the Design Commission, having considered designs for the construction of stairs, 238 East 26th Street, Manhattan, submitted by the Department of Transportation, represented by exhibits 7358-A & B of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26510

RESOLVED That the Design Commission, having considered designs for the installation of City Light poles, 2nd Avenue between East 59th Street and East 64th Street, Manhattan, submitted by the Department of Transportation, represented by exhibits 7359-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26511

RESOLVED That the Design Commission, having considered designs for the installation of TBTA light poles, Bell Boulevard between 35th Avenue and Northern Boulevard, Bayside, Queens, submitted by the Department of Transportation, represented by exhibits 6569-S, T & U of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26512

RESOLVED That the Design Commission, having considered designs for the installation of TBTA light poles, Merrick Boulevard between Springfield Boulevard and Hook Creek Boulevard, Laurelton, Queens, submitted by the Department of Transportation, represented by exhibits 7360-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26513

RESOLVED That the Design Commission, having considered designs for the installation of a prototypical public toilet (APT), Ferris Street between Van Dyke Street and Coffey Street, Louis Valentino, Jr. Park and Pier, Brooklyn, submitted by the Department of Transportation and the Department of Parks & Recreation, represented by exhibits 7361-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that prior to the installation, DOT will submit fabrication drawings for the replicated fence for committee review.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26515

RESOLVED That the Design Commission, having considered designs for the reconstruction of Lewis Playground, Willoughby Avenue and Lewis Avenue, Brooklyn, submitted by the Department of Parks & Recreation, represented by exhibits 7362-A, B & C of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 12, 2020.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26517

RESOLVED That the Design Commission, having considered designs for the relocation of two World War I plaques, Doughboy Park, Woodside Avenue and 56th Street, Woodside, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 3238-T & U of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 12, 2020.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26518

RESOLVED That the Design Commission, having considered designs for the reconstruction of a playground, Clawson Playground, adjacent to P.S. 50, Adelaide Avenue between Platt Street and Clawson Street, , submitted by the Department of Parks & Recreation, represented by exhibits 7319-D, E & F of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26519

RESOLVED That the Design Commission, having considered designs for the reconstruction of Hart Playground, formerly Eight Oaks Trapezoid Park, Broadway, 69th Street, 37th Avenue, and 65th Street, Woodside, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 6548-M, N & O of record in this matter, hereby gives to the same unanimous preliminary and final approval with the understanding that the resetting of the granite cobble will be included in a future project.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26521

RESOLVED That the Design Commission, having considered designs for the construction of a playground, plaza, and adjacent site work, Faber Park, Richmond Terrace between Sharpe Avenue and Faber Street, Staten Island, submitted by the Department of Parks & Recreation, represented by exhibits 1716-AQ, AR & AS of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26522

RESOLVED That the Design Commission, having considered designs for the reconstruction of a playground, Rosemary's Playground, Woodward Avenue between Woodbine Street and Madison Street, Ridgewood, Queens, submitted by the Department of Parks & Recreation, represented by exhibits 3404-M, N, O & P of record in this matter, hereby gives to the same unanimous final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26525

RESOLVED That the Design Commission, having considered designs for the reconstruction of the Crossroads and Rail Track Walk, Park (formerly elevated rail line), West 30th Street between 10th Avenue and 11th Avenue, Manhattan, submitted by the Department of Parks & Recreation and the Friends of the High Line, represented by exhibits 6640-FC, FD, FE & FF of record in this matter, hereby gives to the same unanimous preliminary approval. Commissioner Aarons recused himself.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 12, 2020.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26526

RESOLVED That the Design Commission, having considered designs for the installation of rooftop mechanical equipment, Brooklyn Wholesale Meat Market, 5600 1st Avenue, between 54th Street and 56th Street, Brooklyn, submitted by the Economic Development Corporation, represented by exhibits 7364-A, B & C of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26527

RESOLVED That the Design Commission, having considered designs for the renovation of a warehouse (Fresh Direct), 9 29th Street, Brooklyn, submitted by the Economic Development Corporation, represented by exhibits 7365-A, B, C, D & E of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26528

RESOLVED That the Design Commission, having considered designs for the construction of the Edenwald YMCA facility and adjacent site work, including a guard booth, athletic courts, and adjacent site work at the Christopher School Facility, 1250 East 229th Street at Schieffelin Place, Bronx, submitted by the Economic Development Corporation and the Administration for Children's Services, represented by exhibits 7223-L, M, N, O, S & T of record in this matter, hereby gives to the same unanimous preliminary approval with the understanding that the egress door at the main building ramp will be detailed to minimize its appearance on the façade.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 12, 2020.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26529

RESOLVED That the Design Commission, having considered designs for the rehabilitation of a façade, Engine Company 46, 460 Cross Bronx Expressway, Bronx, submitted by the Fire Department, represented by exhibits 3682-P, Q, R & S of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 12, 2020.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26530

RESOLVED That the Design Commission, having considered designs for the installation of an emergency generator, Engine Company 282, 4210 12th Avenue, Brooklyn, submitted by the Fire Department, represented by exhibits 6293-G, H, I & J of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26531

RESOLVED That the Design Commission, having considered designs for the rehabilitation of Engine Company 276, 1635 East 14th Street, Brooklyn, submitted by the Fire Department, represented by exhibits 7366-A, B, C, D & E of record in this matter, hereby gives to the same unanimous preliminary and final approval with the recommendation that the agency submit a proposal for the replacement of the existing black security lights flanking the garage door with fixtures that more appropriately complement the historic building.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26532

RESOLVED That the Design Commission, having considered designs for the construction of an ADA ramp and stairs, 621 Lenox Avenue, Manhattan, submitted by Housing Preservation and Development, represented by exhibits 7070-E, F, G & H of record in this matter, hereby gives to the same unanimous preliminary and final approval.

Final approval is conditioned upon commencement of work before March 12, 2020 and submission of comprehensive photographic documentation of the completed project consisting of 8” x 10” archival-quality color photographs.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners

March 12, 2018

CERTIFICATE 26533

RESOLVED That the Design Commission, having considered designs for the construction of an ADA path, reading terrace, and adjacent site work, Richmond Hill Community Library, 118-14 Hillside Avenue, Richmond Hill, Queens, submitted by the Queens Library, represented by exhibits 1495-Y, Z, AA & AB of record in this matter, hereby gives to the same unanimous preliminary approval.

Preliminary approval is conditioned upon submission of this project for final review and approval before March 12, 2020.

A true copy of resolution adopted by the Design Commission at its meeting on March 12, 2018.

Justin Garrett Moore Executive Director

Laurie Hawkinson, Richard Moore, Signe Nielsen, Ethel Sheffer, Merryl H. Tisch, Shin-pei Tsay, Commissioners