5/14/2014 New Page 1
KARNATAKA POWER CORPORATION Ltd.
List of files and records under Section 4(1)(a) of the Right to Information Act 2005
Name of the office: Office of the Chief Engineer (EI&TA)
Date of Closing Transfer of Nature of date of Sl. Opening Date of file & file - File No. Subject file/ Remarks No. the file Authoruty Permanent/ Running whom Temporary file transferred
Environmental matters of Hydro Power Projects
1 CE(EI&TA).SSPS.Env Shivanasamudram Seasonal 4/10/2008 Running Permanent Power Scheme (2x135 MW) - file - - - EIA Studies.
2 CE(EI&TA).KPSS.Env Kali Pumped Storage 12-06-2008 Running Permanent Scheme - 600 MW - EIA file - - - studies.
3 CE(EI&TA).SPSS.Env Sharavathi Pumped Storage 12-06-2008 Running Permanent Scheme - 900 MW - EIA file - - - studies.
4 CE(EI&TA).GHEP-II. Env Gundia Hydro Electric 04-10-2008 Running Permanent Project - II (1x200 MW) - EIA file - - - Studies.
5 CE(EI&TA).M'bad.CDM CDM Consultancy for the 02-05-2009 Running Permanent installation of 10 MW file - - - additional Unit at Munirabad Power House.
6 A1.Env.Fisheries PÀ£ÁðlPÀ «zÀÄåvï 14-09-2006 Running Permanent ¤UÀªÀÄzÀ d¯Á file - - - ±ÀAiÀÄUÀ¼À°è «Äà £ÀÄUÁjPÉ PÀÄjvÀÄ.
7 CE(EI&TA).R1A.Fisheries PÀ£ÁðlPÀ «zÀÄåvï 03-07-2008 Running Permanent ¤UÀªÀÄzÀ d¯Á file ±ÀAiÀÄUÀ¼À°è «Äà - - - £ÀÄUÁjPÉ ¤µÉâü¸ÀĪÀ PÀÄjvÀÄ.
8 CE(EI&TA).F1B Budget 06-10-2008 Running Permanent - - - file
9 A1.Env. Hydro MoEF Issues of Hydro 16-02-2004 Running Permanent Projects file - - -
10 CE(EI&TA).STR-Env STR/Varahi-Pending 13-02-2006 Running Permanent Environmental issues in file - - - connection with MoEF stipulations
11 CE(EI&TA)/SVP.Env Afforestion – Rim of 27-04-2004 Running Permanent - - - Linganamakki Reservoir file
12 A1L.Env/STR/Soil. Conv STR Soil conservation 12-01-2004 Running Permanent - - - file
13 ED(C&D)/STR/Env Implementation of 19-06-2006 Running Permanent Environmental safe guard file - - - measures for STR Project
Shivanasamudram Run-off- the River Power Project
SSPH Road – High Court 16-02- 14 SRRP-01 10-10-2002 Permanent Closed petition 2005
27-09- 15 SRRP-02 CWDT papers Sept-1990 Permanent Closed 1993
06-09- 16 SRRP-03 Chief Minister Letters 25-02-1989 Permanent Closed 2000 http://www.karnatakapower.com/lof_HO_CEEITA.asp 1/18 5/14/2014 New Page 1 17 SRRP-04 SSPH – DPR (1987) June- Permanent Closed 1987
18 SRRP-05 Lower Mettur HEP - Report Permanent Record
Expenditure statement – 16-11- 19 SRRP-06 30-12-1999 Permanent Record SSPH & Mekedatu (Flat file) 2005
SSPH – Comments & Replies 26-10- 20 SRRP-07 Permanent Record (CEA / CWC) 1988
21 Report on SSPH – SRRP-08 1991 Permanent Report Catchment area treatment
22 SRRP-09 Correspondence 31-03-1979 08-07- Permanent Closed 1982
23 SRRP-10 SSPH Investigation details 21-06-1990 09-09- Permanent Closed 1991
24 SRRP-11 SSPH Investigation details 04-07-1987 02-06- Permanent Closed 1990
25 SRRP-12 SSPH - Building 16-01-1991 19-08- Permanent Closed 1996
26 SRRP-13 CWC Comments and 05-07-1988 10-03- Permanent Closed replies 1998
27 SRRP-14 SSPH – Environmental Feb1988 25-04- Permanent Closed Clearance 1995
28 SRRP-15 SSPH Correspondence from 28-08-1989 27-10- Permanent Closed 28-06-1989 to 27-10-1989 1989
29 SRRP-16 Shiva – Rock mechanic 27-09-1981 01-02- Permanent Closed studies 1984
30 SRRP-17 SSPH correspondence 21-01-1991 31-10- Permanent Closed 1992
31 SRRP-18 SSPH – Forest clearance Feb 1988 May-1994 Permanent Closed
32 SRRP-19 SSPH correspondence 18-12-1992 27-05- Permanent Closed 1988
33 SRRP-20 SSPH correspondence 03-06-1989 04-02- Permanent Closed 1990
34 SRRP-21 SSPH correspondence 22-08-1988 15-03- Permanent Closed 1990
35 SRRP-22 SSPH correspondence 03-06-1989 17-04- Permanent Closed 1990
36 SRRP-23 Correspondence from 10-01- 12-03-1990 22-08- Permanent Closed 1990 to 22-03-1990 1990
37 SRRP-24 Correspondence from Oct. Oct-1992 14-09- Permanent Closed 1992 to 14-09-1998 1998
38 SRRP-25 SSPH Correspondence from 15-07-1998 29-04- Permanent Closed 15-07-1998 to 29-04-2000 2000
39 SRRP-26 SSPH Correspondence from 08-05-2000 01-01- Permanent Closed 08-05-2000 to 01-04-2004 2004
40 SRRP-27 Cauvery drawings Permanent Closed
41 SRRP-28 With drawing of 50 Ha of 30-07-2003 14-10- Permanent Closed Forest land – Reg. 2005
42 SRRP-29 Papers pertaining to 02-04- Temporary Closed meeting with CS on 02-04-05 2005 and H.O.
43 SRRP-30 Cauvery – papers 27-10- Temporary Closed pertaining to meeting with 2005 CS on 27-10-2005
44 SRRP-31 Meeting file-SSPH 03-04- Temporary Closed 1992
45 SRRP-32 Comment & Replies to 18-03-1988 17-01-89 Temporary Closed Directors http://www.karnatakapower.com/lof_HO_CEEITA.asp 2/18 5/14/2014 New Page 1
46 SRRP-33 Correspondence with 04-11-2003 12-12- forest-Land lease 1989 Permanent Closed
47 SRRP-34 SSPH-Pre-feasibility Report July-2009 Record stored
48 SRRP-35 Coorp-Wild life -PCCF 20-07-07 Running
49 SRRP-36 Corp-Technical Running committee03-03-2007
50 SRRP-37 Acquisition of Forest land 13-04-2007 Temporary Closed
51 SRRP-38 The report of CWDT with 2007 Record stored final decision. (Five Volumes)
52 SRRP-39 Appl, Taking bores in SSPH 26-05-2009 Running
53 SRRP-40 Appl’-90 Ha forest land 19-11-2009 Running Proposal
54 SRRP-41 Corp,-Material-water- 24-02-2009 Running Borrow area testing- Results
55 SRRP-42 SSPH-Hydrological data- 2006-2007-Data Running 1971-2007
56 SRRP-43 General correspondence 20-06-2007 Running
57 SRRP-44 Mini hydels in cauvery basin 12-11-2008 Running
58 SRRP-45 SRRP-Tech correspondence Old Important 30-11- 2008 Permanent Closed &June-2008
59 SRRP-46 SRRP-Tech correspondence 1-12-1008 30-06- Permanent Closed 2009
60 SRRP-47 SRRP-Tech correspondence 29-06-2009 Running
CWDT, Technical Committee and CMP correspondence
1 CWDT-01 CMP – 1 CWDT 19-10-1998 04-07- Permanent Closed 2000
2 CWDT-02 CMP – 1 CWDT 28-03-1998 29-09- 1998
3 CWDT-03 Technical Committee – 10-06-2000 31-03- Permanent Closed 52nd to 58th Meeting 2004
4 CWDT-04 Technical Committee – 2nd 22-06-1990 08-10- Permanent Closed to 28th Meeting 1992
5 CWDT-05 CWDT Supply of information 07-08-1992 01-09- Permanent Closed 1992
6 CWDT-06 CWDT Supply of information 14-08-1992 28-09- Permanent Closed 1992
7 CWDT-07 Advisory sub-committee 26-07-1995 26-09- power development 1995 Permanent Closed (Sept.1995)
8 CWDT-08 Affidavit and Replies 24-12-1994 27-12- Permanent Closed 1997
9 CWDT-09 Advisory sub-committee September-1995 11-10- power development 1995 Permanent Closed (August 1995)
10 CWDT-10 CWDT papers Mekedatu, 25-04-1989 14-02- Hogenakal from 25.05.89 to 1991 Permanent Closed 16.12.91
11 CWDT-11 Kerala Affidavit (April 1998) April 1998 Permanent Closed
12 CWDT-12 CWDT papers (Mekedatu 02-04-1992 June- Permanent Closed and Hogenkal) 1992 http://www.karnatakapower.com/lof_HO_CEEITA.asp 3/18 5/14/2014 New Page 1 13 CWDT-13 Technical Committee from 19-09-1990 09-03- Permanent Closed 29th to 36th meeting 1994
14 CWDT-14 Technical Committee from April-1994 May-2000 Permanent Closed 43rd to 51st meeting
15 CWDT-15 Affidavit and Replies – T N Augst-1993 Feb-1998 Permanent Closed
16 CWDT-16 Affidavit and Replies – T N 27-07-1993 Augst- Permanent Closed 1993
17 CWDT-17 Affidavit and Replies – T N 28-06-1993 14-06- Permanent Closed 1995
18 CWDT-18 Technical Committee from June-1994 26-10- Permanent Closed 31st to 42nd meeting 1995
19 CWDT-19 CWDT papers 03-03-1991 31-03- Permanent Closed 1992
20 CWDT-20 Affidavit Meeting file 23-11-1995 14-05- Permanent Closed 1998
21 CWDT-21 CMP No. 9 – Filed by T N 04-04-1996 03-07- Permanent Closed 1996
22 CWDT-22 CWDT – Additional storage 09-05-1995 27-11- Permanent Closed below Mettur dam 1997
23 CWDT-23 Technical Committee from 20-11-2004 28-03- Permanent Closed 59th to 2007
24 CWDT-24 Feasibility of HEP across river Feb-1981 Cauvery at Mekedatu – Report Stored Sub-committee report – Feb.1981
25 CWDT-25 Feasibility of HEP across river Sept-1981 Cauvery at Mekedatu – Report Stored Sub-committee report – Sept.1981
26 CWDT-26 Bhavani – Kattalai Barrage 1995 Report Stored -1 DPR (1995)
27 CWDT-27 Cauvery Power Project (850 October- MW) originally called – 1996 Report Stored Hogenakal – by T.N. (October 1996)
28 CWDT-28 Hogenakal – 19-11-1998 06-01- Correspondence – Vol(1) - 1999 Permanent Closed File No.C1C3J4A / Hog.
29 CWDT-29 Tech-data-furnished by May-June states to the assessors of 1991 Record Stored CWDT
30 CWDT-30 Before CWDT-Counter January seatement of TN to Caseby 1991 Record Stored GOK
31 CWDT-31 Before CWDT-Rejoinder of March Record Stored GOK to statement of TN 1991
32 CWDT-32 Before CWDT-scope for 03-08- ground water exploitation 1993 Record Stored in the cauvery delta basin
33 CWDT-33 Technical committee 28-03-2007 Running meetings-63rd to
MEKADATU - DESCRIPTION
1 MKDPH-01 No. Mekedatu – Drawings Sept-1965 pertaining A&C site Permanent Closed prepared by HRCP Inv. Division.
2 MKDPH-02 Mekedatu-Sub Committee June -1981 June- Permanent Closed Correspondence 1986
3 MKDPH-03 Mekedatu-Sub Committee 09-12-1980 June Permanent Closed Correspondence -1981 http://www.karnatakapower.com/lof_HO_CEEITA.asp 4/18 5/14/2014 New Page 1 4 MKDPH-04 Mekedatu correspondence Feb-1978 06-08- Permanent Closed 1980
5 MKDPH-05 Mekedatu correspondence 06-08-1974 June- 1979 Permanent Closed
6 MKDPH-06 Mekedatu correspondence 12-08-1982 28-02-83 Permanent Closed
7 MKDPH-07 Mekedatu correspondence 13-06-84 11-03- Permanent Closed 1987
8 MKDPH-08 Mekedatu correspondence 08-09-1980 17-04- Permanent Closed 1984
9 MKDPH-09 Mekedatu correspondence 02-04-1992 June- Permanent Closed 1992
10 MKDPH-10 Mekedatu Dec-1980 Permanent Closed correspondence(Drawings
11 MKDPH-11 Mekedatu correspondence 20-10-1992 23-09- Permanent Closed 1993
12 MKDPH-12 Mekedatu correspondence 15-07-1993 07-05- Permanent Closed 1997
13 MKDPH-13 Mekedatu correspondence 07-05-1997 09-09- Permanent Closed 1998
14 MKDPH-14 Mekedatu correspondence 24-09-1998 12-07- Permanent Closed 2002
15 MKDPH-15 Rock mechanics studies 30-01-1986 06-06- Permanent Closed 1990
16 MKDPH-16 Rock mechanics studies 03-03-1989 20-11- Permanent Closed 2000
17 MKDPH-17 Mekedatu-Drilling works- 25-07-1981 12-09- Permanent Closed corresp. 1981
18 MKDPH-18 Mekedatu-Drilling works- 21-08-1979 25-02- Permanent Closed corresp 1982
19 MKDPH-19 Mekedatu-Drilling works- 29-10-1974 22-09- Permanent Closed corresp 1982
20 MKDPH-20 Mekedatu-Drilling works- 07-08-1980 10-07- Permanent Closed corresp 1982
21 MKDPH-21 Mekedatu-Drilling works- 08-10-1974 23-01- Permanent Closed corresp 1985
22 MKDPH-22 Mekedatu – Submersion 15-12-1981 05-10- Permanent Closed details 1996
23 MKDPH-23 Details of Cauvery progress March near Mekedatu including 1979 Permanent Closed site A,B,C & D.
24 MKDPH-24 Mekedatu-Investigation 18-12-1982 22-11- Details 1985 Permanent Closed
25 MKDPH-25 Mekedatu-Investigation 27-03-1982 07-07- Permanent Closed Details 2982
26 MKDPH-26 Mekedatu correspondence 19-05- Permanent Closed 1981
27 MKDPH-27 Mekedatu correspondence 09-01-1997 15-02- Permanent Closed 2000
28 MKDPH-28 Mekedatu correspondence 14-02-1987 07-06- Permanent Closed 2000
Hydrological Data and Statutory Clearances.
1 CE(EI & TA)/File No 37 Hydro Meteorological Data 15-06-2005 Running - Permanent of all H.E.Projects of File Investigation Wing
2 CE(EI & TA)/File No 27 Coal based New Thermal 19-06-2006 18-03- - Permanent Power Plants 2009 http://www.karnatakapower.com/lof_HO_CEEITA.asp 5/18 5/14/2014 New Page 1
3 CE(EI & TA)/File No 26 Tadadi Ultra Mega Thermal 23-02-2005 15-02- - Permanent Power Plant(4000MW) 2006
4 CE(EI & TA)/File No 43 Barapole H.E.Project 17-04-1999 18-10- - Permanent 2005
5 CE(EI & TA)/File No 85 Correspondence on 13-07-2006 26-12- Closed Permanent Nagarjuna Thermal Power 2006 Plant(1015 MW) in Udupi District
6 CE(EI & TA)/File No 6 Nuclear Power Sites in the 06-09-2005 04-08- Closed Permanent State of Karnataka 2006
7 CE(EI & TA)/File No 54 Water Allotment for new 21-01-2004 08-02- - Permanent Thermal Power Plants & 2010 Gundia H.E. Project
8 CE(EI & TA)/ Old File Correspondence on Old Closed Permanent Tattihalla Augmentation Correspondences Scheme, Bedthi H,E. Project & Bedthi Run-off- River Scheme
9 CE(EI & TA)/File No 54(B) Statutory Clearances for all 18-01-2008 19-11- - Permanent Hydro Electric & New 2009 Thermal Power Projects
10 CE(EI & TA)/File No 142 Formation of Special 22-08-2007 02-06- - Permanent Purpose Vehicle(SPV) under 2008 KPTCL
11 CE(EI & TA)/File No 74 Correspondence on 29-07-2006 17-11- - Permanent Yermarus Thermal Power 2009 Station(2X800 MW) in Raichur District
12 CE(EI & TA)/File No 147 Correspondence on Edlapur 27-08-2007 09-12- - Permanent Thermal Power 2009 Station(1X800 MW) in Raichur District
13 CE(EI & TA)/File No 116 Correspondence on 13-10-2006 06-02- - Permanent BTPS(1X500 MW), Unit -3 2010 Thermal Power Station(1X500 MW) in Bellary District
14 CE(EI & TA)/File No 158 Correspondence on 14-05-2008 30-06- - Permanent Krishnapattanam Ultra 2008 Mega Power Project(5X800 MW) in A.P
Gundia Hydel Project
Correspondence – Public 1 CESQ1/ Gen/23 queries replies NGO 03-05-05 Running Permanent interaction CEA, GoK
05-04-04 & 2 A1R7F/32 TCM papers + Board Running Permanent 05-08-04
Gundia – Right to CEEITA/ information Act & 3 22-03-06 Running Permanent Information Commission RTI /34 (CE(EI&TA)/RTI
CEEITA/CEA/50 th 4 Projects in XI & 12 Plan 17-08-05 Running Permanent periods
CEEITA / Gundia/79 Gundia Project – Techno 5 28-06-06 Running Permanent Economic Clearance
Environmental Clearance for Gundia Project – 6 CEEITA / Gundia/ Env/80 27-07-05 Running Permanent Correspondence with MoEF/CEA/KSPCB
Gundia – Paper / Gazette 7 ED(C&D)/ Gundia/114 Notification – 24-08-06 Running Temporary Representation.
8 A1R1A/121 All memorandum answered 07-11-08 Running Permanent http://www.karnatakapower.com/lof_HO_CEEITA.asp 6/18 5/14/2014 New Page 1 Memorandum regarding 9 A1R1A/123 12-05-05 Running Permanent Gundia Project
10 143 Assurance 05-05-07 Running Temporary
11 148 GoK meetings 26-04-05 Running Permanent
Administrative Approvals 12 CE(EI&TA)/Approvals 08-04-2005 Running Permanent Estimates
Technical Sanction to 13 CE(EI&TA)/Tech.Sanc. 17-03-2007 Running Permanent Estimates
14 CE(EI&TA)/Gundia GHEP- Corespondence 19-09-2005 Running Permanent
Environmental matters of Thermal Power Projects
1 CE(EI&TA).YTPS/ENV Correspondence with MoEF 05-10-2007 Running Permanent - - - and KSPCB file
2 CE(EI&TA).YTPS/ENV Correspondence with 05-10-2007 Running Permanent - - - Consultant file
3 CE(EI&TA).YTPS/ENV Bills of EQMS 06-06-2008 Running Permanent - - - file
4 CE(EI&TA).YTPS/ENV Compliance to MoEF 17-11-2009 Running Permanent - - - file
5 CE(EI&TA).YTPS/ENV General Correspondence 05-10-2007 Running Permanent - - - (Box File) Vol I & II file
6 CE(EI&TA).ETPS/ENV Correspondence with MoEF 03-05-2008 Running Permanent - - - and KSPCB file
7 CE(EI&TA).ETPS/ENV Correspondence with 29-08-2007 Running Permanent - - - Consultant file
8 CE(EI&TA).ETPS/ENV Bills of M/ s Bhagavathi Ana 15-04-2009 Running Permanent - - - Labs file
9 CE(EI&TA).ETPS/ENV General Correspondence 09-08-2008 Running Permanent - - - (Box File) Vol I & II file
10 CE(EI&TA)/BTPS/ENV Correspondence with MoEF 30-11-2007 Running Permanent - - - and KSPCB file
11 CE(EI&TA)/BTPS/ENV Correspondence with 29-08-2007 Running Permanent
Consultant file
12 CE(EI&TA)/BTPS/ENV Bills of M/ s Bhagavathi Ana 29-08-2007 Running Permanent
Labs file
13 CE(EI&TA)/BTPS/ENV Compliance of MoEF 17-11-2009 Running Permanent
file
14 CE(EI&TA)/BTPS/ENV General Correspondence Sept.2008 Running Permanent (Box File) Vol I & II file
15 CE(EI&TA)/BTPS/UNIT – II /ENV BTPS Unit II /Vol : I to V 03-11-2000 Closed Permanent
21-08- 2007
16 CE(EI&TA)/BTPS/UNIT – II /ENV BTPS Unit II /Vol : VI 14-05-2007 Running Permanent file
17 CE(EI&TA)/BTPS/UNIT – II /ENV Kudithini TPS Vol: I & II 13-06-2007 Closed Permanent
30-08- 2008
18 CE(EI&TA)/BTPS/UNIT – II /ENV Bills of BTPS Unit - II Agency 04-03-2006 Closed Permanent M/s Envirotech Pvt. Ltd. 13-12- 2007
20 CE(EI&TA)/GTPS /ENV Correspondence with 21-10-2008 Running Permanent
MoEF/ SPCB & General File
21 CE(EI&TA)/RTPS /ENV Environmental Report Jan. 2008 Running Permanent
File
22 CE(EI&TA)/RTPS /ENV Water drawn from Krishna 02-02-2006 Running Permanent
http://www.karnatakapower.com/lof_HO_CEEITA.asp 7/18 5/14/2014 New Page 1 River and Water Cess File
23 CE(EI&TA)/RTPS /ENV Compliance to MoEF & 21-03-2008 Running Permanent
KSPCB File
24 CE(EI&TA)/RTPS /ENV RTPS UNIT-VIII EIA Studies 03-02-2004 Closed Permanent
March 2008
25 CE(EI&TA)/SE C/ENV EAI Studies for Kalgurki, 31-07-2007 Closed Permanent Yermarus, 05-02- Annechakanahalli,Yadger 2007
Solar PV Plants
1 CE(EI&TA)/ Solar 3.05.2008 Running Permanent
General file file
2 Correspondence with M/s Running Permanent CE(EI&TA)/Solar/ Kolar 26.06.2009 Titan Energy systems file
3 Correspondence with M/s Running Permanent CE(EI&TA)/Solar /Belgaum 12.05.2009 Photon Energy systems file
4 Correspondence with all Running Permanent CE(EI&TA)/Solar/ Firms 28.02.2009 the firms file
5 Correspondence with M/s Running Permanent CE(EI&TA)/Solar/ BHEL 21.12.2009 BHEL file
6 Running Permanent
CE(EI&TA)/KPTCL Correspondence with KPTCL 19.03.2009 file
7 Correspondence with Running Permanent
CE(EI&TA)/Solar/ CDM regard to CDM 16.04.2009 file
8 Correspondence with M/s Running Permanent PRERANA with regard to file CE(EI&TA)/SPUA SPUA. 18.03.2010
9 Correspondence with Running Permanent
CE(EI&TA)/Solar/ Lands regard to Lands 26.03.2010 file
10 Correspondence with Running Permanent regard to new solar plants file CE(EI&TA)/Solar mission/General under JNNSM scheme. 01.03.2010
11 CE(EI&TA)/ Hiring of Vehicle Kolar Solar 19/3/09 Closed. Temporary Plant
12 Correspondence of CE(EI&TA)/ yalesandra solar power 11/8/09 Running Permanent plant
13 Drawings of Yalesandra CE(EI&TA)/ 5/6/09 Running Permanent solar Power Plant
14 Correspondence of Itnal CE(EI&TA)/ 14/12/09 Running Permanent solar power plant
15 Correspondence of CE(EI&TA)/ yapaladinni solar power 21/1/10 Running Permanent plant -BHEL.
16 Running CE(EI&TA)/ CPV Solar Power Plant 13/8/09 Temporary
17 Running CE(EI&TA)/ Thermal Power Plant at KGF 16/2/09 Temporary
Godhna Thermal Power Station
1 CE(EI&TA)/GODHNA/AGREEMENT Agreement file Running Permanent
file
2 CE(EI&TA)/GODHNA/JV EVI for Joint Venture Running Permanent 24.04.2009 file
3 CE(EI&TA)/GODHNA/PFR Consultancy - MECONS - Running Permanent 24.07.2008 Preparation of PFR file
4 CE(EI&TA)/GODHNA/LAND Allotment of Land and Land Running Permanent
Acquisition file http://www.karnatakapower.com/lof_HO_CEEITA.asp 8/18 5/14/2014 New Page 1
5 CE(EI&TA)/GODHNA/Water Allotment of water from Running Permanent Mahanadi River and file construction of Barrage
6 CE(EI&TA)/GODHNA/COAL Allotment of Coal Block Running Permanent
and Railways file
7 CE(EI&TA)/GODHNA/General General correspondence Running Permanent
file
8 CE(EI&TA)/GODHNA/Office/IB Establishment of site office Running Permanent and IB file
9 CE(EI&TA)/GODHNA/RH Rehabilitation Running 12.11.2009 file
10 CE(EI&TA)/GAS/BIDADI Gas Project at Bidadi Running Permanent
file
11 CE(EI&TA)/GODHNA/CDM Clean Development Running Permanent
Mechanism file
12 CE(EI&TA)/GODHNA/CDM Clean Development Running Permanent 15.05.2009 Mechanism/Yermarus file
13 CE(EI&TA)/GODHNA/CDM Clean Development Running Permanent 15.05.2009 Mechanism/Edlapur file
14 CE(EI&TA)/GODHNA/POWER Power Evacuation and Running Permanent
Power Line shifting file
15 CE(EI&TA)/GODHNA/Progress Progress and meeting file Running Permanent
file
16 GTPS Submission of TOR - MoEF Running Permanent 2009 file
Hydrology and Planning of New Hydro Projects
GHEP Correspondence Running Permanent 1 1 Oct. 2009 file
Pumped Storage Scheme Running Permanent 2 2 June 2008 correspondence file
General Correspondence Running Permanent 3 3 Aug. 2009 file
Miscellaneous Running Permanent 4 4 file
Ghataprabha Running Permanent 5 5 Mar. 2009 Correspondence file
Mini Hydel Scheme Running Permanent 6 6 Jan. 2009 file
Munirabad Scheme - Running Permanent 7 7 Apr. 2009 correspondence file
GHEP – Preparation of Rev. Running Permanent 8 8 Jan. 2010 DPR file
Master Plan for utilization of Running Permanent 9 9 2004 Mahadayi basin work file
Name of the Office : SE(TA) Technical
Address : 1st Floor, Trade Centre Building, R.C.Road, Bangalore – 560 001
Sl File Subject Opening Date Closing date Date of Transfer Nature of File Remarks No No. of File of file/ of File and Permanent/ Running file Authority whom transferred Temporary http://www.karnatakapower.com/lof_HO_CEEITA.asp 9/18 5/14/2014 New Page 1 1 1 Raichur Thermal Power Station
Correspondence w.r.to Technical audit observation April 2005 Jan. 2007 Closed Civil works – volume – I January 2007 Nov. 2008 Permanent Closed Civil works – volume – II January 2009 Running Running Civil works - volume – III
2 2 Bellary Thermal Power Station
Correspondence w.r.to
Technical audit observation January 2002 Jan. 2003 Closed
Civil works – volume – I January 2004 Jan. 2005 Permanent Closed
Civil works – volume – II April 2005 Jan. 2007 Closed
Civil works - volume – III January 2007 Jan. 2009 Closed
Civil works - volume - IV January 2009 Running Running
Civil works - volume - V
3 3 Kalinadi Hydro Electric Project
Correspondence w.r.to
Technical audit observation Dec. 2003 Closed
Civil works – volume – I Sept., 02 April 2005 Permanent Closed
Civil works – volume – II January 2004 Nov. 2006 Closed
Civil works - volume – III April 2004 Dec. 2008 Closed
Civil works - volume - IV Nov. 2006 Running Running
Civil works - volume - V Jan. 2009
4 4 Sharavathi Hydro Electric Project
Correspondence w.r.to
Technical audit observation Nov. 2002 Dec. 2003 Closed
Civil works – volume – I Dec. 2003 March 2005 Closed
Civil works – volume – II March 2005 Dec. 2006 Permanent Closed
Civil works - volume – III Jan. 2007 Dec. 2008 Closed
Civil works - volume - IV Dec. 2008 Running Running
Civil works - volume - V
5 5 Details of Minutes of the technical audit review meetings April 2005 April 2006 Closed volume – I April 2006 Oct. 2006 Closed volume – II Nov. 2006 Jan. 2008 Closed volume – III Feb. 2008 Dec. 2008 Permanent Closed volume - IV Jan. 2009 Running Running volume - V
6 6 Shiva Shimsha September Running Permanent Running
Correspondence w.r.to electro mechanical works technical audit observation
7 7 Bellary Thermal Power Station April 2007 Permanent Running http://www.karnatakapower.com/lof_HO_CEEITA.asp 10/18 5/14/2014 New Page 1 Correspondence w.r.to electro Running mechanical works technical audit observation
8 8 Raichur Thermal Power Station June 2007 Permanent
Correspondence w.r.to electro Running Running mechanical works technical audit observation
9 9 Kalinadi Hydro Electric Project Permanent Running
Correspondence w.r.to electro March 2007 Running mechanical works technical audit observation
10. 10 Sharavathi Valley Electric Project
Correspondence w.r.to electro January 2007 Permanent Running mechanical works technical audit observation Running
11. 11 Gundia Hydro Electric Project June 2007 Running Permanent Running
Correspondence w.r.t technical audit observations
12. 12 New project YTPS (correspondence) May 2009 Running Permanent Running
Name of the Office : Executive Engineer(Technical Audit)/BTPS
Address : EE(Technical Audit), KPC Limited, BTPS/ Kuduthini/ Bellary District
Sl File Subject Opening Closing Date of Nature of Re- No No. Date of File date of file/ Transfer of File Running file File and Permanent/ marks Authority whom Temporary transferred
1 1 Technical Audit 12.03.2002 Running Permanent
2 2 Notice Inviting Tender 09.08.2003 13.03.2009 Permanent Closed
3 3 Estimate correspondence 30.03.2008 Running Permanent
4 4 Transparency Act 30.09.2008 Running Permanent
5 5 Monthly report file sent to SE(TA) 28.02.2004 Running Permanent
Construction of RCC weir at Maralihalla pertains to EE(C) - 6 6 10 24.02.2010 Running Permanent
Construction of M.S.Pipe line work from Maralihalla to 7 7 BTPS pertains to EE(C) - 10 30.01.2010 Running Permanent
Construction of pump house at Maralihalla pertains to EE(C) 8 8 - 10 24.02.2010 Running Permanent
Operation and servicing of 3 Nos. of dozer at CHP pertains 9 9 to EE(M)-5 division 23.10.2009 Running Permanent
Belt vulcanizing & repairs to conveyor belt pertains to 10 10 EE(M)-5 division 08.10.2009 Running Permanent
11 11 Environment clearance file for unit - 3 23.11.2009 Running Permanent
12 12 Audit file pertains to SE(E)/EE(C)/Almatti 30.12.2009 Running Permanent
13 13 Audit file pertains to EE(C)/9 10.12.2009 Running Permanent
http://www.karnatakapower.com/lof_HO_CEEITA.asp 11/18 5/14/2014 New Page 1
Name of the Office : Executive Engineer(Technical Audit), Raichur Thermal Power Station, Shakthinagar
Address : O/o: the Executive Engineer(Technical Audit) , CTS-2, Civil Office Building, RTPS Colony,
Shakthi Nagar – 584 170, Raichur District.
Sl File No. Subject Opening Closing date Date of Nature of Remarks No Date of File of file/ Transfer of File Running file File and Permanent/ Authority whom Temporary transferred
Technical Correspondence, Audit Reports, Closed 1 1 28/06/2006 21/11/2007 -- Permanent Minutes of Monthly Meeting.-VOLUME -1
Technical Correspondence, Audit Reports, Closed 2 1(a) 26/11/2007 15/06/2009 -- Permanent Minutes of Monthly Meeting.-VOLUME -2
Technical Correspondence, Audit Reports, 3 1(b) 06/07/2009 Running -- Permanent Minutes of Monthly Meeting.-VOLUME -3
4 2 Correspondence with Local Offices. 18/12/2008 25/02/2009 -- Permanent Closed
5 3 YTPS - Miscellaneous Works. 07/09/2009 Running -- Permanent
Name of the Office : Executive Engineer(TA)/Kargal
Address : KPC Colony, Kargal
Sl File Subject Opening Closing Date of Nature of Re- No No. date of File date of file/ Transfer of File Running file File and Permanent/ marks Authority whom Temporary transferred
1 1 General correspondence pertains to CSS(R) sector 26.12.2005 Running Permanent
2 2 General correspondence pertains to CAS sector 17.11.2006 Running Permanent
3 3 General correspondence of SE(E) - Gerusoppa 22.02.2007 Running Permanent
4 4 General correspondence of SE(E) - Jog 27.02.2009 Running Permanent
5 5 General correspondence of SE(E) - MGHE 30.10.2007 Running Permanent
6 6 General correspondence of SE(E) - Varahi 02.09.2006 Running Permanent
7 7 Deep pointig to the balance area of Upstream face of the 16.03.2009 Running Permanent masonry portion of Linganamakki Dam for reach I & II
8 8 Materials(Departmental issues) 11.06.2005 Running Permanent
9 9 Office correspondence 18.07.2005 Running Permanent
10 10 Progress Report 29.05.2001 07.09.2004 Permanent
11 11 General Correspondence 10.01.2001 16.03.2005 Permanent
12 12 Monthly audit report 29.04.2004 27.08.2007 Permanent
13 13 Monthly audit report 25.09.2007 Running Permanent
Name of the Office : AEE(TA)/Ganeshgudi
Address : O/O AEE(Technical Audit), KPC Limited, Ganeshgudi – 581 365, Ta: Joida, N.K District
Sl File Subject Opening Closing date Date of Nature of File Re- No No. Date of of file/ Transfer of Permanent/ marks http://www.karnatakapower.com/lof_HO_CEEITA.asp 12/18 5/14/2014 New Page 1 File Running file File and Temporary Authority whom transferred
A -TECHNICAL: RUNNING FILES:
Technical Audit report/Minutes of Technical 1 1 audit review meeting. 01.04.2009 Running Permanent
2 2 Observations(Civil) 01.01.2005 Running Permanent
3 3 Observations(Elecl) 01.01.2005 Running Permanent
4 4 C.M.G. Meeting 01.04.2009 Running Permanent
5 5 Estimates(Civil) 01.04.2009 Running Permanent
6 6 Estimates (Elecl.,) 01.04.2009 Running Permanent
B - TECHNICAL CLOSED FILES:
Technical Audit report/Minutes of Technical Closed 7 1 audit review meeting Vol - 1 06.02.1997 9.9.1999 Permanent
8 2 -do- Vol.2 10.09.1999 08.10.2000 Permanent Closed
9 3 -do- Vol.3 09.10.2000 06.02.2001 Permanent Closed
10 4 -do- Vol.4 07.02.2001 10.10.2001 Permanent Closed
11 5 -do- Vol.5 11.10.2001 31.09.2002 Permanent Closed
12 6 -do- Vol.6 31.09.2002 27.05.2003 Permanent Closed
13 7 -do- Vol.7 28.05.2003 31.12.2003 Permanent Closed
14 8 -do- Vol.8 09.09.1997 31.10.2001 Permanent Closed
15 9 -do- Vol.9 01.04.2005 31.03.2006 Permanent Closed
16 10 -do- Vol.10 01.04.2006 31.03.2007 Permanent Closed
17 11 -do- Vol.11 01.04.2007 31.03.2008 Permanent Closed
18 12 -do- Vol.12 01.04.2008 31.03.2009 Permanent Closed
Name of the Office : SE[Consultancy]
Address : O/o. CE[EI & TA], # 22/23, Sudarshan Complex,Sheshadri Road, B’lore-560 009
Consultancy Works:
SL. File No. SUBJECT Opening Closing Date of Transfer Nature of File REMARKS
No. Date Date of of File and Authority Permanent/ File / whom of File Temporary Running Transferred File
1 CE(EI&TA) / Provisional Indemnity Insurance for 20/3/03 7/5/03 - Temporary Chakung-Chu Project Chakung-Chu Closed [ON file] Project
2 CE(EI&TA) / Consultancy Services UTI Bonk – 08.02.07 16.03.07 - Temporary Closed Alakanda Hydro Power Co., ALK - UTI [ON File]
3 CE(EI&TA) / Cost Estimate for preparation of 08.03.04 02.02.05 - Temporary Closed DPRs for various projects of DPR-CEA CEA{ON File]
4 CE(EI&TA) / Detailed Project Report 23.07.04 29.10.07 - Permanent Closed
DPR http://www.karnatakapower.com/lof_HO_CEEITA.asp 13/18 5/14/2014 New Page 1
5 CE(EI&TA) / Consultancy Services to ANA , 04.08.03 21.08.09 - Permanent Closed Portblair (Two volumes) ANA
6 CE(EI&TA) / Consultancy Ser vices to BMTC 26.11.01 01.07.09 - Permanent Closed
BMTC
7 CE(EI&TA) / REMU of Hydro Stations – PFC pre- 10.05.99 28.07.99 - Temporary Closed qualification
8 CE(EI&TA) / Bid for Samal Barrage HEP – M/s. 18.06.01 15.06.02 - Temporary Closed Orissa Power Consortium Ltd., OPL
9 CE(EI&TA) / Copies of Reports on Seminars - - - Temporary Closed workshops & Thermal course
10 CE(EI&TA) / Consultancy services for Rangit-II 27.4.05 29.06.05 - Temporary Closed [60 MW] HEP in SIkkim State Rangit-II
11 CE(EI&TA) / Consultancy services to BWSSB to 23.05.05 23.12.05 - Temporary Closed Augment water supply to BWSSB Bangalore
12 CE(EI&TA) / Two No. of Nerammersats - 19.12.01 12.03.03 - Temporary Closed Terminals for Rolep & Chakung- Chu Projects in Sikkim State
13 CE(EI&TA) / Development of Teesta IV & VI 11.02.05 18.09.06 - Temporary Closed HPEs in SIkkim State [ ON File] Testa IV & VI
14 CE(EI&TA) / Willingness to work in Consultancy 14.06.01 13.11.01 Temporary Closed wing
15 CE(EI&TA) / Consultancy ser vices for 18.4.01 11.04.03 - Temporary Closed Yettinahole Project Yettinhole
16 CE(EI&TA) / Consultancy Services for 5 X 4 MW 11.4.05 26.4.05 - Temporary Closed Samal Barrage OPCL
17 CE(EI&TA) / Consultancy Services for 30.03.02 25.07.02 - Temporary Closed Dhamwari Sunda HEP(70 MW) in Dhamwari- Himachalapradesh Sunda
18 CE(EI&TA) / Empanelment of consultants with 30.08.01 19.03.03 - Temporary Closed PFC PFC
19 CE(EI&TA) / Consultancy Services to M/s. 20.09.01 18.12.02 - Temporary Closed Sandur Manganese & Iron Ore Hemavathi Co., for Hemavathi LBC - PH
20 CE(EI&TA) / Consultancy Services to KSPHCL 28.04.01 02.08.01 - Temporary Closed
KSPHCL
21 CE(EI&TA) / Consultancy Services to Parpikala 23.01.02 05.02.02 - Temporary Closed Mini Hydel Scheme RECL
22 CE(EI&TA) / E.O.I. for consultancy services for 26.09.02 04.03.03 - Temporary Closed projects in Uttaranchal [O.N.File) Quest
23 CE(EI&TA) / Minutes of meeting with regard to 04.03.02 11.03.03 - Temporary Closed the Projects in the State of Sikkim Sikkim
24 CE(EI&TA) / Utilisation of the Services of Retired 15.10.03 06.12.03 - Temporary Closed KPCL Officials
25 CE(EI&TA) / Consultancy Services to Ralong 21.0-8.04 30.10.04 - Temporary Closed HEP in Sikkim Ralong
26 CE(EI&TA) / Hydrological studies of Teesta IV & - - - Temporary Closed VI Teesta IV & VI
27 CE(EI&TA) / Parpikala Power Pvt., Ltd., 20.02.02 18.10.04 - Temporary Closed http://www.karnatakapower.com/lof_HO_CEEITA.asp 14/18 5/14/2014 New Page 1 Parpikala
28 CE(EI&TA) / Monthly Progress Report on - - - Temporary Closed
Projects works
29 CE(EI&TA) / Correspondence with C -DC 23.04.01 12/2006 - Temporary Closed Consultancy Development Co., CDC
30 CE(EI&TA) / Consultancy Services for Temporary Closed Geological & Geo-technical Sub - - - Kaiga surface Investigation {ON File}
31 CE(EI&TA) / Consultancy Services to Rammam 06.07.01 20.10.01 - Temporary Closed HEP [Old File] Rammam
32 CE(EI&TA) / Consultancy Services to Bridge 09.04.01 26.03.03 - Permanent Closed across Krishna River near Gugal Gugal Village
33 CE(EI&TA) / Cost estimate for preparation of 23.11.03 26.06.04 - Permanent Closed Feasibility Reports Thermal-FR
34 CE(EI&TA) / Consultancy Services for Hydro - Permanent Closed Power Projects L&T – S&L
35 CE(EI&TA) / Design Energy Studies for Hydro 20.07.02 19.06.03 - Permanent Closed Stations of VVNL
36 CE(EI&TA) / Consultancy Services for Lata 25.01.05 19.06.06 - Permanent Closed Tapovan HEP [O.N. File} Lata Topovan
37 CE(EI&TA) / - - - Temporary Closed D O C U M E N T S JVSL
38 CE(EI&TA) / Providing Aluminum partition at 20.06.01 10.10.01 - Temporary Closed GM(C)s office
39 CE(EI&TA) / Consultancy Services to Punjab 09.05.05 04.06.05 - Temporary Closed State Electricity Board PSEB
41 CE(EI&TA) / Documents of Carbon Trading - - - Permanent Closed
Carbon trading
42 CE(EI&TA) / Rolep HEP - Insurance - 28.04.03 - Permanent Closed
Rolep
43 CE(EI&TA) / Empanelment with Neepco - - - Permanent Closed
Neepco
44 CE(EI&TA) / BTPS – Consultancy Services 16.02.02 16.07.02 - Permanent Closed
BTPS
45 CE(EI&TA) / Consultancy services to Teesta IV 03.07.01 13.09.06 - Permanent Closed & VI[3 volumes] Teesh IV & IV
48 CE(EI&TA) / Consultancy ser vices to VVNL 05..10.01 04.12.06 - Permanent Closed
VVNL
49 CE(EI&TA) / Consultancy y Services to Lata 25,02.04 18.09.06 - Permanent Closed Toporan HEP(3 X 54 MW) Lola Toporan
50 CE(EI&TA) / AG’s Correspondence 13.03.01 26.07.07 - Permanent Closed
AG
52 CE(EI&TA) / Consultancy to Kaiga Project 10.08.01 21.02.06 Files transferred Permanent Closed from (I&RE) Section CE(EI&TA) Kaiga
53 CE(EI&TA) / Consultancy services to Malana 03.12.99 05.05.01 - Permanent Closed http://www.karnatakapower.com/lof_HO_CEEITA.asp 15/18 5/14/2014 New Page 1 Malana Project
54 CE(EI&TA) / Status of Consultant y payment 12.05.98 12.12.01 - Permanent Closed
Status
55 CE(EI&TA) / Consultancy to BHEL Hydel 17.05.99 18.7.2000 - Permanent Closed Projects BHEL
56 CE(EI&TA) / MOU with PFC 14.09.99 10.05.02 - Permanent Closed
PFC
57 CE(EI&TA) / Setting up of MHS on Boot basis 28.05.00 08.11.99 - Temporary Closed
MHS
58 CE(EI&TA) / Strategic Alliance with - Closed Transcontinental USA(ON file) USA
59 CE(EI&TA) / Bina Power Co., 20.08.97 06.04.00 - Temporary Closed
Bina
60 CE(EI&TA) / Consultancy to M/s. Verbund Plan - 17.06.99 - Temporary Closed of Austria(ON File) Austria
61 CE(EI&TA) / Consultancy Services to Unit 3 & 4 - Temporary Closed of Kaiga Project ( ON File) Kaiga
62 CE(EI&TA) / Consultancy to NTPC(ON File) - Temporary Closed
NTPC
63 CE(EI&TA) / Minutes of 32nd ARC Meeting - Temporary Closed
ARC
64 CE(EI&TA) / Consultancy to Narayanapura - Temporary Closed Power Co., (O.N. File) Narayanapura
65 CE(EI&TA) / Consultancy to Nandi - Temporary Closed Infrastructure (O.N. Files ) Nandi
66 CE(EI&TA)/ Consultancy to Narayanapura 01/01/98 06/08/01 Permanent Closed
Narayanapura LBC
67 CE(EI&TA) /CEA/ Preparation of PFRs for Gundia, 17/03/2003 03/2005 03/2004 Permanent Closed Aghanashini, Kali Stage – III, PFR Gangavali- II & Tamankal - CEA – Vol.1 to 3
68 CE(EI&TA) / Kuttiyadi-HEP - L&T 01/2000 06/2007 Permanent Closed
Kuttiyadi Volumes I to 5 + 1 O.N. File
69 CE(EI&TA) Teggi - SIddapur LIS -CNNL 12/2003 03/2006 Permanent Closed /CNNL/
TEG.SID
70 CE(EI&TA) /110 110 KV Tr. Line Shahapur 12/2002 10/2005 Permanent Closed KV /KBJNL To Indi pump House - KBJNL
71 CE(EI&TA) /Dalal Vented dams at Puttur & Udupi 09/2002 07/2005 Permanent Closed Dalal consultants
72 CE(EI&TA) Singatalur - LIS - KNNL 05/2001 12/2003 Permanent Closed /KNNL/
Singatalur
73 CE(EI&TA) Basapur, Itagi – Sasalwadi – LIS - 12/2004 12/2004 Permanent Closed /KNNL/ KNNL
Bas – Itagi –
Sasal - LIS http://www.karnatakapower.com/lof_HO_CEEITA.asp 16/18 5/14/2014 New Page 1
74 CE(EI&TA) / Hemavathy LBC 06/2000 10/2001 Permanent Closed
Hemavathy - LBC
75 CE(EI&TA) /REC/ Kadamane MHS 10/2003 10/2003 Permanent Closed
Kadamane
76 CE(EI&TA) /TPCPL Singatalur – Huligudda MHS 10/2003 10/2003 Permanent Closed
77 CE(EI&TA) / Bidarahalli and 11/2005 05/2006 Permanent Closed
Kabini – Antharasanthe LIS-CNNL
Antharasanthe
78 CE(EI&TA) Pickup dam across 07/2007 07/2007 Permanent Closed /CNNL/ Hemavathi River - CNNL
79 CE(EI&TA) K – Bellur and Kadamballi - LIS - 10/2003 11/2004 Permanent Closed /CNNL/ CNNL
K-Bellur & Koda
80 CE(EI&TA) /KUWS Vented Dam across Varada River- 08/2005 02/1007 Permanent Closed & DB / Varada KUWS & DB C
81 CE[Ei & TA]/ MYSUGAR - MANDYA 04/2008 09/2008 Permanent Closed
MYSUGAR
82 CE[Ei & TA]/ Sarva Shikshna Abhyana Samithi 12/2007 01/2008 Permanent Closed
Sarva
83 CE(EI&TA) / Consultancy Services for Rolep R.F. Permanent and Chakung-Chu HEPs in Sikkim ATPIL Stage [ VI volumes Rolep and
II volumes Chakung-Chu]
84 CE(EI&TA) / Consultancy Services for Malana R.F. - Permanent Power Project Malana [ Two volumes]
85 CE(EI&TA) / Consultancy services for Rammam R.F. Permanent State- III HEP in West Bengal State[ Rammam V – Volumse]
ON file
86 CE(EI&TA) / Consultancy Services to KUWS & 27/11/03 R.F. Permanent DB KUWS & DB
87 CE(EI&TA) / UKP [R & R] works – KBJNL 5/1998 R.F. 03/2004, Permanent
UKP [R & R] Volume - 1 to 8 + 1 O.N.File
88 CE(EI&TA) / Kalasa Nala & Bandurnala 11/2000 R.F. Permanent Diversion scheme - KNNL K&B [ Volumes – 1 to 4 + 1 O.N. file)
89 CE(EI&TA) /Bonal Bonal MHS 03/2002 R.F. Permanent
90 CE(EI&TA) Y. Kaggal LIS-WRD 05/2005 R.F. Permanent /Y.Kagal
91 CE(EI&TA) Badanavalu LIS-CNNL 15/05/05 R.F. Permanent /CNNL/
Badanavalu
92 CE(EI&TA) /220 220 KV Tr. Line of Mulwadi – LIS - 03/2003 R.F. Permanent KV /KBJNL KBJNL
93 CE(EI&TA) /UKP/ Rajan Kollur – LIS - KBJNL 03/2003 R.F. Permanent
R.Kollur
94 CE(EI&TA) /KNNL Markandeya Dam - KNNL 05/2001 R.F. Permanent http://www.karnatakapower.com/lof_HO_CEEITA.asp 17/18 5/14/2014 New Page 1 Markandeya
95 CE[EI & TA]/ Upper Tunga Project – 07/2001 R.F. Permanent
KNNL/UTP KNNL
96 CE(EI&TA) / Tunga Projects 07/2005 R.F. Permanent
Dandeli –Ferro Volume I & II /Tunga
97 CE[EI&TA] / Chamarajasagar Dam at 06/2002 R.F. Permanent
BWSSB / T.G. Halli - BWSSB
TG Halli
98 CE(EI&TA)/UKP ALBC & ARBC - LIS – 06/2001 R.F. Permanent
ALBC & ARBC KBJNL
99 CE[Ei & TA]/ Upper Bhadra LIS - KNNL 01/2007 R.F. Permanent
UBP- LIS
100 SE[Consultancy] Progress Report 07/2008 R.F. Permanent
PRG
101 CE(EI&TA)/PFC Consultancy Services to PFC 08/2005 R.F. Permanent
BIO-MASSS:
102 CE(EI&TA)/ Bio-Mass Gassfification Power Plant at 09/2001 R.F 24/03/2009 Permanent Bethamangala and Kushalanagar – Bio-Mass Volume 1 to 3 & 5 to 7 SE[E]/RO
(B & K)
WIND PROJECTS:
103 CE(EI&TA)/ Correspondence with NTPC/ R.F 16/12/2009 Permanent
Wind /MOM Minutes of the steering committee N.V. Nagaraj,
EE(C)/ CE(EI& TA)
104 CE(EI&TA)/ Correspondence with Forest 15/03/04 R.F Permanent
Wind/Forest
105 CE(EI&TA)/ Correspondence with C – WET 13/03/09 R.F Permanent
Wind/C-WET Volume – I & II
106 CE(EI&TA)/ Correspondence with H.O. and approvals 07/07/08 R.F Permanent – Volume 1 & 2 Wind/HO
107 CE(EI&TA)/ Correspondence with Airport Authorities 21/05/08 R.F Permanent Wind/AA
108 CE(EI&TA)/ Phase – I works – Survey, Estimates, Tender R.F Permanent Wind/PH-1/ and other correspondence
Survey
109 CE(EI&TA)/ Phase – II works – Survey, Estimates, 27/06/09 R.F Permanent Wind/ PH-2/ Tender and other corresponded
Survey Volume 1 & 2
110 CE(EI&TA)/ Legal Correspondence 17/01/09 R.F Permanent Wind/Legal
111 CE(EI&TA)/ Correspondence with KREDL 30/06/08 R.F Permanent
Wind/KREDL
112 CE(EI&TA)/ Power Evacuation - Correspondence R.F Permanent Wind /
Evacuation
http://www.karnatakapower.com/lof_HO_CEEITA.asp 18/18