Green Initiatives

1. Revival of old water bodies were completed with the cost of `14,000. 2. LED lighting has been provided at all Railway stations under the jurisdiction of Parliamentary constituency. 3. 10 kWp solar panels at Nadikudi and 5 kWp Solar Panels at stations are installed.

Passenger Train Services Narasaraopet Parliamentary Constituency Details of Provision of Stoppages/ Increase in the frequency/ Extension of Trains in Narasaraopet Parliamentary Constituency Jurisdiction. Shri Narendra Modi Hon’ble Prime Minister

New Trains & Provision of Stoppages 1. Tr.No.17215/17216 –Dharmavaram–Vijayawada Tri‐weekly Express stoppage at Narasaraopet & Vinukonda RAIL DEVELOPMENTAL WORKS Increase in Frequency Narasaraopet Parliamentary Constituency Jurisdiction 1. Tr.No.17225/17226 Vijayawada–Hubli–Vijayawada Amaravathi Tri‐Weekly Express to Daily with stopages at Narasaraopet, Vinukonda, Kurichedu and Donakonda

2. Tr.No.17215/17216 Vijayawada–Dharmavaram Tri‐ Weekly Express to daily South Central Railway serving Extension of Train Services the entire state of , major portion of 1. Tr.No.77674/77673 Kacheguda–Miryalguda DEMU up to Nadikude and considerable portion of 2. Tr.No.12733/12734 –Secunderabad Narayanadri Express up to Lingampalli Karnataka, Maharastra states and small parts of Tamilnadu and SOUTH CENTRAL Madhya Pradesh.

The Rail developmental activities RAILWAY in the jurisdiction of Narasaraopet Parliamentary constituency has picked up its pace in the recent past in all spheres. Focused attention has been given for improvement in the thrust areas such as infrastructure, safety, security and Passenger amenities/ facilities. Some of the major activities are showcased in this brochure. ASSEMBLY SEGMENTS Road Over / Under Bridges Passenger Amenities With a view to strengthen safety at Level Provision of Passenger Amenities and facilities, Crossing gates and to avoid untoward and its improvements at Railway Stations is one of incidents and also to provide seamless the most important aspect Railway Services. journey to road traffic, the following R o a d u n d e r / o v e r B r i d g e s Narsaraopet (RuB/RoB) are constructed / proposed Station Amenity Amount in ` Status for construction under Narasaraopet PF Extension 33 lakh Completed Sattenapalli Parliamentary constituency. PF Extension 44 lakh Completed Vinukonda Pedakurapadu PF Extension 48 lakh Completed Road Over Bridges Toilets 10 lakh In progress Gurajala 1. ROB in lieu of LC No.286 between – Pondugula Circulating Area 12 lakh Completed is completed and commissioned. Macherla Circulating Area 68 lakh Completed 2. Construction of ROB in lieu of LC No.64 Narasaraopet CIB & TIB 1.30 Crore Provided between – Piduguralla with an Nadikudi Signages 1.30 Crore Proposed estimated cost of ` 24.66 crore is under Narasaraopet Signages 80 lakh Proposed progress Rentachintala High Level PF RAIL DEVELOPMENTAL WORKS Road Under Bridge and COP 44 lakh Constructed 1. All Unmanned Level Crossings are eliminated Nadikudi CIB & TIB Narasaraopet Parliamentary Constituency Jurisdiction 1.96 Crore Provided in Narasaraopet Parliamentary Constituency Narasaraopet CIB & TIB through Construction of RUB/LHS/Manning Vinukonda Adarsh Station 16 lakh Developed Infrastructural Development 2. Proposed subway in lieu of LC No.263 (M) between Vinukonda and Cheekategapalem Pondugula PF Extension 1.48 crore Proposed Reddigudem PF Extension 1.30 crore Proposed New Railway Lines Stations in Nallapadu – Nandyal Section with an estimated cost of ` 2.49 crore. Pedakurapadu Station Building 0.31 crore Proposed 1. Piduguralla–Savalyapuram for a distance of 45 Kms as a part of Nadikudi–Srikalahasthi section with the cost of Rs.333 Cr is under progress 3. Proposed subway in lieu of LC No. 265 (M) Narasaraopet Station Building 0.10 crore Proposed 2. Proposed for New line between Savalyapuram–Venkatagiri for a distacne of 264 Kms as a part of Nadikudi– between Savalyapuram–Vinukonda stations Piduguralla Station Building 0.10 crore Proposed ` Srikalahasthi section with the cost of 1953.60 crore in Nallapadu – Nandyal Section with an Macherla ATVM 1.5 lakh Provided 3. Proposed New Line between Macherla– for a distance of 92 Kms with estimated cost of ` 458.26 crore estimated cost of ` 2.48 crore. Nadikude ATVM 1.5 lakh Provided 4. Proposed New Line between Vijayawada–Guntur via.Amaravathi 106 Kms with estimated cost of ` 3272.03 crore Doubling of Railway Lines Narasaraopet ATVM 1.5 lakh Provided 1. Doubling of Pendekallu–Dhone & Guntur–Satulur of Guntur ‐ Guntakal Project for a distance of 55.89 Kms is under Piduguralla ATVM 1.5 lakh Provided progress with the cost of ` 501.52 crore ATVM 1.5 lakh Provided 2. Proposed for Doubling of Satulur–Dhone& Pendekallu–Guntakal as a part of Guntur– Guntakal project for a distance Vinukonda ATVM 1.5 lakh Provided of 345.56 Kms with an estimated cost of `3129.55 crore Electrification of Railway Lines 1. Electrification of Nallapadu–Guntakal Railway line for the distance of 426 Kms is completed 2. Electrification of Pagidipalli–Nallapadu 285 Kms Railway line is completed at a cost of ` 296.31 crore Capacity enhancement 1. As a part of Yard remodeling works Standard layout is completed at Santamagaluru with the cost of `3.5 Cr. 2. As a part of Yard remodeling works simultaneous reception and dispatch facility at Pondugula is completed with the cost of `29 Lakhs.

Safety – The First Priority Proposed FOBs Safety is the priority on SCR, to ensure safety of the Rail users, Foot over Bridges (FoBs)/ Road under/over Bridges are Station Cost in ` Crore constructed / proposed for construction at various stations/ locations Pedakurapadu 1.44 in Narasaraopet Parliamentary Constituency Jurisdiction. Tummalacheruvu 2.38