Total Length= 15700 Mtr (0.7110 Hq)
Total Page:16
File Type:pdf, Size:1020Kb
Full Title of the Project: laying of OFC Cable for Reliance Jiolnfocomm Ltd. File No. : _ Date of Proposal: _ (SeeRule6) FORM-"A" FORMFORSEEKINGPRIORAPPROVALUNDERSECTION2 OFTHEPROPOSALSBYTHESTATEGOVT.AND OTHERAUTHORITIES. PART-I (To be filled by User Agency) l. Project Details Requirement of 0.7110 Hq of forest land. I : (1). Barnala to Mansa Road KM 160/700 To 163/950 = 3250 MTR. (RHS) (2) Barnala To Sekha Dhuri Road = 7700 MTR (LHS) (3) Dhanaula Drain RD Fatehgarh Channa Road to Short Narrativesof the proposal and project / Schemefor which the forest land is required Dhanaula = 1600 MTR (RHS) (4) Rajgarh to Kattu Sekha Road = 2600 MTR (LHS) (5) Sangrur To Dirba Road KM 102/600 to 103/150 = 550 MTR (LHS) TOTAL LENGTH= 15700 MTR (0.7110 HQ) Ii Map showing the required forest area, boundary of adjoining : forest on a 1: 50000 scale map Map Enclosed Costof Project : Rs.200/- per meter Approx I Justification for locating the project in forest area. : There is no alternative detail in A-7 v V CostBenefit Analysis( To be enclosed) : NA V Employment likely to be generated : 10 No. unskilled labours i 2 : 1. Length =15700meter 2. Width =d~jmeter Purposewise breakup of the total land required 3. Area = 15700X ~=7065sqm. 4. MHPits =20X1.5X1.5(2.25)=45S.Mtrs. Area in hectare=7110 /10000 = 0.7110hectare 3 Detailsof displacement of people due to the project, if any; : Nil i) Number of families : Nil ii) Number of ScheduleCastes/ ScheduledTribe families : Nil iii) Rehabilitation plan (to be enclosed) : Not Applicable 4 Whether clearanceunder Environmental (Protection) Act, 1986 : required? NO 5 Undertaking to bear the cost of raising and maintenance of : compensatory afforestation and for penal compensatory afforestation as well as cost for protection and regeneration of Undertaking for payment for cost of Afforestation with upward revision if any SafetyZone,etc., as per the scheme prepared by the State will be payable is enclosed. ( Annexure 12) Government ( Undertaking to be enclosed) 6 Detailsof Certificates/ documents enclosed as required under : Undertakingto pay Net PresentValue,Cost Benefit Analysts, Minimum useof the instructions. forest land and Justification of Project are enclosed. Date: Place: State serial No. of Proposal: (Tobe filled by the Nodal officer with date af receipt) Full Title of the Project:laying of OFCCable for Reliance Jiolnfocomm Ltd. File No.: _ Date of Proposal: _ Check list Serial No. 04 Detailed Note on Project The Optical fiber cables are always laid along the road side due to easy supervrsion, quick maintenance, and low cost of maintenance. The Applicant does not have to acquire land for this purpose as the road side land belongs to PWD, PunjabState. Laying of Cable shall be done on a 0.45cm width of surface land, & up to 1.65 metres of depth and near to the extreme road boundary where alignment of trench will be done in such way that no tree will be required to be cut. The laying of Optical fiber cable along roadside is an agreed policy of the Applicant and Ministry of Surface Transport This new scheme of laying optical Fibre Cable is most modern and state of art Technology in the field of Optical fiber cable. Moreover the same cable will provide most of new value added services as well as it will cater for the needs of Integrated of network. Place:- Sangrur Date: _ Full Title of the Project:laying of OFCCable for Reliance Jiolnfocomm Ltd. File No. : _ Date of Proposal: _ CHECK LIST SERIAL NUMBER:-07 STATEMENT SHOWING DETAILS OF FORESTAREA PROPOSED FOR DIVERSION Sr. District Division Range/Teh Khasra/Survey or Forest Area Legal Status Rem No. sil/ Village Compartment Number of Proposed for of Forest arks Km. Stone Diversion (Ha.) Area (1). Barnala to Mansa Road KM 160/700 To 163/950 = 3250 MTR. (RHS) (2) Barnala To Sekha Dhuri Road = 7700 MTR (LHS) (3) Dhanaula Drain RD Fatehgarh 0.441 channa Road to Dhanaula = 1600 MTR(RHS) Hectare Protected 1 Sangrur Sangrur Sangrur (4) Rajgarh to Kattu Sekha Road = Forest 2600 MTR (LHS) (5) Sangrur To Dirba Road KM 102/600 to 103/150 = 550 MTR (LHS) TOTAL LENGTH = 15700 MTR (0.7110 HQ) Details of calculation: 1. Length =15700meter 2. Width = ~:~ meter 3. Area = 15700X'iil~§=7065sqm. 4. MH Pits =20Xl.5Xl.5(2.25)=45 S.Mtrs. Area in hectare=7110 /10000 = 0.7110hectare Place: Sangrur Date: _ - - - - ------------------------------------------------ Full Title of the Project:laying of OFCCable for Reliance Jiolnfocomm Ltd. File No. : _ Date of Proposal: _ CHECK LIST SERIAL NUMBER:-08 STATEMENT SHOWING DETAILSOF NON-FOREST AREA INVOLVED IN THE PROPOSAL Khasra/Survey or Non Forest Area Range/Tehsi Sr. Compartment Involved in the Present District Division I/Village Remarks No Number of Km. Proposed Land use Stone (Ha.) 1. 2. 3. 4. 5. 6. 7. 8. Sangrur Sangrur Sangrur N/A N/A N/A N/A Place: - Sangrur Date: _ Full Title of the Project:laying of OFCCable for Reliance Jiolnfocomm Ltd. File No.: _ Date of Proposal: _ CHECK LIST SERIAL NUMBER:-10 JUSTIFICATION FOR LOCATION THE PROJECT It is to inform you that no other alternative could be considered forest land is required of 0.7110 hq (1). Barnala to Mansa Road KM 160/700 To 163/950 = 3250 MTR. (RHS)(-2) Barnala To Sekha Dhuri Road = 7700 MTR (LHS)(3) Dhanaula Drain RD Fatehgarh Channa Road to Dhanaula = 1600 MTR (RHS)(4) Rajgarh to Kattu Sekha Road = 2600 MTR (LHS) (5) Sangrur To Dirba Road KM 102/600 to 103/150 = 550 MTR (LHS) TOTALLENGTH= 15700 MTR (0.7110 HQ) Place: • Sangrur Date: _ Full Title of the Project:laying of OFCCable for Reliance Jiolnfocomm Ltd. File No.: _ Date of Proposal: _ TO WHOM IS MAY CONCERN UNDERTAKING This is for your information that we have applied the application for granting us permission for laying the optical fiber cable (1). Barnala to Mansa Road KM 160/700 To 163/950 = 3250 MTR. (RHS) (2) Barnala to Sekha Dhuri Road = 7700 MTR (LHS) (3) Dhanaula Drain RD Fatehgarh Channa Road to Dhanaula = 1600 MTR (RHS) (4) Rajgarh to Kattu Sekha Road = 2600 MTR (LHS) (5) Sangrur To Dirba Road KM 102/600 to 103/150 = 550 MTR (LHS)TOTAL LENGTH= 15700 MTR (0.7110 HQ) We hereby certify and undertake that we will submit the NOC letter from the competent authority on receipt for the same. Full Title of the Project:laying of OFCCable forReliance Jiolnfocomm Ltd. File No.: _ Date of Proposal: _ CHECK LIST SERIAL NUMBER:-ll CERTIFICATE FOR MINIMUM USE OF FOREST LAND This is to certify that the forest area involved in the proposed is unavoidable and barest minimum forest area i.e. O.7110Hectarewhich is proposed for diversion. Place: - Sangrur Date: _ Full Title of the Project:laying of OFC Cable for Reliance Jiolnfocomm Ltd. File No.: _ Date of Proposal: _ CHECK LIST SERIAL NUMBER:-12 UNDERTAKING FOR PAYMENT OF COST OF COMPENSATORY AFFORESTATION I/We,hereby,undertake that no trees are affected in this project under the notified forest land. In such casesas per environment & forest ministry circular No. 9-1263/2001 - RCC/Vol-"/3570, dated 31-12-2004, compensatory a forestation is not required. Place:- Sangrur Date: _ Full Title of the Project:laying of OFC Cable for Reliance Jiolnfocomm Ltd. File No. : _ Date of Proposal: _ CHECK LIST SERIAL NUMBER:-13 UNDERTAKING FOR PAYMENT OF NET PRESENTVALUE OF FORESTAREA This is to certify that I!We have applied for diversion of O.7110Hectare of forest area for (1). Barnala to Mansa Road KM 160/700 To 163/950 = 3250 MTR. (RHS) (2) Barnala To Sekha Dhuri Road = 7700 MTR (LHS) (3) Dhanaula Drain RD Fatehgarh Channa Road to Dhanaula = 1600 MTR (RHS) (4) Rajgarh to Kattu Sekha Road = 2600 MTR (LHS) (5) Sangrur To Dirba Road KM 102/600 to 103/150 = 550 MTR (LHS) TOTAL LENGTH= 15700 MTR (0.7110 HQ) in district Sangrur in the state of Punjab, in this forest area and I!we hereby undertake to abide as under: Reference is invited to the Government of India guidelines, contained its letter F. No 5_3/2007_FC dated 5th February 2009, exempting payment ofNPV for underground laying of optical fibre cables (OFC) if the area does not form part of a national park / sanctuary and no falling of trees is involved. As such NPV is not payable in the present case. However, if subsequently any clarification(s) is issued by the Central Government to the contrary, we undertake to make such payment on issue of a demand note by the competent authority. Place: - Sangrur Date: _.