Snowy-Murray Development Engineering 2 Sheet Fact

Total Page:16

File Type:pdf, Size:1020Kb

Snowy-Murray Development Engineering 2 Sheet Fact The Snowy Scheme developments Snowy-Murray Development Engineering 2 sheet Fact Snowy-Murray Power Generation – the Development journey of water SNOWY-TUMUT DEVELOPMENT Water in the Snowy River is diverted at Guthega pumping Dam through Guthega Power Station and power BLOWERING TOOMA OGILVIES INTAKE RESERVOIR stationRESERVOIR DEEP CREEK back into Island Bend Dam. Water from Geehi 1 500 METRES stations OUTSTATION INTAKE JOUNAMA TALBINGO INTAKE BURNS CREEKReservoir, Geehi River, Island Bend and Lake 4 PONDAGE RESERVOIR INTAKE 1 200 1 BLOWERING JOUNAMA TUMUT 3 Eucumbene passes through Murray 1 and POWER SMALL POWER 900 STATION HYDRO STATION Murray 2 power stations. Khancoban DamMURRUMDGEE RVER POWER STATION 600 TUMUT RVER regulates water released from Murray 2 Power generating units TUMUT 2 TUMUT POND LAKE EUCUMBENE TANTANGARA 300 PONDAGE StationRESERVOIR down the Swampy Plains River, whichRESERVOIR TO MURRUMDGEE17 TUMUT 2 TUMUTis 1a tributaryHAPPY of JACKS the Upper River Murray. 0 RRGATON AREA POWER STATION POWER PONDAGE STATION Power or pumping station Underground power station Tunnels and shafts SNOWY-MURRAYSNOWY-MURRAY DEVELOPMENT DEVELOPMENT 2 100 METRES MURRAY 2 MURRAY 1 BOURKES GEEHI GUTHEGA ISLAND BEND JINDABYNE LAKE EUCUMBENE POWER POWER GORGE RESERVOIR PONDAGE PONDAGE PUMPING STATION STATION STATION INTAKE 1 800 BURRUNGUBUGGE LAKE JINDABYNE KHANCOBAN INTAKE PONDAGE JINDABYNE MINI HYDRO 1 500 SNOWY 1 200 RVER GEE RVER 900 SNOWY RVER RVER EUUMENE RVER 600 TO PA OEAN RVER 300 GEE PLAN TO MURRAY SWAMPY MURRAY 2 PONDAGE GUTHEGA POWER STATION 0 RRGATON AREA Power or pumping station Tunnels and shafts About inflows Inflows into Guthega Pondage are seasonal, with a large catchment area and a small reservoir, which can often result in the dam spilling (overtopping due to high inflows), particularly during the snow melt period or sustained high rainfall events. Island Bend Reservoir – Water from Island Bend can be diverted either east into Lake Eucumbene for long-term storage, or west to Geehi Reservoir for short-term energy for power generation. The water is transferred through an underground tunnel system. High flows – water diversions Low flows – water diverted to Geehi to Lake Eucumbene for storage. Reservoir to support generation. Guthega Dam Did you know Water from Lake Jindabyne cannot be pumped back to Lake Eucumbene, or to Island Bend Reservoir. Jindabyne Pumping Jindabyne Mini-hydro Station Power Station The Jindabyne Pumping Station transfers water The Jindabyne Mini-hydro Power Station allows from Lake Jindabyne into Geehi Reservoir, at Snowy Hydro to recover a small amount of times of high electricity supply and low demand. electricity from some of the environmental Water can also be moved the other direction water releases made from Lake Jindabyne Dam from Geehi back through a bypass valve into into the Snowy River. Lake Jindabyne when inflows are high and there is a low market need for the energy. Due to the intermittency of wind and solar generation, periods of excess supply usually occur between 7am-6pm. Jindabyne Pumping Station Visit us at: snowyhydro.com.au.
Recommended publications
  • Assessment of Thermal Pollution in the Snowy River Below Jindabyne
    Assessment of thermal pollution Snowy River Increased Flows Assessment of thermal pollution in the Snowy River below Jindabyne Dam Summary This study assessed water temperature in the highly regulated Snowy River below Jindabyne Dam. What did we study? • The thermal regime of rivers plays a critical role in the health of aquatic ecosystems. We monitored water temperature below Jindabyne Dam to assess the thermal regime of the regulated Snowy River. Monitoring began in 2011, following the installation of a multi-level offtake and the delivery of environmental flows. It continued until 2013. During this time we compared the regulated thermal regime with a natural thermal regime model. The model was developed using pre-dam (1962-1967) water temperature data. What did we find? • Cold water pollution in the Snowy River below Jindabyne Dam is not a significant issue. • Warm water pollution remains an issue in the regulated Snowy River, particularly between March and July. Yet water temperatures are rarely more than 2 - 4°C warmer than natural. Temperatures never exceed the expected natural temperature range of the Snowy River before Jindabyne Dam. • Water temperatures match the expected natural water temperatures at the town of Dalgety. This is approximately 20km downstream of Jindabyne Dam. What does this mean for water management? • The multi-level offtake has improved the thermal regime in this regulated river. Additional management strategies to improve the thermal regime are limited. An alternate release point in the Mowamba River may further improve water temperatures. The extent of improvements would depend on the dilution of flow volumes from the Mowamba River into the Snowy River.
    [Show full text]
  • Murrumbidgee Regional Fact Sheet
    Murrumbidgee region Overview The Murrumbidgee region is home The river and national parks provide to about 550,000 people and covers ideal spots for swimming, fishing, 84,000 km2 – 8% of the Murray– bushwalking, camping and bird Darling Basin. watching. Dryland cropping, grazing and The Murrumbidgee River provides irrigated agriculture are important a critical water supply to several industries, with 42% of NSW grapes regional centres and towns including and 50% of Australia’s rice grown in Canberra, Gundagai, Wagga Wagga, the region. Narrandera, Leeton, Griffith, Hay and Balranald. The region’s villages Chicken production employs such as Goolgowi, Merriwagga and 350 people in the area, aquaculture Carrathool use aquifers and deep allows the production of Murray bores as their potable supply. cod and cotton has also been grown since 2010. Image: Murrumbidgee River at Wagga Wagga, NSW Carnarvon N.P. r e v i r e R iv e R v i o g N re r r e a v i W R o l g n Augathella a L r e v i R d r a W Chesterton Range N.P. Charleville Mitchell Morven Roma Cheepie Miles River Chinchilla amine Cond Condamine k e e r r ve C i R l M e a nn a h lo Dalby c r a Surat a B e n e o B a Wyandra R Tara i v e r QUEENSLAND Brisbane Toowoomba Moonie Thrushton er National e Riv ooni Park M k Beardmore Reservoir Millmerran e r e ve r i R C ir e e St George W n i Allora b e Bollon N r e Jack Taylor Weir iv R Cunnamulla e n n N lo k a e B Warwick e r C Inglewood a l a l l a g n u Coolmunda Reservoir M N acintyre River Goondiwindi 25 Dirranbandi M Stanthorpe 0 50 Currawinya N.P.
    [Show full text]
  • Synopis Sheets MURRAY DARLING UK
    Synopsis sheets Rivers of the World THE MURRAY- DARLING BASIN Initiatives pour l’Avenir des Grands Fleuves The Murray-Darling Basin Australia is the driest inhabited continent on the planet: deserts make up more than two thirds of the country. 90% of the population is concentrated in the southeast, around the Murray-Darling basin and on the coast. This basin is the country’s largest hydrographic network, with a surface area of 1,059,000 km² (14% of the Australian territory), stretching from the Australian Alps to the Indian Ocean. Although it harbours 70% of Australia’s irrigated land and 40% of its agricultural production, it is not spared from water shortages that now affect the rest of the country due to climate change and a lifestyle and economy that consume considerable volumes of water. A laboratory for adapting to water stress The origins The River Murray, called “Millewa” by the Aboriginal traditional owners, has been central to human livelihoods for over 40000 years. Its exploitation was then accelerated in the 19 th century, first as a navigable waterway and as a means for trading by European and other settlers. Development of the river basin quickly led to the degradation of an already fragile ecosystem. In addition to droughts, massive use of the rivers’ waters, firstly for irrigation, and the transformation of the land through grazing and deforestation contributed to the salinisation ot the land and waters. The basin has always seen great variability: severe droughts and floods, that are being accentuated with climate change. 2013, 2014, 2015, 2017 and 2018 have seen some areas in the basin with the hottest temperatures ever recorded.
    [Show full text]
  • Snowy Hydro Fact Sheet
    Introduction to Snowy Hydro Snowy Hydro Engineering 1 sheet Fact History Construction of the Snowy Scheme took 25 years from 1949 to 1974. An incredible engineering feat, this complex interconnected hydro-electric scheme uses the power of water to generate clean, renewable energy. Over the past 70 years, Snowy Hydro has evolved from the Snowy Mountains Hydro-electric Authority, to the Snowy Mountains Authority, to the company we know today. Definition Hydro-power - the use of flowing water to power a turbine to produce electrical energy HYDRO-POWER STATIONS NAME CAPACITY NO. OF UNITS (MW) Tumut 3 1,800 6 9 Murray 1 950 10 renewable generator Murray 2 550 4 Tumut 1 330 4 Tumut 2 287 4 Blowering 80 1 Guthega 60 2 Jindabyne Mini Hydro 1 1 Jounama Small Hydro 14 1 APPROX INSTALLED CAPACITY 4,100 MW TH LARGEST 3 RETAIL BRANDS ELECTRICITY RETAILER IN THE RED LUMO DIREC T NATIONAL ELECTRICITY MARKET ENERGY ENERGY CONNECT Definition Megawatt - a unit of power equal to one million watts, a measure of the output of a power station Definition Aqueduct - a pipe constructed to collect and divert water to a larger body of water Snowy Hydro logo 145km 80km INTER-CONNECTED ‘Snowy’ refers to the snow - most of the water TUNNELS we use to generate electricity comes from snow melt. ‘Hydro’ refers to water - Snowy Hydro uses 16 MAJOR DAMS PUMPING STATION water to generate electricity. at Jindabyne and pump storage 1000MW of contracted wind and solar APPROX 4,800GL capability at Tumut 3 AT LAKE EUCUMBENE The blue colour represents the water and the green colour represents nature, sustainability TOTAL STORAGE and renewables.
    [Show full text]
  • Government Gazette No 164 of Friday 23 April 2021
    GOVERNMENT GAZETTE – 4 September 2020 Government Gazette of the State of New South Wales Number 164–Electricity and Water Friday, 23 April 2021 The New South Wales Government Gazette is the permanent public record of official NSW Government notices. It also contains local council, non-government and other notices. Each notice in the Government Gazette has a unique reference number that appears in parentheses at the end of the notice and can be used as a reference for that notice (for example, (n2019-14)). The Gazette is compiled by the Parliamentary Counsel’s Office and published on the NSW legislation website (www.legislation.nsw.gov.au) under the authority of the NSW Government. The website contains a permanent archive of past Gazettes. To submit a notice for gazettal, see the Gazette page. By Authority ISSN 2201-7534 Government Printer NSW Government Gazette No 164 of 23 April 2021 DATA LOGGING AND TELEMETRY SPECIFICATIONS 2021 under the WATER MANAGEMENT (GENERAL) REGULATION 2018 I, Kaia Hodge, by delegation from the Minister administering the Water Management Act 2000, pursuant to clause 10 of Schedule 8 to the Water Management (General) Regulation 2018 (the Regulation) approve the following data logging and telemetry specifications for metering equipment. Dated this 15 day of April 2021. KAIA HODGE Executive Director, Regional Water Strategies Department of Planning, Industry and Environment By delegation Explanatory note This instrument is made under clause 10 (1) of Schedule 8 to the Regulation. The object of this instrument is to approve data logging and telemetry specifications for metering equipment that holders of water supply work approvals, water access licences and Water Act 1912 licences and entitlements that are subject to the mandatory metering equipment condition must comply with.
    [Show full text]
  • Government Gazette of the STATE of NEW SOUTH WALES Number 112 Monday, 3 September 2007 Published Under Authority by Government Advertising
    6835 Government Gazette OF THE STATE OF NEW SOUTH WALES Number 112 Monday, 3 September 2007 Published under authority by Government Advertising SPECIAL SUPPLEMENT EXOTIC DISEASES OF ANIMALS ACT 1991 ORDER - Section 15 Declaration of Restricted Areas – Hunter Valley and Tamworth I, IAN JAMES ROTH, Deputy Chief Veterinary Offi cer, with the powers the Minister has delegated to me under section 67 of the Exotic Diseases of Animals Act 1991 (“the Act”) and pursuant to section 15 of the Act: 1. revoke each of the orders declared under section 15 of the Act that are listed in Schedule 1 below (“the Orders”); 2. declare the area specifi ed in Schedule 2 to be a restricted area; and 3. declare that the classes of animals, animal products, fodder, fi ttings or vehicles to which this order applies are those described in Schedule 3. SCHEDULE 1 Title of Order Date of Order Declaration of Restricted Area – Moonbi 27 August 2007 Declaration of Restricted Area – Woonooka Road Moonbi 29 August 2007 Declaration of Restricted Area – Anambah 29 August 2007 Declaration of Restricted Area – Muswellbrook 29 August 2007 Declaration of Restricted Area – Aberdeen 29 August 2007 Declaration of Restricted Area – East Maitland 29 August 2007 Declaration of Restricted Area – Timbumburi 29 August 2007 Declaration of Restricted Area – McCullys Gap 30 August 2007 Declaration of Restricted Area – Bunnan 31 August 2007 Declaration of Restricted Area - Gloucester 31 August 2007 Declaration of Restricted Area – Eagleton 29 August 2007 SCHEDULE 2 The area shown in the map below and within the local government areas administered by the following councils: Cessnock City Council Dungog Shire Council Gloucester Shire Council Great Lakes Council Liverpool Plains Shire Council 6836 SPECIAL SUPPLEMENT 3 September 2007 Maitland City Council Muswellbrook Shire Council Newcastle City Council Port Stephens Council Singleton Shire Council Tamworth City Council Upper Hunter Shire Council NEW SOUTH WALES GOVERNMENT GAZETTE No.
    [Show full text]
  • Snowy Mountains Region Visitors Guide
    Snowy Mountains Region Visitors Guide snowymountains.com.au welcome to our year-round The Snowy Mountains is the ultimate adventure four-season holiday destination. There is something very special We welcome you to come and see about the Snowy Mountains. for yourself. It will be an escape that you will never forget! playground It’s one of Australia’s only true year- round destinations. You can enjoy Scan for more things to do the magical winter months, when in the Snowy Mountains or visit snowymountains.com.au/ a snow experience can be thrilling, things-to-do adventurous and relaxing all at Contents the same time. Or see this diverse Kosciuszko National Park ............. 4 region come alive during the Australian Folklore ........................ 5 spring, summer and autumn Snowy Hydro ............................... 6 months with all its wonderful Lakes & Waterways ...................... 7 activities and attractions. Take a Ride & Throw a Line .......... 8 The Snowy Mountains is a natural Our Communities & Bombala ....... 9 wonder of vast peaks, pristine lakes and rushing rivers and streams full of Cooma & Surrounds .................. 10 life and adventure, weaving through Jindabyne & Surrounds .............. 11 unique and interesting landscapes. Tumbarumba & Surrounds ......... 12 Take your time and tour around Tumut & Surrounds .................... 13 our iconic region enjoying fine Our Alpine Resorts ..................... 14 food, wine, local produce and Go For a Drive ............................ 16 much more. Regional Map ............................. 17 Regional Events & Canberra ...... 18 “The Snowy Mountains Getting Here............................... 19 – there’s more to it Call Click Connect Visit .............. 20 than you think!” 2 | snowymountains.com.au snowymountains.com.au | 3 Australian folklore Horse riding is a ‘must do’, when and friends.
    [Show full text]
  • For More Information
    Tumbarumba Tumbarumba SHIRE COUNCIL SHIRE COUNCIL Experience the Magic Experience the Magic KOSCIUSZKO NATIONAL PARK Tumbarumba Shire’s link to the northern end of Kosciusko National Park is the Elliott Way, and the Alpine Way at Khancoban is the gateway to the southern alpine area. Except in winter, the Khancoban to Cabramurra road also provides access. The Geehi Walls track provides a good day walk from the Geehi camping area, which is located 34 kms south of Khancoban on the Alpine Way. The huts at Geehi were damaged in the fires of 2003, but have since been restored to their original condition. There are a number of short and longer walking tracks in the park. For more information contact your nearest National Parks and Wildlife Visitor Centre or the Khancoban Information Centre. Visit www.nationalparks.nsw.gov.au Remember that weather in the mountains can change quickly at any time of year. It is essential that you are adequately prepared for all conditions. Vehicles traveling on the Alpine Way will need to carry a Park entry pass, which can be purchased from the National Parks and Wildlife Information Centre in Khancoban. For more information... Tumbarumba Visitor Information Centre 10 Bridge Street Tumbarumba, NSW 2653 Phone: 02 6948 3333 | Fax: 02 6948 3335 WALKS www.visittumbashire.com.au www.visittumbashire.com.au Tumbarumba Shire experiences four clear seasons, but the SUGAR PINE WALK, Laurel Hill, 23 kms north of Tumbarumba The track can also be accessed from MANNUS LAKE mountain weather can be unpredictable and walkers are Turn right into the Bago Forest along Knopsens Road just after Take the Wagga Road out of Tumbarumba, turn left at Jingellic Road, advised to be adequately prepared with suitable clothing, the village of Laurel Hill.
    [Show full text]
  • Download Brochure
    When is Turnak available? How to book Turnak? Turnak is available to book from 1st Nov to 31st May Our accommodation fees suit group bookings and each year. To our knowledge it’s the only facility of its allow an attractive arrangement for corporate, kind available in the Kosciuszko National Park. social or family events. Turnak Features: • 5 En-suite bedrooms, sleeping up to 18 guests in numerous configurations • Spacious modern appointed kitchen, all new facilities such as power and charging points • Private and common areas with plenty of room to relax and enjoy the natural surroundings. Private Catering can be organised if required and; Local tour guides are available to help plan your activities. Contact: Roger Lucas – [email protected] M: 0418497747 Your summer mountain hideaway to enjoy Chris Douglas – [email protected] • Road bike riding M: 0438258729 • Sightseeing 6 Farm Creek Place, Guthega Village NSW 2624 • Hiking POSTAL: TURNAK CO-OPERATIVE SKI CLUB LTD • Fishing 19 Carlton Street, Freshwater NSW 2096 • Kayaking Phone: 61 2 9907-1554 Email: [email protected] Web: www.turnak.com.au • Mountaineering Turnak Adventure Sports Lodge • Mountain bike trail riding and much more! Turnak Cooperative Ski Club Ltd ABN 52 403 835 543. Doc ID: TDL 20180530 Turnak Adventure Sports Lodge is a beautifully appointed mountain hideaway, situated above the snowline at Island Bend Activities Guthega Village in the Kosciuszko National Park, NSW. The Lodge offers picturesque and dramatic views over For that perfect family picnic, meet at Island Bend off the Guthega Guthega Dam towards the snowcapped ridge line of the Road.
    [Show full text]
  • Data Versus Desktop: an Assessment of the Severity of Cold Water Pollution in the Swampy Plains and Murray Rivers Below Khancoban Dam Pope E1 and Nolan A2
    Full Paper Pope and Nolan – An assessment of the severity of Cold Water Pollution below Khancoban Dam Data versus Desktop: An assessment of the severity of Cold Water Pollution in the Swampy Plains and Murray Rivers below Khancoban Dam Pope E1 and Nolan A2 1. Snowy Hydro Limited, Cooma NSW 2630. Email: [email protected] 2. Snowy Hydro Limited, Cooma NSW 2630. Email: [email protected] Key Points Cold Water Pollution occurs downstream of Khancoban Dam but effects are not as severe or persistent as expected on the basis of the original desktop study Summer suppression is evident but winter elevation, annual amplitude reduction, seasonal displacement and impacts to diel variation are very minor Causes of cold water releases appear to be a combination of reservoir stratification and releases from Murray 2 Power station with releases from the power station being the dominant cause The presence of Khancoban Reservoir appears to be having a minor impact on the percentage of time that breeding temperature thresholds are exceeded during the breeding seasons of a number of native fish expected to occur in the Swampy Plains and Murray Rivers. Abstract In 2004, Khancoban Dam was listed as one of 9 Dams in NSW considered to cause severe cold water pollution on the basis of a desktop study. This study, based on 5 years of field data, demonstrates that cold water releases do occur from Khancoban but that these events are not as severe or prolonged as expected. On average, there is a difference in temperature of only -2.2°C between monitoring points upstream and downstream of Khancoban Dam during summer.
    [Show full text]
  • Turbine Fact Sheet
    Our company SNOWY HYDRO Hydro Snowy 1 Factsheet HISTORY Construction of the Snowy Scheme took 25 years from 1949 - 1974. An engineering feat, this complex interconnected hydro-electric scheme uses the power of water to generate clean, renewable energy. Over the past 70 years Snowy Hydro has evolved from the Snowy Mountains Hydro-electric Authority to the Snowy Mountains Authority (SMA) to the company we know today. Definition Hydropower - the use of flowing water to power a turbine to produce electrical energy HYDRO-POWER STATIONS NAME CAPACITY NO. OF UNITS (MW) Tumut 3 1800 6 9 Murray 1 950 10 renewable generator Murray 2 550 4 Tumut 1 330 4 Tumut 2 287 4 Blowering 80 1 Guthega 60 2 Jindabyne Mini Hydro 11 1 Jounama Small Hydro 14 1 APPROX INSTALLED CAPACITY 4100 MW TH LARGEST 3 RETAIL BRANDS ELECTRICITY RETAILER IN THE RED LUMO DIREC T NATIONAL ELECTRICITY MARKET ENERGY ENERGY CONNECT Definition Megawatt - a unit of power equal to one million watts, a measure of the output of a power station Definition Aqueduct - a pipe constructed to collect and divert water to a larger body of water SNOWY HYDRO LOGO 145km 80km INTER-CONNECTED AQUEDACTS ‘Snowy’ refers to the snow - most of the water TUNNELS we use to generate electricity comes from snow melt. ‘Hydro’ refers to water - Snowy Hydro uses 16 MAJOR DAMS PUMPING STATION water to generate electricity. at Jindabyne and pump storage 1000MW of contracted wind and solar APPROX 4800 GL capability at Tumut 3 AT LAKE EUCUMBENE The blue colour represents the water and the green colour represents nature, sustainability TOTAL STORAGE and renewables.
    [Show full text]
  • Concept Plan
    Monaro Acclimatisation Society Inc 9 Thompson Drive Tathra, NSW. 2550 Sustainable future fishing for trout and native fish SNOWY HYDRO 2.0 – MAS CONCEPT PLAN On 2 July 2020 MAS Secretary Rod Whiteway and I met with senior officers from NSW Fisheries to discuss the MAS Concept Plan for a trout grow-out facility as a recreational fishing offset for Snowy Hydro 2.0. Following that meeting NSW Fisheries have asked the MAS to formally enter into “Agreed Principles” arrangement. The MAS Executive is currently discussing this Agreement; however, we indicated we have four key priorities that we are committed to. On 7 July 2020 I met with senior staff from Snowy Hydro to discuss the MAS Concept Plan. Again, we explained our key priorities and Snowy Hydro did not express any negativity to our approach. Snowy Hydro indicated they are keen for a meeting between MAS, DPI and Snowy Hydro in the not too distant future to begin working formally on the plan. THE OVERALL CONCEPT Since the announcement of Snowy Hydro 2.0 the MAS has been concerned that redfin perch would be pumped from Talbingo Dam into Tantangara Dam and beyond. To help protect the Snowy Mountains trout fishery the MAS embarked on a process to identify how larger trout could be stocked to counter the expected redfin predation and to protect our trout fishing legacy and reassure the Snowy trout community that something was being done. The MAS soon realised that it was undertaking this process in a policy vacuum, so the MAS began negotiating directly with Snowy Hydro on mitigation measures.
    [Show full text]