What Is a Bus Rapid Transit (Brt) System?

Total Page:16

File Type:pdf, Size:1020Kb

What Is a Bus Rapid Transit (Brt) System? TITLE Serving Fairfax County Since 1977 Welcome! RICHMOND HIGHWAY BUS RAPID TRANSIT (BRT) COMMUNITY MEETING #3 Agenda: 6:30-8:30 PM open house, with a presentation at 7:00 PM The purpose of the Richmond Scan this code with your Highway Bus Rapid Transit phone to watch a short System is to provide higher quality video about the project! transit service on US Route 1 / (YouTube: tiny.cc/RHBRT) Richmond Highway from I-495 / Huntington Metrorail Station to Fort Belvoir. We want to hear from you! You can submit comments by completing activities at stations, speaking with staff, and/or filling out a comment form (paper or online). Link to comment form: surveymonkey.com/r/FCDOTBRT3 Translation: • Hay personal que habla español y estamos ofreciendo traducción al español para la presentación. • There are staff here who speak Spanish, and we are offering Spanish translation for the presentation. Additional language services can be requested free of charge by contacting Fairfax County Department of Transportation at 703-877- 5600, TTY 711. Project website: FairfaxCounty.gov/transportation/richmond-hwy-brt The Richmond Highway BRT project RICHMOND HIGHWAY BUS RAPID TRANSIT is funded in part by Fairfax County Department of Transportation (FCDOT) ensures nondiscrimination in all programs and activities in accordance with Serving Fairfax County the Northern Virginia Since 1977 Transportation Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information in an alternate format, Authority. contact FCDOT at 703-877-5600, TTY 711. PROJECT BACKGROUND Embark Richmond Highway Plan Amendment 2015-IV-MV1 Richmond Highway Road Improvements Richmond Highway BRT Conceptual imagery adapted from DRPT’s Multimodal Alternatives Analysis. This graphic is provided for illustrative purposes only and does not represent a proposed station design. • Lead: Fairfax County Department of • Leads: Federal Highway Administration & • Lead: Fairfax County Department of Planning and Development Virginia Department of Transportation (in Transportation • Amendment to the Fairfax County coordination with FCDOT) • Implementation of BRT from Huntington Comprehensive Plan, adopted by the Board • Richmond Highway is planned to be widened Metrorail Station to Fort Belvoir. of Supervisors on March 20, 2018. to six lanes, with space for both BRT and • Project includes environmental evaluation, • Supports the recommendations of the Route bicycle and pedestrian improvements. design, construction, and investigation of 1 Multimodal Alternatives Analysis, led by • Two projects: funding opportunities. the Virginia Department of Rail and Public » Telegraph Road to Mount Vernon • Considering the need for: Transportation. Highway: completed fall 2017. » Additional roadway widening. Establishes corridor-wide planning goals • » Jeff Todd Way to Napper Road: and objectives, with an urban design vision » Bicycle & pedestrian improvements and environmental and preliminary design and land use changes in support of BRT. connections to local walkways, trails, & work is underway, with construction To further support that vision, the County is bicycle facilities. anticipated from 2023 to 2026. currently developing urban design guidelines » Streetscape improvements. for the Richmond Highway corridor. The Richmond Highway BRT project RICHMOND HIGHWAY BUS RAPID TRANSIT is funded in part by Fairfax County Department of Transportation (FCDOT) ensures nondiscrimination in all programs and activities in accordance with Serving Fairfax County the Northern Virginia Since 1977 Transportation Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information in an alternate format, Authority. contact FCDOT at 703-877-5600, TTY 711. " 395 M STUDY AREA & PRELIMINARY SCHEDULEM 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 M Potential BRTM System H un Section I (3.1 miles) Huntington Metro tin 495 gt on A v Environmental Section II (5.5 miles) M e 495 y Evaluation BRT Station w H s g n i Belle K N y Haven w Penn Daw d H Park Preliminary on B hm Ric Design d Q R ua h n p d a r e g r e l R e d T R Beacon Hill Rd Section 1 Final Design and s Hwy S King B y eaco Right-of-Way Acquisition w d n H ill R H Stone " d n T Mansion o m h ic R " Historic M P Huntley o Section 1 Construction pk in s L Lockheed Blvd n Loc kheed Blvd Huntley Meadows Park Section 2 Final Design and Right-of-Way Acquisition Hybla Valley Boswell Ave Section 2 n Gum Springs all L d H oo Construction erw h S Note: Time frames and durations for design, utilities, right-of-way, vehicle procurement, and construction will vary depending on project funding. R u Rd s n N a s m a e k F c p l u r l p y R B e e r d Rd R d For Reference: Richmond Highway Corridor Improvements (VDOT Widening) Schedule Rd Pole South County Center M S t Fort Belvoir a O c V r l e a d m r 1 Draft Environmental Assessment n M e o NEPA J n t n e V 1 2 t H f e f o D no w 2 T V r L FHWA Finding of No Significant Impact expected o y u Studies d n k d e R Fa W n d ir a s fa x y L C n ou Woodlawn nt y P Plantation Woodlawn " kw Detailed / Final Design y " George Fort Hunt D Washington’s " Gristmill George Washington’s ROW Acquisition and Utility wy l H Mount Vernon Estate Mt V moria O e y rnon Me " Richmond Hw Fort Belvoir Relocation B e l v o i r R d T Construction The Richmond Highway BRT project RICHMOND HIGHWAY BUS RAPID TRANSIT is funded in part by Fairfax County Department of Transportation (FCDOT) ensures nondiscrimination in all programs and activities in accordance with Serving Fairfax County the Northern Virginia Since 1977 Transportation Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information in an alternate format, Authority. contact FCDOT at 703-877-5600, TTY 711. 0 . 1 . Miles ° WHAT IS A BUS RAPID TRANSIT (BRT) SYSTEM? BRT is a high-quality public transportation While key elements of the Richmond Highway system designed to be fast, reliable, and more BRT system have not been finalized, BRT convenient than traditional bus routes. It operates systems often include those described below. much like rail service, on a dedicated transit way, but with the flexibility and lower cost of bus vehicles. • SERVICE PLANS & FREQUENCIES that prioritize reliable, frequent, and efficient service. Source: Flickr user Wolfram Burner Source: CTfastrak Emerald Express (Eugene, Oregon) CTfastrak (Hartford, Connecticut) • DEDICATED LANES & TRAFFIC SIGNAL PRIORITY that allow free-flow travel, minimize traffic-related delays, reduce overall travel times, and enhance reliability. • STATIONS offering easier boarding to improve accessibility, off-board fare collection to expedite boarding, and high-quality pedestrian Source: Sasaki connectivity to enhance safety Healthline (Cleveland, OH) and access. • BUSES designed for improved passenger comfort and additional passenger capacity. • INFORMATION TECHNOLOGY SYSTEMS with features such Source: Omnitrans.org Source: Flickr user Chris sbX (San Bernardino, CA) as real-time bus tracking, Strip & Downtown Express (Clark County, Nevada) innovative fare collection, and more. • SYSTEM-WIDE BRANDING to establish a unique and recognizable identity for the Source: Wikimedia Source: STV system. Swift (Snohomish County, Washington) GRTC Pulse (Richmond, Virginia) The Richmond Highway BRT project RICHMOND HIGHWAY BUS RAPID TRANSIT is funded in part by Fairfax County Department of Transportation (FCDOT) ensures nondiscrimination in all programs and activities in accordance with Serving Fairfax County the Northern Virginia Since 1977 Transportation Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information in an alternate format, Authority. contact FCDOT at 703-877-5600, TTY 711. ENVIRONMENTAL RESOURCES The National Environmental Policy Act (NEPA) The environmental effects of transportation requires the project team to study how the project projects include more than just impacts to natural will affect the community and the environment resources—they also include impacts to social, before making decisions. cultural, historic, and economic resources, as well as to air quality and noise. Resource or topic Types of questions to be answered in the environmental document Socioeconomics What do we know about the people who live in the study area? How might the project impact the population? Community Where are schools, Facilities libraries, and religious South County Center institutions? How could the project affect these facilities? Land Use What types of land uses are in the corridor? How might the project change land use? Environmental Where are low- Justice income and minority populations in the study area, and how might they be affected by the Fort Belvoir project? Economics What are the employment patterns and major employers in the area? How could the project change future economic trends? Visual and What types of changes Aesthetic could the project make Resources to the visual quality of the corridor? Walking along Richmond Highway The Richmond Highway BRT project RICHMOND HIGHWAY BUS RAPID TRANSIT is funded in part by Fairfax County Department of Transportation (FCDOT) ensures nondiscrimination in all programs and activities in accordance with Serving Fairfax County the Northern Virginia Since 1977 Transportation Title VI of the Civil Rights Act of 1964 and the Americans with Disabilities Act (ADA). If you need this information
Recommended publications
  • Manual on Uniform Traffic Control Devices (MUTCD) What Is the MUTCD?
    National Committee on Uniform Traffic Control Devices Bus/BRT Applications Introduction • I am Steve Andrle from TRB standing in for Randy McCourt, DKS Associates and 2019 ITE International Vice President • I co-manage with Claire Randall15 TRB public transit standing committees. • I want to bring you up to date on planned bus- oriented improvements to the Manual on Uniform Traffic Control Devices (MUTCD) What is the MUTCD? • Manual on Uniform Traffic Control Devices (MUTCD) – Standards for roadway signs, signals, and markings • Authorized in 23 CFR, Part 655: It is an FHWA document. • National Committee on Uniform Traffic Control Devices (NCUTCD) develops content • Sponsored by 19 organizations including ITE, AASHTO, APTA and ATSSA (American Traffic Safety Services Association) Background • Bus rapid transit, busways, and other bus applications have expanded greatly since the last edition of the MUTCD in 2009 • The bus-related sections need to be updated • Much of the available research speaks to proposed systems, not actual experience • The NCUTCD felt it was a good time to survey actual systems to see what has worked, what didn’t work, and to identify gaps. National Survey • The NCUTCD established a task force with APTA and FTA • Working together they issued a survey in April of 2018. I am sure some of you received it. • The results will be released to the NCUTCD on June 20 – effectively now • I cannot give you any details until the NCUTCD releases the findings Survey Questions • Have you participated in design and/or operations of
    [Show full text]
  • BUS STATIONS AS TOD ANCHORS REPORT Prepared in Accordance with California Senate Bill 961, 2017-2018 Regular Session
    Housing Financing Tools and Equitable, Location-Efficient Development in California BUS STATIONS AS TOD ANCHORS REPORT Prepared in Accordance with California Senate Bill 961, 2017-2018 Regular Session Prepared for: Governor's Office of Planning and Research December 29, 2020 TABLE OF CONTENTS EXECUTIVE SUMMARY ............................................................................................................... 1 I. INTRODUCTION ....................................................................................................................... 5 Report Purpose ....................................................................................................................... 5 Report Organization ................................................................................................................ 5 II. BACKGROUND ON THE SECOND NEIGHBORHOOD INFILL FINANCE AND TRANSIT IMPROVEMENTS ACT ................................................................................................................ 7 Definition of Bus Transit ......................................................................................................... 7 Extent of Use ........................................................................................................................... 7 III. LITERATURE REVIEW ............................................................................................................ 9 Literature Overview ................................................................................................................
    [Show full text]
  • Ctfastrak Existing Condition
    Hartford Line TOD Action Plan Desire & Readiness Workshop: Town of Windsor Locks October 20, 2016 State Project No. 170-3396 1 Task 8 Agenda 1. Project Background and Overview 2. TOD Principles and Precedents 3. CTrail Hartford Line Station Area Assessment • TOD Desire & Readiness Criteria • Initial Observations from the Project Team 4. Interactive Workshop • Preliminary Areas of Focus • Instructions 2 Project Background Establishing a Point of Departure in Windsor Locks • Hartford Line TOD Action Plan • Town of Windsor Locks POCD Update • Main Street Property Acquisition and • Windsor Locks TOD Study Pre-Development (OPM) • Making it Happen • CRCOG Regional Complete Streets Policy and Action Plan (OPM) • Historic Train Station Reuse Study Windsor Locks Downtown • Capitol Region Master Plan Transportation Plan 2007 2008 2012 2013 2014 2015 2016 Ongoing/Forthcoming • Incentive Housing Downtown TIF Zone Study District Master Plan • Capital Region POCD Town of Windsor Locks EA/EIE for NHHS Rail Program POCD 3 Project Background Initial Thoughts from the Project Team: Key Issues to Advance TOD in Windsor Locks Reinvigorate downtown/Main Street Activate and maximize development as a destination potential of catalytic sites in the station area . Address lasting impacts of urban . Target sites and recommended sequencing renewal, and change the mindset of Main have been identified, but there are Street as a pass through outstanding questions: . Find a balance between maintaining • What can be done to make sites more traffic flow and creating a pedestrian- attractive to potential developers? and bicycle-friendly downtown • Are there opportunities to assemble a critical mass of sites to enable a larger . Consider developing a downtown development proposition? parking strategy 4 Source: Windsor Locks TOD Study Project Background Funding through FTA Pilot Program for TOD Planning .
    [Show full text]
  • Grtc Pulse Brt Tour Tour Summary
    GRTC PULSE BRT TOUR TOUR SUMMARY WHAT IS THE PULSE BRT SYSTEM? • 7.6-mile bus rapid transit (BRT) route in Richmond, Virginia, with 14 stations connecting residential areas, healthcare providers and downtown businesses that opened for service in 2018. • BRT runs in mixed traffic, dedicated center running and business access and transit (BAT) lanes. • Buses arrive every 10 to 15 minutes, with an average of over 7,000 riders every weekday. • Pulse BRT received the American Association of State Highway and Transportation Officials (AASHTO) Quality of Life Award. WHAT WAS THE GOAL OF THE TOUR? • Experience a dedicated guideway BRT route similar to the planned Rush Line BRT Project. • Meet staff and officials from local agencies involved in the Pulse BRT project, as well as community members and business representatives along the corridor. • Gather lessons learned about BRT project development, which can be applied to Rush Line decision-making. WHO ATTENDED THE TOUR? • Representatives from the Rush Line BRT Project Policy, Technical and Community Advisory Committees, along with partner agencies and Rush Line BRT Project staff. 1 GRTC PULSE BRT TOUR SUMMARY WHO DID WE MEET WITH ON THE TOUR? • Over the course of two days (October 3 and 4, 2019), we met with representatives from the Greater Richmond Transit Company (GRTC), Virginia Department of Rail and Public Transportation, Virginia Department of Transportation, City of Richmond, Henrico County, Virginia Commonweath University, local businesses and community organizations. WHAT WERE SOME OF THE KEY TAKEAWAYS FROM THE TOUR? Attendees learned pertinent and valuable information by riding the Pulse BRT, listening to project staff presentations and participating in panel discussions.
    [Show full text]
  • Bus Rapid Transit (BRT) and Light Rail Transit
    Bus Rapid Transit (BRT) and Light Rail Transit (LRT) Performance Characteristics Stations Mixed Traffic Lanes* Service Characteristics Newest Corridor End‐to‐End Travel Departures Every 'X' Travel Speed (MPH) City Corridor Segment Open length (mi) # Spacing (mi) Miles % Time Minutes BRT Systems Boston Silver Line Washington Street ‐ SL5 2002 2.40 13 0.18 1.03 42.93% 19 7 7.58 Oakland San Pablo Rapid ‐ 72R 2003 14.79 52 0.28 14.79 100.00% 60 12 14.79 Albuquerque The Red Line (766) 2004 11.00 17 0.65 10.32 93.79% 44 18 15.00 Kansas City Main Street ‐ MAX "Orange Line" 2005 8.95 22 0.41 4.29 47.92% 40 10 13.42 Eugene Green Line 2007 3.98 10 0.40 1.59 40.00% 29 10 8.23 New York Bx12 SBS (Fordham Road ‐ Pelham Pkwy) 2008 9.00 18 0.50 5.20 57.73% 52 3 10.38 Cleveland HealthLine 2008 6.80 39 0.17 2.33 34.19% 38 8 10.74 Snohomish County Swift BRT ‐ Blue Line 2009 16.72 31 0.54 6.77 40.52% 43 12 23.33 Eugene Gateway Line 2011 7.76 14 0.55 2.59 33.33% 29 10 16.05 Kansas City Troost Avenue ‐ "Green Line" 2011 12.93 22 0.59 12.93 100.00% 50 10 15.51 New York M34 SBS (34th Street) 2011 2.00 13 0.15 2.00 100.00% 23 9 5.22 Stockton Route #44 ‐ Airport Corridor 2011 5.50 8 0.69 5.50 100.00% 23 20 14.35 Stockton Route #43 ‐ Hammer Corridor 2012 5.30 14 0.38 5.30 100.00% 28 12 11.35 Alexandria ‐ Arlington Metroway 2014 6.80 15 0.45 6.12 89.95% 24 12 17.00 Fort Collins Mason Corridor 2014 4.97 12 0.41 1.99 40.00% 24 10 12.43 San Bernardino sbX ‐ "Green Line" 2014 15.70 16 0.98 9.86 62.79% 56 10 16.82 Minneapolis A Line 2016 9.90 20 0.50 9.90 100.00% 28 10 21.21 Minneapolis Red Line 2013 13.00 5 2.60 2.00 15.38% 55 15 14.18 Chapel Hill N‐S Corridor Proposed 8.20 16 0.51 1.34 16.34% 30 7.5 16.40 LRT Systems St.
    [Show full text]
  • Regional Bus Rapid Transit Feasiblity Study
    TABLE OF CONTENTS 1 INTRODUCTION ....................................................................................................................................................................................................... 1 2 MODES AND TRENDS THAT FACILITATE BRT ........................................................................................................................................................ 2 2.1 Microtransit ................................................................................................................................................................................................ 2 2.2 Shared Mobility .......................................................................................................................................................................................... 2 2.3 Mobility Hubs ............................................................................................................................................................................................. 3 2.4 Curbside Management .............................................................................................................................................................................. 3 3 VEHICLES THAT SUPPORT BRT OPERATIONS ....................................................................................................................................................... 4 3.1 Automated Vehicles .................................................................................................................................................................................
    [Show full text]
  • 2013 APTA Public Transportation Fact Book
    2013 Public Transportation Fact Book 2013 PUBLIC TRANSPORTATION FACT BOOK 64th Edition October 2013 PUBLISHED BY American Public Transportation Association Fact book historical tables and additional data are available at: http://www.apta.com/resources/statistics/Pages/transitstats.aspx American Public Transportation Association 1666 K Street, N.W., Suite 1100 Washington, DC 20006 TELEPHONE: (202) 496-4800 E-MAIL: [email protected] www.apta.com APTA’s Vision Statement Be the leading force in advancing public transportation. APTA’s Mission Statement APTA serves and leads its diverse membership through advocacy, innovation, and information sharing to strengthen and expand public transportation. prepared by John Neff, Senior Policy Researcher (202) 496-4812 [email protected] Matthew Dickens, Policy Analyst (202) 496-4817 [email protected] PUBLIC TRANSPORTATION FACT BOOK American Public Transportation Association Washington, DC October 2013 Material from the 2013 Public Transportation Fact Book may be quoted or reproduced without obtaining the permission of the American Public Transportation Association. Suggested Identification: American Public Transportation Association: 2013 Public Transportation Fact Book, Washington, DC, October, 2013. TABLE OF CONTENTS Table of Contents APTA AND THE FACT BOOK ......................................... 5 Figure 11: Percent of Systems with Arrival Time Formats .................................................................. 15 NATIONAL DATA SUMMARY ......................................... 6 VEHICLES .....................................................................
    [Show full text]
  • Transit-Oriented Development and Weak Real-Estate Markets
    Trinity College Trinity College Digital Repository Masters Theses Student Scholarship Spring 2016 Transit-Oriented Development and Weak Real-Estate Markets Jonathan Cabral [email protected] Follow this and additional works at: https://digitalrepository.trincoll.edu/grad Part of the Economic Policy Commons, Infrastructure Commons, Other Public Affairs, Public Policy and Public Administration Commons, Policy Design, Analysis, and Evaluation Commons, Public Affairs Commons, Transportation Commons, Urban Studies Commons, and the Urban Studies and Planning Commons Recommended Citation Cabral, Jonathan, "Transit-Oriented Development and Weak Real-Estate Markets" (2016). Masters Theses. 25. https://digitalrepository.trincoll.edu/grad/25 This Thesis is brought to you for free and open access by the Student Scholarship at Trinity College Digital Repository. It has been accepted for inclusion in Masters Theses by an authorized administrator of Trinity College Digital Repository. TRINITY COLLEGE Final Project TRANSIT-ORIENTED DEVELOPMENT AND WEAK REAL-ESTATE MARKETS Submitted by Jonathan M. Cabral In Partial Fulfillment of Requirements for the Degree of Master of Arts in Public Policy Hartford, Connecticut Advisor: Professor Barry Feldman, Ph.D. Unauthorized reproduction prohibited by copyright law Acknowledgements This project would not have been possible without the support of many amazing people in my life. Many thanks to the Trinity College faculty that helped me along the way, most notably my project advisor, Professor Barry Feldman, who guided me through the research process and read countless drafts and revisions of this paper. I would also like to thank everyone who I interviewed for this project who took the time out of their busy schedules to help inform this paper.
    [Show full text]
  • BRT Arlington
    Reconsider the Curb MAITE Conference Curb Space is Limited & in High Demand Transit Delivery Ride Hailing (Uber/Lyft) Bicycle Access Curb Space is Limited & in High Demand Reconsider the Curb: 1 City Block Reconsider the Curb: 1 City Block Reconsider the Curb: 1 City Block 2,000 1,800 1,750 What Does a Curb Space Represent? 1,500 1 car = ~1.1 people / hr. 1,250 1,000 OR 750 500 30 drop-offs = 33+ people / hr. 250 2 minutes per drop-off / pick-up (avg.) Uber, Lyft, Taxi, Micro-Transit, Robot Taxis Reconsider the Curb Chicago, IL ATLANTA DOWNTOWN ATLANTA DOWNTOWN Reconsider the Curb Huntington, NY McKinney, TX Somerville, MA New York, NY (NACTO) Boston, MA Reconsider the Curb: 1 City Block BostonBRT & Local Bus Pilots 2018 Julia Wallerce, Boston Program Manager Institute for Transportation and Development Policy (ITDP) September 26th, 2019 ITDP’s Mission: To promote sustainable and equitable transport to create inclusive, people‐oriented cities Our Focus on BRT…. Bus Rapid Transit: • High capacity • High speed • Customer oriented Not an old bus running in a bus lane! Defining BRT Dedicated bus lanes at least 1.9 miles long Use Keywords The BRT Standard online 5 BRT Basics Dar es Salaam Busway Alignment: Bus lanes separated from traffic with a median alignment Eugene, Oregon: Emerald Express (EmX) Off‐board Fare Collection Mexico City, Mexico: Metrobus Platform Level Boarding Ahmedabad, India: Janmarg High‐quality stations: Wide, weather protected, safe, well‐lit Yichang, China Buses with multiple, very wide doors Bogota, Colombia: TransMilenio BRT in the US: 11 cities, 12 corridors U.S.
    [Show full text]
  • Transit-Oriented Development Ctfastrak & Ctrail Hartford Line Corridors Ctfastrak Teacher’S Corner – 370 Asylum Street, Hartford
    Transit-Oriented Development CTfastrak & CTrail Hartford Line Corridors CTfastrak Teacher’s Corner – 370 Asylum Street, Hartford Union Station, Hartford – CTfastrak & CTrail 60 units (70%/30% market/affordable) $20.2 Million 36 Lewis Street Downtown Loop - CTfastrak 6 units (market rate) $1.8 Million Hartford Streetscape Improvements – Asylum, Main, Jewell, Ford, Gold and Pearl Streets Union Station/Downtown Loop, CTfastrak Pedestrian and Transit Street Improvements $10 Million Completed 2014 Downtown Loop – CTfastrak Upward Hartford Innovation Hub 27,000 sq ft - 20 Church Street Trinity Action Lab – 10 Constitution Plaza Downtown Loop, CTfastrak 21,000 sq ft Completed 2017 UCONN Downtown Hartford – 10 Prospect Street Downtown Loop, CTfastrak $140 Million Completed 2017 Capewell Lofts – 57 Charter Oak Avenue Downtown Loop, CTfastrak 72 Units (80/20 market/affordable) $27 Million Completed 2017 Noble Gas - 131 Buckingham Downtown Loop – CTfastrak 8 Units (market rate) Mixed Use (Gas Station, Convenience Store, Ice Cream) Anticipated Completion 2018 Dunkin Donuts Park – 1214 Main Street Union Station, Hartford – CTfastrak & CTrail $60 Million Completed 2017 Capitol Lofts – 390 Capitol Avenue Sigourney Station - CTfastrak 112 units (80%/20% market/affordable) $35.3 Million Completed 2017 The Hub on Park – 929-981 Park Street Parkville Station – CTfastrak 45 Units (mixed income) $16.2 Million Construction Beginning 2019 Hog River Brewing - 1429 Park Street Parkville Station, CTfastrak 3700 sq ft. Brewery & Tap Room (Food Trucks) Completed 2016 reSET 9,575 sq ft business incubator space Completed 2015 Hands On Hartford – 45/55 Bartholomew Avenue Parkville Station – CTfastrak Hands On Hartford Headquarters 30 Units (affordable) $11.97 Million New Park Brewing Company – 485 New Park Flatbush Station - CTfastrak 2500 sq ft Brewery (plus 400 sq ft Outdoor Patio) Food Trucks onsite when open (Thursday – Sunday) Completed 2017 Elmwood Station – CTfastrak 54 Units (mixed income) 616 New Park - 3,000 sq ft.
    [Show full text]
  • Ctfastrak: BRT and Autonomous Vehicle Buses – CRCOG
    CTfastrak: BRT and Autonomous Vehicle Buses Lyle Wray, Executive Director Capitol Region Council of Governments MAP Online Conference June 19, 2020 CTfastrak Brief Video • Concept started in the 1990s • Opened March 2015 • Ridership solid and growing (COVID-19 excepted) CTfastrak • Ridership rising in corridor for CTfastrak but Story falling in some other parts of the state • More than half of regional interstate congestion on I-84 west of downtown Hartford • Evaluation of highway expansion, rail and BRT • $567 million total cost The CTfastrak system provides a one-seat, no- transfer ride to many CTfastrak is Connecticut’s major regional CTfastrak routes are first Bus Rapid Transit employment, shopping, integrated with the system. It is a system of and healthcare CTtransit system, making it bus routes that utilize a destinations as well as easy to connect, transfer, bus-only guideway for all connections to rail service and pay your fare. or a portion of your trip. via the New Haven Line Waterbury Branch in Waterbury and the CTrail Hartford Line in Hartford. CTfastrak Routes 101 Hartford/New Britain 102 Hartford/New Britain/Bristol 121 MCC / Hartford / UConn Health 128 Hartford / Westfarms-New Britain 140 CCSU Connector 144 Wethersfield / Westfarms 153 Flatbush / Copaco 161 St. Francis Hospital / Hartford Hospital 923 Bristol Express 924 Southington-Cheshire Express 925 Cheshire - Waterbury Express 928 Southington-Cheshire-Waterbury Express • Expansion recommendations developed by CTfastrak Next CTDOT’s CTfastrak Expansion Study (2016)
    [Show full text]
  • Appendix E: Cultural Resources Technical Report
    SAN BERNARDINO COUNTYWIDE PLAN DRAFT PEIR COUNTY OF SAN BERNARDINO Appendices Appendix E: Cultural Resources Technical Report June 2019 SAN BERNARDINO COUNTYWIDE PLAN DRAFT PEIR COUNTY OF SAN BERNARDINO Appendices This page intentionally left blank. PlaceWorks CULTURAL RESOURCES TECHNICAL REPORT FOR THE SAN BERNARDINO COUNTYWIDE PLAN, SAN BERNARDINO COUNTY, CALIFORNIA FEBRUARY 2019 PREPARED FOR PlaceWorks PREPARED BY SWCA Environmental Consultants E-1 E-2 CULTURAL RESOURCES TECHNICAL REPORT FOR THE SAN BERNARDINO COUNTYWIDE PLAN, SAN BERNARDINO COUNTY, CALIFORNIA Prepared for PlaceWorks 3 MacArthur Place, Suite 1100 Santa Ana, California 92707 Attn: Colin Drukker Prepared by Alex Wesson, B.A., Chris Millington, M.A., RPA and Nicole Kromarek, B.A. SWCA Environmental Consultants 51 W. Dayton Street Pasadena, California 91105 (626) 240-0587 www.swca.com Contact: Chris Millington, Project Manager SWCA Project No. 31474 SWCA Cultural Resources Report No. 18-270 February 2019 E-3 This page intentionally left blank. E-4 Cultural Resource Technical Report for the San Bernardino Countywide Plan, San Bernardino County, California EXECUTIVE SUMMARY Purpose and Scope: In support of the forthcoming San Bernardino Countywide Plan, PlaceWorks retained SWCA Environmental Consultants (SWCA) to summarize the existing conditions of cultural resources within the study area, evaluate potential impacts that could occur to these resources because of the Countywide Plan, and to provide mitigation measures for potential impacts. The study area is composed of all unincorporated lands that are subject to the County of San Bernardino’s land use jurisdiction; also referred to as the “County Control Area,” the study area is approximately 1,623,988 acres (2,537 square miles) in area, or 12.627 percent of the approximately 12,861,026-acre (20,105- square mile) county.
    [Show full text]