PUNJAB STATE POWER CORPORATION LIMITED

Office of Ghief Engineer/ARR & TR, l. N Te o. 0 1 75 -2302531, Fax N o. 0 1 7 5 -230241 G, ema i I ce-arr-tr(,i)psnct. i n ry Regd. Office: PSEB Head Office, The Matt patiala- 14tOO1 corporate ldentity Number: u401 09P8201 OsGco3381 3 website: www.pspcl.in

To 4r"r,ry, Punjab State Electricity Regulatory Commission, Site No.3, Block-B, Sector 1B-A, Madhya Marg, .

Memo No: lQlt /ARR/Dy. cAolzsslcrp/Bp/Deficiency . Dated to "r?l lt 1 Sub: Petition for Business Plan including Capital Investment plan for MYT control Period from Fy za2a-zf- to Fy zozz-zl Deficiencies thereof.

In this regard, it is submitted that on 07.L0.20t9 as per verbal discussions held with Er. A.S. Kang, Joint Directorfl-ariff, enclosed please find herewith list of the cost of transmission works scheme wise and the list of schemes for which the Capital Expenditure has been revised in the deficiencies. The revised soft copy of Anexure-H1 is also attached herewith. DA/As above. 6d*1 Cn ief+n-g-i nee r/ARR & TR PSPCL, PatiaIa. List of revised Capital Expenditure submitted in deficiencies to pSERC:

It is submitted to the Hon'ble Commission to kindly consider the revised Capital Expenditure for the schemes as submitted in the deficiencies. The list of schemes is mentioned in the Table below: :

Scheme eapex claimed in Petition Revised Capex Rs. Crore FY 2020-21 Fy 2027-22 Fy 2022-23 Fy 2020-2L By 2021-22 FY 2022-23 IISD 36.44 28.27 22.46 33.05 24.57 3.44 UBDC 19.85 31.96 35.56 11.85 5.23 30"82 ASHP 103.14 77.78 64.96 78.52 51,78 50.96 Strengthening of 67.02 32.98 64.62 0.00 industrial feeders in

Mobile van for 3.30 3.2s testing of HT and EHT meters

* For the rest of the schemesof the capital expenditure plan, the data submitted in the CIP petition must be considered. o*- 6.s --"-' MYT for F .'202G21

Name of Work Scope of Work 2020-21

;6kV Bahumaira (Aue) 1x12.5 MVA,66/11 K V \ddl.2nd 12.5 MVA.66/11 KV 775 ;6 KVTPTNGR (Aug) 1x20 MVA, 66/11 KV+ 1x31.5MVA, 66/11 KV to repl. 199 1x31.5 MVA. 66/11 K V 1x20 MVA, 66/t7KV P.r/F r) 66KV line between 220KV Ladowal (new) -66KV New 10Km/0.4Sq" SC on Ring Main Towers. ,ine GT Road S/stn. DC on DC. b) 66KV line bays b) 1 Nos. 410.3

,lLO of 66KV Line of 66KV GrainMarket-66Kv Hargna at l.600Kms/0.2Sq" Dc on DC Towers ;6KVBhari U/G to 220KV proposed" 76.32

r)LILO of 66KV Line between 220KV Jagroan -66KV Sudhar r) Stringing of 2nd Ckt.0.600Kms/0.4Sq"on )t 66KV Pabian 0.600KM 0.2 sq"SC on DC Towers. structure to make LILO / "'xisting 57.94 )) 66KV Line Bay at 66KV Pabian end. )) One No

)6 KV S/S Giaspur 3X20 MVA, 1X31.5 MVA tx31.5MVA, 66/11 KV to rcpl.2ndT/F TXZO 199.00 vrvA. 66/11 K V ;6 KV S/S Gill Road 1X31.5 ZXIG|ZO MVA, 1x31.5 MVA, 66/11 KV to repl. 1x16/20 MVA, MVA, 199 lx20 MVA 55/11 K V ;5KV S/S Harsana 1X20 MVA \dl.2nd 1x12.5 MVA 163.00 i6 KV Fountain Chowk 1x31.5 MVA \dl. 2nd 20 MVA 183.00 l6KV S/S Jarg 1x20 MVA 1X31.5 MVA 1X31.5MVA, 66/11 KVto repl.2nd T/F 1x20 199.00 MVA. 55/11 K V t6 KV S/S Bahadurke 2X20 MVA 1x31.sMVA, 65/11 KV to repl.2ndf/F 7x2O 199.00 MVA. 66/11 K V 56 KV Sinsla Cvcle Road 1X20 MVA \dl.2nd 1X31.5 MVA,66/11 KV 324.O0 ;6KV S/S Bhari 3x20 MVA 1x31.5MVA,66/11KVto repl.1x20 199.00 MVA,66/11 K V i6 KV S/S Balokee 2x20 MVA,66/11 KV 1x31.5MVA,66/11 KVto repl.1x20 199.00 MVA.66/11 K V 66 KV S/Stn Shahihaour 1X20 MVA {dl.2nd 1X12.5 MVA.66/11 KV 163.00 66 KV S/Stn Roomi 2x20 MVA,65/11 K V 1x31.5MVA, 66/11 KV to repl.1x20 199.00 MVA,66/11 K V 66 KV S/Stn Galib Kalan 2x12.5 MVA,66/11 K v 1X20MVA, 66/11 KV to repl.1x12.5 147.OO MVA,66/11 K V 66KV S/5 G.T Road 2x31.5 MVA,66/11 K V, 3rdI lFlxl6/2OMVA, to repl.1x31.5 tx76120,66/rr KV, 1X20 MVA,66/11 KV MVA,66/11 K v 199.00

132 KV Kharar- Badali Ala Singh Line Replacement of 0.15 sq" on HRP with 330.24 o.2so-in.h SC on DC. 16 KM 56KV Batala Radial-220KV Wadala a)Repl.of 66KV line between Granthian line 11 KM/0.125lRP 220KV Wadala Granthian-- 132KV Batala line with 744 3 KM/ 0.2Sq" SC on DC Towers. b)Repl. of existingT- off Line for 66 KV Batala iitu 7rM /O ? q^rr Ca .)n na T^urar< [$ a)132KV Line between Kotli Surat 24 Km/0.2 Sq" l$ Mali to 220KVS/S Wadala Granthian (To downgrade from132KV b)66KV link line from 22oKvKotli to66KV) 1Km/0.2 Sq." Surat Mali to join downgraded132KV SC on DC towers 704.77 Kotli Surat Mali-Wadala Granthian Line 2 Nos. c) 66KV line bays lana aarh .t \Ar5Hr15 a.a^+hi.^ e

a)66KV line from Mohlekey to 2nd Ckt. 10Km/0.2sq" 142.66 Jasra hoor SC on DC towers bl 66 KV Bavs 2 nos 66KV line from i)New 9.5km DC on DC Towers 66KV line 132KV Sarna--Ranipur ii)Erection ol 0.772x2=7.544ckt-Km 66KV U/G 10KM/0.125 Sq" on HRP cable240mm2 for Double circuit. iii) Erection of Multi Ckt towers 0.310 Ckt-Km of 66KV line/ with 0.2sq"3nos.ckts.(to accommodate znos. ckts. of Sarna to Ranipur& lnos ckt. of Ranipur to Dhar line) by replacing existing DC on DC 795.26 towers line iv)Disraantlement of existing Rail Pole linel0km/0.125sq" conductor (cost -40 lac) v) 1Nos.66KV bay at Ranipur 1nos.66Kv bay at Sarna

i5 KV Bav at 66 KV Mehta Chowk 1no 39.23 66KV S/S Kotli 20MVA to repl.6.3/8MVA, 1X20MVA 66/11 KV 66/77KV t47 6Sl.."srr 1x6.3/8 MVA 66/11 KV DC towers. \ug.of 66KV line from132Kv fiN to 12 Km/0.2 Sq." SC on :atehabad upto T-off Point for 66KV to replace existing line lashiana Kalan using existing right )f way (12 Km/0.15 Sq." HRP) 176.52 !ote: Exist.portion of 12Km/0'155q" IRP line to be dismantled after :ommissioning of above line wlth +h6 .^^.' fron.o af l'F l.,a tRnrder) Sq" SC on DC 56KV Ram Dass--- 15.5 KM/0.2 znd ckt 284 r Fatehgarh Churian Iowers as 1s.s KM/0.125 Sq" HRP of znd Ckt.17Km/ 66KV line from 220KV Patti to Stringing on existing DC 66KV Toot 0.2sq" line in order to make b) 66KV Bay towers DC on DC towers line 150.75 1 no.at 66KV S/Stn.Toot Note:- 1 nos. 66kv baY at 22OKV S/Stn. Patti shall be nlanned bv PSTCL 0.25q" Aug.of ACSR a) 66KV Line from 8Km/ Tower line 220KV Wadala Granthian-- rn existing line Rusted Towers, 66KV Udho Nangal (Aug) )Existing with new towers b) 66kv line BaYs o be replaced as below:- 'ower no fi ,19,29,33,35,37,59, -ower 248.37 no 63,70,71 =10 nos D-2 tower tower no 65,69=2 nos D-30 Tower no 51A =D-60 1 no. bay at Udho nangal \ote:- 1 nos. 66kv bay at z20KV S/Stn. wadalaGranthian .h.ll ha nlennod hvPSTCl rePl.12.5MVA 56 KV Fatehabad l0 MVAto 110 2x12.5 MVA,66/11KV ;6/11 KV U0 MVA to repl.12.5MVA, 66KV Amarkot KV t47 1x20 KV 66/11 KV 66/11 1v1.'11) q MVA 56/1 ',l KV to rePI 12.5MVA, 66KV Mari Mega 20MVA 747 1x12.5 KV 66/11 KV 66/11 KV 1x12.5 MVA 66/11 KV rePl.12.5MVA 66KV S/S S.Mattewal 20MVA to r47 1x12.5 MVA 66/11 KV 65/11 KV on DC towers 66KV line from 10Km/0.2Sq."SC existing H rail 747 132KV Kathunangal to 66KV to replace Pole N.t!:n^in.i lnKM/O 1so" HRP linP of 2nd Ckt 0'2Sq" 9Km ACSR on a) 56KV Line from a)Stringing SC on DC 220KV Fatehgarh Churian- existing line uP to DYal Bharang 66KV A.inala (NEW) Tower make Double Ckt.line b) 66KV BaYs in order to 1 no.at 56KV S/S Ainala 98.27 Notei 1 nos. 66kv bay at 22OKV S/Stn. Fatehgarh Churian shall be Planned bY DCTTI 12.864 Km/0'zsq" a)66KV line from 2ndCircuit ACSR. on DC towers line 220KV Majitha--Nag Kalan, " 192.38 Mudal-Verka Link line. 2 nos. h) 66KV bavs. r)5.766 Km / 0.2 Sq" ACSR a) 66KV Line from I ;tringing of 2nd Ckt on DC I towers of existing line. 220kv Chohla Sahib to I 1no.at 66KV 66KV Gandiwind (NEW) Gandiwind I n.oz {ote:- 1 nos.66kv bay at b) 66KV Bays I l20KV S/S chohla Sahib I

shall be planned bY PSTCL I

13Km 0.2Sq" /SC on DC a) 66KV Line from / line to replace 132kv Taran Taran to towers Rail Pole Line 55 KV Manochahal (NEw) existing 1no.at 66KV Manochahal 307.55 b) 66KV Bays Notei 1 nos. 66(v baY at 132KV VStn. Tarantaran

4.1Km/0.2Sq" /SC on DC Kathunangal to Tarsika towers line from rail pole no 44 to 105 to replace existing

a) 66KV Line from 9Km/0.2Sq" /SC on DC 132KV Sarna to 66KV S/S line from rail pole no 1 to 149 to replace existing I pole no 7! to 749) 125Sq" /HRP line :- Rail pole no 1to 70 already replaced with SC on DC

of 2nd Ckt/ 0.2Sq" 132KVS/S Bhikhiwind to lAcSR on existing Dc Towers ikhiwind to Sursingh portion 7.990Km/0.2Sq',, /SC on DC to make DC on DC line tower line 1 no.at 66KV S/S Sur Singh b) 66 KV Bays Notei 1 nos. 66kv bay at 132KVS/S Bhikhiwind

a) 66KV Line from 6Km/0.2Sq" /SC on DC s line from rail pole no 220KV Fategarh churian to to 100 to replace existing

125Sq" /HRp line

s line from T-off point of his line near Tibber to 66KV S/S Kahnuwan to replace existing 460+7Kmlo.7255q" / rail pole line ii)New 0.460Km/0.25q"/DC on DC

Iibber to T-off point of 156.99

1 ckt for Kahnuwan & ckt for Babehali to replace

Note:- 1 nos. 66kv bay at 220KV S/S Tibber

/Raising of height of isting 66KV line towers at road crossing and at towers / extention of Canal crossing in order existing towers Rail pole/tower no 61-62 Rail pole/tower no 62-63 il pole/tower no 10-11 66KV Focal Point Batala-- ail pole/tower no 12-13 pole/tower no 7-8 pole/tower no 10-11 pole/tower no 141-142 pole/tower no 11-12 Harchowal line Rail poleltower no 11-12 iv) Tibber- Kahnuwan Rail pole/tower no 20-21 pole/tower ng 64-65 pole/tower no 25-26 pole^ower no 27-28 vi) 66KV Gurdaspur-- pole/tower no 73-74 Ranjit Bag line vii) 66KV Gurdaspur: 9 ;hifting /Raising of height of RP/Towers, to be replaced/ 3xisting 66KV line towers at relocated by providing 'oad crossing and at extra towers / extention of :anal crossing in order e,.isting towers :o make proper ground Rail pole/tower no 69-70 :learance line conductor Rail pole/tower n070-71 Jnder TarnTaran Circle Rail pole/tower no 4-5 28 ) 66KV Patti- Rail pole/tower no 40-41 \,laushehra Pannua line Rail pole/tower no 4-5 ii) 66KVSur Singh: 3agobua line v) Patti-Ghariala ine 66KV Khassa- '/) i...i Ah.^.t khrn lina Shifting /Raising of height of RP/Towers, to be replaced/ existing 66KV line towers at relocated by providing road crossing and at extra towers / extention of Canal crossing in order existing towers to make proper ground Rail pole/tower no 2-3, clearance line conductor Rail pole/tower no 8-9 under Gurdaspur Circle Rail pole/tower no 9-10 53 i) 66KV line from Rail pole/tower no 13-14 220KV Civil line- Rail pole/tower no 14-15 Ranjit Avenue Rail pole/tower no 17-18 Ckt no1 & 2 Rall pole/tower no 18-19 Rail pole/tower no 19-20 o-il ^^l^ /+^r,a, ^^ I A1 1 A1 66KV S/S Dasuya (Aug.) I no. 66KV Bay 1x7O/72.5 MVA, 66/11 KV 39.23 1X20 MVA.66/11 KV r) 66KV line from 66 KV Sadhu Ashram to Chabewal r) 9.787 KM/0.2 sq" SC on Dc towers ))66KV linefrom 66KVS/SAjjowal toSadhu Ashramto t\7.717KM10.2 sq" SC on Dc towers nos :6KV S/S Chabewal ,4 568.32 r) 66KV Bays

r) 66KV New Line fromAlawalpur-- 66KV Tanda Road S/S )) 5.450Km/DC on Dc line 0.4 Sq"ACSR. r) 66 KV bays. l) 2 nos. 226"7

66KV Bay at Kot Sadiq S/S for creation of LILO 1 no 66KV Bay Arrangement of 66KV line Badshahpurto Sports & Surgical Complex, at66KV S/S Kot Sadiq 54

;6 KV bays for 66 KV lines emanatingfrom 220KVS/S 10 nos 270 (anili / Kaourthala. r)66KV Kanjli--Nangal Line LILO at 66 KV S/S Dainwind 0.2 Km/ SC on DC line 0.2 Sq" ACSR. :) 66 KV bays. 2 nos. 82.588

a) 65KV Bays. 2 nos 1no at 66KV S/S Tibba and 2 nos 1no at 66 KV S/S Kallu (to use 66KV line already between exists these S/Stns) 1s6.92 b) 66KV bays, 2 no at 66 KV S/S Ucha (to control 66 KV S/S (rrrrrkhnrrr and 66KVS/q Kallul 66KV single circuit 2.0Km,66KV a) 2.0 Ckt-Km(1x4C) 66KV Underground Underground cable 240mm2 cable 240mm2 b) 1 no.66KV line Bay I-off from BBMB -Tanda road s39.23 66 KV Ring Main Jalandhar to provide 2nd 66KV power source to 66KV Radial s/Stn.Jalandhar a)66KV Line from i) Replacement of 4.095KM/ 0.15Sq" 220 KV Dasuyal--- 66KV Miani conductors on existing towers of Dasuya-- (18.702Kmlo.1sq"/HRP line) Khunkhun (TL1 to 20 erected in the ROW of . HRP line) with 0.2sq" cond.to make Double 319.14 ckt. line ii) Replacement€f existing rail pole line 14.067Km/0.1sq"conductor with SC on DC +^\r,a.. r^,ith n ,<^rr .^n.lr r.t^r

220 KV Kartarpur irection of 2nd 66 KV bus bar 2x100 MVA, 220/66KV 1x16/20 MVA, 66/].LKv 20 1x12.5 MVA, 56/11 KV 2x12.5/76 MVA, 132133 KV a) 66 KV bay at 66 KV S/S 1 nos Talwandi chowdhrian 39.23

))66KV LE bay at 66KV S/S Mehsampurtofeed l32 S/S 1 nos. 19.35 {aknalar * (New) 9.550 Km/O'2Sq" SC on DC Towers line 36 KV line from 66 KV S/S Rahon -- 66 KV Aur a) U/G cable 240mm2=600mts. 42A.22 56KV line Bays b) 66KV cl 55KV Bavs 2 no. ZO tUVnto repl. 1x10/12.5 MVA,66/11 KV 66 KV Dasuya (Aug.) tnd 747 Lxro/72.5 MVA,66/11 KV 1 Y?n rr\/a 66ll 1 KV 20 to rePl.12.5MVA 66 KV Attowal MVA KV 147 1x20 KV 66/11 KV 66/11 1x12.5 MVA 66/11 KV to repl.12.5 MVA ;6 KV Kala Bakra 20 MVA L47 )v1? sMVA.65/11KV 65/11 KV repl 12.5MVA 66/11 KV S/S Gardhiwal zoMvl to 66KV t47 1x12.5 MVA 66/11 KV 1x20 MVA 66/11 KV repl 12.5MVA 56KVS/S MehsamPur ZoMVA to 747 1x12.5MVA 66/11 KV 66/11 KV 1x10/12.5 MVA 66/11 KV 12.5MVA Sham Churasi 20MVAto repl 66KV S/S t47 1x70/1?..5 MVA 66/11 KV 66lttKV 1x20 MVA 66/11 KV SC on DC towers 66KV line from132KV " 1.8Km/0.2sq" up to T-off for Kala Bakra 37.752 66KV Kala Bakra on same ROW (To SCon DC line 0.2 Sq"ACSR a)OOrv Ut'e tro.33KV HSP Road--33KVCiheru(New) rO rrn 206.49 rep Rail pole line)

Km SC on Dc line 0.2 Sq" ACSR. r)66KV Line from 220KV Noor Mehal--- 11.150 ;6KWalwan(Aug) (To rep Rail pole line) 1 nos. at talwan no.66KV Bay at 220KV S/S Noor 269.366 r) 66KV bays. Notei 1 i Mehal shall be planned bY PSTCI"

7Km/0.2 sq" SC on DC towers 66KV line from 220KV BadshahPur-- 14t.75 66KV S/S Chitti a) Stringing 9Km/0.2sq" 2nd Ckt. On existing 66KV line from SC on DC towers line 132 KV ---Mehatpur b)1.5Km /0.2sq" znd Ckt.on existing SC on DC towers Solid tap on Nakodar-Mehsampur 67.47 line up to Mehatpur

a)1.2Km single Ckt' new SC on DC 66KV new link line 1.2Km solid tap to tower no 7 to /0.4sq" Kartarpur*-surgical (ckt.-1)up to 66 KV S/Stn. Leather towers S/S Leather ComPlex Complex to provide 2nd 66KV power source to 66 KV 1no.at 66KV 83.05 S/Stn. Leather ComPlex ialandhar, Jalandhar, b) 66KV line baY

7Km/ SC on DC Towers line /o.2Sq"ACSR. a) 66KV Line Lohian Kalan--Rupewali Line 2 nos. lNew link) 222.94 b) 66KV bays.

10 Km/SC on DC line o.2Sq"ACSR. a)66KV Line from Bansia Dhak--Apra Line 2 nos. (New ) 284.86 b) 66KV bays.

SC on DC line 0.2 Sq"ACSR. r)66KV Line from 66KVS/S Behram to 8 Km/ 2 nos. 243.58 )osanj Kalan (New ) r) 66KV bavs. New 13.578Km/ 0.2 Sq" ACSR SC on DC a1 66rv Line from13zKv S/S Kapurthala to Kala Sanghian line to replace exist' 0'15sq" Rail (Exist.13.578Km/Rail Pole line/0.15sq" ) towers 280.25 Pole line

(Aug) ilg of condrctor 8Km/ O'zSq"ACSR bY 1 Osfv r-ir," tro, 66KV Garshankar to 66KV Saroya 52.48 'enlacins existins H rail oole line DC on DC towers line/o.2 Sq" ACSR ,)OOfv une trom Sultanpur-- Jakhopur line LlLo at 66KV 0.4 Km/ at 66KV S/S Lohian Kalan S/S Lohian Kalan 700.22 (New link) 2 nos. b) 66KV bays.

).1 Km/SC on DC line 0.2 Sq"ACSR' a) OOkv bay at O6KV S/S Mehsampur for Nakodar to Mehsampur old 66KV Line (New link) Z nos, 80.524 b) 66KV baYs"

l)New 10Km/0.2sq" inch SC on DC 55KV a) OOfV lin" fto. 22OKV to 66KV Dosanj Kalan from 220KV S/S Goraya to 66KV (Aug) :ower line 206.4 ;/S by replacing existing loKm/o.1so"/ 66KV Rail Pole line 12.5MVA, PlrlF 66111Kv a) 66KV S/S Lakhan Ke Padde SC on DC 66KV tower line (New) (including 1 no.66KV BaY) 4km /0.2sq"/ akm SC on DC 66KV tower line T-off from b) /0.2sq"/ 340.56 existing Kartarpur- Nadala 66KV line ckt. upto the proposed site for new 56KV S/stn. Lakhan Ke Padde a) 66KV S/S Kalyanpur 1x12.5MVA, P lT lF 66h1 Kv (New) (including 1 no. 66KV Iine Bay with line isolators llew 7.5km /0.2sq"/ SC on DC 66KV tower line only) b) Proposed new 7.5km/0.2sq"/SC on DC towers line T-off 400.8 from existing Bhogpur-Kandhala Jattan line ckt. Upto proposed site of Kalyanpur S/Stn.

(a) 66 KV Line from 220 KV S/Stn Jadla to 66 KV S/Stn Replacement of the existing SC on SC / 0.15 Karawar (8.33 km / 0.15 sq"/SC on SC) sq" / 8.33 km lin'with 'DC on DC / 0.2 sq" / 8.33 km Replacement of existing isolator arrangement at 66 KV S/Stn Karawar for existing l/C Jadla line with 1 No. l/C 66 KV Line Bay with Circuit Breaker 1 No. O/G 66 KV Line Bay (with 66 KV Circuit 289.806 Breaker) at 220 KV Grid Jadla 1 No. I /C 66 KV Line Bay (with 66 KV Circuit Breaker) at 66 KV Grid Karawar Replacement of existinB isolator arrangement at 66 KV S/Stn Bhaddi for existing l/C Karawar line with '1 No. l/C 66 KV I i^a a.r, u,ith ai..'tir n16.lzarl r) 66KV S/S Focal Point-2 Jalandhar (NEW) a) 1x25l31.5MVA 66/11 KV + 1X20MVA, r) Proposed 66KV double bus bar system at existing 66KV 66/11 KV ;/Stn Focal Point Jal. to provide 66KV supply to new b) 66KV double bus bar system at existing :roposed 66KV S/Stn. Focal Point-2 Jalandhar" 66KV S/Stn Focal Point Jal. 541 :) 66KV Bays 2 nos

56 KV Line from 66 KV S/S Kupkalan to Replacement of SC on RP existing line 56 KV S/S Ahmedgarh with SC on Dc (0.2 sq" 10.5 KM) / 212.625 (0.125 sq", 10.5 KM / SC on RP)

66 KV F.P.Rajpura- 2.0 KM/0.2 sq. in. SC on DC tower line Naushera Line 9.5KM/o.1Sq.lnch to link 66 KV S/S Old Rajpura -220 on SC Towers KV S/S Rajpura Rail Pole line (to be b) 65 KV bays spared after E/o DC on DC 66 KV S/S line between 220 KV S/S Rajpura - Old Rajpura S/S -FP S/S Rajpura) with existing 2nd ckt. between 220 KV S/S Rajpura-Old S/S Rajpura -FP S/S Rajpura, further linking the latter with 38.33 idle 66 KV Patiala- Dhulkot SC tower line and finally bussing it at 66KV S/S Naushera by erecting a short link enabling to provide a znd ckt in addition to present one, rightfrom 220 KV Rajpura upto 66 KV S/S Naushera by providing links at three locations" h^ 5+ nl.".h6t. ^^6 a) 56 KV HRP line from 220 Kv a) Replacement of existingappox. Ghulal -66 KV Khamano /Ghungrali 4 KM HRP line with66 KV multi ckt. 23 KM/O.1 sq" conductor size Towers (upto common point for work of part-a is completed firm and PSPCL) and stringing of one ckt. for firm with 0.15 sq" conductorand 2nd ckt. for PSPCL for 66 KV S/S Khamano / Ghungrali with 0.2 sq" conductor. b) one no. 66KV bay at 220 KV S/Stn Ghulal for firm use 30s c) Stringing of third ckt . from 132Kv Ghulal upto common point appox.4km and beyond it 10 KM /0.2 sq" DC on DC from common point as per 'a' upto the T-off point for 66 KV S/S Kotla Shamsp.ur d) one No. 66 KV bay at 220 KV S/S Ghulal for

a) 66 KV Line from 220 KV S/S Kohara to a) Stringing of second circuit , 66 KV S/S Chaunta 0.2 sq" (0.84 KM / Multi Ckt Tower + (0.84 + 6.025 KM DC Towers) KM / Multi Ckt Tower / 98.07 6.025 KM / SC on DC Towers b) 66 KV Line Bay b) No. 9-

66 KV Line from 132 KV S/S Anandpur Replacement of SC on RP existing line Sahib to 66 KV S/S Nurpur Bedi with SC on DC (0.2 sq", 15 KM) 303.7s (o.1 so" 115 KM. SC on RP) Dc r) 66 KV DC tower line from 220KV 1KM/0.2sq" DC on tower ;/S Sunam to join near solid tap line )oint for 66KV Sheron SC on DC line 3.5? \4/0.zsq" line DC Dc line )) Stringing of 2nd Ckt from 7KM/0.2sq" on I'-off ( as per'a' above) to 66KV 5 no. ;heron (Under erection) :) DC tower link line from 66KV 3fi3r ;heron to 66KV Longowal with rtringing of 1 Ckt direct from T-off point as per'a' above upto Longowal and 2 Ckt via 66KV Sheron d) 66KV bays (2 no. each at 220KV Longowal end and 1 baY

existing HRP Line (8 KM 0.125 sq") i6 KV Sunam - Nagra Line Repl. of / (8 from 66 KV with SC on DC KM/o.2sq") 762 S/Stn Mehlan chowk to 66 KV S/S Nagra

66/11 KV a) 66 KV S/Stn Baltana (New) 1 x 20 MVA, 0.2 sq" SC on DC b) T-off of 66 KV Line from 66 KV 10 KM / s/Stn Mubarikpur to 66 KV s/Stn Dhakoli 603.s for new 66 KV S/Stn Baltana c) Cost of Land

of 65KV existing line from ;6 KV line from 220 KV S/S Lalru to a) Conversion Lalru to 66KV Handesra ;6 KV S/Stn Alamgir SC on DC 220 KV 5/S (SC on DC 0.2Sq") to Multi cirkit towers i0.2Sq" / 4.7s Km) (O.zSq" / 1.5Km) upto the crossing point of 66KV Dhulkot - Chandigarh Line with stringing of two ckt. For 66KV S/S Alamgir. b) New DC on DC Line (7.5 KM / 0.2 Sq' ) from crossing point of 66KV Dhulkot - (a) above Chandigarh Line as mentioned in 60.42 upto Tower no. 19 of existing 66KV Lalru- Alamgir Line. c) Stringing of 2nd Ckt' ( 0.2 sq ' / 1.0KM) from Tower no. 19 upto 66 KV S/S Alamgir. t ruo. Oo KV line Bay at 66 KVS/Stn lO) lAlamgir.

second circuit (0.2 sq" a) 66 KV Line from 220 KV S/S Bhateri to r) strlnging of / (upto TL no. 85 at 66KV S/Stn. 66 KV S/S Ghanour 18.105 KM) nou r) (0.2 sq" / 13.95 KM , SC on DC) 3ha line bay will be constructed only with 744.\r b) 66 KV Line Bay (at 66KV S/S Ghanour) c) 66KV c) 66KV line bay at 220KV S/S Bhateri ine isolators. b) 1 No.

of 2nd circuit from 220 KV ;6 KV line from 220 KV S/S Malerkotla to a) Stringing to Tower No.38 of i6 KV S/S Malerkotla (10.3 KM / 0'125 sq", SC on RP) s/Stn.Malerkotla Malerkotla-Dhuri (Banbhora) line 7.5 km Sq" ACSR from b) b) a.5 km SC/DC line,0.2 371.76 tower location No.38 Dhuri (Banbhora) 66 KV S/Stn Malerkotla using same ROW. c) 1.1 KM 240 sq. mm, 66 KV U/G cable SC by using different RoW

a) 66 KV Haripur Kura (New) ,) 12.5MVA,66/11 KV 0.4 sq" DC on Dc Towers b) LILO of 66 KV Line Ckt-1 0.4Sq" o) 1.2 Km / 4s3.33 from 220KV Saidpura to 220 KV Lalru at Cost of Land 66KV S/S Haripur Kura (New)

Sq" SC on DC towers 66KV line from 220 KV Handiaya to 66 KV I KM/ 0.2 165 Ba rnala.

Additional 66 KV Line BaY 1 No. 39.23 at 65 KV S/Stn Bahadursarh 20 MVA, 66/tlKyTlF to replace :6 KV Seonk r47 KV 1 x 12.5 MVA,66/11 KV) 12.5 MVA,66/11 Addl 20MVA,66/71KVr/F 55 KV S/Stn Balbera 183 12 x 20 MVA, 66/11 KV) 6'> 12.s MVA,66/11 KV 66 KV S/Stn Dasaundha Singh Wala (Aug) \ddt 163 1x12.5 MVA,66/11 KV

12.5 MVA,66/11 KV 65 KV S/Stn Loh Simbli (Aug) \ddl 163 1x12.5 MVA,66/11 KV Km/0.2 Sq" SC on Dc Towers 66 KV Bangan-Mandvl line on SC Towers 8 t45 line(new) (0.2 10 KM) on a) 66KV Line from 220 KV S/S BBMB r) Stringing of second ckt sq" / point Sangrur to 66 KV S/S Bhawanigarh (Ckt. l) rlready planned SC on DC from T-off to220 KV (19.6 KM / 0.125 sq", Sc on RP) 'o prop. 220 KV S/S Bhawanigarh L18.2 b) Line Bays ;/Stn BBMB Sangrur. o) 1 No.

r)66 KV S/Stn Barass (New) r)1 x 12.5 MVA,66/11 KV SC on DC Towers r) 66KV Line from 220KV S/S Kakrala to r) 9.5 KM/0.2 sq" 450.37 lew 66KV S/S Barass

qddl MVA, ;6 KVS/Stn Sekhuwas (1x 20 MVA,66/11 KV) 20 66/LtKVr/F 183

repl 12.5 MVA, 66/11 KV 66 KV s/Stn Tallewal (Aug) lO MVA to 747 1x2O MVA + 1x12.5 MVA, 66/11 KV KV repl 8/10 MVA, 66/11 66 KV S/Stn Kanjla (Aug) 20 MVA, 66/11 to 150 1 x 20 MVA +1 x 8/10 MVA, 66h7KV KV 12.5 MVA, 66/11 KV T/F 66 KV S/Stn Badshahpur 20 MVA to repl 747 (1x20 MVA + 1x12.5 MVA,66/11 KV) 12.5 MVA, 66/11 KV T/F 66 KV S/Stn KaPlal 20 MVA to repl 747 {2 x 12.5 MVA.66h1 KV} 66 KV Line Dhuri- 16 KV Line from Dhuri to 66 KVS/S Replacement of existing old ]a n bou ra Malerkotla towery line from 66 KV S/Stn Dhuri to T-Off point Bhanbhora (0.1 sq" / 11 km) and T-Off Point to 66 Kv S/Stn 330.24 Bhanbhora S/C on S/C (0.15 sq" / 5 km) to be replaced with S/C on D/c with 0.2 sq"

DC 66 KV line from 220 KV Mohali-132 KV ).8 KM/0.2 sq " SC on 772 Kharar 9.8 KM/0.125 sq" on HRP

portion (5Km) of 65KV Line a) 66 KV Linefrom 220KV S/S Passiana to Replacment of T.L. No. 251(Sanour- 66KV S/S Patiala witho.2Sq" ACSR from (66KV S/S Patiala of !0r.2 0.1Sq" on HRP/SC Towers Passiana)to T.L. No. 266 existingo.l sq" SC on HRP/SC Towers

conductor with 0'4 Rajpura - Rajpura Old 0.2 sq" / 8 KM (Tower leplacement of existing s1.36 linPI ;o" (8 KM) Circuit (0.2 sq"/9.299 KM) r)66KV line from 220KV S/S Ghulal to 66KV S/S r)Stringing of 2nd vlachhiwara 0.2 sq" / 9.299 KM; SC on DC )n DC Towers (i) bay (with 66KV Circuit )) 66KV Line Bays r) 1 No.66KV line 100.23 lreakers) at 220KV Grid Ghulal. ii) 1 No.66KV line bay (with 66KV Circuit lreakersl at 220KV Grid Machhiwara. Sc on DC towers. a)66 KV line from 66 KV S/S KaPial to 3 KM/0.2 sq" cond. 64 66 KV S/S Bhattiwal (Prop.) 1 No.66 KV bay. n\66 KV hav at 66 KV S/S Kaoial. l) 66KV Karoda- Banarsi llne' 8.5 KM SC/DC line C.25q"ACSR. 280.125 )) 2 Nos.66KV baYs. r) 66KV Ghanaur-Dharamgarh line" KM SC/DC line 0.2Sq"ACSR. 249.75 c) 2 Nos.66KV bavs. )) 66KV Loha Khera-Longowal line. 3.6 KM SC/DC line 282.75 1 )(n[ACSR r) 2 Nos.66KV bavs. line l) 66KV Lehragaga-Khandebad line T-off for Ballran. 3.6 KM SC/DC 282.15 r) 2 Nos. 66KV bays. ).2Sq"ACSR.

circuit 0'2 sq" 66 KV Line from 66 KV Grid Focal Point ;tringing / sagging of second / Rajpura to 66 KV Grid Naushera ).8 km 67.42 9.8 km / 0.2 sq", 5C on DC

existing 66 KV Line with 66 KV Line from 220 KV Grid Raipura to Replacement of this DC Tower Line 66 Kv Grid Naushera 22km I O.2 sq" / Sc on 727,76 22km I 0.2 sq" / 0.1 sq" (HRP / SC on DC)

SC on DC into DC Conversion of existing T-off a) converting existing of second circuit (Sc on Dc / 0.2 sq" I 7.2 km) from cn DC by stringing 7.2 knu(being LILO arrangement) 66 KV Bahadurgarh - Baran Line' to ).2 sq' I 51.23 KV Line BaY at 66 KV S/Stn Focal Point Patiala into b) One No. 66 Focal Point Patiala LILO system at 66 KV S/Stn 66 KV S/Stn Focal Point Patiala' DC on DC towers Conversion of existing T-Off (SC on 5C / a) 2 KM / 0.2 sq" (being LILO arrangement) 2 O.z sq" / 2 km) from '66 KV Line from No. 66 KV Line BaY at 220 KV Grid Devigarh to 66 KV Grid b) One Bahadurgarh'to 66 KV S/Stn Bhunerheri 66 KV S/Stn Bhunerheri 119.15 into'LILO system at 66 KV S/Stn Bhunerheri' Conversion of existing T-Off (SC on DC / a) stringing of second circuit 0.2 sq' / 1.2 0.2 sq" 1.2 km) from '66 KV I Line from km(converting existing SC on DC into DC on 220 KV Grid Ablowal to 220 KV Grid DC; being LILO arrangement) Focal Point Nabha' to 66 KV S/Stn Hiana )) One No. 66 KV Line Bay at Kalan into 'LtLO system at 66 KV S/Stn Hiana Kalan 47.462 66 KV S/Stn Hiana Kalan'

Conversion of existlng T-Off a) 6 KM / 0.2 sq" DC on DC towers (SC on SC / 0.2 sq" / 6 km) from (being LILO arrangement) 66 KV Line from 220 KV Grid Devigarh b) One No. 66 KV Line Bay at 220 to KV Grid Bhateri'to 66 KV s/stn 66 KV S/Stn Bhankar 278.99 Bhankar into 'LlLo system at 66 KV S/Stn Bhankar'

66 KV Line from 66 KV Grid Mubarikpur 1) Stringing of second circuit with 0.2 sq,' on to 66 KV Grid Dhakoli existing DC Towers (SC on DC 4.168 66.57 / km / 0.2 sq") 2) 1 No. 66 KV Line Bay at 66 KV Grid Dhakoti

66 KV Line from 220 KV Sub-station rugmentation of the existing 0.2 sq" Phase-7, Mohali to 66 KV Grid Sector-71 :onductor of 66 KV Line wlth 0.4 sq" Mohali :onductor 37.71

t6 KV S/Stn Gidhriani 20 MVA to repl 12.5 MVA, 66/11 KV T/F 2 x 12.5 MVA,66/11 KV) L47 ;6 KV S/Stn Kularan u'0 MVA to repl 12.5 MVA, 66/11 KV T/F 1 x 20 MVA + 1x 12.5 MVA, 66/11 KV) 747

56 KV S/Stn Gurditpura l0 MVA to repl 12.5 MVA, 66/LI Kv T/F | 1 x 20 MVA + 1x 12.5 MVA, 66/11 KV) 747

56 KV Kotli Kalan \dd1.12.5 MVA,66/11kv 163.00 66 KV Pakhi Kalan \dd1.12.5 MVA,66/11kV 1x12.5 MVA,66/11 KV 163.00 66 KV Malke \dd1.12.5 MVA,65/11kV 1x12.5 MVA,66/11 KV 163.00 220 KV Ghubaya- Fattanwala 66 KV line Repl. offirst/initial 12 Km SC on SC line from 31.5 Km/0.15Sq" SC on RP Ghubaya with 12 KM/0.2Sq" DC on DC 66KV Line Bays towers & Stringing of 2nd Ckt from lallalabad T-off point to Chak Janisar T-off 406.65 point 12.5Km/0.2Sq" on DC towers. 1 No. 66KV Bay at 66KV Fattanwala to control 65KV Jhariwala. 16 KV Kassoana (Aug) \dd|.1x12.5 MVA, 66/11KV r.x12.5 MVA,66/11 KV 163 220KV Baja Khana- Bargari 66 KV line tepl. With 9Km/0.2Sq" SC on DC 9Km/0.J.Sq"SC on RP 782.25

66 KV Arniwala- 220KV Malkatora (Malout) 1) 3.5 Kms at Malkatora end.4 ckts with 66 KV line. 0.2 Sq" on multi Ckt. Towers 8Km/0.2Sq" on Towers+ 2122.5 Kms / 0.2Sq" DC on DC 26 Km/o.lsq'on (Total RP Length 34Km) 3) 1 No. 66KV Bay at 66 KV S/S Arniwata. 66 KV 8ay 639.98 work of part (a) completed in 07/79

220KV Malout- Madhir 66 KV line . 1) 3.5 Kms/o.2sq" DC on Multi Ckt towers 2akm/0.7/0.75 Sq" SC on Rp at Malkatora end. 656.76 2) 20.5 Kms/0.2Sq" SC on DC

66 KV Talwandi- Maur Line 22 1. 21.6 Ckt Kms (approx.),0.2 Sq.,, SC on DC KM10.125 Sq." on RP towers (Talwandi Sabo end) to replace existing HRP line. lt shall be connected to one of the Ckts on MCT (0.41 Ckt Km) planned under planning n o. 77 Z/2017-L8/WZ 661.85

2. 6.5Km 0.2 sq" DC on DC with LILO at 66KV Kamalu Swaitch. l. 1 No. Bay at 66KV Kamalu Swaitch

i6 KV Dhan Singh Khanna-GhasoKhanna line (9 KM SC/DC 5 KM SC/DC Line 0.2 Sq." ACSR ine 0.2 Sq." ACSR) 2 No.s ;6 KV Line Bays (2 No.s) 271.20 i) 66KV Jhunir-Boha line T-off for Tahlian. a) 6 KM SC/DC line 0.2Sq"ACSR. ii) 66KV Bays b) 2 No. 231.84

66 KV Talwandi- Raman Line Replace with 13.3 KM 0.2 Sq." on Towers 13.3 KM/ 0.125 Sq." on Rp 274.37

pakho 66 KVJoga Ralla to 66 KV Katan 14 KM/ 0.15 Sq." on Replace with 14 KM 0.2 Sq." on Towers RP 288.95 220 KV Jhunir to 66 KV Mansa T-off Raipur leplace with 16 KM 0.2 Sq." on Towers 16 KM/ 0.125 Sq." on 330.24 RP

220 KV Mansa to 66 KV Kot Dharmu 12 Replace with 12 KM 0.2 Sq." 247.68 KM/ 0.125 sq." on RP

;6 KV Jeeda \ddt.12.5 MVA,66/11kv 153.00 I x2O MVA. 66/11kV i6 KV link between 66 KV S/S Ramuwala to 66 KV SIS ; KM/ 0.2 Sq." SC on DC I :ha rik z No. 66 KV Bays (one at 66 KV S/S Ramuwala 202.30 ;6 KV Line Bays rnd another one at 66 KV S/S Charik).

66 KV link between 66 KV S/S Bhalur to 66 KV S/S Kot 6 KM/ 0.2 Sq." SC on DC (one at 66 KV S/S Bhalur Sukhia 2 No. 66 KV Bays 202.30 66 KV Line Bays and another one at 66 KV S/S Kot Sukhia).

from i) 66KV line Jhoke Tehal Singh - Mamdot T-off at Rauke Stringing of second Ckt 0.2sq"/12KM Jhoke Tehal Singh upto T-off Rauke Hithar on H ithar 732.72 ii) 66KV Eays DC towers hllNn

33/66 KV line 220 KV Abohar (upgraded from 132 KV S/S)- 1) Replace of initial 1 kM 33/66kv line with (4X1C). Khui Khera*18km /0.1sq" HRP 1.8 Ckt. Km 24}mm2 U/G XLPE Cable 2) Repl of remaining portion of 17Km wlth 800.88 0.2Sq" SC on DC towers

fo create 2nd 66 KV source for 66 KV Faridkot from 220 (i) 6 km 66 KV line 0.2 Sq." SC on DC. (V Sandhwan (ii) 2.4 km 0.2 Sq." Dc on MCT to replace Rail ffork of part (a) completed in 0/19 pole (0.15 Sq.") llne portion. (One Ckt on MCT for Sandhwan-Faridkot & other for Kotakpura- Faridkot line). (iii) meter 240 mm2 XLPE Cable for 460 Ckt 334.23 2nd Ckt only at Faridkot end (First Ckt to be laid through 24o mm2 Cable as deposit work of NHAI)" (iv) 2 no.66 KV Bays (1 no. at 66 KV S/S Faridkot and other at 220 KV S/S Sandhwan)

MVA,66/11kV ;6 KV Bangi Nihal Singh 1x20 MVA,66/11kV \ddl.12.s 163.00

Kalyan 1x2O MVA,66/11kV 1x6.3/8 56 KV Sukha 12.5 MVA to replace 1X6.3/8 MVA T/F 105.81 \4VA.66/11kV f,ne No. Bay i6KV Bay at 66KV S/Stn Kamalu Swaich 39.23

;5KV Bav at 66KV S/Stn Chak Alisher )ne No. Ba! 39.23 \ddl.12.s MVA,66/11kV 56 KV Ramuwala 163.00 1x6.3/8 MVA, 66/11KV 220 KV Baghapurana to Nathuwala 13'58 KM/ Replace with conductor size of 2 Phases of 0.2/0.1sSq." Ckt-1 is 0.15 Sq." and Conductor size of 3rd Phase is 0.2 Sq.". where as conductor size of 280.29 2 Phases of ckt-2 is 0.2 Sq."

iio rv oharmkot to Mastian+Fatehgarh Panjtoor 18 KM/ Replace with 18 KM 0.2 Sq." on Towers 377.52 65mmsq. on RP

leplace with 17.2 KM 0.2 Sq." on Towers SC 132 KV Badni Kalan to Bilaspur 355.01 17.2 KM/ 0.1550." on RP rn DC i6 KV SadiqJhoke Tehal Singh 19 KM 0.4 Sq." & both ckts to be terminated (However, 19 KM/ 0.2 Sq." on 66 KV Jhoke Tehal Singh for 56 KV Bays clarity, scope of work is reworded as:- 19 Km,0.4 Sq.", DC on DC towers, both Ckts' 66 KV S/S to be terminated at 772^34 Jhoke Tehal Singh) b) 2 No. 66 KV Bays (1 no. incoming & 1 no' outgoing at 66 KV S/S Jhoke Tehal Singh)

220 KV Botianwala to Makhu+Khosa Dal Singh 22.72KM| teplace with 22.72KM 0.2 Sq." on Towers 468.94 RP(12)+Tubeler Pole(130)+ACSR 0.1 Sq."

MVA 66 KV Jhariwala AddI. 1X2O 183.00 1x20 MVA.66/11kV repl.6.3/8 MVA, 66/11 KV 66 KV Lambi X12.5 MVA to 129.00 rx72.5+7x6.3 / 8 MVA. 66/11kV MVA replace 8 MVA )6KV slS Khuai Sarwar 1x12.5+1x6.3/8 12.5 to 129.00 MVA.65/11kV MVA to replace 8 MVA 36KV S/S Ratta Tibba 1x6.3/8 MVA, 12.5 129.00 v i6l11kv qddl. 12.5MVA 56KV Karni Khera 1X20 MVA, 1b5,UU 56/11kV i6KV S/S Ghattianwali Jatta 1x6.3/8 MVA, 2.5 MVA to replace 8 MVA r29.00 ;5/11kV a) New 66KV line from 66KV S/S Ladhuke to T-off point for New 66KV line 4kml0.2Sq" SC on DC 66KV S/S Rana on Ladhuka-Fazilka line for giving direct i) 1 no. 66KV bay at 66KV Ladhuka to control supply to 66KV Rana from Ladhuka. 66KV Rana. 133.79 b) 66KV line bays ii) To convert existing 66KV isolator controlled bay with 66KV breaker control at 55KV Rana

66 KV Muktsar to Fattanwala Replace with 13 KM 0.2 Sq." on towers SC on 268.32 13 KM/ 0.125 So." on Ro DC 66 KV Abohar to Khuian Sarvar 13 KM/ 0.1Sq.,, Replace with 13 KM 0.2 Sq." on towers SC on 268.32 on Rp DC 56KV Bay at 66KV Fattanwala Jne No. Bav 54.00 66 KV Ganga-Jeeda line. 8 KM SC on DC line 0.2 Sq." ACSR 2 No.66 KV BaVs 273 12 66 KV Attari \dd1.1x12.5 MVA, 66/11kV 163.00 1x12.5 MVA.66-33/11 KV 66 KV Bajeke 1x20 MVA to repl.2nd 12.5 MVA,66/11kV t47.OO 1x20+1x12.5 MVA. 66/11 KV ;6 KV Matti 2xr2.5 l0 MVA to replace 1X12.5 MVA T/F VIVA,65/11 KV L47.OO >6 KV Chaina Zx7Z.s l0 MVA to replace 1X12.5 MVA T/F \4VA,66/11 KV t47.00

)) 66 KV Jhoke Tehal singh- Guru Har 14.66 Km/o.2sq" SC on DC to repl. 121.50 ;ahai line. )xistinP line. i6 KV Killi NihalSingh Wala-Bhalaiana line. I KM SC/DC line O.2Sq"ACSR. I No. 66 KV Bays 273.72 a) 220 KVS/S Maurto 66 KVJoga Raila, 22.8Km/ 0.725 a) Replacement of 66 KV line from 220 KV S/S Sq."/ SC on SC Maur to 66 KV Joga Ralla with 22.8 Km/ b) 66 KV line Bays 0.2Sq."/ SC on DC. b) Replacement of 7 Kml O.IS Sq."/ SC on SC tower line from T-off point to 66 KV Chowke 7 Km/ O.zSq;'/ DC on DC with L|LO at Chowke 739.43 2 No.--1 No. 66 KV Bay at 66 KV Chowke & another one at 66 KVJoga Ralla (because presently the line is isolator controlled at 66 KV Joga Ralla)

38685.2s

Unforseen expenditure to the tune of Rs.15 crore to 20 crore due to natural calamity etc. might be added in above planned works. some new works might be added in above said planning works and some works may be shifted to next year according to the prevailing loading conditions at that time on the Transmission system. I Name of Work Scope of Work 2021-22

1 66 kv link line from 220 kv S/S lkolaha -- 66 kv S/S 3 KM/0.2 sq."SC on DC Towers tomake ringmain" 165.L2 Shamspur T-Off from lkolaha to Jare Circuit. 2 a) 66Kv line 220 KV G1-FP MGG (i) Stringing for 2nd Ckt. 1.2 KM /0.2Sq. Conductor 149.23 1.t62 Km/0.2 Sq" SC on DC from Focal point upto the point where the ckt. For Tower. M/s Bhawani Castings separates. b) 66kV line bays ii) Replacement of existing DC on DC 66KV line 0.5Km, 0.2 Sq" ACSR from 220KV G-1 upto the point where the ckt. For M/s Bhawani Castings separates, with 3 No. Ckts. of 0.2" ACSR on MCT. 1 no. Bay with breaker control at 66KV S/S Focal Point MGG and another 1 No. bay at 220KV S/s G-l which is

3 a) 66KV S/S Tibba 1x20 MVA, PlTlF 66l]tKV 1365.23 (New) 2"5km 66KV underground XLPE Cable 630 mm2 b) New Proposed 2.5km. 66KV underground XLPE 1 no" 66KV line Bay Cable 530 mm2 tapping/T-off from existing 66KV line from 220KV BBMB Jamalpur to 66KV Nurewal DC on DC line ckt.

4 b) Proposed Multi Ckt link line on MCT 0.2sq. lnch i) Proposed 0.150Km/0.2 Sq.inch I 3 no. Ckts on Multi 35.17 ACSR 0.150KM from 220KV S/S Bhari to 66KV S/S Grain Ckt Towers at starting point of Bhari- Hargana & Market MGG. (1 no" Ckt. For Hargana S/Stn. & 2 no. Grain market line (from 220KY Bhari Slstn.) (1 no. Ckts. For Grain market S/Stn.) Ckt. For Hargana S/Stn. & 2 no. Ckts. For Grain market b) Errection of 3 Nos" 66KV Bays at 220KV S/S Bhari SlStn.) Note;- Errection of 3 Nos. 66KV Bays at 220KV S/S Bhari shall be planned by PSTCL (1nos. For Hargana line at Bhari because it is controlled by isolator & 2 no. 66KV Bays for Grain market ckts at Bhari)

5 66 KV S/Stn. Nurewal Augmentation of 3rd 20MVA with 31.5MVA T/F 199 3x20 MVA + 2x31.5 MVA 65l11KV 66/t7KV 6 a)tJnmanned 66KV S/Stn. Jaladiwal (NEW) 1x6.3/8 MVA, 66/11 KV (OLD) 346.07 b) 66KV line 6KM/0.2 Sq" SC on DC tower line from (1 no. 66KV line bay) 66KV S/S Shahjahanpur to new proposed 66KV S/S New 6KM 0.2 Sq" SC on DC Tower line Jaladiwal. 1 no. new 66KV line bay at 66KV S/S Shahjahanpur rl A6(\/ lina El:rr 7 66 KV Chaurwala(Aug) Addl.3rd 20 MVA, 66lI7Kv 183 2x20 MVA.66 /77 KV 8 66 KV Badali ala Singh Addl.20 MVA,66/11KV 183 1x20 MVA,66/t1-KV 1v?1 5 MVA ) 66 KV Tohra Addl.3rd 20 MVA, 66/LLKV 183 2x20 MVA.66lL7KV 10 66 KV Latala(Aug) Addl. 3rd 20 MVA, 66/11KV 183 2x20 MVA.66l7tKV 11 66 KV Raikot(Aug) 1x31.5MVA, 66lt7KV to repl.1x20 MVA,66/ttKV 199 3x20 MVA.66/1.LKv 1,2 66 KV Miller Ganj(Aug) 1x31.5MVA, 56/11 KV to repl. 199 4x20 MVA.56/11 K V 1x20 MVA.66 /L]-KV 13 66 KV Amaltas Addl. 3rd 20 MVA, 66/L]^KV 183 2x20 MVA.56 /77KV 1,4 66 KV Sidhwan Bet Addl. 3rd 20 MVA, 66/11KV 183 2x2O MVA.56 /77 KV 15 56 KV Rajguru nagar tx31.5MVA, 66/11 KV to 199 2x20 MVA.55 /1-LKV repl. 1x20 MVA.66/11 K V 16 66 KV Maloud 20 MVA to replace 12.5 L47 1X12.5 MVA MVA,66/11 KV 1X?O MVA (>5 \7 a) 66kV line between 220kV S/S G-2 and 66kV S/S 4km/0.2sq" SC on DC towers tr\ Grain Market (Aue.) 4km/0.125sq" 2 No. h166l(\/ lino harrc 18 a) 66KV S/S Focal Point Phase-4 (New) a) Addl. 1x 31.5MVA, 66/11KV 611.65 I b)66KV line from lndra park to 66KV b)1.200KMs10.4Sq." SC on DC 2572Sq.yard. S/S Focal Point Phase-4(New) rll and rnct 19 a) 66KV link line from 66KV Giaspura to 66KV 4Kms/0.4 Sq" U/G 66KV cable 1108 Dholewala Chowk. 2 Nos. hl 66K\l havc 20 66 KV line between 22O KV Jagraon -66 KV Raikot 10km /0.2Sq" SC on DC Tower upto Roomi T-off from 202.5 (upto Roomi T-off from 220 KV Jagraon side.) 220 KV Jagraon side 66 KV line between 22O KV

Jagraon-66KV Raikot . Qonleromoni nf rnndr rrtar nn 1Ol(l\/l / n 1 ,q, q^rr t 27 a) 66Kv Gill Rd.- Basant Park line 2.3 Km/0.4Sq"SC T + (a) 2.3Km/0.4Sq" DC on DCTowers. 375.2 HRP (b) 3.2Kml0.4Sq" DC on DCTowers. b)66KV Basant Park - Dholewal - 3.2 Km/0.2Sq" HRP 4 No.(one each for Gill Rd., one bay & c) 66kV line bays Millarganj, two for Basant Park)

22 i)T-off of 66 KV idle line between 220 KV, Kohara- 0.225Km10.4 sq" SC on DC towers 29.3 220KV SIS Doraha for 66KV S/S Sahnewal 1 No. ii)66 KV line bav 23 a) 66KV line between 220 KV Ferozpur Road - 66KV Stringing for 2nd Ckt. 3.5KM with 0.4 Sq"conductor 90.77

Model Town 3.5Km/0.4q" SC on DC Towers. on the existing DC Towers . hl 661(\/ lino herrc hl 1 tU^c 24 a) 66KV line Between 66KV Nurewal-Prop.66KV Bajra 5.6kM/630Sqmm 66kV Underground XLPE Cable 108 Rd. Meharban New. b) 2 Nos. b) 55KV line bavs 25 T-Off of 66KV Line 0.4Sq" / DCbetween 220KV BBMB 1) 1.730Km/SC 630mm2 U/G 669.41 Jamalpur to 66KV PSIEC Ph-8 for 66KV S/S Chandigarh 2) 0.920km/0.4Sq" SC on Ring Main Towers

Road I rrdhiana . 26 220KV S/S Laltonkalan to 66KV S/S Narangwal the L2km/0.2 Sq." SC on DC Towers to replace existing 247.8 existing conductor of 0.125sq. lnch on rail poles with line. O 7so inrh SC on DC towcrq 27 66 KV Quadian 20 MVAto repl.12.5MVA 147 1x20 KV 66/11 KV 66/LLKV 1v1? E t\/\/A 66/1 1 r\/ 28 66KV Jaura Chittran 20MVA to repl 12.5MVA, 747 7xL6120 KV 66/11 KV 66ltLKV 1v1) \ MVA 66l1 1 KV 29 66KV Pringri (Aug.) Addl.12.s MVA 66/11 KV 163 1x20MVA 65/11KV 30 56KV Gande ke choune 20MVA to repl 12.5MVA, 147 1x12.5 MVA 55h1 KV 55h1KV 31 66KV Ranger Nangal 12.5 MVA to repl 6.3/ 8 MVA 150 tx6.3l8 MVA,66/11KV 66177KV 1vA ?19 t\/t\/A 6611 1 t(\/ 32 66 KV Brahampura 20 MVAto repl.6.3/8MVA 147 1x12.5 MVA 66117KV 66/77KV 1X6 ?IR MVA 66/1 1 KV 33 66 KV Sur Singh Wala Addl.12.5 MVA 66/11 KV 163 1x20 KV 66/11 KV 1v?O I\,rt\/A RG111 K\t 34 36 KV Kacha Pacca Addl.12.s MVA 66/11 KV 163 2x20 MVA 65/11 KV 35 56 KV Naushera Pannuan Addl.12.s MV3 66/11 KV 163 2x20MVA.66/1-1KV 36 66KV S/S Saidpur 20MVA to repl 12.5MVA 747 2x12"5 MVA 66h1 KV 66/11 KV 37 66 KV Tarsika Addl,12.s MVA 66/11 KV 163 )v)iK\l 6R111 K\l 38 66 KV Udhanwal 20 MVAto repl.12.5MVA 147 1x20 KV 66/ttKV 66/t!KV 1v1 ? ( l\rl\/A F'A111 K\l 39 66KV Bagga Kallan (AUG) 1x20 MVA, 66/11 KV to repl. I 147 1x10/12.5MVA.66/11KV tx]0/12.5 66h1Kv 56 KV Harchowal Lx20 MVA, 66111 KV to repl. 747 1x10/12.5MVA,66/11KV LxLOlL2.5 66/11Kv 1x20 KV 66/11 KV 66 KV Sarhali (AUG) 1x20 MVA, to repl. L4V LxL}lt2.5 MVA, 66/11KV 1xL2"5 66/11KV 1x12.5 MVA,66/11KV 1vR ?19 t\/t\/a 6611 1K\l 42 66 KV Sabraon 20 MVAto repl.12.5MVA L47 1x20 KV 66/11 KV 66/11 KV 1x12 5 MVA 66/11 KV 43 66 KV Bandala 20 MVA to repl.L2.5 MVA L47 2x12.5 MVA 66h1 KV 66/11 KV 44 66 KV Buche Nangal (Aug.) 20MVA to rep.12.5MVA t47 'r x12 SMVA 56/11KV 65/11 KV 45 66 KV Harike (Aug.) 31.5MVA to rep.20MVA 199 2x20 KV 55/11 KV 65/11 KV 46 66 KV Jastarwal 20MVA to repl. t47 lx10112.5MVA,66/11KV 10/12.5MVA 66/11 KV 1x20 KV 55/11 KV +7 66KV Ajjowal(Aug.) 20 MVA, 66/11 KV to repl. 747 1x12,5MVA,66/11KV 12.5 66ltLKV +8 66KV S/S Daroli Kalan 20 MVA to repl 12.5 MVA 66/11 KV 147 2x1.2.5 MVA 66/11 KV 49 66KV Kot Fatuhi 20 MVA to replace12.s MVA L47 1x20 KV 66/11 KV 66/11 KV 1x12.5 MVA 66/11 KV 50 66KV S/S Kandhala Jattan Addl 12.5MVA,66/11 KV 153 1x20 KV 66/11 KV 51 66 KV Nadala (Aug.) 20MVA to repl. L47 tx!2.5 MVA 66/11 KV 12.5MVA,66/11 KV 7x7O/L2.5 MVA 66/11KV 52 66KV Bheen (Aug.) 20MVA to rep. 147 1x12.5MVA 6611LKV 12.sMVA.66/11KV 53 56 KV Chougittee (Aug.) 20MVA to rep. 147 1x20 KV 66/11 KV 12.sMVA,66/11 KV 1w1f ( t\/t\/A F.F.11'l K\l L47 5A 66 KV Patara (Aug.) 20MVA to rep. 1x20 KV 66lLIKV 12.5MVA,66/11 KV 1x12.5 MVA 66/11 KV i5 a) Kizrabad- Majra 8 KM / 0"2 Sq" ACSR 241.26 hl 7 No. 56 KV Bavs. 56 a) Kizrabad- Parkhali 5 KM / 0.2 Sq" ACSR t40.48 b) 1 No. 66 KV Bavs. 191.1 57 a) Ghulal - Bhaini Sahib 7.5 KM / 0.2 Sq" ACSR b) 1 No. 66 KV Bavs. 58 a) Behlolpur-Hedon Bet 8 KM I 0.2 Sq" ACSR 240.46 hl 7 No.65 KV Bavs. 59 a) Dhakoli- Bhabhat t7 KM 1 0.2 Sq" ACSR 422"71 b) 2 No. 66 KV Bavs. 60 a) Herokalan- Cheema 5KM / 0.2 Sq" ACSR t79"77 b) 2 No. 66 KV Bavs. 729.17 31 220Kv Handiaya - Tapa Stringing of 2nd Circuit (O.!2 sq" /L4 KM) on DC . O.2 sq" / t4 Towers KM' SC on DC 62 132 KV Ropar - Purkhali Replacement of existing rail pole line with SC on DC 243 0.1 so" / 12 (0.2 so" / 12 KM) I 63 New 66KV Grid Sub-Station for Rajindra Hospital, 1x20 MVA, 66/LLKV (entitled for PSPCL) 7084.75 Patiala on co-sharing basis with PSPCL 7x70/12.5 MVA, 66/11KV (entitled for Rajindra New 66KV Line from 66KV S/Stn Shakti Vihar to new Ho;pital) 66KV Grid Rajindra Hospital a) overhead 66KV line of 400mtr/ 0.2 Sq.inch ACSR SC on DC b) 1373 meters 66KV U/G Cable of 240mm2 c) 2 Nos. 66KV Line Bays ( 1 no. bay will be constructed at 66KV Grid S/S Shakti Vihar and 1 no. bay will be constructed at new proposed 66 KV Grid S/S Rajindra

64 New 66 KV Link between 65 KV Grid Nurpur Bedi to 66 t6km/O.2 sq"/SC on DC 408.7 KV Grid Bhaddi 1 No. l/C 66 KV Line Bay (with 66 KV Circuit Breaker) at 66 KV Grid Nurpur Bedi and 1 No. O/G 66 KV Line Bay (with 66 KV Circuit Breaker) at 66 KV Grid Bhaddi.

65 a) 66 KV S/Sttn. Narru (6E!) (New) (including 1 7X72.5 MVA, 66/11 297.6 No" 66 KV line bay with isolators only at new 66 KV 2.5 KM/0.2 Sq" SC on DC Towers S/Stn. Narru (BoV{) b) T-off existing 66 KV line from 22O KV S/Stn. Bhateri to 66 KV S/Stn. Old Rajpura for new 66 KV S/Stn. Narru / Frn\/Il 66 a) 66 KV New Focal Point Nabha Grid S/Stn. Of pSpCL a) 1X20 MVA, 66/11 KV T/F 3s1..23 inside PSIEC, Nabha (including 1 No. 66 KV line Bay b) 1 No. with 66 KV Circuit Breaker at this new 66 KV Grid) c) Shifting of existing 66 KV line Nabha-Hiana Kalan 80 b) Additional 66 KV line Bay along with 66 KV Circuit meters/O.2sq", SC on DC (A to C) to 115 Breakers for making for making LILO arrangement at meters/O.2sq" SC on DC (lncluding erection of 4 Nos. this new proposed 66 KV Grid 66 KV DC Towers) (A-B-C) (nomenclature of points A, c) Shiting of existing 66 KV line Nabha-Hiana Kalan to B and C as specified in the vetted sketch sent by SE/TL provide LILO arrangement for "proposed 66 KV Grid Circle, PSPCL, Patiala vide their office endst. no. New Focal Point Nabha of PSPCL inside PSIEC, Nabha" 634 /TLW -L27 dated 13.02.2019)

37 66 KV S/Stn. Jadiali (1X12.5 MVA, 66/!tKV TIF) 1X20 MVA, 66/71KV T/F to replace 1,47 LXL2.5 MVA, 66/11 KV 58 a) Unmanned 66 KV S/Sttn. Matoli (New) LX6.3/8 MVA,66/11 220.64 (including 1 No. 66 KV line bay with isolators only at t KM/0.2 Sq" SC on DC Towers new 66 KV S/Stn. Matoli) b) T-off existing 66 KV line from 22O KV Slstn.Patran to 66 KV S/Stn. Shergarh(Khanouri) for new 66KV S/Stn. I\Irfnli /llnm:nnadl 69 a) 66KV Passiana - Sanaur line a) New 66KV SC on DC / 0.2 sq" / 1km line ( from 406 0.125 sq" /HRP/ L km ( from 220KV S/Stn. Passiana 220KV S/Stn. Passiana upto TL. No. 210) upto TL No. 210) +

+ 0.1 sq" /SC on SC / 9.5 KM ( from TL no. 210 upto TL 7.5 km /0.2sq" 1 SC on Dc to replace the existing 66KV no. 251) line ( from TL no. 210 upto TL no. 235 + from TL no. 66KV line bay 243 to TL no. 251) + b) 2 Km f 0.2sq" ( SC on Multi-Circuit Towers with DC Configuration) to replace the existing 66KV line in wild life sanctuary from TL - 235 to TL - 2431 1 No. 66KV line bay ( at 220KV S/Stn. Passiana)

70 66 KV S/Stn Banarsi 20 MVA to repl 6.3/8 MVA ,66lLt KV. 150 (1x72.5 MVA + 1x6.3/8 MVA .66/11 KV) 77 66 KV S/Stn Badhour (Aug) Addl 20 MVA,66/11 KV 183 1x20 MVA + 1x31.5 MVA. 66/11 KV 72 66 KV S/Stn Manvi (Aug) Addl 12.5 MVA,66/11 KV 163 1x20 MVA.66/11 KV 73 KV 65 S/Stn Dugal Addl 12.5 MVA, 66/11 KV T/F . 163 (1 x 12.5 MVA, 66/11 KV) 74 66 KV S/Stn Sarajpur Addl 12.5 MVA, 66/11 KV 163 I L x 20 MVA. 55/11 KV) 75 66 KV S/Stn Kup-Kalan (Aug) 20 MVA to repl 12.5 MVA, 66/11 KV 147 1x1,2"5+1,x2O MVA. 66/11 KV * 76 66 KV S/Stn Banboura (Aug) 20 MVA,66/L1 KV to repl 12.5 MVA,66/11 KV 747 tx12.5+ 1x20 MVA, 66/L! KV l7 56 KV Chananwal Addl 12.5 MVA,66/11KV 163 11x 20 MVA. 65/11 KV) 78 56 KV S/Stn Lang 20 MVA to repl 12.5 MVA, 66/11 KV 747 (1x20 MVA + 7x12.5 MVA .66/11 KV 79 66 KV S/Stn Kuthala ( 1 x 20 MVA + 1x 12.5 MVA, 20 MVA to repl 12.5 MVA, 66/!t KV r/f 147 66/11 KV) 80 66 KV S/Stn Guara (1 x 20 qddl 12.s MVA,66/11KV 163 MVA.66/11KV) 8L 66 KV S/Stn Bhunerheri ( t x 20 20 MVA to repl 12,5 MVA, 66lLt KV TIF 747 MVA + 7x !2.5 MVA, 66/11 KV) 82 66 KV S/Stn Bakhopir (2x20 Addl 12.s MVA, 66/1,1KV 163 MVA.65/11 KV) 83 66 KV S/Stn Dhaula ( 1 x 20 20 MVA to repl 12.5 MVA, 66l7tKV TIF L47 MVA + 1x 12.5 MVA. 66/11 KV) 84 66 KV Slstn Sukhpura ( t_ x 20 20 MVA to repl 12.5 MVA, 66/L1,KV T/F L47 MVA + txt2.5 MVA, 66/11 KV) 85 66 KV S/Stn Pakhon ( 1 x 20 20 MVA to repl 12.5 MVA, 66/71 KV T lr L47 MVA + \x 72.5 MVA. 66/11 l(v) 86 66 KV S/Stn Achal ( 1x 12.5 Addl 12.s MVA,66/11 KV 163 MVA.66/11KV) 87 66 KV S/Stn Boormajra (!x2O 20 MVA to repl 12.5 MVA, 66/LLKV TIF 147 MVA + tx 12.5 MVA, 66/11 KV) 88 66 KV S/Stn Satoj (1x 12.5 Addl 12.5 MVA, 66/11KV 163 MVA.65/11KV) 39 66 KV S/Stn Nagra (2x20 Addl 12.s MVA,66/11 KV 163 MVA.66/11 KV) l0 66 KV S/Stn Amargarh (2x20 Addl 20 MVA,66111 KV 183 MVA,66/11KV) 1, 66 KV S/Stn Bhattiwal (1 x 20 Addl 12.5 MVA,66/11KV 163 MVA.65/11KV) )2 66 KV S/Stn Bhunarheri (Aug) Ix 70 I 12.5 20 MVA, 66ltt KV to replace 12.5 MVA, 66lLL KV L47 MVA +1x 1,6 / 20 MVA. 66/11 KV )3 66 KV S/Stn Dakala 2 x 20 MVA. 66/7! KV AddI 20 MVA, 66/11 KV T/F 183 )4 66 KV S/Stn Bhadurgarh (Aug) 2x20 MVA, 66/11 KV Addl 20 MVA,66/11 KV 183

)5 66 KV S/Stn Gajewas (Aug) 1x12.5+1x20 MVA, 66/11 20 MVA to repl 12.5 MVA 147 KV )6 66 KV Model Town Sheron 20 MVA to be replace L2.5 MVA, 66/11 KV L47 0 x 12.5 MVA. 66/11 KV) 97 66 KV S/Stn Sehna Addl 20 MVA, 66/11 KV T/F 183 (1 x 20 MVA. 66/11 KV) 98 66 KV S/Stn Bhasour 20 MVA to repl 12.5 MVA, 66/11 KV 147 Qxt2.5 MVA.66/11KV) 99 66 KV S/Stn Guara Addl 20 MVA,66/11 KV 183 (1, x 20 MVA. 66/11 KV) 100 66 KV'Ialwandi 20 MVA to be replace 12.5 MVA, 66/11 KV t47 /1xL2.5 MVA.66/11KV) 101 66 KV S/Stn Hiana Kalan (Aug) Addl 12.5 MVA, 66/11KV 163 1x20 MVA. 66177KV to2 66 KV S/Stn Maggar Sahib (Aug) 20 MVA to repl 12.5 MVA L47 1x20 MVA + tx\2.5 MVA. 55h1 KV 103 66 KV S/Stn Rohar Jagir Addl 20 MVA,66/11 KV 183 (2x20 MVA.66/11KV) 104 66 KV S/Stn Raidharana 20 MVA to be replace 12.5 MVA, 66lttKV 147 ( 1 x 20 MVA. + 7 x L2.5 MVA. 56/11 KV) 105 66 KV S/Stn Bahmna 20 MVA tdbe replace 12.5 MVA, 66/11 KV 147 ( 7 x 2O MVA + 7 x 72.5 MVA. 55/11 KV) 106 66 KV S/Stn Behlolpur Addl 12.s MVA,66/11 KV 163 (1x 20 MVA. 65/11 KV) r07 66 KV S/Stn Kurali 20 MVA to repl planned 12.5 MVA, 66l7tKV 470 (2x20 MVA, 66/11 KV) Addl 12.5 MVA, 66/11 KV 6t {rivil and olortriralc elmnct rnmnloted 108 66 KV S/Stn Khamano Addl 12.5 MVA,66/11 KV 163 (2x20 MVA,66111KV) 109 66 KV S/Stn Shatrana Addl 20 MVA,66/11 KV 183 Qx20 MVA.66/11KV) 110 66 KV S/Stn Ghamoorghat Addl 12.5 MVA,66/11 KV 163 (1x 20 MVA. 66h1 KV) L77 66 KV Bakshiwala Addl 12.5 MVA,66/11 KV 163 ftx20 MVA. 66/11 KV) t72 220Kv Malerkotla - Guara-Amargarh-Manvi O.2 sq" f Stringing of 2nd Circuit (0.2 sq"/5.5 KM) on DC Towers 35.31 5.5 KM; SC on DC 113 66 KV Kharar - Banur Line 66 KV Underground Cable 240 sq. mm; 20.7 100 metres for PSPCL 774 a) 66KV Chaurwala-Sarai Banjara line. 12 KM SC/DC line 243 b) 2 Nos. 66KV bavs. 0.2So"ACSR. 115 a) 66KV Sumandgarh-Gehlan line. 15 KM SC/DC line 303.75 b) 2 Nos.66KV bavs. O.2So"ACSR- 116 a) 66KV Nadampur-Bharon line. 9.2 KM SC/DC line 186.3 b) 2 Nos. 66KV bavs. 0.2So"ACSR. 1.17 a) 66KV Gujran-Dyalgarh line. 13 KM SC / DC line 377.25 b) 2 Nos. 66KV bavs" 0.2So"ACSR. 118 a) 66KV Dhaipai-Satauj line. 4.5 KM SC / DC line 199.2s b) 2 Nos. 66KV Lravs. l.2Sq"ACSR. 119 220 KV Bhateri - 66 KV Naushera 20.4 KM SC/DC 0.2 sq" ACSR using right of way of 413.1 (T-off at tower no. 76 D) existing 66 KV line (SC/SC towers, 0.1 sq" and 0.2 sq" conductor) 120 220KV Dhanaula - Dhadrian 0.2 sq" / !7.2 Stringing of 2nd Circuit (O.2 sq" /!7 .2 KM) on DC 770.424 KM: SC on DC Towers L21 a) T-Off of 66 KV jodhpur pakhar- 0.9 Km/0.2Sq" on DC towers 13.31 HPCL Refinery Raman line at 1. no.Bay 220KV Talwandisabo b) DC tower at the crossing of lnr{hnr rr Qofinarrr P, AA V\l lraa Dam Tirr+h 1,22 220KV Bajakhana-Jeeda 66 KV line fo repl. existing line with 10Km/0.2Sq" 202.50 10Km/0.125So" on HRP on Dc towers 1,23 a) 220KV Mastewala - 66 KV Zira line a_i)1.1Km/0.2Sq"on MultiCkt.Towers 267.50 b) 220 KV S/S Bottianwala -66 KV from TL 61 to 67 at 66KV S/SZira Zira line (stringing & dismantlement) end by using existing ROW of c) 66 KV bays 220KV Botianwala-66KV Zira Line. ii) Remaining portion of 7Km /0.2Sq" SC on DC towers from 220KV S/S Mastewal end. b) i)Stringing of 1.1Kml.2Sq"/ SC on multi Ckt. towers ii) Dismantlement of 1.5Km/o.1Sq" HRp of existing 7Km l0.1Sq" HRP line from 66KV S/S Zira end. 2 Nos. from TL 61 to 67 at 66KV S/S Zira end by using existing ROW of 220KV Botianwala-66KV Zira Line. ii) Remaining portion of 7Km fO.2Sq" SC on DC towers from 220KV S/S Mastewal end. b) i)Stringing of 1.1Km/.2Sq"/ SC on multi Ckt. towers ii) Dismantleme'nt of 1.5Km/O.1Sq" HRp of existin! 7Km /0.1Sq" HRP line from 65KV S/S Zira end. 724 a) 66 KV Danewala (New) 1x 12.5 MVA, 66/11 KV 377.99 b) T-off of 132 KV Malout-33 KV 3 Kml O.ZSq." SC on DC toweis Abul Khurana on 66 KV SC on Tower for 66 KV Danpwala 125 New 66 KV link from 66 KV Jhanduke to 66KV Ghaso- 7 KM SC on DC line 0.2 Sq." ACSR. 222.94 khanna, 2 No.66 KV Bays one on each side. * 65 KV line Bavs 126 New 66 KV link from GHTP up to T-off point of 66 KV 3.5 KM SC on DC line 0.2 Sq." ACSR. x_77"47 Balaianwali--Jhanduke line 1 No" 65 KV Bay at 220 KV GHTF 65 KV line Bavs 727 a) LILO of 56 KV line emanating from 132 KV 100 Ckt meters, 0.2 Sq.", DC on DC line for creation of 53.95 Kotakpura-l to 66 KV S/S Talwandi Road Faridkot at 66 LILO of 66 KV line emanating from 132 KV Kotakpura-l kV Baba Sheikh Farid. to 66 KV S/S Talwandi Road at 66 KV S/S Baba Sheikh b) 66 KV Line Bays Farid. 1 No. new 66KV line bay at 66KV S/S Baba Sheikh Farid 1 No. bay at 66KV S/S Baba Sheikh Farid to make

t28 a) 66 KV link from 220KV Badal to 66 KV S/S Nandgarh Augmentation of existing 8.5Km 0.15sq" conductor to 310"42 Gudda 0.15 sq"/SC on SC/T 0.4 sq" conductor SC on DC. b) 56 KV Bavs Fxisting 65KV havs will hp rrsp.l t29 66 KV line from 132KV Muktsar to 66KV 15Km/O.2sq" SC on DC 309"60 LuLrianwali/1sKmlo-1so"lRP 130 66 KV line from 220KV Abohar to 66KV Sito Gunno via L7+t5Kml0.2sq" SC on DC 660.48 Amar our a I 32Km /0" lso "lRP 131 tine from l.32KV IGC to 66KV Kotshamirl SC on DC L79"57 \66KV \8.7Km/0.2sq,' i8.7Km/0.15 so"/RP I 1,32 a) New proposed 66KV S/S Ajit Nagar, behind new 1x20 MVA, 66lLLKV 353^80 grain Market, Abohar. lncluding 1 No. incoming 66KV bay with isolator (without 66KV Breaker) b) Cost of land c) Tentative proportionate cowst of 3.5KM backup line to be refunded to MES

133 66 KV Bhikhi 20 MVA to replace 12.5 MVA t47 "00 txt2.5 MVA, 56/11 KV 1x20 MVA. 66/71KV 1,34 66 KV Nangla Jorkian 1X20 MVA PTF to replace 1X12.5 MVA, 66/11kV 747.00 Lxtl/72.5 MVA, 66/11 KV 135 66 KV Ch. Budho ke qddl.L2.5 MVA,66/11kV 163.00 1x20 MVA.66l1,].Kv 136 66 KV Burj Dhilwan 20 MVA to replace L2.5MVA 1.47.00 2x72.5 MVA. 66/11 KV 137 66 KV Jhoke Hari Har 20 MVA to replace 12.5 MVA L47.OO 2xt2.5 MVA. 66/11 KV 138 66 KV Doda 12.5 MVA to replace 8 MVA 129.00 7x6.3/8 MVA.55h1KV 139 66 KV Fatta Khera Addl.12.s MVA,66111kV 163.00 1x12.5 MVA.66111KV 740 66 KV TAHLIAN Addl 1x12.5 MVA 163.00 1X20 MVA. 66/77KV 141. 66 KV Killi NihalSingh Wala 20 MVA to replace 12.5 MVA L47.00 7X12.5 MVA, 66/11 KV 142 66KV SIS Bhai K Kera 12.5 MVA to replace 8 MVA 129.00 1X6.3/8 MVA.65/11 KV 143 66 KV Sikhwala 20 MVA to replace 12.5 MVA 747.00 7X72.5 MVA. 66/11 KV 744 66 KV Jeond Addl1x12.s MVA 163.00 1X12.5 MVA.66/11 KV 745 66 KV Bheetiwala 12.5 MVA to replace 8 MVA r-29.00 1X6.318 MVA,66/11 KV 1X10i/12.s MVA 66/11 KV 146 66 KV RAIPUR Addl 1x12.5 MVA 163"00 txt0/12.5 MVA. 66/11 KV 147 66 KV SIS JANER Addl 1x12:5 MVA 153.00 1X12.5 MVA.66/11 KV 1,48 66 KV Mansa (aug) 3rd Addl. 20MVA,66/11kV 183.00 2x20 MVA-55/77KV 749 66 KV Chak Ali sher Addl. 12.5 MVA,66l11kv 163.00 1x20 MVA.56 /17KV 150 66 KV Dhan Singh Khanna Lx20 MVA, Addl 20 MVA, 66l11kv 183.00 66/11 KV 6S 151 66 KV Dyalpura Bhaika 1x20 MVA, qddl.12,s MVA,66/11kV 163.00 66/11 KV 752 66 KV Kulryian 2l MVA to replace 12.5MVA L47.00 1x12.5 MVA,66/11 KV 1x20 MVA, 66/11 KV 153 66 KVAklia Kalan txt2.5 20 MVA to replace 12.5 MVA 147.00 MVA,66111 KV 154 66 KV Bhadra 2x12.5 20 MVA to replace 1X12.5 MVA T/F 747 "OO MVA, 66/11 KV 155 66 KV Chouganwan Addt.12.s MVA,66/11kV 163.00 1x20 MVA.66/11 KV 156 66 KV Charik 2x20 31.5 MVA to replace 20 MVA 199.00 MVA,65111KV 1,57 66 KV Fatehgarh Korotana 20 MVA to replace 8 MVA 1s0.00 1x6.3/8MVA. 66/11KV 158 66 KV Kaler ].xt2.5 20 MVA to replace 12.5 MVA 747.00 MVA.66/11KV 1s9 66 KV Deep Singh Wala tx2O Addl. 1x20 MVA, 66/11kV 183.00 MVA,66/11 KV 160 66 KV Zira gate 20 MVA to repl. 12.5MVA,66/11kV 147.00 1X1,2.s MVA, 66/11 KV 1X2O MVA. 66111 KV 161 66 KV S/S Dhandi Kadim IxL2.S 20 MVA to replace 12.5 MVA 150.00 MVA,66/11KV 1x20 MVA,66/11 KV LOt 66 KV Fatehgarh Sabraon 1x20 MVA, Addl.12.5 MVA,66/11kV 163.00 66/11 KV 163 66 KV Midda qddl.12.5 MVA,66/11kV 163.00 1x12.5 MVA.66/1,rKv 764 66 KV Kot Bhai 1x12.5 20 MVA to replace 12.5 MVA 747.0O MVA,56/11KV 165 66 KV Dabwali (Killianwali) 1x6.3/8 20 MVA to replace 6.3/8 MVA 150.00 MVA,66/11 KV 1x12.5 MVA,66/11 KV 166 66 KV Rupana LX20 Addl.12.5 MVA,66/11kV 163.00 MVA,66/11KV t67 66 KV Lubianwali txL2.5 20 MVA to replace 12.5 MVA 147.00 MVA,66/11 KV 1x20 MVA,66/11 KV

168 56 KV Phulewala !x6.3/8 12.5 MVA to replace 6.3/8 MVA 129.00 N4VA.66/11 KV 169 t6 KV S/S Kot Mohammad Khan 1X20 MVA PTF to replace 1X12.5 MVA PTF 147.00 770 66 KV Maluka Addl.12.5MV A,661:-LkV 163.00 1x12.5 MVA.66/11 KV 1,71 66 KV Ghasokhana Addl.12.s MVA,66/11kV 163.00 1x12.5 MVA.6611,1, Kv 772 66 KV Boha 1x20 MVA, Addl.12.s MVA,66/11kV 153.00 66/11 KV t73 66 KV Dhana Sheed Addl.12.5 MVA,66/11kV 163.00 1x20 MVA.66 177 Kv t74 66 KV Kishangarh 20 MVA to replace 12.5 MVA 747.00 1xt0l12.s MVA. 66/11 KV 77s 66 KV Baba Sheikh Farid {FDK) 20 MVA to replace 12.5 MVA t47.00 txt2.5 MVA. 66/11 KV t76 56 KV Datewas Addl 1X12.5 MVA 163.00 rx20 MVA. 66/t7KV 777 66KV S/S Ladhuka 31,5 MVA to replace 16/20 MVA 199.00 LX76l20 MVA, 66/11 KV 7X)\/?1.5 MVA 6611't Kv L78 66 KV PATTO HIRA SINGH 31.5 MVA to replace 20 MVA 199.00 1X31.5 MVA, 66/11KV 1X2O MVA. 66/11 KV 779 66 KV RAMAN 20 MVA to replace 1X12.5 MVA L47.O0 2X12.5 MVA. 66h1 KV 180 66 KV S/S DAULATPURA Addl 1X12.s MVA 6, 163.00 1X2O MVA.66/11 KV 181 66KV Jhoke Tehal Singh 20 MVA to replace 1X12.5 MVA M7.OA 2X70/L2.5 MVA. 66/11 KV 1"82 66 KV KOT ISSE KHAN 31.5 MVA to replace 20 MVA 199.00 2X2O MVA,66/11 KV 183 66KV Hamad 20 MVA to replace L0lt2.5 MVA 1.47.00 lXtO/12.5 MVA. 66/11 KV t84 66 KV Jaga Ram Tirth 20 MVA to replace 10/12.5 MVA 747.OO 7X12.5 MVA, 56/11 KV 185 56 KV Chak Fateh Singh Wala 20 MVA to replace 12.5 MVA L47.00 2x12.5 MVA. 66/11 KV 186 66 KV Nandgarh-Ghudda 12.5 MVA to replace 8 MVA 129.O 1X6.3/8 MVA, 66/11 KV 1X125 MVA. 65/11 KV 1,87 66 KV S/S AMMIWALA 20 MVA to replace 10/12.5 MVA 147 "00 1x72.5 MVA, 66/11 KV 7X70/12.5 MVA. 66/11 Kv 188 66 KV Raoke 20 MVA to replace 12.5 MVA L47.00 1X12.s MVA, 66/11 KV 189 66 KV Lakhewali 20 MVA to replace 12.5 MVA 147 "40 1X72.5 MVA. 66/11 KV 190 66 KV JOGA RALLA 20 MVA to replace 12.5 MVA 147.00 1X2O MVA, 66/7tKV tx12.5 MVA. 66/11 KV 1"91 66 KV SARDULGARH 31.5 MVA to replace 20 MVA 199.00 2X2O MVA. 66/]-LKV 792 66KV Mallanwala 20 MVA to replace 12.5 MVA 747.00 1Xt2.5 MVA, 66/11 KV 1X20 MVA. 66/77KV 193 66KV S/S PanjeKe 20 MVA to replace 12.5 MVA L47.00 1X12.5 MVA.66/11 KV L94 66 KV JHANDUKE AddI 1X2O MVA 183.00 1X20 MVA.66/11 KV 195 66KV Mamdot 31.5 MVA to replace 20 MVA 199.00 1X25131.5 MVA, 66/11 KV 1X20 MVA. 66/77KV 38524.75

Note:- 1" Unforseen expenditure to the tune of Rs.15 crore to 20 crore due to natural calamity etc. might be added in above planned works.

2. some new works might be added in above said planning works and some works may be shifted to next year according to the prevailing loading conditions at that time on the Transmission system. Sr.no.

Name of Work Scope of Work 2022-23

1 a) 56KV Nawan Pind--- 10 KM/O.2Sq"ACSR./ 284.86 FocalPoint, Mehta Road, Vallah Link line SC on DC towers link line b) 56KV bavs. 2 no.s. a a) 66KV Line from 15.270Km /0.2Sq"ACSR,/ SC on DC towers line to 354.4 220 kv Khassa--66KV Sarai replace existing Rail Pole Line Amanat Khan (NEW) 1no.66KV Sarai Amanat Khan b) 66KV Bays Note:- 1 nos.66kv bay at 220KV S/Stn,Khassa shall be planned by PSTCL 3 66KV Kalanour 31.5 MVA to repl 20MVA 199 7xt6l20 KV 66/11 KV 66lLtKV 1x 20 MVA 65/LIKV 4 a) 66KV Line from 66KV Panj Graian -- 65KV 10Km / 0.2Sq" SC on DC towers 284.86 Udhanwal(NEW) line to replace existing b) 66KV Bays Rail Pole Line )na 5 a) 66KV Line from 66kv Barahampura to a) 8Km /DC on DC line 0.2Sq" 130.94 66KV N/Pannuan (NEW) ACSR Stringing of 2nd Ckt on b) 66KV Bays existing line )na 6 a) 66KV Khadoor Sahib to Nagoke Link line. (NEW) lKM I O.2 Sq"ACSR./ SC on DC towers link line 202"3 b) 66KV bays. 2 nos.

7 66 KV Guruwali (Gillwali) ADDL 12.5MVA, 163 1x20 KV 66117 Kv 56/tLKV 8 66KV S/S S.Patti 20MVA to repl.12.5MVA 747 1x12.5 MVA 66/11 KV 66/11 KV 9 66KV S/S S.Kala Afghana 20MVA to repl.12.5MVA !47 2x12.5 MVA 66/11 KV 66/11 KV 10 a) 66KV Line from 22O KV Wadala Granthian -- 7.779 Km / 0.2 Sq" Aug. of ACSR. on existing 90.26 66 KV Gande Ke Chone (Aug) SC on DC line b) 66 KV Bays Ino.

11 66 KV Mukerian 20 MVA to repl.12.5MVA 66/11 KV 747 1x20 KV 66lLtKV 1x17.5 MVA 66111 Kv L2 66 KV S/Stn.Panshta qddl 20 MVA, 66/11 KV 183 1x20 MVA 66/71.Kv 13 66KV 5/S Chara Mandi 31.5MVA to repl 20MVA 199 2x20MVA 66/11 KV 66lLtKV 74 66 KV Chitti Addl.12.5 MVA 66/11 KV 163 2x20 KV 66/11 KV 15 66 KV 20 MVA to repl.12.5 MVA, 1"47 Lx20 KV 66/11 KV 66/11 KV 1xl75MVA56l'1 1KV L6 66 KV Ucha 20 MVA to replace 6.3/ 8 MVA 150 1"x12.5 MVA 66/11 KV 66/11 KV 1x6.3/8 MVA 66/1 1 KV t7 66 KV Kala Sangian 20MVA to replace 12.5 MVA, 147 1x20 KV 56/11 KV 66ltLKV 1vl ? s t\rt\/A 6'F'/11 K\t 18 66 KV S&SC, JLD (Aug.) 2nd 31.5 MVA to repl. 199 2x20 MVA 66/11 KV 20 MVA,66/11.KV 1v?l ( N/l\/A 6,F'111 K\l 1.9 66KV Sadhu Ashram (Aug.) Addl 12.5 MVA 66/11" KV 163 2x20 KV 66111KV 20 66KV Bullath (Aug.) lst 20MVA to rep.10/ 12.5MVA 1,47 2x10l12.5MVA 66/11KV 56/\\KV 1 66KV Mehrajwala (Aug.) Addl.12.s MVA 66/11 KV 163 1x20 MVA 66/11KV z2 66KV Allewali (Aug.) 20 MVA to repl. L47 2x12.5 MVA 65/11 KV 12.5 MVA.66/11KV PZ 23 66KV Begowal (Aug.) 20 MVA to repl. 747 2x12.5MVA.6 6/71.KV 12.5MVA.66/11 KV 24 66KV Gugh (Aug.) 12.5MVA to rep. 147 1x6.3/8MVA 66/11KV 6.3/8MVA,66 ltt KV 25 65KV Bilga (Aug.) 20MVA to rep. L47 1x20 KV 66/L7Kv 12.5MVA,66/11KV 1x12 5 MVA 66/11 Kv 26 66KV Chowk Bajaj (Aug.) 20MVA to rep" 747 1xL2.5, MVA 66/11 KV 12.5MVA,66/1r, KV 27 66KV Aur (Aug.) 20MVA to rep, 147 1x20 KV 66/11 KV 12.5MVA,66/11KV 1v1 ? E I\/l\/A ARl11 K\l 28 66KV Muthada (Aug.) 20MVA to rep. 147 1x10/12.5MVA 66/11KV 10/12.sMVA,66/11 KV 1x12.5MVA 66/11KV 29 65 KV Lachowal (AuC.) 12,5 MVA to rep. t47 1x6.3/8MVA 66lLLKV 6.3/ 8 MVA.66/11 KV 30 66,.KV Pa.ndori (Aug,) 20MVA to rep. r47 1x12.5MVA 66/11KV 12.5MVA.66/11KV 31 56 KV Leater Complex (Aug.) 25131.5MVA to rep. 199 1x20MVA 66/11KV 2OMVA 66/11 KV 32 56KV line from MPH Stage-ll to 9 KM/ 0.2sq" SC on DC towers 158.85 66KV S/Stn Dasuva t3 a)66KV Line from 33KV Banga Road-- 2.4 Km/ SC on DC line 0.2 Sq"ACSR. 49.536 33KV HSP Road Phgwara (NEW) ( To rep Rail pole line) 34 a) 55KV Line from 220KV Goraya -- 66KV Apran Aug. ofACSR.9Km /0.1sq" to 0.2Sq" on exist. SC 59.04 (Aus) on DC line. 35 a)66KV line from 132KVNawanshar- Stringing of one ckt 11.5 Km/ DC on DC line 75.44 56KVGa rsha n kar(Aue) 0.2 Sq"ACSR. 36 66KV S/S Kot Sadiq Addl 20 MVA 56/11 KV 183 1x31.5MVA 66/11 KV 37 a)66KV Line from Kotla Jangan--Sahkot line LILO at 0.4 Kmll.2 Sq"ACSR DC on DC towers line 60.99 66KV S/S Malsian (New) 1 nos. at malsian b) 66KV bays. Note:- 1 nos 56 KV Bay at Kotla Jangan shall be

38 a)66KV Line from 66KV Nasrala--- (New) l1Km /SC on DC line 0.2 Sq"ACSR. (by replacing 305.5 b) 65KV bays. 11km/0.1sq"/33KV H rail pole line) 7 nnc 39 a)66KV Line from 66KV Samrai---66Kv Sarhali (New 7 Km/SC on DC line 0.2 Sq"ACSR. 224.94

) 2 nos. hl 66KV havs t0 a)66KV Line from 66KV Bangiwal--Parjian Line 8 Km/ SC on DC line 0.2 Sq"ACSR. 243.58

(New ) 2 nos. hl 66(\/ herrc 7 a)66KV Line from Aug of conductor 10.8 Km/O.15 Sq" to 70.848 132KV S/S Hoshiarpur to 0.2Sq"ACSR.on existing SC on DC line 66K\/ S/S N:

54 220KV GHTP/Phul-Bhairupa 65 KV line" Stringing of 2nd ckt .13Km/0.2Sq" DC on DC 83,46 1.3 Km/0.2Sq" 5C on DC 55 al220KY Mansa- 66 KV Mansa line. LlLOof 220kV Mansa- Maur 66kV 254.25 7"5 Km/O.4Sq" SC on DC line at 66kV Mansa & one no. b) 66 KV Bay at 66 KV Mansa 1" no.Bay

55 65 KV Budhlada- Bareta line 0.125Sq" on HRP 8KM/0.2Sq" SC on DC towers to repl. existing HRP 162.00 line 57 Replacement of Rail Pole with 66 KV Tower of 66 KV 2 No. Tower 4.00 Lehra- Rampura line near 66 KV grid S/Stn Rampura.

58 a) 66 KV Line Bays for Addl 1.00 MVA Tlf 220/66 Kv 2 nos 108.00

59 65 KV Chowke-Jeond line. 11 KM SC/DC line O.2Sq"ACSR. 335.04 2 No. 56 KV Bavs 60 a) 66 KV Giderani-Kishangarh line. 8.6 KM SC/DC line 0.2Sq"ACSR" 282.ts

b) 2 Nos. 55 KV bavs. 61 a) 220 KV Himmatpura- Bilaspur 66 KV line. Stringing of 2nd Ckt. 5.4Km/0.2Sq" on DC towers 88.67 5.4Km/O.2Sq" SC on DC 1 No. bay required at 66 KV Bilaspur & 1 No. at b) 66 KV Bay 220 KV Himmatpura bay wilt be planned by PSTCL

62 a) 66 KV line between 66 KV Khosa Dal Singh - 66 KV 6 Km/O.2Sq" SC on DC Towers 169.98 Kassoana 2 nos. hl 66 KV Bavs 63 36 KV Bav at 56 KV Fatehsarh Panitoor 1. No. 30.00 64 220KV Talwandi Bhai- Dagru 66 KV line. Repl. With 13.5Km/0.2Sq" SC on DC 273.37 1.3.5 Km/0.15So" SC on RP 55 36 KV Bay at 66 KV Guru Har sahai 1. no.Bav 54.00 55 a) 132 KV Jalalabad-66 KV Guru Har Sahai line with 20Kms/0.2 Sq" SC on DC towers 1,8 Kms/0,2 Sq" 389"00 existing T-Off for 66 KV Jiwan Arian on above proposed DC towers b) Stringing 2nd ckt on above DC towers upto T-Off point for 66 KV Bajeke with existing T-Off for 66 KV NurekeExisting line to be dismantled after commissioning of above line with the concurence of

61 33/66 KV T-off of MKT-Sri Ganganagar 3 Kms/0.15Sq" SC on SC towers 28"00 ine for Khuian Sarvar 68 220KV Malout- Gilzerurala 65 KV line. 16Km/0.2Sq" SC on DC. 324.04 18Km/0.1So" SC on RP 69 66 KV Banwala Hanwanta -Khui Khera line. ) KM SC/DC line 0.2Sq"ACSR. 293.76 2 No.66 KV Bavs 70 66KV Mamdot-Tibbi Khurd line 8 KM SC/DC line 0.2Sq"ACSR. 243.s8 2 No. 56KV Bavs 7t 36KV Malke-Samalsar line. I KM SC/DC line 0.2Sq"ACSR. 264"22 2 No- 56KV Bavs 72 66KV Daulatpura-Kot lsekhan line. 3 KM SC/DC line 0.2Sq"ACSR. 243.s8 2 No. 55KV Bavs 73 36 KV S/S P.A.U. Addl. 12.5 MVA, 66/11KV 6' 163 t20 MVA 74 36 KV S/Stn Agwar Lopon 1x12.5+1x20 20MVA, 66/11 KV to repl.T/F 12.5 MVA,'66I11 KV L47 i'l i-

75 66 K.V T:.ipur Rd 31.5MVA, 65/11 KV to repl.T/F 20 MVA, 65/11 199 1x31.5+1x20 KV 76 66KV S/S Model Town 31.sMVA, 66/11 KV to repl.T/F1x20 MVA, 66/11 199 2x20+1x31.5 KV 77 66 KV S/S Dugri Road 1x31.5MVA, 65/11 KV to repl.T/F1x20 MVA, 199 1x31.5+1x20 66/\7KV 78 66KV S/S Shamaspur Addl. 3rd 12.5 MVA,66/11KV 163 1x31.5 79 55 KV Focal Point 1x12.5 MVA, 66/7LKV to repl.T/F 1x20 MVA, 1,47 3x20 66/11 KV 80 56 KV Grid S/Stn Chounth (1x 12.5 MVA, 66/11 qddl 12.5 MVA, 66/11 KV T/F 163 KV) 81 66 KV Grid S/Stn Bhalwan 31.5 MVA, 66/11 KV T/F to replace 20 MVA,66177 199 (2 x 20 MVA. 66/11 KV) KV T/F 82 65 KV Grid S/Stn Bhagpur Addl 20 MVA,65 / 77KV 183 (1x 20 MVA. 66/11 KV) 33 65 K\LGrid S/Stn Allowal Addl 12.s MVA, 66/11 KV T/F 163 (1i.20MVA. 66/11 KV) 84 56 KV Grid S/Stn Gharuan 20 MVA, 66/11 KV T/F to replace 8 / 10 MVA, 150 i1x 12.5 MVA, 66/11 KV Lx8lt0 MVA, 66/11 66/L7KV TIF KVI 85 56 KV Grid S/Stn Ghanour Addl 12,5 MVA, 66/11 KV T/F 163 12 x 20 MVA, 66/11 KV) 85 56 KV Grid S/Stn Cheema Addl 12.5 MV A, 66/tt KV T /F 153 (2 x 20 MVA" 66/11 KV) 87 66 KV Grid S/Stn Lohatbaddi Addl 12.s MV A, 66/7L KV T /F 163 Ux72.5 MVA.66/11KV 88 66 KV Grid S/Stn Katron qddl 12.s MVA, 56/11 KV T/F 163 (2 x 20 MVA. 66/11 KV) 89 66 KV Grid S/Stn Khilrian (1x 12.5 MVA, G6l11 qddl 12.5 MVA, 66/11 KV T/F 163 KV) l0 66 KV Grid S/Stn Moonak (2 x 20 MVA, 66/11 31.5 MVA, 66/ttKV T/F to replace 20 MVA,66/11 199 KV) KV T/F )1 66 KV Grid S/Stn Saraibanjara Addl 12.5 MVA, 66/11 KV T/F 163 (2 x 20 MVA. 66/11 KV) )2 66 KV Grid S/Stn Badrukhan (2 x 20 MVA, 66/11 KV) Addl 12.5 MVA, 66/11 KV T/F 163

93 56 KV Grid S/Stn Gajjumajra (2 x 20 MVA, 66/11KV) Addl 12.s MVA, 65/11 KVT/F 163

94 66 KV Grid S/Stn Dhuri 31.5 MVA,66/LtKVT/F to replace 20MVA,66/1,L 199 (3 x 20 MVA, 66/11 KV) KV TlF 95 66 KV Grid S/Stn Purkhali 20 MVA, 66 / Lt KV T/F to replace 12.5 MVA, 747 (2xt2.5 MVA,66/11KV) 66/t7 KV rlF 96 55 KV Grid S/Stn Kajauli 20 MVA, 66 / tL KV T/F to replace 12.5 MVA, 1,47 (1 x 20 MVA, 66/11 KV + 1x 12.5 MVA, 66/11 KV) 66/11KV TIF

)7 66 KV Grid S/Stn Naushera 20 MVA, 66 / tL KV T/F to replace 12.5 MVA, 147 (1 x 20 MVA, 66/11 KV + 1x 12.5 MVA, 65/11 KV) 66l7tKV TIF l8 56 KV Grid S/Stn Bharo Addl 12.s MVA, 56/11 KV T/F 163 11x 20 MVA. 65/11 KVI 99 66 KV Grid S/Stn Longowal (2x20 MVA, G6l11 31.5 MVA, 65/11 KV T/F to replace 20 MVA, 66/11 199 KV) KV T/F 100 66 KV S/S Jodhpur Ppkhar Augmentation of T-2 70/L2.5 MVA 66/11 KV pTF 747 7-1, txl2.5 MVA, 66/11 KV with 20 MVA 66/11 KV.

T -2 txt1 / L2.5 MVA,66/1 1 KV

101 66 KV S/S Kheowali Dhab Additional tx 12.5 MVA 66/11 KV PTF 153 rxzo Mvn, 66/ttKv LO2 66 KV S/S Sanga Augmentation of 12.5 MVA 66/11 KV PTF with 20 147 1x12.5 MVA,66lLtKV MVA 66/11 KV.

1x20 MVA, 66lL7KV

103 66 KV City Ferozepur Augmentation of 12.5 MVA 66/11 KV PTF with 20 747 1-1 1x12.5, 66177KV MVA 66/11 KV. T-2 1x72.5.66/17 KV 104 66 KV Sarawan Augmentation of 1"2.5 MVA 66/11 KV PTF with 20 L47 7x12.5.66/1"1KV MVA 66/11 KV, 105 66 KV MAUR KALAN 1x2O MVA, Additional 1x 12.5 MVA 56/11 KV PTF 163 55/11 KV 106 66 KV ALIKE Augmentation of 12.5 MVA 66/11 KV PTF with 20 747 T-1 1"x12.5, 56/11 KV MVA 66/11 KV. T-? 1x1? q 66111 Kv L07 66 KV Sukhewala 1x12.5 MVA Augmentation of 12.5 MVA 66/11 KV PTF with 20 t47 6611.7 kv MVA 56111 KV. 108 66 kV KOT DHARMU T-L Lx20,66/11 KV Augmentation of LO/12.5 MVA 65/11 KV PTF with 147 T-21xt0lt2.5,66ltt KV 20 MVA 66/11 KV.

109 66 kV Dalel Singh Wala Additional Lx 12.5 MVA 66/11 KV PTF 163 1x10/1,2.5.66/77 KV 110 65 kV KAMALU SWAICH 1x20 MVA, 66/tLKv Additional 1x 12.5 MVA 66/11 KV PTF 163

111 66 KV S/S Sitto Gunno Additional 7x t2.5 MVA 66/11 KV PTF 163 1.x12.5 MVA 66/LLkv 712 66 KV S/S Abohar Augmentation of 12.5 MVA 66/11 KV PTF with 20 t47 I-1 1x20, 66/LtKV MVA 66/11 KV. 1'-Z 7x12.5.66/11 KV L13 66 KV Peori 1x12.5 MVA 66/11 kv Augmentation of 12.5 MVA 66/11 KV PTF with 20 t47 MVA 65/11 KV. Lt4 66KV DHALEWAN Augmentation of 12.5 MVA 66/11 KV PTF with 20 r47 T-1 1x20, 66/tlKV MVA 66/11 KV. T-21xL2.5.66/1-1 KV 115 66KV HEEREWALA Additional 1x 12.5 MVA 66/11 KV PTF 153 1x12.5 MVA 66/Llkv 1L6 66 KV Sandhe Hasham Augmentation of 12.5 MVA 56/11 KV PTF with 20 t47 1-t 7x12.5,66171KV MVA 66111 KV" 1'-21x72.5. 65/11- Kv tt7 66 KV S/S Kandhwala Hazerkhan 1x12.5 MVA 66/11 KV PTF to replace 6.3/8 MVA r29 1X6.3/8 MVA.66/11KV 66/11 KV PTF 118 66 KV Khem karan 1x 20 MVA to repl. 1x1.0/12.5MVA 65111 KV 747 2x20 KV 66lttKv 1.x1,0/72.5 MVA 56/11 KV 119 66KV Gandiwind 1x12.5MVA,66/11KV 1x 20 MVA to repl. 1x12.5MVA, 66/11KV 147 720 66 KV Wadala Veeram 1x20 KV 66/tlKV Addl. 12.5 MVA,66/11KV 153

127 56 KV Dehriwal 1x20 MVA, 66/11 KV to repl" txl0l!2.5 66/11 Kv t47 LxL)/t2.5 MVA. 66/1-1KV 1x12.5 MVA. 65/11KV 122 66 KV Manochahal Addl" 12.5 MVA,66/11KV 163 2x20 KV 66/tt KV 123 36 KV Ranipur 1x12.5KV 66|1.LKV 12.5MVA to repl. 6.3/8MVA, 66/11 KV t47 Lx6.3/8 MVA 66/11 KV 124 a) 66KV Line from 66 KV S/S Garshankar- 66KV SIS a) New 8.3Km/ 0.25q"/ SC on DC towers line to L65.12 Saroya (existing 8.3kM/ 0.15sq" Single ckt /HRP replace existing 8.39Km/ 0.15sq"/ Rail pole line linel bl 66 KV bavs. 125 36 KV T V Centre 1x20 KV 66hl KV 7x25/31,5 MVA to reol. 1x20MVA 66/11 KV 199 t26 65 KV Mola Wahidpur 1x12.5 MVA 66/11 KV 1x12.5 MVA, 66/ltKV to repl. 1x6.3/8MVA, L47 1x6.3/8MVA 66/77Kv 66/11 KV 127 a) 66KV Line from 220 kv kotla Jangan-- 66KV Stringing of 2nd ckt 74,120 Km 10.2 Sq"ACSR.on 131.8s Mallian (U/G) (existing Single ckt line) b) 66 KV exist SC on DC line to make Double ckt. line 1 bays. Nos.Note:- 1 no.66KV Bay at 220KV S/S kotla Jangan shall be planned by PSTCL.

L28 66KV Parjian tx10/L2.5 MVA,66/11KY 7x701L2.5 1x 20 MVA to repl. 1x10/12.5MVA 56/11 KV L47 MVA.66/11KV L29 65 KV Bullowal1x12.5 MVA,66/11KY LxLOIZ.S 1x20 MVA, 66/11 KV to repi. tx!0112.5 66171Kv 147 MVA, 66/11KV 130 66 KV Samrai 7x6.3/8 MVA, 66/11KV 1x20 MVA, 1x20 MVA, 65/11 KV to repl. Lx6.3/8 66/1.1 KV L47 66/1,LKV 131 56 KV Samsabad txTO/72.5 MVA, 66/11KV 1x20MVA, to repl. txtO/12.5,66/11 KV 747 732 55 KV Patel Chowk 2x20 KV 66/11 KV Lx25/31,5 MVA to reol. 1x20MVA 66/11 KV 199 133 56 KV chabewal 1x20MVA, 66/LIKV 1x12.5 MVA, 1x20 MVA,66/tLKV to repl. tx72.5MYA, 66/tt L47 s6lrtKV KV 734 56 KV Dainwind 1x12.5 MVA, 66/11KV 1x20 MVA, 1x20 MVA, 66/11 KV to repl. txL2.5 66hl KY 747 36/11KV 135 55 KV Malsian tx70/t2.5 MVA, 66/11KV 1x20MVA, 1x20 MVA, 66/11 KV to repl. txt0l72.5 66ltt KV r47 66/77KV 136 66 KV Gaushala txt1/72.5 MVA, 66/11KV 1x20 MVA, 66hIKV to repl.1x10/12.5MVA, L47 66lL7KV

Note:- 1. Some works according to prevailing loading conditions in FY 2022-23 will be added planned work list . So it is requested to accord the approval for the funds of Rs. 301 crore instead of Rs.226.02 crore.

2. Unforseen expenditure to the tune of Rs.15 crore to 20 crore due to natural calamity etc. might be added in above planned works"

3. Some works may be shifted to Previous year/next year and vice versa according to the prevailing loading conditions at that time on the Transmission system.