Department of Water Supply & Sanitation, Website: www.pbdwss.gov.in Procurement Report 3

Procurement Plan For Works Contract Status: 'New' As on : 15-Nov-2012 WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement Public Disclosure Authorized Disclosure Authorized Public Public

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Zone: North Zone, Circle: Circle, District: Amritsar Akalgarh Dhapaian 50.00/0.00 (TW7424) PRWSSP-Asr-Div-II-108-I 1 Prov. Installing T/Well, Civil Works, OHSR, etc. to 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s Scheme Akalgarh 50.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Dhapian Block Tarsikka

Awan Lakha Singh 21.00/0.00 Public Disclosure Authorized Disclosure Authorized Public Public (TW15844) PRWSSP-Asr-Div-1-135-I 2 Providing Tubewell, Civil 30-Nov- Wor, OHSr for W/s 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 21.00 NCB N/A N/A N/A 2011 N/A Scheme Awan Lakha 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Singh Block Chogawan Bagga Kalan 58.21/0.00 (TW15719) PRWSS-W-DIV05-1756-1 3 Installing Tubewell, OHSR, Civil Work for W/s 31-AUG- 31-May- 30-May- 10-Sep- POST- 15-Sep- 17-Oct- 17-Nov- POST- 30-NOV- Scheme Bagga Kalan 58.21 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Harsha Chhina Public Disclosure Authorized Disclosure Authorized Public Public

Ballian Manjpur 50.00/0.00 (TW16320) PRWSS-W-DIV06-1762-1 4

Page 1 of 200 Procurement Plan For Work 15/11/2012 Public Disclosure Authorized Disclosure Authorized Public Public

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tnstalling Tubewell, OHSR, Civil work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- Water Supply Scheme 50.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Ballian Manjpur BLock Ball Khurd 59.00/78.32 (TW15847) PRWSSP-Asr-Div-III-141-I 5 30-Nov- Providing W/s for vill. Ball 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 75.00 NCB N/A N/A N/A 2011 N/A Khurd Block Verka 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

05-OCT- POST- Providing W/s for vill. Ball 01-Apr- 04-Oct- POST- 08-Oct- 09-Nov- POST- 73.78 NCB 2012 REVIE 0.00 Khurd Block Verka 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Bal Sachandar 25.00/42.52 (TW15345) PRWSSP-Asr-Div-III-61-2 6 Construction of RCC 30-Nov- OHSR for W/S scheme 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 30-MAY- 17.50 NCB N/A N/A N/A 2011 N/A Bal Sachander Block 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Verka Construction of RCC 09-OCT- POST- OHSR for W/S scheme 28-May- 04-Oct- POST- 26-Sep- 31-Oct- POST- 17.48 NCB 2012 REVIE 0.00 Bal Sachander Block 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Verka PRWSSP-Asr-Div-III-61-I 7 Prov. Installing T/W, Civil 30-Nov- Works,OHSR etc. for W/S 30-Sep- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 30.00 NCB N/A N/A N/A 2011 N/A scheme Bal Sachander 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Verka Prov. Installing T/W, Civil 09-OCT- POST- Works,OHSR etc. for W/S 28-May- 14-Sep- POST- 26-Sep- 31-Oct- POST- 27.60 NCB 2012 REVIE 0.00 scheme Bal Sachander 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Verka Bal Sarai 50.00/0.00 (TW16319) PRWSS-W-DIV06-1760-1 8 Page 2 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tnstalling Tubewell, OHSR, Civil work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- 50.00 NCB N/A N/A N/A N/A Water Supply Scheme Bal 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Sarai Block Rayya. Banian 45.00/39.71 (TW16321) PRWSS-W-DIV06-1764-1 9 Tnstalling Tubewell, OHSR, Civil work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- 45.00 NCB N/A N/A N/A N/A Water Supply Scheme 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Banian Block Tarsikka Basarke Gillan 73.03/86.33 (TW16340) PRWSS-W-DIV07-1759-1 10 Installing Tubewell, 15-AUG- 30-Jun- OHSR, Civil Work for W/s 28-May- 30-Aug- POST- 20-Sep- 25-Oct- 30-Nov- POST- 30-DEC- 65.00 NCB 2012 N/A N/A N/A 2013 N/A Scheme Baserke Gillan 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Attari Installing Tubewell, POST- OHSR, Civil Work for W/s 01-Apr- 10-SEP- 11-Sep- POST- 17-Sep- 06-Nov- POST- 65.86 NCB REVIE 0.00 Scheme Baserke Gillan 2012 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Attari PRWSS-W-DIV07-1759-2 11 Construction of RCC 15-AUG- 30-Jun- OHSR 1,50,000 ltr for W/s 28-May- 30-Aug- POST- 20-Sep- 25-Oct- 30-Nov- POST- 30-DEC- 23.00 NCB 2012 N/A N/A N/A 2013 N/A Scheme Basarke Gillan 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Attari Construction of RCC POST- OHSR 1,50,000 ltr for W/s 01-Apr- 10-SEP- 11-Sep- POST- 17-Sep- 06-Nov- POST- 22.12 NCB REVIE 0.00 Scheme Basarke Gillan 2012 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Attari Bhangwan 22.00/0.00 (TW15837) PRWSSP-Asr-Div-1-56-I 12 Providing Tubewell, Civil 30-Jun- Work, OHSR for W/s 01-Jun- 30-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- 22.00 NCB N/A N/A N/A 2011 N/A Scheme Bhagwan Block 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Chogawan

Page 3 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Bhorchi Brahmana 56.91/0.00 (TW16323) PRWSS-W-DIV06-1767-1 13 Tnstalling Tubewell, OHSR, Civil work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- Water Supply Scheme 56.91 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Borshi Brahmana BLock Rayya Birbarpura 25.00/37.07 (TW7414) PRWSSP-Asr-Div-1-139-I 14 Prov. Installing T/Well, Civil Works, OHSR, etc. to 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s Scheme Birbarpura 35.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Majitha

Prov. Installing T/Well, Civil Works, OHSR, etc. to 01-OCT- POST- 01-Apr- 01-Oct- POST- 01-Oct- 27-Nov- POST- W/s Scheme Birbarpura 34.95 NCB 2012 REVIE 0.00 2012 2012 REVIEW 2012 2012 REVIEW Block Majitha W ACTUAL

Buey Nangali 37.12/45.47 (TW16316) PRWSS-W-DIV05-1757-1 15 Installing Tubewell, OHSR, Civil Work for W/s 15-AUG- 31-May- 30-May- 25-Aug- POST- 30-Sep- 02-Oct- 02-Nov- POST- 17-NOV- Scheme Buey Nangali 43.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Harsha Chhina

Installing Tubewell, OHSR, Civil Work for W/s 01-OCT- POST- 30-May- 01-Oct- POST- 01-Oct- 27-Nov- POST- Scheme Buey Nangali 42.10 NCB 2012 REVIE 0.00 2012 2012 REVIEW 2012 2012 REVIEW Block Harsha Chhina W ACTUAL

Chaharpur 34.45/38.33 (TW16620) PRWSS-W-DIV05-1953-1 16

Page 4 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Installing T/well, Civl 31-May- Work, OHSR, etc for W/s 30-May- 10-SEP- 15-Sep- POST- 20-Sep- 25-Oct- 10-Nov- POST- 30-NOV- 34.45 NCB N/A N/A N/A 2013 N/A Scheme JChaharpur 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Ajnala Chak Allah Baksh 23.82/26.07 (TW15305) PRWSSP-Asr-Div-1-154-I 17 Installing T/well, Civil 30-Jun- Work, OHSR, etc for W/s 05-May- 07-SEP- 29-Sep- POST- 30-Sep- 02-Nov- 02-Dec- POST- 17-DEC- 16.50 NCB N/A N/A N/A 2012 N/A Scheme Chak Allah 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Baksh Block Chogawan Installing T/well, Civil POST- Work, OHSR, etc for W/s 05-May- 29-SEP- 13-Sep- POST- 25-Sep- 26-Oct- POST- 16.62 NCB REVIE 0.00 Scheme Chak Allah 2011 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Baksh Block Chogawan Chak Bala 19.00/24.44 (TW15836) PRWSSP-Asr-Div-1-47-I 18 30-Jun- Providing W/s for vill. 01-Jun- 30-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- 19.00 NCB N/A N/A N/A 2011 N/A Chak Bala Block Ajnala 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Chak Dogran 50.85/51.15 (TW15313) PRWSSP-ASR-DIV-1-158-I 19 Prov. Installing T/Well, 04-OCT- 03-Sep- Civil Works, OHSR, etc. to 10-Feb- 01-Dec- POST- 15-Dec- 17-Jan- 17-Feb- POST- 03-MAR- 45.00 NCB 2011 N/A N/A N/A 2012 N/A W/s Scheme Chak 2011 2011 REVIEW 2011 2012 2012 REVIEW 2012 PLAN Dogran Block Ajnala Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 10-Feb- 01-DEC- 01-Oct- POST- 25-Sep- 26-Oct- POST- 44.90 NCB REVIE 0.00 W/s Scheme Chak 2011 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Dogran Block Ajnala Chhajjalwadi 70.00/76.94 (TW7416) PRWSSP-Asr-Div-II-105-I 20

Page 5 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Prov. Installing T/Well, Civil Works, OHSR, etc. to 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s Scheme 69.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN ChajjalwaddiBlock Jandiala Prov. Installing T/Well, Civil Works, OHSR, 23-OCT- POST- 02-Nov- POST- 12-Oct- 15-Nov- POST- Distribution etc. to W/s 68.76 NCB 2012 REVIE 0.00 2012 REVIEW 2012 2012 REVIEW Scheme Chajjalwaddi W ACTUAL Block Jandiala Chicha 39.00/0.00 (TW7429) PRWSSP-Asr-Div-1-134-I 21 Prov. Installing T/Well, 30-Nov- Civil Works, OHSR, etc. to 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 39.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Chicha 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Attari Chogawan 90.00/91.42 (TW12461) PRWSSP-Asr-Div-1-92-I 22 Prov. Installing T/Well, Civil Works, OHSR, etc. to 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s Scheme Chogawan 75.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Chogawan

Prov. Installing T/Well, Civil Works, OHSR, etc. to POST- 09-Aug- 15-SEP- 19-Sep- POST- 25-Sep- 26-Oct- POST- W/s Scheme Chogawan 73.07 NCB REVIE 0.00 2010 2011 2012 REVIEW 2012 2012 REVIEW Block Chogawan W ACTUAL

PRWSSP-Asr-Div-1-92-II 23 Prov. Distribution System, 30-Nov- etc. to W/s Scheme 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 47.00 NCB N/A N/A N/A 2011 N/A Chogawan Block 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Chogawan Prov. Distribution System, POST- etc. to W/s Scheme 09-Aug- 15-SEP- 23-Sep- POST- 12-Dec- 13-Jan- POST- 46.29 NCB REVIE 0.00 Chogawan Block 2010 2011 2011 REVIEW 2011 2012 REVIEW W ACTUAL Chogawan PRWSSP-Asr-Div-1-92-III 24 Page 6 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Construction of RCC OHSR 3,00,000 ltr, etc. to 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s Scheme Chogawan 30.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Chogawan

Construction of RCC OHSR 3,00,000 ltr, etc. to POST- 09-Aug- 15-SEP- 23-Sep- POST- 12-Dec- 13-Jan- POST- W/s Scheme Chogawan 29.40 NCB REVIE 0.00 2010 2011 2011 REVIEW 2011 2012 REVIEW Block Chogawan W ACTUAL

Chuchakwal 27.07/28.46 (TW15304) PRWSSP-Asr-Div-1-155-I 25 Prov. Installing T/Well, Civil Works, OHSR, etc. to 30-Jun- 05-May- 07-SEP- 29-Sep- POST- 30-Sep- 02-Nov- 02-Dec- POST- 17-DEC- W/s Scheme Chuchakwal 20.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Chogawan

Prov. Installing T/Well, Civil Works, OHSR, etc. to POST- 06-Jul- 29-SEP- 13-Sep- POST- 25-Sep- 26-Oct- POST- W/s Scheme Chuchakwal 20.33 NCB REVIE 0.00 2011 2011 2012 REVIEW 2012 2012 REVIEW Block Chogawan W ACTUAL

Dahurian 23.00/33.04 (TW12454) PRWSSP-Asr-Div-1-74-I 26 Prov. Installing T/Well, 30-Jun- Civil Works, OHSR, etc. to 01-Jun- 30-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- 25.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Dahurian 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Ajnala Prov. Installing T/Well, Civil Works, Distribution, POST- 01-Jun- 15-SEP- 11-Sep- POST- 01-Oct- 27-Nov- POST- etc. to W/s Scheme 24.75 NCB REVIE 0.00 2010 2011 2012 REVIEW 2012 2012 REVIEW Dahurian Block Ajnala W ACTUAL

Devidasspura 39.08/0.00 (TW16324) PRWSS-W-DIV06-1768-1 27

Page 7 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Tnstalling Tubewell, OHSR, Civil work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- Water Supply Scheme 39.08 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Devidass pura BLock Jandiala Dharamkot 31.70/34.34 (TW15302) PRWSSP-Asr-Div-1-153-I 28 Prov. Installing T/Well, Civil Works, OHSR, etc. to 05-AUG- 30-Jun- 12-Jun- 15-Sep- POST- 30-Sep- 01-Nov- 01-Dec- POST- 16-DEC- W/s Scheme Dharamkot 24.30 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Harsha Chhina

Prov. Installing T/Well, Civil Works, OHSR, etc. to POST- 12-Jun- 12-SEP- 11-Sep- POST- 25-Sep- 26-Oct- POST- W/s Scheme Dharamkot 24.45 NCB REVIE 0.00 2011 2011 2012 REVIEW 2012 2012 REVIEW Block Harsha Chhina W ACTUAL

Dharar 45.00/0.00 (TW16325) PRWSS-W-DIV06-1770-1 29 Tnstalling Tubewell, OHSR, Civil work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- 45.00 NCB N/A N/A N/A N/A Water Supply Scheme 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Dharar Block Jandiala Dhattal 25.00/38.42 (TW7430) PRWSSP-Asr-Div-III-119-I 30 Prov. Installing T/Well, 30-Nov- Civil Works, OHSR, etc. to 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 30.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Dhattal 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Attari Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 30-Sep- 26-JUL- 08-Aug- POST- 21-Aug- 23-Nov- POST- 30.73 NCB REVIE 0.00 W/s Scheme Dhattal 2010 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Attari Dhaul Kalan 40.00/0.00 (TW15848)

Page 8 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-Asr-Div-III-142-I 31 Providing W/s for vill. 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- Dhaul Kalan Block Verka 40.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Dial Pura 20.00/0.00 (TW15841) PRWSSP-Asr-Div-1-123-I 32 Providing Tubewell, Civil 30-Nov- Work, OHSR for vill. Dial 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 20.00 NCB N/A N/A N/A 2011 N/A Pura Block Ajnala 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Fatehgarh Sukar Chak 89.00/0.00 (TW15849) PRWSSP-Asr-Div-III-143-I 33 Providing W/s for 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- vill.Fatehgarh Suker Chak 89.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Verka Fatehpur Rajputan 51.00/0.00 (TW7417) PRWSSP-Asr-Div-II-112-I 34 Prov. Installing T/Well, Civil Works, OHSR, etc. to 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s Scheme Fatehpur 51.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Rajputan Block Jandiala

Gaunsabad 22.00/0.00 (TW7431) PRWSSP-Asr-Div-III-60-I 35 Prov. Installing T/Well, 30-Jun- Civil Works, OHSR, etc. to 01-Jun- 30-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- 22.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Gaunsabad 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Verka Ghohatwind Hinduan 45.00/52.56 (TW16326)

Page 9 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV06-1772-1 36 Installing Tubwell, Civil Work, OHSR for Water 31-AUG- 30-Jun- 03-May- 15-Sep- POST- 25-Sep- 27-Oct- 27-Nov- POST- 31-DEC- Supply Scheme 45.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN GHohatwind Hinduan BLock Rayya Installing Tubewell, Civil Work, OHSR, Distribution 25-OCT- POST- System for Water Supply 26-Oct- POST- 22-Oct- 23-Nov- POST- 48.12 NCB 2012 REVIE 0.00 Scheme Ghohatwind 2012 REVIEW 2012 2012 REVIEW W ACTUAL Hinduan Block Rayya

Gurala (TW7016) PRWSSP-Asr-Div-1-125-II 37 Construction of RCC POST- OHSR, Civil Work etc. to 30-Sep- 05-APR- 31-Aug- POST- 07-Sep- 20-Nov- POST- 22.57 NCB REVIE 0.00 W/s Scheme Gurala Block 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Ajnala Hardo Rattan 40.28/41.81 (TW16341) PRWSS-W-DIV07-1761-1 38 Installing Tubewell, 15-AUG- 30-Jun- OHSR, Civil Work for W/s 30-May- 30-Aug- POST- 20-Sep- 25-Oct- 30-Nov- POST- 30-DEC- 40.28 NCB 2012 N/A N/A N/A 2013 N/A Scheme Hardo Rattan 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Attari Harsha Chhina 100.00/0.00 (TW15839) PRWSSP-Asr-Div-1-95-I 39 Prov. Installing T/well, Civil Work, OHSR, etc for 30-Nov- 100.00 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s scheme Harsha NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Chhina, Block Harsha Chhina Hetampura 24.00/0.00 (TW15694) PRWSSP-Asr-Div-1-90-I 40

Page 10 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Prov. Installing T/Well, 30-Nov- Civil Works, OHSR, etc. to 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 24.00 NCB N/A N/A N/A 2011 N/A W/s Hetampura Block 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Chogawan Jagdev Khurd (TW7017) PRWSSP-Asr-Div-1-86-II 41 Construction of Civil Work POST- & Distribution for W/s 04-Oct- 30-JUN- 31-Aug- POST- 07-Sep- 20-Nov- POST- 16.74 NCB REVIE 0.00 Scheme Jagdev Khurd 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Ajnala Jamalpur 51.53/48.00 (TW16327) PRWSS-W-DIV06-1773-1 42 Installing Tubewell, Civil 31-AUG- 30-Jun- Work, OHSR for Water 03-May- 15-Sep- POST- 25-Sep- 27-Oct- 27-Nov- POST- 31-DEC- 44.10 NCB 2012 N/A N/A N/A 2013 N/A supply scheme Jamalapur 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Blcok Rayya Prov. & Installing Tubewell, Civil Work, 18-OCT- POST- 31-May- 25-Oct- POST- 12-Oct- 15-Nov- POST- Distribution System, 44.23 NCB 2012 REVIE 0.00 2012 2012 REVIEW 2012 2012 REVIEW OHSR for W/s Scheme W ACTUAL Jamalpur Block Rayya Janian 45.00/0.00 (TW16328) PRWSS-W-DIV06-1775-1 43 Installing Tubewell, Civil Work, OHSR for water 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- 45.00 NCB N/A N/A N/A N/A supply scheme Janian 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN BLock Jandiala Jasraur 40.00/56.46 (TW7031) PRWSSP-Asr-Div-1-84-I 44 Prov. Installing T/Well, 30-Nov- Civil Works, OHSR, etc. to 09-Aug- 01-JAN- 11-Jan- POST- 26-Jan- 02-Mar- 01-May- POST- 29-MAY- 45.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Jasraur 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Chogawan

Page 11 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 09-Aug- 24-FEB- 11-Sep- POST- 25-Sep- 26-Oct- POST- 43.13 NCB REVIE 0.00 W/s Scheme Jasraur 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Chogawan PRWSSP-Asr-Div-1-84-II 45 Construction of OHSR for 30-Nov- 09-Aug- 01-JAN- 11-Jan- POST- 26-Jan- 02-Mar- 01-May- POST- 29-MAY- W/s Scheme Jasraur 14.50 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Chogawan

Construction of OHSR for POST- 09-Aug- 24-FEB- 15-Sep- POST- 15-Mar- 17-Apr- POST- W/s Scheme Jasraur 14.10 NCB REVIE 0.00 2010 2011 2011 REVIEW 2012 2012 REVIEW Block Chogawan W ACTUAL

Jhanjoti 43.30/69.69 (TW15695) PRWSS-W-DIV05-1950-1 46 Installing T/well, Civl 31-May- Work, OHSR, etc for W/s 30-May- 10-SEP- 15-Sep- POST- 20-Sep- 25-Oct- 10-Nov- POST- 30-NOV- 70.00 NCB N/A N/A N/A 2013 N/A Scheme Jhanjoti Block 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Harsha Chhina Installing T/well, Civl 01-OCT- POST- Work, OHSR, etc for W/s 05-Apr- 01-Oct- POST- 01-Oct- 27-Nov- POST- 67.18 NCB 2012 REVIE 0.00 Scheme Jhanjoti Block 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Harsha Chhina Jharu Nangal 31.17/31.22 (TW16329) PRWSS-W-DIV06-1776-1 47 Installing Tubewell, Civil Work, OHSR for water 31-AUG- 30-Jun- 03-May- 15-Sep- POST- 25-Sep- 27-Oct- 27-Nov- POST- 31-DEC- supply scheme Jharu 31.17 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Nangal Block Tarsikka

Prov. & installing Tubewell, Civil Work, 18-OCT- POST- 31-May- 25-Oct- POST- 12-Oct- 15-Nov- POST- Distribution, OHSr for W/s 28.70 NCB 2012 REVIE 0.00 2012 2012 REVIEW 2012 2012 REVIEW Scheme Jharu Nangal W ACTUAL Block Tarsikka Kakar 35.66/35.74 (TW16619)

Page 12 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV05-1951-1 48 Installing T/well, Civl 30-May- Work, OHSR, etc for W/s 30-May- 10-SEP- 15-Sep- POST- 20-Sep- 25-Oct- 10-Nov- POST- 30-NOV- 32.00 NCB N/A N/A N/A 2013 N/A Scheme Kakar Block 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Chogawan Installing T/well, Civl 01-OCT- POST- Work, OHSR, etc for W/s 01-Apr- 01-Oct- POST- 01-Oct- 27-Nov- POST- 32.23 NCB 2012 REVIE 0.00 Scheme Kakar Block 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Chogawan Kambo 30.00/36.56 (TW7316) PRWSSP-Asr-Div-III-118-II 49 Construction of RCC 30-Nov- OHSR 75,000 ltr, etc for 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 12.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Kambo 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Verka Construction of RCC POST- OHSR 75,000 ltr, etc for 30-Sep- 10-JUN- 05-Aug- POST- 12-Oct- 19-Nov- POST- 11.85 NCB REVIE 0.00 W/s Scheme Kambo 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Verka Khela 23.66/32.15 (TW15696) PRWSS-W-DIV06-1777-1 50 Installing Tubewell, Civil 31-AUG- 30-Jun- Work, OHSR for Water 03-May- 15-Sep- POST- 25-Sep- 27-Oct- 27-Nov- POST- 31-DEC- 23.66 NCB 2012 N/A N/A N/A 2013 N/A Supply Scheme Khela 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Jandiala Installing Tubewell, OHSR, Civil work, 22-OCT- POST- 05-Mar- 02-Nov- POST- 22-Oct- 23-Nov- POST- Distribution System for 29.63 NCB 2012 REVIE 0.00 2011 2012 REVIEW 2012 2012 REVIEW W/s Scheme Khela BLock W ACTUAL Jandiala Khiala Khurd 22.00/0.00 (TW15842) PRWSSP-Asr-Div-1-128-I 51 Installing Tubewell, 30-Nov- OHSR, Civil Work for W/s 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 22.00 NCB N/A N/A N/A 2011 N/A Scheme Khiala Khurd 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Chogawan Page 13 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Khusupura 36.56/38.18 (TW16317) PRWSS-W-DIV05-1758-1 52 Installing Tubewell, 15-AUG- 31-May- OHSR, Civil Work for W/s 30-May- 25-Aug- POST- 30-Sep- 02-Oct- 02-Nov- POST- 17-NOV- 36.56 NCB 2012 N/A N/A N/A 2013 N/A Scheme Khusupura Block 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Chogawan Installing Tubewell, 01-OCT- POST- OHSR, Civil Work for W/s 01-Apr- 01-Oct- POST- 01-Oct- 02-Nov- POST- 35.73 NCB 2012 REVIE 0.00 Scheme Khusupura Block 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Chogawan Installing Tubewell, 01-OCT- POST- OHSR, Civil Work for W/s 01-Apr- 01-Oct- POST- 01-Oct- 27-Nov- POST- 35.73 NCB 2012 REVIE 0.00 Scheme Khusupura Block 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Chogawan Kohali (TW7032) PRWSSP-Asr-Div-1-85-II 53 Construction of RCC 09-MAY- POST- OHSR 2,00,000 ltr for W/s 09-Aug- 31-Aug- POST- 07-Sep- 20-Nov- POST- 44.80 NCB 2011 REVIE 0.00 Scheme Kohali Block 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL Chogawan Kotla Doom (TW7018) PRWSSP-Asr-Div-1-129-I 54 Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 09-Aug- 15-APR- 31-Aug- POST- 04-Sep- 20-Nov- POST- 26.09 NCB REVIE 0.00 W/s Scheme Kotla Doom 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Chogawan PRWSSP-Asr-Div-1-129-II 55 Construction of RCC OHSR, Civil Work, 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- Distribution System, etc to 28.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN W/s Scheme Kotla Doom Block Chogawan Construction of RCC POST- OHSR, Civil Work, 09-Aug- 15-APR- 01-Jul- POST- 29-Jun- 12-Aug- POST- 30.27 NCB REVIE 0.00 Distribution System, etc to 2010 2011 2011 REVIEW 2011 2011 REVIEW W ACTUAL W/s Scheme Kotla Page 14 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Doom Block Chogawan

Kotli Sakkian Wali (TW15312) 17.00/35.26

PRWSSP-Asr-Div-1-138-I 56 Prov. Installing T/Well, Civil Works, OHSR, etc. to 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s Scheme Koli 30.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Sakkianwali Block Harsha Chhina Prov. Installing T/Well, Civil Works, OHSR, etc. to POST- 01-Jun- 01-DEC- 11-Sep- POST- 25-Sep- 26-Oct- POST- W/s Scheme Koli 27.29 NCB REVIE 0.00 2010 2011 2012 REVIEW 2012 2012 REVIEW Sakkianwali Block Harsha W ACTUAL Chhina Ladhe 18.00/28.96 (TW7019) PRWSSP-Asr-Div-1-70-I 57 Prov. Installing T/Well, 30-Jun- Civil Works, OHSR, etc. to 01-Jun- 30-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 04-Nov- POST- 01-DEC- 21.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Ladhy 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN BlockHarsha Chhina Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 31-Dec- 05-APR- 31-Aug- POST- 04-Sep- 20-Nov- POST- 21.23 NCB REVIE 0.00 W/s Scheme Ladhy 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL BlockHarsha Chhina Lahori Mal 39.31/42.09 (TW15339) PRWSSP-ASR-Div-III-151-I 58 26-AUG- 30-Nov- Providing W/s for vill. 25-Jun- 15-Sep- POST- 15-Sep- 18-Oct- 17-Nov- POST- 30-MAY- 26.00 NCB 2011 N/A N/A N/A 2011 N/A Lahori Mal Block Attari 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN

Providing & installing T/well, Civil Work, POST- 25-Jun- 12-SEP- 16-Aug- POST- 21-Aug- 23-Nov- POST- Distribution System etc. 25.74 NCB REVIE 0.00 2011 2011 2012 REVIEW 2012 2012 REVIEW for W/s Lahori Mal Block W ACTUAL Attari

Page 15 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Loharka Kalan 39.00/0.00 (TW15850) PRWSSP-Asr-Div-III-144-I 59 Providing W/s for vill. 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- Loharka Kalan Block 39.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Verka

Madhepur 35.00/0.00 (TW16330) PRWSS-W-DIV06-1778-1 60 Installing Tubewell, Civil Work, OHSR for Water 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- Supply Scheme 35.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Madehpur BLock Tarsikka

Malik Nangal 50.00/0.00 (TW16622) PRWSS-W-DIV06-1955-1 61 Installing T/well, Civl 31-May- Work, OHSR, etc for W/s 30-May- 10-SEP- 15-Sep- POST- 20-Sep- 25-Oct- 10-Nov- POST- 30-NOV- 50.00 NCB N/A N/A N/A 2013 N/A Scheme Malik Nangal 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Tarsikka Mallu Nangal 40.00/67.67 (TW12463) PRWSSP-Asr-Div-1-132-III 62 Construction of RCC OHSR 1,00,000 etc.for 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- W/s Scheme Mallu 16.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Nangal Block Harsha Chhina Construction of RCC OHSR 1,00,000 etc.for POST- 09-Aug- 16-SEP- 24-Sep- POST- 19-Mar- 26-Apr- POST- W/s Scheme Mallu 15.64 NCB REVIE 0.00 2010 2011 2011 REVIEW 2012 2012 REVIEW Nangal Block Harsha W ACTUAL Chhina Malowal 42.00/0.00 (TW16332)

Page 16 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV06-1779-1 63 Installing Tubewell, Civil Work, OHSR for Water 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- 42.00 NCB N/A N/A N/A N/A Supply Scheme Malowal 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Block Tarsikka

Manj (TW7020) 33.00/41.38

PRWSSP-Asr-Div-1-57-I 64 Prov. Installing T/Well, 30-Jun- Civil Works, OHSR, etc. to 01-Jun- 30-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- 30.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Manj Block 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Chogawan Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 18-Nov- 05-APR- 31-Aug- POST- 04-Sep- 20-Nov- POST- 31.93 NCB REVIE 0.00 W/s Scheme Manj Block 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Chogawan Maure 32.00/0.00 (TW15843) PRWSSP-Asr-Div-1-130-I 65 30-Nov- Providing W/s for vill. 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 32.00 NCB N/A N/A N/A 2011 N/A Maure Block Chogawan 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Mehlan Wala 56.60/60.11 (TW15718) PRWSS-W-DIV05-1952-1 66 Installing T/well, Civl Work, OHSR, etc for W/s 31-May- 30-May- 10-SEP- 15-Sep- POST- 20-Sep- 25-Oct- 10-Nov- POST- 30-NOV- Scheme Mehlanwala 56.60 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Harsha Chhina

Installing T/well, Civl Work, OHSR, etc for W/s 01-OCT- POST- 25-Jul- 01-Oct- POST- 01-Oct- 27-Nov- POST- Scheme Mehlanwala 57.61 NCB 2012 REVIE 0.00 2010 2012 REVIEW 2012 2012 REVIEW Block Harsha Chhina W ACTUAL

Mehma 32.42/48.49 (TW16333)

Page 17 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV06-1780-1 67 Installing Tubewell, Civil Work, OHSR for Water 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- 32.42 NCB N/A N/A N/A N/A Supply Scheme Mehma 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN Block Jandiala Miadi Kalan 17.00/33.17 (TW7023) PRWSSP-Asr-Div-1-94-II 68 Construction of PC, Installing PM, Distribution 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- System etc. to W/s 15.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Scheme Miadi Kalan Block Chogawan Construction of PC, Installing PM, Distribution POST- 30-Sep- 15-APR- 31-Aug- POST- 07-Sep- 20-Nov- POST- System etc. to W/s 15.27 NCB REVIE 0.00 2010 2011 2012 REVIEW 2012 2012 REVIEW Scheme Miadi Kalan W ACTUAL Block Chogawan Mohawa 45.00/62.15 (TW16345) PRWSS-W-DIV07-1769-1 69 Installing Tubewell, 15-AUG- 30-Jun- OHSR, Civil Work for W/s 30-Jun- 30-Sep- POST- 30-Oct- 25-Nov- 31-Dec- POST- 31-JAN- 60.00 NCB 2012 N/A N/A N/A 2013 N/A Scheme Mohawa Block 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN Attari Installing Tubewell, POST- OHSR, Civil Work for W/s 26-SEP- 01-Oct- POST- 08-Oct- 09-Nov- POST- 58.37 NCB REVIE 0.00 Scheme Mohawa Block 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Attari Muchhal (TW7423) PRWSSP-Asr-Div-II-106-I 70 Prov. Installing T/Well, 31-MAY- POST- Civil Works, OHSR, etc. to 09-Aug- 05-Sep- POST- 04-Sep- 05-Oct- POST- 42.55 NCB 2012 REVIE 0.00 W/s Scheme Muchhal 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Tarsikka PRWSSP-Asr-Div-II-106-II 71

Page 18 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Construction of RCC 30-Nov- OHSR for W/s Scheme 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 27.00 NCB N/A N/A N/A 2011 N/A Muchhal Block Tarsikka 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Distt. Amritsar Construction of RCC 31-MAY- POST- OHSR for W/s Scheme 09-Aug- 05-Sep- POST- 04-Sep- 05-Oct- POST- 26.70 NCB 2012 REVIE 0.00 Muchhal Block Tarsikka 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL Distt. Amritsar Mudhal 65.00/100.88 (TW15699) PRWSSP-Asr-Div-III-114-I 72 30-Nov- Providing W/s for vill. 100.00 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- NCB N/A N/A N/A 2011 N/A Mudhal Block Verka 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

04-OCT- POST- Providing W/s for vill. 30-Sep- 04-Oct- POST- 12-Oct- 19-Nov- POST- 95.14 NCB 2012 REVIE 0.00 Mudhal Block Verka 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Mule Chak 37.00/0.00 (TW7425) PRWSSP-Asr-Div-III-145-I 73 Prov. Installing T/Well, 30-Nov- Civil Works, OHSR, etc. to 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 37.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Mule Chak 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Verka Nangal Dial Singh 45.00/42.56 (TW16334) PRWSS-W-DIV06-1781-1 74 Installing Tubewell, Civil Work, OHSR for Water 31-AUG- 30-Jun- 03-May- 15-Sep- POST- 25-Sep- 27-Oct- 27-Nov- POST- 31-DEC- Supply Scheme Nangal 45.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Dyal Singh BLock Jandiala Installing Tubewell, Civil Work, OHSR, Distribution 25-OCT- POST- for Water Supply Scheme 26-Oct- POST- 22-Oct- 23-Nov- POST- 39.39 NCB 2012 REVIE 0.00 Nangal Dyal Singh Block 2012 REVIEW 2012 2012 REVIEW W ACTUAL Jandiala

Page 19 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Nangli 54.55/0.00 (TW16335) PRWSS-W-DIV06-1782-1 75 Installing Tubewell, Civil Work, OHSR for Water 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- 54.55 NCB N/A N/A N/A N/A Supply Scheme Nangli 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Block Rayya Nathupur 32.17/34.62 (TW15342) PRWSSP-Asr-Div-III-149-I 76 Prov. Installing Tubewell, 26-AUG- 30-May- Ciwil Work, OHSr for W/s 25-Jun- 15-Sep- POST- 15-Sep- 18-Oct- 17-Nov- POST- 30-NOV- 21.00 NCB 2011 N/A N/A N/A 2012 N/A Scheme Nathupur Block 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Verka Prov. Installing Tubewell, POST- Ciwil Work, OHSr for W/s 25-Jun- 12-SEP- 21-Aug- POST- 24-Aug- 23-Nov- POST- 20.75 NCB REVIE 0.00 Scheme Nathupur Block 2011 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Verka Nawankot 40.00/40.38 (TW16713) PRWSS-W-DIV06-2153-1 77 Installing Tubewell, Civil Works, OHSR work for 31-AUG- 30-Jun- 03-May- 15-Sep- POST- 25-Sep- 27-Oct- 27-Nov- POST- 31-DEC- Water Supply scheme 28.23 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Nawankot Block Jandiala

Installing Tubewell, OHSR, Civil work, 22-OCT- POST- 02-Nov- POST- 22-Oct- 23-Nov- POST- Distribution System for 37.43 NCB 2012 REVIE 0.00 2012 REVIEW 2012 2012 REVIEW W/s Scheme Nawankot W ACTUAL BLock Jandiala Nepal (TW7024)

PRWSSP-Asr-Div-1-136-II 78 Construction of Civil POST- Work, Distribution System 30-Sep- 11-APR- 31-Aug- POST- 07-Sep- 20-Nov- POST- 14.93 NCB REVIE 0.00 etc. to W/s Scheme Nepal 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block

Page 20 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Chogawan

Nestha 46.08/50.37 (TW15697) PRWSS-W-DIV07-1763-1 79 Installing Tubewell, 15-AUG- 30-Jun- OHSR, Civil Work for W/s 30-Apr- 30-Aug- POST- 20-Sep- 25-Oct- 30-Nov- POST- 30-DEC- 35.40 NCB 2012 N/A N/A N/A 2013 N/A Scheme Nestha Block 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Attari Installing Tubewell, POST- OHSR, Civil Work for W/s 05-Apr- 11-SEP- 11-Sep- POST- 17-Sep- 06-Nov- POST- 35.57 NCB REVIE 0.00 Scheme Nestha Block 2011 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Attari PRWSS-W-DIV07-1763-2 80 Construction of RCC 15-AUG- 30-Jun- OHSR 75,000 lytr for W/s 30-Apr- 30-Aug- POST- 20-Sep- 25-Oct- 30-Nov- POST- 30-DEC- 14.00 NCB 2012 N/A N/A N/A 2013 N/A Scheme Nestha Block 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Attari Construction of RCC POST- OHSR 75,000 lytr for W/s 05-Apr- 11-SEP- 11-Sep- POST- 17-Sep- 06-Nov- POST- 13.85 NCB REVIE 0.00 Scheme Nestha Block 2011 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Attari Pandori & Makhanpura 40.96/42.81 (TW15316) PRWSSP-ASR-DIV-1-159-I 81 Prov. Installing T/Well, 07-OCT- 03-Dec- Civil Works, OHSR, etc. to 10-Feb- 01-Dec- POST- 15-Dec- 17-Jan- 17-Feb- POST- 03-MAR- 37.00 NCB 2011 N/A N/A N/A 2012 N/A W/s Scheme Pandori 2011 2011 REVIEW 2011 2012 2012 REVIEW 2012 PLAN (Ramdas) Block Ajnala Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 10-Feb- 01-DEC- 13-Sep- POST- 25-Sep- 26-Oct- POST- 36.54 NCB REVIE 0.00 W/s Scheme Pandori 2011 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL (Ramdas) Block Ajnala Pandori Warraich (TW7042) PRWSSP-Asr-Div-III-117-II 82

Page 21 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Construction of RCC POST- 30-Sep- 15-APR- 27-May- POST- 11-May- 12-Jun- POST- OHSR for Pandori 26.45 NCB REVIE 0.00 2010 2011 2011 REVIEW 2012 2012 REVIEW Waraich W ACTUAL Panj Grain Nijjaran (TW7025) PRWSSP-Asr-Div-1-87-II 83 Construction of Civil Work, Distribution System POST- 30-Sep- 29-JUN- 31-Aug- POST- 07-Sep- 20-Nov- POST- etc. to W/s Scheme Panj 20.80 NCB REVIE 0.00 2010 2011 2012 REVIEW 2012 2012 REVIEW Grain Nijjaran Block W ACTUAL Ajnala Panju Rai & Leliyan 17.00/51.76 (TW15723) PRWSSP-Asr-Div-1-59-I 84 Prov. & Installing Tubewell, Civil Work, 30-Nov- 01-Jun- 30-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 05-Nov- POST- 31-MAY- Distribution System, 50.00 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN OHSR for W/s Panju rai & Leliyan Prov. & Installing Tubewell, Civil Work, 01-OCT- POST- 05-Nov- 01-Oct- POST- 25-Sep- 26-Oct- POST- Distribution System, 47.17 NCB 2012 REVIE 0.00 2011 2012 REVIEW 2012 2012 REVIEW OHSR for W/s Panju rai & W ACTUAL Leliyan Raipur Kalan 20.00/30.36 (TW12464) PRWSSP-Asr-Div-1-131-I 85 Prov. Installing T/Well, 30-Nov- Civil Works, OHSR, etc. to 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 22.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Raipur Kalan 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Ajnala Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 09-Aug- 15-SEP- 11-Sep- POST- 25-Sep- 26-Oct- POST- 20.36 NCB REVIE 0.00 W/s Scheme Raipur Kalan 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Ajnala Rajatal 79.52/85.06 (TW16343)

Page 22 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV07-1765-1 86 Installing Tubewell, 15-AUG- 30-Jun- OHSR, Civil Work for W/s 30-Apr- 30-Aug- POST- 30-Sep- 25-Oct- 30-Nov- POST- 30-DEC- 70.00 NCB 2012 N/A N/A N/A 2013 N/A Scheme Rajatal Block 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Attari Installing Tubewell, POST- OHSR, Civil Work for W/s 01-Apr- 11-SEP- 11-Sep- POST- 17-Sep- 06-Nov- POST- 65.86 NCB REVIE 0.00 Scheme Rajatal Block 2012 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Attari PRWSS-W-DIV07-1765-2 87 Construction of RCC 15-AUG- 30-Jun- OHSR of 1,00,000 ltr for 30-Apr- 30-Aug- POST- 30-Sep- 25-Oct- 30-Nov- POST- 30-DEC- 18.00 NCB 2012 N/A N/A N/A 2013 N/A W/s Scheme Rajatal 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block Attari Construction of RCC POST- OHSR of 1,00,000 ltr for 01-Apr- 11-SEP- 11-Sep- POST- 17-Sep- 06-Nov- POST- 17.48 NCB REVIE 0.00 W/s Scheme Rajatal 2012 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Attari Ramdas (Rural) 25.00/0.00 (TW15840) PRWSSP-Asr-Div-1-122-I 88 Prov. Tubewell, Civil Work, OHSR, Distribution 30-Nov- 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- System for W/s Ramdas 25.00 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN (Rural) Block Ajnala

Rangarh 70.00/0.00 (TW16344) PRWSS-W-DIV07-1766-1 89 Installing Tubewell, 15-AUG- 30-Jun- OHSR, Civil Work for W/s 30-Apr- 30-Aug- POST- 20-Sep- 25-Oct- 30-Nov- POST- 30-DEC- 70.00 NCB 2012 N/A N/A N/A 2013 N/A Scheme Rangarh Block 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Attari Rattangarh 22.41/0.00 (TW16336) PRWSS-W-DIV06-1820-1 90

Page 23 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Installing Tubewell, Civil Works, OHSR work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- Water Supply scheme 22.41 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Rattangarh Block Rayya

Romana Chak 50.00/0.00 (TW16337) PRWSS-W-DIV06-1821-1 91 Installing Tubewell, Civil Works, OHSR work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- Water Supply scheme 50.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Romana Chak Block Tarsikka Salempura 15.00/0.00 (TW15838) PRWSSP-Asr-Div-1-69-I 92 Prov. Tubewell, Civil Work, OHSR, Distribution 30-Jun- 01-Jun- 30-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- System for W/s 15.00 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Salempura Block Harsha Chhina Sangtu Nangal 33.96/37.53 (TW15307) PRWSSP-Asr-Div-1-156-I 93 Prov. Installing T/Well, Civil Works, Distribution 18-AUG- System, OHSR, etc. to 06-May- 10-Oct- POST- 18-Oct- 18-Nov- 18-Dec- POST- 03-JAN- 03-Jul- 28.00 NCB 2011 N/A N/A N/A N/A W/s Scheme Sangtu 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 2012 PLAN Nagal Block Harsha Chhina Prov. Installing T/Well, Civil Works, Distribution POST- System, OHSR, etc. to 06-May- 24-SEP- 11-Sep- POST- 25-Sep- 26-Oct- POST- 27.55 NCB REVIE 0.00 W/s Scheme Sangtu 2011 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Nagal Block Harsha Chhina Sarangdev 50.00/60.96 (TW15315) PRWSSP-Asr-Div-1-89-I 94 Page 24 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Prov. Installing T/Well, Civil Works, Distribution 30-Nov- System, OHSR, etc. to 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 47.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Sarangdev 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Ajnala

Prov. Installing T/Well, Civil Works, Distribution POST- System, OHSR, etc. to 09-Aug- 01-DEC- 19-Sep- POST- 25-Sep- 26-Oct- POST- 46.69 NCB REVIE 0.00 W/s Scheme Sarangdev 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Ajnala

Sohian Khurd 48.00/47.72 (TW7318) PRWSSP-Asr-Div-III-146-I 95 Prov. Installing T/Well, 30-Nov- Civil Works, OHSR, etc. to 09-Aug- 01-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 25.00 NCB N/A N/A N/A 2011 N/A W/s Scheme 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Khurd Block Verka Prov. Installing T/Well, POST- Civil Works, OHSR, etc. to 09-Aug- 26-SEP- 16-Aug- POST- 21-Aug- 23-Nov- POST- 25.09 NCB REVIE 0.00 W/s Scheme Sohian 2010 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Khurd Block Verka Suffian 23.00/40.99 (TW12438) PRWSSP-Asr-Div-1-41-I 96 Prov. Installing T/Well, 31-Mar- Civil Works, OHSR, etc. to 31-Mar- 30-APR- 15-May- POST- 30-May- 04-Jul- 02-Sep- POST- 30-SEP- 40.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Suffian 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Ajnala Prov. Installing T/Well, 01-OCT- POST- Civil Works, OHSR, etc. to 31-Mar- 01-Oct- POST- 01-Oct- 27-Nov- POST- 37.84 NCB 2012 REVIE 0.00 W/s Scheme Suffian 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL Block Ajnala

Talla (TW7415) 17.00/0.00

PRWSSP-Asr-Div-1-91-I 97

Page 25 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Prov. Installing T/Well, 30-Nov- Civil Works, OHSR, etc. to 09-Aug- 11-JAN- 10-Jan- POST- 25-Jan- 01-Mar- 30-Apr- POST- 28-MAY- 17.00 NCB N/A N/A N/A 2011 N/A W/s Scheme Talla Block 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Chogawan Timmowala 50.00/0.00 (TW16338) PRWSS-W-DIV06-1822-1 98 Installing Tubewell, Civil Works, OHSR work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- Water Supply scheme 50.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Timmowal Block Jandiala

Umarpura 37.70/53.24 (TW15306) PRWSSP-Asr-Div-1-157-I 99 Prov. Installing T/Well, Civil Works, Distribution 26-AUG- System, etc. to W/s 05-May- 10-Oct- POST- 18-Oct- 18-Nov- 18-Dec- POST- 03-JAN- 03-Jul- 46.00 NCB 2011 N/A N/A N/A N/A Scheme Umarpura Block 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 2012 PLAN Harsha Chhina

Prov. Installing T/Well, Civil Works, Distribution 13-OCT- POST- System, etc. to W/s 05-May- 11-Sep- POST- 25-Sep- 26-Oct- POST- 45.18 NCB 2011 REVIE 0.00 Scheme Umarpura Block 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL Harsha Chhina

PRWSSP-Asr-Div-1-157-II 100 Construction of RCC 26-AUG- OHSR 75000 ltr for W/s 05-May- 10-Oct- POST- 18-Oct- 18-Nov- 18-Dec- POST- 03-JAN- 03-Jul- 13.00 NCB 2011 N/A N/A N/A N/A Scheme Umarpura Block 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 2012 PLAN Harsha Chhina Construction of RCC 13-OCT- POST- OHSR 75000 ltr for W/s 05-May- 10-Oct- POST- 10-May- 12-Jun- POST- 12.90 NCB 2011 REVIE 0.00 Scheme Umarpura Block 2011 2011 REVIEW 2012 2012 REVIEW W ACTUAL Harsha Chhina Usman 51.21/0.00 (TW16339) PRWSS-W-DIV06-1823-1 101

Page 26 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Installing Tubewell, Civil Works, OHSR work for 03-May- 30-SEP- 10-Oct- POST- 19-Oct- 22-Nov- 22-Dec- POST- 15-JAN- 15-Jul- Water Supply scheme 51.21 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Usman Block Rayya

Wadali Dogran 54.76/0.00 (TW16621) PRWSS-W-DIV06-1954-1 102 Installing T/well, Civl Work, OHSR, etc for W/s 31-May- 30-May- 10-SEP- 15-Sep- POST- 20-Sep- 25-Oct- 10-Nov- POST- 30-NOV- Scheme Wadali Dogran 54.76 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Block

Zone: South Zone, Circle: Sangrur Circle, District: Barnala Amla Singh Wala 37.00/39.77 (TW16433) PRWSS-W-DIV64-1846-1 103 Water Supply Scheme 31-AUG- 31-Mar- 30-Jun- 15-Oct- POST- 01-Nov- 02-Dec- 07-Dec- POST- 10-DEC- Amla Singh Wala 37.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN (Tubewell) PRWSS-W-DIV64-1846-2 104 Water Supply Scheme 31-AUG- 31-Mar- 30-Jun- 15-Oct- POST- 01-Nov- 02-Dec- 07-Dec- POST- 10-DEC- Amla Singh Wala (Civil 37.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work)

Bidhate 30.00/31.35 (TW16436) PRWSS-W-DIV64-1877-1 105 31-Mar- Water Supply Scheme 31-Aug- 30-SEP- 15-Oct- POST- 01-Nov- 02-Dec- 07-Dec- POST- 10-DEC- 30.00 NCB N/A N/A N/A 2013 N/A Bidhate (Tubewell) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV64-1877-2 106

Page 27 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

31-Mar- Water Supply Scheme 31-Aug- 30-SEP- 15-Oct- POST- 01-Nov- 02-Dec- 07-Dec- POST- 10-DEC- 30.00 NCB N/A N/A N/A 2013 N/A Bidhate (Civil Work) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Dhaner 37.00/44.85 (TW16434) PRWSS-W-DIV64-1848-1 107 31-Mar- Water Supply Scheme 31-Aug- 30-SEP- 15-Oct- POST- 01-Nov- 02-Dec- 07-Dec- POST- 10-DEC- 37.00 NCB N/A N/A N/A 2013 N/A Dhaner (Tubewell) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV64-1848-2 108 31-Mar- Water Supply Scheme 31-Aug- 30-SEP- 15-Oct- POST- 01-Nov- 02-Dec- 07-Dec- POST- 10-DEC- 37.00 NCB N/A N/A N/A 2013 N/A Dhaner (Civil Work) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Gurm 34.00/0.00 (TW16435) PRWSS-W-DIV64-1876-1 109 31-Mar- Water Supply Scheme 31-Aug- 30-SEP- 15-Oct- POST- 01-Nov- 02-Dec- 07-Dec- POST- 10-DEC- 34.00 NCB N/A N/A N/A 2013 N/A Gurm (Tubewell) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV64-1876-2 110 31-Mar- Water Supply Scheme 31-Aug- 30-SEP- 15-Oct- POST- 01-Nov- 02-Dec- 07-Dec- POST- 10-DEC- 34.00 NCB N/A N/A N/A 2013 N/A Gurm (Civil Work) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Patti Jaimal Singh 25.33/25.33 (TW15921) PRWSS-W-DIV64-1553-2 111 31-Mar- 30-Sep- 04-APR- 04-Apr- POST- 04-Apr- 10-May- 22-May- POST- 06-JUN- CW/Repair of OHSR 17.18 NCB N/A N/A N/A 2013 N/A 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Page 28 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

POST- 30-Sep- 04-APR- 04-Apr- POST- 04-Apr- 10-May- POST- CW/Repair of OHSR 17.18 NCB REVIE 0.00 2011 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Zone: Central Zone, Circle: Bathinda Circle, District: Bathinda

Aklai Jalal 75.67/0.00 (TW7617) PRWSS-BTI-B1-W-19-I 112 Augmentation of Water Supply Scheme Aklia 17-Mar- 15-Nov- 15-DEC- 15-Dec- POST- 26-Dec- 26-Jan- 26-Feb- POST- 18-MAR- Jalal Block Bhagta Bhai 75.67 NCB N/A N/A N/A 2010 N/A 2008 2008 2008 REVIEW 2008 2009 2009 REVIEW 2009 PLAN Ka Distt. Bathinda (Canal Based) Augmentation of Water Supply Scheme Aklia POST- POST- POST- Jalal Block Bhagta Bhai 75.67 NCB REVIE 0.00 REVIEW REVIEW Ka Distt. Bathinda (Canal W ACTUAL Based)

Bath (CA9083) 2.23/10.69

PRWSSP-Bth-RWS-1-100-I 113 Improvement of Water 20-AUG- 19-Apr- Supply Scheme Bath, 20-Jul- 20-Aug- POST- 31-Aug- 30-Sep- POST- 2.23 NCB 2009 N/A N/A N/A 2010 N/A Block Nathana, Distt. 2009 2009 REVIEW 2009 2009 REVIEW PLAN Bathinda(Canal Based) Improvement of Water POST- Supply Scheme Bath, POST- POST- 2.23 NCB REVIE 0.00 Block Nathana, Distt. REVIEW REVIEW W ACTUAL Bathinda(Canal Based) Bhagi Bander (CA9389) PRWSS-BTI-B1-W-75-I 114 POST- POST- 31-Dec- 01-Feb- POST- PRWSSP-BTI-B1-W-75/I 69.62 NCB REVIE 0.00 REVIEW 2010 2011 REVIEW W ACTUAL PRWSS-BTI-B1-W-75-II 115

Page 29 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

POST- PRWSSP-BTI-B1-W-75/II 30-Nov- POST- 03-Dec- 04-Jan- POST- 19.00 NCB REVIE 0.00 2010 REVIEW 2010 2011 REVIEW W ACTUAL

Faridkot 70.03/0.00 (CA7515) PRWSS-BTI-B1-W-27-I 116 Augmentation of Water 20-May- Supply Scheme Faridkot 27-Dec- 27-JAN- 27-Jan- POST- 08-Feb- 08-Mar- 08-Apr- POST- 21-MAY- 70.03 NCB N/A N/A N/A 2010 N/A Kotli Block Sangat Distt. 2008 2009 2009 REVIEW 2009 2009 2009 REVIEW 2009 PLAN Bathinda (Canal Based) Harkishanpura 14.08/36.11 (CA9126) PRWSS-BTI-B1-W-84-I 117 Augmentation of Water Supply Scheme 09-May- 10-Jan- 10-FEB- 10-Feb- POST- 22-Feb- 22-Mar- 22-Apr- POST- 10-MAY- Harkishanpura Block 14.08 NCB N/A N/A N/A 2010 N/A 2009 2009 2009 REVIEW 2009 2009 2009 REVIEW 2009 PLAN Rampura Distt. Bathinda (Canal Based) Augmentation of Water Supply Scheme POST- POST- POST- Harkishanpura Block 14.08 NCB REVIE 0.00 REVIEW REVIEW Rampura Distt. Bathinda W ACTUAL (Canal Based) Jodhpur Pakhar 65.50/5.55 (CA7098) PRWSSP-Bth-Div-III-110-I 118 Augmentation of existing Water Supply Scheme 19-Aug- Jodhpur Pakhar, Block 22-May- 22-JUN- 22-Jun- POST- 07-Jul- 11-Aug- 10-Oct- POST- 07-NOV- 55.00 NCB N/A N/A N/A 2011 N/A Maur, Distt. 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Bathinda(Canal Based)

Augmentation of existing Water Supply Scheme POST- Jodhpur Pakhar, Block POST- POST- 55.16 NCB REVIE 0.00 Maur, Distt. REVIEW REVIEW W ACTUAL Bathinda(Canal Based)

Page 30 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Kaile Bander 20.68/110.52 (CA6695) PRWSS-BTI-B1-W-54-I 119 Augmentation of Water Supply Scheme Kaile 10-NOV- 10-Feb- 10-Oct- 10-Nov- POST- 21-Nov- 21-Dec- 21-Jan- POST- 11-FEB- Bander Block Talwandi 85.00 NCB 2008 N/A N/A N/A 2010 N/A 2008 2008 REVIEW 2008 2008 2009 REVIEW 2009 PLAN Sabo Distt. Bathinda (Canal Based) Augmentation of Water Supply Scheme Kaile POST- 25-Jun- 28-DEC- 28-Dec- POST- 30-Dec- 01-Feb- POST- Bander Block Talwandi 85.21 NCB REVIE 0.00 2010 2010 2010 REVIEW 2010 2011 REVIEW Sabo Distt. Bathinda W ACTUAL (Canal Based) PRWSS-BTI-B1-W-54-II 120 POST- 852.10 25-Jun- 28-DEC- POST- 31-Dec- 30-Jan- POST- Kaile Bander NCB REVIE 0.00 2010 2010 REVIEW 2010 2011 REVIEW W ACTUAL

Kaloke 10.28/0.00 (TW16749) PRWSS-BTI-B1-W-72 121 30-Dec- Augumentation of Water 01-Aug- 01-SEP- 01-Oct- POST- 01-Nov- 01-Dec- 21-Dec- POST- 30-DEC- 10.17 NCB N/A N/A N/A 2013 N/A supply scheme. 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Katar singh wala 26.04/23.48 (CA3031) PRWSS-BTI-B1-W-1-I 122 Augmentation of Water Supply Scheme Katar 25-AUG- 25-Nov- 25-Jul- 25-Aug- POST- 06-Sep- 06-Oct- 06-Nov- POST- 26-NOV- Singh Wala & Gulabgarh 16.15 NCB 2008 N/A N/A N/A 2009 N/A 2008 2008 REVIEW 2008 2008 2008 REVIEW 2008 PLAN Block & Distt. Bathinda. (Canal based Scheme) Augmentation of Water Supply Scheme Katar POST- 25-Jul- 10-Oct- POST- 11-Dec- 15-Jan- POST- Singh Wala & Gulabgarh 16.25 NCB REVIE 0.00 2008 2008 REVIEW 2008 2009 REVIEW Block & Distt. Bathinda. W ACTUAL (Canal based Scheme)

Page 31 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Kesar Singh 29.50/39.91 Wala (CA7622) PRWSS-BTI-B1-W-24-I 123 Augmentation of Water Supply Scheme Kesar 06-Apr- 05-Dec- 05-JAN- 05-Jan- POST- 17-Jan- 17-Feb- 17-Mar- POST- 07-APR- Singh Wala Block Bhagta 29.50 NCB N/A N/A N/A 2010 N/A 2008 2009 2009 REVIEW 2009 2009 2009 REVIEW 2009 PLAN Bhai Ka Distt. Bathinda (Canal Based) Augmentation of Water Supply Scheme Kesar POST- POST- POST- Singh Wala Block Bhagta 29.50 NCB REVIE 0.00 REVIEW REVIEW Bhai Ka Distt. Bathinda W ACTUAL (Canal Based) PRWSS-BTI-B1-W-24-II 124 05-Nov- 05-Aug- 05-SEP- 05-Sep- POST- 16-Sep- 16-Oct- POST- New Kesar Singh Wala 13.00 NCB N/A N/A N/A 2010 N/A 2009 2009 2009 REVIEW 2009 2009 REVIEW PLAN

POST- POST- POST- New Kesar Singh Wala REVIE 0.00 REVIEW REVIEW W ACTUAL

Kotha Guru 212.98/19.07 (CA7619) PRWSS-BTI-B1-W-25-I 125 Augmentation of Water Supply Scheme Kotha 20-May- 212.98 27-Dec- 27-JAN- 27-Jan- POST- 08-Feb- 08-Mar- 08-Apr- POST- 21-MAY- Guru Block Bhagta Bhai NCB N/A N/A N/A 2010 N/A 2008 2009 2009 REVIEW 2009 2009 2009 REVIEW 2009 PLAN Ka Distt. Bathinda (Canal Based) Augmentation of Water Supply Scheme Kotha POST- 212.98 POST- POST- Guru Block Bhagta Bhai NCB REVIE 0.00 REVIEW REVIEW Ka Distt. Bathinda (Canal W ACTUAL Based)

Lehri (CA9112) 60.36/39.78

PRWSS-BTI-B1-W-50-I 126

Page 32 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Augmentation of Water Supply Scheme Lehri 10-NOV- 10-Feb- 10-Oct- 10-Nov- POST- 21-Nov- 21-Dec- 21-Jan- POST- 11-FEB- Block Talwandi Sabo 60.36 NCB 2008 N/A N/A N/A 2010 N/A 2008 2008 REVIEW 2008 2008 2009 REVIEW 2009 PLAN Distt. Bathinda (Canal Based) Augmentation of Water Supply Scheme Lehri POST- POST- POST- Block Talwandi Sabo 60.36 NCB REVIE 0.00 REVIEW REVIEW Distt. Bathinda (Canal W ACTUAL Based) Mehma Sarja 150.72/80.86 (CA7483) PRWSS-BTI-B1-W-11-I 127 Augmentation of Water Supply Scheme Mehma 10-OCT- 09-Jan- 150.72 10-Sep- 10-Oct- POST- 21-Oct- 21-Nov- 21-Dec- POST- 10-JAN- Sarja Block Bathinda NCB 2008 N/A N/A N/A 2010 N/A 2008 2008 REVIEW 2008 2008 2008 REVIEW 2009 PLAN Distt. Bathinda (Canal Based) Augmentation of Water Supply Scheme Mehma POST- 150.72 POST- POST- Sarja Block Bathinda NCB REVIE 0.00 REVIEW REVIEW Distt. Bathinda (Canal W ACTUAL Based) Rattangarh Kanakwal 5.00/14.58 (CA9114) PRWSS-BTI-B1-W-42-I 128 Augmentation of Water Supply Scheme 15-OCT- 14-Jan- Rattangarh Kanakwal 15-Sep- 15-Oct- POST- 26-Oct- 26-Nov- 26-Dec- POST- 15-JAN- 14.70 NCB 2008 N/A N/A N/A 2010 N/A Block Talwandi Sabo 2008 2008 REVIEW 2008 2008 2008 REVIEW 2009 PLAN Distt. Bathinda (Canal Based) Augmentation of Water Supply Scheme POST- Rattangarh Kanakwal POST- POST- 14.58 NCB REVIE 0.00 Block Talwandi Sabo REVIEW REVIEW W ACTUAL Distt. Bathinda (Canal Based) Singo (CA7580) 57.41/2.98

Page 33 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-BTI-B1-W-78-I 129 Augmentation of Water 24-Apr- Supply Scheme Singo 25-Dec- 25-JAN- 25-Jan- POST- 08-Feb- 08-Mar- 08-Apr- POST- 25-APR- 57.41 NCB N/A N/A N/A 2010 N/A Block Talwandi Sabo 2008 2009 2009 REVIEW 2009 2009 2009 REVIEW 2009 PLAN Distt. Bathinda. Augmentation of Water POST- Supply Scheme Singo POST- POST- 57.41 NCB REVIE 0.00 Block Talwandi Sabo REVIEW REVIEW W ACTUAL Distt. Bathinda. Tungwali 150.35/0.00 (CA7512) PRWSS-BTI-B1-W-16-I 130 Augmentation of Water Supply Scheme Tungwali 22-NOV- 22-Feb- 150.35 22-Oct- 22-Nov- POST- 03-Dec- 03-Jan- 03-Feb- POST- 23-FEB- Block Nathana Distt. NCB 2008 N/A N/A N/A 2010 N/A 2008 2008 REVIEW 2008 2009 2009 REVIEW 2009 PLAN Bathinda (Canal Based)

Zone: Central Zone, Circle: Faridkot Circle, District: Faridkot

Baggiana 115.00/166.5 (CA15829) 1 PRWSS-W-DIV52-1576-1 131 30-Dec- 153.70 04-Jan- 04-FEB- 04-Mar- POST- 07-Oct- 07-Nov- 30-Dec- POST- 30-DEC- Civil Works NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

POST- Civil Works and 153.49 26-JUL- 21-Aug- POST- 03-Sep- 05-Oct- POST- NCB REVIE 0.00 distribution system 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSS-W-DIV52-1576-2 132 15-Dec- 31-Jan- 28-FEB- 31-Mar- POST- 15-Apr- 15-May- 15-Jun- POST- 15-JUN- OHSR 14.00 NCB N/A N/A N/A 2012 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2011 PLAN

Baja Khana 200.00/208.9 (CA13757) 0 PRWSSP-Frd-Div-39-II 133

Page 34 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

30-AUG- 28-Aug- 30-Jul- 30-Sep- POST- 15-Oct- 17-Nov- 17-Dec- POST- 28-FEB- Distribution System 40.00 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Dhilwan Kalan 550.00/499.3 (CA16120) 4 DWSS-W-DIV52-1683-1 134 10-Oct- 438.65 10-Jun- 10-JUL- 25-Jul- POST- 10-Aug- 10-Sep- 25-Sep- POST- 10-OCT- Civil Works & OHSR NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Khacharan 73.00/99.27 (CA16118) PRWSS-W-DIV52-1680-1 135 21-Dec- 117.38 20-Aug- 20-SEP- 05-Oct- POST- 20-Oct- 20-Nov- 05-Dec- POST- 21-DEC- Civil Works & OHSR NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Lambwali 169.93/169.9 (CA16135) 8 PRWSS-W-DIV52-1686-1 136 29-Dec- 28-Aug- 28-SEP- 13-Oct- POST- 28-Oct- 28-Nov- 13-Dec- POST- 29-DEC- Civil Works and OHSR 71.08 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Nathewala 124.35/0.00 (CA16042) PRWSS-W-DIV52-1624-1 137 26-Dec- 25-Aug- 25-SEP- 10-Oct- POST- 25-Oct- 25-Nov- 10-Dec- POST- 26-NOV- Civil Works & OHSR 68.63 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2011 2012 REVIEW 2012 PLAN

Pindi Blochan 36.16/35.91 (CA15828) PRWSSP-Frd-Div-36-I 138

Page 35 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

28-Oct- 26-Mar- 26-APR- 26-May- POST- 16-Jun- 18-Jul- 18-Aug- POST- 28-OCT- Civil Works & OHSR 36.16 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Rameana 190.96/185.3 (CA7455) 9 DWSS-W-DIV52-1625-1 139 10-Oct- 190.96 15-Jun- 15-JUL- 30-Jul- POST- 15-Aug- 15-Sep- 25-Sep- POST- 10-OCT- Civil Works NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Romana Ajit 98.71/120.17 Singh (CA16033) PRWSS-W-DIV52-1578-1 140 30-Aug- 100.00 30-Mar- 30-APR- 30-May- POST- 30-Jun- 30-Jul- 30-Aug- POST- 30-AUG- Civil Works NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

31-MAY- POST- 02-Mar- 26-Jun- POST- 25-Jul- 27-Aug- POST- Civil Works 99.95 NCB 2012 REVIE 0.00 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Rori Kapura 151.47/146.0 (CA6651) 7 PRWSSP-FDK-B1-W-6 -2 141 15-OCT- 25-Dec- 30-Sep- 30-Oct- POST- 05-Nov- 06-Dec- 20-Dec- POST- 25-DEC- Pkg-2 Rori Kapura 52.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Saide Ke 109.30/109.3 (CA16121) 0 PRWSS-W-DIV52-1684-1 142 20-Oct- 114.40 20-Jun- 20-JUL- 05-Aug- POST- 20-Aug- 20-Sep- POST- 20-OCT- Civil Works and OHSR NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV52-1684-2 143

Page 36 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

30-Sep- 102.05 30-Jun- 30-JUN- 31-Aug- POST- 01-Oct- 01-Nov- 16-Nov- POST- 30-NOV- Civil Works & OHSR NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Sukhan Wala 121.90/121.9 (CA15803) 0 PRWSSP-FDK-B1-W-17-I 144 13-Aug- 10-Jan- 10-FEB- 10-Mar- POST- 02-May- 03-Jun- 03-Jul- POST- 13-AUG- Civil Works 92.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

PRWSSP-FDK-B1-W-17-II 145 13-Aug- 10-Jan- 10-FEB- 10-Mar- POST- 02-May- 03-Jun- 03-Jul- POST- 13-OCT- Distribution System 20.60 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Zone: South Zone, Circle: Patiala Circle, District: Fatehgarh Sahib

BRASS 64.51/0.00 (TW16347) DWSS-W-DIV34-1990-1 146 30-Jun- 30-Aug- 20-SEP- 30-Sep- POST- 15-Oct- 14-Nov- 30-Dec- POST- 10-JAN- TUBEWELL BRASS 18.75 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

DWSS-W-DIV34-1990-2 147 30-Jun- 30-Aug- 20-SEP- 30-Sep- POST- 15-Oct- 14-Nov- 30-Dec- POST- 10-JAN- BRASS CIVIL WORK 30.54 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

DWSS-W-DIV34-1990-3 148 30-Jun- 30-Aug- 20-SEP- 30-Sep- POST- 15-Oct- 14-Nov- 30-Dec- POST- 10-JAN- BRASS OHSR 15.22 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

MULLANPUR SADAK 32.45/0.00 (TW16346) DWSS-W-DIV34-1991-1 149 Page 37 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

30-Jun- MULLANPUR (SADAK) 30-Aug- 22-SEP- 30-Sep- POST- 20-Oct- 19-Nov- 30-Dec- POST- 12-JAN- 7.48 NCB N/A N/A N/A 2013 N/A TUBEWELL 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

DWSS-W-DIV34-1991-2 150 30-Jun- MULLANPUR (SADAK) 30-Aug- 22-SEP- 30-Sep- POST- 20-Oct- 19-Nov- 30-Dec- POST- 12-JAN- 14.99 NCB N/A N/A N/A 2012 N/A CIVIL WORK 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

DWSS-W-DIV34-1991-3 151 30-Jun- MULLANPUR SADAK 30-Aug- 22-SEP- 30-Sep- POST- 20-Oct- 19-Nov- 30-Dec- POST- 12-JAN- 9.98 NCB N/A N/A N/A 2013 N/A (OHSR) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

Zone: Central Zone, Circle: Ferozpur Circle, District: Fazilka

Asaf Wala 46.00/47.07 (TW16260) PRWSS-W-DIV45-1894-1 152 11-Feb- 17-Jan- 20-JUN- 15-Nov- POST- 20-Nov- 23-Dec- 15-Jan- POST- 15-FEB- T/W,C/W,OHSR 44.00 NCB N/A N/A N/A 2013 N/A 2011 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

POST- 23-Jul- 11-SEP- 11-Sep- POST- 09-Nov- 12-Dec- POST- 43.76 NCB REVIE 0.00 2012 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Churi wala 138.60/111.0 Dhanna 1 (CA9293) PRWSSP-Frz-Div-1-36-I 153 25-AUG- 25-Aug- 138.60 30-Sep- 05-Sep- POST- 10-Sep- 11-Oct- POST- Civil works & OHSR NCB 2012 N/A N/A N/A 2013 N/A 2010 2012 REVIEW 2012 2012 REVIEW PLAN

Gagan Ke 55.00/0.00 (TW16738) PRWSS-W-DIV45-2242-1 154

Page 38 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

31-Mar- 15-Aug- 15-SEP- 01-Oct- POST- 25-Oct- 25-Nov- 05-Dec- POST- 10-DEC- Civil Works 55.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Ganjuana 42.00/0.00 (TW16561) PRWSS-W-DIV45-2082-1 155 31-Mar- TW CIVIL AND OHSR 15-Aug- 15-SEP- 01-Oct- POST- 25-Oct- 25-Nov- 05-Dec- POST- 10-DEC- 42.00 NCB N/A N/A N/A 2013 N/A WORKS 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

01-NOV- POST- 01-Nov- POST- 15-Nov- 19-Dec- POST- 47.44 NCB 2012 REVIE 0.00 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Ghallu (CA9296)

PRWSS-W-DIV46-2209-1 156 25-OCT- 25-Oct- 161.63 30-Sep- 05-Nov- POST- 11-Nov- 12-Dec- 12-Feb- POST- 17-FEB- Civil & OHSR works NCB 2012 N/A N/A N/A 2013 N/A 2010 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Hasta Kalan 90.00/0.00 (TW16559) PRWSS-W-DIV45-2080-1 157 31-Mar- 15-Aug- 15-SEP- 01-Oct- POST- 25-Oct- 25-Nov- 05-Dec- POST- 10-DEC- T/W, C/w, OHSR 90.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Kadar Bax 45.00/0.00 (TW16562) PRWSS-W-DIV45-2083-1 158 31-Mar- 15-Aug- 15-SEP- 01-Oct- POST- 25-Oct- 25-Nov- 05-Dec- POST- 10-DEC- TW CIVIL AND OHSR 45.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Murad Wala Dal Singh 71.56/71.56 (CA10187) Page 39 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-FRZ-Div-1-38-II 159 01-May- 01-Apr- 12-APR- 14-Dec- POST- 29-Dec- 02-Feb- 03-Apr- POST- 20-AUG- OHSR 9.00 NCB N/A N/A N/A 2011 N/A 2011 2010 2010 REVIEW 2010 2011 2011 REVIEW 2011 PLAN

POST- 30-Sep- 06-DEC- 14-Dec- POST- 13-Jul- 22-Aug- POST- OHSR 9.00 NCB REVIE 0.00 2010 2010 2010 REVIEW 2011 2011 REVIEW W ACTUAL

Nihal Khera 150.00/0.00 (CA16558) PRWSSP-FZR-B1-W-5-I 160 04-OCT- 01-Oct- 150.00 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- CIVIL AND OHSR NCB 2012 N/A N/A N/A 2012 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN WORKS Saidon-Ke-Hittar (TW16737) 43.00/50.73

PRWSS-W-DIV45-2240-1 161 31-Mar- 15-Aug- 15-SEP- 01-Oct- POST- 25-Oct- 25-Nov- 05-Dec- POST- 10-DEC- T/W,C/W,OHSR 43.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

05-OCT- POST- 26-Oct- POST- 09-Nov- 12-Dec- POST- 46.80 NCB 2012 REVIE 0.00 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Saidon Ke Uttar 45.00/50.73 (TW16560) PRWSS-W-DIV45-2081-1 162 31-Mar- 15-Aug- 15-SEP- 01-Oct- POST- 25-Oct- 25-Nov- 05-Dec- POST- 10-DEC- TW Civil $ OHSR Works 45.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Zone: Central Zone, Circle: Ferozpur Circle, District: Ferozepur

Amir Khas 55.00/0.00 (TW16565)

Page 40 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV72-2206-1 163 31-Mar- 15-Aug- 15-SEP- 01-Oct- POST- 25-Oct- 25-Nov- 05-Dec- POST- 10-DEC- T/W, C/W & OHSR 55.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Bagge Wala 37.67/37.67 (TW16716) PRWSS-W-DIV43-2160-1 164 Scheme.Bagge Wala, 25-Aug- 21-Aug- 20-SEP- 19-Oct- POST- 23-Oct- 23-Nov- POST- Pack. no. 1,T/W,C/W, 37.67 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN OHSR & D/S

Scheme.Bagge 05-OCT- POST- 10-Oct- POST- 08-Oct- 09-Nov- POST- Wala,Pack no. I,T/W,C/W, 34.44 NCB 2012 REVIE 0.00 2012 REVIEW 2012 2012 REVIEW OHSR & D/S W ACTUAL PRWSS-W-DIV43-2160-2 165 Scheme.Bagge Wala, 25-Aug- 21-Aug- 20-SEP- 19-Oct- POST- 23-Oct- 23-Nov- POST- Pack no. 1,T/W,C/W, 37.67 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN OHSR & D/S

Behak Gujjaran 60.00/0.00 (TW8514) PRWSS-W-DIV44-2128-1 166 Scheme.Behak 16-Aug- 21-Aug- 20-SEP- 03-Oct- POST- 12-Oct- 12-Nov- POST- Gujjaran.Pack.I,T/W,C/W, 60.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN OHSR & D/S.

Bhadru 24.00/0.00 (TW16639) PRWSS-W-DIV43-2115-1 167 Scheme.Bhadru,Pack 16-Aug- 21-Aug- 20-SEP- 03-Oct- POST- 12-Oct- 12-Nov- POST- no.I,T/W,C/W,OHSR & 24.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S

Chabba 43.00/46.86 (TW16644)

Page 41 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV44-2129-1 168 16-Aug- Scheme.Chabba.Pack- 21-Aug- 20-SEP- 03-Oct- POST- 12-Oct- 12-Nov- POST- 43.00 NCB N/A N/A N/A 2013 N/A I,T/W,C/W,OHSR & D/S. 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN

11-OCT- POST- Scheme.Chabha, Pack 11-Oct- POST- 16-Oct- 19-Nov- POST- 40.90 NCB 2012 REVIE 0.00 no. I, T/W & C/W 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Changali Jadid 59.00/0.00 (TW16555) PRWSS-W-DIV44-2057-1 169 Scheme.Changali Jadid, 13-AUG- 31-Aug- 02-May- 10-Sep- POST- 15-Oct- 16-Nov- POST- Package no.I,T/W & C/W 44.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV44-2057-2 170 13-AUG- 31-Aug- 02-May- 10-Sep- POST- 15-Oct- 16-Nov- POST- Package no. II, OHSR 15.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Ch. Ghubaya Urf Taran Wali 55.60/57.08 (TW7303) PRWSS-W-DIV43-2054-1 171 Scheme.Ch.Ghubaya Urf 15-AUG- 30-Apr- 01-Jul- 31-Aug- POST- 08-Sep- 09-Oct- POST- Tarn Wali,Pack no.I, 53.50 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN T/W,C/W & D/S

Scheme.Ch.Ghubaya Urf 05-OCT- POST- 10-Oct- POST- 15-Oct- 19-Nov- POST- Taran Wali, Pack. no. I, 53.42 NCB 2012 REVIE 0.00 2012 REVIEW 2012 2012 REVIEW T/Well, C.Work & D/s W ACTUAL PRWSS-W-DIV43-2054-2 172 15-AUG- 30-Apr- 01-Jul- 31-Aug- POST- 08-Sep- 09-Oct- POST- Package no. 2, OHSR 15.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Page 42 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Dhandian 50.00/20.40 (TW16573) PRWSS-W-DIV44-2071-1 173 04-OCT- 01-Oct- Scheme Dhandian,Pack 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- 35.00 NCB 2012 N/A N/A N/A 2013 N/A no.I,T/W,C/W 2012 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV44-2071-2 174 04-OCT- 01-Oct- 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- Pack no. II, OHSR 15.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Faride Wala 28.00/40.39 (TW7899) PRWSS-W-DIV44-2058-1 175 Scheme.Farde Wala, 13-AUG- 31-Aug- 02-May- 10-Sep- POST- 15-Oct- 16-Nov- POST- Package no. I,T/W & C/W 37.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

11-OCT- POST- Scheme.Faride 11-Oct- POST- 16-Oct- 19-Nov- POST- 37.36 NCB 2012 REVIE 0.00 Wala,Pack no. I,T/W & 2012 REVIEW 2012 2012 REVIEW W ACTUAL C/W PRWSS-W-DIV44-2058-2 176 13-AUG- 31-Aug- 02-May- 10-Sep- POST- 15-Oct- 16-Nov- POST- Pack no. 2, OHSR 10.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Gulam Wala 30.00/0.00 (TW16703) PRWSS-W-DIV43-2114-1 177 Scheme.Gulam Wala, 16-Aug- 21-Aug- 20-SEP- 03-Oct- POST- 12-Oct- 12-Nov- POST- Pack.I, T/W,C/W,OHSR & 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S

Hake Wala (TW8739)

Page 43 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV43-2110-1 178 Scheme.Hake Wala, 30-Jun- 15-Aug- 01-SEP- 15-Sep- POST- 23-Sep- 24-Oct- POST- Pack.no.I, T/W,C/W & D/S 37.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV43-2110-2 179 30-Jun- Scheme.Hake Wala, 15-Aug- 01-SEP- 15-Sep- POST- 23-Sep- 24-Oct- POST- 15.00 NCB N/A N/A N/A 2013 N/A Pack.II,OHSR 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Haste Ke 30.00/28.00 (TW7968) PRWSS-W-DIV43-2113-1 180 Scheme.Haste Ke, Pack 16-Aug- 21-Aug- 20-SEP- 03-Oct- POST- 12-Oct- 12-Nov- POST- no. I, T/W,C/W,OHSR & 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S

Hazi Chimba 28.70/29.39 (TW16548) PRWSS-W-DIV43-2048-1 181 Scheme. Hazi Chimba, 01-AUG- 31-May- 10-Jul- 15-Aug- POST- 23-Aug- 24-Sep- POST- Pack-I, Tubewell,C/W & 0.20 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S PRWSS-W-DIV43-2048-2 182 01-AUG- 31-May- 10-Jul- 15-Aug- POST- 23-Aug- 24-Sep- POST- Package. OHSR 8.70 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Hollan Wali 30.00/42.89 (TW16569) PRWSS-W-DIV44-2064-1 183 04-OCT- 31-Aug- Scheme.Hollanwali, Pack 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- 38.50 NCB 2012 N/A N/A N/A 2013 N/A no.1,C/W & T/W 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Page 44 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

11-OCT- POST- Scheme.Hollan Wali, 11-Oct- POST- 16-Oct- 19-Nov- POST- 38.65 NCB 2012 REVIE 0.00 Pack. no. I, T/W & C/W 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSS-W-DIV44-2064-2 184 04-OCT- 31-Aug- 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- Pack no.II,OHSR 10.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

ILLme Wala 30.00/24.32 (TW8741) PRWSS-W-DIV43-2111-1 185 01-AUG- 30-Apr- Scheme.Ilme 15-Jul- 15-Aug- POST- 23-Aug- 24-Sep- POST- 30.00 NCB 2012 N/A N/A N/A 2013 N/A Wala,Pack.I.T/W,C/W & 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S Joge Wala 35.00/36.15 (TW16254) PRWSS-W-DIV44-2061-1 186 Scheme.Joge Wala, 31-Aug- 18-Jun- 22-JUN- 10-Sep- POST- 15-Oct- 16-Nov- POST- Package no.I,T/W & C/W 33.50 NCB N/A N/A N/A 2012 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN

11-OCT- POST- Scheme.Joge Wala,Pack 11-Oct- POST- 16-Oct- 19-Nov- POST- 33.30 NCB 2012 REVIE 0.00 no. 1, T/W & C/W 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSS-W-DIV44-2061-2 187 31-Aug- 18-Jun- 22-JUN- 10-Sep- POST- 15-Oct- 16-Nov- POST- Package no.II, OHSR 10.00 NCB N/A N/A N/A 2012 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Kailu Wala 10.39/0.00 (TW7970) PRWSS-W-DIV43-2158-1 188

Page 45 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Scheme. Kailu Wala Pack 25-Aug- 21-Aug- 20-SEP- 19-Oct- POST- 23-Oct- 23-Nov- POST- no. 1 T/W,C/W, OHSR & 10.39 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S Kamal Wala-324 (TW16715) 38.72/38.72

PRWSS-W-DIV43-2159-1 189 Scheme.Kamal Wala-324, 25-Aug- 21-Aug- 20-SEP- 19-Oct- POST- 23-Oct- 23-Nov- POST- Pack no. 1,T/W,C/W, 38.72 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN OHSR & D/S

Kamal Wala-38 20.00/0.00 (TW16550) PRWSS-W-DIV43-2052-1 190 01-OCT- 31-Mar- Scheme.Kamal Wala-38, 15-Sep- 15-Sep- POST- 23-Sep- 24-Oct- POST- 0.20 NCB 2012 N/A N/A N/A 2013 N/A Package.I, C/W & D/S 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Kassona 59.00/59.52 (TW16568) PRWSS-W-DIV44-2063-1 191 13-AUG- 31-Aug- Scheme.Kassona, Pack 16-Jul- 10-Sep- POST- 15-Oct- 16-Nov- POST- 56.00 NCB 2012 N/A N/A N/A 2013 N/A no. I,T/W & C/W 2012 2012 REVIEW 2012 2012 REVIEW PLAN

11-OCT- POST- Scheme.Kassoana. Pack 11-Oct- POST- 16-Oct- 19-Nov- POST- 55.66 NCB 2012 REVIE 0.00 no. 1, T/W & C/W 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSS-W-DIV44-2063-2 192 13-AUG- 31-Aug- 16-Jul- 10-Sep- POST- 15-Oct- 16-Nov- POST- Package no.II, OHSR 15.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Luther 32.00/0.00 (TW16638) PRWSS-W-DIV43-2116-1 193

Page 46 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Scheme.Luther,Pack. 16-Aug- 21-Aug- 20-SEP- 03-Oct- POST- 12-Oct- 12-Nov- POST- no.I,T/W,C/W,OHSR & 32.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S

Mallu Wala 20.00/19.11 (TW16552) PRWSS-W-DIV43-2055-1 194 31-AUG- 31-Mar- Scheme.Mallu Wala, Pack 15-Jul- 15-Sep- POST- 23-Sep- 24-Oct- POST- 20.00 NCB 2012 N/A N/A N/A 2013 N/A no. I,T/W & D/S 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Mankian Wali 23.00/30.65 (TW16571) PRWSS-W-DIV44-2066-1 195 04-OCT- 01-Oct- Scheme.Mankian 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- 15.00 NCB 2012 N/A N/A N/A 2013 N/A Wali,Pack no.I,T/W & C/W 2012 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV44-2066-2 196 04-OCT- 01-Oct- 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- Pack. no. II, OHSR 8.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Nawan Qilla 20.00/0.00 (TW16726) PRWSS-W-DIV43-2161-1 197 Scheme.Nawan Qila, 25-Aug- 21-Aug- 20-SEP- 19-Oct- POST- 23-Oct- 23-Nov- POST- pack no. 1, T/W,C/W, 20.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN OHSR & D/S

Nile Wala 19.00/28.12 (TW16570) PRWSS-W-DIV44-2065-1 198 Scheme.Neele 04-OCT- 31-Aug- 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- Wala,Package no.I,T/W & 12.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN C/W

Page 47 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV44-2065-2 199 04-OCT- 01-Oct- 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- Pack.no.II, OHSR 7.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Noor Pur Sethan (TW8757)

PRWSS-W-DIV43-2112-1 200 Scheme.Noorpur Sethan 15-OCT- 30-Jun- 20-Sep- 31-Oct- POST- 08-Nov- 09-Dec- POST- Pack. no.I,T/W, C/W & 40.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S PRWSS-W-DIV43-2112-2 201 15-OCT- 30-Jun- Scheme.Noorpur Sethan 20-Sep- 31-Oct- POST- 08-Nov- 09-Dec- POST- 20.00 NCB 2012 N/A N/A N/A 2013 N/A Pack.II,OHSR 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Pandhori Khatrian 50.00/50.16 (TW16641) PRWSS-W-DIV44-2126-1 202 Scheme.Pandhori 16-Aug- 21-Aug- 20-SEP- 03-Oct- POST- 12-Oct- 12-Nov- POST- Khatrian,Pack.I,T/W,C/W, 50.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN OHSR & D/S.

Piye Wala 25.00/26.81 (TW16572) PRWSS-W-DIV44-2069-1 203 04-OCT- 01-Oct- Scheme.Piye Wala,Pack 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- 18.00 NCB 2012 N/A N/A N/A 2013 N/A no. I,T/W & C/W 2012 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV44-2069-2 204 04-OCT- 01-Oct- 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- Pack no.II,OHSR 7.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Page 48 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Ratoul Bet 32.00/39.41 (TW16567) PRWSS-W-DIV44-2062-1 205 Scheme.Ratoul 13-AUG- 31-Aug- 02-May- 10-Sep- POST- 15-Oct- 16-Nov- POST- Bet,Package no.I,T/W & 36.30 NCB 2012 N/A N/A N/A 2012 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN C/W

11-OCT- POST- Scheme.Ratoul Bet, Pack. 11-Oct- POST- 16-Oct- 19-Nov- POST- 36.33 NCB 2012 REVIE 0.00 no.I,T/W & C/W 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSS-W-DIV44-2062-2 206 13-AUG- 31-Aug- 02-May- 10-Sep- POST- 15-Oct- 16-Nov- POST- Package no.II,OHSR 10.00 NCB 2012 N/A N/A N/A 2012 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Rukna Mugla 29.85/0.00 (TW8440) PRWSS-W-DIV43-2162-1 207 Scheme.Rukna Mugla, 25-Aug- 21-Aug- 20-SEP- 19-Oct- POST- 23-Oct- 23-Nov- POST- Pack no.1.T/W,C/W, 29.85 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN OHSR & D/S

Saran Wali 32.00/0.00 (TW7902) PRWSS-W-DIV44-2059-1 208 13-AUG- 31-Aug- Scheme.Saran Wali, Pack 21-May- 10-Sep- POST- 15-Oct- 16-Nov- POST- 22.00 NCB 2012 N/A N/A N/A 2012 N/A no. T/W & C/W 2012 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV44-2059-2 209 13-AUG- 31-Aug- 02-May- 10-Sep- POST- 15-Oct- 16-Nov- POST- Pack no.II, OHSR 10.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Suba Kahan Chand 15.00/0.00 (TW16656)

Page 49 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV43-2053-1 210 Scheme.Suba Kahan 01-OCT- 31-Mar- 15-Sep- 15-Sep- POST- 23-Sep- 24-Oct- POST- Chand, Package. I 15.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN Distribution System

Sudhara 22.00/22.78 (TW16643) PRWSS-W-DIV44-2127-1 211 16-Aug- Scheme.Sudhara.Pack- 21-Aug- 20-SEP- 03-Oct- POST- 12-Oct- 12-Nov- POST- 22.00 NCB N/A N/A N/A 2013 N/A I,T/W,C/W,OHSR & D/S. 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Thethar Kalan 75.00/28.77 (TW16655) PRWSS-W-DIV44-2060-1 212 Scheme.Thethar Kalan & 04-OCT- 01-Oct- 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- Thethar Khurd, Pack no. 60.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN I,T/W & C/W PRWSS-W-DIV44-2060-2 213 04-OCT- 01-Oct- 31-Aug- 31-Oct- POST- 27-Nov- 28-Dec- POST- Package no.II, OHSR 15.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Tibbi Kalan 15.15/17.42 (TW8330) PRWSSP-FZR-DIV-1-52-II 214

Scheme Tibbi Kalan (Pac- POST- POST- 15.15 NCB N/A N/A N/A N/A I, Civil) REVIEW REVIEW PLAN

Usman Wala 30.00/29.17 (TW16549) PRWSS-W-DIV43-2051-1 215

Page 50 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Scheme.Usman Wala. 01-OCT- 30-Jun- 15-Sep- 15-Sep- POST- 23-Sep- 24-Oct- POST- Package no.I, T/W,C/W & 0.30 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 REVIEW PLAN D/S

Virk Khurd 55.00/0.00 (TW16563) DWSS-W-DIV72-2205-1 216 31-Mar- 15-Aug- 15-SEP- 01-Oct- POST- 25-Oct- 25-Nov- 05-Dec- POST- 10-DEC- T/W, C/W & OHSR 55.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Zone: North Zone, Circle: Circle, District: Gurdaspur

AKARPURA 40.00/0.00 (TW16471) PRWSS-W-DIV02-2029-1 217 W/S Scheme Akarpura 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block 40.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN District Gurdaspur.

Alawalpur 58.57/55.86 (TW16462) PRWSS-W-DIV01-1886-1 218 W/S Scheme 10-AUG- 30-Jun- 20-May- 11-Sep- POST- 10-Oct- 10-Nov- 11-Dec- POST- 02-JAN- Block Dhariwal District 58.57 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN Gurdaspur

Ali Chack 38.00/0.00 (TW16582) PRWSS-W-DIV01-1960-1 219 W/S Scheme Ali Chack 31-OCT- 20-Aug- 30-Sep- 30-Nov- POST- 30-Dec- 30-Jan- 18-Feb- POST- 27-FEB- Block Dinanagar District 38.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 PLAN Gurdaspur

AMO NANGAL 52.48/0.00 (TW16486) PRWSS-W-DIV02-2040-1 220 Page 51 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Amo Nangal 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block District 52.48 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

Babowal 55.00/0.00 (TW16481) PRWSS-W-DIV01-1892-1 221 W/S Scheme Babowal 30-Aug- 15-SEP- 16-Oct- POST- 12-Nov- 11-Dec- 13-Jan- POST- 12-FEB- 20-Jul- Block 55.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 2013 PLAN Gurdaspur

Badese 33.00/0.00 (TW16505) PRWSS-W-DIV01-2000-1 222 W/S Scheme Badese 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Dhariwal District 33.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

Baje Chack 23.92/0.00 (TW15883) PRWSSP-Gsp-Gsp-32-I 223 W/S Scheme Baje Chack 23-Nov- Block 11-May- 28-JUN- 08-Jul- POST- 23-Jul- 27-Aug- 26-Oct- POST- 22-MAY- 23.92 NCB N/A N/A N/A 2010 N/A Gurdaspur:Tubewell,OHS 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN R,Distribution System. Bakhatpur 45.00/49.12 (TW16499) PRWSS-W-DIV01-1975-1 224 W/S Scheme Bakhatpur 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Kalanaur District 45.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur

BAL (TW16450) 25.00/0.00

PRWSS-W-DIV02-1966-1 225

Page 52 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Bal Block 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Dera Baba Nanak District 25.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur

Barbari Nangal 65.00/0.00 (TW16484) PRWSS-W-DIV01-1957-1 226 W/S Scheme Babri 30-Aug- 15-SEP- 16-Oct- POST- 12-Nov- 11-Dec- 13-Jan- POST- 12-FEB- 20-Jul- Nangal Block Dhariwal 65.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 2013 PLAN District Gurdaspur

Bariar 30.00/0.00 (TW16583) PRWSS-W-DIV02-2045-1 227 W/S Scheme Bariar Block 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- District 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

Barroe 37.00/0.00 (TW16503) PRWSS-W-DIV01-1998-1 228 W/S Scheme Baroe Block 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Dhariwal District 37.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

BASRAWA 30.00/0.00 (TW16458) PRWSS-W-DIV02-2021-1 229 W/S Scheme Basrawan 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Qadian District 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur

BEHLUWAL (TW7719) PRWSSP-Gsp-Batala-90-I 230

Page 53 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- 20-Aug- 25-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 20-FEB- W/W, Distribution System 30.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Behluwal Block Quadian

Behrampur (TW1490) PRWSSP-GSP-B1-W-3-II 231 Prov. OHSR Developmnt POST- of W/W for W/s Scheme. 05-Sep- 05-DEC- 15-Mar- POST- 26-Mar- 27-Apr- POST- 30.89 NCB REVIE 0.00 Behrampur Block 2008 2008 2012 REVIEW 2012 2012 REVIEW W ACTUAL Gurdaspur BHAGTANA TULIAN 30.00/0.00 (TW16452) PRWSS-W-DIV02-1968-1 232 W/S Scheme Bhagtana 15-Aug- Tullian Block Dera Baba 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 30.00 NCB N/A N/A N/A 2013 N/A Nanak District Gurdaspur 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Bhagwanpur 38.00/0.00 (TW16494) PRWSS-W-DIV01-1962-1 233 W/S Scheme Bhagwanpur 21-AUG- Block Dinanagar District 20-Jul- 22-Sep- POST- 21-Oct- 22-Nov- 20-Dec- POST- 19-JAN- 20-Jul- 38.00 NCB 2012 N/A N/A N/A N/A Gurdaspur 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN

Bhaini Khader 42.89/42.89 (TW16507) PRWSS-W-DIV01-2002-1 234 W/S Scheme Bhani 29-AUG- 30-Jul- 30-Sep- POST- 28-Oct- 29-Nov- 30-Dec- POST- 28-JAN- 27-Jul- Khadar Block 42.89 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN District Gurdaspur.

Bhumbli 70.00/0.00 (TW16465)

Page 54 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV01-1889-1 235 W/S Scheme Bhumbli 21-AUG- 20-Jul- 22-Sep- POST- 20-Oct- 19-Nov- 21-Dec- POST- 22-JAN- 23-Jul- Block Dhariwal District 70.00 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Gurdaspur

BIDIPUR 24.40/0.00 (TW7687) PRWSSP-Gsp-Gsp-38-I 236 W/S Scheme Bidipur 27-Dec- Block Dhariwal:- 08-Jun- 29-JUL- 11-Aug- POST- 26-Aug- 30-Sep- 29-Nov- POST- 27-JUN- 24.40 NCB N/A N/A N/A 2010 N/A Tubewell,OHSR,Distributi 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN on System BURE NANGAL 27.45/0.00 (TW16479) PRWSS-W-DIV02-2038-1 237 W/S Scheme Bure Nangal 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Batala District 27.45 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

Chack Alia 42.00/0.00 (TW16488) PRWSS-W-DIV01-1959-1 238 W/S Scheme Chack Alia 31-OCT- 20-Aug- 30-Sep- 30-Nov- POST- 30-Dec- 30-Jan- 18-Feb- POST- 27-FEB- Block Dinanagar District 42.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 PLAN Gurdaspur

Chack Chao 41.25/41.35 (TW16723) PRWSS-W-DIV02-2249-1 239 W/S Scheme Chack Chao Providing Tubewell, OHSR, Distribution 11-OCT- 13-Nov- System to village Chack 17-Aug- 18-Oct- POST- 08-Nov- 10-Dec- 15-Jan- POST- 14-FEB- 41.25 NCB 2012 N/A N/A N/A 2013 N/A Chao Block Shiri 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Hargobindpur District Gurdaspur.

Page 55 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

CHANDU SUJA 36.00/0.00 (TW16470) PRWSS-W-DIV02-2028-1 240 W/S Scheme Chandu 15-Aug- Suja Block Fatehgarh 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 36.00 NCB N/A N/A N/A 2013 N/A Churian District 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur. Chitt (TW15877) 35.00/0.00

PRWSSP-Gsp-Batala-82-I 241 W/S Scheme Chitt Block 15-Feb- 10-Aug- 15-SEP- 30-Sep- POST- 15-Oct- 19-Nov- 18-Jan- POST- 31-MAR- Batala:Tubewell,OHSR,Di 35.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN stribution System.

CHODARPURA 47.00/44.65 (TW7689) PRWSSP-Gsp-Gsp-66-I 242 Providing Tubewell,Pump Chamber,Machinery & OHSR, Development of 20-Mar- 30-May- 15-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- W/W,Distribution System 47.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN for Scheme Chodarpura Block Dhariwal

Providing Tubewell,Pump Chamber,Machinery & OHSR, Development of 07-MAR- POST- 30-May- 31-Mar- POST- 09-Apr- 10-May- POST- W/W,Distribution System 46.21 NCB 2012 REVIE 0.00 2011 2012 REVIEW 2012 2012 REVIEW for Scheme Chodarpura W ACTUAL Block Dhariwal

DABANWALI 55.00/0.00 (TW7716) PRWSSP-Gsp-Batala-88-I 243 Providing Tubewell, Pump Chamber, Machinery, 31-Mar- 15-Aug- 19-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 20-FEB- OHSR, Development of 55.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN W/W, Distribution System for Page 56 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Scheme Dabanwala Block Fatehgarh Churian

Dadwan 42.00/0.00 (TW16504) PRWSS-W-DIV01-1999-1 244 W/S Scheme Dadwan 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Dhariwal District 42.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

Dakhla 11.73/44.57 (TW7459) PRWSSP-Gsp-Gsp-34-I 245 Prov. T/Well, P/C, Machinery etc. & OHSR 01-Jun- Developmnt of W/W, 21-May- 07-JUL- 19-Jul- POST- 03-Aug- 07-Sep- 06-Nov- POST- 04-DEC- 49.00 NCB N/A N/A N/A 2011 N/A Disribution System for 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN scheme Dakhla Block Prov. T/Well, P/C, Machinery etc. & OHSR POST- Developmnt of W/W, 15-Sep- 24-FEB- 20-Mar- POST- 30-Mar- 03-May- POST- 46.82 NCB REVIE 0.00 Disribution System for 2010 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL scheme Dakhla Block Dorangla DALAM 35.76/38.14 (TW7706) PRWSSP-Gsp-Batala-80-I 246 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- 15-Nov- 31-JUL- 20-Aug- POST- 04-Sep- 09-Oct- 08-Dec- POST- 05-JAN- W/W, Distribution System 35.76 NCB N/A N/A N/A 2012 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN for Scheme Dalam Block Dera Baba Nanak

Providing Tubewell, Pump POST- Chamber, Machinery, 15-Nov- POST- POST- 35.76 NCB REVIE 0.00 OHSR, Development of 2010 REVIEW REVIEW W ACTUAL W/W,

Page 57 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Distribution System for Scheme Dalam Block Dera Baba Nanak

Daulatpur 37.25/33.82 (TW16020) PRWSS-W-DIV02-1567-1 247 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 16-MAY- 11-Oct- 29-Mar- 26-May- POST- 10-Jun- 15-Jul- 13-Sep- POST- 10-OCT- W/W, Distribution System 37.25 NCB 2011 N/A N/A N/A 2011 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN for Scheme Daulatpur Block Qadian.

DAULAT 30.00/43.19 (TW7718) PRWSSP-Gsp-Batala-89-I 248 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- 27-Aug- 30-SEP- 15-Oct- POST- 30-Oct- 04-Dec- 02-Feb- POST- 01-MAR- W/W, Distribution System 30.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Daulat Block Fatehgarh Churian

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of POST- POST- POST- W/W, Distribution System 30.00 NCB REVIE 0.00 REVIEW REVIEW for Scheme Daulat Block W ACTUAL Fatehgarh Churian

DHANE 16.70/0.00 (TW7724) PRWSSP-Gsp-Batala-53-I 249 Prov. T/Well, P/C, Machinery etc. & OHSR 20-MAY- 22-Dec- Developmnt of W/W, 04-Apr- 30-May- POST- 14-Jun- 19-Jul- 17-Sep- POST- 15-OCT- 16.70 NCB 2011 N/A N/A N/A 2011 N/A Disribution System for 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN scheme Dhane Block Quadian

Page 58 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

DHAPAI 30.00/0.00 (TW16491) PRWSS-W-DIV02-2044-1 250 W/S Scheme Dhapai 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Qadian District 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

DHUPSARI 24.20/40.67 (TW16474) PRWSS-W-DIV02-2032-1 251 W/S Scheme Dhupsari 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Batala District 24.20 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

Faridpur 45.00/0.00 (TW16496) PRWSS-W-DIV01-1964-1 252 W/S Scheme Faridpur 31-OCT- 20-Aug- 30-Sep- 30-Nov- POST- 30-Dec- 30-Jan- 18-Feb- POST- 27-FEB- Block Dorangla District 45.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 PLAN Gurdaspur

Gajnipur 46.28/44.07 (TW16297) PRWSS-W-DIV01-1753-1 253 Providing Tubewell, Pump Chamber,Machinery,OHS R,Development of 10-AUG- 15-Jun- W/W,Distribution System 20-May- 19-Aug- POST- 20-Sep- 21-Oct- 22-Nov- POST- 15-DEC- 40.00 NCB 2012 N/A N/A N/A 2013 N/A for 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN W/S Scheme Gajnipur Block Gurdaspur District Gurdaspur Providing Tubewell, Pump Chamber,Machinery,OHS R,Development of 09-AUG- POST- 20-May- 21-Aug- POST- 10-Sep- 11-Oct- POST- W/W,Distribution System 39.80 NCB 2012 REVIE 0.00 2012 2012 REVIEW 2012 2012 REVIEW for W/S Scheme Gajnipur W ACTUAL Block Gurdaspur

Page 59 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

District Gurdaspur

GILLIAN WALI 32.00/34.80 (TW7714) PRWSSP-Gsp-Batala-87-I 254 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- 20-Apr- 31-JUL- 30-Aug- POST- 14-Sep- 19-Oct- 18-Dec- POST- 15-JAN- W/W, Distribution System 32.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN for Scheme Gillianwali Block Dera Baba Nanak

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of POST- 20-Apr- 24-FEB- POST- POST- W/W, Distribution System 32.00 NCB REVIE 0.00 2011 2012 REVIEW REVIEW for Scheme Gillianwali W ACTUAL Block Dera Baba Nanak

GRANTH GARH 30.00/0.00 (TW16477) PRWSS-W-DIV02-2035-1 255 W/S Scheme Granthgarh 15-Aug- Block Qadian District 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 30.00 NCB N/A N/A N/A 2013 N/A Gurdaspur. 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Hardo (TW16482) 65.00/0.00

PRWSS-W-DIV01-1893-1 256 W/S Scheme Hardo Bathwala Block 30-Aug- 15-SEP- 16-Oct- POST- 12-Nov- 11-Dec- 13-Jan- POST- 12-FEB- 20-Jul- 65.00 NCB N/A N/A N/A N/A Gurdaspur District 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 2013 PLAN Gurdaspur HARIPUR 40.00/45.31 (TW7683) PRWSSP-Gsp-Gsp-21-2 257

Page 60 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Haripur Lohgarh:- Providing 30-MAY- 30-Apr- Distribution System to 15-Apr- 15-Jun- POST- 30-Jun- 04-Aug- 03-Oct- POST- 31-OCT- 14.16 NCB 2010 N/A N/A N/A 2011 N/A Village Haripur Block 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Dinanagar District Gurdaspur W/S Scheme Haripur Lohgarh Providing POST- Distribution System to 15-Apr- 17-APR- 28-Jun- POST- 02-Jul- 02-Aug- POST- 14.16 NCB REVIE 0.00 Village Haripur Block 2010 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Dinanagar District Gurdaspur PRWSSP-Gsp-Gsp-21-3 258 W/S Scheme Haripur Lohgarh:- Providing 30-MAY- 30-Apr- Distribution System to 15-Apr- 15-Jun- POST- 30-Jun- 04-Aug- 03-Oct- POST- 31-OCT- 4.18 NCB 2010 N/A N/A N/A 2011 N/A Village Lohgarh Block 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Dinanagar District Gurdaspur. W/S Scheme Haripur Lohgarh Providing POST- Distribution System to 15-Apr- 17-APR- 28-Jun- POST- 02-Jul- 02-Aug- POST- 4.18 NCB REVIE 0.00 Village Lohgarh Block 2010 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Dinanagar District Gurdaspur. PRWSSP-Gsp-Gsp-21-I 259 Prov. T/Well, P/C, Machinery etc. & OHSR 30-MAY- 30-Apr- Developmnt of W/W, 15-Apr- 15-Jun- POST- 30-Jun- 04-Aug- 03-Oct- POST- 31-OCT- 29.00 NCB 2010 N/A N/A N/A 2011 N/A Disribution System for 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN scheme Haripur Block Dinanagar Prov. T/Well, P/C, Machinery etc. & OHSR POST- Developmnt of W/W, 15-Apr- 17-APR- POST- POST- 27.11 NCB REVIE 0.00 Disribution System for 2010 2012 REVIEW REVIEW W ACTUAL scheme Haripur Block Dinanagar HARSIAN 35.00/0.00 (TW16459) PRWSS-W-DIV02-2022-1 260

Page 61 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Harsian 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Batala District 35.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur

HARUWAL 30.00/0.00 (TW16453) PRWSS-W-DIV02-1969-1 261 W/S Scheme Haruwal 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Dera Baba Nanak 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN District Gurdaspur

Issapur 38.84/36.61 (TW15721) PRWSS-W-DIV01-1563-1 262 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 05-OCT- 11-Mar- 20-Jun- 25-Oct- POST- 09-Nov- 14-Dec- 12-Feb- POST- 31-MAR- W/W, Distribution System 36.08 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2012 REVIEW 2013 PLAN for Scheme Issapur Block Dinanagar.

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 16-AUG- POST- 20-Jun- 17-Aug- POST- 10-Sep- 11-Oct- POST- W/W, Distribution System 34.58 NCB 2012 REVIE 0.00 2011 2012 REVIEW 2012 2012 REVIEW for Scheme Issapur Block W ACTUAL Dinanagar.

Jagowal Bedian 35.00/0.00 (TW16498) PRWSS-W-DIV01-1974-1 263 W/S Scheme Jagowal 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Bedian Block Kalanaur 35.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN District Gurdaspur

Jainpur 33.67/31.74 (TW16296) PRWSS-W-DIV01-1755-1 264

Page 62 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Providing Tubewell, Pump Chamber,Machinery,OHS R,Development of 15-Jun- W/W,Distribution 20-May- 20-JUL- 19-Aug- POST- 20-Sep- 21-Oct- 22-Nov- POST- 15-DEC- 28.90 NCB N/A N/A N/A 2013 N/A System for Scheme 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jainpur Block Dorangla District Gurdaspur.

Providing Tubewell, Pump Chamber,Machinery,OHS R,Development of 16-AUG- POST- W/W,Distribution System 20-May- 17-Aug- POST- 10-Sep- 11-Oct- POST- 29.03 NCB 2012 REVIE 0.00 for Scheme Jainpur Block 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Dorangla District Gurdaspur.

JEEWAN NANGAL 42.31/43.29 (TW7704) PRWSSP-Gsp-Batala-79-I 265 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- W/W, Distribution System 15-Nov- 31-JUL- 20-Aug- POST- 04-Sep- 09-Oct- 08-Dec- POST- 05-JAN- 42.31 NCB N/A N/A N/A 2012 N/A for Scheme Jeewan 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN Nangal (MV) Block Dera Baba Nanak

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of POST- W/W, Distribution System 15-Nov- POST- POST- 42.31 NCB REVIE 0.00 for Scheme Jeewan 2010 REVIEW REVIEW W ACTUAL Nangal (MV) Block Dera Baba Nanak

JHANJIAN KALAN 14.02/36.46 (TW16468) PRWSS-W-DIV02-2026-1 266 W/S Scheme Jhanjian 15-Aug- Kalan Block Fatehgarh 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 14.02 NCB N/A N/A N/A 2013 N/A Churian District 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

Page 63 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 JHANJIAN KHURD 15.35/0.00 (TW16469) PRWSS-W-DIV02-2027-1 267 W/S Scheme Jhanjian 15-Aug- Khurd Block Fatehgarh 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 15.35 NCB N/A N/A N/A 2013 N/A Churian District 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur. Jhawar 67.67/64.16 (TW16460) PRWSS-W-DIV01-1885-1 268 W/S Scheme Jhawar 10-AUG- 30-Jun- 20-May- 11-Sep- POST- 10-Oct- 10-Nov- 11-Dec- POST- 02-JAN- Block Gurdaspur District 67.67 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN Gurdaspur.

Kaler Kalan 45.00/0.00 (TW16513) PRWSS-W-DIV01-2008-1 269 W/S Scheme Kaler Kalan 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Dhariwal District 45.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur

Kaler Khurd 47.00/0.00 (TW16514) PRWSS-W-DIV01-2010-1 270 W/S Scheme Kaler Khurd 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Dhariwal District 47.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur

Kallu Sohal 38.89/38.87 (TW16509) PRWSS-W-DIV01-2004-1 271 W/S Scheme Kallu Sohal 10-AUG- 30-Jun- 20-May- 11-Sep- POST- 10-Oct- 10-Nov- 11-Dec- POST- 02-JAN- Block Kahnuwan District 38.89 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN Gurdaspur.

Page 64 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

KANDIAL 46.75/43.43 (TW16473) PRWSS-W-DIV02-2031-1 272 W/S Scheme Kandial 15-AUG- 21-Jun- 25-Apr- 15-Sep- POST- 30-Sep- 30-Oct- 30-Nov- POST- 21-DEC- Block Batala District 46.75 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Gurdaspur.

Kang 36.14/0.00 (TW16021) PRWSS-W-DIV01-1565-1 273 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 11-AUG- 08-Jan- 16-Jun- 23-Aug- POST- 07-Sep- 12-Oct- 11-Dec- POST- 31-MAR- W/W, Distribution System 36.14 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2012 PLAN for Scheme Kang Block Dhariwal.

KARNAWA 20.67/0.00 (TW7728) PRWSSP-Gsp-Batala-54-I 274 Prov. T/Well, P/C, Machinery etc. & OHSR 24-MAY- 22-Dec- Developmnt of W/W, 08-Apr- 03-Jun- POST- 18-Jun- 23-Jul- 21-Sep- POST- 19-OCT- 20.67 NCB 2011 N/A N/A N/A 2011 N/A Disribution System for 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN scheme Karnava Block Quadian KAZAMPUR 42.00/0.00 (TW16492) PRWSS-W-DIV02-2046-1 275 W/S Scheme Kazampur 15-Aug- Block Shri Hargobindpur 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 42.00 NCB N/A N/A N/A 2013 N/A District Gurdaspur. 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

KHOKHARFAU 30.00/0.00 ZI (TW16463) PRWSS-W-DIV02-2024-1 276

Page 65 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Khokhar 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Fauji Block Batala District 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur

KHUSHALPUR (TW16454) PRWSS-W-DIV02-1970-1 277 W/S Scheme Khushalpur 15-Aug- Block Dera Baba Nanak 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 30.00 NCB N/A N/A N/A 2013 N/A District Gurdaspur 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Kot Jog Raj 40.00/0.00 (TW16506) PRWSS-W-DIV01-2001-1 278 W/S Scheme Kot Jograj 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Kahnuwan District 40.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

KOTLI PHASSI 35.00/0.00 (TW16472) PRWSS-W-DIV02-2030-1 279 W/S Scheme Kotli Phassi 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Batala District 35.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

KOTLI SHAIAN 35.00/44.61 (TW7709) PRWSSP-Gsp-Batala-83-I 280 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- 10-Aug- 15-SEP- 30-Sep- POST- 15-Oct- 19-Nov- 18-Jan- POST- 15-FEB- W/W, Distribution System 35.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Kotli Shai Block Batala

Providing Tubewell, Pump POST- POST- POST- Chamber, Machinery, 35.00 NCB REVIE 0.00 REVIEW REVIEW OHSR, W ACTUAL

Page 66 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Development of W/W, Distribution System for Scheme Kotli Shai Block Batala LANGIANWALI 25.00/34.88 (TW7730) PRWSSP-Gsp-Batala-92-I 281 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- W/W, Distribution System 20-Aug- 25-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 20-FEB- 25.00 NCB N/A N/A N/A 2012 N/A for Scheme Langianwali 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN Block Shri Hargobindpur

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of POST- W/W, Distribution System 20-Aug- POST- POST- 25.00 NCB REVIE 0.00 for Scheme Langianwali 2011 REVIEW REVIEW W ACTUAL Block Shri Hargobindpur

LIKMANIA 40.00/0.00 (TW16455) PRWSS-W-DIV02-1971-1 282 W/S Scheme Lukmanian 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Dera Baba Nanak 40.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN District Gurdaspur

Lodipur 29.00/0.00 (TW16483) PRWSS-W-DIV01-1956-1 283 W/S Scheme Lodhipur 30-Aug- 15-SEP- 16-Oct- POST- 12-Nov- 11-Dec- 13-Jan- POST- 12-FEB- 20-Jul- Block Dhariwal District 29.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 2013 PLAN Gurdaspur

Maharajpur 32.00/31.42 (TW16493)

Page 67 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV01-1961-1 284 W/S Scheme Maharajpur 31-OCT- 20-Aug- Block Dinanagar District 30-Sep- 30-Nov- POST- 30-Dec- 30-Jan- 18-Feb- POST- 27-FEB- 32.00 NCB 2012 N/A N/A N/A 2013 N/A Gurdaspur 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 PLAN

Malian 35.48/35.48 (TW15493) PRWSS-W-DIV01-1564-1 285 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 05-OCT- 11-Mar- 20-Jun- 25-Oct- POST- 09-Nov- 14-Dec- 12-Feb- POST- 31-MAR- W/W, Distribution System 37.79 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2012 REVIEW 2013 PLAN for Scheme Mallian Block Dinanagar.

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 07-MAR- POST- 20-Jun- 31-Mar- POST- 09-Apr- 10-May- POST- W/W, Distribution System 36.88 NCB 2012 REVIE 0.00 2011 2012 REVIEW 2012 2012 REVIEW for Scheme Mallian Block W ACTUAL Dinanagar.

Mallowal 45.00/0.00 (TW16485) PRWSS-W-DIV01-1958-1 286 W/S Scheme Mallowal 31-OCT- 20-Aug- 30-Sep- 30-Nov- POST- 30-Dec- 30-Jan- 30-Jan- POST- 27-FEB- Block Gurdaspur District 45.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 PLAN Gurdaspur

MAMRAI 25.00/0.00 (TW7710) PRWSSP-Gsp-Batala-84-I 287 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- 05-Aug- 10-SEP- 30-Sep- POST- 15-Oct- 19-Nov- 18-Jan- POST- 15-FEB- W/W, Distribution System 25.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Mamrai Block Batala

Page 68 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

METLA (TW16449) PRWSS-W-DIV02-1965-1 288 W/S Scheme Metla Block 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Dera Baba Nanak District 25.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur

Mulianwal 61.64/38.59 (TW16512) PRWSS-W-DIV01-2007-1 289 W/S Scheme Mulianwal 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Dhariwal District 61.64 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

Munanwali 25.00/0.00 (TW15891) PRWSSP-Gsp-Gsp-103-I 290 W/S Scheme Munanwali 20-Feb- Block 15-Apr- 25-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 31-MAR- 25.00 NCB N/A N/A N/A 2012 N/A Dinanagar:Tubewell,OHS 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN R,Distribution System. 32.00/0.00 (TW16489) PRWSS-W-DIV02-2042-1 291 W/S Scheme Muradpur 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Qadian District 32.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

Nano Harni 42.00/0.00 (TW16500) PRWSS-W-DIV01-1996-1 292 W/S Scheme Nano Harni 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Kalanaur District 42.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

Page 69 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Nathu Khaira 52.01/47.46 (TW16023) PRWSS-W-DIV02-1568-1 293 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 20-AUG- 15-Jan- 19-Apr- 30-Aug- POST- 14-Sep- 19-Oct- 18-Dec- POST- 31-AUG- W/W, Distribution System 52.01 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN for Scheme Nathu Khaira Block Qadian.

Naushera Majja Singh 65.00/0.00 (TW16611) PRWSS-W-DIV01-2012-1 294 W/S Scheme Naushera 30-NOV- 30-Oct- Majja Singh Block 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- 65.00 NCB 2012 N/A N/A N/A 2013 N/A Dhariwal District 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur NAWAN PIND BIKHARIWAL 25.00/0.00 (TW7711) PRWSSP-Gsp-Batala-85-I 295 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- 05-Aug- 10-SEP- 30-Sep- POST- 15-Oct- 19-Nov- 18-Jan- POST- 15-FEB- W/W, Distribution System 25.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Nawanpind Barkhiwala Block Batala

NAWAN PIND MAHMUWAL 28.00/0.00 (TW16475) PRWSS-W-DIV02-2033-1 296 W/S Scheme Nawanpind 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Mehmowal Block Batala 28.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN District Gurdaspur.

Nusehra 45.00/0.00 (TW16495) PRWSS-W-DIV01-1963-1 297 Page 70 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Naushera 31-OCT- 20-Aug- 30-Sep- 30-Nov- POST- 30-Dec- 30-Jan- 18-Feb- POST- 27-FEB- Block Dorangla District 45.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 PLAN Gurdaspur

PABARALI 33.00/0.00 (TW16456) PRWSS-W-DIV02-1972-1 298 W/S Scheme Pabarali 15-Aug- Block Fatehgarh Churian 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 33.00 NCB N/A N/A N/A 2013 N/A District Gurdaspur 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Pajo Chack 52.66/49.18 (TW16024) PRWSS-W-DIV02-1569-1 299 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 20-AUG- 15-Jan- 15-Apr- 30-Aug- POST- 14-Sep- 19-Oct- 18-Dec- POST- 31-AUG- W/W, Distribution System 52.66 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN for Scheme Daulatpur Block Shri Hargobindpur.

PAKHO KE 32.72/33.83 (TW7707) PRWSSP-Gsp-Batala-81-I 300 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 30-AUG- 31-Mar- 31-Jul- 15-Sep- POST- 30-Sep- 04-Nov- 03-Jan- POST- 31-JAN- W/W, Distribution System 32.72 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Pakho Ke Block Dera Baba Nanak

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 15-MAR- POST- 31-Jul- 15-Mar- POST- 28-Mar- 30-Apr- POST- W/W, Distribution System 33.84 NCB 2012 REVIE 0.00 2011 2012 REVIEW 2012 2012 REVIEW for Scheme Pakho Ke W ACTUAL Block Dera Baba Nanak

PURRIAN KHURD 25.00/0.00 (TW16487) Page 71 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV02-2041-1 301 W/S Scheme Purian 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Khurd Block Batala 25.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN District Gurdaspur. Qila Darshan Singh 35.00/0.00 (TW16610) PRWSS-W-DIV02-2020-1 302 W/S Scheme Qila 15-Aug- Darshan Singh Block 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- 35.00 NCB N/A N/A N/A 2013 N/A Batala District Gurdaspur. 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

QILA TEK SINGH 35.00/42.32 (TW16457) PRWSS-W-DIV02-2037-1 303 W/S Scheme Qila Tek 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Singh Block Batala District 35.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

RAMPUR 30.00/0.00 (TW16490) PRWSS-W-DIV02-2043-1 304 W/S Scheme Rampur 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Qadian District 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

Rania 46.80/81.67 (TW16022) PRWSS-W-DIV01-1566-1 305 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 19-Dec- 02-Jun- 23-JUL- 03-Aug- POST- 18-Aug- 22-Sep- 21-Nov- POST- 20-JUN- W/W, Distribution System 46.80 NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN for Scheme Rania Block Dhariwal.

Page 72 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Rasulpur Ranger 38.00/55.26 (TW7456) PRWSSP-Gsp-Gsp-29-I 306 Prov. T/Well, P/C, Machinery etc. & OHSR 24-MAY- 18-Apr- Developmnt of W/W, 09-Apr- 04-Jun- POST- 19-Jun- 24-Jul- 22-Sep- POST- 20-OCT- 56.00 NCB 2010 N/A N/A N/A 2010 N/A Disribution System for 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN scheme Rasulpur Block Dinanagar RASULPUR 30.00/0.00 (TW16476) PRWSS-W-DIV02-2034-1 307 W/S Scheme Rasulpur 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Qadian District 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

RATTA 47.10/56.32 (TW7703) PRWSSP-Gsp-Batala-78-I 308 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 30-AUG- 31-Mar- 15-Nov- 17-Sep- POST- 02-Oct- 06-Nov- 05-Jan- POST- 02-FEB- W/W, Distribution System 47.10 NCB 2011 N/A N/A N/A 2012 N/A 2010 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Ratta Block Dera Baba Nanak

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of POST- 15-Nov- POST- POST- W/W, Distribution System 47.10 NCB REVIE 0.00 2010 REVIEW REVIEW for Scheme Ratta Block W ACTUAL Dera Baba Nanak

Rorawali 45.00/0.00 (TW16466) PRWSS-W-DIV01-1890-1 309

Page 73 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Rorawali 30-Aug- 15-SEP- 16-Oct- POST- 12-Nov- 11-Dec- 13-Jan- POST- 12-FEB- 20-Jul- Block Dhariwal District 45.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 2013 PLAN Gurdaspur

SALOCHAHAL 40.00/43.29 (TW16480) PRWSS-W-DIV02-2039-1 310 W/S Scheme Sallo 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 18-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Chahal Block Batala 40.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN District Gurdaspur.

Sammu Chack 42.53/42.53 (TW15720) PRWSSP-Gsp-Gsp-33-I 311 W/S Scheme Sammu 27-Nov- Chack Block Dinanagar:- 18-May- 02-JUL- 12-Jul- POST- 27-Jul- 31-Aug- 30-Oct- POST- 27-APR- 42.53 NCB N/A N/A N/A 2010 N/A Tubewell,OHSR,Distributi 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN on System W/S Scheme Sammu 21-MAY- POST- Chack Block Dinanagar 24-Mar- 01-Jun- POST- 17-Aug- 18-Sep- POST- 43.55 NCB 2012 REVIE 0.00 Tubewell,OHSR,Distributi 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL on System Sandmwan 33.00/0.00 (TW16502) PRWSS-W-DIV01-2018-1 312 W/S Scheme Sandhwan 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Dhariwal District 33.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur

SANGHERA 48.16/45.37 (TW16451) PRWSS-W-DIV02-1967-1 313 W/S Scheme Sanghera 15-AUG- 21-Jun- 25-Apr- 15-Sep- POST- 01-Oct- 10-Oct- 30-Nov- POST- 21-DEC- Block Dera Baba Nanak 48.16 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN District Gurdaspur

Saraspur 38.00/0.00 (TW16464)

Page 74 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV01-1888-1 314 W/S Scheme Saraspur 30-Aug- 15-SEP- 16-Oct- POST- 12-Nov- 11-Dec- 13-Jan- POST- 12-FEB- 20-Jul- Block Dhariwal District 38.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Gurdaspur

Shahpur 33.00/0.00 (TW16497) PRWSS-W-DIV01-1973-1 315 W/S Scheme Shahpur 21-AUG- 20-Jul- 22-Sep- POST- 21-Oct- 22-Nov- 20-Dec- POST- 18-JAN- 13-Jul- Block Kalanaur District 33.00 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Gurdaspur

SHEKHUPUR 35.00/0.00 (TW16461) PRWSS-W-DIV02-2023-1 316 W/S Scheme Shekhupur 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Block Batala District 35.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur

Singhpura (TW16501) PRWSS-W-DIV01-1997-1 317 W/S Scheme Singhpura 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Dhariwal District 35.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

Sohal 90.00/0.00 (TW16511) PRWSS-W-DIV01-2006-1 318 W/S Scheme Sohal Block 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Dhariwal District 90.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

Sujanpur 35.00/0.00 (TW16508) PRWSS-W-DIV01-2003-1 319 Page 75 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Sujanpur 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Dhariwal District 35.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur. TALWANDI BHAKTHA 25.00/0.00 (TW7713) PRWSSP-Gsp-Batala-86-I 320 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- 10-Aug- 15-SEP- 30-Sep- POST- 15-Oct- 19-Nov- 18-Jan- POST- 15-FEB- W/W, Distribution System 25.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Talwandi Bhakta Block Batala

TATLE 48.00/0.00 (TW7691) PRWSSP-Gsp-Gsp-67-I 321 Providing Tubewell,Pump Chamber,Machinery & OHSR, Development of 20-Mar- 28-Aug- 30-SEP- 10-Oct- POST- 25-Oct- 29-Nov- 28-Jan- POST- 25-FEB- W/W,Distribution System 48.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN for Scheme Tatle Block Gurdaspur

Thanewal 50.00/0.00 (TW16467) PRWSS-W-DIV01-1891-1 322 W/S Scheme Thanewal 30-Aug- 15-SEP- 16-Oct- POST- 12-Nov- 11-Dec- 13-Jan- POST- 12-FEB- 20-Jul- Block Gurdaspur District 50.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 2013 PLAN Gurdaspur

THIND 30.00/0.00 (TW16478) PRWSS-W-DIV02-2036-1 323 W/S Scheme Thind Block 15-Aug- 31-Aug- 15-SEP- 01-Nov- POST- 15-Nov- 18-Dec- 25-Jan- POST- 15-FEB- Qadian District 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Gurdaspur.

Page 76 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Tugalwal 68.00/0.00 (TW16510) PRWSS-W-DIV01-2005-1 324 W/S Scheme Tugalwala 30-NOV- 30-Oct- 15-Oct- 30-Dec- POST- 30-Jan- 28-Feb- 30-Mar- POST- 20-APR- Block Kahnuwan District 68.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN Gurdaspur.

Udipur 25.00/39.50 (TW15890) PRWSSP-Gsp-Gsp-100-I 325 W/S Scheme Udipur 20-Feb- Block 15-Apr- 25-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 31-MAR- 40.00 NCB N/A N/A N/A 2012 N/A Dinanagar:Tubewell,OHS 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN R,Distribution System. W/S Scheme Udipur 21-AUG- POST- Block 15-Apr- 17-Aug- POST- 10-Sep- 11-Oct- POST- 37.19 NCB 2012 REVIE 0.00 Dinanagar:Tubewell,OHS 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL R,Distribution System. Zone: North Zone, Circle: Hoshiarpur Circle, District: Hoshiarpur

Bhana 51.43/51.43 (TW16614) PRWSS-W-DIV17-2207-1 326 W/s Scheme Bhana 31-Mar- Tubewell ,OHSR, PC, 15-Jun- 16-JUL- 16-Jul- POST- 02-Nov- 03-Dec- 03-Dec- POST- 03-DEC- 0.00 NCB N/A N/A N/A 2013 N/A Machinery, SIP, Laying of 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Pipeline. Kartoli 98.51/79.46 (TW15911) PRWSS-W-DIV19-1929-1 327

W/S Scheme Kartoli,PKG- POST- POST- 0.00 NCB N/A N/A N/A N/A 1,Tubewell REVIEW REVIEW PLAN

Lohar Kangana 46.77/44.65 (TW16524) PRWSS-W-DIV16-1895-4 328 Page 77 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Lohar Kangna, 15-Jan- 18-APR- 18-Apr- POST- 20-Apr- 23-May- POST- internal distribution pipe 4.60 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN line (PKG-4)

Nangal Ishar 46.56/45.68 (TW16617) PRWSS-W-DIV17-2096-1 329 W/s scheme Nangal Ishar Tubewell,OHSR,Pump 20-May- 16-JUL- POST- POST- Chamber,Distribution ,SIP 0.00 NCB N/A N/A N/A N/A 2012 2012 REVIEW REVIEW PLAN Machinary

Randhawa 78.53/78.24 (TW16613) PRWSS-W-DIV16-2094-1 330 W/sscheme Randhwa,Tubewell,OHSR 15-May- 20-JUL- POST- POST- 0.00 NCB N/A N/A N/A N/A , Pump 2012 2012 REVIEW REVIEW PLAN Chamber,Distribution ,SIP W/S Scheme Barapur 67.21/0.00 (TW16618) PRWSS-W-DIV18-2095-1 331 W/s scheme 13-AUG- Barapur,Tubewell,OHSR, 20-Jun- POST- POST- 0.00 NCB 2012 N/A N/A N/A N/A Pump 2012 REVIEW REVIEW PLAN Chamber,Distribution ,SIP W/S Scheme Machriwal 54.17/0.00 Langrian PRWSS-W-DIV16-2093-1 332 W/s scheme Machriwal Langrian Tubewell,OHSR, POST- POST- Pump 0.00 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN Chamber,Distribution ,SIP Machinary W/S Scheme Nainowal Vaid 51.12/0.00 (TW16612) PRWSS-W-DIV16-2092-1 333 Page 78 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Nainowal Vaid,Tubewell,OHSR,Pu 31-Mar- 27-JUL- 24-Jul- POST- POST- mp 0.00 NCB N/A N/A N/A 2012 N/A 2012 2012 REVIEW REVIEW PLAN Chamber,distribution,SIP Machinary W/s Scheme Raipur Rajdhan 33.70/0.00 (TW16615) PRWSS-W-DIV17-2203-1 334 W/S Scheme Raipur 11-AUG- 31-Mar- Rajdhan Tubewell ,OHSR, 10-Jul- 12-Aug- POST- 04-Nov- 05-Dec- 06-Dec- POST- 06-DEC- 0.00 NCB 2012 N/A N/A N/A 2013 N/A PC, Machinery, SIP, 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Laying of Pipeline. Zone: North Zone, Circle: Circle, District: Jalandhar

Akalpur 80.84/58.71 (TW7914) PRWSS-W-DIV13-1023-1 335 01-MAY- 20-Sep- 01-Apr- 15-May- POST- 10-Aug- 11-Sep- 20-Sep- POST- 19-MAY- Pkg-I 48.28 NCB 2011 N/A N/A N/A 2011 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN

Akhara 36.54/39.42 (TW7527) PRWSS-W-DIV14-1858-1 336 W/S Scheme Akhara, Block , District 08-AUG- 17-May- 31-Jul- 09-Sep- POST- 11-Sep- 11-Oct- 28-Oct- POST- 19-NOV- Jalandhar(T/W & Civil 25.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) PKG-I

PRWSS-W-DIV14-1858-2 337 W/S Scheme Akhara, 08-AUG- 17-Mar- 31-Jul- 09-Sep- POST- 11-Sep- 11-Oct- 28-Oct- POST- 19-NOV- Block Bhogpur, District 11.54 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar (OHSR) PKG-II

Ali Chak 25.90/0.00 (TW16392) PRWSS-W-DIV14-1860-1 338

Page 79 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Ali Chak, 28-Jun- Block Jalandhar West, 06-Sep- 14-SEP- 15-Oct- POST- 17-Oct- 18-Oct- 03-Nov- POST- 24-DEC- 25.90 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) Alipur (K) 40.39/0.00 (TW16349) PRWSS-W-DIV13-1785-1 339 W/S Scheme 24-Oct- Alipur(k),Block Jalandhar 02-Jul- 17-JUL- 07-Aug- POST- 23-Aug- 25-Sep- 10-Oct- POST- 25-OCT- 40.39 NCB N/A N/A N/A 2013 N/A East, District 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Alipur (M) 45.84/0.00 (TW16350) PRWSS-W-DIV13-1786-1 340 W/S Scheme 24-Oct- Alipur(M),Block Jalandhar 02-Jul- 17-JUL- 07-Aug- POST- 23-Aug- 25-Sep- 10-Oct- POST- 25-OCT- 45.84 NCB N/A N/A N/A 2013 N/A East, District 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Allewali 21.30/0.00 (TW16376) PRWSS-W-DIV14-1834-1 341 W/S Scheme Allewali, 15-Jun- Block Shahkot, District 30-Aug- 08-SEP- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 17-DEC- 21.30 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Anihar 36.78/0.00 (TW16355) PRWSS-W-DIV13-1793-1 342 W/S Scheme Anihar, 26-Oct- Block , District 04-Jul- 19-JUL- 09-Aug- POST- 25-Aug- 27-Sep- 12-Oct- POST- 27-OCT- 36.78 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) Awankhalsa 26.93/0.00 (TW16398) PRWSS-W-DIV14-1866-1 343

Page 80 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Awankhalsa, Block 25-Jun- 05-Sep- 12-SEP- 13-Oct- POST- 15-Oct- 15-Nov- 30-Nov- POST- 22-DEC- , District 26.93 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Work Distribution) Bachhowal 25.00/0.00 (TW16442) PRWSS-W-DIV13-1807-1 344 W/S Scheme Bachhowal, 31-Oct- Block Phillaur, District 10-Jul- 25-JUL- 16-Aug- POST- 29-Aug- 01-Oct- 17-Oct- POST- 01-NOV- 25.00 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) Bahupur 23.10/0.00 (TW16391) PRWSS-W-DIV14-1859-1 345 W/S Scheme Bahupur, 26-Apr- Block Bhogpur, District 04-Sep- 11-SEP- 12-Oct- POST- 14-Oct- 14-Nov- 30-Nov- POST- 22-DEC- 23.10 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) BajuhaKhurd 47.38/0.00 (TW16401) PRWSS-W-DIV14-1870-1 346 W/S Scheme Bajuhakhurd, Block 15-Jun- 25-Aug- 02-SEP- 03-Oct- POST- 05-Oct- 05-Nov- 20-Nov- POST- 12-DEC- Nakodar, District 47.38 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Work Distribution) Bakhu Nangal 239.00/0.00 (TW16388) PRWSS-W-DIV14-1854-1 347 W/S Scheme Bakhu Nangal, Block Jalandhar 02-May- 15-Jul- 23-JUL- 24-Sep- POST- 26-Aug- 27-Sep- 12-Oct- POST- 02-NOV- West, District 23.90 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Work Distribution) Balno (TW7568) 21.96/38.12

Page 81 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV14-1874-1 348 W/S Scheme Balno, Block Nakodar, District 02-May- 15-Jul- 23-JUL- 24-Jul- POST- 26-Aug- 27-Sep- 12-Oct- POST- 02-NOV- Jalandhar(T/W & Civil 21.96 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) PKG-I

PRWSS-W-DIV14-1874-2 349 W/S Scheme Balno, Block 02-May- 15-Jul- 23-JUL- 24-Jul- POST- 26-Aug- 27-Sep- 12-Oct- POST- 02-NOV- Nakodar, District 21.96 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar (OHSR) PKG-II

Bal (TW16384) 51.18/63.17

PRWSS-W-DIV14-1849-1 350 W/S Scheme Bal, Block 19-Jun- Jalandhar West, District 30-Aug- 08-SEP- 09-Oct- POST- 10-Oct- 10-Nov- 25-Nov- POST- 16-DEC- 51.18 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Basrampur 25.67/41.68 (TW16395) PRWSS-W-DIV14-1863-1 351 W/S Scheme Basrampur, Block Jalandhar West, 07-AUG- 24-May- 30-Jul- 08-Sep- POST- 10-Sep- 11-Oct- 27-Oct- POST- 18-NOV- District Jalandhar(T/W & 25.67 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution)

Bhathe 32.88/33.33 (TW7482) PRWSS-W-DIV14-1844-1 352 W/S Scheme Bhathe, 02-May- Block Jalandhar West, 15-Jul- 23-JUL- 24-Sep- POST- 26-Aug- 27-Sep- 12-Oct- POST- 02-NOV- 32.88 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) Bhodipur 18.75/0.00 (TW16375) PRWSS-W-DIV14-1833-1 353

Page 82 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Bhodipur, 07-AUG- 15-May- Block Shahkot, District 30-Jul- 08-Sep- POST- 10-Sep- 11-Oct- 27-Oct- POST- 18-NOV- 18.75 NCB 2012 N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Bulla 18.01/0.00 (TW16390) PRWSS-W-DIV14-1857-1 354 W/S Scheme Bulla, Block 19-Jun- Bhogpur, District 30-Aug- 08-SEP- 09-Oct- POST- 10-Dec- 10-Nov- 25-Nov- POST- 16-DEC- 18.01 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Chachowal 27.80/36.59 (TW16351) PRWSS-W-DIV13-1787-1 355 W/S Scheme Chachowal,Block 25-Oct- 03-Jul- 18-JUL- 08-Aug- POST- 24-Aug- 26-Sep- 11-Oct- POST- 26-OCT- Jalandhar East, District 27.80 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil work Distribution) Chak Sabu 76.32/0.00 (TW16353) PRWSS-W-DIV13-1790-1 356 W/S Scheme Chak Sabu, 24-Oct- Block Phillaur, District 02-Jul- 17-JUL- 07-Aug- POST- 23-Aug- 25-Sep- 10-Oct- POST- 25-OCT- 76.32 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) 30.00/0.00 (TW15886) PRWSS-W-DIV13-1587-1 357 W/S Scheme Cheema 17-Jan- 01-Jan- 08-JAN- 09-Jan- POST- 16-Sep- 21-Oct- 20-Dec- POST- 01-NOV- Khurd PKG-I T/W & Civil 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN work

Chetewani 36.00/35.74 (TW16439) PRWSS-W-DIV13-1804-1 358

Page 83 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Chetewani, 27-Oct- Block Jalandhar East, 05-Jul- 20-JUL- 10-Aug- POST- 25-Aug- 27-Sep- 13-Oct- POST- 28-OCT- 36.00 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil work Distribution) Chomon 120.26/0.00 (TW7645) PRWSS-W-DIV14-1479-1 359 Pkg-1 Village Chomon 31-MAR- 30-Aug- T/W, Pumping Machinery. 120.26 31-Jul- 30-Apr- POST- 01-May- 02-Jun- 15-Aug- POST- 30-DEC- NCB 2012 N/A N/A N/A 2012 N/A SIO, Distribution, PC 2011 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Chugawan 36.46/0.00 (TW7479) PRWSS-W-DIV14-1843-1 360 W/S Scheme Chugawan, 25-Apr- Block Jalandhar West, 10-Jul- 18-JUL- 19-Aug- POST- 21-Aug- 22-Sep- 07-Oct- POST- 28-OCT- 36.46 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) Chuhar 39.60/0.00 (TW16402) PRWSS-W-DIV14-1871-1 361 W/S Scheme Chuhar, 25-Jun- Block Nakodar, District 27-Aug- 07-SEP- 08-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 22-DEC- 39.60 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Chuharwali 55.99/0.00 (TW16365) PRWSS-W-DIV14-1813-1 362 W/S Scheme Chuharwali, Block District 02-AUG- 16-May- 25-Jul- 09-Sep- POST- 06-Sep- 07-Oct- 22-Oct- POST- 12-NOV- Jalandhar(T/W & Civil 55.99 NCB 2012 N/A N/A N/A 2012 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution)

Dalewal 46.34/0.00 (TW16361) PRWSS-W-DIV13-1799-1 363

Page 84 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme , 28-Oct- Block , District 06-Jul- 21-JUL- 11-Aug- POST- 26-Aug- 28-Sep- 14-Oct- POST- 29-OCT- 46.34 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) Danduwal 41.63/0.00 (TW16027) PRWSSP-Jal-Div-II-57-I 364 W/S Scheme Danduwal 31-Dec- Block Rurka Kalan, PKG-I 01-Jan- 01-SEP- 01-Oct- POST- 16-Oct- 20-Nov- 19-Jan- POST- 16-FEB- 45.00 NCB N/A N/A N/A 2011 N/A (T/W, Civil work & 2010 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN Distribution) Dhandwar 41.63/43.57 (TW16048) PRWSSP-Jal-Div-II-71-I 365 01-AUG- 01-Dec- W/S Scheme Dhandwar 01-Jan- 01-Sep- POST- 16-Sep- 21-Oct- 20-Dec- POST- 17-JAN- 37.68 NCB 2010 N/A N/A N/A 2011 N/A Block Phillaur 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

W/S Scheme Dhandwar 03-AUG- POST- Block Phillaur, District 01-Jan- 03-Aug- POST- 09-Aug- 11-Sep- POST- 23.35 NCB 2012 REVIE 0.00 Jalandhar (T/W, Civil 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL work) Dhehpur 24.69/0.00 (TW16366) PRWSS-W-DIV14-1814-1 366 W/S Scheme Dhehpur, 25-Apr- Block Adampur District 10-Jul- 18-JUL- 19-Aug- POST- 21-Aug- 22-Sep- 07-Oct- POST- 28-OCT- 24.69 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) 82.76/0.00 (TW8252) PRWSS-W-DIV13-1800-1 367 W/S Scheme Dhesian Kahna, Block Rurka 28-Oct- 06-Jul- 21-JUL- 11-Aug- POST- 26-Aug- 28-Sep- 14-Oct- POST- 29-OCT- kalan, District 82.76 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil work Distribution)

Page 85 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Dhesian Sang 2.71/0.00 (TW8253) PRWSS-W-DIV13-1020-1 368 16-Nov- Dhesian Sang T/w, Civil 01-Jan- 01-JUN- 01-Jul- POST- 16-Jul- 20-Aug- 19-Oct- POST- 01-SEP- 60.00 NCB N/A N/A N/A 2010 N/A work 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

Dialpur 36.73/0.00 (TW7917) PRWSS-W-DIV13-1036-1 369 10-MAY- 25-Sep- DialPur Pkg-I T/w & Civil 01-Apr- 10-Jun- POST- 15-Aug- 16-Sep- 25-Sep- POST- 24-APR- 36.73 NCB 2011 N/A N/A N/A 2011 N/A work 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN

Eedda 22.01/0.00 (TW16397) PRWSS-W-DIV14-1865-1 370 W/S Scheme Eedda, 22-Jun- Block Nakodar, District 03-Sep- 10-SEP- 11-Oct- POST- 13-Oct- 14-Nov- 29-Nov- POST- 20-DEC- 22.01 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Fatehpur 20.41/0.00 (TW16406) PRWSS-W-DIV14-1875-1 371 W/S Scheme Fatehpur, 30-Jun- Block Nakodar, District 07-Sep- 15-SEP- 16-Oct- POST- 18-Jun- 18-Sep- 04-Oct- POST- 25-NOV- 20.41 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2013 2012 2012 REVIEW 2012 PLAN Work Distribution) Fazal Pur 25.83/25.54 (TW16539) PRWSS-W-DIV14-1744-1 372 W/S Scheme , Block Shahkot, District 10-MAY- 20-Sep- 02-May- 11-Jun- POST- 13-Jul- 13-Aug- 29-Aug- POST- 20-SEP- Jalandhar (T/W, Civil 25.83 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work, Distribution & OHSR)

Page 86 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Garha 65.00/0.00 (TW16443) PRWSS-W-DIV13-1808-1 373 W/S Scheme Garha, 31-Oct- Block Phillaur District 10-Jul- 25-JUL- 16-Aug- POST- 29-Aug- 01-Oct- 17-Oct- POST- 01-NOV- 65.00 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Garhimahansing 51.52/0.00 h (TW7918) PRWSS-W-DIV13-1791-1 374 W/S Scheme Garhimahansingh, Block 25-Oct- 03-Jul- 18-JUL- 08-Aug- POST- 24-Aug- 26-Sep- 11-Oct- POST- 26-OCT- Phillaur, District 51.32 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil work Distribution) 51.12/0.00 (TW7929) PRWSS-W-DIV13-1802-1 375 W/S Scheme Gumtala, 26-Oct- Block , District 04-Jul- 19-JUL- 09-Aug- POST- 25-Aug- 27-Sep- 12-Oct- POST- 27-OCT- 51.12 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) Indna Kallaske 47.40/0.00 (TW16354) PRWSS-W-DIV13-1792-1 376 W/S Scheme Indna 25-Oct- Kallaske, Block Phillaur, 03-Jul- 18-JUL- 08-Aug- POST- 24-Aug- 26-Sep- 11-Oct- POST- 26-OCT- 47.40 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil work Distribution) Isewal 21.31/0.00 (TW16380) PRWSS-W-DIV14-1839-1 377 W/S Scheme Issewal, 19-Jun- Block , 31-Aug- 09-SEP- 10-Oct- POST- 12-Oct- 12-Nov- 27-Nov- POST- 19-DEC- 21.31 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution)

Page 87 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Jalasingh 22.47/0.00 (TW7485) PRWSS-W-DIV14-1845-1 378 W/S Scheme Jalasingh, 02-AUG- 10-May- Block Jalandhar West, 25-Jul- 03-Sep- POST- 06-Sep- 07-Oct- 22-Oct- POST- 12-NOV- 22.47 NCB 2012 N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) Jallowal 16.95/0.00 (TW7533) PRWSS-W-DIV14-1856-1 379 W/S Scheme Jallowal, 07-AUG- 16-May- Block Bhogpur, District 30-Jul- 08-Sep- POST- 10-Sep- 11-Oct- 27-Oct- POST- 18-NOV- 16.95 NCB 2012 N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Jamsher 2.71/0.00 (TW15887) PRWSS-W-DIV13-1588-1 380 16-Feb- W/S Scheme Jamsher 229.00 01-Jan- 08-JAN- 09-Jan- POST- 16-Oct- 20-Nov- 19-Jan- POST- 01-DEC- NCB N/A N/A N/A 2013 N/A PKG-I T/W & Civil work 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Jandiala 217.00/42.63 (TW8256) PRWSS-W-DIV13-1029-1 381 16-MAY- 25-Oct- Jandiala Pkg-I T/w & Civil 217.00 01-Apr- 15-Jun- POST- 12-Sep- 13-Oct- 25-Oct- POST- 22-OCT- NCB 2011 N/A N/A N/A 2011 N/A work 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN

Jandiali 32.04/42.63 (TW16348) PRWSS-W-DIV13-1784-1 382 W/S Scheme 24-Oct- Jandiali,Block Jalandhar 02-Jul- 17-JUL- 07-Aug- POST- 23-Aug- 25-Sep- 10-Oct- POST- 25-OCT- 32.04 NCB N/A N/A N/A 2013 N/A East, District 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil

Page 88 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Jand Sarai 25.58/0.00 (TW16394) PRWSS-W-DIV14-1862-1 383 W/S Scheme Jand Sarai, 02-AUG- 16-May- Block Jalandhar West, 25-Jul- 03-Sep- POST- 06-Sep- 07-Oct- 22-Oct- POST- 12-NOV- 25.58 NCB 2012 N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) Kaimwala 20.62/0.00 (TW16373) PRWSS-W-DIV14-1831-1 384 W/S Scheme Kaimwala, 15-Jun- Block Nakodar, District 30-Aug- 08-SEP- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 17-DEC- 20.62 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Kalyanpur 32.04/0.00 (TW16441) PRWSS-W-DIV13-1806-1 385 W/S Scheme Kalyanpur, 31-Oct- Block Nurmahal, District 10-Jul- 25-JUL- 16-Aug- POST- 29-Aug- 01-Oct- 17-Oct- POST- 01-NOV- 62.00 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) 75.00/69.23 (TW7937) PRWSS-W-DIV13-1022-1 386 01-MAY- 10-Sep- 01-Apr- 15-May- POST- 01-Aug- 02-Sep- 10-Sep- POST- 25-JUN- Kangniwal Pkg-I 55.00 NCB 2011 N/A N/A N/A 2011 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN

Karari 51.62/0.00 (TW16364) PRWSS-W-DIV14-1812-1 387 W/S Scheme Karari, 07-AUG- 16-May- Block Jalandhar West 30-Jul- 08-Sep- POST- 10-Sep- 11-Oct- 27-Oct- POST- 18-NOV- 51.62 NCB 20123 N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution)

Page 89 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Khela 25.72/0.00 (TW16362) PRWSS-W-DIV13-1801-1 388 W/S Scheme Khela, Block 26-Oct- Nurmahal, District 04-Jul- 19-JUL- 09-Aug- POST- 25-Aug- 27-Sep- 12-Oct- POST- 27-OCT- 25.72 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) Khiwa 40.62/0.00 (TW16403) PRWSS-W-DIV14-1872-1 389 W/S Scheme Khiwa, 23-Jun- Block Nakodar, District 30-Aug- 08-SEP- 09-Oct- POST- 12-Oct- 12-Nov- 28-Nov- POST- 20-DEC- 40.62 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Khursaidpur 32.50/0.00 (TW7571) PRWSS-W-DIV14-1593-1 390 W/S Scheme Khursaidpur, Block 24-Jan- 30-Sep- 03-DEC- 07-May- POST- 20-May- 21-Jun- 10-Jul- POST- 25-JUL- Nakodar, District 32.50 NCB N/A N/A N/A 2013 N/A 2011 2011 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar PKG-I, T/W & Civil work Distribution PRWSS-W-DIV14-1593-2 391 W/S SCheme 24-Jan- Khursaidpur, Block 30-Sep- 03-DEC- 07-May- POST- 20-May- 21-Jun- 10-Jul- POST- 25-JUL- 32.50 NCB N/A N/A N/A 2013 N/A Nakodar, District 2011 2011 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar (OHSR) PKG-II Kingra Chohwala 40.85/0.00 (TW16369) PRWSS-W-DIV14-1824-1 392 W/S Scheme Kingra Chohwala, Block 15-Jun- 30-Aug- 08-SEP- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 17-DEC- Bhogpur, District 40.85 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Work Distribution) Ladhran 38.40/0.00 (TW16389)

Page 90 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV14-1855-1 393 W/S Scheme Ladhran, 19-Jun- Block Bhogpur, District 30-Aug- 08-SEP- 09-Oct- POST- 10-Oct- 10-Nov- 25-Nov- POST- 16-DEC- 38.40 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Ladian 22.24/34.12 (TW16357) PRWSS-W-DIV13-1795-1 394 W/S Scheme Ladian, 27-Oct- Block Phillaur, District 05-Jul- 20-JUL- 10-Aug- POST- 25-Aug- 27-Sep- 13-Oct- POST- 28-OCT- 22.24 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) Laroya 23.76/0.00 (TW16367) PRWSS-W-DIV14-1817-1 395 W/S Scheme Laroya, 21-May- Block Bhogpur District 08-Jul- 16-JUL- 17-Aug- POST- 19-Aug- 18-Sep- 03-Oct- POST- 24-OCT- 23.76 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Lehal 38.49/46.43 (TW16356) PRWSS-W-DIV13-1794-1 396 W/S Scheme Lehal, Block 26-Oct- Phillaur, District 04-Jul- 19-JUL- 09-Aug- POST- 25-Aug- 27-Sep- 12-Oct- POST- 27-OCT- 38.49 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) Lidher Khurd 24.40/0.00 (TW16352) PRWSS-W-DIV13-1789-1 397 W/S Scheme Lidher 24-Oct- Khurd, Block Phillaur, 02-Jul- 17-JUL- 07-Aug- POST- 23-Aug- 25-Sep- 10-Oct- POST- 25-OCT- 24.40 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil work Distribution) Lohar(c) 22.82/0.00 (TW16368)

Page 91 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV14-1819-1 398 W/S Scheme Lohar (c), 29-May- Block Bhogpur District 18-Jul- 22-JUL- 23-Aug- POST- 25-Aug- 24-Sep- 09-Oct- POST- 30-OCT- 22.82 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Lohgarh 0.35/0.00 (TW16445) PRWSS-W-DIV13-1809-1 399 W/S Scheme Lohgarh, 31-Oct- Block Phillaur District 11-Jul- 26-JUL- 17-Aug- POST- 30-Aug- 03-Oct- 18-Oct- POST- 02-NOV- 35.00 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Lutera Kalan 2.15/62.94 (TW7517) PRWSS-W-DIV14-1815-1 400 W/S Scheme Lutera 02-May- kalan, Block Adampur 15-Jul- 23-JUL- 22-Sep- POST- 26-Aug- 27-Sep- 12-Oct- POST- 02-NOV- 21.50 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) Mahuwal 37.97/51.05 (TW16404) PRWSS-W-DIV14-1873-1 401 W/S Scheme Mahuwal, 15-Jun- Block Nakodar, District 25-Aug- 02-SEP- 03-Oct- POST- 05-Oct- 05-Nov- 20-Nov- POST- 12-DEC- 37.97 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Mallian Khurd 41.42/0.00 (TW16396) PRWSS-W-DIV14-1864-1 402 W/S Scheme Mallian 18-Jun- Khurd, Block Nakodar, 01-Sep- 08-SEP- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 17-DEC- 41.42 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) Malupur 21.57/0.00 (TW16381)

Page 92 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV14-1840-1 403 W/S Scheme Malupur, 06-AUG- 16-May- Block Lohian Khas, 29-Jul- 07-Sep- POST- 09-Sep- 10-Oct- 26-Oct- POST- 17-DEC- 21.57 NCB 2012 N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) 22.22/0.00 (TW16371) PRWSS-W-DIV14-1829-1 404 W/S Scheme Malwal, 21-Jun- Block Nakodar, District 03-Sep- 10-SEP- 11-Oct- POST- 13-Oct- 14-Nov- 29-Nov- POST- 20-DEC- 22.22 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) 40.88/40.88 (TW7650) PRWSSP-Jal-Div-II-94-II 405 07-AUG- W/S Scheme Mandiala, 15-Jul- 08-Sep- POST- 23-Sep- 28-Oct- 27-Dec- POST- 24-JAN- 31-Jul- 12.25 NCB 2011 N/A N/A N/A N/A Block Nakodar (OHSR) 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 2012 PLAN

19-AUG- POST- W/S Scheme Mandiala, 15-Jul- 02-Sep- POST- 08-Sep- 13-Oct- POST- 12.00 NCB 2011 REVIE 0.00 Block Nakodar (OHSR) 2011 2011 REVIEW 2011 2011 REVIEW W ACTUAL

Matafllu 28.57/28.57 (TW7944) PRWSSP-Jal-Div-1-104-I 406 W/S Scheme Matafallu, Block Phillaur, Distt 31-May- 01-JUL- 21-Jun- POST- 06-Jul- 10-Aug- 09-Oct- POST- 06-NOV- 31-Jul- 18.36 NCB N/A N/A N/A N/A Jalandhar (T/W, Civil work 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 2012 PLAN & Distribution) W/S Scheme Matafallu, POST- Block Phillaur, Distt 31-May- 09-SEP- 15-Sep- POST- 16-Sep- 19-Oct- POST- 16.72 NCB REVIE 0.00 Jalandhar (T/W, Civil work 2011 2011 2011 REVIEW 2011 2011 REVIEW W ACTUAL & Distribution) PRWSSP-Jal-Div-1-104-II 407

Page 93 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Matafallu, 31-May- 28-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- 31-Jul- Block Phillaur, Distt 10.00 NCB N/A N/A N/A N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 2012 PLAN Jalandhar (OHSR)

W/S Scheme Matafallu, POST- 31-May- 09-SEP- 15-Sep- POST- 16-Sep- 19-Oct- POST- Block Phillaur, Distt 10.00 NCB REVIE 0.00 2011 2011 2011 REVIEW 2011 2011 REVIEW Jalandhar (OHSR) W ACTUAL Mehmuwal Yusafpur 23.72/0.00 (TW16379) PRWSS-W-DIV14-1838-1 408 W/S Scheme Mehmuwal Yusafpur, Block Lohian 19-Jun- 02-Sep- 09-SEP- 10-Oct- POST- 12-Oct- 12-Nov- 27-Nov- POST- 19-DEC- Khas, District 23.72 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Work Distribution) 42.67/0.00 (TW16372) PRWSS-W-DIV14-1830-1 409 W/S Scheme Mehsampur, Block Nakodar, District 18-Jun- 01-Sep- 08-SEP- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 17-DEC- Jalandhar(T/W & Civil 42.67 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution)

Mokhe 22.08/0.00 (TW16383) PRWSS-W-DIV14-1847-1 410 W/S Scheme 12-Jun- Mokhe,Block Jalandhar 01-Sep- 08-SEP- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 17-DEC- 22.08 NCB N/A N/A N/A 2013 N/A West, District 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Mullewal Khaira (TW16374) 30.28/0.00

PRWSS-W-DIV14-1832-1 411 W/S Scheme Mullewal 19-Jun- Khaira, Block Shahkot, 09-Feb- 09-SEP- 10-Oct- POST- 12-Oct- 12-Nov- 27-Nov- POST- 19-DEC- 30.28 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution)

Page 94 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Mumandpur 20.37/36.72 (TW7536) PRWSS-W-DIV14-1827-1 412 W/S Scheme Mumandpur, Block Bhogpur, District 05-May- 20-Jul- 28-JUL- 28-Aug- POST- 30-Aug- 30-Sep- 15-Nov- POST- 06-DEC- Jalandhar(T/W & Civil 20.37 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution)

Nahal (TW7516) 21.54/33.51

PRWSS-W-DIV14-1816-1 413 W/S Scheme Nahal, Block 20-AUG- 26-Apr- Adampur District 12-Jul- 21-Sep- POST- 23-Sep- 24-Oct- 08-Nov- POST- 29-NOV- 21.54 NCB 2012 N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Nawan Kila 28.62/0.00 (TW7655) PRWSSP-Jal-Div-II-48-I 414 01-OCT- 01-Dec- W/S Scheme Nawan Killa 01-Jan- 01-Nov- POST- 16-Nov- 21-Dec- 19-Feb- POST- 19-MAR- 28.62 NCB 2010 N/A N/A N/A 2011 N/A Block Shahkot 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN

Nawanpind Necha 37.00/0.00 (TW16446) PRWSS-W-DIV13-1810-1 415 W/S Scheme Nawanpind Necha, Block Rurka kalan 31-Oct- 12-Jul- 27-JUL- 18-Aug- POST- 31-Aug- 04-Oct- 19-Oct- POST- 03-NOV- District Jalandhar(T/W & 37.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution)

Pandher 21.50/0.00 (TW16399) PRWSS-W-DIV14-1867-1 416 W/S Scheme , 02-Jun- Block Nakodar, District 31-Aug- 09-SEP- 10-Oct- POST- 12-Oct- 12-Nov- 28-Nov- POST- 19-DEC- 21.50 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Page 95 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Rahimpur 49.42/0.00 (TW16400) PRWSS-W-DIV14-1869-1 417 W/S Scheme , 24-Jun- Block Nakodar, District 01-Sep- 10-SEP- 11-Oct- POST- 13-Oct- 14-Nov- 30-Nov- POST- 22-DEC- 49.42 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Rajab 21.70/0.00 (TW16386) PRWSS-W-DIV14-1852-1 418 W/S Scheme Rajab, Block 21-Jun- Jalandhar West, District 03-Sep- 10-SEP- 11-Oct- POST- 13-Oct- 14-Nov- 29-Nov- POST- 20-DEC- 21.70 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Raj Gomal 32.00/34.59 (TW16447) PRWSS-W-DIV13-1811-1 419 W/S Scheme Raj Gomal, 31-Oct- Block Rurka Kalan District 12-Jul- 27-JUL- 18-Aug- POST- 31-Aug- 04-Oct- 19-Oct- POST- 03-NOV- 32.00 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Rajpura 26.56/35.84 (TW16358) PRWSS-W-DIV13-1796-1 420 W/S Scheme Rajpura, 27-Oct- Block Phillaur, District 05-Jul- 20-JUL- 10-Aug- POST- 25-Aug- 27-Sep- 13-Oct- POST- 28-OCT- 26.56 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution) PRWSS-W-DIV13-1796-2 421 W/S Scheme Rajpura, 27-Oct- 05-Jul- 20-JUL- 10-Aug- POST- 25-Aug- 27-Sep- 13-Oct- POST- 28-OCT- Block Phillaur, District 26.56 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar (OHSR) PKG-II

Rajpur 36.59/46.57 (TW7522) PRWSS-W-DIV14-1818-1 422 Page 96 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Rajpur, 24-May- Block Bhogpur District 10-Jul- 18-JUL- 19-Aug- POST- 21-Aug- 20-Sep- 05-Oct- POST- 26-OCT- 36.59 NCB N/A N/A N/A 2012 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Randhawa Masanda 91.67/0.00 (TW7640) PRWSSP-Jal-Div-II-63-I 423 01-Dec- W/S Scheme Randhawa 01-Jan- 01-SEP- 01-Oct- POST- 16-Oct- 20-Nov- 19-Jan- POST- 16-FEB- 91.67 NCB N/A N/A N/A 2011 N/A Masanda Block Jal. West 2010 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN

Raowall 45.30/0.00 (TW16385) PRWSS-W-DIV14-1853-1 424 W/S Raowall, Block 02-AUG- 16-May- Adampur, District 25-Jul- 03-Sep- POST- 06-Sep- 07-Oct- 22-Oct- POST- 11-DEC- 45.30 NCB 2012 N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Rauli 33.62/0.00 (TW16370) PRWSS-W-DIV14-1828-1 425 W/S Scheme Rauli, Block 19-Jun- Nakodar, District 02-Sep- 09-SEP- 10-Oct- POST- 12-Oct- 12-Nov- 27-Nov- POST- 19-DEC- 33.62 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Rurka Kalan 192.00/0.00 (TW15888) PRWSS-W-DIV13-1589-1 426 W/S Scheme Rurka 16-Feb- 192.00 01-Jan- 08-JAN- 09-Jan- POST- 16-Oct- 20-Nov- 19-Jan- POST- 01-DEC- Kalan, PKG-I T/W & Civil NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN work

Salala 40.65/0.00 (TW7530) PRWSS-W-DIV14-1825-1 427

Page 97 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Salala, 14-Jun- Block Bhogpur, District 28-Aug- 06-SEP- 07-Oct- POST- 09-Oct- 09-Nov- 24-Nov- POST- 16-DEC- 40.65 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Samipur 44.36/0.00 (TW16393) PRWSS-W-DIV14-1861-1 428 W/S Scheme Samipur, 19-Jun- Block Jalandhar West, 30-Aug- 08-SEP- 09-Oct- POST- 10-Oct- 10-Nov- 25-Nov- POST- 16-DEC- 44.36 NCB N/A N/A N/A 2013 N/A District Jalandhar(T/W & 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution) Samrai 96.12/0.00 (TW15889) PRWSS-W-DIV13-1590-1 429 20-Feb- W/S Scheme Samrai 01-Jan- 08-JAN- 09-Jan- POST- 16-Oct- 20-Nov- 17-Jan- POST- 19-AUG- 96.12 NCB N/A N/A N/A 2013 N/A PKG-I T/W & Civil Work 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

PRWSS-W-DIV13-1590-II 430 20-Feb- W/S Scheme Samrai, 01-Jan- 08-JAN- 09-Jan- POST- 16-Oct- 20-Nov- 17-Jan- POST- 19-AUG- 96.12 NCB N/A N/A N/A 2013 N/A PKG-II OHSR 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Sangowal 49.90/0.00 (TW7637) PRWSS-W-DIV14-1480-1 431 Pkg-1 Village Sangowal 30-Jun- T/W, Pumping Machinery. 31-Oct- 30-APR- 15-May- POST- 15-May- 15-Jun- 15-Jun- POST- 31-OCT- 49.90 NCB N/A N/A N/A 2012 N/A SIO, Distribution, PC 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Sangranwali 26.91/0.00 (TW7646) PRWSS-W-DIV14-1826-1 432 W/S Scheme 08-MAY- 18-Jun- Sangranwali, Block 01-Sep- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 18-DEC- 26.91 NCB 2019 N/A N/A N/A 2013 N/A Bhogpur, District 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil

Page 98 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Work Distribution)

Sarai Khas 100.32/0.00 (TW16387) PRWSS-W-DIV14-1851-1 433 W/S Sarai Khas, Block 15-Jun- Jalandhar West, District 30-Aug- 08-SEP- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 17-DEC- 20.32 NCB N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Sardarwala 15.00/0.00 (TW16382) PRWSS-W-DIV14-1841-1 434 W/S Scheme Sardarwala, Block Lohian Khas, 21-Jun- 03-Sep- 10-SEP- 11-Oct- POST- 13-Oct- 14-Nov- 29-Nov- POST- 20-DEC- District Jalandhar(T/W & 15.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil Work Distribution)

Sarhal Mundi 46.36/41.04 (TW7940) PRWSSP-Jal-Div-1-105-I 435 W/S Scheme , Block Phillaur, 31-May- 01-JUL- 21-Jul- POST- 05-Aug- 09-Sep- 08-Nov- POST- 06-DEC- 31-Jul- Distt Jalandhar (T/W, Civil 28.48 NCB N/A N/A N/A N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 2012 PLAN work & Distribution)

W/S Scheme Sarhal Mundi, Block Phillaur, POST- 31-May- POST- POST- Distt Jalandhar (T/W, Civil REVIE 0.00 2011 REVIEW REVIEW work & Distribution) W ACTUAL

PRWSSP-Jal-Div-1-105-II 436 W/S Scheme Sarhal 31-May- 28-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- 31-Jul- Mundi, Block Phillaur, 12.50 NCB N/A N/A N/A N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 2012 PLAN Distt Jalandhar (OHSR)

Page 99 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Sarhal POST- 31-May- POST- POST- Mundi, Block Phillaur, REVIE 0.00 2011 REVIEW REVIEW Distt Jalandhar (OHSR) W ACTUAL

Shekhepind 40.00/0.00 (TW16440) PRWSS-W-DIV13-1805-1 437 W/S Scheme Shekhepind, Block Jalandhar East, 28-Oct- 06-Jul- 21-JUL- 11-Aug- POST- 26-Aug- 28-Sep- 14-Oct- POST- 29-OCT- District Jalandhar(T/W & 40.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil work Distribution)

Sherpur 45.35/44.06 (TW7936) PRWSS-W-DIV13-1788-1 438 W/S Scheme 25-Oct- Sherpur,Block Jalandhar 03-Jul- 18-JUL- 08-Aug- POST- 24-Aug- 26-Sep- 11-Oct- POST- 26-OCT- 45.35 NCB N/A N/A N/A 2013 N/A East, District 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Sohal Jagir 32.34/0.00 (TW16377) PRWSS-W-DIV14-1835-1 439 W/S Scheme Sohal Jagir, 08-AUG- 17-May- Block Shahkot, District 31-Jul- 09-Sep- POST- 11-Sep- 12-Oct- 28-Oct- POST- 19-NOV- 32.34 NCB 2012 N/A N/A N/A 2013 N/A Jalandhar(T/W & Civil 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Work Distribution) Sohal Khalsa 15.00/0.00 (TW7659) PRWSS-W-DIV14-1842-1 440 W/S Scheme Sohal Khalsa, Block Lohian 15-Jun- 30-Aug- 08-SEP- 09-Oct- POST- 11-Oct- 11-Nov- 26-Nov- POST- 17-DEC- Khas, District 15.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Work Distribution) Sohal Talkha Dakhni 20.00/0.00 (TW16378) PRWSS-W-DIV14-1836-1 441 Page 100 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Sohal Talkha Dakhni, Block 17-Jun- 30-Aug- 08-SEP- 09-Oct- POST- 10-Oct- 10-Nov- 25-Nov- POST- 16-DEC- Lohian Khas, District 20.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Jalandhar(T/W & Civil Work Distribution) Sunnar Khurd 45.18/0.00 (TW16360) PRWSS-W-DIV13-1798-1 442 W/S Scheme Sunnar Khurd, Block Rurka kalan, 28-Oct- 06-Jul- 21-JUL- 11-Aug- POST- 26-Aug- 28-Sep- 14-Oct- POST- 29-OCT- District Jalandhar(T/W & 45.18 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Civil work Distribution)

Takhar 31.96/32.40 (TW7921) PRWSS-W-DIV13-1042-1 443 01-Jun- Takhar Pkg-I T/w & Civil 15-Sep- 31-DEC- 15-Jan- POST- 30-Jan- 05-Mar- 04-May- POST- 30-NOV- 32.40 NCB N/A N/A N/A 2012 N/A work 2011 2011 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

13-MAR- POST- Takhar Pkg-I T/w & Civil 15-Sep- 22-Mar- POST- 22-Mar- 27-Apr- POST- 33.52 NCB 2012 REVIE 0.00 work 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Zone: North Zone, Circle: Jalandhar Circle, District:

Biharipur 42.82/42.82 (TW7672) PRWSSP-KPT-B1-W-12-II 444 Village Biharipur, Block 15-Jan- 10-Aug- 10-SEP- 15-Oct- POST- 20-Nov- 22-Dec- 10-Jan- POST- 14-JAN- Kapurthala, Distt 11.00 NCB N/A N/A N/A 2010 N/A 2008 2008 2008 REVIEW 2008 2008 2009 REVIEW 2009 PLAN Kapurthala,OHSR

Village Biharipur, Block 18-OCT- POST- 10-Aug- 23-Apr- POST- 26-Apr- 28-May- POST- Kapurthala, Distt 10.50 NCB 2011 REVIE 0.00 2008 2012 REVIEW 2012 2012 REVIEW Kapurthala,OHSR W ACTUAL

Buhai (TW7666) 30.00/25.77

Page 101 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-Kpth-Div-33-II 445 14-Oct- 10-Aug- 10-APR- 20-May- POST- 04-Jun- 09-Jul- 07-Sep- POST- 15-OCT- Buhai Pkg-II OHSR 8.25 NCB N/A N/A N/A 2011 N/A 2009 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

18-OCT- POST- 10-Aug- 28-Oct- POST- 24-May- 26-Jun- POST- Buhai Pkg-II OHSR 8.15 NCB 2011 REVIE 0.00 2009 2011 REVIEW 2012 2012 REVIEW W ACTUAL

Chachoki 98.23/98.23 (TW7153) PRWSSP-Kpth-Div-48-I 446 31-Mar- 10-Jun- 10-FEB- 30-May- POST- 14-Jun- 19-Jul- 17-Sep- POST- 15-OCT- W/s Scheme Chachoki 94.00 NCB N/A N/A N/A 2011 N/A 2009 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Hussainpur 39.48/44.51 (TW16431) PRWSS-W-DIV11-1850-1 447 W/S Scheme , Block Kapurthala, District 31-Oct- 15-Jun- 24-JUL- 24-Aug- POST- 01-Sep- 05-Oct- 20-Oct- POST- 01-NOV- Kapurthala (T/W, Civil 39.48 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN work Distribution etc.)

Manak (TW3577) PRWSSP-KPT-B1-W-16-II 448 Village Manak, Block POST- 15-Sep- 08-APR- POST- 03-Dec- 05-Jan- POST- , Distt. 8.50 NCB REVIE 0.00 2008 2009 REVIEW 2009 2010 REVIEW Kapurthala.OHSR W ACTUAL

Shahpur Piran 30.00/0.00 (TW7669) PRWSSP-Kpth-Div-44-I 449 15-MAY- 31-Mar- W/s Scheme Shahpur 10-Apr- 31-Jul- POST- 15-Aug- 19-Sep- 18-Nov- POST- 16-DEC- 30.00 NCB 2010 N/A N/A N/A 2011 N/A Piran 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Page 102 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Zone: Central Zone, Circle: Circle, District: Ludhiana

Baghian 26.54/0.00 (TW16646) PRWSSP-LDH-B1-W-32 450 03-OCT- 27-May- 26-Sep- 03-Oct- POST- 19-Oct- 18-Nov- 26-Nov- POST- 28-NOV- Single Package Scheme 20.91 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Bahadurke 28.00/0.00 (TW7223) PRWSSP-Ldh-Div-II-116-I 451 Village Bahadurke- T/well, Pumping Machinery, 16-MAR- 15-Dec- Silver Ionization Plant, 10-Mar- 21-Mar- POST- 05-Apr- 10-May- 09-Jul- POST- 06-AUG- 28.00 NCB 2011 N/A N/A N/A 2011 N/A Pump Chamber and 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN distribution of pipeline

Balliewal 47.88/47.88 (TW7260) PRWSSP-Ldh-Div-II-128-I 452 Vill Balliewal Block Ldh- II,T/W, Pumping 30-Apr- 04-May- 24-JUL- 26-Jul- POST- 10-Aug- 14-Sep- 13-Nov- POST- 11-DEC- Machinery, Silver 47.88 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Ionization Plant, Distribution PC, OHSR Vill Balliewal Block Ldh- II,T/W, Pumping 08-AUG- POST- 20-Jul- POST- POST- Machinery, Silver 2011 REVIE 0.00 2011 REVIEW REVIEW Ionization Plant, W ACTUAL Distribution PC, OHSR Ballowal 24.00/48.63 (TW7237) PRWSSP-Ldh-RWS-88-I 453 Village Ballowal : T/W,pumping machinery, 27-MAR- 08-Nov- 12-Mar- 01-Apr- POST- 10-Apr- 09-May- POST- Silver Inozation 24.00 NCB 2010 N/A N/A N/A 2010 N/A 2010 2010 REVIEW 2010 2010 REVIEW PLAN plant,Const. of Pump Chamber etc. complete Page 103 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

in all respects.

Village Ballowal : T/W,pumping machinery, 04-AUG- POST- Silver Inozation 07-Jul- POST- POST- 24.00 NCB 2011 REVIE 0.00 plant,Const. of Pump 2011 REVIEW REVIEW W ACTUAL Chamber etc. complete in all respects. Baraich 40.43/38.87 (TW16301) PRWSS-W-DIV36-1942-1 454

Composite Package POST- POST- 40.43 NCB N/A N/A N/A N/A Scheme Brainch REVIEW REVIEW PLAN

Beela 38.17/39.06 (TW14876) PRWSS-W-DIV37-1313-1 455 06-Jan- 19-Aug- 09-SEP- 19-Sep- POST- 15-Sep- 15-Oct- 27-Dec- POST- 05-JUL- package-I 38.17 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

PRWSS-W-DIV37-1313-II 456 06-Jan- 19-Aug- 09-SEP- 19-Sep- POST- 15-Sep- 15-Oct- 27-Dec- POST- 05-JUL- package-II 38.17 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

Bhagpur 41.19/38.70 (TW7129) PRWSSP-Ldh-Div-II-106-I 457 Village Bhagpur- T/well, Pumping Machinery, 17-MAR- 10-Jan- Silver Ionization Plant, 12-Mar- 17-Apr- POST- 02-May- 06-Jun- 05-Aug- POST- 02-SEP- 41.19 NCB 2011 N/A N/A N/A 2012 N/A Pump Chamber and 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN distribution of pipeline

Page 104 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Village Bhagpur- T/well, Pumping Machinery, POST- Silver Ionization Plant, 05-Jun- 01-JUL- POST- POST- 41.19 NCB REVIE 0.00 Pump Chamber and 2011 2011 REVIEW REVIEW W ACTUAL distribution of pipeline

Bhaini Arrayian 29.52/22.15 (TW16623) PRWSS-W-DIV38-2019-1 458

POST- POST- Single Package Scheme 24.48 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Bhaini Doaba 25.00/27.94 (TW7225) PRWSS-W-DIV37-1319-1 459 05-Oct- 15-Jun- 30-JUN- 10-Jul- POST- 11-Jul- 11-Aug- 25-Sep- POST- 04-APR- Package-I 5.00 NCB N/A N/A N/A 2011 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN

POST- 01-Jun- 30-JUN- 30-Jun- POST- 11-Jul- 11-Aug- POST- Package-I 5.00 NCB REVIE 0.00 2011 2011 2011 REVIEW 2011 2011 REVIEW W ACTUAL

Bhaini Nathu 13.07/13.15 (TW7132) PRWSSP-Ldh-Div-II-110-I 460 03-Jun- 20-Aug- 13-APR- 12-Apr- POST- 21-Apr- 23-May- 03-Jun- POST- 31-MAR- Composite Package 12.28 NCB N/A N/A N/A 2011 N/A 2010 2010 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN

POST- 17-Mar- 13-APR- POST- 21-Apr- 23-May- POST- Composite Package 12.28 NCB REVIE 0.00 2011 2011 REVIEW 2011 2011 REVIEW W ACTUAL PRWSSP-Ldh-Div-II-110-II 461

Page 105 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

03-Jun- 25-Mar- 13-APR- 15-Apr- POST- 21-Apr- 23-May- 15-May- POST- 02-DEC- complete package 12.84 NCB N/A N/A N/A 2011 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Bhairowal Khurd (TW12623) 16.65/16.53

PRWSS-W-DIV38-2013-1 462

POST- POST- Single Package Scheme 17.41 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Bujrag 45.77/45.77 (TW16285) PRWSS-W-DIV38-1742-1 463 03-Mar- 01-Apr- 11-JUL- 11-Jul- POST- 30-Jul- 03-Sep- 03-Oct- POST- 03-OCT- 45.77 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Chakli Manga 27.80/0.00 (TW16666) PRWSS-W-DIV39-1984-1 464

Composite Package WSS POST- POST- 27.80 NCB N/A N/A N/A N/A Chakli Manga REVIEW REVIEW PLAN

Chaminda 9.99/9.99 (TW12620) PRWSSP-Ldh-Div-II-127-I 465 Vill. Chaminda Block Pakhowal, T/W, Pumping 30-Apr- 09-Jun- 24-JUL- 26-Jul- POST- 10-Aug- 14-Sep- 13-Nov- POST- 11-DEC- Machinery, Silver 9.70 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Ionization Plant, Distribution PC, OHSR Vill. Chaminda Block Pakhowal, T/W, Pumping POST- 01-Feb- 14-Nov- POST- 12-Mar- 12-Apr- POST- Machinery, Silver 9.70 NCB REVIE 0.00 2012 2011 REVIEW 2012 2012 REVIEW Ionization Plant, W ACTUAL Distribution PC, OHSR

Page 106 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Chokiman 19.50/97.88 (TW16292) PRWSSP-Ldh-RWS-68 466

POST- POST- Single Package Scheme 99.01 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

DAD (TW16302) 75.00/0.00

PRWSS-W-DIV36-1943-1 467

Composite Package POST- POST- 75.00 NCB N/A N/A N/A N/A Scheme Dad REVIEW REVIEW PLAN

DAKHA 101.00/104.2 (TW16303) 1 PRWSS-W-DIV36-1944-1 468

Composite Package 101.00 POST- POST- NCB N/A N/A N/A N/A Scheme Dakha REVIEW REVIEW PLAN

Deherka 84.02/37.14 (TW12618) PRWSSP-Ldh-Div-1-122-I 469 village Dehrka: T/W, pumping machinery, 21-Feb- Silver Inozation plant, 15-May- 31-JUL- 05-Aug- POST- 20-Aug- 24-Sep- 23-Nov- POST- 21-DEC- 85.80 NCB N/A N/A N/A 2012 N/A Const. of pump chamber 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN etc.complete in all respects village Dehrka: T/W, pumping machinery, POST- Silver Inozation plant, 28-Oct- POST- 25-Oct- 06-Dec- POST- NCB REVIE 0.00 Const. of pump chamber 2011 REVIEW 2011 2011 REVIEW W ACTUAL etc.complete in all respects Dholanwal 48.93/0.00 (TW15703)

Page 107 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV37-1935-1 470

Composite Package POST- POST- 45.62 NCB N/A N/A N/A N/A GPWSC Dholanwal REVIEW REVIEW PLAN

Dolon Khurd 37.08/34.30 (TW16647) PRWSS-W-DIV37-1931-1 471

Composite Package POST- POST- 34.29 NCB N/A N/A N/A N/A GPWSC Dolon Khurd REVIEW REVIEW PLAN

Dulleh 50.49/51.48 (TW16300) PRWSS-W-DIV36-1937-1 472

POST- POST- Package-I(Dulley) 51.48 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

PRWSS-W-DIV36-1937-2 473

POST- POST- Package-II (Dulley) 51.48 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

GAHOUR 32.41/0.00 (TW16304) PRWSS-W-DIV36-1945-1 474 Composite Package POST- POST- Water Supply Scheme 32.41 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN Gahour

Gill (TW12619) 61.22/60.70

PRWSS-W-DIV36-1948-1 475

Page 108 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Composite Package POST- POST- Water Supply Scheme Gill 61.22 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Gorsian Khan Mohammad 34.66/29.67 (TW16533) PRWSS-W-DIV38-2009-1 476

POST- POST- Single Package Scheme 29.67 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Gosal 55.41/55.41 (TW16712) PRWSS-W-DIV37-2169-1 477 05-OCT- 19-Jun- Composite Package 22-Aug- 05-Oct- POST- 15-Oct- 15-Nov- 30-Nov- POST- 20-DEC- 55.41 NCB 2012 N/A N/A N/A 2013 N/A Scheme 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Gujjarwal 52.17/0.00 (TW16651) PRWSSP-Ldh-RWS-92-1 478

POST- POST- Package I 15.92 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

PRWSSP-Ldh-RWS-92-2 479

POST- POST- Package II 21.50 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

PRWSSP-Ldh-RWS-92-3 480

POST- POST- Package III 31.82 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Harnampura 19.61/18.88 (TW16650)

Page 109 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV37-1932-1 481

Composite Package POST- POST- 17.98 NCB N/A N/A N/A N/A GPWSC Harnampura REVIEW REVIEW PLAN

Jagirpur 6.61/32.14 (TW15705) PRWSSP-Ldh-Div-II-119-II 482 09-Nov- 15-Apr- 01-JUL- 01-Jul- POST- 15-Jul- 18-Aug- 09-Nov- POST- 08-MAY- package-II 21.62 NCB N/A N/A N/A 0011 N/A 2011 2011 2011 REVIEW 2011 2011 0011 REVIEW 2012 PLAN

Jaspal Banger 50.00/0.00 (TW7234) PRWSSP-Ldh-RWS-61-I 483 Village Jaspal : T/W,pumping machinery, 31-Dec- Silver Inozation 15-Mar- 16-APR- 30-Apr- POST- 30-May- 29-Jun- POST- 50.00 NCB N/A N/A N/A 2010 N/A plant,Const. of Pump 2010 2010 2010 REVIEW 2010 2010 REVIEW PLAN Chamber etc. complete in all respects. JHANDE 64.32/0.00 (TW16306) PRWSS-W-DIV36-1946-1 484 Composite Package POST- POST- Water Supply Scheme 64.32 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN Jhande

Kadian 22.15/17.08 (TW16648) PRWSS-W-DIV37-1934-1 485

Composite Package POST- POST- 31.42 NCB N/A N/A N/A N/A GPWSC Kadian REVIEW REVIEW PLAN

Kaind (TW2913) 28.00/33.09

Page 110 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-LDH-B1-W-2-I 486 Village Kaind: Installing 12-Apr- Tubewell ,Pumping 11-Mar- 16-DEC- 29-May- POST- 13-Jun- 18-Jul- 16-Sep- POST- 14-OCT- 28.00 NCB N/A N/A N/A 2010 N/A machinery & disinfection 2008 2009 2009 REVIEW 2009 2009 2009 REVIEW 2009 PLAN Unit Khatra 40.50/0.00 (TW16540) PRWSS-W-DIV39-1985-1 487

GPWSC Khatra Package- POST- POST- 23.86 NCB N/A N/A N/A N/A I REVIEW REVIEW PLAN

PRWSS-W-DIV39-1985-2 488

GPWSC Khatra Package POST- POST- 13.50 NCB N/A N/A N/A N/A II REVIEW REVIEW PLAN

Khirnian 45.15/45.81 (TW16541) PRWSSP-Ldh-RWS-85 489

POST- POST- Single Package Scheme 45.06 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Kot Gangu Rai 48.00/43.89 (TW3203) PRWSSP-LDH-B1-W-14-I 490 Village Kot Gangu Rai : 01-May- Installing Tubewell 30-Nov- 15-DEC- 31-Dec- POST- 01-Feb- 01-Mar- 01-Apr- POST- 01-MAY- 15.08 NCB N/A N/A N/A 2010 N/A ,Pumping machinery & 2008 2008 2008 REVIEW 2009 2009 2009 REVIEW 2009 PLAN disinfection Unit Village Kot Gangu Rai : POST- Installing Tubewell 04-Nov- 12-DEC- 07-Jan- POST- 05-Jun- 17-Jul- POST- 15.08 NCB REVIE 0.00 ,Pumping machinery & 2008 0009 2009 REVIEW 2009 2009 REVIEW W ACTUAL disinfection Unit Ladian Kalan 29.15/0.00 (TW15704)

Page 111 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-Ldh-Div-II-131 491

POST- POST- Single Package Scheme 31.42 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Leehan 32.93/19.81 (TW16535) PRWSS-W-DIV38-2014-1 492

POST- POST- Single Package Scheme 18.82 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Littar 35.00/0.00 (TW16309) PRWSS-W-DIV36-1949-1 493 Composite Package POST- POST- Water Supply Scheme 35.00 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN Littar

Lubangarh (TW15350) PRWSSP-LDH-B1-W-20-II 494 02-NOV- POST- 30-Aug- POST- 23-May- 30-Jun- POST- Pkg 2 9.50 NCB 2010 REVIE 0.00 2010 REVIEW 2011 2011 REVIEW W ACTUAL

Madarpura 22.85/19.89 (TW16534) PRWSS-W-DIV38-2011-1 495

POST- POST- Single Package Schmee 19.89 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Mahaun 25.25/0.00 (TW16277) PRWSSP-Ldh-RWS-73 496 Page 112 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

POST- POST- Single Package Scheme 29.30 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Mandiala Kalan 35.00/0.00 (TW16542) PRWSS-W-DIV39-2201-1 497 20-OCT- Composite Package 31-Aug- 25-Oct- POST- 10-Nov- 09-Dec- 30-Dec- POST- 18-JAN- 17-Jul- 50.25 NCB 2012 N/A N/A N/A N/A Scheme 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN

Mullanpur 26.00/62.40 (TW7125) PRWSSP-Ldh-RWS-80-I 498 Village Mullanpur : 26-MAR- 01-Nov- Installing Tubewell 12-Mar- 27-Mar- POST- 02-Apr- 01-May- POST- 40.00 NCB 2010 N/A N/A N/A 2010 N/A ,Pumping machinery & 2010 2010 REVIEW 2010 2010 REVIEW PLAN disinfection Unit Village Mullanpur : POST- Installing Tubewell 01-JUL- POST- 04-Jul- 12-Aug- POST- 40.04 NCB REVIE 0.00 ,Pumping machinery & 2011 REVIEW 2011 2011 REVIEW W ACTUAL disinfection Unit

Natt (TW7235) 37.08/50.97

PRWSS-W-DIV37-1930-1 499

Composite Package POST- POST- 45.35 NCB N/A N/A N/A N/A Village Natt REVIEW REVIEW PLAN

Panglian 31.10/31.17 (TW6732) PRWSSP-Ldh-Div-I-114-I 500

25-Dec- 01-FEB- 01-Feb- POST- 08-Feb- 15-Mar- 20-Jul- POST- 01-JUL- 27-Jul- Pkg 1 Panglian 31.10 NCB N/A N/A N/A N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 2011 PLAN

Rajgarh 23.12/0.00 (TW16543)

Page 113 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV39-1983-1 501

Composite Package POST- POST- 23.12 NCB N/A N/A N/A N/A GPWSC Rajgarh REVIEW REVIEW PLAN

Ranke 28.08/22.67 (TW7242) PRWSS-W-DIV38-2017-1 502

POST- POST- Single Package Scheme 22.71 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Raur (TW7229) 30.05/51.79

PRWSSP-Ldh-RWS-83-I 503 Village Raur : T/W,pumping machinery, 19-Nov- Silver Inozation 27-Mar- 05-APR- 12-Apr- POST- 20-Apr- 19-May- POST- 30.05 NCB N/A N/A N/A 2010 N/A plant,Const. of Pump 2010 2010 2010 REVIEW 2010 2010 REVIEW PLAN Chamber etc. complete in all respects. Village Raur : T/W,pumping machinery, POST- Silver Inozation POST- POST- 30.05 NCB REVIE 0.00 plant,Const. of Pump REVIEW REVIEW W ACTUAL Chamber etc. complete in all respects. Sarabha 42.17/0.00 (TW7240) PRWSSP-Ldh-RWS-93-I 504 Village Sarabha : T/W,pumping machinery, 30-Nov- Silver Inozation 06-Mar- 09-APR- 27-Apr- POST- 01-May- 30-May- POST- 42.17 NCB N/A N/A N/A 2010 N/A plant,Const. of Pump 2010 2010 2010 REVIEW 2010 2010 REVIEW PLAN Chamber etc. complete in all respects Khurd 51.00/50.91 (TW16307)

Page 114 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV36-1947-1 505 Composite Package POST- POST- Water Supply Scheme 51.00 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN Sidhwan Khurd

Sihala 43.00/0.00 (TW16545) PRWSS-W-DIV39-1982-1 506

Composite Package POST- POST- 43.00 NCB N/A N/A N/A N/A GPWSC Sihala REVIEW REVIEW PLAN

Silon Khurd 34.89/35.65 (TW16649) PRWSS-W-DIV37-1933-1 507

Composite Package POST- POST- 34.10 NCB N/A N/A N/A N/A GPWSC Silon Khurd REVIEW REVIEW PLAN

Swaddi Kalan 56.08/0.00 (TW7243) PRWSS-W-DIV38-2025-1 508

POST- POST- Package I 43.25 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

PRWSS-W-DIV38-2025-2 509

POST- POST- Package II 15.50 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Talwandi Naubad 56.37/19.00 (TW16624) PRWSS-W-DIV38-2015-1 510

Page 115 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Single Package POST- POST- 18.95 NCB N/A N/A N/A N/A components REVIEW REVIEW PLAN

Tapper Herrian 40.54/11.08 (TW16645) PRWSS-W-DIV38-2016-1 511

Single Packagae Scheme POST- POST- 10.88 NCB N/A N/A N/A N/A REVIEW REVIEW PLAN

Zone: Central Zone, Circle: Bathinda Circle, District: Mansa

Ghuduwala 40.24/40.24 (CA2487) PRWSS-W-178-187--Ghuduwala-I 512 15-Sep- Ghuduwala(Single 31-Mar- 30-APR- 15-May- POST- 30-Jun- 15-Aug- 25-Aug- POST- 14-SEP- 40.00 NCB N/A N/A N/A 2009 N/A Package) 2008 2008 2008 REVIEW 2008 2008 2008 REVIEW 2008 PLAN

Joga (CA16530) 132.12/0.00

PRWSS-W-DIV59-2070-1 513 Jogga(Single Package for 14-Feb- 132.12 31-Dec- 31-DEC- 28-Feb- POST- 17-Apr- 17-Apr- 30-Jun- POST- 15-AUG- Civil and OHSR work) NCB N/A N/A N/A 2014 N/A 2012 2012 2013 REVIEW 2013 2013 2013 REVIEW 2013 PLAN

Makhewala 128.63/121.9 (CA16531) 7 PRWSS-W-DIV58-2067-1 514 Makhewala(Single 15-Oct- 128.63 30-Jun- 30-SEP- 25-Dec- POST- 12-Feb- 12-Feb- 01-Mar- POST- 16-APR- Package for Civil and NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2013 2013 2013 REVIEW 2013 PLAN OHSR work)

Raipur 125.10/214.2 (CA16537) 2 PRWSS-W-DIV58-2068-1 515 Page 116 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Raipur(Single Package for 15-Nov- 125.10 30-Jul- 30-SEP- 25-Dec- POST- 12-Feb- 12-Feb- 31-Mar- POST- 16-MAY- Civil and OHSR Works) NCB N/A N/A N/A 2013 N/A 2012 2012 2013 REVIEW 2013 2013 2013 REVIEW 2013 PLAN

Tahlian 39.64/14.90 (CA9593) PRWSS-W-DIV59-2224-1 516 31-Mar- 30-Jun- 15-JUL- 15-Sep- POST- 30-Sep- 15-Nov- 25-Dec- POST- 31-DEC- Tahlian (Single Package) 5.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Zone: Central Zone, Circle: Faridkot Circle, District: Moga

Baddu Wal 0.35/10.73 (TW10064) PRWSSP-Mga-Div-48-I 517 05-OCT- 07-Mar- Tubewell 20-Sep- 20-Oct- POST- 04-Nov- 09-Dec- 07-Feb- POST- 07-MAR- 0.35 NCB 2010 N/A N/A N/A 2011 N/A Mach.,OHSR,Distribution 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN System. Badhni Kalan 0.40/6.93 (TW10038) PRWSSP-Mga-Div-31-I 518 15-Nov- Tubewell 01-Jun- 15-JUN- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- 0.40 NCB N/A N/A N/A 2010 N/A Mach.,OHSR,Distribution 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN System. Bahadar Wala 0.20/7.05 (TW12052) PRWSSP-Mga-Div-60-I 519 22-Nov- Tubewell 03-Jun- 07-JUN- 07-Jul- POST- 22-Jul- 26-Aug- 25-Oct- POST- 22-NOV- 0.20 NCB N/A N/A N/A 2011 N/A Mach.,OHSR,Distribution 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN System. Bhaloor 15.00/184.63 (TW16141) PRWSS-W-DIV41-1728-1 520 Page 117 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

28-Mar- 01-Jun- 01-JUL- 15-Jul- POST- 01-Aug- 01-Sep- 01-Oct- POST- 28-SEP- TW, OHSR,Civil Work 15.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Bhinder Kalan 0.20/14.67 (TW10055) PRWSSP-Moga-BI-W-12-I 521 15-NOV- 15-Mar- Tubewell 30-Oct- 15-Dec- POST- 01-Jan- 15-Feb- 28-Feb- POST- 15-MAR- 20.00 NCB 2008 N/A N/A N/A 2009 N/A Mach.,OHSR,Distribution 2008 2008 REVIEW 2009 2009 2009 REVIEW 2009 PLAN System. Butter (TW7904) 40.00/0.00

PRWSSP-Mga-Div-71-I 522 Prov. Safe Drinking Water 31-Mar- supply to Village 10-May- 10-JUN- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- 0.40 NCB N/A N/A N/A 2012 N/A Butter,(P.C.Vill.) Block 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Moga-I Distt. Moga Chand Nawan 0.25/8.14 (TW10015) PRWSSP-Mga-Div-59-I 523 22-Nov- Tubewell 03-Jun- 07-JUN- 07-Jul- POST- 22-Jul- 26-Aug- 25-Oct- POST- 22-NOV- 0.25 NCB N/A N/A N/A 2011 N/A Mach.,OHSR,Distribution 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN system. Chugha Khurd 22.47/22.47 (TW15745) PRWSSP-Mga-Div-50-I 524 01-MAY- 15-Dec- 01-Jul- 10-May- POST- 30-May- 30-Jun- 15-Aug- POST- 10-AUG- TW,Civil work 22.47 NCB 2012 N/A N/A N/A 2012 N/A 2011 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Chupkiti 25.00/27.40 (TW16140) PRWSS-W-DIV41-1732-1 525

Page 118 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

31-Mar- 01-Aug- 01-SEP- 15-Sep- POST- 30-Sep- 30-Oct- 30-Nov- POST- 25-NOV- TW, OHSR,Civil work 25.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Dala (TW10002) 0.20/8.76

PRWSSP-Moga-BI-W-18-I 526 15-NOV- 15-Mar- Tubewell 30-Oct- 15-Dec- POST- 01-Jan- 15-Feb- 28-Feb- POST- 15-MAR- 20.00 NCB 2008 N/A N/A N/A 2009 N/A Mach.,OHSR,Distribution 2008 2008 REVIEW 2009 2009 2009 REVIEW 2009 PLAN System. Datta 0.20/6.28 (TW10048) PRWSSP-Mga-Div-37-I 527 15-Nov- Tubewell 01-Jun- 15-JUN- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- 0.20 NCB N/A N/A N/A 2010 N/A Mach.,OHSR,Distribution 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN system. Datte Wal 0.25/15.80 (TW10052) PRWSSP-Mga-Div-62-I 528 20-Feb- Tubewell 15-Aug- 15-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 20-FEB- 0.25 NCB N/A N/A N/A 2012 N/A Mach.,OHSR,Distribution 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN System. DAUDHAR GARBI 0.35/19.53 (TW15032) PRWSS-W-DIV41-1486-1 529 20-OCT- 07-Mar- Tubewell 20-Sep- 20-Oct- POST- 04-Nov- 09-Dec- 07-Feb- POST- 07-MAR- 35.00 NCB 2010 N/A N/A N/A 2011 N/A Mach.,OHSR,Distribution 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN System. Dhalle Ke 25.00/48.30 (TW16065) PRWSS-W-DIV41-2212-1 530

Page 119 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

30-Jun- Tubewell,OHSR,Civil 01-Jul- 20-SEP- 05-Oct- POST- 15-Oct- 25-Nov- 05-Dec- POST- 30-DEC- 5.20 NCB N/A N/A N/A 2013 N/A Works 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Dhurkot Tahli Wala 25.00/0.00 (TW16128) PRWSS-W-DIV41-1731-1 531 31-Mar- 01-Aug- 01-SEP- 15-Sep- POST- 30-Sep- 30-Oct- 30-Nov- POST- 25-NOV- TW,OHSR,Civil work 25.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Droli Bhai 0.20/26.63 (TW10021) PRWSSP-Moga-BI-W-20-I 532 15-NOV- 15-Mar- Tubewell 30-Oct- 15-Dec- POST- 01-Jan- 15-Feb- 28-Feb- POST- 15-MAR- 20.00 NCB 2008 N/A N/A N/A 2009 N/A Mach.,OHSR,Distribution 2008 2008 REVIEW 2009 2009 2009 REVIEW 2009 PLAN System. Fatehgarh Panjtoor 20.00/49.74 (TW2353) PRWSSP-Mga-Div-69-I 533 Prov. Safe Drinking Water supply to Village 02-AUG- 31-May- 02-Jul- 23-Aug- POST- 07-Sep- 12-Oct- 11-Dec- POST- 08-JAN- Fatehgarh 0.25 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN korotana,(P.C.Vill.) Block Dharamkot Distt. Moga Prov. Safe Drinking Water supply to Village 04-AUG- POST- 29-Apr- POST- POST- Fatehgarh 2009 REVIE 0.00 2009 REVIEW REVIEW korotana,(P.C.Vill.) Block W ACTUAL Dharamkot Distt. Moga Fatehpur Kanian (TW16305) 165.00/0.00

PRWSS-W-DIV41-2236-1 534 T/W, OHSR, Disinfection 31-AUG- 08-Aug- 15-Nov- POST- 30-Nov- 10-Jan- 15-Jan- POST- 20-JAN- 20-Jul- unit,Pump Chamber, 67.02 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Machinery

Page 120 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Ferozewal badda 56.34/42.89 (TW15743) PRWSSP-Mga-Div-45-1 535 28-Mar- 18-Mar- 01-JUL- 15-Jul- POST- 01-Aug- 01-Sep- 01-Oct- POST- 28-SEP- TW,OHSR,Civil work 56.34 NCB N/A N/A N/A 2013 N/A 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Jaimal Wala 0.15/19.24 (TW10017) PRWSSP-Mga-Div-36-I 536 15-Nov- Tubewell 01-Jun- 15-JUN- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15.00 NCB N/A N/A N/A 2010 N/A Mach.,OHSR,Distribution 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW PLAN system. Janer 0.20/6.03 (TW10071) PRWSSP-Mga-Div-46-I 537 05-OCT- Tubewell 20-Feb- 20-Oct- POST- 04-Nov- 09-Dec- 02-Jul- POST- 07-MAR- 20.00 NCB 2010 N/A N/A N/A N/A Mach.,OHSR,Distribution 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN System Jindrah 0.30/24.09 (TW10072) PRWSS-W-DIV41-2239-1 538 20-May- Tubewell,OHSR,Civil work 01-Jun- 20-JUN- 05-Sep- POST- 30-Sep- 10-Nov- 15-Nov- POST- 20-NOV- 65.04 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Karyal 0.30/11.24 (TW7542) PRWSSP-Mga-Div-66-I 539 03-AUG- 09-Jan- Tubewell 03-Jul- 24-Aug- POST- 08-Sep- 13-Oct- 12-Dec- POST- 09-JAN- 30.00 NCB 2011 N/A N/A N/A 2012 N/A Mach.,OHSR,Distribution 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN System.

Page 121 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Khamba 40.00/28.11 (TW16138) PRWSS-W-DIV41-1723-1 540 28-Mar- 18-Mar- 01-JUL- 15-Jul- POST- 01-Aug- 01-Sep- 01-Oct- POST- 28-SEP- TW,OHSR,Civil work 40.00 NCB N/A N/A N/A 2013 N/A 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Kishan Pura Kalan 0.50/8.28 (TW10059) PRWSSP-Mga-Div-35-I 541 15-Nov- Tubewell Mach., 01-Jun- 15-JUN- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- 50.00 NCB N/A N/A N/A 2010 N/A OHSR,Distribution 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN System. Kot Sadar Khan 30.00/0.00 (TW16064) PRWSSP-Mga-Div-42-1 542 31-Mar- 01-Aug- 01-SEP- 15-Sep- POST- 30-Sep- 30-Oct- 30-Nov- POST- 25-NOV- TW,OHSR,Civil work 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Longiwind 36.00/39.06 (TW16114) PRWSSP-Mga-Div-40-1 543 28-Mar- 01-Jun- 01-JUL- 15-Jul- POST- 01-Aug- 01-Sep- 01-Oct- POST- 28-SEP- TW,OHSR,Civil work 36.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Madho Ke 25.00/38.24 (TW7186) PRWSSP-Moga-B1-W-7-I 544 Prov. Safe Drinking Water Supply to Village Madho 31-OCT- 30-May- 30-Sep- 30-Nov- POST- 15-Dec- 31-Jan- 15-Feb- POST- 28-FEB- ke, (P.C.Vill.) Block 38.24 NCB 2008 N/A N/A N/A 2009 N/A 2008 2008 REVIEW 2008 2009 2009 REVIEW 2009 PLAN Dharamkot Distt. Moga

Page 122 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Prov. Safe Drinking Water Supply to Village Madho POST- 26-Jul- POST- POST- ke, (P.C.Vill.) Block 38.24 NCB REVIE 0.00 2010 REVIEW REVIEW Dharamkot Distt. Moga W ACTUAL

Mahla Kalan 82.09/83.55 (TW15812) PRWSSP-Mga-Div-75-II 545

Civil work Pumping 06-Jun- 15-JUN- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- 3.50 NCB N/A N/A N/A N/A Mach.Mahla kalan 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Masitan 0.30/35.06 (TW10078) PRWSSP-Mga-Div-64-I 546 03-AUG- 09-Jan- Tubewell 03-Jul- 24-Aug- POST- 08-Sep- 13-Oct- 12-Dec- POST- 09-JAN- 30.00 NCB 2011 N/A N/A N/A 2012 N/A Mach.,OHSR,Distribution 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN System. Mehal 35.75/35.64 (TW15357) PRWSSP-Mga-Div-38-II 547

06-Jun- 06-JUN- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- OHSR Works 2.00 NCB N/A N/A N/A N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

PRWSSP-Mga-Div-38-III 548 18-Oct- 15-Jun- 01-JUN- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 31-MAR- 2.00 NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

Nasire Wala 25.98/33.61 (TW16741) PRWSSP-Mga-Div-61-I 549 20-Feb- Tubewell 15-Aug- 15-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 20-FEB- 25.98 NCB N/A N/A N/A 2011 N/A Mach.,OHSR,Distribution 2010 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN System. Page 123 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Nasirpur Jania 30.00/37.64 (TW16061) PRWSSP-Mga-Div-39-1 550 28-Mar- 01-Jun- 01-JUL- 15-Jul- POST- 01-Aug- 01-Sep- 01-Oct- POST- 28-SEP- TW,OHSR,Civil work 30.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Nathu wala 102.25/80.11 (TW15746) PRWSSP-Mga-Div-56-1 551 31-Dec- 102.25 01-Jun- 01-JUL- 15-Jul- POST- 01-Aug- 01-Sep- 01-Oct- POST- 28-SEP- TW,Civil work NCB N/A N/A N/A 2012 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV41-1729-2 552 01-AUG- 28-Feb- 102.25 01-Jul- 30-Aug- POST- 01-Sep- 01-Oct- 01-Nov- POST- 28-OCT- OHSR NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Nihal Singh Wala 0.80/18.45 (TW10044) PRWSSP-Mga-Div-34-I 553 05-OCT- 07-Mar- Tubewell Mach., 20-Sep- 20-Oct- POST- 04-Nov- 09-Dec- 07-Feb- POST- 07-MAR- 8.00 NCB 2010 N/A N/A N/A 2011 N/A OHSR,Distribution 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN System Qadar Wala 40.00/0.00 (TW16276) PRWSSP-Mga-Div-44-1 554 31-Mar- 01-Aug- 01-SEP- 15-Sep- POST- 30-Sep- 30-Oct- 30-Nov- POST- 25-NOV- TW,OHSR, Civil work 40.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Rajan Wala 35.00/25.89 (TW16115) PRWSS-W-DIV41-2050-1 555 Page 124 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

25-AUG- 01-Aug- 05-Nov- POST- 15-Nov- 20-Dec- 31-Dec- POST- 07-JAN- 07-Jul- T/W,OHSR,Civil Work 27.47 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN

Rauli 0.30/17.51 (TW10012) PRWSSP-Mga-Div-65-I 556 03-AUG- 09-Jan- Tubewell 03-Jul- 24-Aug- POST- 08-Sep- 13-Oct- 12-Dec- POST- 09-JAN- 30.00 NCB 2011 N/A N/A N/A 2012 N/A Mach.,OHSR,Distribution 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN System. Said Mohammad 40.00/32.98 (TW16063) PRWSS-W-DIV41-1726-1 557 28-Mar- 01-Jun- 01-JUL- 15-Jul- POST- 01-Aug- 01-Sep- 01-Oct- POST- 28-SEP- TW,OHSR,Civil work 40.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Sukha Nand 103.62/103.6 (TW16151) 2 PRWSSP-Mga-Div-70-1 558 25-May- Tubewell,OHSR,Civil 01-May- 20-JUL- 15-Sep- POST- 15-Sep- 25-Oct- 05-Nov- POST- 25-NOV- 10.36 NCB N/A N/A N/A 2013 N/A Works 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Takhan Wadh 0.25/14.64 (TW9997) PRWSSP-Mga-Div-68-I 559 02-AUG- 08-Jan- Tubewell 02-Jul- 23-Aug- POST- 07-Sep- 12-Oct- 22-Dec- POST- 08-JAN- 20.00 ICB 2011 N/A N/A N/A 2012 N/A Mach.,OHSR,Distribution 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN System. Vero Ke 85.00/101.63 (TW16269) PRWSS-W-DIV41-2047-1 560

Page 125 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

30-AUG- 15-Aug- 05-Nov- POST- 15-Nov- 20-Dec- 31-Dec- POST- 07-JAN- 07-Jul- T/W,OHSR,Civil Work 40.00 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN

Wander 98.68/125.78 (TW15744) PRWSSP-Mga-Div-67-I 561 13-MAR- 18-Aug- Tubewell 13-Feb- 02-Apr- POST- 17-Apr- 22-May- 21-Jul- POST- 18-AUG- 98.68 NCB 2011 N/A N/A N/A 2011 N/A Mach.,OHSR,Distribution 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN System. Zone: Central Zone, Circle: Faridkot Circle, District: Muktsar

Alam Wala 108.85/0.00 (CA15899) PRWSSP-Mkt-Malot-74-I 562 02-Jun- 108.85 02-Jan- 09-JAN- 16-Jan- POST- 31-Jan- 06-Mar- 05-May- POST- 01-JUN- OHSR & Civil Work NCB N/A N/A N/A 2012 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

Arni Wala 200.75/240.2 Wazira & Phullu 4 Khera PRWSSP-Mkt-Malot-67-I 563 30-Mar- 200.75 02-Nov- 09-FEB- 13-Nov- POST- 28-Nov- 02-Jan- 02-Mar- POST- 29-MAR- OHSR & Civil Work NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2012 2012 REVIEW 2013 PLAN

Badhai 75.70/157.04 (CA15860) PRWSSP-Mkt-Div-1-37-I 564 21-Dec- 20-Jun- 20-JUL- 05-Aug- POST- 20-Aug- 24-Sep- 23-Nov- POST- 20-DEC- OHSR & Civil Work 75.70 NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

Bhagsar 105.83/0.00 (CA15856) PRWSSP-Mkt-B1-W-11-I 565 Page 126 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

30-NOV- 15-Mar- 105.83 31-Oct- 31-Dec- POST- 29-Jan- 28-Feb- 05-Mar- POST- 30-NOV- OHSR & Civil Work NCB 2008 N/A N/A N/A 2009 N/A 2008 2008 REVIEW 2009 2009 2009 REVIEW 2009 PLAN

Bhagwan Pura 101.15/175.5 (CA15900) 4 PRWSSP-Mkt-Malot-79-I 566

101.15 04-Feb- 11-FEB- 18-Feb- POST- 04-Mar- 08-Apr- 07-Jun- POST- 04-JUL- 05-Jul- OHSR & Civil Work NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2012 PLAN

Bhalliana 404.53/0.00 (CA15901) PRWSSP-Mkt-Malot-80-I 567 10-MAR- 03-Aug- 404.53 03-Mar- 18-Mar- POST- 02-Apr- 07-May- 06-Jul- POST- 02-AUG- OHSR & Civil Work NCB 2012 N/A N/A N/A 2012 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

Bhullerian 95.13/0.00 (CA15876) PRWSSP-Mkt-RWS-16-I 568 20-Sep- 05-Apr- 20-APR- 05-May- POST- 20-May- 24-Jun- 23-Aug- POST- 20-SEP- OHSR & Civil Work 95.43 NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

Burj Sidwhan 277.37/195.3 (CA15898) 7 PRWSSP-Mkt-Malot-73-2 569 07-May- OHSR Pkg-II Burj 145.00 06-Dec- 14-DEC- 21-Dec- POST- 05-Jan- 09-Feb- 09-Apr- POST- 06-MAY- NCB N/A N/A N/A 2013 N/A Sidwhan 2011 2011 2011 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

POST- OHSR Pkg-II Burj 158.72 06-Dec- 13-JUN- POST- 01-Aug- 05-Sep- POST- NCB REVIE 0.00 Sidwhan 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSSP-Mkt-Malot-73-I 570

Page 127 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

07-May- 06-Dec- 14-DEC- 21-Dec- POST- 05-Jan- 09-Feb- 09-Apr- POST- 06-MAY- OHSR & Civil Work 67.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

POST- 06-Dec- 13-JUN- 15-Jun- POST- 01-Aug- 05-Sep- POST- OHSR & Civil Work 64.93 NCB REVIE 0.00 2011 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Chak Badhai 81.56/91.99 (CA15864) PRWSSP-Mkt-Mkt-89-I 571 24-OCT- 10-Apr- 24-Sep- 24-Nov- POST- 09-Dec- 13-Jan- 13-Mar- POST- 09-APR- OHSR & Civil Work 81.56 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2012 2012 REVIEW 2013 PLAN

Chappian Wali 141.19/0.00 (CA16278) PRWSS-W-DIV50-2097-1 572 OHSR, Civil Works & 141.19 05-Jul- 12-JUL- 15-Jul- POST- 20-Jul- 21-Aug- 14-Sep- POST- 20-SEP- 05-Jul- Distribution for W/S NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN Scheme Chappian Wali Charewan 60.22/150.57 Chauntra (CA15686) PRWSSP-Mkt-Div-1-44-I 573 20-AUG- 21-Jan- OHSR,Civil Work & 20-Jul- 05-Sep- POST- 20-Sep- 25-Oct- 24-Dec- POST- 20-JAN- 60.22 NCB 2010 N/A N/A N/A 2011 N/A Distribution (Pkg-1) 2010 2010 REVIEW 2010 2010 2010 REVIEW 2012 PLAN

Dabra 48.51/0.00 (CA15858) PRWSSP-Mkt-B1-W-14-I 574 05-May- 30-Nov- 31-DEC- 01-Feb- POST- 05-Mar- 05-Apr- 25-Apr- POST- 31-MAR- OHSR & Civil Work 48.51 NCB N/A N/A N/A 2009 N/A 2008 2008 2009 REVIEW 2009 2009 2009 REVIEW 2010 PLAN

Dane Wala 179.25/0.00 (CA15897)

Page 128 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-Mkt-Malot-71-I 575 05-May- 179.25 05-Dec- 12-DEC- 19-Dec- POST- 03-Jan- 07-Feb- 07-Apr- POST- 04-MAY- OHSR & Civil Work NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

Deon Khera 137.12/58.98 (CA10207) PRWSSP-Mkt-Malot-66-I 576 OHSR, Civil Works & 08-NOV- 28-Mar- Distribution(Pack-I)for 137.12 01-Nov- 12-Nov- POST- 27-Nov- 01-Jan- 01-Mar- POST- 29-MAR- NCB 2011 N/A N/A N/A 2013 N/A W/S Scheme Deon Khera 2011 2011 REVIEW 2011 2012 2012 REVIEW 2012 PLAN

OHSR, Civil Works & POST- Distribution(Pack-I)for POST- POST- REVIE 0.00 W/S Scheme Deon Khera REVIEW REVIEW W ACTUAL

Dhigana 72.48/0.00 (CA15859) PRWSSP-Mkt-Div-1-36-I 577 21-Dec- 20-Jun- 20-JUL- 05-Aug- POST- 20-Aug- 24-Sep- 23-Nov- POST- 20-DEC- OHSR & Civil Work 72.48 NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

Duhewala 137.07/160.6 (CA15654) 4 PRWSSP-Mkt-Mkt-86-I 578 01-May- 137.07 15-Jul- 01-DEC- 15-Dec- POST- 30-Dec- 30-Jan- 03-Apr- POST- 01-MAY- OHSR & Civil Work NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2012 2012 REVIEW 2013 PLAN

Fatta Khera 101.89/109.2 (CA7584) 0 PRWSSP-Mkt-Malot-64-I 579 OHSR, Civil Works & 11-OCT- 03-Mar- Distribution(Pack-I)for 122.00 04-Oct- 18-Oct- POST- 02-Nov- 07-Dec- 05-Feb- POST- 04-MAR- NCB 2011 N/A N/A N/A 2013 N/A W/S Scheme Fatta Khera 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN

Page 129 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 OHSR, Civil Works & POST- Distribution(Pack-I)for 120.87 01-Aug- 13-JUN- 19-Jul- POST- 01-Aug- 04-Sep- POST- NCB REVIE 0.00 W/S Scheme Fatta Khera 2011 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Gaggar 109.01/0.00 (CA7612) PRWSS-W-DIV50-2098-1 580 OHSR, Civil Works & 109.01 05-Jul- 12-JUL- 15-Jul- POST- 20-Jul- 21-Aug- 14-Sep- POST- 20-SEP- 05-Jul- Distribution for W/S NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN Scheme Gaggar

Gurusar Jodhke 97.52/0.00 (CA15881) PRWSSP-Mkt-Div-III-41-I 581 20-AUG- 21-Jan- 20-Jul- 05-Sep- POST- 20-Sep- 25-Oct- 24-Dec- POST- 20-JAN- OHSR & Civil Work 97.52 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2012 PLAN

Jando Ke 148.00/142.7 (CA16736) 0 PRWSS-W-DIV48-2235-1 582 OHSR, Civil Works & 148.00 11-Jul- 18-JUL- 23-Jul- POST- 25-Jul- 24-Aug- 14-Sep- POST- 20-SEP- 08-Jul- Distribution(Pkg-I) for W/S NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN Scheme Jando Ke

Jhorar 269.78/0.00 (CA15896) PRWSSP-Mkt-Malot-70-I 583 05-May- 269.78 05-Dec- 12-DEC- 19-Dec- POST- 03-Jan- 07-Feb- 07-Apr- POST- 04-MAY- OHSR & Civil Work NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

Karamgarh 289.41/151.0 (CA7594) 8 PRWSSP-Mkt-Malot-75-I 584

Page 130 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 OHSR, Civil Works & 02-Jun- Distribution(Pack-I)for 160.00 03-Jan- 10-JAN- 17-Jan- POST- 01-Feb- 07-Mar- 06-May- POST- 03-JUN- NCB N/A N/A N/A 2013 N/A W/S Scheme Karam Garh 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

OHSR, Civil Works & POST- Distribution(Pack-I)for 158.73 03-Jan- 15-JUN- 29-Jun- POST- 05-Jul- 07-Aug- POST- NCB REVIE 0.00 W/S Scheme Karam Garh 2012 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Katore Wala 88.55/0.00 (CA15879) PRWSSP-Mkt-Div-III-34-I 585 24-Dec- 20-Jun- 20-JUL- 05-Aug- POST- 20-Aug- 24-Sep- 23-Nov- POST- 20-DEC- OHSR & Civil Work 88.55 NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

Kattian wali 126.28/0.00 (CA16279) PRWSS-W-DIV50-2099-1 586 OHSR, Civil Works & 14-Jun- 126.28 18-Jul- 26-JUL- 27-Jul- POST- 06-Aug- 06-Sep- 14-Sep- POST- 20-SEP- Distribution for W/S NCB N/A N/A N/A 2012 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Kattian Wali

Khakhan Wali 196.63/198.9 (CA16733) 8 PRWSS-W-DIV50-2233-1 587 OHSR, Civil Works & Distribution(Pkg-I) for W/S 196.63 11-Jul- 18-JUL- 23-Jul- POST- 25-Jul- 24-Aug- 14-Sep- POST- 20-SEP- 08-Jul- NCB N/A N/A N/A N/A Scheme Kakhan Wali 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

Khema Khera 103.00/0.00 (CA15878) PRWSSP-Mkt-RWS-31-I 588 15-May- 103.00 15-Jan- 15-FEB- 28-Feb- POST- 15-Mar- 14-Apr- 30-Apr- POST- 30-APR- OHSR & Civil Work NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN

Page 131 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Khokhar Chak Khokhar 94.41/94.41 (CA7874) PRWSSP-Mkt-Mkt-83-I 589 OHSR, Civil Works & 01-Mar- Distribution(Pack-I)for 02-May- 28-JUL- 15-Oct- POST- 30-Oct- 04-Dec- 02-Feb- POST- 01-MAR- 94.41 NCB N/A N/A N/A 2013 N/A W/S Scheme Khokhar & 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN Chak Khokhar Killian Wali 636.52/0.00 (CA15895) PRWSSP-Mkt-Malot-68-I 590 09-NOV- 30-Mar- 636.52 02-Nov- 13-Nov- POST- 28-Nov- 02-Jan- 02-Mar- POST- 29-MAR- OHSR & Civil Work NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2012 2012 REVIEW 2013 PLAN

Kotli Devan Lambi Dhab 74.82/0.00 (CA15862) PRWSSP-Mkt-Div-1-49-I 591 20-Feb- 20-Aug- 20-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 20-FEB- OHSR,Civil Work 74.82 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2011 REVIEW 2012 PLAN

Kotli Sangar 62.32/0.00 (CA15855) PRWSSP-Mkt-B1-W-6-I 592 31-OCT- 15-Jan- 30-Sep- 15-Nov- POST- 30-Nov- 29-Dec- 05-Jan- POST- 30-SEP- OHSR & Civil Work 62.32 NCB 2008 N/A N/A N/A 2009 N/A 2008 2008 REVIEW 2008 2008 2009 REVIEW 2009 PLAN

Kurai Wala 261.64/0.00 (CA15902) PRWSSP-Mkt-Malot-81-I 593 11-MAR- 04-Aug- 261.64 04-Mar- 19-Mar- POST- 03-Apr- 08-May- 07-Jul- POST- 03-AUG- OHSR & Civil Work NCB 2012 N/A N/A N/A 2012 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

Page 132 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Lohara 70.90/89.54 (CA16280) PRWSS-W-DIV50-2100-1 594 OHSR, Civil Works & 01-AUG- 17-Mar- 25-Jul- 05-Aug- POST- 07-Aug- 07-Sep- 17-Sep- POST- 25-SEP- Distribution for W/S 70.90 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Lohara

Madrassa 42.16/0.00 (CA15857) PRWSSP-Mkt-B1-W-12-I 595 30-NOV- 15-Mar- 31-Oct- 31-Dec- POST- 29-Jan- 28-Feb- 05-Mar- POST- 30-NOV- OHSR & Civil Work 42.16 NCB 2008 N/A N/A N/A 2009 N/A 2008 2008 REVIEW 2009 2009 2009 REVIEW 2009 PLAN

Maha Badhar 96.65/162.29 Chak Maha Badhar PRWSSP-Mkt- B1-W-2 596 31-OCT- 15-Jan- 30-Sep- 15-Nov- POST- 30-Nov- 29-Dec- 05-Jan- POST- 30-SEP- OHSR 17.90 NCB 2008 N/A N/A N/A 2009 N/A 2008 2008 REVIEW 2008 2008 2009 REVIEW 2009 PLAN

POST- 09-Dec- 11-Nov- POST- 12-Dec- 12-Jan- POST- OHSR 17.72 NCB REVIE 0.00 2010 2011 REVIEW 2011 2012 REVIEW W ACTUAL

Mahuana 138.66/110.6 (CA16281) 4 PRWSS-W-DIV50-2101-1 597 OHSR, Civil Works & 01-AUG- 17-Jun- 138.66 25-Jul- 05-Aug- POST- 07-Aug- 07-Sep- 17-Sep- POST- 25-SEP- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Mahuana

Manian Wala 60.65/0.00 (CA15882) PRWSSP-Mkt-Div-III-47-I 598

Page 133 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

20-Feb- 20-Aug- 20-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 20-FEB- OHSR & Civil Work 60.65 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2011 REVIEW 2012 PLAN

Mehna 272.97/275.7 (CA16282) 8 PRWSS-W-DIV50-2102-1 599 OHSR, Civil Works & 01-AUG- 17-Sep- 272.97 25-Jul- 05-Aug- POST- 07-Aug- 07-Sep- 17-Sep- POST- 25-SEP- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Mehna

Mohlan 175.01/0.00 (CA16283) PRWSS-W-DIV50-2103-1 600 OHSR, Civil Works & 02-AUG- 18-Jun- 175.01 26-Jul- 05-Aug- POST- 09-Aug- 10-Sep- 18-Sep- POST- 25-SEP- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Mohlan

Pakki Tibbi 127.68/132.4 (CA7609) 6 PRWSSP-Mkt-Malot-72-I 601 OHSR, Civil Works & 05-May- 127.68 06-Dec- 13-DEC- 20-Dec- POST- 04-Jan- 08-Feb- 08-Apr- POST- 06-MAY- Distribution(Pack-I)for NCB N/A N/A N/A 2013 N/A 2011 2011 2011 REVIEW 2012 2012 2012 REVIEW 2012 PLAN W/S Scheme Pakki Tibbi

OHSR, Civil Works & POST- 127.63 18-Sep- 12-JUN- 26-Jun- POST- 01-Aug- 04-Sep- POST- Distribution(Pack-I)for NCB REVIE 0.00 2011 2012 2012 REVIEW 2012 2012 REVIEW W/S Scheme Pakki Tibbi W ACTUAL Panni Wala Fatta (CA16734) 120.12/0.00

PRWSS-W-DIV50-2232-1 602 OHSR, Civil Works & 02-AUG- 18-Sep- Distribution(Pkg-I) for W/S 120.12 26-Jul- 05-Aug- POST- 09-Aug- 10-Sep- 18-Sep- POST- 25-SEP- NCB 2012 N/A N/A N/A 2013 N/A Scheme Panni Wala Fatta 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Rani Wala 189.92/163.1 (CA16284) 7

Page 134 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV50-2104-1 603 OHSR, Civil Works & 02-AUG- 18-Jun- 189.92 26-Jul- 06-Aug- POST- 09-Aug- 10-Sep- 18-Sep- POST- 25-SEP- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Rani Wala

Rasulpur Khera 165.66/158.8 (CA15652) 5 PRWSSP-Mkt-Malot-58-I 604 26-Jan- 165.66 25-May- 28-JUL- 10-Sep- POST- 25-Sep- 30-Oct- 29-Dec- POST- 25-JAN- OHSR & Civil Work NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2013 PLAN

Ratta Khera 104.28/114.4 (CA15650) 0 PRWSSP-Mkt-Malot-77-I 605

135.00 01-Feb- 08-FEB- 15-Feb- POST- 01-Mar- 05-Apr- 04-Jun- POST- 01-JUL- 02-Jul- OHSR & Civil Work NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2012 PLAN

POST- 133.72 09-Jun- 15-JUN- 15-Jun- POST- 01-Aug- 05-Sep- POST- OHSR & Civil Work NCB REVIE 0.00 2011 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Sakkan Wali 150.00/0.00 (CA16735) PRWSS-W-DIV48-2234-1 606 OHSR, Civil Works & 13-AUG- 01-Oct- Distribution(Pkg-I) for W/S 150.00 06-Aug- 21-Aug- POST- 24-Aug- 25-Sep- 01-Oct- POST- 08-OCT- NCB 2012 N/A N/A N/A 2013 N/A Scheme Sakkan Wali 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Sarawan Bodla 316.25/0.00 (CA16286) PRWSS-W-DIV50-2105-1 607 OHSR, Civil Works & 08-AUG- 24-Sep- 316.25 01-Aug- 13-Aug- POST- 16-Aug- 17-Sep- 24-Sep- POST- 30-SEP- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Sarawan Bodla

Page 135 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Sikh Wala 231.77/0.00 (CA16287) PRWSS-W-DIV50-2106-1 608 OHSR, Civil Works & 09-AUG- 25-Sep- 231.77 02-Aug- 16-Aug- POST- 21-Aug- 21-Sep- 25-Sep- POST- 30-SEP- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Sikh Wala

Smagh 55.19/111.14 (CA15863) PRWSSP-Mkt-Mkt-85-I 609 01-Jun- 15-Oct- 15-DEC- 15-Jan- POST- 30-Jan- 05-Mar- 04-May- POST- 01-JUN- OHSR & Civil Work 55.19 NCB N/A N/A N/A 2012 N/A 2011 2011 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

Tappa Khera 107.99/119.2 (CA16288) 9 PRWSS-W-DIV50-2107-1 610 OHSR, Civil Works & 09-AUG- 25-Jun- 107.99 02-Aug- 16-Aug- POST- 21-Aug- 21-Sep- 25-Sep- POST- 30-SEP- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Tappa Khera

Tarmala 164.89/0.00 (CA16289) PRWSS-W-DIV50-2108-1 611 OHSR, Civil Works & 09-AUG- 25-Jun- 164.89 02-Aug- 16-Aug- POST- 21-Aug- 21-Sep- 25-Sep- POST- 30-SEP- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Tarmala

Tharaj Wala 245.52/0.00 (CA16290) PRWSS-W-DIV50-2109-1 612 OHSR, Civil Works & 13-AUG- 01-Oct- 245.52 06-Aug- 21-Aug- POST- 24-Aug- 25-Sep- 01-Oct- POST- 08-OCT- Distribution for W/S NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Scheme Tharaj Wala

Page 136 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Theri (CA15880) 110.60/0.00

PRWSSP-Mkt-Div-III-40-I 613 20-AUG- 21-Jan- 110.60 20-Jul- 05-Sep- POST- 20-Sep- 25-Oct- 24-Dec- POST- 20-JAN- OHSR & Civil Work NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2012 PLAN

Warring Khera 214.56/182.2 (CA7572) 9 PRWSSP-Mkt-Malot-65-I 614 OHSR, Civil Works & 11-OCT- 03-Mar- Distribution(Pack-I)for 214.56 04-Oct- 18-Oct- POST- 02-Nov- 07-Dec- 05-Feb- POST- 04-MAR- NCB 2011 N/A N/A N/A 2013 N/A W/S Scheme Warring 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN Khera OHSR, Civil Works & POST- Distribution(Pack-I)for 211.30 18-Aug- 13-JUN- 26-Jul- POST- 01-Aug- 04-Sep- POST- NCB REVIE 0.00 W/S Scheme Warring 2011 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Khera Zone: North Zone, Circle: Hoshiarpur Circle, District: Nawanshahar

Bagoran (TW15951) PRWSS-W-DIV21-1596-1 615 15-NOV- 30-Dec- Tubewell, OHSR, 15-Aug- 15-Dec- POST- 16-Jan- 16-Feb- 23-Feb- POST- 16-MAR- 30.96 NCB 2011 N/A N/A N/A 2012 N/A Distribution 2011 2011 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Chak 55.38/55.38 (TW7566) PRWSS-W-DIV21-1442-1 616 22-NOV- 03-Mar- 22-Jul- 22-Nov- POST- 22-Nov- 23-Dec- 03-Jan- POST- 03-MAR- W/S Scheme Chak Bigla 55.38 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN

Gosal (TW6963) 32.00/38.23

PRWSSP-Nshr-Div-1-32-II 617 Page 137 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme GosalPkg 2 14-MAY- 18-Mar- 29-Mar- 21-May- POST- 05-Jun- 10-Jul- 08-Sep- POST- 06-OCT- :- Distribution System to 7.28 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Village Gosal PRWSSP-Nshr-Div-1-32-III 618 W/S Scheme GosalPkg 3 14-MAY- 18-Mar- 29-Mar- 21-May- POST- 05-Jun- 10-Jul- 08-Sep- POST- 06-OCT- :- Distribution System to 11.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Village Mehrampur.

Hakimpur 50.40/0.00 (TW7700) PRWSSP-Nshr-Div-1-43-I 619 W/S Scheme Hakimpur : 30-Nov- T/W, OHSR, Pump 07-May- 17-JUN- 24-Jun- POST- 09-Jul- 13-Aug- 12-Oct- POST- 09-NOV- 50.40 NCB N/A N/A N/A 2011 N/A Chamber and Distribution. 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Jaffarpur 37.74/44.90 (TW7674) PRWSSP-Nshr-Div-1-38-I 620 W/S Scheme Jafferpur : 30-Nov- T/W, OHSR, Pump 02-May- 17-JUN- 24-Jun- POST- 09-Jul- 13-Aug- 12-Oct- POST- 09-NOV- 37.74 NCB N/A N/A N/A 2011 N/A Chamber and Distribution. 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

W/S Scheme Jafferpur : POST- T/W, OHSR, Pump POST- POST- 37.74 NCB REVIE 0.00 Chamber and Distribution. REVIEW REVIEW W ACTUAL

Mutton 47.04/0.00 (TW7698) PRWSSP-Nshr-Div-1-39-I 621 W/S Scheme Mutton : 30-Nov- T/W, OHSR, Pump 02-May- 17-JUN- 24-Jun- POST- 09-Jul- 13-Aug- 12-Oct- POST- 09-NOV- 47.04 NCB N/A N/A N/A 2011 N/A Chamber and Distribution. 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

PRWSSP-Nshr-Div-1-39-II 622

Page 138 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

12-Jan- W/S scheme Mutton 11-May- 26-JUN- 03-Jul- POST- 18-Jul- 22-Aug- 21-Oct- POST- 18-NOV- 21.69 NCB N/A N/A N/A 2012 N/A distribution 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Surapur 47.90/45.90 (TW15892) PRWSS-W-DIV21-1594-1 623 15-NOV- 30-Dec- 15-Aug- 15-Dec- POST- 16-Jan- 16-Feb- 23-Feb- POST- 16-MAR- Tubewell 0.48 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV21-1594-2 624 15-NOV- 30-Dec- Pump Chamber ,OHSR & 15-Aug- 15-Dec- POST- 16-Jan- 16-Feb- 23-Feb- POST- 16-MAR- 47.90 ICB 2011 N/A N/A N/A 2012 N/A Distribution 2011 2011 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Zone: North Zone, Circle: Gurdaspur Circle, District: Pathankot

Akhrota 28.00/48.63 (TW15866) PRWSSP-Gsp-Ptk-95-I 625 W/S Scheme Akhrota 20-AUG- 15-Jan- Block Pathankot:- 27-Apr- 30-Aug- POST- 14-Sep- 19-Oct- 18-Dec- POST- 31-MAR- 51.94 NCB 2011 N/A N/A N/A 2012 N/A Tubewell,OHSR,Distributi 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN on System Bani Lodhi 65.53/61.84 (TW15352) PRWSS-W-DIV03-1597-2 626 W/S Scheme Bani Lodhi 28-Mar- OHSR,PC,Development 15-May- 15-JUL- 10-Aug- POST- 25-Aug- 29-Sep- 28-Nov- POST- 26-DEC- 40.83 NCB N/A N/A N/A 2012 N/A of Water 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Works,Distribution Bhangwanpur 47.06/47.31 (TW16522) PRWSS-W-DIV03-1979-1 627

Page 139 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Bhangwanpur Block Narot 31-Mar- 28-Jan- 28-FEB- 20-Sep- POST- 25-Sep- 05-Nov- 18-Nov- POST- 20-NOV- Jaimal Singh Distt. 16.27 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Pathankot Pkg-1 Tubewell

PRWSS-W-DIV03-1979-2 628 W/S Scheme Bhangwanpur Block N.J 31-Mar- 28-Jan- 28-FEB- 20-Sep- POST- 25-Sep- 05-Nov- 18-Nov- POST- 20-NOV- Singh Distt. Pathankot 30.79 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Pkg-2 OHSR,PC,Distribution Chaloua 54.45/53.49 (TW16519) PRWSS-W-DIV03-2210-1 629 W/S Chaloua (Jhaloia) 31-Mar- Block 05-Mar- 28-APR- 15-Sep- POST- 16-Sep- 27-Oct- 17-Nov- POST- 19-NOV- 15.58 NCB N/A N/A N/A 2013 N/A Pathankot Pkg-1Tubewell 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV03-2210-2 630 W/S Scheme Chaloua 31-Mar- (jhaloia)Block Pathankot 05-Mar- 28-APR- 15-Sep- POST- 16-Sep- 27-Oct- 17-Nov- POST- 19-NOV- 38.87 NCB N/A N/A N/A 2013 N/A Distt. Pathankot Pkg-2 PC 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN OHSR Distribution Chhatwal 50.83/0.00 (TW15870) PRWSSP-Gsp-Ptk-58-I 631 W/S Scheme Chhatwal 26-OCT- 11-Mar- Block Dhar 26-Oct- 06-Nov- POST- 10-Nov- 15-Dec- 13-Feb- POST- 15-SEP- 50.83 NCB 2010 N/A N/A N/A 2011 N/A Kalan:Tubewell,OHSR,Dis 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN tribution System Danour 55.89/54.42 (TW16518) PRWSS-W-DIV03-1977-1 632 W/S Scheme Danour 31-Mar- 09-Mar- 25-APR- 20-Sep- POST- 14-Sep- 27-Oct- 17-Nov- POST- 19-NOV- Block & Distt. Pathankot 14.08 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Pkg-1 Tubewell

Page 140 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV03-1977-2 633 W/S Scheme Danour 31-Mar- Block & Distt.pathankot 09-Mar- 25-APR- 20-Sep- POST- 14-Sep- 27-Oct- 17-Nov- POST- 19-NOV- 41.81 NCB N/A N/A N/A 2013 N/A Pkg-2 OHSR,PC, 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Distribution System Datiyal 29.00/44.73 (TW15865) PRWSSP-Gsp-Ptk-94-I 634 W/S Scheme Datiyal 15-AUG- 21-Jan- Block Narot Jaimal 27-Apr- 05-Sep- POST- 20-Sep- 25-Oct- 24-Dec- POST- 31-MAR- 48.23 NCB 2011 N/A N/A N/A 2012 N/A Singh:- 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN Tubewell,OHSR,Distributi Kanwan 50.43/50.43 (TW16123) PRWSS-W-DIV03-1783-1 635 W/S Scheme Kanwan 31-Mar- 15-Oct- 03-APR- 10-Sep- POST- 09-Sep- 20-Oct- 10-Nov- POST- 13-NOV- Block pathankot Distt. 0.00 NCB N/A N/A N/A 2013 N/A 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN pathankot Pkg-1 T/Well PRWSS-W-DIV03-1783-2 636 W/S Scheme Kanwan 31-Mar- Block Pathankot Distt. 15-Oct- 03-APR- 10-Sep- POST- 09-Sep- 20-Oct- 10-Nov- POST- 13-NOV- 0.00 NCB N/A N/A N/A 2013 N/A Pathankot Pkg-2 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN OHSR,PC,Distribution Kilpur 46.06/46.06 (TW16521) PRWSS-W-DIV03-1774-1 637 W/S Scheme Kilpur Block 31-Mar- Narot Jamial Singh Distt. 24-Jan- 25-FEB- 08-Aug- POST- 14-Aug- 23-Sep- 05-Oct- POST- 07-OCT- 0.00 NCB N/A N/A N/A 2013 N/A Pathankot Pkg-1 T/Well 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV03-1774-2 638 W/S Scheme Kilpur Block Narot Jamial Singh 31-Mar- 24-Jan- 25-FEB- 08-Aug- POST- 14-Aug- 23-Sep- 05-Oct- POST- 07-OCT- Distt.Pathankot Pkg-2 0.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN OHSR,PC,Distribution System

Page 141 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Kohlian 67.88/65.00 (TW16516) PRWSS-W-DIV03-2163-1 639 W/S Schemes 09-MAR- 31-Mar- Kolian,Charak, Pola Block 20-Feb- 08-Sep- POST- 15-Sep- 28-Oct- 17-Nov- POST- 19-NOV- 15.58 NCB 2012 N/A N/A N/A 2013 N/A N.J Singh District 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Pathankot Pkg-1 T/Well PRWSS-W-DIV03-2163-2 640 W/S Scheme Kolian block 09-MAR- 31-Mar- 20-Feb- 08-Sep- POST- 15-Sep- 28-Oct- 17-Nov- POST- 19-NOV- N.J Singh District 11.61 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Pathankot Distribution PRWSS-W-DIV03-2163-3 641 W/S Scheme Kolian 09-MAR- 31-Mar- village Pola Block N.J 20-Feb- 08-Sep- POST- 15-Sep- 28-Oct- 17-Nov- POST- 19-NOV- 10.60 NCB 2012 N/A N/A N/A 2013 N/A Singh Distt.Pathankot 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Distribution PRWSS-W-DIV03-2163-4 642 W/S Scheme Kolian 09-MAR- 31-Mar- Village Charak Block 20-Feb- 08-Sep- POST- 15-Sep- 28-Oct- 17-Nov- POST- 19-NOV- 4.04 NCB 2012 N/A N/A N/A 2013 N/A N.J.Singh Distt. Pathankot 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Distribution PRWSS-W-DIV03-2163-5 643 W/S Scheme Kolian,Pola, Charak Block N.J Singh 09-MAR- 31-Mar- 20-Feb- 08-Sep- POST- 15-Sep- 28-Oct- 17-Nov- POST- 19-NOV- Distt.Pathankot Pkg-5 20.27 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN PC,OHSR, Development

Kotli Muglan 36.47/0.00 (TW15873) PRWSSP-Gsp-Ptk-20-I 644 W/S Scheme Kotli Muglan Block 25-Nov- 15-May- 09-JUN- 10-Jul- POST- 25-Jul- 29-Aug- 28-Oct- POST- 25-NOV- Pathankot:Tubewell,OHS 36.47 NCB N/A N/A N/A 2009 N/A 2009 2009 2009 REVIEW 2009 2009 2009 REVIEW 2010 PLAN R,Distribution System.

Page 142 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Malkana 53.23/53.07 (TW16520) PRWSS-W-DIV03-1978-1 645 W/S Scheme Malkana 31-Mar- Hayati Chack Block & 02-Mar- 30-APR- 12-Sep- POST- 20-Sep- 30-Oct- 15-Nov- POST- 17-NOV- 15.09 NCB N/A N/A N/A 2013 N/A Distt. Pathankot Pkg-1 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Tubewell PRWSS-W-DIV03-1978-2 646 W/S Scheme Malkana Hayati Chack Block & 31-Mar- 02-Mar- 30-APR- 12-Sep- POST- 20-Sep- 30-Oct- 15-Nov- POST- 17-NOV- Distt. Pathankot Pkg-2 38.14 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN OHSR,PC,Distribution System Manwal 22.60/0.00 (TW7474) PRWSSP-Gsp-Ptk-57-I 647 Aug.W/S Scheme Manwal T/Well Machinery G.Set Silver Ionization Plant C.I. 26-OCT- 15-Oct- Fitting in Pump Chamber 26-Oct- 25-Nov- POST- 10-Dec- 14-Jan- 15-Mar- POST- 12-APR- 22.60 NCB 2010 N/A N/A N/A 2011 N/A of W/S Sch. Manwal 2010 2010 REVIEW 2010 2011 2011 REVIEW 2011 PLAN Handed Over to Consultant Block Bamial

Mari (TW15867) 25.00/70.50

PRWSSP-Gsp-Ptk-97-I 648 W/S Scheme Mari Block 20-Feb- Pathankot:- 15-Apr- 25-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 31-MAR- 25.00 NCB N/A N/A N/A 2012 N/A Tubewell,OHSR,Distributi 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN on System. Mirzapur 39.35/32.55 (TW16523) PRWSS-W-DIV03-1980-1 649 W/S Scheme Mirzapur 31-Mar- 10-Jun- 28-JUL- 21-Sep- POST- 25-Sep- 05-Nov- 18-Nov- POST- 18-NOV- Block & Distt.Pathankot 15.09 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Pkg-1 Tubewell

Page 143 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV03-1980-2 650 W/S Scheme Mirzapur 31-Mar- Block & Distt Pathankot 10-Jun- 28-JUL- 21-Sep- POST- 25-Sep- 05-Nov- 18-Nov- POST- 18-NOV- 24.26 NCB N/A N/A N/A 2013 N/A Pkg-2 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN OHSR,PC,Distribution Najjo Chack 52.62/53.79 (TW16517) PRWSS-W-DIV03-1976-1 651 W/S Scheme Najjo Chack 25-MAR- 31-Mar- Block & Distt.Pathankot 25-Feb- 06-Sep- POST- 20-Sep- 30-Oct- 17-Nov- POST- 17-NOV- 13.90 NCB 2012 N/A N/A N/A 2013 N/A Pkg-1 Tubewell 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV03-1976-2 652 W/S Scheme Najjo Chack 25-MAR- 31-Mar- Block & Distt. Pathankot 25-Feb- 06-Sep- POST- 20-Sep- 30-Oct- 17-Nov- POST- 17-NOV- 38.72 NCB 2012 N/A N/A N/A 2013 N/A Pkg-2 OHSR,PC, 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Distribution System Namala 25.00/47.66 (TW15868) PRWSSP-Gsp-Ptk-98-I 653 W/S Scheme Namala 20-Feb- Block Pathankot:- 15-Apr- 25-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 31-MAR- 52.05 NCB N/A N/A N/A 2012 N/A Tubewell,OHSR,Distributi 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN on System Papial 29.58/0.00 (TW15872) PRWSSP-Gsp-Ptk-24-I 654 W/S Scheme Papial Block 16-Nov- Pathankot:Tubewell,OHS 06-May- 21-JUN- 01-Jul- POST- 16-Jul- 20-Aug- 19-Oct- POST- 15-APR- 29.58 NCB N/A N/A N/A 2010 N/A R,Distribution System. 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Parmanand 82.78/76.14 (TW7466) PRWSSP-Gsp-Ptk-3 655

Page 144 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

W/S Scheme Parmanand 28-Mar- 17-Sep- 15-JUL- 10-Aug- POST- 28-Aug- 29-Sep- 28-Nov- POST- 26-DEC- Pkg-III Distribution 27.93 NCB N/A N/A N/A 2011 N/A 2010 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN System.

W/S Scheme Parmanand POST- 17-Sep- 27-SEP- 29-Sep- POST- 15-Feb- 21-Mar- POST- Pkg-III Distribution 27.93 NCB REVIE 0.00 2010 2011 2011 REVIEW 2012 2012 REVIEW System. W ACTUAL

Pathan Chak 45.59/45.59 (TW16313) PRWSS-W-DIV03-1771-1 656 W/S Scheme Pathan 31-Mar- Chack Block Pathankot 28-Dec- 29-JAN- 08-Aug- POST- 20-Aug- 30-Sep- 15-Oct- POST- 17-OCT- 0.00 NCB N/A N/A N/A 2013 N/A Distt. Pathankot Pkg-1 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN T/Well PRWSS-W-DIV03-1771-2 657 W/S Scheme Pathan Chack Block Pathankot 31-Mar- 28-Dec- 29-JAN- 08-Aug- POST- 20-Aug- 30-Sep- 15-Oct- POST- 17-OCT- Distt.Pathankot Pkg-2 0.00 NCB N/A N/A N/A 2013 N/A 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN OHSR,PC,Distribution System. Ramkalwan 55.60/28.61 (TW15494) PRWSSP-Gsp-Ptk-73-I 658 Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of 31-Mar- W/W, Distribution System 18-Feb- 20-JUL- 15-Aug- POST- 30-Aug- 04-Oct- 03-Dec- POST- 31-DEC- 55.60 NCB N/A N/A N/A 2012 N/A for Scheme Ramkalwan 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Block Narot Jaimal Singh

Providing Tubewell, Pump Chamber, Machinery, OHSR, Development of POST- W/W, Distribution System 18-Feb- 24-FEB- POST- POST- 55.60 NCB REVIE 0.00 for Scheme Ramkalwan 2011 2012 REVIEW REVIEW W ACTUAL Block Narot Jaimal Singh

Page 145 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Sunder Chack 55.70/55.70 (TW15449) PRWSS-W-DIV03-1570-2 659 Providing OHSR, Development of W/W, 19-OCT- 07-Apr- 01-Aug- 21-Nov- POST- 06-Dec- 10-Jan- 10-Mar- POST- 15-AUG- Distribution System for 37.92 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2012 2012 REVIEW 2012 PLAN Scheme Sunder Chack Block Pathankot. Wadala 25.00/40.83 (TW15869) PRWSSP-Gsp-Ptk-99-I 660 W/S Scheme Wadala 20-Feb- Block 15-Apr- 25-SEP- 05-Oct- POST- 20-Oct- 24-Nov- 23-Jan- POST- 31-MAR- 25.00 NCB N/A N/A N/A 2012 N/A Pathankot:Tubewell,OHS 2011 2011 2011 REVIEW 2011 2011 2012 REVIEW 2012 PLAN R,Distribution System. Zone: South Zone, Circle: Patiala Circle, District: Patiala

Abdulpur 1.60/16.00 (TW15831) PRWSS-W-DIV68-1573-1 661

16-Aug- 13-JAN- 13-Jan- POST- 15-Mar- 16-Apr- POST- Abdulpur (T/W) 8.89 NCB N/A N/A N/A N/A 2010 2012 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV68-1573-2 662

16-Aug- 13-JAN- 13-Jan- POST- 26-Apr- 29-May- POST- Abdulpur (C.W) 6.28 NCB N/A N/A N/A N/A 2010 2012 2012 REVIEW 2012 2012 REVIEW PLAN

Bakshiwala 49.45/49.45 (TW16682) PRWSS-W-DIV68-2146-1 663 14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Bakhiwala (T/W) 14.34 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2146-2 664 Page 146 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

14-AUG- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- Bakhiwala (OHSR) 13.59 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

PRWSS-W-DIV68-2146-3 665 14-AUG- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- Bakshiwala (C.W) 18.95 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

Bhateri 24.20/24.20 (TW16604) PRWSS-W-DIV67-2090-1 666 31-AUG- 31-Mar- 28-Jul- 15-Sep- POST- 30-Sep- 31-Oct- 15-Nov- POST- 15-NOV- Bhateri (T/W & C.W) 24.20 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Bir Bahadurgarh (TW16677) 12.01/12.01

PRWSS-W-DIV68-2143-1 667 14-AUG- 31-Mar- Bir Bahadurgarh 30-Jul- 14-Sep- POST- 14-Oct- 13-Nov- 28-Dec- POST- 28-DEC- 4.26 NCB 2012 N/A N/A N/A 2013 N/A (Tubewell) 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2143-2 668 14-AUG- 30-Jul- 14-Sep- POST- 14-Oct- 13-Nov- 28-Dec- POST- 28-DEC- 01-Jul- Bir Bahadurgarh (C.W) 7.32 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

CHHAJU 36.35/37.72 BHATT PRWSS-W-DIV66-2130-1 669 25-AUG- 26-Feb- 24-Jul- 28-Aug- POST- 03-Sep- 08-Oct- 15-Oct- POST- 27-NOV- Chajju Bhatt (T/W) 7.80 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV66-2130-2 670

Page 147 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

25-AUG- 26-Mar- 24-Jul- 28-Aug- POST- 03-Sep- 08-Oct- 15-Oct- POST- 27-NOV- Chajju Bhatt (OHSR) 11.40 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV66-2130-3 671 25-AUG- 25-Mar- 24-Jul- 28-Aug- POST- 03-Sep- 08-Oct- 15-Oct- POST- 27-NOV- Chajju Bhatt (C.W) 17.15 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Darwa 12.47/27.67 (TW2096) PRWSSP-PTA-B1-W-39-II 672

28-Aug- 15-SEP- 15-Oct- POST- 30-Oct- 04-Dec- 02-Feb- POST- 02-MAR- 31-Jul- Darwa (OHSR) 8.22 NCB N/A N/A N/A N/A 2009 2009 2009 REVIEW 2009 2009 2010 REVIEW 2010 2010 PLAN

Daulatpur Fakian 35.46/26.07 (TW16602) PRWSS-W-DIV67-2134-1 673 31-Mar- Daulatpur Fakiran (T/W & 30-Jun- 15-JUL- 01-Sep- POST- 11-Sep- 13-Oct- 30-Oct- POST- 30-OCT- 27.75 NCB N/A N/A N/A 2013 N/A C.W) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV67-2134-2 674 31-Mar- Daulatpur Fakiran 30-Jun- 15-JUL- 01-Sep- POST- 11-Sep- 13-Oct- 30-Oct- POST- 30-OCT- 7.71 NCB N/A N/A N/A 2013 N/A (OHSR) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Daun Kalan 6.04/6.04 (TW16605) PRWSS-W-DIV67-2091-1 675 31-Mar- SHOP 16-Aug- 15-SEP- 30-Sep- POST- 15-Oct- 16-Nov- 01-Dec- POST- 01-DEC- Daun Kalan (C.W) 6.04 N/A N/A N/A 2013 N/A PING 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Dharamgarh 49.67/49.67 (TW16681)

Page 148 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV68-2148-1 676 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Dharamgarh (T/W) 14.91 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2148-2 677 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Dharamgarh (OHSR) 11.32 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2148-3 678 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Dharamgarh (C.W) 10.29 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Dhareri Jattan 1.05/1.05 (TW16694) PRWSS-W-DIV67-2087-1 679 02-AUG- 31-Mar- SHOP 15-Jul- 01-Sep- POST- 11-Sep- 13-Oct- 30-Oct- POST- 30-OCT- Dhareri Jattan (C.W) 1.05 2012 N/A N/A N/A 2013 N/A PING 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Fatehpur Jattan 27.38/27.47 (TW16601) PRWSS-W-DIV67-2086-1 680 06-AUG- 31-Mar- Fatehpur Jatttan (T/W & 02-Aug- 01-Sep- POST- 11-Sep- 13-Oct- 30-Oct- POST- 30-OCT- 19.92 NCB 2012 N/A N/A N/A 2013 N/A C.W) 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV67-2086-2 681 06-AUG- 31-Mar- 02-Aug- 01-Sep- POST- 11-Sep- 13-Oct- 30-Oct- POST- 30-OCT- Fatehpur Jattan (OHSR) 7.46 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Ghumana 44.10/44.10 (TW15820) PRWSS-W-DIV68-2142-1 682 Page 149 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Ghumana (T/W) 15.36 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2142-2 683 14-AUG- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- Ghumana (OHSR) 11.32 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

PRWSS-W-DIV68-2142-3 684 14-AUG- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- Ghumana (C.W) 14.78 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

Hardaspur 36.97/38.57 (TW16696) PRWSS-W-DIV67-2139-1 685 31-Mar- 14-Aug- 15-SEP- 30-Sep- POST- 15-Oct- 16-Nov- 01-Dec- POST- 01-DEC- Hardaspur (T/W & C.W) 36.97 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Harigarh 30.80/38.80 (TW16680) PRWSS-W-DIV68-2141-1 686 14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Harigarh (T/W) 15.37 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2141-2 687 14-AUG- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- Harigarh (OHSR) 11.32 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

PRWSS-W-DIV68-2141-3 688 14-AUG- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- Harigarh (C.W) 10.26 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

Page 150 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Jandoli 51.05/51.05 (TW7275) PRWSS-W-DIV68-1571-1 689

01-Jun- 12-FEB- 29-Mar- POST- 16-Apr- 19-May- POST- Jandoli (T/W) 14.09 NCB N/A N/A N/A N/A 2010 2011 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV68-1571-2 690

01-Jun- 12-FEB- 29-Mar- POST- 16-Apr- 19-May- POST- Jandoli (OHSR) 12.42 NCB N/A N/A N/A N/A 2010 2011 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV68-1571-3 691

01-Jun- 12-FEB- 29-Mar- POST- 16-Apr- 19-May- POST- Jandoli (C.W) 23.46 NCB N/A N/A N/A N/A 2010 2011 2012 REVIEW 2012 2012 REVIEW PLAN

Janherian & Boharpur 5.59/4.69 (TW16607) PRWSS-W-DIV67-2138-1 692 31-Mar- Janherian & SHOP 14-Aug- 15-SEP- 30-Sep- POST- 15-Oct- 16-Nov- 01-Dec- POST- 01-DEC- 5.59 N/A N/A N/A 2013 N/A Boharpur(C.W) PING 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Kaloli 52.79/52.79 (TW16679) PRWSS-W-DIV68-2140-1 693 14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 14-Oct- 13-Nov- 28-Dec- POST- 28-DEC- Kaloli (T/W) 15.57 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2140-2 694 14-AUG- 30-Jul- 14-Sep- POST- 14-Oct- 13-Nov- 28-Dec- POST- 28-DEC- 01-Jul- Kaloli (OHSR) 13.59 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

PRWSS-W-DIV68-2140-3 695 Page 151 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

14-AUG- 30-Jul- 14-Sep- POST- 14-Oct- 13-Nov- 28-Dec- POST- 28-DEC- 01-Jul- Kaloli (C.W) 20.70 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

Kheri Mandalan (TW16314) 41.98/41.98

PRWSS-W-DIV68-1993-1 696 31-Mar- 06-Jun- 28-JUN- 30-Jul- POST- 07-Sep- 06-Oct- 26-Nov- POST- 26-NOV- Kheri Mandalan (T/W) 16.47 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-1993-2 697 31-May- 06-Jun- 28-JUN- 28-Aug- POST- 07-Sep- 06-Oct- 26-Nov- POST- 26-NOV- Kheri Mandalan (OHSR) 11.42 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-1993-3 698 31-May- 06-Jun- 28-JUN- 28-Aug- POST- 07-Sep- 06-Oct- 26-Nov- POST- 26-NOV- Kheri Mandalan (C.W) 12.25 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Kot Kalan 27.45/28.90 (TW16697) PRWSS-W-DIV66-2131-1 699 25-AUG- 26-Feb- 24-Jul- 28-Aug- POST- 03-Sep- 08-Oct- 15-Oct- POST- 27-NOV- Kot Kalan (T/W) 7.60 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV66-2131-2 700 25-AUG- 25-Mar- 24-Jul- 28-Aug- POST- 03-Sep- 08-Oct- 15-Oct- POST- 27-NOV- Kot Kalan (C.W) 19.85 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Mamouli 16.27/16.27 (TW16437) PRWSS-W-DIV68-1995-1 701

Page 152 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

31-Mar- 05-Sep- 10-JUL- 14-Sep- POST- 15-Oct- 14-Nov- 25-Dec- POST- 28-DEC- Mamouli(T/W) 8.89 NCB N/A N/A N/A 2013 N/A 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-1995-2 702 30-Jun- 05-Sep- 10-JUL- 14-Sep- POST- 15-Oct- 14-Nov- 25-Dec- POST- 28-DEC- Mamouli(C.W) 6.84 NCB N/A N/A N/A 2013 N/A 2011 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Manakpur 49.13/49.13 (TW16684) PRWSS-W-DIV68-2151-1 703 14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Manankpur (T/W) 15.07 NCB 2012 N/A N/A N/A 2012 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2151-2 704 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Manakpur (OHSR) 11.32 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2151-3 705 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Manakpur (C.W) 19.22 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Mehas 4.92/4.92 (TW16700) PRWSS-W-DIV66-2133-1 706 14-AUG- 31-Mar- 24-Jul- 31-Aug- POST- 07-Sep- 12-Oct- 19-Oct- POST- 01-DEC- Mehas (C.W) 4.92 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Mehma 38.97/38.97 (TW15822) PRWSS-W-DIV68-2150-1 707

Page 153 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Mehma (T/W) 14.27 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2150-2 708 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Mehma (OHSR) 9.02 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2150-3 709 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Mehma (C.W) 13.29 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Mohabbatpur 19.63/24.20 (TW16600) PRWSS-W-DIV67-2085-1 710 06-AUG- 31-Mar- 04-Aug- 01-Sep- POST- 11-Sep- 13-Oct- 30-Oct- POST- 30-OCT- Mohabbatpur(T/W) 11.79 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV67-2085-2 711 06-AUG- 31-Mar- 04-Aug- 01-Sep- POST- 11-Sep- 13-Oct- 30-Oct- POST- 30-OCT- Mohabbatpur (OHSR) 6.37 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Mugal Sarai 18.15/18.15 (TW7112) PRWSSP-Ptl-Rajpura-42-II 712 30-Mar- 15-Mar- 10-DEC- 19-Oct- POST- 03-Nov- 08-Dec- 06-Feb- POST- 06-MAR- Sarai Mugal (OHSR) 16.48 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN

Multanpur 1.15/1.15 (TW16606) PRWSS-W-DIV67-2137-1 713

Page 154 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

31-Mar- SHOP 16-Aug- 15-SEP- 30-Sep- POST- 15-Oct- 16-Nov- 01-Dec- POST- 01-DEC- Multanpur (C.W) 1.15 N/A N/A N/A 2013 N/A PING 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Muradpur 1.12/1.12 (TW16691) PRWSS-W-DIV67-2089-1 714 02-AUG- 31-Mar- SHOP 16-Jul- 01-Sep- POST- 11-Sep- 13-Oct- 30-Oct- POST- 30-OCT- Muradpur (C.W) 1.12 2012 N/A N/A N/A 2013 N/A PING 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Nalas Khurd 44.52/0.00 (TW16686) PRWSS-W-DIV68-2208-1 715 31-Mar- 30-Jul- 10-SEP- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Nalas Khurd (T/W) 14.92 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2208-2 716 30-Jun- 30-Jul- 10-SEP- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Nalas Khurd (OHSR) 11.52 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2208-3 717 30-Jun- 30-Jul- 10-SEP- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Nalas Khurd (C.W) 10.56 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Nasirpur & Professor 39.35/36.55 Enclave PRWSS-W-DIV67-2136-1 718 31-Mar- Nasirpur & Professor 15-Aug- 01-SEP- 15-Sep- POST- 30-Sep- 02-Nov- 15-Nov- POST- 15-NOV- 29.73 NCB N/A N/A N/A 2013 N/A Enclave (T.W & C.W) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV67-2136-2 719

Page 155 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

31-Mar- Nasirpur & Professor 15-Aug- 01-SEP- 15-Sep- POST- 30-Sep- 02-Nov- 15-Nov- POST- 15-NOV- 9.62 NCB N/A N/A N/A 2013 N/A Enclave (OHSR) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Parao Ugana 20.02/20.02 (TW15823) PRWSS-W-DIV68-2145-1 720 31-Mar- 30-Jul- 10-SEP- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Ugana & Parao Ugana 5.32 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2145-2 721

Ugana & Parao 30-Jul- 10-SEP- 13-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- 13.59 NCB N/A N/A N/A N/A Ugana(OHSR) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

PRWSS-W-DIV68-2145-3 722 30-Jun- Parao Ugana (Pump 30-Jul- 10-SEP- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 5.51 NCB N/A N/A N/A 2013 N/A Chamber) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2145-4 723 30-Jun- Parao Ugana & 30-Jul- 10-SEP- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 2.88 NCB N/A N/A N/A 2013 N/A Ugana(Pipeline) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Raipur 5.32/5.32 (TW16695) PRWSS-W-DIV67-2088-1 724 31-AUG- 31-Mar- SHOP 30-Jul- 15-Sep- POST- 30-Sep- 31-Oct- 15-Nov- POST- 15-NOV- Raipur (C.W) 5.32 2012 N/A N/A N/A 2013 N/A PING 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Ramgarh (Bauranwali) 5.50/5.50 (TW16699) PRWSS-W-DIV66-2132-1 725

Page 156 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

13-AUG- 29-Mar- Ramgarh (Bauranwali) 24-Jul- 31-Aug- POST- 07-Sep- 12-Oct- 19-Oct- POST- 01-DEC- 5.50 NCB 2012 N/A N/A N/A 2013 N/A C.W 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Rampura 51.98/51.98 (TW16678) PRWSS-W-DIV68-2147-1 726 14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 14-Oct- 13-Nov- 28-Dec- POST- 28-DEC- Rampura (T/W) 15.37 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2147-2 727 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 14-Oct- 13-Nov- 28-Dec- POST- 28-DEC- Rampura (OHSR) 11.32 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2147-3 728 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 14-Oct- 13-Nov- 28-Dec- POST- 28-DEC- Rampura (C.W) 22.85 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Rangian 40.55/40.55 (TW16683) PRWSS-W-DIV68-2149-1 729 14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Rangian (T/W) 15.37 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2149-2 730 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Rangian (OHSR) 9.32 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2149-3 731 14-AUG- 30-Jun- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Rangian (C.W) 14.18 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Page 157 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Rasulpur Joran 41.91/44.02 (TW16669) PRWSS-W-DIV67-2135-1 732 31-AUG- 31-Mar- Rasulpur Joran (T/W & 29-Jul- 15-Sep- POST- 30-Sep- 31-Oct- 15-Nov- POST- 15-NOV- 30.21 NCB 2012 N/A N/A N/A 2013 N/A C.W) 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV67-2135-2 733 31-AUG- 31-Mar- 29-Jul- 15-Sep- POST- 30-Sep- 31-Oct- 15-Nov- POST- 15-NOV- Rasulpur Joran (OHSR) 11.70 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Said Kheri & Gazipur 4.87/9.86 (TW16687) PRWSS-W-DIV68-2152-1 734 30-Jun- Saidkheri & Gazipur 30-Jul- 10-SEP- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 18.73 NCB N/A N/A N/A 2013 N/A (C.W) 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Samaspur 44.08/44.08 (TW16685) PRWSS-W-DIV68-2144-1 735 14-AUG- 31-Mar- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- Samaspur (T/W) 14.27 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-2144-2 736 14-AUG- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- Samaspur (OHSR) 9.02 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

PRWSS-W-DIV68-2144-3 737 14-AUG- 30-Jul- 14-Sep- POST- 17-Oct- 16-Nov- 25-Dec- POST- 28-DEC- 01-Jul- Samaspur (C.W) 18.71 NCB 2012 N/A N/A N/A N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 2013 PLAN

Page 158 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Ucha Khera 30.96/30.96 (TW15824) PRWSS-W-DIV68-1994-1 738 31-Mar- 04-May- 28-JUN- 30-Jul- POST- 07-Sep- 06-Oct- 26-Nov- POST- 26-NOV- Ucha Khera(T/W) 12.39 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-1994-2 739 31-May- 04-May- 28-JUN- 30-Jul- POST- 07-Sep- 06-Oct- 26-Nov- POST- 26-NOV- Ucha Khera(OHSR) 9.10 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSS-W-DIV68-1994-3 740 31-May- 04-May- 28-JUN- 30-Jul- POST- 07-Sep- 06-Oct- 26-Nov- POST- 26-NOV- Ucha Khera(C.W) 8.01 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

UGANI 29.99/29.99 (TW15832) PRWSS-W-DIV68-1572-1 741

10-Aug- 12-FEB- 29-Mar- POST- 16-Apr- 19-May- POST- Ugani (T/W) 14.09 NCB N/A N/A N/A N/A 2011 2011 2012 REVIEW 2012 2012 REVIEW PLAN

PRWSS-W-DIV68-1572-3 742

10-Aug- 12-FEB- 29-Mar- POST- 16-Apr- 19-May- POST- Ugani (C.W) 15.66 NCB N/A N/A N/A N/A 2011 2011 2012 REVIEW 2012 2012 REVIEW PLAN

Zone: South Zone, Circle: Circle, District: Ropar

Asalatpur 25.45/23.65 (TW15666) DWSS-W-DIV23-2185-1 743 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 29-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 14.27 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Page 159 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 DWSS-W-DIV23-2185-2 744 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- OHSR Civil 8.56 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Aulakh 25.72/24.55 (TW15664) DWSS-W-DIV23-2184-1 745 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 29-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 14.86 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2184-2 746 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- OHSR Civil Pkg 2 8.44 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Awankot 42.51/42.51 (TW16693) DWSS-W-DIV24-2174-1 747 22-AUG- 31-Oct- 25-Jun- 28-Aug- POST- 29-Aug- 30-Sep- 10-Oct- POST- 25-OCT- Tubewell Pkg 1 42.51 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Babhour Sahib 22.00/19.83 (TW15374) DWSS-W-DIV23-2193-1 748 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 19.83 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Bara Makrona 40.20/0.00 (TW15851) PRWSS-W-DIV24-1435-1 749

Page 160 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

20-Sep- 31-May- 15-JUN- 30-Jun- POST- 01-Jul- 01-Aug- 01-Sep- POST- 31-MAR- Pkg 1 40.20 NCB N/A N/A N/A 2011 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN

Barari 45.50/30.40 (TW7291) PRWSSP-Rpr-Div-1-41-I 750 Tubewell WSS Brari Block 18-AUG- 31-Mar- 15-Jul- 08-May- POST- 23-May- 27-Jun- 26-Aug- POST- 23-SEP- Nurpur Bedi Distt. Ropar 45.50 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Tubewell WSS Brari Block POST- 15-Jul- 05-Jul- POST- 10-Aug- 13-Sep- POST- Nurpur Bedi Distt. Ropar 45.50 NCB REVIE 0.00 2011 2011 REVIEW 2011 2011 REVIEW W ACTUAL

Bara Salora 10.95/38.94 (TW15585) DWSS-W-DIV24-2181-1 751 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 27-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 10.95 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Bardar 50.05/50.50 (TW16692) DWSS-W-DIV24-2173-1 752 22-AUG- 31-Oct- 25-Jun- 28-Aug- POST- 29-Aug- 30-Sep- 10-Oct- POST- 25-OCT- Tubewell Pkg 1 50.05 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Baruwal 64.11/37.52 (TW16704) DWSS-W-DIV23-2165-1 753 18-AUG- 31-Mar- 15-Jul- 18-Sep- POST- 20-Oct- 20-Nov- 15-Dec- POST- 25-DEC- Tubewell Pkg 1 64.11 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Bathlaur Khad 45.50/43.27 (TW15662)

Page 161 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 DWSS-W-DIV23-2191-1 754 22-AUG- 31-Oct- 25-Jun- 28-Aug- POST- 29-Aug- 30-Sep- 10-Oct- POST- 25-OCT- Tubewell Pkg 1 40.75 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Behlu Dhahe 56.53/19.83 (TW15660) DWSS-W-DIV23-2187-1 755 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 29-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 14.25 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2187-2 756 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- OHSR Pkg 2 16.83 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2187-3 757 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Civil Work Pkg 3 3.61 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2187-4 758 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Civil Work Pkg 4 9.73 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Behrampur Bet 12.80/38.11 (TW1491) PRWSSP-Rpr-Div-II-2 759 26-Mar- 11-Oct- 03-DEC- 01-Nov- POST- 15-Dec- 20-Jan- 26-Mar- POST- 26-JUN- Behrampur Bet PKG-I 12.80 NCB N/A N/A N/A 2009 N/A 2008 2008 2008 REVIEW 2008 2009 2009 REVIEW 2009 PLAN

Bhaini 10.95/48.76 (TW15580) DWSS-W-DIV24-2180-1 760 Page 162 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 27-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Tubwell Pkg 1 48.76 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Bhanglan 39.46/39.46 (TW15582) DWSS-W-DIV24-2172-1 761 22-AUG- 31-Oct- 25-Jun- 28-Aug- POST- 29-Aug- 30-Sep- 10-Oct- POST- 25-OCT- Tubewell Pkg 1 39.46 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Burjwala 28.29/28.29 (TW15581) DWSS-W-DIV24-2170-1 762 22-AUG- 31-Oct- 25-Jun- 28-Aug- POST- 29-Aug- 30-Sep- 10-Oct- POST- 25-OCT- Tubewell Pkg 1 28.29 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Chaunta 28.55/26.22 (TW15577) DWSS-W-DIV23-2189-1 763 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 14.22 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2189-2 764 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Civil Work Pkg 2 11.07 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Daghaur 35.28/33.43 (TW15576) DWSS-W-DIV23-2186-1 765 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 29-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 14.75 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Page 163 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 DWSS-W-DIV23-2186-2 766 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- OHSR Civil 17.20 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Haripur 43.70/27.58 (TW15379) DWSS-W-DIV23-2183-1 767 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 29-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 13.99 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2183-2 768 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- OHSR Civil Pkg 2 12.63 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Jhallian Kalan 46.61/46.71 (TW15574) DWSS-W-DIV24-2178-1 769 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 27-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Tubewell civil Pkg 1 30.72 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Katlaur 32.50/0.00 (TW7293) PRWSSP-Rpr-Div-II-40-I 770 Tubewell WSS Katlour 28-Feb- 15-Jun- 30-JUN- 15-Jul- POST- 30-Jul- 03-Sep- 02-Nov- POST- 30-NOV- Block Chamkaur Sahib 32.50 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Distt. Ropar

Kiri Afgana 52.04/52.04 (TW12592) PRWSSP-Rpr-Div-II-24-II 771

Page 164 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

OHSR WSS Kiri Afgana 16-AUG- 16-Mar- 26-May- 26-Jun- POST- 11-Jul- 15-Aug- 14-Oct- POST- 11-NOV- Block Chamkaur Sahib 9.55 NCB 2010 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Distt. Ropar

Lasari 42.50/35.40 (TW15663) DWSS-W-DIV23-2192-1 772 22-AUG- 31-Oct- 25-Jun- 28-Aug- POST- 29-Aug- 30-Sep- 10-Oct- POST- 25-OCT- Tubewell Pkg 1 47.35 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Massewal 57.11/40.89 (TW16705) DWSS-W-DIV23-2166-1 773 18-AUG- 31-Mar- 15-Jul- 20-Sep- POST- 20-Oct- 20-Nov- 15-Dec- POST- 25-DEC- Tubewel Pkg 1 57.11 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Mehandpur 49.62/52.74 (TW15853) DWSS-W-DIV23-2175-1 774 18-AUG- 31-Mar- 15-Jul- 18-Sep- POST- 25-Sep- 25-Oct- 15-Nov- POST- 05-DEC- Tubewell pkg 1 49.62 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Mirpur 42.70/23.79 (TW15376) DWSS-W-DIV23-2182-1 775 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 29-Aug- 10-Sep- POST- 25-SEP- Tubewell 13.11 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2182-2 776 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- OHSR Pkg 2 9.87 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Page 165 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Mohiwal 39.28/58.72 (TW16706) DWSS-W-DIV23-2167-1 777 18-AUG- 31-Mar- 15-Jul- 18-Sep- POST- 20-Oct- 20-Nov- 15-Dec- POST- 25-DEC- Tubewell Pkg 1 39.28 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Muqarbpur 11.35/11.35 (TW16662) PRWSS-W-DIV24-2171-1 778 22-AUG- 31-Oct- 25-Jun- 28-Aug- POST- 29-Aug- 30-Sep- 10-Oct- POST- 25-OCT- Tubewell Pkg 1 11.35 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Nard 27.14/16.70 (TW15852) DWSS-W-DIV23-2168-1 779 18-AUG- 31-Mar- 15-Jul- 18-Sep- POST- 20-Oct- 20-Nov- 15-Dec- POST- 25-DEC- Tubewell Pkg 1 27.14 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Paprali 26.80/39.76 (TW15573) DWSS-W-DIV24-2179-1 780 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 27-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Tubewell Civil Pkg 1 26.80 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Rakauli Manngarh 40.04/40.04 (TW7296) PRWSS-W-DIV24-1981-2 781 OHSR WSS Rakouli 16-MAY- 31-Mar- 27-Apr- 30-May- POST- 14-Jun- 15-Jul- 17-Sep- POST- 16-OCT- Manngarh Block 40.40 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Chamkaur Sahib

Page 166 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Roruane 31.43/25.40 (TW15665) DWSS-W-DIV23-2190-1 782 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 29-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 13.24 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2190-2 783 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Civil Work Pkg 2 11.32 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Seikhpur 18.84/18.84 (TW7105) PRWSSP-Rpr-Div-1-32-II 784 Civil WorksWSS 09-AUG- 31-Mar- 06-Jul- 18-Aug- POST- 02-Sep- 07-Oct- 06-Dec- POST- 03-JAN- Sheikhpur Block Nurpur 11.01 NCB 2010 N/A N/A N/A 2012 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN Bedi Distt. Ropar

Civil WorksWSS 18-AUG- POST- 06-Jul- 30-Sep- POST- 16-Oct- 19-Nov- POST- Sheikhpur Block Nurpur 11.01 NCB 2010 REVIE 0.00 2010 2010 REVIEW 2010 2010 REVIEW Bedi Distt. Ropar W ACTUAL Shahpur Bela Gajpur 60.60/65.86 (TW15661) DWSS-W-DIV23-2164-1 785 18-AUG- 31-Mar- 15-Jul- 18-Sep- POST- 20-Oct- 20-Nov- 25-Nov- POST- 05-DEC- Tubewell Pkg1 60.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Sukhsal 43.07/55.07 (TW15659) DWSS-W-DIV23-2188-1 786 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Tubewell Pkg 1 14.51 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Page 167 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 DWSS-W-DIV23-2188-2 787 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- OHSR Pkg 2 11.50 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

DWSS-W-DIV23-2188-3 788 31-Mar- 25-Jun- 10-JUL- 20-Jul- POST- 28-Jul- 28-Aug- 10-Sep- POST- 25-SEP- Civil Work Pkg 3 27.06 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Zone: South Zone, Circle: Sangrur Circle, District: Sangrur

Badrukhan 73.16/18.19 (TW7244) PRWSSP-SGR B1-W11-I 789 Tubewell machinary, Civil 03-NOV- 31-Mar- works & Distribution 25-Apr- 03-Nov- POST- 05-Nov- 07-Dec- 15-Dec- POST- 07-JAN- 40.16 NCB 2012 N/A N/A N/A 2013 N/A system(Badrukhan) 2010 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

PRWSSP-SGR B1-W11-II 790 31-Mar- 25-Apr- 30-SEP- 31-Oct- POST- 05-Nov- 07-Dec- 15-Dec- POST- 07-JAN- RCC OHSR(Badrukhan) 33.00 NCB N/A N/A N/A 2013 N/A 2010 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

Dugri 29.00/40.84 (TW15884) PRWSSP-SGR B1-W15/I 791 15-OCT- 31-Mar- 15-Sep- 25-Oct- POST- 26-Oct- 30-Nov- 13-Dec- POST- 31-DEC- Tubewell 11.05 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

PRWSSP-SGR B1-W15/II 792 15-OCT- 31-Mar- Machinery,Civil Works & 15-Sep- 25-Oct- POST- 26-Oct- 30-Nov- 13-Dec- POST- 31-DEC- 27.58 NCB 2012 N/A N/A N/A 2013 N/A Distribution System 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Page 168 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Hakimpura 25.00/29.03 (TW16708) PRWSSP-Sng-Mkt-20-2 793 20-OCT- 31-Mar- Machinery,civil works & 10-Sep- 20-Oct- POST- 22-Oct- 26-Nov- 10-Dec- POST- 25-DEC- 17.13 NCB 2012 N/A N/A N/A 2013 N/A distribution system 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Civil works, distribution 12-OCT- POST- system & Repair of Old 30-Sep- 12-Oct- POST- 15-Oct- 22-Nov- POST- 17.13 NCB 2012 REVIE 0.00 Pump Chamber OHSR 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL etc. PRWSSP-Sng-Mkt-20-I 794 20-OCT- 31-Mar- 10-Sep- 20-Oct- POST- 22-Oct- 26-Nov- 10-Dec- POST- 25-DEC- Tubewell 9.97 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

12-OCT- POST- 30-Sep- 12-Oct- POST- 15-Oct- 22-Nov- POST- Tubewell 9.97 NCB 2012 REVIE 0.00 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Kunran 30.00/7.26 (TW9077) PRWSSP-SGRB1-W18-I 795 Tubewell machinery,civil 15-OCT- 30-Jan- 30-May- 15-Oct- POST- 30-Oct- 30-Nov- 30-Dec- POST- 30-JAN- works & distribution 30.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN system

Mithewal 29.00/29.72 (TW15885) PRWSSP-Sng-Sangrur-21-2 796 18-OCT- 31-Mar- Civil Work & Distribution 30-Sep- 25-Oct- POST- 30-Oct- 07-Dec- 18-Dec- POST- 10-JAN- 16.51 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

PRWSSP-Sng-Sangrur-21-I 797

Page 169 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Tubewell machinery,civil 31-Mar- 30-Sep- 25-SEP- 25-Oct- POST- 30-Oct- 07-Dec- 18-Dec- POST- 10-JAN- works & distribution 11.22 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN system

Qasba bhral 30.00/27.47 (TW16709) PRWSSP-Sng-Sangrur-23/II 798 31-Mar- machinery,Civil works & 30-Sep- 28-SEP- 25-Oct- POST- 30-Oct- 07-Dec- 17-Dec- POST- 31-DEC- 25.67 NCB N/A N/A N/A 2013 N/A Distribution system 2012 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN

Qila bharian 30.50/5.34 (TW8712) PRWSSP-SGRB1-W13-I 799 31-Aug- Civil works, distribution 20-Aug- 15-SEP- 31-Oct- POST- 10-Nov- 10-Dec- 31-Jan- POST- 21-FEB- 90.00 NCB N/A N/A N/A 2013 N/A system & OHSR 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Zone: South Zone, Circle: Chandigarh Circle, District: SAS Nagar

Issapur rauni 63.00/35.24 (TW16660) PRWSS-W-DIV28-1882-1 800 AUGMENTATION/BIFUR CATION OF RURAL WATER SUPPLY 14-AUG- 31-Mar- SCHEME FOR VILLAGE 16-Jul- 06-Sep- POST- 15-Sep- 11-Oct- POST- 29.50 NCB 2012 N/A N/A N/A 2013 N/A ISSAPUR RAUNI BLOCK 2012 2012 REVIEW 2012 2012 REVIEW PLAN DERABASSI, DISTT.- S.A.S NAGAR. Packages 1,2 and 3. Khizarabad 45.50/46.17 (TW3130) PRWSSP-Mhl-Div-95-I 801 30-Sep- 01-Jun- 01-JUL- 15-Jul- POST- 30-Jul- 03-Sep- 02-Nov- POST- 30-NOV- Prov. Sewerage Scheme 7.65 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Page 170 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

16-AUG- POST- 09-Jun- POST- POST- Prov. Sewerage Scheme 2010 REVIE 0.00 2010 REVIEW REVIEW W ACTUAL

Lalru (TW10786) PRWSSP-MOHALI-W-19-I 802 T/w Machinery , silver POST- 208.27 09-Apr- 12-JUN- POST- 09-Jul- POST- Ionization Plant Lalru NCB REVIE 0.00 2010 2006 REVIEW 2010 REVIEW Mandi W ACTUAL

Punsar 35.90/42.22 (TW16659) PRWSS-W-DIV28-1881-1 803 AUGMENTATION/BIFUR CATION OF RURAL WATER SUPPLY 31-Mar- 15-Jun- 16-JUL- 16-Aug- POST- 12-Sep- 16-Oct- POST- SCHEME FOR VILLAGE 35.90 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN Punsar BLOCK-DERA BASSI, DISTT.- S.A.S NAGAR. Packages 1, 2 Rampur Behal 32.06/38.70 (TW16658) PRWSS-W-DIV28-1880-1 804 AUGMENTATION/BIFUR CATION OF RURAL WATER SUPPLY 16-AUG- SCHEME FOR VILLAGE 15-Jun- 31-Aug- POST- 17-Sep- 18-Oct- POST- 32.06 NCB 2012 N/A N/A N/A N/A Rampur Behal BLOCK- 2012 2012 REVIEW 2012 2012 REVIEW PLAN DERA BASSI, DISTT.- S.A.S NAGAR. Package 1,2 and 3 Saidpura 57.34/0.00 (TW16661) PRWSS-W-DIV28-1883-1 805 AUGMENTATION/BIFUR 16-AUG- 31-Mar- CATION OF RURAL 15-Jun- 31-Aug- POST- 12-Sep- 16-Oct- POST- 57.34 NCB 2012 N/A N/A N/A 2013 N/A WATER SUPPLY 2012 2012 REVIEW 2012 2012 REVIEW PLAN SCHEME FOR VILLAGE Page 171 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

BLOCK DERABASSI, DISTT.- S.A.S NAGAR. Packages 1, 2 and 3.

Samgoli 63.00/66.30 (TW16663) DWSS-W-DIV28-1884-1 806 AUGMENTATION / BIFURCATION OF RURAL WATER SUPPLY 31-Mar- 05-Jul- 31-JUL- 31-Aug- POST- 12-Sep- 18-Oct- POST- SCHEME FOR VILLAGE 63.00 NCB N/A N/A N/A 2013 N/A 2012 2012 2012 REVIEW 2012 2012 REVIEW PLAN SAMGOLI, BLOCK DERABASSI, DISTT. S.A.S. NAGAR. Packages Singhpura 135.00/32.39 (TW4691) PRWSSP-Mhl-Div-92-I 807 31-Mar- 135.00 01-Jun- 01-JUL- 15-Jul- POST- 30-Jul- 03-Sep- 02-Nov- POST- 30-NOV- Prov. Sewerage Scheme NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

11-NOV- POST- 09-Jun- POST- POST- Prov. Sewerage Scheme 2008 REVIE 0.00 2008 REVIEW REVIEW W ACTUAL

Zone: North Zone, Circle: Amritsar Circle, District: Tarntaran

Allowal 35.00/0.00 (TW16084) PRWSSP-Trtn-Div-75-I 808 Prov. T/Well for Water 30-MAY- 30-Apr- 20-May- 30-Jun- POST- 15-Jul- 15-Aug- 15-Sep- POST- 30-OCT- Supply Scheme Allowal, 36.19 NCB 2010 N/A N/A N/A 2010 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Khadoor Sahib

Amin Shah 31.34/54.73 (TW7441) PRWSSP-Trtn-Div-92-I 809

Page 172 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

31-MAR- 31-Jan- W/S Scheme Aminshah, 20-Mar- 30-Apr- POST- 15-May- 19-Jun- 18-Aug- POST- 15-SEP- 31.34 NCB 2011 N/A N/A N/A 2012 N/A Block Bhikhiwind 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Baserke 49.56/49.56 (TW7050) PRWSSP-Trtn-Div-91-I 810 31-Dec- W/S Scheme Basarke, 08-Jan- 18-JAN- 15-Mar- POST- 30-Mar- 04-May- 03-Jul- POST- 31-JUL- 49.56 NCB N/A N/A N/A 2011 N/A Block Bhikhiwind 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Bhail Dhaiwala 80.00/0.00 (TW16127) PRWSSP-Trtn-Div-53-I 811 W/S Scheme Bhail 15-AUG- Dhaiwal, Block Chohla 20-Jul- 20-Sep- POST- 15-Oct- 17-Nov- 17-Jan- POST- 17-FEB- 01-Jul- 0.00 NCB 2012 N/A N/A N/A N/A Sahib (T/W & Civil work 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 2013 PLAN Distribution) Bhalaipur 30.00/47.82 (TW16085) PRWSSP-Trtn-Div-76-I 812 Prov. T/Well for Water 30-Jun- Supply Scheme 19-Jun- 30-JUN- 31-Jul- POST- 15-Aug- 15-Sep- 18-Nov- POST- 31-DEC- 30.75 NCB N/A N/A N/A 2012 N/A Bhalaipur, Block Khadoor 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Sahib Bharowal 85.00/61.34 (TW11482) PRWSSP-TT-B1-W-7-I 813 W/S Scheme Bharowal, 15-AUG- 30-Apr- Block Khadoor Sahib(T/W 24-Jul- 20-Sep- POST- 30-Sep- 02-Oct- 02-Jan- POST- 02-JAN- 15.00 NCB 2012 N/A N/A N/A 2013 N/A & Civil work Distribution) 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Bhathal Seja Singh 50.00/0.00 (TW16076) PRWSSP-Trtn-Div-54-I 814

Page 173 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Prov. T/Well for Water 30-AUG- 30-Apr- Supply Scheme Bhathal 12-Aug- 15-Sep- POST- 30-Sep- 30-Nov- 03-Jan- POST- 03-JAN- 11.00 NCB 2010 N/A N/A N/A 2011 N/A Seja Singh, Block Chohla 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Sahib Bhure 45.11/0.00 (TW16099) PRWSS-W-DIV09-1898-1 815 W/S Scheme Bhure, Block Tarn Taran (T/W & 05-Aug- 05-SEP- 10-Oct- POST- 30-Nov- 02-Jan- 02-Apr- POST- 02-APR- 31-Jul- 9.00 NCB N/A N/A N/A N/A Civil work Distribution) 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN

Bhusse 45.00/61.81 (TW16408) PRWSS-W-DIV09-1899-1 816 W/S Scheme Bhuse, 05-Aug- 05-SEP- 15-Oct- POST- 30-Nov- 02-Jan- 02-Apr- POST- 02-APR- 31-Jul- Block Gandiwind (T/W & 9.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Civil work Distribution)

Biharipur 36.00/0.00 (TW16068) PRWSSP-Trtn-Div-35-I 817 Prov. T/Well for Water 28-Feb- Supply Scheme Biharipur 01-Jun- 17-JUN- 02-Jul- POST- 17-Jul- 17-Aug- 20-Oct- POST- 17-NOV- 11.00 NCB N/A N/A N/A 2010 N/A Block Khadoor Sahib 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Bucher Kalan 45.00/0.00 (TW16091) PRWSS-W-DIV09-1617-1 818 Prov. T/Well for Water 30-AUG- 30-Jun- 13-Aug- 20-Sep- POST- 05-Oct- 05-Nov- 30-Nov- POST- 31-DEC- Supply Scheme Bhuchar 11.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Kalan, Block Gandiwind

Bur Chand 30.00/0.00 (TW16108) PRWSS-W-DIV09-1921-1 819

Page 174 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Bur Chand, Block Bhikhiwind (T/W & 15-Aug- 30-SEP- 30-Oct- POST- 01-Dec- 03-Jan- 30-Apr- POST- 30-APR- 31-Jul- 11.00 NCB N/A N/A N/A N/A Civil work Distribution) 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN

Chahal (TW16083) PRWSSP-Trtn-Div-72-I 820 Prov. T/Well for Water 30-Apr- 19-Jun- 30-JUN- 31-Jul- POST- 15-Aug- 15-Sep- 15-Oct- POST- 30-OCT- Supply Scheme Chahal, 11.00 NCB N/A N/A N/A 2012 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Gandiwind

Chak Sikander 50.12/50.12 (TW16126) PRWSS-W-DIV09-1900-1 821 W/S Scheme Chak 31-AUG- 02-Mar- Sikander, Block Tarn 24-Jul- 20-Sep- POST- 30-Sep- 02-Oct- 02-Jan- POST- 02-JAN- 7.20 NCB 2012 N/A N/A N/A 2014 N/A Taran (T/W & Civil work 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Distribution) W/S Scheme Chak POST- Sikander, Block Tarn 24-Jul- POST- 28-Sep- 01-Nov- POST- 7.20 NCB REVIE 0.00 Taran (T/W & Civil work 2012 REVIEW 2012 2012 REVIEW W ACTUAL Distribution) PRWSS-W-DIV09-1900-2 822 Construction of pump 31-AUG- 02-Mar- chamber, providing and 24-Jul- 20-Sep- POST- 30-Sep- 02-Oct- 02-Jan- POST- 02-JAN- 28.22 NCB 2012 N/A N/A N/A 2013 N/A installing pumping 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 24-Jul- POST- 28-Sep- 01-Nov- POST- 28.22 NCB REVIE 0.00 installing pumping 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2 PRWSS-W-DIV09-1900-3 823 Construction of RCC 31-AUG- 02-Mar- OHSR of 50,000 ltr. 24-Jul- 20-Sep- POST- 30-Sep- 02-Oct- 02-Jan- POST- 02-JAN- 11.41 NCB 2012 N/A N/A N/A 2013 N/A Capacity with 18 m height 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN upto pkg-3

Construction of RCC POST- 24-Jul- POST- 28-Sep- 01-Nov- POST- OHSR of 50,000 ltr. 11.41 NCB REVIE 0.00 2012 REVIEW 2012 2012 REVIEW Capacity with 18 m W ACTUAL

Page 175 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

height upto pkg-3

Chamba Kalan 45.00/76.39 (TW16710) PRWSS-W-DIV09-2245-1 824 W/S Scheme Chamba 15-AUG- 31-May- Kalan, Block Chohla 20-Jul- 20-Sep- POST- 15-Oct- 17-Nov- 17-Jan- POST- 17-FEB- 9.00 NCB 2012 N/A N/A N/A 2013 N/A Sahib (T/W & Civil work 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Distribution) Chung 42.00/0.00 (TW16409) PRWSS-W-DIV09-1901-1 825 W/S Scheme Chung, Block Bhikhiwing (T/W & 15-Aug- 30-SEP- 01-Nov- POST- 02-Dec- 04-Jan- 04-Apr- POST- 04-APR- 31-Jul- 9.00 NCB N/A N/A N/A N/A Civil work Distribution) 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN

Chutala 30.00/0.00 (TW16088) PRWSSP-Trtn-Div-94-I 826 Prov. T/Well for Water 30-Jun- Supply Scheme Chutala, 20-Feb- 30-JUL- 30-Aug- POST- 14-Sep- 14-Oct- 18-Dec- POST- 31-DEC- 11.00 NCB N/A N/A N/A 2012 N/A Block Naushera Pannuan 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Dadehar Sahib 45.00/0.00 (TW7432) PRWSSP-Trtn-Div-52-I 827 Prov. T/Well, P/C, Machinery etc., OHSR Development of W/W & 10-AUG- 31-May- 28-Jun- 30-Aug- POST- 14-Sep- 19-Oct- 18-Dec- POST- 15-JAN- Pipeline & Distribution for 11.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN W/s scheme Dadehar Sahib, Block Chohla Sahib PRWSSP-Trtn-Div-52-II 828

Page 176 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Prov.OHSR Development of W/W for W/s scheme 10-AUG- 31-May- 28-Jun- 14-Sep- POST- 29-Sep- 03-Nov- 02-Jan- POST- 30-JAN- Dadehar Sahib, Block 20.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN Chohla Sahib

PRWSSP-Trtn-Div-52-III 829 Prov. Pump Chamber & distribution of W/W for 10-AUG- 31-May- 28-Jun- 30-Aug- POST- 14-Sep- 19-Oct- 18-Dec- POST- 15-JAN- W/s scheme Dadehar 14.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN Sahib, Block Chohla Sahib Darapur 38.50/0.00 (TW16410) PRWSS-W-DIV09-1902-1 830 W/S Scheme Darapur, Block Khadoor Sahib 15-Aug- 30-SEP- 01-Nov- POST- 03-Dec- 05-Jan- 05-Apr- POST- 05-APR- 31-Jul- 10.00 NCB N/A N/A N/A N/A (T/W & Civil work 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Distribution) Dhala (TW7437) 30.94/0.00

PRWSSP-Trtn-Div-73-I 831 31-Mar- W/S Scheme Dhala, Block 20-Apr- 30-APR- 31-May- POST- 15-Jun- 20-Jul- 18-Sep- POST- 16-OCT- 29.50 NCB N/A N/A N/A 2012 N/A Gandiwind 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Dhun Dhaiwal 3.20/29.10 (TW14566) PRWSSP-Trtn-Div-96-I 832 Package -I T/well, PC, Silver Ion. Plant scheme 15-Jan- 20-Jul- 30-JUL- 30-Aug- POST- 14-Sep- 20-Sep- 18-Dec- POST- 31-MAR- Dhun Dhaiwal, Block 11.00 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN Chohla Sahib

Dial (TW16072) 30.00/0.00

PRWSSP-Trtn-Div-37-I 833

Page 177 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Prov. T/Well for Water 28-Feb- 14-May- 08-JUN- 23-Jun- POST- 08-Jul- 08-Aug- 11-Oct- POST- 08-NOV- Supply Scheme Dial, 11.00 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Naushera Panuan

Dinewal 60.00/0.00 (TW16412) PRWSS-W-DIV09-1903-1 834 W/S Scheme Dinewal, Block Khadoor Sahib 15-Aug- 30-SEP- 04-Dec- POST- 04-Jan- 06-Jan- 06-Apr- POST- 06-APR- 31-Jul- 60.00 NCB N/A N/A N/A N/A (T/W & Civil work 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2012 PLAN Distribution) Durgapur Garbi (TW16413) 25.00/0.00

PRWSS-W-DIV09-1904-1 835 W/S Scheme Durgapur 15-AUG- 30-Apr- Garbil, Block Naushehra 24-Jul- 20-Sep- POST- 30-Sep- 02-Oct- 02-Jan- POST- 02-JAN- 9.00 NCB 2012 N/A N/A N/A 2013 N/A Punnuan (T/W & Civil 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN work Distribution) Farandipur 38.40/0.00 (TW16414) PRWSS-W-DIV09-1905-1 836 W/S Scheme Farandipur, 31-AUG- 30-Apr- Block Bhikhiwing (T/W & 24-Jul- 20-Sep- POST- 30-Sep- 31-Oct- 03-Jan- POST- 03-JAN- 9.00 NCB 2012 N/A N/A N/A 2013 N/A Civil work Distribution) 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

W/S Scheme Farandipur, POST- Block Bhikhiwing (T/W & 24-Jul- 17-SEP- POST- 21-Sep- 23-Oct- POST- 9.00 NCB REVIE 0.00 Civil work Distribution) 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSS-W-DIV09-1905-2 837 Construction of pump 31-AUG- 30-Apr- chamber, providing and 24-Jul- 30-Sep- POST- 30-Sep- 31-Oct- 03-Jan- POST- 03-JAN- 17.62 NCB 2012 N/A N/A N/A 2013 N/A installing pumping 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 24-Jul- 17-SEP- POST- 21-Sep- 23-Oct- POST- 17.62 NCB REVIE 0.00 installing pumping 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2

Page 178 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV09-1905-3 838 Construction of RCC 31-AUG- 30-Apr- OHSR of 25,000 ltr. 24-Jul- 20-Sep- POST- 30-Sep- 31-Oct- 03-Jan- POST- 03-JAN- 9.41 NCB 2012 N/A N/A N/A 2013 N/A Capacity with 18 m height 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN upto pkg-3 Construction of RCC POST- OHSR of 25,000 ltr. 24-Jul- 17-SEP- POST- 21-Sep- 23-Oct- POST- 9.41 NCB REVIE 0.00 Capacity with 18 m height 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL upto pkg-3 Fatehpur 25.90/56.83 (TW7439) PRWSSP-Trtn-Div-87-2 839 Construction of pump 30-MAY- 31-Mar- chamber, providing and 20-May- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- 17.62 NCB 2011 N/A N/A N/A 2012 N/A installing pumping 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN machinery, pkg-2 Construction of pump POST- chamber, providing and 20-May- 17-SEP- POST- 28-Sep- 31-Oct- POST- 17.62 NCB REVIE 0.00 installing pumping 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery, pkg-2 PRWSSP-Trtn-Div-87-3 840 Construction of RCC OHSR of 25,000 ltr. 30-MAY- 31-Mar- 20-May- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- Capacity with 18 m. height 9.41 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN upto FSL & 15 m up to sill level pkg-3 Construction of RCC OHSR of 25,000 ltr. POST- 20-May- 17-SEP- POST- 28-Sep- 31-Oct- POST- Capacity with 18 m. height 9.41 NCB REVIE 0.00 2011 2012 REVIEW 2012 2012 REVIEW upto FSL & 15 m up to sill W ACTUAL level pkg-3 PRWSSP-Trtn-Div-87-I 841 30-MAY- 31-Mar- W/S Scheme Fatehpur, 20-May- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- 9.00 NCB 2011 N/A N/A N/A 2012 N/A Block Valtoha 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

POST- W/S Scheme Fatehpur, 20-May- 17-SEP- POST- 28-Sep- 31-Oct- POST- 9.00 NCB REVIE 0.00 Block Valtoha 2011 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Page 179 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Gagrewal 45.00/0.00 (TW16597) PRWSS-W-DIV09-1922-1 842 W/S Scheme Gagrewal, Block Khadoor Sahib 05-Aug- 05-SEP- 15-Oct- POST- 30-Nov- 02-Jan- 02-Apr- POST- 02-APR- 31-Jul- 9.00 NCB N/A N/A N/A N/A (T/W & Civil work 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Distribution) Gehri (TW7438) 40.68/0.00

PRWSSP-Trtn-Div-74-I 843 31-MAR- 31-Dec- W/S Scheme Gehri Block 20-Mar- 30-Apr- POST- 15-May- 19-Jun- 18-Aug- POST- 15-SEP- 40.68 NCB 2011 N/A N/A N/A 2011 N/A Gandiwind 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Ghariala 3.40/9.95 (TW12319) PRWSSP-Trtn-Div-69-I 844 Package âI Providing & Installing 200 mm i/d straight Tube well with Hand Boring drilling upto 150 mtr. depth with 15m 31-AUG- 02-Sep- 13-Aug- 20-Sep- POST- 10-May- 10-Oct- 01-Aug- POST- 31-DEC- Stainless steel strainer, 40.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2011 REVIEW 2012 PLAN and all other works contingent there to complete in all respects. scheme Ghariala, Block Patti Ghurkwind 58.32/58.32 (TW16415) PRWSS-W-DIV09-1906-1 845 W/S Scheme Ghurkwind, 31-AUG- 30-Jun- Block Bhikhiwing (T/W & 24-Jul- 02-Oct- POST- 15-Nov- 18-Dec- 18-Mar- POST- 18-MAR- 9.00 NCB 2012 N/A N/A N/A 2013 N/A Civil work Distribution) 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

W/S Scheme Ghurkwind, POST- Block Bhikhiwing (T/W & 24-Jul- POST- 21-Sep- 23-Oct- POST- 9.00 NCB REVIE 0.00 Civil work Distribution) 2012 REVIEW 2012 2012 REVIEW W ACTUAL

Page 180 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV09-1906-2 846 Construction of pump 31-AUG- 30-Jun- chamber, providing and 24-Jul- 02-Oct- POST- 15-Nov- 18-Dec- 18-Mar- POST- 18-MAR- 33.24 NCB 2012 N/A N/A N/A 2013 N/A installing pumping 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 24-Jul- POST- 21-Sep- 23-Oct- POST- 33.24 NCB REVIE 0.00 installing pumping 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2 PRWSS-W-DIV09-1906-3 847 Construction of RCC OHSR of 75,000 ltr. 31-AUG- 30-Jun- 24-Jul- 02-Oct- POST- 15-Nov- 18-Dec- 18-Mar- POST- 18-MAR- Capacity with 18 m height 13.15 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN upto FSL & 15.50 pkg-3

Construction of RCC OHSR of 75,000 ltr. POST- 24-Jul- POST- 21-Sep- 23-Oct- POST- Capacity with 18 m height 13.15 NCB REVIE 0.00 2012 REVIEW 2012 2012 REVIEW upto FSL & 15.50 pkg-3 W ACTUAL

Gidri Bhagiari 45.00/54.58 (TW16074) PRWSSP-Trtn-Div-47-I 848 Prov. T/Well for Water 31-Mar- Supply Scheme Gidri 10-Jun- 28-JUN- 28-Jul- POST- 17-Aug- 17-Sep- 19-Oct- POST- 13-NOV- 7.20 NCB N/A N/A N/A 2011 N/A Bhagiari, Block Gandiwind 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Prov. T/Well for Water POST- Supply Scheme Gidri 10-Jun- 17-SEP- POST- 28-Sep- 31-Oct- POST- 7.20 NCB REVIE 0.00 Bhagiari, Block Gandiwind 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSSP-Trtn-Div-47-II 849 Construction of pump 28-MAY- 31-Mar- chamber, providing and 10-May- 28-Jul- POST- 17-Aug- 17-Sep- 19-Oct- POST- 13-NOV- 28.20 NCB 2010 N/A N/A N/A 2011 N/A installing pumping 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 10-Jun- 17-SEP- POST- 28-Sep- 31-Oct- POST- 28.20 NCB REVIE 0.00 installing pumping 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2

Page 181 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-Trtn-Div-47-III 850 Construction of RCC OHSR of 25,000 ltr. 28-MAY- 31-Mar- 10-May- 28-Jul- POST- 17-Aug- 19-Sep- 19-Oct- POST- 13-NOV- Capacity with 18 m. height 16.15 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN upto FSL & 15 m up to sill level pkg-3 Construction of RCC OHSR of 25,000 ltr. POST- 10-Jun- 17-SEP- POST- 28-Sep- 31-Oct- POST- Capacity with 18 m. height 16.15 NCB REVIE 0.00 2010 2012 REVIEW 2012 2012 REVIEW upto FSL & 15 m up to sill W ACTUAL level pkg-3 Hansanwala 48.17/0.00 (TW16416) PRWSS-W-DIV09-1907-1 851 W/S Scheme Hansawala, 30-AUG- 30-Jun- Block Khadoor Sahib 27-Jul- 02-Oct- POST- 15-Nov- 18-Dec- 18-Mar- POST- 18-MAR- 9.00 NCB 2012 N/A N/A N/A 2013 N/A (T/W & Civil work 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Distribution) Hardo Sarli 3.00/25.18 (TW14627) PRWSSP-Trtn-Div-78-I 852 Package-I Providing & Installing 200 mm i/d straight Tubewell with Hand Boring drilling up to 150 mtr. depth with 15m Stainless steel strainer, 16-Dec- 20-Jun- 30-JUL- 31-Jul- POST- 15-Aug- 19-Sep- 18-Nov- POST- 31-MAR- and all other works 28.50 NCB N/A N/A N/A 2011 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2012 PLAN contingent there to complete in all respects. Scheme, Hardo Sarli, Block Khadoor Sahib

Harike 3.40/9.96 (TW12252) PRWSSP-Trtn-Div-70-I 853

Page 182 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Package âI Providing & Installing 200 mm i/d straight Tube well with Hand Boring drilling upto 150 mtr. depth with 15m 31-MAR- 15-Sep- 20-Mar- 30-Apr- POST- 15-May- 20-May- 18-Aug- POST- 13-DEC- Stainless steel strainer, 50.00 NCB 2011 N/A N/A N/A 2011 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN and all other works contingent there to complete in all respects. scheme Harike, Block Patti Jarmastpur 38.00/0.00 (TW16417) PRWSS-W-DIV09-1908-1 854 W/S Scheme Jarmastpur, 15-AUG- 31-May- Block Tarn Taran (T/W & 24-Jul- 30-Sep- POST- 15-Oct- 17-Nov- 17-Feb- POST- 17-FEB- 9.00 NCB 2012 N/A N/A N/A 2013 N/A Civil work Distribution) 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Jatta (TW16081) 70.00/0.00

PRWSSP-Trtn-Div-67-I 855 Prov. T/Well for Water 30-Apr- 06-Sep- 24-SEP- 11-Oct- POST- 26-Oct- 26-Nov- 26-Dec- POST- 31-DEC- Supply Scheme Jatta, 50.00 NCB N/A N/A N/A 2012 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Naushera Panuan

Jawanda Kalan 50.33/50.33 (TW7051) PRWSSP-Trtn-Div-82-IV 856

T/WELL Jawanda Kalan 01-Dec- 12-SEP- 03-Mar- POST- 03-Jun- 05-Apr- 07-Mar- POST- 11-JUN- 07-Jul- 8.43 NCB N/A N/A N/A N/A pkg-1 2010 2011 2011 REVIEW 2013 2011 2011 REVIEW 2013 2013 PLAN

Jodh Singh Wala 55.00/0.00 (TW16107) PRWSS-W-DIV09-1927-1 857 W/S Scheme Jodh Singh 15-OCT- Wala , Block Valtoha 31-Aug- 30-Nov- POST- 15-Dec- 07-Jan- 09-Mar- POST- 09-APR- 07-Jul- 10.00 NCB 2012 N/A N/A N/A N/A (T/W & Civil work 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Distribution) Page 183 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Johal Dhaiwala 45.00/0.00 (TW16429) PRWSS-W-DIV09-1909-1 858 W/S Scheme Johal 15-AUG- 31-May- Dhaiwala, Block Chohla 24-Jul- 30-Sep- POST- 15-Oct- 17-Nov- 17-Feb- POST- 17-FEB- 9.00 NCB 2012 N/A N/A N/A 2013 N/A Sahib(T/W & Civil work 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Distribution) Kad Gill 3.40/0.00 (TW16092) PRWSS-W-DIV09-1545-1 859 Package âI Providing & Installing 200 mm i/d straight Tube well with Hand Boring drilling upto 150 mtr. depth with 15m 10-AUG- 22-Jan- 30-Jul- 06-Sep- POST- 21-Sep- 30-Sep- 25-Dec- POST- 01-JUL- Stainless steel strainer, 3.40 NCB 0201 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN and all other works contingent there to complete in all respects. scheme Kad Gill, Block Tarn Taran Kakka Kandiala 3.40/19.10 (TW10984) PRWSSP-Trtn-Div-60-I 860 Package âI Providing & Installing 200 mm i/d straight Tube well with Hand Boring drilling upto 150 mtr. depth with 15m 19-Feb- Stainless steel strainer, 03-Sep- 17-SEP- 04-Oct- POST- 19-Oct- 23-Nov- 22-Jan- POST- 30-JUN- 32.00 NCB N/A N/A N/A 2011 N/A and all other works 2010 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN contingent there to complete in all respects. scheme Kakka Kandiala Block Tarn Taran

Kaleke Uttar 38.83/0.00 (TW16418) PRWSS-W-DIV09-1910-1 861

Page 184 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 W/S Scheme Kaleke Utta, 31-AUG- 30-Apr- Block Valtoha (T/W & Civil 24-Jul- 20-Sep- POST- 30-Sep- 02-Oct- 02-Jan- POST- 02-JAN- 7.20 NCB 2012 N/A N/A N/A 2013 N/A work Distribution) 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

W/S Scheme Kaleke Utta, POST- Block Valtoha (T/W & Civil 24-Jul- POST- 21-Sep- 23-Oct- POST- 7.20 NCB REVIE 0.00 work Distribution) 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSS-W-DIV09-1910-2 862 Construction of pump 31-AUG- 30-Apr- chamber, providing and 24-Jul- 20-Sep- POST- 30-Sep- 02-Oct- 02-Jan- POST- 02-JAN- 20.46 NCB 2012 N/A N/A N/A 2013 N/A installing pumping 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 24-Jul- POST- 21-Sep- 23-Oct- POST- 20.46 NCB REVIE 0.00 installing pumping 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2 PRWSS-W-DIV09-1910-3 863 Construction of RCC 31-AUG- 30-Apr- OHSR of 25,000 ltr. 24-Jul- 20-Sep- POST- 30-Sep- 02-Oct- 02-Jan- POST- 02-JAN- 8.91 NCB 2012 N/A N/A N/A 2013 N/A Capacity with 18 m height 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN upto Construction of RCC POST- OHSR of 25,000 ltr. 24-Jul- POST- 21-Sep- 23-Oct- POST- 8.91 NCB REVIE 0.00 Capacity with 18 m height 2012 REVIEW 2012 2012 REVIEW W ACTUAL upto Kaler 17.05/29.44 (TW14625) PRWSSP-Trtn-Div-93-I 864 W/S Scheme Kaler, Block 30-MAY- 31-Mar- 19-May- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- Naushera Pannuan 25.00 NCB 2011 N/A N/A N/A 2012 N/A 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Khabe Dogran 44.00/0.00 (TW16589) PRWSS-W-DIV09-1924-1 865 W/S Scheme Khabe 31-AUG- 30-Apr- 24-Jul- 20-Sep- POST- 30-Sep- 31-Oct- 03-Jan- POST- 03-JAN- Dogra , Block Tarn Taran 9.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN (T/W & Civil work

Page 185 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Distribution)

Khabe Rajputan (TW16086) 30.00/0.00

PRWSS-W-DIV09-1614-1 866 Prov. T/Well for Water 30-Jun- Supply Scheme Khabbe 20-Jul- 30-JUL- 30-Aug- POST- 14-Sep- 14-Oct- 12-Nov- POST- 31-DEC- 27.75 NCB N/A N/A N/A 2012 N/A Rajputan, Block Naushera 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Pannuan Khairdeen Ke 50.00/0.00 (TW16419) PRWSS-W-DIV09-1911-1 867 W/S Scheme Khair deenke, Block Gandiwind 15-Aug- 30-SEP- 10-Nov- POST- 15-Dec- 17-Jan- 17-Apr- POST- 17-APR- 31-Jul- 9.00 NCB N/A N/A N/A N/A (T/W & Civil work 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Distribution) Khawaspur (TW16080) PRWSSP-Trtn-Div-62-I 868 Prov. T/Well for Water 06-AUG- 30-Apr- Supply Scheme 21-Jul- 24-Aug- POST- 09-Aug- 09-Sep- 11-Nov- POST- 20-NOV- 50.00 NCB 2010 N/A N/A N/A 2011 N/A Khwaspur Block Khadoor 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Sahib Khela (TW7433) 25.00/32.10

PRWSSP-Trtn-Div-31-III 869 31-Aug- 28-Jun- 30-JUL- 16-Aug- POST- 23-Dec- 24-Jan- 31-Jan- POST- 28-FEB- Const. of an RCC OHSR 11.00 NCB N/A N/A N/A 2012 N/A 2010 2010 2010 REVIEW 2010 2011 2012 REVIEW 2012 PLAN

21-NOV- POST- 28-Jan- 12-Dec- POST- 10-Apr- 11-May- POST- Const. of an RCC OHSR 10.78 NCB 2011 REVIE 0.00 2010 2011 REVIEW 2012 2012 REVIEW W ACTUAL

Page 186 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Khojkipur 32.44/17.14 (TW12289) PRWSSP-Trtn-Div-79-I 870 Package-I Providing & Installing 200 mm i/d straight Tubewell with Hand Boring drilling up to 150 mtr. depth with 15m Stainless steel strainer, 16-Dec- 20-Jun- 30-JUN- 31-Jul- POST- 15-Aug- 19-Sep- 18-Nov- POST- 31-DEC- and all other works 32.44 NCB N/A N/A N/A 2011 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN contingent there to complete in all respects. Scheme Khojkipur, Block Khadoor Sahib

Kirrian 42.00/0.00 (TW16590) PRWSS-W-DIV09-1925-1 871 W/S Scheme Kirrian , 31-AUG- 30-Jun- Block Chohla Sahib (T/W 24-Jul- 02-Oct- POST- 15-Nov- 18-Dec- 18-Mar- POST- 18-MAR- 9.00 NCB 2012 N/A N/A N/A 2013 N/A & Civil work Distribution) 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Kulla 45.00/0.00 (TW16592) PRWSS-W-DIV09-2248-1 872 W/S Scheme Kulla, Block 15-Aug- 30-SEP- 31-Oct- POST- 01-Dec- 03-Jan- 03-Apr- POST- 03-APR- 31-Jul- Patti (T/W & Civil work 9.00 NCB N/A N/A N/A N/A 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Distribution)

Kuri Wallah 48.79/50.67 (TW16421) PRWSS-W-DIV09-1912-1 873 W/S Scheme Kuri Wallah, 15-OCT- Block Khadoor Sahib 31-Aug- 30-Nov- POST- 05-Dec- 07-Jan- 08-Mar- POST- 08-APR- 07-Jul- 9.00 NCB 2012 N/A N/A N/A N/A (T/W & Civil work 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Distribution)

Page 187 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Manak Deke 35.40/35.40 (TW16096) PRWSS-W-DIV09-1913-1 874 W/S Scheme Manak 31-AUG- 30-Apr- deke, Block Chohla 23-Jul- 20-Sep- POST- 30-Sep- 03-Oct- 03-Dec- POST- 03-JAN- 7.20 NCB 2012 N/A N/A N/A 2013 N/A Sahib(T/W & Civil work 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN Distribution) W/S Scheme Manak POST- deke, Block Chohla 23-Jul- POST- 21-Sep- 23-Oct- POST- 7.20 NCB REVIE 0.00 Sahib(T/W & Civil work 2012 REVIEW 2012 2012 REVIEW W ACTUAL Distribution) PRWSS-W-DIV09-1913-2 875 Construction of pump 31-AUG- 30-Apr- chamber, providing and 23-Jul- 20-Sep- POST- 30-Sep- 03-Oct- 03-Dec- POST- 03-JAN- 16.52 NCB 2012 N/A N/A N/A 2013 N/A installing pumping 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 23-Jul- POST- 21-Sep- 23-Oct- POST- 16.52 NCB REVIE 0.00 installing pumping 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2 PRWSS-W-DIV09-1913-3 876 Construction of RCC OHSR of 25,000 ltr. 31-AUG- 30-Apr- 23-Jul- 20-Sep- POST- 30-Sep- 03-Oct- 03-Dec- POST- 03-JAN- Capacity with 18 m height 9.41 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN upto FSL & 15.50 pkg-3

Construction of RCC OHSR of 25,000 ltr. POST- 23-Jul- POST- 21-Sep- 23-Oct- POST- Capacity with 18 m height 9.41 NCB REVIE 0.00 2012 REVIEW 2012 2012 REVIEW upto FSL & 15.50 pkg-3 W ACTUAL

Manawan 50.00/0.00 (TW11395) PRWSS-W-DIV09-2246-1 877 W/S Scheme Manawan, 15-AUG- 31-May- 20-Jul- 20-Sep- POST- 15-Oct- 17-Nov- 17-Jan- POST- 17-FEB- Block Valtoha (T/W & Civil 10.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN work Distribution)

Page 188 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Mari Kamboke 45.00/0.00 (TW16094) PRWSSP-TT-B1-W-10-I 878 Providing & Installing 200 30-NOV- 27-Sep- 08-Nov- 31-Dec- POST- 20-Jan- 02-Oct- 03-Oct- POST- 26-MAR- mm i/d straight Tube well 40.00 NCB 2009 N/A N/A N/A 2010 N/A 2009 2009 REVIEW 2010 2011 2010 REVIEW 2010 PLAN

Mari Megha 70.00/0.00 (TW16075) PRWSSP-Trtn-Div-51-I 879 Prov. T/Well for Water 22-AUG- 31-Mar- Supply Scheme Mari 22-Jul- 24-Aug- POST- 08-Sep- 08-Oct- 12-Dec- POST- 15-DEC- 65.00 NCB 2010 N/A N/A N/A 2011 N/A Megha, Block Bhikhiwind 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Mari Samra 30.00/0.00 (TW16089) PRWSSP-Trtn-Div-95-I 880 Prov. T/Well for Water 02-MAR- 30-Jun- Supply Scheme Mari 10-Feb- 31-Mar- POST- 14-Sep- 14-Oct- 18-Nov- POST- 30-DEC- 25.00 NCB 2011 N/A N/A N/A 2012 N/A Samra, Block Bhikhiwind 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Mehadipur 50.00/0.00 (TW16077) PRWSS-W-DIV09-1607-1 881 Prov. T/Well for Water 31-Mar- Supply Scheme 26-Jun- 30-JUL- 30-Aug- POST- 19-Sep- 19-Oct- 20-Nov- POST- 30-NOV- 45.00 NCB N/A N/A N/A 2011 N/A Mehdipur, Block Valtoha 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Mianpur 45.00/0.00 (TW16095) PRWSSP-Trtn-Div-33-I 882 Prov. T/Well for Water 30-Jun- Supply Scheme Mianpur, 25-Jun- 15-JUL- 30-Jul- POST- 14-Aug- 14-Sep- 17-Nov- POST- 31-DEC- 45.25 NCB N/A N/A N/A 2011 N/A Block Gandiwind 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Page 189 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Musse 65.00/0.00 (TW16608) PRWSS-W-DIV09-1928-1 883 W/S Scheme Musse , 15-OCT- Block Tarn Taran (T/W & 31-Aug- 01-Dec- POST- 15-Dec- 07-Jan- 08-Apr- POST- 08-APR- 07-Jul- 9.00 NCB 2012 N/A N/A N/A N/A Civil work Distribution) 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN

Nand Pur 45.00/0.00 (TW16073) PRWSSP-Trtn-Div-40-I 884 Prov. T/Well for Water 28-Feb- Supply Scheme Nandpur, 12-Jul- 30-JUL- 16-Aug- POST- 31-Aug- 30-Sep- 10-Oct- POST- 20-OCT- 40.00 NCB N/A N/A N/A 2011 N/A Block Naushera Panuan 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN

Narla 3.30/19.23 (TW14433) PRWSSP-Trtn-Div-97-I 885 Package -I Providing & Installing 200 mm i/d straight Tube well with Hand Boring drilling up to 30-MAY- 11-May- 150 mtr. depth with 20-Apr- 30-Jun- POST- 18-Nov- POST- 31-MAR- 30.00 NCB 2011 N/A N/A N/A 2011 N/A Stainless steel strainer, 2011 2011 REVIEW 2011 REVIEW 2012 PLAN and all other works contingent there to complete in all respects.

Nathupur 0.00/40.67 (TW7324) PRWSSP-Trtn-Div-32-III 886

03-May- POST- 19-Dec- 20-Jan- POST- OHSR 11.50 NCB N/A N/A N/A N/A 2010 REVIEW 2011 2012 REVIEW PLAN

03-NOV- POST- 03-May- 12-Dec- POST- 10-Apr- 11-May- POST- OHSR 11.08 NCB 2011 REVIE 0.00 2010 2011 REVIEW 2012 2012 REVIEW W ACTUAL

Page 190 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Padhri 50.00/0.00 (TW16078) PRWSSP-Trtn-Div-59-I 887 Prov. T/Well for Water 30-Apr- 26-Aug- 13-SEP- 30-Sep- POST- 15-Oct- 15-Nov- 15-Dec- POST- 20-DEC- Supply Scheme Padhri, 50.00 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Tarn Taran

Pakhoke 33.23/0.00 (TW7440) PRWSSP-Trtn-Div-90-I 888 31-MAR- 31-Mar- W/S Scheme Pakhoke, 20-Mar- 30-Apr- POST- 15-May- 19-Jun- 18-Aug- POST- 15-SEP- 33.23 NCB 2011 N/A N/A N/A 2012 N/A Block Tarn Taran 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Pakhupura 40.00/0.00 (TW16422) PRWSS-W-DIV09-1914-1 889 W/S Scheme Pakhupura, 15-OCT- Block Chohla Sahib(T/W 31-Aug- 01-Dec- POST- 31-Dec- 31-Jan- 31-Mar- POST- 30-APR- 31-Jul- 9.00 NCB 2012 N/A N/A N/A N/A & Civil work Distribution) 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN

Pandori Gola 50.00/0.00 (TW7435) PRWSSP-Trtn-Div-58-I 890 Prov. T/Well, P/C, Machinery etc., OHSR Development of W/W & 10-AUG- 31-May- 30-Jul- 06-Sep- POST- 21-Sep- 26-Oct- 25-Dec- POST- 22-JAN- Pipeline & Distribution for 50.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN W/s scheme Pandori Gohla , Block Tarn Taran

PRWSSP-Trtn-Div-58-II 891 Prov.OHSR Development 10-AUG- 31-May- of W/W for W/s scheme 30-Jul- 06-Sep- POST- 21-Sep- 26-Oct- 25-Dec- POST- 22-JAN- 50.00 NCB 2010 N/A N/A N/A 2011 N/A Pondori Gohla, Block Tarn 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN Taran

Page 191 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Piddi (TW7046)

PRWSSP-Trtn-Div-84-III 892 08-NOV- POST- 21-Mar- 12-Dec- POST- 10-Apr- 11-May- POST- PIDDI OHSR PKG-3 15.23 NCB 2011 REVIE 0.00 2011 2011 REVIEW 2012 2012 REVIEW W ACTUAL

Pindian 41.34/41.34 (TW16097) PRWSS-W-DIV09-1915-1 893 W/S Scheme Pindian, 31-AUG- 30-Apr- Block Khadoor Sahib 23-Jul- 20-Sep- POST- 30-Sep- 03-Oct- 03-Dec- POST- 31-JAN- 7.20 NCB 2012 N/A N/A N/A 2013 N/A (T/W & Civil work 2012 2012 REVIEW 2012 2012 2012 REVIEW 2012 PLAN Distribution) W/S Scheme Pindian, POST- Block Khadoor Sahib 23-Jul- 17-SEP- POST- 28-Sep- 31-Oct- POST- 7.20 NCB REVIE 0.00 (T/W & Civil work 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL Distribution) PRWSS-W-DIV09-1915-2 894 Construction of pump 31-AUG- 30-Apr- chamber, providing and 23-Jul- 20-Sep- POST- 30-Sep- 03-Oct- 03-Dec- POST- 31-JAN- 20.28 NCB 2012 N/A N/A N/A 2013 N/A installing pumping 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 23-Jul- 17-SEP- POST- 28-Sep- 31-Oct- POST- 20.28 NCB REVIE 0.00 installing pumping 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2 PRWSS-W-DIV09-1915-3 895 Construction of RCC 31-AUG- 30-Apr- OHSR of 50,000 ltr. 23-Jul- 20-Sep- POST- 30-Sep- 03-Oct- 03-Dec- POST- 31-JAN- 11.41 NCB 2012 N/A N/A N/A 2013 N/A Capacity with 18 m height 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN upto pkg-3 Construction of RCC POST- OHSR of 50,000 ltr. 23-Jul- 17-SEP- POST- 28-Sep- 31-Oct- POST- 11.41 NCB REVIE 0.00 Capacity with 18 m height 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL upto pkg-3 Punian 30.00/0.00 (TW7434)

Page 192 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-Trtn-Div-88-I 896 30-MAY- 31-Mar- W/S Scheme Poonian, 20-May- 30-Jun- POST- 15-Jul- 19-Aug- 18-Oct- POST- 15-NOV- 30.00 NCB 2011 N/A N/A N/A 2012 N/A Block Valtoha 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Rakh Dinewal 42.00/0.00 (TW16587) PRWSS-W-DIV09-1923-1 897 W/S Scheme Rakh Dinewal , Block Khadoor 15-Aug- 30-SEP- 02-Nov- POST- 03-Dec- 05-Jan- 05-Apr- POST- 05-APR- 31-Jul- 9.00 NCB N/A N/A N/A N/A Sahib (T/W & Civil work 2012 2012 2012 REVIEW 2012 2013 2013 REVIEW 2013 2013 PLAN Distribution) Rasulpur 44.14/18.10 (TW12371) PRWSSP-Trtn-Div-85-I 898 Prov. T/Well, P/C, Machinery etc., OHSR Development of W/W & 05-Aug- 05-JUL- 31-Jul- POST- 10-Jun- POST- Pipeline & Distribution for 44.14 NCB N/A N/A N/A N/A 2012 2013 2011 REVIEW 2012 REVIEW PLAN W/s scheme Rasulpur, Block Naushera Panuan

Sakhira 45.00/64.31 (TW7436) PRWSSP-Trtn-Div-66-I 899 Prov. T/Well, P/C, Machinery etc., OHSR Development of W/W & 26-AUG- 31-May- 11-Aug- 14-Sep- POST- 29-Sep- 03-Nov- 02-Jan- POST- 30-JAN- Pipeline & Distribution for 7.20 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN W/s scheme Sakhira, Block Naushera Panuan

Prov. T/Well, P/C, Machinery etc., OHSR Development of W/W & POST- 11-Aug- POST- 28-Sep- 31-Oct- POST- Pipeline & Distribution for 7.20 NCB REVIE 0.00 2010 REVIEW 2012 2012 REVIEW W/s scheme Sakhira, W ACTUAL Block Naushera Panuan

Page 193 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSSP-Trtn-Div-66-II 900 Prov.OHSR Development of W/W for W/s scheme 23-AUG- 31-May- 11-Aug- 14-Sep- POST- 29-Sep- 03-Nov- 02-Jan- POST- 30-JAN- Sakhira, Block Naushera 37.55 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN Panuan

Prov.OHSR Development of W/W for W/s scheme POST- 11-Aug- POST- 28-Sep- 31-Oct- POST- Sakhira, Block Naushera 37.55 NCB REVIE 0.00 2010 REVIEW 2012 2012 REVIEW Panuan W ACTUAL

PRWSSP-Trtn-Div-66-III 901 Prov. Pump Chamber & distribution of W/W for 26-AUG- 31-May- 11-Aug- 14-Sep- POST- 29-Sep- 03-Nov- 02-Jan- POST- 30-JAN- W/s scheme Sakhira , 15.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2011 REVIEW 2011 PLAN Block Naushera Pannuan

Prov. Pump Chamber & distribution of W/W for POST- 11-Aug- POST- 28-Sep- 31-Oct- POST- W/s scheme Sakhira , 16.06 NCB REVIE 0.00 2010 REVIEW 2012 2012 REVIEW Block Naushera Pannuan W ACTUAL

Sandpura 42.10/42.10 (TW16098) PRWSS-W-DIV09-1916-1 902 W/S Scheme Sandpura, 31-AUG- 30-Apr- Block Bhikhiwing (T/W & 23-Jul- 20-Sep- POST- 30-Sep- 04-Oct- 04-Dec- POST- 04-JAN- 9.00 NCB 2012 N/A N/A N/A 2013 N/A Civil work Distribution) 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN

W/S Scheme Sandpura, POST- Block Bhikhiwing (T/W & 23-Jul- 17-SEP- POST- 28-Sep- 01-Nov- POST- 9.00 NCB REVIE 0.00 Civil work Distribution) 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL PRWSS-W-DIV09-1916-2 903 Construction of pump 31-AUG- 30-Apr- chamber, providing and 23-Jul- 20-Sep- POST- 30-Sep- 04-Oct- 01-Dec- POST- 04-JAN- 21.22 NCB 2012 N/A N/A N/A 2013 N/A installing pumping 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN machinery pkg-2

Page 194 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Construction of pump POST- chamber, providing and 23-Jul- 17-SEP- POST- 28-Feb- 01-Nov- POST- 21.22 NCB REVIE 0.00 installing pumping 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2 PRWSS-W-DIV09-1916-3 904 Construction of RCC 31-AUG- 30-Apr- OHSR of 25,000 ltr. 23-Jul- 20-Sep- POST- 03-Sep- 04-Oct- 04-Dec- POST- 04-MAR- 9.41 NCB 2012 N/A N/A N/A 2013 N/A Capacity with 18 m height 2012 2012 REVIEW 2012 2012 2012 REVIEW 2013 PLAN upto pkg-3 Construction of RCC POST- OHSR of 25,000 ltr. 23-Jul- 17-SEP- POST- 28-Sep- 01-Nov- POST- 9.41 NCB REVIE 0.00 Capacity with 18 m height 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL upto pkg-3 Sangar Kalan 40.00/0.00 (TW16594) PRWSS-W-DIV09-2244-1 905 W/S Scheme Sanger 15-AUG- 31-May- Kalan, Block Khadoor 20-Jul- 20-Sep- POST- 15-Oct- 17-Nov- 17-Jan- POST- 17-FEB- 10.00 NCB 2012 N/A N/A N/A 2013 N/A Sahib (T/W & Civil work 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN Distribution) Sangwan 35.00/0.00 (TW16093) PRWSSP-Trtn-Div-41-I 906 Prov. T/Well for Water 30-Apr- 25-Jun- 15-JUL- 30-Jul- POST- 14-Aug- 14-Sep- 17-Oct- POST- 31-OCT- Supply Scheme Sangwan, 40.25 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Patti

Shahabpur 35.00/40.86 (TW7320) PRWSSP-Trtn-Div-38-III 907 Construction of RCC OHSR of 50,000 ltr. Capacity with 18 m height 28-Feb- 12-May- 01-JUN- 17-Jun- POST- 02-Jul- 06-Aug- 05-Oct- POST- 02-NOV- upto FSL & 15.50 m up to 11.08 NCB N/A N/A N/A 2011 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN sill of bottom dome from Ground Level pkg-3

Page 195 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

POST- 12-May- 02-FEB- 08-Jul- POST- 10-Apr- 11-May- POST- OHSR 11.08 NCB REVIE 0.00 2010 2012 2011 REVIEW 2012 2012 REVIEW W ACTUAL

Sheikh Chak 45.00/40.10 (TW7326) PRWSSP-Trtn-Div-49-III 908 Prov. Pump Chamber & 31-Mar- distribution of W/W for 03-Jun- 24-JUN- 09-Jul- POST- 24-Jul- 28-Aug- 27-Oct- POST- 24-NOV- 10.75 NCB N/A N/A N/A 2011 N/A W/s scheme Sheikh Chak, 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Tarn Taran Prov. Pump Chamber & POST- distribution of W/W for 03-Jun- 15-FEB- 01-Dec- POST- 10-Apr- 11-May- POST- 10.75 NCB REVIE 0.00 W/s scheme Sheikh Chak, 2010 2012 2010 REVIEW 2012 2012 REVIEW W ACTUAL Block Tarn Taran Sheron 50.00/0.00 (TW16082) PRWSSP-Trtn-Div-68-I 909 Prov. T/Well for Water 11-OCT- 30-Apr- 27-Sep- 29-Oct- POST- 15-Nov- 15-Dec- 31-Dec- POST- 31-DEC- Supply Scheme Sheron, 50.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Naushera Panuan

Singarpur 20.00/0.00 (TW16425) PRWSS-W-DIV09-1917-1 910 W/S Scheme Shingarpur, Block Naushehra 30-OCT- 30-Jun- 30-Aug- 30-Nov- POST- 10-Dec- 12-Dec- 12-Feb- POST- 12-MAR- Punnuan (T/W & Civil 9.00 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN work Distribution)

Sohal Thathi 3.40/36.34 (TW14645) PRWSSP-Trtn-Div-65-I 911 Package âI Providing & Installing 200 mm i/d 23-AUG- 26-Jan- 05-Aug- 10-Sep- POST- 25-Sep- 30-Sep- 29-Dec- POST- 31-DEC- straight Tube well with 32.00 NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2011 PLAN Hand Boring drilling upto 150 mtr. depth

Page 196 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 with 15m Stainless steel strainer, and all other works contingent there to complete in all respects. scheme Sohal Thathi Block Gandiwind PRWSSP-Trtn-Div-65-II 912 Package -II Construction of pump chamber, providing and installing pumping machinery, silver lionization plant for disinfection of water. Providing & fixing all C.I pipe and fittings inside and outside pump chamber Providing, Laying, Jointing , cutting fixing and testing PVC 23-AUG- 26-Jan- 340.00 08-May- 10-Sep- POST- 25-Sep- 30-Sep- 29-Dec- POST- 31-DEC- pipe (6 kg/cm2), G.I NCB 2010 N/A N/A N/A 2011 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2012 PLAN Pipes, specials for distribution system, construction of sluice valve chambers, dismantling and restorations of roads/streets and all other works contingent there to complete in all respects. scheme Sohal Thathi Block Gandiwind

Surwind (TW15685) PRWSSP-Trtn-Div-99-I 913 POST- 03-Aug- 06-DEC- 12-Dec- POST- 10-Apr- 11-May- POST- T/WELL 9.18 NCB REVIE 0.00 2012 2011 2011 REVIEW 2012 2012 REVIEW W ACTUAL Talwandi Matsada Singh 30.00/33.41 (TW16090) PRWSSP-Trtn-Div-98-I 914

Page 197 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Pro T/WELL W/S Scheme 30-MAY- 30-Apr- Talwandi Matsada Singh, 20-Apr- 30-Jun- POST- 15-Jul- 15-Aug- 18-Oct- POST- 31-OCT- 45.75 NCB 2011 N/A N/A N/A 2012 N/A Block Patti 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN

Thakarpura 45.00/0.00 (TW16591) PRWSS-W-DIV09-1926-1 915 W/S Scheme Thakarpura 30-AUG- 30-Jun- , Block Patti (T/W & Civil 24-Jul- 02-Oct- POST- 15-Nov- 18-Dec- 18-Mar- POST- 18-MAR- 9.00 NCB 2012 N/A N/A N/A 2013 N/A work Distribution) 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Thatha 40.00/0.00 (TW16070) PRWSSP-Trtn-Div-34-I 916 Prov. T/Well for Water 30-Apr- 07-Jan- 07-SEP- 08-May- POST- 20-Aug- 24-Sep- 23-Nov- POST- 21-DEC- Supply Scheme Thatha 35.00 NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2009 2010 2010 REVIEW 2010 PLAN Block Gandiwind Thathian Mehantan (TW16087) PRWSSP-Trtn-Div-86-I 917 Prov. T/Well for Water Supply Scheme Thathian 30-Apr- 20-Jun- 30-JUN- 31-Jul- POST- 15-Aug- 15-Sep- 18-Oct- POST- 20-OCT- Mahantan, Block 40.45 NCB N/A N/A N/A 2012 N/A 2011 2011 2011 REVIEW 2011 2011 2011 REVIEW 2011 PLAN Naushera Pannuan

Ubhoke 56.42/56.42 (TW16426) PRWSS-W-DIV09-1918-1 918 W/S Scheme Uboke, 01-OCT- 30-Apr- 23-Aug- 20-Oct- POST- 04-Oct- 04-Dec- 04-Jan- POST- 04-JAN- Block Patti (T/W & Civil 7.20 NCB 2012 N/A N/A N/A 2013 N/A 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN work Distribution)

W/S Scheme Uboke, POST- 23-Aug- 17-SEP- POST- 28-Sep- 01-Nov- POST- Block Patti (T/W & Civil 7.20 NCB REVIE 0.00 2012 2012 REVIEW 2012 2012 REVIEW work Distribution) W ACTUAL

Page 198 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 PRWSS-W-DIV09-1918-2 919 Construction of pump 01-OCT- 30-Apr- chamber, providing and 23-Aug- 20-Oct- POST- 04-Oct- 04-Dec- 04-Jan- POST- 04-JAN- 34.73 NCB 2012 N/A N/A N/A 2013 N/A installing pumping 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 23-Aug- 17-SEP- POST- 28-Sep- 01-Nov- POST- 34.73 NCB REVIE 0.00 installing pumping 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2 PRWSS-W-DIV09-1918-3 920 Construction of RCC 01-OCT- 30-Apr- OHSR of 50,000 ltr. 23-Aug- 20-Oct- POST- 04-Oct- 04-Dec- 04-Jan- POST- 04-JAN- 11.41 NCB 2012 N/A N/A N/A 2013 N/A Capacity with 18 m height 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN upto pkg-3 Construction of RCC POST- OHSR of 50,000 ltr. 23-Aug- 17-SEP- POST- 28-Sep- 01-Nov- POST- 11.41 NCB REVIE 0.00 Capacity with 18 m height 2012 2012 REVIEW 2012 2012 REVIEW W ACTUAL upto pkg-3 Valtoha 40.00/81.19 (TW16069) PRWSSP-TT-B1-W-20-I 921 Prov. T/Well for Water 30-AUG- 27-Sep- 30-Nov- 31-Dec- POST- 20-Jan- 22-Feb- 10-Mar- POST- 26-MAR- Supply Scheme Valtoha 40.00 NCB 2009 N/A N/A N/A 2010 N/A 2009 2009 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Valtoha

Veeram 25.00/0.00 (TW16104) PRWSS-W-DIV09-1919-1 922 W/S Scheme Veeram, 15-AUG- 31-May- Block Bhikhiwing (T/W & 24-Jul- 30-Sep- POST- 15-Oct- 17-Nov- 17-Jan- POST- 17-FEB- 9.00 NCB 2012 N/A N/A N/A 2013 N/A Civil work Distribution) 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Verowal 45.00/69.37 (TW16071) PRWSSP-Trtn-Div-36-I 923

Page 199 of 200 Procurement Plan For Work 15/11/2012

WBR Bids No. Planned (in Cost/ Sr. Name of Description of Works case y) Admin. Package No. of of

No. Scheme case (Date) (Date) Design App. Cost case of prior Method of Plan/Actual (Date) (Date)

(In Lacs) Expenditure Contract No. Procurement

Investigatiion revie decided (Date) Invitation Estimated cost Contract Award incurred to date Contarct signed DSR Sacntioned Opened on Completed (Date) contract award (in

n of bid Document w) Date of Completion Banks no objection Banks no objection (Package) (RS lacs) Name of Contractor to bid Document (in Preparation/Sanctio (Date/Value/Currenc 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Prov. T/Well for Water 28-Dec- 13-May- 04-JUN- 05-Jul- POST- 20-Jul- 20-Aug- 23-Oct- POST- 20-NOV- Supply Scheme Verowal, 7.20 NCB N/A N/A N/A 2010 N/A 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN Block Khadoor Sahib

Prov. T/Well for Water POST- 13-May- 17-SEP- POST- 28-Sep- 01-Nov- POST- Supply Scheme Verowal, 7.20 NCB REVIE 0.00 2010 2012 REVIEW 2012 2012 REVIEW Block Khadoor Sahib W ACTUAL PRWSSP-Trtn-Div-36-II 924 Construction of pump 31-Dec- chamber, providing and 13-May- 04-JUN- 05-Jul- POST- 20-Jul- 20-Aug- 23-Oct- POST- 20-NOV- 42.77 NCB N/A N/A N/A 2010 N/A installing pumping 2010 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN machinery pkg-2 Construction of pump POST- chamber, providing and 13-May- 17-SEP- POST- 28-Sep- 01-Nov- POST- 42.77 NCB REVIE 0.00 installing pumping 2010 2012 REVIEW 2012 2012 REVIEW W ACTUAL machinery pkg-2 PRWSSP-Trtn-Div-36-III 925 Construction of RCC OHSR of 25,000 ltr. 04-MAY- 31-Dec- 13-May- 05-Jul- POST- 20-Jul- 20-Aug- 23-Oct- POST- 20-NOV- Capacity with 18 m. height 16.15 NCB 2010 N/A N/A N/A 2010 N/A 2010 2010 REVIEW 2010 2010 2010 REVIEW 2010 PLAN upto FSL & 15 m up to sill level pkg-3 Construction of RCC OHSR of 25,000 ltr. POST- 13-May- 17-SEP- POST- 28-Sep- 01-Nov- POST- Capacity with 18 m. height 16.15 NCB REVIE 0.00 2010 2012 REVIEW 2012 2012 REVIEW upto FSL & 15 m up to sill W ACTUAL level pkg-3 Waring 35.00/0.00 (TW16427) PRWSS-W-DIV09-1920-1 926 W/S Scheme Waring, 30-Jun- Block Chohla Sahib(T/W 15-Aug- 20-SEP- 30-Oct- POST- 08-Dec- 10-Dec- 10-Feb- POST- 10-MAR- 9.00 NCB N/A N/A N/A 2013 N/A & Civil work Distribution) 2012 2012 2012 REVIEW 2012 2012 2013 REVIEW 2013 PLAN

Grand Total: 7714 763 926 0.00 .56

Page 200 of 200 Procurement Plan For Work 15/11/2012