
PUNJAB STATE POWER CORPORATION LIMITED Office of Ghief Engineer/ARR & TR, l. N Te o. 0 1 75 -2302531, Fax N o. 0 1 7 5 -230241 G, ema i I ce-arr-tr(,i)psnct. i n ry Regd. Office: PSEB Head Office, The Matt patiala- 14tOO1 corporate ldentity Number: u401 09P8201 OsGco3381 3 website: www.pspcl.in To 4r"r,ry, Punjab State Electricity Regulatory Commission, Site No.3, Block-B, Sector 1B-A, Madhya Marg, Chandigarh. Memo No: lQlt /ARR/Dy. cAolzsslcrp/Bp/Deficiency . Dated to "r?l lt 1 Sub: Petition for Business Plan including Capital Investment plan for MYT control Period from Fy za2a-zf- to Fy zozz-zl Deficiencies thereof. In this regard, it is submitted that on 07.L0.20t9 as per verbal discussions held with Er. A.S. Kang, Joint Directorfl-ariff, enclosed please find herewith list of the cost of transmission works scheme wise and the list of schemes for which the Capital Expenditure has been revised in the deficiencies. The revised soft copy of Anexure-H1 is also attached herewith. DA/As above. 6d*1 Cn ief+n-g-i nee r/ARR & TR PSPCL, PatiaIa. List of revised Capital Expenditure submitted in deficiencies to pSERC: It is submitted to the Hon'ble Commission to kindly consider the revised Capital Expenditure for the schemes as submitted in the deficiencies. The list of schemes is mentioned in the Table below: : Scheme eapex claimed in Petition Revised Capex Rs. Crore FY 2020-21 Fy 2027-22 Fy 2022-23 Fy 2020-2L By 2021-22 FY 2022-23 IISD 36.44 28.27 22.46 33.05 24.57 3.44 UBDC 19.85 31.96 35.56 11.85 5.23 30"82 ASHP 103.14 77.78 64.96 78.52 51,78 50.96 Strengthening of 67.02 32.98 64.62 0.00 industrial feeders in Ludhiana Mobile van for 3.30 3.2s testing of HT and EHT meters * For the rest of the schemesof the capital expenditure plan, the data submitted in the CIP petition must be considered. o*- 6.s --"-' MYT for F .'202G21 Name of Work Scope of Work 2020-21 ;6kV Bahumaira (Aue) 1x12.5 MVA,66/11 K V \ddl.2nd 12.5 MVA.66/11 KV 775 ;6 KVTPTNGR (Aug) 1x20 MVA, 66/11 KV+ 1x31.5MVA, 66/11 KV to repl. 199 1x31.5 MVA. 66/11 K V 1x20 MVA, 66/t7KV P.r/F r) 66KV line between 220KV Ladowal (new) -66KV New 10Km/0.4Sq" SC on Ring Main Towers. ,ine GT Road S/stn. DC on DC. b) 66KV line bays b) 1 Nos. 410.3 ,lLO of 66KV Line of 66KV GrainMarket-66Kv Hargna at l.600Kms/0.2Sq" Dc on DC Towers ;6KVBhari U/G to 220KV proposed" 76.32 r)LILO of 66KV Line between 220KV Jagroan -66KV Sudhar r) Stringing of 2nd Ckt.0.600Kms/0.4Sq"on )t 66KV Pabian 0.600KM 0.2 sq"SC on DC Towers. structure to make LILO / "'xisting 57.94 )) 66KV Line Bay at 66KV Pabian end. )) One No )6 KV S/S Giaspur 3X20 MVA, 1X31.5 MVA tx31.5MVA, 66/11 KV to rcpl.2ndT/F TXZO 199.00 vrvA. 66/11 K V ;6 KV S/S Gill Road 1X31.5 ZXIG|ZO MVA, 1x31.5 MVA, 66/11 KV to repl. 1x16/20 MVA, MVA, 199 lx20 MVA 55/11 K V ;5KV S/S Harsana 1X20 MVA \dl.2nd 1x12.5 MVA 163.00 i6 KV Fountain Chowk 1x31.5 MVA \dl. 2nd 20 MVA 183.00 l6KV S/S Jarg 1x20 MVA 1X31.5 MVA 1X31.5MVA, 66/11 KVto repl.2nd T/F 1x20 199.00 MVA. 55/11 K V t6 KV S/S Bahadurke 2X20 MVA 1x31.sMVA, 65/11 KV to repl.2ndf/F 7x2O 199.00 MVA. 66/11 K V 56 KV Sinsla Cvcle Road 1X20 MVA \dl.2nd 1X31.5 MVA,66/11 KV 324.O0 ;6KV S/S Bhari 3x20 MVA 1x31.5MVA,66/11KVto repl.1x20 199.00 MVA,66/11 K V i6 KV S/S Balokee 2x20 MVA,66/11 KV 1x31.5MVA,66/11 KVto repl.1x20 199.00 MVA.66/11 K V 66 KV S/Stn Shahihaour 1X20 MVA {dl.2nd 1X12.5 MVA.66/11 KV 163.00 66 KV S/Stn Roomi 2x20 MVA,65/11 K V 1x31.5MVA, 66/11 KV to repl.1x20 199.00 MVA,66/11 K V 66 KV S/Stn Galib Kalan 2x12.5 MVA,66/11 K v 1X20MVA, 66/11 KV to repl.1x12.5 147.OO MVA,66/11 K V 66KV S/5 G.T Road 2x31.5 MVA,66/11 K V, 3rdI lFlxl6/2OMVA, to repl.1x31.5 tx76120,66/rr KV, 1X20 MVA,66/11 KV MVA,66/11 K v 199.00 132 KV Kharar- Badali Ala Singh Line Replacement of 0.15 sq" on HRP with 330.24 o.2so-in.h SC on DC. 16 KM 56KV Batala Radial-220KV Wadala a)Repl.of 66KV line between Granthian line 11 KM/0.125lRP 220KV Wadala Granthian-- 132KV Batala line with 744 3 KM/ 0.2Sq" SC on DC Towers. b)Repl. of existingT- off Line for 66 KV Batala iitu 7rM /O ? q^rr Ca .)n na T^urar< [$ a)132KV Line between Kotli Surat 24 Km/0.2 Sq" l$ Mali to 220KVS/S Wadala Granthian (To downgrade from132KV b)66KV link line from 22oKvKotli to66KV) 1Km/0.2 Sq." Surat Mali to join downgraded132KV SC on DC towers 704.77 Kotli Surat Mali-Wadala Granthian Line 2 Nos. c) 66KV line bays lana aarh .t \Ar5Hr15 a.a^+hi.^ e a)66KV line from Mohlekey to 2nd Ckt. 10Km/0.2sq" 142.66 Jasra hoor SC on DC towers bl 66 KV Bavs 2 nos 66KV line from i)New 9.5km DC on DC Towers 66KV line 132KV Sarna--Ranipur ii)Erection ol 0.772x2=7.544ckt-Km 66KV U/G 10KM/0.125 Sq" on HRP cable240mm2 for Double circuit. iii) Erection of Multi Ckt towers 0.310 Ckt-Km of 66KV line/ with 0.2sq"3nos.ckts.(to accommodate znos. ckts. of Sarna to Ranipur& lnos ckt. of Ranipur to Dhar line) by replacing existing DC on DC 795.26 towers line iv)Disraantlement of existing Rail Pole linel0km/0.125sq" conductor (cost -40 lac) v) 1Nos.66KV bay at Ranipur 1nos.66Kv bay at Sarna i5 KV Bav at 66 KV Mehta Chowk 1no 39.23 66KV S/S Kotli 20MVA to repl.6.3/8MVA, 1X20MVA 66/11 KV 66/77KV t47 6Sl.."srr 1x6.3/8 MVA 66/11 KV DC towers. \ug.of 66KV line from132Kv fiN to 12 Km/0.2 Sq." SC on :atehabad upto T-off Point for 66KV to replace existing line lashiana Kalan using existing right )f way (12 Km/0.15 Sq." HRP) 176.52 !ote: Exist.portion of 12Km/0'155q" IRP line to be dismantled after :ommissioning of above line wlth +h6 .^^.' fron.o af l'F l.,a tRnrder) Sq" SC on DC 56KV Ram Dass--- 15.5 KM/0.2 znd ckt 284 r Fatehgarh Churian Iowers as 1s.s KM/0.125 Sq" HRP of znd Ckt.17Km/ 66KV line from 220KV Patti to Stringing on existing DC 66KV Toot 0.2sq" line in order to make b) 66KV Bay towers DC on DC towers line 150.75 1 no.at 66KV S/Stn.Toot Note:- 1 nos. 66kv baY at 22OKV S/Stn. Patti shall be nlanned bv PSTCL 0.25q" Aug.of ACSR a) 66KV Line from 8Km/ Tower line 220KV Wadala Granthian-- rn existing line Rusted Towers, 66KV Udho Nangal (Aug) )Existing with new towers b) 66kv line BaYs o be replaced as below:- 'ower no fi ,19,29,33,35,37,59, -ower 248.37 no 63,70,71 =10 nos D-2 tower tower no 65,69=2 nos D-30 Tower no 51A =D-60 1 no. bay at Udho nangal \ote:- 1 nos. 66kv bay at z20KV S/Stn. wadalaGranthian .h.ll ha nlennod hvPSTCl rePl.12.5MVA 56 KV Fatehabad l0 MVAto 110 2x12.5 MVA,66/11KV ;6/11 KV U0 MVA to repl.12.5MVA, 66KV Amarkot KV t47 1x20 KV 66/11 KV 66/11 1v1.'11) q MVA 56/1 ',l KV to rePI 12.5MVA, 66KV Mari Mega 20MVA 747 1x12.5 KV 66/11 KV 66/11 KV 1x12.5 MVA 66/11 KV rePl.12.5MVA 66KV S/S S.Mattewal 20MVA to r47 1x12.5 MVA 66/11 KV 65/11 KV on DC towers 66KV line from 10Km/0.2Sq."SC existing H rail 747 132KV Kathunangal to 66KV to replace Pole N.t!:n^in.i lnKM/O 1so" HRP linP of 2nd Ckt 0'2Sq" 9Km ACSR on a) 56KV Line from a)Stringing SC on DC 220KV Fatehgarh Churian- existing line uP to DYal Bharang 66KV A.inala (NEW) Tower make Double Ckt.line b) 66KV BaYs in order to 1 no.at 56KV S/S Ainala 98.27 Notei 1 nos. 66kv bay at 22OKV S/Stn. Fatehgarh Churian shall be Planned bY DCTTI 12.864 Km/0'zsq" a)66KV line from 2ndCircuit ACSR. on DC towers line 220KV Majitha--Nag Kalan, " 192.38 Mudal-Verka Link line. 2 nos. h) 66KV bavs. r)5.766 Km / 0.2 Sq" ACSR a) 66KV Line from I ;tringing of 2nd Ckt on DC I towers of existing line.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages28 Page
-
File Size-